Anda di halaman 1dari 20

DAFTAR ANALISA HARGA SATUAN

SNI. 03-2835-2002 - 2 - a
1 m³ Galian tanah biasa sedalam 2 meter.
- Pekerja 0.526 Oh x Rp
- Mandor 0.052 Oh x Rp

SNI. 03-2835-2002 - 2 - b
1 m³ Galian tanah biasa sedalam 3 meter.
- Pekerja 0.735 Oh x Rp
- Mandor 0.073 Oh x Rp

SNI. 03-2835-2002 - 2 -c
1 m³ Urugan kembali
- Pekerja 0.192 Oh x Rp
- Mandor 0.019 Oh x Rp

SNI.-2835-6.10.a
1 m³ Timbunan Tanah
- Tanah Urug 1.200 Oh x Rp
- Pekerja 0.300 Oh x Rp
- Mandor 0.010 Oh x Rp

SNI. 03-2835-2002-2-d
1 m³ Urugan pasir
- Pasir Urug 1.200 M³ x Rp
- Pekerja 0.300 Oh x Rp
- Mandor 0.010 Oh x Rp

SNI. 03-2836-2002-a
1 m³ Pasang pondasi batu kali, 1 Pc : 4 Ps
Batu belah 15/20 cm 1.100 M³ x Rp
Semen portland 4.075 Zak x Rp
Pasir pasang 0.520 M³ x Rp
Pekerja 1.500 Oh x Rp
Tukang batu 0.600 Oh x Rp
Kepala tukang 0.080 Oh x Rp
Mandor 0.080 Oh x Rp
SNI. 03-2836-2002-b
1 m³ Pasang pondasi batu kosong
Batu belah 15/20 cm 1.200 M³ x Rp
Pasir urug 0.300 M³ x Rp
Pekerja 0.780 Oh x Rp
Tukang batu 0.390 Oh x Rp
Kepala tukang 0.039 Oh x Rp
Mandor 0.039 Oh x Rp

SNI. 03-2836-2002-c
1 m³ Pasang pondasi siklop 40% batu kali
Semen portland 5.050 Zak x Rp
Pasir beton 0.320 M³ x Rp
Koral beton 0.490 M³ x Rp
Kawat beton 0.800 Kg x Rp
Pekerja 3.000 Oh x Rp
Tukang batu 0.850 Oh x Rp
Kepala tukang 0.085 Oh x Rp
Mandor 0.150 Oh x Rp

SNI. 03-2837-2002-1-a
1 m² Pasangan bata merah tebal ½ bata, 1 Pc : 2 Ps
Bata merah 80.000 Bh x Rp
Semen portland 0.474 Zak x Rp
Pasir pasang 0.038 M³ x Rp
Pekerja 0.320 Oh x Rp
Tukang 0.100 Oh x Rp
Kepala tukang 0.010 Oh x Rp
Mandor 0.015 Oh x Rp

SNI. 03-2837-2002-1-b
1 m² Pasangan bata merah tebal ½ bata, 1 Pc : 4 Ps
Bata merah 80.000 Bh x Rp
Semen portland 0.288 Zak x Rp
Pasir pasang 0.043 M³ x Rp
Pekerja 0.320 Oh x Rp
Tukang 0.100 Oh x Rp
Kepala tukang 0.010 Oh x Rp
Mandor 0.015 Oh x Rp

SNI. 03-2837-2002-2-a
1 m² Plesteran 1 Pc : 2 Ps, tebal 15 mm.
Semen portland 0.213 Zak x Rp
Pasir pasang 0.017 M³ x Rp
Pekerja 0.200 Oh x Rp
Tukang 0.150 Oh x Rp
Kepala tukang 0.015 Oh x Rp
Mandor 0.010 Oh x Rp

