volume beton
plat 0.9 0.7 0.25
0.63 0.09 0.36
foot 0.3 0.3 1.27
2.324 0.3078
volume beton
plat 0.8 0.8 0.25
foot 0.3 0.2 1.1
1.9 0.226
bj besi
panjang besi 11.111111 1.57824 8
panjang besi 11.111111 1.57824 0
ring tumpuan 1.06 0.88776 56.0555555556
ring lapangan 1.06 0.88776 27.7777777778
bj besi
panjang besi 22.2222 1.57824 6
ring tumpuan 0.76 0.88776 56.055555556
ring lapangan 0.76 0.88776 74.074074074
begisting 1.2 10
balok kantileper, BK 15x20
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.15 0.2
tebal selimut 0.02 m
bj besi
panjang besi 69.4444 0.88776 4
ring tumpuan 0.42 0.39456 347.72222222
ring lapangan 0.42 0.39456 173.61111111
begisting
1.2 8.7333333
BALOK 20 X 30
0.03
16.6667 9 0.6165 1
16.6667 3 0.6165 1
P1) Membuat 1 M
ULISAN MERAH )
ukuran PLAT
kolom
Ketinggian besi di bawah sloop
tebal selimut
over stage
jarak sengkang plat
jarak sengkang kolom
diameter besi Ø PLAT
diameter besi Ø FOOT
diameter besi Ø FOOT
diameter besi Ø RING
Lantai kerja
banyaknya tulangan kolo
banyaknya tulangan kolo
volume beton
0.1575 plat
0.1 0.036
0.1143 foot
0.3078
216.24 berat besi utk analiasa Tulangan dlm 1 m3
begisting
0.8 plat
1.524 foot
2.324
ULISAN MERAH )
0.16
0.066
0.226
322.86 berat besi utk analiasa
0.8
1.1
1.9
ULISAN MERAH )
dimensi
tebal selimut
diameter besi Ø
diameter besi Ø
diameter besi Ø
banyaknya tulangan kolom Ø 12
banyaknya tulangan kolom Ø 0
berat besi
0 berat besi Ø 4
140.29 berat besi Ø 0
105.5 ring
89.355
59.184
29.592
178.13 kg
13.333 m2 begisting
dimensi
tebal selimut
diameter besi Ø
banyaknya tulangan kolom Ø 12
banyaknya tulangan kolom Ø 0
berat besi
140.288 berat besi Ø 8
0
52.74971 berat besi Ø 0
26.1396 ring tumpuan
230.1362 ring lapangan
13.33333
begisting
ULISAN MERAH )
dimensi
146.242 tebal selimut
jarak sengkang
diameter besi
diameter besi
banyaknya tulangan kolom Ø
banyaknya tulangan kolom Ø
berat besi
210.43 panjang besi
37.821
49.978 0.54 ring
313.14 kg
13.333 m2 begisting
ULISAN MERAH )
dimensi
tebal selimut
12 m2 begisting
Pek. Ring Balk RB1 15/30
ULISAN MERAH )
dimensi
tebal selimut
jarak sengkang
diameter besi Ø
diameter besi Ø
diameter besi Ø
banyaknya tulangan kolom Ø 12
banyaknya tulangan kolom Ø
berat besi
177.55 panjang besi
0
84.425 ring
275.08 kg
18.333 m2 begisting
ULISAN MERAH )
berat besi
246.6
57.623 695.444
28.77
349.64 kg
16.667 m2
PEMBES
ULISAN MERAH )
tebal plat
panjang besi dlm 1 mtr
42 jarak sengkang
diameter besi Ø
diameter besi Ø
5979.56 498.2964 tebal selimut
bj besi
0.6165 73.295 banyaknya sengkang melintang
0.6165 69.075 8.28333 banyaknya sengkang memanjang
142.37 kg 16.5667 0.14
16.7066666667
10.631 m2 446.499 16.8066666667 begisting
2.14
jarak sengkang
diameter besi Ø
diameter besi Ø
tebal selimut
bj besi
0.88776 65.102 banyaknya sengkang melintang
0.88776 59.776 banyaknya sengkang memanjang
0 kg
12.24 m2 begisting
379.94
6.66667 379.94
283.385
1889.23 Membuat 1 M3 Plat dinding teras T = 15 Cm
ULISAN MERAH )
tebal plat
panjang besi dlm 1 mtr
jarak sengkang
diameter besi Ø
diameter besi Ø
tebal selimut
bj besi
0.88776 105.54 banyaknya sengkang melintang
0.88776 99.469 banyaknya sengkang memanjang
x kg
10.631 m2 begisting
ULISAN MERAH )
bj besi
