Membuat 1 M3 Pondasi Foot Plat 1,00 x 0,8 (P1)

Ø BESI ( ISI DATA YG BERTANDA TULISAN MERAH )


P L T
ukuran PLAT 0.9 x 0.7 0.25
kolom 0.3 x 0.3
Ketinggian besi di bawah sloop 1.27
tebal selimut 0.03 m
over stage 0.64 m
jarak sengkang plat 0.15 m
jarak sengkang kolom 0.1 m
diameter besi Ø PLAT 16 mm
diameter besi Ø FOOT 12 mm
diameter besi Ø FOOT 12 mm
diameter besi Ø RING 12 mm
Lantai kerja 0.1 m
banyaknya tulangan kolom Ø 12 8 bh
banyaknya tulangan kolom Ø 12 8 bh

panjang besi banyaknya sengkang


plat 1.96 7 1
1.96 4.6666667 1
foot
diameter besi Ø FOOT 12 18.88
diameter besi Ø FOOT

dia 8 12 1.06 11.2

volume beton
plat 0.9 0.7 0.25
0.63 0.09 0.36
foot 0.3 0.3 1.27

Tulangan dlm 1 m3 63.3895 0.3078

begisting Keliling Tinggi


plat 3.2 0.25
foot 1.2 1.27

2.324 0.3078

PEMBESIAN PONDASI setempat


( ISI DATA YG BERTANDA TULISAN MERAH )
P L T
ukuran PLAT 0.8 x 0.8 0.25
kolom 0.3 x 0.2
Ketinggian besi di bawah sloop 1.4
tebal selimut 0.025 m
over stage 0.48 m
jarak sengkang 0.15 m
diameter besi Ø 12 mm
diameter besi Ø 8 mm
Lantai kerja 0.05 m
banyaknya tulangan kolom Ø 12 6 bh

panjang besi banyaknya sengkang


plat 2 6.3333333 2
foot
dia 12 14.31

dia 8 0.9 8.6666667

volume beton
plat 0.8 0.8 0.25
foot 0.3 0.2 1.1

Tulangan dlm 1 m3 69.4912 0.226

begisting Keliling Tinggi


plat 3.2 0.25
foot 1 1.1

1.9 0.226

kolom ukuran Ø 25, K1


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.3 0.3
tebal selimut 0.03 m

jarak sengkang tumpuan 0.1 m AWAS INI LINGKARAN


jarak sengkang lapangan 0.2 m
diameter besi Ø 0 mm
diameter besi Ø 16 mm
diameter besi Ø 12 mm
banyaknya tulangan kolom Ø 0 0 bh
banyaknya tulangan kolom Ø 16 8 bh
bj besi
berat besi Ø 0 11.1111 0 0
berat besi Ø 16 11.1111 1.57824 8

ring 1.06 0.88776 112.11111111


untuk lingkaran
untuk lingkaran Ø 16 7.07714 1.57824 8
Keliling lingkaran tumpuan 0.942 0.88776 70.771408351
Keliling lingkaran lapangan 0.942 0.88776 35.385704176

begisting 0.942 14.154282

Membuat 1 M3 Kolom 20/30 cm


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.3 0.3
tebal selimut 0.03 m

jarak sengkang tumpusn 0.1 m


jarak sengkang lapangan 0.2 m
diameter besi Ø 16 mm
diameter besi Ø 16 mm
diameter besi Ø 12 mm
banyaknya tulangan kolom Ø 16 8 bh
banyaknya tulangan kolom Ø bh

bj besi
panjang besi 11.111111 1.57824 8
panjang besi 11.111111 1.57824 0
ring tumpuan 1.06 0.88776 56.0555555556
ring lapangan 1.06 0.88776 27.7777777778

begisting 1.2 11.111111111

Membuat 1 M3 Sloof Beton 15/25


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.15 0.3
tebal selimut 0.03 m
jarak sengkang tumpuan 0.15 m
jarak sengkang lapangan 0.2 m
diameter besi 16 mm
diameter besi 12 mm
banyaknya tulangan kolom Ø 16 6 bh
banyaknya tulangan kolom Ø

bj besi
panjang besi 22.2222 1.57824 6
ring tumpuan 0.76 0.88776 56.055555556
ring lapangan 0.76 0.88776 74.074074074

begisting 0.6 22.222222

Membuat 1 M3 Balok, B1 20/50


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.2 0.5
tebal selimut 0.03 m

jarak sengkang tumpuan 0.1 m


jarak sengkang lapangan 0.2 m
diameter besi Ø 16 mm
diameter besi Ø 12 mm
diameter besi Ø RING 8 mm
banyaknya tulangan Ø 16 7 bh
banyaknya tulangan Ø 12 2 bh
Over stek 12 8
bj besi
panjang besi 10 1.57824 7
panjang besi 10 0.88776 2
Over stek 0.48 1.57824 8

ring tumpuan 1.26 0.39456 50.5


ring lapangan 1.26 0.39456 25

begisting 1.2 10
balok kantileper, BK 15x20
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.15 0.2
tebal selimut 0.02 m

jarak sengkang 0.1 m


diameter besi Ø 12 mm
diameter besi Ø 0 mm
diameter besi Ø 8 mm
banyaknya tulangan kolom Ø 12 6 bh 12
banyaknya tulangan kolom Ø 0 0 bh 10
banyaknya tulangan kolom Ø 8
bj besi
panjang besi 33.3333 0.88776 6
33.3333 0 0
ring 0.64 0.39456 334.33333333

begisting 0.55 33.333333

Membuat 1 M3 Kolom Praktis 12/12


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.12 0.12
tebal selimut 0.02 m

jarak sengkang tumpusn 0.1 m


jarak sengkang lapangan 0.2 m
diameter besi Ø 12 mm
diameter besi Ø 8 mm
banyaknya tulangan kolom Ø 12 4 bh

bj besi
panjang besi 69.4444 0.88776 4
ring tumpuan 0.42 0.39456 347.72222222
ring lapangan 0.42 0.39456 173.61111111

begisting 0.24 69.444444

Membuat 1 M3 Plat lantai T =12 Cm


dua layer
( ISI DATA YG BERTANDA TULISAN MERAH )
tebal plat 0.12 mtr 1
panjang besi dlm 1 mtr 8.33333 mtr

jarak sengkang 0.15 mtr


diameter besi Ø 10 mm
diameter besi Ø 10 mm
tebal selimut 0.025 mtr
pangang besi
banyaknya sengkang melintang 55.5556 2.14 1
banyaknya sengkang memanjang 6.66667 16.806667 1

begisting 8.57333 1.24

PEMBESIAN PLAT dak T 10 CM satulayer


( ISI DATA YG BERTANDA TULISAN MERAH )
tebal plat 0.1 mtr 1
panjang besi dlm 1 mtr 10 mtr

jarak sengkang 0.15 mtr


diameter besi Ø 12 mm
diameter besi Ø 8 mm
tebal selimut 0.025 mtr
pangang besi
banyaknya sengkang melintang 66.6667 1.1 1
banyaknya sengkang memanjang 6.66667 10.1 1

begisting 10.2 1.2

PEMBESIAN PLAT LANTAI tangga T 12 CM dua layer


( ISI DATA YG BERTANDA TULISAN MERAH )
tebal plat 0.12 mtr 1
panjang besi dlm 1 mtr 8.33333 mtr

jarak sengkang 0.15 mtr


diameter besi Ø 12 mm
diameter besi Ø 8 mm
tebal selimut 0.025 m
pangang besi
banyaknya sengkang melintang 55.5556 2.14 1
banyaknya sengkang memanjang 6.66667 16.806667 1

begisting 8.57333 1.24

PEMBESIAN anak tangga T 12 CM satulayer


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi anak tangga 1 mtr 0.3 0.2

panjang besi dlm 1 mtr 8.33333 mtr 1

jarak sengkang 0.15 mtr


diameter besi Ø 10 mm
diameter besi Ø 0 mm
tebal selimut 0.025 mtr
panjang besi
banyaknya sengkang meMANJANG 2 1.2 1
banyaknya sengkang melintang 55.5556 0.55 1

begisting
1.2 8.7333333
BALOK 20 X 30

MEMANJANG 0.6 9 0.6165 1


MELINTANG 1.56 3 0.6165 1

0.03

16.6667 9 0.6165 1
16.6667 3 0.6165 1
P1) Membuat 1 M
ULISAN MERAH )

ukuran PLAT
kolom
Ketinggian besi di bawah sloop
tebal selimut
over stage
jarak sengkang plat
jarak sengkang kolom
diameter besi Ø PLAT
diameter besi Ø FOOT
diameter besi Ø FOOT
diameter besi Ø RING
Lantai kerja
banyaknya tulangan kolo
banyaknya tulangan kolo

bj besi berat besi


1.57824 21.653 plat
1.57824 14.436
foot
0.88776 16.761 diameter besi Ø FOOT
0.88776 0 diameter besi Ø FOOT

0.88776 10.539 dia RING


63.389

volume beton
0.1575 plat
0.1 0.036
0.1143 foot
0.3078
216.24 berat besi utk analiasa Tulangan dlm 1 m3

begisting
0.8 plat
1.524 foot
2.324

7.5504 luas begisting utk analisa

ULISAN MERAH )

bj besi berat besi


1.57824 39.982 0.9
1.57824 22.585 1.325
0.1
0.88776 6.9245 0.48
69.491 0.48
2.385

0.16
0.066
0.226
322.86 berat besi utk analiasa

0.8
1.1
1.9

8.4071 luas begisting utk analisa

Membuat 1 M3 Kolom 15/15

ULISAN MERAH )
dimensi
tebal selimut

AS INI LINGKARAN jarak sengkang

diameter besi Ø
diameter besi Ø
diameter besi Ø
banyaknya tulangan kolom Ø 12
banyaknya tulangan kolom Ø 0
berat besi
0 berat besi Ø 4
140.29 berat besi Ø 0

105.5 ring

89.355
59.184
29.592
178.13 kg

13.333 m2 begisting

Membuat 1 M3 Kolom 20/20

dimensi
tebal selimut

jarak sengkang tumpuan


jarak sengkang lapangan
diameter besi Ø
diameter besi Ø

diameter besi Ø
banyaknya tulangan kolom Ø 12
banyaknya tulangan kolom Ø 0

berat besi
140.288 berat besi Ø 8
0
52.74971 berat besi Ø 0
26.1396 ring tumpuan
230.1362 ring lapangan

13.33333

begisting

Membuat 1 M3 Sloof Beton

ULISAN MERAH )
dimensi
146.242 tebal selimut

jarak sengkang
diameter besi
diameter besi
banyaknya tulangan kolom Ø
banyaknya tulangan kolom Ø

berat besi
210.43 panjang besi
37.821
49.978 0.54 ring
313.14 kg

13.333 m2 begisting

Pek. Ring Balok B2 15/20

ULISAN MERAH )
dimensi
tebal selimut

jarak sengkang tumpuan


jarak sengkang lapangan
diameter besi Ø
diameter besi Ø
diameter besi Ø RING
banyaknya tulangan kolom Ø 16
banyaknya tulangan kolom Ø 12
Over stek 12
berat besi
110.48 panjang besi
17.755 panjang besi
6.0604 Over stek

25.106 ring tumpuan


12.429 ring lapangan
180.42 kg

12 m2 begisting
Pek. Ring Balk RB1 15/30

ULISAN MERAH )
dimensi
tebal selimut

jarak sengkang
diameter besi Ø
diameter besi Ø
diameter besi Ø
banyaknya tulangan kolom Ø 12
banyaknya tulangan kolom Ø

berat besi
177.55 panjang besi
0
84.425 ring
275.08 kg

18.333 m2 begisting

ULISAN MERAH )

berat besi
246.6
57.623 695.444
28.77
349.64 kg

16.667 m2

PEMBES

ULISAN MERAH )
tebal plat
panjang besi dlm 1 mtr

42 jarak sengkang
diameter besi Ø
diameter besi Ø
5979.56 498.2964 tebal selimut
bj besi
0.6165 73.295 banyaknya sengkang melintang
0.6165 69.075 8.28333 banyaknya sengkang memanjang
142.37 kg 16.5667 0.14
16.7066666667
10.631 m2 446.499 16.8066666667 begisting

2.14

Membuat 1 M3 Plat list plank T = 7 Cm


ULISAN MERAH )
tebal plat
panjang besi dlm 1 mtr

jarak sengkang
diameter besi Ø
diameter besi Ø
tebal selimut
bj besi
0.88776 65.102 banyaknya sengkang melintang
0.88776 59.776 banyaknya sengkang memanjang
0 kg

12.24 m2 begisting
379.94
6.66667 379.94
283.385
1889.23 Membuat 1 M3 Plat dinding teras T = 15 Cm
ULISAN MERAH )
tebal plat
panjang besi dlm 1 mtr

jarak sengkang
diameter besi Ø
diameter besi Ø
tebal selimut
bj besi
0.88776 105.54 banyaknya sengkang melintang
0.88776 99.469 banyaknya sengkang memanjang
x kg

10.631 m2 begisting

ULISAN MERAH )

bj besi
0.6165 1.4796
0.6165 18.838
21.333 kg

10.48 m2
3.3291
2.88522
6.21432 KG/M2
207.144 KG/M2

92.475
30.825
123.3
Membuat 1 M3 Pondasi Plat 0,6 x 0,6 (P2)
( ISI DATA YG BERTANDA TULISAN MERAH )
P L T
0.6 x 0.6 0.15
0.2 x 0.2
besi di bawah sloop 1.3
0.03 m
0.48 m
0.15 m 45
0.1 m 22.5
12 mm
mm
12 mm
8 mm
0.05 m
12 6 bh
12 5 bh

panjang besi banyaknya sengkang bj besi berat besi


1.36 5 1 0.8878 6.036768

12 11.4 6 0.8878 10.120464

8 0.66 12.5 0.3946 3.25512


19.412352

0.6 0.6 0.15 0.054

0.2 0.2 1.1 0.044


0.098
19.41235 0.098 207.9894857 berat besi utk analiasa

Keliling Tinggi
2.4 0.15 0.36
0.8 1.1 0.88
1.24

1.24 0.098 12.65306122 luas begisting utk analisa


14.31

Membuat 1 M3 Kolom 15/15


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.15 0.15 dimensi
0.02 m tebal selimut

0.15 m jarak sengkang tumpuan


jarak sengkang lapangan
12 mm diameter besi Ø
0 mm diameter besi Ø
8 mm diameter besi Ø
4 bh banyaknya tulangan ko
0 bh banyaknya tulangan ko
bj besi berat besi
44.4444444444 0.88776 4 157.82 berat besi Ø
44.4444444444 0 0 0 berat besi Ø
ring tumpuan
0.540 0.39456 297.2962962963 63.343 ring lapangan
221.17

232.22 kg

0.6 44.4444 26.667 m2 begisting

Membuat 1 M3 Kolom 20/20


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.2 0.2 dimensi
0.025 m tebal selimut

0.1 m jarak sengkang tumpuan


0.2 jarak sengkang lapangan
12 mm diameter besi Ø
0 mm diameter besi Ø

8 mm diameter besi Ø RING


8 bh banyaknya tulangan Ø
0 bh banyaknya tulangan Ø

bj besi berat besi Over stek


25 0.88776 8 177.55

25 0 0 0 panjang besi
0.700 0.39456 125 34.524 Over stek
0.700 0.39456 251 69.324
281.4 ring tumpuan
ring lapangan

295.47 kg begisting

0.5 25 12.5 m2

Membuat 1 M3 Sloof Beton 15/20


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.15 0.3
0.03 m

0.2 m
16 mm
12 mm
16 6 bh

bj besi berat besi


22.22222 1.57824 6 210.432

0.76 0.88776 112.1111111 75.6410976


300.3767525

0.6 22.2222222222 13.33333333

Pek. Ring Balok B2 15/20


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.2 0.4 dimensi
0.03 m tebal selimut

0.1 m jarak sengkang tumpuan


0.2 m jarak sengkang lapangan
16 mm diameter besi Ø
12 mm diameter besi Ø
8 mm diameter besi Ø RING
8 bh banyaknya tulangan ko
2 bh banyaknya tulangan ko
0 Over stek
bj besi berat besi
12.5 1.57824 8 157.82 panjang besi
12.5 0.88776 2 22.194
0.48 0.88776 0 0

1.06 0.39456 63 26.349 ring tumpuan


1.06 0.39456 31.25 13.07 ring lapangan
230.41 kg

1 12.5 12.5 m2 begisting


Pek. Ring Balk RB1 15/30
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.15 0.3 dimensi
0.025 m tebal selimut

