RENCANA ANGGARAN BIAYA

POS JAGA ( KONTRAKTOR )

No Gambar Uraian Pekerjaan Rumus Hitungan Volume Jumlah Barang Dan Tukang

I PEKERJAAN PERSIAPAN 1.0 m 2.0 m

1 Pembersihan Lokasi
2.0 m
Panjang 6 M 18.00 M² Volume x Analisa Pembersihan Lokasi
4.0 m Lebar 3 M Pekerja Oh
Rumus P x L Mandor Oh
6Mx3M
3.0 m

2 Pengukuran Dan Pemasangan Panjang 6 M 18.00 M¹ Volume x Analisa Pengukuran


Bowplank 1.0 m 2.0 m
Lebar 3 M Kayu meranti 5 / 7 M3
2.0 m
Rumus (P + L) x 2 Paku biasa 2" - 5" Kg
4.0 m
(6 M + 3 M) x 2 Kayu papan meranti 3/20 M3
Tukang kayu Oh
Pekerja Oh
3.0 m
Kepala tukang Oh
Mandor Oh

II PEKERJAAN TANAH
1 Galian Tanah Pondasi Tinggi 60 Cm 8.64 M³ Volume x Analisa Galian Tanah
Lebar 60 Cm Pekerja Oh
Panjang 24 M Mandor Oh
45

Rumus P x L x T
0.60 M x 0.60 M
x 24 M
95

2 Urugan Pasir Dibawah Pondasi Panjang 24 M 0.72 M³ Volume x Analisa Urugan Pasir
Lebar 0.60 M Pasir urug Oh
Tinggi 0.05 M Pekerja Oh
Rumus P x L x T Mandor Oh
24 M x 0.60 M x 0.05 M

3 Urugan Pasir Dibawah Lantai Panjang 5 M 0.50 M³ Volume x Analisa Urugan Pasir
Lebar 2 M Pasir urug Oh
Tinggi 0.05 M Pekerja Oh
Rumus P x L x T Mandor Oh
5 M x 2 M x 0.05 M

4 Urugan Kembali Bekas Galian Lebar Atas 0.15 M 1.128 M³ Volume x Analisa Urugan Pasir
Lebar Bawah 0.05 M Pekerja Oh
Tinggi 0.47 M Mandor Oh
Panjang 24 M
Rumus (La + Lb) / 2 x T x P
(0,15 M + 0.05 M) / 2
x 0.47 M x 18 M

5 Urugan Tanah Di Bawah Lantai2.50


Panjang 5 M 4.50 M³ Volume x Analisa Urugan Tanah
Lebar 2 M Tanah urug M3

3.00
Tinggi 0.45 M Pekerja Oh
4.50
Rumus P x L x T Mandor Oh
5 M x 2 M x 0.45 M
1.50

0.96
3.00

4.50

1.50

0.96

III PEKERJAAN PONDASI Volume x Analisa Aanstamping


1 Pasang Aanstamping Tinggi 0.20 M 2.88 M³
Lebar 0.60 M Batu belah 15 / 20 cm M3
Panjang 24 M Pasir urug M3
Rumus P x L x T Pekerja Oh
0.2 M x 0.60 M Tukang batu Oh
x 24 M Kepala tukang Oh
Mandor Oh
2 Pondasi Batu Kali Lebar Atas 0.20 M 5.04 M³ Volume x Analisa Pondasi Batu Gunung
Lebar Bawah 0.50 M Batu belah 15 / 20 M3
Tinggi 0.60 M Semen portland Kg
Panjang 24 M Pasir pasang M3
Rumus (La + Lb) / 2 x T x P Pekerja Oh
(0.20 M + 0.50) M / 2 Tukang batu Oh
x 0.60 M x 24 M Kepala tukang Oh
Mandor Oh
IV PEKERJAAN BETON
1 Cor Lantai Panjang 5 M 1.00 M³ Volume x Analisa Beton Tumbuk Rabat
Lebar 2 M Semen Portland Kg
Tinggi 0.10 M Pasir beton M3
Rumus P x L x T Koral beton M3
5 M x 2 M x 0.10 M Pekerja Oh
Tukang batu Oh
Kepala tukang Oh
Mandor Oh
2 Cor Sloof Tinggi 0.15 M 0.432 M³ Volume x Analisa Beton Bertulang
Lebar 0.12 M Semen Portland Kg
Panjang 24 M Pasir beton M3
Rumus P x L x T Koral beton M3
24 M x 0.12 M Pekerja Oh
x 0.15 M Tukang batu Oh
Kepala tukang Oh
Mandor Oh
3 Pembesian Ø 8 Tinggi 0.10 M 34.128 Kg Volume x Analisa Pembesian
Lebar 0.08 M Besi beton ( polos / ulir ) Kg
Jarak Begel 0.10 M Kawat beton Kg
Panjang 24 M Pekerja Oh
Rumus (P/Jarak Besi)x Tukang besi Oh
((T+L)x2)xTabel Besi 8 Kepala tukang Oh
(24/0.10)x((0.10+0.08)x2) Mandor Oh
x 0.395
4 Pembesian Ø 10 Pajang 24 M 59.232 Kg Volume x Analisa Pembesian
Jumlah Besi 4 Buah Besi beton ( polos / ulir ) Kg
Rumus Jumlah Besi x P Kawat beton Kg
x Tabel Besi 10 Pekerja Oh
4 Bh x 24 M x 0.617 Tukang besi Oh
Kepala tukang Oh
Mandor Oh
5 Bekisting Tinggi 0.15 M 7.20 M² Volume x Analisa Bekisting Sloof
Lebar 0.12 M Kayu bekisting M3
Panjang 24 M Paku biasa 2 " - 5 " Kg
Rumus P x T x 2 Minyak bekisting Lt
24 M x 0,15 M x 2 Pekerja Oh
Tukang kayu Oh
Kepala tukang Oh
Mandor Oh
6 Bongkar Bekisting Tinggi 0.15 M 7.20 M²
Lebar 0.12 M
Panjang 24 M
Rumus P x T x 2
24 M x 0.15 M x 2

