5 0.15 38 8.9
6 0.22 39 9.38
7 0.3 40 9.87
8 0.39 42 10.88
9 0.5 44 11.94
10 0.62 46 13.05
11 0.75 48 14.21
12 0.89 50 15.41
13 1.04 52 16.67
14 1.21 54 17.98
15 1.39 56 19.33
16 1.58 58 20.74
17 1.78 60 22.2
18 2 62 23.7
19 2.23 64 25.25
20 2.46 66 26.86
21 2.72 68 28.51
22 2.98 70 30.21
23 3.26 72 31.96
24 3.55 74 33.76
25 3.85 76 35.61
26 4.17 78 37.51
27 4.49 80 39.46
28 4.83 82 41.46
29 5.18 84 43.5
30 5.55 86 45.6
31 5.93 88 47.74
32 6.31 90 49.94
33 6.71 92 52.18
34 7.13 94 54.48
35 7.55 96 56.82
36 7.99 98 59.21
37 8.44 100 61.65
DAFTAR ANALISA BIAYA KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN (ANALISA SNI)
1 M3 PEKERJAAN RINGBALK 15 x 15
110.222 Kg Besi Rp.
4.444 M2 Bekisting Rp.
1.000 M3 Beton Rp.
2. Tenaga
0.620 OH Pekerja Rp.
0.350 OH Tukang batu Rp.
0.035 OH Kepala Tukang Rp.
0.030 OH Mandor Rp.
Jumlah (2) ……………………
Jumlah (1) + (2) ……………
1 M2 Pasang Dinding keramik 20 x 25 cm dan 30 x 30 cm Warna
1. Bahan
20.000 Bh Keramik 20 x 25 cm Rp.
12.000 Bh Keramik 30 x 30 cm Warna/Motif
9.300 Kg Semen portland Rp.
0.018 M3 Pasir pasang Rp.
1.500 Kg Semen warna Rp.
Jumlah(1) 20 x 25………………..
Jumlah (1) 30 x 30 …
2. Tenaga
0.600 OH Pekerja Rp.
0.450 OH Tukang batu Rp.
0.045 OH Kepala Tukang Rp.
0.030 OH Mandor Rp.
Jumlah (2) ……………………
Jumlah (1) + (2) 20 x 25………
Jumlah (1) + (2) 30 x 30
1M2 Pas. Batu Alam Palimanan
1. Bahan
1.050 M2 Batu Palimanan Rp.
11.750 Kg Semen PC (Tonasa) Rp.
0.035 M3 Pasir Pasang Rp.
1.500 Kg Semen Warna Rp.
0.620 OH Pekerja Rp.
0.030 OH Mandor Rp.
0.350 OH Tukang batu Rp.
0.035 OH Kepala Tukang Rp.
Jumlah ……………………
XIV. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN
1 M2 Pengecatan bidang kayu baru (1 lapis plamir,
1 lapis cat dasar, 2 lapis cat penutup)
1. Bahan
0.200 Kg Cat meni Rp.
0.150 Kg Plamuur Rp.
0.170 Kg Cat dasar Rp.
1 2 3 4
0.260 Kg Cat penutup 2 kali Rp.
Jumlah (1) ………………..
2. Tenaga
0.070 OH Pekerja Rp.
0.009 OH Tukang cat Rp.
0.006 OH Kepala Tukang Rp.
0.003 OH Mandor Rp.
Jumlah (2) ……………………
Jumlah (1) + (2) ……………
1 2 3 4
1 M2 Pengecatan Waterprofing
1. Bahan
1.252 Kg Cat Waterprofing Rp.
Jumlah (1) ………………..
