Perencanaa Pelat

Spesi 1 Kg/m3 21 kg/m3


Keramik 1 Kg/m3 24 kg/m3
Plafond 1 Kg/m3 18 kg/m3
Beban guna 479 Kg/m2
F'c 26 Mpa
Fy d 340 Mpa
Fy p 300 Mpa
BJ beton 2400 kg/m3
Dinding 250 kg/m2
hf 12 cm
d 90 mm
B1 0.8642857143
d' 30 mm
Cc 25 mm

Sni 2847 2013 pasal 9.2.1

Elemen BJ Dimensi Berat Satuan


Pelat 2400 0.12 288 Kg/m2
Spesi 21 1 21 Kg/m2
Keramik 24 1 24 Kg/m2
Plafond 18 1 18 Kg/m2
Total 371 Kg/m2

Beban Hidup
Beban guna 479 kg/m2

Beban Terfaktor
1211.6 Kg/m2

Beban U per satu meter


1211.6 kg/m

Statika Pelat A

Lx 3m
Ly 5m

X Mlx 58.6667
X Mly 36
Mlx(-Mtx) 639.72516348 Kgm
Mly(-Mty) 1090.44 Kgm

Rekapitulasi Perhitungan Pelat

Pelat Ly Lx Ly/Lx X
A 5 3 1.666667 58.6667
B 4 2.5 1.6 58
C 3 2.5 1.2 46
D 2.5 1.48125 1.687764 58.8776

Penulangan
pmin 0.0041176471
pb 0.0358586626
pmax 0.026893997

Penulangan Lapangan X

Mu 639.72516348
Rn 0.9872301906
w 0.0388596176
phit 0.0029716178
dipakai pmin
As 3.7058823529 cm2 (disamakan antara lapangan dan tumpu
As' 2.4 cm2 (digunakan untuk luasan tulangan bagi)

As tul di gunakan tul ø 12


113.0973355292 mm2
n tul 3.2767194166 4 tul

As' tul digunakan tul ø 10


78.5398163397 mm2
n tul 3.0557749074 4 tul

sehingga
lap X ø10-200 S 200
Lap X ø8-250 S' 200

Penulangan Lapangan y

Mu 1090.44
Rn 1.6827777778
w 0.067395712
phit 0.0051537897

Digunakan p hit
As 4.6384107701 cm2 (disamakan antara lapangan dan tumpu
As' 2.4 cm2 (digunakan untuk luasan tulangan bagi)

As tul Digunakan ø 12
Astul 113.0973355292
ntul 4.1012555675 5 tul

As' tul digunakan tul ø 10


78.5398163397 mm2
n tul 3.0557749074 4 tul

sehingga
lap X ø10-160
Lap X ø8-250

Jarak Antar Tulangan Kontrol Jarak antar tulangan

S 200 mm S ≥ 25
S' 200 mm S ≤ 240
S ≤ 450
Kontrol Pelat Lap y
1 tinggi blok tegangan persegi ekivalen
a 8.6997950407
2 faktor reduksi beton
b1 0.8642857143
3 Jarak dari serat tekan terjauh ke sumbu netral
c 10.0658785595
4 Regangan tarik
e0 0.003
5 Regangan Tarik Neto
et 0.023823292 OK
6 Kekuatan Lentur Nominal Reduksi
øMny 1.3174045794 tm
Muy 1.09044 tm
SNI 9.5.3.1
Kontrol Lendutan

Lx 3000 mm
As 452.3893421169 mm2
As' 314.159265359 mm2
F'c 26 Mpa
Ec 23965.3917138861 Mpa
Es 200000 Mpa
qu 11.8821612 N/mm
b 1000 mm
hf 120 mm
Ig 144000000.00 mm4
Fr 3.1613920984 Mpa
n 8.3453674527
c 14.61 mm
Icr 22497602.3113408 mm4
yt 60 mm
Mcr 7587341.03622606 Nmm
Ma 13367431.35 Nmm
Ie 44715848.6001642 mm4 OK
Lendutan Seketika izin 8.3333333333 mm OK
Lendutan Elastis Seketika 3.274396453 mm
ξ 50 Tahun 2
p' 0.0034906585
ʎ 1.7028045422
Lendutan Jangka Panjang 5.5756571532 mm
Lendutan Total 8.8500536062 mm OK
Lendutan izin 12.5 mm
Mlx Mtx X Mly Mty
639.7252 -639.725163 36 1090.44 -1090.44
439.205 -439.205 36 697.8816 -697.882
348.335 -348.335 38 414.3672 -414.367
156.5186 -156.518649 36 272.61 -272.61
639.7252 1090.44

Kontrol Pelat Lap x


1 tinggi blok tegangan persegi ekiva
a
2 faktor reduksi beton
b1
3 Jarak dari serat tekan terjauh ke s
an antara lapangan dan tumpuan c
an untuk luasan tulangan bagi) 4 Regangan tarik
e0
Kontrol Jarak antar tulangan 5 Regangan Tarik Neto
et
S ≥ 25 mm 48 OK 6 Kekuatan Lentur Nominal Reduks
S ≤ 240 mm øMnx
S ≤ 450 mm Mux

As 452.3893 mm2

As' 314.1593 mm2


an antara lapangan dan tumpuan
an untuk luasan tulangan bagi)

As 565.4867 mm2

As' 314.1593 mm2

arak antar tulangan

mm 48 OK
mm
mm
(b*c^2)/2 + [n*As+(n-1)*As']*c - [n*As*d] -
1500 *c^2 + 6082.97 *c - 339781.98 -
1500 *c^2 + 6082.97 *c -409010.43

c1 = 14.61 mm c2 =
tinggi blok tegangan persegi ekivalen
6.9598360326
faktor reduksi beton
0.8642857143
Jarak dari serat tekan terjauh ke sumbu netral
8.0527028476
Regangan tarik
0.003
Regangan Tarik Neto
0.030529115 OK
Kekuatan Lentur Nominal Reduksi
1.0646287527 tm
0.6397251635 tm
[(n-1)*As'*d'] = 0
69228.46 = 0
= 0

-18.66 mm
Perencanaa Pelat

Spesi 1 Kg/m3 21 kg/m3


Keramik 1 Kg/m3 24 kg/m3
Plafond 1 Kg/m3 18 kg/m3
Beban guna 479 Kg/m2
F'c 26 Mpa
Fy d 340 Mpa
Fy p 300 Mpa
BJ beton 2400 kg/m3
Dinding 250 kg/m2
hf 12 cm
d 90 mm
B1 0.8642857143
d' 30 mm
Cc 25 mm

Sni 2847 2013 pasal 9.2.1

Elemen BJ Dimensi Berat Satuan


Pelat 2400 0.12 288 Kg/m2
Plafond 18 1 18 Kg/m2
Total 306 Kg/m2

Jenis Beban BJ Dimensi Berat Satuan


Hujan 1000 0.05 50 Kg/m2
Guns Hidup 96 1 96 Kg/m2
Total 146 Kg/m2
Beban Luasan Total
600.8 Kg/m2
Beban U per satu meter
600.8 kg/m

Statika Pelat A

Lx 3m
Ly 5m

X Mlx 58.6667
X Mly 36

Mlx(-Mtx) 317.22258024 Kgm


Mly(-Mty) 194.6592 Kgm
Rekapitulasi Perhitungan Pelat

Pelat Ly Lx Ly/Lx X
A 5 3 1.6666667 58.6667
B 4 2.5 1.6 58
C 3 2.5 1.2 46
D 2.5 1.48125 1.6877637 58.8776