7 Cor Kolom Tinggi 0.15 M 0.405 M³ Volume x Analisa Beton Bertulang


Lebar 0.15 M Semen Portland Kg
Panjang 3 M Pasir beton M3
Jumlah Kolom 6 Bh Koral beton M3
Rumus P x L x T Pekerja Oh
x Jumlah Kolom Tukang batu Oh
3 M x 0.15 M Kepala tukang Oh
x 0.15 M x 6 Bh Mandor Oh
8 Pembesian Ø 6 Tinggi 0.08 M 22.752 Kg Volume x Analisa Pembesian
Lebar 0.08 M Besi beton ( polos / ulir ) Kg
Jarak Begel 0.10 M Kawat beton Kg
Panjang 3 M Pekerja Oh
Rumus (P/Jarak Besi)x Tukang besi Oh
((T+L)x2)xTabel Besi 8 Kepala tukang Oh
x jumlah kolom Mandor Oh
(3/0.10)x((0.08+0.08)x2)
x 0.395 x 6
9 Pembesian Ø 10 Pajang 3 M 44.424 Kg Volume x Analisa Pembesian
Jumlah Besi 4 Buah Besi beton ( polos / ulir ) Kg
Rumus Jumlah Besi x P Kawat beton Kg
x Tabel Besi 10 Pekerja Oh
x jumlah kolom Tukang besi Oh
4 Bh x 3M x 0.617 Kepala tukang Oh
x 6 Bh Mandor Oh
10 Bekisting Tebal 0.12 M 8.64 M² Volume x Analisa Bekisting Sloof
Lebar 0.12 M Kayu bekisting M3
Panjang 3 M Paku biasa 2 " - 5 " Kg
Rumus T x P x 4 Minyak bekisting Lt
x Jumlah Kolom Pekerja Oh
0.12 M x 3 M x 4 x 6 Bh Tukang kayu Oh
Kepala tukang Oh
Mandor Oh
11 Bongkar Bekisting Tebal 0.12 M 8.64 M²
Lebar 0.12 M
Panjang 3 M
Rumus T x P x 4
x Jumlah Kolom
0.12 M x 3 M x 4 x 6 Bh

12 Cor Ring Balk Tinggi 0.15 M 24.00 M¹ Volume x Analisa Ring Balk
Lebar 0.15 M Kayu bekisting M3
Panjang 24 M Paku biasa 2 " - 5 " Kg
Rumus Panjang Besi beton polos kg
Kawat beton Kg
Semen portland Kg
Pasir beton M3
Koral beton M3
Pekerja Oh
Tukang batu Oh
Tukang kayu Oh
Tukang besi Oh
Kepala tukang Oh
Mandor Oh
13 Cor Plat Dak Tebal 0.10 M 2.18 M³ Volume x Analisa Beton Bertulang
Lebar 3.40 M Semen Portland Kg
Panjang 6.40 M Pasir beton M3
Rumus P x L x T Koral beton M3
6.40 M x 3.40 M x 0.10 M Pekerja Oh
Tukang batu Oh
Kepala tukang Oh
Mandor Oh
14 Pembesian Ø 10 Pajang 6.40 M 351.859 Kg Volume x Analisa Pembesian
Lebar 3.40 M Besi beton ( polos / ulir ) Kg
Rumus ((P / 0.10) x L) + Kawat beton Kg
((L / 0.10) x P) Pekerja Oh
x Tabel Besi 10 Tukang besi Oh
((6.40 M / 0.10) x 3.40 M)+ Kepala tukang Oh
((3.40/0.10)x6.40)x0.617 Mandor Oh
15 Bekisting Tebal 0.12 M 8.64 M² Volume x Analisa Bekisting Sloof
Lebar 0.12 M Kayu bekisting M3
Panjang 3 M Paku biasa 2 " - 5 " Kg
Rumus T x P x 4 Minyak bekisting Lt
x Jumlah Kolom Pekerja Oh
0.12 M x 3 M x 4 x 6 Bh Tukang kayu Oh
Kepala tukang Oh
Mandor Oh
16 Bongkar Bekisting Tebal 0.12 M 8.64 M²
Lebar 0.12 M
Panjang 3 M
Rumus T x P x 4
x Jumlah Kolom
0.12 M x 3 M x 4 x 6 Bh