0.15 m jarak sengkang tumpuan


12 mm jarak sengkang lapangan
0 mm diameter besi Ø
8 mm diameter besi Ø
6 bh 12 diameter besi Ø RING
0 bh 10 banyaknya tulangan kolom Ø
banyaknya tulangan kolom Ø
bj besi berat besi
22.2222222222 0.88776 6 118.37
22.2222222222 0 0 0 panjang besi
0.8 0.39456 149.1481481481 47.078
173.72
ring tumpuan
0.6 22.2222 13.333 ring lapangan

begisting

PEMBESIAN PLAT dak T 10 CM


dua layer
( ISI DATA YG BERTANDA TULISAN MERAH )
0.1 mtr 1
10 mtr

0.15 mtr
10 mm
0 mm
0.025 mtr
pangang besi bj besi
sengkang melintang 66.66667 2.1 1 0.6165 86.31
sengkang memanjang 6.666667 20.1 1 0.6165 82.611
0 168.921

10.2 1.2 12.24

M3 Plat list plank T = 7 Cm satu layer Membuat 1 M3 Plat di atas lubang ang
( ISI DATA YG BERTANDA TULISAN MERAH )
0.07 mtr 1 tebal plat
14.28571 mtr panjang besi dlm 1 mtr

0.15 mtr jarak sengkang


8 mm diameter besi Ø
8 mm diameter besi Ø
0.025 mtr tebal selimut
pangang besi bj besi
sengkang melintang 95.2381 1.07 1 0.3946 40.20754286 banyaknya sengkang melintang
sengkang memanjang 6.666667 14.3557142857 1 0.3946 37.76127086 banyaknya sengkang memanjang
81.8672544

14.42571 1.14 16.44531429 begisting

M3 Plat dinding teras T = 15 Cm dua layer


( ISI DATA YG BERTANDA TULISAN MERAH )
0.15 mtr 1
6.66667 mtr

0.15 mtr
10 mm
0 mm
0.025 m
pangang besi bj besi
sengkang melintang 44.4444 2.2 1 0.6165 60.28
sengkang memanjang 6.66667 13.53333333 1 0.6165 55.622
115.902

6.96667 1.3 9.0566666667


Membuat 1 M3 Pondasi Foot Plat 0,8 x 0,7 (P3)
( ISI DATA YG BERTANDA TULISAN MERAH )
P L T
ukuran PLAT 0.9 x 0.7 0.2
kolom 0.3 x 0.3
Ketinggian besi di bawah sloop 1.25
tebal selimut 0.03 m
over stage 0.64 m
jarak sengkang plat 0.15 m
jarak sengkang kolom 0.1 m
diameter besi Ø PLAT 16 mm
diameter besi Ø FOOT mm
diameter besi Ø FOOT 16 mm
diameter besi Ø RING 12 mm
Lantai kerja 0.1 m
banyaknya tulangan k 16 8 bh
banyaknya tulangan k 16 8 bh

panjang besi banyaknya sengkang


plat 1.86 8 2

foot
diameter besi Ø FOOT 0 14.88
diameter besi Ø FOO 16 20

dia 8 12 1.06 11.5

volume beton
plat 0.63 0.2

foot 0.3 0.3 1.15

Tulangan dlm 1 m3 89.35502 0.2295

begisting Keliling Tinggi


plat 3.2 0.2
foot 1.2 1.15

ing utk analisa 2.02 0.2295


Membuat 1 M3 Kolom 20/20 (K1)
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.2 0.2
0.025 m

kang tumpuan 0.1 m


kang lapangan 0.2
12 mm
0 mm
8 mm
12 6 bh
0 0 bh
bj besi berat besi
12 25 0.88776 6 133.164
0 25 0 0 0
0.7 0.39456 125.5 34.662096
0.7 0.39456 62.5 17.262
194.3425008 kg

0.86 25 21.5 m2

Membuat 1 M3 Kolom 15/25


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.15 0.25
0.03 m

0.1 m
0.2 m
13 mm
mm

8 mm
13 5 bh
0 2 bh

12 4
bj besi berat besi

26.6666666667 1.041885 5 138.918


0.48 1.041885 4 2.0004192

0.66 0.39456 133.833 34.851485


0.66 0.39456 66.6667 17.36064
202.78707

0.65 26.666667 17.333333

Membuat 1 M3 Sloof Beton 15/20


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.15 0.2
tebal selimut 0.03 m

jarak sengkang 0.15 m


diameter besi 12 mm
diameter besi 8 mm
banyaknya tulangan kol 12 4 bh
banyaknya tulangan kolom Ø

bj besi
panjang besi 33.3333333333 0.8878 4

ring 0.56 0.3946 223.22222222

begisting 0.4 33.333

Membuat 1 M3 Balok, B42 0/35


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.2 0.35
0.03 m

kang tumpuan 0.1 m


kang lapangan 0.2 m
0 mm
13 mm
8 mm
0 0 bh
13 6 bh
13 8 bh
bj besi berat besi
0.52 1.041885 8 4.3342416

14.2857 1.041885 6 89.304428571

0.96 0.39456 71.92857 27.244931657


0.96 0.39456 35.71429 13.527771429
141.13194192 kg

0.9 14.2857142857 12.857142857 m2


Membuat 1 M3 Ring Balok 12/15

P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.12 0.15
0.03 m

0.1 m
0.2 m
0 mm
10 mm
8 mm
0 0 bh
10 4 bh

bj besi berat besi


55.555556 0 0 0
55.555556 0.6165 4 137

0.4 0.39456 278.27778 43.918912


0.4 0.39456 138.88889 21.92
212.9808576

0.3 55.5555555556 16.6666666667

pangang besi bj besi


66.66666667 2.1 1 0.6165 86.31
6.666666667 20.1 1 0.6165 82.611
168.92

10.2 1.2 12.24

1 M3 Plat di atas lubang angisatu layer Membuat 1 M3 lisplank beto


( ISI DATA YG BERTANDA TULISAN MERAH )
0.05 mtr 1 tebal plat
esi dlm 1 mtr 20 mtr panjang besi dlm 1 mtr

0.15 mtr jarak sengkang


8 mm diameter besi Ø
8 mm diameter besi Ø
0.025 mtr tebal selimut
pangang besi bj besi
sengkang melintang 133.333 1.05 1 0.3946 55.2384 banyaknya sengkang melint
sengkang memanjang 6.66667 20.05 1 0.3946 52.73952 banyaknya sengkang meman
113.376816

20.1 1.1 22.11 begisting

Membuat 1 M3 Plat dak T = 10 Cm dua layer


( ISI DATA YG BERTANDA TULISAN MERAH )
tebal plat 0.1 mtr 1
panjang besi dlm 1 mtr 10 mtr

jarak sengkang 0.15 mtr


diameter besi Ø 8 mm
diameter besi Ø 0 mm
tebal selimut 0.025 m
pangang besi bj besi
banyaknya sengkang melintang 66.6666666667 2.1 1 0.39456
banyaknya sengkang memanjang 6.6666666667 20.1 1 0.39456

begisting 10.2 1.2


x 0,7 (P3) Membuat 1 M3 Pondasi footplat Tangga
BERTANDA TULISAN MERAH ) ( ISI DATA YG BERTANDA TULISAN MERAH )
P L T
ukuran PLAT 1.43 x 0.8 0.25
kolom 1.2 x 0.2
Ketinggian besi di bawah slo 1.16
tebal selimut 0.03 m
over stage 0.48 m
45 jarak sengkang plat 0.25 m
22.5 jarak sengkang kolom 0.2 m
diameter besi Ø PLAT 12 mm
diameter besi Ø FOOT mm
diameter besi Ø FOOT 12 mm
diameter besi Ø RING 8 mm
Lantai kerja 0.05 m
banyaknya 0 bh
banyaknya 12 16 bh

bj besi berat besi panjang besi banyaknya sengkan


1.57824 46.968 plat 2.59 6.72 2

foot
0 0 diameter be 0 0
1.57824 31.565 diameter be 12 34.24

0.88776 10.822 dia RING 8 2.66 5.55


89.355

volume beton
0.126 plat 1.43 0.8 0.25

0.1035 foot 1.2 0.2 0.86


0.2295
408.81 berat besi Tulangan dlm 1 m3 67.1244 0.4924

begisting Keliling Tinggi


0.64 plat 4.46 0.25
1.38 foot 2.8 0.86
2.02

8.8017 luas begisting utk analisa 3.523 0.4924


Membuat 1 M3 Kolom K1 Ø 50
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 3.142 0.0625
tebal selimut 0.03 m

jarak sengkang tumpuan 0.1 m


jarak sengkang lapangan 0.2 m
diameter besi Ø 16 mm
diameter besi Ø 0 mm
diameter besi Ø 8 mm
banyaknya tulanga 16 8 bh
banyaknya tulanga 0 0 bh
bj besi berat besi
berat besi Ø 16 5.0923 1.57824 8 64.2949
berat besi Ø 0 5.0923 0 0 0
ring tumpuan 34.9487 0.39456 1.4139 19.4967
ring lapangan 0 0.39456 12.7307 0
87.9813 kg

begisting 5.0923 1.571 8 m2


berat besi
118.368

49.3217536
176.07424128

13.3333333333

Membuat 1 M3 Balok, 15/20


P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.15 0.3
tebal selimut 0.03 m

jarak sengkang tumpuan 0.1 m


jarak sengkang lapangan 0.2 m
diameter besi Ø 12 mm
diameter besi Ø 0 mm
diameter besi Ø RING 8 mm
banyaknya tulanga 12 6 bh
banyaknya tulanga 0 0 bh
Over stek 12 0 bh
bj besi berat besi
panjang besi 22.2222 0.88776 6 118.368

Over stek 0.52 0.88776 0 0

ring tumpuan 0.66 0.39456 111.611 29.0646


ring lapangan 0.76 0.39456 55.5556 16.6592
172.296 kg

begisting 0.8 22.2222222222 17.7778 m2


Membuat 1 M3 lisplank beto dua layer
( ISI DATA YG BERTANDA TULISAN MERAH )
tebal plat 0.07 mtr 1
panjang besi dlm 1 mtr 14.286 mtr

jarak sengkang 0.15 mtr


diameter besi Ø 8 mm
diameter besi Ø 8 mm
tebal selimut 0.025 mtr
pangang besi bj besi
banyaknya sengkang melint 95.238 1.07 2 0.39456 80.415
banyaknya sengkang meman 6.6667 14.355714 2 0.39456 75.523
163.73

14.426 1.14 16.445

55.2384
52.87104
108.10944

12.24
si footplat Tangga Membuat 1 M3 Po
ERTANDA TULISAN MERAH )

ukuran PLAT
kolom
Ketinggian besi di bawah sloop
tebal selimut
over stage
45 jarak sengkang plat
22.5 jarak sengkang kolom
diameter besi Ø PLAT
diameter besi Ø FOOT
diameter besi Ø FOOT
diameter besi Ø RING
Lantai kerja
banyaknya tulangan kolom 0
7.66667 banyaknya tulangan kolom 12

bj besi berat besi


0.88776 30.90257 plat
plat
foot
0 0 diameter besi Ø FOOT 0
0.88776 30.396902 diameter besi Ø FOOT 12

0.39456 5.8248893 dia 8 8


67.124362

volume beton
0.286 plat

0.2064 foot
0.4924
143.13684 berat besi utk analiasa Tulangan dlm 1 m3

begisting
1.115 plat
2.408 foot
3.523

7.1547522 luas begisting utk analisa


Membuat 1 M3 kolom beton, K1.a 35/40
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.35 0.4
tebal selimut 0.03 m

jarak sengkang tumpuan 0.2 m


jarak sengkang lapangan 0.1 m
diameter besi Ø 16 mm
diameter besi Ø 0 mm
diameter besi Ø 8 mm
banyaknya tulangan ko 16 12 bh
banyaknya tulangan ko 0 0 bh
bj besi
berat besi Ø 16 7.14286 1.57824 12
berat besi Ø 0 7.14286 0 0
ring tumpuan 1.36 0.39456 18.3571428571
ring lapangan 1.36 0.39456 35.7142857143

begisting 1.2 7.14286


Membuat 1 M3 Balok, B1 20/35
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.2 0.35
tebal selimut 0.03 m

jarak sengkang tumpuan 0.1 m


jarak sengkang lapangan 0.2 m
diameter besi Ø 10 mm
diameter besi Ø 12 mm
diameter besi Ø RING 8 mm
banyaknya tulangan ko 10 2 bh
banyaknya tulangan ko 12 8 bh
Over stek 12 8 bh
bj besi
Over stek 0.64 0.88776 8

panjang besi 14.2857 0.88776 8


panjang besi 14.2857 0.6165 2
ring tumpuan 0.96 0.39456 71.9285714286
ring lapangan 0.96 0.39456 35.7142857143

begisting 0.93 14.2857


Membuat 1 M3 Pondasi Foot Plat Tangga
Ø BESI ( ISI DATA YG BERTANDA TULISAN MERAH )
P L T
0.84 x 0.6 0.27
0.84 x 0.12
1.18
0.03 m
0.48 m
0.12 m 45
0.1 m 22.5
12 mm
mm
12 mm
8 mm
0.05 m
bh 167
8 bh

panjang besi banyaknya sengkang bj besi berat besi


1.48 8 1 0.88776 10.5110784
1.88 5 1 0.88776 8.344944

0 0 0
17.28 0.88776 15.3404928

1.78 10.1 0.39456 7.09339968


41.28991488

0.84 0.6 0.27 0.13608

0.84 0.12 0.86 0.086688


0.222768
41.28991488 0.222768 185.3493988365 berat besi utk analiasa

Keliling Tinggi
2.88 0.27 0.7776
1.92 0.86 1.6512
2.4288

2.4288 0.222768 10.9028226675 luas begisting utk analisa


Membuat 1 M3 kolom beton, K1.b 35/40
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.35 0.4
tebal selimut 0.03 m

jarak sengkang tumpuan 0.15 m


jarak sengkang lapangan 0.15 m
diameter besi Ø 13 mm
diameter besi Ø 0 mm
diameter besi Ø 8 mm
banyaknya tulangan ko 13 8 bh
banyaknya tulangan ko 0 0 bh
berat besi bj besi
135.27771429 berat besi Ø 13 7.14286 1.04189 8
0 berat besi Ø 0 7.14286 0 0
9.8504722286 ring tumpuan 1.36 0.39456 24.3095
19.164342857 ring lapangan 1.36 0.39456 23.8095
172.50715584 kg

8.5714285714 m2 begisting 1.2 7.14286


Membuat 1 M3 Balok Lintel 15/20
P L T
( ISI DATA YG BERTANDA TULISAN MERAH )
dimensi 0.15 0.2
tebal selimut 0.03 m

jarak sengkang tumpuan 0.1 m


jarak sengkang lapangan 0.2 m
diameter besi Ø 0 mm
diameter besi Ø 12 mm
diameter besi Ø RING 8 mm
banyaknya tulangan ko 0 0 bh
banyaknya tulangan ko 12 4 bh

berat besi bj besi


4.5453312 panjang besi 33.3333 0 0

101.45828571 33.3333 0.88776 4


17.614285714
27.244931657 ring tumpuan 0.56 0.39456 167.167
13.527771429 ring lapangan 0.56 0.39456 83.3333
164.39060571 kg

13.285714286 m2 begisting 0.4 33.3333


Membuat 1 M3 Pondasi Plat 0,7 x 0,7 (P3)
Ø BESI ( ISI DATA YG BERTANDA TULISAN MERAH )
P L T
ukuran PLAT 0.7 x 0.7 0.2
kolom 0.3 x 0.15
Ketinggian besi di bawah sloop 1.45
tebal selimut 0.03 m
over stage 0.48 m
jarak sengkang plat 0.15 m
jarak sengkang kolom 0.1 m
diameter besi Ø PLAT 12 mm
diameter besi Ø FOOT mm
diameter besi Ø FOOT 12 mm
diameter besi Ø RING 8 mm
Lantai kerja 0.05 m
banyaknya tulangan kolom 0 bh
banyaknya tulangan kolom 12 6 bh

panjang besi banyaknya sengkang


plat 1.74 5.6666666667 2

foot
diameter besi Ø FOOT 0 0
diameter besi Ø FOOT 12 14.58

dia 8 8 0.76 13.5

volume beton
plat 0.7 0.7 0.2

foot 0.3 0.15 1.2

esi utk analiasa Tulangan dlm 1 m3 34.4983536 0.152

begisting Keliling Tinggi


plat 2.8 0.2
foot 0.9 1.2

gisting utk analisa 1.64 0.152


b 35/40 Membuat 1 M3 Kolom K3,a 25/25
P
( ISI DATA YG BERTANDA TULISA
dimensi 0.25
tebal selimut 0.03 m

jarak sengkang tumpuan 0.15 m


jarak sengkang lapangan 0.15 m
diameter besi Ø 13 mm
diameter besi Ø 0 mm
diameter besi Ø 8 mm
banyaknya tula 13 8 bh
banyaknya tula 0 0 bh
berat besi
59.5362857143 berat besi Ø 13 16
0 berat besi Ø 0 16
13.0445293714 ring tumpuan 0.86
12.7762285714 ring lapangan 0.86
89.62489584

