XIII.

BIAYA JASA PENUNJANG OPERASIONAL KEGIATAN

KODE HARGA HARGA


NO NAMA BARANG MERK / UKURAN SATUAN
BARANG SATUAN 2016 SATUAN 2015
1 2 3 4 5 6 7
22 BIAYA UPAH PENUNJANG KEGIATAN
22.01 BIAYA JASA NON PNS
2 22.01.01.01 Kepala Tukang
3 22.01.01.01.01 Kepala Tukang Batu O.H 80,000 70,000
4 22.01.01.01.03 Kepala Tukang Cat O.H 80,000 70,000
### 22.01.01.02.03 Tukang Cat OH 70,000 60,000
### 22.01.01.02.04 Tukang Cat Mobil OH 75,000 65,000
### 22.01.01.02.05 Tukang Gali Jalan OH 60,000 50,000
### 22.01.01.02.06 Tukang Gali Lumpur OH 60,000 50,000
4 Tukang Taman OH 70,000
Tukang Potong Rumput OH 60,000
22.01.01.03 Pekerja Terampil/ Pembantu Tukang
1 22.01.01.03.01 Colter/Kalibrasi O.H 400,000 400,000
8 22.01.01.03.04 Mekanik Pembantu OH 60,000 40,000
9 22.01.01.03.07 Pekerja (buruh tak trampil) OH 55,000 43,000
10 22.01.01.03.08 Pekerja (buruh agak trampil) OH 57,000 47,000
11 22.01.01.03.09 Pekerja (buruh trampil) OH 60,000 50,000
12 22.01.01.03.10 Pembantu Operator OH 60,000 47,000
13 22.01.01.03.11 Pembantu Sopir OH 47,000 47,000
14 22.01.01.03.12 Penganyam Bronjong OH 60,000 53,000
17 22.01.01.04.03 Asisten Driller OH 35,000 35,000
18 22.01.01.04.06 Tenaga Ahli Geologi OH 120,000 120,000
19 22.01.01.04.07 Tool Pusher OH 45,000 45,000
20 22.01.01.04.08 Watchman OH 37,500 37,500
22.01.02 JASA PEMELIHARAAN
22.01.02.01 Tenaga Perbaikan Mesin Penggerak
1 22.01.02.01.01 Pengecatan Mesin Unit 200,000 200,000
2 22.01.02.01.02 Penyempurnaan Panel Unit Bh 266,000 266,000
3 22.01.02.01.03 Perbaikan Knalpot Bh 200,000 200,000
4 22.01.02.01.04 Perbaikan Oil Pump Bh 100,000 100,000
5 22.01.02.01.05 Poles Liner Bh 86,500 86,500
6 22.01.02.01.06 Rebuilt Stang Piston Bh 80,500 80,500
7 22.01.02.01.07 Rekondisi Dinamo Amper Unit 1,106,500 1,106,500
8 22.01.02.01.08 Rekondisi Dinamo Stater Unit 1,328,000 1,328,000
9 22.01.02.01.09 Service Oil Cooller Bh 61,000 61,000
10 22.01.02.01.10 Skur Valve Bh 12,500 12,500
11 22.01.02.01.11 Slep dan Sentering As Cruck Bh 46,500 46,500
12 22.01.02.01.12 Test dan service Boschpump Unit 183,000 183,000
13 22.01.02.01.13 Test dan service Nozle Bh 70,000 70,000
22.01.02.02 Tenaga Pemeliharaan AC
1 22.01.02.02.01 Ganti Kompresor AC Windows 1 PK Unit 1,000,000 1,000,000
2 22.01.02.02.02 Ganti Kompresor AC Windows 1,5 PK Unit 2,000,000 2,000,000
3 22.01.02.02.03 Ganti Kompresor AC Windows 2 PK Unit 4,000,000 4,000,000
4 22.01.02.02.04 Isi Freon AC AC Split 0,5 - 1 PK Unit 175,000 175,000
5 22.01.02.02.05 Isi Freon AC AC Split 1,5 – 2 PK Unit 200,000 200,000
6 22.01.02.02.06 Isi Freon AC AC Split 2,5 – 2 PK Unit 350,000 350,000
7 22.01.02.02.07 Isi Freon AC AC Split 5 PK Unit 400,000 400,000
8 22.01.02.02.08 Pemeliharaan 1 PK AC Split Unit 75,000 75,000
9 22.01.02.02.09 Pemeliharaan 1 PK AC Windows Unit 75,000 75,000
10 22.01.02.02.10 Pemeliharaan 2 PK AC Split Unit 100,000 100,000
22.01.02.03 Tenaga Pemeliharaan Mesin Tulis
1 22.01.02.03.01 Service dan Perbaikan Mesin Calculator Unit 40,000 30,000
2 22.01.02.03.02 Service dan Perbaikan Mesin Hitung Listrik Unit 50,000 50,000
3 22.01.02.03.03 Service dan Perbaikan Mesin Hitung Manual Unit 40,000 40,000
4 22.01.02.03.04 Service dan Perbaikan Mesin Hitung Tangan Unit 25,000 25,000
5 22.01.02.03.05 Service dan Perbaikan Mesin Tulis KK Listrik Unit 75,000 75,000
8 22.01.02.04.02 Service/Tune up Unit 100,000 100,000
9 22.01.02.04.04 Turun Mesin Bensin Unit 500,000 500,000
10 22.01.03.01.03 Ahli Pembina Kepala S1 ( Pengalaman Kerja 23 Th ) OB 26,010,000 26,010,000
4 22.01.03.01.04 Ahli Pembina Kepala S1 ( Pengalaman Kerja 24 Th ) OB 26,610,000 26,610,000
5 22.01.03.01.05 Ahli Pembina Kepala S1 ( Pengalaman Kerja 25 Th ) OB 27,810,000 27,810,000
6 22.01.03.01.06 Ahli Pembina Kepala S2 ( Pengalaman Kerja 17 Th ) OB 27,810,000 27,810,000
7 22.01.03.01.07 Ahli Pembina Kepala S2 ( Pengalaman Kerja 18 Th ) OB 28,890,000 28,890,000
8 22.01.03.01.08 Ahli Pembina Kepala S2 ( Pengalaman Kerja 19 Th ) OB 29,970,000 29,970,000
9 22.01.03.01.09 Ahli Pembina Kepala S2 ( Pengalaman Kerja 20 Th ) OB 31,140,000 31,140,000
10 22.01.03.01.10 Ahli Pembina Kepala S2 ( Pengalaman Kerja 21 Th ) OB 32,220,000 32,220,000
11 22.01.03.01.11 Ahli Pembina Kepala S3 ( Pengalaman Kerja 13 Th ) OB 30,240,000 30,240,000
12 22.01.03.01.12 Ahli Pembina Kepala S3 ( Pengalaman Kerja 14 Th ) OB 31,410,000 31,410,000
13 22.01.03.01.13 Ahli Pembina Kepala S3 ( Pengalaman Kerja 15 Th ) OB 32,670,000 32,670,000

1
1 2 3 4 5 6 7
14 22.01.03.01.14 Ahli Pembina Kepala S3 ( Pengalaman Kerja 16 Th ) OB 33,840,000 33,840,000
15 22.01.03.01.15 Ahli Pembina Kepala S3 ( Pengalaman Kerja 17 Th ) OB 35,010,000 35,010,000
22.01.03.02 Tenaga Ahli Kepala
1 22.01.03.02.01 Ahli S1 ( Pengalaman Kerja 17 Th ) OB 20,610,000 20,610,000
2 22.01.03.02.02 Ahli S1 ( Pengalaman Kerja 18 Th ) OB 21,510,000 21,510,000
3 22.01.03.02.03 Ahli S1 ( Pengalaman Kerja 19 Th ) OB 22,410,000 22,410,000
4 22.01.03.02.04 Ahli S1 ( Pengalaman Kerja 20 Th ) OB 23,310,000 23,310,000
5 22.01.03.02.05 Ahli S2 ( Pengalaman Kerja 13 Th ) OB 23,400,000 23,400,000
6 22.01.03.02.06 Ahli S2 ( Pengalaman Kerja 14 Th ) OB 24,570,000 24,570,000
7 22.01.03.02.07 Ahli S2 ( Pengalaman Kerja 15 Th ) OB 25,650,000 25,650,000
8 22.01.03.02.08 Ahli S2 ( Pengalaman Kerja 16 Th ) OB 26,730,000 26,730,000
9 22.01.03.02.09 Ahli S3 ( Pengalaman Kerja 9 Th ) OB 25,470,000 25,470,000
10 22.01.03.02.10 Ahli S3 ( Pengalaman Kerja 10 Th ) OB 26,640,000 26,640,000
11 22.01.03.02.11 Ahli S3 ( Pengalaman Kerja 11 Th ) OB 27,900,000 27,900,000
12 22.01.03.02.12 Ahli S3 ( Pengalaman Kerja 12 Th ) OB 29,070,000 29,070,000
22.01.03.03 Tenaga Ahli Utama
1 22.01.03.03.01 Ahli Utama S1 ( Pengalaman Kerja 13 Th ) OB 17,010,000 17,010,000
2 22.01.03.03.02 Ahli Utama S1 ( Pengalaman Kerja 14 Th ) OB 17,910,000 17,910,000
3 22.01.03.03.03 Ahli Utama S1 ( Pengalaman Kerja 15 Th ) OB 18,810,000 18,810,000
4 22.01.03.03.04 Ahli Utama S1 ( Pengalaman Kerja 16 Th ) OB 19,710,000 19,710,000
5 22.01.03.03.05 Ahli Utama S2 ( Pengalaman Kerja 9 Th ) OB 19,080,000 19,080,000
6 22.01.03.03.06 Ahli Utama S2 ( Pengalaman Kerja 10 Th ) OB 20,160,000 20,160,000
7 22.01.03.03.07 Ahli Utama S2 ( Pengalaman Kerja 11 Th ) OB 21,240,000 21,240,000
8 22.01.03.03.08 Pekerjaan Finishing OB 22,320,000 22,320,000
1 22.01.03.03.10 Ahli Utama S3 ( Pengalaman Kerja 6 Th ) OB 21,870,000 21,870,000
11 22.01.03.03.11 Ahli Utama S3 ( Pengalaman Kerja 7 Th ) OB 23,130,000 23,130,000
12 22.01.03.03.12 Ahli Utama S3 ( Pengalaman Kerja 8 Th ) OB 24,300,000 24,300,000
22.01.03.04 Tenaga Ahli Madya
5 22.01.03.04.02 Ahli Madya S1 ( Pengalaman Kerja 10 Th ) OB 14,310,000 14,310,000
6 22.01.03.04.07 Ahli Madya S2 ( Pengalaman Kerja 7 Th ) OB 16,830,000 16,830,000
8 22.01.03.04.08 Ahli Madya S2 ( Pengalaman Kerja 8 Th ) OB 17,910,000 17,910,000
8 22.01.03.05 Tenaga Ahli Muda
3 22.01.03.05.03 Ahli Muda S1 ( Pengalaman Kerja 7 Th ) OB 11,610,000 11,610,000
1 22.01.03.08.02 Designer OB 5,000,000 5,000,000
2 22.01.03.08.03 Implementator OB 5,000,000 5,000,000
3 22.01.03.08.04 Manager Tim OB 7,000,000 7,000,000
5 22.01.03.08.05 Programer Senior OB 5,000,000 5,000,000
1 22.01.03.08.12 Tenaga Teknisi Hardware OH 75,000 75,000

2
XIII. BIAYA SEWA PERALATAN KEGIATAN

KODE HARGA HARGA


NO NAMA BARANG MERK / UKURAN SATUAN
BARANG SATUAN 2016 SATUAN 2015
1 2 3 4 5 6 6
21.02 BIAYA SEWA
21.02.01. SEWA ALAT KONTRUKSI
2 21.02.01.01.01 Alat Bantu Strouss Pile Jam 15,000 15,000
3 21.02.01.01.02 Alat Pancang Kapasitas; 10 T Jam 340,750 340,750
4 21.02.01.01.03 Aspalt Mixing Plant Jam 5,821,650 4,800,000
### 21.02.01.01.15 Excavator 80 - 140 HP; 0,8 m3 Jam 362,250 362,250
### 21.02.01.01.18 Fuel Tank truck Jam 114,030 114,030
### 21.02.01.01.19 Incinerator Jam 4,778 4,778
### 21.02.01.01.16 Jack hammer. 0,5 HP Jam 110,250 110,250
4 21.02.01.01.31 Pengadaan dan Pemasangan Unit 127,365 127,365
5 21.02.01.01.21 Piellscale (bahan
Pesawat Ukur Marmer)
(Poligone) Jam 57,645 57,645
6 21.02.01.01.22 Pile Driver + Hammer Jam 102,650 89,250
7 21.02.01.01.34 Pompa turbine Unit/Hari 26,565,000 26,565,000
8 21.02.01.01.23 Three Wheel Roller Kapasitas; 6-8 Ton Jam 151,650 149,900
9 21.02.01.01.40 Sprayer Selfprop Kapasitas; 1000 L Jam 54,600 54,600
10 21.02.01.01.26 Stone Crusher Jam 697,400 689,300
11 21.02.01.01.27 Tamper Vibr. Palte Kapasitas; 4 HP Jam 40,050 39,550
12 21.02.01.01.43 TC Bulan 69,300,000 69,300,000
13 21.02.01.01.28 Thandem Roller Kapasitas; 6-10 Ton Jam 378,650 374,300
14 21.02.01.01.29 Trailer 175 HP; 20 Ton Jam 619,500 619,500
15 21.02.01.02.02 Alat Bantu Unit 91,850 91,850
16 21.02.01.02.03 Alat Bantu Pemasangan Stoplog Unit/Hari 42,750 42,750
17 21.02.01.02.09 Ganco Unit/Hari 6,380 6,380
18 21.02.01.02.12 Gergaji Kayu Unit/Hari 6,380 6,380
19 21.02.01.02.13 Gerobak Unit/Hari 36,300 36,300
20 21.02.01.02.14 Hand Sprayer Unit/ Hari 9,570 9,570
21 21.02.01.02.15 Kayu pemikul & tampar. Unit/Hari 12,705 12,705
22 21.02.01.02.16 Kereta dorong Unit/Hari 6,380 6,380
23 21.02.01.02.17 Kompor minyak tanah Unit/Hari 6,380 6,380
24 21.02.01.02.18 Kunci Pemotong Baja Unit/Hari 3,850 3,850
25 21.02.01.02.19 Linggis Unit/Hari 2,255 2,255
26 21.02.01.02.20 Palu Besi/ Kayu 6 Pon Unit/Hari 1,925 1,925
7 21.02.01.02.29 Sekop Unit/Hari 12,705 12,705
8 21.02.01.02.30 Senter Unit/Hari 3,190 3,190
9 21.02.01.02.31 Service Timer Unit 254,100 254,100
10 21.02.01.02.32 Bahan Las/Bahan Lain Unit/Hari 50,820 50,820
33 21.02.01.02.33 Alat Scafolding Uk. 2 x 1,8 m Set/Hari 23,000 22,750
21.02.01.03. Sewa Alat Ukur
1 21.02.01.03.01 Sewa Alat Ukur Theodolit Unit/Hari 202,400 202,400
2 21.02.01.03.02 Sewa Waterpass Unit/Hari 6,800 6,800
21.02.03. SEWA ALAT TRANSPORTASI
21.02.03.01. Sewa Mobil Angkutan Barang
1 21.02.03.01.01 Dump Truck Kapasitas 10 T Jam 340,000 340,000
2 21.02.03.01.02 Dump Truck Kapasitas 3.5 T Jam 280,000 280,000
3 21.02.03.01.03 Flat Bed Truck Kapasitas 3 - 4 m3, 10.0 Ton Jam 231,450 210,000
4 21.02.03.01.04 Mobil Pick Up Dalam Kota Unit/ Hari 372,450 315,000
5 21.02.03.01.05 Mobil Pick Up Luar Kota Unit/ Hari 595,650 525,000
6 21.02.03.01.06 Truck Tangki Air Unit/Hari 866,250 866,250
7 21.02.03.01.07 Water Tank 100 HP;4000 Liter Jam 345,800 345,800
9 21.02.03.01.08 Truk Angkut Luar Propinsi Jam 126,000 126,000
10 21.02.03.01.09 Truk Angkut (Arm Roll 14 m3) Jam 120,000 120,000
11 21.02.03.01.11 Dalam Kota
Truk Angkutan Dalam Kota Jam 126,213 126,213
12 21.02.03.01.10 Mesin Gilas 3 Roda 8-10 T Jam 120,000 120,000
13 21.02.03.01.11 Mesin Penyemprot Aspal 200 L Jam 41,000 41,000
14 21.02.03.01.14 Dump Truck Kapasitas 5T/145 HP Jam 21,000 21,000
15 21.02.03.01.12 Stamper 4 HP Jam 21,000 21,000
16 21.02.03.01.13 Operasional Mesin Las Jam 63,000 63,000
17 21.02.03.01.17 Pan Mixer Jam 315,000 315,000
18 21.02.03.01.18 Truk Mixer Jam 217,000 217,000
21.02.04 SEWA PERLENGKAPAN DAN PERALATAN KANTOR
21.02.04.06 Sewa Alat Penerangan/Listrik
1 21.02.04.06.01 Generator Selama 12 Jam, 3000 Watt Set/Hari 1,724,600 1,692,600
2 21.02.04.06.02 Generator Selama 12 Jam, 5000 Watt Set/Hari 2,299,400 2,256,800
3 21.02.04.06.03 Generator Set 125 KVA Set/Hari 202,400 202,400
21.02.04.17 Sewa Pakaian Lapangan
1 21.02.04.17.01 Sewa Jas Hujan Buah 10,200 10,200
2 21.02.04.17.02 Sewa Masker Plastik Buah 2,750 2,750
3 21.02.04.17.03 Sewa Sarung Tangan Buah 2,750 2,750
4 21.02.04.17.04 Sewa Sepatu Karet Sepatu Boot Buah 6,800 6,800
1 2 3 4 5 6 6
5 21.02.04.17.05 Sewa Seragam Ketelpak Buah 67,500 67,500
6 21.02.04.17.06 Sewa Topi Ranger Buah 6,800 6,800
8 21.01.05.01.02 Biaya Air m3 3,100 3,100
9 21.01.05.01.04 Biaya Listrik 450 Watt Kwh 800 800
DAFTAR REKAPITULASI
HARGA SATUAN POKOK KEGIATAN

NO URAIAN KEGIATAN SATUAN HSPK ( Perenc. )

A Pekerjaan Persiapan
1 Pagar sementara seng gelombang tinggi 2 m m1 Rp 229,462.79
2 Pengukuran dan pemasangan bowplank m1 Rp 119,639.90
3 Uitzet Dengan WaterPass / Theodolit Hari Rp 442,400.00
4 Pembersihan Lapangan dan Perataan m2 Rp 10,000.00
Pekerjaan Tanah
1 Galian tanah biasa sedalam 1 meter m3 Rp 43,500.00
2 Galian tanah biasa sedalam 2 meter m3 Rp 53,550.00
3 Galian tanah keras sedalam 1 meter m3 Rp 57,880.00
4 Pengurugan tanah kembali untuk gedung m3 Rp 10,879.50
5 Pengurugan tanah kembali untuk jembatan m3 Rp 21,750.00
6 Pengurugan tanah dengan pemadatan m3 Rp 110,500.00
7 Pengurugan Pasir (PADAT) m3 Rp 169,200.00
8 Galian Tanah biasa untuk Timbunan / dibuang m3 Rp 42,375.00
9 Timbunan Tanah Kembali Dipadatkan dan Dirapikan (manual) m3 Rp 42,755.60
10 Pemadatan Tanah Timbunan dan dirapikan (Mekanis) m3 Rp 15,720.00
11 Pemadatan Tanah Timbunan dan dirapikan (Manual) m3 Rp 17,149.00
12 Timbunan Tanah dari Luar dipadatkan dan dirapikan (mekanis) m3 Rp 131,364.24
13 Timbunan Tanah dari Luar dipadatkan dan dirapikan (manual) m3 Rp 121,888.88
14 Timbunan Sirtu dipadatkan dan dirapikan (manual) m3 Rp 295,369.40
15 Pembuatan lubang strouss pile diameter 25 cm m1 Rp 28,799.50
16 Pembuatan lubang strouss pile diameter 30 cm m1 Rp 34,560.00
17 Galian Tanah Untuk Konstruksi Menggunakan Buruh m3 Rp 55,570.00
18 Pekerjaan Galian tanah Menggunakan Alat Berat m3 Rp 117,657.28
B Pekerjaan Pondasi
1 Pemasangan Batu Kali Belah 15/20 cm ( 1Pc : 1 Ps) m3 Rp 1,031,938.00
2 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 2 Ps) m3 Rp 852,573.00
3 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps) m3 Rp 770,048.00
4 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 4 Ps) m3 Rp 714,017.00
5 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 4 Ps) Bangunan Air m3 Rp 833,896.15
6 Pasangan Batu Kali Belah 15/20 cm (1 Pc : 5 Ps) m3 Rp 675,164.00
7 Pengadaan Tiang Pancang 30 x 30 cm m1 Rp 285,125.00
8 Pemancangan Tiang Pancang 30 x 30 cm m1 Rp 105,112.50
C Pekerjaan Beton
1 Bekisting untuk Beton Struktur Menggunakan Buruh m2 Rp 158,877.00
2 Pasang bekisting untuk pondasi m2 Rp 201,567.00
3 Pasang bekisting untuk sloof m2 Rp 219,387.25
4 Pasang bekisting untuk kolom m2 Rp 429,126.75
5 Pasang bekisting untuk kolom Bahan Kayu dipakai 2 Kali m2 Rp 252,453.38
6 Pasang bekisting untuk balok m2 Rp 452,918.70
7 Pasang bekisting untuk balok Bahan Kayu dipakai 2 kali m2 Rp 264,349.35
8 Pasang bekisting untuk lantai m2 Rp 502,526.75
9 Pasang bekisting untuk lantai Bahan Kayu dipakai 2 kali m2 Rp 289,153.38
10 Pasang bekisting untuk tangga m2 Rp 393,068.75
11 Pasang bekisting untuk tangga Bahan Kayu dipakai 2 kali m2 Rp 234,215.63
12 Pasang bekisting Beton dengan Perancah Stager m2 Rp 412,426.75
13 Pembesian dengan besi polos Kg Rp 15,004.75
14 Pembesian dengan besi Ulir Kg Rp 15,214.75
15 Pegecoran Beton Site Mix dengan Mutu K 100 ( Konvensional ) m3 Rp 947,379.52
16 Pegecoran Beton Site Mix dengan Mutu K 125 ( Konvensional ) m3 Rp 990,448.83
17 Pegecoran Beton Site Mix dengan Mutu K 150 ( Konvensional ) m3 Rp 1,024,310.10
18 Pengecoran Beton Site Mix untuk Lantai Kerja ( Konvensional ) m3 Rp 894,966.70
19 Pegecoran Beton Site Mix dengan Mutu K 175 ( Konvensional ) m3 Rp 1,064,235.07
20 Pegecoran Beton Site Mix dengan Mutu K 200 ( Konvensional ) m3 Rp 1,102,555.37
21 Pegecoran Beton Site Mix dengan Mutu K 225 ( Konvensional ) m3 Rp 1,130,982.14

5
NO URAIAN KEGIATAN SATUAN HSPK ( Perenc. )

22 Pegecoran Beton Site Mix dengan Mutu K 250 ( Konvensional ) m3 Rp 1,150,131.83


23 Pegecoran Beton Site Mix dengan Mutu K 275 ( Konvensional ) m3 Rp 1,183,063.77
24 Pegecoran Beton Site Mix dengan Mutu K 300 ( Konvensional ) m3 Rp 1,193,283.17
25 Pegecoran Beton Site Mix dengan Mutu K 325 ( Konvensional ) m3 Rp 1,264,138.32
26 Pegecoran Beton Site Mix dengan Mutu K 350 ( Konvensional ) m3 Rp 1,277,528.20
27 Pegecoran Beton Ready Mix dengan Mutu K 125 ( untuk kapasitas besar ) m3 Rp 1,112,706.16
28 Pegecoran Beton Ready Mix dengan Mutu K 150 ( untuk kapasitas besar ) m3 Rp 1,146,567.44
29 Pengecoran Beton Ready Mix dengan Mutu K 175 ( untuk kapasitas besar ) m3 Rp 1,186,492.40
30 Pengecoran Beton Ready Mix dengan Mutu K 200 ( untuk kapasitas besar ) m3 Rp 1,224,812.70
31 Pengecoran Beton Ready Mix dengan Mutu K 225 ( untuk kapasitas besar ) m3 Rp 1,253,239.48
32 Pengecoran Beton Ready Mix dengan Mutu K 250 ( untuk kapasitas besar ) m3 Rp 1,272,389.16
33 Pengecoran Beton Ready Mix dengan Mutu K 275 ( untuk kapasitas besar ) m3 Rp 1,305,321.10
34 Pengecoran Beton Ready Mix dengan Mutu K 300 ( untuk kapasitas besar ) m3 Rp 1,315,540.50
35 Pengecoran Beton Ready Mix dengan Mutu K 325 ( untuk kapasitas besar ) m3 Rp 1,386,395.65
36 Pengecoran Beton Ready Mix dengan Mutu K 350 ( untuk kapasitas besar ) m3 Rp 1,399,785.54
37 Membuat Pondasi Beton Bertulang dg150 Kg Besi dan Bekisting m3 Rp 4,260,356.00
38 Membuat Beton Bertulang Strous dg150 Kg Besi m3 Rp 3,216,555.50
39 Membuat Beton Bertulang Slouf (200 Kg Besi + Bekisting) m3 Rp 5,282,622.00
40 Membuat Kolom Praktis Beton Bertulang Uk 11 x 11 cm m1 Rp 80,903.15
41 Membuat Ring Balok Beton Bertulang Uk.10 x 15 cm m1 Rp 99,348.40
42 Membuat Kolom Beton Bertulang dg 200 Kg Besi dan Bekisting m3 Rp 7,390,469.50
43 Membuat Balok Beton Bertulang dg 200 Kg Besi dan Bekisting m3 Rp 7,380,215.50
44 Membuat Plat Lantai Beton Bertulang dg 150 Kg Besi dan Bekisting m3 Rp 6,702,830.00
45 Membuat Tangga Beton Bertulang dg 200 Kg Besi dan Bekisting m3 Rp 6,602,098.75
46 Pembongkaran Cetakan Dan Penyiraman Beton m3 Rp 165,000.00
Pekerjaan Besi & Baja
1 Ongkos kerja Perakitan dan Pemasangan Baja (Erection) Kg Rp 840.00
2 Pekerjaan Besi Plat Bordes Kg Rp 24,470.00
3 Pekerjaan Besi Plat Tebal 2 mm Kg Rp 24,470.00
4 Pekerjaan Besi Plat Strip Kg Rp 24,470.00
5 Pekerjaan Besi Baja Profil WF Kg Rp 25,045.00
6 Pekerjaan Besi Baja Kanal C Kg Rp 23,895.00
7 Pekerjaan Besi Baja siku untuk rangka Kg Rp 24,470.00
8 Pemasangan Pipa/Buis Beton dia 30-100 cm m1 Rp 162,372.20
9 Pasangan Gorong-Gorong Buis Beton dia.40 cm dg Cincin Batu Bata m1 Rp 354,451.32
10 Lantai Kerja m3 Rp 825,722.51
11 Pembesian dengan Besi Wiremesh M6 m2 Rp 42,045.38
D Pekerjaan Dinding dan Plesteran
1 Pemasangan Batu Merah tebal 1 bata (1 Pc : 2 Ps) m2 Rp 249,936.50
2 Pemasangan Batu Merah tebal 1/2bata (1 Pc : 2 Ps) m2 Rp 119,727.05
3 Pemasangan Batu Merah tebal 1 bata (1 Pc : 3 Ps) m2 Rp 235,193.05
4 Pemasangan Batu Merah tebal 1/2 bata (1 Pc : 3 Ps) m2 Rp 112,577.23
5 Pemasangan Batu Merah tebal 1 bata (1 Pc : 4 Ps) m2 Rp 224,987.45
6 Pemasangan Batu Merah tebal 1/2bata (1 Pc : 4 Ps) m2 Rp 108,568.50
7 Pemasangan Batu Merah tebal 1 bata (1 Pc : 5 Ps) m2 Rp 220,113.80
8 Pemasangan Batu Merah tebal 1/2bata (1 Pc : 5 Ps) m2 Rp 106,052.72
9 Pemasangan Batu Merah tebal 1 bata (1 Pc : 6 Ps) m2 Rp 219,301.50
10 Pemasangan Batu Merah tebal 1/2bata (1 Pc : 6 Ps) m2 Rp 104,849.28
11 Pasang Bataco m2 Rp 128,665.00
12 Pasang dinding rooster Tera Kota 10x10x20 cm m2 Rp 416,296.00
13 Pasang dinding rooster Abu-abu 10x20x40 cm m2 Rp 184,421.00
14 Plesteran 1 Pc : 2 Ps tebal 15 mm m2 Rp 51,366.10
15 Plesteran 1 Pc : 3 Ps tebal 15 mm m2 Rp 48,065.90
16 Plesteran speci 1 Pc : 3 Ps tebal 15 mm untuk bangunan basah m2 Rp 56,305.40
17 Plesteran 1 Pc : 4 Ps tebal 15 mm m2 Rp 45,756.96
18 Plesteran 1 Pc : 5 Ps tebal 15 mm m2 Rp 44,523.94
19 Plesteran 1 Pc : 6 Ps tebal 15 mm m2 Rp 43,504.46
20 Plesteran 1 Pc : 2 Ps tebal 20 mm m2 Rp 68,754.77
21 Plesteran 1 Pc : 3 Ps tebal 20 mm m2 Rp 64,357.87

6
NO URAIAN KEGIATAN SATUAN HSPK ( Perenc. )

22 Plesteran 1 Pc : 4 Ps tebal 20 mm m2 Rp 61,189.28


23 Plesteran 1 Pc : 5 Ps tebal 20 mm m2 Rp 59,635.25
24 Plesteran 1 Pc : 6 Ps tebal 20 mm m2 Rp 58,185.95
25 Plesteran Skoning 1 Pc : 3 Ps Lebar 10 Cm m1 Rp 38,309.50
26 Plesteran Benangan Sudut m1 Rp 10,204.50
27 Plesteran Ciprat 1 Pc : 2 Ps m2 Rp 34,023.28
28 Plesteran Siar adukan 1 Pc : 2 Ps untuk pasangan batu kali m2 Rp 42,684.86
29 Plesteran Siar adukan 1 Pc : 2 Ps untuk bangunan basah m2 Rp 42,231.30
30 Acian m2 Rp 24,656.75
31 Pemasangan Batu Merah Kosongan tebal 1 bata m2 Rp 143,067.00
E Pekerjaan Finishing
1 Pasangan plint keramik 10x20 cm m1 Rp 51,516.06
2 Pasangan lantai keramik motif 20x20 cm m2 Rp 174,022.60
3 Pasangan lantai keramik motif 30x30 cm m2 Rp 178,273.39
4 Pasangan lantai keramik Motif 40x40 cm m2 Rp 183,971.25
5 Pasangan lantai keramik polos 40x40 cm m2 Rp 174,136.75
6 Pasangan lantai Vinil m2 Rp 386,912.50
7 Pasangan Dinding keramik motif 20x25 cm m2 Rp 190,939.70
8 Pasangan lantai keramik Kasar 40x40 cm m2 Rp 206,844.75
F Pekerjaaan Rangka Atap
1 Pasang rangka atap Galvalume m2 Rp 263,995.00
2 Pasang Usuk + Reng Galvalume m2 Rp 218,254.93
3 Pasang Rangka Atap Hollow m2 Rp 259,024.75
Penutup Atap
1 Pasang Atap Genteng Keramik m2 Rp 160,460.00
2 Pasang Atap Fiber Glass m2 Rp 54,785.00
3 Pasang Penutup Atap Zincalum m2 Rp 112,040.00
4 Pasang Atap Spandek m2 Rp 114,431.25
5 Pasang Nok Genteng Beton lokal m1 Rp 117,623.20
6 Pasang Genteng Wuwung Beton Setara Ex. Cisangkan m1 Rp 168,948.20
7 Pasang rangka stainless dan atap polycarbonate m2 Rp 746,668.50
8 Pasang genteng Wuwung Plam lokal m1 Rp 94,939.65
9 Pasang genteng Wuwung ex. Trenggalek m1 Rp 90,602.00
10 Pasang genteng Wuwung ex.Karangpilang m1 Rp 133,602.00
11 Pemasangan Wuwung/Jurai Genteng Galvalume m1 Rp 60,470.00
12 Pasang Talang dari Seng BJLS 30 (lebar 60cm) m1 Rp 169,240.60
13 Pasang Talang dari Seng BJLS 30 (lbr 90cm) m1 Rp 194,265.60
14 Pasang Talang dari Seng BJLS 40 (lebar 60 cm) m1 Rp 181,540.60
15 Pasang Talang dari Seng BJLS 40 (lbr 90cm) m1 Rp 198,440.60
16 Pasang Alluminium Foil t=4mm m2 Rp 51,985.54
Plafon
1 List langit - langit gypsum m1 Rp 28,385.00
2 Pekerjaan Langit-langit Calsiboard tebal 6mm m2 Rp 60,296.30
3 Pemasangan Papan Reiuter m1 Rp 32,469.00
4 Pemasangan Kompres Atap m1 Rp 48,569.70
5 Pemasangan Rangka Plafond Hollow Galvalume (0,5 X 1) m2 Rp 119,634.27
6 Pasang Kalsiplank Lebar 30 Cm #REF! Rp 43,961.25
7 Pasang Rangka Lisplank Hollow Galvalume m2 Rp 109,579.77
8 Pasang Lisplank GRC Board m2 Rp 135,976.00
G Pekerjaan Kusen, Pintu, & Jendela
1 Pasang Kaca Mati tebal 5 mm m2 Rp 146,490.00
2 Pasang Kaca Mati Rayban tebal 5 mm m2 Rp 156,722.50
3 Pasang Kaca Mati tebal 8 mm m2 Rp 194,032.50
4 Pasang Kaca Mati tebal 10 mm m2 Rp 269,877.50
5 Pasang Kaca Tempered Warna tebal 8 mm m2 Rp 797,272.50
6 Pasang Kaca Tempered Warna tebal 12 mm m2 Rp 1,728,648.50
7 Pasang dinding Lambriziring kayu kamper m2 Rp 267,004.35
8 Pemasangan Kunci Tanam Kamar mandi Buah Rp 82,695.00
9 Pemasangan Kunci Tanam Pintu Almunium Buah Rp 486,000.00

7
NO URAIAN KEGIATAN SATUAN HSPK ( Perenc. )

10 Pemasangan Engsel Pintu Buah Rp 22,342.50


11 Pemasangan Engsel Jendela Kupu-Kupu Buah Rp 17,845.00
12 Pemasangan Kait Angin Buah Rp 32,492.50
13 Pemasangan Hak Angin Lurus Kuningan Buah Rp 52,392.50
14 Pemasangan Engsel Hidrolis Pintu Almunium Buah Rp 837,040.00
15 Pemasangan Grendel Biasa (Besar) Buah Rp 22,100.00
16 Pemasangan Grendel Biasa (Kecil) Buah Rp 14,250.00
17 Pemasangan Grendel Tanam Buah Rp 76,350.00
18 Pemasangan Door Holder Buah Rp 138,470.00
19 Pemasangan Door Stoper Buah Rp 128,400.00
20 Pemasangan Door Kloser Buah Rp 202,670.00
21 Pemasangan Rel Pintu Dorong Buah Rp 369,670.00
22 Pemasangan Fitrase ex. Corais & aquirlda m2 Rp 80,115.00
23 Pemasangan Vertical Blind ex. Shin ichi m2 Rp 186,170.00
24 Pemasangan Lapisan Foam untuk Karpet m2 Rp 76,056.25
25 Pemasangan Karpet Wool ex. Aloha m2 Rp 71,820.00
26 Pemasangan Kawat Nyamuk (Kassa Plastik) m2 Rp 56,719.70
27 Pemasangan Kawat Nyamuk (Kassa Aluminium) m2 Rp 160,064.70
28 Pemasangan Kusen Alumunium Profil 4" Polos m1 Rp 110,965.00
29 Pemasangan Kusen Alumunium Profil 4" Warna m1 Rp 122,955.00
30 Pemasangan Slimar Alumunium Profil 3/8" Dg Kaca Rayben 5 mm m2 Rp 466,438.00
31 Pemasangan Pintu Kaca Tb.12 mm Rangka Aluminium m2 Rp 878,726.50
32 Pemasangan Pintu WPVC lebar 90 - 120 Unit Rp 3,223,272.50
33 Pemasangan Pintu WPVC lebar 160 - 180 Unit Rp 3,290,366.50
Sanitair
1 Pemasangan Dasar Saluran R.25 Segmen m1 Rp 127,250.00
2 Pemasangan Dasar Saluran R.15 Segmen m1 Rp 89,900.00
3 Pemasangan Dasar Saluran R.25 (1/2 lingkaran) m1 Rp 85,240.00
4 Pemasangan Kran Air dia.3/4" atau 1/2" Buah Rp 27,410.00
5 Pemasangan Kloset Jongkok Porselen Buah Rp 335,074.00
6 Pemasangan Kloset Duduk ex. Toto komplit Buah Rp 2,854,812.00
7 Pemasangan Wastafel ex. KIA Buah Rp 552,830.00
8 Pemasangan Wastafel ex. TOTO Buah Rp 681,530.00
9 Pemasangan Urinoir Buah Rp 1,490,449.00
10 Memasang Bak Kontrol Pasangan Batu bata uk 30 x 30 cm, Tinggi 35 cm Buah Rp 350,132.50
11 Pemasangan Bak cuci piring stainless steel dan accessories Buah Rp 209,900.00
12 Pemasangan Floor Drain Buah Rp 60,200.00
13 Pemasangan Kran Bebek Fio 10 JC Buah Rp 124,350.00
14 Pekerjaan Besi Pipa Stainless 5/8 " m1 Rp 58,614.73
15 Pekerjaan Besi Pipa Stainless 1.25 " m1 Rp 70,876.38
16 Pekerjaan Besi Pipa Stainless 1.5 " m1 Rp 93,694.43
17 Pekerjaan Besi Pipa Stainless 2 " m1 Rp 133,806.09
18 Pemasangan Pipa Galvanis Termasuk Elektrode m1 Rp 7,706.40
19 Pemasangan Pipa Galvanis Diameter 3/4 " m1 Rp 61,728.75
20 Pemasangan Pipa Galvanis Diameter 1 " m1 Rp 94,653.33
21 Pekerjaan Besi Pipa Galvanis 2 " (Medium) m1 Rp 149,036.10
22 Pemasangan Pipa Galvanis Diameter 3 " m1 Rp 275,333.48
23 Pemasangan Pipa Galvanis Diameter 4 " m1 Rp 467,182.92
24 Pengadaan dan Pemasangan Pipa GI Dia. 3/4" m1 Rp 73,968.75
25 Pengadaan dan Pemasangan Pipa GI Dia. 1" m1 Rp 106,893.33
26 Pengadaan dan Pemasangan Pipa GI Dia.1,5" m1 Rp 163,636.00
27 Pengadaan dan Pemasangan Pipa GI Dia. 2" m1 Rp 224,062.00
28 Pengadaan dan Pemasangan Pipa GI Dia. 3" m1 Rp 342,803.08
29 Pengadaan & Pemasangan Pipa GI Dia. 4" m1 Rp 492,319.92
30 Pengadaan & Pemasangan Pipa GI Dia. 6" m1 Rp 783,694.00
31 Pasang Pipa PVC Type AW dia. 3/4" m1 Rp 20,141.25
32 Pasang Pipa PVC Type AW dia. 1" m1 Rp 23,667.50
33 Pasang Pipa PVC Type AW dia. 2" m1 Rp 56,600.63
34 Pasang Pipa PVC Type AW dia. 3" m1 Rp 100,365.63

8
NO URAIAN KEGIATAN SATUAN HSPK ( Perenc. )

35 Pasang Pipa PVC Type AW dia. 4" m1 Rp 139,561.25


36 Pemasangan Pipa PVC 3" Type AW untuk Talang Pembuluh m1 Rp 65,287.88
37 Pemasangan Pipa PVC 4" Type AW untuk Talang Pembuluh m1 Rp 90,828.25
38 Pemasangan Pipa PVC 5" Type AW untuk Talang Pembuluh m1 Rp 128,311.88
39 Pemasangan Pipa PVC 3" Type D untuk Talang Pembuluh m1 Rp 40,719.63
40 Pemasangan Pipa PVC 4" Type D untuk Talang Pembuluh m1 Rp 53,445.63
41 Pemasangan Pipa PVC 5" Type D untuk Talang Pembuluh m1 Rp 81,309.00
Pengg. Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia
42 m1 Rp 548,748.83
12 "
Pengg. Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia
43 m1 Rp 286,890.50
8Pengg.
" Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia
44 m1 Rp 192,016.07
6"
45 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 1" P. 6 m m1 Rp 73,530.00
46 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 2" P. 6 m m1 Rp 194,645.04
47 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 3" P. 6 m m1 Rp 389,762.30
48 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 4" P. 6 m Batang Rp 600,172.47
49 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 6" P. 6 m Batang Rp 1,191,560.00
Pengecatan
1 Membersihkan permukaan cat tembok lama m2 Rp 9,520.00
2 Mengerok Karat Cat Lama Permukaan Baja secara Manual m2 Rp 11,317.50
3 Pekerjaan Coating m2 Rp 64,256.80
4 Pengecatan Tembok dalam Baru 2 Lapis (Interior Standar) m2 Rp 22,773.70
5 Pengecatan Tembok dalam Baru 2 Lapis (Interior Khusus) m2 Rp 51,778.00
6 Pengecatan Tembok luar Baru 2 Lapis (Eksterior) m2 Rp 75,254.50
7 Pengecatan Permukaan Baja dengan Meni Besi m2 Rp 19,891.50
8 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah m2 Rp 43,091.50
Pengecatan Permukaan Baja lapis seng (galbani) scr manual sistem 1 lapis cat
9 m2 Rp 27,086.50
mutakhir tbl 200 mm
10 Pengecatan Plafond m2 Rp 22,773.70
11 Pengecatan Genteng m2 Rp 31,244.88
12 Pelapisan Waterproofing m2 Rp 28,182.50
Finishing Dinding
1 Pemasangan Batu Palimanan/ Hijau + Finishing m2 Rp 283,358.25
2 Pemasangan Wall Paper m2 Rp 39,375.00
3 Pemasangan HPL 1,2 x 2,4 m2 Rp 105,968.41
Perkerasan Paving
1 Pemasangan Paving Stone (Blok) Tbl.8 cm ( Lokal Kw 1) m2 Rp 146,275.00
2 Pemasangan Paving Conblock Tbl.8 cm abu-abu m2 Rp 198,250.00
3 Pemasangan Paving Conblock Tbl.6 cm Warna m2 Rp 203,500.00
4 Pemasangan Paving Conblock Tbl.8 cm Warna m2 Rp 229,750.00
5 Kanstin Trap uk. t= 15, l=10 m1 Rp 66,152.14
6 Kanstin Trap uk. t= 35, l=15 m1 Rp 88,527.25
7 Stopper/Uskup m1 Rp 35,024.00

9
- 10 -

HARGA SATUAN POKOK KEGIATAN ( HPS )

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN

BANGUNAN GEDUNG
Pekerjaan Persiapan & Tanah
Pekerjaan Persiapan
Pagar sementara seng gelombang tinggi 2 m m1
Tenaga:
Mandor 0.0200 O.H Rp 90,000.00 Rp 1,800.00
Kepala Tukang Kayu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang kayu 0.4000 O.H Rp 70,000.00 Rp 28,000.00
Pekerja/Buruh Tak Terampil 0.2000 O.H Rp 55,000.00 Rp 11,000.00
Bahan:
Bambu 1.2500 Batang Rp 18,350.00 Rp 22,937.50
Semen portland (50kg) 0.0500 zak Rp 83,950.00 Rp 4,197.50
BJLS 30 uk. (80 x 210 cm) 1.2000 Lembar Rp 86,250.00 Rp 103,500.00
Pasir beton 0.0050 m3 Rp 275,000.00 Rp 1,375.00
Batu Pecah Mesin 2/3 0.0090 m3 Rp 252,950.00 Rp 2,276.55
Kayu Meranti Kaso 5/7 0.0072 m3 Rp 5,490,450.00 Rp 39,531.24
Paku biasa 2" - 5" 0.0600 kg Rp 14,500.00 Rp 870.00
Meni besi 0.4500 kg Rp 27,500.00 Rp 12,375.00
Nilai HSPK : Rp 229,462.79
Pengukuran dan pemasangan bowplank m1
Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Kayu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Kayu 0.1000 O.H Rp 70,000.00 Rp 7,000.00
Pekerja/Buruh Tak Terampil 0.1000 O.H Rp 55,000.00 Rp 5,500.00
Bahan:
Meranti Papan 2 x 20 x 400 cm 0.0070 m3 Rp 5,673,500.00 Rp 39,714.50
Kayu Meranti Kaso 5/7 0.0120 m3 Rp 5,490,450.00 Rp 65,885.40
Paku biasa 2" - 5" 0.0200 kg Rp 14,500.00 Rp 290.00
Nilai HSPK : Rp 119,639.90
Uitzet Dengan WaterPass / Theodolit Hari
Tenaga:
Surveyor Geodesi 1.0000 O.H Rp 120,000.00 Rp 120,000.00
Pekerja / Buruh Terampil 2.0000 O.H Rp 60,000.00 Rp 120,000.00
Peralatan:
Sewa Theodolit 1.0000 Unit/Hari Rp 202,400.00 Rp 202,400.00
Nilai HSPK : Rp 442,400.00
Pembersihan Lapangan dan Perataan m2
Tenaga:
Mandor 0.0500 O.H Rp 90,000.00 Rp 4,500.00
Pekerja/Buruh Tak Terampil 0.1000 O.H Rp 55,000.00 Rp 5,500.00
Nilai HSPK : Rp 10,000.00
Pekerjaan Tanah
Galian tanah biasa sedalam 1 meter m3
Tenaga:
Mandor 0.0250 O.H Rp 90,000.00 Rp 2,250.00
Pekerja/Buruh Tak Terampil 0.7500 O.H Rp 55,000.00 Rp 41,250.00
Nilai HSPK : Rp 43,500.00
Galian tanah biasa sedalam 2 meter m3
Tenaga:
Mandor 0.0450 O.H Rp 90,000.00 Rp 4,050.00
Pekerja/Buruh Tak Terampil 0.9000 O.H Rp 55,000.00 Rp 49,500.00
Nilai HSPK : Rp 53,550.00
Galian tanah keras sedalam 1 meter m3
Tenaga:
Mandor 0.0320 O.H Rp 90,000.00 Rp 2,880.00
Pekerja/Buruh Tak Terampil 1.0000 O.H Rp 55,000.00 Rp 55,000.00
Nilai HSPK : Rp 57,880.00
- 11 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN

Pengurugan tanah kembali untuk gedung m3


Tenaga:
Mandor 0.0063 O.H Rp 90,000.00 Rp 567.00
Pekerja/Buruh Tak Terampil 0.1875 O.H Rp 55,000.00 Rp 10,312.50
Nilai HSPK : Rp 10,879.50
Pengurugan tanah kembali untuk jembatan m3
Tenaga:
Mandor 0.0125 O.H Rp 90,000.00 Rp 1,125.00
Pekerja/Buruh Tak Terampil 0.3750 O.H Rp 55,000.00 Rp 20,625.00
Nilai HSPK : Rp 21,750.00
Pengurugan tanah dengan pemadatan m3
Tenaga:
Mandor 0.0250 O.H Rp 90,000.00 Rp 2,250.00
Pekerja/Buruh Tak Terampil 0.2500 O.H Rp 55,000.00 Rp 13,750.00
Bahan:
Tanah Urug 1.2000 m3 Rp 70,000.00 Rp 84,000.00
Peralatan:
Sewa alat bantu ( Stamper ) 1.0000 Ls Rp 10,500.00 Rp 10,500.00
Nilai HSPK : Rp 110,500.00
Pengurugan Pasir (PADAT) m3
Tenaga:
Mandor 0.0100 O.H Rp 90,000.00 Rp 900.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Pasir Urug 1.2000 m3 Rp 126,500.00 Rp 151,800.00
Nilai HSPK : Rp 169,200.00
Galian Tanah biasa untuk Timbunan / dibuang m3
Tenaga:
Mandor 0.0240 O.H Rp 90,000.00 Rp 2,160.00
Pekerja/Buruh Tak Terampil 0.7200 O.H Rp 55,000.00 Rp 39,600.00
Peralatan:
Keranjang 0.0500 Buah Rp 12,300.00 Rp 615.00
Nilai HSPK : Rp 42,375.00
Timbunan Tanah Kembali Dipadatkan dan Dirapikan m3
(manual)
Tenaga:
Mandor 0.0230 O.H Rp 90,000.00 Rp 2,070.00
Pekerja/Buruh Tak Terampil 0.6380 O.H Rp 55,000.00 Rp 35,090.00
Peralatan:
Keranjang 0.1250 Buah Rp 12,300.00 Rp 1,537.50
Timbris 0.1670 Unit/Hari Rp 24,300.00 Rp 4,058.10
Nilai HSPK : Rp 42,755.60
Pemadatan Tanah Timbunan dan dirapikan m3
(Mekanis)
Tenaga:
Mandor 0.0040 O.H Rp 90,000.00 Rp 360.00
Pekerja/Buruh Tak Terampil 0.0900 O.H Rp 55,000.00 Rp 4,950.00
Peralatan:
Sewa Vibro Roller - Pediatric 1 Ton 0.2000 Jam Rp 52,050.00 Rp 10,410.00
Nilai HSPK : Rp 15,720.00
Pemadatan Tanah Timbunan dan dirapikan (Manual) m3

Tenaga:
Mandor 0.0211 O.H Rp 90,000.00 Rp 1,899.00
Pekerja/Buruh Tak Terampil 0.2110 O.H Rp 55,000.00 Rp 11,605.00
Peralatan:
Timbris 0.1500 Unit/Hari Rp 24,300.00 Rp 3,645.00
Nilai HSPK : Rp 17,149.00
- 12 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN

: Urugan dengan Pemadatan Mekanis Kode Koef. Satuan


: M3

ASUMSI
Pekerjaan dilakukan secara mekanis
Lokasi pekerjaan : persawahan/tanah lapang
Kondisi tanah asli : normal
Jam kerja efektif per-hari Tk 7.00 Jam
Faktor pengembangan bahan Fk 1.20 -
Tebal hamparan padat t 0.30 M
Berat volume bahan (lepas) D 1.60 Ton/M3

URUTAN KERJA
Material timbunan pilihan didatangkan ke lokasi dengan dump truck
Material diratakan dengan menggunakan Bulldozer
Material dipadatkan menggunakan Vibratory Roller
Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

PEMAKAIAN BAHAN, ALAT DAN TENAGA


BAHAN
Bahan timbunan (M08) 1.20 M3
= 1 x Fk

ALAT
BULLDOZER (E13)
Kec. Rata-rata
- maju = 2,77 km/jam F 47.00 m/menit
- mundur = 7,14 km/jam R 119.00 m/menit
Kapasitas bucket q 4.38 m3
Efisiensi alat E 0.60
Jarak gusur D 30.00 m
Jumlah Lintasan n 2.00 lintasan
Ganti persneling + Manuver Z 0.25 menit
Waktu siklus ( Circle time / cm )
= (D/F + D/R + Z) x n
= (30/47 + 30/119 + 0,25) x 2
= (0,64 + 0,26 + 0,25) x 2
= 2,3 menit
Produksi Bulldozer
= q x 60/cm x E
= 4,38 x 60/2,3 x 0,6
= 68,56 m3/jam
Koefisien Alat / m3
= 1m3 /68,56 m2/jam
= 0,0146
- 13 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN

VIBRATOR ROLLER (E19)


Kec. Rata-rata v 4.00 km/jam
Lebar Efektif Pemadatan b 1.48 lintasan
Jumlah Lintasan n 10.00
Lajur Lintasan N 3.00
Lebar Overlap bo 0.30
Faktor Efisiensi Alat E 0.60
Tebal Hamparan Tanah t 0.20 m

Produksi Alat / Jam


v(10000) x b x t x E
n
4000 x 1,48 x 0,2 x 0,6
10
710.4
10
= 71,04 m3/jam

Koefisien Alat / m3
= 1 / 71,04
= 0,014

WATER TANK TRUCK (E32)


Volume tangki air V 5.00 M3
Kebutuhan air/M3 material padat Wc 0.07 M3
Kapasitas pompa air pa 100.00 liter/menit
Faktor efisiensi alat Fa 0.60

Kapasitas Prod./Jam = Q5 51.43 M3


pa x Fa x 60
1000 x Wc

Koefisien Alat / M3 0.0194 jam


= 1 : Q5

ALAT BANTU
Diperlukan alat-alat bantu kecil Lump Sump
- sekop
- cangkul
- kereta dorong

Timbunan Tanah dari Luar dipadatkan dan dirapikan m3


(mekanis)
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Pekerja/Buruh Tak Terampil 0.3300 O.H Rp 55,000.00 Rp 18,150.00
Bahan:
Tanah Urug 1.2000 m3 Rp 70,000.00 Rp 84,000.00
Peralatan:
Bulldozer 0.0146 Jam Rp 483,600.00 Rp 7,060.56
Vibrator Roller ( 8 T ) 0.0140 Jam Rp 304,750.00 Rp 4,266.50
Water Tank Truck 0.0194 Jam Rp 114,030.00 Rp 2,212.18
Alat Bantu ( Sekop, Cangkul, Kereta Dorong ) 1.0000 Ls Rp 12,705.00 Rp 12,705.00
Nilai HSPK : Rp 131,364.24
Timbunan Tanah dari Luar dipadatkan dan dirapikan m3
(manual)
Tenaga:
Mandor 0.0499 O.H Rp 90,000.00 Rp 4,491.00
Pekerja/Buruh Tak Terampil 0.4990 O.H Rp 55,000.00 Rp 27,445.00
Bahan:
Tanah Urug 1.2000 m3 Rp 70,000.00 Rp 84,000.00
Peralatan:
Timbris 0.1670 Unit/m3 Rp 24,300.00 Rp 4,058.10
Keranjang 0.1250 Jam Rp 12,300.00 Rp 1,537.50
Kereta Dorong 0.0560 Jam Rp 6,380.00 Rp 357.28
Nilai HSPK : Rp 121,888.88
- 14 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN

Timbunan Sirtu dipadatkan dan dirapikan (manual) m3


Tenaga:
Mandor 0.0180 O.H Rp 90,000.00 Rp 1,620.00
Pekerja/Buruh Tak Terampil 0.4990 O.H Rp 55,000.00 Rp 27,445.00
Bahan:
Sirtu 1.2000 m3 Rp 217,300.00 Rp 260,760.00
Peralatan:
Timbris 0.1670 Unit/m3 Rp 24,300.00 Rp 4,058.10
Keranjang 0.0560 Jam Rp 12,300.00 Rp 688.80
Kereta Dorong 0.1250 Jam Rp 6,380.00 Rp 797.50
Nilai HSPK : Rp 295,369.40
Pembuatan lubang strouss pile diameter 25 cm m1
Tenaga:
Mandor 0.0200 O.H Rp 90,000.00 Rp 1,800.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Peralatan:
Sewa alat bantu strouss pile 0.3333 jam Rp 15,000.00 Rp 4,999.50
Nilai HSPK : Rp 28,799.50
Pembuatan lubang strouss pile diameter 30 cm m1
Tenaga:
Mandor 0.0240 O.H Rp 90,000.00 Rp 2,160.00
Pekerja/Buruh Tak Terampil 0.4800 O.H Rp 55,000.00 Rp 26,400.00
Peralatan:
Sewa alat bantu strouss pile 0.4000 jam Rp 15,000.00 Rp 6,000.00
Nilai HSPK : Rp 34,560.00
Galian Tanah Untuk Konstruksi Menggunakan Buruh m3
Tenaga:
Mandor 0.0200 O.H Rp 90,000.00 Rp 1,800.00
Pekerja / Buruh Terampil 0.0400 O.H Rp 60,000.00 Rp 2,400.00
Pekerja/Buruh Tak Terampil 0.6000 O.H Rp 55,000.00 Rp 33,000.00
Peralatan:
Sewa alat bantu 0.2000 Unit Rp 91,850.00 Rp 18,370.00
Nilai HSPK : Rp 55,570.00
Pekerjaan Galian tanah Menggunakan Alat Berat m3 an. HSPK PROP JATIM 2005 A II.02.004
Tenaga:
Mandor 0.0459 O.H Rp 90,000.00 Rp 4,131.00
Pekerja / Buruh Tak Terampil 0.0918 O.H Rp 55,000.00 Rp 5,049.00
Peralatan:
Excavator 0.0459 Jam Rp 362,250.00 Rp 16,627.28
Sewa Alat Bantu 1.0000 Set Rp 91,850.00 Rp 91,850.00
Nilai HSPK : Rp 117,657.28
- 12 -

URAIAN KEGIATAN Koef. HARGA


SATUAN HARGA
SATUAN
Pekerjaan Pondasi
Pekerjaan Pondasi
Pemasangan Batu Kali Belah 15/20 cm ( 1Pc : 1 Ps) m3
Tenaga:
Mandor 0.0750 O.H Rp 90,000.00 Rp 6,750.00
Kepala Tukang Batu 0.0600 O.H Rp 80,000.00 Rp 4,800.00
Tukang Batu 0.6000 O.H Rp 65,000.00 Rp 39,000.00
Pekerja/Buruh Tak Terampil 1.5000 O.H Rp 55,000.00 Rp 82,500.00
Bahan:
Semen portland (50kg) 7.8400 Zak Rp 83,950.00 Rp 658,168.00
Pasir Pasang 0.3140 m3 Rp 270,000.00 Rp 84,780.00
Batu Kali Pecah 15/20 cm 1.2000 m3 Rp 129,950.00 Rp 155,940.00
Nilai HSPK : Rp 1,031,938.00
Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 2 Ps) m3
Tenaga:
Mandor 0.0750 O.H Rp 90,000.00 Rp 6,750.00
Kepala Tukang Batu 0.0600 O.H Rp 80,000.00 Rp 4,800.00
Tukang Batu 0.6000 O.H Rp 65,000.00 Rp 39,000.00
Pekerja/Buruh Tak Terampil 1.5000 O.H Rp 55,000.00 Rp 82,500.00
Bahan:
Semen portland (50kg) 5.3400 Zak Rp 83,950.00 Rp 448,293.00
Pasir Pasang 0.4270 m3 Rp 270,000.00 Rp 115,290.00
Batu Kali Pecah 15/20 cm 1.2000 m3 Rp 129,950.00 Rp 155,940.00
Nilai HSPK : Rp 852,573.00
Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps) m3
Tenaga:
Mandor 0.0750 O.H Rp 90,000.00 Rp 6,750.00
Kepala Tukang Batu 0.0750 O.H Rp 80,000.00 Rp 6,000.00
Tukang Batu 0.7500 O.H Rp 65,000.00 Rp 48,750.00
Pekerja/Buruh Tak Terampil 1.5000 O.H Rp 55,000.00 Rp 82,500.00
Bahan:
Semen portland (50kg) 4.0400 Zak Rp 83,950.00 Rp 339,158.00
Pasir Pasang 0.4850 m3 Rp 270,000.00 Rp 130,950.00
Batu Kali Pecah 15/20 cm 1.2000 m3 Rp 129,950.00 Rp 155,940.00
Nilai HSPK : Rp 770,048.00
Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 4 Ps) m3
Tenaga:
Mandor 0.0750 O.H Rp 90,000.00 Rp 6,750.00
Kepala Tukang Batu 0.0750 O.H Rp 80,000.00 Rp 6,000.00
Tukang Batu 0.7500 O.H Rp 65,000.00 Rp 48,750.00
Pekerja/Buruh Tak Terampil 1.5000 O.H Rp 55,000.00 Rp 82,500.00
Bahan:
Semen portland (50kg) 3.2600 Zak Rp 83,950.00 Rp 273,677.00
Pasir Pasang 0.5200 m3 Rp 270,000.00 Rp 140,400.00
Batu Kali Pecah 15/20 cm 1.2000 m3 Rp 129,950.00 Rp 155,940.00
Nilai HSPK : Rp 714,017.00
Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 4 Ps) m3
Bangunan Air
Tenaga:
Mandor 0.1440 O.H Rp 90,000.00 Rp 12,960.00
Kepala Tukang Batu 0.0960 O.H Rp 80,000.00 Rp 7,680.00
Tukang Batu 0.9600 O.H Rp 65,000.00 Rp 62,400.00
Pekerja/Buruh Tak Terampil 2.8800 O.H Rp 55,000.00 Rp 158,400.00
Bahan:
Semen portland (50kg) 3.2570 Zak Rp 83,950.00 Rp 273,425.15
Pasir Pasang 0.5220 m3 Rp 270,000.00 Rp 140,940.00
Batu Kali Pecah 15/20 cm 1.2000 m3 Rp 129,950.00 Rp 155,940.00
Peralatan:
Molen 0.1670 Unit/Hari Rp 121,300.00 Rp 20,257.10
Ember 0.1670 Buah Rp 9,200.00 Rp 1,536.40
Kotak adukan 0.0110 Buah Rp 32,500.00 Rp 357.50
Nilai HSPK : Rp 833,896.15
- 13 -

URAIAN KEGIATAN Koef. HARGA


SATUAN HARGA
SATUAN
Pasangan Batu Kali Belah 15/20 cm (1 Pc : 5 Ps) m3
Tenaga:
Mandor 0.0750 O.H Rp 90,000.00 Rp 6,750.00
Kepala Tukang Batu 0.0750 O.H Rp 80,000.00 Rp 6,000.00
Tukang Batu 0.7500 O.H Rp 65,000.00 Rp 48,750.00
Pekerja/Buruh Tak Terampil 1.5000 O.H Rp 55,000.00 Rp 82,500.00
Bahan:
Semen portland (50kg) 2.7200 Zak Rp 83,950.00 Rp 228,344.00
Pasir Pasang 0.5440 m3 Rp 270,000.00 Rp 146,880.00
Batu Kali Pecah 15/20 cm 1.2000 m3 Rp 129,950.00 Rp 155,940.00
Nilai HSPK : Rp 675,164.00
Pengadaan Tiang Pancang 25 x 25 cm, K 500 m1
Bahan:
Tiang Pancang 25 x 25 cm, K 500 1.0000 m1 Rp 237,925.00 Rp 237,925.00
Biaya Mobilisasi / Angkut 1.0000 m1 Rp 47,200.00 Rp 47,200.00
Trailer = Rp. 7.080.000,00/Ls
Kapasitas Trailer = 15 lonjor/batang
1 batang = 10 m1
Ongkos Angkut Per m1 = Rp. 7.080.000,00/150
= Rp. 47.200
Nilai HSPK : Rp 285,125.00
Pemancangan Tiang Pancang 25 x 25 cm m1
Tenaga:
Mandor 0.1500 O.H Rp 90,000.00 Rp 13,500.00
Operator Alat Konstruksi 0.3000 O.H Rp 75,000.00 Rp 22,500.00
Pembantu Operator 0.3000 O.H Rp 60,000.00 Rp 18,000.00
Peralatan:
Alat Pancang 0.1500 Jam Rp 340,750.00 Rp 51,112.50
Nilai HSPK : Rp 105,112.50
- 15 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Struktur Utama
Pekerjaan Beton
Bekisting untuk Beton Struktur Menggunakan Buruh m2
Tenaga:
Mandor 0.0500 O.H Rp 90,000.00 Rp 4,500.00
Tukang Kayu 0.2000 O.H Rp 70,000.00 Rp 14,000.00
Pekerja/Buruh Tak Terampil 0.3500 O.H Rp 55,000.00 Rp 19,250.00
Pekerja/Buruh Agak Terampil 0.1500 O.H Rp 57,000.00 Rp 8,550.00
Bahan:
Kayu Meranti 0.0300 m3 Rp 3,564,050.00 Rp 106,921.50
Paku Biasa 2"-5" 0.2000 Kg Rp 14,500.00 Rp 2,900.00
Peralatan:
Sewa Alat Bantu 0.0300 Unit Rp 91,850.00 Rp 2,755.50
Nilai HSPK : Rp 158,877.00
Pasang bekisting untuk pondasi m2
Tenaga:
Mandor 0.0260 O.H Rp 90,000.00 Rp 2,340.00
Kepala Tukang Kayu 0.0260 O.H Rp 80,000.00 Rp 2,080.00
Tukang Kayu 0.2600 O.H Rp 70,000.00 Rp 18,200.00
Pekerja Terampil 0.5200 O.H Rp 60,000.00 Rp 31,200.00
Bahan:
Kayu Meranti 0.0400 m3 Rp 3,564,050.00 Rp 142,562.00
Paku biasa 2"-5" 0.3000 Kg Rp 14,500.00 Rp 4,350.00
Minyak Bekesting (solar) 0.1000 Ltr Rp 8,350.00 Rp 835.00
Nilai HSPK : Rp 201,567.00
Pasang bekisting untuk sloof m2
Tenaga:
Mandor 0.0260 O.H Rp 90,000.00 Rp 2,340.00
Kepala Tukang Kayu 0.0260 O.H Rp 80,000.00 Rp 2,080.00
Tukang Kayu 0.2600 O.H Rp 70,000.00 Rp 18,200.00
Pekerja Terampil 0.5200 O.H Rp 60,000.00 Rp 31,200.00
Bahan:
Kayu Meranti 0.0450 m3 Rp 3,564,050.00 Rp 160,382.25
Paku biasa 2"-5" 0.3000 Kg Rp 14,500.00 Rp 4,350.00
Minyak Bekesting (solar) 0.1000 Ltr Rp 8,350.00 Rp 835.00
Nilai HSPK : Rp 219,387.25
Pasang bekisting untuk kolom m2
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Kepala Tukang Kayu 0.0330 O.H Rp 80,000.00 Rp 2,640.00
Tukang Kayu 0.3300 O.H Rp 70,000.00 Rp 23,100.00
Pekerja Terampil 0.6600 O.H Rp 60,000.00 Rp 39,600.00
Bahan:
Kayu Meranti 0.0400 m3 Rp 3,564,050.00 Rp 142,562.00
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekesting (solar) 0.2000 Ltr Rp 8,350.00 Rp 1,670.00
Kayu Kruing Balok 6"12"4 0.0150 m3 Rp 7,930,650.00 Rp 118,959.75
Multipleks tebal 9 mm 0.3500 Lembar Rp 157,500.00 Rp 55,125.00
Bambu 2.0000 Batang Rp 18,350.00 Rp 36,700.00
Nilai HSPK : Rp 429,126.75
Pasang bekisting untuk kolom Bahan Kayu dipakai 2 Kali m2
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Kepala Tukang Kayu 0.0330 O.H Rp 80,000.00 Rp 2,640.00
Tukang Kayu 0.3300 O.H Rp 70,000.00 Rp 23,100.00
Pekerja Terampil 0.6600 O.H Rp 60,000.00 Rp 39,600.00
Bahan:
Kayu Meranti 0.0200 m3 Rp 3,564,050.00 Rp 71,281.00
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekesting (solar) 0.2000 Ltr Rp 8,350.00 Rp 1,670.00
Kayu Kruing Balok 6"12"4 0.0075 m3 Rp 7,930,650.00 Rp 59,479.88
Multipleks tebal 9 mm 0.1750 Lembar Rp 157,500.00 Rp 27,562.50
Bambu 1.0000 Batang Rp 18,350.00 Rp 18,350.00
Nilai HSPK : Rp 252,453.38
- 16 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pasang bekisting untuk balok m2
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Kepala Tukang Kayu 0.0330 O.H Rp 80,000.00 Rp 2,640.00
Tukang Kayu 0.3300 O.H Rp 70,000.00 Rp 23,100.00
Pekerja Terampil 0.6600 O.H Rp 60,000.00 Rp 39,600.00
Bahan:
Kayu Meranti 0.0400 m3 Rp 3,564,050.00 Rp 142,562.00
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekesting (solar) 0.2000 Ltr Rp 8,350.00 Rp 1,670.00
Kayu Kruing Balok 6"12"4 0.0180 m3 Rp 7,930,650.00 Rp 142,751.70
Multipleks tebal 9 mm 0.3500 Lembar Rp 157,500.00 Rp 55,125.00
Bambu 2.0000 Batang Rp 18,350.00 Rp 36,700.00
Nilai HSPK : Rp 452,918.70
Pasang bekisting untuk balok Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Kepala Tukang Kayu 0.0330 O.H Rp 80,000.00 Rp 2,640.00
Tukang Kayu 0.3300 O.H Rp 70,000.00 Rp 23,100.00
Pekerja Terampil 0.6600 O.H Rp 60,000.00 Rp 39,600.00
Bahan:
Kayu Meranti 0.0200 m3 Rp 3,564,050.00 Rp 71,281.00
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekesting (solar) 0.2000 Ltr Rp 8,350.00 Rp 1,670.00
Kayu Kruing Balok 6"12"4 0.0090 m3 Rp 7,930,650.00 Rp 71,375.85
Multipleks tebal 9 mm 0.1750 Lembar Rp 157,500.00 Rp 27,562.50
Bambu 1.0000 Batang Rp 18,350.00 Rp 18,350.00
Nilai HSPK : Rp 264,349.35
Pasang bekisting untuk lantai m2
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Kepala Tukang Kayu 0.0330 O.H Rp 80,000.00 Rp 2,640.00
Tukang Kayu 0.3300 O.H Rp 70,000.00 Rp 23,100.00
Pekerja Terampil 0.6600 O.H Rp 60,000.00 Rp 39,600.00
Bahan:
Kayu Meranti 0.0400 m3 Rp 3,564,050.00 Rp 142,562.00
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekesting (solar) 0.2000 Ltr Rp 8,350.00 Rp 1,670.00
Kayu Kruing Balok 6"12"4 0.0150 m3 Rp 7,930,650.00 Rp 118,959.75
Multipleks tebal 9 mm 0.3500 Lembar Rp 157,500.00 Rp 55,125.00
Bambu 6.0000 Batang Rp 18,350.00 Rp 110,100.00
Nilai HSPK : Rp 502,526.75
Pasang bekisting untuk lantai Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Kepala Tukang Kayu 0.0330 O.H Rp 80,000.00 Rp 2,640.00
Tukang Kayu 0.3300 O.H Rp 70,000.00 Rp 23,100.00
Pekerja Terampil 0.6600 O.H Rp 60,000.00 Rp 39,600.00
Bahan:
Kayu Meranti 0.0200 m3 Rp 3,564,050.00 Rp 71,281.00
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekesting (solar) 0.2000 Ltr Rp 8,350.00 Rp 1,670.00
Kayu Kruing Balok 6"12"4 0.0075 m3 Rp 7,930,650.00 Rp 59,479.88
Multipleks tebal 9 mm 0.1750 Lembar Rp 157,500.00 Rp 27,562.50
Bambu 3.0000 Batang Rp 18,350.00 Rp 55,050.00
Nilai HSPK : Rp 289,153.38
Pasang bekisting untuk tangga m2
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Kepala Tukang Kayu 0.0330 O.H Rp 80,000.00 Rp 2,640.00
Tukang Kayu 0.3300 O.H Rp 70,000.00 Rp 23,100.00
Pekerja Terampil 0.6600 O.H Rp 60,000.00 Rp 39,600.00
- 17 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Bahan:
Kayu Meranti 0.0300 m3 Rp 3,564,050.00 Rp 106,921.50
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekesting (solar) 0.1500 Ltr Rp 8,350.00 Rp 1,252.50
Kayu Kruing Balok 6"12"4 0.0150 m3 Rp 7,930,650.00 Rp 118,959.75
Multipleks tebal 9 mm 0.3500 Lembar Rp 157,500.00 Rp 55,125.00
Bambu 2.0000 Batang Rp 18,350.00 Rp 36,700.00
Nilai HSPK : Rp 393,068.75
Pasang bekisting untuk tangga Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Kepala Tukang Kayu 0.0330 O.H Rp 80,000.00 Rp 2,640.00
Tukang Kayu 0.3300 O.H Rp 70,000.00 Rp 23,100.00
Pekerja Terampil 0.6600 O.H Rp 60,000.00 Rp 39,600.00
Bahan:
Kayu Meranti 0.0150 m3 Rp 3,564,050.00 Rp 53,460.75
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekesting (solar) 0.1500 Ltr Rp 8,350.00 Rp 1,252.50
Kayu Kruing Balok 6"12"4 0.0075 m3 Rp 7,930,650.00 Rp 59,479.88
Multipleks tebal 9 mm 0.1750 Lembar Rp 157,500.00 Rp 27,562.50
Bambu 1.0000 Batang Rp 18,350.00 Rp 18,350.00
Nilai HSPK : Rp 234,215.63
Pasang bekisting Beton dengan Perancah Stager m2
Tenaga:
Mandor 0.0330 O.H Rp 90,000.00 Rp 2,970.00
Kepala Tukang Kayu 0.0330 O.H Rp 80,000.00 Rp 2,640.00
Tukang Kayu 0.3300 O.H Rp 70,000.00 Rp 23,100.00
Pekerja Terampil 0.6600 O.H Rp 60,000.00 Rp 39,600.00
Bahan:
Kayu Meranti 0.0400 m3 Rp 3,564,050.00 Rp 142,562.00
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Minyak Bekesting (solar) 0.2000 Ltr Rp 8,350.00 Rp 1,670.00
Kayu Kruing Balok 6"12"4 0.0150 m3 Rp 7,930,650.00 Rp 118,959.75
Multipleks tebal 9 mm 0.3500 Lembar Rp 157,500.00 Rp 55,125.00
Sewa Stager 1.3333 set Rp 15,000.00 Rp 20,000.00
Nilai HSPK : Rp 412,426.75
Pembesian dengan besi polos Kg
Tenaga:
Mandor 0.0004 O.H Rp 90,000.00 Rp 36.00
Kepala Tukang Besi 0.0070 O.H Rp 80,000.00 Rp 560.00
Tukang Besi 0.0007 O.H Rp 65,000.00 Rp 45.50
Pekerja/Buruh Terampil 0.0070 O.H Rp 60,000.00 Rp 420.00
Bahan:
Besi Beton Polos 1.0500 Kg Rp 13,000.00 Rp 13,650.00
Kawat Beton 0.0150 Kg Rp 19,550.00 Rp 293.25
Nilai HSPK : Rp 15,004.75
Pembesian dengan besi Ulir Kg
Tenaga:
Mandor 0.0004 O.H Rp 90,000.00 Rp 36.00
Kepala Tukang Besi 0.0070 O.H Rp 80,000.00 Rp 560.00
Tukang Besi 0.0007 O.H Rp 65,000.00 Rp 45.50
Pekerja/Buruh Terampil 0.0070 O.H Rp 60,000.00 Rp 420.00
Bahan:
Besi Beton Ulir 1.0500 Kg Rp 13,200.00 Rp 13,860.00
Kawat Beton 0.0150 Kg Rp 19,550.00 Rp 293.25
Nilai HSPK : Rp 15,214.75
Pegecoran Beton Site Mix dengan Mutu K 100 m3
( Konvensional )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
- 18 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Bahan:
Semen portland (50kg) 4.9400 Zak Rp 83,950.00 Rp 414,713.00
Pasir Beton 0.6207 m3 Rp 275,000.00 Rp 170,692.50
Batu Pecah Mesin 2/3 0.7400 m3 Rp 252,950.00 Rp 187,183.00
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 947,379.52
Pegecoran Beton Site Mix dengan Mutu K 125 m3
( Konvensional )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 5.5200 Zak Rp 83,950.00 Rp 463,404.00
Pasir Beton 0.5914 m3 Rp 275,000.00 Rp 162,635.00
Batu Pecah Mesin 2/3 0.7496 m3 Rp 252,950.00 Rp 189,618.81
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 990,448.83
Pegecoran Beton Site Mix dengan Mutu K 150 m3
( Konvensional )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 5.9800 Zak Rp 83,950.00 Rp 502,021.00
Pasir Beton 0.5707 m3 Rp 275,000.00 Rp 156,942.50
Batu Pecah Mesin 2/3 0.7533 m3 Rp 252,950.00 Rp 190,555.58
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,024,310.10
Pengecoran Beton Site Mix untuk Lantai Kerja m3
( Konvensional )
Tenaga:
Mandor 0.0600 O.H Rp 90,000.00 Rp 5,400.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 1.2000 O.H Rp 55,000.00 Rp 66,000.00
Bahan:
Semen portland (50kg) 4.6000 Zak Rp 83,950.00 Rp 386,170.00
Pasir Beton 0.6379 m3 Rp 275,000.00 Rp 175,411.50
Batu Pecah Mesin 2/3 0.7607 m3 Rp 252,950.00 Rp 192,429.18
Air 200 Ltr Rp 100.00 Rp 20,000.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 894,966.70
- 19 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pegecoran Beton Site Mix dengan Mutu K 175 m3
( Konvensional )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 6.5200 Zak Rp 83,950.00 Rp 547,354.00
Pasir Beton 0.5429 m3 Rp 275,000.00 Rp 149,286.50
Batu Pecah Mesin 2/3 0.7622 m3 Rp 252,950.00 Rp 192,803.55
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,064,235.07
Pegecoran Beton Site Mix dengan Mutu K 200 m3
( Konvensional )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 7.0400 Zak Rp 83,950.00 Rp 591,008.00
Pasir Beton 0.5221 m3 Rp 275,000.00 Rp 143,577.50
Batu Pecah Mesin 2/3 0.7637 m3 Rp 252,950.00 Rp 193,178.85
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,102,555.37
Pegecoran Beton Site Mix dengan Mutu K 225 m3
( Konvensional )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 7.4200 Zak Rp 83,950.00 Rp 622,909.00
Pasir Beton 0.4986 m3 Rp 275,000.00 Rp 137,106.75
Batu Pecah Mesin 2/3 0.7756 m3 Rp 252,950.00 Rp 196,175.37
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,130,982.14
Pegecoran Beton Site Mix dengan Mutu K 250 m3
( Konvensional )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 7.6800 Zak Rp 83,950.00 Rp 644,736.00
Pasir Beton 0.4943 m3 Rp 275,000.00 Rp 135,927.00
Batu Pecah Mesin 2/3 0.7696 m3 Rp 252,950.00 Rp 194,677.81
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,150,131.83
- 20 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pegecoran Beton Site Mix dengan Mutu K 275 m3
( Konvensional )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 8.1200 Zak Rp 83,950.00 Rp 681,674.00
Pasir Beton 0.4886 m3 Rp 275,000.00 Rp 134,356.75
Batu Pecah Mesin 2/3 0.7600 m3 Rp 252,950.00 Rp 192,242.00
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,183,063.77
Pegecoran Beton Site Mix dengan Mutu K 300 m3
( Konvensional )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 8.2600 Zak Rp 83,950.00 Rp 693,427.00
Pasir Beton 0.4864 m3 Rp 275,000.00 Rp 133,760.00
Batu Pecah Mesin 2/3 0.7563 m3 Rp 252,950.00 Rp 191,305.15
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,193,283.17
Pegecoran Beton Site Mix dengan Mutu K 325 m3
( Konvensional )
Tenaga:
Mandor 0.1050 O.H Rp 90,000.00 Rp 9,450.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 2.1000 O.H Rp 55,000.00 Rp 115,500.00
Bahan:
Semen portland (50kg) 8.7800 Zak Rp 83,950.00 Rp 737,081.00
Pasir Beton 0.4786 m3 Rp 275,000.00 Rp 131,606.75
Batu Pecah Mesin 2/3 0.7452 m3 Rp 252,950.00 Rp 188,494.55
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,264,138.32
Pegecoran Beton Site Mix dengan Mutu K 350 m3
( Konvensional )
Tenaga:
Mandor 0.1050 O.H Rp 90,000.00 Rp 9,450.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 2.1000 O.H Rp 55,000.00 Rp 115,500.00
Bahan:
Semen portland (50kg) 8.9600 Zak Rp 83,950.00 Rp 752,192.00
Pasir Beton 0.4764 m3 Rp 275,000.00 Rp 131,010.00
Batu Pecah Mesin 2/3 0.7407 m3 Rp 252,950.00 Rp 187,370.18
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Pan Mixer 0.1004 Jam Rp 315,000.00 Rp 31,626.00
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,277,528.20
- 21 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pegecoran Beton Ready Mix dengan Mutu K m3
125 ( untuk kapasitas besar )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 5.5200 Zak Rp 83,950.00 Rp 463,404.00
Pasir Beton 0.5914 m3 Rp 275,000.00 Rp 162,635.00
Batu Pecah Mesin 2/3 0.7496 m3 Rp 252,950.00 Rp 189,618.81
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truck Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,112,706.16
Pegecoran Beton Ready Mix dengan Mutu K m3
150 ( untuk kapasitas besar )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 5.9800 Zak Rp 83,950.00 Rp 502,021.00
Pasir Beton 0.5707 m3 Rp 275,000.00 Rp 156,942.50
Batu Pecah Mesin 2/3 0.7533 m3 Rp 252,950.00 Rp 190,555.58
Air 215 Ltr Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truck Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,146,567.44
Pengecoran Beton Ready Mix dengan Mutu K m3
175 ( untuk kapasitas besar )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 6.5200 Zak Rp 83,950.00 Rp 547,354.00
Pasir Beton 0.5429 m3 Rp 275,000.00 Rp 149,286.50
Batu Pecah Mesin 2/3 0.7622 m3 Rp 252,950.00 Rp 192,803.55
Air 215 Ls Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truk Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,186,492.40
Pengecoran Beton Ready Mix dengan Mutu K m3
200 ( untuk kapasitas besar )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 7.0400 Zak Rp 83,950.00 Rp 591,008.00
Pasir Beton 0.5221 m3 Rp 275,000.00 Rp 143,577.50
Batu Pecah Mesin 2/3 0.7637 m3 Rp 252,950.00 Rp 193,178.85
Air 215 Ls Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truk Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,224,812.70
- 22 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pengecoran Beton Ready Mix dengan Mutu K m3
225 ( untuk kapasitas besar )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 7.4200 Zak Rp 83,950.00 Rp 622,909.00
Pasir Beton 0.4986 m3 Rp 275,000.00 Rp 137,106.75
Batu Pecah Mesin 2/3 0.7756 m3 Rp 252,950.00 Rp 196,175.37
Air 215 Ls Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truk Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,253,239.48
Pengecoran Beton Ready Mix dengan Mutu K m3
250 ( untuk kapasitas besar )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 7.6800 Zak Rp 83,950.00 Rp 644,736.00
Pasir Beton 0.4943 m3 Rp 275,000.00 Rp 135,927.00
Batu Pecah Mesin 2/3 0.7696 m3 Rp 252,950.00 Rp 194,677.81
Air 215 Ls Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truk Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,272,389.16
Pengecoran Beton Ready Mix dengan Mutu K m3
275 ( untuk kapasitas besar )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 8.1200 Zak Rp 83,950.00 Rp 681,674.00
Pasir Beton 0.4886 m3 Rp 275,000.00 Rp 134,356.75
Batu Pecah Mesin 2/3 0.7600 m3 Rp 252,950.00 Rp 192,242.00
Air 215 Ls Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truk Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,305,321.10
Pengecoran Beton Ready Mix dengan Mutu K m3
300 ( untuk kapasitas besar )
Tenaga:
Mandor 0.0830 O.H Rp 90,000.00 Rp 7,470.00
Kepala Tukang Batu 0.0280 O.H Rp 80,000.00 Rp 2,240.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen portland (50kg) 8.2600 Zak Rp 83,950.00 Rp 693,427.00
Pasir Beton 0.4864 m3 Rp 275,000.00 Rp 133,760.00
Batu Pecah Mesin 2/3 0.7563 m3 Rp 252,950.00 Rp 191,305.15
Air 215 Ls Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truk Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,315,540.50
- 23 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pengecoran Beton Ready Mix dengan Mutu K m3
325 ( untuk kapasitas besar )
Tenaga:
Mandor 0.1050 O.H Rp 90,000.00 Rp 9,450.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 2.1000 O.H Rp 55,000.00 Rp 115,500.00
Bahan:
Semen portland (50kg) 8.7800 Zak Rp 83,950.00 Rp 737,081.00
Pasir Beton 0.4786 m3 Rp 275,000.00 Rp 131,606.75
Batu Pecah Mesin 2/3 0.7452 m3 Rp 252,950.00 Rp 188,494.55
Air 215 Ls Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truk Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,386,395.65
Pengecoran Beton Ready Mix dengan Mutu K m3
350 ( untuk kapasitas besar )
Tenaga:
Mandor 0.1050 O.H Rp 90,000.00 Rp 9,450.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 2.1000 O.H Rp 55,000.00 Rp 115,500.00
Bahan:
Semen portland (50kg) 8.9600 Zak Rp 83,950.00 Rp 752,192.00
Pasir Beton 0.4764 m3 Rp 275,000.00 Rp 131,010.00
Batu Pecah Mesin 2/3 0.7407 m3 Rp 252,950.00 Rp 187,370.18
Air 215 Ls Rp 100.00 Rp 21,500.00
Peralatan:
Concrete Pump 1.0000 m3 Rp 67,083.33 Rp 67,083.33
Concrete Vibrator 0.0623 Jam Rp 37,400.00 Rp 2,330.02
Truk Mixer 0.4000 Jam Rp 217,000.00 Rp 86,800.00
Alat Bantu ( cagkul, sekop, dll ) 1.0000 Ls Rp 1,000.00 Rp 1,000.00
Nilai HSPK : Rp 1,399,785.54
Membuat Pondasi Beton Bertulang dg150 Kg Besi dan m3
Bekisting
Tenaga:
Mandor 0.2650 O.H Rp 90,000.00 Rp 23,850.00
Kepala Tukang Batu 0.2620 O.H Rp 80,000.00 Rp 20,960.00
Tukang Kayu 1.3000 O.H Rp 70,000.00 Rp 91,000.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Tukang Besi 1.0500 O.H Rp 65,000.00 Rp 68,250.00
Pekerja/Buruh Tak Terampil 5.3000 O.H Rp 55,000.00 Rp 291,500.00
Bahan:
Kayu Bekisting Meranti 0.2000 m3 Rp 3,564,050.00 Rp 712,810.00
Paku biasa 2"-5" 1.5000 Kg Rp 14,500.00 Rp 21,750.00
Minyak Bekesting (solar) 0.4000 Ltr Rp 8,350.00 Rp 3,340.00
Besi Beton Polos 157.50 Kg Rp 13,000.00 Rp 2,047,500.00
Kawat Beton 2.2500 Kg Rp 19,550.00 Rp 43,987.50
Semen portland (50kg) 6.7200 Zak Rp 83,950.00 Rp 564,144.00
Pasir Beton 0.5400 m3 Rp 275,000.00 Rp 148,500.00
Batu Pecah Mesin 2/3 0.8100 m3 Rp 252,950.00 Rp 204,889.50
Nilai HSPK : Rp 4,260,356.00
Membuat Beton Bertulang Strous dg150 Kg Besi m3
Tenaga:
Mandor 0.1650 O.H Rp 90,000.00 Rp 14,850.00
Kepala Tukang Batu 0.2450 O.H Rp 80,000.00 Rp 19,600.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Tukang Besi 1.0500 O.H Rp 65,000.00 Rp 68,250.00
Pekerja/Buruh Tak Terampil 3.9000 O.H Rp 55,000.00 Rp 214,500.00
Bahan:
Besi Beton Polos 150.00 Kg Rp 13,000.00 Rp 1,950,000.00
Kawat Beton 2.2500 Kg Rp 19,550.00 Rp 43,987.50
Semen portland (50kg) 6.4600 Zak Rp 83,950.00 Rp 542,317.00
Pasir Beton 0.5200 m3 Rp 275,000.00 Rp 143,000.00
Batu Pecah Mesin 2/3 0.7800 m3 Rp 252,950.00 Rp 197,301.00
Nilai HSPK : Rp 3,216,555.50
- 24 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Membuat Beton Bertulang Slouf (200 Kg Besi + Bekisting) m3

