I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi 2.00 HOK
2 Pek. Pengukuran dan Pemasangan Bowplang 1.00 LS
3 Pek. Pengadaan Papan Proyek 1.00 LS
Rp 75,000.00 Rp 150,000.00
Rp 300,000.00 Rp 300,000.00
Rp 100,000.00 Rp 100,000.00
Rp 550,000.00
Rp 58,250.00 Rp 559,200.00
Rp 41,500.00 Rp 132,800.00
Rp 203,300.00 Rp 15,613,440.00
Rp 16,305,440.00
Rp 585,420.00 Rp 2,810,016.00
Rp 952,300.00 Rp 12,951,280.00
Rp 127,600.00 Rp 16,039,320.00
Rp 753,880.00 Rp 3,618,624.00
Rp 5,566,325.00 Rp 12,468,568.00
Rp 4,730,390.00 Rp 3,784,312.00
Rp 97,750.00 Rp 3,910,000.00
Rp 55,582,120.00
Rp 5,330,250.00 Rp 3,891,082.50
Rp 450,000.00 Rp 900,000.00
Rp 4,791,082.50
Rp 4,781,000.00 Rp 18,119,990.00
Rp 61,680.00 Rp 12,057,823.20
Rp 39,230.00 Rp 1,098,440.00
Rp 57,400.00 Rp 2,812,600.00
Rp 34,088,853.20
Rp 3,500,000.00 Rp 3,500,000.00
Rp 500,000.00 Rp 500,000.00
Rp 500,000.00 Rp 500,000.00
Rp 4,500,000.00
Rp 58,250.00 Rp 419,400.00
Rp 41,500.00 Rp 99,600.00
Rp 952,300.00 Rp 11,570,445.00
Rp 203,300.00 Rp 15,247,500.00
Rp 753,880.00 Rp 56,541,000.00
Rp 31,000.00 Rp 15,500,000.00
Rp 99,377,945.00
Rp 75,000.00 Rp 300,000.00
Rp 750,000.00 Rp 750,000.00
Rp 1,050,000.00
PEMERINTAH KABUPATEN PARIGI MOUTONG
KECAMATAN TINOMBO SELATAN
DESA POLY
Alamat : Jln Trans Sulawesi No. Desa Poly Kode Pos 94375
REKAPITULASI
PEKERJAAN : PEMBANGUNAN GEDUNG PENGGILINGAN PADI
LOKASI : DESA POLY
TAHUN ANGGARAN : 2019
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH DAN PASIR
III PEKERJAAN PEMASANGAN
IV PEKERJAAN KOZEN PINTU DAN VENTILASI
V PEKERJAAN ATAP, KAP
VI PEKERJAAN INSTALASI LISTRIK
VII PEK. TEMPAT PENJEMURAN PADI 20 x 20 METER
VIII PEKERJAAN AKHIR
NGAN PADI
JUMLAH HARGA
Rp 550,000.00
Rp 16,305,440.00
Rp 55,582,120.00
Rp 4,791,082.50
Rp 34,088,853.20
Rp 4,500,000.00
Rp 99,377,945.00
Rp 1,050,000.00
Rp 216,245,440.70
Rp 10,812,272.04
Rp 227,057,712.74
Rp 227,057,000.00
KETUA TPK
ACO
PEMERINTAH KABUPATEN PARIGI MOUTON
KECAMATAN TINOMBO SELATAN
DESA POLY
Alamat : Jln Trans Sulawesi No. Desa Poly Kode Pos 94375
NO URAIAN
1 2
I BAHAN/MATERIAL
1 Pasir Urug
2 Pasir Pasang
3 Pasir Beton
4 Koral Beton/Kerikil
5 Batu Kali/Belah
6 Bataco
7 Semen Portland
8 Besi Beton Polos Uk. Ø 6 mm
9 Besi Beton Polos Uk. Ø 10 mm
10 Kawat Beton/Bendrat
11 Kayu Kls. II
12 Kayu Kls. III
13 Playwood 9 MM
14 Dolken Kayu Bulat Panjang 4 m
15 Minyak Bekisting
16 Air
17 Seng Plat BJLS 0.20
18 Seng Gelombang BJLS 0.20
19 Paku Biasa Ukuran 2" s/d 5"
