TENAGA KERJA MINGGU 1

PERIODE TANGGAL : 07 S/D 12 AGUSTUS 2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 5 Rp 120,000 Rp 600,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 5 Rp 90,000 Rp 450,000
4 MAS RUDI ORANG 4 Rp 90,000 Rp 360,000

JUMLAH Rp 2,010,000.00

PERIODE TANGGAL : 14 S/D 19 AGUSTUS 2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 6 Rp 120,000 Rp 720,000


2 MAS ARI ORANG 6 Rp 120,000 Rp 720,000
3 MAS OOK ORANG 6 Rp 90,000 Rp 540,000
4 MAS RUDI ORANG 6 Rp 90,000 Rp 540,000

JUMLAH Rp 2,520,000.00
PERIODE TANGGAL : 21 S/D 26 AGUSTUS 2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 6 Rp 120,000 Rp 720,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 6 Rp 90,000 Rp 540,000
4 MAS RUDI ORANG 5 Rp 90,000 Rp 450,000

JUMLAH Rp 2,310,000.00

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 HANIF ORANG 2 Rp 110,000 Rp 220,000


2 PEMBANTU ORANG 2 Rp 90,000 Rp 180,000

JUMLAH Rp 400,000.00

PERIODE TANGGAL : 28 AGUSTUS S/D 2 SEPTEMB


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 5 Rp 120,000 Rp 600,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 5 Rp 90,000 Rp 450,000
4 MAS RUDI ORANG 4 Rp 90,000 Rp 360,000

JUMLAH Rp 2,010,000.00

TOTAL TENAGA KERJA


STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,010,000.00

STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,520,000.00
STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,310,000.00

STATUS

CASH
CASH

Rp 400,000.00

/D 2 SEPTEMBER 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,010,000.00

A KERJA Rp 9,250,000.00
RESUME TRANSAKSI HARIAN
MINGGU KE 2
PERIODE TANGGAL : 9/5/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PASIR TRUCK 1 Rp 1,400,000 Rp 1,400,000 UD ANUGERAH
JUMLAH Rp 1,400,000.00
PERIODE TANGGAL : 9/12/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 KUMBUNG PASANG BIJI 200 Rp 1,000 Rp 200,000 TB.BUMI JAYA
2 SEMEN SAK 10 Rp 46,000 Rp 460,000 TB.BUMI JAYA
JUMLAH Rp 660,000.00
PERIODE TANGGAL : 9/13/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PASIR LUMAJANG COLT 2 Rp 370,000 Rp 740,000 UD ANUGERAH
2 BESI 8" BIJI 5 Rp 38,000 Rp 190,000 UD ANUGERAH
3 PAKU 5 CM KG 1 Rp 16,000 Rp 16,000 UD ANUGERAH
4 PAKU 5 CM KG 1 Rp 16,000 Rp 16,000 UD ANUGERAH
JUMLAH Rp 962,000.00
PERIODE TANGGAL : 9/16/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 KAYU 3X5 2 METER BUAH 7 Rp 102,000 Rp 714,000 UD ANUGERAH
2 BESI 6" BIJI 20 Rp 26,000 Rp 520,000 UD ANUGERAH
3 TRIPLEK 9 MIL LEMBAR 4 Rp 118,000 Rp 472,000 UD ANUGERAH
4 PAKU 5 CM KG 1 Rp 16,000 Rp 16,000 UD ANUGERAH
5 PAKU 7 CM KG 2 Rp 16,000 Rp 32,000 UD ANUGERAH
5 SEMEN SAK 10 Rp 46,000 Rp 460,000 UD ANUGERAH
6 METERAN BUAH 1 Rp 25,000 Rp 25,000 UD ANUGERAH
JUMLAH Rp 2,239,000.00
PERIODE TANGGAL : 9/24/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 SEMEN SAK 10 Rp 45,500 Rp 455,000 TB.BUMI JAYA
2 PVC 2" BIJI 3 Rp 40,000 Rp 120,000 TB.BUMI JAYA
3 KENE 2" BIJI 3 Rp 5,000 Rp 15,000 TB.BUMI JAYA
4 PVC 5/8 LISTRIK BIJI 10 Rp 7,000 Rp 70,000 TB.BUMI JAYA
JUMLAH Rp 660,000.00
PERIODE TANGGAL : 9/25/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 BENDRAT KG 10 Rp 17,000 Rp 170,000 UD ANUGERAH
JUMLAH Rp 170,000.00
PERIODE TANGGAL : 9/25/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 SEWA KAPOLDING SET 20 Rp 50,000 Rp 1,000,000 WESYAH SKAPOLDING
2 SEWA BALOKAN 2 METER BUAH 23 Rp 15,000 Rp 345,000 WESYAH SKAPOLDING
3 SEWA BALOKAN 3 METER BUAH 2 Rp 15,000 Rp 30,000 WESYAH SKAPOLDING
4 TRANSPORT LS 1 Rp 100,000 Rp 100,000 WESYAH SKAPOLDING
JUMLAH Rp 1,475,000.00
PERIODE TANGGAL : 9/25/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 TRIPLEK 4 X 8 X 9 MM LBR 13 Rp 111,000 Rp 1,443,000 BINTANG PUTRA
2 KAYU 3 X 5 2 MTR PAK 4 Rp 108,000 Rp 432,000 BINTANG PUTRA
RESUME TRANSAKSI HARIAN
3 KAYU 4X 6 2 MTR PAK 7 Rp 53,000 Rp 371,000 BINTANG PUTRA
4 PAKU 5 CM KG 2 Rp 16,000 Rp 32,000 BINTANG PUTRA
5 PAKU 7 CM KG 2 Rp 16,000 Rp 32,000 BINTANG PUTRA
6 PAKU 2 CM KG 1 Rp 17,500 Rp 17,500 BINTANG PUTRA
7 BESI 10 A LJR 35 Rp 40,000 Rp 1,400,000 BINTANG PUTRA
8 LEM PVC PCS 2 Rp 7,000 Rp 14,000 BINTANG PUTRA
9 TEE 3" PCS 3 Rp 9,000 Rp 27,000 BINTANG PUTRA
10 BENANG TAMPAR PCS 2 Rp 9,000 Rp 18,000 BINTANG PUTRA
JUMLAH Rp 3,786,500.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 9/29/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 KAYU 3 X 5 UK.1,5 METER PAX 8 Rp 55,000 Rp 440,000 UD ANUGERAH
2 PAKU 5 CM KG 2 Rp 16,000 Rp 32,000 UD ANUGERAH
3 PAKU 7 CM KG 2 Rp 16,000 Rp 32,000 UD ANUGERAH
JUMLAH Rp 504,000.00
PERIODE TANGGAL : 10/1/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 BESI 8 " LJR 80 Rp 43,500 Rp 3,480,000 TB.BUMI JAYA
NOTA DIBAWA IBU JUMLAH Rp 3,480,000.00
PERIODE TANGGAL : 10/5/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 COR BETON K 300 KUBIK 6 Rp 800,000 Rp 4,800,000 H DOTO
2 SEWA POMPA UNIT 1 Rp 2,000,000 Rp 2,000,000 H DOTO
3 FEE SOPIR LS 1 Rp 300,000 Rp 300,000 H DOTO
JUMLAH Rp 7,100,000.00
PERIODE TANGGAL : 10/6/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PASIR LUMAJANG TRUK 1 Rp 1,750,000 Rp 1,750,000 UD.LANGGENG JAYA
3 FEE SOPIR LS 1 Rp 50,000 Rp 50,000 UD.LANGGENG JAYA
JUMLAH Rp 1,800,000.00
PERIODE TANGGAL : 10/6/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 KABEL NYA 2,5 ML ROL 2 Rp 180,000 Rp 360,000 ANUGRAH ELEKTRO
2 L BOX 5/8 UNIT 20 Rp 500 Rp 10,000 ANUGRAH ELEKTRO
3 ARDE UNIT 1 Rp 20,000 Rp 20,000 ANUGRAH ELEKTRO
3 STOP ANTENA UNIT 1 Rp 34,000 Rp 34,000 ANUGRAH ELEKTRO
JUMLAH Rp 424,000.00
PERIODE TANGGAL : 10/6/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PIPA 3/4 BIJI 15 Rp 24,000 Rp 360,000 UD.ANUGERAH
2 KENI 4/3 BIJI 20 Rp 2,900 Rp 58,000 UD.ANUGERAH
3 SOK 3/4 BIJI 10 Rp 2,500 Rp 25,000 UD.ANUGERAH
4 KENI DRAT 3/4 BIJI 10 Rp 4,500 Rp 45,000 UD.ANUGERAH
5 LEM PVC BIJI 5 Rp 9,000 Rp 45,000 UD.ANUGERAH
6 KENI 4 " BIJI 1 Rp 18,000 Rp 18,000 UD.ANUGERAH
JUMLAH Rp 551,000.00
PERIODE TANGGAL : 10/7/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 STOP KONTAK PANASONIC PCS 1 Rp 35,000 Rp 35,000 TOKO LANCAR
JUMLAH Rp 35,000.00
PERIODE TANGGAL : 10/7/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 TUTUP DOP 3" PCS 1 Rp 5,000 Rp 5,000 BINTANG PUTRA
JUMLAH Rp 5,000.00
PERIODE TANGGAL : 10/9/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 SEMEN SAK 10 Rp 45,500 Rp 455,000 UD.ANUGERAH
JUMLAH Rp 455,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 10/10/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 SEMEN SAK 10 Rp 45,500 Rp 455,000 UD.ANUGERAH
2 PIPA PVC 3/4 BIJI 5 Rp 24,000 Rp 120,000 UD.ANUGERAH
3 SOLATIP BIJI 2 Rp 3,000 Rp 6,000 UD.ANUGERAH
4 LEM PVC BIJI 2 Rp 7,500 Rp 15,000 UD.ANUGERAH
JUMLAH Rp 596,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 10/10/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 KENI 3/4 BIJI 10 Rp 1,500 Rp 15,000 UD.ANUGERAH
2 T 3/4 BIJI 10 Rp 2,500 Rp 25,000 UD.ANUGERAH
3 SOK KRAN BIJI 2 Rp 12,000 Rp 24,000 UD.ANUGERAH
4 SOK 3/4 BIJI 5 Rp 1,500 Rp 7,500 UD.ANUGERAH
5 LEM PVC BIJI 3 Rp 7,500 Rp 22,500 UD.ANUGERAH
JUMLAH Rp 94,000.00
PERIODE TANGGAL : 10/10/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PELAMPUNG TANDON BIJI 1 Rp 110,000 Rp 110,000 BINTANG PUTRA
2 KENI DRAT 3/4 BIJI 5 Rp 2,250 Rp 11,250 BINTANG PUTRA
3 SOK DRAT 3/4 BIJI 1 Rp 2,500 Rp 2,500 BINTANG PUTRA
JUMLAH Rp 123,750.00
PERIODE TANGGAL : 10/10/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PINDAH JARNGAN METER PDAM LS 1 Rp 150,000 Rp 150,000 PDAM
JUMLAH Rp 150,000.00

Rp 22,684,250.00
STATUS
CASH

STATUS
CASH
CASH

STATUS
CASH
CASH
CASH
CASH

STATUS
CASH
CASH
CASH
CASH
CASH
CASH
CASH

STATUS
CASH
CASH
CASH
CASH

STATUS
CASH

STATUS
CASH
CASH
CASH
CASH

STATUS
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
STATUS
CASH
CASH
CASH

STATUS
CASH

STATUS
CASH
CASH
CASH

STATUS
CASH
CASH

STATUS
CASH
CASH
CASH
CASH

STATUS
CASH
CASH
CASH
CASH
CASH
CASH

STATUS
CASH

STATUS
CASH

STATUS
CASH
STATUS
CASH
CASH
CASH
CASH
STATUS
CASH
CASH
CASH
CASH
CASH

STATUS
CASH
CASH
CASH

STATUS
CASH
REKAPITULASI HARGA
RENOVASI PEMBANGUNAN RUMAH MERPATI 12
CV.ADHIYATMA GRIYA PERKASA
TYPE 40
MINGGU 1
NO JENIS PEKERJAAN JUMLAH

A TOTAL BAHAN 35,187,250.00


B TOTAL TENAGA KERJA 9,250,000.00
TOTAL 44,437,250.00
PEMBULATAN 44,400,000.00

MINGGU 2
NO JENIS PEKERJAAN JUMLAH

A TOTAL BAHAN 22,684,250.00


B TOTAL TENAGA KERJA 10,480,000.00
TOTAL 33,164,250.00
PEMBULATAN 33,100,000.00

TOTAL BAHAN 57,871,500.00


TOTAL TENAGA 19,730,000.00
JUMLAH TOTAL 77,601,500.00

KEKURANGAN PEKERJAAN

NO JENIS PEKERJAAN JUMLAH

C PEKERJAAN ELEKTRIKAL -
E PEKERJAAN PLESTERAN DAN MLAMIR -
F PEKERJAAN PLUMBING 3,653,000.00
G PEKERJAAN KERAMIK -
H PEKERJAAN PENGECATAN 3,780,000.00
I PEKERJAAN PINTU DAN JENDELA 7,500,000.00
J PEKERJAAN TAMAN -
K PEKERJAAN PAGAR SAMPING DAN LAIN-LAIN 3,000,000.00
TOTAL 17,933,000.00
PEMBULATAN 17,900,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/7/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 BESI 10 A BIJI 60 Rp 60,000 Rp 3,600,000 TB.BUMI JAYA
2 BESI 10 A BIJI 20 Rp 56,000 Rp 1,120,000 TB.BUMI JAYA
3 SEMEN SAK 20 Rp 46,000 Rp 920,000 TB.BUMI JAYA
4 PASIR COLT 1 Rp 290,000 Rp 290,000 TB.BUMI JAYA
5 GRAGAL COLT 1 Rp 360,000 Rp 360,000 TB.BUMI JAYA
6 KUMBUNG PASANG SEKAPUK BIJI 1,000 Rp 1,000 Rp 1,000,000 TB.BUMI JAYA
7 TRIPLEK 8 Ml LBR 3 Rp 95,000 Rp 285,000 TB.BUMI JAYA
8 KAYU RENG 3 M PAX 1 Rp 145,000 Rp 145,000 TB.BUMI JAYA
9 PAKU RENG KG 1 Rp 14,000 Rp 14,000 TB.BUMI JAYA
10 BENDRAT KG 5 Rp 16,000 Rp 80,000 TB.BUMI JAYA
JUMLAH Rp 7,814,000.00

PERIODE TANGGAL : 8/9/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 TIMBA COR PC 4 Rp 7,500 Rp 30,000 BINTANG PUTRA
2 KAWAT LOKET 1/4''PVC MTR 2 Rp 16,500 Rp 24,750 BINTANG PUTRA
3 BENANG TAMPAR 1 MM PC 1 Rp 7,000 Rp 7,000 BINTANG PUTRA
4 PAKU 3 CM KG 0.5 Rp 16,000 Rp 8,000 BINTANG PUTRA
JUMLAH Rp 69,750.00

PERIODE TANGGAL : 8/10/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 SELANG MTR 10 Rp 2,500 Rp 25,000 RIZQI BERSAUDARA
2 SKOP BAJA BUAH 20 Rp 2,250 Rp 45,000 RIZQI BERSAUDARA
JUMLAH Rp 70,000.00

PERIODE TANGGAL : 8/12/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PIPA 3'' BUAH 1 Rp 85,000 Rp 85,000 UD ANUGERAH
2 PIPA 2'' BUAH 3 Rp 45,000 Rp 135,000 UD ANUGERAH
3 KENI 3" BUAH 4 Rp 9,000 Rp 36,000 UD ANUGERAH
4 T 3'' BUAH 2 Rp 8,000 Rp 16,000 UD ANUGERAH
5 LEM PVC BIJI 2 Rp 9,000 Rp 18,000 UD ANUGERAH
6 KENI 2'' BUAH 6 Rp 4,000 Rp 24,000 UD ANUGERAH
7 PASIR LUMAJANG COLT 2 Rp 380,000 Rp 760,000 UD ANUGERAH
8 RETUR BESI BATANG 20 Rp 5,000 Rp 100,000 UD ANUGERAH
9 PEGANGAN SEKOP BUAH 1 Rp 20,000 Rp 20,000 UD ANUGERAH
JUMLAH Rp 1,194,000.00