8.5714285714 begisting 0.7


/20 Membuat 1 M3 Ring Balok, RB1 15/40
P
( ISI DATA YG BERTANDA TULISA
dimensi 0.15
tebal selimut 0.03 m

jarak sengkang tumpuan 0.1 m


jarak sengkang lapangan 0.2 m
diameter besi Ø 0 mm
diameter besi Ø 12 mm
diameter besi Ø RING 8 mm
banyaknya tula 0 0 bh
banyaknya tula 12 10 bh

berat besi
0 panjang besi 16.6666666667

118.368 16.6666666667

36.9360768 ring tumpuan 0.96


18.4128 ring lapangan 0.96
182.40272064 kg

13.3333333333 m2 begisting 0.95


212.9808576
30.57813696
PEMBESIAN PONDASI setempat p1
Ø BESI
P
ukuran PLAT 2.8
kolom 0
Ketinggian besi di bawah sloop 1.5
tebal selimut 0.03
over stage 0.52
45 jarak sengkang plat 0.15
22.5 jarak sengkang kolom 0.1
diameter besi Ø PLAT 13
diameter besi Ø FOOT
diameter besi Ø FOOT 13
diameter besi Ø RING 0
Lantai kerja 0.05
banyaknya t 0 0
banyaknya t 13 0

bj besi berat besi panjang besi


0.88776 17.5066272 plat 6.46

foot
0 0 diameter be 0 0
0.88776 12.9435408 diameter bes 13 0

0.39456 4.0481856 dia 8 0 -0.14


34.4983536

volume beton
0.098 plat 2.8

0.054 foot 0
0.152
226.9628526316 berat besi utk anali Tulangan dlm 1 m3 264.7360326

begisting Keliling
0.56 plat 11.2
1.08 foot 0
1.64

10.7894736842 luas begisting utk analisa 5.6


t 1 M3 Kolom K3,a 25/25 Membuat 1 M3 Kolom K4,a 15/40
L T P
SI DATA YG BERTANDA TULISAN MERAH )
0.25 dimensi 0.15
tebal selimut 0.03

jarak sengkang tumpuan 0.15


jarak sengkang lapangan 0.15
diameter besi Ø 13
diameter besi Ø 0
diameter besi Ø 8
banyaknya tulangan 13 8
banyaknya tulangan 0 0
bj besi berat besi
1.04189 8 133.361 berat besi Ø 13 16.6666667
0 0 0 berat besi Ø 0 16.6666667
0.39456 53.8333333333 18.2668 ring tumpuan 0.96
0.39456 53.3333333333 18.0972 ring lapangan 0.96
178.212

16 11.2 begisting 0.8


M3 Ring Balok, RB1 15/40 Membuat 1 M3 Ring Balk RB1,a 20
L T P
SI DATA YG BERTANDA TULISAN MERAH )
0.4 dimensi 0.2
tebal selimut 0.03

jarak sengkang tumpuan 0.1


jarak sengkang lapangan 0.2
diameter besi Ø 0
diameter besi Ø 13
diameter besi Ø RING 8
banyaknya tulangan 0 0
banyaknya tulangan 13 6

bj besi berat besi


0 0 0 panjang besi 12.5

0.88776 10 147.96 12.5

0.39456 83.8333333333 31.7542 ring tumpuan 1.06


0.39456 41.6666666667 15.7824 ring lapangan 1.06
195.497 kg

16.6667 15.8333 m2 begisting 0.8


AN PONDASI setempat p1
( ISI DATA YG BERTANDA TULISAN MERAH )
L T
x 2.8 0.5
x 0

m
m
m
m
mm
mm
mm
mm
m
bh
bh

banyaknya sengkang bj besi berat besi


19.666667 2 1.041885 264.73603

0 0
1.041885 0

11 0 0
264.73603

2.8 0.5 3.92

0 0.95 0
3.92
3.92 70.911437

Tinggi
0.5 5.6
0.95 0
5.6

3.92 1.4285714
buat 1 M3 Kolom K4,a 15/40 Membuat 1 M3 Kolom K5,a 15/30
L T P
( ISI DATA YG BERTANDA TULISAN MERAH )
0.4 dimensi 0.15
m tebal selimut 0.03

m jarak sengkang tumpuan 0.15


m jarak sengkang lapangan 0.15
mm diameter besi Ø 12
mm diameter besi Ø 0
mm diameter besi Ø 8
bh banyaknya tula 12 8
bh banyaknya tula 0 0
bj besi berat besi
1.04189 8 138.918 berat besi Ø 12 22.2222
0 0 0 berat besi Ø 0 22.2222
0.39456 56.0556 21.2326 ring tumpuan 0.76
0.39456 55.5556 21.0432 ring lapangan 0.76
190.253

16.6667 13.3333 begisting 0.6


t 1 M3 Ring Balk RB1,a 20/40 Membuat 1 M3 Ring Balok, RB2 15/25
L T P
( ISI DATA YG BERTANDA TULISAN MERAH )
0.4 dimensi 0.15
m tebal selimut 0.025

m jarak sengkang tumpuan 0.15


m jarak sengkang lapangan 0.15
mm diameter besi Ø 0
mm diameter besi Ø 12
mm diameter besi Ø RING 8
bh banyaknya tula 0 0
bh banyaknya tula 12 5

bj besi berat besi


0 0 0 panjang besi 26.6667

1.04189 6 78.1414 26.6667

0.39456 63 26.3487 ring tumpuan 0.7


0.39456 31.25 13.0698 ring lapangan 0.7
117.56 kg

12.5 10 m2 begisting 0.5


mbuat 1 M3 Kolom K5,a 15/30 Membuat 1 M3 Portal beton K3 15/30
L T P
( ISI DATA YG BERTANDA TULISAN MERAH ) ( ISI DATA YG BERTANDA T
0.3 dimensi 0.15
m tebal selimut 0.03 m

m jarak sengkang tumpuan 0.15 m


m jarak sengkang lapangan 0.15 m
mm diameter besi Ø 12 mm
mm diameter besi Ø 0 mm
mm diameter besi Ø 8 mm
bh banyaknya 12 6 bh
bh banyaknya 0 0 bh
bj besi berat besi
0.88776 8 157.824 berat besi 12 22.2222
0 0 0 berat besi 0 22.2222
0.39456 74.5741 22.3622 ring tumpuan 0.76
0.39456 74.0741 22.2123 ring lapangan 0.76
212.518

22.2222 13.3333 begisting 0.6


at 1 M3 Ring Balok, RB2 15/25 Membuat 1 M3 Ring Balk RB1 15/20
L T P
( ISI DATA YG BERTANDA TULISAN MERAH ) ( ISI DATA YG BERTANDA T
0.25 dimensi 0.15
m tebal selimut 0.03 m

m jarak sengkang tumpuan 0.1 m


m jarak sengkang lapangan 0.2 m
mm diameter besi Ø 0 mm
mm diameter besi Ø 12 mm
mm diameter besi Ø RING 8 mm
bh banyaknya 0 0 bh
bh banyaknya 12 4 bh

bj besi berat besi


0 0 0 panjang besi 33.3333

0.88776 5 118.368 33.3333

0.39456 89.3889 24.6885 ring tumpuan 0.56


0.39456 88.8889 24.5504 ring lapangan 0.56
167.607 kg

26.6667 13.3333 m2 begisting 0.4


M3 Portal beton K3 15/30
L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.3

bj besi berat besi


0.88776 6 118.368
0 0 0
0.39456 74.5741 22.362199467
0.39456 74.0741 22.212266667
171.08958944

22.2222 13.333333333
M3 Ring Balk RB1 15/20
L T
( ISI DATA YG BERTANDA TULISAN MERAH )
0.2

bj besi berat besi


0 0 0

0.88776 4 118.368

0.39456 167.167 36.9360768


0.39456 83.3333 18.4128
173.7168768 kg

33.3333 13.333333333 m2
DAFTAR
PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( HARGA
RKB ) DANUPAH
RUANG KANTOR MI CIMERAK KELURAHAN
SUKAASIH
KOTA TASIKMALAYA
TAHUN ANGGARAN 2016

No JENIS TENAGA KERJA SATUAN HARGA


(Rp)

1 Pekerja HOK 60,000.00


2 Tukang Batu ( terampil) HOK 80,000.00
3 Kepala Tukang Batu HOK 90,000.00
4 Tukang Kayu ( terampil) HOK 80,000.00
5 Kepala Tukang Kayu HOK 90,000.00
6 Tukang Cat / Plitur ( terampil) HOK 80,000.00
7 Kepala Tukang Cat / Plitur HOK 90,000.00
8 Tukang Besi Beton ( terampil) HOK 80,000.00
9 Kepala Tukang Besi Beton HOK 90,000.00
10 Tukang Las ( terampil) HOK 80,000.00
11 Kepala Tukang Las HOK 90,000.00
12 Mandor HOK 90,000.00

Tasikmalaya, 2016
Dibuat;
CV. ARCHIDO MEDIA KARYA

BUDI NURCAnNIHYADI, ST
DireNIZAR FARID R, ST.
NIP.198590801 201001 1 012
ktur

47 of 81
DAFTAR
PEMBANGUNAN 1 PAKET RUANG KELAS BARU (HARGA BAHAN
RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN
SUKAASIH
KOTA TASIKMALAYA
TAHUN ANGGARAN 2016

No JENIS BAHAN BANGUNAN SATUAN HARGA


(Rp)

A. AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA


1 Sirtu ( tersaring bergradasi ) m3 90,000.00
2 Pasir Urug /Bawah lantai m3 86,500.00
3 Pasir Pasang /gunung pilihan m3 120,000.00
4 Pasir Beton m3 160,000.00
5 Batu Belah m3 100,000.00
6 Batu Pecah 2/3 m3 160,000.00
7 Bata Merah bh 750.00
8 Semen Portland ( PC ) /50 Kg Zak 67,000.00
9 Semen Portland ( PC ) /50 Kg Kg 1,340.00
10 Semen Warna Kg 9,500.00
11 Lem kayu Kg 12,700.00

B. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton (ukuran rata rata) Kg 9,000.00
2 Kawat Beton Kg 16,500.00
3 Kawat Las Listrik Kg 28,400.00
4 Rangka Atap Baja Ringan Terpasang m2 150,000.00
5 Bondex m2 117,000.00
6 Wermesh 10 m2 88,844.80

C. BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu Diameter 7 s/d 10 cm btg 7,000.00
2 Kayu Balok Borneo 6/12, 8/12, 8/15 * m3 5,313,000.00
3 Kayu Balok Kayu Gunung Klas II 6/12, 8/12, 8/15* m3 2,750,000.00
4 Kayu Kaso 5/7, 5/10 Kayu Gunung Klas II* m3 2,750,000.00
5 Kayu Kaso, Kayu Gunung Klas III ( Albasia ) m3 1,700,000.00
6 Kayu Papan /Kayu Gunung Klas III m3 1,700,000.00
7 Kayu Papan Klas II sekelas rasamala m3 3,000,000.00

D. BAHAN PENUTUP RANGKA PLAFOND


1 GRC Board 4 mm lbr 60,000.00
2 List Profil Gypsum 10 cm m' 15,000.00
3 Screen / Kain Kassa roll 10,400.00
4 Wood Plank lebar 20 cm tebal 0,8 cm setara elephant btg/4 mtr 81,250.00

E. BAHAN FINISHING : LABURAN, PENGISIAN DAN ALATNYA


1 Ampelas Lbr 1,500.00
2 Cat Kayu stara AVIAN Kg 45,000.00
3 Cat Tembok setara Sanlex Kg 19,500.00
4 Cat Watter frooping Kg 79,200.00
5 Cat Tembok setara Mowilex interior Kg 65,208.00
6 Cotton plaster roll 10,400.00
7 Compound Kg 4,620.00
8 Meni Kayu /Besi Kg 17,600.00
9 Plamir Cat Kg 15,400.00
10 Rol cat Tembok Bh 13,200.00

F. BAHAN KACA
1 Kaca Polos 3 mm m2 52,750.00

G. BAHAN PAKU DAN MUR-BAUT


1 Paku (berbagai macam ukuran /rata-rata) Kg 15,000.00
2 Skrup Ukuran khusus 6x1 1/2" setara sunray bh 155.00

H. BAHAN PENUTUP ATAP


1 Genteng Palentong Kecil bh 1,750.00
48 of 81
No JENIS BAHAN BANGUNAN SATUAN HARGA
(Rp)
2 Genting Bubungan palentong bh 3,000.00

49 of 81
No JENIS BAHAN BANGUNAN SATUAN HARGA
(Rp)
I. BAHAN MEKANIKAL & ELEKTRIKAL ( ME )
1 Pemasangan Instalasi Titik Cahaya dihitung 110,000.00
2 Pemasangan Instalasi Titik Stop Kontak dihitung 120,000.00
3 Lampu SL 18 Watt bh 40,000.00
4 Lampu TL 1 x 36 Watt bh 100,000.00
5 Saklar Ganda Broco bh 15,000.00
6 Saklar tunggal Broco bh 14,000.00
7 Stop kontak Broco bh 15,000.00

J. BAHAN ALAT PENGGANTUNG KUNCI bh


1 Engsel Jendela setara UNION bh 19,000.00
2 Engsel Pintu psg 36,000.00
3 Grendel 15 cm bh 21,800.00
4 Hak Angin Biasa bh 16,500.00
5 Kunci 2 Slaag setara "ANCOR" / "ASTON" bh 139,000.00
6 Slot Jendela bh 9,000.00

K. STANDAR SEWA ALAT BERAT, TRUK, KENDARAAN RODA EMPAT, DLL


1 Stamper Tegak, Viberator Plate Jam 30,000.00

L. BAHAN LANTAI DAN PELAPIS DINDING


1 Keramik 30 x 30 KW I DN Putih ( polos) m2 /Dus 47,500.00
2 Keramik 30 x 30 KW I DN Warna (Anti Sleep) m2 /Dus 52,000.00

M. HARGA BAHAN CAIR


1 Minyak Solar Ltr 5,500.00
2 Oli SAE Mesran Pertamina Ltr 22,000.00
3 Minyak begisting Ltr 5,000.00

50 of 81
51 of 81
ANALISA HARGA SATUAN PEKERJAAN
PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
KOTA TASIKMALAYA
TAHUN ANGGARAN 2016
Keuntungan 10 % 0.1500
HARGA HARGA HARGA SATUAN
KODE JENIS PEKERJAAN KOEFISIEN SATUAN UPAH BAHAN PEKERJAAN
( Rp ) ( Rp ) ( Rp ) ( Rp )
a b c d e f=(cxe) g=(cxe) h

B-02 1 m3 GALIAN TANAH BIASA SEDALAM 2 METER


Pekerja 0.5260 HOK 60,000.00 31,560.00
Mandor 0.0520 HOK 90,000.00 4,680.00
Total 36,240.00
Total Harga 36,240.00
Keuntungan 5,436.00
Jumlah Total 41,700.00

B-09 1 m3 URUGAN KEMBALI


Pekerja 0.1920 HOK 60,000.00 11,520.00
Mandor 0.0190 HOK 90,000.00 1,710.00
Total 13,230.00
Total Harga 13,230.00
Keuntungan 1,984.50
Jumlah Total 15,200.00

B-11 1 m3 URUGAN PASIR


Pasir Urug 1.2000 m3 86,500.00 103,800.00
Pekerja 0.3000 HOK 60,000.00 18,000.00
Mandor 0.0100 HOK 90,000.00 900.00
Total 18,900.00 103,800.00
Total Harga 122,700.00
Keuntungan 18,405.00
Jumlah Total 141,100.00

B-15 1 m3 URUGAN SIRTU (DIPADATKAN )


Sirtu 1.1000 m3 90,000.00 99,000.00
Pekerja 0.2500 HOK 60,000.00 15,000.00
Mandor 0.0250 HOK 90,000.00 2,250.00
Alat bantu ( sewa stamper) 0.1250 Jam 30,000.00 3,750.00
Total 21,000.00 99,000.00
Total Harga 120,000.00
Keuntungan 18,000.00
Jumlah Total 138,000.00

B-16 1 m2 PEMBUATAN JALAN SEMENTARA TEBAL 25 CM


Batu Belah 0.2750 m3 100,000.00 27,500.00
Kerikil 0.0300 m3 160,000.00 4,800.00
Pasir 0.0500 m3 86,500.00 4,325.00
Pekerja 1.0000 HOK 60,000.00 60,000.00
Mandor 0.1000 HOK 90,000.00 9,000.00
Total 69,000.00 36,625.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total #VALUE!
Dihitung 1 m3 URUGAN TANAH
Tanah Urugan 1.2000 m3 Z #VALUE!
Pekerja 0.3000 HOK 60,000.00 18,000.00
Mandor 0.0100 HOK 90,000.00 900.00
Total 18,900.00 #VALUE!
Total Harga #VALUE!
Keuntungan #VALUE!
Jumlah Total #VALUE!