V PEKERJAAN PASANGAN Volume x Pasangan Batu Bata Trasram 1/2


1 Pasangan Dinding Batu Bata Trasram Panjang 24 M 1.80 M³ Bata Merah bh
1:2 Lebar 0,15 M Semen sak
Tinggi 0,50 M Pasir m3
Rumus P x L x T Alat Bantu Ls
24 M x 0,15 M x 0,5 M Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
2 Pasangan Batu Bata Panjang 24 M 10.80 M³ Volume x Pasangan Batu Bata Trasram 1/2
Lebar 0,15 M Bata Merah bh
Tinggi 3 M Semen sak
Rumus P x L x T Pasir m3
24 M x 0,15 M x 3 M Alat Bantu Ls
- Pintu Dan Jendela Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
3 Plesteran Dinding Trasram 1:2 Panjang 24 M 24.00 M² volume x analisa pekerjaan plesteran
Tinggi 0.50 M Semen Portland Kg
Rumus PxTx2 Pasir Pasang M3
24 M x 0.5 M x 2 Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
4 Plesteran Dinding Panjang 24 M 72.00 M² volume x analisa pekerjaan plesteran
Tinggi 3,M Semen Portland Kg
Rumus PxT Pasir Pasang M3
24 M x 3 M Pekerja OH
- Pintu Dan Jendela Tukang Batu OH
Kepala Tukang OH
Mandor OH

5 Saluran Pasangan Rolag Panjang 24 M 24.00 M¹ -


Lebar 50 Cm
Tinggi 30 Cm

VI PEKERJAAN LANTAI KERAMIK


1 Pasang Lantai Keramik Panjang 6 M 18.00 M² Volume x analisa pekerjaan lantai
Lebar 3 M Pekerja OH
Rumus P x L Tukang OH
6Mx3M Kepala Tukang OH
Mandor OH
Lantai Tegel keramik 30 x 30 Tagel Keramik 30 x 30 Dos
Pasir Pasang M3
Semen portland Kg
Semen Warna Kg
VII PEKERJAAN KUSEN PINTU DAN
JENDELA Volume x analisa pekerjaan Kusen Jendela &
1 Kusen Jendela Dan Pintu Lebar pintu 0,8 M 2.04 M² pintu
Tinggi pintu 1,5 M Pekerja OH
Lebar Jendela 0,4 M Tukang OH
Tinggi Jendela 1 M Kepala Tukang OH
tebal kusen jendela 0,06 M Mandor OH
Kayu kelas 2 Kayu Kelas 2 M3
Rumus Paku Biasa 2" - 5" Kg
(T x Lpintu) + (( T x Ljendela )
jumlah jendela
(1,5 x 0,8 ) + ((0,06x 0,4 )x10)
+((0,06 x1)x10)

2 Kaca Mati Panjang 0,30 M 1.35 M


Tinggi 0,9 M
Rumus P x L
0,30 x 0,90 x 5

VIII
PEKERJAAN RANGKA KAP DAN ATAP
1 Pasang Atap volume x analisa pasang atap
Panjang 6 M 18 M² Pekerja OH
Lebar 3 M Tukang OH
Rumus P x L Kepala Tukang OH
6x3 Mandor OH
Atap Seng gelombang Atap Seng BJLS 20 Lb
Paku seng Kg

2 Bubungan Atap volume x analisa pasang atap


Panjang 6 6.00 M¹ pekerja oh
tukang oh
kepala tukang oh
Mandor oh
Papan Kayu Kelas 2 m3
Bubungan Seng pelat m'
Paku seng kg
Paku Biasa 2"-5" kg
3 Lisplank Panjang 8 M 26.00 M¹ volume x analisa lisplank
Lebar 5 M pekerja oh
Rumus P + L x 2 tukang oh
8+5x2 kepala tukang oh
Mandor oh
Kayu kelas 2 m3
Paku biasa 2"-5" kg
IX PEKERJAAN PLAFOND
1 Rangka Plafond + Plafond Panjang 8 M 40 M² volume x analisa rangka plafond
Lebar 5 M pekerja oh
Rumus P x L tukang oh
8x5 mandor oh
kayu kelas 2 m3
tripleks 3 mm lbr
paku biasa 2"-5" kg
Paku tripleks kg
X PEKERJAAN PENGECATAN
1 Pengecatan Dinding Panjang 24 M 144.00 M² volume x analisa pengecatan
Tinggi 3 M pekerja oh
Rumus PxT tukang oh
24 M x 3 M mador oh
- Pintu Dan Jendela cat tembok kg
amplas lbr
plamir kg
kuas rol bh
2 Pengecatan Plafond volume x analisa pengecatan
Panjang 8 M 40.00 M² pekerja oh
Lebar 5 M tukang oh
Rumus P x L kepala tukang oh
8 x5 mandor oh
cat tembok kg
kuas rol bh

JUMLAH TOTAL
DIBULATKAN
Harga
Dan Tukang Estimasi Biaya
Satuan

mbersihan Lokasi 121,500.00


1.800 40,000.00 72,000.00
0.900 55,000.00 49,500.00

Pengukuran 761,850.00
0.216 1,800,000.00 388,800.00
0.360 20,000.00 7,200.00
0.126 1,500,000.00 189,000.00
1.800 50,000.00 90,000.00
1.800 40,000.00 72,000.00
0.180 55,000.00 9,900.00
0.090 55,000.00 4,950.00

157,248.00
Galian Tanah
3.456 40,000.00 138,240.00
0.346 55,000.00 19,008.00

Urugan Pasir 95,436.00


0.864 100,000.00 86,400.00
0.216 40,000.00 8,640.00
0.007 55,000.00 396.000

Urugan Pasir 66,275.00


0.600 100,000.00 60,000.000
0.150 40,000.00 6,000.000
0.005 55,000.00 275.000

Urugan Pasir 9,841.80


0.217 40,000.00 8,663.040
0.021 55,000.00 1,178.760

Urugan Tanah 591,187.50


5.40 100,000.00 540,000.00
1.13 40,000.00 45,000.00
0.11 55,000.00 6,187.50
Aanstamping 849,571.20