0.6165 1.4796
0.6165 18.838
21.333 kg
10.48 m2
3.3291
2.88522
6.21432 KG/M2
207.144 KG/M2
92.475
30.825
123.3
Membuat 1 M3 Pondasi Plat 0,6 x 0,6 (P2)
( ISI DATA YG BERTANDA TULISAN MERAH )
P L T
0.6 x 0.6 0.15
0.2 x 0.2
besi di bawah sloop 1.3
0.03 m
0.48 m
0.15 m 45
0.1 m 22.5
12 mm
mm
12 mm
8 mm
0.05 m
12 6 bh
12 5 bh
Keliling Tinggi
2.4 0.15 0.36
0.8 1.1 0.88
1.24
232.22 kg
25 0 0 0 panjang besi
0.700 0.39456 125 34.524 Over stek
0.700 0.39456 251 69.324
281.4 ring tumpuan
ring lapangan
295.47 kg begisting
0.5 25 12.5 m2
0.2 m
16 mm
12 mm
16 6 bh
begisting
0.15 mtr
10 mm
0 mm
0.025 mtr
pangang besi bj besi
sengkang melintang 66.66667 2.1 1 0.6165 86.31
sengkang memanjang 6.666667 20.1 1 0.6165 82.611
0 168.921
M3 Plat list plank T = 7 Cm satu layer Membuat 1 M3 Plat di atas lubang ang
( ISI DATA YG BERTANDA TULISAN MERAH )
0.07 mtr 1 tebal plat
14.28571 mtr panjang besi dlm 1 mtr
0.15 mtr
10 mm
0 mm
0.025 m
pangang besi bj besi
sengkang melintang 44.4444 2.2 1 0.6165 60.28
sengkang memanjang 6.66667 13.53333333 1 0.6165 55.622
115.902
foot
diameter besi Ø FOOT 0 14.88
diameter besi Ø FOO 16 20
volume beton
plat 0.63 0.2
0.86 25 21.5 m2
0.1 m
0.2 m
13 mm
mm
8 mm
13 5 bh
0 2 bh
12 4
bj besi berat besi
bj besi
panjang besi 33.3333333333 0.8878 4
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.12 0.15
0.03 m
0.1 m
0.2 m
0 mm
10 mm
8 mm
0 0 bh
10 4 bh
foot
0 0 diameter be 0 0
1.57824 31.565 diameter be 12 34.24
volume beton
0.126 plat 1.43 0.8 0.25
49.3217536
176.07424128
13.3333333333
55.2384
52.87104
108.10944
12.24
si footplat Tangga Membuat 1 M3 Po
ERTANDA TULISAN MERAH )
ukuran PLAT
kolom
Ketinggian besi di bawah sloop
tebal selimut
over stage
45 jarak sengkang plat
22.5 jarak sengkang kolom
diameter besi Ø PLAT
diameter besi Ø FOOT
diameter besi Ø FOOT
diameter besi Ø RING
Lantai kerja
banyaknya tulangan kolom 0
7.66667 banyaknya tulangan kolom 12
volume beton
0.286 plat
0.2064 foot
0.4924
143.13684 berat besi utk analiasa Tulangan dlm 1 m3
begisting
1.115 plat
2.408 foot
3.523
0 0 0
17.28 0.88776 15.3404928
Keliling Tinggi
2.88 0.27 0.7776
1.92 0.86 1.6512
2.4288
foot
diameter besi Ø FOOT 0 0
diameter besi Ø FOOT 12 14.58
volume beton
plat 0.7 0.7 0.2
berat besi
0 panjang besi 16.6666666667
118.368 16.6666666667
foot
0 0 diameter be 0 0
0.88776 12.9435408 diameter bes 13 0
volume beton
0.098 plat 2.8
0.054 foot 0
0.152
226.9628526316 berat besi utk anali Tulangan dlm 1 m3 264.7360326
begisting Keliling
0.56 plat 11.2
1.08 foot 0
1.64
m
m
m
m
mm
mm
mm
mm
m
bh
bh
0 0
1.041885 0
11 0 0
264.73603
0 0.95 0
3.92
3.92 70.911437
Tinggi
0.5 5.6
0.95 0
5.6
3.92 1.4285714
buat 1 M3 Kolom K4,a 15/40 Membuat 1 M3 Kolom K5,a 15/30
L T P
( ISI DATA YG BERTANDA TULISAN MERAH )
0.4 dimensi 0.15
m tebal selimut 0.03
22.2222 13.333333333
M3 Ring Balk RB1 15/20
L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.2
0.88776 4 118.368
33.3333 13.333333333 m2
DAFTAR
PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( HARGA
RKB ) DANUPAH
RUANG KANTOR MI CIMERAK KELURAHAN
SUKAASIH
KOTA TASIKMALAYA
TAHUN ANGGARAN 2016
Tasikmalaya, 2016
Dibuat;
CV. ARCHIDO MEDIA KARYA
BUDI NURCAnNIHYADI, ST
DireNIZAR FARID R, ST.