Penulangan
pmin 0.0046666667
pb 0.0424460317
pmax 0.0318345238

Penulangan Lapangan X

Mu 317.22258024
Rn 0.4895410189
w 0.0190422703
phit 0.0016503301
dipakai pmin
As 4.2 cm2 (disamakan antara lapangan dan tump
As' 2.4 cm2 (digunakan untuk luasan tulangan bagi

As tul di gunakan tul ø 12


113.0973355292 mm2
n tul 3.7136153388 4 tul

As' tul digunakan tul ø 10


78.5398163397 mm2
n tul 3.0557749074 4 tul

sehingga
lap X ø10-200 S 200
Lap X ø8-250 S' 200

Penulangan Lapangan y

Mu 194.6592
Rn 0.3004
w 0.0116337492
phit 0.0010082583
Digunakan p hit
As 4.2 cm2 (disamakan antara lapangan dan tump
As' 2.4 cm2 (digunakan untuk luasan tulangan bagi

As tul Digunakan ø 12
Astul 113.0973355292
ntul 3.7136153388 4 tul

As' tul digunakan tul ø 10


78.5398163397 mm2
n tul 3.0557749074 4 tul

sehingga
lap X ø10-160
Lap X ø8-250

Jarak Antar Tulangan Kontrol Jarak antar tulangan

S 200 mm S ≥ 25
S' 200 mm S ≤ 240
S ≤ 450
Kontrol Pelat Lap y
1 tinggi blok tegangan persegi ekivalen
a 6.1410317934
2 faktor reduksi beton
b1 0.8642857143
3 Jarak dari serat tekan terjauh ke sumbu netral
c 7.105326042
4 Regangan tarik
e0 0.003
5 Regangan Tarik Neto
et 0.0349996637 OK
6 Kekuatan Lentur Nominal Reduksi
øMny 0.943823331 tm
Muy 0.3460608 tm

SNI 9.5.3.1
Kontrol Lendutan
Lx 3000 mm
As 452.3893421169 mm2
As' 314.159265359 mm2
F'c 26 Mpa
Ec 23965.3917138861 Mpa
Es 200000 Mpa
qu 5.8920456 N/mm
b 1000 mm
hf 120 mm
Ig 144000000.00 mm4
Fr 3.1613920984 Mpa
n 8.3453674527
c 14.61 mm
Icr 22497602.3113408 mm4
yt 60 mm
Mcr 7587341.03622606 Nmm
Ma 6628551.3 Nmm
Ie 227203772.830411 mm4 NOT OK
Lendutan Seketika izin 8.3333333333 mm OK
Lendutan Elastis Seketika 0.3195566493 mm
ξ 50 Tahun 2
p' 0.0034906585
ʎ 1.7028045422
Lendutan Jangka Panjang 0.544142514 mm
Lendutan Total 0.8636991633 mm OK
Lendutan izin 12.5 mm
Mlx Mtx X Mly Mty
317.22258 -317.22258 36 194.6592 -194.6592
217.79 -217.79 36 346.0608 -346.0608
172.73 -172.73 38 205.4736 -205.4736
77.613407 -77.6134072 36 135.18 -135.18
317.22258 346.0608

3172226

Kontrol Pelat Lap x


1 tinggi blok tegangan persegi ek
a
2 faktor reduksi beton
b1
3 Jarak dari serat tekan terjauh k
n antara lapangan dan tumpuan c
n untuk luasan tulangan bagi) 4 Regangan tarik
e0
Kontrol Jarak antar tulangan 5 Regangan Tarik Neto
et
S ≥ 25 mm 48 OK 6 Kekuatan Lentur Nominal Redu
S ≤ 240 mm øMnx
S ≤ 450 mm Mux

As 452.38934 mm2

As' 314.15927 mm2


n antara lapangan dan tumpuan
n untuk luasan tulangan bagi)

As 452.38934 mm2

As' 314.15927 mm2

ak antar tulangan

mm 48 OK
mm
mm
(b*c^2)/2 + [n*As+(n-1)*As']*c - [n*As*d] -
1500 *c^2 + 6082.97 *c - 339781.98 -
1500 *c^2 + 6082.97 *c -409010.43

c1 = 14.61 mm c2 =
tinggi blok tegangan persegi ekivalen
6.1410317934
faktor reduksi beton
0.8642857143
Jarak dari serat tekan terjauh ke sumbu netral
7.105326042
Regangan tarik
0.003
Regangan Tarik Neto
0.0349996637 OK
Kekuatan Lentur Nominal Reduksi
0.943823331 tm
0.3172225802 tm
[(n-1)*As'*d'] = 0
69228.46 = 0
= 0

-18.66 mm
Pembebanan Tangga

Beban Mati Pelat Tangga ( PPURG 1987)

Elemen BJ Dimensi Berat


Pelat 2400 0.16 1 384
Spesi 21 1 1 21
Keramik 24 1 1 24
Sandaran 30 1 1 30
anak tangga 2400 0.35 0.15 126
Total 585 kg/m

Beban Hidup Tangga


Beban Guna Hidup 300 Kg/m2
Beban Guna Hidup per 1m 300 Kg/m
Beban Hidup Terfaktor 1182 Kg/m

Pembebanan Bordes

Beban Mati Bordes ( PPURG 1987)

Elemen BJ Dimensi Berat


Bordes 2400 0.16 1 384
Spesi 21 1 1 21
Keramik 24 1 1 24
Total 429 kg/m

Beban Hidup Bordes

Beban Guna Hidup 300 kg/m2


Beban Hidup per 1m 300 kg/m
Beban U 994.8 kg/m

Mu tangga 3836.2 kgm


Mu bordes 3391.11 kgm

Perencanaa Pelat

Spesi 1 Kg/m3 21 kg/m3


Keramik 1 Kg/m3 24 kg/m3
Plafond 1 Kg/m3 18 kg/m3
Beban guna 479 Kg/m2
F'c 26 Mpa
Fy d 340 Mpa
Fy p 300 Mpa
BJ beton 2400 kg/m3
Dinding 250 kg/m2
hf 160 mm
d 120 mm
B1 0.8642857143
d' 40 mm
b 1000 mm
Cc 25 mm
pmin 0.0046666667
pb 0.0424460317
pmax 0.0318345238

Penulangan pelat Tangga


Mu 3836.2 kgm
Rn 3.3300347222 Mpa
w 0.1395342956
p 0.0120929723

dipakai phit

As 1451.1566741265 mm2 (disamakan antara lapangan dan tumpuan )


As' 320 mm2 (digunakan untuk luasan tulangan bagi)

