No Gambar Uraian Pekerjaan Rumus Hitungan Volume Jumlah Barang Dan Tukang
1 Pembersihan Lokasi
2.0 m
Panjang 6 M 18.00 M² Volume x Analisa Pembersihan Lokasi
4.0 m Lebar 3 M Pekerja Oh
Rumus P x L Mandor Oh
6Mx3M
3.0 m
II PEKERJAAN TANAH
1 Galian Tanah Pondasi Tinggi 60 Cm 8.64 M³ Volume x Analisa Galian Tanah
Lebar 60 Cm Pekerja Oh
Panjang 24 M Mandor Oh
45
Rumus P x L x T
0.60 M x 0.60 M
x 24 M
95
2 Urugan Pasir Dibawah Pondasi Panjang 24 M 0.72 M³ Volume x Analisa Urugan Pasir
Lebar 0.60 M Pasir urug Oh
Tinggi 0.05 M Pekerja Oh
Rumus P x L x T Mandor Oh
24 M x 0.60 M x 0.05 M
3 Urugan Pasir Dibawah Lantai Panjang 5 M 0.50 M³ Volume x Analisa Urugan Pasir
Lebar 2 M Pasir urug Oh
Tinggi 0.05 M Pekerja Oh
Rumus P x L x T Mandor Oh
5 M x 2 M x 0.05 M
4 Urugan Kembali Bekas Galian Lebar Atas 0.15 M 1.128 M³ Volume x Analisa Urugan Pasir
Lebar Bawah 0.05 M Pekerja Oh
Tinggi 0.47 M Mandor Oh
Panjang 24 M
Rumus (La + Lb) / 2 x T x P
(0,15 M + 0.05 M) / 2
x 0.47 M x 18 M
3.00
Tinggi 0.45 M Pekerja Oh
4.50
Rumus P x L x T Mandor Oh
5 M x 2 M x 0.45 M
1.50
0.96
3.00
4.50
1.50
0.96
12 Cor Ring Balk Tinggi 0.15 M 24.00 M¹ Volume x Analisa Ring Balk
Lebar 0.15 M Kayu bekisting M3
Panjang 24 M Paku biasa 2 " - 5 " Kg
Rumus Panjang Besi beton polos kg
Kawat beton Kg
Semen portland Kg
Pasir beton M3
Koral beton M3
Pekerja Oh
Tukang batu Oh
Tukang kayu Oh
Tukang besi Oh
Kepala tukang Oh
Mandor Oh
13 Cor Plat Dak Tebal 0.10 M 2.18 M³ Volume x Analisa Beton Bertulang
Lebar 3.40 M Semen Portland Kg
Panjang 6.40 M Pasir beton M3
Rumus P x L x T Koral beton M3
6.40 M x 3.40 M x 0.10 M Pekerja Oh
Tukang batu Oh
Kepala tukang Oh
Mandor Oh
14 Pembesian Ø 10 Pajang 6.40 M 351.859 Kg Volume x Analisa Pembesian
Lebar 3.40 M Besi beton ( polos / ulir ) Kg
Rumus ((P / 0.10) x L) + Kawat beton Kg
((L / 0.10) x P) Pekerja Oh
x Tabel Besi 10 Tukang besi Oh
((6.40 M / 0.10) x 3.40 M)+ Kepala tukang Oh
((3.40/0.10)x6.40)x0.617 Mandor Oh
15 Bekisting Tebal 0.12 M 8.64 M² Volume x Analisa Bekisting Sloof
Lebar 0.12 M Kayu bekisting M3
Panjang 3 M Paku biasa 2 " - 5 " Kg
Rumus T x P x 4 Minyak bekisting Lt
x Jumlah Kolom Pekerja Oh
0.12 M x 3 M x 4 x 6 Bh Tukang kayu Oh
Kepala tukang Oh
Mandor Oh
16 Bongkar Bekisting Tebal 0.12 M 8.64 M²
Lebar 0.12 M
Panjang 3 M
Rumus T x P x 4
x Jumlah Kolom
0.12 M x 3 M x 4 x 6 Bh
VIII
PEKERJAAN RANGKA KAP DAN ATAP
1 Pasang Atap volume x analisa pasang atap
Panjang 6 M 18 M² Pekerja OH
Lebar 3 M Tukang OH
Rumus P x L Kepala Tukang OH
6x3 Mandor OH
Atap Seng gelombang Atap Seng BJLS 20 Lb
Paku seng Kg
JUMLAH TOTAL
DIBULATKAN
Harga
Dan Tukang Estimasi Biaya
Satuan
Pengukuran 761,850.00
0.216 1,800,000.00 388,800.00
0.360 20,000.00 7,200.00
0.126 1,500,000.00 189,000.00
1.800 50,000.00 90,000.00
1.800 40,000.00 72,000.00
0.180 55,000.00 9,900.00
0.090 55,000.00 4,950.00
157,248.00
Galian Tanah
3.456 40,000.00 138,240.00
0.346 55,000.00 19,008.00
Pembesian 842,649.24
62.19 12,675.00 788,303.88
0.89 15,500.00 13,771.44
0.41 40,000.00 16,584.96
0.41 50,000.00 20,731.20
0.04 55,000.00 2,280.43
0.02 55,000.00 977.33
ekisting Sloof 818,676.00
0.32 1,800,000.00 583,200.00
2.16 20,000.00 43,200.00
0.72 - -
2.16 40,000.00 86,400.00
1.87 50,000.00 93,600.00
0.19 55,000.00 10,296.00
0.04 55,000.00 1,980.00
-
Pembesian 1,614,398.13
46.65 12,675.00 591,227.91
0.67 15,500.00 10,328.58
0.31 40,000.00 12,438.72
0.31 50,000.00 15,548.40
0.03 55,000.00 1,710.32