2. Tenaga
0.070 OH Pekerja Rp.
0.009 OH Tukang cat Rp.
0.006 OH Kepala Tukang Rp.
0.003 OH Mandor Rp.
Jumlah (2) ……………………
Jumlah (1) + (2) ……………
1 M2 Pengecatan tembok baru/lama (1 lapis plamir,
1 lapis cat dasar, 2 lapis cat penutup) & Cat Eskterior
1. Bahan
0.100 Kg Plamur Rp.
0.100 Kg Cat dasar Rp.
0.260 Kg Cat Metrolite 2 x Rp.
0.260 Kg Cat Eksterior Rp.
Jumlah (1) Metrolite………………
Jml (1) Cat Eksterior ………
2. Tenaga
0.020 OH Pekerja Rp.
0.063 OH Tukang cat Rp.
0.006 OH Kepala Tukang Rp.
0.003 OH Mandor Rp.
Jml (2) ……………………
1. Bahan
0.700 Lbr Seng Spandek 3" x 6" 4mm Rp.
0.020 Kg Skrup/Paku Rp.
Jumlah (1) ………………..
2. Tenaga
0.200 OH Pekerja Rp.
0.100 OH Tukang kayu Rp.
0.010 OH Kepala Tukang Rp.
0.001 OH Mandor Rp.
Jumlah (2) ……………………
Jumlah (1) + (2) ……………
MEMASANG 1 M' ATAP NOK SPANDEK
1. Bahan
1.020 Lbr Nok Atap Spandek Rp.
0.050 Kg Skrup/Paku Rp.
Jumlah (1) ………………..
2. Tenaga
0.200 OH Pekerja Rp.
0.100 OH Tukang kayu Rp.
0.010 OH Kepala Tukang Rp.
0.001 OH Mandor Rp.
Jumlah (2) ……………………
Jumlah (1) + (2) ……………
1 M2 Pasang lantai Keramik 60 x 60 cm
1. Bahan
4.000 Bh Keramik 60 x 60 cm Rp.
14.150 Kg Semen portland Rp.
0.039 M3 Pasir pasang Rp.
2.000 Kg Semen warna Rp.
Jumlah (1) ………………..
2. Tenaga
0.620 OH Pekerja Rp.
0.350 OH Tukang batu Rp.
0.035 OH Kepala Tukang Rp.
0.030 OH Mandor Rp.
Jumlah (2) ……………………
Jumlah (1) + (2) ……………
XVI. ANALISA BIAYA KONSTRUKSI PEKERJAAN ALUMINIUM DAN BAJA RINGAN
1 M2 PASANG PINTU ALUMINIUM + KACA 5 MM LENGKAP ACCESORIES (ENGSEL,KUNCI & DOOR CLOSE)
1. BAHAN
1.100 M' Aluminium Ukuran Besar Rp.
2.000 bh Sekrup Pixer Rp.
0.060 tube Sealent Rp.
Jumlah (1) ………………..
2. TENAGA
0.043 Oh Pekerja Rp.
0.043 Oh Tukang besi Rp.
1 2 3 4
0.0043 Oh Kepala tukang Rp.
0.0021 Oh Mandor Rp.
Jumlah (2) ………………..
Jumlah 1 + 2………………..
1 M2 PASANG JENDELA ALUMINIUM + KACA 5 MM LENGKAP ACCESORIES (ENGSEL,KUNCI & DOOR CLOSE)
1. BAHAN
1.100 M' Aluminium Ukuran Kecil Rp.
0.470 M' Kaca Rayband 5 mm Rp.
0.100 M' Alat Bantu (Accesories) Rp.
Jumlah (1) ………………..
2. TENAGA
0.800 Oh Pekerja Rp.
2.000 Oh Tukang besi Rp.
0.200 Oh Kepala tukang Rp.
0.040 Oh Mandor Rp.
Jumlah (2) ………………..
Jumlah 1 + 2………………..
1 M2 PEKERJAAN KUSEN PINTU DAN RANGKA ALUMINIUM
1. BAHAN
10.500 M' Aluminium warna 4" Rp.
10.500 M' Aluminium warna 3" Rp.
0.100 M' Alat Bantu Rp.
Jumlah (1) Alinumium 3"
Jumlah (2) Alinumium 4"
2. TENAGA
0.900 Oh Pekerja Rp.
2.200 Oh Tukang besi Rp.
0.220 Oh Kepala tukang Rp.
0.090 Oh Mandor Rp.
Jumlah ………………..