Dihitung 1 m3 URUGAN TANAH SETEMPAT


Pekerja 0.3000 HOK 60,000.00 18,000.00
Mandor 0.0100 HOK 90,000.00 900.00
Total 18,900.00
Total Harga Z
Keuntungan #VALUE!
Jumlah Total #VALUE!
C PEKERJAAN PONDASI
Analisa
52 of 81
a b c d e f=(cxe) g=(cxe) h
C-01 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 1 Ps
Batu belah 15/20 cm 1.1000 m3 100,000.00 110,000.00
Semen Portland 392.0000 Kg 1,340.00 525,280.00
Pasir pasang 0.3140 m3 120,000.00 37,680.00
Pekerja 1.5000 HOK 60,000.00 90,000.00
Tukang batu 0.6000 HOK 80,000.00 48,000.00
Kepala tukang 0.0600 HOK 90,000.00 5,400.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 150,150.00 672,960.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total

C-02 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 2 Ps


Batu belah 15/20 cm 1.1000 m3 100,000.00 110,000.00
Semen Portland 267.0000 Kg 1,340.00 357,780.00
Pasir pasang 0.4270 m3 120,000.00 51,240.00
Pekerja 1.5000 HOK 60,000.00 90,000.00
Tukang batu 0.6000 HOK 80,000.00 48,000.00
Kepala tukang 0.0600 HOK 90,000.00 5,400.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 150,150.00 519,020.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total

C-04 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Ps


Batu belah 15/20 cm 1.1000 m3 100,000.00 110,000.00
Semen Portland 202.0000 Kg 1,340.00 270,680.00
Pasir pasang 0.4850 m3 120,000.00 58,200.00
Pekerja 1.5000 HOK 60,000.00 90,000.00
Tukang batu 0.6000 HOK 80,000.00 48,000.00
Kepala tukang 0.0600 HOK 90,000.00 5,400.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 150,150.00 438,880.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total

C-05 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 4 Ps


Batu belah 15/20 cm 1.1000 m3 100,000.00 110,000.00
Semen Portland 163.0000 Kg 1,340.00 218,420.00
Pasir pasang 0.5200 m3 120,000.00 62,400.00
Pekerja 1.5000 HOK 60,000.00 90,000.00
Tukang batu 0.6000 HOK 80,000.00 48,000.00
Kepala tukang 0.0600 HOK 90,000.00 5,400.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 150,150.00 390,820.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total #VALUE!

C-06 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 5 Ps


Batu belah 15/20 cm 1.1000 m3 100,000.00 110,000.00
Semen Portland 136.0000 Kg 1,340.00 182,240.00
Pasir pasang 0.5440 m3 120,000.00 65,280.00
Pekerja 1.5000 HOK 60,000.00 90,000.00
Tukang batu 0.6000 HOK 80,000.00 48,000.00
Kepala tukang 0.0600 HOK 90,000.00 5,400.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 150,150.00 357,520.00
Total Harga 507,670.00
Keuntungan 76,150.50
Jumlah Total 583,800.00

C-07 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 6 Ps


Batu belah 15/20 cm 1.1000 m3 100,000.00 110,000.00
Semen Portland 117.0000 Kg 1,340.00 156,780.00
Pasir pasang 0.5610 m3 120,000.00 67,320.00
Pekerja 1.5000 HOK 60,000.00 90,000.00
Tukang batu 0.6000 HOK 80,000.00 48,000.00
Analisa
53 of 81
a b c d e f=(cxe) g=(cxe) h
Kepala tukang 0.0600 HOK 90,000.00 5,400.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 150,150.00 334,100.00
Total Harga Z
Keuntungan #VALUE!
Jumlah Total #VALUE!

C-08 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 8 Ps


Batu belah 15/20 cm 1.1000 m3 100,000.00 110,000.00
Semen Portland 91.0000 Kg 1,340.00 121,940.00
Pasir pasang 0.5610 m3 120,000.00 67,320.00
Pekerja 1.5000 HOK 60,000.00 90,000.00
Tukang batu 0.6000 HOK 80,000.00 48,000.00
Kepala tukang 0.0600 HOK 90,000.00 5,400.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 150,150.00 299,260.00
Total Harga
Keuntungan
Jumlah Total

C-09 1 m3 PASANGAN PONDASI BATU KALI, 1 Kp : 1 Sm : 1 Ps


C-10 1 m3 PASANGAN PONDASI BATU KALI, 1 Kp : 1 Sm : 2 Ps
C-11 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 1/4 Kp : 4 Ps
C-12 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Kp : 10 Ps
C-13 1 m3 PASANGAN PONDASI BATU KALI, 1/4 Pc : 1 Kp : 4 Ps

C-014 1 m3 PASANGAN PONDASI BATU KOSONG


Batu belah 15/20 cm 1.2000 m3 100,000.00 120,000.00
Pasir Urug 0.3000 m3 86,500.00 25,950.00
Pekerja 0.7800 HOK 60,000.00 46,800.00
Tukang batu 0.3900 HOK 80,000.00 31,200.00
Kepala tukang 0.0390 HOK 90,000.00 3,510.00
Mandor 0.0390 HOK 90,000.00 3,510.00
Total 85,020.00 145,950.00
Total Harga 230,970.00
Keuntungan 34,645.50
Jumlah Total 265,600.00

C-015 1 m3 PASANGAN PONDASI SIKLOP 40% BATU KALI


Besi beton 75.0000 Kg 9,000.00 675,000.00
Semen Portland 202.0000 Kg 1,340.00 270,680.00
Pasir beton 0.3200 m3 160,000.00 51,200.00
Koral beton 0.4900 m3 160,000.00 78,400.00
Kawat beton 0.8000 Kg 16,500.00 13,200.00
Pekerja 3.0000 HOK 60,000.00 180,000.00
Tukang batu 0.8500 HOK 80,000.00 68,000.00
Kepala tukang 0.0850 HOK 90,000.00 7,650.00
Mandor 0.1500 HOK 90,000.00 13,500.00
Total 269,150.00 1,088,480.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total

C-016 1 m3 PASANGAN PONDASI SUMURAN DIAMETER 100 cm


Batu belah 15/20 cm 0.4500 m3 100,000.00 45,000.00
Semen Portland 280.0000 Kg 1,340.00 375,200.00
Pasir beton 0.4500 m3 160,000.00 72,000.00
Koral beton 0.6700 m3 160,000.00 107,200.00
Pekerja 2.3800 HOK 60,000.00 142,800.00
Tukang batu 0.3000 HOK 80,000.00 24,000.00
Kepala tukang 0.0300 HOK 90,000.00 2,700.00
Mandor 0.0800 HOK 90,000.00 7,200.00
Total 176,700.00 599,400.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total

C-017 1 m3 PEMBUATAN TIANG PANCANG BETON BERTULANG ( 40x40 ) cm,


Pasir urug darat 0.0190 m3 86,500.00 1,643.50
Pasir beton 0.0940 m3 160,000.00 15,040.00
Koral beton 0.1500 m3 160,000.00 24,000.00
Analisa
54 of 81
a b c d e f=(cxe) g=(cxe) h
Semen Portland 60.5000 Kg 1,340.00 81,070.00
Besi beton 45.0000 Kg 9,000.00 405,000.00
Kawat beton 0.9000 Kg 16,500.00 14,850.00
Kayu kaso 5/7 0.0320 m3 1,700,000.00 54,400.00
Paku 0.1200 Kg 15,000.00 1,800.00
Minyak bekisting 0.0900 Lt - -
Plamir tembok 0.2400 Kg Z #VALUE!
Pekerja 1.0000 HOK 60,000.00 60,000.00
Tukang batu 0.6700 HOK 80,000.00 53,600.00
Kepala tukang 0.0670 HOK 90,000.00 6,030.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total 124,130.00 #VALUE!
Total Harga #VALUE!
Keuntungan #VALUE!
Jumlah Total

C-018 1 m3 PEMBUATAN TIANG PANCANG BETON BERTULANG ( 35x35 ) cm,


Pasir urug darat 0.0160 m3 86,500.00 1,384.00
Pasir beton 0.0800 m3 160,000.00 12,800.00
Koral beton 0.1250 m3 160,000.00 20,000.00
Semen Portland 49.0000 Kg 1,340.00 65,660.00
Besi beton 34.5000 Kg 9,000.00 310,500.00
Kawat beton 0.7000 Kg 16,500.00 11,550.00
Kayu kaso 5/7 0.0270 m3 1,700,000.00 45,900.00
Paku 0.1200 Kg 15,000.00 1,800.00
Minyak bekisting 0.0900 Lt - -
Plamuur tembok 0.2000 Kg Z #VALUE!
Pekerja 0.8000 HOK 60,000.00 48,000.00
Tukang batu 0.5000 HOK 80,000.00 40,000.00
Kepala tukang 0.0500 HOK 90,000.00 4,500.00
Mandor 0.0400 HOK 90,000.00 3,600.00
Total 96,100.00 #VALUE!
Total Harga #VALUE!
Keuntungan #VALUE!
Jumlah Total

D PEKERJAAN DINDING
D-01 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 1 Ps
Bata merah ( 5x11x22 ) cm 140.0000 Bh 750.00 105,000.00
Semen Portland 64.0300 Kg 1,340.00 85,800.20
Pasir pasang 0.0590 m3 120,000.00 7,080.00
Pekerja 0.6500 HOK 60,000.00 39,000.00
Tukang batu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 59,500.00 197,880.20
Total Harga z
Keuntungan #VALUE!
Jumlah Total

D-02 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 2 Ps


Bata merah ( 5x11x22 ) cm 140.0000 Bh 750.00 105,000.00
Semen Portland 43.5000 Kg 1,340.00 58,290.00
Pasir pasang 0.0800 m3 120,000.00 9,600.00
Pekerja 0.6500 HOK 60,000.00 39,000.00
Tukang batu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 59,500.00 172,890.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total

D-03 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 3 Ps


Bata merah ( 5x11x22 ) cm 140.0000 Bh 750.00 105,000.00
Semen Portland 32.9500 Kg 1,340.00 44,153.00
Pasir pasang 0.0910 m3 120,000.00 10,920.00
Pekerja 0.6500 HOK 60,000.00 39,000.00
Tukang batu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Analisa
55 of 81
a b c d e f=(cxe) g=(cxe) h
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 59,500.00 160,073.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total #VALUE!

D-04 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 4 Ps


Bata merah ( 5x11x22 ) cm 140.0000 Bh 750.00 105,000.00
Semen Portland 26.5500 Kg 1,340.00 35,577.00
Pasir pasang 0.0930 m3 120,000.00 11,160.00
Pekerja 0.6500 HOK 60,000.00 39,000.00
Tukang batu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 59,500.00 151,737.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total
D-05 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 5 Ps
Bata merah ( 5x11x22 ) cm 140.0000 Bh 750.00 105,000.00
Semen Portland 22.2000 Kg 1,340.00 29,748.00
Pasir pasang 0.1020 m3 120,000.00 12,240.00
Pekerja 0.6500 HOK 60,000.00 39,000.00
Tukang batu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 59,500.00 146,988.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total #VALUE!
Dibulatkan #VALUE!
D-06 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 6 Ps
D-07 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 3 Kp : 10 Ps
D-08 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 1 Ps

D-09 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 2 Ps


Bata merah ( 5x11x22 ) cm 70.0000 Bh 750.00 52,500.00
Semen Portland 18.9500 Kg 1,340.00 25,393.00
Pasir pasang 0.0380 m3 120,000.00 4,560.00
Pekerja 0.3200 HOK 60,000.00 19,200.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total 29,450.00 82,453.00
Total Harga z
Keuntungan #VALUE!
Jumlah Total #VALUE!

D-010 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 3 Ps


Bata merah ( 5x11x22 ) cm 70.0000 Bh 750.00 52,500.00
Semen Portland 14.3700 Kg 1,340.00 19,255.80
Pasir pasang 0.0400 m3 120,000.00 4,800.00
Pekerja 0.3200 HOK 60,000.00 19,200.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total 29,450.00 76,555.80
Total Harga Z
Keuntungan #VALUE!
Jumlah Total #VALUE!

D-011 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 4 Ps


Bata merah ( 5x11x22 ) cm 70.0000 Bh 750.00 52,500.00
Semen Portland 11.5000 Kg 1,340.00 15,410.00
Pasir pasang 0.0430 m3 120,000.00 5,160.00
Pekerja 0.3200 HOK 60,000.00 19,200.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total 29,450.00 73,070.00
Total Harga z
Analisa
56 of 81
a b c d e f=(cxe) g=(cxe) h
Keuntungan #VALUE!
Jumlah Total

D-012 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps


Bata merah ( 5x11x22 ) cm 70.0000 Bh 750.00 52,500.00
Semen Portland 9.6800 Kg 1,340.00 12,971.20
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Pekerja 0.3000 HOK 60,000.00 18,000.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOKK 90,000.00 1,350.00
Total 28,250.00 70,871.20
Total Harga 99,121.20
Keuntungan 14,868.18
Jumlah Total 113,900.00

E-05 1 m2 PLESTERAN 1 PC : 5 Ps, TEBAL 15 mm + ACIAN


Semen Portland 5.4000 kg 1,340.00 7,236.00
Pasir pasang 0.0280 m3 120,000.00 3,360.00
Pekerja 0.2250 HOK 60,000.00 13,500.00
Tukang batu 0.1525 HOK 80,000.00 12,200.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0080 HOK 90,000.00 720.00
Total 27,770.00 10,596.00
Total Harga 38,366.00
Keuntungan 5,754.90
Jumlah Total 44,100.00

Analisa
57 of 81
a b c d e f=(cxe) g=(cxe) h

E-30 1 m2 PLESTERAN BETON 1 PC : 3 Ps, TEBAL 15 mm +ACIAN


Semen Portland 8.0000 kg 1,340.00 10,720.00
Pasir pasang 0.0260 m3 120,000.00 3,120.00
Pekerja 0.2250 HOK 60,000.00 13,500.00
Tukang batu 0.1525 HOK 80,000.00 12,200.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0080 HOK 90,000.00 720.00
Total 27,320.00 13,840.00
Total Harga 41,160.00
Keuntungan 6,174.00
Jumlah Total 47,300.00

F-02.a MEMBUAT DAN MEMASANG 1 m3 KUSEN PINTU DAN JENDELA KAYU KELAS II
Kayu Kelas II, balok 1.2000 m3 2,750,000.00 3,300,000.00
Paku 10 cm 1.2500 kg 15,000.00 18,750.00
Lem kayu 1.0000 kg 12,700.00 12,700.00
Pekerja 6.0000 HOK 60,000.00 360,000.00
Tukang kayu 18.0000 HOK 80,000.00 1,440,000.00
Kepala tukang 1.8000 HOK 90,000.00 162,000.00
Mandor 0.3000 HOK 90,000.00 27,000.00
Total 1,989,000.00 3,331,450.00
Total Harga 5,320,450.00
Keuntungan 798,067.50
Jumlah Total 6,118,500.00
F-07.a MEMBUAT DAN MEMASANG 1 m2 PINTU PANEL KAYU GUNUNG KELAS II
Kayu Klas II, papan 0.0400 m3 3,000,000.00 120,000.00
Lem kayu 0.5000 kg 12,700.00 6,350.00
Pekerja 1.0000 HOK 60,000.00 60,000.00
Tukang kayu 3.0000 HOK 80,000.00 240,000.00
Kepala tukang 0.3000 HOK 90,000.00 27,000.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total 331,500.00 126,350.00
Total Harga 457,850.00
Keuntungan 68,677.50
Jumlah Total 526,500.00

F-11.b 1 m2 PASANG JENDELA KACA KAYU KELAS II (TANPA KACA)


Kayu Klas II, papan 0.0100 m3 3,000,000.00 30,000.00
Pekerja 0.8000 HOK 60,000.00 48,000.00
Tukang kayu 2.0000 HOK 80,000.00 160,000.00
Kepala tukang 0.2000 HOK 90,000.00 18,000.00
Mandor 0.0400 HOK 90,000.00 3,600.00
Total 229,600.00 30,000.00
Total Harga 259,600.00
Keuntungan 38,940.00
Jumlah Total 298,500.00
F-39 1 m2 PASANG LANGIT - LANGIT GRC 4 mm + RANGKA KAYU KLAS II ( 1 x 0.6 m )
Kayu klas II, kaso 0.0123 m3 2,750,000.00 33,880.00
GRC ( 120 x 240 x 0.04 ) cm 0.3646 m2 60,000.00 21,876.00
Cotton plaster 0.0720 roll 10,400.00 748.80
Compound 0.1250 zak 4,620.00 577.50
Paku biasa 2"-5" 0.1000 Kg 15,000.00 1,500.00
Pekerja 0.1500 HOK 60,000.00 9,000.00
Tukang kayu 0.2500 HOK 80,000.00 20,000.00
Kepala tukang 0.0250 HOK 90,000.00 2,250.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 38,000.00 58,582.30
Total Harga 96,582.30
Keuntungan 14,487.35
Jumlah Total 111,069.65
Dibulatkan 111,000.00
F-39.a 1 m2 PASANG LANGIT - LANGIT GRC 4 mm + RANGKA KAYU ALBASIAH ( 1 x 0.6 m )
Kayu albasiah, kaso 0.0123 m3 1,700,000.00 20,944.00
GRC ( 120 x 240 x 0.04 ) cm 0.3646 m2 60,000.00 21,876.00
Cotton plaster 0.0720 roll 10,400.00 748.80
Compound 0.1250 zak 4,620.00 577.50
Paku biasa 2"-5" 0.1000 Kg 15,000.00 1,500.00
Pekerja 0.1500 HOK 60,000.00 9,000.00
Tukang kayu 0.2500 HOK 80,000.00 20,000.00
Kepala tukang 0.0250 HOK 90,000.00 2,250.00
Analisa
58 of 81
a b c d e f=(cxe) g=(cxe) h
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 38,000.00 45,646.30
Total Harga 83,646.30
Keuntungan 12,546.95
Jumlah Total 96,193.25
Dibulatkan 96,100.00