PERIODE TANGGAL : 8/12/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 TRIPLEK 9 Ml LBR 9 Rp 118,000 Rp 1,062,000 UD ANUGERAH
2 PIPA 3'' BUAH 2 Rp 85,000 Rp 170,000 UD ANUGERAH
3 KENI 3" BUAH 4 Rp 8,500 Rp 34,000 UD ANUGERAH
4 BESI 6'' BUAH 20 Rp 17,000 Rp 340,000 UD ANUGERAH
RESUME TRANSAKSI HARIAN
5 PAKU TRIPLEK 2 CM KG 0.5 Rp 20,000 Rp 10,000 UD ANUGERAH
6 BENDRAT KG 5 Rp 15,000 Rp 75,000 UD ANUGERAH
7 PASIR COLT 2 Rp 260,000 Rp 520,000 UD ANUGERAH
8 GRAGAL BATANG 2 Rp 365,000 Rp 730,000 UD ANUGERAH
JUMLAH Rp 2,941,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/14/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 KENI 2'' BUAH 3 Rp 4,000 Rp 12,000 UD ANUGERAH
2 KENI 3'' BUAH 6 Rp 8,000 Rp 48,000 UD ANUGERAH
3 PIPA 2'' BUAH 1 Rp 45,000 Rp 45,000 UD ANUGERAH
4 PIPA 3'' BUAH 4 Rp 85,000 Rp 340,000 UD ANUGERAH
5 T 3'' BIJI 1 Rp 8,000 Rp 8,000 UD ANUGERAH
6 KAYU RENG 3/5 4 MTR PAX 1 Rp 270,000 Rp 270,000 UD ANUGERAH
7 PAKU TRIPLEK 2 CM KG 1 Rp 15,000 Rp 15,000 UD ANUGERAH
8 PIPA 3/4 BATANG 3 Rp 22,000 Rp 66,000 UD ANUGERAH
9 LEM PVC BUAH 2 Rp 8,000 Rp 16,000 UD ANUGERAH
10 T 1'' BUAH 1 Rp 4,000 Rp 4,000 UD ANUGERAH
11 GERGAJI BESI BUAH 1 Rp 15,000 Rp 15,000 UD ANUGERAH
12 ?????????????????? BUAH 1 Rp 180,000 Rp 180,000 UD ANUGERAH
RETUR Rp (20,000.00)
JUMLAH Rp 999,000.00

PERIODE TANGGAL : 8/15/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PASIR LUMAJANG COLT 1 Rp 380,000 Rp 380,000 UD ANUGERAH
2 SEMEN SAK 20 Rp 45,500 Rp 910,000 UD ANUGERAH
JUMLAH Rp 1,290,000.00

PERIODE TANGGAL : 8/16/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 KUMBUNG PASANG SEKAPUK BIJI 1,000 Rp 900 Rp 900,000 TB.BUMI JAYA
JUMLAH Rp 900,000.00

PERIODE TANGGAL : 8/15/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 SEPTIC TANK 2 M3 UNIT 1 Rp 2,100,000 Rp 2,100,000 CV.PUTRA DEWI
2 TANDON AIR 3 M3 UNIT 1 Rp 3,100,000 Rp 3,100,000 CV.PUTRA DEWI
DP Rp (700,000)
JUMLAH Rp 4,500,000.00

PERIODE TANGGAL : 8/16/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 KUSEN 80 X 210 M BUAH 3 Rp 450,000 Rp 1,350,000 TRI JAYA SANUR
2 KUSEN 70 X 180 M BUAH 2 Rp 400,000 Rp 800,000 TRI JAYA SANUR
3 KUSEN 80 X 180 M BUAH 1 Rp 400,000 Rp 400,000 TRI JAYA SANUR
4 KUSEN 50 X 110 M BUAH 2 Rp 350,000 Rp 700,000 TRI JAYA SANUR
5 KUSEN 50 X 30 M BUAH 1 Rp 250,000 Rp 250,000 TRI JAYA SANUR
JUMLAH Rp 3,500,000.00

PERIODE TANGGAL : 8/17/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 BESI 10 A SKET 93 BATANG 100 Rp 57,000 Rp 5,700,000 TB.BUMI JAYA
JUMLAH Rp 5,700,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/17/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 SEPTIC TANK 2 M3 UNIT 1 Rp 2,100,000 Rp 2,100,000 CV.PUTRA DEWI
2 TANDON AIR 3 M3 UNIT 1 Rp 3,100,000 Rp 3,100,000 CV.PUTRA DEWI
3 BUANG TANAH LS LS Rp 500,000 Rp 500,000 CV.PUTRA DEWI
Rp (700,000.00)
JUMLAH Rp 5,000,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/23/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PINDAH KABEL LISTRIK PLN UNIT LS Rp 200,000 Rp 200,000 PLN
JUMLAH Rp 200,000.00

PERIODE TANGGAL : 8/23/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 GRAGAL COLT 2 Rp 360,000 Rp 720,000 TB.BUMI JAYA
2 PASIR COLT 1 Rp 290,000 Rp 290,000 TB.BUMI JAYA
3 BESI 6 SNI BATANG 20 Rp 25,000 Rp 500,000 TB.BUMI JAYA
4 LOSTER BIJI 7 Rp 22,000 Rp 154,000 TB.BUMI JAYA
5 SEMEN SAK 20 Rp 45,500 Rp 910,000 TB.BUMI JAYA
JUMLAH Rp 2,574,000.00

PERIODE TANGGAL : 8/24/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 KUMBUNG PASANG BIJI 1,000 Rp 900 Rp 900,000 TB.BUMI JAYA
2 TALANG GAVALUM MTR 7 Rp 26,000 Rp 182,000 TB.BUMI JAYA
JUMLAH Rp 1,082,000.00

PERIODE TANGGAL : 8/23/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PASIR COLT 1 Rp 290,000 Rp 290,000 TB.BUMI JAYA
JUMLAH Rp 290,000.00

PERIODE TANGGAL : 8/28/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
1 PASIR COLT 2 Rp 290,000 Rp 580,000 TB.BUMI JAYA
2 PAKU USUK KG 1 Rp 16,000 Rp 16,000 TB.BUMI JAYA
3 PAKU RENG KG 1 Rp 16,000 Rp 16,000 TB.BUMI JAYA
4 PAKU 2 CM KG 0.5 Rp 17,000 Rp 8,500 TB.BUMI JAYA
5 BENDRAT KG 20 Rp 8,750 Rp 175,000 TB.BUMI JAYA
6 PVC 2 " BIJI 1 Rp 43,000 Rp 43,000 TB.BUMI JAYA
7 METERAN 7,5 M BUAH 1 Rp 25,000 Rp 25,000 TB.BUMI JAYA
JUMLAH Rp 863,500.00

TOTAL BAHAN Rp 35,187,250.00


STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH

STATUS
CASH
CASH
CASH
CASH

STATUS
CASH
CASH

STATUS
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH

STATUS
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
STATUS
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH

STATUS
CASH
CASH

STATUS
CASH

STATUS
DP
DP

STATUS
CASH
CASH
CASH
CASH
CASH

STATUS
CASH
STATUS
CASH
CASH
CASH
STATUS
CASH

STATUS
CASH
CASH
CASH
CASH
CASH

STATUS
CASH
CASH

STATUS
CASH

STATUS
CASH
CASH
CASH
CASH
CASH
CASH
CASH
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/7/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 BESI 10 A BIJI 60 Rp 60,000 Rp 3,600,000 TB.BUMI JAYA


2 BESI 10 A BIJI 20 Rp 56,000 Rp 1,120,000 TB.BUMI JAYA
3 SEMEN SAK 20 Rp 46,000 Rp 920,000 TB.BUMI JAYA
4 PASIR COLT 1 Rp 290,000 Rp 290,000 TB.BUMI JAYA
5 GRAGAL COLT 1 Rp 360,000 Rp 360,000 TB.BUMI JAYA
6 KUMBUNG PASANG SEKAPUK BIJI 1,000 Rp 1,000 Rp 1,000,000 TB.BUMI JAYA
7 TRIPLEK 8 Ml LBR 3 Rp 95,000 Rp 285,000 TB.BUMI JAYA
8 KAYU RENG 3 M PAX 1 Rp 145,000 Rp 145,000 TB.BUMI JAYA
9 PAKU RENG KG 1 Rp 14,000 Rp 14,000 TB.BUMI JAYA
10 BENDRAT KG 5 Rp 16,000 Rp 80,000 TB.BUMI JAYA

JUMLAH Rp 7,814,000.00

PERIODE TANGGAL : 8/9/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 TIMBA COR PC 4 Rp 7,500 Rp 30,000 BINTANG PUTRA


2 KAWAT LOKET 1/4''PVC MTR 2 Rp 16,500 Rp 24,750 BINTANG PUTRA
3 BENANG TAMPAR 1 MM PC 1 Rp 7,000 Rp 7,000 BINTANG PUTRA
4 PAKU 3 CM KG 0.5 Rp 16,000 Rp 8,000 BINTANG PUTRA

JUMLAH Rp 69,750.00

PERIODE TANGGAL : 8/10/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 SELANG MTR 10 Rp 2,500 Rp 25,000 RIZQI BERSAUDARA


2 SKOP BAJA BUAH 20 Rp 2,250 Rp 45,000 RIZQI BERSAUDARA

JUMLAH Rp 70,000.00

PERIODE TANGGAL : 8/12/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PIPA 3'' BUAH 1 Rp 85,000 Rp 85,000 UD ANUGERAH


2 PIPA 2'' BUAH 3 Rp 45,000 Rp 135,000 UD ANUGERAH
3 KENI 3" BUAH 4 Rp 9,000 Rp 36,000 UD ANUGERAH
4 T 3'' BUAH 2 Rp 8,000 Rp 16,000 UD ANUGERAH
5 LEM PVC BIJI 2 Rp 9,000 Rp 18,000 UD ANUGERAH
6 KENI 2'' BUAH 6 Rp 4,000 Rp 24,000 UD ANUGERAH
7 PASIR LUMAJANG COLT 2 Rp 380,000 Rp 760,000 UD ANUGERAH
8 RETUR BESI BATANG 20 Rp 5,000 Rp 100,000 UD ANUGERAH
9 PEGANGAN SEKOP BUAH 1 Rp 20,000 Rp 20,000 UD ANUGERAH
RESUME TRANSAKSI HARIAN
JUMLAH Rp 1,194,000.00

PERIODE TANGGAL : 8/12/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 TRIPLEK 9 Ml LBR 9 Rp 118,000 Rp 1,062,000 UD ANUGERAH


2 PIPA 3'' BUAH 2 Rp 85,000 Rp 170,000 UD ANUGERAH
3 KENI 3" BUAH 4 Rp 8,500 Rp 34,000 UD ANUGERAH
4 BESI 6'' BUAH 20 Rp 17,000 Rp 340,000 UD ANUGERAH
5 PAKU TRIPLEK 2 CM KG 0.5 Rp 20,000 Rp 10,000 UD ANUGERAH
6 BENDRAT KG 5 Rp 15,000 Rp 75,000 UD ANUGERAH
7 PASIR COLT 2 Rp 260,000 Rp 520,000 UD ANUGERAH
8 GRAGAL BATANG 2 Rp 365,000 Rp 730,000 UD ANUGERAH

JUMLAH Rp 2,941,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/14/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 KENI 2'' BUAH 3 Rp 4,000 Rp 12,000 UD ANUGERAH


2 KENI 3'' BUAH 6 Rp 8,000 Rp 48,000 UD ANUGERAH
3 PIPA 2'' BUAH 1 Rp 45,000 Rp 45,000 UD ANUGERAH
4 PIPA 3'' BUAH 4 Rp 85,000 Rp 340,000 UD ANUGERAH
5 T 3'' BIJI 1 Rp 8,000 Rp 8,000 UD ANUGERAH
6 KAYU RENG 3/5 4 MTR PAX 1 Rp 270,000 Rp 270,000 UD ANUGERAH
7 PAKU TRIPLEK 2 CM KG 1 Rp 15,000 Rp 15,000 UD ANUGERAH
8 PIPA 3/4 BATANG 3 Rp 22,000 Rp 66,000 UD ANUGERAH
9 LEM PVC BUAH 2 Rp 8,000 Rp 16,000 UD ANUGERAH
10 T 1'' BUAH 1 Rp 4,000 Rp 4,000 UD ANUGERAH
11 GERGAJI BESI BUAH 1 Rp 15,000 Rp 15,000 UD ANUGERAH
12 ?????????????????? BUAH 1 Rp 180,000 Rp 180,000 UD ANUGERAH
RETUR Rp (20,000.00)
JUMLAH Rp 999,000.00

PERIODE TANGGAL : 8/15/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PASIR LUMAJANG COLT 1 Rp 380,000 Rp 380,000 UD ANUGERAH


2 SEMEN SAK 20 Rp 45,500 Rp 910,000 UD ANUGERAH

JUMLAH Rp 1,290,000.00

PERIODE TANGGAL : 8/16/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 KUMBUNG PASANG SEKAPUK BIJI 1,000 Rp 900 Rp 900,000 TB.BUMI JAYA

JUMLAH Rp 900,000.00

PERIODE TANGGAL : 8/15/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 SEPTIC TANK 2 M3 UNIT 1 Rp 2,100,000 Rp 2,100,000 CV.PUTRA DEWI


2 TANDON AIR 3 M3 UNIT 1 Rp 3,100,000 Rp 3,100,000 CV.PUTRA DEWI
DP Rp (700,000)

JUMLAH Rp 4,500,000.00

PERIODE TANGGAL : 8/16/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 KUSEN 80 X 210 M BUAH 3 Rp 450,000 Rp 1,350,000 TRI JAYA SANUR


2 KUSEN 70 X 180 M BUAH 2 Rp 400,000 Rp 800,000 TRI JAYA SANUR
3 KUSEN 80 X 180 M BUAH 1 Rp 400,000 Rp 400,000 TRI JAYA SANUR
4 KUSEN 50 X 110 M BUAH 2 Rp 350,000 Rp 700,000 TRI JAYA SANUR
5 KUSEN 50 X 30 M BUAH 1 Rp 250,000 Rp 250,000 TRI JAYA SANUR
RESUME TRANSAKSI HARIAN

JUMLAH Rp 3,500,000.00

PERIODE TANGGAL : 8/17/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 BESI 10 A SKET 93 BATANG 100 Rp 57,000 Rp 5,700,000 TB.BUMI JAYA

JUMLAH Rp 5,700,000.00

PERIODE TANGGAL : 8/17/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 SEPTIC TANK 2 M3 UNIT 1 Rp 2,100,000 Rp 2,100,000 CV.PUTRA DEWI


2 TANDON AIR 3 M3 UNIT 1 Rp 3,100,000 Rp 3,100,000 CV.PUTRA DEWI
3 BUANG TANAH LS LS Rp 500,000 Rp 500,000 CV.PUTRA DEWI
Rp (700,000.00)
JUMLAH Rp 5,000,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/23/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PINDAH KABEL LISTRIK PLN UNIT LS Rp 200,000 Rp 200,000 PLN

JUMLAH Rp 200,000.00

PERIODE TANGGAL : 8/23/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 GRAGAL COLT 2 Rp 360,000 Rp 720,000 TB.BUMI JAYA