Tenaga:
Mandor 0.2830 O.H Rp 90,000.00 Rp 25,470.00
Kepala Tukang Batu 0.3230 O.H Rp 80,000.00 Rp 25,840.00
Tukang Kayu 1.5600 O.H Rp 70,000.00 Rp 109,200.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Tukang Besi 1.4000 O.H Rp 65,000.00 Rp 91,000.00
Pekerja/Buruh Tak Terampil 5.6500 O.H Rp 55,000.00 Rp 310,750.00
Bahan:
Kayu Bekisting Meranti 0.2700 m3 Rp 3,564,050.00 Rp 962,293.50
Paku biasa 2"-5" 2.0000 Kg Rp 14,500.00 Rp 29,000.00
Minyak Bekesting (solar) 0.6000 Ltr Rp 8,350.00 Rp 5,010.00
Besi Beton Polos 210.00 Kg Rp 13,000.00 Rp 2,730,000.00
Kawat Beton 3.0000 Kg Rp 19,550.00 Rp 58,650.00
Semen portland (50kg) 6.7200 Zak Rp 83,950.00 Rp 564,144.00
Pasir Beton 0.5400 m3 Rp 275,000.00 Rp 148,500.00
Batu Pecah Mesin 2/3 0.8100 m3 Rp 252,950.00 Rp 204,889.50
Nilai HSPK : Rp 5,282,622.00
Membuat Kolom Praktis Beton Bertulang Uk 11 x 11 cm m1
Tenaga:
Mandor 0.0090 O.H Rp 90,000.00 Rp 810.00
Kepala Tukang Batu 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Kayu 0.0200 O.H Rp 70,000.00 Rp 1,400.00
Tukang Batu 0.0200 O.H Rp 65,000.00 Rp 1,300.00
Tukang Besi 0.0200 O.H Rp 65,000.00 Rp 1,300.00
Pekerja/Buruh Tak Terampil 0.1800 O.H Rp 55,000.00 Rp 9,900.00
Bahan:
Kayu Bekisting Meranti 0.0020 m3 Rp 3,564,050.00 Rp 7,128.10
Paku biasa 2"-5" 0.0100 Kg Rp 14,500.00 Rp 145.00
Besi Beton Polos 3.0000 Kg Rp 13,000.00 Rp 39,000.00
Kawat Beton 0.4500 Kg Rp 19,550.00 Rp 8,797.50
Semen portland (50kg) 4.0000 Kg Rp 1,679.00 Rp 6,716.00
Pasir Beton 0.0060 m3 Rp 275,000.00 Rp 1,650.00
Batu Pecah Mesin 2/3 0.0090 m3 Rp 252,950.00 Rp 2,276.55
Nilai HSPK : Rp 80,903.15
Membuat Ring Balok Beton Bertulang Uk.10 x 15 cm m1
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Kayu 0.0330 O.H Rp 70,000.00 Rp 2,310.00
Tukang Batu 0.0330 O.H Rp 65,000.00 Rp 2,145.00
Tukang Besi 0.0330 O.H Rp 65,000.00 Rp 2,145.00
Pekerja/Buruh Tak Terampil 0.2970 O.H Rp 55,000.00 Rp 16,335.00
Bahan:
Kayu Bekisting Meranti 0.0030 m3 Rp 3,564,050.00 Rp 10,692.15
Paku biasa 2"-5" 0.0200 Kg Rp 14,500.00 Rp 290.00
Besi Beton Polos 3.6000 Kg Rp 13,000.00 Rp 46,800.00
Kawat Beton 0.0500 Kg Rp 19,550.00 Rp 977.50
Semen portland (50kg) 5.5000 Kg Rp 1,679.00 Rp 9,234.50
Pasir Beton 0.0090 m3 Rp 275,000.00 Rp 2,475.00
Batu Pecah Mesin 2/3 0.0150 m3 Rp 252,950.00 Rp 3,794.25
Nilai HSPK : Rp 99,348.40
- 25 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Membuat Kolom Beton Bertulang dg 200 Kg Besi dan m3
Bekisting
Tenaga:
Mandor 0.2830 O.H Rp 90,000.00 Rp 25,470.00
Kepala Tukang Batu 0.3230 O.H Rp 80,000.00 Rp 25,840.00
Tukang Kayu 1.5600 O.H Rp 70,000.00 Rp 109,200.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Tukang Besi 1.4000 O.H Rp 65,000.00 Rp 91,000.00
Pekerja/Buruh Tak Terampil 5.6500 O.H Rp 55,000.00 Rp 310,750.00
Bahan:
Kayu Meranti 0.2700 m3 Rp 3,564,050.00 Rp 962,293.50
Paku biasa 2"-5" 2.0000 Kg Rp 14,500.00 Rp 29,000.00
Minyak Bekesting (solar) 0.6000 Ltr Rp 8,350.00 Rp 5,010.00
Besi Beton Polos 210.00 Kg Rp 13,000.00 Rp 2,730,000.00
Kawat Beton 3.0000 Kg Rp 19,550.00 Rp 58,650.00
Semen portland (50kg) 6.7200 Zak Rp 83,950.00 Rp 564,144.00
Pasir Beton 0.5400 m3 Rp 275,000.00 Rp 148,500.00
Batu Pecah Mesin 2/3 0.8100 m3 Rp 252,950.00 Rp 204,889.50
Kayu Kruing Balok 6"12"4 0.1500 m3 Rp 7,930,650.00 Rp 1,189,597.50
Multipleks tebal 9 mm 3.5000 Lembar Rp 157,500.00 Rp 551,250.00
Bambu 20.0000 Batang Rp 18,350.00 Rp 367,000.00
Nilai HSPK : Rp 7,390,469.50
Membuat Balok Beton Bertulang dg 200 Kg Besi dan m3
Bekisting
Tenaga:
Mandor 0.3180 O.H Rp 90,000.00 Rp 28,620.00
Kepala Tukang Batu 0.3330 O.H Rp 80,000.00 Rp 26,640.00
Tukang Kayu 1.6500 O.H Rp 70,000.00 Rp 115,500.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Tukang Besi 1.4000 O.H Rp 65,000.00 Rp 91,000.00
Pekerja/Buruh Tak Terampil 6.3500 O.H Rp 55,000.00 Rp 349,250.00
Bahan:
Kayu Meranti 0.3200 m3 Rp 3,564,050.00 Rp 1,140,496.00
Paku biasa 2"-5" 3.2000 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekesting (solar) 1.6000 Ltr Rp 8,350.00 Rp 13,360.00
Besi Beton Polos 210.00 Kg Rp 13,000.00 Rp 2,730,000.00
Kawat Beton 3.0000 Kg Rp 19,550.00 Rp 58,650.00
Semen portland (50kg) 6.7200 Zak Rp 83,950.00 Rp 564,144.00
Pasir Beton 0.5400 m3 Rp 275,000.00 Rp 148,500.00
Batu Pecah Mesin 2/3 0.8100 m3 Rp 252,950.00 Rp 204,889.50
Kayu Kruing Balok 6"12"4 0.1400 m3 Rp 7,930,650.00 Rp 1,110,291.00
Multipleks tebal 9 mm 2.8000 Lembar Rp 157,500.00 Rp 441,000.00
Bambu 16.0000 Batang Rp 18,350.00 Rp 293,600.00
Nilai HSPK : Rp 7,380,215.50
Membuat Plat Lantai Beton Bertulang dg 150 Kg Besi dan m3
Bekisting
Tenaga:
Mandor 0.2650 O.H Rp 90,000.00 Rp 23,850.00
Kepala Tukang Batu 0.2650 O.H Rp 80,000.00 Rp 21,200.00
Tukang Kayu 1.3000 O.H Rp 70,000.00 Rp 91,000.00
Tukang Batu 0.2750 O.H Rp 65,000.00 Rp 17,875.00
Tukang Besi 1.0500 O.H Rp 65,000.00 Rp 68,250.00
Pekerja/Buruh Tak Terampil 5.3000 O.H Rp 55,000.00 Rp 291,500.00
Bahan:
Kayu Meranti 0.3200 m3 Rp 3,564,050.00 Rp 1,140,496.00
Paku biasa 2"-5" 3.2000 Kg Rp 14,500.00 Rp 46,400.00
Minyak Bekesting (solar) 1.6000 Ltr Rp 8,350.00 Rp 13,360.00
Besi Beton Polos 157.50 Kg Rp 13,000.00 Rp 2,047,500.00
Kawat Beton 2.2500 Kg Rp 19,550.00 Rp 43,987.50
Semen portland (50kg) 6.7200 Zak Rp 83,950.00 Rp 564,144.00
Pasir Beton 0.5400 m3 Rp 275,000.00 Rp 148,500.00
Batu Pecah Mesin 2/3 0.8100 m3 Rp 252,950.00 Rp 204,889.50
Multipleks tebal 9 mm 2.8000 Lembar Rp 157,500.00 Rp 441,000.00
Kayu Kruing Balok 6"12"4 0.1200 m3 Rp 7,930,650.00 Rp 951,678.00
Bambu 32.0000 Batang Rp 18,350.00 Rp 587,200.00
Nilai HSPK : Rp 6,702,830.00
- 26 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Membuat Tangga Beton Bertulang dg 200 Kg Besi dan m3
Bekisting
Tenaga:
Mandor 0.2020 O.H Rp 90,000.00 Rp 18,180.00
Kepala Tukang Batu 0.4000 O.H Rp 80,000.00 Rp 32,000.00
Tukang Kayu 2.3000 O.H Rp 70,000.00 Rp 161,000.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Tukang Besi 1.4000 O.H Rp 65,000.00 Rp 91,000.00
Pekerja/Buruh Tak Terampil 5.6000 O.H Rp 55,000.00 Rp 308,000.00
Bahan:
Kayu Meranti 0.2500 m3 Rp 3,564,050.00 Rp 891,012.50
Paku biasa 2"-5" 3.0000 Kg Rp 14,500.00 Rp 43,500.00
Minyak Bekesting (solar) 1.2000 Ltr Rp 8,350.00 Rp 10,020.00
Besi Beton Polos 200.00 Kg Rp 13,000.00 Rp 2,600,000.00
Kawat Beton 3.0000 Kg Rp 19,550.00 Rp 58,650.00
Semen portland (50kg) 6.4600 Zak Rp 83,950.00 Rp 542,317.00
Pasir Beton 0.5200 m3 Rp 275,000.00 Rp 143,000.00
Batu Pecah Mesin 2/3 0.7800 m3 Rp 252,950.00 Rp 197,301.00
Kayu Kruing Balok 6"12"4 0.1050 m3 Rp 7,930,650.00 Rp 832,718.25
Multipleks tebal 9 mm 2.5000 Lembar Rp 157,500.00 Rp 393,750.00
Bambu 14.0000 Batang Rp 18,350.00 Rp 256,900.00
Nilai HSPK : Rp 6,602,098.75
Pembongkaran Cetakan Dan Penyiraman Beton m3
Tenaga:
Pekerja/Buruh Tak Terampil 3.0000 O.H Rp 55,000.00 Rp 165,000.00
Nilai HSPK : Rp 165,000.00
Pekerjaan Besi & Baja
Ongkos kerja Perakitan dan Pemasangan Baja (Erection) Kg
Tenaga:
Mandor 0.0001 O.H Rp 90,000.00 Rp 4.50
Kepala Tukang Besi 0.0001 O.H Rp 80,000.00 Rp 4.00
Tukang Besi 0.0010 O.H Rp 65,000.00 Rp 65.00
Pekerja/Buruh Tak Terampil 0.0010 O.H Rp 55,000.00 Rp 55.00
Bahan:
Bio Solar 0.0100 Ltr Rp 8,350.00 Rp 83.50
Minyak Pelumas 0.0010 Ltr Rp 40,000.00 Rp 40.00
Peralatan:
Sewa Welding Set (min 5 jam) 0.0080 jam Rp 73,500.00 Rp 588.00
Nilai HSPK : Rp 840.00
Pekerjaan Besi Plat Bordes Kg
Bahan:
Besi Plat Bordes 1.1500 Kg Rp 14,000.00 Rp 16,100.00
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Besi 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Las 0.0600 O.H Rp 70,000.00 Rp 4,200.00
Pekerja (buruh agak trampil) 0.0600 O.H Rp 57,000.00 Rp 3,420.00
Nilai HSPK : Rp 24,470.00
Pekerjaan Besi Plat Tebal 2 mm Kg
Bahan:
Besi Plat Tebal 2 mm 1.1500 Kg Rp 14,000.00 Rp 16,100.00
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Besi 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Las 0.0600 O.H Rp 70,000.00 Rp 4,200.00
Pekerja (buruh agak trampil) 0.0600 O.H Rp 57,000.00 Rp 3,420.00
Nilai HSPK : Rp 24,470.00
Pekerjaan Besi Plat Strip Kg
Bahan:
Besi Plat Strip 1.1500 Kg Rp 14,000.00 Rp 16,100.00
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Besi 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Las 0.0600 O.H Rp 70,000.00 Rp 4,200.00
Pekerja (buruh agak trampil) 0.0600 O.H Rp 57,000.00 Rp 3,420.00
Nilai HSPK : Rp 24,470.00
- 27 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pekerjaan Besi Baja Profil WF Kg
Bahan:
Besi Profil WF 1.1500 Kg Rp 14,500.00 Rp 16,675.00
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Besi 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Las 0.0600 O.H Rp 70,000.00 Rp 4,200.00
Pekerja (buruh agak trampil) 0.0600 O.H Rp 57,000.00 Rp 3,420.00
Nilai HSPK : Rp 25,045.00
Pekerjaan Besi Baja Kanal C Kg
Bahan:
Besi Baja Kanal C 1.1500 Kg Rp 13,500.00 Rp 15,525.00
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Besi 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Las 0.0600 O.H Rp 70,000.00 Rp 4,200.00
Pekerja (buruh agak trampil) 0.0600 O.H Rp 57,000.00 Rp 3,420.00
Nilai HSPK : Rp 23,895.00
Pekerjaan Besi Baja siku untuk rangka Kg
Bahan:
Besi baja siku 1.1500 Kg Rp 14,000.00 Rp 16,100.00
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Besi 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Las 0.0600 O.H Rp 70,000.00 Rp 4,200.00
Pekerja (buruh agak trampil) 0.0600 O.H Rp 57,000.00 Rp 3,420.00
Nilai HSPK : Rp 24,470.00
Pemasangan Pipa/Buis Beton dia 30-100 cm m1
Tenaga:
Mandor 0.0190 O.H Rp 90,000.00 Rp 1,710.00
Kepala Tukang Batu 0.0190 O.H Rp 80,000.00 Rp 1,520.00
Tukang Batu 0.1900 O.H Rp 65,000.00 Rp 12,350.00
Pekerja / Buruh Tak Terampil 0.3800 O.H Rp 55,000.00 Rp 20,900.00
Bahan:
Pipa beton 30/100 1.0000 Biji Rp 66,150.00 Rp 66,150.00
Batu Bata 23.0000 Buah Rp 750.00 Rp 17,250.00
Semen portland (50 kg) 0.2060 Zak Rp 83,950.00 Rp 17,293.70
Pasir Pasang 0.0610 m3 Rp 270,000.00 Rp 16,470.00
Pasir urug 0.0690 m3 Rp 126,500.00 Rp 8,728.50
Nilai HSPK : Rp 162,372.20
Pasangan Gorong-Gorong Buis Beton dia.40 cm dg Cincin m1
Batu Bata
Tenaga:
Mandor 0.5000 O.H Rp 90,000.00 Rp 45,000.00
Pekerja / Buruh Tak Terampil 2.5000 O.H Rp 55,000.00 Rp 137,500.00
Pekerja / Buruh Semi Terampil 1.0000 O.H Rp 57,000.00 Rp 57,000.00
Bahan:
Pemasangan Batu Merah Tb. 1 bata (1Pc : 4Ps) 0.0943 m2 Rp 224,987.45 Rp 21,216.32
Pipa Beton Dia.40/100 cm 1.0000 Biji Rp 84,550.00 Rp 84,550.00
Peralatan:
Sewa alat bantu 0.1000 Unit Rp 91,850.00 Rp 9,185.00
Nilai HSPK : Rp 354,451.32
Lantai Kerja m3
Upah:
Mandor 0.0800 O.H Rp 90,000.00 Rp 7,200.00
Kepala Tukang Batu 0.0250 O.H Rp 80,000.00 Rp 2,000.00
Tukang Batu 0.2500 O.H Rp 65,000.00 Rp 16,250.00
Pekerja Tak Terampil 1.6500 O.H Rp 55,000.00 Rp 90,750.00
Bahan:
Semen PC (Portland Cement) 50kg 3.7257 Zak Rp 83,950.00 Rp 312,772.52
Pasir Cor 0.5081 m3 Rp 275,000.00 Rp 139,727.50
Batu Pecah 2/3 cm 1.0161 m3 Rp 252,950.00 Rp 257,022.50
Nilai HSPK : Rp 825,722.51
Pembesian dengan Besi Wiremesh M6 m2
Tenaga:
Mandor 0.0182 O.H Rp 90,000.00 Rp 1,638.00
Pekerja Terampil 0.0183 O.H Rp 60,000.00 Rp 1,098.00
Pekerja/Buruh Tak Terampil 0.0820 O.H Rp 55,000.00 Rp 4,510.00
Bahan:
Besi Wiremesh M 6 1.1000 m2 Rp 31,635.80 Rp 34,799.38
Nilai HSPK : Rp 42,045.38
- 31 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pekerjaan Dinding dan Plesteran
Pekerjaan Dinding dan Plesteran
Pemasangan Batu Merah tebal 1 bata (1 Pc : 2 Ps) m2
Tenaga:
Mandor 0.0300 O.H Rp 90,000.00 Rp 2,700.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.6000 O.H Rp 55,000.00 Rp 33,000.00
Bahan:
Semen portland (50 kg) 0.8700 Zak Rp 83,950.00 Rp 73,036.50
Pasir Pasang 0.0800 m3 Rp 270,000.00 Rp 21,600.00
Bata Merah uk.5 x 11 x 22 140.00 Buah Rp 750.00 Rp 105,000.00
Nilai HSPK : Rp 249,936.50
Pemasangan Batu Merah tebal 1/2bata (1 Pc : 2 Ps) m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 kg Rp 65,000.00 Rp 6,500.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.3790 Zak Rp 83,950.00 Rp 31,817.05
Pasir Pasang 0.0380 m3 Rp 270,000.00 Rp 10,260.00
Bata Merah uk.5 x 11 x 22 70.0000 Buah Rp 750.00 Rp 52,500.00
Nilai HSPK : Rp 119,727.05
Pemasangan Batu Merah tebal 1 bata (1 Pc : 3 Ps) m2
Tenaga:
Mandor 0.0300 O.H Rp 90,000.00 Rp 2,700.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.6000 O.H Rp 55,000.00 Rp 33,000.00
Bahan:
Semen portland (50 kg) 0.6590 Zak Rp 83,950.00 Rp 55,323.05
Pasir Pasang 0.0910 m3 Rp 270,000.00 Rp 24,570.00
Bata Merah uk.5 x 11 x 22 140.00 Buah Rp 750.00 Rp 105,000.00
Nilai HSPK : Rp 235,193.05
Pemasangan Batu Merah tebal 1/2 bata (1 Pc : 3 Ps) m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.2874 Zak Rp 83,950.00 Rp 24,127.23
Pasir Pasang 0.0400 m3 Rp 270,000.00 Rp 10,800.00
Bata Merah uk.5 x 11 x 22 70.00 Buah Rp 750.00 Rp 52,500.00
Nilai HSPK : Rp 112,577.23
Pemasangan Batu Merah tebal 1 bata (1 Pc : 4 Ps) m2
Tenaga:
Mandor 0.0300 O.H Rp 90,000.00 Rp 2,700.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.6000 O.H Rp 55,000.00 Rp 33,000.00
Bahan:
Semen portland (50 kg) 0.5310 Zak Rp 83,950.00 Rp 44,577.45
Pasir Pasang 0.0930 m3 Rp 270,000.00 Rp 25,110.00
Bata Merah uk.5 x 11 x 22 140.00 Buah Rp 750.00 Rp 105,000.00
Nilai HSPK : Rp 224,987.45
- 32 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pemasangan Batu Merah tebal 1/2bata (1 Pc : 4 Ps) m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.2300 Zak Rp 83,950.00 Rp 19,308.50
Pasir Pasang 0.0430 m3 Rp 270,000.00 Rp 11,610.00
Bata Merah uk.5 x 11 x 22 70.00 Buah Rp 750.00 Rp 52,500.00
Nilai HSPK : Rp 108,568.50
Pemasangan Batu Merah tebal 1 bata (1 Pc : 5 Ps) m2
Tenaga:
Mandor 0.0300 O.H Rp 90,000.00 Rp 2,700.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.6000 O.H Rp 55,000.00 Rp 33,000.00
Bahan:
Semen portland (50 kg) 0.4440 Zak Rp 83,950.00 Rp 37,273.80
Pasir Pasang 0.1020 m3 Rp 270,000.00 Rp 27,540.00
Bata Merah uk.5 x 11 x 22 140.00 Buah Rp 750.00 Rp 105,000.00
Nilai HSPK : Rp 220,113.80
Pemasangan Batu Merah tebal 1/2bata (1 Pc : 5 Ps) m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.1936 Zak Rp 83,950.00 Rp 16,252.72
Pasir Pasang 0.0450 m3 Rp 270,000.00 Rp 12,150.00
Bata Merah uk.5 x 11 x 22 70.0000 Buah Rp 750.00 Rp 52,500.00
Nilai HSPK : Rp 106,052.72
Pemasangan Batu Merah tebal 1 bata (1 Pc : 6 Ps) m2
Tenaga:
Mandor 0.0300 O.H Rp 90,000.00 Rp 2,700.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.6000 O.H Rp 55,000.00 Rp 33,000.00
Bahan:
Semen portland (50 kg) 0.3700 Zak Rp 83,950.00 Rp 31,061.50
Pasir Pasang 0.1220 m3 Rp 270,000.00 Rp 32,940.00
Bata Merah uk.5 x 11 x 22 140.00 Buah Rp 750.00 Rp 105,000.00
Nilai HSPK : Rp 219,301.50
Pemasangan Batu Merah tebal 1/2bata (1 Pc : 6 Ps) m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.1664 Zak Rp 83,950.00 Rp 13,969.28
Pasir Pasang 0.0490 m3 Rp 270,000.00 Rp 13,230.00
Bata Merah uk.5 x 11 x 22 70.00 Buah Rp 750.00 Rp 52,500.00
Nilai HSPK : Rp 104,849.28
- 33 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pasang Bataco m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja Terampil 0.3000 O.H Rp 60,000.00 Rp 18,000.00
Bahan:
Semen portland (50 kg) 0.1000 Zak Rp 83,950.00 Rp 8,395.00
Pasir Pasang 0.0410 m3 Rp 270,000.00 Rp 11,070.00
Bataco Semen 10"20"40 cm 13.0000 Buah Rp 6,350.00 Rp 82,550.00
Nilai HSPK : Rp 128,665.00
Pasang dinding rooster Tera Kota 10x10x20 cm m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja Terampil 0.3000 O.H Rp 60,000.00 Rp 18,000.00
Bahan:
Semen portland (50 kg) 0.2800 Zak Rp 83,950.00 Rp 23,506.00
Pasir Pasang 0.0320 m3 Rp 270,000.00 Rp 8,640.00
Batu Loster Merah 50.0000 Biji Rp 7,150.00 Rp 357,500.00
Nilai HSPK : Rp 416,296.00
Pasang dinding rooster Abu-abu 10x20x40 cm m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja Terampil 0.3000 O.H Rp 60,000.00 Rp 18,000.00
Bahan:
Semen portland (50 kg) 0.2800 Zak Rp 83,950.00 Rp 23,506.00
Pasir Pasang 0.0320 m3 Rp 270,000.00 Rp 8,640.00
Batu Loster Abu-abu 12.5000 Biji Rp 10,050.00 Rp 125,625.00
Nilai HSPK : Rp 184,421.00
Plesteran 1 Pc : 2 Ps tebal 15 mm m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Batu 0.1500 O.H Rp 65,000.00 Rp 9,750.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.2045 Zak Rp 83,950.00 Rp 17,166.10
Pasir Pasang 0.0200 m3 Rp 270,000.00 Rp 5,400.00
Nilai HSPK : Rp 51,366.10
Plesteran 1 Pc : 3 Ps tebal 15 mm m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Batu 0.1500 O.H Rp 65,000.00 Rp 9,750.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.1555 Zak Rp 83,950.00 Rp 13,055.90
Pasir Pasang 0.0230 m3 Rp 270,000.00 Rp 6,210.00
Nilai HSPK : Rp 48,065.90
Plesteran speci 1 Pc : 3 Ps tebal 15 mm untuk m2
bangunan basah
Tenaga:
Mandor 0.0190 O.H Rp 90,000.00 Rp 1,710.00
Kepala Tukang Batu 0.0190 O.H Rp 80,000.00 Rp 1,520.00
Tukang Batu 0.1900 O.H Rp 65,000.00 Rp 12,350.00
Pekerja/Buruh Tak Terampil 0.3840 O.H Rp 55,000.00 Rp 21,120.00
Bahan:
Semen portland (50 kg) 0.1630 Zak Rp 83,950.00 Rp 13,683.85
Pasir Pasang 0.0190 m3 Rp 270,000.00 Rp 5,130.00
- 34 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Peralatan
Ember 0.0100 Buah Rp 9,200.00 Rp 92.00
Kasut Kayu 0.0330 Buah Rp 11,350.00 Rp 374.55
Kotak Adukan 0.0100 Buah Rp 32,500.00 Rp 325.00
Nilai HSPK : Rp 56,305.40
Plesteran 1 Pc : 4 Ps tebal 15 mm m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Batu 0.1500 O.H Rp 65,000.00 Rp 9,750.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.1248 Zak Rp 83,950.00 Rp 10,476.96
Pasir Pasang 0.0240 m3 Rp 270,000.00 Rp 6,480.00
Nilai HSPK : Rp 45,756.96
Plesteran 1 Pc : 5 Ps tebal 15 mm m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Batu 0.1500 O.H Rp 65,000.00 Rp 9,750.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.1037 Zak Rp 83,950.00 Rp 8,703.94
Pasir Pasang 0.0260 m3 Rp 270,000.00 Rp 7,020.00
Nilai HSPK : Rp 44,523.94
Plesteran 1 Pc : 6 Ps tebal 15 mm m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Batu 0.1500 O.H Rp 65,000.00 Rp 9,750.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.0883 Zak Rp 83,950.00 Rp 7,414.46
Pasir Pasang 0.0270 m3 Rp 270,000.00 Rp 7,290.00
Nilai HSPK : Rp 43,504.46
Plesteran 1 Pc : 2 Ps tebal 20 mm m2
Tenaga:
Mandor 0.0220 O.H Rp 90,000.00 Rp 1,980.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Semen portland (50 kg) 0.2726 Zak Rp 83,950.00 Rp 22,884.77
Pasir Pasang 0.0270 m3 Rp 270,000.00 Rp 7,290.00
Nilai HSPK : Rp 68,754.77
Plesteran 1 Pc : 3 Ps tebal 20 mm m2
Tenaga:
Mandor 0.0220 O.H Rp 90,000.00 Rp 1,980.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Semen portland (50 kg) 0.2074 Zak Rp 83,950.00 Rp 17,407.87
Pasir Pasang 0.0310 m3 Rp 270,000.00 Rp 8,370.00
Nilai HSPK : Rp 64,357.87
Plesteran 1 Pc : 4 Ps tebal 20 mm m2
Tenaga:
Mandor 0.0220 O.H Rp 90,000.00 Rp 1,980.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Semen portland (50 kg) 0.1664 Zak Rp 83,950.00 Rp 13,969.28
Pasir Pasang 0.0320 m3 Rp 270,000.00 Rp 8,640.00
Nilai HSPK : Rp 61,189.28
- 35 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Plesteran 1 Pc : 5 Ps tebal 20 mm m2
Tenaga:
Mandor 0.0220 O.H Rp 90,000.00 Rp 1,980.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Semen portland (50 kg) 0.1382 Zak Rp 83,950.00 Rp 11,605.25
Pasir Pasang 0.0350 m3 Rp 270,000.00 Rp 9,450.00
Nilai HSPK : Rp 59,635.25
Plesteran 1 Pc : 6 Ps tebal 20 mm m2
Tenaga:
Mandor 0.0220 O.H Rp 90,000.00 Rp 1,980.00
Kepala Tukang Batu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Batu 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Semen portland (50 kg) 0.1178 Zak Rp 83,950.00 Rp 9,885.95
Pasir Pasang 0.0360 m3 Rp 270,000.00 Rp 9,720.00
Nilai HSPK : Rp 58,185.95
Plesteran Skoning 1 Pc : 3 Ps Lebar 10 Cm m1
Tenaga:
Mandor 0.0040 O.H Rp 90,000.00 Rp 360.00
Kepala Tukang Batu 0.0400 O.H Rp 80,000.00 Rp 3,200.00
Tukang Batu 0.4000 O.H Rp 65,000.00 Rp 26,000.00
Pekerja/Buruh Tak Terampil 0.0800 O.H Rp 55,000.00 Rp 4,400.00
Bahan:
Semen portland (50 kg) 0.0100 Zak Rp 83,950.00 Rp 839.50
Pasir Pasang 0.0130 m3 Rp 270,000.00 Rp 3,510.00
Nilai HSPK : Rp 38,309.50
Plesteran Benangan Sudut m1
Tenaga:
Mandor 0.0020 O.H Rp 90,000.00 Rp 180.00
Kepala Tukang Batu 0.0380 O.H Rp 80,000.00 Rp 3,040.00
Tukang Batu 0.0380 O.H Rp 65,000.00 Rp 2,470.00
Pekerja/Buruh Tak Terampil 0.0570 O.H Rp 55,000.00 Rp 3,135.00
Bahan:
Semen portland (50 kg) 0.0100 Zak Rp 83,950.00 Rp 839.50
Pasir Pasang 0.0020 m3 Rp 270,000.00 Rp 540.00
Nilai HSPK : Rp 10,204.50
Plesteran Ciprat 1 Pc : 2 Ps m2
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.0864 Zak Rp 83,950.00 Rp 7,253.28
Pasir Pasang 0.0060 m3 Rp 270,000.00 Rp 1,620.00
Nilai HSPK : Rp 34,023.28
Plesteran Siar adukan 1 Pc : 2 Ps untuk pasangan batu m2
kali
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Batu 0.1500 O.H Rp 65,000.00 Rp 9,750.00
Pekerja/Buruh Tak Terampil 0.3000 O.H Rp 55,000.00 Rp 16,500.00
Bahan:
Semen portland (50 kg) 0.1268 Zak Rp 83,950.00 Rp 10,644.86
Pasir Pasang 0.0120 m3 Rp 270,000.00 Rp 3,240.00
Nilai HSPK : Rp 42,684.86
- 36 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Plesteran Siar adukan 1 Pc : 2 Ps untuk bangunan m2
basah
Tenaga:
Mandor 0.0170 O.H Rp 90,000.00 Rp 1,530.00
Kepala Tukang Batu 0.0120 O.H Rp 80,000.00 Rp 960.00
Tukang Batu 0.1150 O.H Rp 65,000.00 Rp 7,475.00
Pekerja/Buruh Tak Terampil 0.3460 O.H Rp 55,000.00 Rp 19,030.00
Bahan:
Semen portland (50 kg) 0.1050 Zak Rp 83,950.00 Rp 8,814.75
Pasir Pasang 0.0080 m3 Rp 270,000.00 Rp 2,160.00
Peralatan
Ember 0.0100 Buah Rp 9,200.00 Rp 92.00
Cetok 0.0200 Buah Rp 11,200.00 Rp 224.00
Kuas 0.1670 Buah Rp 11,650.00 Rp 1,945.55
Nilai HSPK : Rp 42,231.30
Acian m2
Tenaga:
Mandor 0.0100 O.H Rp 90,000.00 Rp 900.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja/Buruh Tak Terampil 0.2000 O.H Rp 55,000.00 Rp 11,000.00
Bahan:
Semen portland (50 kg) 0.0650 Zak Rp 83,950.00 Rp 5,456.75
Nilai HSPK : Rp 24,656.75
Pemasangan Batu Merah Kosongan tebal 1 bata m2
Tenaga:
Mandor 0.0063 O.H Rp 90,000.00 Rp 567.00
Tukang Batu 0.0625 O.H Rp 65,000.00 Rp 4,062.50
Pekerja/Buruh Tak Terampil 0.0625 O.H Rp 55,000.00 Rp 3,437.50
Bahan:
Bata Merah uk.5 x 11 x 22 180.00 Buah Rp 750.00 Rp 135,000.00
Nilai HSPK : Rp 143,067.00
- 37 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pekerjaan Lantai
Pasangan plint keramik 10x20 cm m1
Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.0900 O.H Rp 65,000.00 Rp 5,850.00
Pekerja/Buruh Tak Terampil 0.0900 O.H Rp 55,000.00 Rp 4,950.00
Bahan:
Semen portland (50 kg) 1.1400 Kg Rp 1,679.00 Rp 1,914.06
Pasir Pasang 0.0030 m3 Rp 270,000.00 Rp 810.00
Semen Warna 0.0250 Kg Rp 13,800.00 Rp 345.00
Plint keramik 10x20 cm 5.3000 Buah Rp 6,490.00 Rp 34,397.00
Nilai HSPK : Rp 51,516.06
Pasangan lantai keramik motif 20x20 cm m2
Tenaga:
Mandor 0.0350 O.H Rp 90,000.00 Rp 3,150.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 0.7000 O.H Rp 55,000.00 Rp 38,500.00
Bahan:
Semen portland 10.4000 Kg Rp 1,679.00 Rp 17,461.60
Semen Warna 1.6200 Kg Rp 13,800.00 Rp 22,356.00
Pasir Pasang 0.0450 m3 Rp 270,000.00 Rp 12,150.00
Keramik Artistik 20x20 cm 26.5000 Buah Rp 2,070.00 Rp 54,855.00
Nilai HSPK : Rp 174,022.60
Pasangan lantai keramik motif 30x30 cm m2
Tenaga:
Mandor 0.0350 O.H Rp 90,000.00 Rp 3,150.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 0.7000 O.H Rp 55,000.00 Rp 38,500.00
Bahan:
Semen portland 10.0000 Kg Rp 1,679.00 Rp 16,790.00
Semen Warna 1.5000 Kg Rp 13,800.00 Rp 20,700.00
Pasir Pasang 0.0450 m3 Rp 270,000.00 Rp 12,150.00
Keramik Artistik 30x30 cm 11.8700 Buah Rp 5,175.52 Rp 61,433.39
Nilai HSPK : Rp 178,273.39
Pasangan lantai keramik Motif 40x40 cm m2
Tenaga:
Mandor 0.0350 O.H Rp 90,000.00 Rp 3,150.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 0.7000 O.H Rp 55,000.00 Rp 38,500.00
Bahan:
Semen portland (50 kg) 0.2000 Zak Rp 83,950.00 Rp 16,790.00
Semen Warna 1.3000 Kg Rp 13,800.00 Rp 17,940.00
Pasir Pasang 0.0450 m3 Rp 270,000.00 Rp 12,150.00
Keramik Motif 40x40 cm 1.1050 m2 Rp 63,250.00 Rp 69,891.25
Nilai HSPK : Rp 183,971.25
- 38 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pasangan lantai keramik polos 40x40 cm m2
Tenaga:
Mandor 0.0350 O.H Rp 90,000.00 Rp 3,150.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 0.7000 O.H Rp 55,000.00 Rp 38,500.00
Bahan:
Semen portland (50 kg) 0.2000 Zak Rp 83,950.00 Rp 16,790.00
Semen Warna 1.3000 Kg Rp 13,800.00 Rp 17,940.00
Pasir Pasang 0.0450 m3 Rp 270,000.00 Rp 12,150.00
Keramik Polos 40x40 cm 1.1050 m2 Rp 54,350.00 Rp 60,056.75
Nilai HSPK : Rp 174,136.75
Pasangan lantai Vinil m2
Tenaga:
Mandor 0.0090 O.H Rp 90,000.00 Rp 810.00
Kepala Tukang Kayu 0.0170 O.H Rp 80,000.00 Rp 1,360.00
Tukang Kayu 0.1700 O.H Rp 70,000.00 Rp 11,900.00
Pekerja/Buruh Tak Terampil 0.1700 O.H Rp 55,000.00 Rp 9,350.00
Bahan:
Vinil Lantai RS 1.0000 m2 Rp 350,000.00 Rp 350,000.00
Lem Fox 0.3500 Kg Rp 38,550.00 Rp 13,492.50
Nilai HSPK : Rp 386,912.50
Pasangan Dinding keramik motif 20x25 cm m2
Tenaga:
Mandor 0.0450 O.H Rp 90,000.00 Rp 4,050.00
Kepala Tukang Batu 0.0450 O.H Rp 80,000.00 Rp 3,600.00
Tukang Batu 0.4500 O.H Rp 65,000.00 Rp 29,250.00
Pekerja/Buruh Tak Terampil 0.9000 O.H Rp 55,000.00 Rp 49,500.00
Bahan:
Semen portland (50 kg) 0.1860 Zak Rp 83,950.00 Rp 15,614.70
Semen Warna 1.9400 Kg Rp 13,800.00 Rp 26,772.00
Pasir Pasang 0.0180 m3 Rp 270,000.00 Rp 4,860.00
Dinding keramik 20x25 cm 1.0600 m2 Rp 54,050.00 Rp 57,293.00
Nilai HSPK : Rp 190,939.70
Pasangan lantai keramik Kasar 40x40 cm m2
Tenaga:
Mandor 0.0350 O.H Rp 90,000.00 Rp 3,150.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 0.7000 O.H Rp 55,000.00 Rp 38,500.00
Bahan:
Semen portland (50 kg) 0.2000 Zak Rp 83,950.00 Rp 16,790.00
Semen Warna 1.3000 Kg Rp 13,800.00 Rp 17,940.00
Pasir Pasang 0.0450 m3 Rp 270,000.00 Rp 12,150.00
Keramik Kasar 40x40 cm 1.1050 m2 Rp 83,950.00 Rp 92,764.75
Nilai HSPK : Rp 206,844.75
- 39 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pasang Lantai Keramik 60x60 cm (Motif/Warna) m2
Tenaga:
Mandor 0.0350 O.H Rp 90,000.00 Rp 3,150.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 0.7000 O.H Rp 55,000.00 Rp 38,500.00
Bahan:
Semen portland (50 kg) 0.2000 Zak Rp 83,950.00 Rp 16,790.00
Semen Warna 1.3000 Kg Rp 13,800.00 Rp 17,940.00
Pasir Pasang 0.0450 m3 Rp 270,000.00 Rp 12,150.00
Keramik Motif 60 x 60 1.1050 m2 Rp 139,700.00 Rp 154,368.50
Nilai HSPK : Rp 268,448.50

Pasangan lantai keramik 20 x 40/ keramik tangga m2


Tenaga:
Mandor 0.0350 O.H Rp 90,000.00 Rp 3,150.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 0.7000 O.H Rp 55,000.00 Rp 38,500.00
Bahan:
Semen portland (50 kg) 0.2000 Zak Rp 83,950.00 Rp 16,790.00
Semen Warna 1.3000 Kg Rp 13,800.00 Rp 17,940.00
Pasir Pasang 0.0450 m3 Rp 270,000.00 Rp 12,150.00
Keramik 1.1050 m2 Rp 83,950.00 Rp 92,764.75
Nilai HSPK : Rp 206,844.75
- 41 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pekerjaan Atap
Pekerjaaan Rangka Atap
Pasang rangka atap Galvalume m2
Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Besi 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Besi 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Rangka Galvalume & Accessories 1.1000 m2 Rp 212,950.00 Rp 234,245.00
Nilai HSPK : Rp 263,995.00
Pasang Usuk + Reng Galvalume m2
Tenaga:
Mandor 0.0760 O.H Rp 90,000.00 Rp 6,840.00
Kepala Tukang Besi 0.0320 O.H Rp 80,000.00 Rp 2,560.00
Tukang Besi 0.3200 O.H Rp 65,000.00 Rp 20,800.00
Pekerja/Buruh Tak Terampil 0.0760 O.H Rp 55,000.00 Rp 4,180.00
Bahan:
Usuk Galvalume 75.35.7.0,75 2.0833 m1 Rp 33,750.00 Rp 70,311.38
Reng Galvalume 38.25.15.0,48 4.7826 m1 Rp 20,250.00 Rp 96,847.65
Accessories 0.1000 Ls Rp 167,159.03 Rp 16,715.90
Nilai HSPK : Rp 218,254.93
Pasang Rangka Atap Hollow m2
Tenaga :
Mandor 0.0800 O.H Rp 90,000.00 Rp 7,200.00
Kepala Tukang Besi 0.0800 O.H Rp 80,000.00 Rp 6,400.00
Tukang Besi 0.8500 O.H Rp 65,000.00 Rp 55,250.00
Pekerja/Buruh Tak Terampil 0.8500 O.H Rp 55,000.00 Rp 46,750.00
Bahan:
Hollow 5,5 7.6500 m1 Rp 18,375.00 Rp 140,568.75
Kawat las Hs RRT 2.6 m 0.0850 Kg Rp 33,600.00 Rp 2,856.00
Nilai HSPK : Rp 259,024.75
Penutup Atap
Pasang Atap Genteng Keramik m2
Tenaga:
Mandor 0.0080 O.H Rp 90,000.00 Rp 720.00
Kepala Tukang Kayu 0.0080 O.H Rp 80,000.00 Rp 640.00
Tukang Kayu 0.0750 O.H Rp 70,000.00 Rp 5,250.00
Pekerja/Buruh Tak Terampil 0.1500 O.H Rp 55,000.00 Rp 8,250.00
Bahan:
Genteng Keramik 14.0000 Biji Rp 10,400.00 Rp 145,600.00
Nilai HSPK : Rp 160,460.00
Pasang Atap Fiber Glass m2
Tenaga:
Mandor 0.0070 O.H Rp 90,000.00 Rp 630.00
Kepala Tukang kayu 0.0070 O.H Rp 80,000.00 Rp 560.00
Tukang kayu 0.0670 O.H Rp 70,000.00 Rp 4,690.00
Pekerja/Buruh Tak Terampil 0.1400 O.H Rp 55,000.00 Rp 7,700.00
Bahan:
Roof light fibreglass 1.1000 m2 Rp 36,800.00 Rp 40,480.00
Paku biasa 2"-5" 0.0500 Kg Rp 14,500.00 Rp 725.00
Nilai HSPK : Rp 54,785.00
Pasang Penutup Atap Zincalum m2
Tenaga:
Mandor 0.0070 O.H Rp 90,000.00 Rp 630.00
Kepala Tukang Kayu 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Kayu 0.0600 O.H Rp 70,000.00 Rp 4,200.00
Pekerja/Buruh Tak Terampil 0.1200 O.H Rp 55,000.00 Rp 6,600.00
Bahan:
Penutup Atap Zincalum tbl 0,3 mm 1.0500 m2 Rp 88,800.00 Rp 93,240.00
Sekrup 5.3000 bh Rp 1,300.00 Rp 6,890.00
Nilai HSPK : Rp 112,040.00
- 42 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pasang Atap Spandek m2
Tenaga:
Mandor 0.0070 O.H Rp 90,000.00 Rp 630.00
Kepala Tukang Kayu 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Kayu 0.0600 O.H Rp 70,000.00 Rp 4,200.00
Pekerja/Buruh Tak Terampil 0.1200 O.H Rp 55,000.00 Rp 6,600.00
Bahan:
Atap Spandek tebal 0,4 mm 1.1000 m2 Rp 86,937.50 Rp 95,631.25
Sekrup 5.3000 bh Rp 1,300.00 Rp 6,890.00
Nilai HSPK : Rp 114,431.25
Pasang Nok Genteng Beton lokal m1
Tenaga:
Mandor 0.0200 O.H Rp 90,000.00 Rp 1,800.00
Kepala Tukang Kayu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Kayu 0.2000 O.H Rp 70,000.00 Rp 14,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Nok Genteng Beton Lokal 3.5000 Biji Rp 10,550.00 Rp 36,925.00
Paku biasa 2"-5" 0.0500 Kg Rp 14,500.00 Rp 725.00
Semen (PC 50 Kg) 0.2160 zak Rp 83,950.00 Rp 18,133.20
Pasir Pasang 0.0320 m3 Rp 270,000.00 Rp 8,640.00
Semen Warna 1.0000 Kg Rp 13,800.00 Rp 13,800.00
Nilai HSPK : Rp 117,623.20
Pasang Genteng Wuwung Beton Setara Ex. Cisangkan m1

Tenaga:
Mandor 0.0200 O.H Rp 90,000.00 Rp 1,800.00
Kepala Tukang Kayu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Kayu 0.2000 O.H Rp 70,000.00 Rp 14,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Genteng Wuwung Beton Setara Ex. 2.5000 Biji Rp 35,300.00 Rp 88,250.00
Cisangkan
Paku biasa 2"-5" 0.0500 Kg Rp 14,500.00 Rp 725.00
Semen (PC 50 Kg) 0.2160 zak Rp 83,950.00 Rp 18,133.20
Pasir Pasang 0.0320 m3 Rp 270,000.00 Rp 8,640.00
Semen Warna 1.0000 Kg Rp 13,800.00 Rp 13,800.00
Nilai HSPK : Rp 168,948.20
Pasang rangka stainless dan atap polycarbonate m2
Tenaga:
Mandor 0.0800 O.H Rp 90,000.00 Rp 7,200.00
Kepala Tukang Besi 0.0800 O.H Rp 80,000.00 Rp 6,400.00
Tukang Besi 0.8500 O.H Rp 65,000.00 Rp 55,250.00
Pekerja/Buruh Tak Terampil 0.8500 O.H Rp 55,000.00 Rp 46,750.00
Bahan:
Pipa stainless dia. 5/8" 0.5500 Batang Rp 305,450.00 Rp 167,997.50
Pipa stainless dia. 1.25" 0.4500 Batang Rp 357,200.00 Rp 160,740.00
Pipa stainless dia. 2" 0.2750 Batang Rp 651,600.00 Rp 179,190.00
Polycarbonate 5 mm 1.1000 m2 Rp 109,350.00 Rp 120,285.00
Kawat las Hs RRT 2.6 m 0.0850 Kg Rp 33,600.00 Rp 2,856.00
Nilai HSPK : Rp 746,668.50
Pasang genteng Wuwung Plam lokal m1
Tenaga:
Mandor 0.0020 O.H Rp 90,000.00 Rp 180.00
Kepala Tukang Kayu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Kayu 0.2000 O.H Rp 70,000.00 Rp 14,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Semen (PC 50 Kg) 0.1670 zak Rp 83,950.00 Rp 14,019.65
Pasir Pasang 0.0320 m3 Rp 270,000.00 Rp 8,640.00
Genteng Wuwung plam lokal 5.0000 Biji Rp 6,900.00 Rp 34,500.00
Nilai HSPK : Rp 94,939.65
- 43 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pasang genteng Wuwung ex. Trenggalek m1
Tenaga:
Mandor 0.0020 O.H Rp 90,000.00 Rp 180.00
Kepala Tukang Kayu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Kayu 0.2000 O.H Rp 70,000.00 Rp 14,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Semen (PC 50 Kg) 0.1600 zak Rp 83,950.00 Rp 13,432.00
Pasir Pasang 0.0320 m3 Rp 270,000.00 Rp 8,640.00
Genteng Wuwung ex. Trenggalek 5.0000 Biji Rp 6,150.00 Rp 30,750.00
Nilai HSPK : Rp 90,602.00
Pasang genteng Wuwung ex.Karangpilang m1
Tenaga:
Mandor 0.0020 O.H Rp 90,000.00 Rp 180.00
Kepala Tukang Kayu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Kayu 0.2000 O.H Rp 70,000.00 Rp 14,000.00
Pekerja/Buruh Tak Terampil 0.4000 O.H Rp 55,000.00 Rp 22,000.00
Bahan:
Semen (PC 50 kg) 0.1600 zak Rp 83,950.00 Rp 13,432.00
Pasir Pasang 0.0320 m3 Rp 270,000.00 Rp 8,640.00
Genteng Wuwung Karang Pilang 5.0000 Biji Rp 14,750.00 Rp 73,750.00
Nilai HSPK : Rp 133,602.00
Pemasangan Wuwung/Jurai Genteng Galvalume m1
Tenaga:
Kepala Tukang Kayu 0.0250 O.H Rp 80,000.00 Rp 2,000.00
Tukang Kayu 0.2500 O.H Rp 70,000.00 Rp 17,500.00
Pekerja/Buruh Tak Terampil 0.2500 O.H Rp 55,000.00 Rp 13,750.00
Bahan:
Genteng Wuwung Galvalume 2.6500 Biji Rp 8,800.00 Rp 23,320.00
Paku Skrup 3.0000 Buah Rp 1,300.00 Rp 3,900.00
Nilai HSPK : Rp 60,470.00
Pasang Talang dari Seng BJLS 30 (lebar 60cm) m1
Tenaga:
Mandor 0.1750 O.H Rp 90,000.00 Rp 15,750.00
Tukang Kayu 0.6000 O.H Rp 70,000.00 Rp 42,000.00
Pekerja/Buruh Tak Terampil 0.3500 O.H Rp 55,000.00 Rp 19,250.00
Bahan:
Kayu Meranti (Papan 2/20/400) 0.0096 m3 Rp 5,673,500.00 Rp 54,465.60
Seng Talang BJLS 30 (0.60x1.1) 1.0000 m1 Rp 34,150.00 Rp 34,150.00
Paku biasa 2"-5" 0.2500 Kg Rp 14,500.00 Rp 3,625.00
Nilai HSPK : Rp 169,240.60
Pasang Talang dari Seng BJLS 30 (lbr 90cm) m1
Tenaga:
Mandor 0.0250 O.H Rp 90,000.00 Rp 2,250.00
Tukang Kayu 0.8000 O.H Rp 70,000.00 Rp 56,000.00
Pekerja/Buruh Tak Terampil 0.5000 O.H Rp 55,000.00 Rp 27,500.00
Bahan:
Kayu Meranti (Papan 2/20/400) 0.0096 m3 Rp 5,673,500.00 Rp 54,465.60
Seng Talang BJLS 30 (0.90x1.1) 1.0000 m1 Rp 48,250.00 Rp 48,250.00
Paku biasa 2"-5" 0.4000 Kg Rp 14,500.00 Rp 5,800.00
Nilai HSPK : Rp 194,265.60
Pasang Talang dari Seng BJLS 40 (lebar 60 cm) m1
Tenaga:
Mandor 0.1750 O.H Rp 90,000.00 Rp 15,750.00
Tukang Kayu 0.6000 O.H Rp 70,000.00 Rp 42,000.00
Pekerja/Buruh Tak Terampil 0.3500 O.H Rp 55,000.00 Rp 19,250.00
Bahan:
Kayu Meranti (Papan 2/20/400) 0.0096 m3 Rp 5,673,500.00 Rp 54,465.60
Seng Talang BJLS 40 (0.60x1.1) 1.0000 m1 Rp 46,450.00 Rp 46,450.00
Paku biasa 2"-5" 0.2500 Kg Rp 14,500.00 Rp 3,625.00
Nilai HSPK : Rp 181,540.60
- 44 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pasang Talang dari Seng BJLS 40 (lbr 90cm) m1
Tenaga:
Mandor 0.0250 O.H Rp 90,000.00 Rp 2,250.00
Tukang Kayu 0.8000 O.H Rp 70,000.00 Rp 56,000.00
Pekerja/Buruh Tak Terampil 0.5000 O.H Rp 55,000.00 Rp 27,500.00
Bahan:
Kayu Meranti (Papan 2/20/400) 0.0096 m3 Rp 5,673,500.00 Rp 54,465.60
Seng Talang BJLS 40 (0.90x1.1) 1.0000 m1 Rp 51,700.00 Rp 51,700.00
Paku biasa 2"-5" 0.4500 Kg Rp 14,500.00 Rp 6,525.00
Nilai HSPK : Rp 198,440.60
Pasang Alluminium Foil t=4mm m2
Tenaga:
Mandor 0.0800 O.H Rp 90,000.00 Rp 7,200.00
Kepala Tukang Kayu 0.0050 O.H Rp 80,000.00 Rp 400.00
Tukang Kayu 0.0500 O.H Rp 70,000.00 Rp 3,500.00
Pekerja/Buruh Tak Terampil 0.1500 O.H Rp 55,000.00 Rp 8,250.00
Bahan:
Aluminium Foil t=4mm 1.0500 m2 Rp 28,743.33 Rp 30,180.50
Assesories ( Allumunium Foil Tape ) 1.9213 m1 Rp 1,277.78 Rp 2,455.04
Nilai HSPK : Rp 51,985.54
Plafon
List langit - langit gypsum m1
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Kayu 0.0050 O.H Rp 80,000.00 Rp 400.00
Tukang Kayu 0.0500 O.H Rp 70,000.00 Rp 3,500.00
Pekerja/Buruh Tak Terampil 0.0500 O.H Rp 55,000.00 Rp 2,750.00
Bahan:
List gypsum 1 x 10 cm 1.0500 m1 Rp 18,350.00 Rp 19,267.50
Tepung Gypsum 0.1500 Kg Rp 14,650.00 Rp 2,197.50
Nilai HSPK : Rp 28,385.00
Pekerjaan Langit-langit Calsiboard tebal 6mm m2
Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Kayu 0.0050 O.H Rp 80,000.00 Rp 400.00
Tukang Kayu 0.0500 O.H Rp 70,000.00 Rp 3,500.00
Pekerja/Buruh Tak Terampil 0.1000 O.H Rp 55,000.00 Rp 5,500.00
Bahan:
Calsiboard Uk. 244x122x6mm 0.3640 Lembar Rp 131,200.00 Rp 47,756.80
Paku Asbes 0.1100 Kg Rp 24,450.00 Rp 2,689.50
Nilai HSPK : Rp 60,296.30
Pemasangan Papan Reiuter m1
Tenaga:
Mandor 0.0025 O.H Rp 90,000.00 Rp 225.00
Kepala Tukang Kayu 0.0025 O.H Rp 80,000.00 Rp 200.00
Tukang Kayu 0.0250 O.H Rp 70,000.00 Rp 1,750.00
Pekerja/Buruh Tak Terampil 0.1250 O.H Rp 55,000.00 Rp 6,875.00
Bahan:
Kayu Meranti (Papan 2/20/400) 0.0040 m3 5,673,500.00 Rp 22,694.00
Paku biasa 2"-5" 0.0500 Kg Rp 14,500.00 Rp 725.00
Nilai HSPK : Rp 32,469.00
Pemasangan Kompres Atap m1
Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Kayu 0.0050 O.H Rp 80,000.00 Rp 400.00
Tukang Kayu 0.0500 O.H Rp 70,000.00 Rp 3,500.00
Pekerja/Buruh Tak Terampil 0.1250 O.H Rp 55,000.00 Rp 6,875.00
Bahan:
Kayu Kamper (Papan 2/20/400) 0.0020 m3 Rp 9,772,350.00 Rp 19,544.70
Seng Talang BJLS 30 (0.60x1.1) 0.5000 m1 Rp 34,150.00 Rp 17,075.00
Paku biasa 2"-5" 0.0500 Kg Rp 14,500.00 Rp 725.00
Nilai HSPK : Rp 48,569.70
- 45 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pemasangan Rangka Plafond Hollow Galvalume (0,5 X m2
1)
Tenaga:
Mandor 0.0760 O.H Rp 90,000.00 Rp 6,840.00
Kepala Tukang Besi 0.0320 O.H Rp 80,000.00 Rp 2,560.00
Tukang Besi 0.3200 O.H Rp 65,000.00 Rp 20,800.00
Pekerja/Buruh Tak Terampil 0.0760 O.H Rp 55,000.00 Rp 4,180.00
Bahan:
Hollow 2,4 1.1000 m1 Rp 14,083.33 Rp 15,491.67
Hollow 4,4 3.3000 m1 Rp 15,991.67 Rp 52,772.50
Kawat BWG 0.2500 Kg Rp 30,762.50 Rp 7,690.63
Suspention Roof 0.1500 m1 Rp 23,908.50 Rp 3,586.28
Fasting Nails 18.0000 bh Rp 317.40 Rp 5,713.20
Nilai HSPK : Rp 119,634.27
Pasang Kalsiplank Lbr 30 cm tebal 8 mm m1
Tenaga:
Mandor 0.0015 O.H Rp 90,000.00 Rp 135.00
Kepala Tukang Kayu 0.0015 O.H Rp 80,000.00 Rp 120.00
Tukang Kayu 0.0150 O.H Rp 70,000.00 Rp 1,050.00
Pekerja/Buruh Tak Terampil 0.0300 O.H Rp 55,000.00 Rp 1,650.00
Bahan:
Kalsiplank Lebar 30 cm tebal 8 mm 0.5250 lbr Rp 63,250.00 Rp 33,206.25
Sekrup Besar 6.0000 bh Rp 1,300.00 Rp 7,800.00
Nilai HSPK : Rp 43,961.25
Pasang Rangka Lisplank Hollow Galvalume m2
Tenaga :
Mandor 0.0760 O.H Rp 90,000.00 Rp 6,840.00
Kepala Tukang Besi 0.0320 O.H Rp 80,000.00 Rp 2,560.00
Tukang Besi 0.3200 O.H Rp 65,000.00 Rp 20,800.00
Pekerja/Buruh Tak Terampil 0.0760 O.H Rp 55,000.00 Rp 4,180.00
Bahan :
Hollow 4,4 3.6400 m1 Rp 15,991.67 Rp 58,209.67
Kawat BWG 0.2500 Kg Rp 30,762.50 Rp 7,690.63
Suspention Roof 0.1500 m1 Rp 23,908.50 Rp 3,586.28
Fasting Nails 18.0000 bh Rp 317.40 Rp 5,713.20
Nilai HSPK : Rp 109,579.77
Pasang Lisplank GRC Board m2
Tenaga :
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Kayu 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Kayu 0.2000 O.H Rp 70,000.00 Rp 14,000.00
Pekerja/Buruh Tak Terampil 0.1000 O.H Rp 55,000.00 Rp 5,500.00
Bahan :
Lisplank GRC Board 1.1000 m2 Rp 93,600.00 Rp 102,960.00
Aksesoris 35% 0.3500 kg Rp 32,760.00 Rp 11,466.00
Nilai HSPK : Rp 135,976.00
XI. BIDANG BARANG : ALAT DAN BAHAN PERSEDIAAN PAKAI HABIS ( ZONA 1 )

KODE HARGA HARGA


NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
1 2 2 3 4 5
02.02 ALAT-ALAT BESAR
02.02.01 ALAT-ALAT BESAR DARAT
02.02.01.07 COMPACTING EQUIPMENT
02.02.01.07. Alat Berat Lainnya
1 02.02.01.07.05.03 Drilling Rig Kapasitas; 90 Pk Unit 5,090,931,600 5,090,931,600
2 02.02.01.07.05.04 Truck Cargo Kapasitas; 125 Pk Unit 282,997,650 282,997,650
3 02.02.01.07.05.05 Truck Crane Kapasitas; 120 Pk Unit 68,356,500 68,356,500
02.02.03 ALAT BANTU
02.02.03.05 Pompa
1 02.02.03.05.07.12 Pompa Jet Pump Panasonic ( GN-205HX, 200WATT) Unit 1,988,500 1,988,500
2 02.02.03.05.08.02 Pompa Turbine Kapasitas; 75 Pk Unit 31041600 31041600
02.04 ALAT BENGKEL
02.04.01 ALAT BENGKEL BERMESIN
02.04.01.01 PERKAKAS KONSTRUKSI LOGAM TERPASANG PADA PONDASI
02.04.01.01.18. Mesin Kompresor
Multipro, 1/4 HP-KOSOKU 5,5 HP, 2,414,400 2,414,400
1 02.04.01.01.18.19 Mesin Kompresor Unit
BELT ENGINE
Multipro, 1/4 HP-HONDA 5,5 HP,
2 02.04.01.01.18.20 Mesin Kompresor Unit 3,449,100 3,449,100
BELT ENGINE
02.04.02 PERKAKAS STANDAR TAK BERMESIN
02.04.02.07 Perkakas Bengkel Kerja
1 02.04.02.07.01.01 Gergaji Besi, Double RRT Buah 11,400 11,400
2 02.04.02.07.01.02 Gergaji Uk 18" lokal Buah 22,750 22,750
3 02.04.02.07.08.36 Palu Aneka Maju, besar Buah 41,100 41,100
4 02.04.02.07.08.05 Bodem Uk. 8 Lb Buah 69,000 69,000
5 02.04.02.07.18.01 Cetok Semen RRT Bulat 5" Buah 11,200 11,200
6 02.04.02.07.19.02 Kasutan Lokal Buah 11,350 11,350
02.04.02.08. PERALATAN TUKANG-TUKANG BESI
02.04.02.08.06 Tang
1 02.04.02.08.06.17 Tang TJAP MATA, potong 6" Buah 69000 69000
02.05 ALAT-ALAT PERTANIAN
02.05.01 ALAT PENGOLAHAN
1 02.05.01.01.05.02 Ganco Lokal, Besar, Biasa Buah 60300 60300
2 02.05.01.03.22.10 Gelangsing Buah 3,600 3,600
02.05.02 ALAT PEMELIHARAAN TANAMAN / ALAT PENYIMPAN
02.05.02.01 Alat Pemeliharaan Tanaman
1 02.05.02.01.10.03 Garuk Gigi 10 Buah 28,750 28,750
2 02.05.02.01.10.05 Garuk Songrok Besi Buah
02.05.02.03 Alat Penyimpanan
1 02.05.02.03.01.07 Kantong Plastik Uk. 15 x 20 cm, 10 Pcs Pak
2 02.05.02.03.03.03 Keranjang Rotan Buah
05.19 HEWAN/TERNAK DAN TANAMAN
05.19.02 TANAMAN
05.19.02.03 TANAMAN PELINDUNG
05.19.02.03.01 Bibit Tanaman Pelindung
1 05.19.02.03.01.17 Mangrove T. 1 M Batang
05.19.02.05 Tanaman Lainnya
1 05.19.02.05.01.22 Rumput Lamur (Embun) m2
2 05.19.02.05.01.23 Rumput Manila Golf t = 0,05 m m2
05.19.03 TANAMAN HIAS DAN MATERIAL PELENGKAPNYA
05.19.03.14 Pupuk dan Bahan Material Lainnya
1 05.19.03.14.37 Pupuk Daun @ 100 gr Bks
2 05.19.03.14.40 Pupuk Kandang Kg
3 05.19.03.14.55 Pupuk Urea Non Subsidi Kg 4,850 4,850
4 05.19.03.14.52 Stek Non Lokal Batang
5 05.19.03.14.34 Penggantian Tanaman Batang
6 05.19.03.14.25 Obat Hama Tanaman Liter
20 BARANG PERSEDIAAN DAN BARANG PAKAI HABIS
20.01 BARANG PAKAI HABIS
20.01.01 BAHAN BANGUNAN DAN KONSTRUKSI
20.01.01.01. Aspal
1 20.01.01.01.01 Aspal Aspal Bitumen Kg 13,800 14,400
2 20.01.01.01.02 Aspal Aspal Curah (AC 60/70) Kg 13,800 14,400
3 20.01.01.01.03 Aspal Buton Granular Kg 2,300 2,400
4 20.01.01.01.04 Aspal Chemecrete Kg 19,700 20,500