As Dipakai ø 12
As 113.0973355292 mm2
n tul 12.8310421049
tul perlu 13

As' Dipakai ø 10
As' 78.5398163397 mm2
ntul 4.0743665432
tul perlu 5

sehingga
As ø12-80
As' ø10-100

SNI 9.5.3.1
Kontrol Lendutan Tangga (b*c^2)/2
L Tangga 3969.4 mm 1984.7
L Bordes 5000 mm 1984.7
As 1470.26536188 mm2
As' 392.6990816987 mm2
F'c 26 Mpa
Ec 23965.3917138861 Mpa
Es 200000 Mpa Kontrol Pelat Tangg
qu 11.591874 N/mm 1
b 1000 mm
hf 160 mm 2
Ig 341333333.33 mm4
Fr 3.1613920984 Mpa 3
n 8.3453674527
c 24.72 mm 4
Icr 116419642.467415 mm4
yt 80 mm 5
Mcr 13488606.2866241 Nmm
Ma 38362000 Nmm 6
Ie 126196817.829404 mm4 OK
Lendutan seketika izin 13.8888888889 mm
Lendutan Elastis Seketika 4.9558590805 mm OK 7
ξ 50 Tahun 2 SNI 9.5.2.5
p' 0.0032724923
ʎ 1.71876735
Lendutan Jangka Panjang 8.5179687787 mm
Lendutan Total 13.4738278592 mm OK
Lendutan izin 16.5391666667 mm
SNI 9.5.3.1
Kontrol Lendutan Bordes (b*c^2)/2
L Tangga 3969.4 mm 775
L Bordes 1550 mm 775
As 1357.1680263508 mm2
As' 392.6990816987 mm2
F'c 26 Mpa
Ec 23965.3917138861 Mpa
Es 200000 Mpa Kontrol Pelat Borde
qu 9.7560036 N/mm 1
b 1000 mm
hf 160 mm 2
Ig 341333333.33 mm4
Fr 3.1613920984 Mpa 3
n 8.3453674527
c 37.01 mm 4
Icr 94902449.9743892 mm4
yt 80 mm 5
Mcr 13488606.2866241 Nmm
Ma 33911100 Nmm 6
Ie 110410983.614151 mm4 OK
Lendutan seketika izin 4.3055555556 mm
Lendutan Elastis Seketika 0.1108410689 mm OK 7
ξ 50 Tahun 2 SNI 9.5.2.5
p' 0.0032724923
ʎ 1.71876735
Lendutan Jangka Panjang 0.1905100102 mm
Lendutan Total 0.301351079 mm OK
Lendutan izin 6.4583333333 mm
Balok Bordes

Data Perencanaan

F'c 26 Mpa b1
Fyp 300 Mpa d'
Fyd 340 Mpa
P Bordes 4000 mm
L Bordes 1500 mm
b 150 mm
h 400 mm
Cc 30 mm
Pembebanan Balok
Beban Mati
Elemen BJ Dimensi Berat
Balok 2400 0.15 0.4 144
Dinding 250 0.15 3 112.5
Berat Pelat 2400 0.16 1 384
Total 640.5
Beban Hidup
Beban Guna 300 1 300

U 1248.6 Kg/m

Mmax 2497.2 Kgm 24972000 Nmm


Vu 2497.2 Kg 24972 N

Penulangan Lentur Balok

Direncanakan
D Sengkang 8 mm As
D Utama 12 mm As

d 356 mm

pmin 0.00411765 pb 0.0358586626


m 15.3846154 pmax 0.026893997
Rn 1.64199596 Mpa

p 0.00502352

Perhitungan Rasio Penulangan


p-p' 0.01792933
As-As' 957.426292 mm2
Perhitungan Tul
As 268.256029 mm2 As'
n 2.37190406 n
n perlu 3 n perlu
As Pasang 339.292007 mm2 As' Pasang

Penulangan pelat Bordes


Mu 3391.11 kgm
Rn 2.943671875 Mpa
w 0.121972298
p 0.0105709325

dipakai phit

apangan dan tumpuan ) As 1268.5118993151 mm2 (disamakan antara lapangan


asan tulangan bagi) As' 320 mm2 (digunakan untuk luasan tula

As Dipakai ø 12
As 113.0973355292 mm2
n tul 11.2161077304
tul perlu 12

As' Dipakai ø 10
As' 78.5398163397 mm2
ntul 4.0743665432
tul perlu 5

sehingga
As ø12-80
As' ø10-100

(b*c^2)/2 + [n*As+(n-1)*As']*c - [n*As*d] - [(n-1)*As'*d']


*c^2 + 15154.42 *c - 1472388.56 - 115380.76
*c^2 + 15154.42 *c -1587769.33

c1 = 24.72 mm c2 = -32.36

Kontrol Pelat Tangga


tinggi blok tegangan persegi ekivalen
a 19.95835 mm
faktor reduksi beton
b1 0.864286
Jarak dari serat tekan terjauh ke sumbu netral
c 23.09231
Regangan tarik
e0 0.003
Regangan Tarik Neto
et 0.01259 OK
Kekuatan Lentur Nominal Reduksi
øMny 3.882235 tm OK
Muy 3.8362 tm
Kontrol Jarak antar tulangan

S ≥ 25 mm 88 OK
S ≤ 320 mm
S ≤ 450 mm

(b*c^2)/2 + [n*As+(n-1)*As']*c - [n*As*d] - [(n-1)*As'*d']


*c^2 + 14210.58 *c - 1472388.56 - 115380.76
*c^2 + 14210.58 *c -1587769.33

c1 = 37.01 mm c2 = -55.35

Kontrol Pelat Bordes


tinggi blok tegangan persegi ekivalen
a 18.4231 mm
faktor reduksi beton
b1 0.864286
Jarak dari serat tekan terjauh ke sumbu netral
c 21.31598
Regangan tarik
e0 0.003
Regangan Tarik Neto
et 0.013889 OK
Kekuatan Lentur Nominal Reduksi
øMny 3.608605 tm OK
Muy 3.39111 tm
Kontrol Jarak antar tulangan

S ≥ 25 mm 88 OK
S ≤ 10 mm
S ≤ 450 mm
0.864286
44 mm

Kg/m
Kg/m
Kg/m
Kg/m

Kg/m

Mn 27746666.6666667 Nmm

Hitung Tinggi Blok dan Tinggi Sumbu Netral

a 98.19757 mm
50.26548 mm2 c 113.617 mm
113.0973 mm2 Kontrol Tegangan Regangan Tulangan
es 0.0064
fs 1280 Mpa LELEH
es' 0.001838
fs' 367.6404 Mpa LELEH
Cek Penampang
ey 0.0017
et 0.0064 Penampang Terkendali Tarik
Ø 0.9
Hitung Nilai As'
As' -680.216 Tul Semu
Tul Tekan tetap dipasang untuk memudahkan pekerjaan
Perhitungan Tulangan Perlu
134.128 mm2 a 34.79918 mm
1.185952 c 40.26351 mm
2 et 0.023525 Penampang Terkendali Tarik
226.1947 mm2 Ø 0.9
es 0.023525
fs 4705.051 Mpa LELEH
ØMn 35154630 Nmm OK

makan antara lapangan dan tumpuan )


nakan untuk luasan tulangan bagi)

= 0
= 0
= 0

mm

= 0
= 0
= 0

mm
Penulangan Geser
øVc Pengaruh Momen
Vu 24972 N
Av 100.530965 mm2
pw 0
Rasio Ges 0.356 OK
Vc1 46288.8991 N
Vc2 43566.0227 N
78963.4162 OK
Vsmin 90762.5473 N
Vc 43566.0227 N
øVc Dengan Sengkang
32674.52 N
øVc Tanpa Sengkang
16337.26 N Karena 0.5ØVc<Vu<ØVc, maka :
Sengkang Minimum Perlu
S 200 mm
Smin 178 mm
Avmin1 31.613921 mm2
Avmin2 35 mm2
Avmin 35 mm2
Av 100.530965 mm2
Sehingga dipakai sengkang Ø8-150
an Geser
Perencanaan Tulangan Balok Anak Bentang 5m