20 Paku Biasa Ukuran 1"- 2"
21 Paku Seng
22 Lem Kayu
23 Pemb./Pasang Daun Pintu Papan + Kunci dan Hengsel +cat
24 Pengadaan Meteran Listrik
25 Perlengkapan Instalasi Listrik
26 Pengukuran/Pasang Bouwplank
27 Pengadaan Prasasti
28 Papan Proyek
II ALAT
1-
2-
3-
19
Rp 159,095,970.70
184.234 M3 Rp 150,000.00 Rp 27,635,100.00
20.681 M3 Rp 150,000.00 Rp 3,102,150.00
51.478 M3 Rp 150,000.00 Rp 7,721,700.00
59.720 M3 Rp 150,000.00 Rp 8,958,000.00
36.660 M3 Rp 350,000.00 Rp 12,831,000.00
2639.70 bh Rp 2,500.00 Rp 6,599,250.00
581.241 Zak Rp 80,000.00 Rp 46,499,280.00
46.563 btg Rp 36,000.00 Rp 1,676,268.00
73.518 btg Rp 90,000.00 Rp 6,616,620.00
9.440 Kg Rp 27,500.00 Rp 259,600.00
5.8430 M3 Rp 2,500,000.00 Rp 14,607,500.00
1.053 M3 Rp 1,700,000.00 Rp 1,790,100.00
6.272 lbr Rp 250,000.00 Rp 1,568,000.00
71.680 btg Rp 15,000.00 Rp 1,075,200.00
4.064 ltr Rp 6,500.00 Rp 26,416.00
17157.00 ltr Rp 6.00 Rp 102,942.00
8.400 M1 Rp 65,000.00 Rp 546,000.00
136.843 lbr Rp 65,000.00 Rp 8,894,795.00
72.231 Kg Rp 25,000.00 Rp 1,805,775.00
1.120 Kg Rp 25,000.00 Rp 28,000.00
4.381 Kg Rp 35,000.00 Rp 153,335.00
21.954 Kg Rp 25,000.00 Rp 548,850.00
2.00 bh Rp 450,000.00 Rp 900,000.00
1.00 bh Rp 3,500,000.00 Rp 3,500,000.00
1.00 ls Rp 500,000.00 Rp 500,000.00
1.00 bh Rp 300,000.00 Rp 300,000.00
1.00 bh Rp 750,089.70 Rp 750,089.70
1.00 bh Rp 100,000.00 Rp 100,000.00
Rp 57,149,470.00
21.954 Hok Rp 80,000.00 Rp 1,756,320.00
461.574 Hok Rp 75,000.00 Rp 34,618,050.00
202.751 Hok Rp 100,000.00 Rp 20,275,100.00
1.00 Hok Rp 500,000.00 Rp 500,000.00
REKAPITULASI
PEKERJAAN : PEMBANGUNAN GEDUNG PENGGILINGAN PADI
LOKASI : DESA POLY
TAHUN ANGGARAN : 2019
BIAYA
NO URAIAN JUMLAH HARGA
DANA DESA SWADAYA
II ALAT 0 - 0
70.07
25.17
2.00
3.00
100.00
PEMERINTAH KABUPATEN PARIGI MOUTONG
KECAMATAN TINOMBO SELATAN
DESA POLY
Alamat : Jln Trans Sulawesi No. Desa Poly Kode Pos 94375
TIME SCHEDULE
PEKERJAAN : PEMBANGUNAN GEDUNG PENGGILINGAN PADI
LOKASI : DESA POLY
TAHUN ANGGARAN : 2019
LE
xxxxxxxxxxxxxxxxx
xxxxxxxxx
xxxxxxxxx
KETUA TPK
PEMERINTAH KABUPATEN PARIGI MOUT
KECAMATAN TINOMBO SELATAN
DESA POLY
Alamat : Jln Trans Sulawesi No. Desa Poly Kode Pos 9437
UPAH
BAHAN/MATERIAL
1 2 3 4 5
p 75,000.00
p 100,000.00
p 80,000.00
Rp 27.00 Rp 1,100.00
Rp 60.00 Rp 2,500.00
Rp 60,000.00 Rp 2,500,000.00
Rp 37,500.00 Rp 1,700,000.00
Rp 21,750.00 Rp 6,525.00 Rp 250,000.00
6 7 8 9
ATUAN PEKERJAAN
AN PADI
Rp 75,000.00 Rp 7,500.00
Rp 80,000.00 Rp 4,000.00
JA Rp 11,500.00