SNI. 03-2837-2002
1 m² Plesteran 1 Pc : 4 Ps, tebal 15 mm.
Semen portland 0.130 Kg x Rp
Pasir pasang 0.02 M³ x Rp
Pekerja 0.200 Oh x Rp
Tukang 0.150 Oh x Rp
Kepala tukang 0.015 Oh x Rp
Mandor 0.010 Oh x Rp

SNI.3434-6.4
1 m³ Pasang kayu kusen pintu dan jendela
Kayu klas II 1.200 M³ x Rp
Pekerja 6.000 Oh x Rp
Tukang kayu 1.800 Oh x Rp
Kepala tukang 2.000 Oh x Rp
Mandor 0.300 Oh x Rp

SNI.3434-6.39
1 m' Pasang lisplang ukuran 2.5/28 cm
Kayu klas II 0.0100 M³ x Rp
Paku biasa 0.050 Kg x Rp
Pekerja 0.110 Oh x Rp
Tukang kayu 0.220 Oh x Rp
Kepala tukang 0.022 Oh x Rp
Mandor 0.005 Oh x Rp

SNI. 03-3435-2002-a
1 m³ Membuat beton tumbuk, 1 PC : 3 PS : 6 Kr
Semen portland 4.900 Zak x Rp
Pasir beton 0.470 M³ x Rp
Koral beton 0.940 M³ x Rp
Pekerja 1.650 Oh x Rp
Tukang batu 0.850 Oh x Rp
Kepala tukang 0.085 Oh x Rp
Mandor 0.085 Oh x Rp

SNI. 03-3435-2002-b
1 m³ Membuat lantai kerja beton tumbuk, 1 PC : 3 Ps : 5 Kr, tebal 5 cm
Semen portland 0.400 Zak x Rp
Pasir beton 0.026 M³ x Rp
Koral beton 0.044 M³ x Rp
Pekerja 1.150 Oh x Rp
Tukang batu 0.020 Oh x Rp
Kepala tukang 0.002 Oh x Rp
Mandor 0.006 Oh x Rp

SNI. 03-3435-2002-c
1 m³ Membuat beton bertulang 1 PC : 2 PS : 3 Kr
Semen portland 5.800 Zak x Rp
Pasir beton 0.520 M³ x Rp
Koral beton 0.780 M³ x Rp
Pekerja 1.650 Oh x Rp
Tukang batu 0.850 Oh x Rp
Kepala tukang 0.085 Oh x Rp
Mandor 0.080 Oh x Rp

SNI. 03-3435-2002 Besi Polos


1 Kg Pembesian dengan besi polos
Besi beton polos 1.050 Kg x Rp
Kawat beton 0.015 Kg x Rp
Pekerja 0.007 Oh x Rp
Tukang besi 0.007 Oh x Rp
Kepala tukang 0.0007 Oh x Rp
Mandor 0.0007 Oh x Rp

SNI. 03-3435-2002 Bek. Pondasi


1 m² Pasang bekisting untuk pondasi
Kayu terentang 0.040 M³ x Rp
Paku biasa 2" - 5" 0.300 Kg x Rp
Minyak bekisting 0.100 Lt x Rp
Pekerja 0.300 Oh x Rp
Tukang kayu 0.260 Oh x Rp
Kepala tukang 0.026 Oh x Rp
Mandor 0.026 Oh x Rp
SNI. 03-3435-2002 Bek.sloof
1 m² Pasang bekisting untuk sloof
Kayu terentang 0.045 M³ x Rp
Paku biasa 2" - 5" 0.300 Kg x Rp
Minyak bekisting 0.100 Lt x Rp
Pekerja 0.300 Oh x Rp
Tukang kayu 0.260 Oh x Rp
Kepala tukang 0.026 Oh x Rp
Mandor 0.026 Oh x Rp