F'c 26 Mpa b 350


Fyd 340 Mpa h 450
Cc 30 mm L 5000
D utama 24 mm d 396
D sengkang 12 mm
d' 54 mm Mu 257506400
b1 0.85 Mu 50523500
Fyp 300 Mpa Mu 0
pmin 0.0041176 Vu 74455.775
pb 0.035266
pmax 0.0264495

Hitung Rasio Tulangan Tumpuan Ujung

pmin 0.004117647
pbal 0.035265957
pmax 0.026449468
Rn 5.212992519 Mpa
w 0.232228223
phit 0.017758629 Digunakan phit

Hitung Kebutuhan Tulangan Tumpuan Ujung

As 2461.345959 mm2 n 5.4407691 7


As' 1230.67298 mm2 n 3.2374824 4

As Pasang 3166.725395 mm2


As' Pasang 1809.557368 mm2

Hitung Rasio Tulangan Lapangan Ujung

Rn 1.0228042 Mpa
w 0.040294702
phit 0.00308136 Digunakan phit

Hitung Kebutuhan Tulangan Lapangan Ujung


As 427.0764406 mm2 n 0.9440462 4
As' 213.5382203 mm2 n 0.8391522 2

As Pasang 1809.557368 mm2


As' Pasang 904.7786842 mm2

Karena Momen pada Tumpuan tengah = Lapangan Ujung Maka Kebutuhan tulanganya sama

Hitung Rasio Tulangan Lapangan Tengah

Rn 0 Mpa
w 0
phit 0 Digunakan phit

Hitung Kebutuhan Tulangan Lapangan Tengah

As 0 mm2 n 0 4
As' 0 mm2 n 0 3

As Pasang 1809.557368 mm2


As' Pasang 603.1857895 mm2

Penulangan Geser
øVc Pengaruh Momen
Vu 74455.775 N
Av 226.1946711 mm2
pw 0.022847947
Rasio Geser Momen 0.583579659 OK
Vc1 120143.0978 N
Vc2 119239.8886 N
204949.9903 OK
Vsmin 235574.7015 N
Vc 119239.8886 N
øVc Dengan Sengkang
89429.9164286959 N
øVc Tanpa Sengkang
44714.958214348 N Karena Vu>ØVc, Sehingga :
Hitung Sengkang Minimum
S 200 mm
Smin 198 mm
Avmin 73.76581563 mm2
Avmin 81.66666667 mm2
Av 81.66666667 mm2
digunakan ø10-125 daerah -0.502786 sampai 2.5 m

Kebutuhan Sengkang Pada Zona Kritis


Vu Tumpuan 74455.775 N
Vs -19965.5219 OK 466437.91 N
-19965.5219 OK 233219 N
Smax 198 mm
Av/s -0.168059949 mm2/mm
S -1345.916578 mm
Smin 198 mm
ø10-125 daerah 0 - -0.502786 m

99274.367
mm q 3486.264 kgm
mm l 5m
mm
mm Momen (Kgm) -3631.525 6225.4714 -7263.05 -7263 5447 -7263 -7263

Nmm
Nmm
Nmm
N
Geser (Kg) 8715.66

AE/I

Hitung Tinggi Blok dan Tinggi Sumbu Netral

a 139.196720651 mm
c 163.760847825 mm
Kontrol Tegangan Regangan Tulangan
es 0.0042544812
fs 850.896249961 Mpa LELEH

Cek Penampang
ey 0.0017
et 0.0042544812 Penampang Terkendali Tarik
Ø 0.8
ØMn 281145826.265 Nmm OK

Hitung Tinggi Blok dan Tinggi Sumbu Netral

a 79.5409832294 mm
c 93.5776273286 mm
Kontrol Tegangan Regangan Tulangan
es 0.0096953422
fs 1939.06843743 Mpa LELEH
Cek Penampang
ey 0.0017
et 0.0096953422 Penampang Terkendali Tarik
Ø 0.8
ØMn 175336023.04 Nmm OK

Hitung Tinggi Blok dan Tinggi Sumbu Netral

a 79.5409832294 mm
c 93.5776273286 mm
Kontrol Tegangan Regangan Tulangan
es 0.0096953422
fs 1939.06843743 Mpa LELEH

Cek Penampang
ey 0.0017
et 0.0096953422 Penampang Terkendali Tarik
Ø 0.9
ØMn 197253025.92 Nmm OK
5447 -7263 -7263 5447.29 -7263.1 -7263 6225.4714286 -3631.525
Perencanaan Tulangan Balok Anak Bentang 4m

F'c 26 Mpa b 250


Fyd 340 Mpa h 300
Cc 30 mm L 4000
D utama 16 mm d 252
D sengkang 10 mm
d' 48 mm Mu 19556133.333333
b1 0.8642857 Mu 33524800
Fyp 300 Mpa Vu 58668.4
pmin 0.0041176
pb 0.0358587
pmax 0.026894

Hitung Rasio Tulangan Tumpuan

pmin 0.004117647
pbal 0.035858663
pmax 0.026893997
Rn 1.368672023 Mpa
w 0.054382209
phit 0.00415864
Karena pmin<phit<pmax, sehingga dipakai phit

Hitung Kebutuhan Tulangan Tumpuan

As 261.9942905 mm2 n 1.3030527 2


As' 130.9971453 mm2 n 0.6515263 2

As Pasang 402.1238597 mm2


As' Pasang 402.1238597 mm2

Hitung Rasio Tulangan Lapangan

Rn 2.346294897 Mpa
w 0.095623055
phit 0.007312351 Digunakan phit

Hitung Kebutuhan Tulangan Lapangan


As 460.6781291 mm2 n 2.291225 3
As' 230.3390646 mm2 n 1.1456125 2

As Pasang 603.1857895 mm2


As' Pasang 402.1238597 mm2

Penulangan Geser
øVc Pengaruh Momen
Vu 58668.4 N
Av 157.0796327 mm2
pw 0.006382918
Rasio Geser Momen 0.756 OK
Vc1 54610.49899 N
Vc2 56566.21254 N
93159.08651 OK
Vsmin 107079.4098 N
Vc 54610.49899 N
øVc Dengan Sengkang
40957.874242934 N
øVc Tanpa Sengkang
20478.937121467 N Karena Vu>ØVc, Sehingga :
Hitung Sengkang Minimum
S 200 mm
Smin 126 mm
Avmin 52.68986831 mm2
Avmin 58.33333333 mm2
Av 58.33333333 mm2
digunakan ø10-125 daerah 0.6037501 sampai 2m

Kebutuhan Sengkang Pada Zona Kritis


Vu Tumpuan 58668.4 N
Vs 23614.03434 OK 212017.23 N
23614.03434 OK 106008.62 N
Smax 126 mm
Av/s 0.312354952 mm2/mm
S 502.8882426 mm
ø10-125 daerah 0 - 0.6037501 m
mm q 2933.42 Kgm
mm l 4m
mm
mm

Nmm Momen (Kgm) -1955.613 3352.48


Nmm
N

Geser (Kg) 5866.84

Hitung Tinggi Blok dan Tinggi Sumbu Netral

a 24.7460836714 mm
c 28.631832347 mm
Kontrol Tegangan Regangan Tulangan
es 0.0234041781
fs 4680.83561567 Mpa LELEH