NIP.198590801 201001 1 012
ktur
47 of 81
DAFTAR
PEMBANGUNAN 1 PAKET RUANG KELAS BARU (HARGA BAHAN
RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN
SUKAASIH
KOTA TASIKMALAYA
TAHUN ANGGARAN 2016
F. BAHAN KACA
1 Kaca Polos 3 mm m2 52,750.00
49 of 81
No JENIS BAHAN BANGUNAN SATUAN HARGA
(Rp)
I. BAHAN MEKANIKAL & ELEKTRIKAL ( ME )
1 Pemasangan Instalasi Titik Cahaya dihitung 110,000.00
2 Pemasangan Instalasi Titik Stop Kontak dihitung 120,000.00
3 Lampu SL 18 Watt bh 40,000.00
4 Lampu TL 1 x 36 Watt bh 100,000.00
5 Saklar Ganda Broco bh 15,000.00
6 Saklar tunggal Broco bh 14,000.00
7 Stop kontak Broco bh 15,000.00
50 of 81
51 of 81
ANALISA HARGA SATUAN PEKERJAAN
PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
KOTA TASIKMALAYA
TAHUN ANGGARAN 2016
Keuntungan 10 % 0.1500
HARGA HARGA HARGA SATUAN
KODE JENIS PEKERJAAN KOEFISIEN SATUAN UPAH BAHAN PEKERJAAN
( Rp ) ( Rp ) ( Rp ) ( Rp )
a b c d e f=(cxe) g=(cxe) h
D PEKERJAAN DINDING
D-01 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 1 Ps
Bata merah ( 5x11x22 ) cm 140.0000 Bh 750.00 105,000.00
Semen Portland 64.0300 Kg 1,340.00 85,800.20
Pasir pasang 0.0590 m3 120,000.00 7,080.00
Pekerja 0.6500 HOK 60,000.00 39,000.00
Tukang batu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 59,500.00 197,880.20
Total Harga z
Keuntungan #VALUE!
Jumlah Total
Analisa
57 of 81
a b c d e f=(cxe) g=(cxe) h
F-02.a MEMBUAT DAN MEMASANG 1 m3 KUSEN PINTU DAN JENDELA KAYU KELAS II
Kayu Kelas II, balok 1.2000 m3 2,750,000.00 3,300,000.00
Paku 10 cm 1.2500 kg 15,000.00 18,750.00
Lem kayu 1.0000 kg 12,700.00 12,700.00
Pekerja 6.0000 HOK 60,000.00 360,000.00
Tukang kayu 18.0000 HOK 80,000.00 1,440,000.00
Kepala tukang 1.8000 HOK 90,000.00 162,000.00
Mandor 0.3000 HOK 90,000.00 27,000.00
Total 1,989,000.00 3,331,450.00
Total Harga 5,320,450.00
Keuntungan 798,067.50
Jumlah Total 6,118,500.00
F-07.a MEMBUAT DAN MEMASANG 1 m2 PINTU PANEL KAYU GUNUNG KELAS II
Kayu Klas II, papan 0.0400 m3 3,000,000.00 120,000.00
Lem kayu 0.5000 kg 12,700.00 6,350.00
Pekerja 1.0000 HOK 60,000.00 60,000.00
Tukang kayu 3.0000 HOK 80,000.00 240,000.00
Kepala tukang 0.3000 HOK 90,000.00 27,000.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total 331,500.00 126,350.00
Total Harga 457,850.00
Keuntungan 68,677.50
Jumlah Total 526,500.00
F-39.a 1 m2 PASANG LANGIT - LANGIT GRC T=4 mm + RANGKA HOLLOW GALVANIS 40x40,20x40 mm
Hollow Galvanis 40 x 40 3.7000 m' #VALUE! #VALUE!
Hollow Galvanis 20 x 40 2.2000 m' #VALUE! #VALUE!
Skrup/Suspension clip 8.0000 bh Z #VALUE!