F-39.a 1 m2 PASANG LANGIT - LANGIT GRC T=4 mm + RANGKA HOLLOW GALVANIS 40x40,20x40 mm
Hollow Galvanis 40 x 40 3.7000 m' #VALUE! #VALUE!
Hollow Galvanis 20 x 40 2.2000 m' #VALUE! #VALUE!
Skrup/Suspension clip 8.0000 bh Z #VALUE!
Skrup/Suspension road 8.0000 bh Z #VALUE!
GRC ( 120 x 240 x 0.9 ) cm 0.3646 m2 60,000.00 21,876.00
Cotton plaster 0.0720 roll 10,400.00 748.80
Compound 0.1250 kg 4,620.00 577.50
Paku skrup khusus hollow 60.0000 bh 155.00 9,300.00
Pekerja 0.1130 HOK 60,000.00 6,780.00
Tukang kayu 0.1430 HOK 80,000.00 11,440.00
Kepala tukang 0.0500 HOK 90,000.00 4,500.00
Mandor 0.0240 HOK 90,000.00 2,160.00
Total 24,880.00 #VALUE!
Total harga #VALUE!
Keuntungan #VALUE!
Jumlah total #VALUE!
F-39.b 1 m2 PASANG LANGIT - LANGIT GYPSUM 9 mm + RANGKA HOLLOW GALVANIS 40x40,20x40 mm
Hollow Galvanis 40 x 40 3.7000 m' #VALUE! #VALUE!
Hollow Galvanis 20 x 40 2.2000 m' #VALUE! #VALUE!
Skrup/Suspension clip 8.0000 bh Z #VALUE!
Skrup/Suspension road 8.0000 bh Z #VALUE!
Gypsum ( 120 x 240 x 0.9) cm 0.3646 m2 Z #VALUE!
Cotton plaster 0.0720 roll 10,400.00 748.80
Compound 0.1250 kg 4,620.00 577.50
Paku skrup khusus hollow 60.0000 bh 155.00 9,300.00
Pekerja 0.1130 HOK 60,000.00 6,780.00
Tukang kayu 0.1430 HOK 80,000.00 11,440.00
Kepala tukang 0.0500 HOK 90,000.00 4,500.00
Mandor 0.0240 HOK 90,000.00 2,160.00
Total 24,880.00 #VALUE!
Total harga #VALUE!
Keuntungan #VALUE!
Jumlah total #VALUE!
F-39.c 1 m2 PASANG LANGIT - LANGIT GRC 5 mm TANPA RANGKA
GRC ( 120 x 240 x 0.4 ) cm 0.3646 lbr 60,000.00 21,876.00
Cotton plaster 0.0720 roll 10,400.00 748.80
Compound 0.1250 kg 4,620.00 577.50
Paku skrup khusus hollow 10.0000 bh 155.00 1,550.00
Pekerja 0.1500 HOK 60,000.00 9,000.00
Tukang kayu 0.2500 HOK 80,000.00 20,000.00
Kepala tukang 0.0250 HOK 90,000.00 2,250.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total 38,000.00 24,752.30
Total harga 62,752.30
Keuntungan 9,412.85
Jumlah total 72,100.00

Analisa
59 of 81
a b c d e f=(cxe) g=(cxe) h
F-53.b 1 m' LIST LANGIT-LANGIT GYPSUM
List Gypsum 1.1000 m' 15,000.00 16,500.00
Paku 0.0100 Kg 15,000.00 150.00
Pekerja 0.0500 HOK 60,000.00 3,000.00
Tukang kayu 0.0500 HOK 80,000.00 4,000.00
Kepala tukang 0.0050 HOK 90,000.00 450.00
Mandor 0.0030 HOK 90,000.00 270.00
Total 7,720.00 16,650.00
Total Harga 24,370.00
Keuntungan 3,655.50
Jumlah Total 28,000.00

F-53.a 1 m' PASANG LISTPLANK WOOD PLANK ukuran 25 cm


Woodplank lebar 25 cm 1.1000 m' 20,312.50 22,343.75
Skrup 6x1 1/2" 8.0000 bh 155.00 1,240.00
Pekerja 0.1000 HOK 60,000.00 6,000.00
Tukang kayu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total 19,400.00 23,583.75
Total harga 42,983.75
Keuntungan 6,447.56
Jumlah total 49,400.00
G-01 1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 5 Kr
Semen portland 218.0000 kg 1,340.00 292,120.00
Pasir beton 0.5200 m3 160,000.00 83,200.00
Koral beton 0.8700 m3 160,000.00 139,200.00
Pekerja 1.6500 HOK 60,000.00 99,000.00
Tukang batu 0.2500 HOK 80,000.00 20,000.00
Kepala tukang 0.0250 HOK 90,000.00 2,250.00
Mandor 0.0800 HOK 90,000.00 7,200.00
Total 128,450.00 514,520.00
Total Harga 642,970.00
Keuntungan 96,445.50
Jumlah Total 739,400.00

G-05 1 m3 MEMBUAT BETON 1 PC : 2 Ps : 3 Kr


Semen portland 336.0000 kg 1,340.00 450,240.00
Pasir beton 0.5400 m3 160,000.00 86,400.00
Koral beton/split 2/3 0.8100 m3 160,000.00 129,600.00
Pekerja 1.6500 HOK 60,000.00 99,000.00
Tukang batu 0.2500 HOK 80,000.00 20,000.00
Kepala tukang 0.0250 HOK 90,000.00 2,250.00
Mandor 0.0800 HOK 90,000.00 7,200.00
Total 128,450.00 666,240.00
Total Harga 794,690.00
Keuntungan 119,203.50
Jumlah Total 913,900.00

G-25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR


Besi beton ( polos /ulir ) 1.0500 Kg 9,000.00 9,450.00
Kawat beton 0.0150 Kg 16,500.00 247.50
Pekerja 0.0070 HOK 60,000.00 420.00
Tukang besi 0.0070 HOK 80,000.00 560.00
Kepala tukang 0.0007 HOK 90,000.00 63.00
Mandor 0.0003 HOK 90,000.00 27.00
Total 1,070.00 9,697.50
Total Harga 10,767.50
Keuntungan 1,615.13
Jumlah Total 12,400.00

G-28 1 m2 PASANG BEKISTING UNTUK PONDASI


Kayu terentang 0.0400 m3 1,700,000.00 68,000.00
Paku biasa 2'-5" 0.3000 Kg 15,000.00 4,500.00
Minyak bekisting 0.1000 Ltr 5,000.00 500.00
Pekerja 0.3000 HOK 60,000.00 18,000.00
Tukang kayu 0.2600 HOK 80,000.00 20,800.00
Kepala tukang 0.0260 HOK 90,000.00 2,340.00
Mandor 0.0050 HOK 90,000.00 450.00
Total 41,590.00 73,000.00
Total Harga 114,590.00
Analisa
60 of 81
a b c d e f=(cxe) g=(cxe) h
Keuntungan 17,188.50
Jumlah Total 131,778.50

Analisa
61 of 81
a b c d e f=(cxe) g=(cxe) h

G-29.a 1 m2 PASANG BEKISTING UNTUK SLOOF ( 2 X Pakai )


Kayu terentang Klas III ( Albasiah ) 0.0225 m3 1,700,000.00 38,250.00
Paku biasa 2'-5" 0.3000 Kg 15,000.00 4,500.00
Minyak bekisting 0.1000 Ltr 5,000.00 500.00
Pekerja 0.3000 HOK 60,000.00 18,000.00
Tukang kayu 0.2600 HOK 80,000.00 20,800.00
Kepala tukang 0.0260 HOK 90,000.00 2,340.00
Mandor 0.0050 HOK 90,000.00 450.00
Total 41,590.00 43,250.00
Total Harga 84,840.00
Keuntungan 12,726.00
Jumlah Total 97,600.00
G-30.A 1 m2 PASANG BEKISTING UNTUK KOLOM ( Albasiah 2X pakai)
Kayu Papan Albasiah 0.0200 m3 1,700,000.00 34,000.00
Paku biasa 2'-5" 0.4000 Kg 15,000.00 6,000.00
Minyak bekisting 0.2000 Ltr 5,000.00 1,000.00
Balok kayu Kelas III 0.0075 m3 1,700,000.00 12,750.00
bambu 1.0000 Btg 7,000.00 7,000.00
Pekerja 0.3000 HOK 60,000.00 18,000.00
Tukang kayu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0060 HOK 90,000.00 540.00
Total 47,910.00 60,750.00
Total Harga 108,660.00
Keuntungan 16,299.00
Jumlah Total 125,000.00

G-31.a 1 m2 PASANG BEKISTING UNTUK BALOK ( Albasiah 2X Pakai )


Kayu Papan Albasiah 0.0200 m3 1,700,000.00 34,000.00
Paku biasa 2'-5" 0.4000 Kg 15,000.00 6,000.00
Minyak bekisting 0.2000 Ltr 5,000.00 1,000.00
Balok kayu Kelas III 0.0090 m3 1,700,000.00 15,300.00
Bambu 1.0000 Btg 7,000.00 7,000.00
Pekerja 0.3200 HOK 60,000.00 19,200.00
Tukang kayu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0060 HOK 90,000.00 540.00
Total 49,110.00 63,300.00
Total Harga 112,410.00
Keuntungan 16,861.50
Jumlah Total 129,300.00

G-32.B 1 m2 PASANG BEKISTING UNTUK LANTAI


Kayu Papan Albasiah 0.0200 m3 1,700,000.00 34,000.00
Paku biasa 2'-5" 0.4000 Kg 15,000.00 6,000.00
Minyak bekisting 0.2000 Ltr 5,000.00 1,000.00
Balok kayu Kelas III 0.0075 m3 1,700,000.00 12,750.00
Bambu 3.0000 Btg 7,000.00 21,000.00
Pekerja 0.3200 HOK 60,000.00 19,200.00
Tukang batu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0060 HOK 90,000.00 540.00
Total 49,110.00 74,750.00
Total Harga 123,860.00
Keuntungan 18,579.00
Jumlah Total 142,400.00

G-37 1 m2 PASANG STEGER/PERANCAH DARI BAMBU


Bambu Ø 6-8/4 m 1.2500 bt 7,000.00 8,750.00
Balok kayu Kelas III 0.0075 m3 1,700,000.00 12,750.00
Paku biasa 2"-5" 0.6000 Kg 15,000.00 9,000.00
Pekerja 1.0000 HOK 60,000.00 60,000.00
Tukang kayu 2.0000 HOK 80,000.00 160,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0050 HOK 90,000.00 450.00
Total 222,250.00 30,500.00
Total Harga 252,750.00
Keuntungan 37,912.50
Jumlah Total 290,700.00

Analisa
62 of 81
a b c d e f=(cxe) g=(cxe) h
G-A Membuat 1 M3 Pondasi Foot Plat 1,00 x 0,8 (P1)
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 7.5504 M2 98,833.88 746,231.08
Besi beton polos & uril 216.2409 KG 12,400.00 2,681,387.51

4,341,518.59 4,341,518.59
G-B Membuat 1 M3 Pondasi Plat 0,6 x 0,6 (P2)
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 12.6531 M2 98,833.88 1,250,551.07
Besi beton polos 207.9895 KG 12,400.00 2,579,069.62

4,743,520.69 4,743,520.69

Analisa
63 of 81
a b c d e f=(cxe) g=(cxe) h
G-B.a Membuat 1 M3 Pondasi Plat 0,7 x 0,7 (P3)
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 739,400.00 739,400.00
Bekisting 2XPAKAI 10.7895 M2 98,833.88 1,066,365.49
Besi beton polos 226.9629 KG 12,400.00 2,814,339.37

4,620,104.87 4,620,104.87
G-B.b Membuat 1 M3 Pondasi Foot Plat Tangga
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 10.9028 M2 98,833.88 1,077,568.21
Besi beton polos 185.3494 KG 12,400.00 2,298,332.55

4,289,800.76 4,289,800.76
G-B.c Membuat 1 M3 Pondasi Foot Plat F4 1,20 x 1,20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 8.8017 M2 98,833.88 869,910.36
Besi beton polos 408.8138 KG 12,400.00 5,069,291.15

6,853,101.51 z
G-C Membuat 1 M3 Pondasi Foot Plat 0,8 x 0,7 (P3)
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 8.8017 M2 98,833.88 869,910.36
Besi beton polos 408.8138 KG 12,400.00 5,069,291.15

6,853,101.51 z
G-D Membuat 1 M3 Pondasi footplat Tangga
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 7.1548 M2 98,833.88 707,131.89
Besi beton polos 143.1368 KG 12,400.00 1,774,896.82

3,395,928.71 z

G-E Membuat 1 M3 Pondasi Plat beton


Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 1.4286 M2 98,833.88 141,191.25
Besi beton polos 70.9114 KG 12,400.00 879,301.82

1,934,393.07 z
G-F Membuat 1 M3 Sloof Beton 15/20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 13.3333 M2 97,600.00 1,301,333.33
Besi beton polos 300.3768 KG 12,400.00 3,724,671.73

5,939,905.06 5,939,905.06
G-O Membuat 1 M3 Kolom K2 20/20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 21.5000 M2 125,000.00 2,687,500.00
Besi beton polos 194.3425 KG 12,400.00 2,409,847.01

6,011,247.01 6,011,247.01
G-R Membuat 1 M3 Portal beton K3 15/30
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 13.3333 M2 125,000.00 1,666,666.67
Besi beton polos 171.0896 KG 12,400.00 2,121,510.91

4,702,077.58 4,702,077.58
G-L Membuat 1 M3 Kolom 15/15
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 26.6667 M2 125,000.00 3,333,333.33
Besi beton polos 232.2250 KG 12,400.00 2,879,589.94

7,126,823.28 7,126,823.28
G-N.4 Membuat 1 M3 Balok, 15/20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 739,400.00 739,400.00
Bekisting 2XPAKAI 17.7778 M2 129,300.00 2,298,666.67
Besi beton polos 172.2964 KG 12,400.00 2,136,475.30

5,174,541.97 5,174,541.97
G-Z.a Membuat 1 M3 Ring Balk RB1 15/20
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 13.3333 M2 129,300.00 1,724,000.00
Besi beton polos 173.7169 KG 12,400.00 2,154,089.27
Analisa
64 of 81
a b c d e f=(cxe) g=(cxe) h

4,791,989.27 4,791,989.27
G-Z.b Membuat 1 M3 Ring Balok, RB2 15/25
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2XPAKAI 13.3333 M2 129,300.00 1,724,000.00
Besi beton polos 167.6069 KG 12,400.00 2,078,325.51

4,716,225.51 4,716,225.51
G-Z.c Membuat 1 M3 Ring Balok 12/15
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 739,400.00 739,400.00
Bekisting 2XPAKAI 16.6667 M2 129,300.00 2,155,000.00
Besi beton polos 212.9809 KG 12,400.00 2,640,962.63

5,535,362.63 5,535,362.63
G-Z.d Membuat 1 M3 Plat lantai T =12 Cm
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2 X Pakai 10.6309 M2 142,400.00 1,513,844.91
Besi beton polos 142.3704 KG 12,400.00 1,765,392.96

4,193,137.87 4,193,137.87
Membuat 1 M3 Plat Lantai T=12 Cm
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bondex 8.7500 M2 117,000.00 1,023,750.00
Wermesh 10 8.7500 M2 88,844.80 777,391.98
Steger 8.3333 m2 290,700.00 2,422,500.00
Pengelasan 41.0000 ttk 2,100.00 86,100.00
4,309,741.98 4,309,741.98

Analisa
65 of 81
a b c d e f=(cxe) g=(cxe) h
G-Z.f Membuat 1 M3 lisplank beton T =7 Cm
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 2 X Pakai 16.4453 M2 142,400.00 2,341,812.75
Besi beton polos 163.7345 KG 12,400.00 2,030,307.91

5,286,020.66 5,286,020.66
G-Z.g Membuat 1 M3 Anak tangga
Beton Site Mix 1PC : 2Ps :3Kr 1.0000 M3 913,900.00 913,900.00
Bekisting 10.4800 M2 142,400.00 1,492,352.00
Besi beton polos 21.3330 KG 12,400.00 264,528.64

