19
…………………… ………………………
Pekerjaan Persiapan
Form. 19
…………………… ………………………
Pekerjaan Tanah
Form. 19
…………………… ………………………
Pekerjaan Tanah
Form. 19
…………………… ………………………
Pekerjaan Pondasi
Form. 19
0,15 m
…………………… ………………………
…………………… ………………………
…………………… ………………………
0,25 m
KOLOM 20/20
P. Beugel = (0,17x2) + (0,17x2) + 0.04 = 0.72 m'
Besi D 6 mm - 200
jml = 32.00 / 0.15 = 213.33 bh
4 - D 10 mm
= 0.72 x 213.33 = 153.60 m'
0,20 m Tulangan = 4.00 x 32.00 = 128.00 m'
KOLOM 20/20 Kebutuhan Besi
Besi 10 = 187.20 m'
jml = 17.02 ljr
0,20 m
berat = 17.02 x 7.40 = 125.93 KG
Besi 6 = 222.51 m' No Tenaga An. SNI sat
= 20.23 ljr 1 Pekerja 1.33 oh
Besi D 6 mm - 200
8 - D 10 mm = 20.23 x 3.20 = 64.73 KG 2 Tukang batu 1.33 oh
3 Kepala Kelompok 0.13 oh
Tanggal Survey : Dibuat Oleh : PK KT
…………………… ………………………
Kebutuhan Besi
Besi 10 = 126.00 m'
jml = 11.45 ljr
berat = 11.45 x 7.40 = 84.76 KG
Besi 6 = 679.70 m' No Tenaga An. SNI sat
= 61.79 ljr 1 Pekerja 1.98 oh
= 61.79 x 3.20 = 197.73 KG 2 Tukang batu 1.98 oh
3 Kepala Kelompok 0.20 oh
Tanggal Survey : Dibuat Oleh : TPK KT
…………………… ………………………
…………………… ………………………
B PEKERJAAN PLESTERAN
L = - m2
…………………… ………………………
…………………… ………………………
Pekerjaan Pengecatan
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Pemb. Gapura & Pagar
Lokasi : Balai Desa Jatijejer
Dimensi : Gapura 1 Unit & Pagar 23,4 m'
VOLUME Harga
Dari Dari Satuan Jumlah Jumlah APBDes
URAIAN sat
Total Swadaya Rp. Rp.
Swadaya APBDes ( Rp )
1. BAHAN a b c=a-b d e f=bxe g=cxe
1.1 Semen PC ( 40 kg ) 154.00 - 154.00 zak 58,300.00 - 8,978,200.00
1.2 Pasir pasang (KW1) 15.00 - 15.00 m 3
242,000.00 - 3,630,000.00
1.3 Batu Gebal 5.00 - 5.00 m3 209,000.00 - 1,045,000.00
1.4 Koral Beton 6.00 - 6.00 m3 302,500.00 - 1,815,000.00
1.5 Besi Beton ø 10 mm 28.00 - 28.00 ljr 71,500.00 - 2,002,000.00
1.6 Besi Beton ø 8 mm 61.00 - 61.00 ljr 55,000.00 - 3,355,000.00
1.7 Besi Beton ø 6 mm 20.00 - 20.00 ljr 33,000.00 - 660,000.00
1.8 Kawat Bendrat 11.00 - 11.00 kg 19,800.00 - 217,800.00
1.9 Batu Bata Exspose 18,585.00 - 18,585.00 bh 880.00 - 16,354,800.00
1.10 Paku biasa 2" - 5 " 13.00 - 13.00 kg 19,800.00 - 257,400.00
1.11 Coating Batu Bata Exspose 32.00 - 32.00 kg 176,000.00 - 5,632,000.00
1.12 Papan Begesting 2/20 x 2 13.00 - 13.00 ljr 16,500.00 - 214,500.00
1.13 Bambu 10.00 - 10.00 btg 20,000.00 - 200,000.00
Sub Total 1 ) - 44,361,700.00
2. ALAT a b c=a-b d e f=bxe g=cxe
2.1 Skrop 2.00 - 2.00 bh 55,000.00 - 110,000.00
2.2 Cangkul 1.00 - 1.00 bh 55,000.00 - 55,000.00
2.3 Ember plastik / timba 10.00 - 10.00 bh 11,000.00 - 110,000.00
2.4 Selang timbang 15.00 - 15.00 m' 5,500.00 - 82,500.00
2.5 Benang tampar 2.00 - 2.00 rol 5,500.00 - 11,000.00
2.6 Kuas 2" 2.00 - 2.00 bh 13,200.00 - 26,400.00
2.7 Kuas 4" 2.00 - 2.00 bh 16,500.00 - 33,000.00
2.8 Ayakan Pasir 2.00 - 2.00 m2 22,000.00 - 44,000.00
Sub Total 2 ) - 471,900.00
3. UPAH a b c=a-b d f g=bxf h=cxf
3.1 Pekerja 149.00 - 149.00 OH 95,000.00 - 14,155,000.00
3.2 Tukang 64.00 - 64.00 OH 115,000.00 - 7,360,000.00
3.3 Operasional Tim 1.00 - 1.00 LS 3,400,000.00 - 3,400,000.00
Sub Total 3 ) - 24,915,000.00
Jatijejer, 2018
Diketahui / Mengesahkan Diperiksa Oleh Dibuat oleh :
Kepala Desa Jatijejer Koordinator PPKD Pelaksana Kegiatan
3,487,430.00
94,548,000.00
24,799,400.00
28,199,400.00
FORM ENTRY DATA
PROVINSI
KABUPATEN
KECAMATAN
DESA
NO. RAB
PROGRAM
KEGIATAN
DIMENSI
TRY DATA
: Jawa Timur
: Mojokerto
: Trawas
: Jatijejer
: 01
: APBDesa 2019
: Pemb. Gapura & Pagar
: Gapura 1 Unit & Pagar 23,4 m'
Jatijejer, 2018
: Balai Desa Jatijejer
………………………..
……………………….
……………………….