Skrup/Suspension road 8.0000 bh Z #VALUE!
GRC ( 120 x 240 x 0.9 ) cm 0.3646 m2 60,000.00 21,876.00
Cotton plaster 0.0720 roll 10,400.00 748.80
Compound 0.1250 kg 4,620.00 577.50
Paku skrup khusus hollow 60.0000 bh 155.00 9,300.00
Pekerja 0.1130 HOK 60,000.00 6,780.00
Tukang kayu 0.1430 HOK 80,000.00 11,440.00
Kepala tukang 0.0500 HOK 90,000.00 4,500.00
Mandor 0.0240 HOK 90,000.00 2,160.00
Total 24,880.00 #VALUE!
Total harga #VALUE!
Keuntungan #VALUE!
Jumlah total #VALUE!
F-39.b 1 m2 PASANG LANGIT - LANGIT GYPSUM 9 mm + RANGKA HOLLOW GALVANIS 40x40,20x40 mm
Hollow Galvanis 40 x 40 3.7000 m' #VALUE! #VALUE!
Hollow Galvanis 20 x 40 2.2000 m' #VALUE! #VALUE!
Skrup/Suspension clip 8.0000 bh Z #VALUE!
Skrup/Suspension road 8.0000 bh Z #VALUE!
Gypsum ( 120 x 240 x 0.9) cm 0.3646 m2 Z #VALUE!
Cotton plaster 0.0720 roll 10,400.00 748.80
Compound 0.1250 kg 4,620.00 577.50
Paku skrup khusus hollow 60.0000 bh 155.00 9,300.00
Pekerja 0.1130 HOK 60,000.00 6,780.00
Tukang kayu 0.1430 HOK 80,000.00 11,440.00
Kepala tukang 0.0500 HOK 90,000.00 4,500.00
Mandor 0.0240 HOK 90,000.00 2,160.00
Total 24,880.00 #VALUE!
Total harga #VALUE!
Keuntungan #VALUE!
Jumlah total #VALUE!
F-39.c 1 m2 PASANG LANGIT - LANGIT GRC 5 mm TANPA RANGKA
GRC ( 120 x 240 x 0.4 ) cm 0.3646 lbr 60,000.00 21,876.00
Cotton plaster 0.0720 roll 10,400.00 748.80
Compound 0.1250 kg 4,620.00 577.50
Paku skrup khusus hollow 10.0000 bh 155.00 1,550.00
Pekerja 0.1500 HOK 60,000.00 9,000.00
Tukang kayu 0.2500 HOK 80,000.00 20,000.00
Kepala tukang 0.0250 HOK 90,000.00 2,250.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 38,000.00 24,752.30
Total harga 62,752.30
Keuntungan 9,412.85
Jumlah total 72,100.00
Analisa
59 of 81
a b c d e f=(cxe) g=(cxe) h
F-53.b 1 m' LIST LANGIT-LANGIT GYPSUM
List Gypsum 1.1000 m' 15,000.00 16,500.00
Paku 0.0100 Kg 15,000.00 150.00
Pekerja 0.0500 HOK 60,000.00 3,000.00
Tukang kayu 0.0500 HOK 80,000.00 4,000.00
Kepala tukang 0.0050 HOK 90,000.00 450.00
Mandor 0.0030 HOK 90,000.00 270.00
Total 7,720.00 16,650.00
Total Harga 24,370.00
Keuntungan 3,655.50
Jumlah Total 28,000.00
Analisa
61 of 81
a b c d e f=(cxe) g=(cxe) h
Analisa
62 of 81
a b c d e f=(cxe) g=(cxe) h
G-A Membuat 1 M3 Pondasi Foot Plat 1,00 x 0,8 (P1)
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 7.5504 M2 98,833.88 746,231.08
Besi beton polos & uril 216.2409 KG 12,400.00 2,681,387.51
4,341,518.59 4,341,518.59
G-B Membuat 1 M3 Pondasi Plat 0,6 x 0,6 (P2)
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 12.6531 M2 98,833.88 1,250,551.07
Besi beton polos 207.9895 KG 12,400.00 2,579,069.62
4,743,520.69 4,743,520.69
Analisa
63 of 81
a b c d e f=(cxe) g=(cxe) h
G-B.a Membuat 1 M3 Pondasi Plat 0,7 x 0,7 (P3)
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 739,400.00 739,400.00
Bekisting 2XPAKAI 10.7895 M2 98,833.88 1,066,365.49
Besi beton polos 226.9629 KG 12,400.00 2,814,339.37
4,620,104.87 4,620,104.87
G-B.b Membuat 1 M3 Pondasi Foot Plat Tangga
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 10.9028 M2 98,833.88 1,077,568.21
Besi beton polos 185.3494 KG 12,400.00 2,298,332.55
4,289,800.76 4,289,800.76
G-B.c Membuat 1 M3 Pondasi Foot Plat F4 1,20 x 1,20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 8.8017 M2 98,833.88 869,910.36
Besi beton polos 408.8138 KG 12,400.00 5,069,291.15
6,853,101.51 z
G-C Membuat 1 M3 Pondasi Foot Plat 0,8 x 0,7 (P3)
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 8.8017 M2 98,833.88 869,910.36