2 PASIR COLT 1 Rp 290,000 Rp 290,000 TB.BUMI JAYA
3 BESI 6 SNI BATANG 20 Rp 25,000 Rp 500,000 TB.BUMI JAYA
4 LOSTER BIJI 7 Rp 22,000 Rp 154,000 TB.BUMI JAYA
5 SEMEN SAK 20 Rp 45,500 Rp 910,000 TB.BUMI JAYA

JUMLAH Rp 2,574,000.00

PERIODE TANGGAL : 8/24/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 KUMBUNG PASANG BIJI 1,000 Rp 900 Rp 900,000 TB.BUMI JAYA


2 TALANG GAVALUM MTR 7 Rp 26,000 Rp 182,000 TB.BUMI JAYA

JUMLAH Rp 1,082,000.00

PERIODE TANGGAL : 8/23/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PASIR COLT 1 Rp 290,000 Rp 290,000 TB.BUMI JAYA

JUMLAH Rp 290,000.00

PERIODE TANGGAL : 8/28/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PASIR COLT 2 Rp 290,000 Rp 580,000 TB.BUMI JAYA


2 PAKU USUK KG 1 Rp 16,000 Rp 16,000 TB.BUMI JAYA
3 PAKU RENG KG 1 Rp 16,000 Rp 16,000 TB.BUMI JAYA
4 PAKU 2 CM KG 0.5 Rp 17,000 Rp 8,500 TB.BUMI JAYA
5 BENDRAT KG 20 Rp 8,750 Rp 175,000 TB.BUMI JAYA
6 PVC 2 " BIJI 1 Rp 43,000 Rp 43,000 TB.BUMI JAYA
7 METERAN 7,5 M BUAH 1 Rp 25,000 Rp 25,000 TB.BUMI JAYA

JUMLAH Rp 863,500.00

TOTAL BAHAN
RESUME TRANSAKSI HARIAN

TENAGA KERJA

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 TUKANG ORANG 1 Rp 120,000 Rp 120,000


2 KULI ORANG 1 Rp 90,000 Rp 90,000

JUMLAH Rp 210,000.00
PERIODE TANGGAL : 07 S/D 12 AGUSTUS 2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 5 Rp 120,000 Rp 600,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 5 Rp 90,000 Rp 450,000
4 MAS RUDI ORANG 4 Rp 90,000 Rp 360,000

JUMLAH Rp 2,010,000.00

PERIODE TANGGAL : 14 S/D 19 AGUSTUS 2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 6 Rp 120,000 Rp 720,000


2 MAS ARI ORANG 6 Rp 120,000 Rp 720,000
3 MAS OOK ORANG 6 Rp 90,000 Rp 540,000
4 MAS RUDI ORANG 6 Rp 90,000 Rp 540,000

JUMLAH Rp 2,520,000.00
PERIODE TANGGAL : 21 S/D 26 AGUSTUS 2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 6 Rp 120,000 Rp 720,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 6 Rp 90,000 Rp 540,000
4 MAS RUDI ORANG 5 Rp 90,000 Rp 450,000

JUMLAH Rp 2,310,000.00

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 HANIF ORANG 2 Rp 110,000 Rp 220,000


2 PEMBANTU ORANG 2 Rp 90,000 Rp 180,000

JUMLAH Rp 400,000.00

PERIODE TANGGAL : 28 AGUSTUS S/D 2 SEPTEMB


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER
RESUME TRANSAKSI HARIAN

1 MAS WITO ORANG 5 Rp 120,000 Rp 600,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 5 Rp 90,000 Rp 450,000
4 MAS RUDI ORANG 4 Rp 90,000 Rp 360,000

JUMLAH Rp 2,010,000.00

TOTAL TENAGA KERJA


RESUME TRANSAKSI HARIAN
TENAGA KERJA
PERIODE TANGGAL : 4 S/D 9 SEPTEMBER 2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PAK SUPRI ORANG 6 Rp 100,000 Rp 600,000


2 MAS YURI ORANG 6 Rp 90,000 Rp 540,000

JUMLAH Rp 1,140,000

PERIODE TANGGAL : 11 S/D 16 SEPTEMBER 2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PAK SUPRI ORANG 6 Rp 100,000 Rp 600,000


2 MAS YURI ORANG 6 Rp 90,000 Rp 540,000
3 MAS ARIP ORANG 3 Rp 100,000 Rp 300,000
2 MAS BAGUS ORANG 3 Rp 90,000 Rp 270,000

JUMLAH Rp 1,710,000

PERIODE TANGGAL : 18 S/D 23 SEPTEMBER 2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PAK SUPRI ORANG 6 Rp 100,000 Rp 600,000


2 MAS YURI ORANG 6 Rp 90,000 Rp 540,000
3 MAS ARIP ORANG 5 Rp 100,000 Rp 500,000
2 MAS BAGUS ORANG 6 Rp 90,000 Rp 540,000

JUMLAH Rp 2,180,000
STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH

Rp 7,814,000.00

STATUS

CASH
CASH
CASH
CASH

Rp 69,750.00

STATUS

CASH
CASH

Rp 70,000.00

STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
Rp 1,194,000.00

STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH

Rp 2,941,000.00
STATUS

CASH
CASH
CASH 2,580,000
CASH 8
CASH 20640000
CASH
CASH
CASH
CASH
CASH
CASH
CASH

Rp 999,000.00

STATUS

CASH
CASH

Rp 1,290,000.00

STATUS

CASH

Rp 900,000.00

STATUS

DP
DP

Rp 700,000.00

STATUS

CASH
CASH
CASH
CASH
CASH
Rp 3,500,000.00

STATUS

CASH

Rp 5,700,000.00

STATUS

CASH
CASH
CASH

Rp 5,000,000.00
STATUS

CASH

Rp 200,000.00

STATUS

CASH
CASH
CASH
CASH
CASH

Rp 2,574,000.00

STATUS

CASH
CASH

Rp 1,082,000.00

STATUS

CASH

Rp 290,000.00

STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH

Rp 863,500.00

Rp 35,187,250.00
STATUS

CASH
CASH

STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,010,000.00

STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,520,000.00
STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,310,000.00

STATUS

CASH
CASH

Rp 400,000.00

/D 2 SEPTEMBER 2017
STATUS
CASH
CASH
CASH
CASH

Rp 2,010,000.00

A KERJA Rp 9,250,000.00
MBER 2017
STATUS

CASH
CASH

Rp 1,140,000.00

TEMBER 2017
STATUS

CASH
CASH
CASH
CASH

Rp 1,710,000.00

TEMBER 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,180,000.00
TENAGA KERJA
PERIODE TANGGA
Tanggal/Hari
No Nama Pekerja Jabatan Upah/Hari Minggu Senin Selasa Rabu Kamis Jumat
3-Sep-17 4-Sep-17 5-Sep-17 6-Sep-17 7-Sep-17 8-Sep-17
1 Pak Supri Tukang Rp 100,000 0 1 1 1 1 1
2 Mas Yuri Pembantu Rp 90,000 0 1 1 1 1 1
JUMLAH

PERIODE TANGGA
Tanggal/Hari
No Nama Pekerja Jabatan Upah/Hari Minggu Senin Selasa Rabu Kamis Jumat
10-Sep-17 11-Sep-17 12-Sep-17 13-Sep-17 14-Sep-17 15-Sep-17
1 Pak Supri Tukang Rp 100,000 0 1 1 1 1 1
2 Mas Yuri Pembantu Rp 90,000 0 1 1 1 1 1
3 Mas Arip Tukang Rp 100,000 0 0 0 0 1 1
4 Mas Bagus Pembantu Rp 90,000 0 0 0 0 1 1
JUMLAH

PERIODE TANGGA
Tanggal/Hari
No Nama Pekerja Jabatan Upah/Hari Minggu Senin Selasa Rabu Kamis Jumat
17-Sep-17 18-Sep-17 19-Sep-17 20-Sep-17 21-Sep-17 22-Sep-17
1 Pak Supri Tukang Rp 100,000 0 1 1 1 1 1
2 Mas Yuri Pembantu Rp 90,000 0 1 1 1 1 1
3 Mas Arip Tukang Rp 100,000 0 1 1 1 1 1
4 Mas Bagus Pembantu Rp 90,000 0 1 1 1 1 1
JUMLAH

PERIODE TANGGA
Tanggal/Hari
No Nama Pekerja Jabatan Upah/Hari Minggu Senin Selasa Rabu Kamis Jumat
24-Sep-17 25-Sep-17 26-Sep-17 27-Sep-17 28-Sep-17 29-Sep-17
1 Pak Supri Tukang Rp 100,000 1 0 1 1 1 0
2 Mas Yuri Pembantu Rp 90,000 0 1 1 1 1 1
3 Mas Arip Tukang Rp 100,000 1 1 1 1 1 1
4 Mas Bagus Pembantu Rp 90,000 0 1 1 1 1 1
JUMLAH

PERIODE TANGGA
Tanggal/Hari
No Nama Pekerja Jabatan Upah/Hari Minggu Senin Selasa Rabu Kamis Jumat
1-Oct-17 2-Oct-17 3-Oct-17 4-Oct-17 5-Oct-17 6-Oct-17
1 Pak Supri Tukang Rp 100,000 1 1 1 1 1 1
2 Mas Yuri Pembantu Rp 90,000 1 1 1 1 1 1
3 Mas Arip Tukang Rp 100,000 1 1 1 1 1 1
2 Mas Bagus Pembantu Rp 90,000 0 1 1 1 1 1
JUMLAH
PERIODE TANGGA
Tanggal/Hari
No Nama Pekerja Jabatan Upah/Hari Minggu Senin Selasa Rabu Kamis Jumat
1-Oct-17 2-Oct-17 3-Oct-17 4-Oct-17 5-Oct-17 6-Oct-17
1 Pak Supri Tukang Rp 100,000 0 0 0 0 0 0
2 Mas Yuri Pembantu Rp 100,000 0 0 0 0 0 0
3 Mas Arip Tukang Rp 100,000 0 0 0 0 0 0
4 Mas Bagus Pembantu Rp 100,000 0 0 0 0 0 0
5 Mas Rudi Pembantu Rp 50,000 0 0 0 0 0 0
6 ????? Pembantu Rp 125,000 0 0 0 0 0 0
7 ???? Pembantu Rp 125,000 0 0 0 0 0 0
JUMLAH

PERIODE TANGGA
Tanggal/Hari
No Nama Pekerja Jabatan Upah/Hari Minggu Senin Selasa Rabu Kamis Jumat
8-Oct-17 9-Oct-17 10-Oct-17 11-Oct-17 12-Oct-17 13-Oct-17
1 Pak Supri Tukang Rp 100,000 0 1 1 1 1 1
2 Mas Yuri Pembantu Rp 90,000 0 1 0 1 1 1
3 Mas Arip Tukang Rp 100,000 0 1 1 1 1 1
4 Mas Bagus Pembantu Rp 90,000 0 1 1 1 1 1
JUMLAH
Rp 10,480,000.00
PERIODE TANGGA
Tanggal/Hari
No Nama Pekerja Jabatan Upah/Hari Minggu Senin Selasa Rabu Kamis Jumat
8-Oct-17 9-Oct-17 10-Oct-17 11-Oct-17 12-Oct-17 13-Oct-17
1 Pak Supri Tukang Rp 100,000 0 1 1 1 1 1
2 Mas Yuri Pembantu Rp 90,000 0 1 0 1 1 1
3 Mas Arip Tukang Rp 100,000 0 1 1 1 1 1
4 Mas Bagus Pembantu Rp 90,000 0 1 1 1 1 1
JUMLAH
TANGGAL : 3 S/D 9 SEPTEMBER 2017
Jumlah Jumlah
Sabtu Hari Upah
9-Sep-17 Kerja Hari Kerja
1 6 Rp 600,000
1 6 Rp 540,000
12 Rp 1,140,000

TANGGAL : 10 S/D 16 SEPTEMBER 2017


Jumlah Jumlah
Sabtu Hari Upah
Kerja Hari Kerja
16-Sep-17
1 6 Rp 600,000
1 6 Rp 540,000
1 3 Rp 300,000
1 3 Rp 270,000
18 Rp 1,710,000

TANGGAL : 17 S/D 23 SEPTEMBER 2017


Jumlah Jumlah
Sabtu Hari Upah
23-Sep-17 Kerja Hari Kerja
1 6 Rp 600,000
1 6 Rp 540,000
0 5 Rp 500,000
1 6 Rp 540,000
23 Rp 2,180,000

TANGGAL : 24 S/D 30 SEPTEMBER 2017


Jumlah Jumlah
Sabtu Hari Upah
30-Sep-17 Kerja Hari Kerja
0 4 Rp 400,000
1 6 Rp 540,000
1 7 Rp 700,000
1 6 Rp 540,000
23 Rp 2,180,000

TANGGAL : 1 S/D 7 OKTOBER 2017


Jumlah Jumlah
Sabtu Hari Upah
7-Oct-17 Kerja Hari Kerja
1 7 Rp 700,000
1 7 Rp 630,000
1 7 Rp 700,000
1 6 Rp 540,000
27 Rp 2,570,000
TANGGAL : GECOR
Jumlah Jumlah
Sabtu Hari Upah
7-Oct-17 Kerja Hari Kerja
1 1 Rp 100,000
1 1 Rp 100,000
1 1 Rp 100,000
1 1 Rp 100,000
1 1 Rp 50,000
1 1 Rp 125,000
1 1 Rp 125,000
7 Rp 700,000

TANGGAL : 8 S/D 14 OKTOBER 2017


Jumlah Jumlah
Sabtu Hari Upah
14-Oct-17 Kerja Hari Kerja
1 6 Rp 600,000
1 5 Rp 450,000
1 6 Rp 600,000
1 6 Rp 540,000
23 Rp 2,190,000
TANGGAL : 8 S/D 14 OKTOBER 2017
Jumlah Jumlah
Sabtu Hari Upah
14-Oct-17 Kerja Hari Kerja
1 6 Rp 600,000
1 5 Rp 450,000
1 6 Rp 600,000
1 6 Rp 540,000
23 Rp 2,190,000
RENCANA ANGGARAN BIAYA
RENOVASI PEMBANGUNAN RUMAH MERPATI 12
CV.ADHIYATMA GRIYA PERKASA
TYPE 60
NO NO. HSPK JENIS PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN RABAT BETON NGEDAK