N
Rp 11,500.00
Rp 75,000.00 Rp 56,250.00
Rp 80,000.00 Rp 2,000.00
JA Rp 58,250.00
N
Rp 58,250.00
Rp 75,000.00 Rp 37,500.00
Rp 80,000.00 Rp 4,000.00
JA Rp 41,500.00
N
Rp 41,500.00
Rp 75,000.00 Rp 22,500.00
Rp 80,000.00 Rp 800.00
JA Rp 23,300.00
Rp 150,000.00 Rp 180,000.000
AN Rp 180,000.00
Rp 203,300.00
Rp 75,000.00 Rp 58,500.00
Rp 100,000.00 Rp 39,000.00
Rp - Rp -
Rp 80,000.00 Rp 3,120.00
A Rp 100,620.000
Rp 350,000.00 Rp 420,000.00
Rp 150,000.00 Rp 64,800.00
N Rp 484,800.00
Rp 585,420.000
Pemasangan 1 m3 pondasi batu kali campuran 1 SP:4 PP
No Uraian Kode Satuan Koefisien
TENAGA
Pekerja L.01 OH 1.500
Tukang Batu L.02 OH 0.750
A
Kepala Tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENGA KERJA
BAHAN
Batu Kali m3 1.200
B Semen Portland Kg 163.000
Pasir Pasang m3 0.520
JULAH HARGA BAHAN
JUMLAH A & B
Pemasangan 1 m2 acian
No Uraian Kode Satuan Koefisien
TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.02 OH 0.100
A
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENGA KERJA
BAHAN
Semen Portland Kg 3.250
B
JUMLAH HARGA BAHAN
JULAH A & B
Harga Satuan Jumlah Harga (Rp)
Rp 75,000.00 Rp 112,500.00
Rp 100,000.00 Rp 75,000.00
Rp - Rp -
Rp 80,000.00 Rp 6,000.00
Rp 193,500.000
Rp 350,000.00 Rp 420,000.00
Rp 1,600.00 Rp 260,800.00
Rp 150,000.00 Rp 78,000.00
Rp 758,800.000
Rp 952,300.000
Rp 75,000.00 Rp 24,000.00
Rp 100,000.00 Rp 12,000.00
Rp - Rp -
Rp 80,000.00 Rp 1,280.00
Rp 37,280.000
Rp 2,500.00 Rp 52,500.00
Rp 1,600.00 Rp 29,120.00
Rp 150,000.00 Rp 8,700.00
Rp 90,320.000
Rp 127,600.000
1 SP : 4 PP
Harga Satuan Jumlah Harga (Rp)
Rp 75,000.00 Rp 22,500.00
Rp 100,000.00 Rp 10,000.00
Rp - Rp -
Rp 80,000.00 Rp 1,200.00
Rp 33,700.000
Rp 1,100.00 Rp 77,000.00
Rp 1,600.00 Rp 18,400.00
Rp 150,000.00 Rp 6,450.00
Rp 101,850.000
Rp 135,550.000
Rp 75,000.00 Rp 22,500.00
Rp 100,000.00 Rp 15,000.00
Rp - Rp -
Rp 80,000.00 Rp 1,200.00
Rp 38,700.000
Rp 1,600.00 Rp 9,984.00
Rp 150,000.00 Rp 3,600.00
Rp 13,584.00
Rp 52,284.000
Rp 75,000.00 Rp 15,000.00
Rp 100,000.00 Rp 10,000.00
Rp - Rp -
Rp 80,000.00 Rp 800.00
Rp 25,800.000
Rp 1,600.00 Rp 5,200.00
Rp 5,200.00
Rp 31,000.000
Pemasangan 1 m2 lantai keramik 40 cm x 40 cm
No Uraian Kode Satuan Koefisien Harga Satuan
TENAGA
Pekerja L.01 OH 0.250 Rp 75,000.00
Tukang Batu L.02 OH 0.125 Rp 100,000.00
A
Kepala Tukang L.03 OH 0.013 Rp -
Mandor L.04 OH 0.013 Rp 80,000.00
JUMLAH TENGA KERJA
BAHAN
Tegel Keramik Bh 6.63 Rp 12,820.51
Semen Portland Kg 9.80 Rp 1,600.00