3.46 175,000.00 604,800.00


0.86 100,000.00 86,400.00
2.25 40,000.00 89,856.00
1.12 50,000.00 56,160.00
0.11 55,000.00 6,177.60
0.11 55,000.00 6,177.60
dasi Batu Gunung 2,785,456.80
5.54 175,000.00 970,200.00
821.52 1,300.00 1,067,976.00
2.62 100,000.00 262,080.00
7.56 40,000.00 302,400.00
3.02 50,000.00 151,200.00
0.20 55,000.00 10,810.80
0.38 55,000.00 20,790.00
534,475.00
n Tumbuk Rabat
218.00 1,300.00 283,400.00
0.52 120,000.00 62,400.00
0.87 120,000.00 104,400.00
1.65 40,000.00 66,000.00
0.25 50,000.00 12,500.00
0.03 55,000.00 1,375.00
0.08 55,000.00 4,400.00
eton Bertulang 293,533.20
145.15 1,300.00 188,697.60
0.23 120,000.00 27,993.60
0.34 120,000.00 40,435.20
0.71 40,000.00 28,512.00
0.11 50,000.00 5,400.00
0.01 55,000.00 594.00
0.03 55,000.00 1,900.80
Pembesian 485,513.46
35.83 12,675.00 454,201.02
0.51 15,500.00 7,934.76
0.24 40,000.00 9,555.84
0.24 50,000.00 11,944.80
0.02 55,000.00 1,313.93
0.01 55,000.00 563.11

Pembesian 842,649.24
62.19 12,675.00 788,303.88
0.89 15,500.00 13,771.44
0.41 40,000.00 16,584.96
0.41 50,000.00 20,731.20
0.04 55,000.00 2,280.43
0.02 55,000.00 977.33
ekisting Sloof 818,676.00
0.32 1,800,000.00 583,200.00
2.16 20,000.00 43,200.00
0.72 - -
2.16 40,000.00 86,400.00
1.87 50,000.00 93,600.00
0.19 55,000.00 10,296.00
0.04 55,000.00 1,980.00
-

eton Bertulang 275,187.38


136.08 1,300.00 176,904.00
0.22 120,000.00 26,244.00
0.32 120,000.00 37,908.00
0.67 40,000.00 26,730.00
0.10 50,000.00 5,062.50
0.01 55,000.00 556.88
0.03 55,000.00 1,782.00
Pembesian 323,675.64
23.89 12,675.00 302,800.68
0.34 15,500.00 5,289.84
0.16 40,000.00 6,370.56
0.16 50,000.00 7,963.20
0.02 55,000.00 875.95
0.01 55,000.00 375.41

Pembesian 1,614,398.13
46.65 12,675.00 591,227.91
0.67 15,500.00 10,328.58
0.31 40,000.00 12,438.72
0.31 50,000.00 15,548.40
0.03 55,000.00 1,710.32
0.01 55,000.00 733.00
ekisting Sloof 982,411.20
0.39 1,800,000.00 699,840.00
2.59 20,000.00 51,840.00
0.86 - -
2.59 40,000.00 103,680.00
2.25 50,000.00 112,320.00
0.22 55,000.00 12,355.20
0.04 55,000.00 2,376.00
-

a Ring Balk 1,728,240.00


0.07 1,800,000.00 129,600.00
0.48 20,000.00 9,600.00
86.40 12,675.00 1,095,120.00
1.20 15,500.00 18,600.00
132.00 1,300.00 171,600.00
0.22 120,000.00 25,920.00
0.36 120,000.00 43,200.00
2.40 40,000.00 96,000.00
0.79 50,000.00 39,600.00
0.79 50,000.00 39,600.00
0.79 50,000.00 39,600.00
0.24 55,000.00 13,200.00
0.12 55,000.00 6,600.00
eton Bertulang 1,478,537.60
731.14 1,300.00 950,476.80
1.18 120,000.00 141,004.80
1.70 120,000.00 203,673.60
3.59 40,000.00 143,616.00
0.54 50,000.00 27,200.00
0.05 55,000.00 2,992.00
0.17 55,000.00 9,574.40
Pembesian 5,005,636.94
369.45 12,675.00 4,682,806.13
5.28 15,500.00 81,807.26
2.46 40,000.00 98,520.58
2.46 50,000.00 123,150.72
0.25 55,000.00 13,546.58
0.11 55,000.00 5,805.68
ekisting Sloof 982,411.20
0.39 1,800,000.00 699,840.00
2.59 20,000.00 51,840.00
0.86 - -
2.59 40,000.00 103,680.00
2.25 50,000.00 112,320.00
0.22 55,000.00 12,355.20
0.04 55,000.00 2,376.00
-

u Bata Trasram 1/2 178,930.80


126.000 800.00 100,800.00
25.866 1,300.00 33,625.80
0.072 120,000.00 8,640.00
1.800 750.00 1,350.00
0.576 40,000.00 23,040.00
0.180 50,000.00 9,000.00
0.018 55,000.00 990.00
0.027 55,000.00 1,485.00
u Bata Trasram 1/2 1,073,584.80
756.000 800.00 604,800.00
155.196 1,300.00 201,754.80
0.432 120,000.00 51,840.00
10.800 750.00 8,100.00
3.456 40,000.00 138,240.00
1.080 50,000.00 54,000.00
0.108 55,000.00 5,940.00
0.162 55,000.00 8,910.00
erjaan plesteran 2,447,784.00
204.48 1,300.00 265,824.00
0.408 120,000.00 48,960.00
4.800 400,000.00 1,920,000.00
3.600 50,000.00 180,000.00
0.360 55,000.00 19,800.00
0.240 55,000.00 13,200.00
erjaan plesteran 2,159,352.00
613.44 1,300.00 797,472.00
1.224 120,000.00 146,880.00
14.400 40,000.00 576,000.00
10.800 50,000.00 540,000.00
1.080 55,000.00 59,400.00
0.720 55,000.00 39,600.00