Jumlah Aluminium 3"
Jumlah Aluminium 4"
1 M2 PASANG ATAP ALUMINIUM/SPANDEK (SNI. 03 - 3436 - 2002)
1. BAHAN
1.050 M2 Atap Spandek Zincalum Rp.
6.000 Bh Skrup Spandec Rp.
Jumlah (1) ………………..
2. TENAGA
0.150 Oh Pekerja Rp.
0.750 Oh Tukang Kayu Rp.
0.008 Oh Kepala Tukang Rp.
0.006 Oh Mandor Rp.
Jumlah (2) …………………
Jumlah (1 + 2 ) …………..
1 M2 PASANG NOK ALUMINIUM/SPANDEK (SNI. 03 - 3436 - 2002)
1. BAHAN
1.200 M2 Nok Spandek Zincalum Rp.
6.000 Bh Skrup Spandec Rp.
Jumlah (1) Alinumium 3"
2. TENAGA
0.100 Oh Pekerja Rp.
1.000 Oh Tukang Kayu Rp.
0.010 Oh Kepala Tukang Rp.
0.010 Oh Mandor Rp.
Jumlah ………………..
1 Buah Pasang Door Kloser
1. Bahan
1.000 Bh Door kloser Rp.
2. Tenaga
0.010 OH Pekerja Rp.
0.100 OH Tukang Rp.
0.010 OH Kepala Tukang Rp.
0.001 OH Mandor Rp.
Jumlah (2) ……………………
Jumlah (1) + (2) ……………
1 M2 PASANG DINDING ALUMINIUM + KACA 5 MM
1. BAHAN
1.100 M' Aluminium Ukuran Besar Rp.
1 2 3 4
1.000 m2 Kaca Ryben T. 5 mm Rp.
Jumlah (1) ………………..
2. Tenaga
0.043 Oh Pekerja Rp.
0.043 Oh Tukang besi Rp.
0.0043 Oh Kepala tukang Rp.
0.0021 Oh Mandor Rp.
Jumlah (2) ………………..
Jumlah 1 + 2………………..
1 M2 PASANG ATAP ALUMINIUM/SPANDEK (SNI. 03 - 3436 - 2002)
1. Bahan
1.050 M2 Atap Spandek Zincalum Rp.
6.000 Bh Skrup Spandec Rp.
Jumlah (1) ………………..
2. Tenaga
0.150 Oh Pekerja Rp.
0.750 Oh Tukang Kayu Rp.
0.008 Oh Kepala Tukang Rp.
0.006 Oh Mandor Rp.
Jumlah (2) ………………..
Jumlah 1 + 2………………..
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp.
12,500.00 Rp. 1,500,000.00
Rp.
Rp.
4 5
Rp.
Jumlah (1) ……………….. Rp. 1,500,000.00
4 5
- Rp. -
70,000.00 Rp. 52,500.00
95,000.00 Rp. 760.00
105,000.00 Rp. 630.00
Jumlah (2) ………………… Rp. 53,890.00
Jumlah (1 + 2 ) ………….. Rp. 107,780.00
O. BAHAN TAMBAHAN
Calsiboard 3" Lbr Rp.
Gypsum t = 6 mm Lbr Rp.
Lem CA-15 (20Kg/180M') M' Rp.
List Plafond Gypsum M' Rp.
Suspension Rod PN 225 Pcs Rp.
Siku Tembak + Pelor Set Rp.
OB 20 20 Kg Zak Rp.
Screw Pcs Rp.
Hollow Steel Galvanis 40 x 40, 0,5 Btg/2m Rp.
Hollow Steel Galvanis 20 x 40, 0,5 Btg/2m Rp.
WaterProofing Membrane M2 Rp.
Pintu Fiber bh Rp.
2. TENAGA KERJA
NO. URAIAN TENAGA KERJA SATUAN HARG
1. PEKERJA Hari Rp.
2. TUKANG
Tukang Gali Hari Rp.