B
Pasir Pasang m3 0.05 Rp 150,000.00
Semen Warna Kg 1.30 Rp 20,000.00
JUMLAH HARGA BAHAN
JUMLAH A & B
Rp 18,750.00
Rp 12,500.00
Rp -
Rp 1,040.00
Rp 32,290.000
Rp 84,999.98
Rp 15,680.00
Rp 7,500.00
Rp 26,000.000
Rp 134,179.981
Rp 166,469.981
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 84,999.98
Rp 15,680.00
Rp 3,250.00
Rp 39,000.000
Rp 142,929.981
Rp 142,929.981
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 84,999.98
Rp 15,680.00
Rp -
Rp -
Rp 100,679.981
Rp 100,679.981
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 84,999.98
Rp 15,680.00
Rp -
Rp 390,000.000
Rp 490,679.981
Rp 490,679.981
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
No Uraian Kode Satuan Koefisien
TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
A
Tukang Kayu L.03 OH 0.013
Tukang Besi L.04 OH 0.013
Kepala Tukang
Mandor
JUMLAH TENAGA KERJA
BAHAN
Kayu Kelas III m3 0.05
Paku 5 cm - 12 cm Kg 1.30
Minyak Bekisting
Besi Beton Polos
B Kawat Beton
Seman Portland
Pasir Beton
Kerikil
Kayu Kelas II Balok
Plywood 9 mm
Dolken Kayu Panjang 4 m
JUMLAH HARGA BAHAN
JUMLAH A & B
Rp 3,500,000.00 Rp 2,730,000.00
Rp 500,000.00 Rp 195,000.00
Rp - Rp -
Rp 450,000.00 Rp 17,550.00
Rp 2,942,550.000
Rp - Rp -
Rp - Rp -
Rp -
Rp 2,942,550.000
Rp 100,000.00 Rp 78,000.00
Rp 500,000.00 Rp 195,000.00
Rp - Rp -
Rp 75,000.00 Rp 2,925.00
Rp 275,925.000
Rp 2,500.00 Rp 3,000.00
Rp 150,000.00 Rp 64,800.00
Rp 67,800.00
Rp 343,725.000
Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm
No Uraian Kode Satuan Koefisien
TENAGA
Pekerja L.01 OH 0.780
Tukang Kayu L.02 OH 0.390
A
Kepala Tukang L.03 OH 0.039
Mandor L.04 OH 0.039
JUMLAH TENGA KERJA
BAHAN
Tripleks m3 1.200
B
Paku Tripleks m3 0.432
JUMLAH HARGA BAHAN
JULAH A & B
Pengecetan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien
TENAGA
Pekerja L.01 OH 0.300
Tukang Cat L.02 OH 0.100
A
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENGA KERJA
BAHAN
Plamuur m3 70.000
B Cat Dasr Kg 11.500
Cat Penutup m3 0.043
JULAH HARGA BAHAN
JUMLAH A & B
mm dan 6 mm
Harga Satuan Jumlah Harga (Rp)
Err:509 Err:509
Err:509 Err:509
Rp - Rp -
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Rp - Rp -
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Rp - Rp -
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Harga Satuan Jumlah Harga (Rp)
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp -
Rp 6.00 Rp 419.90
Rp 1,600.00 Rp 18,400.00
Rp 15,000.00 Rp 645.00
Rp 19,464.902