1 Pembersihan Lokasi

P= 13.00
L= 9.00

V= PxL

1300
V= 13x 9.00

V= 117 M²

900

2 Pemasangan bowplank

P= 13.30
L= 9.30

V= 2X(P+L)
V= 2 X (13.15 + 9.15)

V= 45.20 M¹

3 Pekerjaan Galian Tanah


Pondasi Menerus

200 150 150 250 150


P= 24.00
L= 1.00
T= 0.80
200
300

300

1
350
200
PxLxT
300

300
12 x 1 x 0,80
19.200 M³
350

500
150
50

100
150

200
100

200 300 400

4 Pek. Galian pondasi menerus

P= 0.80
L= 1.00
TP= 19.200
80

V= P x L x TP
V= 0.8x 1 x 19,2
V= 15.36 M3

100

1
5 Pasangan Pondasi Menerus
La = 0.30
Lb = 0.80
T= 0.8
Tp = 24.00

V= La + Lb x T x Tp
2
V= 0.30 + 0.80 x 0.8 x 24
2
V= 10.56 M³

6 Urugan pasir di bawah Lantai

P= 1.00
L= 0.05
TP= 24.00

V= VP x L x T x TP
V= 1.00 x 1.00 x0.05x24
V= 1.2

7 Pasangan Batu Kosong

P= 0.15
L= 1.00
TP= 24

V= P x L x TP
V= 0.15 x 1.00 x 24
V= 3.600

8 Urugan tanah kembali Menerus

PxL 0,50 X 0,8


0.4

1
VA= 0,4 X 0,5
2
VA= 0.1
VA= 2.4

VB= 1X0.2X24
VB= 4.8

VA+VB= 7.2

VTOTAL-Panjang galian menerus


7,2 - 19,2 12

9 Pekerjaan Tanah Pasir


Pek. Galian Pondasi Telapak

Galian Pondasi Telapak


P= 1
L= 1
120 T= 1.2
TP= 18.00
PXLxT
1 x 1 x 1,2
1.20 x 18 buah
100

21.60 M³

1
10 Urugan tanah kembali Pondasi Telapak

V. Pondasi =
Volume Galian =
Total pondasi=

V. Galian - V. Pondasi
14.076

11 Pasangan Pondasi Telapak


V1
P= 1.00
L= 1.00
T= 0.25
V= P x L x T
1 x 1 x 0,25
0.25
V2
La= 0,20 x 0,20
Lb= 1 x 1
T= 0.25
La + Lb x T
2
0,04 + 1 x 0,25
2
0.13
V3
P= 0.20
L= 0.20
T= 0.95
V= P x L x T
V= 0.038

TOTAL = 0.418
7.524

1
12 Cor lantai kerja 1: 3: 5 pondasi telapak

Total luas ruangan 122,27

Total ruangan X 0.1


122,27 X 0,1
12.227

1
13 Pondasi titik alas Pasir

P= 1.00
L= 1.00
T= 0.05

V= PxLXT
V= 1 x 1 x 0,05
V= 0.050
0.05 1.00

0,050 x jumlah pondasi


0,050 x 18
0.9 M³

ᴥ PASIR URUG

P= 1.00
L= 1.00
T= 1.2
ZP = 18 BUAH

V= PxLxT
V= 1 x 1 x 1,2 x ZP
V= 21.6 M³

14 Pasangan Sloof

Sloof 20/30
P= 0.30
L= 0.20
200 150 150 250 150

PXL
200

0,3 x 0,2 = 0.06

Luas Sloof x Luas Ruangan


300

300

0,06 x 87
5.22 M³
350

500

Sloof 15/30
P= 0.30
150

L= 0.15
50

100
150

200
100

1
200 300 400
500
150
50

100
150
PXL

200
100

0,3 x 0,15 = 0.05


200 300 400

Luas Sloof x Luas Ruangan


0,045 x 87
20 3.92 M³
8 Ø16

Ø10 - 15 cm
30

15

6 Ø16

Ø10 - 15 cm
30

1
15 Pasangan Kolom
kolom I 15/15

P= 0.15
L= 0.15
15 T= 7.75
∑k= 18 buah
6 Ø16
V= PxLxTx∑k
Ø10 - 15 cm V0,15
= x 0,15 x 7,75 x 18
15