1 Borongan 3c K 300 6.00 m3 350,000.00 2,100,000.00
Sub Total 2,100,000.00
B PEKERJAAN KAPOLDING
1 Borongan 3n Paket Pemasangan Kapolding - m3 100,000.00 -
Sub Total -
C PEKERJAAN ELEKTRIKAL
1 Borongan 5j Pek. Titik Lampu 11.00 ttk 35,000.00 385,000.00
2 Borongan 5j Pek. Stop Kontak 5.00 ttk 35,000.00 175,000.00
3 Borongan 5j Pek. Saklar Tunggal 6.00 ttk 35,000.00 210,000.00
4 Borongan 5j Pek. Saklar Ganda 4.00 ttk 35,000.00 140,000.00
Sub Total 910,000.00
D PEKERJAAN BETON NGEDAK
1 Borongan 3i K 300 6.00 m3 800,000.00 4,800,000.00
2 Borongan 3u Pompa 1.00 unit 2,000,000.00 2,000,000.00
3 Borongan 3g Lain-Lain 1.00 LS 500,000.00 500,000.00
Sub Total 7,300,000.00
E PEKERJAAN PLESTERAN DAN MLAMIR
1 Borongan 4a Pek. Plesteran dan Acian/Mlamir 150.00 m2 - -
Sub Total -
F PEKERJAAN PLUMBING
1 Borongan 10o Pek. Pas. Shower 2.00 Bh - -
2 Borongan 10e Pek. Pas. Floor Drain 2.00 Bh - -
3 Borongan 10i Pek. Pipa Air Bersih 3/4" 16.00 m1 - -
4 Borongan 10m Pek. Pipa Air Kotor Padat 4" 6.00 m1 - -
5 Borongan 10a Kloset Duduk 1.00 Bh - -
6 Borongan 10n Bak Kontrol 1.00 Unit - -
7 Borongan 10o Kitchen Seat 2.00 Unit - -
Sub Total -
G PEKERJAAN KERAMIK
1 Borongan 8c Keramik Lantai 2 Kamar Tidur 40x40 18.90 m2 40,000.00 756,000.00
2 Borongan 8a Keramik Teras 40x40 15.54 m2 40,000.00 621,600.00
3 Borongan 8d Keramik KM 20x20 6.00 m2 20,000.00 120,000.00
4 Borongan 8f Keramik Dinding KM 20x25 - m2 65,000.00 -
6 Borongan 8g Plin 10x40 10.00 m1 50,000.00 500,000.00
Sub Total 1,997,600.00
H PEKERJAAN PENGECATAN
1 Borongan 11a Pek. Cat Dinding (1x Cat Dasar, 2x Cat Penutup) 100.00 m2 15,000.00 1,500,000.00
2 Borongan 11a Pek. Cat Plafon - m2 15,000.00 -
Sub Total 1,500,000.00
I PEKERJAAN PINTU DAN JENDELA
1 Borongan 7a Daun Pintu 80 X 210 M 3 m2 800,000.00 2,400,000.00
2 Borongan 7b Daun Pintu 70 X 180 M 2 m2 800,000.00 1,600,000.00
3 Borongan 7b Daun Pintu 80 X 180 M 1 m2 800,000.00 800,000.00
4 Borongan 8a Jendela 50 X 110 M 2 m2 350,000.00 700,000.00
5 Borongan 8b Angin2 50 X 30 M 1 m2 50,000.00 50,000.00
6 Borongan 8c Pelitur 9 m2 50,000.00 2,000,000.00
7 Borongan 8d Pasang Kunci dan Hadle 9 m2 50,000.00 800,000.00
DISCOUNT (850,000.00) (850,000.00)
Sub Total 7,500,000.00
J PEKERJAAN TAMAN
1 Borongan 6e Pek. Taman Belakang - m2 - -
Sub Total -
K PEKERJAAN PAGAR SAMPING DAN LAIN-LAIN
1 Borongan 8i Pek. Pagar Samping 10.00 m2 600,000.00 6,000,000.00
Sub Total 6,000,000.00

TOTAL 27,307,600.00
PEMBULATAN 27,300,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/7/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 BESI 10 A BIJI 60 Rp 60,000 Rp 3,600,000 TB.BUMI JAYA


2 BESI 10 A BIJI 20 Rp 56,000 Rp 1,120,000 TB.BUMI JAYA
3 SEMEN SAK 20 Rp 46,000 Rp 920,000 TB.BUMI JAYA
4 PASIR COLT 1 Rp 290,000 Rp 290,000 TB.BUMI JAYA
5 GRAGAL COLT 1 Rp 360,000 Rp 360,000 TB.BUMI JAYA
6 KUMBUNG PASANG SEKAPUK BIJI 1,000 Rp 1,000 Rp 1,000,000 TB.BUMI JAYA
7 TRIPLEK 8 Ml LBR 3 Rp 95,000 Rp 285,000 TB.BUMI JAYA
8 KAYU RENG 3 M PAX 1 Rp 145,000 Rp 145,000 TB.BUMI JAYA
9 PAKU RENG KG 1 Rp 14,000 Rp 14,000 TB.BUMI JAYA
10 BENDRAT KG 5 Rp 16,000 Rp 80,000 TB.BUMI JAYA

JUMLAH Rp 7,814,000.00

PERIODE TANGGAL : 8/9/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 TIMBA COR PC 4 Rp 7,500 Rp 30,000 BINTANG PUTRA


2 KAWAT LOKET 1/4''PVC MTR 2 Rp 16,500 Rp 24,750 BINTANG PUTRA
3 BENANG TAMPAR 1 MM PC 1 Rp 7,000 Rp 7,000 BINTANG PUTRA
4 PAKU 3 CM KG 0.5 Rp 16,000 Rp 8,000 BINTANG PUTRA

JUMLAH Rp 69,750.00

PERIODE TANGGAL : 8/10/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 SELANG MTR 10 Rp 2,500 Rp 25,000 RIZQI BERSAUDARA


2 SKOP BAJA BUAH 20 Rp 2,250 Rp 45,000 RIZQI BERSAUDARA

JUMLAH Rp 70,000.00

PERIODE TANGGAL : 8/12/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PIPA 3'' BUAH 1 Rp 85,000 Rp 85,000 UD ANUGERAH


2 PIPA 2'' BUAH 3 Rp 45,000 Rp 135,000 UD ANUGERAH
3 KENI 3" BUAH 4 Rp 9,000 Rp 36,000 UD ANUGERAH
4 T 3'' BUAH 2 Rp 8,000 Rp 16,000 UD ANUGERAH
5 LEM PVC BIJI 2 Rp 9,000 Rp 18,000 UD ANUGERAH
6 KENI 2'' BUAH 6 Rp 4,000 Rp 24,000 UD ANUGERAH
7 PASIR LUMAJANG COLT 2 Rp 380,000 Rp 760,000 UD ANUGERAH
8 RETUR BESI BATANG 20 Rp 5,000 Rp 100,000 UD ANUGERAH
9 PEGANGAN SEKOP BUAH 1 Rp 20,000 Rp 20,000 UD ANUGERAH
RESUME TRANSAKSI HARIAN
JUMLAH Rp 1,194,000.00

PERIODE TANGGAL : 8/12/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 TRIPLEK 9 Ml LBR 9 Rp 118,000 Rp 1,062,000 UD ANUGERAH


2 PIPA 3'' BUAH 2 Rp 85,000 Rp 170,000 UD ANUGERAH
3 KENI 3" BUAH 4 Rp 8,500 Rp 34,000 UD ANUGERAH
4 BESI 6'' BUAH 20 Rp 17,000 Rp 340,000 UD ANUGERAH
5 PAKU TRIPLEK 2 CM KG 0.5 Rp 20,000 Rp 10,000 UD ANUGERAH
6 BENDRAT KG 5 Rp 15,000 Rp 75,000 UD ANUGERAH
7 PASIR COLT 2 Rp 260,000 Rp 520,000 UD ANUGERAH
8 GRAGAL BATANG 2 Rp 365,000 Rp 730,000 UD ANUGERAH

JUMLAH Rp 2,941,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/14/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 KENI 2'' BUAH 3 Rp 4,000 Rp 12,000 UD ANUGERAH


2 KENI 3'' BUAH 6 Rp 8,000 Rp 48,000 UD ANUGERAH
3 PIPA 2'' BUAH 1 Rp 45,000 Rp 45,000 UD ANUGERAH
4 PIPA 3'' BUAH 4 Rp 85,000 Rp 340,000 UD ANUGERAH
5 T 3'' BIJI 1 Rp 8,000 Rp 8,000 UD ANUGERAH
6 KAYU RENG 3/5 4 MTR PAX 1 Rp 270,000 Rp 270,000 UD ANUGERAH
7 PAKU TRIPLEK 2 CM KG 1 Rp 15,000 Rp 15,000 UD ANUGERAH
8 PIPA 3/4 BATANG 3 Rp 22,000 Rp 66,000 UD ANUGERAH
9 LEM PVC BUAH 2 Rp 8,000 Rp 16,000 UD ANUGERAH
10 T 1'' BUAH 1 Rp 4,000 Rp 4,000 UD ANUGERAH
11 GERGAJI BESI BUAH 1 Rp 15,000 Rp 15,000 UD ANUGERAH
12 ?????????????????? BUAH 1 Rp 180,000 Rp 180,000 UD ANUGERAH
RETUR Rp (20,000.00)
JUMLAH Rp 999,000.00

PERIODE TANGGAL : 8/15/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PASIR LUMAJANG COLT 1 Rp 380,000 Rp 380,000 UD ANUGERAH


2 SEMEN SAK 20 Rp 45,500 Rp 910,000 UD ANUGERAH

JUMLAH Rp 1,290,000.00

PERIODE TANGGAL : 8/16/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 KUMBUNG PASANG SEKAPUK BIJI 1,000 Rp 900 Rp 900,000 TB.BUMI JAYA

JUMLAH Rp 900,000.00

PERIODE TANGGAL : 8/15/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 SEPTIC TANK 2 M3 UNIT 1 Rp 2,100,000 Rp 2,100,000 CV.PUTRA DEWI


2 TANDON AIR 3 M3 UNIT 1 Rp 3,100,000 Rp 3,100,000 CV.PUTRA DEWI
DP Rp (700,000)

JUMLAH Rp 4,500,000.00

PERIODE TANGGAL : 8/16/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 KUSEN 80 X 210 M BUAH 3 Rp 450,000 Rp 1,350,000 TRI JAYA SANUR


2 KUSEN 70 X 180 M BUAH 2 Rp 400,000 Rp 800,000 TRI JAYA SANUR
3 KUSEN 80 X 180 M BUAH 1 Rp 400,000 Rp 400,000 TRI JAYA SANUR
4 KUSEN 50 X 110 M BUAH 2 Rp 350,000 Rp 700,000 TRI JAYA SANUR
5 KUSEN 50 X 30 M BUAH 1 Rp 250,000 Rp 250,000 TRI JAYA SANUR
RESUME TRANSAKSI HARIAN

JUMLAH Rp 3,500,000.00

PERIODE TANGGAL : 8/17/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 BESI 10 A SKET 93 BATANG 100 Rp 57,000 Rp 5,700,000 TB.BUMI JAYA

JUMLAH Rp 5,700,000.00

PERIODE TANGGAL : 8/17/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 SEPTIC TANK 2 M3 UNIT 1 Rp 2,100,000 Rp 2,100,000 CV.PUTRA DEWI


2 TANDON AIR 3 M3 UNIT 1 Rp 3,100,000 Rp 3,100,000 CV.PUTRA DEWI
3 BUANG TANAH LS LS Rp 500,000 Rp 500,000 CV.PUTRA DEWI

JUMLAH Rp 5,700,000.00
RESUME TRANSAKSI HARIAN
PERIODE TANGGAL : 8/23/2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PINDAH KABEL LISTRIK PLN UNIT LS Rp 200,000 Rp 200,000 PLN

JUMLAH Rp 200,000.00

PERIODE TANGGAL : 8/23/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 GRAGAL COLT 2 Rp 360,000 Rp 720,000 TB.BUMI JAYA


2 PASIR COLT 1 Rp 290,000 Rp 290,000 TB.BUMI JAYA
3 BESI 6 SNI BATANG 20 Rp 25,000 Rp 500,000 TB.BUMI JAYA
4 LOSTER BIJI 7 Rp 22,000 Rp 154,000 TB.BUMI JAYA
5 SEMEN SAK 20 Rp 45,500 Rp 910,000 TB.BUMI JAYA

JUMLAH Rp 2,574,000.00

PERIODE TANGGAL : 8/24/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 KUMBUNG PASANG BIJI 1,000 Rp 900 Rp 900,000 TB.BUMI JAYA


2 TALANG GAVALUM MTR 7 Rp 26,000 Rp 182,000 TB.BUMI JAYA

JUMLAH Rp 1,082,000.00

PERIODE TANGGAL : 8/23/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PASIR COLT 1 Rp 290,000 Rp 290,000 TB.BUMI JAYA

JUMLAH Rp 290,000.00

PERIODE TANGGAL : 8/28/2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 PASIR COLT 2 Rp 290,000 Rp 580,000 TB.BUMI JAYA


2 PAKU USUK KG 1 Rp 16,000 Rp 16,000 TB.BUMI JAYA
3 PAKU RENG KG 1 Rp 16,000 Rp 16,000 TB.BUMI JAYA
4 PAKU 2 CM KG 0.5 Rp 17,000 Rp 8,500 TB.BUMI JAYA
5 BENDRAT KG 20 Rp 8,750 Rp 175,000 TB.BUMI JAYA
6 PVC 2 " BIJI 1 Rp 43,000 Rp 43,000 TB.BUMI JAYA
7 METERAN 7,5 M BUAH 1 Rp 25,000 Rp 25,000 TB.BUMI JAYA

JUMLAH Rp 863,500.00

TOTAL BAHAN
RESUME TRANSAKSI HARIAN

REALISASI PENGELUARAN AAN


REALISASI PENGELUARAN CAK WITO
REALISASI UPAH KERJA SEMINGGU
REALISASI UPAH KERJA SEMINGGU

TOTAL

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 COR MOLEN JAYAMIX KUBIK 6 Rp 800,000 Rp 4,800,000 H.DOTO


2 POMPA UNIT 1 Rp 2,000,000 Rp 2,000,000 H.DOTO

JUMLAH Rp 6,800,000.00

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 KAPOLDING SET 38.6 Rp 100,000 Rp 3,862,000 H.DOTO

JUMLAH Rp 3,862,000.00

KEKURANGAN

TOTAL SAMPAI DAK LANTAI 1


RESUME TRANSAKSI HARIAN
TENAGA KERJA

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 TUKANG ORANG 12 Rp 120,000 Rp 1,440,000


2 KULI ORANG 12 Rp 90,000 Rp 1,080,000

JUMLAH Rp 2,520,000.00
7 MINGGU

PERIODE TANGGAL : 07 S/D 12 AGUSTUS 2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 5 Rp 120,000 Rp 600,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 5 Rp 90,000 Rp 450,000
4 MAS RUDI ORANG 4 Rp 90,000 Rp 360,000

JUMLAH Rp 2,010,000.00

PERIODE TANGGAL : 14 S/D 19 AGUSTUS 2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 6 Rp 120,000 Rp 720,000


2 MAS ARI ORANG 6 Rp 120,000 Rp 720,000
3 MAS OOK ORANG 6 Rp 90,000 Rp 540,000
4 MAS RUDI ORANG 6 Rp 90,000 Rp 540,000

JUMLAH Rp 2,520,000.00
PERIODE TANGGAL : 21 S/D 26 AGUSTUS 2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 6 Rp 120,000 Rp 720,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 6 Rp 90,000 Rp 540,000
4 MAS RUDI ORANG 5 Rp 90,000 Rp 450,000

JUMLAH Rp 2,310,000.00

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 HANIF ORANG 2 Rp 110,000 Rp 220,000


2 PEMBANTU ORANG 1 Rp 90,000 Rp 90,000

JUMLAH Rp 310,000.00
STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH

Rp 7,814,000.00

STATUS

CASH
CASH
CASH
CASH

Rp 69,750.00

STATUS

CASH
CASH

Rp 70,000.00

STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
Rp 1,194,000.00

STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH

Rp 2,941,000.00
STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH

Rp 999,000.00

STATUS

CASH
CASH

Rp 1,290,000.00

STATUS

CASH

Rp 900,000.00

STATUS

DP
DP

Rp 700,000.00

STATUS

CASH
CASH
CASH
CASH
CASH
Rp 3,500,000.00

STATUS

CASH

Rp 5,700,000.00

STATUS

CASH
CASH
CASH

Rp 5,700,000.00
STATUS

CASH

Rp 200,000.00

STATUS

CASH
CASH
CASH
CASH
CASH

Rp 2,574,000.00

STATUS

CASH
CASH

Rp 1,082,000.00

STATUS

CASH

Rp 290,000.00

STATUS

CASH
CASH
CASH
CASH
CASH
CASH
CASH

Rp 863,500.00

Rp 35,887,250.00
Rp 28,073,250
Rp 7,814,000
Rp 2,010,000
Rp 5,140,000

Rp 43,037,250

STATUS

CASH
CASH

Rp 6,800,000.00

STATUS

CASH

Rp 3,862,000.00

Rp 10,662,000.00

Rp 53,699,250.00
STATUS

CASH
CASH

STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,010,000.00

STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,520,000.00
STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,310,000.00