SNI. 03-3435-2002 Bek. Kolom


1 m² Pasang bekisting untuk kolom
Kayu terentang 0.040 M³ x Rp
Paku biasa 2" - 5" 0.400 Kg x Rp
Minyak bekisting 0.200 Lt x Rp
Balok kayu borneo 0.015 M³ x Rp
Plywood tebal 9 mm 0.350 Lbr x Rp
Dolken kayu galam Ø-8-10/4 m 2.000 Btg x Rp
Pekerja 0.300 Oh x Rp
Tukang kayu 0.330 Oh x Rp
Kepala tukang 0.033 Oh x Rp
Mandor 0.006 Oh x Rp

SNI. 03-3435-2002 Bek. Balok


1 m² Pasang bekisting untuk balok
Kayu terentang 0.040 M³ x Rp
Paku biasa 2" - 5" 0.400 Kg x Rp
Minyak bekisting 0.200 Lt x Rp
Balok kayu borneo 0.018 M³ x Rp
Plywood tebal 9 mm 0.350 Lbr x Rp
Dolken kayu galam Ø-8-10/4 m 2.000 Btg x Rp
Pekerja 0.320 Oh x Rp
Tukang kayu 0.330 Oh x Rp
Kepala tukang 0.033 Oh x Rp
Mandor 0.006 Oh x Rp

SNI. 03-3435-2002 Bek. Lantai


1 m² Pasang bekisting untuk lantai
Kayu terentang 0.040 M³ x Rp
Paku biasa 2" - 5" 0.400 Kg x Rp
Minyak bekisting 0.200 Lt x Rp
Balok kayu borneo 0.015 M³ x Rp
Plywood tebal 9 mm 0.350 Lbr x Rp
Dolken kayu galam Ø-8-10/4 m 6.000 Btg x Rp
Pekerja 0.320 Oh x Rp
Tukang batu 0.330 Oh x Rp
Kepala tukang 0.033 Oh x Rp
Mandor 0.006 Oh x Rp

SNI. 03-3435-2002 - Beton K 225


1 m³ Membuat beton dengan mutu K 225
Semen portland 9.700 Zak x Rp
Pasir beton 0.650 M³ x Rp
Koral beton 0.650 M³ x Rp
Pekerja 6.000 Oh x Rp
Tukang batu 1.000 Oh x Rp
Kepala tukang 0.100 Oh x Rp
Mandor 0.300 Oh x Rp

SNI. 03-3435-2002 - Beton K 275


1 m³ Membuat beton dengan mutu K 275
Semen portland 10.500 Zak x Rp
Pasir beton 0.400 M³ x Rp
Koral beton 0.820 M³ x Rp
Pekerja 6.000 Oh x Rp
Tukang batu 1.000 Oh x Rp
Kepala tukang 0.100 Oh x Rp
Mandor 0.300 Oh x Rp

SNI. 03-3435-6.13.a
1 m³ Beton Bertulang Pondasi Tapak
SNI. 03-3435-2002 - Beton K 225 1.000 M³ x Rp
SNI. 03-3435-2002 Besi Polos 130.000 Kg x Rp
SNI. 03-3435-2002 Bek. Pondasi 4.000 M2 x Rp

SNI. 03-3435-6.13.b
1 m³ Beton bertulang Kolom 20 x 25 cm
SNI. 03-3435-2002 - Beton K 275 1.000 M³ x Rp
SNI. 03-3435-2002 Besi Polos 138.370 Kg x Rp
SNI. 03-3435-2002 Bek. Kolom 10.000 M2 x Rp

SNI. 03-3435-6.13.c
1 m³ Beton Sloof 15/18 cm
SNI. 03-3435-2002 - Beton K 275 1.000 M³ x Rp
SNI. 03-3435-2002 Besi Polos 190.000 Kg x Rp
SNI. 03-3435-2002 Bek. Balok 6.667 M2 x Rp
SNI. 03-3435-6.13.j
1 m³ Beton bertulang Plat Dag
SNI. 03-3435-2002 - Beton K 225 1.000 M³ x Rp
SNI. 03-3435-2002 Besi Polos 125.000 Kg x Rp
SNI. 03-3435-2002 Bek. Lantai 5.000 M2 x Rp