Besi beton polos 408.8138 KG 12,400.00 5,069,291.15
6,853,101.51 z
G-D Membuat 1 M3 Pondasi footplat Tangga
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 7.1548 M2 98,833.88 707,131.89
Besi beton polos 143.1368 KG 12,400.00 1,774,896.82
3,395,928.71 z
1,934,393.07 z
G-F Membuat 1 M3 Sloof Beton 15/20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 13.3333 M2 97,600.00 1,301,333.33
Besi beton polos 300.3768 KG 12,400.00 3,724,671.73
5,939,905.06 5,939,905.06
G-O Membuat 1 M3 Kolom K2 20/20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 21.5000 M2 125,000.00 2,687,500.00
Besi beton polos 194.3425 KG 12,400.00 2,409,847.01
6,011,247.01 6,011,247.01
G-R Membuat 1 M3 Portal beton K3 15/30
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 13.3333 M2 125,000.00 1,666,666.67
Besi beton polos 171.0896 KG 12,400.00 2,121,510.91
4,702,077.58 4,702,077.58
G-L Membuat 1 M3 Kolom 15/15
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 26.6667 M2 125,000.00 3,333,333.33
Besi beton polos 232.2250 KG 12,400.00 2,879,589.94
7,126,823.28 7,126,823.28
G-N.4 Membuat 1 M3 Balok, 15/20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 739,400.00 739,400.00
Bekisting 2XPAKAI 17.7778 M2 129,300.00 2,298,666.67
Besi beton polos 172.2964 KG 12,400.00 2,136,475.30
5,174,541.97 5,174,541.97
G-Z.a Membuat 1 M3 Ring Balk RB1 15/20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 13.3333 M2 129,300.00 1,724,000.00
Besi beton polos 173.7169 KG 12,400.00 2,154,089.27
Analisa
64 of 81
a b c d e f=(cxe) g=(cxe) h
4,791,989.27 4,791,989.27
G-Z.b Membuat 1 M3 Ring Balok, RB2 15/25
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 13.3333 M2 129,300.00 1,724,000.00
Besi beton polos 167.6069 KG 12,400.00 2,078,325.51
4,716,225.51 4,716,225.51
G-Z.c Membuat 1 M3 Ring Balok 12/15
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 739,400.00 739,400.00
Bekisting 2XPAKAI 16.6667 M2 129,300.00 2,155,000.00
Besi beton polos 212.9809 KG 12,400.00 2,640,962.63
5,535,362.63 5,535,362.63
G-Z.d Membuat 1 M3 Plat lantai T =12 Cm
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2 X Pakai 10.6309 M2 142,400.00 1,513,844.91
Besi beton polos 142.3704 KG 12,400.00 1,765,392.96
4,193,137.87 4,193,137.87
Membuat 1 M3 Plat Lantai T=12 Cm
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bondex 8.7500 M2 117,000.00 1,023,750.00
Wermesh 10 8.7500 M2 88,844.80 777,391.98
Steger 8.3333 m2 290,700.00 2,422,500.00
Pengelasan 41.0000 ttk 2,100.00 86,100.00
4,309,741.98 4,309,741.98
Analisa
65 of 81
a b c d e f=(cxe) g=(cxe) h
G-Z.f Membuat 1 M3 lisplank beton T =7 Cm
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2 X Pakai 16.4453 M2 142,400.00 2,341,812.75
Besi beton polos 163.7345 KG 12,400.00 2,030,307.91
5,286,020.66 5,286,020.66
G-Z.g Membuat 1 M3 Anak tangga
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 10.4800 M2 142,400.00 1,492,352.00
Besi beton polos 21.3330 KG 12,400.00 264,528.64
2,670,780.64 2,670,780.64
H-01 1 m2 PASANG ATAP GENTENG PALENTONG KECIL
Genteng palentong 25.0000 Bh 1,750.00 43,750.00
Pekerja 0.1500 HOK 60,000.00 9,000.00
Tukang kayu 0.0750 HOK 80,000.00 6,000.00
Kepala tukang 0.0080 HOK 90,000.00 720.00
Mandor 0.0080 HOK 90,000.00 720.00
Total 16,440.00 43,750.00
Total Harga 60,190.00
Keuntungan 9,028.50
Jumlah Total 69,200.00
Analisa
66 of 81
a b c d e f=(cxe) g=(cxe) h
Analisa
67 of 81
a b c d e f=(cxe) g=(cxe) h
M-62 1 m2 PASANG DINDING PORSELIN 10X20 cm, WARNA
Keramik 10x20 cm warna 50.0000 bh #VALUE! #VALUE!