Tukang Batu Hari Rp.
Tukang Kayu Hari Rp.
Tukang Besi Hari Rp.
Tukang Cat Hari Rp.
Tukang Listrik Hari Rp.
3. KEPALA TUKANG
Kepala Tukang Batu Hari Rp.
Kepala Tukang Kayu Hari Rp.
Kepala Tukang Besi Hari Rp.
Kepala Tukang Cat Hari Rp.
Kepala Tukang Listrik Hari Rp.
4. MANDOR Hari Rp.
ATAN
HARGA SATUAN
4
146,000.00
254,000.00
285,000.00
317,500.00
152,000.00
395,000.00
125,000.00
600.00
1,640.00
1,380.00
105,000.00
127,000.00
158,000.00
180,000.00
133,400.00
45,000.00
19,700.00
18,200.00
6,000.00
71,000.00
1,420.00
1,492.50
20,000.00
57,200.00
1,430.00
3,685.00
4,750.00
4,387.50
10,583.33
60,300.00
53,975.00
12,065,000.00
16,700,000.00
65,000.00
4,572,000.00
4,572,000.00
2,540,000.00
2,540,000.00
45,000.00
1,239,550.00
12,500.00
18,000.00
27,900.00
44,500.00
69,900.00
101,600.00
152,400.00
184,200.00
285,800.00
600,000.00
100,000.00
90,000.00
16,000.00
4
20,500.00
23,300.00
26,275.00
25,500.00
22,000.00
390,000.00
25,400.00
17,800.00
17,500.00
38,000.00
22,500.00
2,500.00
25,400.00
25,400.00
10,000.00
8,625.00
8,700.00
14,644.00
6,150.00
16,400.00
20,500.00
24,600.00
32,800.00
5,682.63
8,523.94
11,859.25
14,231.50
16,603.25
18,975.00
21,346.75
23,719.00
6,819.25
9,487.50
11,859.25
14,231.50
3,900.00
20,750
18,750.00
132,000.00
20,100.00
5,500.00
41,900.00
36,800.00
30,000.00
45,000.00
12,000.00
65,000.00
57,200.00
96,500.00
10,950.00
65,700.00
180,000.00
168,900.00
158,800.00
4
190,000.00
225,000.00
32,000.00
20,000.00
19,100.00
19,100.00
10,250.00
28,750.00
175,000.00
19,100.00
25,400.00
19,100.00
38,100.00
317,500.00
49,665.00
47,000.00
40,000.00
31,350.00
46,000.00
25,400.00
63,500.00
17,250.00
20,000.00
50,000.00
13,200.00
63,500.00
36,000.00
20,500.00
18,000.00
6,900.00
15,000.00
8,500.00
13,200.00
15,000.00
3,100.00
11,200.00
177,800.00
108,000.00
209,600.00
200,000.00
25,000.00
250,000.00
350,000.00
325,000.00
750,000.00
1,500,000.00
1,562,500.00
1,650,000.00
210,000.00
125,000.00
30,000.00
28,750.00
26,500.00
23,000.00
21,000.00
325,000.00
402,500.00
431,250.00
3,750,000.00
4,500.00
4
1,380.00
1,640.00
38,500.00
44,000.00
46,200.00
49,500.00
60,200.00
80,800.00
305,000.00
280,000.00
250,000.00
55,000.00
45,000.00
49,000.00
90,000.00
45,000.00
37,000.00
47,000.00
8,000.00
4,500.00
27,800.00
13,000.00
10,500.00
17,000.00
7,250.00
450,000.00
375,500.00
41,000.00
41,000.00
750.00
11,500.00
7,000.00
17,500.00
62,500.00
500.00
46,500.00
42,500.00
80,000.00
400,000.00
HARGA
70,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
105,000.00
105,000.00
105,000.00
105,000.00
105,000.00
120,000.00
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : INSPEKTORAT KAB. TAKALAR
SUMBER DANA : DANA ALOKASI UMUM (DAU) KAB. TAKALAR
PEKERJAAN : PEMBANGUNAN KANTOR INSPEKTORAT KAB. TAKALAR
T. ANGGARAN : 2016
LOKASI : KANTOR INSPEKTORAT KAB. TAKALAR
HARGA SAT.