SNI. 03-2838-2002-5-d
1 m² Pasang lantai keramik 40 x 40 cm anti slip
Keramik 40 x 40 cm anti slip 1.000 m2 x Rp
Semen portland 0.300 Zak x Rp
Pasir pasang 0.042 M³ x Rp
Semen warna 1.500 Kg x Rp
Pekerja 0.620 Oh x Rp
Tukang 0.350 Oh x Rp
Kepala tukang 0.035 Oh x Rp
Mandor 0.030 Oh x Rp

SNI. 03-2838-2002-6-b
1 m² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Plamir 0.100 Kg x Rp
Cat dasar 0.100 Kg x Rp
Cat penutup 0.260 Kg x Rp
Pekerja 0.020 Oh x Rp
Tukang 0.063 Oh x Rp
Kepala tukang 0.006 Oh x Rp
Mandor 0.003 Oh x Rp

Analisa K 230
Timbunan dan Pemadatan
Mandor Lapangan 1.00 Oh x Rp
Operator Terampil 3.00 Oh x Rp
Operator Tidak Terampil 4.00 Oh x Rp
Material Tanah Timbun biasa 140.00 M³ x Rp
Alat Bantu 0.40 Set x Rp
Bulldozer 7.00 Jam x Rp
Mesin Gilas 3 Roda 8-10 T 7.00 Jam x Rp
Volume / Quantity
Satuan M³
1 M³
ATUAN

54,000.00 = Rp 28,404.00
73,000.00 = Rp 3,796.00
Jumlah = Rp 32,200.00
Dibulatkan = Rp 32,200.00

54,000.00 = Rp 39,690.00
73,000.00 = Rp 5,329.00
Jumlah = Rp 45,019.00
Dibulatkan = Rp 45,020.00

54,000.00 = Rp 10,368.00
73,000.00 = Rp 1,387.00
Jumlah = Rp 11,755.00
Dibulatkan = Rp 11,760.00

40,000.00 = Rp 48,000.00
54,000.00 = Rp 16,200.00
73,000.00 = Rp 730.00
Jumlah = Rp 64,930.00
Dibulatkan = Rp 64,930.00

86,000.00 = Rp 103,200.00
54,000.00 = Rp 16,200.00
73,000.00 = Rp 730.00
Jumlah = Rp 120,130.00
Dibulatkan = Rp 120,130.00

160,000.00 = Rp 176,000.00
39,000.00 = Rp 158,925.00
103,000.00 = Rp 53,560.00
54,000.00 = Rp 81,000.00
59,400.00 = Rp 35,640.00
56,000.00 = Rp 4,480.00
73,000.00 = Rp 5,840.00
Jumlah = Rp 515,445.00
Dibulatkan = Rp 515,450.00
160,000.00 = Rp 192,000.00
86,000.00 = Rp 25,800.00
54,000.00 = Rp 42,120.00
59,400.00 = Rp 23,166.00
56,000.00 = Rp 2,184.00
73,000.00 = Rp 2,847.00
Jumlah = Rp 288,117.00
Dibulatkan = Rp 288,120.00

39,000.00 = Rp 196,950.00
113,000.00 = Rp 36,160.00
118,000.00 = Rp 57,820.00
9,500.00 = Rp 7,600.00
54,000.00 = Rp 162,000.00
59,400.00 = Rp 50,490.00
56,000.00 = Rp 4,760.00
73,000.00 = Rp 10,950.00
Jumlah = Rp 526,730.00
Dibulatkan = Rp 526,730.00

600.00 = Rp 48,000.00
39,000.00 = Rp 18,486.00
103,000.00 = Rp 3,914.00
54,000.00 = Rp 17,280.00
59,400.00 = Rp 5,940.00
56,000.00 = Rp 560.00
73,000.00 = Rp 1,095.00
Jumlah = Rp 95,275.00
Dibulatkan = Rp 95,280.00