Semen Abu-abu 9.3000 Kg 1,340.00 12,462.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.5000 Kg 9,500.00 14,250.00
Pekerja 0.6000 HOK 60,000.00 36,000.00
Tukang batu 0.4500 HOK 80,000.00 36,000.00
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 78,750.00 #VALUE!
Total Harga #VALUE!
Keuntungan #VALUE!
Jumlah Total -
Analisa
70 of 81
a b c d e f=(cxe) g=(cxe) h
N-09 1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 3 Lapis Cat Penutup)
Cat meni 0.2000 Kg 17,600.00 3,520.00
Plamir 0.1500 Kg 15,400.00 2,310.00
Cat dasar 0.1700 Kg 45,000.00 7,650.00
Cat Penutup ( 3 kali ) 0.3500 Kg 45,000.00 15,750.00
Pekerja 0.0700 HOK 60,000.00 4,200.00
Tukang cat 0.1050 HOK 80,000.00 8,400.00
Kepala tukang 0.0040 HOK 90,000.00 360.00
Mandor 0.0025 HOK 90,000.00 225.00
Total 13,185.00 29,230.00
Total Harga 42,415.00
Keuntungan 6,362.25
Jumlah Total 48,777.25
Dibulatkan 48,700.00
N-14.a 1 m2 PENGECATAN BIDANG TEMBOK BARU INTERIOR (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Plamir 0.1000 Kg 15,400.00 1,540.00
Cat dasar setara sanlex 0.1000 Kg 19,500.00 1,950.00
Cat Penutup ( 2 kali ) setara sanlex 0.2600 Kg 19,500.00 5,070.00
Amplas 0.5000 lbr 1,500.00 750.00
Rool Cat 0.0100 bh 13,200.00 132.00
Pekerja 0.0200 HOK 60,000.00 1,200.00
Tukang cat 0.0630 HOK 80,000.00 5,040.00
Kepala tukang 0.0063 HOK 90,000.00 567.00
Mandor 0.0025 HOK 90,000.00 225.00
Total 7,032.00 9,442.00
Total Harga 16,474.00
Keuntungan 2,471.10
Jumlah Total 18,900.00
N-14.d 1 m2 PENGECATAN PLAFOND BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Plamir 0.1000 Kg 15,400.00 1,540.00
Cat dasar setara sanlex 0.1000 Kg 19,500.00 1,950.00
Cat Penutup ( 2 kali ) setara sanlex 0.2600 Kg 19,500.00 5,070.00
Amplas 0.5000 lbr 1,500.00 750.00
Rool Cat 0.0100 bh 13,200.00 132.00
Pekerja 0.0200 HOK 60,000.00 1,200.00
Tukang cat 0.0700 HOK 80,000.00 5,600.00
Kepala tukang 0.0063 HOK 90,000.00 567.00
Mandor 0.0025 HOK 90,000.00 225.00
Total 7,592.00 9,442.00
Total Harga 17,034.00
Keuntungan 2,555.10
Jumlah Total 19,600.00
Analisa
Page 71
PEKERJAAN : PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
LOKASI : KOTA TASIKMALAYA
JUMLAH
NO. URAIAN HARGA
Rp.