2,095,560.00
ekerjaan lantai
4.500 40,000.00 180,000.00
2.700 50,000.00 135,000.00
0.270 55,000.00 14,850.00
0.234 55,000.00 12,870.00
18.000 52,000.00 936,000.00
0.396 120,000.00 47,520.00
176.400 1,300.00 229,320.00
27.000 20,000.00 540,000.00
7,192,530.00
an Kusen Jendela &

12.24 40,000.00 489,600.0


40.8 50,000.00 2,040,000.0
4.08 55,000.00 224,400.0
0.51 55,000.00 28,050.0
2.448 1,800,000.00 4,406,400.0
0.204 20,000.00 4,080.0

733,005.00

pasang atap
2.16 40,000.00 86,400.00
1.08 50,000.00 54,000.00
0.108 55,000.00 5,940.00
0.108 55,000.00 5,940.00
13.5 41,000.00 553,500.00
0.99 27,500.00 27,225.00

pasang atap 202,608.00


0.015 40,000.00 600.00
0.015 50,000.00 750.00
0.015 55,000.00 825.00
0.0078 55,000.00 429.00
0.0072 2,700,000.00 19,440.00
6 30,000.00 180,000.00
0.0144 27,500.00 396.00
0.0084 20,000.00 168.00
a lisplank 61,850.00
0.15 40,000.00 6,000.00
0.2 50,000.00 10,000.00
0.025 55,000.00 1,375.00
0.075 55,000.00 4,125.00
0.0145 2,700,000.00 39,150.00
0.06 20,000.00 1,200.00
5,008,900.00

17.2 40,000.00 688,000.00


42 50,000.00 2,100,000.00
3.56 55,000.00 195,800.00
0.48 2,700,000.00 1,296,000.00
16.6 38,500.00 639,100.00
4 20,000.00 80,000.00
0.4 25,000.00 10,000.00
2,835,360.00
pengecatan
3.6 40,000.00 144,000.00
10.8 50,000.00 540,000.00
1.152 55,000.00 63,360.00
57.6 12,500.00 720,000.00
86.4 10,000.00 864,000.00
14.4 15,000.00 216,000.00
14.4 20,000.00 288,000.00
pengecatan 694,200.00
1 40,000.00 40,000.00
3 50,000.00 150,000.00
0.32 55,000.00 17,600.00
0.12 55,000.00 6,600.00
16 25,000.00 400,000.00
4 20,000.00 80,000.00

- 45,487,375.89
-
REKAPITULASI RENCANA ANGGARAN BIAYA

JUMLAH HARGA BOBOT MINGGU KE-


NO. URAIAN PEKERJAAN SAT KUANTITAS
{Rp} {%} 1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi M² 18.00 121,500.00 0.27 0.27
2 Pengukuran Dan Pemasangan Bowplank M¹ 18.00 761,850.00 1.67 1.67
II PEKERJAAN TANAH
1 Galian Tanah Pondasi M³ 8.64 157,248.00 0.35 0.35
2 Urugan Pasir Dibawah Pondasi M³ 0.72 95,436.00 0.21 0.21
3 Urugan Pasir Dibawah Lantai M³ 0.50 66,275.00 0.15 0.15
4 Urugan Kembali Bekas Galian M³ 1.128 66,275.00 0.15 0.15
5 Urugan Tanah Di Bawah Lantai M³ 4.50 591,187.50 1.30 1.30
III PEKERJAAN PONDASI
1 Pasang Aanstamping M³ 2.88 849,571.20 1.87 1.87
2 Pondasi Batu Kali M³ 5.04 2,785,456.80 6.12 3.06 3.06
IV PEKERJAAN BETON
1 Cor Lantai M³ 1.00 534,475.00 1.17 1.17
2 Cor Sloof M³ 0.432 293,533.20 0.64 0.64
3 Pembesian Ø 8 Kg 34.128 485,513.46 1.07 1.07
4 Pembesian Ø 10 Kg 59.232 842,649.24 1.85 1.85
5 Bekisting M² 7.20 818,676.00 1.80 1.80
6 Bongkar Bekisting M² 7.20 - -
7 Cor Kolom M³ 0.405 275,187.38 0.60 0.60
8 Pembesian Ø 6 Kg 22.752 323,675.64 0.71 0.71
9 Pembesian Ø 10 Kg 44.424 1,614,398.13 3.54 3.54
10 Bekisting M² 8.64 982,411.20 2.16 2.16
11 Bongkar Bekisting M² 8.64 - -
12 Cor Ring Balk M¹ 24 1,728,240.00 3.79 3.79
13 Cor Plat Dak M³ 2.176 1,478,537.60 3.25
14 Pembesian Ø 10 Kg 351.8592 5,005,636.94 10.99 2.75 2.75 2.75 2.75
15 Bekisting M² 8.64 982,411.20 2.16
16 Bongkar Bekisting M² 8.64 - -
V PEKERJAAN PASANGAN
1 Pasangan Dinding Batu Bata Trasram 1:2 M³ 1.80 178,930.80 0.39 0.39
2 Pasangan Batu Bata M³ 10.80 1,073,584.80 2.36 1.18 1.18
3 Plesteran Dinding Trasram 1:2 M² 24.00 2,447,784.00 5.37
4 Plesteran Dinding M² 72.00 2,159,352.00 4.74
5 Saluran Pasangan Rolag M¹ 24.00 - -
VI PEKERJAAN LANTAI KERAMIK
1 Pasang Lantai Keramik M² 18.00 2,095,560.00 4.60
VII PEKERJAAN KUSEN PINTU DAN JENDELA
1 Kusen Jendela Dan Pintu M² 2.04 7,192,530.00 15.79 3.95 3.95 3.95 3.95
2 Kaca Mati M 1.35 - -
VIII PEKERJAAN RANGKA KAP DAN ATAP
1 Pasang Atap M² 18 733,005.00 1.61 1.61
2 Bubungan Atap M¹ 6.00 202,608.00 0.44
3 Lisplank M¹ 26 61,850.00 0.14
IX PEKERJAAN PLAFOND -
1 Rangka Plafond + Plafond M² 40 5,008,900.00 11.00
X PEKERJAAN PENGECATAN
1 Pengecatan Dinding M² 144.00 2,835,360.00 6.23
2 Pengecatan Plafond M² 40.00 694,200.00 1.52
JUMLAH 45,543,809.09 100.00 8.16 7.67 7.60 11.60 9.87 8.92 6.73
RENCANA 1076.77
KUMULATIF 0 8.16 15.83 23.43 35.03 44.90 53.82 60.55
JUMLAH
REALISASI
KUMULATIF
ENCANA ANGGARAN BIAYA
MINGGU KE-
KET
8 9 10 11 12
100%