600.00 = Rp 48,000.00
39,000.00 = Rp 11,232.00
103,000.00 = Rp 4,429.00
54,000.00 = Rp 17,280.00
59,400.00 = Rp 5,940.00
56,000.00 = Rp 560.00
73,000.00 = Rp 1,095.00
Jumlah = Rp 88,536.00
Dibulatkan = Rp 88,540.00
39,000.00 = Rp 8,307.00
103,000.00 = Rp 1,751.00
54,000.00 = Rp 10,800.00
59,400.00 = Rp 8,910.00
56,000.00 = Rp 840.00
73,000.00 = Rp 730.00
Jumlah = Rp 31,338.00
Dibulatkan = Rp 31,340.00

39,000.00 = Rp 5,070.00
103,000.00 = Rp 2,060.00
54,000.00 = Rp 10,800.00
59,400.00 = Rp 8,910.00
56,000.00 = Rp 840.00
73,000.00 = Rp 730.00
Jumlah = Rp 28,410.00
Dibulatkan = Rp 28,410.00

3,240,000.00 = Rp 3,888,000.00
54,000.00 = Rp 324,000.00
59,400.00 = Rp 106,920.00
56,000.00 = Rp 112,000.00
73,000.00 = Rp 21,900.00
Jumlah = Rp 4,452,820.00
Dibulatkan = Rp 4,452,820.00

3,240,000.00 = Rp 32,400.00
10,500.00 = Rp 525.00
54,000.00 = Rp 5,940.00
59,400.00 = Rp 13,068.00
56,000.00 = Rp 1,232.00
73,000.00 = Rp 365.00
Jumlah = Rp 53,530.00
Dibulatkan = Rp 53,530.00

39,000.00 = Rp 191,100.00
113,000.00 = Rp 53,110.00
118,000.00 = Rp 110,920.00
54,000.00 = Rp 89,100.00
59,400.00 = Rp 50,490.00
56,000.00 = Rp 4,760.00
73,000.00 = Rp 6,205.00
Jumlah = Rp 505,685.00
Dibulatkan = Rp 505,690.00

39,000.00 = Rp 15,600.00
113,000.00 = Rp 2,938.00
118,000.00 = Rp 5,192.00
54,000.00 = Rp 62,100.00
59,400.00 = Rp 1,188.00
56,000.00 = Rp 112.00
73,000.00 = Rp 438.00
Jumlah = Rp 87,568.00
Dibulatkan = Rp 87,570.00

39,000.00 = Rp 226,200.00
113,000.00 = Rp 58,760.00
118,000.00 = Rp 92,040.00
54,000.00 = Rp 89,100.00
59,400.00 = Rp 50,490.00
56,000.00 = Rp 4,760.00
73,000.00 = Rp 5,840.00
Jumlah = Rp 527,190.00
Dibulatkan = Rp 527,190.00

6,000.00 = Rp 6,300.00
9,500.00 = Rp 142.50
54,000.00 = Rp 378.00
59,400.00 = Rp 415.80
56,000.00 = Rp 39.20
73,000.00 = Rp 51.10
Jumlah = Rp 7,326.60
Dibulatkan = Rp 7,330.00

2,750,000.00 = Rp 110,000.00
10,500.00 = Rp 3,150.00
12,700.00 = Rp 1,270.00
54,000.00 = Rp 16,200.00
59,400.00 = Rp 15,444.00
56,000.00 = Rp 1,456.00
73,000.00 = Rp 1,898.00
Jumlah = Rp 149,418.00
Dibulatkan = Rp 149,420.00
2,750,000.00 = Rp 123,750.00
10,500.00 = Rp 3,150.00
12,700.00 = Rp 1,270.00
54,000.00 = Rp 16,200.00
59,400.00 = Rp 15,444.00
56,000.00 = Rp 1,456.00
73,000.00 = Rp 1,898.00
Jumlah = Rp 163,168.00
Dibulatkan = Rp 163,170.00