46
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
5 20.01.01.01.05 Aspal Pengikat (Tack Coat) ltr 15,600 16,300
6 20.01.01.01.06 Aspal resap pengikat ( prime coat ) Kg 16,800 16,800
7 20.01.01.01.07 Filler ltr 2,100 2,200
8 20.01.01.01.08 Aspal Curah Kemasan Drum Kg 17,000 17,700
9 20.01.01.01.09 Asbuton Halus Ton 341,250
20.01.01.02. Semen
1 20.01.01.03.02 Kapur Bubuk 25 kg zak 59,250 59,250
2 20.01.01.03.01 Kapur Bubuk 5 kg Kg 5,000 5,000
3 20.01.01.03.03 Kapur Gamping Kg 6,900 6,900
4 20.01.01.03.06 Kapur Pasang 10 Kg zak 17,000 17,000
1 20.01.01.02.01 Semen Gresik 40 Kg zak 69,000 71,800
2 20.01.01.02.02 Semen Gresik 50 Kg zak 83,950 87,350
3 20.01.01.02.03 Semen Holcim, 40 Kg zak 67,850 70,600
4 20.01.01.02.04 Semen Holcim, 50 Kg zak 80,500 83,750
5 20.01.01.02.08 Semen Putih 40 Kg Gresik zak 97,750 101,700
6 20.01.01.02.10 Semen Semen Putih zak 64,400 67,000
7 20.01.01.02.11 Semen Semen warna/nat Kg 13,800 14,400
8 20.01.01.02.06 Semen Tiga Roda, 40 Kg zak 65,550 68,200
9 20.01.01.02.07 Semen Tiga Roda, 50 Kg zak 80,500 83,750
20.01.01.04. Kaca
1 20.01.01.04.03.01 Kaca Cermin 3 mm m2 117,250 117,250
2 20.01.01.04.03.03 Kaca Espanyolet Buah 120,750 120,750
3 20.01.01.04.03.04 Kaca Fiber glas 92 cm m2 36,800 36,800
4 20.01.01.04.03.05 Kaca Fitrase m2 47,150 47,150
5 20.01.01.04.03.06 Kaca Glass Block Buah 24,750 24,750
6 20.01.01.04.03.07 Kaca Krepyak Nako daun 17,850 17,850
7 20.01.01.04.01.03 Kaca Polos Bening 8 mm m2 161,000 161,000
8 20.01.01.04.01.04 Kaca Polos Bening 10 mm m2 229,950 229,950
9 20.01.01.04.01.05 Kaca Polos Bening 12 mm m2 312,850 312,850
10 20.01.01.04.01.06 Kaca Polos Bening 20 mm m2 1,030,050 1,030,050
11 20.01.01.04.01.01 Kaca Polos Bening tebal 3mm m2 96,600 96,600
12 20.01.01.04.01.02 Kaca Polos Bening tebal 5mm m2 120,000 120,000
13 20.01.01.04.102.05 Kaca Rayben 12 mm m2 862,300 862,300
14 20.01.01.04.02.01 Kaca Rayben tebal 3mm m2 98,150 98,150
15 20.01.01.04.02.02 Kaca Rayben tebal 5mm m2 120,750 120,750
16 20.01.01.04.03.08 Kaca Vertical Blind m2 138,000 138,000
17 20.01.01.04.03.09 Kaca Acrylic, bening uk. 5mm ( 122 x buah 1,322,150 1,322,150
18 20.01.01.04.03.10 Kaca 244 cm )bening uk. 10mm ( 122 x
Acrylic, buah 2,414,350 2,414,350
19 20.01.01.04.03.12 Kaca 244 cm
Kaca )
Tempered Warna Tebal 8 mm m2 709,400 709,400
20 20.01.01.04.03.13 Kaca Kaca Tempered Warna Tebal 12 mm m2 1,550,000 1,550,000
20.01.01.05. Pasir
1 20.01.01.05.01 Pasir Beton m3 275,000 275,000
2 20.01.01.05.02 Pasir Kali m3 192,000 199,700
3 20.01.01.05.03 Pasir Pasang m3 270,000 270,000
4 20.01.01.05.04 Pasir Sirtu m3 217,300 226,000
5 20.01.01.05.05 Pasir Tanah Urug /Padas/Tanah Liat m3 70,000 106,400
6 20.01.01.05.06 Pasir Urug m3 126,500 131,600
7 20.01.01.05.09 Tanah Tanam 80,000 80,000
20.01.01.08. Batu
1 20.01.01.08.06.01 Batu Ampyang Multi warna m2 87,000 90,500
2 20.01.01.08.12.01 Batu Bata Klingker Buah 2,250 2,400
3 20.01.01.08.03.02 Batu Bata Merah Biji 750 780
4 20.01.01.08.12.02 Batu Batako Kapur Biji 4,850 5,100
5 20.01.01.08.12.03 Batu Batako Semen (40x 20x 10 cm) Buah 6,350 6,650
6 20.01.01.08.09.06 Batu Candi Alur m2 143,750 149,500
7 20.01.01.08.07.02 Batu Gilang Ex Cirebon Acak m2 115,000 119,600
8 20.01.01.08.07.06 Batu Gilang Ex Cirebon Uk. 10 x 20 m2 112,700 117,250
9 20.01.01.08.07.01 Batu Gilang Ex Jember Acak m2 109,250 113,650
10 20.01.01.08.07.04 Batu Gilang Ex Jember 20x40 m2 101,200 105,250
11 20.01.01.08.12.05 Batu Grass Block Buah 24,300 25,300
12 20.01.01.08.12.06 Batu Kali / Gunung m3 114,200 118,800
13 20.01.01.08.02.01 Batu Krikil sungai (dengan pasir) m3 109,250 113,650
14 20.01.01.08.02.02 Batu Krikil sungai (tanpa pasir) m3 115,000 119,600
15 20.01.01.08.12.07 Batu Looster, abu-abu (55x25) cm Biji 10,050 10,500
16 20.01.01.08.12.08 Batu Looster, Merah (10x25) cm Biji 7,150 7,450
17 20.01.01.08.12.09 Batu Palimanan Hijau m2 151,800 157,900
18 20.01.01.08.12.10 Batu Palimanan Kuning m2 148,350 154,300
19 20.01.01.05.01.01 Batu Pecah Mesin 0,5/1 cm m3 287,450 298,950
20 20.01.01.05.01.02 Batu Pecah Mesin 1/2 cm m3 258,700 269,050
21 20.01.01.05.01.03 Batu Pecah Mesin 2/3 cm m3 252,950 263,100
22 20.01.01.05.01.06 Batu Pecah Tangan 10/15 m3 146,050 151,900
23 20.01.01.05.01.07 Batu Pecah Tangan 15/20 m3 129,950 135,150

47
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
24 20.01.01.05.01.04 Batu Pecah Tangan 3/5 cm m3 229,950 239,150
25 20.01.01.05.01.05 Batu Pecah Tangan 5/7 cm m3 178,250 185,400
26 20.01.01.05.01.08 Batu Pecah Tangan 7/10 m3 178,250 185,400
27 20.01.01.08.06.01 Batu Ampyang Multi warna m2 87,000 90,500
20.01.01.09. Cat
1 20.01.01.09.04.20 Cat Avian Kg 55,200 55,200
2 20.01.01.09.04.01 Cat Bron Kg 44,300 44,300
3 20.01.01.09.04.02 Cat Cat Mobil Liter 134,500 134,500
4 20.01.01.09.03.02 Cat Cerlak galon 231,850 231,850
5 20.01.01.09.03.01 Cat Clear Doof Kg 53,150 53,150
6 20.01.01.09.03.05 Cat Coumpond isi 1 Kg Kaleng 39,050 39,050
7 20.01.01.09.05.08 Cat Dempul Kayu, Pedang Kg 24,450 24,450
8 20.01.01.09.05.09 Cat Dempul Kayu, Bakar Buah 3,700 3,700
9 20.01.01.09.05.05 Cat Dempul Mobil Kg 27,500 27,500
10 20.01.01.09.05.06 Cat Dempul Mobil Classy Kg 26,300 26,300
11 20.01.01.09.04.30 Cat Duco Gram 66,700 66,700
12 20.01.01.09.04.19 Cat Genteng, Sanlek Galon 187,050 187,050
13 20.01.01.09.03.09 Cat Kayu / Emco Kg 61,550 61,550
14 20.01.01.09.01.02 Cat Besi/emco Kg 59,800 59,800
15 20.01.01.09.04.31 Cat Kolter Liter 12,100 12,100
16 20.01.01.09.01.05 Cat Meni Besi, Pedang Kg 27,500 27,500
17 20.01.01.09.04.04 Cat Minyak Cat, Avian Liter 27,600 27,600
18 20.01.01.09.04.05 Cat Minyak Cat, Biasa Liter 10,700 10,700
19 20.01.01.09.04.22 Cat Pernis Kayu / Besi Kg 31,050 31,050
20 20.01.01.09.04.03 Cat Pernis Mobil Kg 106,150 106,150
21 20.01.01.09.04.34 Cat Pewarna Cat Tembak Kg 58,950 58,950
22 20.01.01.09.03.10 Cat Plamur Kayu, Cap Pedang Kg 28,750 28,750
23 20.01.01.09.04.18 Cat Plamur Tembok Kg 36,050 36,050
24 20.01.01.09.04.15 Cat Politur jadi Liter 36,650 36,650
25 20.01.01.09.04.32 Residu Liter 5,200 5,200
26 20.01.01.09.04.23 Cat Shanding Kg 51,250 51,250
27 20.01.01.09.04.06 Cat Spirtus ltr 16,700 16,700
28 20.01.01.09.04.24 Cat Teer Kg 12,650 12,650
29 20.01.01.09.04.21 Cat Catylac 5Kg 106,800 106,800
30 20.01.01.09.02.01 Cat Tembok Decholite (5 Kg) Galon 102,350 102,350
31 20.01.01.09.02.09 Cat Tembok Interior Dulux Khusus Liter 90,950 90,950
32 20.01.01.09.02.08 Cat Tembok Interior Dulux standar Liter 78,050 78,050
33 20.01.01.09.02.02 Cat Tembok, Paragon Kg 24,150 24,150
34 20.01.01.09.02.03 Cat Tembok, Paragon (5 Kg) Galon 93,150 93,150
35 20.01.01.09.04.08 Cat Thinner A Special Liter 31,050 31,050
36 20.01.01.09.04.09 Cat Thinner B Liter 10,700 10,700
37 20.01.01.09.04.33 Cat Utk. Marka Jalan / Scotch Light Kg 37,400 37,400
38 20.01.01.09.04.25 Cat Wood Filler Kg 36,800 36,800
39 20.01.01.09.02.13 Cat Tembok Eksterior Dulux ( Standar ) Liter 128,000 128,000
40 20.01.01.09.02.14 Cat Tembok Eksterior Dulux ( Khusus ) Liter 142,600 142,600
41 20.01.01.09.02.16 Cat Tembok Dasar Alkali, Interior Dulux Liter 57,550 57,550
42 20.01.01.09.04.19 Cat Genteng Sanlek Galon 187,050 187,050
20.01.01.09.06 Waterproofing
1 20.01.01.09.06.01 Waterproofing No Drop, 1 Kg Kaleng 46,600 46,600
2 20.01.01.09.06.02 Waterproofing No Drop, 4 Kg Kaleng 173,050 173,050
3 20.01.01.09.06.03 Waterproofing No Drop, 20 Kg Kaleng 850,800 850,800
4 20.01.01.09.06.04 Waterproofing Multiguard, 1 Kg Kaleng 47,050 47,050
20.01.01.11. Seng
1 20.01.01.11.01.02 Seng Gelombang BJLS 20 uk. (80 x 300 cm) Lembar 89,700 89,700
2 20.01.01.11.01.03 Seng Gelombang BJLS 28 uk. (80 x 180 cm) Lembar 58,650 58,650
3 20.01.01.11.01.04 Seng Gelombang BJLS 30 uk. (80 x 210 cm) Lembar 86,250 86,250
4 20.01.01.11.01.07 Seng Gelombang BJLS 30 uk. (80x 300cm) Lembar 120,750 120,750
5 20.01.01.11.01.05 Seng Gelombang BJLS 30 uk. (80x 180cm) Lembar 78,200 78,200
6 20.01.01.11.01.08 Seng Gelombang BJLS 40 uk. (80 cm x300 cm) Lembar 155,250 155,250
7 20.01.01.11.01.09 Seng Gelombang BJLS 40 uk. (80 cm x210 cm) Lembar 115,000 115,000
8 20.01.01.11.01.10 Seng Gelombang BJLS 40 uk (80 x 240 cm) Lembar 126,500 126,500
9 20.01.01.11.04.04 Seng Gelombang Nok Stel Gelombang Seng Stel 27,600 27,600
10 20.01.01.11.02.11 Seng Gelombang Plat BJLS 30/30 cm m1 19,300 19,300
11 20.01.01.11.02.12 Seng Gelombang Plat BJLS 30/40 cm m1 23,250 23,250
12 20.01.01.11.02.13 Seng Gelombang Plat BJLS 30/80 cm m1 46,200 46,200
13 20.01.01.11.02.14 Seng Gelombang Plat uk (0,03x90x180)cm Lembar 73,100 73,100
14 20.01.01.11.04.05 Seng Gelombang Sambungan talang Buah 9,750 9,750
15 20.01.01.11.03.09 Seng Gelombang Talang 60cm x 30 BJLS m1 34,150 34,150
16 20.01.01.11.03.10 Seng Gelombang Talang 60cm x 40 BJLS m1 46,450 46,450
17 20.01.01.11.03.11 Seng Gelombang Talang 90cm x 30 BJLS m1 48,250 48,250
18 20.01.01.11.03.12 Seng Gelombang Talang 90cm x 40 BJLS m1 51,700 51,700
20.01.01.12. Atap Spandek
1 20.01.01.12.01 Atap Spandek tebal 0,3 meter 57,350 57,350

48
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
2 20.01.01.12.02 Atap Spandek tebal 0,35 meter 62,250 62,250
3 20.01.01.12.03 Atap Spandek tebal 0,4 meter 69,550 69,550
4 20.01.01.12.04 Atap Spandek tebal 0,45 meter 76,900 76,900
5 20.01.01.12.05 Atap Spandek tebal 0,5 meter 84,200 84,200

49
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
20.01.01.13. Baja
1 20.01.01.13.02 Baja Baja WF Kg 14,500 17,700
2 20.01.01.13.05 Baja Plat esser 0.12x120x 240 cm m2 100,050 104,100
3 20.01.01.13.06 Baja Plat esser 0.3x120 x 240 cm m2 231,800 241,100
4 20.01.01.13.07 Baja Plat Eyser 0,09 m2 140,650 146,300
5 20.01.01.13.08 Baja Plat Eyser 0,2 m2 197,750 205,700
6 20.01.01.13.09 Baja Plat Eyser 0,3 m2 272,450 283,350
7 20.01.01.13.10 Baja Plat Siku Kg 14,000 15,100
8 20.01.01.13.11 Baja Plat Strip Kg 14,000 14,900
9 20.01.01.13.12 Baja Plate Bronze Kg 29,100 30,300
10 20.01.01.13.13 Baja Rangka Galvalume & Accessories m2 212,950 221,500
11 20.01.01.13.14 Baja Ringan Zincalum, C75 - 1mm m2 44,350 46,200
12 20.01.01.13.15 Baja Ringan Zincalum, C75 - 0.75mm m2 33,750 35,100
13 20.01.01.13.16 Baja Ringan Zincalum, Reng TS 40.048 m2 20,250 21,100
14 20.01.01.13.04 Baja Kanal C kg 13,500 15,300
20.01.01.14. Besi
1 20.01.01.14. Besi Angkur lengkung Buah
2 20.01.01.14.01.10 Besi Beton, polos Kg 13,000 14,800
3 20.01.01.14.01.11 Besi Beton, Ulir Kg 13,200 15,100
4 20.01.01.14.05.06 Besi Angkur 30 x 30 x 3 mm Meter 169,900 176,700
5 20.01.01.14.05.07 Besi Pagar BRC / Pmg A (Uk. 1,2x2,4 m) m2 124,800 129,800
6 20.01.01.14.05.08 Besi Utk. Penyangga Lampu Ulir dia.16 Batang 261,250 271,700
mm x 12 m
7 20.01.01.14.05.01 Besi Balk Kg 27,850 29,000
8 20.01.01.14.04.01 Besi Hollow 4 x 4, tebal 1,00, panjang 6 m Batang 95,950 99,788
9 20.01.01.14.04.02 Besi Hollow 3 x 3, tebal 1,00, panjang 6 m Batang 64,450 67,028
10 20.01.01.14.04.03 Besi Hollow 1,5 x 3, tebal 1,00, panjang 6 m Batang 48,000 49,920
11 20.01.01.14.04.04 Besi Hollow 2 x 4, tebal 1,00, panjang 6 m Batang 84,500 87,880
12 20.01.01.14.04.05 Besi Hollow 4 x 6, tebal 1,00, panjang 6 m Batang 108,800 113,152
13 20.01.01.14.04.06 Besi Hollow 5 x 5, tebal 1,00, panjang 6 m Batang 110,250 114,660
20.01.01.14.06 Wire Mesh U50
1 20.01.01.14.06.01 Besi M4, Uk. 2,1 x 5,4 m Lembar 171,350 171,350
2 20.01.01.14.06.02 Besi M5, Uk. 2,1 x 5,4 m Lembar 255,250 255,250
3 20.01.01.14.06.03 Besi M6, Uk. 2,1 x 5,4 m Lembar 358,750 358,750
4 20.01.01.14.06.04 Besi M7, Uk. 2,1 x 5,4 m Lembar 488,650 488,650
5 20.01.01.14.06.05 Besi M8, Uk. 2,1 x 5,4 m Lembar 638,100 638,100
6 20.01.01.14.06.06 Besi M9, Uk. 2,1 x 5,4 m Lembar 827,800 827,800
7 20.01.01.14.06.07 Besi M10, Uk. 2,1 x 5,4 m Lembar 1,020,950 1,020,950
8 20.01.01.14.06.08 Besi M12, Uk. 2,1 x 5,4 m Lembar 1,486,550 1,486,550
20.01.01.15. Genteng
1 20.01.01.15.01.01 Genteng Beton Biji 6,600 6,600
2 20.01.01.15.02.01 Genteng Bubungan Beton Biji 8,650 8,650
3 20.01.01.15.02.02 Genteng Bubungan ex Trenggalek Biji 6,150 6,150
4 20.01.01.15.02.03 Genteng Bubungan ex Wisma Biji 14,750 14,750
5 20.01.01.15.02.04 Genteng Bubungan Lokal Biji 6,900 6,900
6 20.01.01.15.08.06 Genteng Galvalume Biji 8,800 8,800
7 20.01.01.15.08.07 Genteng Glassur Biji 11,000 11,000
8 20.01.01.15.03.01 Genteng Kaca Beton Biji 38,450 38,450
9 20.01.01.15.03.02 Genteng Kaca Kodok Biji 16,100 16,100
10 20.01.01.15.03.03 Genteng Kaca Plumpring Biji 12,450 12,450
11 20.01.01.15.04.05 Genteng Karangpilang ex Wisma Biji 4,500 4,500
12 20.01.01.15.08.01 Genteng Keramik Biji 10,400 10,400
13 20.01.01.15.06.01 Genteng Kodok ex Trenggalek Biji 2,300 2,300
14 20.01.01.15.08.02 Genteng Lokal Biji 1,350 1,350
15 20.01.01.15.08.03 Genteng Nok Genteng Beton Biji 10,550 10,550
16 20.01.01.15.08.04 Genteng Penutup Zincalum m2 58,700 58,700
17 20.01.01.15.05.04 Genteng Wuwung / NOK Bulat Biji 6,900 6,900
18 20.01.01.15.05.06 Genteng Wuwung Jawa / Lokal Biji 8,550 8,550
19 20.01.01.15.01.05 Genteng Beton Setara Ex. Cisangkan Biji 13,800 13,800
20 20.01.01.15.05.10 Genteng Wuwung Beton Setara Ex. Biji 35,300 35,300
20.01.01.16 Cisangkan
Penutup AtapZincalum
1 20.01.01.16.01 Penutup AtapZincalu Tebal = 0,3 mm m2 88,800 88,800
2 20.01.01.16.02 Penutup AtapZincalu Tebal = 0,35 mm m2 105,750 105,750
3 20.01.01.16.03 Penutup AtapZincalu Tebal = 0,4 mm m2 117,750 117,750
20.01.01.17. Buis Beton
1 20.01.01.17.09 Buis Beton Bulat 100/100 cm Biji 178,250 178,250
2 20.01.01.17.01 Buis Beton Bulat 15/100 cm Biji 42,550 42,550
3 20.01.01.17.02 Buis Beton Bulat 20/100 cm Biji 53,400 53,400
4 20.01.01.17.03 Buis Beton Bulat 30/100 cm Biji 66,150 66,150
5 20.01.01.17.04 Buis Beton Bulat 40/100 cm Biji 84,550 84,550
6 20.01.01.17.05 Buis Beton Bulat 50/100 cm biji 103,500 103,500
7 20.01.01.17.10 Buis Beton Bulat 50/50 cm Biji 69,000 69,000

50
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
8 20.01.01.17.06 Buis Beton Bulat 60/100 cm Biji 123,600 123,600
9 20.01.01.17.11 Buis Beton Bulat 60/50 cm Biji 79,350 79,350
10 20.01.01.17.08 Buis Beton Bulat 80/100 cm Biji 161,000 161,000
11 20.01.01.17.12 Buis Beton Bulat 80/50 cm Biji 110,000 110,000
12 20.01.01.17.13 Buis Beton Bulat 100/50 cm Biji 128,150 128,150
13 20.01.01.17.14 Buis Beton U 15 cm Biji 20,150 20,150
14 20.01.01.17.15 Buis Beton U 20 cm Biji 26,600 26,600
15 20.01.01.17.16 Buis Beton U 30 cm Biji 33,900 33,900
16 20.01.01.17.17 Buis Beton U 40 cm Biji 40,250 40,250
17 20.01.01.17.18 Buis Beton U 50 cm Biji 46,600 46,600
20.01.01.18. Aluminium
1 20.01.01.18.04 Aluminum Plat aluminium tb 2 mm m2 584,700 584,700
2 20.01.01.18.01 Aluminum Alloy 10 x 10 x 2 cm buah 73,900 73,900
3 20.01.01.18.02 Aluminum Braket m 25,900 25,900
4 20.01.01.18.03 Aluminum Karet Kusen Aluminium M 4,450 4,450
5 20.01.01.18.05 Aluminum Profil 3" Coklat ( 3 x 7.5 ) m1 67,850 67,850
6 20.01.01.18.06 Aluminum Profil 3" Putih ( 3 x 7.5 ) m1 54,050 54,050
7 20.01.01.18.07 Aluminum Profil 4" Coklat ( 4 x 10 ) m1 103,700 103,700
8 20.01.01.18.08 Aluminum Profil 4" Putih ( 4 x 10 ) m1 92,800 92,800
9 20.01.01.18.09 Aluminum Slimar 3/8" Jendela m1 58,400 58,400
10 Allumunium Foil Bubble, Double Side Medium t = lembar 862,300
11 Allumunium Foil Tape 4mm
48 mm x 45 m roll 57,500
20.01.01.19. Amplas
1 20.01.01.19.02 Amplas Halus Feting 0 s/d 3 Buah 5,200 5,200
2 20.01.01.19.04 Amplas Kasar Fujistar 0 s/d 1000 Buah 4,600 4,600
20.01.01.20. Asbes
1 20.01.01.20.01.01 Asbes Gel Besar Tbl 6 mm; 1.80x1.05 m Lembar 81,650 81,650
2 20.01.01.20.01.12 Asbes Gel Besar Tbl 4 mm ; 3 x 1.05 m Lembar 155,250 155,250
3 20.01.01.20.01.05 Asbes Gel Besar Tbl 5 mm ; 3 x 1.10 m Lembar 131,100 131,100
4 20.01.01.20.01.02 Asbes Gel Besar Tbl 6 mm; 2.10x1.05 m Lembar 68,650 68,650
5 20.01.01.20.01.03 Asbes Gel Besar Tbl 6 mm; 2.40x1.05 m Lembar 84,550 84,550
6 20.01.01.20.01.13 Asbes Gel Besar Tbl 6 mm; 2.70x1.05 m Lembar 111,550 111,550
7 20.01.01.20.01.04 Asbes Gel. Besar Tbl 6 mm ; 3 x 1.05 m Lembar 156,750 156,750
8 20.01.01.20.02.05 Asbes Gel Kecil Tbl 4 mm; 1.80x1.05 m Lembar 63,850 63,850
9 20.01.01.20.02.04 Asbes Gel Kecil Tbl 4 mm; 2.10x1.05 m Lembar 74,750 74,750
10 20.01.01.20.02.03 Asbes Gel Kecil Tbl 4 mm; 2.40x1.05 m Lembar 83,750 83,750
11 20.01.01.20.02.02 Asbes Gel Kecil Tbl 4 mm; 2.70x1.05 m Lembar 86,650 86,650
12 20.01.01.20.02.01 Asbes Gel Kecil Tbl 4 mm; 3.00x1.05 m Lembar 102,350 102,350
13 20.01.01.20.02.08 Asbes Gel Kecil Tbl 5 mm; 3.05x1.05 m Lembar 94,600 94,600
14 20.01.01.20.03.03 Asbes Datar uk. 100 x 100 x 0.3Cm Lembar 20,150 20,150
15 20.01.01.20.01.06 Asbes Gel. Besar Tbl 5 mm ; 2.5 x 1.10 Lembar 109,250 109,250
16 20.01.01.20.02.06 Asbes Gel. Kecil Tbl 4 mm ; 1.5 x 1.05 Lembar 57,500 57,500
17 20.01.01.20. Asbes Gel. Kecil Tbl 5 mm ; 1.8 x 0.92 Lembar 71,450 71,450
18 20.01.01.20.02.09 Asbes Gel. Kecil Tbl 5 mm ; 2.00 x 0.92 Lembar 74,750 74,750
19 20.01.01.20.02.10 Asbes Gel. Kecil Tbl 5 mm ; 2.25 x 0.92 Lembar 82,800 82,800
20 20.01.01.20.40 Asbes Plat 90x 180x 0.3 cm Buah 21,360 21,360
21 20.01.01.20.04.03 Asbes Sirap Uk. 20x3x400 cm Lembar 25,650 25,650
22 20.01.01.20.04.04 Asbes Nok Nok Asbes Gel. Besar Lembar 60,400 60,400
23 20.01.01.20.04.02 Asbes Nok Nok Asbes Gel. Kecil Lembar 38,550 38,550
20.01.01.21. Bahan Las
1 20.01.01.21.01 Bahan Las Elektroda Baja Kg 67,150 67,150
2 20.01.01.21.02 Bahan Las Karbit (Asetelin) Kg 26,450 26,450
3 20.01.01.21.03 Bahan Las Karbit, MDQ Kg 17,750 17,750
4 20.01.01.21.04 Bahan Las Kawat Las 2.6 mm Kg 33,600 33,600
5 20.01.01.21.05 Bahan Las Kawat Las 3.2 mm Kg 32,150 32,150
6 20.01.01.21.06 Bahan Las Laminasi Kg 15,550 15,550
20.01.01.22. Batu Asah
1 20.01.01.22.01 Batu Asah Eltoro 8" Buah 13,800 13,800
2 20.01.01.22.08 Batu Asah Ikan Mas Tanggung RRT Buah 19,350 19,350
3 20.01.01.22.09 Batu Asah Ikan Mas Tipis 117 Buah 22,400 22,400
4 20.01.01.22.02 Batu Asah Inax Uk. 6 " Buah 19,550 19,550
5 20.01.01.22.03 Batu Asah Inax Uk. 8 " Buah 20,750 20,750
6 20.01.01.22.04 Batu Asah Kaca Bulat Green Silicone Buah 54,000 54,000
7 20.01.01.22.05 Batu Asah Kaca Bulat RRT Buah 21,300 21,300
20.01.01.24. Baut
1 20.01.01.24.01 Baut Kuda, Uk, 1/2 Uk. 10 s/d 25 Buah 6,150 6,150
2 20.01.01.24.02 Baut MB Seng, 1/4" Uk. 1.5" s/d 5/8" Buah 2,500 2,500
3 20.01.01.24.03 Baut MB-JES emas uk. 10*15 pj 1,5 cm Buah 3,700 3,700
4 20.01.01.24.04 Baut MB-JES emas uk. 10*20 pj 2 cm Buah 1,950 1,950
5 20.01.01.24.05 Baut MB-JES emas uk. 10*25 pj 2,5 cm Buah 1,950 1,950
6 20.01.01.24.10 Baut Mur Beam 12 x 25 mm Buah 3,750 3,750
7 20.01.01.24.13 Baut Mur Blocking 12 x 25 mm Buah 4,150 4,150

51
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
8 20.01.01.24.11 Baut Mur Post 16 x 48 mm Buah 4,300 4,300
20.01.01.25. Closet
1 20.01.01.25.01.01 Closet Ina, Duduk Komplit [2 Kran] Set 1,494,600 1,494,600
2 20.01.01.25.02.04 Closet Jongkok porselin Buah 143,400 143,400
3 20.01.01.25.02.05 Closet Jongkok teraso Buah 109,850 109,850
4 20.01.01.25.01.06 Closet Toto, Lengkap Set 2,440,200 2,440,200
20.01.01.26. Hand Shower
1 20.01.01.26.01 Hand Shower Damani Lengkap dengan Selang Buah 50,000 50,000
2 20.01.01.26.02 Hand Shower KIG 4 posisi Buah 115,000 115,000
3 20.01.01.26.03 Hand Shower KIG 6 posisi Buah 125,000 125,000
4 20.01.01.26.04 Hand Shower Shower (Stainless) Buah 103,450 103,450
20.01.01.27 Wastafel
1 20.01.01.27.10 Wastafel duty blue/white Buah 195,450 195,450
2 20.01.01.27.11 Wastafel duty sorento blue Buah 195,450 195,450
3 20.01.01.27.01 Wastafel KIA Buah 274,550 274,550
4 20.01.01.27.04 Wastafel Toto Buah 372,050 372,050
5 20.01.01.27.12 Wastafel Urinoir Merk. Toto Buah 1,034,750 1,034,750
20.01.01.28 Bak Cuci Piring
1 20.01.01.28.01 Bak Cuci Piring Bak Cuci Piring 100 Cm Afur Besar Buah 700,900 700,900
2 20.01.01.28.02 Bak Cuci Piring Bak Cuci Piring 100 Cm Afur Kecil Buah 357,300 357,300
3 20.01.01.28.03 Bak Cuci Piring Bak Cuci Piring 80 Cm Afur Besar Buah 595,650 595,650
4 20.01.01.28.10 Bak Cuci Piring Kenny, Stainless 90x50x14 cm+Afur Buah 185,000 185,000
20.01.01.29 Tempat Sabun
1 20.01.01.29.04 Tempat Sabun data blue/white Buah 21,300 21,300
2 20.01.01.29.05 Tempat Sabun data sorento blue Buah 67,900 67,900
3 20.01.01.29.06 Tempat Sabun Data oval maron/sorento/tosca Buah 21,850 21,850
4 20.01.01.29.01 Tempat Sabun Duty kotak blue/green Buah 24,450 24,450
5 20.01.01.29.02 Tempat Sabun Duty kotak maron/sorento/tosca Buah 30,550 30,550
6 20.01.01.29.07 Tempat Sabun Duty oval blue/green Buah 385,750 385,750
7 20.01.01.29.08 Tempat Sabun Duty oval maron/ sorento/ tosca Buah 456,400 456,400
20.01.01.30. Kapi
1 20.01.01.30.02 Kapi Cat rrt 1,75" Buah 4,400 4,400
2 20.01.01.30.01 Kapi Cat rrt 1,5" Buah 3,800 3,800
3 20.01.01.30.03 Kapi Cat rrt 2" Buah 5,000 5,000
4 20.01.01.30.04 Kapi Cat rrt 2,5" Buah 5,700 5,700
5 20.01.01.30.05 Kapi Cat rrt 3" Buah 6,300 6,300
6 20.01.01.30.06 Kapi Cat rrt 3,5" Buah 7,000 7,000
7 20.01.01.30.07 Kapi Cat rrt 4" Buah 8,000 8,000
8 20.01.01.30.13 Kapi KP bruno ac Buah 83,900 83,900
9 20.01.01.30.14 Kapi KP kuda asli 9332 Buah 81,200 81,200
10 20.01.01.30.15 Kapi KP mmwm 9332 putih Buah 68,450 68,450
20.01.01.31. Karpet
1 20.01.01.31.01 Karpet Foam Lapisan Karpet m2 55,550 55,550
2 20.01.01.31.02 Karpet Kain Utk. Lantai m2 58,650 58,650
3 20.01.01.31.03 Karpet Plastik fiberglass polos lbr 1m m2 34,200 34,200
4 20.01.01.31.04 Karpet Talang lebar 55 cm m2 11,000 11,000
5 20.01.01.31.05 Karpet Talang lebar 65 cm m2 12,250 12,250
6 20.01.01.31.06 Karpet Talang lebar 75 cm m2 13,450 13,450
7 20.01.01.31.10 Wall Paper Buaya, lebar 90 cm m2 17,100 17,100
8 20.01.01.31.11 Wall Paper Buaya, lebar 75 cm m2 14,650 14,650
9 20.01.01.31.12 Wall Paper Buaya, lebar 65 cm m2 12,250 12,250
10 20.01.01.31.13 Wall Paper Buaya, lebar 55 cm m2 11,000 11,000
20.01.01.32. Keramik
1 20.01.01.32.19 Keramik Batu Granit, 30 x 60 m2 518,150 518,150
2 20.01.01.32.20 Keramik Batu Granit, 40 x 60 m2 582,900 582,900
3 20.01.01.32.12 Keramik Granito 40x40 cm (Motif/ Warna) m2 394,150 394,150
4 20.01.01.32.15 Keramik Kuku Macan 2,5 cm x 10 cm Biji 1,000 1,000
5 20.01.01.32.05 Keramik Motif 20 x 20 ( asia ) m2 51,750 51,750
6 20.01.01.32.10 Keramik Motif 20 x 25 ( asia ) m2 54,050 54,050
7 20.01.01.32.06 Keramik Motif 30 x 30 ( asia ) m2 57,500 57,500
8 20.01.01.32.08 Keramik Motif 40 x 40 ( asia ) m2 63,250 63,250
9 20.01.01.32.24 Keramik Motif 60 x 60 ( decogres ) m2 139,700 139,700
10 20.01.01.32.25 Keramik Plint keramik 10x20 cm m1 32,450 32,450
11 20.01.01.32.26 Keramik Polos 20 x 25 m2 51,250 51,250
12 20.01.01.32.27 Keramik Polos 30 x 30 m2 48,250 48,250
13 20.01.01.32.28 Keramik Polos 40 x 40 m2 54,350 54,350
14 20.01.01.32.29 Keramik Variasi, Motif Lukisan Biji 21,850 21,850
15 20.01.01.32.16 Keramik List motif / variasi m1 62,500 62,500
16 20.01.01.32.38 Keramik Kasar Platinum 40 x 40 m2 83,950 83,950
20.01.01.33. Kuas
1 20.01.01.33. Kuas Cat Tendiko 1" tebal Buah 3,450 3,450

52
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
2 20.01.01.33.07 Kuas Cat Sterna, 1" Buah 4,900 4,900
3 20.01.01.33.09 Kuas Cat Sterna, 2 " Buah 6,750 6,750
4 20.01.01.33.10 Kuas Cat Sterna, 3" Buah 11,650 11,650
5 20.01.01.33.11 Kuas Cat Sterna, 4" Buah 16,550 16,550
6 20.01.01.33.05 Kuas Cat Mdn, 4" Buah 9,200
7 20.01.01.33. Kuas Roll Kapal Biasa Uk.4" Buah 31,650 31,650
8 20.01.01.33.14 Kuas Roll Imundex Kecil Buah 17,250 17,250
9 20.01.01.33.13 Kuas Roll Imundex Besar Buah 19,550 19,550
20.01.01.34. Lem
1 20.01.01.34.01 Lem Dextone 5 menit Pcs 10,400 10,400
2 20.01.01.34.25 Lem Kayu, Cair Ltr 44,850 44,850
3 20.01.01.34.07 Lem Kayu, FoX Kg 38,550 38,550
4 20.01.01.34.14 Lem Kayu, Rajawali Kg 14,650 14,650
5 20.01.01.34.16 Lem Minyak Flincote Liter 21,400 21,400
6 20.01.01.34.15 Lem mixed Epoxy Adhesive Kg 119,600 119,600
7 20.01.01.34.17 Lem PVC Kg 8,550 8,550
8 20.01.01.34.18 Lem PVC Isarplas Buah 7,800 7,800
9 20.01.01.34.21 sealent botol 37,950 37,950
20.01.01.35. Marmer
1 20.01.01.35.01 Marmer Ex. Lampung 30 x 60 cm (A) m2 573,950 573,950
2 20.01.01.35.02 Marmer Ex. Lampung 30 x 60 cm (B) m2 323,900 323,900
3 20.01.01.35.03 Marmer Ex. Lampung 40 x 60 cm (A) m2 466,350 466,350
4 20.01.01.35.04 Marmer Ex. Tulungagung 30 x 60 cm m2 242,350 242,350
5 20.01.01.35.05 Marmer Ex. Tulungagung 40 x 60 cm m2 250,100 250,100
6 20.01.01.35.06 Marmer Plint m1 242,350 242,350
20.01.01.37. Mur Baut
1 20.01.01.37.01 Mur Baut Uk. 3/8 X 1 Cm Baja/Ring Per Buah 7,300 7,300
2 20.01.01.37.02 Mur Baut Uk. 3/8x1.5 Cm Baja/Ring Per Buah 11,000 11,000
3 20.01.01.37.03 Mur Baut Uk. 8x1 Cm Baja/Ring Per Buah 12,650 12,650
20.01.01.40. Paku
1 20.01.01.40.06 Paku Paku Asbes Kg 24,450 24,450
2 20.01.01.40.01 Paku Paku Beton Hitam Kg 24,450 24,450
3 20.01.01.40.08 Paku Paku Biasa/ keling/ Usuk/ Triplek/ Kg 14,500 14,500
Eternit/ Reng
4 20.01.01.40.27 Paku Paku Klem dos 14,400 14,400
5 20.01.01.40.09 Paku Paku payung Kg 24,450 24,450
6 20.01.01.40.19 Paku Paku Sekrup Besar Buah 1,300 1,300
7 20.01.01.40.28 Paku Paku Sumbat Kg 52,300 52,300
8 20.01.01.40.29 Paku Paku Mata Sapi Buah 14,400 14,400
20.01.01.41. Pintu & Pagar
1 20.01.01.41.01 Angkur Kusen Buah 15,300 15,300
2 20.01.01.41.02 Kusen Aluminium m2 192,350 192,350
3 20.01.01.41.03 Pagar Besi Motif Biasa m2 466,350 466,350
4 20.01.01.41.04 Pagar Besi Motif Variasi m2 589,400 589,400
5 20.01.01.41.05 Pagar Besi Steinles m2 1,030,450 1,030,450
6 20.01.01.41.06 Pintu Besi Lipat m2 330,700 330,700
7 20.01.01.41.07 Pintu Rolling Door Aluminium tb.1.2 mm m2 466,350 466,350
8 20.01.01.41.08 Pintu Rolling Door Seng m2 272,100 272,100
9 20.01.01.41.09 Pintu Swing Ganda BRC/PMG Uk. unit 1,575,300 1,575,300
1.2x3.00 m2
10 20.01.01.41.16 Pintu Harmonika Lebar sayap 20 cm Set 1,099,200 1,099,200
11 20.01.01.41.17 Pintu Kamar Mandi galvalum wto Set 304,700 304,700
12 20.01.01.41. Pintu Kamar Mandi Lapis Aluminium Set
Uk.185 x 64 cm
13 20.01.01.41.18 Pintu Kamar Mandi PVC polos uk. Set 201,200 201,200
197 x 70 cm
14 20.01.01.41.19 Pintu Kamar Mandi serat kayu Set 212,700 212,700
15 20.01.01.41.10 Pintu Henderson asli j-3 Set 499,550 499,550
16 20.01.01.41.11 Pintu Henderson asli j-4 Set 593,550 593,550
17 20.01.01.41.12 Pintu Henderson asli j-5 Set 646,050 646,050
18 20.01.01.41.20 Pagar BRC Lbr 115,100 115,100
19 20.01.01.41.21 Pintu Lebar 80-90 cm Kaca unit 1,733,350 1,733,350
20 20.01.01.41.22 Pintu Lebar 70 cm Kaca Unit 1,600,400 1,600,400
21 20.01.01.41.15 Pintu HPL, 70x210 Unit 1,000,250 1,000,250
20.01.01.47 Sekrup
1 20.01.01.40.25 Sekrup 2" Buah 350 350
20.01.01.51. Tegel
1 20.01.01.51.01 Tegel Abu-abu, 20x20 cm m2 34,150 34,150
2 20.01.01.51.03 Tegel Teraso 30x30 m2 37,700 37,700
3 20.01.01.51.04 Tegel Wafel 20x20cm m2 24,950 24,950
4 20.01.01.51.05 Tegel Warna, 20x20 cm m2 36,000 36,000
5 20.01.01.51.06 Tegel Warna 30x30cm m2 51,750 51,750

53
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
20.01.01.52. Terpal
1 20.01.01.52.02 Terpal rajawali/kudamas a2 uk. 3*4 m Buah 78,200 78,200
2 20.01.01.52.03 Terpal rajawali/kudamas a2 uk. 3*5 m Buah 97,750 97,750
3 20.01.01.52.04 Terpal rajawali/kudamas a2 uk. 3*6 m Buah 155,250 155,250
4 20.01.01.52.05 Terpal rajawali/kudamas a2 uk. 5*7 m Buah 229,950 229,950
5 20.01.01.52.01 Terpal rajawali/kudamas a2 uk. 2*3 m Buah 43,700 43,700
6 20.01.01.52.06 Terpal rajawali/kudamas a2 uk. 5*8 m Buah 252,950 252,950
7 20.01.01.52.07 Terpal rajawali/kudamas a2 uk. 6*8 m Buah 293,200 293,200
20.01.01.53. Timba untuk Bangunan
1 20.01.01.53.01 Timba timba cor biru Buah 9,200 9,200
2 20.01.01.53.02 Timba timba cor hitam Buah 9,200 9,200
20.01.01.56. PolyCarbonate
1 20.01.01.56.01 PolyCarbonate L. 2,1 m P. 11,8 m t.4 mm m2 104,300 104,300
2 20.01.01.56.02 PolyCarbonate L. 2,1 m P. 11,8 m t.5 mm m2 109,350 109,350
3 20.01.01.56.03 PolyCarbonate L. 2,1 m P. 11,8 m t.6 mm m2 113,500 113,500
4 20.01.01.56.04 PolyCarbonate L. 2,5 m P. 11,8 m t.6 mm m2 130,300 130,300
20.01.01.57. Gypsum
1 20.01.01.57.04 Gypsum board Tebal 12 mm Lembar 88,650 88,650
2 20.01.01.57.03 Gypsum board Tebal 9 mm Lembar 71,850 71,850
3 20.01.01.57.10 List Gypsum profil m 18,350 18,350
4 20.01.01.57.11 Metal Furing Uk. Panjang 4 m, Lebar 3,5 cm, Buah 26,850 26,850
5 20.01.01.57.12 Metal Furing tebal 0,3
Uk. Panjang 3 m, Lebar 5 cm, tebal Buah 34,200 34,200
6 20.01.01.57.13 Metal Furing 0,4
Uk. Panjang 3 m, Lebar 7,5 cm, Buah 42,750 42,750
20.01.01.58. Kalsiboard tebal 0,4

1 20.01.01.58.06 Kalsiboard Uk. 115 x 65 x 2 mm Lembar 16,700 16,700


2 20.01.01.58.07 Kalsiboard Uk. 244 x 122 x 12 mm Lembar 63,250 63,250
3 20.01.01.58.03 Kalsiboard Uk. 244 x 122 x 3,5 mm Lembar 62,250 62,250
4 20.01.01.58.02 Kalsiboard Uk. 244 x 122 x 4,5 mm Lembar 94,600 94,600
5 20.01.01.58.01 Kalsiboard Uk. 244 x 122 x 6 mm Lembar 131,200 131,200
5 20.01.01.58.08 Kalsiboard Uk. 244 x 122 x 9 mm Lembar 226,100 226,100
6 20.01.01.58.06 Kalsiplank lbr = 20 cm Lembar 42,550 42,550
7 20.01.01.58.07 Kalsiplank lbr = 30 cm Lembar 63,250 63,250
20.01.01.59 Got Talang
1 20.01.01.59.01 Got Talang R.10 (1/2 lingkaran) Buah 13,750 13,750
2 20.01.01.59.02 Got Talang R.10 (segmen) Buah 15,000 15,000
3 20.01.01.59.03 Got Talang R.15 (1/2 lingkaran) Buah 17,800 17,800
4 20.01.01.59.04 Got Talang R.15 (segmen) Buah 18,700 18,700
5 20.01.01.59.05 Got Talang R.25 (1/2 lingkaran) Buah 27,050 27,050
6 20.01.01.59.06 Got Talang R.25 (segmen) Buah 30,150 30,150
20.01.01.60 Paving Stone
1 20.01.01.60.01 Paving Stone Abu - abu Tb 6 cm m2 39,500 39,500
2 20.01.01.60.02 Paving Stone Abu - abu Tb 8 cm m2 58,750 58,750
3 20.01.01.60.03 Paving Stone Abu - abu Tb 6 cm (K 300) m2 56,150 56,150
4 20.01.01.60.05 Paving Stone Abu - abu Tb 8 cm (K 300) m2 68,650 68,650
5 20.01.01.60.08 Kanstin Uk. 40 x15 x 10 cm bh 14,950 14,950
6 20.01.01.60.41 Kanstin Uk. 50 x 35 x 15 cm bh 28,750 29,900
7 20.01.01.60.16 Paving Stone Merah Tb 8 cm m 53,300 53,300
8 20.01.01.60.32 Paving conblock Abu. Uk. 11,5 x 22,5 x 6 cm m2 110,000 119,200
9 20.01.01.60.33 Paving conblock Abu. Uk. 11,5 x 22,5 x 8 cm m2 130,000 138,350
10 20.01.01.60.34 Paving conblock Hijau. Uk. 11,5 x 22,5 x 6 cm m2 135,000 151,750
11 20.01.01.60.35 Paving conblock Hijau. Uk. 11,5 x 22,5 x 8 cm m2 160,000 174,300
12 20.01.01.60.37 Grass Block Tebal 6 Buah 20,700 21,550
13 20.01.01.60.38 Grass Block uk. 21.5 x 42 cm, Tebal 10 m2 115,000 115,000
14 20.01.01.60.28 Paving Stone Tebal 6cm Kw 1,abu-abu m2 66,150 68,800
15 20.01.01.60.30 Paving Stone Tebal 8cm Kw 1, abu-abu m2 80,500 83,750
20.01.01.61 Kawat
1 20.01.01.61.02 Kawat Bronjong, 3"-4" Kg 18,350 18,350
2 20.01.01.61.04 Kawat Kawat Berduri 50m m' 91,550 91,550
3 20.01.01.61.05 Kawat Nyamuk Kasa Aluminium M2 115,350 115,350
4 20.01.01.61.08 Kawat Nyamuk, Hijau M2 21,400 21,400
5 20.01.01.61.09 Kawat Parabola Meter 45,700 45,700
6 20.01.01.60.10 Kawat Strimin Warna Meter 22,000 22,000
7 20.01.01.61.11 Kawat Kawat Harmonika lebar 90cm m2 25,900 25,900
8 20.01.01.61.12 Kawat Kawat Beton Kg 19,550 19,550
9 20.01.01.61.13 Kawat Loket tbl 2mm m2 14,650 14,650
20.01.01.62. Kayu dan Bambu
1 20.01.01.62.01 Bambu Bongkotan Dia 12 cm x 6 m Batang 18,350 19,100
2 20.01.01.62.02 Bambu Gedek guling ( 200 x 150 cm) Lembar 41,500 43,200
3 20.01.01.62.03 Bambu Keranjang Buah 12,300 12,800
4 20.01.01.62.04 Bambu Pring Dia 10-12 cm x 6 cm Batang 19,750 20,600
5 20.01.01.62.05 Bambu Tusuk 10 cm x 100 -150 cm Batang 2,100 2,200

54
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
6 20.01.01.62.06 Kayu Bakar m3 355,950 370,200
7 20.01.01.62.07 Kayu Bekesting (meranti) m3 3,564,050 3,706,650
8 20.01.01.62.08 Kayu Bekesting (Sengon) m3 1,149,700 1,195,700
9 20.01.01.62.09 Kayu Bengkirai Balok m3 9,772,350 10,163,250
10 20.01.01.62.10 Kayu Bengkirai Papan m3 10,404,700 10,820,900
11 20.01.01.62.11 Kayu Bengkirai Usuk m3 9,197,500 9,565,400
12 20.01.01.62.12 Kayu Borneo Balok 6 x 12 x 400cm m3 9,197,500 9,565,400
13 20.01.01.62.13 Kayu Borneo Kaso 5 x 7 x 400cm m3 8,622,700 8,967,650
14 20.01.01.62.14 Kayu Borneo Papan 2 x 20 x 400cm m3 9,197,500 9,565,400
15 20.01.01.62.15 Kayu Borneo Reng 2 x 3 x 400cm m3 3,564,050 3,706,650
16 20.01.01.62.16 Kayu Dolken Jati dia 10cm - 300cm Batang 34,500 35,900
17 20.01.01.62.17 Kayu Gelam D. 10-12 cm Pj. 400cm Batang 43,700 45,450
18 20.01.01.62.18 Kayu Glugu / pohon kelapa Batang 175,950 183,000
19 20.01.01.62.19 Kayu Jati Balok 6 x 12 x 400cm m3 18,009,150 18,729,550
20 20.01.01.62.20 Kayu Jati Balok 8 x 12 x 400cm m3 18,009,150 18,729,550
21 20.01.01.62.21 Kayu Jati Kaso 3 x 5 x 400cm m3 7,873,350 8,188,300
22 20.01.01.62.22 Kayu Jati Kaso 4 x 6 x 400cm m3 13,031,500 13,552,800
23 20.01.01.62.23 Kayu Jati Kaso 5 x 7 x 400cm m3 13,446,700 13,984,600
24 20.01.01.62.24 Kayu Jati Papan 2 x 20 x 400cm m3 18,009,150 18,729,550
25 20.01.01.62.25 Kayu Jati Reng 2 x 3 x 400cm m3 12,071,750 12,554,650
26 20.01.01.62.26 Kayu Jati Reng 3 x 5 x 400cm m3 12,646,600 13,152,500
27 20.01.01.62.27 Kayu Kamper Balok 6 x 12 x 400cm m3 10,922,050 11,358,950
28 20.01.01.62.28 Kayu Kamper Kaso 5 x 7 x 400cm m3 7,930,650 8,247,900
29 20.01.01.62.29 Kayu Kamper Papan 2 x 20 x 400cm m3 9,772,350 10,163,250
30 20.01.01.62.30 Kayu Kamper Reng 2 x 3 x 400cm m3 8,622,700 8,967,650
31 20.01.01.62.32 Kayu Kotak adukan Buah 32,500 33,800
32 20.01.01.62.33 Kayu Kruing Balok 6 x 12 x 400cm m3 7,930,650 6,344,550
33 20.01.01.62.34 Kayu Kruing Kaso 5 x 7 x 400cm m3 6,100,500 6,344,550
34 20.01.01.62.35 Kayu Kruing Papan 2 x 20 x 400cm m3 8,540,700 8,882,350
35 20.01.01.62.36 Kayu Kruing Reng 2 x 3 x 400cm m3 6,100,500 6,344,550
36 20.01.01.62.38 Kayu Meranti Balok 6 x 12 x 400Cm m3 5,490,450 5,710,100
37 20.01.01.62.40 Kayu Meranti Kaso 5 x 7 x 400Cm m3 5,490,450 5,710,100
38 20.01.01.62.41 Kayu Meranti Papan 2 x 20 x 400Cm m3 5,673,500 5,900,450
39 20.01.01.62.42 Kayu Meranti Reng 2 x 3 x 400Cm m3 5,173,600 5,380,550
40 20.01.01.62.43 Kayu Multipleks (0,9 x 122 x 244)cm Lembar 157,500 163,800
41 20.01.01.62.44 Kayu Multipleks (1,2 x 122 x 244) cm Lembar 224,200 233,200
42 20.01.01.62.46 Kayu Perancah m3 3,500,000 3,640,000
43 20.01.01.62.47 Kayu Plywood 122x244x4 mm Lembar 106,000 110,300
44 20.01.01.62.48 Kayu Plywood 122x244x6 mm Lembar 143,400 149,200
45 20.01.01.62.49 Kayu Plywood 122x244x8 mm Lembar 138,550 144,100
46 20.01.01.62.50 Kayu Teakwood 90.210.4 mm Lembar 83,950 87,350
47 20.01.01.62.51 Kayu Teakwood (0,4 x 110 x 210) cm Lembar 127,450 132,600
48 20.01.01.62.52 Kayu Teakwood (0,4 x 122 x 244) cm Lembar 140,200 145,900
49 20.01.01.62.61 Kayu Tripleks (0,3 x 122 x 244)cm Lembar 61,550 64,050
50 20.01.01.62.60 Kayu Tripleks (0,4 x 122 x 244)cm Lembar 74,750 77,750
51 20.01.01.62.59 Kayu Tripleks (0,6 x 122 x 244)cm Lembar 82,800 86,150
52 20.01.01.62.53 Kayu Tripleks (0,3 x 90 x 210) cm + Lembar 100,050 104,100
53 20.01.01.70.144 Lencek Aluminium Buah 49,900 49,900
20.01.01.70 Bahan-Bahan Lainnya
1 20.01.01.70.06 Glass Bit Kg 15,850 15,850
2 20.01.01.70.07 Pemantul/Scotch m2 260,400 260,400
Light Putih
3 20.01.01.70.11 Thermo Plastic Kg 35,400 35,400
4 20.01.01.70.15 Tiang Pancang Uk. 30 cm x 30 cm x 6 m Beton K Batang 1,427,550 1,427,550
5 20.01.01.70.117 Persegi
HPL 500
Type Metalic, Hairline, Uk. 1242mm Buah 396,550 396,550
6 20.01.01.70.118 HPL x 2484
Type mm x Alumunium,
Metalic, 0,8 mm Uk. Buah 597,850 597,850
7 20.01.01.70.119 HPL 1242mm
Type x 2484
Metalic, mm x
Bronze, 0,81242mm
Uk. mm Buah 390,450 390,450
8 20.01.01.70.120 HPL x 2484
Type mm x 0,8 mm Light Grey,Uk.
Monochromatic, Buah 219,650 219,650
9 20.01.01.70.121 Lem HPL 1242mm
9,5 Kg x 2484 mm x 0,8 mm Botol 359,950 359,950
10 20.01.01.70.124 Alucopan Goldstar m2 220,750 220,750
11 20.01.01.70.125 Alucopan Alustar m2 248,350 248,350
12 20.01.01.70.126 Alucopan New Alucopan m2 303,550 303,550
13 20.01.01.70.127 Alucopan Luminate m2 234,550 234,550
14 20.01.01.70.128 Alucopan Alucobond m2 662,250 662,250
15 20.01.01.70.129 Roof Tank Kap. 2m3 Buah 2,069,450 2,069,450
16 20.01.01.70.130 Tandon Air Stainless + Fiber Buah 1,189,950 1,189,950
20.01.02 BAHAN KIMIA
20.01.02.01 Larutan Kimia
1 20.01.02.01.01 Aceton Liter
2 20.01.02.01.02 Amonium Vannadate Liter
3 20.01.02.01.03 Amonium Neptamoly 1 Kg
4 20.01.02.01.04 Amonium Penolpkatein Gr
5 20.01.02.01.05 Aquadest Liter

55
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
6 20.01.02.01.06 Brilliant Green Bile 166 Gram
7 20.01.02.01.07 Lactose
CCL 4 Liter
8 20.01.02.01.08 CH3COOH (96 - 99%) Liter
9 20.01.02.01.09 D. maritoll 238 Gram
10 20.01.02.01.10 Diammo hydrophospa0.5 Kg
11 20.01.02.01.11 Diamonium Kg
12 20.01.02.01.12 Hydrogin Citrat
Enzim/Biokultur Liter
13 20.01.02.01.13 Etahnol M. 983 3.5 Liter
14 20.01.02.01.14 Faselin Kg
15 20.01.02.01.15 Gilaswood M. 4086- 0.4 Kg
16 20.01.02.01.16 L,6
HCI 0,1 N pK
17 20.01.02.01.17 HCI pekat Liter
18 20.01.02.01.18 HCI pekat Liter
19 20.01.02.01.19 KMNO4 Kg
20 20.01.02.01.20 KNO3 1 % Kg
21 20.01.02.01.21 Laed dryde M. 740 1- 0.313 Kg
22 20.01.02.01.22 Lar. Brom Cresol Gr
Green 0,1 %
23 20.01.02.01.23 Lead Acetate M. 7375 0.4 Kg
24 20.01.02.01.24 Melylin red Liter
25 20.01.02.01.25 N.-Hexave 0.7 Kg
26 20.01.02.01.26 Na OH Cair 49% Liter
27 20.01.02.01.27 Na OH Flek 98 % Kg
28 20.01.02.01.28 Na. OHM 6498 1.5 Kg
29 20.01.02.01.29 Na. Triosuetate 2.2 Kg
30 20.01.02.01.30 NaOH 98 % Liter
31 20.01.02.01.31 NH3 Pekat Liter
32 20.01.02.01.32 NH4CL Kg
33 20.01.02.01.33 NH4NO3 Kg
34 20.01.02.01.34 NH4OH Liter
35 20.01.02.01.35 Nutrim agar 0.1 Kg
36 20.01.02.01.36 Oksigen Botol
37 20.01.02.01.37 Pepton water 0.2 Kg
38 20.01.02.01.38 Pestisida Organik Liter
39 20.01.02.01.39 Petrolium ether Liter
40 20.01.02.01.40 Plate Count Agar 102 Gram
41 20.01.02.01.41 Potasium Dicromate 0.3 Kg
M.4864
42 20.01.02.01.42 Pupuk Organik (cair) Liter
43 20.01.02.01.43 Pupuk Organik (padat) Kg
44 20.01.02.01.44 Sodium Carbonate 1.1 Kg
M. 6391- Q.6
45 20.01.02.01.45 Sodium Hydtixide M. 1.42 Kg
6498 - Q.6
46 20.01.02.01.46 Spands. M 7998 15 Kg
47 20.01.02.01.47 Toulene 2.8 Kg
48 20.01.02.01.48 Yeast extract 200 Gram
20.03.06.21 Peralatan Pengairan
1 20.03.06.21.07 Filter Oli Buah 75,705 75,705
2 20.03.06.21.08 Filter Solar Buah 75,705 75,705
3 20.03.06.21.06 Filter Hidroulis Buah 78,540 78,540
20.02 SUKU CADANG
20.02.01 SUKU CADANG ALAT ANGKUTAN DARAT
20.02.01.07. Bahan Bakar Minyak
1 20.02.01.07.01 Bensin / Premium ltr 8,600 8,600
2 20.02.01.07.02 Minyak Tanah ltr 9,000 9,000
3 20.02.01.07.03 Pertamax ltr 10,900 10,900
4 20.02.01.07.06 Bio Solar ltr 8,350 8,350
20.02.01.08 Minyak Pelumas
1 20.02.01.08.02 Gemuk Oil Bekas Kg 9,250 9,250
2 20.02.01.08.03 Minyak Flux Kg 6,250 6,250
3 20.02.01.08.04 Minyak Pelumas ltr 40,000 40,000
4 20.02.01.08.05 Minyak Rem Btl 27,050 27,050
5 20.02.01.08.06 Oli Gear/Gardan Galon 142,050 142,050
6 20.02.01.08.07 Oli Gear/Gardan ltr 36,350 36,350
7 20.02.01.08.08 Oli Hydroulis ltr 55,150 55,150
8 20.02.01.08.09 Oli Mesin Mesran Super Galon 220,500 220,500
9 20.02.01.08.10 Oli Mesin Mesran Super ltr 45,550 45,550
10 20.02.01.08.11 Oli Transmisi Rored 90/100 ltr 47,250 47,250
11 20.02.01.08.12 Residu ltr 4,500 4,500
12 20.02.01.08.13 Stemvet Kg 41,150 41,150
20.02.06 SUKU CADANG PERALATAN LAIN

56
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
20.02.06.02 Suku Cadang Mesin Penggerak Pompa
1 20.02.06.02.01 Alat Ukur (Jangka Sorong) Buah 1,091,400 1,091,400
2 20.02.06.02.02 Amper Meter Buah 314,700 314,700
3 20.02.06.02.03 Colter Liner Buah 312,400 312,400
4 20.02.06.02.04 Conrod bearing Buah 897,600 897,600
5 20.02.06.02.05 Crankshaft Seal Buah 437,200 437,200
6 20.02.06.02.06 Cresh Joint Buah 409,500 409,500
7 20.02.06.02.07 Delevery Valve Buah 603,100 603,100
8 20.02.06.02.08 Boschpump
Engine oil Buah 103,200 103,200
9 20.02.06.02.09 Fanbelt Buah 197,700 197,700
10 20.02.06.02.10 Flendes Tutup Turbo Buah 223,200 223,200
11 20.02.06.02.11 Intake Valve Buah 811,500 811,500
12 20.02.06.02.12 Kabel Accu 2x2M+Skun Buah 106,300 106,300
13 20.02.06.02.13 Kampas Koupling Set 1,736,600 1,736,600
14 20.02.06.02.14 Klem Slang Oil Buah 21,000 21,000
15 20.02.06.02.15 Kunci Kontak Buah 540,900 540,900
16 20.02.06.02.16 Lager as roda gigi Buah 480,000 480,000
17 20.02.06.02.17 penghubung
Lager Asprize Coupling Buah 547,700 547,700
18 20.02.06.02.18 Lager Blower Buah 451,600 451,600
19 20.02.06.02.19 Lager Drug Coupling Buah 670,800 670,800
20 20.02.06.02.20 Lager Noken As Buah 703,800 703,800
21 20.02.06.02.21 Main Bearing Buah 808,500 808,500
22 20.02.06.02.22 Monting engine Buah 866,100 866,100
23 20.02.06.02.23 Oil Meter Buah 389,300 389,300
24 20.02.06.02.24 Oil Switch Buah 279,300 279,300
25 20.02.06.02.25 Oli Filter Buah 573,900 573,900
26 20.02.06.02.26 Out Valve Buah 1,008,400 1,008,400
27 20.02.06.02.27 Packing Full Set Buah 4,013,500 4,013,500
28 20.02.06.02.28 Piston + pin Buah 2,268,350 2,268,350
29 20.02.06.02.29 Piston ring Buah 1,839,500 1,839,500
30 20.02.06.02.30 Plunyer nozle Buah 1,149,700 1,149,700
31 20.02.06.02.31 Ring Nozle Tembaga Buah 12,500 12,500
32 20.02.06.02.32 Rol Meter (5 meter) Buah 91,700 91,700
33 20.02.06.02.33 Seal as Stater Buah 173,200 173,200
34 20.02.06.02.34 Slang Oil Buah 376,200 376,200
35 20.02.06.02.35 Slang solar Buah 149,300 149,300
36 20.02.06.02.36 Solar Filter Buah 458,500 458,500
37 20.02.06.02.37 Specer Bearing psg 796,100 796,100
38 20.02.06.02.38 Live Pump Assy Buah 2,928,900 2,928,900
20.02.01.09 Suku Cadang Lainnya
1 20.02.01.09.01 Angker Bolt 20Kg Buah 793,300 793,300
2 20.02.01.09.02 Ban Kipas Buah 43,300 43,300
3 20.02.01.09.03 Busi Buah 27,150 27,150
4 20.02.01.09.04 Busi Mobil Denso Buah 16,300 16,300
5 20.02.01.09.05 Busi Motor NGK Buah 15,000 15,000
6 20.02.01.09.06 Campas Copling Orsi Buah 479,050 479,050
7 20.02.01.09.07 Condensor Buah 59,100 59,100
8 20.02.01.09.08 Drucklager Buah 214,050 214,050
9 20.02.01.09.09 Fanbelt Besar Buah 183,950 183,950
10 20.02.01.09.10 Fanbelt Kecil Buah 104,750 104,750
11 20.02.01.09.11 Gigi Pinion Wales Set 9,082,500 9,082,500
12 20.02.01.09.12 Gigi Roda Bear Wales Set 15,592,500 15,592,500
13 20.02.01.09.13 Kampas Koupling Wales Set 5,522,200 5,522,200
14 20.02.01.09.15 Kampas Rem Buah 505,900 505,900
15 20.02.01.09.16 Kampas Rem Mobil Orsi Buah 252,800 252,800
16 20.02.01.09.17 Kampas Rem Motor Aspira Set 199,000 199,000
17 20.02.01.09.18 Knalpot Rored 90/100 Buah 1,080,750 1,080,750
18 20.02.01.09.19 Lager Roda Belakang Buah 264,450 264,450
19 20.02.01.09.20 Lager Roda Dalam Buah 201,200 201,200
20 20.02.01.09.21 Lager Roda Depan Luar Buah 170,650 170,650
21 20.02.01.09.22 Master Rem Seal Tas Buah 218,750 218,750
22 20.02.01.09.23 Na F dan Ring Kg 30,800 30,800
23 20.02.01.09.24 Nozzle Wales Buah 702,750 702,750
24 20.02.01.09.25 Olor Copling Buah 186,400 186,400
25 20.02.01.09.26 Olor Perseneleng Buah 436,600 436,600
26 20.02.01.09.27 Olor Spido Buah 165,650 165,650
27 20.02.01.09.28 Pack Knalpot Buah 13,250 13,250
28 20.02.01.09.29 Platina Mesran Buah 68,550 68,550
29 20.02.01.09.30 Roda Gigi M.10 Buah 3,276,300 3,276,300
30 20.02.01.09.31 Seal karet M' 10,200 10,200
31 20.02.01.09.32 Seal karet Untuk mesin pompa M' 283,900 283,900
32 20.02.01.09.33 Seal pack Top Set Fuboru Set 420,300 420,300
33 20.02.01.09.34 Seal Rem Buah 157,500 157,500

57
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
34 20.02.01.09.35 Seal Roda Buah 131,250 131,250
35 20.02.01.09.36 Shock Breaker Belaka Moon Roe Set 438,400 438,400
36 20.02.01.09.37 Shock Breaker Depan Set 782,550 782,550
37 20.02.01.09.39 Spie Buah 30,800 30,800
38 20.02.01.09.40 Splite Pen Buah 20,550 20,550
39 20.02.01.09.41 Stang Wiper Set 141,300 141,300
40 20.02.01.09.42 Tune up Buah 101,400 101,400
41 20.02.01.09.43 Tutup Radiator Buah 93,300 93,300
20.03 ALAT/BAHAN UNTUK KEGIATAN KANTOR
20.03.05 PERABOT KANTOR
20.03.05.01 Sapu dan Sikat
20.03.05.01.01 Sapu
1 20.03.05.01.01.11 Sapu Lidi Dengan Gagang Buah 8,650 8,650
20.03.05.03.01 Ember
1 20.03.05.03.01.09 Ember Lux Flint 0,5 Gln Buah 5,350 5,350
20.03.05.05 Alat-Alat Perlengkapan Rumah
20.03.05.05.01 Engsel
1 20.03.05.05.01.01 Engsel Akses Set 15,750 15,750
2 20.03.05.05.01.02 Engsel Dior 3 kuning Set 18,250 18,250
3 20.03.05.05.01.03 Engsel Dior 4 kuning Set 24,350 24,350
4 20.03.05.05.01.04 Engsel Dior 5 kuning Set 30,450 30,450
5 20.03.05.05.01.05 Engsel Engsel Dorong / Railing Pintu Merk Pasang 401,500 401,500
Handerson
6 20.03.05.05.01.06 Engsel Gomeo 4 dim Kuningan Set 19,200 19,200
7 20.03.05.05.01.07 Engsel Hidrolis Pintu aluminium Pasang 827,250 827,250
8 20.03.05.05.01.08 Engsel Hings, 5 dim Kuningan Jendela Set 25,200 25,200
9 20.03.05.05.01.09 Engsel Jendela Kuningan Pasang 31,150 31,150
10 20.03.05.05.01.10 Engsel kuningan 2" (Pintu Kayu) Kotak 19,500 19,500
11 20.03.05.05.01.11 Engsel muller kuning 3" (Pintu Alm.) Kotak 682,500 682,500
12 20.03.05.05.01.12 Engsel salon HK 20 Kotak 18,900 18,900
13 20.03.05.05.01.13 Engsel salon HK 25 Kotak 20,800 20,800
14 20.03.05.05.01.14 Engsel Salon HK 30 Pasang 29,500 29,500
15 20.03.05.05.01.15 Engsel Solid EK 17 Pasang 37,000 37,000
20.03.05.05.02 Gembok
1 20.03.05.05.02.11 Gembok Hitam Cooper 75 mm Buah 118,550 118,550
20.03.05.05.03 Grendel
1 20.03.05.05.03.04 Grendel Engsel Kuningan Buah 34,300 34,300
2 20.03.05.05.03.05 Grendel Grendel Biasa (Besar) Buah 14,300 14,300
3 20.03.05.05.03.06 Grendel Grendel Biasa (Kecil) Buah 6,450 6,450
4 20.03.05.05.03.07 Grendel Grendel Panjang Buah 16,400 16,400
5 20.03.05.05.03.08 Grendel Grendel Tanam Buah 68,550 68,550
6 20.03.05.05.03.10 Grendel Kuningan / crom (kuning) Buah 26,550 26,550
20.03.05.05.05 Kran
1 20.03.05.05.05.04 Kran air goldeno /yuri 1/2" Buah 19,050 19,050
2 20.03.05.05.05.20 Kran Plastik 1/2" Buah 12,150 12,150
3 20.03.05.05.05.21 Kran Putar Untuk Tanaman 3/4" Buah 57,500 57,500
4 20.03.05.05.05.05 Kran Bebek, SKM 10 JC Buah 45,500 45,500
5 20.03.05.05.05.06 Kran Bebek, Sobar 10 JC Buah 163,650 163,650
6 20.03.05.05.05.07 Kran Bebek, Fio 10 JC Buah 113,650 113,650
20.03.05.05.06 Kunci
1 20.03.05.05.06.01 Kunci Kuda Terbang 2x Putar Buah 72,350 72,350
2 20.03.05.05.06.02 Kunci Kunci Tanam Aluminium Buah 447,000 447,000
3 20.03.05.05.06.03 Kunci Kunci Tanam Biasa Buah 56,700 56,700
4 20.03.05.05.06.04 Kunci Kunci Tanam Kamar Mandi Buah 43,150 43,150
5 20.03.05.05.06.19 Kunci Mortus Cylinder - Basket 50 mm Unit 223,500 223,500
6 20.03.05.05.04.03 Handle Solid HRE 6141 Pasang 180,600 180,600
20.03.05.05.09 Hak Angin
1 20.03.05.05.09.01 Hak Angin Biasa set 8,600 8,600
2 20.03.05.05.09.02 Hak Angin Kuningan set 24,250 24,250
3 20.03.05.05.09.03 Kait Angin set 19,900 19,900
4 20.03.05.05.09.04 Hak Angin Lurus Kuningan Set 39,800 39,800
20.03.05.05.10 Bahan Penggantung dan Pengunci
1 20.03.05.05.09.01 Door Holder Set 96,450 96,450
2 20.03.05.05.09.02 Door Kloser Set 160,650 160,650
3 20.03.05.05.09.03 Door Stop Set 119,600 119,600
4 20.03.05.05.09.04 Rel Pintu Dorong Set 319,300 319,300
5 20.03.05.05.09.05 Penyangga Jendela Biasa Buah 15,250 15,250
6 20.03.05.05.09.06 Rel Pintu Dorong Uk. 90 Buah 113,650 113,650
20.03.05.08 Bahan Pembersih
20.03.05.08.10.08 Pembersih Lantai Densol 1 Liter Botol 25,900 25,900
20.03.05.08.15.25 Sabun Colek Wing Biru 900 gr Bks 10,250 10,250

58
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
20.03.06 ALAT LISTRIK
20.03.06.01 KABEL
20.03.06.01.02 Kabel NYA
1 20.03.06.01.02.23 Kabel NYA Supreme, 2 x 2,5 mm m 10,950 10,950
2 20.03.06.01.02.05 Kabel NYA Supreme, 2.5 mm m 4,500 4,500
20.03.06.01.03 Kabel NYM
1 20.03.06.01.03.03 Kabel NYM Supreme 2 x 1.5 mm m 9,300 9,300
2 20.03.06.01.03.04 Kabel NYM Supreme, 2 x 2.5 mm m 13,000 13,000
20.03.06.01.04 Kabel NYY
1 20.03.06.01.04.23 Kabel NYY Supreme, 2 X 4 mm m 21,050 21,050
2 20.03.06.01.04.50 Kabel NYY Supreme, 4 X 2,5 mm m 26,150 26,150
3 20.03.06.01.04.53 Kabel NYY Supreme, 4 X 10 mm m 82,700
20.03.06.01.11 Kabel TC & Twisted
1 20.03.06.01.11.01 Kabel TC & Twisted Twisted 2x10 Mm m 9,188 9,188
2 20.03.06.01.11.02 Kabel TC & Twisted Twisted 2x16 Mm m 16,013 16,013
3 20.03.06.01.11.03 Kabel TC & Twisted Twisted 4x16 Mm m 25,830 25,830