0.01 55,000.00 733.00
ekisting Sloof 982,411.20
0.39 1,800,000.00 699,840.00
2.59 20,000.00 51,840.00
0.86 - -
2.59 40,000.00 103,680.00
2.25 50,000.00 112,320.00
0.22 55,000.00 12,355.20
0.04 55,000.00 2,376.00
-
2,095,560.00
ekerjaan lantai
4.500 40,000.00 180,000.00
2.700 50,000.00 135,000.00
0.270 55,000.00 14,850.00
0.234 55,000.00 12,870.00
18.000 52,000.00 936,000.00
0.396 120,000.00 47,520.00
176.400 1,300.00 229,320.00
27.000 20,000.00 540,000.00
7,192,530.00
an Kusen Jendela &
733,005.00
pasang atap
2.16 40,000.00 86,400.00
1.08 50,000.00 54,000.00
0.108 55,000.00 5,940.00
0.108 55,000.00 5,940.00
13.5 41,000.00 553,500.00
0.99 27,500.00 27,225.00
- 45,487,375.89
-
REKAPITULASI RENCANA ANGGARAN BIAYA
75%
50%
3.25
2.16
5.37
4.74
4.60 25%
0.44
0.14
5.50 5.50
3.11 3.11
0.76 0.76 0%
10.70 7.66 13.35 3.87 3.87
71.25 78.90 92.25 96.13 100.00
RENCANA ANGGARAN BIAYA
RKB ( KONSULTAN )
A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasih Panjang 26 M 275.60 M² -
Lebar 10.60 M
Rumus P x L
26 M x 10.60 M
Rumus P + L x 2
26 M + 10.60 M x 2
B PEKERJAAN TANAH
1 Galian Tanah Pondasi Tinggi 90 Cm 73.53 M³ -
Lebar 95 Cm
Panjang 86 M
Rumus P x L x T
45
0,65 Cm x 0.95 Cm
x 86 M
95
0,30 Cm x 0.40 Cm
x 73.2 M
95
Lebar 9 M
Tinggi 30 Cm
Rumus P x L x T
24 M x 9 M x 0.30 Cm
C PEKERJAAN PONDASI
1 Pekerjaan Melancipkan Dan Panjang Ulin 4 M 87.00 Ttk Err:509
Pentiang Pancang Jarak Pancang 1 m
Panjang 86 M
D PEKERJAAN PASANGAN
1 Pasangan Dinding Batu Bata Panjang 76 M 5.70 M³ Err:509
Trasram Lebar 0,15 Cm
Tinggi 0,50 Cm
Rumus P x L x T
76 M x 0,15 Cm x 0,5 Cm
E PEKERJAAN BETON
1 a. Cor Sloof Tinggi 20 Cm 2.58 M³ -
Lebar 15 Cm
Panjang 86 M
Rumus P x L x T
0,20 Cm x 0.15Cm
x 86 M
Panjang 2,2 M
Tinggi 2,5 M
kayu Lembasung 5/10
2 Daun Pintu Panel
Panjang 2,1 M 6.00 Bh Err:509
Tinggi 80 Cm
kayu Lembasung 5/10
2 Gording
Panjang 9 M 4.15 M³ #REF!
Lebar 26 Cm
Balok Kayu 8/12
9 x 0,08 x 0,12 x 48
5 Pasang Atap
Panjang 32 M 512 M² #REF!
Lebar 16 M
Rumus P x L
32 x 16
6 Bubungan Atap
Panjang 26 26.00 M¹ #REF!
I PEKERJAAN PLAFOND
1 Rangka Plafond + Plafond Panjang 26 M 275.6 M² #REF!
Lebar 10,60 M
Rumus P + L
26 x 10,60
J PEKERJAAN PENGGATUNGAN
PENUTUP DAN PENGUNCI
1 Kunci Tanam 2 x Putar 3.00 Bh Err:509
2 Engsel Pintu 9.00 Bh Err:509
3 Ikatan Angin - Angin 66.00 Bh Err:509
4 Hak angin 66.00 Bh Err:509
5 Grendel Pintu 66.00 Bh Err:509
6 Grendel Jendela 66.00 Bh Err:509
K PEKERJAAN PENGECATAN
1 Penegecatan Diding Panjang 76 M 551.00 M² #REF!
Tinggi 4 M
Rumus PxT
76 M x 4 M
- Pintu Dan Jendela
2 Plamir Dinding
Panjang 76 M 551.00 M² #REF!
Tinggi 4 M
Rumus PxT
76 M x 4 M
- Pintu Dan Jendela
3 Pengecatan Plafond
Panjang 26 M 275.60 M² #REF!
Lebar 10,60 M
Rumus P + L
26 x 10,60
4 Pengecatan Lisplank
Panjang 26 M 120.40 M¹ #REF!
Lebar 10,60 M
K PEKERJAAN LISTRIK
TOTAL HARGA
Lembar 1
Jumlah Harga
Err:509
Err:509
Lembar 2
Err:509
Err:509
Err:509
Err:509
-
Lembar 3
-
Err:509
-
Err:509
Err:509
Err:509
Lembar 4
-
Err:509
Err:509
-
-
Err:509
Err:509
Lembar 5
-
-
-
Err:509
Err:509
Err:509
-
Lembar 6
Err:509
Err:509
Err:509
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Lembar 7
#REF!
#REF!
#REF!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
#REF!
#REF!
#REF!
#REF!
Lembar 8
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
REKAPITULASI
RENCANA ANGGARAN BIAYA
RKB ( KONSULTAN )
1 2 3
# Terbilang : Tujuh Ratus Tujuh Puluh Satu Juta Empat Ratus Empat Puluh Enam Ribu Rupiah #