2,750,000.00 = Rp 110,000.00
10,500.00 = Rp 4,200.00
12,700.00 = Rp 2,540.00
2,850,000.00 = Rp 42,750.00
124,200.00 = Rp 43,470.00
51,500.00 = Rp 103,000.00
54,000.00 = Rp 16,200.00
59,400.00 = Rp 19,602.00
56,000.00 = Rp 1,848.00
73,000.00 = Rp 438.00
Jumlah = Rp 344,048.00
Dibulatkan = Rp 344,050.00

2,750,000.00 = Rp 110,000.00
10,500.00 = Rp 4,200.00
12,700.00 = Rp 2,540.00
2,850,000.00 = Rp 51,300.00
124,200.00 = Rp 43,470.00
51,500.00 = Rp 103,000.00
54,000.00 = Rp 17,280.00
59,400.00 = Rp 19,602.00
56,000.00 = Rp 1,848.00
73,000.00 = Rp 438.00
Jumlah = Rp 353,678.00
Dibulatkan = Rp 353,680.00

2,750,000.00 = Rp 110,000.00
10,500.00 = Rp 4,200.00
12,700.00 = Rp 2,540.00
2,850,000.00 = Rp 42,750.00
124,200.00 = Rp 43,470.00
51,500.00 = Rp 309,000.00
54,000.00 = Rp 17,280.00
59,400.00 = Rp 19,602.00
56,000.00 = Rp 1,848.00
73,000.00 = Rp 438.00
Jumlah = Rp 551,128.00
Dibulatkan = Rp 551,130.00

39,000.00 = Rp 378,300.00
113,000.00 = Rp 73,450.00
118,000.00 = Rp 76,700.00
54,000.00 = Rp 324,000.00
59,400.00 = Rp 59,400.00
56,000.00 = Rp 5,600.00
73,000.00 = Rp 21,900.00
Jumlah = Rp 939,350.00
Dibulatkan = Rp 939,350.00
=

39,000.00 = Rp 409,500.00
113,000.00 = Rp 45,200.00
118,000.00 = Rp 96,760.00
54,000.00 = Rp 324,000.00
59,400.00 = Rp 59,400.00
56,000.00 = Rp 5,600.00
73,000.00 = Rp 21,900.00
Jumlah = Rp 962,360.00
Dibulatkan = Rp 962,360.00

939,350.00 = Rp 939,350.00
7,330.00 = Rp 952,900.00
149,420.00 = Rp 597,680.00
Jumlah = Rp 2,489,930.00
Dibulatkan = Rp 2,489,930.00

962,360.00 = Rp 962,360.00
7,330.00 = Rp 1,014,252.10
344,050.00 = Rp 3,440,500.00
Jumlah = Rp 5,417,112.10
Dibulatkan = Rp 5,417,110.00

962,360.00 = Rp 962,360.00
7,330.00 = Rp 1,392,700.00
353,680.00 = Rp 2,357,984.56
Jumlah = Rp 4,713,044.56
Dibulatkan = Rp 4,713,040.00

939,350.00 = Rp 939,350.00
7,330.00 = Rp 916,250.00
551,130.00 = Rp 2,755,650.00
Jumlah = Rp 4,611,250.00
Dibulatkan = Rp 4,611,250.00

32,000.00 = Rp 32,000.00
39,000.00 = Rp 11,700.00
103,000.00 = Rp 4,326.00
8,500.00 = Rp 12,750.00
54,000.00 = Rp 33,480.00
59,400.00 = Rp 20,790.00
56,000.00 = Rp 1,960.00
73,000.00 = Rp 2,190.00
Jumlah = Rp 119,196.00
Dibulatkan = Rp 119,200.00