59
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
20.03.06.01.12
1 20.03.06.01.12.01 Kabel Tray Lebar 100 x Tinggi 50 x Panjang 2400 x Roll 143,750 143,750
2 20.03.06.01.12.02 Kabel Tray Ketebalan
150 x 50 x Plat
24001,2 mmmm
x 1,2 Roll 151,800 151,800
3 20.03.06.01.12.03 Kabel Tray 200 x 50 x 2400 x 1,2 mm Roll 172,500 172,500
4 20.03.06.01.12.04 Kabel Tray 300 x 50 x 2400 x 1,2 mm Roll 212,700 212,700
5 20.03.06.01.12.05 Kabel Tray 400 x 50 x 2400 x 1,2 mm Roll 254,100 254,100
6 20.03.06.01.12.06 Kabel Tray 500 x 50 x 2400 x 1,2 mm Roll 295,500 295,500
7 20.03.06.01.12.07 Kabel Tray 150 x 100 x 2400 x 1,2 mm Roll 187,400 187,400
8 20.03.06.01.12.08 Kabel Tray 200 x 100 x 2400 x 1,2 mm Roll 212,700 212,700
9 20.03.06.01.12.09 Kabel Tray 300 x 100 x 2400 x 1,2 mm Roll 254,100 254,100
10 20.03.06.01.12.10 Kabel Tray 400 x 100 x 2400 x 1,2 mm Roll 295,500 295,500
11 20.03.06.01.12.11 Kabel Tray 500 x 100 x 2400 x 1,2 mm Roll 341,500 341,500
20.03.06.02 LAMPU
20.03.06.02.08 Lampu Son Natrium
1 20.03.06.02.08.01 Lampu Son Natrium Philips, T 400 W Buah 335,213 335,213
2 20.03.06.02.08.02 Lampu Son Natrium Philips, T 250 W Buah 335,213 335,213
3 20.03.06.02.08.03 Lampu Son Natrium Philips, T 100 W Buah 335,213 335,213
4 20.03.06.02.08.04 Lampu Son Natrium Philips, H 350 W Buah 395,903 395,903
5 20.03.06.02.08.05 Lampu Son Natrium Philips, H 220 W Buah 370,335 370,335
20.03.06.02.09 Lampu Pijar
1 20.03.06.02.09.13 Lampu Pijar Umum Philips, Clear 25 Watt Buah 6,143 6,143
20.03.06.02.11 Lampu TL
1 20.03.06.02.11.03 Lampu TL Philips, 18 watt Buah 36,800 36,800
2 20.03.06.02.11.04 Lampu TL Philips, 20 Watt + Kap Unit 86,250 86,250
3 20.03.06.02.11.06 Lampu TL Philips, 40 Watt + Kap Unit 120,750 120,750
20.03.06.02.12 Lampu Essential
1 20.03.06.02.12.06 Lampu Essential Philips, 18 watt Buah 41,400 41,400
2 20.03.06.02.12.07 Lampu Essential Philips, 23 watt Buah 43,700 43,700
20.03.06.02.17 Lampu Lainnya
1 20.03.06.02.17.01 Lampu RM 2 x 36 Watt, Fatro Unit 344,950 344,950
2 20.03.06.02.17.02 Lampu RM 2 x 18 Watt, Fatro Unit 287,450 287,450
3 20.03.06.02.17.03 Lampu Baret 32 Watt Unti 155,250 155,250
4 Lampu RM 2 x 36 Watt, Artolite Unit 792,436
5 Lampu RM 2 x 18 Watt, Artolite Unit 470,925
6 Lampu Downlight SM D 150 E27 PL ESS 18W, Artolite Unit 345,115
7 Lampu Downlight RD 150 E27 SAVY PL ESS 18W, Artolite Unit 217,465
20.03.06.03 Stop Kontak
1 20.03.06.03.02 Stop Kontak Broco, 2 Port Unit 25,300 25,300
20.03.06.04 Saklar
1 20.03.06.04.03 Saklar Broco, Ganda Buah 14,850 14,850
2 20.03.06.04.02 Saklar Broco, Engkel IB Buah 11,500 11,500
20.03.06.07 Fitting
1 20.03.06.07.09 Fitting Plafon Buah 3,750 3,750
20.03.06.10 Battery
1 20.03.06.10.02 Battery ABC 3.8 Buah 3,045 3,045
2 20.03.06.10.23 Battery Panasonic, A3 Buah 3,203 3,203
20.03.06.17 MCB
1 20.03.06.17.04 MCB 10A, 3 Phase Philips Buah 364,140 364,140
20.03.06.18 Tiang Lampu Listrik
1 20.03.06.18.01 Tiang Lampu Besi lengkung Bulat Batang 3,410,400 3,410,400
2 20.03.06.18.02 Tiang Lampu Besi lurus bulat Batang 2,092,808 2,092,808
3 20.03.06.18.04 Tiang Lampu Cor logam antik , 5 m (Ganda), Set 5,725,335 5,725,335
4 20.03.06.18.05 Tiang Lampu WDD
Cor logam antik , 8 m (Ganda), Set 7,633,658 7,633,658
5 20.03.06.18.06 Tiang Lampu WDD
Cor logam antik , 8 m (tunggal), Set 6,573,578 6,573,578
6 20.03.06.18.07 Tiang Lampu WDD
Cor Logam antik cab 2 segi 8 Unit 2,923,463 2,923,463
flender, WDD
7 20.03.06.18.08 Tiang Lampu Cor Logam Antik cab 4 segi 8 Unit 12,187,980 12,187,980
flanges, WDD
8 20.03.06.18.11 Tiang Lampu Mercury 9m cab 2 flanges terminal Unit 4,761,173 4,761,173
dlm lapisan Galvanis
9 20.03.06.18.12 Tiang Lampu Mercury 9m cab 4 flanges terminal Unit 6,897,240 6,897,240
dlm lapisan Galvanis
10 20.03.06.18.13 Tiang Lampu RPPJ type Lengkung H-08 meter Unit 13,642,598 13,642,598
Bentang 3.5m dan Angkur dia. 1""
panj. 60 Cm
11 20.03.06.18.21 Tiang Lampu SEMA, Octogonaal/, 7 M, 1 cabang, Buah 3,271,590 3,271,590
Hotdeep
12 20.03.06.18.22 Tiang Lampu SEMA, Octogonal 9 M, 1 Cabang + Buah 4,079,513 4,079,513
Biaya Pemasangan
13 20.03.06.18.23 Tiang Lampu SEMA, Octogonal 9 M, 2 Cabang + Buah 4,687,463 4,687,463
Biaya Pemasangan

60
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
14 20.03.06.18.24 Tiang Lampu Taman 4.5m cab 1 flanges terminal Unit 2,307,375 2,307,375
dalam lapisan Galvanis
15 20.03.06.18.25 Tiang Lampu Angker lengkung Buah 990,360 990,360
16 20.03.06.18.26 Tiang Lampu Besi 6 m Buah 1,322,633 1,322,633
17 20.03.06.18.27 Tiang Lampu Besi Ornamen 2"-TL 40 Unit 40,898 40,898
18 20.03.06.18.28 Tiang Lampu Beton 11 m 200 DaN Batang 1,785,420 1,785,420
19 20.03.06.18.29 Tiang Lampu Beton 11 m 350 DaN Batang 2,046,293 2,046,293
20 20.03.06.18.30 Tiang Lampu Beton 11 m 350 DaN + E Unit 2,197,913 2,197,913
21 20.03.06.18.31 Tiang Lampu Beton 9 m 200 DaN Unit 1,273,440 1,273,440
22 20.03.06.18.32 Tiang Lampu Beton 9 m 200 DaN + E Unit 1,370,408 1,370,408
23 20.03.06.18.33 Tiang Lampu Beton 7 m 100 DaN Unit 1,219,418 1,219,418
24 20.03.06.18.34 Tiang Lampu Concraf BC 12 Signal Group (LC) Buah 80,605,560 80,605,560
25 20.03.06.18.35 Tiang Lampu Concraf BC 16 Signal Group (LC) Buah 93,781,485 93,781,485
26 20.03.06.18.36 Tiang Lampu Concraf BC 8 Signal Group (LC) Buah 71,304,818 71,304,818
27 20.03.06.18.37 Tiang Lampu Galvanis Gas pijp 2" 6 mtr Medium Buah 441,368 441,368
28 20.03.06.18.38 Tiang Lampu Galvanis Gas pijp 3" 6 mtr Medium Buah 662,550 662,550
29 20.03.06.18.39 Tiang Lampu Galvanis Gas pijp 1" u arde Buah 153,248 153,248
30 20.03.06.18.40 Tiang Lampu Galvanis lengkung 6 m Batang 5,425,508 5,425,508
31 20.03.06.18.41 Tiang Lampu Galvanis lurus 6 m Unit 2,712,780 2,712,780
32 20.03.06.18.42 Tiang Lampu Galvanis standar wire 22m2 meter 6,405 6,405
33 20.03.06.18.43 Tiang Lampu Galvanis Standar wire 70-150 m2 meter 18,428 18,428
34 20.03.06.18.44 Tiang Lampu Galvanis 2 m (Dia ; 1,5) Set 421,838 421,838
35 20.03.06.18.45 Tiang Lampu Galvanis 8 m (Dia ; 3 s/d 5) Set 3,373,125 3,373,125
36 20.03.06.18.46 Tiang Lampu Galvanis Gas pijp schroeren 2" x 2 Buah 154,665 154,665
mtr [strut tie]
37 20.03.06.18.47 Tiang Lampu Octagonal ( segi delapan ) tebal 32 Unit 11,625,810 11,625,810
mm blasé plate 300 X 300 tinggi 11
meter, lengkung
38 20.03.06.18.48 Tiang Lampu Octagonal ( segi delapan ) tebal 32 Unit 5,425,508 5,425,508
mm blasé plate 300 X 300 tinggi
3m, lurus
39 20.03.06.18.49 Tiang Lampu Octagonal, lengkung Buah 10,463,355 10,463,355
40 20.03.06.18.50 Tiang Lampu Octagonal, lurus Buah 2,712,780 2,712,780
41 20.03.06.18.51 Tiang Lampu Octagonal, pendek Buah 4,262,948 4,262,948
42 20.03.06.18.52 Tiang Lampu Pipa Pelindung galvanis 0,75" x 2 Buah 110,355 110,355
20.03.06.19 mtr
Bahan Listrik Lainnya
1 20.03.06.19.01 Amatur Box Lampu Buah 84,945 84,945
2 20.03.06.19.02 Ascessories Lampu Automatic circuit lampu selang kw. Buah 358,628 358,628
Hias 1 (Controller)
3 20.03.06.19.03 Ascessories Lampu Automatic circuit lampu selang kw. Buah 264,233 264,233
4 20.03.06.19.04 Hias
Ascessories Lampu 2
Jack Lampu Selang (3 line) Hitam Buah 41,633 41,633
5 20.03.06.19.05 Hias
Ascessories Lampu Jack Lampu Selang (3 line) Putih Buah 41,633 41,633
6 20.03.06.19.06 Hias
Bel Ted Set 19,740 19,740
7 20.03.06.19.07 Bel Lagu Melody Set 32,288 32,288
8 20.03.06.19. Biaya Penyambungan PLN Buah
9 20.03.06.19.09 Box Lampu 2 Aspek LED 20 cm Unit 1,915,515 1,915,515
10 20.03.06.19.10 Box Lampu 3 Aspek LED 20 cm Set 10,024,560 10,024,560
11 20.03.06.19.11 Box MCB 4 grub Buah 37,013 37,013
12 20.03.06.19.12 Box Meteran, Mika Buah 63,158 63,158
13 20.03.06.19.13 Capasitor UF 50 Buah 107,205 107,205
14 20.03.06.19.15 Ignator SN 51 Buah 88,253 88,253
15 20.03.06.19.16 Ignitor Philips, SI 51 Buah 83,055 83,055
16 20.03.06.19.17 Ignitor Philips, SX 75 Buah 464,625 464,625
17 20.03.06.19.18 Ignitor SN 58 Buah 95,813 95,813
18 20.03.06.19.33 Isolator / Isolasi Plastik Roll 9,818 9,818
19 20.03.06.19.34 Kondensator Philips Buah 90,300 90,300
20 20.03.06.19.35 Konektor Kabel Buah 16,013 16,013
21 20.03.06.19.36 Konektor Kedap Air Buah 12,810 12,810
22 20.03.06.19.37 Kontroller Lampu Set 3,511,778 3,511,778
ATCS / Peringatan
23 20.03.06.19.38 Kontroller TLC x 1 comp 4 Unit 2,962,680 2,962,680
24 20.03.06.19.39 Kop Sekering NT 100 A Buah 8,033 8,033
25 20.03.06.19.40 Kop Sekring Batu Buah 4,043 4,043
26 20.03.06.19.41 Kop Sekring Otomat BBC Buah 92,243 92,243
27 20.03.06.19.42 KWH Meter (1 Pas) 20 (60)A Fuji Dharma Elektrik Buah 491,558 491,558
28 20.03.06.19.46 Mainswitch Buah 322,140 322,140
29 20.03.06.19.47 Multi Tester Biasa Buah 57,488 57,488
30 20.03.06.19.48 Multi Tester Sanwa, YX 360 TRF Buah 283,763 283,763
31 20.03.06.19.52 Patok Pengaman 4" BSB Buah 292,845 292,845
32 20.03.06.19.55 Plat Clamp Roll 688,223 688,223
33 20.03.06.19.56 Rambu Tabel 1 + Set 543,638 543,638
Pengaman
34 20.03.06.19.57 Reflektor pemantul cahaya Buah 13,000 13,000
35 20.03.06.19.59 Sekring otomatis likon 10 A Buah 83,055 83,055
36 20.03.06.19.60 Sekring otomatis likon 25 A Buah 102,165 102,165

61
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
37 20.03.06.19.62 Service Kabel SR Buah 15,330 15,330
38 20.03.06.19.63 Terminal End (Sleeve Buah 89,355 89,355
Beam)
39 20.03.06.19.64 Terminal Kabel 1 Jalur Buah 27,248 27,248
40 20.03.06.19.67 Volt Meter H & G AC 500 V Buah 231,263 231,263
41 20.03.06.19.74 Foto Cell 6/A Buah 113,400 113,400
42 20.03.06.19.75 Foto Cell Selcon 3 A (kw. 1) Buah 78,435 78,435
43 20.03.06.19.76 Foto Cell Selcon 6 A (kw. 1) Buah 89,565 89,565
44 20.03.06.19.77 Foto Cell Selcon 10 A (kw. 1) Buah 126,840 126,840
45 20.03.06.19.78 Handel 63 / A Buah 316,575 316,575
46 20.03.06.19.79 Lampu Tindakan Utk rumah Sakit, Onemed Buah 1,760,745 1,760,745
47 20.03.06.19.80 Sabuk Pengaman NIKKD TH 100 Buah 2,735,513 2,735,513
48 20.03.06.19.81 Servis Buah 4,883 4,883
49 20.03.06.19.82 Ascessories Lampu Hi Sambungan sock lampu Buah 16,643 16,643
50 20.03.06.19.83 Ascessories Lampu Hi Penutup lampu selang Buah 1,943 1,943
51 20.03.06.19.84 Ascessories Lampu Hi Klem Mundek No. 12 Buah 16,643 16,643
52 20.03.06.19.85 Stater Philips FS 2 (10-20 W) Buah 3,833 3,833
53 20.03.06.19.86 Stater Philips FS 4 (40-65 W) Buah 6,405 6,405
54 20.03.06.19.87 Sekring otomatis likon 6A Buah 56,070 56,070
55 20.03.06.19.90 Perbaikan Box Traffic Buah 540,225 540,225
luar dan cat
56 20.03.06.19.91 Tiang Patok Buah 240,765 240,765
57 20.03.06.19.92 Tiang Pancang d = 30 cm m 160,913 160,913
58 20.03.06.19.93 Tiang rambu beton umpak Buah 240,765 240,765
59 20.03.06.19.94 Isolasi Unibel Buah 6,405 6,405
60 20.03.06.19.95 Isolasi Scot Merek 3 Buah 87,518 87,518
61 20.03.06.19.96 M
Biaya Programming Buah 191,573 191,573
62 20.03.06.19.97 Klem PVC Buah 2,573 2,573
63 20.03.06.19.98 Klem PVC Kecil Buah 1,943 1,943
64 20.03.06.19.99 Socket Unit 2,282,700 2,282,700
65 20.03.06.19.100 Flazer Unit 3,755,063 3,755,063
66 20.03.06.19.101 Pin Buah 22,995 22,995
67 20.03.06.19.102 Batang Lampu Lampu Hias Sinyoku DC. 007 Batang 385,665 385,665
68 20.03.06.19.103 Pipa BSB 1" Batang 102,165 102,165
69 20.03.06.19.104 Walter Moer Buah 830,078 830,078
70 20.03.06.19.105 Bearing Pad Buah 1,085,490 1,085,490
71 20.03.06.19.106 Reilling Buah 102,165 102,165
72 20.03.06.19.107 Suku Cadang Lampu HSinyoku DC 001, Batang Lampu 3 Batang 29,400 29,400
73 20.03.06.19. Pompa air m Buah
74 20.01.01.70.01 Avour Buah 70,250 70,250
20.05 PERPIPAAN
20.05.06 PIPA PVC/UPVC
20.05.06.01 Pipa PVC
1 20.05.06.01.01 Pipa PVC buta dia = 12" klas VP AWS 10 m' 632,550 632,550
2 20.05.06.01.02 Pipa PVC buta dia = 6" klas VP AWS 10 m' 275,650 275,650
3 20.05.06.01.23 Pipa PVC Maspion AW 1 1/2" X 6 m Batang 117,650 117,650
4 20.05.06.01.22 Pipa PVC Maspion AW 1 1/4" X 6 m Batang 90,450 90,450
5 20.05.06.01.05 Pipa PVC Maspion AW 1" X 4 m Batang 44,200 44,200
6 20.05.06.01.21 Pipa PVC Maspion AW 1" X 6 m Batang 63,950 63,950
7 20.05.06.01.06 Pipa PVC Maspion AW 1 1/4" X 4 m Batang 62,500 62,500
8 20.05.06.01.07 Pipa PVC Maspion AW 1 1/2" X 4 m Batang 81,300 81,300
9 20.05.06.01.03 Pipa PVC Maspion AW 1/2" X 4 m Batang 28,750 28,750
10 20.05.06.01.19 Pipa PVC Maspion AW 1/2" X 6 m Batang 42,250 42,250
11 20.05.06.01.15 Pipa PVC Maspion AW 10" X 4 m Batang 1,398,900 1,398,900
12 20.05.06.01.31 Pipa PVC Maspion AW 10" X 6 m Batang 2,098,350 2,098,350
13 20.05.06.01.16 Pipa PVC Maspion AW 12" X 4 m Batang 2,019,950 2,019,950
14 20.05.06.01.32 Pipa PVC Maspion AW 12" X 6 m Batang 3,002,800 3,002,800
15 20.05.06.01.17 Pipa PVC Maspion AW 14" X 4 m Batang 2,809,850 2,809,850
16 20.05.06.01.33 Pipa PVC Maspion AW 14" X 6 m Batang 4,220,750 4,220,750
17 20.05.06.01.18 Pipa PVC Maspion AW 16" X 4 m Batang 3,521,350 3,521,350
18 20.05.06.01.34 Pipa PVC Maspion AW 16" X 6 m Batang 4,935,050 4,935,050
19 20.05.06.01.25 Pipa PVC Maspion AW 2 1/2" X 6 m Batang 223,100 223,100
20 20.05.06.01.08 Pipa PVC Maspion AW 2" X 4 m Batang 120,750 120,750
21 20.05.06.01.24 Pipa PVC Maspion AW 2" X 6 m Batang 174,900 174,900
22 20.05.06.01.09 Pipa PVC Maspion AW 2 1/2" X 4 m Batang 155,000 155,000
23 20.05.06.01.10 Pipa PVC Maspion AW 3" X 4 m Batang 221,150 221,150
24 20.05.06.01.26 Pipa PVC Maspion AW 3" X 6 m Batang 319,600 319,600
25 20.05.06.01.04 Pipa PVC Maspion AW 3/4" X 4 m Batang 35,100 35,100
26 20.05.06.01.20 Pipa PVC Maspion AW 3/4" X 6 m Batang 51,300 51,300
27 20.05.06.01.11 Pipa PVC Maspion AW 4" X 4 m Batang 322,300 322,300
28 20.05.06.01.27 Pipa PVC Maspion AW 4" X 6 m Batang 458,300 458,300
29 20.05.06.01.12 Pipa PVC Maspion AW 5" X 4 m Batang 470,750 470,750
30 20.05.06.01.28 Pipa PVC Maspion AW 5" X 6 m Batang 719,950 719,950

62
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
31 20.05.06.01.13 Pipa PVC Maspion AW 6" X 4 m Batang 639,150 639,150
32 20.05.06.01.29 Pipa PVC Maspion AW 6" X 6 m Batang 952,700 952,700
33 20.05.06.01.14 Pipa PVC Maspion AW 8" x 4 m Batang 988,900 988,900
34 20.05.06.01.30 Pipa PVC Maspion AW 8" X 6 m Batang 1,483,300 1,483,300
35 20.05.06.01.39 Pipa PVC Maspion C 1 1/2" X 4 m Batang 30,500 30,500
36 20.05.06.01.48 Pipa PVC Maspion C 1 1/2" X 6 m Batang 42,850 42,850
37 20.05.06.01.38 Pipa PVC Maspion C 1 1/4" X 4 m Batang 23,650 23,650
38 20.05.06.01.47 Pipa PVC Maspion C 1 1/4" X 6 m Batang 35,850 35,850
39 20.05.06.01.37 Pipa PVC Maspion C 1" X 4 m Batang 18,700 18,700
40 20.05.06.01.46 Pipa PVC Maspion C 1" X 6 m Batang 28,400 28,400
41 20.05.06.01.41 Pipa PVC Maspion C 2 1/2" X 4 m Batang 61,350 61,350
42 20.05.06.01.50 Pipa PVC Maspion C 2 1/2" X 6 m Batang 86,050 86,050
43 20.05.06.01.40 Pipa PVC Maspion C 2" X 4 m Batang 48,300 48,300
44 20.05.06.01.49 Pipa PVC Maspion C 2" X 6 m Batang 68,200 68,200
45 20.05.06.01.42 Pipa PVC Maspion C 3" X 4 m Batang 71,100 71,100
46 20.05.06.01.51 Pipa PVC Maspion C 3" X 6 m Batang 100,100 100,100
47 20.05.06.01.36 Pipa PVC Maspion C 3/4" X 4 m Batang 12,700 12,700
48 20.05.06.01.45 Pipa PVC Maspion C 3/4" X 6 m Batang 19,200 19,200
49 20.05.06.01.43 Pipa PVC Maspion C 4" X 4 m Batang 91,550 91,550
50 20.05.06.01.52 Pipa PVC Maspion C 4" X 6 m Batang 127,850 127,850
51 20.05.06.01.35 Pipa PVC Maspion C 5/8" X 4 m Batang 6,950 6,950
52 20.05.06.01.44 Pipa PVC Maspion C 5/8" X 6 m Batang 10,550 10,550
53 20.05.06.01.70 Pipa PVC Maspion D 2 1/2" X 6 m Batang 120,150 120,150
54 20.05.06.01.68 Pipa PVC Maspion D 1 1/2" X 6 m Batang 62,100 62,100
55 20.05.06.01.67 Pipa PVC Maspion D 1 1/4" X 6 m Batang 54,750 54,750
56 20.05.06.01.53 Pipa PVC Maspion D 1 1/4" X 4 m Batang 38,900 38,900
57 20.05.06.01.54 Pipa PVC Maspion D 1 1/2" X 4 m Batang 44,200 44,200
58 20.05.06.01.62 Pipa PVC Maspion D 10" X 4 m Batang 999,750 999,750
59 20.05.06.01.76 Pipa PVC Maspion D 10" X 6 m Batang 1,500,950 1,500,950
60 20.05.06.01.63 Pipa PVC Maspion D 12" X 4 m Batang 1,363,800 1,363,800
61 20.05.06.01.77 Pipa PVC Maspion D 12" X 6 m Batang 2,045,250 2,045,250
62 20.05.06.01.64 Pipa PVC Maspion D 14" x 4 m Batang 1,786,300 1,786,300
63 20.05.06.01.78 Pipa PVC Maspion D 14" X 6 m Batang 2,678,400 2,678,400
64 20.05.06.01.65 Pipa PVC Maspion D 16" x 4 m Batang 2,311,800 2,311,800
65 20.05.06.01.79 Pipa PVC Maspion D 16" X 6 m Batang 3,467,050 3,467,050
66 20.05.06.01.55 Pipa PVC Maspion D 2" X 4 m Batang 57,800 57,800
67 20.05.06.01.69 Pipa PVC Maspion D 2" X 6 m Batang 81,100 81,100
68 20.05.06.01.56 Pipa PVC Maspion D 2 1/2" X 4 m Batang 83,150 83,150
69 20.05.06.01.66 Pipa PVC Maspion D 20" x 4 m Batang 3,993,650 3,993,650
70 20.05.06.01.80 Pipa PVC Maspion D 20" X 6 m Batang 5,990,600 5,990,600
71 20.05.06.01.57 Pipa PVC Maspion D 3" X 4 m Batang 123,850 123,850
72 20.05.06.01.71 Pipa PVC Maspion D 3" X 6 m Batang 174,300 174,300
73 20.05.06.01.58 Pipa PVC Maspion D 4" X 4 m Batang 174,250 174,250
74 20.05.06.01.72 Pipa PVC Maspion D 4" X 6 m Batang 245,100 245,100
75 20.05.06.01.59 Pipa PVC Maspion D 5" X 4 m Batang 284,600 284,600
76 20.05.06.01.73 Pipa PVC Maspion D 5" X 6 m Batang 400,450 400,450
77 20.05.06.01.60 Pipa PVC Maspion D 6" X 4 m Batang 345,550 345,550
78 20.05.06.01.74 Pipa PVC Maspion D 6" X 6 m Batang 486,300 486,300
79 20.05.06.01.61 Pipa PVC Maspion D 8" X 4 m Batang 572,850 572,850
80 20.05.06.01.75 Pipa PVC Maspion D 8" X 6 m Batang 859,850 859,850
81 20.05.06.01.81 Pipa PVC Dia 1" S-12,5 @ 6m Batang 60,555 60,555
82 20.05.06.01.82 Pipa PVC Dia 1 1/2" S-12,5 @ 6m Batang 92,290 92,290
83 20.05.06.01.83 Pipa PVC Dia 10" S-12,5 @ 6m AW Batang 1,810,435 1,810,435
84 20.05.06.01.84 Pipa PVC Dia 2" S-12,5 @ 6m Batang 170,940 170,940
85 20.05.06.01.85 Pipa PVC Dia 2 1/2" S-12,5 @ 6m Batang 184,910 184,910
86 20.05.06.01.86 Pipa PVC Dia 3" S-12,5 @ 6m Batang 354,365 354,365
87 20.05.06.01.87 Pipa PVC Dia 3/4" S-12,5 @ 6m Batang 45,815 45,815
88 20.05.06.01.88 Pipa PVC Dia 4" S-12,5 @ 6m Batang 554,455 554,455
89 20.05.06.01.89 Pipa PVC Dia 6" S-12,5 @ 6m Batang 1,155,275 1,155,275
90 20.05.06.01.90 Pipa PVC Dia 8" S-12,5 @ 6m AW Batang 1,279,355 1,279,355
91 20.05.06.01.91 Pipa PVC screen dia = 6" klas VP AWS 10 m' 359,205 359,205
20.05.06.02 Pipa Galvanis (Air Tuang)
1 20.05.06.02.01 Pipa Galvanis Dia 2 - 1/2" @ 6m Kelas B Batang 674,000 674,000
2 20.05.06.02.02 Pipa Galvanis Dia 3" @ 6m Kelas B Batang 793,500 793,500
3 20.05.06.02.03 Pipa Galvanis Dia 4" @ 6m Kelas B Batang 1,051,350 1,051,350
4 20.05.06.02.04 Pipa Galvanis Dia 5" @ 6m Kelas B Batang 1,482,100 1,482,100
5 20.05.06.02.05 Pipa Galvanis Dia 6" @ 6m Kelas B Batang 1,798,050 1,798,050
6 20.05.06.02.06 Pipa Galvanis Dia 1/2" @ 6m Kelas A Batang 150,550 150,550
7 20.05.06.02.07 Pipa Galvanis Dia 3/4" @ 6m Kelas A Batang 191,550 191,550
8 20.05.06.02.08 Pipa Galvanis Dia 1" @ 6m Kelas A Batang 249,650 249,650
9 20.05.06.02.09 Pipa Galvanis Dia 1 - 1/4" @ 6m Kelas A Batang 319,000 319,000
10 20.05.06.02.10 Pipa Galvanis Dia 1 - 1/2" @ 6m Kelas A Batang 396,200 396,200
11 20.05.06.02.11 Pipa Galvanis Dia 2" @ 6m Kelas A Batang 532,000 532,000

63
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
12 20.05.06.02.12 Pipa Galvanis Dia 2 - 1/2" @ 6m Kelas A Batang 733,750 733,750
13 20.05.06.02.13 Pipa Galvanis Dia 3" @ 6m Kelas A Batang 861,700 861,700
14 20.05.06.02.14 Pipa Galvanis Dia 4" @ 6m Kelas A Batang 1,223,700 1,223,700
15 20.05.06.02.15 Pipa Galvanis Dia 5" @ 6m Kelas A Batang 1,752,750 1,752,750
16 20.05.06.02.16 Pipa Galvanis Dia 6" @ 6m Kelas A Batang 2,088,450 2,088,450
17 20.05.06.02.17 Pipa Galvanis Dia 8" @ 6m Kelas A Batang 3,509,250 3,509,250
18 20.05.06.02.18 Pipa Galvanis Dia 1/2" @ 6m Medium B Batang 153,050 153,050
19 20.05.06.02.19 Pipa Galvanis Dia 3/4" @ 6m Medium B Batang 189,000 189,000
20 20.05.06.02.20 Pipa Galvanis Dia 1" @ 6m Medium B Batang 289,950 289,950
21 20.05.06.02.21 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium B Batang 374,250 374,250
22 20.05.06.02.22 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium B Batang 444,000 444,000
23 20.05.06.02.23 Pipa Galvanis Dia 2" @ 6m Medium B Batang 658,450 658,450
24 20.05.06.02.24 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium B Batang 840,850 840,850
25 20.05.06.02.25 Pipa Galvanis Dia 3" @ 6m Medium B Batang 1,041,500 1,041,500
26 20.05.06.02.26 Pipa Galvanis Dia 4" @ 6m Medium B Batang 1,507,100 1,507,100
27 20.05.06.02.27 Pipa Galvanis Dia 5" @ 6m Medium B Batang 1,950,300 1,950,300
28 20.05.06.02.28 Pipa Galvanis Dia 6" @ 6m Medium B Batang 2,356,700 2,356,700
29 20.05.06.02.29 Pipa Galvanis Dia 1/2" @ 6m Medium A Batang 186,000 186,000
30 20.05.06.02.30 Pipa Galvanis Dia 3/4" @ 6m Medium A Batang 238,950 238,950
31 20.05.06.02.31 Pipa Galvanis Dia 1" @ 6m Medium A Batang 366,400 366,400
32 20.05.06.02.32 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium A Batang 483,600 483,600
33 20.05.06.02.33 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium A Batang 555,600 555,600
34 20.05.06.02.34 Pipa Galvanis Dia 2" @ 6m Medium A Batang 758,100 758,100
35 20.05.06.02.35 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium A Batang 966,950 966,950
36 20.05.06.02.36 Pipa Galvanis Dia 3" @ 6m Medium A Batang 1,249,150 1,249,150
37 20.05.06.02.37 Pipa Galvanis Dia 4" @ 6m Medium A Batang 1,808,450 1,808,450
38 20.05.06.02.38 Pipa Galvanis Dia 5" @ 6m Medium A Batang 2,433,850 2,433,850
39 20.05.06.02.39 Pipa Galvanis Dia 6" @ 6m Medium A Batang 2,897,400 2,897,400
40 20.05.06.02.40 Pipa Galvanis Dia 8" @ 6m Medium A Batang 4,161,850 4,161,850
20.05.06.03 Pipa Stainless
1 20.05.06.03.01 Pipa Stainless Dia 5/8" @ 6m (heinse Merah) Batang 305,450 305,450
2 20.05.06.03.02 Pipa Stainless Dia 1 1/4" @ 6m (heinse Merah) Batang 357,200 357,200
3 20.05.06.03.03 Pipa Stainless Dia 1 1/2" @ 6m (heinse Merah) Batang 426,050 426,050
4 20.05.06.03.04 Pipa Stainless Dia 2" @ 6m (heinse Merah) Batang 651,600 651,600
20.05.06.09 Reducer
1 20.05.06.09.05 Reducer PVC All Flange Dia 12" x 6" Buah 766,900 766,900
20.05.06.12 Tee
1 20.05.06.12.33 Tee Maspion, TS 1" Buah 2,900 2,900
20.05.06.20. Bahan Konstruksi Lain
1 20.05.06.20.01 Bahan Pengkilap Lantai Liter 40,250 40,250
2 20.05.06.20.02 Barite Kg 825,450 825,450
3 20.05.06.20.03 Benang Rol Lokal Meter 4,250 4,250
4 20.05.06.20.04 Bentonit Kg 10,600 10,600
5 20.05.06.20.05 Biopolimer Kg 302,650 302,650
6 20.05.06.20.06 Bottom Plug Buah 139,050 139,050
7 20.05.06.20.07 CMC Kg 30,750 30,750
8 20.05.06.20.08 Calgon Kg 407,100 407,100
9 20.05.06.20.09 Centralizer Buah 378,000 378,000
10 20.05.06.20.10 Check Valve Pintu air, dia 100mm Buah 1,349,550 1,349,550
11 20.05.06.20.14 Condet Kg 242,100 242,100
12 20.05.06.20.15 Floor Drain Aluminium / Stainless Buah 51,900 51,900
13 20.05.06.20.16 Gebalan Rumput M2 3,000 3,000
14 20.05.06.20.17 Gland Pacing, Fuel Set 139,050 139,050
Filter, Air Filter dll
15 20.05.06.20.18 Grease, Pacing dll Set 59,850 59,850
16 20.05.06.20.19 Grevel Pack m3 503,600 503,600
17 20.05.06.20.20 Ijuk m2 23,250 23,250
18 20.05.06.20.23 Manometer Buah 422,900 422,900
19 20.05.06.20.24 Nipple Kg 8,300 8,300
20 20.05.06.20.25 Otomatis Pompa otomatis pompa Buah 48,300 48,300
21 20.05.06.20.26 Patok Tanda Sumur Buah 29,950 29,950
22 20.05.06.20.30 Rol TBA Roll 12,500 12,500
23 20.05.06.20.32 Seal Tape Pelapis Pemasang Kran Biji 2,400 2,400
24 20.05.06.20.33 Sifon Waser Set 65,650 65,650
25 20.05.06.20.34 Singgle Bracket Buah 6,700 6,700
26 20.05.06.20.35 Sketmatz kotak kayu rrt 6" Set 130,100 130,100
27 20.05.06.20.36 Soda Api Soda Api (Hcl) Kg 15,700 15,700
28 20.05.06.20.37 Stopper/uskup buah 4,600 4,600
29 20.05.06.20.38 Straatpot Buah 131,600 131,600
30 20.05.06.20.39 Talang U Maspion 4 m Lonjor 93,150 93,150
31 20.05.06.20.41 Tutup Bak Mandi Buah 10,250 10,250
32 20.05.06.20.42 Tutup Sumur Beton, (termasuk kunci) Buah 186,850 186,850

64
KODE HARGA HARGA
NO NAMA BARANG MERK / UKURAN SATUAN PERENCANAAN PERENCANAAN
BARANG 2016 2016 ( Zona 2 )
33 20.05.06.20.44 Ajir 2m Batang 197,000 197,000
34 05.19.03.04.107 Tanaman Lili Paris Pohon 5,750 5,750
35 05.19.03.04.119 Tanaman Puring Polibeg 10,700 10,700
36 05.19.03.04.124 Tanaman Rumput Jepang m2 33,750 33,750
37 05.19.03.01.41 Tanaman Pucuk Merah tinggi 1 m Batang 175,000
38 Tanaman Taiwan Beauty Putih Batang 3,000
39 Tanaman Tanaman Menjalar Batang 7200

65
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
6 7 5

5,090,931,600 5,090,931,600
282,997,650 282,997,650
68,356,500 68,356,500

686,550 686,550

2,268,300 2,268,300
3,215,700 3,215,700

11,400 11,400
22,750 22,750
41,100 41,100
65,400 65,400
11,200 11,200 11,200
11,350 9,950 11,350

3,600

13,650
20,350

28,850
176,900

8,500

20,300
20,300

9,600
1,750
4,850 4,200 4,850
22,500
44,950
55,500

13,550 13,150 13,550


13,550 12,750 13,550
2,250 2,150 2,250
19,700 18,000 19,700

66
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
15,600 14,250 15,600
15,600 14,800 15,600
2,100 2,000 2,100
17,000 16,600 17,000
341,250 325,000 341,250

59,250 59,250 59,250


5,300 4,900 5,000
6,700 6,150 6,500
17,000 17,000 17,000
65,950 62,000 65,950
81,200 77,000 81,200
62,550 61,000 62,550
77,300 75,000 77,300
90,950 83,000 90,950
59,100 58,000 59,100
13,450 12,250 13,450
61,050 61,000 61,050
73,900 72,000 73,900

117,250 117,250 117,250


117,750 117,750 117,750
35,100 35,100 35,100
46,200 46,200 46,200
22,800 20,750 22,800
16,700 15,300 16,700
159,100 373,750 159,100
227,300 715,875 227,300
309,300 272,100 309,300
1,018,150 1,018,150
92,000 84,000 92,000
110,000 92,000 105,000
852,350 852,350
98,150 98,150 98,150
114,050 110,000 114,000
129,600 129,600 129,600
1,281,150 ### 1,281,150
2,379,200 ### 2,379,200
701,200 617,550 701,200
1,455,750 ### 1,455,750

193,200 183,050 193,200


176,150 170,850 176,150
181,850 176,950 181,850
198,900 189,150 198,900
102,300 60,000 60,000
115,950 115,950 115,950
184,000 75,000

87,000 87,000 87,000


2,250 2,250 2,250
750 750 750
4,850 4,850 4,850
5,400 5,400 5,400
135,000 125,300 135,000
115,000 115,000 115,000
103,200 103,200 103,200
106,400 106,400 106,400
99,000 99,000 99,000
24,300 24,300 24,300
114,200 114,200 114,200
107,800 107,800 107,800
112,250 112,250 112,250
9,400 9,400 9,400
6,700 6,700 6,700
140,000 140,000 140,000
136,000 136,000 136,000
268,450 268,450 268,450
244,050 244,050 244,050
240,400 240,400 240,400
135,000 135,000 135,000
120,000 120,000 120,000

67
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
213,550 213,550 213,550
164,750 164,750 164,750
165,950 165,950
87,000 87,000 87,000

50,650 50,650 50,650


40,950 40,950 40,950
134,500 134,500 134,500
231,850 88,500 136,800
53,150 51,250 53,150
39,050 39,050 39,050
24,450 24,450 24,450
3,700 3,700 3,700
27,500 27,500 27,500
26,300 26,300 26,300
65,950 65,950
187,050 187,050 187,050
56,500 56,500 56,500
54,950 54,950 54,950
12,000 12,000
27,500 27,500 27,500
25,500 25,500 25,500
9,800 9,800 9,800
28,500 28,500 28,500
106,150 106,150 106,150
58,300 51,250 58,300
26,300 26,300 26,300
36,050 36,050 36,050
36,650 36,650 36,650
5,150 4,500 5,150
51,250 51,250 51,250
16,550 16,550 16,550
11,650 11,650 11,650
106,800 16,650 106,800
93,950 93,950 93,950
90,950 90,950 90,950
78,050 78,050 78,050
22,000 22,000 22,000
90,950 83,650 90,950
29,350 26,850 29,350
9,800 9,800 9,800
37,000 32,500 37,000
36,650 36,650 36,650
128,000 128,000 126,000
142,600 142,600 142,600
57,550 57,550 57,550
187,050 187,050 187,050

42,750 42,750 42,750


158,650 158,650 158,650
774,800 774,800 774,800
47,050 47,050 47,050

82,400 82,400 82,400


53,700 53,700 53,700
78,750 78,750 78,750
111,700 111,700 111,700
73,250 73,250 73,250
145,200 145,200 145,200
106,650 106,650 106,650
117,750 117,750 117,750
25,500 25,500 25,500
19,300 19,300 19,300
23,250 23,250 23,250
46,200 46,200 46,200
73,100 73,100 73,100
9,750 9,750 9,750
34,150 34,150 34,150
46,450 46,450 46,450
48,250 48,250 48,250
51,700 51,700 51,700

57,350 57,350 57,350

68
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
62,250 62,250 62,250
69,550 69,550 69,550
76,900 76,900 76,900
84,200 84,200 84,200

69
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015

17,000 14,500 14,500


100,050 100,050 100,050
231,800 231,800 231,800
140,650 140,650 140,650
197,750 197,750 197,750
272,450 272,450 272,450
14,500 14,000 14,000
14,300 14,000 14,000
29,100 29,100 29,100
212,950 212,950 212,950
44,350 44,350 44,350
33,750 33,750 33,750
20,250 20,250 20,250
14,650 13,500 13,500

14,200 12,500 13,000


14,500 13,000 13,200
169,900 176,700 169,900
124,800 129,800 124,800
261,250 271,700 261,250

27,850 29,000 27,850


95,950 95,950 95,950
64,450 64,450 64,450
48,000 48,000 48,000
84,500 84,500 84,500
108,800 108,800 108,800
110,250 110,250 110,250

169,350 169,350
252,300 252,300
354,600 354,600
483,000 483,000
630,750 630,750
818,250 818,250
1,009,150 1,009,150
1,469,400 1,469,400

6,500 6,050 6,500


8,000 8,000 8,000
6,150 6,150 6,150
13,450 13,300 13,450
6,850 6,700 6,850
8,800 8,800 8,800
11,000 11,000 11,000
38,450 38,450 38,450
14,650 14,650 14,650
11,400 10,400 11,400
4,100 4,050 4,100
10,400 10,400 10,400
2,300 2,100 2,200
1,250 2,000 1,250
10,550 10,550 10,550
58,700 58,700 58,700
6,750 6,150 6,750
8,550 8,550 8,550
13,650 12,190 13,500
34,950 39,675 30,000

88,800 88,800 88,800


105,750 105,750 105,750
117,750 117,750 117,750

164,750 164,750 164,750


39,800 36,650 39,800
53,400 53,400 53,400
63,450 63,450 63,450
77,300 73,250 77,300
85,450 85,450 85,450
67,150 67,150 67,150

70
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
109,850 109,850 109,850
79,350 79,350 79,350
146,450 146,450 146,450
91,550 91,550 91,550
128,150
18,350
26,600
33,900
36,650
42,750

584,700 584,700 584,700


73,900 73,900 73,900
24,000 24,000 24,000
4,450 4,450 4,450
62,450 62,450 62,450
50,150 50,150 50,150
103,700 103,700 103,700
92,800 92,800 92,800
58,400 58,400 58,400

4,900 4,900 4,900


4,550 4,300 4,550

81,650 81,650 81,650


143,300 143,300
128,150 128,150 128,150
68,650 68,650 68,650
84,550 84,550 84,550
102,250 102,250
156,750 156,750 156,750
61,050 61,050 61,050
68,350 68,350 68,350
79,350 72,500 78,000
86,650 86,650 86,000
97,650 92,500 95,000
94,600 94,600
18,350 18,350 18,350
108,050 108,050 108,050
56,150 56,150 56,150
71,450 71,450
68,200 68,200
77,900 77,900
73,100 21,360
25,400 22,300 25,400
59,700 52,400 55,000
36,650 36,000 36,500

67,150 67,150 67,150


24,300 22,150 24,300
17,750 17,750 17,750
33,600 33,600 33,600
32,150 32,150 32,150
15,550 15,550 15,550

13,800 13,800 13,800


19,150 16,800 19,150
22,150 19,450 22,150
19,550 19,550 19,550
20,750 20,750 20,750
54,000 54,000 54,000
21,300 21,300 21,300

6,150 6,150 6,150


2,500 2,500 2,500
3,700 3,700 3,700
1,950 1,950 1,950
1,950 1,950 1,950
3,750 3,750 3,750
4,150 3,600 4,150

71
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
4,300 4,300 4,300

1,430,000 ### 1,430,000


143,400 143,400 143,400
109,850 109,850 109,850
2,440,200 ### 2,440,200

46,000 41,900 46,000


105,000 101,350 105,000
115,000 110,250 115,000
103,450 103,450 103,450

193,200 193,200
193,200 193,200
274,550 274,550 274,550
372,050 372,050 372,050
1,022,800 1,022,800

700,900 700,900 700,900


357,300 357,300 357,300
595,650 595,650 595,650
170,850 170,850

21,100 21,100
67,200 67,200
21,600 21,600
24,450 24,450 24,450
30,550 30,550 30,550
381,300 381,300
451,150 451,150

4,300 4,300 4,300


3,700 3,700 3,700
4,900 4,900 4,900
5,550 5,550 5,550
6,150 6,150 6,150
6,750 6,750 6,750
8,000 8,000 8,000

55,550 55,550 55,550


58,650 58,650 58,650
34,200 34,200 34,200
11,000 11,000 11,000
12,250 12,250 12,250
13,450 13,450 13,450
17,100 17,100 17,100
14,650 14,650 14,650
12,250 12,250 12,250
11,000 11,000 11,000

518,150 518,150 518,150


582,900 582,900 582,900
394,150 394,150 394,150
1,000 1,000 1,000
53,050 53,050 53,050
53,300 53,300 53,300
56,450 56,450 56,450
61,450 61,450 61,450
89,400 89,400 89,400
32,450 32,450 32,450
51,250 50,450 51,250
48,250 45,650 48,250
54,350 53,500 54,350
20,000 20,000 20,000
62,500 62,500 62,500
83,000 83,000

72
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
4,900 4,900 4,900
6,750 6,750 6,750
11,650 11,650 11,650
16,550 16,550 16,550

17,100 17,100 17,100


19,550 19,550 19,550

10,400 10,400 10,400


44,350 44,350
38,500 35,400 38,500
13,400 12,250 13,400
21,400 21,400 21,400
119,600 119,600 119,600
8,550 8,550 8,550
7,350 7,350 7,350

573,950 573,950 573,950


323,900 323,900 323,900
466,350 466,350 466,350
242,350 242,350 242,350
250,100 250,100 250,100
242,350 242,350 242,350

7,300 7,300 7,300


11,000 11,000 11,000
12,550 12,550

24,450 24,450 24,450


24,450 24,450 24,450
14,500 14,500 14,500

14,250 14,250
24,450 24,450 24,450
1,300 1,300 1,300
51,700 45,450 51,700
14,250 14,250

15,300 15,300 15,300


192,350 192,350 192,350
466,350 466,350 466,350
589,400 589,400 589,400
1,030,450 ### 1,030,450
330,700 330,700 330,700
466,350 466,350 466,350
272,100 272,100 272,100
1,575,300 ### 1,575,300

1,086,550 956,050 1,086,550


301,150 301,150

198,900 198,900

210,250 210,250
499,550
593,550
646,050
113,850 100,100 113,850
1,713,350 ### 1,713,350
1,581,900 ### 1,581,900
988,700 988,700

350 350 350

34,150 34,150 34,150


37,700 37,700 37,700
24,950 24,950 24,950
36,000 36,000 36,000
51,750 51,750 51,750

73
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015

72,000 65,900 72,000


90,000 82,400 90,000
144,000 131,800 144,000
210,000 192,200 210,000
40,000 36,650 40,000
241,000 219,650 241,000
289,800 263,550 289,800

9,200 9,200 9,200


9,200 920 9,200

95,450 95,450 95,450


100,100 100,100 100,100
103,900 103,900 103,900
119,300 119,300 119,300

88,650 88,650 88,650


68,650 71,850 68,650
18,350 18,350 18,350
26,850 26,850 26,850
34,200 34,200 34,200
42,750 42,750 42,750

16,550 16,550
62,550 62,550
62,250 62,250 62,250
94,600 94,600 94,600
131,200 131,200 131,200
223,500 223,500
39,700 39,700 39,700
59,250 59,250 59,250

13,750 13,750 13,750


15,000 15,000 15,000
17,800 17,800 17,800
18,700 18,700 18,700
27,050 27,050 27,050
30,150 30,150 30,150

39,500 39,500 39,500


58,750 58,750 58,750
56,150 56,150 56,150
68,650 68,650 68,650
48,850 48,850 48,850
30,550 30,550 30,550
53,300 53,300 53,300
106,000 97,500 106,000
123,000 120,000 123,000
135,000 115,000 135,000
155,000 130,000 155,000
20,750 20,750 20,750
29,300 29,300 29,300
53,650 53,650
58,100 58,100

18,350 18,350 18,350


91,550 91,550 91,550
115,350 115,350 115,350
21,400 21,400 21,400
45,700 45,700 45,700
22,000 22,000 22,000
25,650 25,650 25,650
19,550 18,000 19,550
14,650 14,650 14,650

18,350 18,350 18,350


41,500 41,500 41,500
12,300 11,200 12,300
19,750 19,750 19,750
2,100 2,100 2,100

74
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
355,950 355,950 355,950
3,300,000 ### 3,000,000
1,061,300 ### 1,061,300
9,659,550 ### 9,659,550
9,800,000 ### 9,800,000
9,091,350 ### 9,091,350
9,091,350 ### 9,091,350
8,523,150 ### 8,523,150
9,091,350 ### 9,091,350
3,454,700 ### 3,454,700
32,500 32,500 32,500
41,500 41,500 41,500
160,950 160,950 160,950
18,009,150 ### 18,009,150
18,009,150 ### 18,009,150
7,873,350 ### 7,873,350
13,031,500 ### 13,031,500
13,446,700 ### 13,446,700
18,009,150 ### 18,009,150
11,000,000 ### 11,000,000
12,500,600 ### 12,500,600
10,795,950 ### 10,795,950
7,930,650 ### 7,930,650
8,925,000 ### 8,925,000
8,000,000 ### 8,000,000
32,500 32,500 32,500
7,930,650 ### 7,930,650
6,100,500 ### 6,100,500
8,540,700 ### 8,540,700
6,100,500 ### 6,100,500
5,490,450 ### 5,490,450
5,490,450 ### 5,490,450
5,673,500 ### 5,673,500
4,725,000 ### 4,725,000
157,500 150,000 150,000
224,200 195,000 195,000
3,500,000 ### 3,500,000
106,000 106,000 106,000
143,400 143,400 143,400
138,550 138,550 138,550
77,200 77,200 77,200
127,450 127,450 127,450
140,200 140,200 140,200
58,000 58,000 58,000
69,550 69,550 69,550
81,850 79,350 81,850
100,050 100,050 100,050
49,900 49,900

15,850 15,850 15,850


260,400 260,400 260,400

35,400 35,400 35,400


1,427,550 ### 1,427,550
396,550 396,550 396,550
597,850 597,850 597,850
390,450 390,450 390,450
219,650 219,650 219,650
359,950 359,950 359,950
218,200 218,200
245,500 245,500
300,050 300,050
231,850 231,850
654,600 654,600
2,045,550 2,045,550
1,176,200 1,176,200

75
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015

114,750

75,705 75,705 75,705


75,705 75,705 75,705
78,540 78,540 78,540

6,500 6,500 6,500


9,000 9,000 9,000
10,900 10,000 10,900
5,500 5,500 5,500

9,250 9,250 9,250


6,250 6,250 6,250
40,000 40,000 40,000
27,050 27,050 27,050
142,050 142,050 142,050
36,350 36,350 36,350
55,150 55,150 55,150
220,500 220,500 220,500
45,550 45,550 45,550
47,250 47,250 47,250
4,500 4,500 4,500
41,150 41,150 41,150

76
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015

1,049,400 ### 1,049,400


302,550 302,550 302,550
300,300 300,300 300,300
863,050 863,050 863,050
420,300 420,300 420,300
393,750 393,750 393,750
579,850 579,850 579,850
99,200 99,200 99,200
190,200 190,200 190,200
214,550 214,550 214,550
780,250 780,250 780,250
102,200 102,200 102,200
1,669,800 ### 1,669,800
20,100 20,100 20,100
520,050 520,050 520,050
461,500 461,500 461,500
526,600 526,600 526,600
434,150 434,150 434,150
644,950 644,950 644,950
676,700 676,700 676,700
777,350 777,350 777,350
832,750 832,750 832,750
374,250 374,250 374,250
268,500 268,500 268,500
551,800 551,800 551,800
969,600 969,600 969,600
3,859,050 ### 3,859,050
1,973,000 ### 1,973,000
1,600,000 ### 1,600,000
1,000,000 ### 1,000,000
11,950 11,950 11,950
88,100 88,100 88,100
166,450 166,450 166,450
361,700 361,700 361,700
143,500 143,500 143,500
440,800 440,800 440,800
765,450 765,450 765,450
2,816,250 ### 2,816,250

690,000 690,000 690,000


43,300 43,300 43,300
27,150 27,150 27,150
16,300 16,300 16,300
15,000 15,000 15,000
479,050 479,050 479,050
59,100 59,100 59,100
214,050 214,050 214,050
160,000 160,000 160,000
104,750 104,750 104,750
9,082,500 ### 9,082,500
15,592,500 ### 15,592,500
5,522,200 ### 5,522,200
440,000 440,000 440,000
252,800 252,800 252,800
199,000 199,000 199,000
940,000 940,000 940,000
230,000 230,000 230,000
175,000 175,000 175,000
170,650 170,650 170,650
218,750 218,750 218,750
30,800 30,800 30,800
702,750 702,750 702,750
186,400 186,400 186,400
436,600 436,600 436,600
165,650 165,650 165,650
13,250 13,250 13,250
68,550 68,550 68,550
3,276,300 ### 3,276,300
10,200 10,200 10,200
283,900 283,900 283,900
420,300 420,300 420,300
157,500 157,500 157,500

77
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
131,250 131,250 131,250
438,400 438,400 438,400
782,550 782,550 782,550
30,800 30,800 30,800
20,550 20,550 20,550
141,300 141,300 141,300
101,400 101,400 101,400
93,300 93,300 93,300

8,650 8,650 8,650

5,250 5,250 5,250

15,750 15,750 15,750


18,250 18,250 18,250
24,350 24,350 24,350
30,450 30,450 30,450
401,500 401,500 401,500

19,200 19,200 19,200


827,250 827,250 827,250
25,200 25,200 25,200
31,150 31,150 31,150
19,500 19,500 19,500
682,500 682,500 682,500
18,900 18,900 18,900
20,800 20,800 20,800
29,500 29,500 29,500
37,000 93,555 37,000

118,550 118,550 118,550

33,900 33,900 33,900


14,300 14,300 14,300
6,450 6,450 6,450
16,150 16,150 16,150
68,550 68,550 68,550
26,550 26,550 26,550

19,050 19,050 19,050


12,000 12,000 12,000
57,500 57,500 57,500
45,500 45,500
163,650 163,650
113,650 113,650

72,350 72,350 72,350


447,000 447,000 447,000
56,700 56,700 56,700
43,150 43,150 43,150
223,500 196,625 223,500
180,600 158,895 180,600

8,600 8,150 8,600


24,250 24,250 24,250
19,900 19,900 19,900
39,800 39,800

96,450 96,450 96,450


160,650 160,650 160,650
119,600 119,600 119,600
319,300 319,300 319,300
15,250 15,250 15,250
113,650 109,500 113,650

25,900 25,900 25,900


10,250 10,250 10,250

78
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015

10,850 4,950 10,850


4,500 5,513 4,500

9,300 9,300 9,300


13,000 13,000 13,000

21,050 21,050 21,050


26,150 24,700 26,150

9,188 9,188 9,188


16,013 16,013 16,013
25,830 25,830 25,830

79
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015

142,100 142,100
150,050 150,050
170,500 170,500
210,250 210,250
251,150 251,150
292,100 292,100
185,250 185,250
210,250 210,250
251,150 251,150
292,100 292,100
337,550 337,550

335,213 335,213 335,213


335,213 335,213 335,213
335,213 335,213 335,213
395,903 395,903 395,903
370,335 370,335 370,335

6,143 6,143 6,143

35,000 32,025 35,000


85,250 80,850 85,250
119,350 110,513 119,350

40,950 38,300 40,950


43,200 43,200

340,950 340,950
284,150 284,150
153,450 153,450

25,050 24,700 25,050

14,850 14,850 14,850


14,300 13,000 14,300

3,750 3,750 3,750

3,045 3,045 3,045


3,203 3,203 3,203

364,140 364,140 364,140

3,410,400 ### 3,410,400


2,092,808 ### 2,092,808
5,725,335 ### 5,725,335
7,633,658 ### 7,633,658
6,573,578 ### 6,573,578
2,923,463 ### 2,923,463

12,187,980 ### 12,187,980

4,761,173 ### 4,761,173

6,897,240 ### 6,897,240

13,642,598 ### 13,642,598

3,271,590 ### 3,271,590

4,079,513 ### 4,079,513

4,687,463 ### 4,687,463

80
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
2,307,375 ### 2,307,375

990,360 990,360 990,360


1,322,633 ### 1,322,633
40,898 40,898 40,898
1,785,420 ### 1,785,420
2,046,293 ### 2,046,293
2,197,913 ### 2,197,913
1,273,440 ### 1,273,440
1,370,408 ### 1,370,408
1,219,418 ### 1,219,418
80,605,560 ### 80,605,560
93,781,485 ### 93,781,485
71,304,818 ### 71,304,818
441,368 441,368 441,368
662,550 662,550 662,550
153,248 153,248 153,248
5,425,508 ### 5,425,508
2,712,780 ### 2,712,780
6,405 6,405 6,405
18,428 18,428 18,428
421,838 421,838 421,838
3,373,125 ### 3,373,125
154,665 154,665 154,665

11,625,810 ### 11,625,810

5,425,508 ### 5,425,508

10,463,355 ### 10,463,355


2,712,780 ### 2,712,780
4,262,948 ### 4,262,948
110,355 110,355 110,355

84,945 84,945 84,945


358,628 358,628 358,628

264,233 264,233 264,233


41,633 41,633 41,633
41,633 41,633 41,633
19,740 19,740 19,740
32,288 32,288 32,288
###
1,915,515 ### 1,915,515
10,024,560 ### 10,024,560
37,013 37,013 37,013
63,158 63,158 63,158
107,205 107,205 107,205
88,253 88,253 88,253
83,055 83,055 83,055
464,625 464,625 464,625
95,813 95,813 95,813
9,818 9,818 9,818
90,300 90,300 90,300
16,013 16,013 16,013
12,810 12,810 12,810
3,511,778 ### 3,511,778

2,962,680 ### 2,962,680


8,033 8,033 8,033
4,043 4,043 4,043
92,243 92,243 92,243
491,558 491,558 491,558
322,140 322,140 322,140
57,488 57,488 57,488
283,763 283,763 283,763
292,845 292,845 292,845
688,223 688,223 688,223
543,638 543,638 543,638

13,000 13,000 13,000


83,055 83,055 83,055
102,165 102,165 102,165

81
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
15,330 15,330 15,330
89,355 89,355 89,355

27,248 27,248 27,248


231,263 231,263 231,263
113,400 113,400 113,400
78,435 78,435 78,435
89,565 89,565 89,565
126,840 126,840 126,840
316,575 316,575 316,575
1,760,745 ### 1,760,745
2,735,513 ### 2,735,513
4,883 4,883 4,883
16,643 16,643 16,643
1,943 1,943 1,943
16,643 16,643 16,643
3,833 3,833 3,833
6,405 6,405 6,405
56,070 56,070 56,070
540,225 540,225 540,225

240,765 240,765 240,765


160,913 160,913 160,913
240,765 240,765 240,765
6,405 6,405 6,405
87,518 87,518 87,518
191,573 191,573 191,573
2,573 2,573 2,573
1,943 1,943 1,943
2,282,700 ### 2,282,700
3,755,063 ### 3,755,063
22,995 22,995 22,995
385,665 385,665 385,665
102,165 102,165 102,165
830,078 830,078 830,078
1,085,490 ### 1,085,490
102,165 102,165 102,165
29,400 29,400 29,400

70,250 70,250 70,250

632,550 632,550 632,550


275,650 275,650 275,650
117,650 117,650 117,650
90,450 90,450 90,450
43,700 40,900 43,700
63,950 63,950 63,950
61,750 60,300 61,750
80,400 78,400 80,400
28,450 26,650 28,450
42,250 42,250 42,250
1,398,900 ### 1,398,900
2,098,350 ### 2,098,350
2,019,950 ### 2,019,950
3,002,800 ### 3,002,800
2,809,850 ### 2,809,850
4,220,750 ### 4,220,750
3,521,350 ### 3,521,350
4,935,050 ### 4,935,050
223,100 223,100 223,100
119,350 114,600 119,350
174,900 174,900 174,900
153,200 150,750 153,200
218,600 211,050 218,600
319,600 319,600 319,600
34,700 32,550 34,700
51,300 51,300 51,300
318,600 307,550 318,600
458,300 458,300 458,300
470,750 470,750 470,750
719,950 719,950 719,950

82
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
639,150 639,150 639,150
952,700 952,700 952,700
988,900 988,900 988,900
1,483,300 ### 1,483,300
30,150 28,200 30,150
42,850 42,850 42,850
23,650 23,650 23,650
35,850 35,850 35,850
18,700 18,700 18,700
28,400 28,400 28,400
56,700 56,700 56,700
42,850 86,050 42,850
47,750 44,800 47,750
68,200 68,200 68,200
70,250 65,850 70,250
100,100 100,100 100,100
12,700 12,700 12,700
19,200 19,200 19,200
90,500 84,800 90,500
127,850 127,850 127,850
6,950 6,950 6,950
10,550 10,550 10,550
120,150 120,150 120,150
62,100 62,100 62,100
54,750 54,750 54,750
37,500 34,350 37,500
43,700 40,900 43,700
999,750 999,750 999,750
1,500,950 ### 1,500,950
1,363,800 ### 1,363,800
2,045,250 ### 2,045,250
1,786,300 ### 1,786,300
2,678,400 ### 2,678,400
2,311,800 ### 2,311,800
3,467,050 ### 3,467,050
57,100 53,450 57,100
81,100 81,100 81,100
82,150 75,300 82,150
3,993,650 ### 3,993,650
5,990,600 ### 5,990,600
120,000 109,250 120,000
174,300 174,300 174,300
168,000 153,650 168,000
245,100 245,100 245,100
281,300 267,000 281,300
400,450 400450 400,450
341,550 324,200 341,550
486,300 486,300 486,300
572,850 572,850 572,850
859,850 859,850 859,850
60,555 60,555 60,555
92,290 92,290 92,290
1,810,435 ### 1,810,435
170,940 170,940 170,940
184,910 184,910 184,910
354,365 354,365 354,365
45,815 45,815 45,815
554,455 554,455 554,455
1,155,275 ### 1,155,275
1,279,355 ### 1,279,355
359,205 359,205 359,205

674,000 674,000 674,000


793,500 793,500 793,500
1,051,350 ### 1,051,350
1,482,100 ### 1,482,100
1,798,050 ### 1,798,050
150,550 150,550 150,550
191,550 191,550 191,550
249,650 249,650 249,650
319,000 319,000 319,000
396,200 396,200 396,200
532,000 532,000 532,000

83
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
733,750 733,750 733,750
861,700 861,700 861,700
1,223,700 ### 1,223,700
1,752,750 ### 1,752,750
2,088,450 ### 2,088,450
3,509,250 ### 3,509,250
153,050 153,050 153,050
189,000 189,000 189,000
289,950 289,950 289,950
374,250 374,250 374,250
444,000 444,000 444,000
658,450 658,450 658,450
840,850 840,850 840,850
1,041,500 ### 1,041,500
1,507,100 ### 1,507,100
1,950,300 ### 1,950,300
2,356,700 ### 2,356,700
186,000 186,000 186,000
238,950 238,950 238,950
366,400 366,400 366,400
483,600 483,600 483,600
555,600 555,600 555,600
758,100 758,100 758,100
966,950 966,950 966,950
1,249,150 ### 1,249,150
1,808,450 ### 1,808,450
2,433,850 ### 2,433,850
2,897,400 ### 2,897,400
4,161,850 ### 4,161,850

305,450 305,450 305,450


357,200 357,200 357,200
426,050 426,050 426,050
651,600 651,600 651,600

766,900 766,900 766,900

2,900 2,900 2,900

36,750 36,750 36,750


825,450 825,450 825,450
4,250 4,250 4,250
10,600 10,600 10,600
302,650 302,650 302,650
139,050 139,050 139,050
30,750 30,750 30,750
407,100 407,100 407,100
378,000 378,000 378,000
1,349,550 ### 1,349,550
242,100 242,100 242,100
51,900 51,900 51,900
3,000 3,000 3,000
139,050 139,050 139,050

59,850 59,850 59,850


503,600 503,600 503,600
23,250 23,250 23,250
422,900 422,900 422,900
8,300 8,300 8,300
47,750 47,550 47,750
29,950 29,950 29,950
12,500 12,500 12,500
2,400 2,400 2,400
65,650 65,650 65,650
6,700 6,700 6,700
130,100 130,100 130,100
15,700 15,700 15,700
4,600 4,600 4,600
131,600 131,600 131,600
106,400 82,700 106,400
10,250 10,250 10,250
186,850 186,850 186,850

84
HARGA HARGA
HARGA SATUAN
SATUAN PERENCANAAN
KABUPATEN 2015
2014 2015
197,000 197,000 197,000
5,350 5,350
10,700 10,700
33,750 33,750

85
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
7 9 10 11

5,090,931,600 5,090,931,600
282,997,650 282,997,650
68,356,500 68,356,500

686,550 686,550

2,268,300 2,268,300
3,215,700 3,215,700

11,400 11,400
22,750 22,750
41,100 41,100
65,400 65,400
11,200 11,200 11,200
9,950 11,350 11,350

3,600

13,650
20,350

28,850
176,900

8,500

20,300
20,300

9,600
1,750
4,200 4,850 4,850
22,500
44,950
55,500

11,900 13,550 13,550


11,400 13,550 13,550
2,150 2,250 2,250
18,000 19,700 19,700

86
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
14,250 15,600 15,600
14,800 15,600 15,600
2,000 2,100 2,100
16,600 17,000 17,000
325,000 341,250 341,250

59,250 59,000 59,250


4,900 5,000 5,300
6,150 8,000 9,600 6,500 6,700
17,000 17,000 17,000
62,000 70,000 84,000 68,500 68,600
77,000 78,500 94,200 85,000 85,000
61,000 58,000 69,600 65,000 65,000
75,000 72,500 87,000 80,000 80,400
83,000 94,500 94,600
58,000 61,500 61,500
12,250 12,500 13,988
61,000 63,500 63,500
72,000 76,500 72,000

117,250 117,000 117,250


117,750 117,500 117,750
35,100 35,000 35,100
46,200 46,000 46,200
20,750 22,500 22,800
15,300 16,500 16,700
373,750 145,000 174,000 159,000 159,100
715,875 210,000 252,000 227,000 227,300
272,100 350,000 420,000 309,000 309,300
1,018,000 1,018,150
84,000 80,000 96,000 92,000 92,000
92,000 89,000 106,800 105,000 105,000
852,000 852,350
98,150 98,000 98,150
110,000 120,000 144,000 114,000 114,050
129,600 129,500 129,600
1,281,150 1,281,000 1,281,150
2,379,200 2,379,000 2,379,200
617,550 701,000 701,200
1,281,675 1,455,500 1,455,750

183,050 228,500 274,200 193,000 193,200


170,850 150,000 180,000 176,000 176,150
176,950 175,000 210,000 181,500 181,850
189,150 198,500 198,900
60,000 65,000 78,000 60,000 65,000
115,950 75,000 90,000 115,500 115,950
75,000 184,000

87,000 87,000 87,000


2,250 2,250 2,250
750 750 900 750 750
4,850 4,850 4,850
5,400 8,000 9,600 5,400 5,400
125,300 150,000 180,000 135,000 135,000
115,000 115,000 115,000
103,200 103,000 103,200
106,400 106,000 106,400
99,000 99,000 99,000
24,300 24,300 24,300
114,200 160,000 192,000 114,000 114,200
107,800 107,500 107,800
112,250 112,000 112,250
9,400 9,400 9,400
6,700 6,700 6,700
140,000 140,000 140,000
136,000 136,000 136,000
268,450 240,000 288,000 268,000 268,450
244,050 244,000 292,800 244,000 244,050
240,400 235,000 282,000 240,000 240,400
135,000 135,000 135,000
120,000 150,000 180,000 120,000 120,000

87
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
213,550 206,500 247,800 213,500 213,550
164,750 164,500 164,750
165,500 165,950
87,000 87,000 87,000

50,650 45,000 54,000 50,650 50,650


40,950 40,950 40,950
134,500 134,500 134,500
88,500 114,000 136,800 136,800 136,800
51,250 53,150 53,150
39,050 35,000 42,000 39,050 39,050
24,450 14,000 16,800 24,450 24,450
3,700 3,700 3,700
27,500 27,500 27,500
26,300 26,300 26,300
65,950 65,950
187,050 187,000 187,050
56,500 56,500 56,500
54,950 50,000 60,000 54,950 54,950
12,000 12,000
27,500 25,000 30,000 27,500 27,500
25,500 25,500 25,500
9,800 9,800 9,800
28,500 28,500 28,500
106,150 106,150 106,150
51,250 58,300 58,300
26,300 22,000 26,400 26,300 26,300
36,050 36,050 36,050
36,650 30,500 36,600 36,650 36,650
4,500 5,150 5,150
51,250 35,000 42,000 51,250 51,250
16,550 12,000 14,400 16,550 16,550
11,650 21,000 25,200 11,650 11,650
16,650 95,000 114,000 106,500 106,800
93,950 97,500 117,000 93,500 93,950
90,950 87,500 105,000 90,950 90,950
78,050 74,000 88,800 78,050 78,050
22,000 16,000 19,200 22,000 22,000
83,650 77,000 92,400 90,500 90,950
26,850 29,000 34,800 29,350 29,350
9,800 20,000 24,000 9,800 9,800
32,500 37,000 37,000
36,650 30,500 36,600 36,650 36,650
128,000 105,000 126,000 126,000 126,000
142,600 135,000 162,000 142,600 142,600
57,550 57,550 57,550
187,050 185,000 222,000 187,000 187,050

42,750 35,000 42,000 42,000 42,000


158,650 135,000 162,000 158,500 158,650
774,800 645,000 774,000 774,000 774,000
47,050 42,000 50,400 47,000 47,050

82,400 88,000 105,600 82,000 82,400


53,700 57,000 68,400 53,500 53,700
78,750 76,000 91,200 78,500 78,750
111,700 109,000 130,800 111,500 111,700
73,250 65,500 78,600 73,000 73,250
145,200 145,000 145,200
106,650 106,500 106,650
117,750 117,500 117,750
25,500 23,000 27,600 25,500 25,500
19,300 19,300 19,300
23,250 23,250 23,250
46,200 46,200 46,200
73,100 73,000 73,100
9,750 9,750 9,750
34,150 20,000 24,000 24,000 24,000
46,450 46,450 46,450
48,250 48,250 48,250
51,700 51,700 51,700

57,350 55,000 66,000 57,350 57,350

88
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
62,250 60,000 72,000 62,250 62,250
69,550 65,000 78,000 69,550 69,550
76,900 70,000 84,000 76,900 76,900
84,200 75,000 90,000 84,200 84,200

89
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )

14,500 11,500 13,800 14,500 15,000


100,050 100,050 100,050
231,800 231,800 231,800
140,650 140,650 140,650
197,750 197,750 197,750
272,450 272,450 272,450
14,000 15,000 18,000 14,000 14,500
14,000 15,000 18,000 14,000 14,500
29,100 29,100 29,100
212,950 212,950 212,950
44,350 100,000 120,000 44,350 44,350
33,750 85,000 102,000 33,750 33,750
20,250 20,250 20,250
13,500 10,900 13,080 13,500 14,000

12,500 10,500 12,600 13,000 13,000


13,000 11,000 13,200 13,200 13,200
176,700 169,900 169,900
129,800 124,500 124,800
271,700 261,000 261,250

29,000 27,850 27,850


95,950 78,000 93,600 93,500 93,600
64,450 66,000 79,200 64,000 64,450
48,000 43,416 52,099 48,000 48,000
84,500 61,200 73,440 73,000 73,440
108,800 98,496 118,195 108,500 108,800
110,250 99,792 119,750 110,000 110,250

169,000 169,350
252,000 252,300
354,500 354,600
483,000 483,000
630,500 630,750
818,000 818,250
1,009,000 1,009,150
1,469,000 1,469,400

6,050 5,700 6,840 6,500 6,500


8,000 7,000 8,400 8,000 8,000
6,150 6,000 7,200 6,150 6,150
13,300 11,500 13,800 13,450 13,450
6,700 6,000 7,200 6,850 6,850
8,800 8,000 9,600 8,800 8,800
11,000 10,000 12,000 11,000 11,000
38,450 25,000 30,000 30,000 30,000
14,650 12,000 14,400 14,400 14,400
10,400 11,400 11,400
4,050 4,000 4,800 4,100 4,100
10,400 10,400 10,400
2,100 2,600 3,120 2,200 2,300
2,000 1,250 1,250
10,550 10,000 12,000 10,550 10,550
58,700 58,700 58,700
6,150 6,750 6,750
8,550 8,550 8,550
12,190 11,300 13,560 13,500 13,560
39,675 24,000 28,800 30,000 28,800

88,800 88,800 88,800


105,750 105,750 105,750
117,750 117,750 117,750

164,750 164,500 164,750


36,650 39,500 39,800
53,400 53,000 53,400
63,450 63,000 63,450
73,250 77,000 77,300
85,450 85,000 85,450
67,150 67,000 67,150

90
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
109,850 109,500 109,850
79,350 79,000 79,350
146,450 146,000 146,450
91,550 91,500 91,550

584,700 584,500 584,700


73,900 73,500 73,900
24,000 24,000 24,000
4,450 4,450 4,450
62,450 75,000 90,000 62,450 62,450
50,150 55,000 66,000 50,150 50,150
103,700 110,000 132,000 103,700 103,700
92,800 100,000 120,000 92,800 92,800
58,400 58,400 58,400

4,900 4,900 4,900


4,300 4,550 4,550

81,650 81,500 81,650


143,000 143,300
128,150 94,800 113,760 113,500 113,760
68,650 68,500 68,650
84,550 84,500 84,550
102,000 102,250
156,750 156,500 156,750
61,050 61,000 61,050
68,350 56,000 67,200 67,000 67,200
72,500 65,000 78,000 78,000 78,000
86,650 75,000 90,000 86,000 86,650
92,500 86,650 103,980 95,000 97,650
85,500 102,600 94,500 94,600
18,350 19,000 22,800 18,000 18,350
108,050 57,000 68,400 68,000 68,400
56,150 45,000 54,000 54,000 54,000
69,700 83,640 71,000 71,450
96,000 115,200 68,000 68,200
84,000 100,800 77,500 77,900
17,800 21,360 21,360 21,360
22,300 25,000 25,400
52,400 52,400 62,880 55,000 59,700
36,000 34,500 41,400 36,500 36,650

67,150 67,150 67,150


22,150 24,300 24,300
17,750 17,750 17,750
33,600 33,600 33,600
32,150 32,150 32,150
15,550 15,550 15,550

13,800 13,800 13,800


16,800 19,150 19,150
19,450 22,150 22,150
19,550 19,550 19,550
20,750 20,750 20,750
54,000 54,000 54,000
21,300 21,300 21,300

6,150 6,150 6,150


2,500 2,500 2,500
3,700 3,700 3,700
1,950 1,950 1,950
1,950 1,950 1,950
3,750 3,750 3,750
3,600 4,150 4,150

91
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
4,300 4,300 4,300

1,300,000 1,430,000 1,430,000


143,400 143,400 143,400
109,850 109,850 109,850
2,440,200 2,440,200 2,440,200

41,900 46,000 46,000


101,350 105,000 105,000
110,250 115,000 115,000
103,450 103,450 103,450

193,200 193,200
193,200 193,200
274,550 274,550 274,550
372,050 372,050 372,050
1,022,800 1,022,800

700,900 700,900 700,900


357,300 357,300 357,300
595,650 595,650 595,650
170,850 170,850

21,100 21,100
67,200 67,200
21,600 21,600
24,450 24,450 24,450
30,550 30,550 30,550
381,300 381,300
451,150 451,150