2,670,780.64 2,670,780.64
H-01 1 m2 PASANG ATAP GENTENG PALENTONG KECIL
Genteng palentong 25.0000 Bh 1,750.00 43,750.00
Pekerja 0.1500 HOK 60,000.00 9,000.00
Tukang kayu 0.0750 HOK 80,000.00 6,000.00
Kepala tukang 0.0080 HOK 90,000.00 720.00
Mandor 0.0080 HOK 90,000.00 720.00
Total 16,440.00 43,750.00
Total Harga 60,190.00
Keuntungan 9,028.50
Jumlah Total 69,200.00

H-04 1 m1 PASANG GENTENG BUBUNG PALENTONG


Genteng bubung palentong 5.0000 Bh 3,000.00 15,000.00
Semen portland 8.0000 Kg 1,340.00 10,720.00
Pasir pasang 0.0320 m3 120,000.00 3,840.00
Pekerja 0.4000 HOK 60,000.00 24,000.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0020 HOK 90,000.00 180.00
Total 41,980.00 29,560.00
Total Harga 71,540.00
Keuntungan 10,731.00
Jumlah Total 82,300.00

L-02 1 BUAH PASANG KUNCI DOUBLE SLAAG


Kunci tanam biasa 1.0000 bh 139,000.00 139,000.00
Pekerja 0.0100 HOK 60,000.00 600.00
Tukang kayu 0.5000 HOK 80,000.00 40,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0050 HOK 90,000.00 450.00
Total 41,950.00 139,000.00
Total Harga 180,950.00
Keuntungan 27,142.50
Jumlah Total 208,100.00

L-05 1 PASANG, ENGSEL PINTU


Engsel pintu 1.0000 psng 36,000.00 36,000.00
Pekerja 0.0150 HOK 60,000.00 900.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0008 HOK 90,000.00 67.50
Total 14,317.50 36,000.00
Total Harga 50,317.50
Keuntungan 7,547.63
Jumlah Total 57,900.00

L-06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU


Engsel jendela 1.0000 bh 19,000.00 19,000.00
Pekerja 0.0100 HOK 60,000.00 600.00
Tukang kayu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0005 HOK 90,000.00 45.00
Total 9,545.00 19,000.00
Total Harga 28,545.00
Keuntungan 4,281.75
Jumlah Total 32,800.00

Analisa
66 of 81
a b c d e f=(cxe) g=(cxe) h

L-09 1 BUAH PASANG KAIT ANGIN


Kait angin 1.0000 bh 16,500.00 16,500.00
Pekerja 0.0150 HOK 60,000.00 900.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0008 HOK 90,000.00 67.50
Total 14,317.50 16,500.00
Total Harga 30,817.50
Keuntungan 4,622.63
Jumlah Total 35,400.00

L-11 1 BUAH PASANG KUNCI SELOT JENDELA


Kunci selot 1.0000 bh 9,000.00 9,000.00
Pekerja 0.0200 HOK 60,000.00 1,200.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0010 HOK 90,000.00 90.00
Total 19,090.00 9,000.00
Total Harga 28,090.00
Keuntungan 4,213.50
Jumlah Total 32,300.00
L-11.a 1 SET PASANG SELOT PINTU
Selot Pintu 1.0000 bh 21,800.00 21,800.00
Pekerja 0.0200 HOK 60,000.00 1,200.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0010 HOK 90,000.00 90.00
Total 19,090.00 21,800.00
Total Harga 40,890.00
Keuntungan 6,133.50
Jumlah Total 47,000.00

L-16 1 m2 PASANG KACA TEBAL 3 mm


Kaca 1.1000 M2 52,750.00 58,025.00
Pekerja 0.0150 HOK 60,000.00 900.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0008 HOK 90,000.00 67.50
Total 14,317.50 58,025.00
Total Harga 72,342.50
Keuntungan 10,851.38
Jumlah Total 83,190.00
M-47 1 m2 PASANG LANTAI KERAMIK 30X30 cm
Ubin keramik 30x30 cm 11.6667 bh 4,318.18 50,378.79
Semen Portland 11.3800 Kg 1,340.00 15,249.20
Pasir pasang 0.0420 m3 120,000.00 5,040.00
Semen warna 0.5000 Kg 9,500.00 4,750.00
Pekerja 0.6200 HOK 60,000.00 37,200.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 71,050.00 75,417.99
Total Harga 146,467.99
Keuntungan 21,970.20
Jumlah Total 168,400.00

M-59 1 m2 PASANG DINDING PORSELIN 11X11 cm, WARNA


Porselin 11x11 cm, warna 83.0000 bh #VALUE! #VALUE!
Semen Abu-abu 9.3000 Kg 1,340.00 12,462.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.5000 Kg 9,500.00 14,250.00
Pekerja 0.6200 HOK 60,000.00 37,200.00
Tukang batu 0.5000 HOK 80,000.00 40,000.00
Kepala tukang 0.0500 HOK 90,000.00 4,500.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 84,400.00 #VALUE!
Total Harga Z
Keuntungan #VALUE!
Jumlah Total -

Analisa
67 of 81
a b c d e f=(cxe) g=(cxe) h
M-62 1 m2 PASANG DINDING PORSELIN 10X20 cm, WARNA
Keramik 10x20 cm warna 50.0000 bh #VALUE! #VALUE!
Semen Abu-abu 9.3000 Kg 1,340.00 12,462.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.5000 Kg 9,500.00 14,250.00
Pekerja 0.6000 HOK 60,000.00 36,000.00
Tukang batu 0.4500 HOK 80,000.00 36,000.00
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 78,750.00 #VALUE!
Total Harga #VALUE!
Keuntungan #VALUE!
Jumlah Total -

M-64 1 m2 PASANG DINDING KERAMIK 10X20 cm


Keramik 10x20 cm 50.0000 bh #VALUE! #VALUE!
Semen Abu-abu 9.3000 Kg 1,340.00 12,462.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.5000 Kg 9,500.00 14,250.00
Pekerja 0.6000 HOK 60,000.00 36,000.00
Tukang batu 0.4500 HOK 80,000.00 36,000.00
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 78,750.00 #VALUE!
Total Harga #VALUE!
Keuntungan #VALUE!
Jumlah Total -

M-67 1 m2 PASANG DINDING KERAMIK 15X15 cm


Keramik 15x15 cm 45.0000 bh -
Semen Abu-abu 9.3000 Kg -
Pasir pasang 0.0180 m3 -
Semen warna 1.5000 Kg -
Pekerja 0.6000 HOK -
Tukang batu 0.0450 HOK -
Kepala tukang 0.0450 HOK -
Mandor 0.0300 HOK -
Total - -
Total Harga -
Keuntungan -
Jumlah Total -

M-68 1 m2 PASANG DINDING KERAMIK 20X20 cm


Keramik 20x20 cm 25.0000 bh -
Semen Abu-abu 9.3000 Kg -
Pasir pasang 0.0180 m3 -
Semen warna 1.5000 Kg -
Pekerja 0.6000 HOK -
Tukang batu 0.1000 HOK -
Kepala tukang 0.0450 HOK -
Mandor 0.0300 HOK -
Total - -
Total Harga -
Keuntungan -
Jumlah Total -
M-68,a 1 m2 PASANG DINDING KERAMIK 20X25 cm
Keramik 20x25 cm 20.0000 bh #VALUE! #VALUE!
Semen Abu-abu 9.3000 Kg 1,340.00 12,462.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.0000 Kg 9,500.00 9,500.00
Pekerja 0.6000 HOK 60,000.00 36,000.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 50,750.00 #VALUE!
Total Harga #VALUE!
Keuntungan #VALUE!
Jumlah Total #VALUE!
M-70 1 m2 PASANG DINDING MARMER
Marmer 1.0200 bh - -
Pacu Pancing 60 x 230 2.0000 bh - -
Analisa
68 of 81
a b c d e f=(cxe) g=(cxe) h
Semen Abu-abu 12.4400 Kg - -
Pasir pasang 0.0250 m3 - -
Semen warna 1.5000 Kg - -
Pekerja 0.7200 HOK - -
Tukang batu 0.6500 HOK - -
Kepala tukang 0.0650 HOK - -
Mandor 0.0350 HOK - -
Total - -
Total Harga -
Keuntungan -
Jumlah Total -

M-74 1 m2 PASANG DINDING BATU TEMPEL HITAM/ANDESIT


Batu tempel hitam/Andesit 1.1000 m2 Z #VALUE!
Semen Abu-abu 12.8000 Kg 1,340.00 17,152.00
Pasir pasang 0.0350 m3 120,000.00 4,200.00
Pekerja 0.6200 HOK 60,000.00 37,200.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 71,050.00 #VALUE!
Total Harga z
Keuntungan #VALUE!
Jumlah Total #VALUE!

M-79.a 1 m2 PASANG KARPET LANTAI


Karpet 1.1000 m2 Z #VALUE!
Lem 0.0250 Kg Z #VALUE!
Pekerja 0.0750 HOK 60,000.00 4,500.00
Tukang batu 0.1700 HOK 80,000.00 13,600.00
Kepala tukang 0.0170 HOK 90,000.00 1,530.00
Mandor 0.0085 HOK 90,000.00 765.00
Total 20,395.00 #VALUE!
Total Harga #VALUE!
Keuntungan #VALUE!
Jumlah Total #VALUE!

M-82 1 m2 PLINT KAYU 2X10 cm


Kayu jati, papan 0.0024 m2 -
Paku skrup 3.5" 0.0500 Kg -
Pekerja 0.1200 HOK -
Tukang kayu 0.1200 HOK -
Kepala tukang 0.0120 HOK -
Mandor 0.0060 HOK -
Total - -
Total Harga -
Keuntungan -
Jumlah Total -

M-82.a 1 m2 PASANG LANTAI KERAMIK 30X30 cm putih (polos)


Ubin keramik 30x30 cm 1.1000 m2 47,500.00 52,250.00
Semen Portland 8.0000 Kg 1,340.00 10,720.00
Pasir pasang 0.0215 m3 120,000.00 2,580.00
Semen warna 0.0130 Kg 9,500.00 123.50
Pekerja 0.2500 HOK 60,000.00 15,000.00
Tukang batu 0.1200 HOK 80,000.00 9,600.00
Kepala tukang 0.0120 HOK 90,000.00 1,080.00
Mandor 0.0125 HOK 90,000.00 1,125.00
Total 26,805.00 65,673.50
Total Harga z
Keuntungan #VALUE!
Jumlah Total #VALUE!

M-82.b 1 m2 PASANG LANTAI KERAMIK 30X30 cm warna


Ubin keramik 30x30 cm 11.0000 bh 4,680.00 51,480.00
Semen Portland 11.3800 Kg 1,340.00 15,249.20
Pasir pasang 0.0420 m3 120,000.00 5,040.00
Semen warna 0.0130 Kg 9,500.00 123.50
Pekerja 0.6200 HOK 60,000.00 37,200.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Analisa
69 of 81
a b c d e f=(cxe) g=(cxe) h
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 71,050.00 71,892.70
Total Harga Z
Keuntungan #VALUE!
Jumlah Total #VALUE!

M-82.c 1 m2 PASANG LANTAI KERAMIK 40X40 cm (warna)


Ubin keramik 40x40 cm 6.9300 bh 9,379.51 65,000.00
Semen Portland 8.0000 Kg 1,340.00 10,720.00
Pasir pasang 0.0215 m3 120,000.00 2,580.00
Semen warna 0.0130 Kg 9,500.00 123.50
Pekerja 0.2500 HOK 60,000.00 15,000.00
Tukang batu 0.1200 HOK 80,000.00 9,600.00
Kepala tukang 0.0120 HOK 90,000.00 1,080.00
Mandor 0.0125 HOK 90,000.00 1,125.00
Total 26,805.00 78,423.50
Total Harga 105,228.50
Keuntungan 15,784.28
Jumlah Total 121,000.00

M-82.d 1 m2 PASANG LANTAI KERAMIK 60X60 cm, polos


Ubin keramik 60x60 cm 3.0000 bh #VALUE! #VALUE!
Semen Portland 11.3800 Kg 1,340.00 15,249.20
Pasir pasang 0.0420 m3 120,000.00 5,040.00
Semen warna 1.0000 Kg 9,500.00 9,500.00
Pekerja 0.6200 HOK 60,000.00 37,200.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 71,050.00 #VALUE!
Total Harga #VALUE!
Keuntungan #VALUE!
Jumlah Total #VALUE!

M-82.e 1 m2 PASANG LANTAI KERAMIK 30X30 cm ANTI SELIP


Ubin keramik 30x30 cm anti selip 11.0000 bh 4,727.27 52,000.00
Semen Portland 11.3800 Kg 1,340.00 15,249.20
Pasir pasang 0.0420 m3 120,000.00 5,040.00
Semen warna 1.5000 Kg 9,500.00 14,250.00
Pekerja 0.6200 HOK 60,000.00 37,200.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total 71,050.00 86,539.20
Total Harga 157,589.20
Keuntungan 23,638.38
Jumlah Total 181,227.58

Analisa
70 of 81
a b c d e f=(cxe) g=(cxe) h

N-09 1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 3 Lapis Cat Penutup)
Cat meni 0.2000 Kg 17,600.00 3,520.00
Plamir 0.1500 Kg 15,400.00 2,310.00
Cat dasar 0.1700 Kg 45,000.00 7,650.00
Cat Penutup ( 3 kali ) 0.3500 Kg 45,000.00 15,750.00
Pekerja 0.0700 HOK 60,000.00 4,200.00
Tukang cat 0.1050 HOK 80,000.00 8,400.00
Kepala tukang 0.0040 HOK 90,000.00 360.00
Mandor 0.0025 HOK 90,000.00 225.00
Total 13,185.00 29,230.00
Total Harga 42,415.00
Keuntungan 6,362.25
Jumlah Total 48,777.25
Dibulatkan 48,700.00
N-14.a 1 m2 PENGECATAN BIDANG TEMBOK BARU INTERIOR (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Plamir 0.1000 Kg 15,400.00 1,540.00
Cat dasar setara sanlex 0.1000 Kg 19,500.00 1,950.00
Cat Penutup ( 2 kali ) setara sanlex 0.2600 Kg 19,500.00 5,070.00
Amplas 0.5000 lbr 1,500.00 750.00
Rool Cat 0.0100 bh 13,200.00 132.00
Pekerja 0.0200 HOK 60,000.00 1,200.00
Tukang cat 0.0630 HOK 80,000.00 5,040.00
Kepala tukang 0.0063 HOK 90,000.00 567.00
Mandor 0.0025 HOK 90,000.00 225.00
Total 7,032.00 9,442.00
Total Harga 16,474.00
Keuntungan 2,471.10
Jumlah Total 18,900.00
N-14.d 1 m2 PENGECATAN PLAFOND BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Plamir 0.1000 Kg 15,400.00 1,540.00
Cat dasar setara sanlex 0.1000 Kg 19,500.00 1,950.00
Cat Penutup ( 2 kali ) setara sanlex 0.2600 Kg 19,500.00 5,070.00
Amplas 0.5000 lbr 1,500.00 750.00
Rool Cat 0.0100 bh 13,200.00 132.00
Pekerja 0.0200 HOK 60,000.00 1,200.00
Tukang cat 0.0700 HOK 80,000.00 5,600.00
Kepala tukang 0.0063 HOK 90,000.00 567.00
Mandor 0.0025 HOK 90,000.00 225.00
Total 7,592.00 9,442.00
Total Harga 17,034.00
Keuntungan 2,555.10
Jumlah Total 19,600.00

N-14.c PENGERJAAN 1 CM PENGELASAN DENGAN LAS LISTRIK


Kawat las listrik 0.0400 Kg 28,400.00 1,136.00
Solar 0.0300 ltr 5,500.00 165.00
Minyak pelumas 0.0040 ltr 22,000.00 88.00
Pekerja 0.0040 HOK 60,000.00 240.00
Tukang las 0.0020 HOK 80,000.00 160.00
Kepala tukang 0.0002 HOK 90,000.00 18.00
Mandor 0.0002 HOK 90,000.00 18.00
Total 436.00 1,389.00
Total Harga 1,825.00
Keuntungan 273.75
Jumlah Total 2,100.00

Analisa
Page 71

REKAPITULASI ANGGARAN BIAYA ESTIMITE ENGGENEER ( EE )

PEKERJAAN : PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
LOKASI : KOTA TASIKMALAYA

JUMLAH
NO. URAIAN HARGA
Rp.
1 2 3

PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH

A. PEK. PERSIAPAN 2,100,000.00


SUB JUMLAH A 2,100,000.00

B. PEKERJAAN LANTAI I

B.I. PEK. TANAH DAN URUGAN 1,994,311.00


B.II. PEK. BETON 106,203,092.55
B.III. PEK. DINDING DAN PASANGAN 19,732,861.00
B.IV. PEK. KUSEN,PINTU DAN JENDELA 6,787,428.60
B.V. PEK. PLAFOND 9,923,375.00
B.VI. PEK. LANTAI 13,876,465.00
B.VII. PEK. KUNCI DAN GANTUNGAN 3,036,900.00
B.VIII. PEK. PENGECATAN 7,851,712.00
B.IX. PEK. LISTRIK 1,154,000.00
SUB JUMLAH B 170,560,145.15