10,700.00 = Rp 1,070.00
28,000.00 = Rp 2,800.00
24,000.00 = Rp 6,240.00
54,000.00 = Rp 1,080.00
59,400.00 = Rp 3,742.20
56,000.00 = Rp 336.00
73,000.00 = Rp 219.00
Jumlah = Rp 15,487.20
Dibulatkan = Rp 15,490.00

73,000.00 = Rp 73,000.00
48,600.00 = Rp 145,800.00
45,000.00 = Rp 180,000.00
40,000.00 = Rp 5,600,000.00
2,000.00 = Rp 800.00
50,000.00 = Rp 350,000.00
80,000.00 = Rp 560,000.00
Jumlah = Rp 6,909,600.00
Dibulatkan = Rp 6,909,600.00
120.00

Penimbunan = 57,580.00
HARGA UPAH DAN BAHAN

A UPAH PEKERJA HARIAN


1 2 3
1 Pekerja 1.00 Hari
2 Kepala Tukang 1.00 Hari
3 Mandor 1.00 Hari
4 Tukang 1.00 Hari
5 Operator 1.00 Hari
6 Operator tak terampil 1.00 Hari

B HARGA BAHAN
1 2 3
1 Batu Bata 1.00 Buah
2 Batu Gunung (batu Belah) 1.00 M3
3 Besi Beton Polos 1.00 kg
4 Cat Dasar Super Vinylex 1.00 kg
5 Cat Kayu Dasar 1.00 kg
6 Cat Meni kayu 1.00 kg
7 Cat minyak 1.00 kg
8 Cat Vinylex 1.00 kg
9 Dempul Vinylex 1.00 kg
10 Formite/penjaga jarak bekisting/spacer 1.00 Buah
11 Kawat beton 1.00 kg
12 Kawat las 1.00 kg
13 Kayu Bekisting 1.00 M3
14 Kayu Dolken / Tiang Perancah 1.00 btg
15 Kayu Klas I (kayu kosen) 1.00 M3
16 Kayu Klas II 1.00 M3
17 Kayu Klas III (Borneo/ dll) 1.00 M3
18 Keramik lantai 40x40 cm anti slip 1.00 M2
19 Kerikil (beton) 1.00 M3
20 Kertas Amplas 1.00 M'
21 Koral Beton 1.00 M3
22 Minyak bekisting 1.00 ltr
23 Minyak Cat 1.00 ltr
24 Multiplek Tebal 9 mm 1.00 lembar
25 Multiplek Tebal 6 mm 1.00 lembar
26 Multiplek Tebal 4 mm 1.00 lembar
27 Multiplek Tebal 3 mm 1.00 lembar
28 Paku Kayu 1.00 kg
29 Papan Kayu Bouplank 1.00 M3
30 Pasir Beton 1.00 M3
31 Pasir Pasangan 1.00 M3
32 Pasir Urug 1.00 M3
33 Plamir 1.00 kg
34 Semen @ 40 kg 1.00 Zak
35 Semen Putih 1.00 kg
36 Tanah urug 1.00 M3

C HARGA SEWA ALAT


1 2 3
1 Bulldozer 1.00 Jam
2 Mesin Gilas 3 roda 8 - 10 T 1.00 Jam
4.00
54,000.00
56,000.00
73,000.00
59,400.00
48,600.00
45,000.00

4.00
600.00
160,000.00
6,000.00
28,000.00
25,000.00
21,000.00
19,000.00
24,000.00
15,500.00
18,000.00
9,500.00
10,000.00
2,750,000.00
51,500.00
4,160,000.00
3,240,000.00
2,850,000.00
32,000.00
115,000.00
2,000.00
118,000.00
12,700.00
11,300.00
124,200.00
80,200.00
59,400.00
46,500.00
10,500.00
2,000,000.00
113,000.00
103,000.00
86,000.00
10,700.00
39,000.00
8,500.00
40,000.00

4.00
50,000.00
80,000.00

Anda mungkin juga menyukai