V= 3.13875 M³

Kolom II 20/20 P= 0.2


L= 0.2
T= 7.75
20 ∑k= 18 buah

V= P x L x T x ∑k
V= 0,2 x 0,2 x 7,75 x 18
V= 5.58
20
TOTAL K 1 + K2

16 Pekerjaan Ring Balok


Ring Balok 15/30

15
P= 0.15
6 Ø16 L= 0.30
Luas Ruangan= 87.00
Ø10 - 15 cm
30

Luas Ring Balok=P x L


0,15 x 0,30
0.045

L. R. Balok x Luas ruang

1
0,045 x 87
3.92 M³

Ring Balk 20/30

P= 0.20
L= 0.30
Luas Ruangan= 87.00
20
8 Ø16

Ø10 - 15 cm
Luas Ring Balok=P x L
30

0,20 x 0,30
0.06

L. R. Balok x Luas ruang


0,06 x 87
5.22 M³

1
17 Pasangan Tangga

Luasan Tangga
= 0,39
= 0,85
1.24 M2

+ 4.00 Ring Balk


Volume Tangga
luasan tanggal x lebar tangga
1.24 "+0,95
1.18 M³

+ 0.00 Lantai

18 c. Pek. Lubang dinding dan kusen


ᴥ Tipe Kusen PJ1

P= 2,40 X 1
L= 1,35 X 2
T= 2,05 X 2

9,2 X 0,1 X 0,05


0.046 M3
0,046 X JUMLAH PINTU
0,046 X 4
0.184

ᴥ Tipe Kusen P1

P= 0,9 X 2
L= 2,05 X 2

5,9 X 0,1 X 0,05


0,0295 X JUMLAH PINTU
0,0295 X 8
0.236

1
ᴥ Tipe Kusen P2
P= 1,70 X 2
L= 0,78 X 2

4,96 X 0,1 X 0,05


0,0248 X JUMLAH PINTU
0,0248 X 6
0.0992 M3

1
ᴥ Tipe Kusen J1

P= 1,5 x 2
L= 0,5 x 2

4 X 0,1 X 0,05
0,02 X JUMLAH JENDELA
B 0,02 X 18
0.36 M3

0.05 0.40 0.05

ᴥ Tipe Kusen J2

A P= 1,5 x 2
L= 1 x 2

5 X 0,1 X 0,05
0,025 X JUMLAH JENDELA
0,025 X 1
0.025 M3
B

ᴥ Ventilas

P= 0,2 X 2
L= 0,30 X 2
0.20

0.05

0.30 0.20
1
0.05
0.20

0.05

0.30 0.20
1 X 0,1 X 0,05
0.05 0.005
0,005 X JUMLAH VENTILASI
0.3450 M3

ᴥ Total Luas Kusen


V= PJ1 + P1 + P2 + P3 + J1 + V1

V= 1.2492

1
19 Pek. Daun Pintu Jendela Dan Ventilasi
ᴥ Tipe Pintu Jendela 1

P= 1.4
L= 2.05
JML= 4.00
11.48

ᴥ Tipe Pintu Panel 1

P= 0.80
L= 2.05
1.64
∑P2= 8

V= P x L x ∑P2
V= 0,8 x 2,05 x 8
V= 13.12

ᴥ Tipe Pintu Panel 2

P= 0.70
L= 1.70 X
1.19
∑P2= 6 Buah

V = P x L x ∑P2
V = 0,7 x 1,7 x 6
V= 7.14 M3

1
ᴥ Tipe jendela panel kaca 2

P= 1.50
L= 1.00 X
1.6
∑P2= 1 Buah

V= P x L x ∑P2
A
V = 1,5 x 1 x 1
V= 1.5 M3

total pintu panil


PJ1+ P1+ P2+ J2
33.240

1
ᴥ Tipe jendela panel kaca 1

P= 1.50
L= 0.50 X
0.75

∑J1= 18 Buah

V= P x L x ∑J1
1,5 x 0,5 x 18
13.5

ᴥ Total daun panil jendela

20 pekerjaan dinding
Pas. Batu tela 1:4

P= 78.5
T= 7.15

Luas Tembok PxL


87 x 7,15
561.275

Luas Tembok - Luas Kusen dan ring balk


561,275 - 30,03
531.245

531,245 x 0,15
70.55175 M³

ᴥ Plesteran 1 : 4
Luas Tembok - Luas Kusen
561,245 - 30,03
531.245

531,245 x 2
1062.49 M³

1
21 Perhitungan Luasan Lantai
Urugan tanah peninggian lantai

± 0,00 72,25 x 0,3