4,300 4,300 4,300


3,700 3,700 3,700
4,900 4,900 4,900
5,550 5,550 5,550
6,150 6,150 6,150
6,750 6,750 6,750
8,000 8,000 8,000

55,550 55,500 55,550


58,650 58,500 58,650
34,200 34,000 34,200
11,000 11,000 11,000
12,250 12,000 12,250
13,450 13,000 13,450
17,100 17,000 17,100
14,650 14,500 14,650
12,250 12,000 12,250
11,000 11,000 11,000

518,150 518,150 518,150


582,900 582,900 582,900
394,150 394,150 394,150
1,000 1,000 1,000
53,050 53,050 53,050
53,300 53,300 53,300
56,450 56,450 56,450
61,450 61,450 61,450
89,400 89,400 89,400
32,450 32,450 32,450
50,450 51,250 51,250
45,650 48,250 48,250
53,500 54,350 54,350
20,000 20,000 20,000
62,500 62,500 62,500
83,000 83,000

92
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
4,900 4,900 4,900
6,750 6,750 6,750
11,650 11,650 11,650
16,550 16,550 16,550

17,100 17,100 17,100


19,550 19,550 19,550

10,400 10,400 10,400


44,350 44,350
35,400 38,500 38,500
12,250 13,400 13,400
21,400 21,400 21,400
119,600 119,600 119,600
8,550 8,550 8,550
7,350 7,350 7,350

573,950 573,950 573,950


323,900 323,900 323,900
466,350 466,350 466,350
242,350 242,350 242,350
250,100 250,100 250,100
242,350 242,350 242,350

7,300 7,300 7,300


11,000 11,000 11,000
12,550 12,550

24,450 24,450 24,450


24,450 24,450 24,450
14,500 14,500 14,500

14,250 14,250
24,450 24,450 24,450
1,300 1,300 1,300
45,450 51,700 51,700
14,250 14,250

15,300 15,300 15,300


192,350 192,350 192,350
466,350 466,350 466,350
589,400 589,400 589,400
1,030,450 1,030,450 1,030,450
330,700 330,700 330,700
466,350 466,350 466,350
272,100 272,100 272,100
1,575,300 1,575,300 1,575,300

956,050 1,086,550 1,086,550


301,150 301,150

198,900 198,900

210,250 210,250
499,550
593,550
646,050
100,100 113,850 113,850
1,507,650 1,713,350 1,713,350
1,392,650 1,581,900 1,581,900
988,700 988,700

350 350 350

34,150 34,150 34,150


37,700 37,700 37,700
24,950 24,950 24,950
36,000 36,000 36,000
51,750 51,750 51,750

93
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )

65,900 72,000 72,000


82,400 90,000 90,000
131,800 144,000 144,000
192,200 210,000 210,000
36,650 40,000 40,000
219,650 241,000 241,000
263,550 289,800 289,800

9,200 9,200 9,200


920 9,200 9,200

95,450 95,450 95,450


100,100 100,100 100,100
103,900 103,900 103,900
119,300 119,300 119,300

88,650 88,650 88,650


71,850 68,650 68,650
18,350 18,350 18,350
26,850 26,850 26,850
34,200 34,200 34,200
42,750 42,750 42,750

16,550 16,550
62,550 62,550
62,250 62,250 62,250
94,600 94,600 94,600
131,200 131,200 131,200
223,500 223,500
39,700 39,700 39,700
59,250 59,250 59,250

13,750 13,750 13,750


15,000 15,000 15,000
17,800 17,800 17,800
18,700 18,700 18,700
27,050 27,050 27,050
30,150 30,150 30,150

39,500 39,500 39,500


58,750 58,750 58,750
56,150 56,150 56,150
68,650 68,650 68,650
48,850 48,850 48,850
30,550 30,550 30,550
53,300 53,300 53,300
97,500 106,000 106,000
120,000 123,000 123,000
115,000 135,000 135,000
130,000 155,000 155,000
20,750 20,750 20,750
29,300 29,300 29,300

18,350 18,350 18,350


91,550 91,550 91,550
115,350 115,350 115,350
21,400 21,400 21,400
45,700 45,700 45,700
22,000 22,000 22,000
25,650 25,650 25,650
18,000 19,550 19,550
14,650 14,650 14,650

18,350 18,350 18,350


41,500 41,500 41,500
11,200 12,300 12,300
19,750 19,750 19,750
2,100 2,100 2,100

94
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
355,950 355,950 355,950
3,000,000 3,000,000 3,300,000
1,061,300 1,061,300 1,061,300
8,976,050 ### 6,600,000 9,659,550 6,600,000
8,938,400 9,800,000 9,800,000
8,976,050 9,091,350 9,091,350
8,400,000 ### 6,840,000 9,091,350 6,840,000
7,875,000 ### 6,600,000 8,523,150 6,600,000
8,400,000 ### 6,840,000 9,091,350 6,840,000
3,454,700 ### 4,680,000 3,454,700 3,454,700
32,500 32,500 32,500
41,500 41,500 41,500
160,950 160,950 160,950
18,009,150 ### ### 18,009,150 18,000,000
18,009,150 ### ### 18,009,150 18,000,000
7,873,350 ### ### 7,873,350 7,873,350
13,031,500 ### ### 13,031,500 13,031,500
13,446,700 ### ### 13,446,700 13,446,700
18,009,150 ### ### 18,009,150 18,000,000
10,000,000 ### ### 11,000,000 11,000,000
12,500,000 ### ### 12,500,600 12,500,600
9,975,000 ### 8,400,000 10,795,950 8,400,000
7,930,650 ### 8,280,000 7,930,650 7,930,650
8,925,000 ### 9,000,000 8,925,000 8,925,000
7,350,000 ### 8,400,000 8,000,000 8,000,000
32,500 32,500 32,500
7,930,650 ### 6,000,000 7,930,650 6,000,000
6,100,500 ### 5,400,000 6,100,500 5,400,000
8,540,700 ### 5,640,000 8,540,700 5,640,000
6,100,500 ### 5,400,000 6,100,500 5,400,000
5,490,450 5,490,450 5,490,450
5,490,450 ### 4,440,000 5,490,450 4,440,000
5,673,500 ### 4,440,000 5,673,500 4,440,000
4,725,000 ### 4,440,000 4,725,000 4,440,000
150,000 150,000 157,500
190,000 195,000 224,200
3,500,000 ### 4,200,000 3,500,000 3,500,000
106,000 106,000 106,000
143,400 143,400 143,400
138,550 138,550 138,550
77,200 77,200 77,200
127,450 127,450 127,450
140,200 110,000 132,000 140,200 132,000
58,000 55,000 66,000 58,000 58,000
69,550 65,000 78,000 69,550 69,550
79,350 79,000 94,800 81,850 81,850
100,050 100,050 100,050
49,900 49,900

15,850 15,850 15,850


260,400 260,400 260,400

35,400 35,400 35,400


1,427,550 1,427,550 1,427,550
396,550 396,550 396,550
597,850 597,850 597,850
390,450 390,450 390,450
219,650 219,650 219,650
359,950 359,950 359,950
218,200 218,200
245,500 245,500
300,050 300,050
231,850 231,850
654,600 654,600
2,045,550 2,045,550
1,176,200 1,176,200

95
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )

114,750

75,705 75,705 75,705


75,705 75,705 75,705
78,540 78,540 78,540

6,500 6,500 6,500


9,000 9,000 9,000
10,000 10,900 10,900
5,500 5,500 5,500

9,250 9,250 9,250


6,250 6,250 6,250
40,000 40,000 40,000
27,050 27,050 27,050
142,050 142,050 142,050
36,350 36,350 36,350
55,150 55,150 55,150
220,500 220,500 220,500
45,550 45,550 45,550
47,250 47,250 47,250
4,500 4,500 4,500
41,150 41,150 41,150

96
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )

1,049,400 1,049,400 1,049,400


302,550 302,550 302,550
300,300 300,300 300,300
863,050 863,050 863,050
420,300 420,300 420,300
393,750 393,750 393,750
579,850 579,850 579,850
99,200 99,200 99,200
190,200 190,200 190,200
214,550 214,550 214,550
780,250 780,250 780,250
102,200 102,200 102,200
1,669,800 1,669,800 1,669,800
20,100 20,100 20,100
520,050 520,050 520,050
461,500 461,500 461,500
526,600 526,600 526,600
434,150 434,150 434,150
644,950 644,950 644,950
676,700 676,700 676,700
777,350 777,350 777,350
832,750 832,750 832,750
374,250 374,250 374,250
268,500 268,500 268,500
551,800 551,800 551,800
969,600 969,600 969,600
3,859,050 3,859,050 3,859,050
1,973,000 1,973,000 1,973,000
1,600,000 1,600,000 1,600,000
1,000,000 1,000,000 1,000,000
11,950 11,950 11,950
88,100 88,100 88,100
166,450 166,450 166,450
361,700 361,700 361,700
143,500 143,500 143,500
440,800 440,800 440,800
765,450 765,450 765,450
2,816,250 2,816,250 2,816,250

690,000 690,000 690,000


43,300 43,300 43,300
27,150 27,150 27,150
16,300 16,300 16,300
15,000 15,000 15,000
479,050 479,050 479,050
59,100 59,100 59,100
214,050 214,050 214,050
160,000 160,000 160,000
104,750 104,750 104,750
9,082,500 9,082,500 9,082,500
15,592,500 15,592,500 15,592,500
5,522,200 5,522,200 5,522,200
440,000 440,000 440,000
252,800 252,800 252,800
199,000 199,000 199,000
940,000 940,000 940,000
230,000 230,000 230,000
175,000 175,000 175,000
170,650 170,650 170,650
218,750 218,750 218,750
30,800 30,800 30,800
702,750 702,750 702,750
186,400 186,400 186,400
436,600 436,600 436,600
165,650 165,650 165,650
13,250 13,250 13,250
68,550 68,550 68,550
3,276,300 3,276,300 3,276,300
10,200 10,200 10,200
283,900 283,900 283,900
420,300 420,300 420,300
157,500 157,500 157,500

97
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
131,250 131,250 131,250
438,400 438,400 438,400
782,550 782,550 782,550
30,800 30,800 30,800
20,550 20,550 20,550
141,300 141,300 141,300
101,400 101,400 101,400
93,300 93,300 93,300

8,650 8,650 8,650

5,250 5,250 5,250

15,750 15,750 15,750


18,250 18,250 18,250
24,350 24,350 24,350
30,450 30,450 30,450
401,500 401,500 401,500

19,200 19,200 19,200


827,250 827,250 827,250
25,200 25,200 25,200
31,150 31,150 31,150
19,500 19,500 19,500
682,500 682,500 682,500
18,900 18,900 18,900
20,800 20,800 20,800
29,500 29,500 29,500
93,555 37,000 37,000

118,550 118,550 118,550

33,900 33,900 33,900


14,300 14,300 14,300
6,450 6,450 6,450
16,150 16,150 16,150
68,550 68,550 68,550
26,550 26,550 26,550

19,050 19,050 19,050


12,000 12,000 12,000
57,500 57,500 57,500
45,500 45,500
163,650 163,650
113,650 113,650

72,350 72,350 72,350


447,000 447,000 447,000
56,700 56,700 56,700
43,150 43,150 43,150
196,625 223,500 223,500
158,895 180,600 180,600

8,150 8,600 8,600


24,250 24,250 24,250
19,900 19,900 19,900
39,800 39,800

96,450 96,450 96,450


160,650 160,650 160,650
119,600 119,600 119,600
319,300 319,300 319,300
15,250 15,250 15,250
109,500 113,650 113,650

25,900 25,900 25,900


10,250 10,250 10,250

98
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )

4,950 10,850 10,850


5,513 4,500 4,500

9,300 9,300 9,300


13,000 13,000 13,000

21,050 21,050 21,050


24,700 26,150 26,150

9,188 9,188 9,188


16,013 16,013 16,013
25,830 25,830 25,830

99
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )

142,100 142,100
150,050 150,050
170,500 170,500
210,250 210,250
251,150 251,150
292,100 292,100
185,250 185,250
210,250 210,250
251,150 251,150
292,100 292,100
337,550 337,550

335,213 335,213 335,213


335,213 335,213 335,213
335,213 335,213 335,213
395,903 395,903 395,903
370,335 370,335 370,335

6,143 6,143 6,143

32,025 35,000 35,000


80,850 85,250 85,250
110,513 119,350 119,350

38,300 40,950 40,950


43,200 43,200

340,950 340,950
284,150 284,150
153,450 153,450

24,700 25,050 25,050

14,850 14,850 14,850


13,000 14,300 14,300

3,750 3,750 3,750

3,045 3,045 3,045


3,203 3,203 3,203

364,140 364,140 364,140

3,410,400 3,410,000 3,410,400


2,092,808 2,092,500 2,092,808
5,725,335 5,725,000 5,725,335
7,633,658 7,633,500 7,633,658
6,573,578 6,573,500 6,573,578
2,923,463 2,923,000 2,923,463

12,187,980 12,187,500 12,187,980

4,761,173 4,761,000 4,761,173

6,897,240 6,897,000 6,897,240

13,642,598 13,642,500 13,642,598

3,271,590 3,271,500 3,271,590

4,079,513 4,079,500 4,079,513

4,687,463 4,687,000 4,687,463

100
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
2,307,375 2,307,000 2,307,375

990,360 990,000 990,360


1,322,633 1,322,500 1,322,633
40,898 40,500 40,898
1,785,420 1,785,000 1,785,420
2,046,293 2,046,000 2,046,293
2,197,913 2,197,500 2,197,913
1,273,440 1,273,000 1,273,440
1,370,408 1,370,000 1,370,408
1,219,418 1,219,000 1,219,418
80,605,560 80,605,500 80,605,560
93,781,485 93,781,000 93,781,485
71,304,818 71,304,500 71,304,818
441,368 441,000 441,368
662,550 662,500 662,550
153,248 153,000 153,248
5,425,508 5,425,500 5,425,508
2,712,780 2,712,500 2,712,780
6,405 6,000 6,405
18,428 18,000 18,428
421,838 421,500 421,838
3,373,125 3,373,000 3,373,125
154,665 154,500 154,665

11,625,810 11,625,500 11,625,810

5,425,508 5,425,500 5,425,508

10,463,355 10,463,000 10,463,355


2,712,780 2,712,500 2,712,780
4,262,948 4,262,500 4,262,948
110,355 110,000 110,355

84,945 84,945 84,945


358,628 358,628 358,628

264,233 264,233 264,233


41,633 41,633 41,633
41,633 41,633 41,633
19,740 19,740 19,740
32,288 32,288 32,288
2,500,000
1,915,515 1,915,515 1,915,515
10,024,560 10,024,560 10,024,560
37,013 37,013 37,013
63,158 63,158 63,158
107,205 107,205 107,205
88,253 88,253 88,253
83,055 83,055 83,055
464,625 464,625 464,625
95,813 95,813 95,813
9,818 9,818 9,818
90,300 90,300 90,300
16,013 16,013 16,013
12,810 12,810 12,810
3,511,778 3,511,778 3,511,778

2,962,680 2,962,680 2,962,680


8,033 8,033 8,033
4,043 4,043 4,043
92,243 92,243 92,243
491,558 491,558 491,558
322,140 322,140 322,140
57,488 57,488 57,488
283,763 283,763 283,763
292,845 292,845 292,845
688,223 688,223 688,223
543,638 543,638 543,638

13,000 13,000 13,000


83,055 83,055 83,055
102,165 102,165 102,165

101
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
15,330 15,330 15,330
89,355 89,355 89,355

27,248 27,248 27,248


231,263 231,263 231,263
113,400 113,400 113,400
78,435 78,435 78,435
89,565 89,565 89,565
126,840 126,840 126,840
316,575 316,575 316,575
1,760,745 1,760,745 1,760,745
2,735,513 2,735,513 2,735,513
4,883 4,883 4,883
16,643 16,643 16,643
1,943 1,943 1,943
16,643 16,643 16,643
3,833 3,833 3,833
6,405 6,405 6,405
56,070 56,070 56,070
540,225 540,225 540,225

240,765 240,765 240,765


160,913 160,913 160,913
240,765 240,765 240,765
6,405 6,405 6,405
87,518 87,518 87,518
191,573 191,573 191,573
2,573 2,573 2,573
1,943 1,943 1,943
2,282,700 2,282,700 2,282,700
3,755,063 3,755,063 3,755,063
22,995 22,995 22,995
385,665 385,665 385,665
102,165 102,165 102,165
830,078 830,078 830,078
1,085,490 1,085,490 1,085,490
102,165 102,165 102,165
29,400 29,400 29,400

70,250 70,250 70,250

632,550 632,550 632,550


275,650 275,650 275,650
117,650 117,650 117,650
90,450 90,450 90,450
40,900 43,700 43,700
63,950 63,950 63,950
60,300 61,750 61,750
78,400 80,400 80,400
26,650 28,450 28,450
42,250 42,250 42,250
1,398,900 1,398,900 1,398,900
2,098,350 2,098,350 2,098,350
2,019,950 2,019,950 2,019,950
3,002,800 3,002,800 3,002,800
2,809,850 2,809,850 2,809,850
4,220,750 4,220,750 4,220,750
3,521,350 3,521,350 3,521,350
4,935,050 4,935,050 4,935,050
223,100 223,100 223,100
114,600 119,350 119,350
174,900 174,900 174,900
150,750 153,200 153,200
211,050 218,600 218,600
319,600 319,600 319,600
32,550 34,700 34,700
51,300 51,300 51,300
307,550 318,600 318,600
458,300 458,300 458,300
470,750 470,750 470,750
719,950 719,950 719,950

102
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
639,150 639,150 639,150
952,700 952,700 952,700
988,900 988,900 988,900
1,483,300 1,483,300 1,483,300
28,200 30,150 30,150
42,850 42,850 42,850
23,650 23,650 23,650
35,850 35,850 35,850
18,700 18,700 18,700
28,400 28,400 28,400
56,700 56,700 56,700
86,050 42,850 42,850
44,800 47,750 47,750
68,200 68,200 68,200
65,850 70,250 70,250
100,100 100,100 100,100
12,700 12,700 12,700
19,200 19,200 19,200
84,800 90,500 90,500
127,850 127,850 127,850
6,950 6,950 6,950
10,550 10,550 10,550
120,150 120,150 120,150
62,100 62,100 62,100
54,750 54,750 54,750
34,350 37,500 37,500
40,900 43,700 43,700
999,750 999,750 999,750
1,500,950 1,500,950 1,500,950
1,363,800 1,363,800 1,363,800
2,045,250 2,045,250 2,045,250
1,786,300 1,786,300 1,786,300
2,678,400 2,678,400 2,678,400
2,311,800 2,311,800 2,311,800
3,467,050 3,467,050 3,467,050
53,450 57,100 57,100
81,100 81,100 81,100
75,300 82,150 82,150
3,993,650 3,993,650 3,993,650
5,990,600 5,990,600 5,990,600
109,250 120,000 120,000
174,300 174,300 174,300
153,650 168,000 168,000
245,100 245,100 245,100
267,000 281,300 281,300
400450 400,450 400,450
324,200 341,550 341,550
486,300 486,300 486,300
572,850 572,850 572,850
859,850 859,850 859,850
60,555 60,555 60,555
92,290 92,290 92,290
1,810,435 1,810,435 1,810,435
170,940 170,940 170,940
184,910 184,910 184,910
354,365 354,365 354,365
45,815 45,815 45,815
554,455 554,455 554,455
1,155,275 1,155,275 1,155,275
1,279,355 1,279,355 1,279,355
359,205 359,205 359,205

674,000 674,000 674,000


793,500 793,500 793,500
1,051,350 1,051,350 1,051,350
1,482,100 1,482,100 1,482,100
1,798,050 1,798,050 1,798,050
150,550 150,550 150,550
191,550 191,550 191,550
249,650 249,650 249,650
319,000 319,000 319,000
396,200 396,200 396,200
532,000 532,000 532,000

103
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
733,750 733,750 733,750
861,700 861,700 861,700
1,223,700 1,223,700 1,223,700
1,752,750 1,752,750 1,752,750
2,088,450 2,088,450 2,088,450
3,509,250 3,509,250 3,509,250
153,050 153,050 153,050
189,000 189,000 189,000
289,950 289,950 289,950
374,250 374,250 374,250
444,000 444,000 444,000
658,450 658,450 658,450
840,850 840,850 840,850
1,041,500 1,041,500 1,041,500
1,507,100 1,507,100 1,507,100
1,950,300 1,950,300 1,950,300
2,356,700 2,356,700 2,356,700
186,000 186,000 186,000
238,950 238,950 238,950
366,400 366,400 366,400
483,600 483,600 483,600
555,600 555,600 555,600
758,100 758,100 758,100
966,950 966,950 966,950
1,249,150 1,249,150 1,249,150
1,808,450 1,808,450 1,808,450
2,433,850 2,433,850 2,433,850
2,897,400 2,897,400 2,897,400
4,161,850 4,161,850 4,161,850

305,450 305,450 305,450


357,200 357,200 357,200
426,050 426,050 426,050
651,600 651,600 651,600

766,900 766,900 766,900

2,900 2,900 2,900

36,750 36,750 36,750


825,450 825,450 825,450
4,250 4,250 4,250
10,600 10,600 10,600
302,650 302,650 302,650
139,050 139,050 139,050
30,750 30,750 30,750
407,100 407,100 407,100
378,000 378,000 378,000
1,349,550 1,349,550 1,349,550
242,100 242,100 242,100
51,900 51,900 51,900
3,000 3,000 3,000
139,050 139,050 139,050

59,850 59,850 59,850


503,600 503,600 503,600
23,250 23,250 23,250
422,900 422,900 422,900
8,300 8,300 8,300
47,550 47,750 47,750
29,950 29,950 29,950
12,500 12,500 12,500
2,400 2,400 2,400
65,650 65,650 65,650
6,700 6,700 6,700
130,100 130,100 130,100
15,700 15,700 15,700
4,600 4,600 4,600
131,600 131,600 131,600
82,700 106,400 106,400
10,250 10,250 10,250
186,850 186,850 186,850

104
HPS HARGA HPS HPS
HS + 20% 2015
2014 SURVEI 2015
( Awal )
197,000 197,000 197,000

105
HARGA HARGA
SATUAN 2013 SATUAN 2012

6 7

144,596,750 144,596,750 4,946,334,850

36,714,800 36,714,800 246,282,850

58,743,600 58,743,600 9,612,900

671,900 1,057,200 931,300 88.09

29,371,965 29,371,965 1,669,635

1,353,000 1,353,000 1,061,400

88,330,000 88,330,000 (84,880,900)

4,850 11,000 400 3.64

57,750 57,750 (35,000)

30,600 30,600 10,500

63,550 63,550 5,450

11,200 11,200 -

9,950 9,950 1,400

43,900 43,900 25,100

55,550 33,700 26,600 78.93

3,600 3,600 -

11,250 11,250 17,500

16,850 16,850 (16,850)

25,850 25,850 (25,850)

176,900 176,900 (176,900)

8,500 20,700 (20,700) (100.00)

20,300 20,300 (20,300)

20,300 20,300 (20,300)

9,600 9,600 (9,600)

1,750 1,750 (1,750)

4,200 4,200 650

22,500 22,500 (22,500)

44,950 44,950 (44,950)

55,500 55,500 (55,500)

10,750 10,750 3,050

10,250 10,250 3,550

16,400 16,400 3,300

106
HARGA HARGA
SATUAN 2013 SATUAN 2012

11,650 11,650 3,950

59,250 59,250 - -

4,250 6,900 (1,900) (27.54)

4,900 3,400 3,500 102.94

16,750 232,850 (215,850) (92.70)

60,050 56,900 12,100 21.27

73,900 69,500 14,450 20.79

72,050 68,550 11,950 17.43

81,700 75,900 21,850 28.79

57,050 87,000 (22,600) (25.98)

10,900 9,850 3,950 40.10

57,650 55,950 9,600 17.16

70,900 67,500 13,000 19.26

117,250 117,250 -

117,750 117,750 3,000

35,100 35,100 1,700

46,200 46,200 950

20,500 20,300 4,450 21.92

15,150 15,150 2,700

239,750 239,750 (9,800)

272,100 272,100 40,750

841,900 841,900 188,150

78,050 74,850 21,750 29.06

92,100 83,750 36,250 43.28

518,150 518,150 344,150

98,150 98,150 -

114,050 101,100 19,650 19.44

129,600 129,600 8,400

168,050 167,600 107,400 64.08

156,050 446,950 (254,950) (57.04)

144,050 137,200 132,800 96.79

186,050 183,750 33,550 18.26

96,300 96,300 (26,300)

107,200 107,200 19,300

18,050 79,550 7,450 9.37

2,050 2,050 200

800 750 - -

4,500 4,500 350

5,000 5,000 1,350

114,050 121,300 22,450 18.51

106,500 104,200 10,800 10.36

95,500 93,850 18,850 20.09

98,500 96,000 13,250 13.80

91,500 89,850 11,350 12.63

22,500 22,500 1,800

105,700 105,700 8,500

107,800 107,800 1,450

112,250 112,250 2,750

8,700 8,700 1,350

5,400 5,400 1,750

129,600 129,600 22,200

125,900 125,900 22,450

220,000 176,150 111,300 63.18

207,800 207,800 50,900 24.49

217,900 182,100 70,850 38.91

126,000 120,000 26,050 21.71

113,700 113,700 16,250 14.29

107
HARGA HARGA
SATUAN 2013 SATUAN 2012

234,650 154,350 75,600 48.98

153,050 141,750 36,500 25.75

137,200 130,650 47,600 36.43

80,500 79,550 7,450 9.37

50,650 50,650 4,550

40,300 38,950 5,350 13.74

72,050 320,400 (185,900) (58.02)

87,050 84,250 147,600 175.19

50,450 46,800 6,350 13.57

33,700 36,200 2,850 7.87

21,700 23,650 800 3.38

3,700 2,750 950 34.55

27,050 59,250 (31,750) (53.59)

24,650 30,050 (3,750) (12.48)

3,950 3,950 62,750

187,050 187,050 - -

55,550 50,100 11,450 22.85

11,200 11,200 900

24,050 22,350 5,150 23.04

25,500 16,250 11,350 69.85

9,700 13,900 (3,200) (23.02)

28,500 25,600 5,450 21.29

104,450 159,000 (52,850) (33.24)

51,250 51,250 7,700

24,050 22,350 6,400 28.64

35,500 22,350 13,700 61.30

34,300 45,150 (8,500) (18.83)

44,700 44,700 (39,500)

50,450 46,800 4,450 9.51

16,250 15,200 1,500 9.87

11,450 11,250 1,400 12.44

16,350 54,450 52,350 96.14

84,050 76,100 26,250 34.49

89,500 59,845 31,105 51.98

76,800 51,298 26,753 52.15

21,050 41,800 (17,650) (42.22)

78,050 73,900 19,250 26.05

24,050 28,650 2,400 8.38

8,500 11,750 (1,050) (8.94)

32,500 32,500 4,900

36,050 54,900 (18,100) (32.97)

125,900 63,940 64,060 100.19

140,350 104,880 37,720 35.96

56,650 41,860 15,690 37.48

154,250

81,050 98,200 (8,500) (8.66)

50,450 75,600 (16,950) (22.42)

77,450 80,100 6,150 7.68

109,900 113,050 7,700 6.81

72,050 75,100 3,100 4.13

145,200 145,200 10,050

106,650 106,650 8,350

117,750 117,750 8,750

25,500 25,500 2,100

19,300 19,300 -

23,250 23,250 -

46,200 46,200 -

73,100 73,100 -

9,750 9,750 -

34,150 34,150 -

46,450 46,450 -

48,250 48,250 -

51,700 51,700 -

108
HARGA HARGA
SATUAN 2013 SATUAN 2012

109
HARGA HARGA
SATUAN 2013 SATUAN 2012

17,000 21,450 (6,950) (32.40)

100,050 99,550 500 0.50

231,800 231,300 500 0.22

140,650 140,150 500 0.36

197,750 197,250 500 0.25

272,450 271,950 500 0.18

14,500 20,300 (6,300) (31.03)

14,100 20,550 (6,550) (31.87)

29,100 30,450 (1,350) (4.43)

212,950 212,950 -

44,350 43,850 500 1.14

33,750 33,250 500 1.50

20,250 19,750 500 2.53

850,000 850,000 (850,000)

14,200 14,200 (1,200) (8.45)

14,500 14,500 (1,300) (8.97)

169,900 169,900 -

124,800 124,800 -

261,250 261,250 -

27,850 27,850 -

6,050 6,000 600 10.00

7,900 7,550 1,100 14.57

6,050 5,600 550 9.82

13,300 10,500 4,250 40.48

6,700 5,550 1,350 24.32

8,800 8,800 -

10,250 8,000 3,000 37.50

38,450 33,550 4,900 14.61

14,500 17,100 (1,000) (5.85)

10,250 10,400 2,050 19.71

4,050 3,900 600 15.38

10,250 8,000 2,400 30.00

2,100 1,800 500 27.78

2,000 1,600 (250) (15.63)

10,550 9,400 1,150 12.23

58,700 58,700 -

6,050 6,600 300 4.55

7,000 5,850 2,700 46.15

88,800
105,750
117,750

85,250 187,050 (8,800) (4.70)

36,050 28,100 14,450 51.42

52,550 37,450 15,950 42.59

62,500 49,900 16,250 32.57

72,050 71,750 12,800 17.84

54,050 96,700 6,800 7.03

66,100 78,750 (9,750) (12.38)

110
HARGA HARGA
SATUAN 2013 SATUAN 2012

61,250 112,250 11,350 10.11

78,050 100,600 (21,250) (21.12)

72,050 157,500 3,500 2.22

90,050 93,550 16,450 17.58

584,700 584,700 -

73,900 73,900 -

20,100 20,100 5,800

4,450 4,450 -

62,450 62,450 5,400

50,150 50,150 3,900

103,700 103,700 -

92,800 92,800 -

58,400 58,400 -

4,900 4,750 450 9.47

4,250 4,200 400 9.52

81,650 81,650 -

134,700 134,700 20,550

126,100 163,600 (32,500) (19.87)

68,650 68,650 -

84,550 84,550 -

96,100 96,100 15,450

156,750 156,750 -

63,050 51,450 12,400 24.10

58,650 58,650 16,100

70,900 65,500 18,250 27.86

79,300 75,100 11,550 15.38

88,900 86,650 15,700 18.12

93,050 76,500 18,100 23.66

18,050 19,000 1,150 6.05

106,300 93,550 15,700 16.78

55,250 44,650 12,850 28.78

61,650 61,650 9,800

73,100 73,100 1,650

87,750 87,750 (4,950)

17,800 17,800 3,560

22,300 22,300 3,350

52,400 52,400 8,000

36,050 32,450 6,100 18.80

67,150 67,150 -

22,150 22,150 4,300

17,450 18,150 (400) (2.20)

33,600 33,600 -

32,150 32,150 -

15,550 15,550 -

13,800 13,800 -

16,800 16,800 2,550

19,450 19,450 2,950

15,050 13,450 6,100 45.35

17,450 23,400 (2,650) (11.32)

54,000 54,000 -

21,300 21,300 -

6,050 13,350 (7,200) (53.93)

2,500 1,600 900 56.25

3,700 1,950 1,750 89.74

1,950 1,950 -

1,950 1,950 -

3,750 3,750 -

3,600 3,600 700

111
HARGA HARGA
SATUAN 2013 SATUAN 2012

4,300 4,300 #VALUE!

1,300,000 1,246,700 247,900 19.88

141,050 139,150 4,250 3.05

108,050 121,050 (11,200) (9.25)

2,400,150 1,932,400 507,800 26.28

41,900 41,900 8,100

101,350 101,350 13,650

110,250 110,250 14,750

103,450 103,450 -

279,350 279,350 (83,900)

596,700 596,700 (401,250)

270,050 415,050 (140,500) (33.85)

372,050 530,550 (158,500) (29.87)

658,240 658,240 376,510


-

700,900 700,900 -

357,300 357,300 -

595,650 595,650 -
185,000 #DIV/0!

55,900 55,900 (34,600)

55,500 55,500 12,400

54,900 54,900 (33,050)

24,050 36,000 (11,550) (32.08)

30,050 49,700 (19,150) (38.53)

315,300 315,300 70,450

373,050 373,050 83,350

4,250 5,250 (850) (16.19)

3,700 4,750 (950) (20.00)

4,250 5,200 (200) (3.85)

5,450 4,750 950 20.00

6,050 6,900 (600) (8.70)

6,700 6,500 500 7.69

7,900 6,900 1,100 15.94

68,550 68,550 15,350

66,350 66,350 14,850

55,950 55,950 12,500

55,550 55,550 -

58,650 58,650 -

33,700 38,100 (3,900) (10.24)

10,900 12,350 (1,350) (10.93)

12,050 17,600 (5,350) (30.40)

13,300 24,450 (11,000) (44.99)

63,500 63,500 (46,400)

518,150 518,150 -

582,900 582,900 -

394,150 394,150 -

1,000 1,600 (600) (37.50)

53,050 53,050 (1,300)

53,300 53,300 750

56,450 56,450 1,050

61,450 61,450 1,800

89,400 89,400 50,300

32,450 32,450 -

50,450 47,800 3,450 7.22

45,650 43,350 4,900 11.30

53,500 50,700 3,650 7.20

19,300 19,300 2,550 13.21

62,500 53,300 9,200 17.26

15,250 15,250 (11,800)

112
HARGA HARGA
SATUAN 2013 SATUAN 2012

4,250 3,700 1,200 32.43

6,700 5,850 900 15.38

11,450 9,000 2,650 29.44

16,250 13,150 3,400 25.86

19,200 19,200 12,450

14,500 15,000 2,250 15.00

18,050 23,650 (4,100) (17.34)

9,700 9,450 950 10.05

33,850 33,850 11,000

34,900 46,900 (8,350) (17.80)

12,050 12,600 2,050 16.27

18,050 16,300 5,100 31.29

40,900 27,950 91,650 327.91

34,300 70,650 (62,100) (87.90)

7,300 7,500 300 4.00

573,950 573,950 -

323,900 323,900 -

466,350 466,350 -

242,350 242,350 -

250,100 250,100 -

242,350 242,350 -

7,300 12,900 (5,600) (43.41)

11,000 15,500 (4,500) (29.03)

17,600 17,600 (4,950)

24,050 29,700 (5,250) (17.68)

24,050 32,850 (8,400) (25.57)

14,500 22,350 (7,850) (35.12)

28,900 28,900 (14,500)

24,050 27,500 (3,050) (11.09)

1,300 2,150 (850) (39.53)

45,450 45,450 6,850

27,050 27,050 (12,650)

15,050 3,550 11,750 330.99

192,350 192,350 -

466,350 466,350 -

589,400 589,400 -

1,030,450 1,030,450 -

330,700 330,700 -

466,350 466,350 -

272,100 272,100 -

1,575,300 1,575,300 -

956,050 956,050 143,150

216,250 216,250 88,450

166,250 166,250 (166,250)

267,500 267,500 (66,300)

297,000 297,000 (84,300)

499,550 499,550 -

593,550 593,550 -

646,050 646,050 -

100,100 100,100

350 250 100 40.00

34,150 34,150 -

37,700 37,700 -

24,950 24,950 -

36,000 36,000 -

51,750 51,750 -

113
HARGA HARGA
SATUAN 2013 SATUAN 2012

64,900 168,850 (90,650) (53.69)

81,050 210,950 (113,200) (53.66)

129,700 215,550 (60,300) (27.97)

189,050 232,400 (2,450) (1.05)

36,050 30,750 12,950 42.11

216,050 189,800 63,150 33.27

259,300 194,550 98,650 50.71

9,050 7,950 1,250 15.72

9,050 5,800 3,400 58.62

95,450 95,450 8,850

100,100 100,100 9,250

103,900 103,900 9,600

119,300 119,300 11,000

88,650 81,100 7,550 9.31

68,650 68,650 3,200 4.66

18,050 18,750 (400) (2.13)

53,100 53,100 (36,400)

262,800 262,800 (199,550)

61,250 63,150 (900) (1.43)

93,050 88,500 6,100 6.89

129,050 117,900 13,300 11.28

184,800 184,800 41,300

39,050 42,550

58,250 63,250

13,750 13,750 -

15,000 15,000 -

17,800 17,800 -

18,700 18,700 -

27,050 27,050 -

30,150 30,150 -

39,500 39,500 - -

58,750 47,550 11,200 23.55

56,150 56,150 -

68,650 68,650 -

48,050 36,700 (21,750) (59.26)

29,650 29,650 (900) (3.04)

53,300 53,300 - -

18,050 24,700 (6,350) (25.71)

1,801 5,800 85,750 1,478.45

115,350 115,350 - -

21,050 15,750 5,650 35.87

45,700 45,700 - -

18,500 12,200 9,800 80.33

21,050 21,000 4,900 23.33

18,050 16,250 3,300 20.31

14,500 28,900 (14,250) (49.31)

15,850 15,850 2,500 15.77

41,500 41,500 - -

11,200 11,200 1,100 9.82

19,750 19,750 - -

2,100 2,100 - -

114
HARGA HARGA
SATUAN 2013 SATUAN 2012

355,950 355,950 - -

2,152,800 2,152,800 1,411,250 65.55

1,061,300 1,061,300 88,400 8.33

8,976,050 8,976,050 796,300 8.87

8,938,400 8,938,400 1,466,300 16.40

8,976,050 8,976,050 221,450 2.47

8,000,000 4,469,200 4,728,300 105.80

7,500,000 3,516,150 5,106,550 145.23

8,000,000 3,934,500 5,263,000 133.77

3,454,700 3,454,700 109,350 3.17

32,500 32,500 2,000 6.15

41,500 41,500 2,200 5.30

160,950 160,950 15,000 9.32

18,009,150 18,009,150 - -

18,009,150 18,009,150 - -

7,873,350 7,873,350 - -

13,031,500 13,031,500 - -

13,446,700 13,446,700 - -

18,009,150 18,009,150 - -

7,821,100 7,821,100 4,250,650 54.35

10,614,350 10,614,350 2,032,250 19.15

9,500,000 8,820,200 2,101,850 23.83

7,800,400 7,430,050 500,600 6.74

8,500,000 8,032,500 1,739,850 21.66

7,000,000 6,539,700 2,083,000 31.85

32,500 32,500 - -

6,900,400 6,588,750 1,341,900 20.37

6,000,300 7,297,500 (1,197,000) (16.40)

7,680,000 6,615,000 1,925,700 29.11

6,000,300 5,853,750 246,750 4.22

5,400,300 4,692,700 797,750 17.00

5,400,300 4,641,000 849,450 18.30

5,580,300 5,091,650 581,850 11.43

4,669,850 4,669,850 503,750 10.79

157,500 157,500 - -

224,200 224,200 - -

3,484,050 3,484,050 15,950 0.46

106,000 106,000 - -

143,400 143,400 - -

138,550 138,550 - -

77,200 77,200 6,750 8.74

127,450 127,450 - -

140,200 140,200 - -

65,650 65,650 (4,100) (6.25)

73,500 73,500 1,250 1.70

101,850 101,850 (19,050) (18.70)

100,050 100,050 - -

41,250 41,250 8,650 20.97

15,850 15,850 - -

260,400 260,400 - -

35,400 35,400 - -

1,404,100

29,100 29,100 (29,100) (100.00)

1,633,350 1,633,350 (1,633,350) (100.00)

864,750 864,750 (864,750) (100.00)

86,700 86,700 (86,700) (100.00)

1,200 1,200 (1,200) (100.00)

115
HARGA HARGA
SATUAN 2013 SATUAN 2012

3,550 3,550 (3,550) (100.00)

1,921,500 1,921,500 (1,921,500) (100.00)

23,300 23,300 (23,300) (100.00)

4,600 4,600 (4,600) (100.00)

864,750 864,750 (864,750) (100.00)

4,918,900 4,918,900 (4,918,900) (100.00)

127,000 127,000 (127,000) (100.00)

288,350 288,350 (288,350) (100.00)

26,100 26,100 (26,100) (100.00)

288,350 288,350 (288,350) (100.00)

11,800 11,800 (11,800) (100.00)

5,950 5,950 (5,950) (100.00)

4,100 4,100 (4,100) (100.00)

4,131,050 4,131,050 (4,131,050) (100.00)

18,450 18,450 (18,450) (100.00)

2,786,200 2,786,200 (2,786,200) (100.00)

173,050 173,050 (173,050) (100.00)

278,800 278,800 (278,800) (100.00)

2,305,800 2,305,800 (2,305,800) (100.00)

2,161,750 2,161,750 (2,161,750) (100.00)

16,500 16,500 (16,500) (100.00)

5,950 5,950 (5,950) (100.00)

2,815,050 2,815,050 (2,815,050) (100.00)

672,550 672,550 (672,550) (100.00)

91,500 91,500 (91,500) (100.00)

12,600 12,600 (12,600) (100.00)

42,500 42,500 (42,500) (100.00)

2,882,200 2,882,200 (2,882,200) (100.00)

9,850 9,850 (9,850) (100.00)

67,450 67,450 (67,450) (100.00)

52,050 52,050 (52,050) (100.00)

10,020,350 10,020,350 (10,020,350) (100.00)

38,950 38,950 (38,950) (100.00)

29,100 29,100 (29,100) (100.00)

4,323,300 4,323,300 (4,323,300) (100.00)

480,450 480,450 (480,450) (100.00)

64,800 64,800 (64,800) (100.00)

2,100 2,100 (2,100) (100.00)

2,786,200 2,786,200 (2,786,200) (100.00)

672,550 672,550 (672,550) (100.00)

3,377,950 3,377,950 (3,377,950) (100.00)

1,249,000 1,249,000 (1,249,000) (100.00)

4,950 4,950 (4,950) (100.00)

75,705 75,705 - -

75,705 75,705 - -

78,540 78,540 - -

4,500 4,500 4,100 91.11

9,000 7,000 2,000 28.57

10,000 10,900 - -

4,500 4,500 3,850 85.56

9,250 9,250 - -

6,250 6,250 - -

38,500 38,500 1,500 3.90

27,050 27,050 - -

142,050 142,050 - -

36,350 36,350 - -

55,150 55,150 - -

220,500 220,500 - -

45,550 45,550 - -

47,250 47,250 - -

4,500 4,500 - -

41,150 41,150 - -

116
HARGA HARGA
SATUAN 2013 SATUAN 2012

1,049,400 1,049,400 42,000 4.00

302,550 302,550 12,150 4.02

300,300 300,300 12,100 4.03

863,050 863,050 34,550 4.00

420,300 420,300 16,900 4.02

393,750 393,750 15,750 4.00

579,850 579,850 23,250 4.01

99,200 99,200 4,000 4.03

190,200 190,200 7,500 3.94

214,550 214,550 8,650 4.03

780,250 780,250 31,250 4.01

102,200 102,200 4,100 4.01

1,669,800 1,669,800 66,800 4.00

20,100 20,100 900 4.48

520,050 520,050 20,850 4.01

461,500 461,500 18,500 4.01

526,600 526,600 21,100 4.01

434,150 434,150 17,450 4.02

644,950 644,950 25,850 4.01

676,700 676,700 27,100 4.00

777,350 777,350 31,150 4.01

832,750 832,750 33,350 4.00

374,250 374,250 15,050 4.02

268,500 268,500 10,800 4.02

551,800 551,800 22,100 4.01

969,600 969,600 38,800 4.00

3,859,050 3,859,050 154,450 4.00

3,937,800 3,937,800 (1,669,450) (42.40)

2,494,050 2,494,050 (654,550) (26.24)

1,680,950 1,680,950 (531,250) (31.60)

11,950 11,950 550 4.60

88,100 88,100 3,600 4.09

166,450 166,450 6,750 4.06

361,700 361,700 14,500 4.01

143,500 143,500 5,800 4.04

440,800 440,800 17,700 4.02

765,450 765,450 30,650 4.00

2,816,250 2,816,250 112,650 4.00

567,550 567,550 225,750 39.78

43,300 43,300 - -

27,150 27,150 - -

16,300 16,300 - -

15,000 15,000 - -

479,050 479,050 - -

59,100 59,100 - -

214,050 214,050 - -

116,300 116,300 67,650 58.17

104,750 104,750 - -

9,082,500 9,082,500 - -

15,592,500 15,592,500 - -

5,522,200 5,522,200 - -

415,550 415,550 90,350 21.74

252,800 252,800 - -

199,000 199,000 - -

786,400 786,400 294,350 37.43

168,300 168,300 96,150 57.13

126,300 126,300 74,900 59.30

170,650 170,650 - -

218,750 218,750 - -

30,800 30,800 - -

702,750 702,750 - -

186,400 186,400 - -

436,600 436,600 - -

165,650 165,650 - -

13,250 13,250 - -

68,550 68,550 - -

3,276,300 3,276,300 - -

10,200 10,200 - -

283,900 283,900 - -

420,300 420,300 - -

157,500 157,500 - -

117
HARGA HARGA
SATUAN 2013 SATUAN 2012

131,250 131,250 - -

438,400 438,400 - -

782,550 782,550 - -

30,800 30,800 - -

20,550 20,550 - -

141,300 141,300 - -

101,400 101,400 - -

93,300 93,300 - -

8,600 18,400 (9,750) (52.99)


-

5,250 5,800 (450) (7.76)

15,750 15,750 - -

18,250 18,250 - -

24,350 24,350 - -

30,450 30,450 - -

401,500 401,500 - -

19,200 19,200 - -

827,250 827,250 - -

25,200 25,200 - -

31,150 31,150 - -

19,500 19,500 - -

682,500 682,500 - -

18,900 18,900 - -

20,800 20,800 - -

29,500 29,500 - -

118,550 118,500 50 0.04

33,900 33,900 400 1.18

14,300 14,300 - -

6,450 6,450 - -

16,150 16,150 250 1.55

68,550 68,550 - -

26,550 26,550 - -

19,050 19,050 - -

12,000 12,000 150 1.25

57,500 57,500 - -

72,350 72,350 - -

447,000 447,000 - -

56,700 56,700 - -

43,150 43,150 - -

8,150 8,150 450 5.52

24,250 24,250 - -

19,900 19,900 - -

40,000 40,000 (200) (0.50)

96,450 96,450 - -

160,650 160,650 - -

119,600 119,600 - -

319,300 319,300 - -

15,250 15,250 - -

109,500 109,500 4,150 3.79

25,900 25,900 - -

10,250 10,250 - -

118
HARGA HARGA
SATUAN 2013 SATUAN 2012

4,950 4,950 6,000 121.21

5,513 5,513 (1,013) (18.37)

9,200 7,665 1,635 21.33

12,900 10,868 2,132 19.62

20,850 22,680 (1,630) (7.19)

24,500 26,408 (258) (0.98)

9,188 9,188 (1) (0.01)

16,013 16,013 (1) (0.00)

25,830 25,830 - -

119
HARGA HARGA
SATUAN 2013 SATUAN 2012

335,213 335,213 (1) (0.00)

335,213 335,213 (1) (0.00)

335,213 335,213 (1) (0.00)

395,903 395,903 (1) (0.00)

370,335 370,335 - -

6,143 6,143 (1) (0.01)

32,025 32,025 4,775 14.91

80,850 80,850 5,400 6.68

110,513 110,513 10,237 9.26

37,900 39,060 2,340 5.99

24,500 28,770 (3,470) (12.06)

14,700 20,370 (5,520) (27.10)

12,900 14,700 (3,200) (21.77)

3,700 6,038 (2,288) (37.89)

3,045 3,048 (3) (0.10)

3,203 3,203 - -

422,678 422,678 (58,538) (13.85)

3,410,400 3,410,400 - -

2,092,808 2,092,808 (1) (0.00)

5,725,335 5,725,335 - -

7,633,658 7,633,658 (1) (0.00)

6,573,578 6,573,578 (1) (0.00)

2,923,463 2,923,463 (1) (0.00)

12,187,980 12,187,980 - -

4,761,173 4,761,173 (1) (0.00)

6,897,240 6,897,240 - -

13,642,598 13,642,598 (1) (0.00)

3,271,590 3,271,590 - -

4,079,513 4,079,513 (1) (0.00)

4,687,463 4,687,463 (1) (0.00)

120
HARGA HARGA
SATUAN 2013 SATUAN 2012

2,307,375 2,307,375 - -

990,360 990,360 - -

1,322,633 1,322,633 (1) (0.00)

40,898 40,898 (1) (0.00)

1,785,420 1,785,420 - -

2,046,293 2,046,293 (1) (0.00)

2,197,913 2,197,913 (1) (0.00)

1,273,440 1,273,440 - -

1,370,408 1,370,408 (1) (0.00)

1,219,418 1,219,418 (1) (0.00)

80,605,560 80,605,560 - -

93,781,485 93,781,485 - -

71,304,818 71,304,818 (1) (0.00)

441,368 441,368 (1) (0.00)

662,550 662,550 - -

153,248 153,248 (1) (0.00)

5,425,508 5,425,508 (1) (0.00)

2,712,780 2,712,780 - -

6,405 6,405 - -

18,428 18,428 (1) (0.00)

421,838 421,838 (1) (0.00)

3,373,125 3,373,125 - -

154,665 154,665 - -

11,625,810 11,625,810 - -

5,425,508 5,425,508 (1) (0.00)

10,463,355 10,463,355 - -

2,712,780 2,712,780 - -

4,262,948 4,262,948 (1) (0.00)

110,355 110,355 - -

84,945 84,945 - -

358,628 358,628 (1) (0.00)

264,233 264,233 (1) (0.00)

41,633 41,633 (1) (0.00)

41,633 41,633 (1) (0.00)

19,740 19,740 - -

32,288 32,288 (1) (0.00)

2,500,000 2,250,000 (2,250,000) (100.00)

1,915,515 1,915,515 - -

10,024,560 10,024,560 - -

37,013 37,013 (1) (0.00)

63,158 63,158 (1) (0.00)

107,205 107,205 - -

88,253 88,253 (1) (0.00)

83,055 83,055 - -

464,625 464,625 - -

95,813 95,813 (1) (0.00)

9,818 9,818 (1) (0.01)

90,300 90,300 - -

16,013 16,013 (1) (0.00)

12,810 12,810 - -

3,511,778 3,511,778 (1) (0.00)

2,962,680 2,962,680 - -

8,033 8,033 (1) (0.01)

4,043 4,043 (1) (0.01)

92,243 92,243 (1) (0.00)

491,558 491,558 (1) (0.00)

322,140 322,140 - -

57,488 57,488 (1) (0.00)

283,763 283,763 (1) (0.00)

292,845 292,845 - -

688,223 688,223 (1) (0.00)

543,638 543,638 (1) (0.00)

46,620 46,620 (33,620) (72.11)

83,055 83,055 - -

102,165 102,165 - -

121
HARGA HARGA
SATUAN 2013 SATUAN 2012

15,330 15,330 - -

89,355 89,355 - -

27,248 27,248 (1) (0.00)

231,263 231,263 (1) (0.00)

113,400 113,400 - -

78,435 78,435 - -

89,565 89,565 - -

126,840 126,840 - -

316,575 316,575 - -

1,760,745 1,760,745 - -

2,735,513 2,735,513 (1) (0.00)

4,883 4,883 (1) (0.01)

16,643 16,643 (1) (0.00)

1,943 1,943 (1) (0.03)

16,643 16,643 (1) (0.00)

3,833 3,833 (1) (0.01)

6,405 6,405 - -

56,070 56,070 - -

540,225 540,225 - -

240,765 240,765 - -

160,913 160,913 (1) (0.00)

240,765 240,765 - -

6,405 6,405 - -

87,518 87,518 (1) (0.00)

191,573 191,573 (1) (0.00)

2,573 2,573 (1) (0.02)

1,943 1,943 (1) (0.03)

2,282,700 2,282,700 - -

3,755,063 3,755,063 (1) (0.00)

22,995 22,995 - -

385,665 385,665 - -

102,165 102,165 - -

830,078 830,078 (1) (0.00)

1,085,490 1,085,490 - -

102,165 102,165 - -

29,400 29,400 - -

1,057,200 1,057,200 (1,057,200) (100.00)

70,250 70,250 - -

632,550 632,550 - -

275,650 275,650 - -

117,050 106,600 11,050 10.37

90,050 81,750 8,700 10.64

38,800 36,250 7,950 21.93

63,700 57,600 6,350 11.02

60,050 47,500 15,000 31.58

78,050 62,350 18,950 30.39

25,300 23,750 5,000 21.05

42,050 37,700 4,550 12.07

1,392,150 1,296,950 101,950 7.86

2,088,150 1,945,400 152,950 7.86

2,010,150 1,853,200 166,750 9.00

2,988,150 2,915,250 87,550 3.00

2,796,150 2,607,350 202,500 7.77

4,200,250 3,911,000 309,750 7.92

3,504,250 3,259,000 262,350 8.05

4,911,050 4,888,500 46,550 0.95

222,050 203,200 19,900 9.79

114,050 105,500 15,250 14.45

174,050 158,250 16,650 10.52

150,050 135,450 19,550 14.43

210,050 193,150 28,000 14.50

318,100 289,750 29,850 10.30

30,900 27,250 7,850 28.81

51,050 45,900 5,400 11.76

306,050 281,500 40,800 14.49

456,100 422,250 36,050 8.54

445,700 444,050 26,700 6.01

716,500 666,050 53,900 8.09

122
HARGA HARGA
SATUAN 2013 SATUAN 2012

636,100 587,000 52,150 8.88

948,100 976,500 (23,800) (2.44)

984,100 856,050 132,850 15.52

1,476,100 1,545,150 (61,850) (4.00)

27,700 25,150 5,350 21.27

42,700 39,850 3,000 7.53

22,900 21,550 2,100 9.74

35,700 33,450 2,400 7.17

18,050 17,550 1,150 6.55

28,250 26,300 2,100 7.98

46,300 47,500 13,850 29.16

85,650 80,150 5,900 7.36

37,250 38,950 9,350 24.01

67,900 63,350 4,850 7.66

52,900 57,800 13,300 23.01

99,700 93,150 6,950 7.46

12,050 12,000 700 5.83

19,150 18,000 1,200 6.67

67,900 75,600 15,950 21.10

127,300 119,900 7,950 6.63

6,700 9,650 (2,700) (27.98)

10,450 10,350 200 1.93

119,600 111,800 8,350 7.47

61,850 57,750 4,350 7.53

54,550 50,950 3,800 7.46

34,250 26,250 12,650 48.19

38,800 33,250 10,950 32.93

994,900 931,750 68,000 7.30

1,493,650 1,397,650 103,300 7.39

1,357,200 1,269,950 93,850 7.39

2,035,350 1,904,950 140,300 7.37

1,777,550 1,525,250 261,050 17.12

2,665,400 2,494,850 183,550 7.36

2,300,550 1,934,000 377,800 19.53

3,450,250 3,229,300 237,750 7.36

50,600 47,750 10,050 21.05

80,700 75,550 5,550 7.35

74,950 70,250 12,900 18.36

3,974,250 3,410,050 583,600 17.11

5,961,550 5,120,250 870,350 17.00

108,750 100,750 23,100 22.93

173,500 162,300 12,000 7.39

152,900 142,250 32,000 22.50

243,950 228,200 16,900 7.41

265,750 248,600 36,000 14.48

398,550 372,900 (27,350) (7.33)

322,700 301,900 #VALUE! #VALUE!

483,900 452,800 33,500 7.40

570,100 533,850 39,000 7.31

855,700 800,750 59,100 7.38

55,050 55,050 5,505 10.00

83,900 83,900 8,390 10.00

1,645,850 1,645,850 164,585 10.00

155,400 155,400 15,540 10.00

168,100 168,100 16,810 10.00

322,150 322,150 32,215 10.00

41,650 41,650 4,165 10.00

504,050 504,050 50,405 10.00

1,050,250 1,050,250 105,025 10.00

1,163,050 1,163,050 116,305 10.00

326,550 326,550 32,655 10.00

670,800 kode urutan Harga Pipa Galvanis Disesuaikan dengan harga 2013
789,700 koreksi link.........ada perubahan
1,046,300
1,474,950
1,789,350
149,850
190,650
248,450
317,500
394,250
529,400

123
HARGA HARGA
SATUAN 2013 SATUAN 2012

730,200
857,550
1,217,800
1,744,250
2,078,350
3,492,200
152,350
188,100
288,600
372,500
441,850
648,950
836,750
1,036,450
1,499,750
1,940,800
2,345,200
185,150
237,800
364,650
481,250
552,950
754,400
962,300
1,243,100
1,799,700
2,422,000
2,883,350
4,141,600

305,450 305,450 - -

357,200 357,200 - -

426,050 426,050 - -

651,600 651,600 - -

766,900 766,900 - -

2,900 2,900 - -

222,100 222,100 (181,850) (81.88)

825,450 825,450 - -

3,500 2,650 1,600 60.38

10,600 10,600 - -

302,650 302,650 - -

139,050 139,050 - -

30,750 30,750 - -

407,100 407,100 - -

378,000 378,000 - -

1,349,550 1,349,550 - -

242,100 242,100 - -

51,900 51,900 - -

3,000 3,000 - -

139,050 139,050 - -

59,850 59,850 - -

503,600 503,600 - -

23,250 23,250 - -

422,900 422,900 - -

8,300 8,300 - -

47,550 47,550 750 1.58

29,950 29,950 - -

12,500 12,500 - -

2,400 2,400 - -

65,650 65,650 - -

6,700 6,700 - -

130,100 130,100 - -

15,700 17,500 (1,800) (10.29)

4,600 4,600 - -

131,600 131,600 - -

82,700 82,700 10,450 12.64

10,250 15,000 (4,750) (31.67)

186,850 186,850 - -

124
HARGA HARGA
SATUAN 2013 SATUAN 2012

197,000 197,000 - -

125
- 79 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
INFRASTRUKTUR JALAN
Perkerasan Paving
Pemasangan Paving Stone (Blok) Tbl.8 cm ( Lokal m2
Kw 1)
Tenaga:
Mandor 0.0250 Kg Rp 90,000.00 Rp 2,250.00
Kepala Tukang Batu 0.0250 O.H Rp 80,000.00 Rp 2,000.00
Tukang Batu 0.2500 O.H Rp 65,000.00 Rp 16,250.00
Pekerja / Buruh Tak Terampil 0.7500 O.H Rp 55,000.00 Rp 41,250.00
Bahan:
Paving Stone Abu-2 Tb 8 Cm ( Lokal Kw 1 ) 1.0500 m2 Rp 80,500.00 Rp 84,525.00
Nilai HSPK : Rp 146,275.00
Pemasangan Paving Conblock Tbl.8 cm Abu-abu m2
Tenaga:
Mandor 0.0250 O.H Rp 90,000.00 Rp 2,250.00
Kepala Tukang Batu 0.0250 O.H Rp 80,000.00 Rp 2,000.00
Tukang Batu 0.2500 O.H Rp 65,000.00 Rp 16,250.00
Pekerja / Buruh Tak Terampil 0.7500 O.H Rp 55,000.00 Rp 41,250.00
Bahan:
Paving Conblock Abu-2 Tb 8 Cm 1.0500 m2 Rp 130,000.00 Rp 136,500.00
(3 Berlian-DT 1) Nilai HSPK : Rp 198,250.00
Pemasangan Paving Conblock Tbl.6 cm Warna m2
Tenaga:
Mandor 0.0250 O.H Rp 90,000.00 Rp 2,250.00
Kepala Tukang Batu 0.0250 O.H Rp 80,000.00 Rp 2,000.00
Tukang Batu 0.2500 O.H Rp 65,000.00 Rp 16,250.00
Pekerja / Buruh Tak Terampil 0.7500 O.H Rp 55,000.00 Rp 41,250.00
Bahan:
Paving Conblock Hijau Tb 6 Cm 1.0500 m2 Rp 135,000.00 Rp 141,750.00
(3 Berlian-DT 1) Nilai HSPK : Rp 203,500.00
Pemasangan Paving Conblock Tbl.8 cm Warna m2
Tenaga:
Mandor 0.0250 O.H Rp 90,000.00 Rp 2,250.00
Kepala Tukang Batu 0.0250 O.H Rp 80,000.00 Rp 2,000.00
Tukang Batu 0.2500 O.H Rp 65,000.00 Rp 16,250.00
Pekerja / Buruh Tak Terampil 0.7500 O.H Rp 55,000.00 Rp 41,250.00
Bahan:
Paving Conblock Hijau Tb 8 Cm 1.0500 m2 Rp 160,000.00 Rp 168,000.00
(3 Berlian-DT 1) Nilai HSPK : Rp 229,750.00
Kanstin Trap uk. t= 15, l=10 m1
Tenaga:
Mandor 0.0010 O.H Rp 90,000.00 Rp 90.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja / Buruh Terampil 0.2000 O.H Rp 60,000.00 Rp 12,000.00
Bahan:
Semen PC (portland Cement) 50 kg 0.047434 zak Rp 83,950.00 Rp 3,982.05
Pasir Pasang 0.006176 m3 Rp 270,000.00 Rp 1,667.59
Kanstin trap uk. t = 15 cm, l = 10 cm 2.7500 bh Rp 14,950.00 Rp 41,112.50
Nilai HSPK : Rp 66,152.14
- 80 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Kanstin Trap uk. t= 35, l=15 m1
Tenaga:
Mandor 0.0010 O.H Rp 90,000.00 Rp 90.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja / Buruh Terampil 0.2000 O.H Rp 60,000.00 Rp 12,000.00
Bahan:
Semen PC (portland Cement) 50 kg 0.0638 zak Rp 83,950.00 Rp 5,352.65
Pasir Pasang 0.0020 m3 Rp 270,000.00 Rp 534.60
Kanstin Trap uk. 15.35.50 2.2000 bh Rp 28,750.00 Rp 63,250.00
Nilai HSPK : Rp 88,527.25
Stopper/Uskup m1
Tenaga:
Mandor 0.0010 O.H Rp 90,000.00 Rp 90.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja / Buruh Terampil 0.2000 O.H Rp 60,000.00 Rp 12,000.00
Bahan:
Pasir Pasang 0.0010 m3 Rp 270,000.00 Rp 270.00
Stopper/uskup 3.3400 Buah Rp 4,600.00 Rp 15,364.00
Nilai HSPK : Rp 35,024.00
- 55 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pekerjaan Finishing
Pekerjaan Kusen, Pintu, & Jendela
Pasang Kaca Mati tebal 5 mm m2
Tenaga:
Mandor 0.0008 O.H Rp 90,000.00 Rp 67.50
Kepala Tukang Kayu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Kayu 0.1500 O.H Rp 70,000.00 Rp 10,500.00
Pekerja/Buruh Tak Terampil 0.0150 O.H Rp 55,000.00 Rp 825.00
Bahan:
Kaca Polos Tebal 5 mm 1.1000 m2 Rp 120,000.00 Rp 132,000.00
Sealant 0.0500 kg Rp 37,950.00 Rp 1,897.50
Nilai HSPK : Rp 146,490.00
Pasang Kaca Mati Rayban tebal 5 mm m2
Tenaga:
Mandor 0.0080 O.H Rp 90,000.00 Rp 720.00
Kepala Tukang Kayu 0.0160 O.H Rp 80,000.00 Rp 1,280.00
Tukang Kayu 0.1600 O.H Rp 70,000.00 Rp 11,200.00
Pekerja/Buruh Tak Terampil 0.1600 O.H Rp 55,000.00 Rp 8,800.00
Bahan:
Kaca rayban Tebal 5 mm 1.1000 m2 Rp 120,750.00 Rp 132,825.00
Sealant 0.0500 kg Rp 37,950.00 Rp 1,897.50
Nilai HSPK : Rp 156,722.50
Pasang Kaca Mati tebal 8 mm m2
Tenaga:
Mandor 0.0009 O.H Rp 90,000.00 Rp 81.00
Kepala Tukang Kayu 0.0170 O.H Rp 80,000.00 Rp 1,360.00
Tukang Kayu 0.1700 O.H Rp 70,000.00 Rp 11,900.00
Pekerja/Buruh Tak Terampil 0.0170 O.H Rp 55,000.00 Rp 935.00
Bahan:
Kaca Polos Tebal 8 mm 1.1000 m2 Rp 161,000.00 Rp 177,100.00
Sealant 0.0700 kg Rp 37,950.00 Rp 2,656.50
Nilai HSPK : Rp 194,032.50
Pasang Kaca Mati tebal 10 mm m2
Tenaga:
Mandor 0.0009 O.H Rp 90,000.00 Rp 81.00
Kepala Tukang Kayu 0.0170 O.H Rp 80,000.00 Rp 1,360.00
Tukang Kayu 0.1700 O.H Rp 70,000.00 Rp 11,900.00
Pekerja/Buruh Tak Terampil 0.0170 O.H Rp 55,000.00 Rp 935.00
Bahan:
Kaca Polos Tebal 10 mm 1.1000 m2 Rp 229,950.00 Rp 252,945.00
Sealant 0.0700 kg Rp 37,950.00 Rp 2,656.50
Nilai HSPK : Rp 269,877.50
Pasang Kaca Tempered Warna tebal 8 mm m2
Tenaga:
Mandor 0.0009 O.H Rp 90,000.00 Rp 81.00
Kepala Tukang Kayu 0.0170 O.H Rp 80,000.00 Rp 1,360.00
Tukang Kayu 0.1700 O.H Rp 70,000.00 Rp 11,900.00
Pekerja/Buruh Tak Terampil 0.0170 O.H Rp 55,000.00 Rp 935.00
Bahan:
Kaca Tempered Warna Tebal 8 mm 1.1000 m2 Rp 709,400.00 Rp 780,340.00
Sealant 0.0700 kg Rp 37,950.00 Rp 2,656.50
Nilai HSPK : Rp 797,272.50
Pasang Kaca Tempered Warna tebal 12 mm m2
Tenaga:
Mandor 0.0013 O.H Rp 90,000.00 Rp 117.00
Kepala Tukang Kayu 0.0250 O.H Rp 80,000.00 Rp 2,000.00
Tukang Kayu 0.2500 O.H Rp 70,000.00 Rp 17,500.00
Pekerja/Buruh Tak Terampil 0.0250 O.H Rp 55,000.00 Rp 1,375.00
Bahan:
Kaca Tempered Warna Tebal 12 mm 1.1000 m2 Rp 1,550,000.00 Rp 1,705,000.00
Sealant 0.0700 kg Rp 37,950.00 Rp 2,656.50
Nilai HSPK : Rp 1,728,648.50
- 56 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pasang dinding Lambriziring kayu kamper m2
Tenaga:
Mandor 0.0300 O.H Rp 90,000.00 Rp 2,700.00
Kepala Tukang Kayu 0.1800 O.H Rp 80,000.00 Rp 14,400.00
Tukang Kayu 1.8000 O.H Rp 70,000.00 Rp 126,000.00
Pekerja/Buruh Tak Terampil 0.6000 O.H Rp 55,000.00 Rp 33,000.00
Bahan:
Kayu Kamper balok 6"12" 4 mt 0.0070 m3 Rp 10,922,050.00 Rp 76,454.35
Paku biasa 2"-5" 0.1000 kg Rp 14,500.00 Rp 1,450.00
Paku Sekrup 3,5" 10.0000 Buah Rp 1,300.00 Rp 13,000.00
Nilai HSPK : Rp 267,004.35
Pemasangan Kunci Tanam Kamar mandi Buah
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Kayu 0.0500 O.H Rp 80,000.00 Rp 4,000.00
Tukang Kayu 0.5000 O.H Rp 70,000.00 Rp 35,000.00
Pekerja/Buruh Tak Terampil 0.0050 O.H Rp 55,000.00 Rp 275.00
Bahan:
Kunci Tanam Kamar mandi 1.0000 Buah Rp 43,150.00 Rp 43,150.00
Nilai HSPK : Rp 82,695.00
Pemasangan Kunci Tanam Pintu Almunium Buah
Tenaga:
Kepala Tukang Kayu 0.0500 O.H Rp 80,000.00 Rp 4,000.00
Tukang Kayu 0.5000 O.H Rp 70,000.00 Rp 35,000.00
Bahan:
Kunci Tanam Almunium 1.0000 Buah Rp 447,000.00 Rp 447,000.00
Nilai HSPK : Rp 486,000.00
Pemasangan Engsel Pintu Buah
Tenaga:
Mandor 0.0008 O.H Rp 90,000.00 Rp 67.50
Kepala Tukang Kayu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Kayu 0.1500 O.H Rp 70,000.00 Rp 10,500.00
Pekerja/Buruh Tak Terampil 0.0150 O.H Rp 55,000.00 Rp 825.00
Bahan:
Engsel pintu kuningan 3" 1.0000 Buah Rp 9,750.00 Rp 9,750.00
Nilai HSPK : Rp 22,342.50
Pemasangan Engsel Jendela Kupu-Kupu Buah
Tenaga:
Mandor 0.0005 O.H Rp 90,000.00 Rp 45.00
Kepala Tukang Kayu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Kayu 0.1000 O.H Rp 70,000.00 Rp 7,000.00
Pekerja/Buruh Tak Terampil 0.0100 O.H Rp 55,000.00 Rp 550.00
Bahan:
Engsel Jendela kupu-kupu Kuningan 2.5" 1.0000 Buah Rp 9,450.00 Rp 9,450.00
Nilai HSPK : Rp 17,845.00
Pemasangan Kait Angin Buah
Tenaga:
Mandor 0.0008 O.H Rp 90,000.00 Rp 67.50
Kepala Tukang Kayu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Kayu 0.1500 O.H Rp 70,000.00 Rp 10,500.00
Pekerja/Buruh Tak Terampil 0.0150 O.H Rp 55,000.00 Rp 825.00
Bahan:
Kait Angin 1.0000 buah Rp 19,900.00 Rp 19,900.00
Nilai HSPK : Rp 32,492.50
Pemasangan Hak Angin Lurus Kuningan Buah
Tenaga:
Mandor 0.0008 0 Rp 90,000.00 Rp 67.50
Kepala Tukang Kayu 0.0150 O.H Rp 80,000.00 Rp 1,200.00
Tukang Kayu 0.1500 O.H Rp 70,000.00 Rp 10,500.00
Pekerja/Buruh Tak Terampil 0.0150 O.H Rp 55,000.00 Rp 825.00
Bahan:
Hak Angin Lurus Kuningan 1.0000 buah Rp 39,800.00 Rp 39,800.00
Nilai HSPK : Rp 52,392.50
- 57 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pemasangan Engsel Hidrolis Pintu Almunium Buah
Tenaga:
Kepala Tukang Kayu 0.0130 O.H Rp 80,000.00 Rp 1,040.00
Tukang Kayu 0.1250 O.H Rp 70,000.00 Rp 8,750.00
Bahan:
Hidrolis Pintu Almunium 1.0000 buah Rp 827,250.00 Rp 827,250.00
Nilai HSPK : Rp 837,040.00
Pemasangan Grendel Biasa (Besar) Buah
Tenaga:
Kepala Tukang Kayu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Kayu 0.1000 O.H Rp 70,000.00 Rp 7,000.00
Bahan:
Grendel Biasa (Besar) 1.0000 buah Rp 14,300.00 Rp 14,300.00
Nilai HSPK : Rp 22,100.00
Pemasangan Grendel Biasa (Kecil) Buah
Tenaga:
Kepala Tukang Kayu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Kayu 0.1000 O.H Rp 70,000.00 Rp 7,000.00
Bahan:
Grendel Biasa (Kecil) 1.0000 buah Rp 6,450.00 Rp 6,450.00
Nilai HSPK : Rp 14,250.00
Pemasangan Grendel Tanam Buah
Tenaga:
Kepala Tukang Kayu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Kayu 0.1000 O.H Rp 70,000.00 Rp 7,000.00
Bahan:
Grendel Tanam 1.0000 buah Rp 68,550.00 Rp 68,550.00
Nilai HSPK : Rp 76,350.00
Pemasangan Door Holder Buah
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Kayu 0.0500 O.H Rp 80,000.00 Rp 4,000.00
Tukang Kayu 0.5000 O.H Rp 70,000.00 Rp 35,000.00
Pekerja/Buruh Tak Terampil 0.0500 O.H Rp 55,000.00 Rp 2,750.00
Bahan:
Door Holder 1.0000 Buah Rp 96,450.00 Rp 96,450.00
Nilai HSPK : Rp 138,470.00
Pemasangan Door Stoper Buah
Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Kayu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Kayu 0.1000 O.H Rp 70,000.00 Rp 7,000.00
Pekerja/Buruh Tak Terampil 0.0100 O.H Rp 55,000.00 Rp 550.00
Bahan:
Door Stoper 1.0000 Buah Rp 119,600.00 Rp 119,600.00
Nilai HSPK : Rp 128,400.00
Pemasangan Door Kloser Buah
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Kayu 0.0500 O.H Rp 80,000.00 Rp 4,000.00
Tukang Kayu 0.5000 O.H Rp 70,000.00 Rp 35,000.00
Pekerja/Buruh Tak Terampil 0.0500 O.H Rp 55,000.00 Rp 2,750.00
Bahan:
Door Kloser 1.0000 Buah Rp 160,650.00 Rp 160,650.00
Nilai HSPK : Rp 202,670.00
Pemasangan Rel Pintu Dorong Buah
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Kayu 0.0600 O.H Rp 80,000.00 Rp 4,800.00
Tukang Kayu 0.6000 O.H Rp 70,000.00 Rp 42,000.00
Pekerja/Buruh Tak Terampil 0.0600 O.H Rp 55,000.00 Rp 3,300.00
Bahan:
Rel Pintu Dorong 1.0000 buah Rp 319,300.00 Rp 319,300.00
Nilai HSPK : Rp 369,670.00
Pemasangan Fitrase ex. Corais & aquirlda m2
Tenaga:
Mandor 0.0400 O.H Rp 90,000.00 Rp 3,600.00
Tukang kayu 0.2500 O.H Rp 70,000.00 Rp 17,500.00
Pekerja / Buruh Tak Terampil 0.1300 O.H Rp 55,000.00 Rp 7,150.00
Bahan:
Fitrase 1.1000 m2 Rp 47,150.00 Rp 51,865.00
Nilai HSPK : Rp 80,115.00
- 58 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pemasangan Vertical Blind ex. Shin ichi m2
Tenaga:
Mandor 0.0180 O.H Rp 90,000.00 Rp 1,620.00
Kepala Tukang Kayu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang kayu 0.3500 O.H Rp 70,000.00 Rp 24,500.00
Pekerja / Buruh tak terampil 0.3500 O.H Rp 55,000.00 Rp 19,250.00
Bahan:
Vertical Blind ex. Shin Ichi 1.0000 m2 Rp 138,000.00 Rp 138,000.00
Nilai HSPK : Rp 186,170.00
Pemasangan Lapisan Foam untuk Karpet m2
Tenaga:
Mandor 0.0100 O.H Rp 90,000.00 Rp 900.00
Tukang kayu 0.0500 O.H Rp 70,000.00 Rp 3,500.00
Pekerja / Buruh tak terampil 0.0300 O.H Rp 55,000.00 Rp 1,650.00
Bahan:
Foam Lapisan karpet 1.0000 m2 Rp 55,550.00 Rp 55,550.00
Lem Kayu Fox 0.3750 kg Rp 38,550.00 Rp 14,456.25
Nilai HSPK : Rp 76,056.25
Pemasangan Karpet Wool ex. Aloha m2
Tenaga:
Mandor 0.0100 O.H Rp 90,000.00 Rp 900.00
Tukang Kayu 0.1000 O.H Rp 70,000.00 Rp 7,000.00
Pekerja / Buruh Tak Terampil 0.0500 O.H Rp 55,000.00 Rp 2,750.00
Bahan:
Karpet lebar 2m 0.5500 m2 Rp 58,650.00 Rp 32,257.50
Lem Kayu Fox 0.7500 kg Rp 38,550.00 Rp 28,912.50
Nilai HSPK : Rp 71,820.00
Pemasangan Kawat Nyamuk (Kassa Plastik) m2
Tenaga:
Mandor 0.0005 O.H Rp 90,000.00 Rp 45.00
Kepala Tukang Kayu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Kayu 0.1000 O.H Rp 70,000.00 Rp 7,000.00
Pekerja / Buruh Tak Terampil 0.1000 O.H Rp 55,000.00 Rp 5,500.00
Bahan:
Paku biasa 1/2"-1" 0.0200 kg Rp 14,500.00 Rp 290.00
Kamper Papan 2 x 20 x 400 cm 0.0020 m3 Rp 9,772,350.00 Rp 19,544.70
Kawat Nyamuk Kasa Plastik lebar 90 cm 1.1000 m2 Rp 21,400.00 Rp 23,540.00
Nilai HSPK : Rp 56,719.70
Pemasangan Kawat Nyamuk (Kassa Aluminium) m2
Tenaga:
Mandor 0.0005 O.H Rp 90,000.00 Rp 45.00
Kepala Tukang Kayu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Kayu 0.1000 O.H Rp 70,000.00 Rp 7,000.00
Pekerja / Buruh Tak Terampil 0.1000 O.H Rp 55,000.00 Rp 5,500.00
Bahan:
Paku biasa 1/2"-1" 0.0200 kg Rp 14,500.00 Rp 290.00
Kamper Papan 2 x 20 x 400 cm 0.0020 m3 Rp 9,772,350.00 Rp 19,544.70
Kawat Nyamuk Kasa Aluminium lebar 90 cm 1.1000 m2 Rp 115,350.00 Rp 126,885.00
Nilai HSPK : Rp 160,064.70
Pemasangan Kusen Alumunium Profil 4" Polos m1
Tenaga:
Mandor 0.0021 O.H Rp 90,000.00 Rp 189.00
Kepala Tukang besi 0.0043 O.H Rp 80,000.00 Rp 344.00
Tukang besi 0.0430 O.H Rp 65,000.00 Rp 2,795.00
Pekerja Terampil 0.0430 O.H Rp 60,000.00 Rp 2,580.00
Bahan:
Profil 4" Putih ( 4 x 10 ) 1.1000 m1 Rp 92,800.00 Rp 102,080.00
Skrup/Ripet 2.0000 Buah Rp 350.00 Rp 700.00
Sealent 0.0600 Botol Rp 37,950.00 Rp 2,277.00
Nilai HSPK : Rp 110,965.00
Pemasangan Kusen Alumunium Profil 4" Warna m1
Tenaga:
Mandor 0.0021 O.H Rp 90,000.00 Rp 189.00
Kepala Tukang besi 0.0043 O.H Rp 80,000.00 Rp 344.00
Tukang besi 0.0430 O.H Rp 65,000.00 Rp 2,795.00
Pekerja Terampil 0.0430 O.H Rp 60,000.00 Rp 2,580.00
Bahan:
Profil 4" coklat ( 4 x 10 ) 1.1000 m1 Rp 103,700.00 Rp 114,070.00
Skrup/Ripet 2.0000 Buah Rp 350.00 Rp 700.00
Sealent 0.0600 Botol Rp 37,950.00 Rp 2,277.00
Nilai HSPK : Rp 122,955.00
- 59 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pemasangan Slimar Alumunium Profil 3/8" Dg Kaca m2
Rayben 5 mm
Tenaga:
Mandor 0.0042 O.H Rp 90,000.00 Rp 378.00
Kepala Tukang besi 0.0085 O.H Rp 80,000.00 Rp 680.00
Tukang besi 0.0850 O.H Rp 65,000.00 Rp 5,525.00
Pekerja Terampil 0.0850 O.H Rp 60,000.00 Rp 5,100.00
Bahan:
Slimar 3/8" Jendela 4.4000 m1 Rp 58,400.00 Rp 256,960.00
Karet Kusen Aluminium 14.6000 m1 Rp 4,450.00 Rp 64,970.00
Kaca rayban Tebal 5 mm 1.1000 m2 Rp 120,750.00 Rp 132,825.00
Nilai HSPK : Rp 466,438.00
Pemasangan Pintu Kaca Tb.12 mm Rangka Aluminium m2

Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang besi 0.0090 O.H Rp 80,000.00 Rp 720.00
Tukang besi 0.0850 O.H Rp 65,000.00 Rp 5,525.00
Pekerja Terampil 0.0850 O.H Rp 60,000.00 Rp 5,100.00
Bahan:
Kaca Bening Tb. 12 mm 1.1000 m2 Rp 312,850.00 Rp 344,135.00
Profil 4" Coklat ( 4 x 10 ) 4.5000 m1 Rp 103,700.00 Rp 466,650.00
Sealent 0.2700 Botol Rp 37,950.00 Rp 10,246.50
Seal Karet 4.5000 m1 Rp 10,200.00 Rp 45,900.00
Nilai HSPK : Rp 878,726.50
Pemasangan Pintu WPVC lebar 90 - 120 Buah
Tenaga:
Mandor 0.0008 O.H Rp 90,000.00 Rp 67.50
Kepala Tukang Kayu 0.0410 O.H Rp 80,000.00 Rp 3,280.00
Tukang Kayu 0.4000 O.H Rp 70,000.00 Rp 28,000.00
Pekerja / Buruh Tak Terampil 0.0150 O.H Rp 55,000.00 Rp 825.00
Bahan:
Pintu WPVC ex. Duma 1.0000 Unit Rp 3,191,100.00 Rp 3,191,100.00
Nilai HSPK : Rp 3,223,272.50
Pemasangan Pintu WPVC lebar 160 - 180 Buah
Tenaga:
Mandor 0.0008 O.H Rp 90,000.00 Rp 67.50
Kepala Tukang Kayu 0.0410 O.H Rp 80,000.00 Rp 3,280.00
Tukang Kayu 0.4000 O.H Rp 70,000.00 Rp 28,000.00
Pekerja / Buruh Tak Terampil 0.0150 O.H Rp 55,000.00 Rp 825.00
Bahan:
Pintu WPVC ex. Duma 1.0000 Unit Rp 3,258,194.00 Rp 3,258,194.00
Nilai HSPK : Rp 3,290,366.50
Sanitair
Pemasangan Dasar Saluran R.25 Segmen m1
Tenaga:
Mandor 0.0500 O.H Rp 90,000.00 Rp 4,500.00
Pekerja/Buruh Tak Terampil 0.3500 O.H Rp 55,000.00 Rp 19,250.00
Bahan:
Buis Beton Bulat dia. 50 cm / 100 cm 1.0000 Buah Rp 103,500.00 Rp 103,500.00
Nilai HSPK : Rp 127,250.00
Pemasangan Dasar Saluran R.15 Segmen m1
Tenaga:
Mandor 0.0500 O.H Rp 90,000.00 Rp 4,500.00
Pekerja/Buruh Tak Terampil 0.3500 O.H Rp 55,000.00 Rp 19,250.00
Bahan:
Buis Beton Bulat dia. 30 cm / 100 cm 1.0000 Buah Rp 66,150.00 Rp 66,150.00
Nilai HSPK : Rp 89,900.00
Pemasangan Dasar Saluran R.25 (1/2 lingkaran) m1
Tenaga:
Mandor 0.0810 O.H Rp 90,000.00 Rp 7,290.00
Pekerja/Buruh Tak Terampil 0.5700 O.H Rp 55,000.00 Rp 31,350.00
Bahan:
Buis Beton U 50 cm 1.0000 Buah Rp 46,600.00 Rp 46,600.00
Nilai HSPK : Rp 85,240.00
Pemasangan Kran Air dia.3/4" atau 1/2" Buah
Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Pipa 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Pipa 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja / Buruh Tak Terampil 0.0100 O.H Rp 55,000.00 Rp 550.00
Bahan:
Kran Air 1.0000 Buah Rp 19,050.00 Rp 19,050.00
Seal Tape 0.0250 Biji Rp 2,400.00 Rp 60.00
Nilai HSPK : Rp 27,410.00
- 60 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pemasangan Kloset Jongkok Porselen Buah
Tenaga:
Mandor 0.1600 O.H Rp 90,000.00 Rp 14,400.00
Kepala Tukang batu 0.1500 O.H Rp 80,000.00 Rp 12,000.00
Tukang Batu 1.5000 O.H Rp 65,000.00 Rp 97,500.00
Pekerja / Buruh Tak Terampil 1.0000 O.H Rp 55,000.00 Rp 55,000.00
Bahan:
Kloset Jongkok Porselen 1.0000 Buah Rp 143,400.00 Rp 143,400.00
Semen portland (50 kg) 6.0000 Kg Rp 1,679.00 Rp 10,074.00
Pasir Pasang 0.0100 m3 Rp 270,000.00 Rp 2,700.00
Nilai HSPK : Rp 335,074.00
Pemasangan Kloset Duduk ex. Toto komplit Buah
Tenaga:
Mandor 0.1600 O.H Rp 90,000.00 Rp 14,400.00
Kepala Tukang batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 1.1000 O.H Rp 65,000.00 Rp 71,500.00
Pekerja / Buruh Tak Terampil 3.3000 O.H Rp 55,000.00 Rp 181,500.00
Bahan:
Kloset Duduk ex. Toto komplit 1.0000 Buah Rp 2,440,200.00 Rp 2,440,200.00
Perlengkapan : 0.0600 Harga Kloset Rp 2,440,200.00 Rp 146,412.00
Nilai HSPK : Rp 2,854,812.00
Pemasangan Wastafel ex. KIA Buah
Tenaga:
Mandor 0.0600 O.H Rp 90,000.00 Rp 5,400.00
Kepala Tukang batu 0.1500 O.H Rp 80,000.00 Rp 12,000.00
Tukang Batu 1.4500 O.H Rp 65,000.00 Rp 94,250.00
Pekerja / Buruh Tak Terampil 1.2000 O.H Rp 55,000.00 Rp 66,000.00
Bahan:
Wastafel Merk KIA 1.2000 Buah Rp 274,550.00 Rp 329,460.00
Semen portland 6.0000 Kg Rp 1,679.00 Rp 10,074.00
Pasir Pasang 0.0100 m3 Rp 270,000.00 Rp 2,700.00
Perlengkapan: 0.1200 Harga Wastafel Rp 274,550.00 Rp 32,946.00
Nilai HSPK : Rp 552,830.00
Pemasangan Wastafel ex. TOTO Buah
Tenaga:
Mandor 0.0600 O.H Rp 90,000.00 Rp 5,400.00
Kepala Tukang batu 0.1500 O.H Rp 80,000.00 Rp 12,000.00
Tukang Batu 1.4500 O.H Rp 65,000.00 Rp 94,250.00
Pekerja / Buruh Tak Terampil 1.2000 O.H Rp 55,000.00 Rp 66,000.00
Bahan:
Wastafel Merk TOTO 1.2000 Buah Rp 372,050.00 Rp 446,460.00
Semen portland 6.0000 Kg Rp 1,679.00 Rp 10,074.00
Pasir Pasang 0.0100 m3 Rp 270,000.00 Rp 2,700.00
Perlengkapan: 0.1200 Harga Wastafel Rp 372,050.00 Rp 44,646.00
Nilai HSPK : Rp 681,530.00
Pemasangan Urinoir Buah
Tenaga:
Mandor 0.0500 O.H Rp 90,000.00 Rp 4,500.00
Kepala Tukang Batu 0.1000 O.H Rp 80,000.00 Rp 8,000.00
Tukang Batu 1.0000 O.H Rp 65,000.00 Rp 65,000.00
Pekerja / Buruh Tak Terampil 1.0000 O.H Rp 55,000.00 Rp 55,000.00
Bahan:
Urinoir ex TOTO 1.0000 Buah Rp 1,034,750.00 Rp 1,034,750.00
Semen portland 6.0000 Kg Rp 1,679.00 Rp 10,074.00
Pasir Pasang 0.0100 m3 Rp 270,000.00 Rp 2,700.00
Perlengkapan: 0.3000 Harga Urinoir Rp 1,034,750.00 Rp 310,425.00
Nilai HSPK : Rp 1,490,449.00
Memasang Bak Kontrol Pasangan Batu bata uk 30 x 30 cm, Buah
Tinggi 35 cm
Tenaga:
Mandor 0.0110 O.H Rp 90,000.00 Rp 990.00
Kepala Tukang Batu 0.0720 O.H Rp 80,000.00 Rp 5,760.00
Tukang Batu 0.7200 O.H Rp 65,000.00 Rp 46,800.00
Pekerja / Buruh Tak Terampil 2.1600 O.H Rp 55,000.00 Rp 118,800.00
Bahan:
Batu Bata 40.0000 buah Rp 750.00 Rp 30,000.00
Semen portland 44.0000 Kg Rp 1,679.00 Rp 73,876.00
Pasir Pasang 0.0700 m3 Rp 270,000.00 Rp 18,900.00
Batu Pecah Mesin 2/3 0.0700 m3 Rp 252,950.00 Rp 17,706.50
Besi Beton Polos 1.6000 Kg Rp 13,000.00 Rp 20,800.00
Pasir beton 0.0600 m3 Rp 275,000.00 Rp 16,500.00
Nilai HSPK : Rp 350,132.50
- 61 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pemasangan Bak cuci piring stainless steel dan Buah
accessories
Tenaga:
Mandor 0.0150 O.H Rp 90,000.00 Rp 1,350.00
Kepala Tukang Batu 0.0300 O.H Rp 80,000.00 Rp 2,400.00
Tukang Batu 0.3000 O.H Rp 65,000.00 Rp 19,500.00
Pekerja / Buruh Tak Terampil 0.0300 O.H Rp 55,000.00 Rp 1,650.00
Bahan:
Bak cuci Stainless steel + accessories 1.0000 Buah Rp 185,000.00 Rp 185,000.00
Nilai HSPK : Rp 209,900.00
Pemasangan Floor Drain Buah
Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Batu 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Batu 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja / Buruh Tak Terampil 0.0100 O.H Rp 55,000.00 Rp 550.00
Bahan:
Floor drain 1.0000 Buah Rp 51,900.00 Rp 51,900.00
Nilai HSPK : Rp 60,200.00
Pemasangan Kran Bebek Fio 10 JC Buah
Tenaga:
Mandor 0.0050 O.H Rp 90,000.00 Rp 450.00
Kepala Tukang Pipa 0.0100 O.H Rp 80,000.00 Rp 800.00
Tukang Pipa 0.1000 O.H Rp 65,000.00 Rp 6,500.00
Pekerja / Buruh Tak Terampil 0.0100 O.H Rp 55,000.00 Rp 550.00
Bahan:
Kran Bebek Fio 10 JC 1.0000 Buah Rp 113,650.00 Rp 113,650.00
Seal Tape 1.0000 biji Rp 2,400.00 Rp 2,400.00
Nilai HSPK : Rp 124,350.00
Pekerjaan Besi Pipa Stainless 5/8 " m1
Bahan:
Besi Pipa Stainless 5/8 " 1.0000 m1 Rp 50,908.33 Rp 50,908.33
Upah:
Ongkos kerja pemasangan + Elektrode 1.0000 m1 Rp 7,706.40 Rp 7,706.40
Nilai HSPK : Rp 58,614.73
Pekerjaan Besi Pipa Stainless 1.25 " m1
Bahan:
Besi Pipa Stainless 1.25 " 1.0000 m1 Rp 59,533.33 Rp 59,533.33
Upah:
Ongkos kerja pemasangan + Elektrode 1.4719 m1 Rp 7,706.40 Rp 11,343.05
Nilai HSPK : Rp 70,876.38
Pekerjaan Besi Pipa Stainless 1.5 " m1
Bahan:
Besi Pipa Stainless 1.5 " 1.0000 m1 Rp 71,008.33 Rp 71,008.33
Upah:
Ongkos kerja pemasangan + Elektrode 2.9438 m1 Rp 7,706.40 Rp 22,686.10
Nilai HSPK : Rp 93,694.43
- 62 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pekerjaan Besi Pipa Stainless 2 " m1
Bahan:
Besi Pipa Stainless 2 " 1.0000 m1 Rp 108,600.00 Rp 108,600.00
Upah:
Ongkos kerja pemasangan + Elektrode 3.2708 m1 Rp 7,706.40 Rp 25,206.09
Nilai HSPK : Rp 133,806.09
Pemasangan Pipa Galvanis Termasuk Elektrode m1
Tenaga:
Mandor 0.0020 O.H Rp 90,000.00 Rp 180.00
Tukang Besi 0.0600 O.H Rp 65,000.00 Rp 3,900.00
Pekerja Terampil 0.0280 O.H Rp 60,000.00 Rp 1,680.00
Bahan:
Elektroda Baja 0.0060 kg Rp 67,150.00 Rp 402.90
Peralatan:
Sewa Welding Set (min 5 jam) 0.0210 jam Rp 73,500.00 Rp 1,543.50
Nilai HSPK : Rp 7,706.40
Pemasangan Pipa Galvanis Diameter 3/4 " m1

Tenaga:
Mandor 0.0270 O.H Rp 90,000.00 Rp 2,430.00
Kepala Tukang Pipa 0.0090 O.H Rp 80,000.00 Rp 720.00
Tukang Pipa 0.0900 O.H Rp 65,000.00 Rp 5,850.00
Pekerja Terampil 0.0540 O.H Rp 60,000.00 Rp 3,240.00
Bahan:
Pipa Galvanis Medium 3/4 " 1.2000 m1 Rp 39,825.00 Rp 47,790.00
Perlengkapan 0.3500 m1 Rp 39,825.00 Rp 13,938.75
Nilai HSPK : Rp 61,728.75
Pemasangan Pipa Galvanis Diameter 1 " m1

Tenaga:
Mandor 0.0270 O.H Rp 90,000.00 Rp 2,430.00
Kepala Tukang Pipa 0.0090 O.H Rp 80,000.00 Rp 720.00
Tukang Pipa 0.0900 O.H Rp 65,000.00 Rp 5,850.00
Pekerja Terampil 0.0540 O.H Rp 60,000.00 Rp 3,240.00
Bahan:
Pipa Galvanis Medium 1" 1.2000 m1 Rp 61,066.67 Rp 73,280.00
Perlengkapan 0.3500 m1 Rp 61,066.67 Rp 21,373.33
Nilai HSPK : Rp 94,653.33
Pekerjaan Besi Pipa Galvanis 2 " (Medium) m1
Bahan:
Besi Pipa Galvanis Medium 2" 1.0000 m1 Rp 126,350.00 Rp 126,350.00
Upah:
Ongkos kerja pemasangan + Elektrode 2.9438 m1 Rp 7,706.40 Rp 22,686.10
Nilai HSPK : Rp 149,036.10
Pemasangan Pipa Galvanis Diameter 3 " m1
Tenaga:
Mandor 0.0070 O.H Rp 90,000.00 Rp 630.00
Kepala Tukang Pipa 0.0230 O.H Rp 80,000.00 Rp 1,840.00
Tukang Pipa 0.2250 O.H Rp 65,000.00 Rp 14,625.00
Pekerja Terampil 0.1350 O.H Rp 60,000.00 Rp 8,100.00
Bahan:
Pipa Galvanis Medium 3" 1.2000 m1 Rp 208,191.67 Rp 249,830.00
Perlengkapan 0.3500 m1 Rp 72,867.08 Rp 25,503.48
Nilai HSPK : Rp 275,333.48
Pemasangan Pipa Galvanis Diameter 4 " m1
Tenaga:
Mandor 0.0070 O.H Rp 90,000.00 Rp 630.00
Kepala Tukang Pipa 0.0230 O.H Rp 80,000.00 Rp 1,840.00
Tukang Pipa 0.2250 O.H Rp 65,000.00 Rp 14,625.00
Pekerja Terampil 0.1350 O.H Rp 60,000.00 Rp 8,100.00
Bahan:
Pipa Galvanis Medium 4" 1.2000 m1 Rp 301,408.33 Rp 361,690.00
Perlengkapan 0.3500 m1 Rp 301,408.33 Rp 105,492.92
Nilai HSPK : Rp 467,182.92
Pengadaan dan Pemasangan Pipa GI Dia. 3/4" m1
Tenaga:
Mandor 0.0270 O.H Rp 90,000.00 Rp 2,430.00
Kepala Tukang Pipa 0.0090 O.H Rp 80,000.00 Rp 720.00
Tukang Pipa 0.0900 O.H Rp 65,000.00 Rp 5,850.00
Pekerja Terampil 0.0540 O.H Rp 60,000.00 Rp 3,240.00
Bahan:
Pipa GI dia. 3/4" 1.2000 m1 Rp 39,825.00 Rp 47,790.00
Perlengkapan: 0.3500 Harga Pipa Rp 39,825.00 Rp 13,938.75
Nilai HSPK : Rp 73,968.75
- 63 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pengadaan dan Pemasangan Pipa GI Dia. 1" m1
Tenaga:
Mandor 0.0270 O.H Rp 90,000.00 Rp 2,430.00
Kepala Tukang Pipa 0.0090 O.H Rp 80,000.00 Rp 720.00
Tukang Pipa 0.0900 O.H Rp 65,000.00 Rp 5,850.00
Pekerja Terampil 0.0540 O.H Rp 60,000.00 Rp 3,240.00
Bahan:
Pipa GI dia 1" 1.2000 m1 Rp 61,066.67 Rp 73,280.00
Perlengkapan: 0.3500 Harga Pipa Rp 61,066.67 Rp 21,373.33
Nilai HSPK : Rp 106,893.33
Pengadaan dan Pemasangan Pipa GI Dia.1,5" m1
Tenaga:
Mandor 0.0054 O.H Rp 90,000.00 Rp 486.00
Kepala Tukang Pipa 0.0180 O.H Rp 80,000.00 Rp 1,440.00
Tukang Pipa 0.1800 O.H Rp 65,000.00 Rp 11,700.00
Pekerja Terampil 0.1080 O.H Rp 60,000.00 Rp 6,480.00
Bahan:
Pipa GI dia 1,5" 1.2000 m1 Rp 92,600.00 Rp 111,120.00
Perlengkapan: 0.3500 Harga Pipa Rp 92,600.00 Rp 32,410.00
Nilai HSPK : Rp 163,636.00
Pengadaan dan Pemasangan Pipa GI Dia. 2" m1
Tenaga:
Mandor 0.0041 O.H Rp 90,000.00 Rp 364.50
Kepala Tukang Pipa 0.0315 O.H Rp 80,000.00 Rp 2,520.00
Tukang Pipa 0.3150 O.H Rp 65,000.00 Rp 20,475.00
Pekerja Terampil 0.0810 O.H Rp 60,000.00 Rp 4,860.00
Bahan:
Pipa GI dia 2" 1.2000 m1 Rp 126,350.00 Rp 151,620.00
Perlengkapan : 0.3500 Set Rp 126,350.00 Rp 44,222.50
Nilai HSPK : Rp 224,062.00
Pengadaan dan Pemasangan Pipa GI Dia. 3" m1
Tenaga:
Mandor 0.0054 O.H Rp 90,000.00 Rp 486.00
Kepala Tukang Pipa 0.0180 O.H Rp 80,000.00 Rp 1,440.00
Tukang Pipa 0.1800 O.H Rp 65,000.00 Rp 11,700.00
Pekerja Terampil 0.1080 O.H Rp 60,000.00 Rp 6,480.00
Bahan:
Pipa GI dia 3" 1.2000 m1 Rp 208,191.67 Rp 249,830.00
Perlengkapan : 0.3500 Harga Pipa Rp 208,191.67 Rp 72,867.08
Nilai HSPK : Rp 342,803.08
Pengadaan & Pemasangan Pipa GI Dia. 4" m1
Tenaga:
Mandor 0.0068 O.H Rp 90,000.00 Rp 612.00
Kepala Tukang Pipa 0.0225 O.H Rp 80,000.00 Rp 1,800.00
Tukang Pipa 0.2250 O.H Rp 65,000.00 Rp 14,625.00
Pekerja Terampil 0.1350 O.H Rp 60,000.00 Rp 8,100.00
Bahan:
Pipa GI dia 4" 1.2000 m1 Rp 301,408.33 Rp 361,690.00
Perlengkapan: 0.3500 Harga Pipa Rp 301,408.33 Rp 105,492.92
Nilai HSPK : Rp 492,319.92
Pengadaan & Pemasangan Pipa GI Dia. 6" m1
Tenaga:
Mandor 0.0096 O.H Rp 90,000.00 Rp 864.00
Kepala Tukang Pipa 0.0315 O.H Rp 80,000.00 Rp 2,520.00
Tukang Pipa 0.3150 O.H Rp 65,000.00 Rp 20,475.00
Pekerja Terampil 0.1890 O.H Rp 60,000.00 Rp 11,340.00
Bahan:
Pipa GI dia 6" 1.2000 m1 Rp 482,900.00 Rp 579,480.00
Perlengkapan : 0.3500 set Rp 482,900.00 Rp 169,015.00
Nilai HSPK : Rp 783,694.00
Pasang Pipa PVC Type AW dia. 3/4" m1
Tenaga:
Mandor 0.0020 O.H Rp 90,000.00 Rp 180.00
Kepala Tukang Pipa 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Pipa 0.0600 O.H Rp 65,000.00 Rp 3,900.00
Pekerja / Buruh Tak Terampil 0.0360 O.H Rp 55,000.00 Rp 1,980.00
Bahan:
Pipa PVC AW Dia. 3/4" 1.2000 m1 Rp 8,775.00 Rp 10,530.00
Perlengkapan 0.3500 Harga Pipa Rp 8,775.00 Rp 3,071.25
Nilai HSPK : Rp 20,141.25
- 64 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pasang Pipa PVC Type AW dia. 1" m1
Tenaga:
Mandor 0.0020 O.H Rp 90,000.00 Rp 180.00
Kepala Tukang Pipa 0.0060 O.H Rp 80,000.00 Rp 480.00
Tukang Pipa 0.0600 O.H Rp 65,000.00 Rp 3,900.00
Pekerja / Buruh Tak Terampil 0.0360 O.H Rp 55,000.00 Rp 1,980.00
Bahan:
Pipa PVC AW dia. 1" 1.2000 m1 Rp 11,050.00 Rp 13,260.00
Perlengkapan 0.3500 Harga Pipa Rp 11,050.00 Rp 3,867.50
Nilai HSPK : Rp 23,667.50
Pasang Pipa PVC Type AW dia. 2" m1
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Pipa 0.0090 O.H Rp 80,000.00 Rp 720.00
Tukang Pipa 0.0900 O.H Rp 65,000.00 Rp 5,850.00
Pekerja / Buruh Tak Terampil 0.0540 O.H Rp 55,000.00 Rp 2,970.00
Bahan:
Pipa PVC AW dia. 2" 1.2000 m1 Rp 30,187.50 Rp 36,225.00
Perlengkapan 0.3500 Harga Pipa Rp 30,187.50 Rp 10,565.63
Nilai HSPK : Rp 56,600.63
Pasang Pipa PVC Type AW dia. 3" m1
Tenaga:
Mandor 0.0040 O.H Rp 90,000.00 Rp 360.00
Kepala Tukang Pipa 0.0135 O.H Rp 80,000.00 Rp 1,080.00
Tukang Pipa 0.1350 O.H Rp 65,000.00 Rp 8,775.00
Pekerja / Buruh Tak Terampil 0.0810 O.H Rp 55,000.00 Rp 4,455.00
Bahan:
Pipa PVC AW dia. 3" 1.2000 m1 Rp 55,287.50 Rp 66,345.00
Perlengkapan 0.3500 Harga Pipa Rp 55,287.50 Rp 19,350.63
Nilai HSPK : Rp 100,365.63
Pasang Pipa PVC Type AW dia. 4" m1
Tenaga:
Mandor 0.0040 O.H Rp 90,000.00 Rp 360.00
Kepala Tukang Pipa 0.0135 O.H Rp 80,000.00 Rp 1,080.00
Tukang Pipa 0.1350 O.H Rp 65,000.00 Rp 8,775.00
Pekerja / Buruh Tak Terampil 0.0810 O.H Rp 55,000.00 Rp 4,455.00
Bahan:
Pipa PVC AW dia. 4" 1.2000 m1 Rp 80,575.00 Rp 96,690.00
Perlengkapan 0.3500 Harga Pipa Rp 80,575.00 Rp 28,201.25
Nilai HSPK : Rp 139,561.25
Pemasangan Pipa PVC 3" Type AW untuk Talang Pembuluh m1

Tenaga:
Pekerja/Buruh Tak Terampil 0.1250 O.H Rp 55,000.00 Rp 6,875.00
Bahan:
Pipa PVC 3" Type AW 1.0100 m1 Rp 55,287.50 Rp 55,840.38
Klem PVC 1.0000 Buah Rp 2,572.50 Rp 2,572.50
Nilai HSPK : Rp 65,287.88
Pemasangan Pipa PVC 4" Type AW untuk Talang Pembuluh m1

Tenaga:
Pekerja/Buruh Tak Terampil 0.1250 O.H Rp 55,000.00 Rp 6,875.00
Bahan:
Pipa PVC 4" Type AW 1.0100 m1 Rp 80,575.00 Rp 81,380.75
Klem PVC 1.0000 Buah Rp 2,572.50 Rp 2,572.50
Nilai HSPK : Rp 90,828.25
Pemasangan Pipa PVC 5" Type AW untuk Talang Pembuluh m1

Tenaga:
Pekerja/Buruh Tak Terampil 0.1250 O.H Rp 55,000.00 Rp 6,875.00
Bahan:
Pipa PVC 5" Type AW 1.0100 m1 Rp 117,687.50 Rp 118,864.38
Klem PVC 1.0000 Buah Rp 2,572.50 Rp 2,572.50
Nilai HSPK : Rp 128,311.88
Pemasangan Pipa PVC 3" Type D untuk Talang Pembuluh m1

Tenaga:
Pekerja/Buruh Tak Terampil 0.1250 O.H Rp 55,000.00 Rp 6,875.00
Bahan:
Pipa PVC 3" Type D 1.0100 m1 Rp 30,962.50 Rp 31,272.13
Klem PVC 1.0000 Buah Rp 2,572.50 Rp 2,572.50
Nilai HSPK : Rp 40,719.63
- 65 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pemasangan Pipa PVC 4" Type D untuk Talang Pembuluh m1

Tenaga:
Pekerja/Buruh Tak Terampil 0.1250 O.H Rp 55,000.00 Rp 6,875.00
Bahan:
Pipa PVC 4" Panjang 4 Mt type D 1.0100 m1 Rp 43,562.50 Rp 43,998.13
Klem PVC 1.0000 Buah Rp 2,572.50 Rp 2,572.50
Nilai HSPK : Rp 53,445.63
Pemasangan Pipa PVC 5" Type D untuk Talang Pembuluh m1

Tenaga:
Pekerja/Buruh Tak Terampil 0.1250 O.H Rp 55,000.00 Rp 6,875.00
Bahan:
Pipa PVC 5" Panjang 4 Mt type D 1.0100 m1 Rp 71,150.00 Rp 71,861.50
Klem PVC 1.0000 Buah Rp 2,572.50 Rp 2,572.50
Nilai HSPK : Rp 81,309.00
Pengg. Pemasangan, Penyambungan dan Pengetesan m1
Kebocoran Pipa PVC Dia 12 "
Tenaga:
Mandor 0.0100 O.H Rp 90,000.00 Rp 900.00
Tukang Pipa 0.0400 O.H Rp 65,000.00 Rp 2,600.00
Pekerja / Buruh Tak terampil 0.2400 O.H Rp 55,000.00 Rp 13,200.00
Bahan:
Pipa PVC dia 12 " AW 1.0500 m1 Rp 500,466.67 Rp 525,490.00
Lem PVC 0.2265 kg Rp 8,550.00 Rp 1,936.58
Amplas 0.4000 Lembar Rp 5,200.00 Rp 2,080.00
Pemasangan dan Penyambungan 0.1670 m1 Rp 6,050.00 Rp 1,010.35
Peralatan:
Gergaji Besi 0.0100 Buah Rp 3,190.00 Rp 31.90
Pengetesan Kebocoran 1.0000 m1 Rp 1,500.00 Rp 1,500.00
Nilai HSPK : Rp 548,748.83
Pengg. Pemasangan, Penyambungan dan Pengetesan m1
Kebocoran Pipa PVC Dia 8 "
Tenaga:
Mandor 0.0100 O.H Rp 90,000.00 Rp 900.00
Tukang Pipa 0.2400 O.H Rp 65,000.00 Rp 15,600.00
Pekerja / Buruh Tak terampil 0.0800 O.H Rp 55,000.00 Rp 4,400.00
Bahan:
Pipa PVC dia 8 " AW 1.0500 m1 Rp 247,216.67 Rp 259,577.50
Lem PVC 0.2094 kg Rp 8,550.00 Rp 1,790.75
Amplas 0.4000 Lembar Rp 5,200.00 Rp 2,080.00
Pemasangan dan Penyambungan 0.1670 m1 Rp 6,050.00 Rp 1,010.35
Peralatan:
Gergaji Besi 0.0100 Buah Rp 3,190.00 Rp 31.90
Pengetesan Kebocoran 1.0000 m1 Rp 1,500.00 Rp 1,500.00
Nilai HSPK : Rp 286,890.50
Pengg. Pemasangan, Penyambungan dan Pengetesan m1
Kebocoran Pipa PVC Dia 6 "
Tenaga:
Mandor 0.0100 O.H Rp 90,000.00 Rp 900.00
Tukang Pipa 0.2400 O.H Rp 65,000.00 Rp 15,600.00
Pekerja / Buruh Tak terampil 0.0400 O.H Rp 55,000.00 Rp 2,200.00
Bahan:
Pipa PVC dia 6 " 1.0500 m1 Rp 159,787.50 Rp 167,776.88
Lem PVC 0.2102 kg Rp 8,550.00 Rp 1,796.87
Amplas 0.4000 Lembar Rp 3,000.00 Rp 1,200.00
Pemasangan dan Penyambungan 0.1670 m1 Rp 6,050.00 Rp 1,010.35
Peralatan:
Gergaji Besi 0.0100 Buah Rp 3,190.00 Rp 31.90
Pengetesan Kebocoran 1.0000 m1 Rp 1,500.00 Rp 1,500.07
Nilai HSPK : Rp 192,016.07
Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 1" P. 6 m1
m
Tenaga:
Mandor 0.0110 O.H Rp 90,000.00 Rp 990.00
Kepala Tukang Pipa 0.0090 O.H Rp 80,000.00 Rp 720.00
Juru ukur 0.0090 O.H Rp 80,000.00 Rp 720.00
Tukang Pipa 0.0800 O.H Rp 65,000.00 Rp 5,200.00
Pekerja Terampil 0.0800 O.H Rp 60,000.00 Rp 4,800.00
Bahan:
Pipa PVC S-12.5 dia 1" 1.0000 m1 Rp 60,555.00 Rp 60,555.00
Peralatan:
Penyusutan Bahan: 0.0090 set Rp 60,555.00 Rp 545.00
Nilai HSPK : Rp 73,530.00
- 66 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 2" P. 6 m1
m
Tenaga:
Mandor 0.0240 O.H Rp 90,000.00 Rp 2,160.00
Kepala Tukang Pipa 0.0160 O.H Rp 80,000.00 Rp 1,280.00
Juru ukur 0.0160 O.H Rp 80,000.00 Rp 1,280.00
Tukang Pipa 0.1300 O.H Rp 65,000.00 Rp 8,450.00
Pekerja Terampil 0.1300 O.H Rp 60,000.00 Rp 7,800.00
Bahan:
Pipa PVC S-12.5 dia 2" 1.0000 m1 Rp 170,940.00 Rp 170,940.00
Peralatan:
Penyusutan Bahan: 0.0160 set Rp 170,940.00 Rp 2,735.04
Nilai HSPK : Rp 194,645.04
Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 3" P. 6 m1
m
Tenaga:
Mandor 0.0290 O.H Rp 90,000.00 Rp 2,610.00
Kepala Tukang Pipa 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Juru ukur 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Pipa 0.1800 O.H Rp 65,000.00 Rp 11,700.00
Pekerja Terampil 0.1800 O.H Rp 60,000.00 Rp 10,800.00
Bahan:
Pipa PVC S-12.5 dia 3" 1.0000 m1 Rp 354,365.00 Rp 354,365.00
Peralatan:
Penyusutan Bahan: 0.0200 set Rp 354,365.00 Rp 7,087.30
Nilai HSPK : Rp 389,762.30
Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 4" P. 6 Batang
m
Tenaga:
Mandor 0.0300 O.H Rp 90,000.00 Rp 2,700.00
Kepala Tukang Pipa 0.0230 O.H Rp 80,000.00 Rp 1,840.00
Juru ukur 0.0230 O.H Rp 80,000.00 Rp 1,840.00
Tukang Pipa 0.2050 O.H Rp 65,000.00 Rp 13,325.00
Pekerja Terampil 0.2210 O.H Rp 60,000.00 Rp 13,260.00
Bahan:
Pipa PVC S-12.5 dia 4" 1.0000 Batang Rp 554,455.00 Rp 554,455.00
Peralatan:
Penyusutan Bahan: 0.0230 set Rp 554,455.00 Rp 12,752.47
Nilai HSPK : Rp 600,172.47
Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 6" P. 6 Batang
m
Tenaga:
Mandor 0.0350 O.H Rp 90,000.00 Rp 3,150.00
Kepala Tukang Pipa 0.0260 O.H Rp 80,000.00 Rp 2,080.00
Juru ukur 0.0260 O.H Rp 80,000.00 Rp 2,080.00
Tukang Pipa 0.2150 O.H Rp 65,000.00 Rp 13,975.00
Pekerja Terampil 0.2500 O.H Rp 60,000.00 Rp 15,000.00
Bahan:
Pipa PVC S-12.5 dia 6" 1.0000 Batang Rp 1,155,275.00 Rp 1,155,275.00
Peralatan:
Penyusutan Bahan: 0.0260 set Rp 1,155,275.00 Rp 30,037.15
Nilai HSPK : Rp 1,191,560.00
Pengecatan
Membersihkan permukaan cat tembok lama m2
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Pekerja Terampil 0.1500 O.H Rp 60,000.00 Rp 9,000.00
Bahan:
Kapi 0.0500 Buah Rp 5,000.00 Rp 250.00
Nilai HSPK : Rp 9,520.00
Mengerok Karat Cat Lama Permukaan Baja secara Manual m2

Tenaga:
Mandor 0.0080 O.H Rp 90,000.00 Rp 720.00
Pekerja Terampil 0.1500 O.H Rp 60,000.00 Rp 9,000.00
Bahan:
Soda api 0.0500 Kg Rp 15,700.00 Rp 785.00
Kertas Gosok 0.0500 Lembar Rp 4,600.00 Rp 230.00
Kuas Cat Ukuran 3" 0.0500 Buah Rp 11,650.00 Rp 582.50
Nilai HSPK : Rp 11,317.50
- 67 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pekerjaan Coating m2
Tenaga:
Mandor 0.0130 O.H Rp 90,000.00 Rp 1,170.00
Kepala Tukang Cat 0.0250 O.H Rp 80,000.00 Rp 2,000.00
Tukang cat 0.2500 O.H Rp 70,000.00 Rp 17,500.00
Pekerja Terampil 0.2500 O.H Rp 60,000.00 Rp 15,000.00
Bahan:
Couting 0.3720 Liter Rp 36,650.00 Rp 13,633.80
Filler 0.1500 kg Rp 36,800.00 Rp 5,520.00
Kertas Gosok 2.0000 Buah Rp 4,600.00 Rp 9,200.00
kuas Cat 0.0200 Buah Rp 11,650.00 Rp 233.00
Nilai HSPK : Rp 64,256.80
Pengecatan Tembok dalam Baru 2 Lapis (Interior Standar) m2

Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Cat 0.0063 O.H Rp 80,000.00 Rp 504.00
Tukang cat 0.0630 O.H Rp 70,000.00 Rp 4,410.00
Pekerja terampil 0.0200 O.H Rp 60,000.00 Rp 1,200.00
Bahan:
Plamir 0.1000 Kg Rp 36,050.00 Rp 3,605.00
Kapi 0.0500 Buah Rp 5,000.00 Rp 250.00
Kertas gosok 0.5000 Lembar Rp 4,600.00 Rp 2,300.00
Cat Tembok Interior Standar ( Catylac ) 0.4700 Kg Rp 21,360.00 Rp 10,039.20
Roll 0.0100 Buah Rp 19,550.00 Rp 195.50
Nilai HSPK : Rp 22,773.70
Pengecatan Tembok dalam Baru 2 Lapis (Interior Khusus) m2

Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Cat 0.0063 O.H Rp 80,000.00 Rp 504.00
Tukang cat 0.0630 O.H Rp 70,000.00 Rp 4,410.00
Pekerja terampil 0.0200 O.H Rp 60,000.00 Rp 1,200.00
Bahan:
Cat Tembok Dasar/Alkali 0.1000 Liter Rp 57,550.00 Rp 5,755.00
Kuas Cat 0.0500 Buah Rp 9,200.00 Rp 460.00
Kertas gosok 0.5000 Lembar Rp 4,600.00 Rp 2,300.00
Cat Tembok Interior Khusus ( Dulux ) 0.4700 Kg Rp 78,050.00 Rp 36,683.50
Roll 0.0100 Buah Rp 19,550.00 Rp 195.50
Nilai HSPK : Rp 51,778.00
Pengecatan Tembok luar Baru 2 Lapis (Eksterior) m2
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Cat 0.0063 O.H Rp 80,000.00 Rp 504.00
Tukang cat 0.0630 O.H Rp 70,000.00 Rp 4,410.00
Pekerja terampil 0.0200 O.H Rp 60,000.00 Rp 1,200.00
Bahan:
Cat Tembok Dasar/Alkali 0.1000 Liter Rp 57,550.00 Rp 5,755.00
Kuas Cat 0.0500 Buah Rp 9,200.00 Rp 460.00
Kertas gosok 0.5000 Lembar Rp 4,600.00 Rp 2,300.00
Cat Tembok Eksterior Khusus ( Dulux ) 0.4700 Kg Rp 128,000.00 Rp 60,160.00
Roll 0.0100 Buah Rp 19,550.00 Rp 195.50
Nilai HSPK : Rp 75,254.50
Pengecatan Permukaan Baja dengan Meni Besi m2
Tenaga:
Mandor 0.0025 O.H Rp 90,000.00 Rp 225.00
Kepala Tukang Cat 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang cat 0.2000 O.H Rp 70,000.00 Rp 14,000.00
Pekerja Terampil 0.0200 O.H Rp 60,000.00 Rp 1,200.00
Bahan:
Meni besi 0.1000 Kg Rp 27,500.00 Rp 2,750.00
Kuas Cat 0.0100 Buah Rp 11,650.00 Rp 116.50
Nilai HSPK : Rp 19,891.50
Pengecatan Permukaan Baja dengan Meni Besi dan m2
Perancah
Tenaga:
Mandor 0.0075 O.H Rp 90,000.00 Rp 675.00
Kepala Tukang Cat 0.0225 O.H Rp 80,000.00 Rp 1,800.00
Tukang cat 0.2250 O.H Rp 70,000.00 Rp 15,750.00
Pekerja terampil 0.2500 O.H Rp 60,000.00 Rp 15,000.00
Bahan:
Meni besi 0.1000 Kg Rp 27,500.00 Rp 2,750.00
Kuas Cat 0.0100 Buah Rp 11,650.00 Rp 116.50
Perancah kayu 0.0020 m3 Rp 3,500,000.00 Rp 7,000.00
Nilai HSPK : Rp 43,091.50
- 68 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pengecatan Permukaan Baja lapis seng (galbani) scr m2
manual sistem 1 lapis cat mutakhir tbl 200 mm

Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Cat 0.0120 O.H Rp 80,000.00 Rp 960.00
Tukang cat 0.0600 O.H Rp 70,000.00 Rp 4,200.00
Pekerja terampil 0.0600 O.H Rp 60,000.00 Rp 3,600.00
Bahan:
Cat Besi 0.3000 Kg Rp 59,800.00 Rp 17,940.00
Kuas Cat 0.0100 Buah Rp 11,650.00 Rp 116.50
Nilai HSPK : Rp 27,086.50
Pengecatan Plafond m2
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Cat 0.0063 O.H Rp 80,000.00 Rp 504.00
Tukang cat 0.0630 O.H Rp 70,000.00 Rp 4,410.00
Pekerja terampil 0.0200 O.H Rp 60,000.00 Rp 1,200.00
Bahan:
Kapi 0.0500 Buah Rp 5,000.00 Rp 250.00
Plamir 0.1000 Kg Rp 36,050.00 Rp 3,605.00
Cat Tembok 0.4700 Kg Rp 21,360.00 Rp 10,039.20
Kertas Gosok 0.5000 lembar Rp 4,600.00 Rp 2,300.00
Roll 0.0100 Buah Rp 19,550.00 Rp 195.50
Nilai HSPK : Rp 22,773.70
Pengecatan Genteng m2
Tenaga:
Mandor 0.0030 O.H Rp 90,000.00 Rp 270.00
Kepala Tukang Cat 0.0063 O.H Rp 80,000.00 Rp 504.00
Tukang cat 0.0630 O.H Rp 70,000.00 Rp 4,410.00
Pekerja terampil 0.0200 O.H Rp 60,000.00 Rp 1,200.00
Bahan:
Kertas Gosok 0.5000 Lembar Rp 4,600.00 Rp 2,300.00
Cat Genteng 0.4700 Kg Rp 46,762.50 Rp 21,978.38
Kuas Cat 0.0500 Buah Rp 11,650.00 Rp 582.50
Nilai HSPK : Rp 31,244.88
Pelapisan Waterproofing m2
Tenaga:
Mandor 0.003 O.H Rp 90,000.00 Rp 225.00
Kepala Tukang Cat 0.008 O.H Rp 80,000.00 Rp 600.00
Tukang cat 0.075 O.H Rp 70,000.00 Rp 5,250.00
Pekerja terampil 0.050 O.H Rp 60,000.00 Rp 3,000.00
Bahan:
Waterproofing 0.350 Kg Rp 47,050.00 Rp 16,467.50
Serat Fiber 1.000 m2 Rp 2,640.00 Rp 2,640.00
Nilai HSPK : Rp 28,182.50
Finishing Dinding
Pemasangan Batu Palimanan/ Hijau + Finishing m2
Tenaga:
Mandor 0.0350 O.H Rp 90,000.00 Rp 3,150.00
Kepala Tukang Batu 0.0350 O.H Rp 80,000.00 Rp 2,800.00
Tukang Batu 0.3500 O.H Rp 65,000.00 Rp 22,750.00
Pekerja/Buruh Tak Terampil 0.7000 O.H Rp 55,000.00 Rp 38,500.00
Bahan:
Semen PC 50 kg 0.2350 zak Rp 83,950.00 Rp 19,728.25
Pasir Pasang 0.0350 m3 Rp 270,000.00 Rp 9,450.00
Batu Palimanan Hijau 1.1000 m2 Rp 151,800.00 Rp 166,980.00
Coating 1.0000 m2 Rp 20,000.00 Rp 20,000.00
Nilai HSPK : Rp 283,358.25
- 69 -

HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Pemasangan Wall Paper m2
Tenaga:
Mandor 0.0025 O.H Rp 90,000.00 Rp 225.00
Kepala Tukang cat 0.0200 O.H Rp 80,000.00 Rp 1,600.00
Tukang Cat 0.2000 O.H Rp 65,000.00 Rp 13,000.00
Pekerja / Buruh Tak Terampil 0.0200 O.H Rp 55,000.00 Rp 1,100.00
Bahan:
Wall Paper 1.2000 m2 Rp 17,100.00 Rp 20,520.00
Lem Rajawali 0.2000 kg Rp 14,650.00 Rp 2,930.00
Nilai HSPK : Rp 39,375.00
Pemasangan HPL 1,2 x 2,4 m2
Tenaga:
Mandor 0.0020 O.H Rp 90,000.00 Rp 180.00
Pekerja terampil 0.3000 O.H Rp 60,000.00 Rp 18,000.00
Bahan:
HPL 1,2 x 2,4 1.1000 m2 Rp 71,196.40 Rp 78,316.04
Lem HPL 0.2500 kg Rp 37,889.47 Rp 9,472.37
Nilai HSPK : Rp 105,968.41

Madiun, 24 Maret 2016


Dibuat oleh
PEJABAT PEMBUAT KOMITMEN

dr. Purnomo Hadi


Nip 197509072009021001
- 81 -

Koef. SATUAN HARGA


URAIAN KEGIATAN HARGA
SATUAN

Pertamanan dan Kebersihan


Pertamanan
Penanaman Semak Hias m2
Tenaga:
Mandor 0.0100 O.H #REF! #REF!
Tukang Tanam 0.3300 O.H #REF! #REF!
Bahan:
Semak Hias 1.0000 m2 Rp 60,000.00 Rp 60,000.00
Nilai HSPK : #REF!
Menanam Rumput Jepang termasuk Perawatannya m2
Tenaga:
Mandor 0.0100 O.H #REF! #REF!
Pekerja Tak Terampil 0.1500 O.H Rp 55,000.00 Rp 8,250.00
Bahan:
Rumput Jepang 1.0000 m2 Rp 33,750.00 Rp 33,750.00
Nilai HSPK : #REF!
Penanaman Pohon Pucuk Merah Tinggi 1 m Batang
Tenaga:
Mandor 0.0200 O.H #REF! #REF!
Tukang Tanam 0.4000 O.H #REF! #REF!
Bahan:
Pucuk Merah tinggi 1 m 1.0000 Btg Rp 175,000.00 Rp 175,000.00
Nilai HSPK : #REF!
Penanaman Taiwan Beauty Putih m1
Tenaga:
Mandor 0.0020 O.H #REF! #REF!
Tukang Tanam 0.0660 O.H #REF! #REF!
Bahan:
Taiwan Beauty Putih 10.0000 Btg Rp 3,000.00 Rp 30,000.00
Nilai HSPK : #REF!
Penanaman Tanaman Menjalar m1
Tenaga:
Mandor 0.0020 O.H #REF! #REF!
Tukang Tanam 0.0660 O.H #REF! #REF!
Bahan:
Tanaman Menjalar 3.0000 Btg Rp 7,200.00 Rp 21,600.00
Nilai HSPK : #REF!
- 82 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

I PENGAIRAN
24.09.01 Pekerjaan Bangunan Air
24.09.01.01 Pengukuran Bangunan MC untuk JIAT Buah
Tenaga:
#REF! #REF! 0.250 O.H #REF! #REF!
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.750 O.H Rp 55,000.00 Rp 41,250.00
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.002 m3 Rp 5,490,450.00 Rp 10,980.90
20.01.01.09.01.05 Cat Meni/dasar 0.020 kg Rp 27,500.00 Rp 550.00
20.01.01.40.09 Paku Payung 0.010 kg Rp 24,450.00 Rp 244.50
Peralatan:
21.02.01.01.21 Sewa Pesawat Ukur (Poligone) 0.250 Jam Rp 57,645.00 Rp 14,411.25
20.02.06.02.32 Meteran 0.020 Buah Rp 91,700.00 Rp 1,834.00
#REF! Palu / Bodem 0.030 unit/Hari #REF! #REF!
Nilai HSPK : #REF!
24.09.01.02 Pengukuran Bangunan MC untuk Bendung Buah
Tenaga:
#REF! Juru Ukur 1.500 O.H #REF! #REF!
22.01.01.03.08 Pekerja/Buruh Tak Terampil 4.500 kg Rp 55,000.00 Rp 247,500.00
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.012 m3 Rp 5,490,450.00 Rp 65,885.40
20.01.01.09.01.05 Cat Meni/dasar 0.120 kg Rp 27,500.00 Rp 3,300.00
20.01.01.40.09 Paku Payung 0.050 kg Rp 24,450.00 Rp 1,222.50
Peralatan:
21.02.01.01.21 Sewa Pesawat Ukur (Poligone) 1.000 Jam Rp 57,645.00 Rp 57,645.00
20.02.06.02.32 Meteran 0.030 Buah Rp 91,700.00 Rp 2,751.00
#REF! Palu / Bodem 0.060 unit/Hari #REF! #REF!
Nilai HSPK : #REF!
24.09.01.03 Pengukuran Saluran MC untuk JIAT km
Tenaga:
#REF! Juru Ukur 2.000 O.H #REF! #REF!
22.01.01.03.08 Pekerja/Buruh Tak Terampil 6.000 O.H Rp 55,000.00 Rp 330,000.00
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.012 m3 Rp 5,490,450.00 Rp 65,885.40
20.01.01.09.01.05 Cat Meni/dasar 0.120 kg Rp 27,500.00 Rp 3,300.00
20.01.01.40.09 Paku Payung 0.050 kg Rp 24,450.00 Rp 1,222.50
Peralatan:
21.02.01.01.21 Sewa Pesawat Ukur (Poligone) 2.000 Jam Rp 57,645.00 Rp 115,290.00
20.02.06.02.32 Meteran 0.045 Buah Rp 91,700.00 Rp 4,126.50
#REF! Palu / Bodem 0.090 unit/Hari #REF! #REF!
Nilai HSPK : #REF!
24.09.01.04 Pengukuran Saluran MC untuk Saluran km
Terbuka
Tenaga:
#REF! Juru Ukur 2.000 O.H #REF! #REF!
22.01.01.03.08 Pekerja/Buruh Tak Terampil 6.000 O.H Rp 55,000.00 Rp 330,000.00
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.012 m3 Rp 5,490,450.00 Rp 65,885.40
20.01.01.09.01.05 Cat Meni/dasar 0.120 kg Rp 27,500.00 Rp 3,300.00
20.01.01.40.09 Paku Payung 0.050 kg Rp 24,450.00 Rp 1,222.50
Peralatan:
21.02.01.01.21 Pesawat Ukur/sewa 2.000 Jam Rp 57,645.00 Rp 115,290.00
20.02.06.02.32 Meteran 0.045 Buah Rp 91,700.00 Rp 4,126.50
#REF! Palu / Bodem 0.090 unit/Hari #REF! #REF!
Nilai HSPK : #REF!
24.09.01.05 Bronjong Kawat Galvanis D = 3 mm m3
(Uk : 0.50 x 1.00 x 2.00 m)
Tenaga:
#REF! Mandor Penganyaman 0.026 O.H Rp 60,000.00 Rp 1,560.00
22.01.01.03.12 Penganyam 0.704 O.H Rp 40,000.00 Rp 28,160.00
22.01.01.03.08 Pekerja Penganyam 0.576 O.H Rp 55,000.00 Rp 31,680.00
#REF! Mandor Pengisi 0.024 O.H Rp 60,000.00 Rp 1,440.00
22.01.01.03.08 Pekerja Pengisi 1.382 O.H Rp 55,000.00 Rp 76,010.00

Pemerintah Kabupaten Madiun


- 83 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

Bahan:
20.01.01.08.12.06 Batu Kali 1.000 m3 Rp 114,200.00 Rp 114,200.00
20.01.01.61.02 Kawat Galvanis 8.334 kg Rp 18,350.00 Rp 152,928.90
Peralatan:
02.04.02.08.06.17 Tang Pemotong Kawat 0.010 Buah 69000 Rp 690.00
02.04.02.07.08.36 Palu kayu/besi 0.010 Buah Rp 41,100.00 Rp 411.00
Nilai HSPK : Rp 407,079.90
24.09.01.06 Bronjong Kawat Galvanis D = 4 mm m3
(Uk : 0.50 x 1.00 x 2.00 m)
Tenaga:
#REF! Mandor Penganyaman 0.026 O.H Rp 60,000.00 Rp 1,560.00
22.01.01.03.12 Penganyam 0.704 O.H Rp 40,000.00 Rp 28,160.00
22.01.01.03.08 Pekerja Penganyam 0.576 O.H Rp 55,000.00 Rp 31,680.00
#REF! Mandor Pengisi 0.024 O.H Rp 60,000.00 Rp 1,440.00
22.01.01.03.08 Pekerja Pengisi 1.382 O.H Rp 55,000.00 Rp 76,010.00
Bahan:
20.01.01.08.12.06 Batu Kali 1.000 m3 Rp 114,200.00 Rp 114,200.00
20.01.01.61.02 Kawat Galvanis 15.000 kg Rp 18,350.00 Rp 275,250.00
Peralatan:
02.04.02.08.06.17 Tang Pemotong Kawat 0.010 Buah 69000 Rp 690.00
02.04.02.07.08.36 Palu kayu/besi 0.010 Buah Rp 41,100.00 Rp 411.00
Nilai HSPK : Rp 529,401.00
24.09.01.07 Pengadaan Bronjong Kawat Buah
Galvanis D = 4 mm (Uk: 0.50 x 1,00
x 2,00 m)

Tenaga:
#REF! Mandor Penganyaman 0.026 O.H Rp 60,000.00 Rp 1,560.00
22.01.01.03.12 Penganyam 0.704 O.H Rp 40,000.00 Rp 28,160.00
22.01.01.03.08 Pekerja Penganyam 0.576 O.H Rp 55,000.00 Rp 31,680.00
Bahan:
20.01.01.61.02 Kawat Galvanis 15.000 kg Rp 18,350.00 Rp 275,250.00
Peralatan:
02.04.02.08.06.17 Tang Pemotong Kawat 0.010 Buah 69000 Rp 690.00
02.04.02.07.08.36 Palu kayu/besi 0.010 Buah Rp 41,100.00 Rp 411.00
Nilai HSPK : Rp 337,751.00
24.09.01.08 Gebalan Rumput m2
Tenaga:
#REF! Mandor 0.010 O.H Rp 60,000.00 Rp 600.00
22.01.01.03.08 Pekerja / Buruh Tak terampil 0.144 O.H Rp 55,000.00 Rp 7,920.00
Bahan:
20.05.06.20.16 Gebalan Rumput 1.000 m2 Rp 3,000.00 Rp 3,000.00
Peralatan:
20.01.01.62.05 Tusuk Bambu 0.020 Buah Rp 2,100.00 Rp 42.00
21.02.01.02.13 Gerobak 0.005 unit/Hari Rp 36,300.00 Rp 181.50
Nilai HSPK : Rp 11,743.50
24.09.01.09 Pendongkelan Rumpun Bambu m2
Tenaga:
#REF! Mandor 0.045 O.H Rp 60,000.00 Rp 2,700.00
22.01.01.03.08 Pekerja / Buruh Tak terampil 1.327 O.H Rp 55,000.00 Rp 72,985.00
Peralatan:
21.02.01.02.09 Ganco 0.050 unit/Hari Rp 6,380.00 Rp 319.00
20.01.01.62.03 Keranjang 0.225 Buah Rp 12,300.00 Rp 2,767.50
Nilai HSPK : Rp 78,771.50
24.09.01.10 Pendongkelan Rumpun Bambu dan Menimbun m2
Bekas Dongkelan
Tenaga:
#REF! Mandor 0.054 O.H Rp 60,000.00 Rp 3,240.00
22.01.01.03.08 Pekerja / Buruh Tak terampil 1.575 O.H Rp 55,000.00 Rp 86,625.00
Bahan:
20.01.01.05.05 Tanah Urug 0.900 m3 Rp 70,000.00 Rp 63,000.00

Pemerintah Kabupaten Madiun


- 84 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

Peralatan:
#REF! Timbris 0.900 unit/Hari #REF! #REF!
21.02.01.02.16 Kereta Dorong 0.042 unit/Hari Rp 6,380.00 Rp 267.96
21.02.01.02.09 Ganco 0.050 unit/Hari Rp 6,380.00 Rp 319.00
20.01.01.62.03 Keranjang 0.225 Buah Rp 12,300.00 Rp 2,767.50
Nilai HSPK : #REF!
24.09.01.11 Pendongkelan Pohon Keliling > 0.75 M Batang
Tenaga:
#REF! Mandor 0.400 O.H Rp 60,000.00 Rp 24,000.00
22.01.01.03.08 Pekerja / Buruh Tak terampil 3.000 O.H Rp 55,000.00 Rp 165,000.00
Peralatan:
21.02.01.02.12 Gergaji Kayu 0.034 unit/Hari Rp 6,380.00 Rp 216.92
#REF! Sabit Besar 0.040 unit/Hari #REF! #REF!
21.02.01.02.09 Ganco 0.050 unit/Hari Rp 6,380.00 Rp 319.00
Nilai HSPK : #REF!
24.09.01.12 Pendongkelan Pohon Keliling > 0.75 M dan Batang
Menimbun Kembali Bekas Dongkelan
Tenaga:
#REF! Mandor 0.412 O.H Rp 60,000.00 Rp 24,720.00
22.01.01.03.08 Pekerja / Buruh Tak terampil 3.330 O.H Rp 55,000.00 Rp 183,150.00
Bahan:
20.01.01.05.05 Tanah Urug 1.200 m3 Rp 70,000.00 Rp 84,000.00
Peralatan:
#REF! Timbris 1.200 unit/Hari #REF! #REF!
21.02.01.02.16 Kereta Dorong 0.042 unit/Hari Rp 6,380.00 Rp 267.96
21.02.01.02.12 Gergaji Kayu 0.050 unit/Hari Rp 6,380.00 Rp 319.00
21.02.01.02.09 Ganco 0.034 unit/Hari Rp 6,380.00 Rp 216.92
#REF! Sabit Besar 0.040 unit/Hari #REF! #REF!
Nilai HSPK : #REF!
24.09.01.13 Pekerjaan Tiang Besi Siku 50.50.3 m1
Tenaga:
#REF! Mandor 0.015 O.H Rp 60,000.00 Rp 900.00
22.01.01.03.08 Pekerja / Buruh Tak terampil 0.350 O.H Rp 55,000.00 Rp 19,250.00
Bahan:
20.01.01.13.10 Baja Siku 50.50.3 1.100 m1 Rp 14,000.00 Rp 15,400.00
20.01.01.37.01 Baut Angker 2.000 Buah Rp 7,300.00 Rp 14,600.00
Nilai HSPK : Rp 50,150.00
24.09.01.14 Pekerjaan Teralis Besi m2
Tenaga:
#REF! Mandor 0.006 O.H Rp 60,000.00 Rp 360.00
#REF! Kepala Tukang Las 0.012 O.H #REF! #REF!
#REF! Tukang Las 1.200 O.H #REF! #REF!
22.01.01.03.08 Pekerja / Buruh Tak terampil 1.200 O.H Rp 55,000.00 Rp 66,000.00
Bahan:
20.01.01.13.11 Baja Strip 2 x 3 1.150 m2 Rp 14,000.00 Rp 16,100.00
Nilai HSPK : #REF!
24.09.01.15 Stoplog Kayu Balau / Tahun m3
Tenaga:
#REF! Mandor 0.144 O.H Rp 60,000.00 Rp 8,640.00
22.01.01.01.01 Kepala Tukang Batu 0.072 O.H Rp 50,000.00 Rp 3,600.00
22.01.01.02.01 Tukang Batu 1.440 O.H Rp 40,000.00 Rp 57,600.00
22.01.01.03.08 Pekerja / Buruh Tak terampil 5.760 O.H Rp 55,000.00 Rp 316,800.00
Bahan:
20.01.01.62.40 Kayu Balau / Tahun 1.000 m3 Rp 5,490,450.00 Rp 5,490,450.00
Peralatan:
#REF! Bodem 0.050 unit/Hari #REF! #REF!
21.02.01.02.02 Alat Bantu 0.036 Unit Rp 91,850.00 Rp 3,306.60
Nilai HSPK : #REF!
24.09.01.16 Pengadaan dan Pemasangan Pompa Unit
Persiapan Pompa & Perlengkapannya Unit
TENAGA
#REF! Mandor 0.050 O.H Rp 60,000.00 Rp 3,000.00
#REF! Mekanik Pompa 0.250 O.H #REF! #REF!
22.01.01.03.08 Pekerja / Buruh Tak terampil 0.500 O.H Rp 55,000.00 Rp 27,500.00
Pemerintah Kabupaten Madiun
- 85 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

ALAT
#REF! Sikat baja, Isolasi, Drat Dll 1.000 Unit #REF! #REF!
20.02.01.08.06 Gear Box Oil 5.000 Liter Rp 36,350.00 Rp 181,750.00
Nilai HSPK : #REF!
Angkutan Pompa & Perlengkapannya Unit
TENAGA
21.02.03.01.04 Angkutan ke Lokasi 0.500 Unit Rp 372,450.00 Rp 186,225.00
22.01.01.03.08 Biaya Bongkar Muat 4 Orang 2.000 O.H Rp 55,000.00 Rp 110,000.00
Pemasangan & Pengelasan Pompa Nilai HSPK : Rp 296,225.00
Perlengkapannya Unit
TENAGA
#REF! Mandor 0.400 O.H Rp 60,000.00 Rp 24,000.00
#REF! Mekanik Pompa 1.000 O.H #REF! #REF!
22.01.01.03.08 Pekerja 4.000 O.H Rp 55,000.00 Rp 220,000.00
ALAT
#REF! Sewa / Truk Crane 1.000 Hari #REF! #REF!
20.05.06.20.18 Grease, Pacing Dll 1.000 set Rp 59,850.00 Rp 59,850.00
21.02.03.01.13 Sewa / Operasional Mesin Las 1.000 Jam Rp 63,000.00 Rp 63,000.00
Bahan Las, Bahan lain 1.000 set Rp 40,000.00 Rp 40,000.00
Nilai HSPK : #REF!
Trial Run Pompa Unit
TENAGA
#REF! Mandor 0.100 O.H Rp 60,000.00 Rp 6,000.00
#REF! Mekanik Pompa 1.000 O.H #REF! #REF!
ALAT
20.05.06.20.17 Gland Pacing, Fuel Filter, Air Filter Dll 1.000 Set Rp 139,050.00 Rp 139,050.00
Nilai HSPK : #REF!
24.09.01.17 Pengadaan Mesin Penggerak dan Unit
Pemasangan perlengkapannya
Persiapan Pompa, Mesin & Unit
Perlengkapannya
TENAGA
#REF! Mandor 0.050 O.H Rp 60,000.00 Rp 3,000.00
#REF! Mekanik Pompa 0.250 O.H #REF! #REF!
22.01.01.03.08 Pekerja Tak Trampil 0.500 O.H Rp 55,000.00 Rp 27,500.00
ALAT
20.02.01.08.04 Minyak Pelumas Mesin 15.000 Liter Rp 40,000.00 Rp 600,000.00
#REF! Sikat baja, Isolasi, Drat Dll 1.000 Unit #REF! #REF!
20.02.01.08.07 Gear Box Oil 5.000 Liter Rp 36,350.00 Rp 181,750.00
Nilai HSPK : #REF!
Angkutan Pompa Mesin & Unit
Perlengkapannya
TENAGA
21.02.03.01.04 Angkutan ke Lokasi 0.500 Unit Rp 372,450.00 Rp 186,225.00
22.01.01.03.08 Pekerja Tak Trampil 2.000 O.H Rp 55,000.00 Rp 110,000.00
Nilai HSPK : Rp 296,225.00
Pemasangan & Pengelasan Mesin Unit
Pompa
TENAGA
#REF! Mandor 0.400 O.H Rp 60,000.00 Rp 24,000.00
#REF! Mekanik Pompa 1.000 O.H #REF! #REF!
#REF! Mekanik Mesin 1.000 O.H #REF! #REF!
22.01.01.03.08 Pekerja 4.000 O.H Rp 55,000.00 Rp 220,000.00
ALAT
#REF! Sewa / Truk Crane 1.000 unit/Hari #REF! #REF!
20.05.06.20.18 Grease, Pacing Dll 1.000 set Rp 59,850.00 Rp 59,850.00
21.02.03.01.13 Sewa / Operasional Mesin Las 2.000 Jam Rp 63,000.00 Rp 126,000.00
- Bahan Las, Bahan lain 1.000 set Rp 40,000.00 Rp 40,000.00
Nilai HSPK : #REF!
Trial - Run Pemasangan Pompa & Mesin Unit
TENAGA
#REF! Mandor 1.000 O.H Rp 60,000.00 Rp 60,000.00
#REF! Mekanik Pompa 1.000 O.H #REF! #REF!
#REF! Mekanik Mesin 1.000 O.H #REF! #REF!
22.01.01.03.08 Pekerja 2.000 O.H Rp 55,000.00 Rp 110,000.00

Pemerintah Kabupaten Madiun


- 86 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

BAHAN
20.02.01.07.06 Solar 40.000 Liter Rp 8,350.00 Rp 334,000.00
ALAT
20.05.06.20.17 Gland Pacing, Fuel Filter, Air Filter Dll 0.500 set Rp 139,050.00 Rp 69,525.00
Nilai HSPK : #REF!
24.09.01.18 Pembuatan Pintu Air Type A Buah
(B=1950mm, H=2600mm,
H'=5550mm)
Tenaga:
Ongkos Kerja Konstruksi 1910.000 kg Rp 1,250.00 Rp 2,387,500.00
Ongkos Kerja Mesin 574.000 kg Rp 6,000.00 Rp 3,444,000.00
Ongkos Kerja Kayu 0.955 m3 Rp 500,000.00 Rp 477,500.00
Ongkos Sandblasting dan Cat 42.000 m2 Rp 55,000.00 Rp 2,310,000.00
12.165 m2
Ongkos Pengecatan Tanpa Sandblasting Rp 27,500.00 Rp 334,537.50

Ongkos Pemasangan 2462.000 kg Rp 700.00 Rp 1,723,400.00


Ongkos Pembongkaran 2463.000 kg Rp 500.00 Rp 1,231,500.00
Transport 2463.000 kg Rp 500.00 Rp 1,231,500.00
20.01.01.13.10 Besi Siku 27.000 kg Rp 14,000.00 Rp 378,000.00
20.01.01.13.02 Besi Kanal 1002.000 kg Rp 14,500.00 Rp 14,529,000.00
20.01.01.13.12 Plat Bronze 40.000 kg Rp 29,100.00 Rp 1,164,000.00
20.01.01.13.11 Besi Plate 294.000 kg Rp 14,000.00 Rp 4,116,000.00
20.01.01.13.11 Besi Plate Strip 480.000 kg Rp 14,000.00 Rp 6,720,000.00
20.01.01.14.01.10 Besi Beton 67.000 kg Rp 13,000.00 Rp 871,000.00
Bahan: Bantu Konstruksi (10% Bahan: 0.100
Rp 27,778,000.00 Rp 2,777,800.00
Konstruksi)
20.01.01.13.11 Besi Bulat st 60 292.000 kg Rp 14,000.00 Rp 4,088,000.00
20.01.01.13.12 Bronze 96.000 kg Rp 29,100.00 Rp 2,793,600.00
20.01.01.14.01.10 Besi polos 186.000 kg Rp 13,000.00 Rp 2,418,000.00
20.01.04.08.07 Roda Gigi m.10 (112) kg 3.000 Ps Rp 2,520,000.00 Rp 7,560,000.00
20.01.01.37.01 Mur Baut 1/2'', 5/8", 7/8" 40.000 kg Rp 7,300.00 Rp 292,000.00
20.05.06.20.24 Nipple 6.000 kg Rp 8,300.00 Rp 49,800.00
20.02.01.09.39 Spie 7.000 Buah Rp 151,650.00 Rp 1,061,550.00
20.03.05.05.02.11 Gembok 1.000 Buah Rp 118,550.00 Rp 118,550.00
20.02.01.09.08 Drucklager Kecil/besar 4.000 Buah Rp 214,050.00 Rp 856,200.00
20.02.01.09.01 Angker Bolt (20kg) 8.000 Buah Rp 793,300.00 Rp 6,346,400.00
20.02.01.09.40 Splite Pen / Pengunci 1.000 Buah Rp 20,550.00 Rp 20,550.00
20.01.01.62.21 Kayu Jati Kaso 3"5"4 0.955 m3 Rp 7,873,350.00 Rp 7,519,049.25
20.02.01.09.23 Na F + Ring 3.000 kg Rp 30,800.00 Rp 92,400.00
20.02.01.09.32 Seal Karet 7.410 m1 Rp 283,900.00 Rp 2,103,699.00
#REF! Beton Tumbuk 1 :2 : 3 0.340 m3 Rp 894,966.70 Rp 304,288.68
Nilai HSPK : Rp 79,319,824.43
24.09.01.19 Pembuatan Pintu Air Type B Buah
(B=1000mm, H=1400mm,
H'=3200mm)
Tenaga:
Ongkos Kerja Konstruksi 1104.000 kg Rp 1,250.00 Rp 1,380,000.00
Transport 2463.000 kg Rp 500.00 Rp 1,231,500.00
Ongkos Kerja Kayu 0.253 m3 Rp 500,000.00 Rp 126,500.00
Ongkos Sandblasting dan Cat 24.259 m2 Rp 55,000.00 Rp 1,334,245.00
4.166 m2
Ongkos Pengecatan Tanpa Sandblasting Rp 27,500.00 Rp 114,565.00

Ongkos Pemasangan 1013.000 kg Rp 700.00 Rp 709,100.00


Bahan:
20.01.01.13.10 Besi Siku 19.000 kg Rp 14,000.00 Rp 266,000.00
20.01.01.13.02 Besi Kanal 600.000 kg Rp 14,500.00 Rp 8,700,000.00
20.01.01.13.12 Plat Bronze 22.000 kg Rp 29,100.00 Rp 640,200.00
20.01.01.13.11 Besi Plate 187.000 kg Rp 14,000.00 Rp 2,618,000.00
20.01.01.13.11 Besi Plate Strip 228.000 kg Rp 14,000.00 Rp 3,192,000.00
20.01.01.14.01.10 Besi Beton 48.000 kg Rp 13,000.00 Rp 624,000.00
Bahan: Bantu Konstruksi (10% Bahan: 0.100
Rp 16,040,200.00 Rp 1,604,020.00
Konstruksi)
20.01.01.13.11 Besi Bulat st 60 101.000 kg Rp 14,000.00 Rp 1,414,000.00
20.01.01.13.12 Bronze 47.000 kg Rp 29,100.00 Rp 1,367,700.00
20.01.01.14.01.10 Besi polos 65.000 kg Rp 13,000.00 Rp 845,000.00

Pemerintah Kabupaten Madiun


- 87 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

20.01.04.08.07 Roda Gigi m.10 (112) kg 1.000 Ps Rp 2,520,000.00 Rp 2,520,000.00

Pemerintah Kabupaten Madiun


- 88 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

20.01.01.37.01 Mur Baut 1/2'', 5/8", 7/8" 38.000 kg Rp 7,300.00 Rp 277,400.00


20.05.06.20.24 Nipple 2.000 Buah Rp 8,300.00 Rp 16,600.00
20.02.01.09.39 Spie 3.000 Buah Rp 151,650.00 Rp 454,950.00
20.03.05.05.02.11 Gembok 1.000 Buah Rp 118,550.00 Rp 118,550.00
20.02.01.09.08 Drucklager Kecil/besar 2.000 Buah Rp 214,050.00 Rp 428,100.00
20.02.01.09.01 Angker Bolt (20kg) 8.000 Buah Rp 793,300.00 Rp 6,346,400.00
20.02.01.09.40 Splite Pen / Pengunci 1.000 Buah Rp 20,550.00 Rp 20,550.00
20.01.01.62.21 Kayu Jati 0.253 m3 Rp 7,873,350.00 Rp 1,991,957.55
20.02.01.09.23 Na F + Ring 2.000 Kg Rp 30,800.00 Rp 61,600.00
20.02.01.09.32 Seal Karet 4.060 m1 Rp 283,900.00 Rp 1,152,634.00
#REF! Beton Tumbuk 1 :2 : 3 0.340 m3 Rp 894,966.70 Rp 304,288.68
Nilai HSPK : Rp 39,859,860.23
24.09.01.20 Pembuatan Pintu Air Type C2 (B=1000mm, Buah
H=2000mm, H'=3000mm)
Tenaga:
Ongkos Kerja Konstruksi 745.000 kg Rp 1,250.00 Rp 931,250.00
Ongkos Kerja Mesin 128.000 kg Rp 6,000.00 Rp 768,000.00
14.118 m2
Ongkos Pengecatan Tanpa Sandblasting Rp 27,500.00 Rp 388,245.00