STATUS

CASH
CASH

Rp 310,000.00

Rp 7,150,000.00
RENCANA ANGGARAN BIAYA
RENOVASI PEMBANGUNAN RUMAH MERPATI 12
CV.ADHIYATMA GRIYA PERKASA
TYPE 40
NO NO. HSPK JENIS PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN RABAT BETON NGEDAK


1 Borongan 3c K 300 39.00 m3 350,000.00 13,650,000.00
Sub Total 13,650,000.00
B PEKERJAAN KAPOLDING
1 Borongan 3n Paket Pemasangan Kapolding 39.00 m3 100,000.00 3,900,000.00
Sub Total 3,900,000.00
C PEKERJAAN ELEKTRIKAL
1 Borongan 5j Pek. Titik Lampu 11.00 ttk 35,000.00 385,000.00
2 Borongan 5j Pek. Stop Kontak 5.00 ttk 35,000.00 175,000.00
3 Borongan 5j Pek. Saklar Tunggal 6.00 ttk 35,000.00 210,000.00
4 Borongan 5j Pek. Saklar Ganda 4.00 ttk 35,000.00 140,000.00
Sub Total 910,000.00
D PEKERJAAN BETON NGEDAK
1 Borongan 3i K 300 6.00 m3 800,000.00 4,800,000.00
2 Borongan 3u Pompa 1.00 unit 2,000,000.00 2,000,000.00
3 Borongan 3g Lain-Lain 1.00 LS 500,000.00 500,000.00
Sub Total 7,300,000.00
E PEKERJAAN PLESTERAN DAN MLAMIR
1 Borongan 4a Pek. Plesteran dan Acian/Mlamir 150.00 m2 - -
Sub Total -
F PEKERJAAN PLUMBING
1 Borongan 10o Pek. Pas. Shower 2.00 Bh - -
2 Borongan 10e Pek. Pas. Floor Drain 2.00 Bh - -
3 Borongan 10i Pek. Pipa Air Bersih 3/4" 16.00 m1 - -
4 Borongan 10m Pek. Pipa Air Kotor Padat 4" 6.00 m1 - -
5 Borongan 10a Kloset Duduk 1.00 Bh - -
6 Borongan 10n Bak Kontrol 1.00 Unit - -
7 Borongan 10o Kitchen Seat 2.00 Unit - -
Sub Total -
G PEKERJAAN KERAMIK
1 Borongan 8c Keramik Lantai 2 Kamar Tidur 40x40 12.00 m2 40,000.00 480,000.00
2 Borongan 8a Keramik Teras 40x40 12.00 m2 40,000.00 480,000.00
3 Borongan 8d Keramik KM 20x20 8.00 m2 20,000.00 160,000.00
4 Borongan 8f Keramik Dinding KM 20x25 6.00 m2 65,000.00 390,000.00
6 Borongan 8g Plin 10x40 10.00 m1 50,000.00 500,000.00
Sub Total 2,010,000.00
H PEKERJAAN PENGECATAN
1 Borongan 11a Pek. Cat Dinding (1x Cat Dasar, 2x Cat Penutup) 100.00 m2 15,000.00 1,500,000.00
2 Borongan 11a Pek. Cat Plafon - m2 15,000.00 -
Sub Total 1,500,000.00
I PEKERJAAN PINTU DAN JENDELA
1 Borongan 7a Daun Pintu 80 X 210 M 3 m2 800,000.00 2,400,000.00
2 Borongan 7b Daun Pintu 70 X 180 M 2 m2 800,000.00 1,600,000.00
3 Borongan 7b Daun Pintu 80 X 180 M 1 m2 800,000.00 800,000.00
4 Borongan 8a Jendela 50 X 110 M 2 m2 350,000.00 700,000.00
5 Borongan 8b Angin2 50 X 30 M 1 m2 50,000.00 50,000.00
6 Borongan 8c Pelitur 1 m2 50,000.00 2,000,000.00
7 Borongan 8d Pasang Kunci dan Hadle 1 m2 50,000.00 800,000.00
DISCOUNT (850,000.00) (850,000.00)
Sub Total 7,500,000.00
J PEKERJAAN TAMAN
1 Borongan 6e Pek. Taman Belakang - m2 - -
Sub Total -
K PEKERJAAN PAGAR SAMPING DAN LAIN-LAIN
1 Borongan 8i Pek. Pagar Samping 20.00 m2 600,000.00 12,000,000.00
Sub Total 12,000,000.00

TOTAL 48,770,000.00
PEMBULATAN 48,700,000.00
RESUME TRANSAKSI HARIAN

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 TUKANG ORANG 1 Rp 120,000 Rp 120,000


2 KULI ORANG 1 Rp 90,000 Rp 90,000

JUMLAH Rp 210,000.00
7 MINGGU

PERIODE TANGGAL : 07 S/D 12 AGUSTUS 2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 5 Rp 120,000 Rp 600,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 5 Rp 90,000 Rp 450,000
4 MAS RUDI ORANG 4 Rp 90,000 Rp 360,000

JUMLAH Rp 2,010,000.00

PERIODE TANGGAL : 14 S/D 19 AGUSTUS 2017


NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 6 Rp 120,000 Rp 720,000


2 MAS ARI ORANG 6 Rp 120,000 Rp 720,000
3 MAS OOK ORANG 6 Rp 90,000 Rp 540,000
4 MAS RUDI ORANG 6 Rp 90,000 Rp 540,000

JUMLAH Rp 2,520,000.00
PERIODE TANGGAL : 21 S/D 26 AGUSTUS 2017
NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 MAS WITO ORANG 6 Rp 120,000 Rp 720,000


2 MAS ARI ORANG 5 Rp 120,000 Rp 600,000
3 MAS OOK ORANG 6 Rp 90,000 Rp 540,000
4 MAS RUDI ORANG 5 Rp 90,000 Rp 450,000

JUMLAH Rp 2,310,000.00

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH SUPPLIER

1 HANIF ORANG 2 Rp 110,000 Rp 220,000


2 PEMBANTU ORANG 2 Rp 90,000 Rp 180,000

JUMLAH Rp 400,000.00
STATUS

CASH
CASH

STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,010,000.00

STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,520,000.00
STUS 2017
STATUS

CASH
CASH
CASH
CASH

Rp 2,310,000.00

STATUS

CASH
CASH

Rp 400,000.00
Rp 7,240,000.00
RENCANA ANGGARAN BIAYA
RENOVASI PEMBANGUNAN RUMAH MERPATI 12
CV.ADHIYATMA GRIYA PERKASA
TYPE 40
NO NO. HSPK JENIS PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN RABAT BETON NGEDAK


1 Borongan 3c K 300 40.00 m3 25,000.00 1,000,000.00
Sub Total 1,000,000.00
B PEKERJAAN KAPOLDING
1 Borongan 3n Paket Pemasangan Kapolding 39.00 m3 100,000.00 3,900,000.00
Sub Total 3,900,000.00
C PEKERJAAN ELEKTRIKAL
1 Borongan 5j Pek. Titik Lampu 11.00 ttk - -
2 Borongan 5j Pek. Stop Kontak 5.00 ttk - -
3 Borongan 5j Pek. Saklar Tunggal 6.00 ttk - -
4 Borongan 5j Pek. Saklar Ganda 4.00 ttk - -
Sub Total -
D PEKERJAAN BETON NGEDAK
1 Borongan 3i K 300 6.00 m3 800,000.00 4,800,000.00
2 Borongan 3u Pompa 1.00 unit 2,000,000.00 2,000,000.00
3 Borongan 3g Lain-Lain 1.00 LS 500,000.00 500,000.00
Sub Total 7,300,000.00
E PEKERJAAN PLESTERAN DAN MLAMIR
1 Borongan 4a Pek. Plesteran dan Acian/Mlamir 150.00 m2 - -
Sub Total -
F PEKERJAAN PLUMBING
1 Borongan 10o Pek. Pas. Shower 2.00 Bh 500,000.00 1,000,000.00
2 Borongan 10e Pek. Pas. Floor Drain 2.00 Bh 25,000.00 50,000.00
3 Borongan 10i Pek. Pipa Air Bersih 3/4" 16.00 m1 12,500.00 200,000.00
4 Borongan 10m Pek. Pipa Air Kotor Padat 4" 6.00 m1 38,000.00 228,000.00
5 Borongan 10a Kloset Duduk 1.00 Bh 1,000,000.00 1,000,000.00
6 Borongan 10n Bak Kontrol 1.00 Unit 175,000.00 175,000.00
7 Borongan 10o Kitchen Seat 2.00 Unit 500,000.00 1,000,000.00
Sub Total 3,653,000.00
G PEKERJAAN KERAMIK
1 Borongan 8c Keramik Lantai 2 Kamar Tidur 40x40 - m2 - -
2 Borongan 8a Keramik Teras 40x40 - m2 - -
3 Borongan 8d Keramik KM 20x20 - m2 - -
4 Borongan 8f Keramik Dinding KM 20x25 - m2 - -
6 Borongan 8g Plin 10x40 - m1 - -
Sub Total -
H PEKERJAAN PENGECATAN
1 Borongan 11a Pek. Cat Dinding (1x Cat Dasar, 2x Cat Penutup) 100.00 m2 27,000.00 2,700,000.00
2 Borongan 11a Pek. Cat Plafon 40.00 m2 27,000.00 1,080,000.00
Sub Total 3,780,000.00
I PEKERJAAN PINTU DAN JENDELA
1 Borongan 7a Daun Pintu 80 X 210 M 3 m2 800,000.00 2,400,000.00
2 Borongan 7b Daun Pintu 70 X 180 M 2 m2 800,000.00 1,600,000.00
3 Borongan 7b Daun Pintu 80 X 180 M 1 m2 800,000.00 800,000.00
4 Borongan 8a Jendela 50 X 110 M 2 m2 350,000.00 700,000.00
5 Borongan 8b Angin2 50 X 30 M 1 m2 50,000.00 50,000.00
6 Borongan 8c Pelitur 1 m2 50,000.00 2,000,000.00
7 Borongan 8d Pasang Kunci dan Hadle 1 m2 50,000.00 800,000.00
DISCOUNT (850,000.00) (850,000.00)
Sub Total 7,500,000.00
J PEKERJAAN TAMAN
1 Borongan 6e Pek. Taman Belakang - m2 - -
Sub Total -
K PEKERJAAN PAGAR SAMPING DAN LAIN-LAIN
1 Borongan 8i Pek. Pagar Samping 20.00 m2 150,000.00 3,000,000.00
Sub Total 3,000,000.00

TOTAL 30,133,000.00
PEMBULATAN 30,100,000.00
REKAPITULASI HARGA
RENOVASI PEMBANGUNAN RUMAH MERPATI 12
CV.ADHIYATMA GRIYA PERKASA
TYPE 40

NO JENIS PEKERJAAN JUMLAH

A PEKERJAAN RABAT BETON NGEDAK 1,000,000.00


B PEKERJAAN KAPOLDING 3,900,000.00
C PEKERJAAN ELEKTRIKAL -
D PEKERJAAN BETON NGEDAK 7,300,000.00
E PEKERJAAN PLESTERAN DAN MLAMIR -
F PEKERJAAN PLUMBING 3,653,000.00
G PEKERJAAN KERAMIK -
H PEKERJAAN PENGECATAN 3,780,000.00
I PEKERJAAN PINTU DAN JENDELA 7,500,000.00
J PEKERJAAN TAMAN -
K PEKERJAAN PAGAR SAMPING DAN LAIN-LAIN 3,000,000.00
TOTAL 30,133,000.00
PEMBULATAN 30,100,000.00
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PERUMAHAN
ADHIYATMA
TYPE 52

NO NO. HSPK JENIS PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN
1 Borongan 1b Uitset / bouplank 36.00 m2 27,000.00 972,000.00
2 Borongan 1d Pek. Pembersihan Lahan 77.00 m2 5,000.00 385,000.00
Sub Total 1,357,000.00

B PEKERJAAN GALIAN DAN URUGAN


1 Borongan 2a Galian Tanah untuk Pondasi 6.72 m3 63,000.00 423,360.00
2 Borongan 2c Urugan Sirtu Atau Tanah 11.25 m3 52,000.00 585,000.00
3 Borongan 2d Urugan Pasir Lantai Kerja Tb. 5 cm 45.00 m2 17,000.00 765,000.00
4 Borongan 2d Urugan Pasir Bawah Pondasi Tb. 10cm 19.20 m2 34,000.00 652,800.00
5 Borongan 2f Galian Strouse dia 20-150 34.00 m1 60,000.00 2,040,000.00
Sub Total 4,466,160.00

C PEKERJAAN BETON
1 Borongan 3i Pile Cap 1 40/40/25 16.00 Ttk 148,645.00 2,378,320.00
Borongan 3u Pile Cap 2 60/40/25 1.00 Ttk 220,000.00 220,000.00
2 Borongan 3g Strouse dia 20-200 34.00 m1 88,435.00 3,006,790.00
3 Borongan 2e Pas. Batu Kumbung 25x50 1 Lapis 57.00 m1 35,000.00 1,995,000.00
4 Borongan 3a Sloof 1 12.5/20 57.00 m1 80,834.00 4,607,538.00
5 Borongan 3d Kolom 1 15/15 90.00 m1 78,051.00 7,024,590.00
6 Borongan 3c Kolom Praktis 10/10 25.00 m1 57,473.00 1,436,825.00
7 Borongan 3w Balok Latei 10/15 67.50 m1 63,873.00 4,311,427.50
9 Borongan 3l Ring Balok 10/20 87.80 m1 76,107.00 6,682,194.60
10 Borongan 3k Gewel 10/10 10.00 m1 63,873.00 638,730.00
11 Borongan 3r Plat Dag Talang 10cm Elv. +4.40 7.80 m2 162,939.00 1,270,924.20
Borongan 3v Plat Kanopi 15cm Elv. +2.90 & +3.40 9.70 m2 307,061.00 2,978,491.70
Sub Total 36,550,831.00

D PEKERJAAN PASANGAN
1 Borongan 4a Pek. Pasangan Dinding 1/2 Bata 1:5 239.71 m2 89,000.00 21,334,190.00
2 Borongan 4b Pek. Plesteran dan Acian 284.22 m2 65,000.00 18,474,300.00
3 Borongan 4a Rolag Bata 4.80 m2 89,000.00 427,200.00
Sub Total 40,235,690.00

E PEKERJAAN KERAMIK
1 Borongan 8c Keramik Lantai Ruangan 40x40 39.50 m2 101,500.00 4,009,250.00
2 Borongan 8a Keramik Teras 40x40 5.30 m2 101,500.00 537,950.00
3 Borongan 8d Keramik KM 20x20 2.30 m2 85,000.00 195,500.00
4 Borongan 8f Keramik Dinding KM 20x25 11.10 m2 104,000.00 1,154,400.00
5 Borongan 4b Plester + Aci Lantai Carport 13.75 m2 65,000.00 893,750.00
6 Borongan 8g Plin 10x40 47.00 m1 20,500.00 963,500.00
Sub Total 7,754,350.00

F PEKERJAAN KUSEN
1 P1 Kusen P 1 4.00 Bh 1,640,851.53 6,563,406.13
2 PJ 1 Kusen PJ 1 1.00 Bh 2,008,052.77 2,008,052.77
3 PVC Kusen PVC 1.00 Bh 250,000.00 250,000.00
4 J1 Kusen J 1 1.00 Bh 2,475,490.00 2,475,490.00
5 J2 Kusen J 2 2.00 Bh 1,896,253.67 3,792,507.33
6 J3 Kusen J 3 1.00 Bh 1,712,314.50 1,712,314.50
7 J4 Kusen J 4 1.00 Bh 334,455.80 334,455.80