-0.05 33,9 x 0,25

1
22 Perhitungan Luasan Plat Lantai

+4,00 22 x 0,12
+4.50 57 x 0,12
+4,10 6 x 0,12

Pasangan Keramik 40/40 kmr tdr+kmr utama+teras+gudang+r.keluarga

151.25

Pasangan keramik 20/20 wc + r.cuci baju


P= 1.5
L= 2
JML = 3
V= 18

Dibutuhkan = 75
450

Pasanagn dinding keramik 25/25


P= 1.5
L= 2
JML = 3
V= 18

Dibutuhkan = 48
288

1
23 Kuda-Kuda
Kuda-Kuda 1

B
182

C 361

86
P1= 1.96
P2= 1.53 D
P3= 3.06 716

P4= 3.61 DETAIL KUDA-KUDA 1


SKALA 1 : 50
P5= 7.16
P6= 9.38
P7 = 9.08
35.78 X 3

K1= 107.34 M

1
24 Kuda-Kuda 2

172

186

P1= 1.72
P2= 0.66 363
P3= 1.5
P4= 1.86
DETAIL KUDA-KUDA + 2
P5= 3.63
SKALA 1 : 50
P6= 4.55
P7= 4.65
18.57 x6

K2 = 111.42

K1 + K2
218.76
TOTAL KUDA-KUDA V= PxLxT
218,76 x 0,1 x 0,05
1.0938

Gording Dan Reng

1
Gording
P=
L=
T=
5 70 550

K2

177
423
Reng
P=
K1
Balo k Gording 5/10 L=
1509

T=
Reng 2/3 K1

Usuk 5/7
K1

Atap Seng Metal Roof

524
100

500 620

K2

1
25 Rangka Plafond

Luas Plafond = Luasan lanta


169,25 x 2
338.5

26 Lisplank
P= 59,57 x 2
L= 0.2

LUAS= PxL
119,14 x 0,2
23.828
27 pasangan Atap seng

Atap Depan Belakang

570 5 50

K2
177

Atap Tengah
423

K1
Balo k Gording 5/10
tengah + belakang =
1509

Reng 2/3 K1

Usuk 5/7
K1 1
K1
Balo k Gording 5/10

1509
Reng 2/3 K1

Usuk 5/7
K1
Dibutuhkan =
Atap Seng Metal Roof Multi Roof 2x5 daun, uku

524
100

500 620

28 Nok seng Plat K2

N1= 14.06
N2= 1.5
15.56

29 Pemasangan Plafond Tripleks


Pas. Tripleks = Rangka Plafond
338.5

Dibutuhkan = 114
Ukuran 1,22 x 2,44 m

30 List Pinggir Plfond


323

1
31 PEKERJAAN PENGANTUNGAN

ᴥ Kunci Pintu
a. kunci pintu panel V = jumlah kunci yang akan di pasang

= 12 set

b. kunci pintu Km/WC V = jumlah kunci yang akan di pasang

= 6 set

a. Engsel Pintu Dan Jendela V = menghitung volume engsel pintu


engsel pintu
= 66 set

V = menghitung volume engsel jendela

= 44 set

ᴥ gendel Pintu Dan Jendela


a. gendel pintu V= menghitung volume gendel pintu

V= 12 set

a. gendel jendela V= menghitung volume gendell jendela

V= 22 st

ᴥ Kait angin Jendela V= menghitung volume kait angin jendela (2 b


V= 22 x 2 buah
V= 44 set

32 Pekerjaan instalasi listrik

ᴥ titik pas saklar saklar tunggal = 1


saklar ganda = 15

ᴥ stop kontak stop kontak = 10

ᴥ stand lampu lampu philip 18 watt = 37

1
ᴥ fuse box V= 1

33 PEKERJAAN PENGECATAN

ᴥ Pengecatan dinding V= pengecatan dinding = luasan plesteran

V= 1062.49 M²

