19
…………………… ………………………
Pekerjaan Persiapan
Form. 19
…………………… ………………………
Pekerjaan Tanah
Form. 19
…………………… ………………………
Pekerjaan Tanah
Form. 19
…………………… ………………………
Pekerjaan Pondasi
Form. 19
0,15 m
…………………… ………………………
m'
bh
m'
m'
0,15 m
Besi D 6 mm - 200
4 - D 10 mm
…………………… ………………………
…………………… ………………………
0,15 m
KOLOM 15/15
P. Beugel = (0,15x2) + (0,15x2) + 0.04 = 0.64 m'
Besi D 6 mm - 200
jml = 56.00 / 0.15 = 373.33 bh
4 - D 10 mm
= 0.64 x 373.33 = 238.93 m'
0,15 m Tulangan = 8.00 x 56.00 = 448.00 m'
KOLOM 15/15 Kebutuhan Besi
Besi 10 = 601.60 m'
jml = 54.69 ljr
0,15 m
berat = 54.69 x 7.40 = 404.71 KG
Besi 6 = 359.68 m' No Tenaga An. SNI sat
= 32.70 ljr 1 Pekerja 3.57 oh
Besi D 6 mm - 200
4 - D 10 mm = 32.70 x 3.20 = 104.63 KG 2 Tukang batu 3.57 oh
3 Kepala Kelompok 0.36 oh
Tanggal Survey : Dibuat Oleh : PK KT
…………………… ………………………
Kebutuhan Besi
Besi 10 = 147.60 m'
jml = 13.42 ljr
berat = 13.42 x 7.40 = 99.29 KG
Besi 8 = 404.80 m' No Tenaga An. SNI sat
= 36.80 ljr 1 Pekerja 1.92 oh
= 36.80 x 4.74 = 174.43 KG 2 Tukang batu 1.92 oh
3 Kepala Kelompok 0.19 oh
Tanggal Survey : Dibuat Oleh : TPK KT
…………………… ………………………
…………………… ………………………
C PEKERJAAN PLESTERAN
L = 9.60 m2
…………………… ………………………
…………………… ………………………
Pekerjaan Pengecatan
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Pemb. Gapura Gang Dusun
Lokasi : Dsn. Tangkep & Dsn. Jatijejer
Dimensi : Gapura 2 Unit
VOLUME Harga
Dari Dari Satuan Jumlah Jumlah APBDes
URAIAN sat
Total Swadaya Rp. Rp.
Swadaya APBDes ( Rp )
1. BAHAN a b c=a-b d e f=bxe g=cxe
1.1 Semen PC ( 40 kg ) 132.00 - 132.00 zak 58,300.00 - 7,695,600.00
1.2 Pasir pasang (KW1) 13.00 - 13.00 m 3
220,000.00 - 2,860,000.00
1.3 Koral Beton 7.00 - 7.00 m3 209,000.00 - 1,463,000.00
1.4 Batu Gebal 5.00 - 5.00 ljr 302,500.00 - 1,512,500.00
1.5 Besi Beton ø 10 mm 68.00 - 68.00 ljr 71,500.00 - 4,862,000.00
1.6 Besi Beton ø 8 mm 36.00 - 36.00 ljr 55,000.00 - 1,980,000.00
1.7 Besi Beton ø 6 mm 32.00 - 32.00 ljr 33,000.00 - 1,056,000.00
1.8 Kawat Bendrat 12.00 - 12.00 kg 19,800.00 - 237,600.00
1.9 Batu Bata Exspose 12,270.00 - 12,270.00 bh 880.00 - 10,797,600.00
1.10 Paku biasa 2" - 5 " 19.00 - 19.00 kg 19,800.00 - 376,200.00
1.11 Coating Batu Bata Exspose 15.00 - 15.00 kg 176,000.00 - 2,640,000.00
1.12 Papan Begesting 2/20 x 2 19.00 - 19.00 ljr 16,500.00 - 313,500.00
1.13 Bambu 12.00 - 12.00 btg 20,000.00 - 240,000.00
Sub Total 1 ) - 36,034,000.00
2. ALAT a b c=a-b d e f=bxe g=cxe
2.1 Skrop 2.00 - 2.00 bh 44,000.00 - 88,000.00
2.2 Cangkul 1.00 - 1.00 bh 49,500.00 - 49,500.00
2.3 Ember plastik / timba 10.00 - 10.00 bh 11,000.00 - 110,000.00
2.4 Selang timbang 15.00 - 15.00 m' 4,400.00 - 66,000.00
2.5 Benang tampar 2.00 - 2.00 rol 5,500.00 - 11,000.00
2.6 Kuas 2" 2.00 - 2.00 bh 11,000.00 - 22,000.00
2.7 Kuas 4" 2.00 - 2.00 bh 13,200.00 - 26,400.00
2.8 Ayakan Pasir 2.00 - 2.00 m2 18,700.00 - 37,400.00
Sub Total 2 ) - 410,300.00
3. UPAH a b c=a-b d f g=bxf h=cxf
3.1 Pekerja 143.00 - 143.00 OH 95,000.00 - 13,585,000.00
3.3 Tukang 70.00 - 70.00 OH 115,000.00 - 8,050,000.00
3.3 Operasional Tim 5 % 1.00 - 1.00 LS 3,000,000.00 - 3,000,000.00
Sub Total 3 ) - 24,635,000.00
Jatijejer, 2018
Diketahui / Mengesahkan Diperiksa Oleh Dibuat oleh :
Kepala Desa Jatijejer Koordinator PPKD Pelaksana Kegiatan
3,053,965.00
94,548,000.00
33,468,700.00
36,468,700.00
FORM ENTRY DATA
PROVINSI
KABUPATEN
KECAMATAN
DESA
NO. RAB
PROGRAM
KEGIATAN
DIMENSI
TRY DATA
: Jawa Timur
: Mojokerto
: Trawas
: Jatijejer
: 01
: APBDesa 2019
: Pemb. Gapura Gang Dusun
: Gapura 2 Unit
Jatijejer, 2018
: Dsn. Tangkep & Dsn. Jatijejer
………………………..
……………………….
……………………….