Sub Total 17,136,226.54

G PEKERJAAN ELEKTRIKAL
1 Borongan 9a Pek. Titik Lampu 11.00 ttk 63,000.00 693,000.00
2 Borongan 9a Pek. Stop Kontak 5.00 ttk 63,000.00 315,000.00
3 Borongan 9b Pek. Saklar Tunggal 6.00 ttk 73,000.00 438,000.00
4 Borongan 9b Pek. Saklar Ganda 2.00 ttk 73,000.00 146,000.00
5 Bahan J9 Pas. Lampu 18 Pijar Watt 8.00 Buah 29,000.00 232,000.00
6 Borongan 9f Pek. Pas. Lampu Dinding 3.00 ttk 150,000.00 450,000.00
7 HSPK 29 MCB 1.00 Bh 65,830.00 65,830.00
Sub Total 2,339,830.00

H PEKERJAAN PLAFON
1 Borongan 7a Pek. Plafon Gypsum 9mm 39.50 m2 95,000.00 3,752,500.00
2 Borongan 7a Pek. Plafon Kalsi 4mm KM & Atap 8.75 m2 95,000.00 831,250.00
Sub Total 4,583,750.00

I PEKERJAAN PENGECATAN
1 Borongan 11a Pek. Cat Dinding (1x Cat Dasar, 2x Cat Penutup) 284.22 m2 18,000.00 5,115,960.00
2 Borongan 11a Pek. Cat Plafon 48.25 m2 18,000.00 868,500.00
Sub Total 5,984,460.00

J PEKERJAAN PLUMBING
1 Borongan 10o Pek. Pas. Shower 1.00 Bh 500,000.00 500,000.00
2 Borongan 10e Pek. Pas. Floor Drain 1.00 Bh 25,000.00 25,000.00
3 Borongan 10i Pek. Pipa Air Bersih 3/4" 16.00 m1 12,500.00 200,000.00
4 Borongan 10l Pek. Pipa Air Kotor 3" 44.00 m1 27,000.00 1,188,000.00
5 Borongan 10m Pek. Pipa Air Kotor Padat 4" 6.00 m1 38,000.00 228,000.00
6 Borongan 10a Kloset Duduk 1.00 Bh 1,000,000.00 1,000,000.00
7 Borongan 10n Bak Kontrol 4.00 Unit 175,000.00 700,000.00
Sub Total 3,841,000.00

K PEKERJAAN ATAP
1 Borongan 6e Pek. Rangka Atap Galvalum 60.00 m2 135,000.00 8,100,000.00
2 Borongan 6g Atap Genteng 60.00 m2 100,000.00 6,000,000.00
3 Borongan 6j Wuwungan 19.00 m1 20,000.00 380,000.00
4 Borongan 6c List Plank 12.00 m1 42,000.00 504,000.00

Sub Total 14,984,000.00

L PEKERJAAN LAIN-LAIN
1 Borongan 8i Pek. Batu Alam 9.15 m2 150,000.00 1,372,500.00
Sub Total 1,372,500.00

TOTAL 140,605,797.54
PEMBULATAN 140,600,000.00
Terbilang : " Seratus Empat Puluh Juta Enam Ratus Ribu Rupiah "
P1
Kusen Kayu 5.9 m1 70,000.00 413,000.00 HSPK 15
Daun Pintu 1.96 m2 479,878.33 940,561.53 HSPK 16
Kaca 0 m2 125,000.00 - Borongan 5f
Engsel 1 unit 42,640.00 42,640.00 HSPK 19
Kunci Tanam 1 unit 144,650.00 144,650.00 HSPK 18
Hendle 1 unit 100,000.00 100,000.00 Bahan H3
1,640,851.53

P2
Kusen Kayu m1 70,000.00 - HSPK 15
Daun Pintu m2 479,878.33 - HSPK 16
Kaca m2 125,000.00 - Borongan 5f
Engsel pintu unit 42,640.00 - HSPK 19
Kunci Tanam unit 144,650.00 - HSPK 18
Hendle unit 100,000.00 - Bahan H3
Daun Jendela m2 479,878.33 -
Engsel Jendela 24,785.00 -
Hak Angin 25,825.00 -
Grendel 28,675.00 -
-

PJ1
Kusen Kayu 7.575 m3 70,000.00 530,250.00 HSPK 15
Daun Pintu 1.5375 m2 479,878.33 737,812.94 HSPK 16
Jalusi 0.3 m2 125,000.00 37,500.00 Borongan 5f
Engsel pintu 1 unit 42,640.00 42,640.00 HSPK 19
Kunci Tanam 1 unit 144,650.00 144,650.00 HSPK 18
Hendle 1 unit 100,000.00 100,000.00 Bahan H3
Daun Jendela 0.7 m2 479,878.33 335,914.83
Engsel Jendela 1 24,785.00 24,785.00
Hak Angin 1 25,825.00 25,825.00
Grendel 1 28,675.00 28,675.00
2,008,052.77

PVC
PVC 1 Unit 250,000.00 250,000.00 HSPK 15
250,000.00
J1
Kusen Kayu 11.4 m1 70,000.00 798,000.00 HSPK 19
Daun Jendela 3 m2 479,878.33 1,439,635.00 HSPK 18
Engsel 3 unit 24,785.00 74,355.00 HSPK 20
Grendel 3 unit 28,675.00 86,025.00 HSPK 21
Hak Angin 3 unit 25,825.00 77,475.00 HSPK 22
Kaca m2 125,000.00 -
2,475,490.00

J2
Kusen Kayu 7 m3 70,000.00 490,000.00 HSPK 19
Daun Jendela 2.6 m2 479,878.33 1,247,683.67 HSPK 18
Engsel 2 unit 24,785.00 49,570.00 HSPK 20
Grendel 2 unit 28,675.00 57,350.00 HSPK 21
Hak Angin 2 unit 25,825.00 51,650.00 HSPK 22
Kaca 0 m2 125,000.00 - Borongan 5f
1,896,253.67

J3
Kusen Kayu 7.8 m3 70,000.00 546,000.00 HSPK 19
Daun Jendela 2.1 m2 479,878.33 1,007,744.50 HSPK 18
Engsel 2 unit 24,785.00 49,570.00 HSPK 20
Grendel 2 28,675.00 57,350.00 HSPK 21
Hak Angin 2 25,825.00 51,650.00 HSPK 22
Kaca 0 125,000.00 - Borongan 5f
1,712,314.50

J4
Kusen Kayu 2 m3 70,000.00 140,000.00 HSPK 19
Daun Jendela 0.24 479,878.33 115,170.80
Engsel 1 m2 24,785.00 24,785.00 HSPK 18
Grendel 1 unit 28,675.00 28,675.00 HSPK 20
Hak Angin 1 unit 25,825.00 25,825.00 HSPK 21
Kaca unit 125,000.00 - HSPK 22
334,455.80

J5
Kusen Kayu m3 70,000.00 - HSPK 19
Daun Jendela m2 479,878.33 - HSPK 19
Engsel 24,785.00 -
Grendel 28,675.00 -
Hak Angin 25,825.00 -
Kaca 125,000.00 -
-

J6
Kaca 125,000.00 -
List Alumunium 1x1 10,000.00 -
Silent 8,000.00 -
-

J4
Kusen Kayu m3 70,000.00 - 0
12,830,779.17 -
Kaca m2 125,000.00 - HSPK 19
Engsel unit 479,878.33 - HSPK 19
Grendel unit 24,785.00 - 0
Hak Angin unit 28,675.00 - 0
Jalusi m2 125,000.00 - 0
-
371000
ANALISA HARGA SATUAN PEKERJAAN (HSPK)

NO. URAIAN PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH HARGA


a b c d e f=cxe
HSPK 1 Pembersihan Lokasi m2
Upah:
Mandor 0.025 O.H 120,000.00 3,000.00
Pembantu Tukang 0.05 O.H 80,000.00 4,000.00
Jumlah: 7,000.00

HSPK 2 Pembuatan Bouwplank /Titik Titik


Upah:
Mandor 0.0045 O.H 120,000.00 540.00
Kepala Tukang Kayu 0.01 O.H 110,000.00 1,100.00
Tukang Kayu 0.1 O.H 100,000.00 10,000.00
Pembantu Tukang 0.1 O.H 80,000.00 8,000.00
Jumlah: 19,640.00
Bahan/Material:
Kayu Meranti (bekisting) 0.008 m3 3,000,000.00 24,000.00
Kayu Meranti (Usuk 4/6) 0.012 m3 3,500,000.00 42,000.00
Paku Biasa 2" - 5" 0.05 Kg 12,750.00 637.50
Jumlah: 66,637.50
Jumlah Total: 86,277.50

HSPK 3 Penggalian Tanah m3


Upah:
Mandor 0.025 O.H 120,000.00 3,000.00
Pembantu Tukang 0.75 O.H 80,000.00 60,000.00
Jumlah: 63,000.00

HSPK 4 Pengurugan Sirtu (Padat) m3


Upah:
Mandor 0.025 O.H 120,000.00 3,000.00
Pembantu Tukang 0.25 O.H 80,000.00 20,000.00
Jumlah: 23,000.00
Bahan:
Tanah/ Sirtu 1.2 m3 95,000.00 114,000.00
Jumlah: 114,000.00
Nilai HSPK : 137,000.00

HSPK 5 Pengurugan Pasir (Padat) m3


Upah:
Mandor 0.01 O.H 120,000.00 1,200.00
Pembantu Tukang 0.3 O.H 80,000.00 24,000.00
Jumlah: 25,200.00
Bahan:
Pasir Urug 1.2 m3 120,000.00 144,000.00
Jumlah: 144,000.00
Jumlah Total: 169,200.00

HSPK 6 Lantai kerja K100 slump(3-6) cm w/c=0,87 m3


Tenaga:
Mandor 0.06 O.H 120,000.00 7,200.00
Kepala Tukang Batu 0.02 O.H 110,000.00 2,200.00
Tukang batu 0.2 O.H 100,000.00 20,000.00
Pembantu Tukang 1.2 O.H 80,000.00 96,000.00
Jumlah: 125,400.00
Bahan:
Semen portland (40kg) 5.75 Zak 60,000.00 345,000.00
Pasir Beton 0.5581 m3 135,000.00 75,343.50
Batu Pecah Mesin 1/2 cm 0.5405 m3 210,000.00 113,505.00
Air (biaya air tawar) 215 Liter 30.00 6,450.00
Jumlah: 540,298.50
Nilai HSPK : 665,698.50

HSPK 7 Beton bertulang K 175 Sloof 15/20 m3


Pekerjaan pembesian (polos/ulir) 195 kg 11,441.80 2,231,151.00
Pekerjaan Bekesting Sloof Balok (2 x 9.166667 m2 104,097.25 954,224.79
Pekerjaan Beton K-175 1 m3 840,013.00 840,013.00
Pembongkaran Cetakan 18.33333 m2 6,425.00 117,791.67
4,143,180.46

HSPK 8 Beton bertulang K 175 Ringbalk 15/20 m3


Pekerjaan pembesian (polos/ulir) 195 kg 11,441.80 2,231,151.00
Pekerjaan Bekisting Balok (2 x pakai) 9.166667 m2 197,787.75 1,813,054.38
Pekerjaan Beton K-175 1 m3 840,013.00 840,013.00
Pembongkaran Cetakan 18.33333 m2 6,425.00 117,791.67
5,002,010.04

HSPK 10 Pekerjaan Kolom Praktis 12x12 cm K 175 M3


Beton K 175 1 m3 840,013.00 840,013.00
Besi Polos 175 kg 11,441.80 2,002,315.00
Bekisting Kolom 3 x Pakai 11.11111 m2 123,282.11 1,369,801.23
Pembongkaran Bekesting 4.44444 m2 6,425.00 28,555.53
4,240,684.76

HSPK 11 Beton bertulang K 225 Pondasi Pile Cap 40x60 m3


Pekerjaan pembesian (polos/ulir) 102 kg 11,441.80 1,167,063.60
Pekerjaan Bekisting Sloof ( 2x pakai) 2.222222 m2 208,194.50 462,654.44
Pekerjaan Beton K-225 1 m3 903,527.50 903,527.50
Pembongkaran Bekisting 4.444444 m2 6,425.00 28,555.56
2,561,801.10
HSPK 12 Beton bertulang K 175 plat kanopi t = 10 cm m3
Pekerjaan pembesian (polos/ulir) 90 kg 11,441.80 1,029,762.00
Pekerjaan Bekisting Lantai (2 x pakai) 5 m2 184,923.17 924,615.83
Pekerjaan Beton K-175 1 m3 840,013.00 840,013.00
Pembongkaran Bekesting 10 m3 6,425.00 64,250.00
2,858,640.83

HSPK 13 Pemasangan Bata Merah 1 Pc : 4 Ps (tabal 1/2 m2


Upah:
Mandor 0.015 O.H 120,000.00 1,800.00
Kepala Tukang Batu 0.01 O.H 110,000.00 1,100.00
Tukang Batu 0.1 O.H 100,000.00 10,000.00
Pembantu Tukang 0.3 O.H 80,000.00 24,000.00
Jumlah: 36,900.00
Bahan:
Semen portland (50kg) 0.23 Zak 70,000.00 16,100.00
Pasir Pasang 0.043 m3 135,000.00 5,805.00
Batu Bata Merah 70 Buah 650.00 45,500.00
Jumlah: 67,405.00
Nilai HSPK : 104,305.00

HSPK 14 Plesteran + Acian Mortar Render m2


Upah:
Mandor 0.015 O.H 120,000.00 1,800.00
Kepala Tukang Batu 0.015 O.H 110,000.00 1,650.00
Tukang Batu 0.15 O.H 100,000.00 15,000.00
Pembantu Tukang 0.3 O.H 80,000.00 24,000.00
Jumlah: 42,450.00
Bahan:
Semen Mortar Render 0.1248 Zak 95,000.00 11,856.00
Jumlah: 11,856.00
Nilai HSPK : 54,306.00

HSPK 15 Kusen Pintu & jendela (kayu kamper) m3


Upah:
Mandor 0.3 O.H 120,000.00 36,000.00
Kepala Tukang Kayu 1.8 O.H 110,000.00 198,000.00
Tukang Kayu 18 O.H 100,000.00 1,800,000.00
Pembantu Tukang 6 O.H 80,000.00 480,000.00
Jumlah: 2,514,000.00
Bahan:
Kayu Kamper Balok 1.2 m3 8,576,388.89 10,291,666.67
Paku Klem (No.4) 1.25 kg 13,850.00 17,312.50
Lem Kayu 1 Kg 7,800.00 7,800.00
Jumlah: 10,316,779.17
Nilai HSPK : 12,830,779.17

HSPK 16 Daun Pintu & jendela kaca (kayu kamper) m2


Upah:
Mandor 0.04 O.H 120,000.00 4,800.00
Kepala Tukang Kayu 0.2 O.H 110,000.00 22,000.00
Tukang Kayu 2 O.H 100,000.00 200,000.00
Pembantu Tukang 0.8 O.H 80,000.00 64,000.00
Jumlah: 290,800.00
Bahan:
Kayu Kamper Papan 0.024 m3 7,780,763.89 186,738.33
Lem Kayu 0.3 Kg 7,800.00 2,340.00
Jumlah: 189,078.33
Nilai HSPK : 479,878.33

HSPK 17 Pemasangan Kaca Mati Polos tebal 5 mm m2


Upah:
Mandor 0.00075 O.H 120,000.00 90.00
Kepala Tukang Kayu 0.015 O.H 110,000.00 1,650.00
Tukang Kayu 0.15 O.H 100,000.00 15,000.00
Pembantu Tukang 0.015 O.H 80,000.00 1,200.00
Jumlah: 17,940.00
Bahan:
Kaca Polos Tebal 5 mm 1.1 m2 75,500.00 83,050.00
Jumlah: 83,050.00
Nilai HSPK : 100,990.00

HSPK 18 Pemasangan Kunci Tanam 2 x Putar Buah


Upah:
Mandor 0.005 O.H 120,000.00 600.00
Kepala Tukang Kayu 0.01 O.H 110,000.00 1,100.00
Tukang Kayu 0.5 O.H 100,000.00 50,000.00
Pembantu Tukang 0.01 O.H 80,000.00 800.00
Jumlah: 52,500.00
Bahan:
Kunci Tanam 2 X putar 1 Buah 92,150.00 92,150.00
Jumlah: 92,150.00
Nilai HSPK : 144,650.00