Cek Penampang
ey 0.0017
et 0.0234041781 Penampang Terkendali Tarik
Ø 0.9
ØMn 29486073.4924 Nmm OK

Hitung Tinggi Blok dan Tinggi Sumbu Netral

a 37.119125507 mm
c 42.9477485205 mm
Kontrol Tegangan Regangan Tulangan
es 0.0146027854
fs 2920.55707711 Mpa LELEH
Cek Penampang
ey 0.0017
et 0.0146027854 Penampang Terkendali Tarik
Ø 0.9
ØMn 43087234.0584 Nmm OK
3352.48 -1955.613
Perencanaan Tulangan Balok Anak Bentang 5m

F'c 26 Mpa b 250


Fyd 340 Mpa h 300
Cc 30 mm L 5000
D utama 20 mm d 250
D sengkang 10 mm
d' 50 mm Mu 95892500
b1 0.8642857 Mn 106547222.22222
Fyp 300 Mpa
pmin 0.0041176
pb 0.0358587
pmax 0.026894

Hitung Rasio Tulangan Hitung Tinggi Blok dan Ti

pmin 0.004117647 a
pbal 0.035858663 c
pmax 0.026893997 Kontrol Tegangan Reg
Rn 6.819022222 Mpa es
w 0.324044005 fs
phit 0.024779836 es'
Karena pmin<phit<pmax, sehingga dipakai phit fs'
Cek Penam
Perhitungan Rasio Penulangan ey
p-p' 0.017929331 et
As-As' 1120.583207 mm2 Ø
Hitung Nila
As'
Tul Tekan tetap dipasang untuk

Perhitungan Tulangan Perlu


As 1548.739732 mm2 As' 774.36987 mm2
n 4.929791678 n 2.4648958
n perlu 5 n perlu 3
As Pasang 1570.796327 mm2 As' Pasang 942.4778 mm2

Kontrol Penampang
As max 1680.87481 Balanced Reinforcement Spasi tulangan

Penulangan Geser
øVc Pengaruh Momen
Vu 61022.5 N
Av 157.0796327 mm2
pw 0.025132741
Rasio Geser Momen 0.159090909 OK
Vc1 54177.08233 N
Vc2 55238.4852 N
92419.72868 OK
Vsmin 106229.5732 N
Vc 54177.08233 N
øVc Dengan Sengkang
40632.8117489425 N
øVc Tanpa Sengkang
20316.4058744713 N Karena Vu>ØVc, Sehingga :
Hitung Sengkang Minimum
S 200 mm
Smin 125 mm
Avmin 52.68986831 mm2
Avmin 58.33333333 mm2
Av 58.33333333 mm2
digunakan ø10-125 daerah 0.8353348 sampai 2.5 m
Kebutuhan Sengkang berjarak d dari tumpuan Kebutuhan Sengkang
Vu 7842.26 Kg Vu Tumpuan
Vs 50386.38433 OK 210334.55 N Vs
50386.38433 OK 105167.28 N
Smax 125 mm Smax
Av/s 0.671818458 mm2/mm Av/s
S 233.8126184 mm S
Smin 125 mm Smin
ø10-125 daerah 0.25 sampai 0.8353348 m ø10-125
mm
mm
mm
mm

Nmm

Hitung Tinggi Blok dan Tinggi Sumbu Netral

68.958967 mm
79.787234 mm
Kontrol Tegangan Regangan Tulangan
0.0064
1280 Mpa LELEH
0.00112
224 Mpa TIDAK LELEH
Cek Penampang
0.0017
0.0064 Penampang Terkendali Tarik
0.9
Hitung Nilai As'
545.4079 Tul Sejati
Tekan tetap dipasang untuk memudahkan pekerjaan

gan Perlu
a 96.664389 mm
c 111.8431 mm
et 0.0037058 Penampang Transisi
Ø 0.7921519
es 0.0037058
fs 741.1646 Mpa LELEH
ØMn 85318624 Nmm NOT OK
30 OK

Kebutuhan Sengkang Pada Zona Kritis


61022.5 N
27186.251 OK 210334.55 N
27186.251 OK 105167.28 N
125 mm
0.3624833 mm2/mm
433.34303 mm
125 mm
daerah 0 - 0.25 m
Perencanaan Tulangan Balok Anak Bentang 5m

F'c 26 Mpa b 250


Fyd 340 Mpa h 300
Cc 30 mm L 5000
D utama 20 mm d 250
D sengkang 10 mm
d' 50 mm Mu 58944155
b1 0.864286
Fyp 300 Mpa
pmin 0.004118
pb 0.035859
pmax 0.026894

Hitung Rasio Tulangan

pmin 0.004117647
pbal 0.035858663
pmax 0.026893997
Rn 4.191584356 Mpa
w 0.180352318
phit 0.013791648
Karena phit>pmax, sehingga dipakai tulangan rangkap

Hitung Cc

Diasumsikan Keruntuhan Penampang Bersifat Daktail es=ey


ec 0.003
ey 0.0017
cb 159.5744681 mm
c 119.6808511 mm
Cc 571497.4354 N
Mnc 113316954.4 Nmm
a 103.4384498 mm
Kontrol Tulangan Tekan
Hitung Cs
Mns -35302631.65 Nmm fs' 349.3333333333
Cs -176513.1583 N Jika Leleh Maka,
As' -519.1563478 mm2 Tidak Leleh
Hitung T Cek Penampang
T = Cc+Cs ey 0.0017
T 394984.2771 N et 0.0032666667
As 1161.718462 mm2 eccl 0.0017
Ø 0.7555555556
Kebutuhan Tulangan es 0.0032666667
Tarik 3.697864715 7Ø20 es' 0.0017466667
Tekan -2.582071844 3Ø16
Sehingga,
As 1256.6371 mm2 Mn 78014322.794118
As' 603.1857895 mm2 ØMn 58944155
As max 1680.8748100304
Penulangan Geser
øVc Pengaruh Momen
Vu 87175 N
Av 157.0796327 mm2
pw 0.020106194
Rasio Geser Momen 0.369735557 OK
Vc1 54177.08233 N
Vc2 58888.79325 N
92419.72868 OK
Vsmin 106229.5732 N
Vc 54177.08233 N
øVc Dengan Sengkang
40632.8117489425 N
øVc Tanpa Sengkang
20316.4058744713 N Karena Vu>ØVc, Sehingga :
Hitung Sengkang Minimum
S 200 mm
Smin 125 mm
Avmin 52.68986831 mm2
Avmin 58.33333333 mm2
Av 58.33333333 mm2
digunakan ø10-125 daerah 1.135673 sampai 2.5 m
Kebutuhan Sengkang berjarak d dari tumpuan Kebutuhan Sengkang Pada
Vu 6701.02 Kg Vu Tumpuan
Vs 35169.84833 OK 210334.6 N Vs
35169.84833 OK 105167.3 N
Smax 125 mm Smax
Av/s 0.468931311 mm2/mm Av/s
S 334.9736496 mm S
Smin 125 mm Smin
ø10-125 daerah 0.25 sampai 1.135673 m ø10-125
mm
mm
mm
mm