1 2 3
PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
B. PEKERJAAN LANTAI I
C. PEKERJAAN LANTAI II
TERBILANG :
SERATUS LIMA PULUH TIGA JUTA SERATUS ENAM BELAS RIBU RUPIAH
BUDI NURCAHYADI, ST
TONI ANTONI,ST Direktur
NIP.19690709 200312 1 006
Mengetahui ;
Kepala Dinas Cipta Karya
Tata Ruang dan Kebersihan
Kota Tasikmalaya
Page 72
Mengetahui ;
Kepala Dinas Cipta Karya
Tata Ruang dan Kebersihan Menyetujui ;
Pejabat Pembuat Komitmen
Kota Tasikmalaya (PPK)
PEKERJAAN : PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
LOKASI : KOTA TASIKMALAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN KD ANL VOLUME SAT. SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6 7
A. PEK. PERSIAPAN
1 Pek. pengukuran /Uitzet dan pasangan bouwplank - 1.00 ls 500,000.00 500,000.00
2 Papan nama kegiatan - 1.00 ls 250,000.00 250,000.00
3 Pengadaan air kerja - 1.00 ls 350,000.00 350,000.00
4 Sewa/Pengadaan Los kerja /Gudang - 1.00 ls 1,000,000.00 1,000,000.00
Jumlah 2,100,000.00
B. PEKERJAAN LANTAI I
B.I. PEK. TANAH DAN URUGAN
1 Pek. galian tanah pondasi setempat B-02 11.20 m3 41,700.00 467,040.00
2 Pek. Urugan pasir bawah pondasi B-11 0.37 m3 141,100.00 52,207.00
3 Pek. urugan kembali bekas galian B-09 8.07 m3 15,200.00 122,664.00
4 Pek. Urugan sirtu + pemadatan B-15 9.80 m3 138,000.00 1,352,400.00
Jumlah 1,994,311.00
1 2 3 4 5 6 7
C. PEKERJAAN LANTAI II
1 2 3 4 5 6 7
D. PEK. TANGGA
1 Pek. galian tanah pondasi setempat B-02 1.30 m3 41,700.00 54,210.00
2 Pek. Urugan pasir bawah pondasi B-11 0.05 m3 141,100.00 7,055.00
3 Pek. Lantai Kerja beton tumbuk camp 1 : 3 : 5 G-01 0.05 m3 739,400.00 36,970.00
4 Pek. Pondasi foot plat camp 1 : 2 : 3 G-B.b 1.14 m3 4,289,800.76 4,890,372.86
5 Pek. Pondasi setempat, P2 G-B 0.11 m3 4,743,520.69 521,787.28
6 Pek. kolom beton, K2 20/20 G-O 0.10 m3 6,011,247.01 601,124.70
7 Pek. Plat tangga dan plat bordes beton, camp 1 : 2 : 3 G-Z.d 1.07 m3 4,193,137.87 4,486,657.52
8 Pek. Anak tangga beton, camp 1 : 2 : 3 G-Z.g 0.46 m3 2,670,780.64 1,228,559.10
9 Pek. Balok B2 15/30 G-Z.a 0.30 m3 5,174,541.97 1,552,362.59
10 Pas. dinding 1/2 bata, camp. 1:5 D-012 10.85 m2 113,900.00 1,235,815.00
11 Pas. plesteran 1 : 5 + Acian E-05 21.70 m2 44,100.00 956,970.00
12 Pas. plesteran beton 1 : 3 + acian E-30 4.46 m2 47,300.00 210,958.00
13 Pas. plafond dari GRC 4 mm tanpa rangka F-39.c 8.88 m2 72,100.00 640,248.00
14 Pas. keramik lantai, 30 x 30 cm (anti sleep) M-82.e 5.04 m2 181,227.58 913,387.00
15 Pek. cat dinding baru setara sanlex N-14.a 15.30 m2 18,900.00 289,170.00
16 Pek. cat plafond setara sanlex N-14.d 8.88 m2 19,600.00 174,048.00
17,799,695.05
E. PEKERJAAN LAIN-LAIN
1 Pek. pembersihan lokasi bekas pekerjaan/Bongkaran 1.00 ls 250,000.00 250,000.00
Jumlah 250,000.00
REKAPITULASI ANGGARAN BIAYA ESTIMITE ENGGENEER ( EE )
Pembangunan Sarana Prasarana Belajar Yayasan Keluarga Sejahtera Bandung (TK Sejahtera 4) Perum Tamansari Indah Jl. Ermawar Blok B Kelurahan
PEKERJAAN : Karsamenak Kecamatan Kawalu
LOKASI : KOTA TASIKMALAYA
JUMLAH
NO. URAIAN HARGA
Rp.
1 2 3
Pembangunan Sarana Prasarana Belajar Yayasan Keluarga Sejahtera Bandung (TK Sejahtera 4) Perum Tamansari Indah Jl. Ermawar Blok B
Kelurahan Karsamenak Kecamatan Kawalu
B. PEKERJAAN KONSTRUKSI
Pembangunan Sarana Prasarana Belajar Yayasan Keluarga Sejahtera Bandung (TK Sejahtera 4) Perum Tamansari Indah Jl. Ermawar Blok B Kelurahan
PEKERJAAN : Karsamenak Kecamatan Kawalu
LOKASI : KOTA TASIKMALAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN KD ANL VOL LAMAVOL BARU VOLUME SAT. SATUAN HARGA SATUAN
TOTAL Rp. Rp.