HSPK 19 Pemasangan Engsel Kuningan Untuk Pintu Stel


Upah:
Mandor 0.00075 O.H 120,000.00 90.00
Kepala Tukang Kayu 0.015 O.H 110,000.00 1,650.00
Tukang Kayu 0.15 O.H 100,000.00 15,000.00
Pembantu Tukang 0.015 O.H 80,000.00 1,200.00
Jumlah: 17,940.00
Bahan:
Engsel Kuningan (untuk Pintu) 1 stel 24,700.00 24,700.00
Jumlah: 24,700.00
Nilai HSPK : 42,640.00

HSPK 20 Pemasangan Engsel Kuningan Untuk jendela Stel


Upah:
Mandor 0.0005 O.H 120,000.00 60.00
Kepala Tukang Kayu 0.01 O.H 110,000.00 1,100.00
Tukang Kayu 0.1 O.H 100,000.00 10,000.00
Pembantu Tukang 0.01 O.H 80,000.00 800.00
Jumlah: 11,960.00
Bahan:
Engsel Kuningan 1 stel 12,825.00 12,825.00
Jumlah: 12,825.00
Nilai HSPK : 24,785.00

HSPK 21 Pemasangan Grendel Biasa (Kecil) Buah


Upah:
Tukang Kayu 0.12 O.H 100,000.00 12,000.00
Pembantu Tukang 0.06 O.H 80,000.00 4,800.00
Jumlah: 16,800.00
Bahan:
Grendel Biasa (kecil) + Sekrup 1 set 11,875.00 11,875.00
Jumlah: 11,875.00
Nilai HSPK : 28,675.00

HSPK 22 Pemasangan Hak Angin (Sikutan) Stel


Upah:
Tukang Kayu 0.12 O.H 100,000.00 12,000.00
Pembantu Tukang 0.06 O.H 80,000.00 4,800.00
Jumlah: 16,800.00
Bahan:
Hak Angin (sikutan biasa) + Sekrup 1 set 9,025.00 9,025.00
Jumlah: 9,025.00
Nilai HSPK : 25,825.00

HSPK 23 Pemasangan Plafon Gypsumboard Rangka Hol m2 Pemasangan Besi Profil WF (Termasuk Perakg
Upah: Tenaga:
Mandor 0.075 O.H 120,000.00 9,000.00 Mandor 0.003 O.H 97000
Kepala Tukang Kayu 0.025 O.H 110,000.00 2,750.00 Kepala Tukang 0.006 O.H 95000
Pembantu Tukang 0.15 O.H 80,000.00 12,000.00 Tukang Las 0.06 O.H 92500
Tukang Kayu 0.25 O.H 100,000.00 25,000.00 Pembantu Tukang 0.06 O.H 89100
Jumlah: 48,750.00 Jumlah:
Bahan: Bahan:
Gypsumboard Uk.240 x 120 x 9 mm 0.3819 Lbr 57,000.00 21,768.30 Besi Profil WF 1.15 kg 12500
Besi Hollow 40/40 0.75 m' 21,000.00 15,750.00 Elektroda 0.04 kg 30000
Besi Hollow 20/40 2 m' 14,300.00 28,600.00 Cat Meni besi 0.03 kg 32000
Skrup 4 Buah 150.00 600.00 Jumlah:
Jumlah: 66,718.30 Nilai HSPK :
Nilai HSPK : 115,468.30

HSPK 24 Pemasangan Plafon Calsiboard 4 mm Rangka h m2


Upah:
Mandor 0.075 O.H 120,000.00 9,000.00
Kepala Tukang Kayu 0.025 O.H 110,000.00 2,750.00
Tukang Kayu 0.25 O.H 100,000.00 25,000.00
Pembantu Tukang 0.15 O.H 80,000.00 12,000.00
Jumlah: 48,750.00
Bahan:
Kalsiboard EG Uk. 240 x 120 x 4 mm 0.3819 Lbr 52,000.00 19,858.80
Besi Hollow 40/40 0.75 m' 21,000.00 15,750.00
Besi Hollow 20/20 2 m' 14,300.00 28,600.00
Skrup 4 bh 150.00 600.00
Jumlah: 64,808.80
Nilai HSPK : 113,558.80

HSPK 25 Pemasang rangka atap Galvalume Uk 0.8 mm m2


Upah:
Mandor 0.005 O.H 120,000.00 600.00
Kepala Tukang besi 0.01 O.H 110,000.00 1,100.00
Tukang besi 0.1 O.H 100,000.00 10,000.00
Pembantu tukang 0.4 O.H 80,000.00 32,000.00
Jumlah: 43,700.00
Bahan:
Rangka Galvalume uk 0.8mm 1.1 m2 120,000.00 132,000.00
Jumlah: 132,000.00
Nilai HSPK : 175,700.00

HSPK 26 Pemasangan genteng Beton m2


Upah:
Mandor 0.008 O.H 120,000.00 960.00
Kepala Tukang Kayu 0.008 O.H 110,000.00 880.00
Tukang Kayu 0.075 O.H 100,000.00 7,500.00
Pembantu Tukang 0.15 O.H 80,000.00 12,000.00
Jumlah: 21,340.00
Bahan:
Genteng Beton 25 Buah 4,000.00 100,000.00
Jumlah: 100,000.00
Nilai HSPK : 121,340.00

HSPK 27 Pemasangan wuwung genteng beton m1


Upah:
Mandor 0.002 O.H 120,000.00 240.00
Kepala Tukang Kayu 0.02 O.H 110,000.00 2,200.00
Tukang Kayu 0.2 O.H 100,000.00 20,000.00
Pembantu Tukang 0.4 O.H 80,000.00 32,000.00
Jumlah: 54,440.00
Bahan:
Semen portland (40 kg) 0.2 Zak 60,000.00 12,000.00
Pasir Pasang 0.0323 m3 135,000.00 4,360.50
wuwung Genteng beton 3 m2 13,000.00 39,000.00
Jumlah: 55,360.50
Nilai HSPK : 109,800.50

HSPK 28 Pemasangan Lisplank Calsiplank rangka hollo m'


Upah:
Mandor 0.075 O.H 120,000.00 9,000.00
Kepala Tukang Kayu 0.025 O.H 110,000.00 2,750.00
Tukang Kayu 0.15 O.H 100,000.00 15,000.00
Pembantu Tukang 0.25 O.H 80,000.00 20,000.00
Jumlah: 46,750.00
Bahan:
GRC tebal 0.9 mm 0.3 Lbr 51,300.00 15,390.00
Besi Hollow 40/40 0.75 m' 21,000.00 15,750.00
Besi Hollow 20/20 2 m' 14,300.00 28,600.00
Skrup 4 bh 150.00 600.00
Jumlah: 64,541.47
Nilai HSPK : 111,291.47

HSPK 29 Pemasangan PANEL MCB Titik


Upah:
Kepala Tukang Listrik 0.05 O.H 110,000.00 5,500.00
Tukang Listrik 0.2 O.H 100,000.00 20,000.00
Pembantu Tukang 0.001 O.H 80,000.00 80.00
Jumlah: 25,580.00
Bahan:
Panel MCB 4 fase 6A 1 Buah 40,250.00 40,250.00
Jumlah: 40,250.00
Nilai HSPK : 65,830.00

HSPK 30 Pemasangan Titik Lampu + Stop Kontak Titik


Upah:
Kepala Tukang Listrik 0.05 O.H 110,000.00 5,500.00
Tukang Listrik 0.5 O.H 100,000.00 50,000.00
Pembantu Tukang 0.3 O.H 80,000.00 24,000.00
Jumlah: 79,500.00
Bahan:
Isolator 4 Buah 5,500.00 22,000.00
Kabel NYA 500 Volt 2 x 2,5 mm2 10 m1 5,650.00 56,500.00
Pipa conduit 20 mm panjang 3 m 1.1 Lonjor 8,360.00 9,196.00
T Doos Pvc 1 Buah 2,132.00 2,132.00
Jumlah: 89,828.00
Nilai HSPK : 169,328.00

HSPK 31 Pemasangan Saklar Tunggal Titik


Upah:
Kepala Tukang Listrik 0.05 O.H 110,000.00 5,500.00
Tukang Listrik 0.2 O.H 100,000.00 20,000.00
Pembantu Tukang 0.001 O.H 80,000.00 80.00
Jumlah: 25,580.00
Bahan
Saklar Tunggal Broco 1 Buah 8,500.00 8,500.00
Jumlah: 8,500.00
Nilai HSPK : 34,080.00

HSPK 32 Pemasangan Saklar Ganda Titik


Upah:
Kepala Tukang Listrik 0.05 O.H 110,000.00 5,500.00
Tukang Listrik 0.2 O.H 100,000.00 20,000.00
Pembantu Tukang 0.001 O.H 80,000.00 80.00
Jumlah: 25,580.00
Bahan
Saklar Ganda Broco 1 Buah 17,600.00 17,600.00
Jumlah: 17,600.00
Nilai HSPK : 43,180.00

HSPK 33 Pemasangan Pipa HDPE 1/2" M'


Bahan :
Pipa HDPE 1/2" 1.2 m' 4,750.00 5,700.00
perlengkapan (15%) 0.35 hrg 8,500.00 2,975.00
Jumlah: 8,675.00
Upah :
Tukang Batu 0.06 O.H 100,000.00 6,000.00
Pekerja 0.036 O.H 80,000.00 2,880.00
Kepala Tukang Batu 0.006 O.H 110,000.00 660.00
Mandor 0.0018 O.H 120,000.00 216.00
Jumlah: 9,756.00
Nilai HSPK : 9,756.00
18,431.00
HSPK 34 Pemasangan Pipa Air Kotor diameter 3'' m1
Upah:
Mandor 0.0041 O.H 120,000.00 492.00
Kepala Tukang Batu 0.0135 O.H 110,000.00 1,485.00
Tukang Batu 0.135 O.H 100,000.00 13,500.00
Pembantu Tukang 0.081 O.H 80,000.00 6,480.00
Jumlah: 21,957.00
Bahan:
Pipa PVC 3'' type C Panjang 4 m 0.3 batang 60,277.50 18,083.25
Perlengkapan 10% harga pipa 0.105 Buah 60,277.50 6,329.14
Jumlah: 24,412.39
Nilai HSPK : 46,369.39

HSPK 35 Pemasangan Pipa Air Kotor diameter 4'' m1


Upah:
Mandor 0.0041 O.H 120,000.00 492.00
Kepala Tukang Batu 0.0135 O.H 110,000.00 1,485.00
Tukang Batu 0.135 O.H 100,000.00 13,500.00
Pembantu Tukang 0.081 O.H 80,000.00 6,480.00
Jumlah: 21,957.00
Bahan:
Pipa PVC 4'' type C Panjang 4 m 0.3 batang 78,450.00 23,535.00
Perlengkapan 10% harga pipa 0.105 Buah 78,450.00 8,237.25
Jumlah: 31,772.25
Nilai HSPK : 53,729.25

HSPK 36 Pengecatan Tembok (1 lapis cat dasar, 2 lapis m2


Upah:
Mandor 0.0025 O.H 120,000.00 300.00
Kepala Tukang Cat 0.0042 O.H 110,000.00 462.00
Tukang Cat 0.042 O.H 100,000.00 4,200.00
Pembantu Tukang 0.028 O.H 80,000.00 2,240.00
Jumlah: 7,202.00
Bahan:
Dempul tembok (cat dasar) 0.12 kg 14,250.00 1,710.00
Cat Tembok dalam / interior 0.18 kg 40,000.00 7,200.00
Jumlah: 8,910.00
Nilai HSPK : 16,112.00

HSPK 37 Water Proofing m2


Upah:
Mandor 0.005 O.H 120,000.00 600.00
Kepala Tukang Cat 0.005 O.H 110,000.00 550.00
Tukang Cat 0.05 O.H 100,000.00 5,000.00
Pembantu Tukang 0.025 O.H 80,000.00 2,000.00
Jumlah: 8,150.00
Bahan:
Water Profing 1.5 kg 42,000.00 63,000.00
Kuas 0.35 lbr 12,000.00 4,200.00
Jumlah: 67,200.00
Nilai HSPK : 75,350.00

HSPK 38 Pemasangan Tegel Keramik 40x40 cm (Warna / m2


Upah:
Mandor 0.035 O.H 120,000.00 4,200.00
Kepala Tukang Batu 0.035 O.H 110,000.00 3,850.00
Tukang Batu 0.35 O.H 100,000.00 35,000.00
Pembantu Tukang 0.7 O.H 80,000.00 56,000.00
Jumlah: 99,050.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.196 Zak 70,000.00 13,720.00
Semen Berwarna Yiyitan 1.3 Kg 10,500.00 13,650.00
Pasir Pasang 0.045 m3 135,000.00 6,075.00
Tegel Keramik 40x40 (motif/warna ge 1.0608 m2 57,500.00 60,996.00
Jumlah: 94,441.00
Nilai HSPK : 193,491.00

HSPK 39 Pemasangan Tegel Keramik 20x20 cm (Warna / m2


Upah:
Mandor 0.035 O.H 120,000.00 4,200.00
Kepala Tukang Batu 0.035 O.H 110,000.00 3,850.00
Tukang Batu 0.35 O.H 100,000.00 35,000.00
Pembantu Tukang 0.7 O.H 80,000.00 56,000.00
Jumlah: 99,050.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.196 Zak 70,000.00 13,720.00
Semen Berwarna Yiyitan 1.3 Kg 10,500.00 13,650.00
Pasir Pasang 0.045 m3 135,000.00 6,075.00
Tegel Keramik 20x20 (motif/warna ge 1.0608 m2 47,000.00 49,857.60
Jumlah: 83,302.60
Nilai HSPK : 182,352.60

HSPK 40 Pemasangan Tegel Keramik 20x25 cm (Warna / m2


Upah:
Mandor 0.035 O.H 120,000.00 4,200.00
Kepala Tukang Batu 0.035 O.H 110,000.00 3,850.00
Tukang Batu 0.35 O.H 100,000.00 35,000.00
Pembantu Tukang 0.7 O.H 80,000.00 56,000.00
Jumlah: 99,050.00
Bahan:
Semen PC (Portland Cement) 50 kg 0.196 Zak 70,000.00 13,720.00
Semen Berwarna Yiyitan 1.3 Kg 10,500.00 13,650.00
Pasir Pasang 0.045 m3 135,000.00 6,075.00
Tegel Keramik 20x20 (motif/warna ge 1.0608 m2 50,500.00 53,570.40
Jumlah: 87,015.40
Nilai HSPK : 186,065.40

HSPK 41 Pemasangan Batu Kumbung m2


Upah:
Mandor 0.025 O.H 120,000.00 3,000.00
Kepala Tukang Batu 0.025 O.H 110,000.00 2,750.00
Tukang Batu 0.25 O.H 100,000.00 25,000.00
Pembantu Tukang 0.5 O.H 80,000.00 40,000.00
Jumlah: 70,750.00
Bahan:
Batu Kumbung 25/25/50 2.1 Bh 11,500.00 24,150.00
Semen portland (50kg) 0.1 Kg 70,000.00 7,000.00
Pasir Pasang 0.045 m3 16,000.00 720.00
Jumlah: 31,870.00
Nilai HSPK : 102,620.00
DAFTAR HARGA SATUAN UPAH & BAHAN