Nmm

Kontrol Tulangan Tekan

Leleh
Fs' = Fy
Fs' = Fs'
Cek Penampang
Penampang Transisi

LELEH Asumsi Benar


LELEH Asumsi Benar

Kontrol Penampang
Nmm Spasi tulangan 30 OK
Nmm OK
UnderReinforced

Kebutuhan Sengkang Pada Zona Kritis


74455.78 N
45097.28 OK 210334.6 N
45097.28 OK 105167.3 N
125 mm
0.601297 mm2/mm
261.2346 mm
125 mm
daerah 0 - 0.25 m
Beban Mati Beban Mati
Pembebanan Pelat Lantai A Pembebanan Pelat Lantai B
Pelat 432 Kg/m Pelat
Ducting +Plumbing 30 Kg/m Ducting +Plumbing
Spesi 31.5 Kg/m Spesi
Keramik 36 Kg/m Keramik
Plafon + Penggantung 27 Kg/m Plafon + Penggantung
qp 556.5 Kg/m qp

Beban Dinding Beban Dinding


650 Kg/m 650

Beban Hidup Beban Hidup


718.5 Kg/m 598.75

1 Trapesium 5m 1 Trapesium
DL 1139.720 Kg/m DL
LL 632.280 Kg/m LL

2 Trapesium 5m 2 Trapesium
DL 1629.440 Kg/m DL
LL 1264.560 Kg/m LL

1 Segitiga 3m 1 Segitiga
DL 1021.000 Kg/m DL
LL 479.000 Kg/m LL

2 Segitiga 3m 2 Segitiga
DL 1392.000 Kg/m DL
LL 958.000 Kg/m LL

UDL
Elemen BJ Dimensi Faktor
Spesi 21 1 1 1
Dinding 250 1 2.6 1
PELAT B 1 TRAPESIUM
UDL Elemen BJ Dimensi
Spesi 21 1 1
Dinding 250 0.15 3

Beban Mati
PELAT A 1 TRAPESIUM
Elemen BJ Dimensi Faktor
Pelat 2400 1 0.12 Kg/m
Spesi 21 1 1 Kg/m
keramik 24 1 1 Kg/m
Plafond 18 1 1 Kg/m
Dinding 250 0.15 3 1
Total
Beban Hidup B/m2 dimensi Faktor
Beban Guna 479 1 Kg/m

Beban Mati
PELAT B 1 TRAPESIUM
Elemen BJ Dimensi Faktor
Pelat 2400 1 0.12 Kg/m
Spesi 21 1 1 Kg/m
keramik 24 1 1 Kg/m
Plafond 18 1 1 Kg/m
Dinding 250 0.15 3 1
Total
Beban Hidup B/m2 dimensi Faktor
Beban Guna 479 1 Kg/m

Beban Mati
PELAT A 1 TRAPESIUM
Elemen BJ Dimensi Faktor
Pelat 2400 1 0.12 Kg/m
Spesi 21 1 1 Kg/m
Plafond 18 1 1 Kg/m
Total
Beban Hidup B/m2 dimensi Faktor
Beban Guna 96 1 Kg/m
Beban Hujan 50
Beban Mati
PELAT B 1 TRAPESIUM
Elemen BJ Dimensi Faktor
Pelat 2400 1 0.12 Kg/m
Spesi 21 1 1 Kg/m
Plafond 18 1 1 Kg/m
Total
Beban Hidup B/m2 dimensi Faktor
Beban Guna 96 1 Kg/m
Beban Hujan 50
Beban Mati
Pelat Lantai B Pembebanan Pelat Atap A
360 Kg/m Pelat 432 Kg/m
25 Kg/m Plafon + Penggantung 27 Kg/m
26.25 Kg/m qp 459 Kg/m
30 Kg/m
22.5 Kg/m
463.75 Kg/m

Beban Hidup
Kg/m Beban Guna 144 Kg/m
Air Hujan 75 Kg/m
219 Kg/m
Kg/m

4m 1 Trapesium 5m
1053.366 Kg/m DL 403.920 Kg/m
520.788 Kg/m LL 192.720 Kg/m

4m 2 Trapesium 5m
1456.732 Kg/m DL 807.840 Kg/m
1041.576 Kg/m LL 385.440 Kg/m

3m 1 Segitiga 3m
959.167 Kg/m DL 306.000 Kg/m
399.167 Kg/m LL 146.000 Kg/m

3m 2 Segitiga 3m
1268.333 Kg/m DL 612.000 Kg/m
798.333 Kg/m LL 292.000 Kg/m

Berat
21
650
671 kg/m
M
Faktor Berat
1 21
1 112.5
133.5 kg/m

Beban Mati
PELAT A 2 TRAPESIUM
Berat Elemen BJ Dimensi Faktor
#VALUE! Pelat 2400 1 0.12 #VALUE!
#VALUE! Spesi 21 1 1 #VALUE!
#VALUE! keramik 24 1 1 #VALUE!
#VALUE! Plafond 18 1 1 #VALUE!
112.5 Dinding 250 0.15 3 1
#VALUE! Total
Beban Hidup B/m2 dimensi Faktor
#VALUE! Beban Guna 479 1 ###

Beban Mati
PELAT B 2 TRAPESIUM
Berat Elemen BJ Dimensi Faktor
#VALUE! Pelat 2400 1 0.12 #VALUE!
#VALUE! Spesi 21 1 1 #VALUE!
#VALUE! keramik 24 1 1 #VALUE!
#VALUE! Plafond 18 1 1 #VALUE!
112.5 Dinding 250 0.15 3 1
#VALUE! Total
Beban Hidup B/m2 dimensi Faktor
#VALUE! Beban Guna 479 1 ###

Beban Mati
PELAT A 2 TRAPESIUM
Berat Elemen BJ Dimensi Faktor
#VALUE! Pelat 2400 1 0.12 #VALUE!
#VALUE! Spesi 21 1 1 #VALUE!
#VALUE! Plafond 18 1 1 #VALUE!
#VALUE! Total
Beban Hidup B/m2 dimensi Faktor
#VALUE! Beban Guna 96 1 ###
Beban Hujan 50
Beban Mati
PELAT B 2 TRAPESIUM
Berat Elemen BJ Dimensi Faktor
#VALUE! Pelat 2400 1 0.12 #VALUE!
#VALUE! Spesi 21 1 1 #VALUE!
#VALUE! Plafond 18 1 1 #VALUE!
#VALUE! Total
Beban Hidup B/m2 dimensi Faktor
#VALUE! Beban Guna 96 1 ###
Beban Hujan 50
Beban Mati
Pembebanan Pelat Atap B
Pelat 360 Kg/m
Plafon + Penggantung 22.5 Kg/m
qp 382.5 Kg/m

Beban Hidup
Beban Guna 120 Kg/m
Air Hujan 62.5 Kg/m
182.5 Kg/m

1 Trapesium 4m
DL 350.625 Kg/m
LL 167.292 Kg/m

2 Trapesium 4m
DL 701.250 Kg/m
LL 334.583 Kg/m

1 Segitiga 3m
DL 255.000 Kg/m
LL 121.667 Kg/m

2 Segitiga 3m
DL 510.000 Kg/m
LL 243.333 Kg/m
Beban Mati
PELAT A 1 SEGITIGA
Berat Elemen BJ Dimensi Faktor Berat
#VALUE! Pelat 2400 1 0.12 0 0
#VALUE! Spesi 21 1 1 0 0
#VALUE! keramik 24 1 1 0 0
#VALUE! Plafond 18 1 1 0 0
112.5 Dinding 250 0.15 3 1 112.5
#VALUE! Total 112.5
Beban Hidup B/m2 dimensi Faktor
#VALUE! Beban Guna 479 1 0 0