C. PEKERJAAN LANTAI II

C.1 PEK. BETON 22,506,663.65


C.II. PEK. DINDING DAN PASANGAN 27,704,427.00
C,III. PEK. KUSEN,PINTU DAN JENDELA 6,787,428.60
C.IV. PEK. KUDA - KUDA, ATAP DAN PLAFOND 48,049,748.00
C.V. PEK. LANTAI 13,018,761.00
C.VI. PEK. KUNCI DAN GANTUNGAN 1,094,600.00
C.VII. PEK. PENGECATAN 10,260,762.00
C.VIII. PEK. LISTRIK 1,404,000.00
SUB JUMLAH C 130,826,390.25

D. PEK. TANGGA 17,799,695.05


SUB JUMLAH D 17,799,695.05

E. PEKERJAAN LAIN-LAIN 250,000.00


SUB JUMLAH E 250,000.00

JUMLAH TOTAL 321,536,230.45


PPN 10% 32,153,623.04
JUMLAH + PPN 353,689,853.49
DIBULATKAN 353,689,000.00

TERBILANG :
SERATUS LIMA PULUH TIGA JUTA SERATUS ENAM BELAS RIBU RUPIAH

Diperiksa ; Tasikmalaya, 2016


Pejabat Pelaksana Teknis Kegiatan Dibuat;
(PPTK) Konsultan Perencana
CV. ARCHIDO MEDIA KARYA

BUDI NURCAHYADI, ST
TONI ANTONI,ST Direktur
NIP.19690709 200312 1 006

Mengetahui ;
Kepala Dinas Cipta Karya
Tata Ruang dan Kebersihan
Kota Tasikmalaya
Page 72

Mengetahui ;
Kepala Dinas Cipta Karya
Tata Ruang dan Kebersihan Menyetujui ;
Pejabat Pembuat Komitmen
Kota Tasikmalaya (PPK)

YONO S. KARSO, SH, MP SOFIAN ZM, S.STP., M.Si


NIP. 19600806 198603 1 017
NIP. 19770125 199603 1 001
Page 73

RENCANA ANGGARAN BIAYA ESTIMITE ENGGENEER ( EE )

PEKERJAAN : PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
LOKASI : KOTA TASIKMALAYA

HARGA JUMLAH
NO. URAIAN PEKERJAAN KD ANL VOLUME SAT. SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6 7

A. PEK. PERSIAPAN
1 Pek. pengukuran /Uitzet dan pasangan bouwplank - 1.00 ls 500,000.00 500,000.00
2 Papan nama kegiatan - 1.00 ls 250,000.00 250,000.00
3 Pengadaan air kerja - 1.00 ls 350,000.00 350,000.00
4 Sewa/Pengadaan Los kerja /Gudang - 1.00 ls 1,000,000.00 1,000,000.00
Jumlah 2,100,000.00

B. PEKERJAAN LANTAI I
B.I. PEK. TANAH DAN URUGAN
1 Pek. galian tanah pondasi setempat B-02 11.20 m3 41,700.00 467,040.00
2 Pek. Urugan pasir bawah pondasi B-11 0.37 m3 141,100.00 52,207.00
3 Pek. urugan kembali bekas galian B-09 8.07 m3 15,200.00 122,664.00
4 Pek. Urugan sirtu + pemadatan B-15 9.80 m3 138,000.00 1,352,400.00
Jumlah 1,994,311.00

B.II. PEK. BETON


1 Pek. Lantai kerja camp 1 : 3 : 5 G-01 0.37 m3 739,400.00 273,578.00
2 Pek. Pondasi setempat, P1 G-A 1.16 m3 4,341,518.59 5,036,161.56
3 Pek. Pondasi setempat, P2 G-B 0.32 m3 4,743,520.69 1,517,926.62
4 Pek. Pondasi setempat, P3 G-B.a 0.93 m3 4,620,104.87 4,296,697.53
5 Pek. Sloof beton, 20/30 G-F 1.90 m3 5,939,905.06 11,285,819.62
6 Pek. kolom beton, K1 25/30 G-L 1.15 m3 7,126,823.28 8,195,846.77
7 Pek. kolom beton, K2 20/20 G-O 0.46 m3 6,011,247.01 2,765,173.62
8 Pek. kolom beton, K3 15/30 G-R 1.04 m3 4,702,077.58 4,890,160.68
9 Pek. Balok B1 20/50 G-Z.c 1.40 m3 4,702,686.69 6,583,761.36
10 Pek. Balok B2 15/30 G-Z.a 3.08 m3 5,174,541.97 15,937,589.25
11 Pek. Plat lantai T= 12 cm G-Z.d 10.29 m3 4,193,137.87 43,147,388.65
12 Pek. Lisplank beton T= 7 cm G-Z.f 0.43 m3 5,286,020.66 2,272,988.89
Jumlah 106,203,092.55

B.III. PEK. DINDING DAN PASANGAN


1 Pas. dinding 1/2 bata, camp. 1:5 D-012 73.57 m2 113,900.00 8,379,623.00
2 Pas. plesteran 1 : 5 + Acian E-05 147.13 m2 44,100.00 6,488,433.00
3 Pas. plesteran beton 1 : 3 + acian E-30 102.85 m2 47,300.00 4,864,805.00
Jumlah 19,732,861.00

B.IV. PEK. KUSEN,PINTU DAN JENDELA


1 Pas. Kusen Pintu Dan Jendela Kayu klas II F-02.a 0.51 m3 6,118,500.00 3,120,435.00
2 Pas. Daun Pintu Panel, Kayu Gunung Klas II F-07.a 2.86 m2 526,500.00 1,505,790.00
3 Pas. Daun Jendela, Kayu Klas II ( Tanpa Kaca) F-11.b 4.47 m2 298,500.00 1,334,295.00
4 Pek.Kaca Polos Tebal 3 mm L-16 9.94 m2 83,190.00 826,908.60
Jumlah 6,787,428.60

B.V. PEK. PLAFOND


1 Pas. plafond dari GRC 4 mm tanpa rangka F-39.c 85.75 m2 72,100.00 6,182,575.00
2 Pas. List plafond dari gypsum l= 10 cm F-53.b 133.60 m' 28,000.00 3,740,800.00
Jumlah 9,923,375.00

B.VI. PEK. LANTAI


1 Pek. urugan pasir bawah lantai B-11 3.71 m3 141,100.00 523,481.00
2 Pas. keramik lantai, 30 x 30 cm (polos) M-47 74.20 m2 168,400.00 12,495,280.00
3 Pek. Rabat beton camp 1 : 3 : 5 G-01 1.16 m3 739,400.00 857,704.00
Jumlah 13,876,465.00
Page 74

1 2 3 4 5 6 7

B.VII. PEK. KUNCI DAN GANTUNGAN


1 Pek.Kunci Pintu L-02 1.00 bh 208,100.00 208,100.00
2 Pas.Engsel Pintu L-05 2.00 psng 57,900.00 115,800.00
3 Pas. Slot Pintu L-11.a 1.00 set 47,000.00 47,000.00
4 Pek.Engsel Jendela L-06 40.00 bh 32,800.00 1,312,000.00
5 Pek.Slot Jendela L-11 20.00 bh 32,300.00 646,000.00
6 Pek.Hak Angin Type Kait L-09 20.00 bh 35,400.00 708,000.00
Jumlah 3,036,900.00

B.VIII. PEK. PENGECATAN


1 Pek. cat dinding baru setara sanlex N-14.a 249.98 m2 18,900.00 4,724,622.00
2 Pek. cat plafond setara sanlex N-14.d 85.75 m2 19,600.00 1,680,700.00
3 Pek. cat kayu N-09 29.70 m2 48,700.00 1,446,390.00
Jumlah 7,851,712.00

B.IX. PEK. LISTRIK


1 Pek. instalasi titik cahaya uph+bhn 5.00 ttk 110,000.00 550,000.00
2 Pek. instalasi titik stop kontak uph+bhn 1.00 ttk 120,000.00 120,000.00
3 Pas. Lampu TL 36 watt uph+bhn 4.00 bh 100,000.00 400,000.00
4 Pas. Lampu SL 18 watt uph+bhn 1.00 bh 40,000.00 40,000.00
5 Pas. saklar tunggal sekelas broco uph+bhn 1.00 bh 14,000.00 14,000.00
6 Pas. saklar ganda, sekelas broco uph+bhn 1.00 bh 15,000.00 15,000.00
7 Pas. stop kontak , sekelas broco uph+bhn 1.00 bh 15,000.00 15,000.00
Jumlah 1,154,000.00

C. PEKERJAAN LANTAI II

C.1 PEK. BETON


1 Pek. kolom beton, K2 20/20 G-O 1.46 m3 6,011,247.01 8,776,420.63
2 Pek. kolom beton, K3 15/30 G-R 1.17 m3 4,702,077.58 5,501,430.76
3 Pek. Ring balk RB1 15/20 G-Z.a 0.95 m3 4,791,989.27 4,552,389.81
4 Pek. Ring balk RB2 15/25 G-Z.b 0.58 m3 4,716,225.51 2,735,410.80
5 Pek. Balok lintel 12/15 G-Z.c 0.17 m3 5,535,362.63 941,011.65
Jumlah 22,506,663.65

C.II. PEK. DINDING DAN PASANGAN


1 Pas. dinding 1/2 bata, camp. 1:5 D-012 124.29 m2 113,900.00 14,156,631.00
2 Pas. plesteran 1 : 5 + Acian 78% E-05 248.58 m2 44,100.00 10,962,378.00
3 Pas. plesteran beton 1 : 3 + acian E-30 54.66 m2 47,300.00 2,585,418.00
Jumlah 27,704,427.00

C,III. PEK. KUSEN,PINTU DAN JENDELA


1 Pas. Kusen Pintu Dan Jendela Kayu klas II F-02.a 0.51 m3 6,118,500.00 3,120,435.00
2 Pas. Daun Pintu Panel, Kayu Gunung Klas II F-07.a 2.86 m2 526,500.00 1,505,790.00
3 Pas. Daun Jendela, Kayu Klas II ( Tanpa Kaca) F-11.b 4.47 m2 298,500.00 1,334,295.00
4 Pek.Kaca Polos Tebal 3 mm L-16 9.94 m2 83,190.00 826,908.60
Jumlah 6,787,428.60

C.IV. PEK. KUDA - KUDA, ATAP DAN PLAFOND


1 Pas. rangka atap dan kuda - kuda baja ringan upah-bahan 129.42 m2 150,000.00 19,413,000.00
2 Pas. Genteng Palentong H-01 130.32 m2 69,200.00 9,018,144.00
3 Pas. bubungan genteng Palentong H-04 9.00 m' 82,300.00 740,700.00
4 Pas. listplank dari woodflange 20 cm F-53.a 46.76 m' 49,400.00 2,309,944.00
5 Pas. plafond dari GRC 4 mm + rangka kayu klas II F-39 115.56 m2 111,000.00 12,827,160.00
6 Pas. List plafond dari gypsum l= 10 cm F-53.b 133.60 m3 28,000.00 3,740,800.00
Jumlah 48,049,748.00

C.V. PEK. LANTAI


1 Pek. urugan pasir bawah lantai B-11 3.71 m3 141,100.00 523,481.00
2 Pas. keramik lantai, 30 x 30 cm (polos) M-47 74.20 m2 168,400.00 12,495,280.00
Jumlah 13,018,761.00

C.VI. PEK. KUNCI DAN GANTUNGAN


1 Pek.Kunci Pintu L-02 1.00 bh 208,100.00 208,100.00
2 Pas.Engsel Pintu L-05 2.00 psng 57,900.00 115,800.00
3 Pas. Slot Pintu L-11.a 1.00 set 47,000.00 47,000.00
4 Pek.Engsel Jendela L-06 20.00 bh 32,800.00 656,000.00
5 Pek.Slot Jendela L-11 1.00 bh 32,300.00 32,300.00
6 Pek.Hak Angin Type Kait L-09 1.00 bh 35,400.00 35,400.00
Jumlah 1,094,600.00
Page 75

1 2 3 4 5 6 7

C.VII. PEK. PENGECATAN


1 Pek. cat dinding baru setara sanlex N-14.a 303.24 m2 18,900.00 5,731,236.00
2 Pek. cat plafond setara sanlex N-14.d 115.56 m2 19,600.00 2,264,976.00
3 Pek. cat kayu N-09 46.50 m2 48,700.00 2,264,550.00
Jumlah 10,260,762.00

C.VIII. PEK. LISTRIK


1 Penyambungan listrik ke jalur exsisting uph+bhn 1.00 set 250,000.00 250,000.00
2 Pek. instalasi titik cahaya uph+bhn 5.00 ttk 110,000.00 550,000.00
3 Pek. instalasi titik stop kontak uph+bhn 1.00 ttk 120,000.00 120,000.00
4 Pas. Lampu TL 36 watt uph+bhn 4.00 bh 100,000.00 400,000.00
5 Pas. Lampu SL 18 watt uph+bhn 1.00 bh 40,000.00 40,000.00
6 Pas. saklar tunggal sekelas broco uph+bhn 1.00 bh 14,000.00 14,000.00
7 Pas. saklar ganda, sekelas broco uph+bhn 1.00 bh 15,000.00 15,000.00
8 Pas. stop kontak , sekelas broco uph+bhn 1.00 bh 15,000.00 15,000.00
Jumlah 1,404,000.00

D. PEK. TANGGA
1 Pek. galian tanah pondasi setempat B-02 1.30 m3 41,700.00 54,210.00
2 Pek. Urugan pasir bawah pondasi B-11 0.05 m3 141,100.00 7,055.00
3 Pek. Lantai Kerja beton tumbuk camp 1 : 3 : 5 G-01 0.05 m3 739,400.00 36,970.00
4 Pek. Pondasi foot plat camp 1 : 2 : 3 G-B.b 1.14 m3 4,289,800.76 4,890,372.86
5 Pek. Pondasi setempat, P2 G-B 0.11 m3 4,743,520.69 521,787.28
6 Pek. kolom beton, K2 20/20 G-O 0.10 m3 6,011,247.01 601,124.70
7 Pek. Plat tangga dan plat bordes beton, camp 1 : 2 : 3 G-Z.d 1.07 m3 4,193,137.87 4,486,657.52
8 Pek. Anak tangga beton, camp 1 : 2 : 3 G-Z.g 0.46 m3 2,670,780.64 1,228,559.10
9 Pek. Balok B2 15/30 G-Z.a 0.30 m3 5,174,541.97 1,552,362.59
10 Pas. dinding 1/2 bata, camp. 1:5 D-012 10.85 m2 113,900.00 1,235,815.00
11 Pas. plesteran 1 : 5 + Acian E-05 21.70 m2 44,100.00 956,970.00
12 Pas. plesteran beton 1 : 3 + acian E-30 4.46 m2 47,300.00 210,958.00
13 Pas. plafond dari GRC 4 mm tanpa rangka F-39.c 8.88 m2 72,100.00 640,248.00
14 Pas. keramik lantai, 30 x 30 cm (anti sleep) M-82.e 5.04 m2 181,227.58 913,387.00
15 Pek. cat dinding baru setara sanlex N-14.a 15.30 m2 18,900.00 289,170.00
16 Pek. cat plafond setara sanlex N-14.d 8.88 m2 19,600.00 174,048.00
17,799,695.05

E. PEKERJAAN LAIN-LAIN
1 Pek. pembersihan lokasi bekas pekerjaan/Bongkaran 1.00 ls 250,000.00 250,000.00
Jumlah 250,000.00
REKAPITULASI ANGGARAN BIAYA ESTIMITE ENGGENEER ( EE )

Pembangunan Sarana Prasarana Belajar Yayasan Keluarga Sejahtera Bandung (TK Sejahtera 4) Perum Tamansari Indah Jl. Ermawar Blok B Kelurahan
PEKERJAAN : Karsamenak Kecamatan Kawalu
LOKASI : KOTA TASIKMALAYA

JUMLAH
NO. URAIAN HARGA
Rp.
1 2 3

Pembangunan Sarana Prasarana Belajar Yayasan Keluarga Sejahtera Bandung (TK Sejahtera 4) Perum Tamansari Indah Jl. Ermawar Blok B
Kelurahan Karsamenak Kecamatan Kawalu

A. PEK. PERSIAPAN 3,400,000.00


SUB JUMLAH A 3,400,000.00

B. PEKERJAAN KONSTRUKSI

B.I. PEK. TANAH DAN URUGAN 4,410,790.08


B.II. PEK. BETON 21,120,763.12
B.III. PEK. DINDING DAN PASANGAN 21,463,020.00
B.IV. PEK. KUSEN,PINTU DAN JENDELA 5,320,352.29
B.V. PEK. KUDA - KUDA, ATAP DAN PLAFOND 65,379,925.84
B.VI. PEK. LANTAI 4,818,187.03
B.VII. PEK. KUNCI DAN GANTUNGAN 2,219,500.00
B.VIII. PEK. PENGECATAN 8,499,266.00
B.IX. PEK. LISTRIK 2,265,000.00
SUB JUMLAH B 135,496,804.36