NO. URAIAN PEKERJAAN VOLUME SAT.
(Rp.)
1 2 3 4 5
I PEKERJAAN PENDAHULUAN
1 Pas. Papan Nama Proyek 1.000 Ls 350,000.00
2 Pek. Bongkaran Bangunan Lama 1.000 Ls 16,855,500.00
3 Pek. Pembangunan Direksi Keet 1.000 Ls 5,000,000.00
4 Pek. Pembersihan dan Pas. Bouwplank 1.000 Ls 2,500,000.00
5 Pek. Administrasi, Dokumentasi dan Asbuildrawing 1.000 Ls 2,000,000.00
6 Pek. P3K dan Jamsostek 1.000 Ls 1,000,000.00
Sub Total I …………………………………
PEKERJAAN LANTAI 1
II PEKERJAAN TANAH & PASIR
1 Pek. Galian Tanah Pondasi dan Poer Plat 138.590 M3 32,800.00
2 Pek. Urugan Kembali Tanah Galian 55.436 M3 15,720.00
3 Pek. Urugan Pasir Bawah Pondasi 39.288 M3 174,600.00
4 Pek. Urugan Pasir Bawah Lantai 20.434 M3 174,600.00
5 Pek. Urugan Tanah Bawah Lantai + Halaman Kantor 982.025 M3 148,200.00
dipadatkan per 20 cm
Sub Total II …………………………………
III PEK. LANTAI, PASANGAN & PLESTERAN
1 Pek. Pasangan Batu Kosong 35.418 M3 320,925.00
2 Pek. Pasangan Pondasi Batu Gunung 1 : 4 106.301 M3 623,572.00
3 Pek. Pasangan Dinding Batu bata 1 : 5 598.000 M2 99,874.00
4 Pek. Plesteran Dinding Tembok 1 : 3 1,196.000 M2 54,217.40
5 Pek. List Profil Plesteran 15.500 M2 54,217.40
6 Pas. Plesteran Tali Air 24.000 M2 54,217.40
7 Pek. Acian Tembok 1,196.000 M2 13,549.80
Sub Total III ………………………………
IV PEKERJAAN BETON STRUKTUR
1 Pek. Lantai Kerja 1 : 3 : 5 2.400 M3 565,181.00
2 Pek. Pondasi Poer Plat 1 : 2 : 3 4.870 M3 3,890,944.90
3 Pek. Sloef Beton 15/20 cm 1 : 3 : 5 0.471 M3 3,861,846.50
4 Pek. Sloef Beton 20/35 cm 1 : 3 : 5 9.113 M3 3,861,846.50
5 Pek. Kolom Utama Beton Bertulang K1. 30/30 cm 10.600 M3 4,847,460.50
6 Pek. Kolom Utama Beton Bertulang K2. 15/15 cm 3.420 M3 4,847,460.50
7 Pek. Plat Beton Bertulang T. 12 cm 1 : 3 : 5 25.962 M3 4,612,514.50
8 Pek. Balok Induk Beton Bertulang 25/40 cm 15.880 M3 4,544,251.66
9 Pek. Balok Anak Beton Bertulang 20/30 cm 8.040 M3 4,544,251.66
10 Pek. Tangga Beton Bertulang 1.760 M3 4,612,514.50
11 Pek. Plat Beton Darfol T. 10 cm 2.470 M3 4,612,514.50
12 Pek. Rabat Beton Drof Off T. 10 cm 4.000 M3 565,181.00
13 Pas. Realing Tangga Steenlees 7.030 M3 600,000.00
Sub Total IV …………………………………
V PEKERJAAN KUSEN, PINTU, JENDELA
1 Pek. Kusen Kayu Kelas I 1.563 M3 15,837,500.00