Beban Mati
PELAT B 1 SEGITIGA
Berat Elemen BJ Dimensi Faktor Berat
#VALUE! Pelat 2400 1 0.12 0 0
#VALUE! Spesi 21 1 1 0 0
#VALUE! keramik 24 1 1 0 0
#VALUE! Plafond 18 1 1 0 0
112.5 Dinding 250 0.15 3 1 112.5
#VALUE! Total 112.5
Beban Hidup B/m2 dimensi Faktor
#VALUE! Beban Guna 479 1 0 0

Beban Mati
PELAT A 1 SEGITIGA
Berat Elemen BJ Dimensi Faktor Berat
#VALUE! Pelat 2400 1 0.12 0 0
#VALUE! Spesi 21 1 1 0 0
#VALUE! Plafond 18 1 1 0 0
#VALUE! Total 0
Beban Hidup B/m2 dimensi Faktor
#VALUE! Beban Guna 96 1 0 50
Beban Hujan 50
Beban Mati
PELAT B 1 SEGITIGA
Berat Elemen BJ Dimensi Faktor Berat
#VALUE! Pelat 2400 1 0.12 0 0
#VALUE! Spesi 21 1 1 0 0
#VALUE! Plafond 18 1 1 0 0
#VALUE! Total 0
Beban Hidup B/m2 dimensi Faktor
#VALUE! Beban Guna 96 1 0 50
Beban Hujan 50
Beban Mati
PELAT A 2 SEGITIGA
Elemen BJ Dimensi Faktor Berat
Pelat 2400 1 0.12 0 0
Spesi 21 1 1 0 0
keramik 24 1 1 0 0
Plafond 18 1 1 0 0
Dinding 250 0.15 3 1 112.5
Total 112.5
Beban Hidup B/m2 dimensi Faktor
Beban Guna 479 1 0 0

Beban Mati
PELAT B 2 SEGITIGA
Elemen BJ Dimensi Faktor Berat
Pelat 2400 1 0.12 0 0
Spesi 21 1 1 0 0
keramik 24 1 1 0 0
Plafond 18 1 1 0 0
Dinding 250 0.15 3 1 112.5
Total 112.5
Beban Hidup B/m2 dimensi Faktor
Beban Guna 479 1 0 0

Beban Mati
PELAT A 2 SEGITIGA
Elemen BJ Dimensi Faktor Berat
Pelat 2400 1 0.12 0 0
Spesi 21 1 1 0 0
Plafond 18 1 1 0 0
Total 0
Beban Hidup B/m2 dimensi Faktor
Beban Guna 96 1 0 50
Beban Hujan 50
Beban Mati
PELAT B 2 SEGITIGA
Elemen BJ Dimensi Faktor Berat
Pelat 2400 1 0.12 0 0
Spesi 21 1 1 0 0
Plafond 18 1 1 0 0
Total 0
Beban Hidup B/m2 dimensi Faktor
Beban Guna 96 1 0 50
Beban Hujan 50
Verifikasi Beban
Beban Gravitasi Hitungan Manual = Reaksi Verti

Beban Lantai

Beban Mati
Elemen Jenis Beban Jumlah qu L QDL (kg)
Pelat A 1 Segitiga 48 1021 3 176428.8
Pelat A 2 Segitiga 48 1392 3 240537.6
Pelat A 1 Trapesium 40 1139.72 5 273532.8
Pelat A 2 Trapesium 52 1629.44 5 508385.28
Pelat B 1 Segitiga 64 959.16667 3 220992
Pelat B 1 Trapesium 8 1053.3659 4 40449.25
Pelat B 2 Trapesium 28 1456.7318 4 195784.75
Balok UDL 1 Beban Merata 4 671 5 16104
Balok UDL 1 Beban Merata 4 671 5 16104
Balok UDL 1 Beban Merata 4 671 4 12883.2

Beban Atap

Beban Mati
Elemen Jenis Beban Jumlah qu L QDL (kg)
Pelat A 1 Segitiga 8 306 3 8812.8
Pelat A 2 Segitiga 16 612 3 35251.2
Pelat A 1 Trapesium 10 403.92 5 24235.2
Pelat A 2 Trapesium 15 807.84 5 72705.6
Pelat B 1 Segitiga 20 255 3 18360
Pelat B 1 Trapesium 2 350.625 4 3366
Pelat B 2 Trapesium 11 701.25 4 37026

BASE REACTION SAP2000 3159811.59


TOTAL BEBAN 3423446.91
Persentase 0.077
Verifikasi Beban
an Manual = Reaksi Vertikal SAP2000

Beban Lantai

Beban Hidup
Elemen Jenis Beban Jumlah qu L QDL (kg)
Pelat A 1 Segitiga 48 479 3 110361.6
Pelat A 2 Segitiga 48 958 3 220723.2
Pelat A 1 Trapesium 40 632.28 5 202329.6
Pelat A 2 Trapesium 52 1264.56 5 526056.96
Pelat B 1 Segitiga 64 399.16667 3 122624
Pelat B 1 Trapesium 8 520.78776 4 26664.333
Pelat B 2 Trapesium 28 1041.5755 4 186650.33

Beban Atap

Beban Hidup
Elemen Jenis Beban Jumlah qu L QDL (kg)
Pelat A 1 Segitiga 8 146 3 5606.4
Pelat A 2 Segitiga 16 292 3 22425.6
Pelat A 1 Trapesium 10 192.72 5 15417.6
Pelat A 2 Trapesium 15 385.44 5 46252.8
Pelat B 1 Segitiga 20 121.66667 3 11680
Pelat B 1 Trapesium 2 167.29167 4 2141.3333
Pelat B 2 Trapesium 11 334.58333 4 23554.667
Beban Hidup
Elemen Jenis Beban Jumlah qu QDL (kg)
Balok Induk1 Segitiga
Balok Induk2 Segitiga
Balok Induk1 Trapesium
Balok Induk2 Trapesium
Balok Induk1 Segitiga
Balok Induk1 Trapesium Atas
Balok Induk1 Segitiga
Balok UDL Beban Merata
Lantai

Trapesium A Trapesium B
Ln 4.65 m Ln 4.65 m
a 1.35 m a 1.825 m
qek 0.887617 q qek 0.79462 q

Segitiga A Segitiga B
Ln 2.7 m Ln 2.2 m
a 1.35 m a 1.1 m
qek 0.666667 q qek 0.666667 q

Segitiga A Segitiga B
Pelat 259.2 Kg/m Pelat 211.2 Kg/m
Spesi 18.9 Kg/m Spesi 15.4 Kg/m
Keramik 21.6 Kg/m Keramik 17.6 Kg/m
Pelafon 16.2 Kg/m Pelafon 13.2 Kg/m
Plumbing 18 Kg/m Plumbing 14.66667 Kg/m
333.9 Kg/m 272.0667 Kg/m Guna
Hujan