75%

50%
3.25

2.16
5.37
4.74

4.60 25%

0.44
0.14

5.50 5.50

3.11 3.11
0.76 0.76 0%
10.70 7.66 13.35 3.87 3.87
71.25 78.90 92.25 96.13 100.00
RENCANA ANGGARAN BIAYA
RKB ( KONSULTAN )

No Gambar Uraian Pekerjaan Rumus Hitungan Volume Harga Satuan

A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasih Panjang 26 M 275.60 M² -
Lebar 10.60 M
      

Rumus P x L


26 M x 10.60 M




2 Pengukuran Dan Pemasangan Panjang 26 M 73.20 M¹ -


Bowplank Lebar 10.60 M
      

Rumus P + L x 2
26 M + 10.60 M x 2





B PEKERJAAN TANAH
1 Galian Tanah Pondasi Tinggi 90 Cm 73.53 M³ -
Lebar 95 Cm
Panjang 86 M
Rumus P x L x T
45

0,65 Cm x 0.95 Cm
x 86 M
95

2 Galian Saluran Air Hujan Tinggi 30 Cm 8.784 M³ -


Lebar 40 Cm
Panjang 73,2 M
Rumus P x L x T
45

0,30 Cm x 0.40 Cm
x 73.2 M
95

3 Urugan Kembali Bekas Galian Lebar Atas 50 Cm 16.77 M³ -


Lebar Bawah 10 Cm
Tinggi 65 Cm
Panjang 86 M
Rumus La + Lb / 2 x T x P
0,50 Cm + 0.10 Cm / 2
x 0.65 Cm x 86 M

4 Urugan Tanah Di Bawah Lantai Panjang 24 M 64.80 M³ -


      

Lebar 9 M
Tinggi 30 Cm


Rumus P x L x T
24 M x 9 M x 0.30 Cm




5 Urugan Pasir Dibawah Pondasi Panjang 86 M 4.09 M³ Err:509


Lebar 95 Cm
Tinggi 5 Cm
Rumus P x L x T
86 M x 0.95 Cm
x 0.05 Cm

6 Urugan Pasir Dibawah Lantai Panjang 24 M 32.40 M³ Err:509


Lebar 9 M
Tinggi 15 Cm
Rumus P x L x T
24 M x 9 M x 0.15 Cm

C PEKERJAAN PONDASI
1 Pekerjaan Melancipkan Dan Panjang Ulin 4 M 87.00 Ttk Err:509
Pentiang Pancang Jarak Pancang 1 m
Panjang 86 M

2 Pekerjaan Kalang Dan Sunduk Panjang Sunduk 0,5 M 0.75 M³ Err:509


Kayu Ulin Panjang Kalan 4 M
Kayu Ulin 5/10
Panjang 86

3 Pekerjaan Pancang Kayu Ulin Panjang Ulin 4 M 87.00 Ttk Err:509


Jarak Pancang 1 m
Panjang 86 M

4 Pasang Aanstamping Tinggi 20 Cm 16.34 M³ -


Lebar 95Cm
Panjang 86 M
Rumus P x L x T
0,20 Cm x 0.95Cm
x 86 M

3 Pondasi Batu Bunung Lebar Atas 25 Cm 30.745 M³ -


Lebar Bawah 85 Cm
Tinggi 75 Cm
Panjang 86 M
Rumus La + Lb / 2 x T x P
0,25Cm + 0.85 Cm / 2
x 0.75 Cm x 86 M

D PEKERJAAN PASANGAN
1 Pasangan Dinding Batu Bata Panjang 76 M 5.70 M³ Err:509
Trasram Lebar 0,15 Cm
Tinggi 0,50 Cm
Rumus P x L x T
76 M x 0,15 Cm x 0,5 Cm