2 Pek. Pas. Daun Pintu Panil Kelas I 7.100 M2 1,007,750.00
3 Pek. Pas. Daun Jendela Bingkai Kaca 7.315 M' 856,300.00
4 Pek. Pas. Ventilasi Angin 10.000 M2 75,000.00
5 Pek. Pas. Kaca Mati 5 mm 33.000 M2 212,545.00
6 Pek. Pas. Kunci Tanam 2 Slang 3.000 Bh 229,850.00
7 Pek. Pas. Engsel Pintu 6.000 Psg 31,310.00
8 Pek. Pas. Engsel Jendela 36.000 Psg 31,310.00
9 Pek. Pas. Grendel Jendela 18.000 Psg 30,410.00
10 Pek. Pas. Kait Angin 18.000 Bh 36,065.00
11 Pek. Kusen Pintu Aluminium Warna 4" 33.600 m' 397,250.00
12 Pek. Daun Pintu Aluminium Warna (Uk.Besar) + Panel 55.710 m2 124,148.50
Kaca Ryben 5 mm dan Aluminium Streep 8 mm
13 Pek. Dinding Aluminium Warna Uk. Besar + Kaca Buram 33.480 m' 327,398.50
14 Pas. Door Closer + Handle Pintu + Kunci Tanam 6.000 bh 236,310.00
15 Pas. Engsel Pintu 18.000 bh 31,310.00
16 Pas. Grendel Pintu 6.000 bh 30,410.00
Sub Total V…………………………………
TERBILANG :
"SATU MILYAR DELAPAN RATUS ENAM PULUH JUTA RUPIAH"
AMRULLAH, ST
IR. ACHSAN Direktur
Nip : 19730608 200903 1 001
Rp. 350,000.00
Rp. 16,855,500.00
Rp. 5,000,000.00
Rp. 2,500,000.00
Rp. 2,000,000.00
Rp. 1,000,000.00
Rp. 27,705,500.00
Rp. 4,545,752.00
Rp. 871,453.92
Rp. 6,859,684.80
Rp. 3,567,776.40
Rp. 145,536,105.00
Rp. 161,380,772.12
Rp. 11,366,521.65
Rp. 66,286,327.17
Rp. 59,724,652.00
Rp. 64,844,010.40
Rp. 840,369.70
Rp. 1,301,217.60
Rp. 16,205,560.80
Rp. 220,568,659.32
Rp. 1,356,434.40
Rp. 18,948,901.65
Rp. 1,818,929.70
Rp. 35,193,007.15
Rp. 51,383,081.30
Rp. 16,578,314.91
Rp. 119,750,101.45
Rp. 72,162,716.41
Rp. 36,535,783.37
Rp. 8,118,025.52
Rp. 11,392,910.82
Rp. 2,260,724.00
Rp. 4,218,000.00
Rp. 379,716,930.67
Rp. 24,754,012.50
Rp. 7,155,025.00
Rp. 6,263,834.50
Rp. 750,000.00
Rp. 7,013,985.00
Rp. 689,550.00
Rp. 187,860.00
Rp. 1,127,160.00
Rp. 547,380.00
Rp. 649,170.00
Rp. 13,347,600.00
Rp. 6,916,312.94
Rp. 10,961,301.78
Rp. 1,417,860.00
Rp. 563,580.00
Rp. 182,460.00
Rp. 82,527,091.72
Rp. 12,108,914.12
Rp. 81,760,307.20
Rp. 1,720,576.00
Rp. 5,149,026.00
Rp. 7,150,920.00
Rp. 7,926,888.75
Rp. 5,000,000.00
Rp. 120,816,632.07
Rp. 5,000,000.00
Rp. 611,000.00
Rp. 148,000.00
Rp. 850,000.00
Rp. 576,000.00
Rp. 266,000.00
Rp. 910,500.00
Rp. 83,000.00
Rp. 2,500,000.00