C PEKERJAAN LAIN-LAIN 300,000.00


SUB JUMLAH E 300,000.00

JUMLAH TOTAL 139,196,804.36


PPN 10% 13,919,680.44
JUMLAH + PPN 153,116,484.80
DIBULATKAN 153,116,000.00

RENCANA ANGGARAN BIAYA ESTIMITE ENGGENEER ( EE )

Pembangunan Sarana Prasarana Belajar Yayasan Keluarga Sejahtera Bandung (TK Sejahtera 4) Perum Tamansari Indah Jl. Ermawar Blok B Kelurahan
PEKERJAAN : Karsamenak Kecamatan Kawalu
LOKASI : KOTA TASIKMALAYA

HARGA JUMLAH
NO. URAIAN PEKERJAAN KD ANL VOL LAMAVOL BARU VOLUME SAT. SATUAN HARGA SATUAN
TOTAL Rp. Rp.
1 2 3 4 5 6 7 8 9

A. PEK. PERSIAPAN
1 Pek. pengukuran /Uitzet dan pasangan bouwplank - 1.00 1.00 ls 350,000.00 350,000.00
2 Papan nama kegiatan - 1.00 1.00 ls 250,000.00 250,000.00
3 Pek. Bongkaran - 1.00 1.00 ls 2,000,000.00 2,000,000.00
4 Sewa/Pengadaan Los kerja /Gudang - 1.00 1.00 ls 800,000.00 800,000.00
Jumlah 3,400,000.00

B. PEKERJAAN KONSTRUKSI
B.I. PEK. TANAH DAN URUGAN
1 Pek. galian tanah pondasi setempat B-02 0.14 12.90 13.05 m3 41,700.00 544,034.88
2 Pek. Pondasi batu kosong C-014 - 1.96 1.96 m3 265,600.00 521,043.46
3 Pek. Pondasi Batu Belah 1 : 5 C-06 - 4.11 4.11 m3 583,800.00 2,397,754.17
4 Pek. Urugan pasir bawah pondasi B-11 - 0.65 0.65 m3 141,100.00 92,268.11
5 Pek. urugan kembali bekas galian B-09 6.18 6.18 m3 15,200.00 93,929.46
6 Pek. Urugan sirtu + pemadatan B-15 5.52 5.52 m3 138,000.00 761,760.00
Jumlah 4,410,790.08

B.II. PEK. BETON


1 Pek. Sloof beton, 15/20 G-F 0.60 0.60 m3 5,939,905.06 3,592,454.58
2 Pek. kolom beton, 15/15 G-R 0.28 0.60 0.89 m3 7,126,823.28 6,317,928.84
3 Pek. Ring Balok B2 15/20 G-Z.a 1.73 0.60 2.34 m3 4,791,989.27 11,210,379.70
Jumlah 21,120,763.12

B.III. PEK. DINDING DAN PASANGAN


1 Pas. dinding 1/2 bata, camp. 1:5 D-012 35.00 71.20 106.20 m2 113,900.00 12,096,180.00
2 Pas. plesteran 1 : 5 + Acian E-05 70.00 142.40 212.40 m2 44,100.00 9,366,840.00
Jumlah 21,463,020.00

B.IV. PEK. KUSEN,PINTU DAN JENDELA


Page 78

REKAPITULASI ANGGARAN BIAYA ESTIMITE ENGGENEER ( EE )

PEKERJAAN : PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
LOKASI : KOTA TASIKMALAYA

JUMLAH
NO. URAIAN HARGA
Rp.
1 2 3

PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH

A. PEK. PERSIAPAN 2,250,000.00


SUB JUMLAH A 2,250,000.00

B. PEKERJAAN RUANG KELAS

B.I. PEK. TANAH DAN URUGAN -


B.II. PEK. BETON 5,175,348.41
B.III. PEK. DINDING DAN PASANGAN 3,637,800.00
B.IV. PEK. KUSEN,PINTU DAN JENDELA 2,681,430.38
B.V. PEK. PLAFOND 11,322,000.00
B.VI. PEK. LANTAI -
B.VII. PEK. KUNCI DAN GANTUNGAN -
B.VIII. PEK. PENGECATAN -
B.IX. PEK. LISTRIK -
SUB JUMLAH B 22,816,578.79

C. PEKERJAAN LANTAI II

C.I PEK. BETON -


C.II. PEK. DINDING DAN PASANGAN -
C.III. PEK. KUDA - KUDA, ATAP DAN PLAFOND 18,319,000.00
SUB JUMLAH C 20,551,300.00

D. PEK. TANGGA -
SUB JUMLAH D -

E. PEKERJAAN LAIN-LAIN 250,000.00


SUB JUMLAH E 250,000.00

JUMLAH TOTAL 45,867,878.79


PPN 10% 4,586,787.88
JUMLAH + PPN 50,454,666.67
DIBULATKAN 50,454,000.00

TERBILANG :

SERATUS LIMA PULUH TIGA JUTA SERATUS ENAM BELAS RIBU RUPIAH

Diperiksa ; Tasikmalaya, 2016


Pejabat Pelaksana Teknis Kegiatan Dibuat;
(PPTK) CV. ARCHIDO MEDIA KARYA

BUDI NURCAnNIHYADI, ST
DireNIZAR FARID R, ST.
TONI ANTONI,ST NIP.198590801 201001 1 012
NIP.19690709 200312 1 006 ktur

Mengetahui ;
Kepala Dinas Cipta Karya Menyetujui ;
Tata Ruang dan Kebersihan
Kota Tasikmalaya Pejabat Pembuat Komitmen
(PPK)

YONO S. KARSO, SH, MP SOFIAN ZM, S.STP., M.Si


NIP. 19600806 198603 1 017 NIP. 19770125 199603 1 001
Page 79

RENCANA ANGGARAN BIAYA ESTIMITE ENGGENEER ( EE )

PEKERJAAN : PEMBANGUNAN 1 PAKET RUANG KELAS BARU ( RKB ) DAN RUANG KANTOR MI CIMERAK KELURAHAN SUKAASIH
LOKASI : KOTA TASIKMALAYA

HARGA JUMLAH
NO. URAIAN PEKERJAAN KD ANL VOLUME SAT. SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6 7

A. PEK. PERSIAPAN
1 Pek. pengukuran /Uitzet dan pasangan bouwplank - 1.00 ls 500,000.00 500,000.00
2 Papan nama kegiatan - 1.00 ls 250,000.00 250,000.00
3 Pek. Bongkaran - 1.00 ls 900,000.00 900,000.00
4 Sewa/Pengadaan Los kerja /Gudang - 1.00 ls 600,000.00 600,000.00
Jumlah 2,250,000.00

B. PEKERJAAN RUANG KELAS


B.I. PEK. TANAH DAN URUGAN
1 Pek. galian tanah pondasi setempat B-02 m3 41,700.00 -
2 Pek. Urugan pasir bawah pondasi B-11 m3 141,100.00 -
3 Pek. urugan kembali bekas galian B-09 m3 15,200.00 -
4 Pek. Urugan sirtu + pemadatan B-15 m3 138,000.00 -
Jumlah -

B.II. PEK. BETON


1 Pek. Lantai kerja camp 1 : 3 : 5 G-01 m3 739,400.00 -
2 Pek. Pondasi setempat, P1 G-A m3 4,341,518.59 -
3 Pek. Pondasi setempat, P2 G-B m3 4,743,520.69 -
4 Pek. Pondasi setempat, P3 G-B.a m3 4,620,104.87 -
5 Pek. Sloof beton, 20/30 G-F m3 5,939,905.06 -
6 Pek. kolom beton, K1 25/30 G-L m3 7,126,823.28 -
7 Pek. kolom beton, K2 20/20 G-O m3 6,011,247.01 -
8 Pek. kolom beton, K3 15/30 G-R m3 4,702,077.58 -
9 Pek. Balok B1 20/50 G-Z.c m3 4,702,686.69 -
10 Pek. Balok B2 15/20 G-Z.a 1.08 m3 4,791,989.27 5,175,348.41
11 Pek. Plat lantai T= 12 cm G-Z.d m3 4,193,137.87
12 Pek. Plat Lantai Beton T = 12 cm, pakai bondek, tulangan wermesh M10 - m3 4,309,741.98 -
13 Pek. Lisplank beton T= 7 cm G-Z.f m3 5,286,020.66 -
Jumlah 5,175,348.41

B.III. PEK. DINDING DAN PASANGAN


1 Pas. dinding 1/2 bata, camp. 1:5 D-012 18.00 m2 113,900.00 2,050,200.00
2 Pas. plesteran 1 : 5 + Acian E-05 36.00 m2 44,100.00 1,587,600.00
3 Pas. plesteran beton 1 : 3 + acian E-30 m2 47,300.00 -
Jumlah 3,637,800.00

B.IV. PEK. KUSEN,PINTU DAN JENDELA


1 Pas. Kusen Pintu Dan Jendela Kayu klas II F-02.a 0.08 m3 6,118,500.00 500,187.38
2 Pas. Daun Pintu Panel, Kayu Gunung Klas II F-07.a 3.20 m2 526,500.00 1,684,800.00
3 Pas. Daun Jendela, Kayu Klas II ( Tanpa Kaca) F-11.b 1.05 m2 298,500.00 313,425.00
4 Pek.Kaca Polos Tebal 3 mm L-16 2.20 m2 83,190.00 183,018.00
Jumlah 2,681,430.38

B.V. PEK. PLAFOND


1 Pas. plafond dari GRC 4 mm + rangka kayu klas II F-39 102.00 m2 111,000.00 11,322,000.00
2 Pas. List plafond dari gypsum l= 10 cm F-53.b m3 28,000.00 -
Jumlah 11,322,000.00

B.VI. PEK. LANTAI


1 Pek. urugan pasir bawah lantai B-11 m3 141,100.00 -
2 Pas. keramik lantai, 30 x 30 cm (polos) M-47 m2 168,400.00 -
3 Pek. Rabat beton camp 1 : 3 : 5 G-01 m3 739,400.00 -
Jumlah -
Page 80

1 2 3 4 5 6 7

B.VII. PEK. KUNCI DAN GANTUNGAN


1 Pek.Kunci Pintu L-02 bh 208,100.00 -
2 Pas.Engsel Pintu L-05 psng 57,900.00 -
3 Pas. Slot Pintu L-11.a set 47,000.00 -
4 Pek.Engsel Jendela L-06 bh 32,800.00 -
5 Pek.Slot Jendela L-11 bh 32,300.00 -
6 Pek.Hak Angin Type Kait L-09 bh 35,400.00 -
Jumlah -

B.VIII. PEK. PENGECATAN


1 Pek. cat dinding baru setara sanlex N-14.a m2 18,900.00 -
2 Pek. cat plafond setara sanlex N-14.d m2 19,600.00 -
3 Pek. cat kayu N-09 m2 48,700.00 -
Jumlah -

B.IX. PEK. LISTRIK


1 Pek. instalasi titik cahaya uph+bhn ttk 110,000.00 -
2 Pek. instalasi titik stop kontak uph+bhn ttk 120,000.00 -
3 Pas. Lampu TL 36 watt uph+bhn bh 100,000.00 -
4 Pas. Lampu SL 18 watt uph+bhn bh 40,000.00 -
5 Pas. saklar tunggal sekelas broco uph+bhn bh 14,000.00 -
6 Pas. saklar ganda, sekelas broco uph+bhn bh 15,000.00 -
7 Pas. stop kontak , sekelas broco uph+bhn bh 15,000.00 -
Jumlah -

C. PEKERJAAN LANTAI II

C.I PEK. BETON


1 Pek. kolom beton, K2 20/20 G-O m3 6,011,247.01 -
2 Pek. kolom beton, K3 15/30 G-R m3 4,702,077.58 -
3 Pek. Ring balk RB1 15/20 G-Z.a m3 4,791,989.27 -
4 Pek. Ring balk RB2 15/25 G-Z.b m3 4,716,225.51 -
5 Pek. Balok lintel 12/15 G-Z.c m3 5,535,362.63 -
Jumlah -

C.II. PEK. DINDING DAN PASANGAN


1 Pas. dinding 1/2 bata, camp. 1:5 D-012 m2 113,900.00 -
2 Pas. plesteran 1 : 5 + Acian ( Bagian luar ) E-05 m2 44,100.00 -
Jumlah -

C,III. PEK. KUSEN,PINTU DAN JENDELA


1 Pas. Kusen Pintu Dan Jendela Kayu klas II F-02.a m3 6,118,500.00
2 Pas. Daun Pintu Panel, Kayu Gunung Klas II F-07.a m2 526,500.00
3 Pas. Daun Jendela, Kayu Klas II ( Tanpa Kaca) F-11.b m2 298,500.00
4 Pek.Kaca Polos Tebal 3 mm L-16 m2 83,190.00
Jumlah -

C.III. PEK. KUDA - KUDA, ATAP DAN PLAFOND


1 Pas. rangka atap dan kuda - kuda baja ringan upah-bahan 115.00 m2 155,000.00 17,825,000.00
2 Pas. Genteng Palentong H-01 m2 69,200.00 -
3 Pas. bubungan genteng Palentong H-04 m' 82,300.00 -
4 Pas. listplank dari woodflange 20 cm F-53.a 10.00 m' 49,400.00 494,000.00
5 Pas. plafond dari GRC 4 mm + rangka kayu klas II F-39 m2 111,000.00
6 Pas. List plafond dari gypsum l= 10 cm F-53.b m3 28,000.00
Jumlah 18,319,000.00

C.V. PEK. LANTAI


1 Pek. urugan pasir bawah lantai B-11 m3 141,100.00
2 Pas. keramik lantai, 30 x 30 cm (polos) M-47 m2 168,400.00
Jumlah -

C.VI. PEK. KUNCI DAN GANTUNGAN


1 Pek.Kunci Pintu L-02 2.00 bh 208,100.00 416,200.00
2 Pas.Engsel Pintu L-05 4.00 psng 57,900.00 231,600.00
3 Pas. Slot Pintu L-11.a 2.00 set 47,000.00 94,000.00
4 Pek.Engsel Jendela L-06 10.00 bh 32,800.00 328,000.00
5 Pek.Slot Jendela L-11 5.00 bh 32,300.00 161,500.00
6 Pek.Hak Angin Type Kait L-09 5.00 bh 35,400.00 177,000.00
Jumlah 1,408,300.00
Page 81

1 2 3 4 5 6 7

C.VII. PEK. PENGECATAN


1 Pek. cat dinding baru setara sanlex N-14.a m2 18,900.00
2 Pek. cat plafond setara sanlex N-14.d m2 19,600.00
3 Pek. cat kayu N-09 m2 48,700.00
Jumlah -

C.VIII. PEK. LISTRIK


1 Penyambungan listrik ke jalur exsisting uph+bhn set 250,000.00 -
2 Pek. instalasi titik cahaya uph+bhn 5.00 ttk 110,000.00 550,000.00
3 Pek. instalasi titik stop kontak uph+bhn ttk 120,000.00 -
4 Pas. Lampu TL 36 watt uph+bhn bh 100,000.00 -
5 Pas. Lampu SL 18 watt uph+bhn 5.00 bh 40,000.00 200,000.00
6 Pas. saklar tunggal sekelas broco uph+bhn 1.00 bh 14,000.00 14,000.00
7 Pas. saklar ganda, sekelas broco uph+bhn 2.00 bh 15,000.00 30,000.00
8 Pas. stop kontak , sekelas broco uph+bhn 2.00 bh 15,000.00 30,000.00
Jumlah 824,000.00

D. PEK. TANGGA
1 Pek. galian tanah pondasi setempat B-02 m3 41,700.00 -
2 Pek. Urugan pasir bawah pondasi B-11 m3 141,100.00 -
3 Pek. Lantai Kerja beton tumbuk camp 1 : 3 : 5 G-01 m3 739,400.00 -
4 Pek. Pondasi foot plat camp 1 : 2 : 3 G-B.b m3 4,289,800.76 -
5 Pek. Pondasi setempat, P2 G-B m3 4,743,520.69 -
6 Pek. kolom beton, K2 20/20 G-O m3 6,011,247.01 -
7 Pek. Plat tangga dan plat bordes beton, camp 1 : 2 : 3 G-Z.d m3 4,193,137.87 -
8 Pek. Anak tangga beton, camp 1 : 2 : 3 G-Z.g m3 2,670,780.64 -
9 Pek. Balok B2 15/30 G-Z.a m3 5,174,541.97 -
10 Pas. plafond dari GRC 4 mm tanpa rangka F-39.c m2 72,100.00 -
-

E. PEKERJAAN LAIN-LAIN
1 Pek. pembersihan lokasi bekas pekerjaan/Bongkaran 1.00 ls 250,000.00 250,000.00
Jumlah 250,000.00