NO. TENAGA KERJA SAT. UPAH


a b c d
1 Mandor O.H 120,000.00
2 Kepala Tukang Batu O.H 110,000.00
3 Kepala Tukang Besi O.H 110,000.00
4 Kepala Tukang Kayu O.H 110,000.00
5 Kepala Tukang Listrik O.H 110,000.00
6 Kepala Tukang Cat O.H 110,000.00
7 Tukang Batu O.H 100,000.00
8 Tukang besi O.H 100,000.00
9 Tukang Kayu O.H 100,000.00
10 Tukang Listrik O.H 100,000.00
11 Tukang Cat O.H 100,000.00
12 Pembantu Tukang O.H 80,000.00

NO. BAHAN SAT. HARGA


A Bahan Tanah & Pasir
1 Tanah / Sirtu m3 95,000.00
2 Pasir Urug m3 120,000.00
3 Pasir Pasang m3 135,000.00
4 Pasir Beton m3 135,000.00

B Bahan Batu
1 Batu Kali Belah 15/20 cm m3 140,200.00
2 Batu Pecah Mesin 1/2 cm m3 210,000.00
3 Batu Bata Merah Buah 650.00

C Bahan Semen / PC
1 Semen portland (50kg) Zak 70,000.00
2 Semen portland (40kg) Zak 60,000.00
3 Semen Mortar Render Zak 95,000.00
4 Semen Berwarna Yiyitan Kg 10,500.00

D Bahan Besi & Aluminium


1 Besi Beton (polos/ulir) Kg 9,500.00
2 Kawat Beton Kg 14,000.00
3 Aluminium Coklat Uk. 4 x 10, Profil 4" m1 85,000.00
4 Slimar Alumunium 3/8 m1 62,375.00
5 Besi Hollow 40/40 m' 21,000.00
6 Besi Hollow 20/40 m' 14,300.00
7 Rangka Galvalume uk 0.8mm m2 237,600.00
Bahan D8 Daun Pintu PVC Unit 250,000.00

E Bahan Kayu & Kusen


1 Kayu kamper balok m3 8,576,388.89
2 Kayu Kamper papan m3 7,780,763.89
3 Kayu Meranti (bekisting) m3 3,000,000.00
4 Kayu Meranti (Usuk 4/6) m3 3,500,000.00
5 Plywood tebal 9 mm Lembar 78,470.00
6 Dolken kayu gelam dia 8-10 cm, panjan Batang 5,000.00
7 Teakwood 122x244x3mm Lembar 65,300.00
Bahan E8 Daun Pintu Panel buah 500,000.00
Bahan E9 Jalusi m2 513,200.00
F Bahan Keramik
1 Tegel Keramik 30x30 (motif/warna) m2 103,000.00
2 Tegel Keramik 20x20 (motif/warna) m2 104,000.00

G Bahan Plafond & Atap


1 Gypsumboard Uk.240 x 120 x 9 mm Lbr 68,875.00
2 Kalsiboard EG Uk. 240 x 120 x 4 mm Lbr 69,245.50
3 GRC tebal 0.9 mm Lbr 51,300.00
4 Genteng Beton Buah 5,500.00
5 wuwung Genteng beton m2 13,000.00

H Bahan Kaca, Kunci & Penggantung


1 Kaca Polos Tebal 5 mm m2 75,500.00
2 Kunci Tanam 2 X putar Buah 92,150.00
Bahan H3 Handle Pintu Buah 100,000.00
4 Engsel Kuningan (untuk Pintu) stel 24,700.00
5 Engsel Kuningan stel 12,825.00
6 Grendel Biasa (kecil) + Sekrup set 11,875.00
7 Grendel Tanam + Sekrup set 96,900.00
8 Hak Angin (sikutan biasa) + Sekrup set 9,025.00

I Bahan Paku
1 Paku Biasa 2" - 5" Kg 12,750.00
2 Skrup/Ripet Buah 150.00
3 Skrup Buah 150.00
4 Pake Klem (No.4) Kg 13,850.00
J Bahan Listrik
1 Panel MCB 4 fase 6A Buah 40,250.00
2 Isolator Buah 5,500.00
3 Kabel NYA 500 Volt 2 x 2,5 mm2 m1 5,650.00
4 Pipa conduit 20 mm panjang 3 m Lonjor 8,360.00
5 T Doos Pvc Buah 2,132.00
6 Saklar Tunggal Broco Buah 8,500.00
7 Saklar Ganda Broco Buah 17,600.00
8 Lampu LED 8 Watt Buah 125,000.00
Bahan J9 Lampu 18 Watt Buah 29,000.00
Bahan J10 Exhaust fan Buah 350,000.00
K Bahan Sanitasi
1 Pipa HDPE 3/4" m' 8,500.00
2 Pipa PVC 3'' type C Panjang 4 m batang 60,277.50
3 Pipa PVC 4'' type C Panjang 4 m batang 78,450.00
Bahan K4 Kran Air 1/2 Buah 15,500.00
Bahan K5 Kloset Jongkok Buah 120,000.00
Bahan K6 Avour Buah 25,000.00
Bahan K7 Bak Mandi Fiber Buah 350,000.00
L Bahan Cat
1 Cat Tembok dalam / interior kg 40,000.00
2 Plamur Tembok kg 14,250.00
3 Kertas gosok no. 150 (halus) lbr 8,312.50
4 Air (biaya air tawar) Liter 30.00
5 Minyak bekesting ltr 8,075.00
6 Sealent tube 25,460.00
7 Lem Kayu Kg 7,800.00
M Bahan Konstruksi Baja
1 Besi Profil WF, CNP, L, Plat Kg 12,500.00
2 Angkur, Baut HTB Kg 12,500.00
3 Elektroda Kg 30,000.00
4 Jarum Keras Uk.20cm Bh 75,000.00
5 Cat Meni Besi Kg 32,000.00
No Item Pekerjaan Satuan Harga
1 Pekerjaan Persiapan
Borongan 1a Direksikit Per m2 48.000,- m2 48,000.00
Borongan 1b Bouwplank Per m1 27.000,- m1 27,000.00
Borongan 1c Pekerjaan Pemagaran Per m1 28.000,- m1 28,000.00
Borongan 1d Pembersiahan Pembersihan Lahan m2 5,000.00
2 Harga Borongan Galian dan Pondasi
Borongan 2a Galian Tanah Pondasi Per m3 82.500,- m3 63,000.00
Borongan 2b Pasang batu kali Per m3 95.000,- m3 95,000.00
Borongan 2c Urungan Tanah leveling lantai m3 52,000.00
Borongan 2d Lantai Kerja Per m2 17.000,- m2 17,000.00
Borongan 2e Pondasi Batu Kumbung m1 35,000.00
Borongan 2f Galian Strouse m1 60,000.00
3 Harga Borongan Beton Bertulang
Borongan 3a Sloof 12.5/20 m1 80,834.00
Borongan 3b Sloof 15/25 m1 104,572.00
Borongan 3c Kolom Praktis 10/10 m1 57,473.00
Borongan 3d Kolom 12.5/12.5 m1 71,026.00
Borongan 3e Kolom 15/15 m1 78,051.00
Borongan 3f Kolom 15/25 m1 104,572.00
Borongan 3g Strouse dia 20 m1 88,435.00
Borongan 3h Strouse dia 30 m1 121,568.00
Borongan 3i Pile Cap 40/40/25 Ttk 148,645.00
Borongan 3j Pile Cap 60/60/25 Ttk 219,714.00
Borongan 3k Balok Latei 10/10 m1 58,073.00
Borongan 3l Balok 12.5/20 m1 81,434.00
Borongan 3m Balok 15/20 m1 86,881.00
Borongan 3n Balok 15/25 m1 106,132.00
Borongan 3o Balok 20/35 m1 153,507.00
Borongan 3p Balok 20/40 m1 180,001.00
Borongan 3q Ring Balok 10/20 m1 76,107.00
Borongan 3r Plat 10cm kanopi 1 lapis m2 162,939.00
Borongan 3s Plat 12cm Lantai 2 lapis m2 261,544.00
Borongan 3t Plat 15cm Lantai 2 lapis m2 361,313.00
Borongan 3u Pile Cap 60/40/25 Ttk 220,000.00
Borongan 3v Plat 15cm Kanopi 1 Lapis m2 307,061.00
Borongan 3w BL 10/15 m1 63,873.00

4 Harga Borongan Pasangan Bata


Borongan 4a Pasang Bata Per m2 89.000,- m2 89,000.00
Borongan 4b Pekerjaan Plester+ Aci Per m2 65.000,- m2 65,000.00
Borongan 4c Sekonengan Per m1 m1 30,000.00
Borongan 4d Sudutan Per m1 m1 30,000.00
Borongan 4e Tali Air Per m1 m1 30,000.00
Borongan 4f Ban-Banan m1 30,000.00
5 Harga Borongan Kusen
Borongan 5a Kusen Pintu 5/12 m1 70,000.00
Borongan 5b Kusen Jendela 5/12 m1 70,000.00
Borongan 5c Daun Pintu Bh 900,000.00
Borongan 5d Pasang Daun Jendela unit 77.000,- unit 77,000.00
Borongan 5e Kusen Alexindo 4 inc m1 95,000.00
Borongan 5f Kaca 5mm m2 125,000.00
Borongan 5g Pintu + Kaca Alumunium Unit 1,200,000.00
Borongan 5h Silent m1 8,000.00
Borongan 5i Jendela + Kaca Unit 500,000.00
Borongan 5j Kayu Papan m3 3,250,000.00
6 Harga Borongan Pemasangan Rangka Atap
Borongan 6a Pasang atap ( termasuk pas Kuda2, usuk ,reng) m2 97,000.00
Borongan 6b Kerpus Per m1 82.000,- m1 82,000.00
Borongan 6c Listplank Per m1 42.000,- m1 42,000.00
Borongan 6d pekerjaan pasang talang Per m1 43.000,- m1 43,000.00
Borongan 6e Rangka Atap 0,75mm x 75 mm - 1200 mm m2 135,000.00
Borongan 6f Rangka Atap 0,75mm x 75 mm - 1000 mm m2 150,000.00
Borongan 6g Atap Genteng / Metal Pasir m2 100,000.00
Borongan 6h Biaya Pemasangan Alumunium Single side m2 20,000.00
Borongan 6i Pagar Atau Railing Hollow 4x4 / 2x4 m2 350,000.00
Borongan 6j Wuwungan m1 20,000.00
7 Harga Borongan Pekerjaan Pasang Plafond
Borongan 7a Plapon gypsum 9mm + Rangka Galvanis m2 95,000.00
Borongan 7b Pasang List Plapon gypsum Per m1 11.000,- m1 11,000.00
8 Harga Borongan Pasangan Keramik
Borongan 8a Pasang Keramik Lantai 30 × 30 m2 93,000.00
Borongan 8b Pasang Keramik Lantai 40 × 40 m2 101,500.00
Borongan 8c Pasang Keramik Lantai 60 × 60 m2 141,300.00
Borongan 8d Pasang Keramik Lantai KM 20x20 m2 85,000.00
Borongan 8e Pasang Keramik Dinding 30x60 m2 108,000.00
Borongan 8f Pasang Keramik Dinding 20x25 m2 104,000.00
Borongan 8g Pasang Keramik Plin 10x40 m1 20,500.00
Borongan 8h Pasang Keramik Plin Per m1 20.500,- m1 20,500.00
Borongan 8i Pas. Batu Alam m2 150,000.00
9 Harga Borongan Pemasangan Listrik
Borongan 9a Stop Kontak TITIK 63.000,- ttk 63,000.00
Borongan 9b Fiting lampu + saklar TITIK 73.000,- ttk 73,000.00
Borongan 9c Lampu Spot unit 200,000.00
Borongan 9d Lampu TL Unit 200,000.00
Borongan 9e Exhaust Fan unit 150,000.00
Borongan 9f Lampu Dinding unit 150,000.00
10 Harga Borongan Pekerjaan Sanitasi
Borongan 10a Pasang Closet Duduk unit 169.000,- unit 1,000,000.00
Borongan 10b Pasang Closet Jongkok unit 109.000,- unit 109,000.00
Borongan 10c Pasang Wall Shower unit 53.000,- unit 53,000.00
Borongan 10d Pasang Wastafel unit 159.000,- unit 159,000.00
Borongan 10e Pasang Floordrain unit 25.000,- unit 25,000.00
Borongan 10f Pasang Kran unit 14.000,- unit 14,000.00
Borongan 10g Pasang Bath unit 885.000,- unit 88,500.00
Borongan 10h Pemipaan Air Bersih 1/2" m1 10,000.00
Borongan 10i Pipa Air Bersih 3/4" m1 12,500.00
Borongan 10j Pipa Air Bersih 1" m1 15,000.00
Borongan 10k Pipa Air Bersih 1 1/2" m1 20,000.00
Borongan 10l Pipa Air Kotor 3" m1 27,000.00
Borongan 10m Pemipaan Air Kotor 4 " m1 38,000.00
Borongan 10n Bak Kontrol unit 175.500,- unit 175,000.00
Borongan 10o Shower Set 500,000.00

11 Harga Borongan Pekerjaan Pengecatan


Borongan 11a Cat Dinding m2 18,000.00
Borongan 11b Cat duco kusen (berikut material) m1 85.000,- m1 85,000.00
Borongan 11c Cat duco daun jendela (berikut material) m1 85.000,- m1 85,000.00
Borongan 11d Cat duco daun pintu panel (berikut material) m1 880,000.00
Borongan 11e Cat duco ram/list jendela (berikut material) m1 37,000.00
Borongan 11f Water Proofing m2 75,000.00
12 Borongan Pekerjaan Baja
Borongan 12a Baja WF kg 17,000.00
Borongan 12b Plate 10 mm m2 799,000.00
Borongan 12c Plate 15 mm m2 1,204,000.00
Borongan 12d Reng Galvalum m1 9,000.00
Borongan 12e Seng Galvalum m2 42,000.00
Borongan 12f Alumunium Panel Composit m2 500,000.00
Borongan 12g Plafon Ceilling Grid modul 120x60 m2 75,000.00
Borongan 12h Railing m2 450,000.00
Borongan 12i Kanal C kg 12,000.00
Borongan 12j Usul Galvalum 75 m1 14,000.00
Borongan 12k BetonNesser 10mm m1 5,750.00
Borongan 12l Hollow 10x10 m1 71,000.00
Borongan 12m Atap Galvalum m2 150,000.00
13 Harga Borongan Pekerjaan Pembongkaran
Borongan 13a Bongkaran Atap Per m2 37.500,- m2 37,000.00
Borongan 13b Bongkaran Dinding Per m2 22.000,- m2 22,000.00
Borongan 13c Pembersihan bongkaran Per m2 17.000,- m2 17,000.00

Gaji/ Upah Jasa Borongan Tukang Permeter :


Galian tanah = Rp 79.000/m3 m3 79,000.00
Pondasi batu belah = Rp 139.000/m3 m3 139,000.00
Pasang beton slop 15/20 = Rp 29.000/m m1 29,000.00
Pasang kolom 10/10/ = Rp 29.000/m m1 29,000.00
Pasang beton ring 10/10/ = Rp 29.000/m m2 29,000.00
Pasang batu bata = Rp 35.000/m2 m2 35,000.00
Plesteran = Rp 29.000/m2 m2 29,000.00
Acian = Rp 25.000/m2 m2 25,000.00
Pasang keramik lantai = Rp 49.000/m2 m2 49,000.00
Pasang keramik dinding = Rp 55.000/m2 m2 55,000.00
Cat dinding =Rp 18.000/m2 m2 18,000.00
Instalasi listrik = Rp 65.000/m2 m2 65,000.00
Pemasangan Besi Profil WF (Termasuk
Tenaga:
Mandor
Kepala Tukang
Tukang Las
Pembantu Tukang

Bahan:
Besi Profil WF
Elektroda
Cat Meni besi
sangan Besi Profil WF (Termasuk Perakitan dan Pengelakg

0.003 O.H 97000


0.006 O.H 95000
0.06 O.H 92500
antu Tukang 0.06 O.H 89100
Jumlah:

1.15 kg 12500
0.04 kg 30000
0.03 kg 32000
Jumlah:
Nilai HSPK :