Rp. 10,944,500.00
Rp. 778,169.23
Rp. 1,178,745.00
Rp. 711,135.96
Rp. 1,572,900.00
Rp. 139,850.00
Rp. 98,550.00
Rp. 975,000.00
Rp. 1,293,750.00
Rp. 2,250,000.00
Rp. 6,000,000.00
Rp. 6,000,000.00
Rp. 20,998,100.19
Rp. 29,394,690.00
Rp. 913,994.55
Rp. 30,308,684.55
Rp. 43,624,963.20
Rp. 47,364,320.64
Rp. 623,500.10
Rp. 1,301,217.60
Rp. 11,837,105.28
Rp. 104,751,106.82
Rp. 12,690,651.59
Rp. 16,796,450.63
Rp. 11,165,226.34
Rp. 807,190.04
Rp. 8,071,900.38
Rp. 49,531,418.97
Rp. 12,021,081.93
Rp. 81,167,257.60
Rp. 3,089,415.60
Rp. 400,479.80
Rp. 744,887.50
Rp. 7,448,875.00
Rp. 4,732,932.60
Rp. 109,604,930.03
Rp. 16,138,412.50
Rp. 12,899,200.00
Rp. 4,281,500.00
Rp. 600,000.00
Rp. 6,748,303.75
Rp. 1,379,100.00
Rp. 407,030.00
Rp. 1,628,120.00
Rp. 790,660.00
Rp. 1,875,380.00
Rp. 46,747,706.25
Rp. 66,187,265.90
Rp. 4,824,041.25
Rp. 43,839,480.00
Rp. 1,897,344.00
Rp. 116,748,131.15
Rp. 5,000,000.00
Rp. 564,000.00
Rp. 185,000.00
Rp. 850,000.00
Rp. 448,000.00
Rp. 199,500.00
Rp. 637,350.00
Rp. 83,000.00
Rp. 7,966,850.00
Rp. 1,459,067.31
Rp. 884,058.75
Rp. 888,919.95
Rp. 1,048,600.00
Rp. 1,668,815.00
Rp. 139,850.00
Rp. 244,737.50
Rp. 131,400.00
Rp. 975,000.00
Rp. 2,250,000.00
Rp. 862,500.00
Rp. 10,552,948.51
Rp. 30,527,039.10
Rp. 10,338,063.90
Rp. 3,678,420.00
Rp. 44,543,523.00
Rp. 21,470,904.00
Rp. 7,022,283.30
Rp. 1,326,241.35
Rp. 29,819,428.65
Rp. 848,929.00
Rp. 2,650,181.00
Rp. 1,152,119.75
Rp. 95,302,500.00
Rp. 99,104,800.75
Rp. 4,404,443.40
Rp. 4,781,974.68
Rp. 678,043.38
Rp. 4,084,847.03
Rp. 13,949,308.49
Rp. 2,622,500.00
Rp. 2,622,500.00
JUMLAH
Rp. 27,705,500.00
Rp. 161,380,772.12
Rp. 220,568,659.32
Rp. 379,716,930.67
Rp. 82,527,091.72
Rp. 120,816,632.07
Rp. 10,944,500.00
Rp. 20,998,100.19
Rp. 30,308,684.55
Rp. 104,751,106.82
Rp. 49,531,418.97
Rp. 109,604,930.03
Rp. 46,747,706.25
Rp. 116,748,131.15
Rp. 7,966,850.00
Rp. 10,552,948.51
Rp. 44,543,523.00
Rp. 29,819,428.65
Rp. 99,104,800.75
Rp. 13,949,308.49
Rp. 2,622,500.00
Rp. 1,690,909,523.25
Rp. 169,090,952.33
Rp. 1,860,000,475.58
Rp. 1,860,000,000.00
SULTAN PERENCANA
A'EMPAT KONSULTAN
AMRULLAH, ST
Direktur
tahui /Menyetujui:
NAS PEKERJAAN UMUM
UPATEN TAKALAR
H. ALIMUDDIN
581231 198303 1 220
581231 198303 1 220