Ongkos Pemasangan 873.000 kg Rp 700.00 Rp 611,100.00


Ongkos Pembongkaran 873.000 kg Rp 500.00 Rp 436,500.00
Transport 873.000 kg Rp 500.00 Rp 436,500.00
Bahan:
20.01.01.13.10 Besi Siku 433.000 kg Rp 14,000.00 Rp 6,062,000.00
20.01.01.13.11 Besi Plate 223.000 kg Rp 14,000.00 Rp 3,122,000.00
20.01.01.13.11 Besi Plate Strip 68.000 kg Rp 14,000.00 Rp 952,000.00
20.01.01.14.01.10 Besi Beton 20.000 kg Rp 13,000.00 Rp 260,000.00
20.05.06.01.06 Pipa 1.000 m1 Rp 62,500.00 Rp 62,500.00
Bahan: Bantu Konstruksi (10% Bahan: 0.100
Rp 10,458,500.00 Rp 1,045,850.00
Konstruksi)
20.01.01.13.11 Besi Bulat st 60 69.000 kg Rp 14,000.00 Rp 966,000.00
20.01.01.13.12 Bronze 23.000 kg Rp 29,100.00 Rp 669,300.00
20.01.01.14.01.10 Besi polos 36.000 kg Rp 13,000.00 Rp 468,000.00
20.01.01.37.01 Mur Baut 1/2'', 5/8", 7/8" 5.000 kg Rp 7,300.00 Rp 36,500.00
20.01.01.40.08 Paku Keling 3/4'', 5/8", 7/8" 15.000 kg Rp 14,500.00 Rp 217,500.00
20.05.06.20.24 Nipple 1.000 kg Rp 8,300.00 Rp 8,300.00
20.02.01.09.40 Splite Pen / Pengunci 2.000 Buah Rp 20,550.00 Rp 41,100.00
20.03.05.05.02.11 Gembok hitam Cooper 75 2.000 Buah Rp 118,550.00 Rp 237,100.00
20.02.01.09.08 Drucklager Kecil/besar 1.000 Buah Rp 214,050.00 Rp 214,050.00
20.02.01.09.23 Na F + Ring 1.000 Buah Rp 30,800.00 Rp 30,800.00
#REF! Beton Tumbuk 1 :2 : 3 0.160 m3 Rp 894,966.70 Rp 143,194.67
Nilai HSPK : Rp 18,107,789.67
24.09.01.21 Pembuatan Pintu Air Type C2 (B=600mm, Buah
H=600mm, H'=3000mm)
Tenaga:
Ongkos Kerja Konstruksi 286.000 kg Rp 1,250.00 Rp 357,500.00
Ongkos Kerja Mesin 99.000 kg Rp 6,000.00 Rp 594,000.00
6.168 m2
Ongkos Pengecatan Tanpa Sandblasting Rp 27,500.00 Rp 169,620.00

Ongkos Pemasangan 296.000 kg Rp 700.00 Rp 207,200.00


Ongkos Pembongkaran 296.000 kg Rp 500.00 Rp 148,000.00
Transport 296.000 kg Rp 500.00 Rp 148,000.00
Bahan:
20.01.01.13.10 Besi Siku 193.000 kg Rp 14,000.00 Rp 2,702,000.00
20.01.01.13.11 Besi Plate 33.000 kg Rp 14,000.00 Rp 462,000.00
20.01.01.13.11 Besi Plate Strip 45.000 kg Rp 14,000.00 Rp 630,000.00
20.01.01.14.01.10 Besi Beton 14.000 kg Rp 13,000.00 Rp 182,000.00
20.05.06.01.06 Pipa 1.000 m1 Rp 62,500.00 Rp 62,500.00
Bahan: Bantu Konstruksi (10% Bahan: 0.100
Rp 10,458,500.00 Rp 1,045,850.00
Konstruksi)
20.01.01.13.11 Besi Bulat st 60 47.000 kg Rp 14,000.00 Rp 658,000.00
20.01.01.13.12 Bronze 16.000 kg Rp 29,100.00 Rp 465,600.00
20.01.01.14.01.10 Besi polos 36.000 kg Rp 13,000.00 Rp 468,000.00
20.01.01.37.01 Mur Baut 1/2'', 5/8", 7/8" 5.000 kg Rp 7,300.00 Rp 36,500.00
20.01.01.40.08 Paku Keling 3/4'', 5/8", 7/8" 11.000 kg Rp 14,500.00 Rp 159,500.00

Pemerintah Kabupaten Madiun


- 89 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

20.05.06.20.24 Nipple 1.000 kg Rp 8,300.00 Rp 8,300.00

Pemerintah Kabupaten Madiun


- 90 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

20.02.01.09.40 Splite Pen / Pengunci 2.000 Buah Rp 20,550.00 Rp 41,100.00


20.03.05.05.02.11 Gembok hitam Cooper 75 2.000 Buah Rp 118,550.00 Rp 237,100.00
20.02.01.09.08 Drucklager Kecil/besar 1.000 Buah Rp 214,050.00 Rp 214,050.00
20.02.01.09.23 Na F + Ring 1.000 Buah Rp 30,800.00 Rp 30,800.00
#REF! Beton Tumbuk 1 :2 : 3 0.100 m3 Rp 894,966.70 Rp 89,496.67
Nilai HSPK : Rp 9,117,116.67
24.09.01.22 Operasi Mesin Gilas m3
Tenaga:
#REF! Operator 30.000 O.H #REF! #REF!
22.01.01.03.11 Pembantu Operator 30.000 O.H Rp 60,000.00 Rp 1,800,000.00
#REF! Penjaga Malam 30.000 O.H #REF! #REF!
22.01.01.03.08 Pekerja 150.000 O.H Rp 55,000.00 Rp 8,250,000.00
Bahan:
20.02.01.07.06 Solar 1.000 Liter Rp 8,350.00 Rp 8,350.00
20.02.01.08.04 Minyak Pelumas 20.000 Liter Rp 40,000.00 Rp 800,000.00
20.02.01.08.02 Gemuk 5.000 kg Rp 9,250.00 Rp 46,250.00
Nilai HSPK : #REF!
24.09.01.23 Pek. Pengeboran Sumur segala formasi, dia. 8 m1
3/4 "
Tenaga:
#REF! Mandor 0.030 O.H Rp 60,000.00 Rp 1,800.00
22.01.01.04.07 Tool Pusher 0.042 O.H Rp 45,000.00 Rp 1,890.00
#REF! Driller 0.210 O.H #REF! #REF!
22.01.01.04.03 Assisten Driller 0.210 O.H Rp 35,000.00 Rp 7,350.00
#REF! Mekanik 0.210 O.H #REF! #REF!
22.01.01.05.05 Welder 0.210 O.H Rp 45,000.00 Rp 9,450.00
22.01.01.05.07 Helper/Fillter 0.280 O.H Rp 30,000.00 Rp 8,400.00
22.01.01.04.08 Watchman 0.280 O.H Rp 37,500.00 Rp 10,500.00
#REF! Operator Crane 0.140 O.H Rp 45,000.00 Rp 6,300.00
Bahan:
20.02.01.07.06 Solar 0.693 Liter Rp 8,350.00 Rp 5,786.55
20.02.01.08.04 Minyak Pelumas 0.041 Liter Rp 40,000.00 Rp 1,640.80
20.02.01.08.02 Gemuk 0.105 kg Rp 9,250.00 Rp 971.25
Peralatan:
#REF! Drilling Rig 0.044 Jam #REF! #REF!
#REF! Mud Pump 0.105 Jam #REF! #REF!
21.02.03.01. Cargo Truck 5.0 Ton 0.070 Jam Rp 16,603.13 Rp 1,162.22
#REF! Crane on Truck 0.070 jam #REF! #REF!
Nilai HSPK : #REF!
24.09.01.24 Pek. Pengeboran Sumur segala formasi m1
kedalaman 0 s/d 100 m, dia. 6"
Tenaga:
#REF! Mandor 0.030 O.H Rp 60,000.00 Rp 1,800.00
22.01.01.04.07 Tool Pusher 0.042 O.H Rp 45,000.00 Rp 1,890.00
#REF! Driller 0.212 O.H #REF! #REF!
22.01.01.04.03 Assisten Driller 0.212 O.H Rp 35,000.00 Rp 7,423.50
#REF! Mekanik 0.210 O.H #REF! #REF!
22.01.01.05.05 Welder 0.210 O.H Rp 45,000.00 Rp 9,450.00
22.01.01.05.07 Helper/Fillter 0.280 O.H Rp 30,000.00 Rp 8,400.00
22.01.01.04.08 Watchman 0.280 O.H Rp 37,500.00 Rp 10,500.00
#REF! Operator Crane 0.140 O.H Rp 45,000.00 Rp 6,300.00
Bahan:
20.02.01.07.06 Solar 0.693 Liter Rp 8,350.00 Rp 2,979.90
20.02.01.08.04 Minyak Pelumas 0.041 Liter Rp 40,000.00 Rp 1,066.52
20.02.01.08.02 Gemuk 0.105 kg Rp 9,250.00 Rp 714.00
Peralatan:
#REF! Drilling Rig 0.018 Jam #REF! #REF!
#REF! Mud Pump 0.070 jam #REF! #REF!
21.02.03.01. Cargo Truck 5.0 Ton 0.070 Jam Rp 16,603.13 Rp 1,162.22
#REF! Crane on Truck 0.070 jam #REF! #REF!
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 91 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

24.09.01.25 Pek. Pengeboran Sumur segala formasi m1


kedalaman 0 s/d 100 m, dia. 8 3/4"
Tenaga:
#REF! Mandor 0.030 O.H Rp 60,000.00 Rp 1,800.00
22.01.01.04.07 Tool Pusher 0.042 O.H Rp 45,000.00 Rp 1,890.00
#REF! Driller 0.315 O.H #REF! #REF!
22.01.01.04.03 Assisten Driller 0.315 O.H Rp 35,000.00 Rp 11,025.00
#REF! Mekanik 0.315 O.H #REF! #REF!
22.01.01.05.05 Welder 0.252 O.H Rp 45,000.00 Rp 11,340.00
22.01.01.05.07 Helper/Fillter 0.280 O.H Rp 30,000.00 Rp 8,400.00
22.01.01.04.08 Watchman 0.280 O.H Rp 37,500.00 Rp 10,500.00
#REF! Operator Crane 0.140 O.H Rp 45,000.00 Rp 6,300.00
Bahan:
20.02.01.07.06 Solar 0.693 Liter Rp 8,350.00 Rp 5,786.55
20.02.01.08.04 Minyak Pelumas 0.041 Liter Rp 40,000.00 Rp 1,640.80
20.02.01.08.02 Gemuk 0.105 kg Rp 9,250.00 Rp 971.25
Peralatan:
#REF! Drilling Rig 0.066 Jam #REF! #REF!
#REF! Mud Pump 0.140 Jam #REF! #REF!
21.02.03.01. Cargo Truck 5.0 Ton 0.070 Jam Rp 16,603.13 Rp 1,162.22
#REF! Crane on Truck 0.070 jam #REF! #REF!
Nilai HSPK : #REF!
24.09.01.26 Pek. Pengeboran Sumur segala formasi m1
kedalaman 0 s/d 100 m, dia. 12"
Tenaga:
#REF! Mandor 0.030 O.H Rp 60,000.00 Rp 1,800.00
22.01.01.04.07 Tool Pusher 0.042 O.H Rp 45,000.00 Rp 1,890.00
#REF! Driller 0.315 O.H #REF! #REF!
22.01.01.04.03 Assisten Driller 0.315 O.H Rp 35,000.00 Rp 11,025.00
#REF! Mekanik 0.315 O.H #REF! #REF!
22.01.01.05.05 Welder 0.252 O.H Rp 45,000.00 Rp 11,340.00
22.01.01.05.07 Helper/Fillter 0.280 O.H Rp 30,000.00 Rp 8,400.00
22.01.01.04.08 Watchman 0.280 O.H Rp 37,500.00 Rp 10,500.00
#REF! Operator Crane 0.140 O.H Rp 45,000.00 Rp 6,300.00
Bahan:
20.02.01.07.06 Solar 0.693 Liter Rp 8,350.00 Rp 5,786.55
20.02.01.08.04 Minyak Pelumas 0.041 Liter Rp 40,000.00 Rp 1,640.80
20.02.01.08.02 Gemuk 0.105 kg Rp 9,250.00 Rp 971.25
Peralatan:
#REF! Drilling Rig 0.066 Jam #REF! #REF!
#REF! Mud Pump 0.140 jam #REF! #REF!
21.02.03.01. Cargo Truck 5.0 Ton 0.070 Jam Rp 16,603.13 Rp 1,162.22
#REF! Crane on Truck 0.070 jam #REF! #REF!
Nilai HSPK : #REF!
24.09.01.27 Pek. Pengeboran Sumur segala formasi, m1
Pembesaran lubang bor dia. 8 3/4" ke 18"
Tenaga:
#REF! Mandor 0.030 O.H Rp 60,000.00 Rp 1,800.00
22.01.01.04.07 Tool Pusher 0.087 O.H Rp 45,000.00 Rp 3,915.00
#REF! Driller 0.435 O.H #REF! #REF!
22.01.01.04.03 Assisten Driller 0.435 O.H Rp 35,000.00 Rp 15,225.00
#REF! Mekanik 0.435 O.H #REF! #REF!
22.01.01.05.05 Welder 0.435 O.H Rp 45,000.00 Rp 19,575.00
22.01.01.05.07 Helper/Fillter 0.580 O.H Rp 30,000.00 Rp 17,400.00
22.01.01.04.08 Watchman 0.435 O.H Rp 37,500.00 Rp 16,312.50
#REF! Operator Crane 0.140 O.H Rp 45,000.00 Rp 6,300.00
Bahan:
20.02.01.07.06 Solar 1.436 Liter Rp 8,350.00 Rp 11,986.43
20.02.01.08.04 Minyak Pelumas 0.085 Liter Rp 40,000.00 Rp 3,398.80
20.02.01.08.02 Gemuk 0.218 kg Rp 9,250.00 Rp 2,011.88
Peralatan:
#REF! Drilling Rig 0.091 Jam #REF! #REF!
21.02.03.01. Cargo Truck 5.0 Ton 0.073 Jam Rp 16,603.13 Rp 1,203.73
#REF! Crane on Truck 0.073 jam #REF! #REF!
Nilai HSPK : #REF!
Pemerintah Kabupaten Madiun
- 92 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

24.09.01.28 Pek. Pengadaan/Pemasangan Pipa Sumur m1


Bor, PVC dia. 12"
Tenaga:
#REF! Mandor 0.030 O.H Rp 60,000.00 Rp 1,800.00
22.01.01.04.07 Tool Pusher 0.030 O.H Rp 45,000.00 Rp 1,350.00
#REF! Driller 0.100 O.H #REF! #REF!
22.01.01.04.03 Assisten Driller 0.100 O.H Rp 35,000.00 Rp 3,500.00
#REF! Mekanik 0.100 O.H #REF! #REF!
22.01.01.05.05 Welder 0.100 O.H Rp 45,000.00 Rp 4,500.00
22.01.01.05.07 Helper/Fillter 0.400 O.H Rp 30,000.00 Rp 12,000.00
22.01.01.04.08 Watchman 0.100 O.H Rp 37,500.00 Rp 3,750.00
#REF! Operator Crane 0.100 O.H Rp 45,000.00 Rp 4,500.00
Bahan:
20.05.06.01.32 Pipa PVC Maspion AW 12" x 6m 0.167 Btg Rp 3,002,800.00 Rp 500,466.67
20.02.01.07.06 Solar 1.436 Liter Rp 8,350.00 Rp 11,986.43
20.02.01.08.04 Minyak Pelumas 0.117 Liter Rp 40,000.00 Rp 4,688.00
20.02.01.08.02 Gemuk 0.300 kg Rp 9,250.00 Rp 2,775.00
Peralatan:
#REF! Drilling Rig 0.145 jam #REF! #REF!
21.02.03.01. Cargo Truck 5.0 Ton 0.073 Jam Rp 16,603.13 Rp 1,203.73
#REF! Crane on Truck 0.073 jam #REF! #REF!
Nilai HSPK : #REF!
24.09.01.29 Pek. Pengadaan/Pemasangan Pipa Sumur m1
Bor, PVC dia. 6"
Tenaga:
#REF! Mandor 0.020 O.H Rp 60,000.00 Rp 1,200.00
22.01.01.04.07 Tool Pusher 0.022 O.H Rp 45,000.00 Rp 978.75
#REF! Driller 0.073 O.H #REF! #REF!
22.01.01.04.03 Assisten Driller 0.073 O.H Rp 35,000.00 Rp 2,537.50
#REF! Mekanik 0.073 O.H #REF! #REF!
22.01.01.05.05 Welder 0.073 O.H Rp 45,000.00 Rp 3,262.50
22.01.01.05.07 Helper/Fillter 0.290 O.H Rp 30,000.00 Rp 8,700.00
22.01.01.04.08 Watchman 0.073 O.H Rp 37,500.00 Rp 2,718.75
#REF! Operator Crane 0.073 O.H Rp 45,000.00 Rp 3,262.50
Bahan:
20.05.06.01.29 Pipa PVC Maspion AW 6" x 6m 0.167 Btg Rp 952,700.00 Rp 158,783.33
20.02.01.07.06 Solar 1.436 Liter Rp 8,350.00 Rp 11,986.43
20.02.01.08.04 Minyak Pelumas 0.085 Liter Rp 40,000.00 Rp 3,398.80
20.02.01.08.02 Gemuk 0.218 kg Rp 9,250.00 Rp 2,011.88
Peralatan:
#REF! Drilling Rig 0.145 Jam #REF! #REF!
21.02.03.01. Cargo Truck 5.0 Ton 0.073 Jam Rp 16,603.13 Rp 1,203.73
#REF! Crane on Truck 0.073 jam #REF! #REF!
Nilai HSPK : #REF!
24.09.01.30 Pek. Pengadaan/Pemasangan Pipa Sumur m1
Bor, PVC dia. 6" (Screen)
Tenaga:
#REF! Mandor 0.020 O.H Rp 60,000.00 Rp 1,200.00
22.01.01.04.07 Tool Pusher 0.022 O.H Rp 45,000.00 Rp 978.75
#REF! Driller 0.073 O.H #REF! #REF!
22.01.01.04.03 Assisten Driller 0.073 O.H Rp 35,000.00 Rp 2,537.50
#REF! Mekanik 0.073 O.H #REF! #REF!
22.01.01.05.05 Welder 0.073 O.H Rp 45,000.00 Rp 3,262.50
22.01.01.05.07 Helper/Fillter 0.290 O.H Rp 30,000.00 Rp 8,700.00
22.01.01.04.08 Watchman 0.073 O.H Rp 37,500.00 Rp 2,718.75
#REF! Operator Crane 0.073 O.H Rp 45,000.00 Rp 3,262.50
Bahan:
20.05.06.01.91 Screen dia = 6" klas VP AWS 10 1.000 m1 Rp 359,205.00 Rp 359,205.00
20.02.01.07.06 Solar 1.436 Liter Rp 8,350.00 Rp 11,986.43
20.02.01.08.04 Minyak Pelumas 0.085 Liter Rp 40,000.00 Rp 3,398.80
20.02.01.08.02 Gemuk 0.218 kg Rp 9,250.00 Rp 2,011.88
Peralatan:
#REF! Drilling Rig 0.018 jam #REF! #REF!
21.02.03.01. Cargo Truck 5.0 Ton 0.073 jam Rp 16,603.13 Rp 1,203.73
#REF! Crane on Truck 0.073 jam #REF! #REF!
Pemerintah Kabupaten Madiun
- 93 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 94 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

24.09.01.31 Pencucian dan Pembersihan Lobang m1


Sumur
Tenaga:
#REF! Mandor 0.020 O.H Rp 60,000.00 Rp 1,200.00
22.01.01.04.07 Tool Pusher 0.022 O.H Rp 45,000.00 Rp 978.75
#REF! Driller 0.250 O.H #REF! #REF!
22.01.01.04.03 Assisten Driller 0.250 O.H Rp 35,000.00 Rp 8,750.00
#REF! Mekanik 0.250 O.H #REF! #REF!
22.01.01.05.05 Welder 0.250 O.H Rp 45,000.00 Rp 11,250.00
22.01.01.05.07 Helper/Fillter 1.000 O.H Rp 30,000.00 Rp 30,000.00
22.01.01.04.08 Watchman 0.250 O.H Rp 37,500.00 Rp 9,375.00
#REF! Operator Crane 0.250 O.H Rp 45,000.00 Rp 11,250.00
Bahan:
20.02.01.07.06 Solar 4.950 Liter Rp 8,350.00 Rp 41,332.50
20.02.01.08.04 Minyak Pelumas 0.293 Liter Rp 40,000.00 Rp 11,720.00
20.02.01.08.02 Gemuk 0.750 kg Rp 9,250.00 Rp 6,937.50
Peralatan:
#REF! Drilling Rig 0.063 jam #REF! #REF!
#REF! Mud Pump 0.750 jam #REF! #REF!
#REF! Air Compressor 0.750 jam #REF! #REF!
#REF! Crane on Truck 0.250 jam #REF! #REF!
Nilai HSPK : #REF!
24.09.01.32 Pekerjaan Uji Pompa Test m1
Tenaga:
#REF! Kepala Laboratorium 0.125 O.H #REF! #REF!
#REF! Operator 0.125 O.H #REF! #REF!
#REF! Mekanik 0.125 O.H #REF! #REF!
22.01.01.05.07 Helper/Fillter 0.500 O.H Rp 30,000.00 Rp 15,000.00
#REF! Operator Crane 0.125 O.H Rp 45,000.00 Rp 5,625.00
Bahan:
20.02.01.07.06 Solar 2.475 Liter Rp 8,350.00 Rp 20,666.25
20.02.01.08.04 Minyak Pelumas 0.293 Liter Rp 40,000.00 Rp 11,720.00
20.02.01.08.02 Gemuk 0.375 kg Rp 9,250.00 Rp 3,468.75
Peralatan:
#REF! Pompa Uji 0.375 jam #REF! #REF!
#REF! Crane on Truck 0.125 jam #REF! #REF!
Nilai HSPK : #REF!
24.09.02. Pekerjaan Beton Struktur Bangunan Air m3
24.09.02.01 Beton Struktur Bertulang K - 175 m3
Bahan:
#REF! Beton Struktur Klas 175 1.000 m3 Rp 1,067,510.99 Rp 1,067,510.99
#REF! Besi Tulangan 100.000 Kg Rp 15,004.75 Rp 1,500,475.00
#REF! Bekisting 10.000 m2 Rp 158,877.00 Rp 1,588,770.00
Nilai HSPK : Rp 4,156,755.99
24.09.02.02 Beton Struktur Bertulang K - 225 m3
Bahan:
#REF! Beton Struktur Klas 225 1.000 m3 Rp 1,122,456.96 Rp 1,122,456.96
#REF! Besi Tulangan 125.000 Kg Rp 15,004.75 Rp 1,875,593.75
#REF! Bekisting 10.000 m2 Rp 158,877.00 Rp 1,588,770.00
Nilai HSPK : Rp 4,586,820.71
24.09.02.03 Beton Bertulang K - 175 untuk Sloof m3
Bahan:
#REF! Beton Mutu K - 175 1.000 m3 #REF! #REF!
#REF! Besi Tulangan 100.000 Kg Rp 15,004.75 Rp 1,500,475.00
#REF! Bekisting 10.000 m2 Rp 219,387.25 Rp 2,193,872.50
Nilai HSPK : #REF!
24.09.02.04 Beton Bertulang K - 225 untuk Sloof m3
Bahan:
#REF! Beton Mutu K - 225 1.000 m3 #REF! #REF!
#REF! Besi Tulangan 125.000 Kg Rp 15,004.75 Rp 1,875,593.75
#REF! Bekisting 10.000 m2 Rp 219,387.25 Rp 2,193,872.50
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 95 -

Koef. SATUAN HARGA


NOMOR URAIAN KEGIATAN HARGA
SATUAN

24.09.02.05 Beton Bertulang K - 175 untuk Kolom m3


Bahan:
#REF! Beton Mutu K - 175 1.000 m3 #REF! #REF!
#REF! Besi Tulangan 100.000 Kg Rp 15,004.75 Rp 1,500,475.00
#REF! Bekisting 10.000 m2 Rp 429,126.75 Rp 4,291,267.50
Nilai HSPK : #REF!
24.09.02.06 Beton Bertulang K - 225 untuk Kolom m3
Bahan:
#REF! Beton Mutu K - 225 1.000 m3 #REF! #REF!
#REF! Besi Tulangan 125.000 Kg Rp 15,004.75 Rp 1,875,593.75
#REF! Bekisting 10.000 m2 Rp 429,126.75 Rp 4,291,267.50
Nilai HSPK : #REF!
24.09.02.07 Beton Bertulang K - 175 untuk Balok m3
Bahan:
#REF! Beton Mutu K - 175 1.000 m3 #REF! #REF!
#REF! Besi Tulangan 100.000 Kg Rp 15,004.75 Rp 1,500,475.00
#REF! Bekisting 10.000 m2 Rp 452,918.70 Rp 4,529,187.00
Nilai HSPK : #REF!
24.09.02.08 Beton Bertulang K - 225 untuk Balok m3
Bahan:
#REF! Beton Mutu K - 225 1.000 m3 #REF! #REF!
#REF! Besi Tulangan 125.000 Kg Rp 15,004.75 Rp 1,875,593.75
#REF! Bekisting 10.000 m2 Rp 452,918.70 Rp 4,529,187.00
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 93 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
NON KONSTRUKSI
J Pertamanan dan Kebersihan
24.10.01 Pertamanan
24.10.01.01 Penyiapan bibit tanaman/ Pemutaran tanaman
m3
(Volume 0.063 m3)
Tenaga:
#REF! Tukang Tanam 0.2000 O.H #REF! #REF!
22.01.01.03.07 Pekerja Semi Terampil 0.1000 O.H Rp 57,000.00 Rp 5,700.00
Peralatan:
02.05.01.03.22.10 Gelangsing 1.0000 Buah Rp 3,600.00 Rp 3,600.00
20.03.15.11.02.02 Tali Rafiah 0.1500 Kg Rp 10,550.00 Rp 1,582.50
Nilai HSPK : #REF!
24.10.01.02 Tanah Taman (Terolah) m3
Tenaga:
#REF! Mandor 0.0100 O.H #REF! #REF!
22.01.01.03.09 Pekerja Terampil 0.2500 O.H Rp 60,000.00 Rp 15,000.00
Bahan:
05.19.03.14.52 Stek Non Lokal 1.0000 btg Rp - Rp -
Nilai HSPK : #REF!
24.10.01.03 Pengapuran dan pengecatan 1 batang pohon Batang
Tenaga:
#REF! Mandor 0.0031 O.H #REF! #REF!
22.01.01.01.03 Kepala Tukang cat 0.0031 O.H Rp 80,000.00 Rp 248.00
22.01.01.02.03 Tukang cat 0.0313 O.H Rp 70,000.00 Rp 2,187.50
Bahan:
20.01.01.09.02.02 Cat Tembok 0.2500 Kg Rp 18,630.00 Rp 4,657.50
20.01.01.09.03.09 Cat kayu Emco 0.0500 Kg Rp 61,550.00 Rp 3,077.50
20.01.01.09.04.05 Minyak Cat / Afduner 0.0150 ltr Rp 10,700.00 Rp 160.50
Nilai HSPK : #REF!
24.10.01.04 Membabat/Merapikan Rumput t<20 cm m2
Tenaga:
#REF! Mandor 0.0001 O.H #REF! #REF!
#REF! Tukang Tanam 0.0100 O.H #REF! #REF!
22.01.01.03.08 Pekerja Tak Terampil 0.0100 O.H Rp 55,000.00 Rp 550.00
Nilai HSPK : #REF!
24.10.01.05 Membabat/Merapikan Rumput
m2
20cm< t <50 cm
Tenaga:
#REF! Mandor 0.0002 O.H #REF! #REF!
#REF! Tukang Tanam 0.0200 O.H #REF! #REF!
22.01.01.03.08 Pekerja Tak Terampil 0.0100 O.H Rp 55,000.00 Rp 550.00
Nilai HSPK : #REF!
24.10.01.06 Membabat/Merapikan Rumput t>50 cm m2
Tenaga:
#REF! Mandor 0.0003 O.H #REF! #REF!
#REF! Tukang Tanam 0.0300 O.H #REF! #REF!
22.01.01.03.08 Pekerja Tak Terampil 0.0200 O.H Rp 55,000.00 Rp 1,100.00
Nilai HSPK : #REF!
24.10.01.07 Membabat/Merapikan Rumput t>100 cm m2
Tenaga:
#REF! Mandor 0.0003 O.H #REF! #REF!
#REF! Tukang Tanam 0.0300 O.H #REF! #REF!
22.01.01.03.08 Pekerja Tak Terampil 0.0350 O.H Rp 55,000.00 Rp 1,925.00
Nilai HSPK : #REF!
24.10.01.08 Pemotongan Rumput Tinggi maks 15 cm scr
m2
mekanik dg mobil pemotong
Tenaga:
#REF! Operator 0.0010 O.H #REF! #REF!
Bahan:
20.02.01.07.06 Solar 0.0550 ltr Rp 8,350.00 Rp 459.25
20.02.01.08.10 Oil Mesin 0.0020 ltr Rp 45,550.00 Rp 91.10
Peralatan:
#REF! Mesin Pemotong Dorong 0.0650 unit/hari #REF! #REF!
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 94 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.10.01.09 Pemotongan Rumput Tinggi maks 15 cm scr
m2
mekanik dg Mesin pemotong
Tenaga:
#REF! Operator 0.0050 O.H #REF! #REF!
Bahan:
20.02.01.07.06 Solar 0.0550 ltr Rp 8,350.00 Rp 459.25
20.02.01.08.10 Oil Mesin 0.0020 ltr Rp 45,550.00 Rp 91.10
Peralatan:
#REF! Mesin Pemotong Gendong 0.0850 unit/hari #REF! #REF!
Nilai HSPK : #REF!
24.10.01.10 Pemotongan Rumput Tinggi maks 50 cm scr
m2
mekanik dg Mesin pemotong
Tenaga:
#REF! Operator 0.0050 O.H #REF! #REF!
Bahan:
20.02.01.07.06 Solar 0.0650 ltr Rp 8,350.00 Rp 542.75
20.02.01.08.10 Oil Mesin 0.0030 ltr Rp 45,550.00 Rp 136.65
Peralatan:
#REF! Mesin Pemotong Gendong 0.1050 unit/hari #REF! #REF!
Nilai HSPK : #REF!
24.10.01.11 Menanam Rumput Manila Sistem Tandur m2
Tenaga:
#REF! Mandor 0.0100 O.H #REF! #REF!
22.01.01.03.08 Pekerja Tak Terampil 0.1500 O.H Rp 55,000.00 Rp 8,250.00
Bahan:
05.19.02.05.01.23 Rumput Manila (Golf) t=0,05 m 1.0000 m2 Rp - Rp -
Nilai HSPK : #REF!
24.10.01.12 Menanam Rumput Lamur m2
Tenaga:
#REF! Mandor 0.0100 O.H #REF! #REF!
22.01.01.03.08 Pekerja Tak Terampil 0.1500 O.H Rp 55,000.00 Rp 8,250.00
Bahan:
05.19.02.05.01.22 Rumput Lamur (embun) 1.0000 m2 Rp - Rp -
Nilai HSPK : #REF!
24.10.01.13 Mengolah Tanah (Mencangkul)
m2
sedalam 30 Cm
Tenaga:
#REF! Mandor 0.0035 O.H #REF! #REF!
#REF! Tukang Tanam 0.1000 O.H #REF! #REF!
Nilai HSPK : #REF!
24.10.01.14 Ongkos kerja menanam tanaman pagar m2
Tenaga:
#REF! Mandor 0.0050 O.H #REF! #REF!
#REF! Tukang Tanam 0.1000 O.H #REF! #REF!
Nilai HSPK : Rp 3,300.00
24.10.01.15 Ongkos menanam pohon pelindung t = 1-2 m Batang
Tenaga:
#REF! Mandor 0.0200 O.H #REF! #REF!
#REF! Tukang Tanam 0.4000 O.H #REF! #REF!
Nilai HSPK : #REF!
24.10.01.16 Ongkos menanam semak hias (15 batang) m2
Tenaga:
#REF! Mandor 0.1000 O.H #REF! #REF!
#REF! Tukang Tanam 0.3300 O.H #REF! #REF!
Nilai HSPK : #REF!
24.10.01.17 Pemijahan bibit taman (Batang Pohon) Batang
Tenaga:
#REF! Tukang Tanam 0.0400 O.H #REF! #REF!
22.01.01.03.08 Pekerja Tak Terampil 0.0400 O.H Rp 55,000.00 Rp 2,200.00
Bahan:
Tanah Taman 0.0010 m3 Rp 129,000.00 Rp 129.00
05.19.03.14.40 Pupuk Kandang 0.0010 Kg Rp - Rp -
02.05.02.03.01.07 Kantong Plastik 15 x 22 cm 0.0100 Pak Rp - Rp -
Nilai HSPK : #REF!
24.10.01.18 Penanaman Semak Hias m2
Tenaga:
#REF! Mandor 0.0100 O.H #REF! #REF!
#REF! Tukang Tanam 0.3300 O.H #REF! #REF!
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 95 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.10.01.19 Pengendalian/Pemberantasan hama semak hias m2
Tenaga:
#REF! Mandor 0.0013 O.H #REF! #REF!
22.01.01.03.08 Pekerja tak Terampil 0.0040 O.H Rp 55,000.00 Rp 220.00
Bahan:
05.19.03.14.25 Obat Hama Tanaman (Basudin) 0.0015 Liter Rp - Rp -
Peralatan:
20.03.05.03.01.09 Ember karet 0.0040 buah Rp 5,350.00 Rp 21.40
#REF! Sewa Gembor siram 0.0040 unit/hari #REF! #REF!
21.02.01.02.14 Sewa Hand sprayer 0.0020 unit/hari Rp 9,570.00 Rp 19.14
Nilai HSPK : #REF!
24.10.01.20 Pemupukan semak hias m2
Tenaga:
#REF! Mandor 0.0010 O.H #REF! #REF!
22.01.01.03.08 Pekerja tak Terampil 0.0059 O.H Rp 55,000.00 Rp 326.15
Bahan:
05.19.03.14.55 Pupuk Urea 0.0185 Kg Rp 4,850.00 Rp 89.82
Peralatan:
20.03.05.03.01.09 Ember karet 0.0059 buah Rp 5,350.00 Rp 31.73
Nilai HSPK : #REF!
24.10.01.21 Pendangiran semak hias m2
Tenaga:
#REF! Mandor 0.0014 O.H #REF! #REF!
#REF! Sopir Terampil 0.0002 O.H #REF! #REF!
22.01.01.03.09 Pekerja Terampil 0.0080 O.H Rp 60,000.00 Rp 480.00
Bahan:
20.02.01.07.01 Bensin 0.0028 Liter Rp 8,600.00 Rp 24.08
Peralatan:
#REF! Cangkul 0.0024 unit/hari #REF! #REF!
#REF! Sabit besar 0.0024 unit/hari #REF! #REF!
21.02.03.01.04 Sewa Pickup 0.0002 unit/hari Rp 372,450.00 Rp 89.39
02.05.02.03.03.03 Keranjang rotan 0.0016 buah Rp - Rp -
20.01.01.22.09 Batu asah 0.0008 buah Rp 22,400.00 Rp 17.92
Nilai HSPK : #REF!
24.10.02 Pemotongan Pohon
24.10.02.01 Pekerjaan Pangkas Meja, Ada Kabel Listrik, Ø <
Pohon
60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1667 OH Rp 40,000.00 Rp 6,666.67
#REF! Tukang Potong 0.3333 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 1.3333 OH Rp 55,000.00 Rp 73,333.33
#REF! Sopir Truk 0.3333 OH #REF! #REF!
#REF! Sopir Skywalker 0.3333 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 1.0000 Liter Rp 8,600.00 Rp 8,600.00
20.02.01.08.07 Oli Rantai 0.3333 Liter Rp 36,350.00 Rp 12,116.67
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 1.6667 Liter Rp 8,350.00 Rp 13,916.67
Nilai HSPK : #REF!
24.10.02.02 Pekerjaan Pangkas Meja, Tidak Ada Kabel
Pohon
Listrik, Ø < 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.0833 OH Rp 40,000.00 Rp 3,333.33
#REF! Tukang Potong 0.1667 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 0.6667 OH Rp 55,000.00 Rp 36,666.67
#REF! Sopir Truk 0.1667 OH #REF! #REF!
#REF! Sopir Skywalker 0.1667 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 0.5000 Liter Rp 8,600.00 Rp 4,300.00
20.02.01.08.07 Oli Rantai 0.1250 Liter Rp 36,350.00 Rp 4,543.75
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 0.8333 Liter Rp 8,350.00 Rp 6,958.33
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 96 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.10.02.03 Pekerjaan Pangkas Meja, Ada Kabel Listrik, Ø >
Pohon
60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.2500 OH Rp 40,000.00 Rp 10,000.00
#REF! Tukang Potong 0.5000 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 2.0000 OH Rp 55,000.00 Rp 110,000.00
#REF! Sopir Truk 0.5000 OH #REF! #REF!
#REF! Sopir Skywalker 0.5000 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 1.5000 Liter Rp 8,600.00 Rp 12,900.00
20.02.01.08.07 Oli Rantai 0.1250 Liter Rp 36,350.00 Rp 4,543.75
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 2.5000 Liter Rp 8,350.00 Rp 20,875.00
Nilai HSPK : #REF!
24.10.02.04 Pekerjaan Pangkas Meja, Tidak Ada Kabel
Pohon
Listrik, Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1250 OH Rp 40,000.00 Rp 5,000.00
#REF! Tukang Potong 0.2500 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 1.0000 OH Rp 55,000.00 Rp 55,000.00
#REF! Sopir Truk 0.2500 OH #REF! #REF!
#REF! Sopir Skywalker 0.2500 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 0.7500 Liter Rp 8,600.00 Rp 6,450.00
20.02.01.08.07 Oli Rantai 0.1250 Liter Rp 36,350.00 Rp 4,543.75
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 1.2500 Liter Rp 8,350.00 Rp 10,437.50
Nilai HSPK : #REF!
24.10.02.05 Pekerjaan Perantingan , Ada Kabel Listrik, Ø <
Pohon
60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1000 OH Rp 40,000.00 Rp 4,000.00
#REF! Tukang Potong 0.2000 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 0.8000 OH Rp 55,000.00 Rp 44,000.00
#REF! Sopir Truk 0.2000 OH #REF! #REF!
#REF! Sopir Skywalker 0.2000 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 0.6000 Liter Rp 8,600.00 Rp 5,160.00
20.02.01.08.07 Oli Rantai 0.1250 Liter Rp 36,350.00 Rp 4,543.75
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 1.0000 Liter Rp 8,350.00 Rp 8,350.00
Nilai HSPK : #REF!
24.10.02.06 Pekerjaan Perantingan, Tidak Ada Kabel Listrik,
Pohon
Ø < 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.0500 OH Rp 40,000.00 Rp 2,000.00
#REF! Tukang Potong 0.1000 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 0.4000 OH Rp 55,000.00 Rp 22,000.00
#REF! Sopir Truk 0.1000 OH #REF! #REF!
#REF! Sopir Skywalker 0.1000 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 0.3000 Liter Rp 8,600.00 Rp 2,580.00
20.02.01.08.07 Oli Rantai 0.1250 Liter Rp 36,350.00 Rp 4,543.75
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 0.5000 Liter Rp 8,350.00 Rp 4,175.00
Nilai HSPK : #REF!
24.10.02.07 Pekerjaan Perantingan, Ada Kabel
Pohon
Listrik, Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1667 OH Rp 40,000.00 Rp 6,666.67
#REF! Tukang Potong 0.3333 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 1.3333 OH Rp 55,000.00 Rp 73,333.33
#REF! Sopir Truk 0.3333 OH #REF! #REF!
#REF! Sopir Skywalker 0.3333 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 1.0000 Liter Rp 8,600.00 Rp 8,600.00
20.02.01.08.07 Oli Rantai 0.1250 Liter Rp 36,350.00 Rp 4,543.75
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 1.6667 Liter Rp 8,350.00 Rp 13,916.67
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 97 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.10.02.08 Pekerjaan Perantingan, Tidak Ada Kabel Listrik,
Pohon
Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1000 OH Rp 40,000.00 Rp 4,000.00
#REF! Tukang Potong 0.2000 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 0.8000 OH Rp 55,000.00 Rp 44,000.00
#REF! Sopir Truk 0.2000 OH #REF! #REF!
#REF! Sopir Skywalker 0.2000 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 0.6000 Liter Rp 8,600.00 Rp 5,160.00
20.02.01.08.07 Oli Rantai 0.1250 Liter Rp 36,350.00 Rp 4,543.75
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 1.0000 Liter Rp 8,350.00 Rp 8,350.00
Nilai HSPK : #REF!
24.10.02.09 Pekerjaan Pemotongan, Ada Kabel
Pohon
Listrik, Ø < 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.2500 OH Rp 40,000.00 Rp 10,000.00
#REF! Tukang Potong 0.5000 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 2.0000 OH Rp 55,000.00 Rp 110,000.00
#REF! Sopir Truk 0.5000 OH #REF! #REF!
#REF! Sopir Skywalker 0.5000 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 1.5000 Liter Rp 8,600.00 Rp 12,900.00
20.02.01.08.07 Oli Rantai 0.2500 Liter Rp 36,350.00 Rp 9,087.50
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 2.5000 Liter Rp 8,350.00 Rp 20,875.00
Nilai HSPK : #REF!
24.10.02.10 Pekerjaan Pemotongan, Tidak Ada Kabel
Pohon
Listrik, Ø < 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1250 OH Rp 40,000.00 Rp 5,000.00
#REF! Tukang Potong 0.2500 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 1.0000 OH Rp 55,000.00 Rp 55,000.00
#REF! Sopir Truk 0.2500 OH #REF! #REF!
#REF! Sopir Skywalker 0.2500 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 0.7500 Liter Rp 8,600.00 Rp 6,450.00
20.02.01.08.07 Oli Rantai 0.2500 Liter Rp 36,350.00 Rp 9,087.50
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 1.2500 Liter Rp 8,350.00 Rp 10,437.50
Nilai HSPK : #REF!
24.10.02.11 Pekerjaan Pemotongan, Ada Kabel
Pohon
Listrik, Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.5000 OH Rp 40,000.00 Rp 20,000.00
#REF! Tukang Potong 1.0000 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 4.0000 OH Rp 55,000.00 Rp 220,000.00
#REF! Sopir Truk 1.0000 OH #REF! #REF!
#REF! Sopir Skywalker 1.0000 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 3.0000 Liter Rp 8,600.00 Rp 25,800.00
20.02.01.08.07 Oli Rantai 0.2500 Liter Rp 36,350.00 Rp 9,087.50
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 5.0000 Liter Rp 8,350.00 Rp 41,750.00
Nilai HSPK : #REF!
24.10.02.12 Pekerjaan Pemotongan, Tidak Ada Kabel
Pohon
Listrik, Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.2500 OH Rp 40,000.00 Rp 10,000.00
#REF! Tukang Potong 0.5000 OH #REF! #REF!
22.01.01.03.08 Tukang Bersih 2.0000 OH Rp 55,000.00 Rp 110,000.00
#REF! Sopir Truk 0.5000 OH #REF! #REF!
#REF! Sopir Skywalker 0.5000 OH #REF! #REF!
Peralatan:
20.02.01.07.01 Bensin 1.5000 Liter Rp 8,600.00 Rp 12,900.00
20.02.01.08.07 Oli Rantai 0.2500 Liter Rp 36,350.00 Rp 9,087.50
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter Rp 8,350.00 Rp 12,525.00
20.02.01.07.06 Solar Skywalker 2.5000 Liter Rp 8,350.00 Rp 20,875.00
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 98 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.10.03 Kebersihan
24.10.03.01 Pekerjaan Angkutan Sampah m3
Tenaga:
#REF! Pengemudi / Sopir 0.0185 O.H #REF! #REF!
22.01.01.03.11 Pembantu Sopir 0.0185 O.H Rp 47,000.00 Rp 870.44
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.0556 O.H Rp 55,000.00 Rp 3,055.80
Peralatan:
21.02.04.17.02 Masker Plastik 0.0015 buah Rp 2,750.00 Rp 4.18
21.02.04.17.03 Sarung Tangan 0.0030 buah Rp 2,750.00 Rp 8.36
21.02.04.17.04 Sepatu boot 0.0005 buah Rp 6,800.00 Rp 3.47
21.02.04.17.06 Topi Ranger 0.0005 buah Rp 6,800.00 Rp 3.47
21.02.01.02.29 Sekop 0.0015 Unit/Hari Rp 12,705.00 Rp 19.06
21.02.04.17.05 Katel pack 0.0010 Buah Rp 67,500.00 Rp 68.18
02.05.02.01.10.03 Garuk+Gagang 0.0015 buah Rp 28,750.00 Rp 43.13
02.05.02.03.03.03 Keranjang Rotan 0.0030 buah Rp - Rp -
21.02.03.01.02 Sewa Truck 0.0093 Jam Rp 280,000.00 Rp 2,592.80
20.02.01.07.06 Solar 0.5093 Liter Rp 8,350.00 Rp 4,252.32
Nilai HSPK : #REF!
24.10.03.02 Pekerjaan Incinerator mini m3
Tenaga:
#REF! Mandor 0.0909 O.H #REF! #REF!
22.01.01.03.09 Pekerja Terampil 0.0909 O.H Rp 60,000.00 Rp 5,454.00
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.2730 O.H Rp 55,000.00 Rp 15,015.00
Peralatan:
21.02.04.17.02 Masker Plastik 0.0150 buah Rp 2,750.00 Rp 41.11
21.02.04.17.03 Sarung Tangan 0.0598 buah Rp 2,750.00 Rp 164.45
21.02.04.17.04 Sepatu boot 0.0970 buah Rp 6,800.00 Rp 659.57
21.02.04.17.05 Katel pack 0.0996 buah Rp 67,500.00 Rp 6,723.00
21.02.04.17.06 Topi Ranger 0.0499 buah Rp 6,800.00 Rp 339.32
21.02.01.02.29 Sekop 0.0100 Unit/Hari Rp 12,705.00 Rp 126.54
02.05.02.01.10.03 Garuk+Gagang 0.0199 buah Rp 28,750.00 Rp 572.99
02.05.02.03.03.03 Keranjang Rotan 0.0299 buah Rp - Rp -
20.02.01.07.02 Minyak Tanah 4.8000 ltr Rp 9,000.00 Rp 43,200.00
#REF! Listrik 0.4000 Kwh #REF! #REF!
21.01.05.01.02 Air 0.1091 m3 Rp 3,100.00 Rp 338.21
02.05.02.01.10.05 Sogrok Besi 0.0199 buah Rp - Rp -
Nilai HSPK : #REF!
24.10.03.03 Pekerjaan Penyapuan m2
Tenaga:
#REF! Kepala Tukang Sapu 0.0002 O.H #REF! #REF!
#REF! Tukang Sapu 0.0020 O.H #REF! #REF!
Peralatan:
21.02.04.17.02 Masker Plastik 0.0013 buah Rp 2,750.00 Rp 3.63
21.02.04.17.03 Sarung Tangan 0.0008 buah Rp 2,750.00 Rp 2.12
21.02.04.17.04 Sepatu Karet 0.0004 buah Rp 6,800.00 Rp 3.05
21.02.04.17.06 Topi Ranger 0.0004 buah Rp 6,800.00 Rp 2.99
21.02.04.17.01 Jas Hujan 0.0004 buah Rp 10,200.00 Rp 4.49
20.03.05.01.01.11 Sapu Lidi + Pegangan 0.0580 buah Rp 8,650.00 Rp 501.70
02.05.02.03.03.03 Keranjang Rotan 0.0029 buah Rp - Rp -
02.05.01.03.22.10 Gelangsing 0.0009 buah Rp 3,600.00 Rp 3.17
21.02.04.17.05 Katelpak 0.0005 Stel Rp 67,500.00 Rp 33.75
Nilai HSPK : #REF!
24.10.03.04 Pekerjaan Incinerator Mini Swasta m3
Tenaga:
#REF! Mandor 0.0636 O.H #REF! #REF!
22.01.01.03.09 Pekerja Terampil 0.0636 O.H Rp 60,000.00 Rp 3,818.18
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.3818 O.H Rp 55,000.00 Rp 21,000.00
Peralatan:
21.02.01.01.19 Sewa Incinerator 1.0000 jam Rp 4,778.00 Rp 4,778.00
21.02.04.17.02 Masker Plastik 0.0024 Buah Rp 2,750.00 Rp 6.58
21.02.04.17.03 Sarung Tangan 0.0060 buah Rp 2,750.00 Rp 16.45
21.02.04.17.04 Sepatu boot 0.0010 buah Rp 6,800.00 Rp 6.60
21.02.04.17.05 Katel pack 0.0016 Buah Rp 67,500.00 Rp 107.60
21.02.04.17.06 Topi Ranger 0.0010 buah Rp 6,800.00 Rp 6.78
21.02.01.02.29 Sekop 0.0001 Unit/Hari Rp 12,705.00 Rp 1.27
02.05.02.01.10.03 Garuk+Gagang 0.0003 buah Rp 28,750.00 Rp 8.60
02.05.02.03.03.03 Keranjang Rotan 0.0003 buah Rp - Rp -
20.02.01.07.02 Minyak Tanah 4.8000 ltr Rp 9,000.00 Rp 43,200.00
21.01.05.01.02 Air 0.1091 m3 Rp 3,100.00 Rp 338.18
20.02.01.07.06 Solar 1.8182 ltr Rp 8,350.00 Rp 15,181.82
02.05.02.01.10.05 Sogrok Besi 0.0003 buah Rp - Rp -
Pemerintah Kabupaten Madiun
- 99 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 100 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.10.03.05 Perbaikan Container Sampah (rusak berat) unit
Tenaga:
#REF! Tukang las 8.0000 O.H #REF! #REF!
22.01.01.03.07 Pekerja Semi Terampil 8.0000 O.H Rp 55,000.00 Rp 440,000.00
22.01.01.02.03 Tukang Cat 8.0000 O.H Rp 70,000.00 Rp 560,000.00
22.01.01.03.08 Pembantu Tukang Cat dan dempul 8.0000 O.H Rp 55,000.00 Rp 440,000.00
Bahan:
20.01.01.13.06 Plat esser 3 mm (120 x 240 cm) 8.0000 m2 Rp 231,800.00 Rp 1,854,400.00
20.01.01.13.05 Plat esser 1,2 mm (120 x 240 cm) 28.0000 m2 Rp 100,050.00 Rp 2,801,400.00
20.01.01.21.05 Kawat Las 9.0000 Box Rp 32,150.00 Rp 289,350.00
20.01.01.09.04.05 Cat Minyak 7.0000 Kg Rp 10,700.00 Rp 74,900.00
20.01.01.09.04.08 Thinner 15.0000 Liter Rp 31,050.00 Rp 465,750.00
20.01.01.19.02 Amplas 25.0000 Buah Rp 5,200.00 Rp 130,000.00
20.01.01.09.05.05 Dempul 15.0000 Kg Rp 27,500.00 Rp 412,500.00
Peralatan:
21.02.04.06.03 Sewa Genset 125 48.0000 Set/hari Rp 25,300.00 Rp 1,214,400.00
Nilai HSPK : #REF!
24.10.03.06 Perbaikan Gerobak Sampah (rusak berat) unit
Tenaga:
#REF! Tukang las 2.0000 O.H #REF! #REF!
22.01.01.03.07 Buruh Semi Terampil 2.0000 O.H Rp 55,000.00 Rp 110,000.00
22.01.01.02.03 Tukang Cat dan dempul 2.0000 O.H Rp 70,000.00 Rp 140,000.00
22.01.01.03.08 Pembantu Tukang Cat dan dempul 2.0000 O.H Rp 55,000.00 Rp 110,000.00
Bahan:
20.01.01.13.06 Plat esser 3 mm (120 x 240 cm) 1.0000 m2 Rp 231,800.00 Rp 231,800.00
20.01.01.13.05 Plat esser 1,2 mm (120 x 240 cm) 2.0000 m2 Rp 100,050.00 Rp 200,100.00
20.01.01.21.05 Kawat Las 1.5000 Box Rp 32,150.00 Rp 48,225.00
20.01.01.09.04.05 Cat Minyak 3.0000 Kg Rp 10,700.00 Rp 32,100.00
20.01.01.09.04.08 Thinner 3.0000 Liter Rp 31,050.00 Rp 93,150.00
20.01.01.19.02 Amplas 10.0000 Buah Rp 5,200.00 Rp 52,000.00
20.01.01.09.05.05 Dempul 3.0000 Kg Rp 27,500.00 Rp 82,500.00
Peralatan:
21.02.04.06.01 Sewa Genset 3000 10.0000 Set/hari Rp 215,575.00 Rp 2,155,750.00
Nilai HSPK : #REF!
24.10.04 Lingkungan Hidup
24.10.04.01 Perawatan Mangrove 1 Rb /BTG
Tenaga:
#REF! Mandor 0.3000 O.H #REF! #REF!
#REF! Tukang Tanam 3.0000 OH #REF! #REF!
Bahan:
20.03.06.10.02 Batteray kecil 16.00 Buah Rp 3,045.00 Rp 48,720.00
20.05.06.20.44 Ajir (2m) 100.00 btg Rp 197,000.00 Rp 19,700,000.00
05.19.03.14.34 Penggantian Tanaman 250.00 btg Rp - Rp -
05.19.03.14.37 Pupuk daun @ 100 gr 12.00 bks Rp - Rp -
Peralatan:
21.02.03.01.04 Sewa Mobil Pick up 1.00 Unit/Hari Rp 372,450.00 Rp 372,450.00
#REF! Sewa Rakit 1.00 Unit/Hari #REF! #REF!
21.02.01.02.14 Sewa Sprayer 3.00 Unit/Hari Rp 9,570.00 Rp 28,710.00
#REF! Sewa Cutter 3.00 Unit/Hari #REF! #REF!
21.02.01.02.32 Sewa Senter 3.00 Unit/Hari Rp 50,820.00 Rp 152,460.00
Nilai HSPK : #REF!
24.10.04.02 Penanaman Mangrove 1 Rb /BTG
Tenaga:
#REF! Mandor 0.8000 O.H #REF! #REF!
#REF! Tukang Tanam 8.0000 O.H #REF! #REF!
Bahan:
20.03.06.10.02 Batteray kecil 38.0000 Buah Rp 3,045.00 Rp 115,710.00
Peralatan:
#REF! Sewa Cutter 8.0000 Unit/Hari #REF! #REF!
21.02.01.02.32 Sewa Senter 9.0000 Unit/Hari Rp 50,820.00 Rp 457,380.00
21.02.01.02.19 Sewa Linggis 8.0000 Unit/Hari Rp 2,255.00 Rp 18,040.00
#REF! Sewa Rakit 2.0000 Unit/Hari #REF! #REF!
21.02.03.01.11 Sewa Truk Kelas I Dlm Kota 0.1500 Unit/Hari Rp 757,275.00 Rp 113,591.25
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 101 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.10.04.03 Penanaman Mangrove Batang
Tenaga:
#REF! Mandor 0.0008 O.H #REF! #REF!
#REF! Tukang Tanam 0.0080 O.H #REF! #REF!
Bahan:
20.03.06.10.02 Batteray kecil 0.0360 Buah Rp 3,045.00 Rp 109.62
Peralatan:
21.02.01.02.02 Sewa alat bantu 0.0025 Unit Rp 91,850.00 Rp 229.63
21.02.03.01.09 Sewa Truk Angkut (arm roll 14 m3) 0.0010 Unit/Hari Rp 720,000.00 Rp 720.00
#REF! Sewa Rakit 0.0020 Unit/Hari #REF! #REF!
Nilai HSPK : #REF!
24.10.04.04 Perawatan Mangrove (Batang Pohon) Batang
Tenaga:
#REF! Mandor 0.0003 O.H #REF! #REF!
22.01.01.03.09 Pekerja Terampil 0.0030 O.H Rp 60,000.00 Rp 180.00
Bahan:
05.19.02.03.01.17 Mangrove T. 1M 0.2500 btg Rp - Rp -
20.03.06.10.02 Batteray kecil 0.0160 Buah Rp 3,045.00 Rp 48.72
20.05.06.20.44 Bambu (Ajir) 0.1000 btg Rp 197,000.00 Rp 19,700.00
05.19.03.14.37 Pupuk daun 0.0050 bks Rp - Rp -
Peralatan:
21.02.03.01.04 Sewa Mobil Pick up 0.0010 Hari Rp 372,450.00 Rp 372.45
#REF! Sewa Rakit 0.0010 Unit/Hari #REF! #REF!
21.02.01.02.14 Sewa Sprayer 0.0030 Unit/Hari Rp 9,570.00 Rp 28.71
21.02.01.02.02 Sewa alat bantu 0.0030 Unit Rp 91,850.00 Rp 275.55
Nilai HSPK : #REF!
24.10.05 Pengecatan Mobil
24.10.05.01 Pengecatan Mobil Kijang/Panther, Tanpa Unit
Kerusakan Bodi
Tenaga:
22.01.01.01.03 Kepala Tukang 3.0000 OH Rp 80,000.00 Rp 240,000.00
22.01.01.02.03 Tukang Cat Mobil 5.0000 OH Rp 70,000.00 Rp 350,000.00
22.01.01.03.08 Tenaga: Tak Terampil 20.0000 OH Rp 55,000.00 Rp 1,100,000.00
Bahan:
20.01.01.09.04.02 Cat 3.0000 Kg Rp 134,500.00 Rp 403,500.00
20.01.01.09.04.03 Pernis 3.0000 Kg Rp 106,150.00 Rp 318,450.00
20.01.01.09.05.05 Dempul 5.0000 Kg Rp 26,300.00 Rp 131,500.00
20.01.01.19.02 Kertas Gosok 25.0000 Lbr Rp 5,200.00 Rp 130,000.00
Nilai HSPK : Rp 2,673,450.00
24.10.05.02 Pengecatan Mobil Kijang/Panther, Unit
Kerusakan Bodi Ringan
Tenaga:
22.01.01.01.03 Kepala Tukang 3.0000 OH Rp 80,000.00 Rp 240,000.00
22.01.01.02.03 Tukang Cat Mobil 5.0000 OH Rp 70,000.00 Rp 350,000.00
#REF! Tukang Las 10.0000 OH #REF! #REF!
22.01.01.03.08 Tenaga: Tak Terampil 25.0000 OH Rp 55,000.00 Rp 1,375,000.00
Bahan:
20.01.01.09.04.02 Cat 3.0000 Kg Rp 134,500.00 Rp 403,500.00
20.01.01.09.04.03 Pernis 3.0000 Kg Rp 106,150.00 Rp 318,450.00
20.01.01.09.05.05 Dempul 5.0000 Kg Rp 26,300.00 Rp 131,500.00
20.01.01.19.02 Kertas Gosok 30.0000 Lbr Rp 5,200.00 Rp 156,000.00
20.01.02.01.36 Oksigen 15.7000 Liter Rp - Rp -
20.01.01.21.02 Karbit (Asetilin) 4.0000 Kg Rp 26,450.00 Rp 105,800.00
20.01.01.13.11 Plat besi 8.4553 Kg Rp 14,000.00 Rp 118,373.50
Nilai HSPK : #REF!
24.10.05.03 Pengecatan Mobil Kijang/Panther, Kerusakan Unit
Bodi Sedang
Tenaga:
22.01.01.01.03 Kepala Tukang 3.0000 OH Rp 80,000.00 Rp 240,000.00
22.01.01.02.03 Tukang Cat Mobil 5.0000 OH Rp 70,000.00 Rp 350,000.00
#REF! Tukang Las 15.0000 OH #REF! #REF!
22.01.01.03.08 Tenaga: Tak Terampil 30.0000 OH Rp 55,000.00 Rp 1,650,000.00
Bahan:
20.01.01.09.04.02 Cat 3.0000 Kg Rp 134,500.00 Rp 403,500.00
20.01.01.09.04.03 Pernis 3.0000 Kg Rp 106,150.00 Rp 318,450.00
20.01.01.09.05.05 Dempul 5.0000 Kg Rp 26,300.00 Rp 131,500.00
20.01.01.19.02 Kertas Gosok 40.0000 Lbr Rp 5,200.00 Rp 208,000.00
20.01.02.01.36 Oksigen 15.7000 Liter Rp - Rp -
20.01.01.21.02 Karbit (Asetilin) 5.0000 Kg Rp 26,450.00 Rp 132,250.00
20.01.01.13.11 Plat besi 17.0115 Kg Rp 14,000.00 Rp 238,161.63
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 102 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.10.05.04 Pengecatan Mobil Kijang/Panther, Kerusakan Unit
Bodi Berat
Tenaga:
22.01.01.01.03 Kepala Tukang 3.0000 OH Rp 80,000.00 Rp 240,000.00
22.01.01.02.03 Tukang Cat Mobil 5.0000 OH Rp 70,000.00 Rp 350,000.00
#REF! Tukang Las 20.0000 OH #REF! #REF!
22.01.01.03.08 Tenaga: Tak Terampil 35.0000 OH Rp 55,000.00 Rp 1,925,000.00
Bahan:
20.01.01.09.04.02 Cat 3.0000 Kg Rp 134,500.00 Rp 403,500.00
20.01.01.09.04.03 Pernis 3.0000 Kg Rp 106,150.00 Rp 318,450.00
20.01.01.09.05.05 Dempul 5.0000 Kg Rp 26,300.00 Rp 131,500.00
20.01.01.19.02 Kertas Gosok 50.0000 Lbr Rp 5,200.00 Rp 260,000.00
20.01.02.01.36 Oksigen 15.7000 Liter Rp - Rp -
20.01.01.21.02 Karbit (Asetilin) 6.0000 Kg Rp 26,450.00 Rp 158,700.00
20.01.01.13.11 Plat besi 33.8545 Kg Rp 14,000.00 Rp 473,963.00
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 102 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.11.01 Pekerjaan Kemarkaan
24.11.01.01 Pengecatan Marka dan Zebra Cross (mekanis) m2
Tenaga:
#REF! Mandor 0.0220 O.H #REF! #REF!
22.01.01.02.03 Tukang Cat 0.0440 O.H Rp 70,000.00 Rp 3,080.00
22.01.01.03.08 Pekerja / Buruh Tak Terampil 0.0890 O.H Rp 55,000.00 Rp 4,895.00
Bahan:
20.01.01.70.11 Thermo Plastic 3.7500 Kg Rp 35,400.00 Rp 132,750.00
LPG 0.0440 Kg Rp 77,000.00 Rp 3,388.00
20.01.01.70.06 Glass Bit 0.5000 Kg Rp 15,850.00 Rp 7,925.00
Peralatan:
21.02.01.02.02 Sewa Alat Bantu 0.0440 Unit Rp 91,850.00 Rp 4,041.40
21.02.03.01.03 Flat Bed Truck 0.0440 Jam Rp 231,450.00 Rp 10,183.80
Nilai HSPK : #REF!
24.11.01.02 Pengecatan Marka dan Zebra Cross (manual) m2
Tenaga:
#REF! Mandor 0.0220 O.H #REF! #REF!
22.01.01.02.03 Tukang Cat 0.0440 O.H Rp 70,000.00 Rp 3,080.00
22.01.01.03.08 Pekerja / Buruh Tak Terampil 0.0890 O.H Rp 55,000.00 Rp 4,895.00
Bahan:
20.01.01.09.04.33 Cat marka 3.7500 kg Rp 37,400.00 Rp 140,250.00
Peralatan:
21.02.01.02.02 Alat bantu 0.0440 Unit Rp 91,850.00 Rp 4,041.40
Nilai HSPK : #REF!
24.11.01.03 Pengadaan dan Pemasangan Warning Light 2
Buah
Aspek
I. Pengadaan
20.03.06.19.37 Kontroller Lampu Peringatan 1.0000 set Rp 3,511,777.50 Rp 3,511,777.50
20.03.06.19.10 Box Lampu 3 Aspek LED 20 Cm 2.0000 set Rp 10,024,560.00 Rp 20,049,120.00
20.03.06.18.01 Tiang Over Head 6.4.3" 1.0000 Batang Rp 3,410,400.00 Rp 3,410,400.00
20.03.06.19.01 Armatur Box Lampu 4.0000 Buah Rp 84,945.00 Rp 339,780.00
20.03.06.19.52 Patok Pengaman 4" BSB 3.0000 Buah Rp 292,845.00 Rp 878,535.00
20.03.06.19.64 Terminal Kabel Besar 1.0000 Buah Rp 27,247.50 Rp 27,247.50
20.03.06.01.03.03 Kabel NYM 1.5 mm 30.0000 meter Rp 9,300.00 Rp 279,000.00
20.03.06.01.11.02 Kabel SR / Twister 50.0000 meter Rp 16,012.50 Rp 800,625.00
20.03.06.19.35 Konektor Kabel 4.0000 Buah Rp 16,012.50 Rp 64,050.00
20.03.06.19.62 Service Kabel SR 4.0000 Buah Rp 15,330.00 Rp 61,320.00
20.03.06.19. Biaya Penyambungan PLN 1.0000 unit Rp - Rp -
II. Konstruksi Pemasangan
Penggelaran kabel 80.0000 meter Rp 100.00 Rp 8,000.00
Gali dan Tutup Tanah Keras 2.0000 m3 Rp 40,000.00 Rp 80,000.00
Pengecoran Tiang Over Head 1.0000 Unit Rp 100,000.00 Rp 100,000.00
Pengecoran Patok Pengaman 3.0000 Unit Rp 60,000.00 Rp 180,000.00
Pasang dan Stel Box Lampu 1.0000 Unit Rp 15,000.00 Rp 15,000.00
Pembuatan dudukan Box Control 1.0000 Buah Rp 140,000.00 Rp 140,000.00

Pengecatan Tiang dan Patok Pengaman 1.0000 Unit Rp 26,850.00 Rp 26,850.00

Nilai HSPK : Rp 29,971,705.00

Pemerintah Kabupaten Madiun


- 103 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.11.01.04 Pengadaan Warning Light 3 Aspek Buah
I. Pengadaan
20.03.06.19.37 Kontroller Lampu Peringatan 1.0000 set Rp 3,511,777.50 Rp 3,511,777.50
20.03.06.19.10 Box Lampu 3 Aspek LED 30 Cm 2.0000 set Rp 10,024,560.00 Rp 20,049,120.00
20.03.06.18.01 Tiang Over Head 6.4.3" 1.0000 Batang Rp 3,410,400.00 Rp 3,410,400.00
20.03.06.19.01 Armatur Box Lampu 4.0000 Buah Rp 84,945.00 Rp 339,780.00
20.03.06.19.52 Patok Pengaman 4" BSB 3.0000 Buah Rp 292,845.00 Rp 878,535.00
20.03.06.19.64 Terminal Kabel Besar 1.0000 Buah Rp 27,247.50 Rp 27,247.50
20.03.06.01.03.03 Kabel NYM 1.5 mm 30.0000 meter Rp 9,300.00 Rp 279,000.00
20.03.06.01.11.02 Kabel SR / Twister 50.0000 meter Rp 16,012.50 Rp 800,625.00
20.03.06.19.35 Konektor Kabel 4.0000 Buah Rp 16,012.50 Rp 64,050.00
20.03.06.19.62 Service Kabel SR 4.0000 Buah Rp 15,330.00 Rp 61,320.00
20.03.06.19. Biaya Penyambungan PLN 1.0000 unit Rp - Rp -
20.03.06.19.96 Biaya Programming 1.0000 Buah Rp 191,572.50 Rp 191,572.50
II. Konstruksi Pemasangan
Penggelaran kabel 80.0000 meter Rp 100.00 Rp 8,000.00
Gali dan Tutup Tanah Keras 2.0000 m3 Rp 40,000.00 Rp 80,000.00
Pengecoran Tiang Over Head 1.0000 Unit Rp 100,000.00 Rp 100,000.00
Pengecoran Patok Pengaman 3.0000 Unit Rp 60,000.00 Rp 180,000.00
Pasang dan Stel Box Lampu 1.0000 Unit Rp 15,000.00 Rp 15,000.00
Pembuatan dudukan Box Control 1.0000 Buah Rp 140,000.00 Rp 140,000.00

Pengecatan Tiang dan Patok Pengaman 1.0000 Unit Rp 26,850.00 Rp 26,850.00

Nilai HSPK : Rp 30,163,277.50


24.11.01.05 Pengadaan Traffic Light Tiang Lurus Buah
I. Pengadaan
20.03.06.19.38 Kontroller TLC x1 comp 4 1.0000 Unit Rp 2,962,680.00 Rp 2,962,680.00
20.03.06.19.10 Box Lampu 3 Aspek LED 30 Cm 10.0000 Unit Rp 10,024,560.00 Rp 100,245,600.00
20.03.06.19.09 Box Lampu 2 Aspek LED 20 Cm 8.0000 Unit Rp 1,915,515.00 Rp 15,324,120.00
20.03.06.18.01 Tiang Over Head 6.5.3" 3.0000 Batang Rp 3,410,400.00 Rp 10,231,200.00
20.03.06.18.02 Tiang Lurus 5", tinggi 2 m 3.0000 Batang Rp 2,092,807.50 Rp 6,278,422.50
20.03.06.19.01 Armatur Box Lampu 36.0000 Buah Rp 84,945.00 Rp 3,058,020.00
20.03.06.19.52 Patok Pengaman 4" BSB 24.0000 Buah Rp 292,845.00 Rp 7,028,280.00
20.03.06.19.64 Terminal Kabel 10.0000 Buah Rp 27,247.50 Rp 272,475.00
20.03.06.01.04.50 Kabel NYY 4 x 2.5 mm 420.00 m Rp 26,150.00 Rp 10,983,000.00
20.03.06.01.04.23 Kabel NYY 2 x 4 mm 40.0000 m Rp 21,050.00 Rp 842,000.00
20.03.06.19.103 Pipa BSB 1" 2.0000 Batang Rp 102,165.00 Rp 204,330.00
20.01.01.05.06 Pasir Urug 3.0000 m3 Rp 126,500.00 Rp 379,500.00
20.03.06.19.56 Rambu Tabel 1 plus Pengaman 4.0000 set Rp 543,637.50 Rp 2,174,550.00
20.03.06.19. Biaya Penyambungan PLN 1.0000 Unit Rp - Rp -
II. Konstruksi Pemasangan
Penggelaran Kabel 460.00 m Rp 100.00 Rp 46,000.00
Pemasangan Pipa PVC 200.00 m Rp 1,000.00 Rp 200,000.00
Boring Bawah Aspal 68.0000 m3 Rp 32,500.00 Rp 2,210,000.00
Gali dan Tutup Tanah Keras 70.0000 m3 Rp 40,000.00 Rp 2,800,000.00
Pengecoran Tiang Over Head 3.0000 Buah Rp 100,000.00 Rp 300,000.00
Pengecoran Tiang Lurus 3.0000 Buah Rp 80,000.00 Rp 240,000.00
Pengecoran Tiang Patok Pengaman 24.0000 Buah Rp 60,000.00 Rp 1,440,000.00
Pasang dan Stel Box Lampu 18.0000 Buah Rp 15,000.00 Rp 270,000.00
Pembuatan Dudukan Box Lampu 1.0000 set Rp 140,000.00 Rp 140,000.00
Pasang dan Stel 1 pesawat Kontroller 1.0000 Buah Rp 165,000.00 Rp 165,000.00

Pengecatan Tiang dan Patok Pengaman 1.0000 Unit Rp 26,850.00 Rp 26,850.00

24.11.01.01 Pengecatan Marka dan Zebra Cross 66.0000 m2 #REF! #REF!


20.03.06.19.96 Biaya Programming 1.0000 Buah Rp 191,572.50 Rp 191,572.50
Nilai HSPK : #REF!

Pemerintah Kabupaten Madiun


- 104 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.11.01.06 Pengadaan Traffic Light Tiang Lengkung Buah
I. Pengadaan
20.03.06.19.38 Kontroller TLC x1 comp 4 1.0000 Unit Rp 2,962,680.00 Rp 2,962,680.00
20.03.06.19.10 Box Lampu 3 Aspek LED 30 Cm 10.0000 Unit Rp 10,024,560.00 Rp 100,245,600.00
20.03.06.19.09 Box Lampu 2 Aspek LED 20 Cm 8.0000 Unit Rp 1,915,515.00 Rp 15,324,120.00
20.03.06.18.01 Tiang Over Head 6.5.3" 3.0000 Batang Rp 3,410,400.00 Rp 10,231,200.00
20.03.06.18.02 Tiang Lengkung 5", tinggi 3.5 m 3.0000 Batang Rp 2,092,807.50 Rp 6,278,422.50
20.03.06.19.01 Armatur Box Lampu 36.0000 Buah Rp 84,945.00 Rp 3,058,020.00
20.03.06.19.52 Patok Pengaman 4" BSB 24.0000 Buah Rp 292,845.00 Rp 7,028,280.00
20.03.06.19.64 Terminal Kabel 10.0000 Buah Rp 27,247.50 Rp 272,475.00
20.03.06.01.04.50 Kabel NYY 4 x 2.5 mm 420.00 m Rp 26,150.00 Rp 10,983,000.00
20.03.06.01.04.23 Kabel NYY 2 x 4 mm 40.00 m Rp 21,050.00 Rp 842,000.00
20.03.06.19.103 Pipa BSB 1" 2.0000 Batang Rp 102,165.00 Rp 204,330.00
20.01.01.05.06 Pasir Urug 3.0000 m3 Rp 126,500.00 Rp 379,500.00
20.03.06.19.56 Rambu Tabel 1 plus Pengaman 4.0000 set Rp 543,637.50 Rp 2,174,550.00
20.03.06.19. Biaya Penyambungan PLN 1.0000 Unit Rp - Rp -
II. Konstruksi Pemasangan
Penggelaran Kabel 460.00 m Rp 100.00 Rp 46,000.00
Pemasangan Pipa PVC 200.00 m Rp 1,000.00 Rp 200,000.00
Boring Bawah Aspal 68.0000 m Rp 32,500.00 Rp 2,210,000.00
Gali dan Tutup Tanah Keras 70.0000 m Rp 40,000.00 Rp 2,800,000.00
Pengecoran Tiang Over Head 3.0000 Buah Rp 100,000.00 Rp 300,000.00
Pengecoran Tiang Lurus 3.0000 Buah Rp 80,000.00 Rp 240,000.00
Pengecoran Tiang Patok Pengaman 24.0000 Buah Rp 60,000.00 Rp 1,440,000.00
Pasang dan Stel Box Lampu 18.0000 Buah Rp 15,000.00 Rp 270,000.00
Pembuatan Dudukan Box Lampu 1.0000 set Rp 140,000.00 Rp 140,000.00
Pasang dan Stel 1 pesawat Kontroller 1.0000 Buah Rp 165,000.00 Rp 165,000.00

Pengecatan Tiang dan Patok Pengaman 1.0000 Unit Rp 26,850.00 Rp 26,850.00

24.11.01.01 Pengecatan Marka dan Zebra Cross 66.0000 m2 #REF! #REF!


20.03.06.19.96 Biaya Programming 1.0000 Unit Rp 191,572.50 Rp 191,572.50
Nilai HSPK : #REF!
24.11.01.07 Pembuatan & Pemasangan Rambu Lalu Lintas
(Uk. diameter 60 CM ) dr Plat Alumunium 2 MM Unit
dgn SCOTCHLIGHT serta Plat Tambahan:
Tenaga:
#REF! Mandor 0.5000 OH #REF! #REF!
22.01.01.03.08 Pekerja / Buruh tak terampil 3.5000 OH Rp 55,000.00 Rp 192,500.00
Bahan:
20.01.01.18.04 Plat Almunium teb. 2 mm 0.0485 M2 Rp 584,700.00 Rp 28,357.95
20.01.01.70.07 Pemantul / Scotch Light Putih 0.3850 M2 Rp 260,400.00 Rp 100,254.00
20.01.01.09.04.33 Cat Warna Scotch Light 0.1720 kg Rp 37,400.00 Rp 6,432.80
20.05.06.02.06 Pipa Galvanis 1,5 " Medium B 3.0000 M Rp 25,091.67 Rp 75,275.00
20.01.01.13.11 Plat Strip Uk. 3 x 40 mm 0.7500 kg Rp 14,000.00 Rp 10,500.00
20.01.01.13.10 Plat Siku L. 20 x 20 x 2 0.2500 kg Rp 14,000.00 Rp 3,500.00
#REF! Pondasi Umpak Beton K-225 0.1120 m3 Rp 1,122,456.96 Rp 125,715.18
Peralatan:
21.02.01.02.02 Sewa Alat Bantu 0.0850 Unit Rp 91,850.00 Rp 7,807.25
Pengangkutan Rambu ke Lokasi 1.0000 Unit Rp 12,000.00 Rp 12,000.00
Nilai HSPK: #REF!