1 2 3 4 5 6 7 8 9
A. PEK. PERSIAPAN
1 Pek. pengukuran /Uitzet dan pasangan bouwplank - 1.00 1.00 ls 350,000.00 350,000.00
2 Papan nama kegiatan - 1.00 1.00 ls 250,000.00 250,000.00
3 Pek. Bongkaran - 1.00 1.00 ls 2,000,000.00 2,000,000.00
4 Sewa/Pengadaan Los kerja /Gudang - 1.00 1.00 ls 800,000.00 800,000.00
Jumlah 3,400,000.00
B. PEKERJAAN KONSTRUKSI
B.I. PEK. TANAH DAN URUGAN
1 Pek. galian tanah pondasi setempat B-02 0.14 12.90 13.05 m3 41,700.00 544,034.88
2 Pek. Pondasi batu kosong C-014 - 1.96 1.96 m3 265,600.00 521,043.46
3 Pek. Pondasi Batu Belah 1 : 5 C-06 - 4.11 4.11 m3 583,800.00 2,397,754.17
4 Pek. Urugan pasir bawah pondasi B-11 - 0.65 0.65 m3 141,100.00 92,268.11
5 Pek. urugan kembali bekas galian B-09 6.18 6.18 m3 15,200.00 93,929.46
6 Pek. Urugan sirtu + pemadatan B-15 5.52 5.52 m3 138,000.00 761,760.00
Jumlah 4,410,790.08
PEKERJAAN : PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
LOKASI : KOTA TASIKMALAYA
JUMLAH
NO. URAIAN HARGA
Rp.
1 2 3
PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
C. PEKERJAAN LANTAI II
D. PEK. TANGGA -
SUB JUMLAH D -
TERBILANG :
SERATUS LIMA PULUH TIGA JUTA SERATUS ENAM BELAS RIBU RUPIAH
BUDI NURCAnNIHYADI, ST
DireNIZAR FARID R, ST.
TONI ANTONI,ST NIP.198590801 201001 1 012
NIP.19690709 200312 1 006 ktur
Mengetahui ;
Kepala Dinas Cipta Karya Menyetujui ;
Tata Ruang dan Kebersihan
Kota Tasikmalaya Pejabat Pembuat Komitmen
(PPK)
PEKERJAAN : PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
LOKASI : KOTA TASIKMALAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN KD ANL VOLUME SAT. SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6 7
A. PEK. PERSIAPAN
1 Pek. pengukuran /Uitzet dan pasangan bouwplank - 1.00 ls 500,000.00 500,000.00
2 Papan nama kegiatan - 1.00 ls 250,000.00 250,000.00
3 Pek. Bongkaran - 1.00 ls 900,000.00 900,000.00
4 Sewa/Pengadaan Los kerja /Gudang - 1.00 ls 600,000.00 600,000.00
Jumlah 2,250,000.00
1 2 3 4 5 6 7
C. PEKERJAAN LANTAI II
1 2 3 4 5 6 7
D. PEK. TANGGA
1 Pek. galian tanah pondasi setempat B-02 m3 41,700.00 -
2 Pek. Urugan pasir bawah pondasi B-11 m3 141,100.00 -
3 Pek. Lantai Kerja beton tumbuk camp 1 : 3 : 5 G-01 m3 739,400.00 -
4 Pek. Pondasi foot plat camp 1 : 2 : 3 G-B.b m3 4,289,800.76 -
5 Pek. Pondasi setempat, P2 G-B m3 4,743,520.69 -
6 Pek. kolom beton, K2 20/20 G-O m3 6,011,247.01 -
7 Pek. Plat tangga dan plat bordes beton, camp 1 : 2 : 3 G-Z.d m3 4,193,137.87 -
8 Pek. Anak tangga beton, camp 1 : 2 : 3 G-Z.g m3 2,670,780.64 -
9 Pek. Balok B2 15/30 G-Z.a m3 5,174,541.97 -
10 Pas. plafond dari GRC 4 mm tanpa rangka F-39.c m2 72,100.00 -
-
E. PEKERJAAN LAIN-LAIN
1 Pek. pembersihan lokasi bekas pekerjaan/Bongkaran 1.00 ls 250,000.00 250,000.00
Jumlah 250,000.00