2 Pasangan Batu Bata Panjang 76 M 31.35 M³ -


Lebar 0,15 Cm
Tinggi 35 M
Rumus P x L x T
76 M x 0,15 Cm x 3,5 M
- Pintu Dan Jendela

3 Plesteran Dinding Trasram Panjang 76 M 76.00 M² -


Tinggi 0,50 Cm
Rumus PxT
24 M x 0,5 M

4 Plesteran Dinding Panjang 76 M 475.00 M² -


Tinggi 3,5 M
Rumus PxT
76 M x 3,5 M
- Pintu Dan Jendela

5 Saluran Pasangan Rolag Panjang 71,6 M 71.60 M¹ Err:509


Lebar 50 Cm
Tinggi 30 Cm

E PEKERJAAN BETON
1 a. Cor Sloof Tinggi 20 Cm 2.58 M³ -
Lebar 15 Cm
Panjang 86 M
Rumus P x L x T
0,20 Cm x 0.15Cm
x 86 M

b. Pembesian Ø 8 Tinggi 20 Cm 167.873 Kg -


Lebar 15 Cm
Jarak Begel 15 Cm
Panjang 86 M
Rumus Jlh Besi x P Besi
566,66 x 0,75 x 0,395

c. Pembesian Ø 12 Tinggi 20 Cm 458.208 Kg -


Lebar 15 Cm
Panjang 86 M
Rumus Jlh Besi x P Besi
6 x 86 x 0,888

d. Bekisting Tebal 20 Mm 34.40 M² Err:509


Lebar 15 Cm
Panjang 86 M
Rumus P x L
0,2 x 86 x 2

e. Bongkar Bekisting Tebal 20 Mm 34.40 M² Err:509


Lebar 15 Cm
Panjang 86 M
Rumus P x L
0,2 x 86 x 2

2 a. Cor Ring Balk Tinggi 20 Cm 2.58 M³ Err:509


Lebar 15 Cm
Panjang 86 M
Rumus P x L x T
0,20 Cm x 0.15Cm
x 86 M

b. Pembesian Ø 8 Tinggi 20 Cm 125.906 Kg -


Lebar 15 Cm
Jarak Begel 20 Cm
Panjang 86 M
Rumus Jlh Besi x P Besi
425x 0,75 x 0,395

c. Pembesian Ø 12 Tinggi 20 Cm 534.576 Kg -


Lebar 15 Cm
Panjang 86 M
Rumus Jlh Besi x P Besi
7 x 86 x 0,888

d. Bekisting Tebal 20 Mm 34.40 M² Err:509


Lebar 15 Cm
Panjang 86 M
Rumus P x L
0,2 x 86 x 2

e. Bongkar Bekisting Tebal 20 Mm 34.4 M² Err:509


Lebar 15 Cm
Panjang 86 M
Rumus P x L
0,2 x 86 x 2

3 a. Cor Kolom Utama Tinggi 4 M 4.50 M³ -


Lebar 15 Cm
Panjang 25 Cm
Rumus P x L x T
0,25 Cm x 0.15 Cm
x 4 M x 30

b. Pembesian Ø 8 Tinggi 4 M 268.533 Kg -


Lebar 15 Cm
Jarak Begel 15 Cm
Panjang 25 Cm
Rumus Jlh Besi x P Besi
26,66 x 0,85 x 0,395 x 30

c. Pembesian Ø 12 Tinggi 4 M 639.36 Kg -


Lebar 15 Cm
Panjang 25 Cm
Rumus Jlh Besi x P Besi
6 x 4 x 0,888 x 30

d. Bekisting Tinggi 4 M 120 M² -


Lebar 15 Cm
Panjang 25 Cm
Rumus P x L
0,25 x 4 x 4 x 30

e. Bongkar Bekisting Tinggi 4 M 120 M² Err:509


Lebar 15 Cm
Panjang 25 Cm
Rumus P x L
0,25 x 4 x 4 x 30

4 a. Cor Kolom Praktis Tinggi 4 M 0.58 M³ Err:509


Lebar 12 Cm
Panjang 15 Cm
Rumus P x L x T
0,15 Cm x 0.12 Cm
x4Mx8

b. Pembesian Ø 8 Tinggi 4 M 50.5474 Kg -


Lebar 12 Cm
Jarak Begel 15 Cm
Panjang 15 Cm
Rumus Jlh Besi x P Besi
26,66 x 0,6 x 0,395 x 8

c. Pembesian Ø 12 Tinggi 4 M 113.664 Kg -


Lebar 12 Cm
Panjang 15 Cm
Rumus Jlh Besi x P Besi
4 x 4 x 0,888 x 8

d. Bekisting Tinggi 4 M 19.2 M² -


Lebar 15 Cm
Panjang 15 Cm
Rumus P x L
0,15 x 4 x 4 x 30

e. Bongkar Bekisting Tinggi 4 M 19.2 M² Err:509


Lebar 15 Cm
Panjang 15 Cm
Rumus P x L
0,15 x 4 x 4 x 30

5 Cor Lantai Panjang 24 M 21.60 M³ Err:509


Lebar 9 M
Tebal 10 Cm
Rumus P x L x T
24 M x 9 M x 0.10 Cm

6 Cor Dasar Saluran Panjang 71,6 M 1.07 M³ Err:509


Lebar 30 Cm
Tebal 5 Cm
Rumus P x L x T
71,6 M x 0,30 Cm
x 0.05 Cm

F PEKERJAAN LANTAI KERAMIK


1 Pasang Lantai Keramik Panjang 24 M 216.00 M² -
Lebar 9 M
Rumus P x L
24 M x 9 M

G PEKERJAAN KUSEN PINTU DAN


JENDELA
1 Kusen Jendela Dan Pintu Panjang 2,5 M 3.45 M³ -
Tinggi 1,5 M
kayu Lembasung 5/10