Beban Hidup Beban Hidup


Guna 431.1 Kg/m Guna 351.2667 Kg/m

Trapesium B Trapesium B
Pelat 345.1055 Kg/m Pelat 417.6522 Kg/m
Spesi 25.16394 Kg/m Spesi 30.4538 Kg/m
Keramik 28.75879 Kg/m Keramik 34.80435 Kg/m Guna
Pelafon 21.56909 Kg/m Pelafon 26.10326 Kg/m Hujan
Plumbing 23.96566 Kg/m Plumbing 29.00362 Kg/m
444.563 Kg/m 538.0172 Kg/m

Beban Hidup Beban Hidup


Guna 573.9776 Kg/m Guna 694.6368 Kg/m

Beban UDL
Dinding 650 Kg/m
Atap

Trapesium A Trapesium B
Ln 4.65 m Ln 3.65 m
a 1.35 m a 1.1 m
qek 0.887617 q qek 0.878902 q

Segitiga A Segitiga B
Ln 2.7 m Ln 2.2 m
a 1.35 m a 1.1 m
qek 0.666667 q qek 0.666667 q

Segitiga A Segitiga A
Pelat 259.2 Kg/m Pelat 211.2 Kg/m
Pelafon 16.2 Kg/m Pelafon 13.2 Kg/m
275.4 Kg/m 224.4 Kg/m

Beban Hidup Beban Hidup


86.4 Kg/m Guna 70.4 Kg/m
45 Kg/m Hujan 36.66667 Kg/m
131.4 Kg/m 107.0667 Kg/m

Trapesium B Trapesium B
Pelat 345.1055 Kg/m Pelat 278.436 Kg/m
Pelafon 21.56909 Kg/m Pelafon 17.40225 Kg/m
366.6746 Kg/m 295.8383 Kg/m

Beban Hidup Beban Hidup


115.0352 Kg/m Guna 139.2174 Kg/m
59.91415 Kg/m Hujan 48.33959 Kg/m
174.9493 Kg/m 187.557 Kg/m
Pembebanan Pelat Lantai

Beban Mati Beban Mati


Pelat 388.8 Kg/m Pelat 525.6
Spesi 28.35 Kg/m Spesi 38.325
Keramik 32.4 Kg/m Keramik 43.8
Plafon + Penggantung 24.3 Kg/m Plafon + Penggantung 32.85
Ducting Plumbing 27 Kg/m Ducting Plumbing 36.5
qp 500.85 Kg/m qp 677.075

Beban Hidup Beban Hidup


Beban Guna 646.65 Kg/m Beban Guna 874.175
qp 646.65 Kg/m qp 874.175

Beban Trapesium A Beban Trapesium B

Ln 4.65 m Ln 4.65
a 1.35 m a 1.825
qb 0.887617 qb 0.794619802

Beban Segitiga A Beban Segitiga B


qb 0.666667 qb 0.666666667

Jenis Beban Dead Live


1 Segitiga A 333.9 431.1
2 Segitiga A 667.8 862.2
1 Trapesium A 444.563 573.97758
2 Trapesium A 889.126 1147.9552
1 Segitiga B 451.3833 582.78333
1 Trapesium B 538.0172 694.63677

Beban Dinding
Beban UDL
637.5 kg/m
Pembebanan Pelat Atap

Beban Mati Beban Mati


Kg/m Pelat 388.8 Kg/m Pelat 525.6
Kg/m Plafon + Penggantung 24.3 Kg/m Plafon + Penggantung 32.85
Kg/m qp 413.1 Kg/m qp 558.45
Kg/m
Kg/m Beban Hidup Beban Hidup
Kg/m Beban Guna 129.6 Kg/m Beban Guna 175.2
qp 129.6 Kg/m qp 175.2

Kg/m Beban Trapesium A Beban Trapesium B


Kg/m
Ln 4.65 m Ln 4.65
a 1.35 m a 1.825
qb 0.887617 qb 0.79462
m
m Beban Segitiga A Beban Segitiga B
qb 0.666667 qb 0.666667

Jenis Beban Dead Live


1 Segitiga A 275.4 86.4
2 Segitiga A 550.8 172.8
1 Trapesium A 366.6746 115.0352
2 Trapesium A 733.3492 230.0703
1 Segitiga B 372.3 116.8
1 Trapesium B 443.7554 139.2174
Kg/m
Kg/m
Kg/m

Kg/m
Kg/m

m
m
Beban Pelat Lantai

Jenis Beban Dead Live L Jumlah QD


1 Segitiga A 333.9 431.1 3 48 57697.92
2 Segitiga A 667.8 862.2 3 48 115395.84
1 Trapesium A 444.563 573.97 5 40 106695.12
2 Trapesium A 889.126 1147.95 5 52 277407.312
1 Segitiga B 451.383 582.78 4 20 43332.768
1 Trapesium B 538.017 694.636 5 32 103299.264

Beban Pelat Lantai

Jenis Beban Dead Live L Jumlah QD


1 Segitiga A 275.4 86.4 3 8 7931.52
2 Segitiga A 550.8 172.8 3 16 31726.08
1 Trapesium A 366.674 115.035 5 10 22000.44
2 Trapesium A 733.34 230.0703 5 15 66000.6
1 Segitiga B 372.3 116.8 4 6 10722.24
1 Trapesium B 443.75 139.21 5 10 26625

Beban Dinding

Bentang Jumlah Dead QD Qu


3m 96 637.5 183600 220320
4m 24 637.5 61200 73440
5m 116 637.5 369750 443700
737460

QTOTAL 2886932.636 Kg
Base Reaction SAP2000 2886936.96 Kg
Validasi 0.000149778 %
QL Qtot
99325.44 157023.36
198650.88 314046.72
183670.4 290365.52
477547.2 754954.512
74595.84 117928.608
177826.816 281126.08
1915444.8

QL Qtot
3317.76 11249.28
13271.04 44997.12
9202.8 31203.24
27608.436 93609.036
4485.12 15207.36
11136.8 37761.8
234027.836
d tul 26 mm ec 0.003
d stirup 10 mm ey 0.0017
Fc 26 Mpa As 2123.717 mm2
Fyd 340 Mpa As' 2123.717 mm2
Fyp 300 Mpa
b 600 mm
h 600 mm
b1 0.85
d' 63 mm
d 537 mm

Kondisi 1 (Pn maks,Mn=0)

Ast 4247.4332676534 mm2


Pn0 9306259.03578702 N
ØPn0 6049068.37326156 N
Pnmax 4839254.69860925 N 483.9255 t

Kondisi 2 Pn bal,Mn bal

a 291.3510638298 mm
c 342.7659574468 mm
Cc 3863315.10638298 N
es 0.0024486034 Leleh
Cs 722063.655501078 N
Ts 722063.655501078 N
Pnb 3863315.10638298 N
c/d 0.6382978723
ØPnb 2511154.81914894 N 251.1155 t

Mnb 938462221.54522 Nmm


ØMnb 844615999.390698 Nmm 84.4616 tm

Kondisi 3 Pn = 0, Mn

ab 53.55 mm
Cc 710073 N
Ts 722063.6555 N Cc<Ts

Trial 2
a 53.874 mm
c 63.3811764706 mm

Cc 714369.24 N
Cs 3799.700813565 N
Ts 722063.655501078 N

Mn 362572259.47649 Nmm 36.25723 tm

Cek Kondisi Keruntuhan

c/d 0.118028
ØMn 32.6315 tm

ØPn ØMn
Kondisi 1 483.9254698609 0
Kondisi 2 251.1154819149 84.4616
Kondisi 3 0 36.25723