Pemerintah Kabupaten Madiun


- 105 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.11.01.08 Pembuatan & Pemasangan Rambu Lalu Lintas
(Uk. diameter 70 CM ) dr Plat Almunium 2 MM Unit
dgn SCOTCHLIGHT serta Plat Tambahan:
Tenaga:
#REF! Mandor 0.5000 OH #REF! #REF!
22.01.01.03.08 Pekerja / Buruh tak terampil 3.5000 OH Rp 55,000.00 Rp 192,500.00
Bahan:
20.01.01.18.04 Plat Almunium teb. 2 mm 0.2150 M2 Rp 584,700.00 Rp 125,710.50
20.01.01.70.07 Pemantul / Scotch Light Putih 0.3150 M2 Rp 260,400.00 Rp 82,026.00
20.01.01.09.04.33 Tinta Warna Scotch Light 0.8500 kg Rp 37,400.00 Rp 31,790.00
20.05.06.02.02 Pipa Galvanis 2 " Medium B 3.0000 M Rp 793,500.00 Rp 2,380,500.00
20.01.01.13.11 Plat Strip Uk. 3 x 40 mm 0.5000 kg Rp 14,000.00 Rp 7,000.00
20.01.01.13.10 Plat Siku L. 20 x 20 x 2 0.3000 kg Rp 14,000.00 Rp 4,200.00
#REF! Pondasi Umpak Beton K-225 0.0805 M3 Rp 1,122,456.96 Rp 90,380.23
Peralatan:
21.02.01.02.02 Sewa Alat Bantu 0.0750 unit Rp 91,850.00 Rp 6,888.75
Pengangkutan Rambu ke Lokasi 1.0000 Unit Rp 12,000.00 Rp 12,000.00
Nilai HSPK: #REF!
24.11.01.09 Pengadaan dan Pemasangan Pagar Pengaman
Buah
Jalan 4 m
20.01.01.13.02 Lempengan Besi Baja Profil Desain
1.0000 kg Rp 14,500.00 Rp 14,500.00
Galvanis
20.01.01.14.01.10 Tiang Penyangga Besi Struktur
45.7500 Kg Rp 13,000.00 Rp 594,750.00
Pengendali
20.01.01.61.12 Besi Pengikat Baja Profil Desain 3.0000 Kg Rp 19,550.00 Rp 58,650.00
20.01.01.24.10 Mur Baut Beam 12 x 25 mm 10.0000 Buah Rp 3,750.00 Rp 37,500.00
20.01.01.24.13 Mur Baut Blocking 12 x 25 mm 3.0000 Buah Rp 4,300.00 Rp 12,900.00
20.01.01.24.11 Mur Baut Post 16 x 48 mm 3.0000 Buah #REF! #REF!
20.01.01.14.05.06 Besi Angkur 30 x 30 x 3 mm 2.2500 meter Rp 169,900.00 Rp 382,275.00
20.03.06.19.63 Terminal End (Sleeve Beam) 2.0000 Buah Rp 89,355.00 Rp 178,710.00
#REF! Galian Tanah Urug Kembali 1.6800 m3 Rp 42,375.00 Rp 71,190.00
#REF! Urugan Tanah di bawah Pasir 0.2000 m3 Rp 169,200.00 Rp 33,840.00
#REF! Bekisting Pondasi 5.8500 m3 Rp 201,567.00 Rp 1,179,166.95
#REF! Cor Pondasi Beton 0.6100 m3 Rp 947,379.52 Rp 577,901.51
Ongkos Angkut ke Lokasi 1.0000 Buah Rp 100,000.00 Rp 100,000.00
Nilai HSPK : #REF!
24.11.01.10 Pengadaan dan Pemasangan Paku Jalan (Uk.
Buah
10 x 10 x 2 Cm)
20.01.01.18.01 Alluminium Alloy (10 x 10 x 2 cm) 1.0000 Buah Rp 73,900.00 Rp 73,900.00
20.03.06.19.57 Reflektor 2.0000 Buah Rp 13,000.00 Rp 26,000.00
20.01.01.34.15 Lem mixed Epoxy Adhesive 0.1300 kg Rp 119,600.00 Rp 15,548.00
Pengeboran dan Pemasangan Paku
1.0000 Buah Rp 50,000.00 Rp 50,000.00
Jalan
Ongkos Angkut ke Lokasi 0.0020 Buah Rp 100,000.00 Rp 200.00
Nilai HSPK : Rp 165,648.00
24.11.01.11 Pengadaan dan Pemasangan Paku Jalan (Uk.
Buah
10 x 12 x 2 Cm)
20.01.01.18.01 Alluminium Alloy 10 x 12 x 2 cm) 1.0000 Buah Rp 73,900.00 Rp 73,900.00
20.03.06.19.57 Reflektor 2.0000 Buah Rp 13,000.00 Rp 26,000.00
20.01.01.34.15 Lem mixed Epoxy Adhesive 0.1300 kg Rp 119,600.00 Rp 15,548.00
Pengeboran dan Pemasangan Paku
1.0000 Buah Rp 50,000.00 Rp 50,000.00
Jalan
Ongkos Angkut ke Lokasi 0.0150 Buah Rp 100,000.00 Rp 1,500.00
Nilai HSPK : Rp 166,948.00

Pemerintah Kabupaten Madiun


- 106 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
24.03.02.23 Pekerjaan Pintu Rumah Pompa Unit
Bahan:
20.01.01.13.02 Besi UNP 120 80.4000 Kg Rp 14,500.00 Rp 1,165,800.00
20.05.06.02.02 Pipa Galvanis 2" 117.0000 Kg Rp 66,125.00 Rp 7,736,625.00
20.01.01.13.10 Besi Siku 4 x 4 x 400 cm 6.0000 Kg Rp 14,000.00 Rp 84,000.00
20.01.01.14.01.10 Besi Beton 16 21.5680 Kg Rp 13,000.00 Rp 280,384.00
20.01.01.13.08 Plat Esser 2 mm 65.0000 Kg Rp 16,479.17 Rp 1,071,145.83
20.01.01.13.11 Plat Strip 50 x 3 0.2400 Kg Rp 14,000.00 Rp 3,360.00
20.01.01.13.10 Besi Plat 7.0000 Kg Rp 14,000.00 Rp 98,000.00
20.01.01.21.01 Elektroda Baja (20 %) 3.0000 Kg Rp 67,150.00 Rp 201,450.00
Upah:
#REF! Ongkos kerja Pabrikasi dan 300.2080 Kg Rp 840.00 Rp 252,174.72
Pemasangan Baja
Nilai HSPK : Rp 10,892,939.55
24.03.02.24 Pekerjaan Pintu Pagar Rumah Pompa M2
Tenaga:
#REF! Mandor 0.0250 OH #REF! #REF!
#REF! Tukang Las 0.0250 OH #REF! #REF!
22.01.01.03.08 Pekerja / Buruh tak terampil 0.2500 OH Rp 55,000.00 Rp 13,750.00
Bahan:
20.05.06.02.06 Pipa Galvanis 1,5" 2.7300 m1 Rp 25,091.67 Rp 68,500.25
20.05.06.02.01 Pipa Galvanis 1" 2.5260 m1 Rp 674,000.00 Rp 1,702,524.00
20.01.01.61.13 Kawat Loket tbl 2 mm 1.0500 M2 Rp 14,650.00 Rp 15,382.50
Peralatan:
#REF! Sewa Welding 0.2500 Jam #REF! #REF!
21.02.01.02.02 Sewa Alat Bantu 0.0500 Unit Rp 91,850.00 Rp 4,592.50
Nilai HSPK : #REF!

WAKIL BUPATI MADIUN,

Drs. ISWANTO, M.Si.

Pemerintah Kabupaten Madiun


PERUBAHAN HARGA BARANG DAN BAHAN BANGUNAN / KONSTRUKSI

TAHUN 2008

KODE HARGA
NO NAMA BARANG MERK / UKURAN SATUAN
BARANG SATUAN
1 2 3 4 5 6
20 BARANG PERSEDIAAN DAN BARANG PAKAI HABIS
20.01 BARANG PAKAI HABIS
20.01.01 BAHAN BANGUNAN DAN KONSTRUKSI
20.01.01.01. Aspal
4 20.01.01.01.04 Aspal Aspal Curah Kg 7,700
5 20.01.01.01.05 Aspal Aspal Bitumen Kg 8,100
20.01.01.02. Semen
3 20.01.01.02.03 Semen Gresik 40 Kg zak 48,300
4 20.01.01.02.04 Semen Gresik 50 Kg zak 59,000
20.01.01.08. Baja
1 20.01.01.08.01 Baja Plat Siku Kg 14,750
2 20.01.01.08.02 Baja Baja WF/ Profil/ INP/ H.Beam Kg 15,900
3 20.01.01.08.03 Baja Plat Strip Kg 15,200
20.01.01.12. Besi
16 20.01.01.12.16 Besi Beton, polos Kg 12,900
17 20.01.01.12.17 Besi Beton, Ulir Kg 13,200
20.01.05. BAHAN BAKU
20.01.05.01. Kawat
2 20.01.05.01.02 Kawat Kawat Berduri m' 3,500
3 20.01.05.01.03 Kawat Kawat Beton Kg 12,700
20.01.05.02 Kayu
1 20.01.05.02.01 Kayu Bengkirai Balok m3 6,254,000
2 20.01.05.02.02 Kayu Bengkirai Papan m3 6,077,000
3 20.01.05.02.03 Kayu Bengkirai Usuk m3 5,723,000
16 20.01.05.02.16 Kayu Kamper Balok 6 x 12 x 400cm m3 6,555,500
17 20.01.05.02.17 Kayu Kamper Kaso 5 x 7 x 400cm m3 5,900,000
18 20.01.05.02.18 Kayu Kamper Papan 2 x 20 x 400cm m3 6,268,750
19 20.01.05.02.19 Kayu Kamper Reng 2 x 3 x 400cm m3 5,654,100
20 20.01.05.02.20 Kayu Kruing Balok 6 x 12 x 400cm m3 6,145,800
21 20.01.05.02.21 Kayu Kruing Kaso 5 x 7 x 400cm m3 5,689,200
22 20.01.05.02.22 Kayu Kruing Papan 2 x 20 x 400cm m3 6,047,500
23 20.01.05.02.23 Kayu Kruing Reng 2 x 3 x 400cm m3 5,408,300
24 20.01.05.02.24 Kayu Meranti Balok 6 x 12 x 400Cm m3 4,302,000
25 20.01.05.02.25 Kayu Meranti Kaso 5 x 7 x 400Cm m3 3,540,000
26 20.01.05.02.26 Kayu Meranti Papan 2 x 20 x 400Cm m3 4,056,250
27 20.01.05.02.27 Kayu Meranti Reng 2 x 3 x 400Cm m3 3,441,600
20.05.06 PIPA PVC/UPVC
20.05.06.01 Pipa PVC
85 20.05.06.01.85 Pipa PVC Dia 2" S-12,5 @ 6m Batang 115,700
20.05.06.02 Pipa Galvanis (Air Tuang)
1 20.05.06.02.01 Pipa Galvanis dia 1/2" @ 6m Batang 165,200
2 20.05.06.02.02 Pipa Galvanis dia 3/4" @ 6m Batang 247,800
3 20.05.06.02.03 Pipa Galvanis dia 1" @ 6m Batang 324,500
4 20.05.06.02.04 Pipa Galvanis dia 1 1/2" @ 6m Batang 385,800
5 20.05.06.02.05 Pipa Galvanis dia 2" @ 6m Batang 678,500
6 20.05.06.02.06 Pipa Galvanis dia 2 1/2" @ 6m Batang 890,900
7 20.05.06.02.07 Pipa Galvanis dia 3" @ 6m Batang 1,091,500
8 20.05.06.02.08 Pipa Galvanis dia 4" @ 6m Batang 1,476,100
9 20.05.06.02.09 Pipa Galvanis dia 6" @ 6m Batang 2,100,400

107
KODE HARGA
NO NAMA BARANG MERK / UKURAN SATUAN
BARANG SATUAN
10 20.05.06.02.10 Pipa Galvanis dia 8" @ 6m Batang 2,478,000
20.01.04. BAHAN BAKAR DAN PELUMAS
20.01.04.01. Bahan Bakar Minyak
1 20.01.04.01.01 Bensin / Premium ltr 6,000
2 20.01.04.01.02 Solar ltr 5,500
Pompa Turbin & Submersible
Pompa Turbin Kap. 30 Brand Rovatti (Complit dg
1 02.02.03.05.02.01 Unit 133,731,000
Ltr/dt Head 40 m Acessoris dan Perlengkapan)

Brand Southern Franklin Type


Pompa Submersible Kap.
2 02.02.03.05.01.51 SJ60-6 (Complit dg Acessoris dan Unit 118,440,000
15 Ltr/Dt Head 50 m
Perlengkapan)

Brand Southern Franklin Type


Pompa Submersible Kap.
3 02.02.03.05.01.01 SJ60-6 (Complit dg Acessoris dan Unit 137,820,000
20 Ltr/Dt Head 50 m
Perlengkapan)

Mesin Penggerak Daya 32


4 02.02.03.05.02.02 Deutz Engine Type F3L-912 Unit 126,000,000
HP untuk Pompa Turbin

Generator Set Kap. 27,5 Deutz EngineType F3L-912 dg


5 02.02.01.11.08..34 Unit 157,800,000
KVA 3P / 380 Stamford Type BCI 184 F

108
DAFTAR ANALISA STANDAR BELANJA
PEMBANGUNAN DAN REHABILITASI BANGUNAN GEDUNG
DAN PENDOPO
26.08.01 Pembangunan Gedung
HARGA
NO JENIS PEKERJAAN Koeff SAT. JUMLAH (Rp)
SATUAN (Rp)
26.08.01.01 Pembangunan Gedung Type A M2
I PEK. PENDAHULUAN
20.01.01.64.01.05 Pek. Persiapan 0.006557377 Ls 500,000.00 3,278.69
25.01.01.02 Pembuatan bouwplank/uietzet 0.462295082 M 35,520.14 16,420.79
JUMLAH 19,699.47
II PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.174688525 M³ 20,250.00 3,537.44
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.196721311 Ttk 45,600.00 8,970.49
25.01.02.13 Urugan tanah kembali 0.043672131 M³ 5,062.50 221.09
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.03042623 M³ 117,741.25 3,582.42
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.050819672 M³ 117,741.25 5,983.57
JUMLAH 22,295.02
III PEK. BETON STRUKTUR
25.03.01.24 Pas. sloof 20/25 0.044262295 M³ 3,457,113.56 153,019.78
25.03.01.16 Pas. kolom praktis 15/15 0.022491148 M³ 1,880,541.98 42,295.55
25.03.01.16 Pas. kolom pendek 20/20 0.003777049 M³ 1,880,541.98 7,102.90
25.03.01.28 Pas. ring balok 15/15 0.026557377 M³ 2,777,913.59 73,774.10
25.03.01.33 Pek. beton rabatan t = 5 cm 0.065652459 M³ 419,259.66 27,525.43
25.03.01.28 Pek. balok lantai 0.003836066 M³ 2,777,913.59 10,656.26
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.03147541 M³ 2,777,913.59 87,435.97
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.041733021 M³ 2,777,913.59 115,930.73
25.03.01.33 Pek. Lantai Kerja 0.0116 M³ 419,259.66 4,845.54
25.03.01.28 Pek Plat Level 0.0073 M³ 2,777,913.59 20,401.73
JUMLAH 542,987.98
IV PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M² 50,100.92 134,566.15
25.04.01.30 Pek. Plesteran halus 5.3718 M² 18,901.15 101,533.26
25.04.01.38 Pek. benangan 1.9148 M¹ 5,865.60 11,231.18
25.02.01.12 Pek. pondasi batu kali 0.0813 M³ 427,332.94 34,740.07
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³ 179,720.00 8,885.83
JUMLAH 290,956.48
V PEK. LANTAI
25.05.01.11 Pas. Lantai marmer 0.9820 M² 449,184.00 441,083.96
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M² 106,978.74 14,591.20
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M² 76,305.40 2,626.91
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M² 106,978.74 124,586.39
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹ 22,569.25 1,553.95
JUMLAH 584,442.40
VI PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.04 Pas. daun pintu teakwood rangka ky. kamper 0.0771 M² 284,491.72 21,938.51
25.07.01.04 Pas. daun pintu kaca rangka ky. kamper 0.0204 M² 284,491.72 5,798.03
25.07.01.47 Pas. kaca mati tb = 5 mm 0.1034 M² 307,273.40 31,773.08
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M² 332,624.50 19,451.44
dan bouvenlist ( kaca selipan )
25.07.01.02 Pas. kusen ky kamper 0.0150 M³ 6,617,060.00 99,362.64
JUMLAH 178,323.71
VII PEK. ATAP
25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M² 65,130.00 107,191.17
25.06.01.01 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³ 12,914,000.00 165,841.16
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³ 62,276.80 469.27
25.06.01.07 Pas. gording kamper 8/12 0.0132 M² 62,276.80 824.26
25.06.01.06 Pas. reng jati Usuk ky. Kamper 1.6458 M³ 104,435.80 171,880.78
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹ 49,958.25 12,121.02
25.06.02.32 Pas Listplank Kayu Jati 3 / 30 cm 0.4508 M¹ 152,017.90 68,532.66
25.06.02.18 Pek. talang jurai 0.0656 M¹ 118,263.44 7,754.98
JUMLAH 534,615.30
VIII PEK. PLAFOND
25.06.03.17 Pas. Plafond Kalsiboard Rangka Aluminium 1.5984 M² 122,735.00 196,174.80
25.06.03.06 Pas. list plafond 1.6295 M¹ 4,683.00 7,630.99
JUMLAH 203,805.78
IX PEK. PENGECATAN
25.04.02.18 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M² 88,190.90 90,913.36
25.04.02.22 Pek. pengecatan dinding 5.3718 M² 19,986.00 107,360.86
25.04.02.21 Pek. pengecatan plafond 1.5984 M² 21,821.40 34,878.47
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M² 39,277.80 7,658.78
25.04.02.16 Pek. koltir rangka atap 1.6458 M² 6,287.50 10,347.99
25.04.02.12 Pek. meni rangka plafond 1.5984 M² 5,287.20 8,450.85
JUMLAH 259,610.31
X PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit 97,650.00 7,043.61
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel 42,800.00 4,630.82
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel 34,700.00 2,730.49
25.07.01.32 Pas. hak angin lurus 0.0393 Bh 26,200.00 1,030.82
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh 9,600.00 1,447.87
JUMLAH 16,883.61
XI PEK. INSTALASI LISTRIK
25.07.02.02 Pas. titik lampu 0.1246 Ttk 195,150.00 24,313.77
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh 51,700.00 5,424.26
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh 7,450.00 146.56
B.24.01.02.05.023 Pas. MCB 0.0066 Bh 227,500.00 1,491.80
25.07.02.01 Pas. stop kontak 0.0787 Ttk 29,205.30 2,298.12
25.07.02.03 Pas. saklar tunggal 0.0787 Bh 26,755.30 2,105.34
25.07.02.04 Pas. saklar ganda 0.0131 Bh 29,205.30 383.02
JUMLAH 36,162.87
XII Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit
25.01.02.07 Pek Galian tanah 0.0407 M³ 20,250.00 824.89
25.01.02.16 Pek Urugan pasir 0.0014 M³ 117,741.25 159.87
25.04.01.12 Pas. batu merah 0.1130 M² 50,100.92 5,660.11
25.07.03.08 Pek. pelat penutup beton 0.0033 M³ 1,784,684.36 5,815.98
25.04.01.30 Pek. Plesteran halus 0.1130 M² 18,901.15 2,135.34
25.07.05.08 Pas Pipa 4 " 0.0098 M¹ 135,517.96 1,332.96
Jumlah 15,929.17
XIII Tandon Air (1.2 x 2.2 x 1.20) Unit
25.01.02.07 Pek Galian tanah 0.0234 M³ 20,250.00 473.25
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg 13,753.60 356.24
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M² 76,305.40 4,723.43
25.01.02.16 Pek Urugan pasir 0.0017 M³ 117,741.25 203.83
25.03.01.36 Pek Lantai kerja 0.0009 M³ 418,649.94 362.37
Pek beton 0.0062 M³ 2,777,913.59 17,195.74
Jumlah 23,314.86
XIV PEK. INSTALASI AIR
25.07.03.23 Pas. wastafel warna 0.0393 Unit 459,150.00 18,064.92
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit 450,000.00 2,950.82
25.07.03.19 Pas. kran air 0.0525 Bh 58,250.00 3,055.74
25.07.03.30 Instalasi air bersih 0.3279 M¹ 69,000.00 22,622.95
25.07.03.31 Instalasi air kotor 0.1639 M¹ 77,937.50 12,776.64
25.07.03.22 Pas. kloset duduk 0.0131 Bh 281,900.00 3,697.05
25.07.03.24 Pas. avour 0.0131 Bh 19,060.00 249.97
25.07.03.24 Pas. floor drain 0.0131 Bh 19,060.00 249.97
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh 185,120.00 2,427.80
JUMLAH 66,095.85
XII PEK. LAIN-LAIN
22.04.03.01.02.08 Air kerja 0.0066 Ls 300000 1,967.21
20.01.01.64.02.06 Pembersihan akhir 0.0066 Ls 500,000.00 3,278.69
JUMLAH 5,245.90
Nilai ASB 2,800,368.71
26.08.01.02 Pembangunan Gedung Type B M2
I PEK. PENDAHULUAN
20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
25.01.01.02 Pembuatan bouwplank/uietzet 0.4623 M 35,520.14 16,420.79
JUMLAH 19,699.47
II PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³ 20,250.00 3,537.44
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk 45,600.00 8,970.49
25.01.02.13 Urugan tanah kembali 0.0437 M³ 5,062.50 221.09
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³ 117,741.25 3,582.42
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³ 117,741.25 5,983.57
JUMLAH 22,295.02
III PEK. BETON STRUKTUR
25.03.01.24 Pas. sloof 20/25 0.0443 M³ 3,457,113.56 153,019.78
25.03.01.16 Pas. kolom praktis 15/15 0.0225 M³ 1,880,541.98 42,295.55
25.03.01.16 Pas. kolom pendek 20/20 0.0038 M³ 1,880,541.98 7,102.90
25.03.01.28 Pas. ring balok 15/15 0.0266 M³ 2,777,913.59 73,774.10
25.03.01.33 Pek. beton rabatan t = 5 cm 0.0657 M³ 419,259.66 27,525.43
25.03.01.28 Pek. balok lantai 0.0038 M³ 2,777,913.59 10,656.26
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.0315 M³ 2,777,913.59 87,435.97
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.0417 M³ 2,777,913.59 115,930.73
25.03.01.33 Pek. Lantai Kerja 0.0116 M³ 419,259.66 4,845.54
25.03.01.28 Pek Plat Level 0.0073 M³ 2,777,913.59 20,401.73
JUMLAH 542,987.98
IV PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M² 50,100.92 134,566.15
25.04.01.30 Pek. Plesteran halus 5.3718 M² 18,901.15 101,533.26
25.04.01.38 Pek. benangan 1.9148 M¹ 5,865.60 11,231.18
25.02.01.12 Pek. pondasi batu kali 0.0813 M³ 427,332.94 34,740.07
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³ 179,720.00 8,885.83
JUMLAH 290,956.48
V PEK. LANTAI
25.05.01.04 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.9820 M² 69,654.00 68,397.94
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M² 106,978.74 14,591.20
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M² 76,305.40 2,626.91
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M² 106,978.74 124,586.39
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹ 22,569.25 1,553.95
JUMLAH 211,756.39
VI PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.04 Pas. daun pintu teakwood rangka ky. kamper 0.0771 M² 284,491.72 21,938.51
25.07.01.04 Pas. daun pintu kaca rangka ky. kamper 0.0204 M² 284,491.72 5,798.03
25.07.01.13 Pas. kaca mati tb = 5 mm 0.1034 M² 55,973.40 5,787.83
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M² 332,624.50 19,451.44
dan bouvenlist ( kaca selipan )
25.07.01.02 Pas. kusen ky kamper 0.0150 M³ 6,617,060.00 99,362.64
JUMLAH 152,338.46
VII PEK. ATAP
25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M² 65,130.00 107,191.17
25.06.01.02 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³ 5,273,760.00 67,725.45
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³ 62,276.80 469.27
25.06.01.07 Pas. gording kamper 8/12 0.0132 M² 62,276.80 824.26
25.06.01.04 Pas. reng kamper Usuk ky. kamper 1.6458 M³ 81,248.35 133,718.80
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹ 49,958.25 12,121.02
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.4508 M¹ 69,049.16 31,128.72
25.06.02.18 Pek. talang jurai 0.0656 M¹ 118,263.44 7,754.98
JUMLAH 360,933.67
VIII PEK. PLAFOND
25.06.03.07 Pas. plafond eternit rangka ky kamper 1.5984 M² 113,412.72 181,274.43
25.06.03.06 Pas. list plafond 1.6295 M¹ 4,683.00 7,630.99
JUMLAH 188,905.42
IX PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M² 21,821.40 22,495.03
25.04.02.10 Pek. pengecatan dinding 5.3718 M² 11,820.00 63,494.71
25.04.02.21 Pek. pengecatan plafond 1.5984 M² 21,821.40 34,878.47
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M² 39,277.80 7,658.78
25.04.02.16 Pek. koltir rangka atap 1.6458 M² 6,287.50 10,347.99
25.04.02.12 Pek. meni rangka plafond 1.5984 M² 5,287.20 8,450.85
JUMLAH 147,325.83
X PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit 97,650.00 7,043.61
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel 42,800.00 4,630.82
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel 34,700.00 2,730.49
25.07.01.32 Pas. hak angin lurus 0.0393 Bh 26,200.00 1,030.82
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh 9,600.00 1,447.87
JUMLAH 16,883.61
XI PEK. INSTALASI LISTRIK
25.07.02.02 Pas. titik lampu 0.1246 Ttk 195,150.00 24,313.77
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh 51,700.00 5,424.26
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh 7,450.00 146.56
B.24.01.02.05.023 Pas. MCB 0.0066 Bh 227,500.00 1,491.80
25.07.02.01 Pas. stop kontak 0.0787 Ttk 29,205.30 2,298.12
25.07.02.03 Pas. saklar tunggal 0.0787 Bh 26,755.30 2,105.34
25.07.02.04 Pas. saklar ganda 0.0131 Bh 29,205.30 383.02
JUMLAH 36,162.87
XII Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit
25.01.02.07 Pek Galian tanah 0.0407 M³ 20,250.00 824.89
25.01.02.16 Pek Urugan pasir 0.0014 M³ 117,741.25 159.87
25.04.01.12 Pas. batu merah 0.1130 M² 50,100.92 5,660.11
25.07.03.08 Pek. pelat penutup beton 0.0033 M³ 1,784,684.36 5,815.98
25.04.01.30 Pek. Plesteran halus 0.1130 M² 18,901.15 2,135.34
25.07.05.08 Pas Pipa 4 " 0.0098 M¹ 135,517.96 1,332.96
Jumlah 15,929.17
XIII Tandon Air (1.2 x 2.2 x 1.20) Unit
25.01.02.07 Pek Galian tanah 0.0234 M³ 20,250.00 473.25
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg 13,753.60 356.24
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M² 76,305.40 4,723.43
25.01.02.16 Pek Urugan pasir 0.0017 M³ 117,741.25 203.83
25.03.01.36 Pek Lantai kerja 0.0009 M³ 418,649.94 362.37
Pek beton 0.0062 M³ 2,777,913.59 17,195.74
Jumlah 23,314.86
XIV PEK. INSTALASI AIR
25.07.03.23 Pas. wastafel warna 0.0393 Unit 459,150.00 18,064.92
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit 450,000.00 2,950.82
25.07.03.19 Pas. kran air 0.0525 Bh 58,250.00 3,055.74
25.07.03.30 Instalasi air bersih 0.3279 M¹ 69,000.00 22,622.95
25.07.03.31 Instalasi air kotor 0.1639 M¹ 77,937.50 12,776.64
25.07.03.22 Pas. kloset duduk 0.0131 Bh 281,900.00 3,697.05
25.07.03.24 Pas. avour 0.0131 Bh 19,060.00 249.97
25.07.03.24 Pas. floor drain 0.0131 Bh 19060 249.97
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh 185120 2,427.80
JUMLAH 66,095.85
XII PEK. LAIN-LAIN
22.04.03.01.02.08 Air kerja 0.0066 Ls 300000 1,967.21
20.01.01.64.02.06 Pembersihan akhir 0.0066 Ls 500000 3,278.69
JUMLAH 5,245.90
Nilai ASB 2,100,830.98

26.08.01.03 Pembangunan Gedung Type C M2


I PEK. PENDAHULUAN
20.01.01.64.01.05 Pek. Persiapan 0.006557377 Ls 500000 3,278.69
25.01.01.02 Pembuatan bouwplank/uietzet 0.462295082 M 35520.14 16,420.79
JUMLAH 19,699.47
II PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.174688525 M³ 20250 3,537.44
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.196721311 Ttk 3600 708.20
25.01.02.13 Urugan tanah kembali 0.043672131 M³ 45600 1,991.45
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.03042623 M³ 117741.25 3,582.42
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.050819672 M³ 117741.25 5,983.57
JUMLAH 15,803.08
III PEK. BETON STRUKTUR
25.03.01.24 Pas. sloof 20/25 0.044262295 M³ 3457113.56 153,019.78
25.03.01.16 Pas. kolom praktis 15/15 0.022491148 M³ 1880541.98025 42,295.55
25.03.01.16 Pas. kolom pendek 20/20 0.003777049 M³ 1880541.98025 7,102.90
25.03.01.28 Pas. ring balok 15/15 0.026557377 M³ 2777913.591 73,774.10
25.03.01.33 Pek. beton rabatan t = 5 cm 0.065652459 M³ 419259.66 27,525.43
25.03.01.28 Pek. balok lantai 0.003836066 M³ 2777913.591 10,656.26
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.03147541 M³ 2777913.591 87,435.97
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.041733021 M³ 2777913.591 115,930.73
25.03.01.33 Pek. Lantai Kerja 0.011557377 M³ 419259.66 4,845.54
25.03.01.28 Pek Plat Level 0.007344262 M³ 2777913.591 20,401.73
JUMLAH 542,987.98
IV PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.685901639 M² 50100.9219009219 134,566.15
25.04.01.30 Pek. Plesteran halus 5.371803279 M² 18901.15 101,533.26
25.04.01.38 Pek. benangan 1.914754098 M¹ 5865.6 11,231.18
25.02.01.12 Pek. pondasi batu kali 0.081295082 M³ 427332.94 34,740.07
25.02.01.20 Pas. aanstamping t = 20 cm 0.049442623 M³ 179720 8,885.83
JUMLAH 290,956.48
V PEK. LANTAI
25.05.01.03 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.981967213 M² 67924 66,699.14
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.136393443 M² 106978.74 14,591.20
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.03442623 M² 76305.4 2,626.91
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.164590164 M² 106978.74 124,586.39
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.068852459 M¹ 22569.245625 1,553.95
JUMLAH 210,057.58
VI PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.05 Pas. daun pintu triplek rangka ky. kamper 0.077114754 M² 281731.72 21,725.67
25.07.01.05 Pas. daun pintu kaca rangka ky. kamper 0.020380328 M² 281731.72 5,741.78
25.07.01.13 Pas. kaca mati tb = 5 mm 0.103403279 M² 55973.4 5,787.83
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.058478689 M² 332624.5 19,451.44
dan bouvenlist ( kaca selipan ) 0
25.07.01.02 Pas. kusen ky kamper 0.015016131 M³ 4635300 69,604.27
JUMLAH 122,311.01
VII PEK. ATAP
25.06.02.01 Pas. genteng jawa 1.645803279 M² 22630 37,244.53
25.06.01.02 Pas. kuda - kuda Ky. meranti 8/12 0.012841967 M³ 4768720 61,239.75
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.007535213 M³ 62276.8 469.27
25.06.01.07 Pas. gording kamper 8/12 0.01323541 M² 62276.8 824.26
25.06.01.05 Pas. reng kamper Usuk ky. kamper 1.645803279 M³ 70547.71 116,107.65
25.06.02.11 Pas. Wuwungan genteng jawa 0.242622951 M¹ 42312.9 10,266.08
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.450819672 M¹ 69049.16 31,128.72
25.06.02.18 Pek. talang jurai 0.06557377 M¹ 118263.44 7,754.98
JUMLAH 265,035.23
VIII PEK. PLAFOND
25.06.03.04 Pas. plafond eternit rangka ky kamper 1.598360656 M² 77374.84 123,672.90
25.06.03.06 Pas. list plafond 1.629508197 M¹ 4683 7,630.99
JUMLAH 131,303.89
IX PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.030870033 M² 21821.4 22,495.03
25.04.02.10 Pek. pengecatan dinding 5.371803279 M² 11820 63,494.71
25.04.02.21 Pek. pengecatan plafond 1.598360656 M² 21821.4 34,878.47
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.194990164 M² 39277.8 7,658.78
25.04.02.16 Pek. koltir rangka atap 1.645803279 M² 6287.5 10,347.99
25.04.02.12 Pek. meni rangka plafond 1.598360656 M² 5287.2 8,450.85
JUMLAH 147,325.83
X PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.072131148 Unit 97650 7,043.61
25.07.01.22 Pas. engsel kuningan untuk pintu 0.108196721 Stel 42800 4,630.82
25.07.01.21 Pas. engsel kuningan untuk jendela 0.078688525 Stel 34700 2,730.49
25.07.01.32 Pas. hak angin lurus 0.039344262 Bh 26200 1,030.82
25.07.01.24 Pas. grendel kecil biasa 0.150819672 Bh 9600 1,447.87
JUMLAH 16,883.61
XI PEK. INSTALASI LISTRIK
25.07.02.02 Pas. titik lampu 0.124590164 Ttk 94500 11,773.77
25.07.02.02 Pas. lampu TL 20 watt 0.104918033 Bh 1650 173.11
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.019672131 Bh 7800 153.44
B.24.01.02.05.023 Pas. MCB 0.006557377 Bh 227,500.00 1,491.80
25.07.02.01 Pas. stop kontak 0.078688525 Ttk 29,205.30 2,298.12
25.07.02.03 Pas. saklar tunggal 0.078688525 Bh 26,755.30 2,105.34
25.07.02.04 Pas. saklar ganda 0.013114754 Bh 29,205.30 383.02
JUMLAH 18,378.61
XII Pekerjaan Sanitasi Air Kotor (Septictank + Resapan)
25.01.02.07 Pek Galian tanah 0.040735363 M³ 20250 824.89
25.01.02.16 Pek Urugan pasir 0.001357845 M³ 117741.25 159.87
25.04.01.12 Pas. batu merah 0.112974239 M² 50100.9219009219 5,660.11
25.07.03.08 Pek. pelat penutup beton 0.003258829 M³ 1784684.36 5,815.98
25.04.01.30 Pek. Plesteran halus 0.112974239 M² 18901.15 2,135.34
25.07.05.08 Pas Pipa 4 " 0.009836066 M¹ 135517.96296 1,332.96
Jumlah 15,929.17
XIII Tandon Air (1.2 x 2.2 x 1.20) Unit 0.00
25.01.02.07 Pek Galian tanah 0.023370492 M³ 208732.5 4,878.18
25.03.02.03 Pek Pelat besi penutup tandon 0.025901639 kg 13753.6 356.24
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.061901639 M² 76305.4 4,723.43
25.01.02.16 Pek Urugan pasir 0.001731148 M³ 117741.25 203.83
25.03.01.36 Pek Lantai kerja 0.000865574 M³ 418649.94 362.37
Pek beton 0.006190164 M³ 2777913.591 17,195.74
Jumlah 27,719.79
XIV PEK. INSTALASI AIR
25.07.03.23 Pas. wastafel warna 0.039344262 Unit 459150 18,064.92
B.08.03.05.07.02 Pas. pompa air 0.006557377 Unit 450000 2,950.82
25.07.03.19 Pas. kran air 0.052459016 Bh 58250 3,055.74
25.07.03.30 Instalasi air bersih 0.327868852 M¹ 69000 22,622.95
25.07.03.31 Instalasi air kotor 0.163934426 M¹ 77937.5 12,776.64
25.07.03.22 Pas. kloset jongkok 0.013114754 Bh 281900 3,697.05
25.07.03.24 Pas. avour 0.013114754 Bh 19060 249.97
25.07.03.24 Pas. floor drain 0.013114754 Bh 19060 249.97
25.07.01.46 Pas. pintu PVC KM/WC 0.013114754 Bh 185120 2,427.80
JUMLAH 66,095.85
XII PEK. LAIN-LAIN
22.04.03.01.02.08 Air kerja 0.006557377 Ls 300000 1,967.21
20.01.01.64.02.06 Pembersihan akhir 0.006557377 Ls 500000 3,278.69
JUMLAH 5,245.90
Nilai ASB 1,889,455.21
26.08.02 Pembangunan Pendopo
HARGA
NO JENIS PEKERJAAN Koeff SAT. JUMLAH (Rp)
SATUAN (Rp)

26.08.02.01 Pembangunan Pendopo M2


I PEK. PERSIAPAN
20.01.01.64.01.05 Pek. Persiapan 0.01 Ls 350000 3,500.00
25.01.01.01 Pembuatan bouwplank/uietzet 0.08 Ttk 43115.8 3,449.26
Jumlah 6,949.26
II PEK. TANAH
25.02.01.24 Pembuatan Lubang Strous Pile diameter 30 cm 0.04 Ttk 43115.8 1,724.63
25.01.02.07 Galian Tanah 0.468 M³ 20250 9,477.00
25.01.02.13 Urugan Tanah Kembali 0.22596 M³ 5062.5 1,143.92
25.01.02.16 Pengurugan Pasir (PADAT) 0.1542 M³ 106956.25 16,492.65
25.01.02.17 Pengurugan Sirtu (PADAT) 0.3987 M³ 87501.25 34,886.75
Jumlah 63,724.96
III PEK. PASANGAN
25.02.01.11 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps) 0.21504 M³ 406973.71338 87,515.63
25.04.01.30 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm 1.1365 M³ 5000 5,682.50
25.04.01.38 Pasang Benangan 2.98 M 5680.8 16,928.78
Jumlah 110,126.91
III PEK. BETON STRUKTUR
25.03.01.23 Pekerjaan Beton Rabat (1 Pc : 3 Ps : 6 Kr) 0.075264 M³ 404051.645 30,410.54
25.04.01.30 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm 0.0405 M³ 18606.5 753.56
Beton Bertulang 1 Pc : 1.5 Ps : 2.5 Kr (K350) dengan
25.03.01.19 Pemakaian Besi 160 kg 0.13544 M³ 3241888.403 439,081.37
25.03.01.17 Pekerjaan Beton Bertulang Strous Pile 0
(1 Pc : 1,5 Ps : 2,5 Kr, untuk besi 130 kg) 0.011314286 M³ 2907758.003 32,899.20
Jumlah 503,144.68
IV PEK. LANTAI
25.05.01.06 Pas. keramik lantai 40 x 40 cm ( Motif ) 1.4336 M² 80364 115,209.83
Jumlah 115,209.83
IV PEK. PEMBESIAN
25.03.02.05 Pekerjaan Besi WF 150x100x7x10 6.9802425 Kg 13093.6 91,396.50
25.03.02.03 Pekerjaan Besi Plat Tebal 2 mm 1.1740032 Kg 13753.6 16,146.77
B.20.01.01.44.06 Baut 22 mm 3.6 Bh 3000 10,800.00
B.20.01.01.62.02 Angker 0.8 Bh 2200 1,760.00
Jumlah 118,343.27
V PEK. ATAP + Plafond
25.06.01.04 Pemasangan Reng kamper/Usuk kamper 2.115 M2 58904.52 124,583.06
25.06.02.03 Pemasangan Genteng Karang Pilang / Wisma 2.115 M2 64380 136,163.70
25.06.02.12 Pemasangan Wuwung Genteng Karang Pilang 0.43 M¹ 49958.25 21,482.05
25.06.02.33 Pemasangan Listplank Kayu Kamper 3 / 30 cm 0.498 M¹ 46133.18 22,974.32
25.06.01.07 Pas. gording kamper 8/12 0.02845056 M³ 62276.8 1,771.81
25.06.03.02 Pas. plafond eternit rangka ky kamper 2.142 M2 67775.76 145,175.68
25.06.03.06 Pas. list plafond 2.88 M¹ 2988.25 8,606.16
Jumlah 460,756.78
VI PEK. PENGECATAN, PENGANTUNG
25.04.02.12 Pengecatan Dasar (cat meni) 2.49408 M² 5287.2 13,186.70
25.04.02.16 Pekerjaan Ter Kayu (rangka atap) 2.115 M² 6287.5 13,298.06
25.04.02.21 Pek. pengecatan kayu 0.35208 M² 21821.4 7,682.88
25.04.02.21 Pengecatan Plafond 2.142 M² 21821.4 46,741.44
25.04.02.10 Pengecatan Tembok (balok dan kolom) 1.1365 M² 11820 13,433.43
Jumlah 94,342.51
VII PEK. INSTALASI LISTRIK
25.07.02.02 Pas. titik lampu 0.05 Ttk 195150 9,757.50
20.03.06.02.21.65 Pas. lampu TL 20 watt 0.04 Bh 51700 2,068.00
Pas Lampu Gantung 0.01 Ls 1500000 15,000.00
25.07.02.01 Pas. stop kontak 0.02 Ttk 29205.3 584.11
25.07.02.04 Pas. saklar ganda 0.02 Bh 29205.3 584.11
Jumlah 27,993.71
VIII PEK. LAIN-LAIN
22.04.03.01.02.08 Air kerja 0.01 Ls 300000 3,000.00
20.01.01.64.02.06 Pembersihan akhir 0.01 Ls 350000 3,500.00
Jumlah 6,500.00
Nilai ASB 1,507,091.91
26.08.03 Rehabilitasi Bangunan Type A
HARGA
NO JENIS PEKERJAAN Koeff SAT. JUMLAH (Rp)
SATUAN (Rp)
26.08.03.01 Rehabilitasi Pondasi Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³ 20,250.00 3,537.44
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk 45,600.00 8,970.49
25.01.02.13 Urugan tanah kembali 0.0437 M³ 5,062.50 221.09
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³ 117,741.25 3,582.42
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³ 117,741.25 5,983.57
JUMLAH 22,295.02
Nilai ASB 25,573.71
26.08.03.02 Rehabilitasi Struktur Beton Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. BETON STRUKTUR
25.03.01.24 Pas. sloof 20/25 0.0443 M³ 3,457,113.56 153,019.78
25.03.01.16 Pas. kolom praktis 15/15 0.0225 M³ 1,880,541.98 42,295.55
25.03.01.16 Pas. kolom pendek 20/20 0.0038 M³ 1,880,541.98 7,102.90
25.03.01.28 Pas. ring balok 15/15 0.0266 M³ 2,777,913.59 73,774.10
25.03.01.33 Pek. beton rabatan t = 5 cm 0.0657 M³ 419,259.66 27,525.43
25.03.01.28 Pek. balok lantai 0.0038 M³ 2,777,913.59 10,656.26
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.0315 M³ 2,777,913.59 87,435.97
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.0417 M³ 2,777,913.59 115,930.73
25.03.01.33 Pek. Lantai Kerja 0.0116 M³ 419,259.66 4,845.54
25.03.01.28 Pek Plat Level 0.0073 M³ 2,777,913.59 20,401.73
JUMLAH 542,987.98
Nilai ASB 546,266.66

26.08.03.03 Rehabilitasi Pekerjaan Pasangan Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M² 50,100.92 134,566.15
25.04.01.30 Pek. Plesteran halus 5.3718 M² 18,901.15 101,533.26
25.04.01.38 Pek. benangan 1.9148 M¹ 5,865.60 11,231.18
25.02.01.12 Pek. pondasi batu kali 0.0813 M³ 427,332.94 34,740.07
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³ 179,720.00 8,885.83
JUMLAH 290,956.48
Nilai ASB 294,235.17
26.08.03.04 Rehabilitasi Lantai Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. LANTAI
25.05.01.11 Pas. Lantai marmer 0.9820 M² 449,184.00 441,083.96
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M² 106,978.74 14,591.20
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M² 76,305.40 2,626.91
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M² 106,978.74 124,586.39
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹ 22,569.25 1,553.95
JUMLAH 584,442.40
Nilai ASB 587,721.09
26.08.03.05 Rehabilitasi Daun Pintu,Jendela dan Kusen Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.04 Pas. daun pintu teakwood rangka ky. kamper 0.0771 M² 284,491.72 21,938.51
25.07.01.04 Pas. daun pintu kaca rangka ky. kamper 0.0204 M² 284,491.72 5,798.03
25.07.01.47 Pas. kaca mati tb = 5 mm 0.1034 M² 307,273.40 31,773.08
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M² 332,624.50 19,451.44
dan bouvenlist ( kaca selipan ) 0.0000
25.07.01.02 Pas. kusen ky kamper 0.0150 M³ 6,617,060.00 99,362.64
JUMLAH 178,323.71
Nilai ASB 181,602.39
26.08.03.06 Rehabilitasi Atap Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. ATAP
25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M² 65,130.00 107,191.17
25.06.01.01 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³ 12,914,000.00 165,841.16
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³ 62,276.80 469.27
25.06.01.07 Pas. gording kamper 8/12 0.0132 M² 62,276.80 824.26
25.06.01.06 Pas. reng jati Usuk ky. Kamper 1.6458 M³ 104,435.80 171,880.78
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹ 49,958.25 12,121.02
25.06.02.32 Pas Listplank Kayu Jati 3 / 30 cm 0.4508 M¹ 152,017.90 68,532.66
25.06.02.18 Pek. talang jurai 0.0656 M¹ 118,263.44 7,754.98
JUMLAH 534,615.30
Nilai ASB 537,893.99
26.08.03.07 Rehabilitasi Plafond Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PLAFOND
25.06.03.17 Pas. Plafond Kalsiboard Rangka Aluminium 1.5984 M² 122,735.00 196,174.80
25.06.03.06 Pas. list plafond 1.6295 M¹ 4,683.00 7,630.99
JUMLAH 203,805.78
Nilai ASB 207,084.47
26.08.03.08 Rehabilitasi Pengecatan Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PENGECATAN
25.04.02.18 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M² 88,190.90 90,913.36
25.04.02.22 Pek. pengecatan dinding 5.3718 M² 19,986.00 107,360.86
25.04.02.21 Pek. pengecatan plafond 1.5984 M² 21,821.40 34,878.47
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M² 39,277.80 7,658.78
25.04.02.16 Pek. koltir rangka atap 1.6458 M² 6,287.50 10,347.99
25.04.02.12 Pek. meni rangka plafond 1.5984 M² 5,287.20 8,450.85
JUMLAH 259,610.31
Nilai ASB 262,889.00
26.08.03.09 Rehabilitasi Pekerjaan Penggantung Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit 97,650.00 7,043.61
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel 42,800.00 4,630.82
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel 34,700.00 2,730.49
25.07.01.32 Pas. hak angin lurus 0.0393 Bh 26,200.00 1,030.82
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh 9,600.00 1,447.87
JUMLAH 16,883.61
Nilai ASB 20,162.30
26.08.03.10 Rehabilitasi Instalasi Listrik Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. INSTALASI LISTRIK
25.07.02.02 Pas. titik lampu 0.1246 Ttk 195,150.00 24,313.77
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh 51,700.00 5,424.26
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh 7,450.00 146.56
B.24.01.02.05.023 Pas. MCB 0.0066 Bh 227,500.00 1,491.80
25.07.02.01 Pas. stop kontak 0.0787 Ttk 29,205.30 2,298.12
25.07.02.03 Pas. saklar tunggal 0.0787 Bh 26,755.30 2,105.34
25.07.02.04 Pas. saklar ganda 0.0131 Bh 29,205.30 383.02
JUMLAH 36,162.87
Nilai ASB 39,441.56
26.08.03.11 Rehabilitasi Septictank & Resapan Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit
25.01.02.07 Pek Galian tanah 0.0407 M³ 20,250.00 824.89
25.01.02.16 Pek Urugan pasir 0.0014 M³ 117,741.25 159.87
25.04.01.12 Pas. batu merah 0.1130 M² 50,100.92 5,660.11
25.07.03.08 Pek. pelat penutup beton 0.0033 M³ 1,784,684.36 5,815.98
25.04.01.30 Pek. Plesteran halus 0.1130 M² 18,901.15 2,135.34
25.07.05.08 Pas Pipa 4 " 0.0098 M¹ 135,517.96 1,332.96
Jumlah 15,929.17
Nilai ASB 19,207.86
26.08.03.12 Rehabilitasi Tandon Air (1.2x2.2x1.2) Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
Tandon Air (1.2 x 2.2 x 1.20) Unit
25.01.02.07 Pek Galian tanah 0.0234 M³ 20,250.00 473.25
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg 13,753.60 356.24
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M² 76,305.40 4,723.43
25.01.02.16 Pek Urugan pasir 0.0017 M³ 117,741.25 203.83
25.03.01.36 Pek Lantai kerja 0.0009 M³ 418,649.94 362.37
25.03.01.16 Pek beton 0.0062 M³ 2,777,913.59 17,195.74
Jumlah 23,314.86
Nilai ASB 26,593.55
26.08.03.12 Rehabilitasi Instalasi Air Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. INSTALASI AIR
25.07.03.23 Pas. wastafel warna 0.0393 Unit 459,150.00 18,064.92
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit 450,000.00 2,950.82
25.07.03.19 Pas. kran air 0.0525 Bh 58,250.00 3,055.74
25.07.03.30 Instalasi air bersih 0.3279 M¹ 69,000.00 22,622.95
25.07.03.31 Instalasi air kotor 0.1639 M¹ 77,937.50 12,776.64
25.07.03.22 Pas. kloset duduk 0.0131 Bh 281,900.00 3,697.05
25.07.03.24 Pas. avour 0.0131 Bh 19,060.00 249.97
25.07.03.24 Pas. floor drain 0.0131 Bh 19,060.00 249.97
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh 185,120.00 2,427.80
JUMLAH 66,095.85
Nilai ASB 69,374.54

26.08.04 Rehabilitasi Bangunan Type B


HARGA
NO JENIS PEKERJAAN Koeff SAT. JUMLAH (Rp)
SATUAN (Rp)
26.08.04.01 Rehabilitasi Pondasi Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³ 20,250.00 3,537.44
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk 45,600.00 8,970.49
25.01.02.13 Urugan tanah kembali 0.0437 M³ 5,062.50 221.09
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³ 117,741.25 3,582.42
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³ 117,741.25 5,983.57
JUMLAH 22,295.02
Nilai ASB 25,573.71
26.08.04.02 Rehabilitasi Struktur Beton Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. BETON STRUKTUR
25.03.01.24 Pas. sloof 20/25 0.0443 M³ 3,457,113.56 153,019.78
25.03.01.16 Pas. kolom praktis 15/15 0.0225 M³ 1,880,541.98 42,295.55
25.03.01.16 Pas. kolom pendek 20/20 0.0038 M³ 1,880,541.98 7,102.90
25.03.01.28 Pas. ring balok 15/15 0.0266 M³ 2,777,913.59 73,774.10
25.03.01.33 Pek. beton rabatan t = 5 cm 0.0657 M³ 419,259.66 27,525.43
25.03.01.28 Pek. balok lantai 0.0038 M³ 2,777,913.59 10,656.26
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.0315 M³ 2,777,913.59 87,435.97
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.0417 M³ 2,777,913.59 115,930.73
25.03.01.33 Pek. Lantai Kerja 0.0116 M³ 419,259.66 4,845.54
25.03.01.28 Pek Plat Level 0.0073 M³ 2,777,913.59 20,401.73
JUMLAH 542,987.98
Nilai ASB 546,266.66
26.08.04.03 Rehabilitasi Pekerjaan Pasangan Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M² 50,100.92 134,566.15
25.04.01.30 Pek. Plesteran halus 5.3718 M² 18,901.15 101,533.26
25.04.01.38 Pek. benangan 1.9148 M¹ 5,865.60 11,231.18
25.02.01.12 Pek. pondasi batu kali 0.0813 M³ 427,332.94 34,740.07
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³ 179,720.00 8,885.83
JUMLAH 290,956.48
Nilai ASB 294,235.17
26.08.04.04 Rehabilitasi Lantai Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. LANTAI
25.05.01.04 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.9820 M² 69,654.00 68,397.94
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M² 106,978.74 14,591.20
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M² 76,305.40 2,626.91
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M² 106,978.74 124,586.39
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹ 22,569.25 1,553.95
JUMLAH 211,756.39
Nilai ASB 215,035.08
26.08.04.05 Rehabilitasi Daun Pintu,Jendela dan Kusen Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.04 Pas. daun pintu teakwood rangka ky. kamper 0.0771 M² 284,491.72 21,938.51
25.07.01.04 Pas. daun pintu kaca rangka ky. kamper 0.0204 M² 284,491.72 5,798.03
25.07.01.13 Pas. kaca mati tb = 5 mm 0.1034 M² 55,973.40 5,787.83
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M² 332,624.50 33,524.38
dan bouvenlist ( kaca selipan )
25.07.01.02 Pas. kusen ky kamper 0.0150 M³ 6,617,060.00 99,362.64
JUMLAH 166,411.39
Nilai ASB 169,690.08
26.08.04.06 Rehabilitasi Atap Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. ATAP
25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M² 65,130.00 107,191.17
25.06.01.02 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³ 5,273,760.00 67,725.45
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³ 62,276.80 469.27
25.06.01.07 Pas. gording kamper 8/12 0.0132 M² 62,276.80 824.26
25.06.01.04 Pas. reng kamper Usuk ky. kamper 1.6458 M³ 81,248.35 133,718.80
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹ 49,958.25 12,121.02
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.4508 M¹ 69,049.16 31,128.72
25.06.02.18 Pek. talang jurai 0.0656 M¹ 118,263.44 7,754.98
JUMLAH 360,933.67
Nilai ASB 364,212.36
26.08.04.07 Rehabilitasi Plafond Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PLAFOND
25.06.03.07 Pas. plafond eternit rangka ky kamper 1.5984 M² 113,412.72 181,274.43
25.06.03.06 Pas. list plafond 1.6295 M¹ 4,683.00 7,630.99
JUMLAH 188,905.42
Nilai ASB 192,184.10
26.08.04.08 Rehabilitasi Pengecatan Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M² 21,821.40 22,495.03
25.04.02.10 Pek. pengecatan dinding 5.3718 M² 11,820.00 63,494.71
25.04.02.21 Pek. pengecatan plafond 1.5984 M² 21,821.40 34,878.47
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M² 39,277.80 7,658.78
25.04.02.16 Pek. koltir rangka atap 1.6458 M² 6,287.50 10,347.99
25.04.02.12 Pek. meni rangka plafond 1.5984 M² 5,287.20 8,450.85
JUMLAH 147,325.83
Nilai ASB 150,604.52
26.08.04.09 Rehabilitasi Pekerjaan Penggantung Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit 97,650.00 7,043.61
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel 42,800.00 4,630.82
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel 34,700.00 2,730.49
25.07.01.32 Pas. hak angin lurus 0.0393 Bh 26,200.00 1,030.82
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh 9,600.00 1,447.87
JUMLAH 16,883.61
Nilai ASB 20,162.30
26.08.04.10 Rehabilitasi Instalasi Listrik Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. INSTALASI LISTRIK
25.07.02.02 Pas. titik lampu 0.1246 Ttk 195,150.00 24,313.77
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh 51,700.00 5,424.26
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh 7,450.00 146.56
B.24.01.02.05.023 Pas. MCB 0.0066 Bh 227,500.00 1,491.80
25.07.02.01 Pas. stop kontak 0.0787 Ttk 29,205.30 2,298.12
25.07.02.03 Pas. saklar tunggal 0.0787 Bh 26,755.30 2,105.34
25.07.02.04 Pas. saklar ganda 0.0131 Bh 29,205.30 383.02
JUMLAH 36,162.87
Nilai ASB 39,441.56
26.08.04.11 Rehabilitasi Septictank & Resapan Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit
25.01.02.07 Pek Galian tanah 0.0407 M³ 20,250.00 824.89
25.01.02.16 Pek Urugan pasir 0.0014 M³ 117,741.25 159.87
25.04.01.12 Pas. batu merah 0.1130 M² 50,100.92 5,660.11
25.07.03.08 Pek. pelat penutup beton 0.0033 M³ 1,784,684.36 5,815.98
25.04.01.30 Pek. Plesteran halus 0.1130 M² 18,901.15 2,135.34
25.07.05.08 Pas Pipa 4 " 0.0098 M¹ 135,517.96 1,332.96
Jumlah 15,929.17
Nilai ASB 19,207.86
26.08.04.12 Rehabilitasi Tandon Air (1.2x2.2x1.2) Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
Tandon Air (1.2 x 2.2 x 1.20) Unit
25.01.02.07 Pek Galian tanah 0.0234 M³ 20,250.00 473.25
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg 13,753.60 356.24
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M² 76,305.40 4,723.43
25.01.02.16 Pek Urugan pasir 0.0017 M³ 117,741.25 203.83
25.03.01.36 Pek Lantai kerja 0.0009 M³ 418,649.94 362.37
25.03.01.16 Pek beton 0.0062 M³ 2,777,913.59 17,195.74
Jumlah 23,314.86
Nilai ASB 26,593.55
26.08.04.13 Rehabilitasi Instalasi Air Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. INSTALASI AIR
25.07.03.23 Pas. wastafel warna 0.0393 Unit 459,150.00 18,064.92
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit 450,000.00 2,950.82
25.07.03.19 Pas. kran air 0.0525 Bh 58,250.00 3,055.74
25.07.03.30 Instalasi air bersih 0.3279 M¹ 69,000.00 22,622.95
25.07.03.31 Instalasi air kotor 0.1639 M¹ 77,937.50 12,776.64
25.07.03.22 Pas. kloset duduk 0.0131 Bh 281,900.00 3,697.05
25.07.03.24 Pas. avour 0.0131 Bh 19,060.00 249.97
25.07.03.24 Pas. floor drain 0.0131 Bh 19,060.00 249.97
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh 185,120.00 2,427.80
JUMLAH 66,095.85
Nilai ASB 69,374.54

26.08.05 Rehabilitasi Bangunan Type C


HARGA
NO JENIS PEKERJAAN Koeff SAT. JUMLAH (Rp)
SATUAN (Rp)
26.08.05.01 Rehabilitasi Pondasi Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³ 20,250.00 3,537.44
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk 45,600.00 8,970.49
25.01.02.13 Urugan tanah kembali 0.0437 M³ 5,062.50 221.09
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³ 117,741.25 3,582.42
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³ 117,741.25 5,983.57
JUMLAH 22,295.02
Nilai ASB 25,573.71
26.08.05.02 Rehabilitasi Struktur Beton Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. BETON STRUKTUR
25.03.01.24 Pas. sloof 20/25 0.0443 M³ 3,457,113.56 153,019.78
25.03.01.16 Pas. kolom praktis 15/15 0.0225 M³ 1,880,541.98 42,295.55
25.03.01.16 Pas. kolom pendek 20/20 0.0038 M³ 1,880,541.98 7,102.90
25.03.01.28 Pas. ring balok 15/15 0.0266 M³ 2,777,913.59 73,774.10
25.03.01.33 Pek. beton rabatan t = 5 cm 0.0657 M³ 419,259.66 27,525.43
25.03.01.28 Pek. balok lantai 0.0038 M³ 2,777,913.59 10,656.26
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.0315 M³ 2,777,913.59 87,435.97
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.0417 M³ 2,777,913.59 115,930.73
25.03.01.33 Pek. Lantai Kerja 0.0116 M³ 419,259.66 4,845.54
25.03.01.28 Pek Plat Level 0.0073 M³ 2,777,913.59 20,401.73
JUMLAH 542,987.98
Nilai ASB 546,266.66
26.08.05.03 Rehabilitasi Pekerjaan Pasangan Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M² 50,100.92 134,566.15
25.04.01.30 Pek. Plesteran halus 5.3718 M² 18,901.15 101,533.26
25.04.01.38 Pek. benangan 1.9148 M¹ 5,865.60 11,231.18
25.02.01.12 Pek. pondasi batu kali 0.0813 M³ 427,332.94 34,740.07
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³ 179,720.00 8,885.83
JUMLAH 290,956.48
Nilai ASB 294,235.17
26.08.05.04 Rehabilitasi Lantai Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. LANTAI
25.05.01.03 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.9820 M² 67,924.00 66,699.14
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M² 106,978.74 14,591.20
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M² 76,305.40 2,626.91
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M² 106,978.74 124,586.39
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹ 22,569.25 1,553.95
JUMLAH 210,057.58
Nilai ASB 213,336.27
26.08.05.05 Rehabilitasi Daun Pintu,Jendela dan Kusen Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.05 Pas. daun pintu triplek rangka ky. kamper 0.0771 M² 281,731.72 21,725.67
25.07.01.05 Pas. daun pintu kaca rangka ky. kamper 0.0204 M² 281,731.72 5,741.78
25.07.01.13 Pas. kaca mati tb = 5 mm 0.1034 M² 55,973.40 5,787.83
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M² 332,624.50 19,451.44
dan bouvenlist ( kaca selipan ) 0.0000
25.07.01.02 Pas. kusen ky kamper 0.0150 M³ 4,635,300.00 69,604.27
JUMLAH 122,311.01
Nilai ASB 125,589.70
26.08.05.06 Rehabilitasi Atap Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. ATAP
25.06.02.01 Pas. genteng jawa 1.6458 M² 22,630.00 37,244.53
25.06.01.02 Pas. kuda - kuda Ky. meranti 8/12 0.0128 M³ 4,768,720.00 61,239.75
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³ 62,276.80 469.27
25.06.01.07 Pas. gording kamper 8/12 0.0132 M² 62,276.80 824.26
25.06.01.05 Pas. reng kamper Usuk ky. kamper 1.6458 M³ 70,547.71 116,107.65
25.06.02.11 Pas. Wuwungan genteng jawa 0.2426 M¹ 42,312.90 10,266.08
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.4508 M¹ 69,049.16 31,128.72
25.06.02.18 Pek. talang jurai 0.0656 M¹ 118,263.44 7,754.98
JUMLAH 265,035.23
Nilai ASB 268,313.92
26.08.05.07 Rehabilitasi Plafond Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PLAFOND
25.06.03.04 Pas. plafond eternit rangka ky kamper 1.5984 M² 77,374.84 123,672.90
25.06.03.06 Pas. list plafond 1.6295 M¹ 4,683.00 7,630.99
JUMLAH 131,303.89
Nilai ASB 134,582.58
26.08.05.08 Rehabilitasi Pengecatan Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M² 21,821.40 22,495.03
25.04.02.10 Pek. pengecatan dinding 5.3718 M² 11,820.00 63,494.71
25.04.02.21 Pek. pengecatan plafond 1.5984 M² 21,821.40 34,878.47
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M² 39,277.80 7,658.78
25.04.02.16 Pek. koltir rangka atap 1.6458 M² 6,287.50 10,347.99
25.04.02.12 Pek. meni rangka plafond 1.5984 M² 5,287.20 8,450.85
JUMLAH 147,325.83
Nilai ASB 150,604.52
26.08.05.09 Rehabilitasi Pekerjaan Penggantung Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit 97,650.00 7,043.61
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel 42,800.00 4,630.82
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel 34,700.00 2,730.49
25.07.01.32 Pas. hak angin lurus 0.0393 Bh 26,200.00 1,030.82
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh 9,600.00 1,447.87
JUMLAH 16,883.61
Nilai ASB 20,162.30
26.08.05.10 Rehabilitasi Instalasi Listrik Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. INSTALASI LISTRIK
25.07.02.02 Pas. titik lampu 0.1246 Ttk 195,150.00 24,313.77
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh 51,700.00 5,424.26
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh 7,450.00 146.56
B.24.01.02.05.023 Pas. MCB 0.0066 Bh 227,500.00 1,491.80
25.07.02.01 Pas. stop kontak 0.0787 Ttk 29,205.30 2,298.12
25.07.02.03 Pas. saklar tunggal 0.0787 Bh 26,755.30 2,105.34
25.07.02.04 Pas. saklar ganda 0.0131 Bh 29,205.30 383.02
JUMLAH 36,162.87
Nilai ASB 39,441.56
26.08.04.11 Rehabilitasi Septictank & Resapan Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit
25.01.02.07 Pek Galian tanah 0.0407 M³ 20,250.00 824.89
25.01.02.16 Pek Urugan pasir 0.0014 M³ 117,741.25 159.87
25.04.01.12 Pas. batu merah 0.1130 M² 50,100.92 5,660.11
25.07.03.08 Pek. pelat penutup beton 0.0033 M³ 1,784,684.36 5,815.98
25.04.01.30 Pek. Plesteran halus 0.1130 M² 18,901.15 2,135.34
25.07.05.08 Pas Pipa 4 " 0.0098 M¹ 135,517.96 1,332.96
Jumlah 15,929.17
Nilai ASB 19,207.86
26.08.05.12 Rehabilitasi Tandon Air (1.2x2.2x1.2) Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
Tandon Air (1.2 x 2.2 x 1.20) Unit
25.01.02.07 Pek Galian tanah 0.0234 M³ 20,250.00 473.25
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg 13,753.60 356.24
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M² 76,305.40 4,723.43
25.01.02.16 Pek Urugan pasir 0.0017 M³ 117,741.25 203.83
25.03.01.36 Pek Lantai kerja 0.0009 M³ 418,649.94 362.37
25.03.01.16 Pek beton 0.0062 M³ 2,777,913.59 17,195.74
Jumlah 23,314.86
Nilai ASB 26,593.55
26.08.05.13 Rehabilitasi Instalasi Air Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls 500,000.00 3,278.69
JUMLAH 3,278.69
PEK. INSTALASI AIR
25.07.03.23 Pas. wastafel warna 0.0393 Unit 459,150.00 18,064.92
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit 450,000.00 2,950.82
25.07.03.19 Pas. kran air 0.0525 Bh 58,250.00 3,055.74
25.07.03.30 Instalasi air bersih 0.3279 M¹ 69,000.00 22,622.95
25.07.03.31 Instalasi air kotor 0.1639 M¹ 77,937.50 12,776.64
25.07.03.22 Pas. kloset duduk 0.0131 Bh 281,900.00 3,697.05
25.07.03.24 Pas. avour 0.0131 Bh 19,060.00 249.97
25.07.03.24 Pas. floor drain 0.0131 Bh 19,060.00 249.97
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh 185,120.00 2,427.80
JUMLAH 66,095.85
Nilai ASB 69,374.54
26.08.06 Rehabilitasi Pendopo
HARGA
NO JENIS PEKERJAAN Koeff SAT. JUMLAH (Rp)
SATUAN (Rp)
26.08.06.01 Rehabilitasi Pondasi Pendopo M2
PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls 350,000.00 3,500.00
Jumlah 3,500.00
PEK. TANAH
25.02.01.24 Pembuatan Lubang Strous Pile diameter 30 cm 0.0400 Ttk 43,115.80 1,724.63
25.01.02.07 Galian Tanah 0.4680 M³ 20,250.00 9,477.00
25.01.02.13 Urugan Tanah Kembali 0.2260 M³ 5,062.50 1,143.92
25.01.02.16 Pengurugan Pasir (PADAT) 0.1542 M³ 106,956.25 16,492.65
25.01.02.17 Pengurugan Sirtu (PADAT) 0.3987 M³ 87,501.25 34,886.75
Jumlah 63,724.96
Nilai ASB 67,224.96
26.08.06.02 Rehabilitasi Pasangan Pendopo M2
PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls 350,000.00 3,500.00
Jumlah 3,500.00
PEK. PASANGAN
25.02.01.11 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps) 0.2150 M³ 406,973.71 87,515.63
25.04.01.30 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm 1.1365 M³ 5,000.00 5,682.50
25.04.01.38 Pasang Benangan 2.9800 M 5,680.80 16,928.78
Jumlah 110,126.91
Nilai ASB 113,626.91
26.08.06.03 Rehabilitasi Beton Struktur Pendopo M2
PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls 350,000.00 3,500.00
Jumlah 3,500.00
PEK. BETON STRUKTUR
25.03.01.23 Pekerjaan Beton Rabat (1 Pc : 3 Ps : 6 Kr) 0.0753 M³ 404,051.65 30,410.54
25.04.01.30 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm 0.0405 M³ 18,606.50 753.56
Beton Bertulang 1 Pc : 1.5 Ps : 2.5 Kr (K350) dengan
25.03.01.19 Pemakaian Besi 160 kg 0.1354 M³ 3,241,888.40 439,081.37
25.03.01.17 Pekerjaan Beton Bertulang Strous Pile 0.0000
(1 Pc : 1,5 Ps : 2,5 Kr, untuk besi 130 kg) 0.0113 M³ 2,907,758.00 32,899.20
Jumlah 503,144.68
Nilai ASB 506,644.68
26.08.06.04 Rehabilitasi Lantai Pendopo M2
PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls 350,000.00 3,500.00
Jumlah 3,500.00
PEK. LANTAI
25.05.01.06 Pas. keramik lantai 40 x 40 cm ( Motif ) 1.4336 M² 80,364.00 115,209.83
Jumlah 115,209.83
Nilai ASB 118,709.83
26.08.06.05 Rehabilitasi Pembesian Pendopo M2
PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls 350,000.00 3,500.00
Jumlah 3,500.00
PEK. PEMBESIAN
25.03.02.05 Pekerjaan Besi WF 150x100x7x10 6.9802 Kg 13,093.60 91,396.50
25.03.02.03 Pekerjaan Besi Plat Tebal 2 mm 1.1740 Kg 13,753.60 16,146.77
B.20.01.01.44.06 Baut 22 mm 3.6000 Bh 3,000.00 10,800.00
B.20.01.01.62.02 Angker 0.8000 Bh 2,200.00 1,760.00
Jumlah 118,343.27
Nilai ASB 121,843.27
26.08.06.07 Rehabilitasi Atap + Plafond Pendopo M2
PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls 350,000.00 3,500.00
Jumlah 3,500.00
PEK. ATAP + Plafond
25.06.01.04 Pemasangan Reng kamper/Usuk kamper 2.1150 M2 58,904.52 124,583.06
25.06.02.03 Pemasangan Genteng Karang Pilang / Wisma 2.1150 M2 64,380.00 136,163.70
25.06.02.12 Pemasangan Wuwung Genteng Karang Pilang 0.4300 M¹ 49,958.25 21,482.05
25.06.02.33 Pemasangan Listplank Kayu Kamper 3 / 30 cm 0.4980 M¹ 46,133.18 22,974.32
25.06.01.07 Pas. gording kamper 8/12 0.0285 M³ 62,276.80 1,771.81
25.06.03.02 Pas. plafond eternit rangka ky kamper 2.1420 M2 67,775.76 145,175.68
25.06.03.06 Pas. list plafond 2.8800 M¹ 2,988.25 8,606.16
Jumlah 460,756.78
Nilai ASB 464,256.78
26.08.06.08 Rehabilitasi Pengecatan Pendopo M2
PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls 350,000.00 3,500.00
Jumlah 3,500.00
PEK. PENGECATAN, PENGANTUNG
25.04.02.12 Pengecatan Dasar (cat meni) 2.4941 M² 5,287.20 13,186.70
25.04.02.16 Pekerjaan Ter Kayu (rangka atap) 2.1150 M² 6,287.50 13,298.06
25.04.02.21 Pek. pengecatan kayu 0.3521 M² 21,821.40 7,682.88
25.04.02.21 Pengecatan Plafond 2.1420 M² 21,821.40 46,741.44
25.04.02.10 Pengecatan Tembok (balok dan kolom) 1.1365 M² 11,820.00 13,433.43
Jumlah 94,342.51
Nilai ASB 97,842.51
26.08.06.09 Rehabilitasi Instalasi Listrik Pendopo M2
PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls 350,000.00 3,500.00
Jumlah 3,500.00
PEK. INSTALASI LISTRIK
25.07.02.02 Pas. titik lampu 0.0500 Ttk 195,150.00 9,757.50
20.03.06.02.21.65 Pas. lampu TL 20 watt 0.0400 Bh 51,700.00 2,068.00
Pas Lampu Gantung 0.0100 Ls 1,500,000.00 15,000.00
25.07.02.01 Pas. stop kontak 0.0200 Ttk 29,205.30 584.11
25.07.02.04 Pas. saklar ganda 0.0200 Bh 29,205.30 584.11
Jumlah 27,993.71
Nilai ASB 31,493.71
Pemasangan Penangkal Petir
Harga ( Rp)
No Uraian Koefisien Sat
Satuan Jumlah
A Upah :
Kepala Tukang Listrik 1.0000 O.H 80,000.00 80,000.00
Tukang Listrik 2.0000 O.H 70,000.00 140,000.00
Pembantu Tukang 0.5000 O.H 55,000.00 27,500.00
Jumlah 247,500.00
B Bahan :
Runcingan penangkal petir/ spliter 1" 1.0000 Bh 400,000.00 400,000.00
Kabel BC dia 50 mm2 21.5000 m1 45,000.00 967,500.00
Pipa Pralon 5/8 7.0000 lonjor 5,000.00 35,000.00
Klem Kabel BC dia 50 mm2 61.0000 Bh 20,000.00 1,220,000.00
Pentanahan grounding kabel BC 50 mm2 3.0000 m1 45,000.00 135,000.00
Bak kontrol 1.0000 Unit 200,000.00 200,000.00
Box test line 1.0000 Set 250,000.00 250,000.00
Kabel schoon 1.0000 Set 5,500.00 5,500.00
Connector 3.0000 Set 7,500.00 22,500.00
Peralatan bantu 8.0000 jam 950.00 7,600.00
Testing - commissioning dan izin 1.0000 Ls 509,400.00 509,400.00
Jumlah 3,752,500.00
Nilai HSPK : 4,000,000.00