Panjang 2,2 M
Tinggi 2,5 M
kayu Lembasung 5/10
2 Daun Pintu Panel
Panjang 2,1 M 6.00 Bh Err:509
Tinggi 80 Cm
kayu Lembasung 5/10

3 Daun Jendela + Kaca Bening Panjang 65 Cm 36 Bh Err:509


Tinggi 60 Cm
kayu Lembasung 5/10

4 Kaca Mati Panjang 65 Cm 5.85 Bh Err:509


Tinggi 60 Cm
Rumus P x L
0,65 x 0,60 x 15

H PEKERJAAN RANGKA KAP DAN


ATAP
1 Kuda - Kuda Panjang 9 M 4.58 M³ #REF!
Balok Kayu 8/12
Balok Kayu 8/12

2 Gording
Panjang 9 M 4.15 M³ #REF!
Lebar 26 Cm
Balok Kayu 8/12
9 x 0,08 x 0,12 x 48

3 Ikatan Angin - Angin Panjang 9 M 0.46 M³ #REF!


Balok Kayu 8/12
0,08 x 0,12 x 48

4 Pasang Kaso + Reng


Panjang 26 M 512 M³ #REF!
Lebar 10,16 M
Balok Kayu 5/7

5 Pasang Atap
Panjang 32 M 512 M² #REF!
Lebar 16 M
Rumus P x L
32 x 16
6 Bubungan Atap
Panjang 26 26.00 M¹ #REF!

2 Lisplank Panjang 26 M 73.20 M¹ #REF!


Lebar 10,60 M
Rumus P + L x 2
26 + 10,60 x 2

I PEKERJAAN PLAFOND
1 Rangka Plafond + Plafond Panjang 26 M 275.6 M² #REF!
Lebar 10,60 M
Rumus P + L
26 x 10,60

2 List Plafond Panjang 26 M 120.40 M¹ #REF!


Lebar 10,60 M

J PEKERJAAN PENGGATUNGAN
PENUTUP DAN PENGUNCI
1 Kunci Tanam 2 x Putar 3.00 Bh Err:509
2 Engsel Pintu 9.00 Bh Err:509
3 Ikatan Angin - Angin 66.00 Bh Err:509
4 Hak angin 66.00 Bh Err:509
5 Grendel Pintu 66.00 Bh Err:509
6 Grendel Jendela 66.00 Bh Err:509
K PEKERJAAN PENGECATAN
1 Penegecatan Diding Panjang 76 M 551.00 M² #REF!
Tinggi 4 M
Rumus PxT
76 M x 4 M
- Pintu Dan Jendela

2 Plamir Dinding
Panjang 76 M 551.00 M² #REF!
Tinggi 4 M
Rumus PxT
76 M x 4 M
- Pintu Dan Jendela
3 Pengecatan Plafond
Panjang 26 M 275.60 M² #REF!
Lebar 10,60 M
Rumus P + L
26 x 10,60

4 Pengecatan Lisplank
Panjang 26 M 120.40 M¹ #REF!
Lebar 10,60 M

K PEKERJAAN LISTRIK

1 Instalasi Titik Lampu 34 Bh Err:509


2 Stop Kontak 5 Bh Err:509
3 Control Panel 2 Unit Err:509
4 Grounding / Pentanahan 1 Ls Err:509
5 Pengadaan Lampu XL 34 Bh Err:509

TOTAL HARGA
Lembar 1
Jumlah Harga

Err:509
Err:509

Lembar 2

Err:509

Err:509

Err:509

Err:509
-

Lembar 3
-

Err:509

-
Err:509

Err:509

Err:509

Lembar 4
-

Err:509

Err:509

-
-

Err:509

Err:509

Lembar 5
-

-
-

Err:509

Err:509

Err:509

-
Lembar 6

Err:509

Err:509

Err:509

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

Lembar 7
#REF!

#REF!

#REF!

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

#REF!

#REF!
#REF!

#REF!

Lembar 8
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
REKAPITULASI
RENCANA ANGGARAN BIAYA
RKB ( KONSULTAN )

NO. URAIAN PEKERJAAN JUMLAH HARGA

1 2 3

1 PEKERJAAN PERSIAPAN Rp. -

2 PEKERJAAN TANAH Rp. Err:509

3 PEKERJAAN PONDASI Rp. Err:509

4 PEKERJAAN PASANGAN Rp. Err:509

5 PEKERJAAN BETON Rp. -

6 PEKERJAAN LANTAI KERAMIK Rp. Err:509

7 PEKERJAAN KUSEN PINTU DAN JENDELA Rp. #REF!

8 PEKERJAAN RANGKA KAP DAN ATAP Rp. #REF!

9 PEKERJAAN PLAFOND Rp. Err:509

10 PEKERJAAN PENGGANTUNGAN PENUTUP DAN PENGUNCI Rp. #REF!

11 PEKERJAAN LISTRIK Rp. Err:509

JUMLAH TOTAL Rp. Err:509


PPN 10 % Rp. Err:509
GRAND TOTAL Rp. Err:509
DIBULATKAN Rp. Err:509

# Terbilang : Tujuh Ratus Tujuh Puluh Satu Juta Empat Ratus Empat Puluh Enam Ribu Rupiah #