ᴥ Pengecatan tripleks plafond V= pengecatan dinding = volume plafond

V= 338.500 M²

ᴥ Pengecatan kusen V= pengecatan kusen = luas kusen x 0.20

V= 6.012 M²

1
ᴥ Pengecatan daun pintu V= pengecatan daun pintu =
volume daun pintu

V= 33.24 M3

ᴥ Pengecatan daun jendela V= pengecatan daun jendela =


volume daun jendela

V= 5.40 M3

ᴥ Pengecatan lisplank V= pengecatan lispalnk =


panjang lisplank x 0.42

V= 50.0388 M3

34 PEKERJAAN SANITASI AIR


pipaP=
PVC diameter ½ inci
ᴥ instalasi air bersih
P= 62.7

Dibutuhkan = 16

ᴥ instalasi air kotor pipaP=


PVC diameter 2 inci

P= 87.1

Dibutuhkan = 22

ᴥ Floor drain
floor drain

V= 7 Buah

ᴥ Kloset Duduk

V= 6 Buah

1
ᴥ Keran Air
Keran Air

V= 8 Buah

ᴥ BAK Tipy B1
P= 1.43
L= 0.59
T= 1.10
Zb1 = 6 Buah

V= P x L x T x Zb1
V= 1.43 x 0.59 x 1.10 x 2
V= 5.56842 0
1.43
ᴥ TOTAL PEKERJAAN BAK AIR Km/Wc V= 5.56842
0.95

1
an Pekerjaan Satuan Volume

M² 117 M²

M¹ 45.20 M¹

1
M³ 19.20 M³

M3 15.36 M3

1
M³ 10.56 M³

M³ 1.2 M³

M³ 3.600 M³

x L x TP
15 x 1.00 x 24

1
Mᵌ 12 Mᵌ
x 24

g galian menerus

M³ 21.60 M³

1
7.524
21.60
18 buah
M³ 14.08 M³
V. Pondasi
076

x 1 x 0,25

0.04
1.00 M³ 7.524 M³

Lb x T
2
1 x 0,25
2

X 18

1
M³ 12.227 M³

1
M³ 0.9 M³
x 1 x 0,05

mlah pondasi
0 x 18

M³ 5.22 M³

1
1
M³ 3.139 M³

M³ 5.58 M³

8.719

M³ 3.92 M³

1
M3 5.22 M3

1
nggal x lebar tangga
M3 1.18 M3

2.40
2.7
4.1 +
9.2 M1 M3 0.184 M3

JUMLAH PINTU

1.8
4.1 + M3 0.236 M3
5.9 M1

1
3.4
1.56 +
4.96 M1
M3 0.0992 M3

1
3
1+
4 M1

M3 0.36 M3

3
2+
5 M1

M3 0.025 M3

0.4
0.6 +
1 M1

1
M3 0.3450 M3
0,1 X 0,05

UMLAH VENTILASI

P1 + P2 + P3 + J1 + V1
M3 1.249 M3

1.2492

1
M3 11.48 M3

X
M3

Buah
M3 13.120 M3
P x L x ∑P2
0,8 x 2,05 x 8
M3

M3 7.14 M3

1
M3 1.5 M3

J1+ P1+ P2+ J2 M3 33.24 M3


M3

1
M3 5.4 M3

5 x 0,5 x 18

5.4 M3

M³ 70.55175 M³

as Kusen dan ring balk

M³ 1062.49 M³

1
21.675
8.475 + M³ 30.15 M³
30.15 M³

1
M2 10.2 M2
2.64
6.84
0.72 +
10.2 M2

+teras+gudang+r.keluarga

M2 M2 151.25 M2

uci baju

M2 M2 18 M2

Lembar
Lembar

M2

M2 M2 18 M2

Lembar
Lembar

1
1

1
M3 1.0938 M3
218,76 x 0,1 x 0,05
M3

1
312
0.05
0.1

V= PxLxT
V= 312 X 0,05 X 0,1
V= 1.56 M3

568
0.02
0.03

V= PxLxT
V= 368 X 0,02 X 0,03
V= 0.2208 M²

v total 1.7808

1
uas Plafond = Luasan lantai

M3

= 119,14

M3 23.828 M3

119,14 x 0,2
M3

tap Depan Belakang


PxL= 104 + 10 + 8,16

122.160

tap Tengah
P= 4.85
L= 4.54 x
22.019

ngah + belakang = 144.179

1
144,179 x cos 30
124.863 M²

Dibutuhkan = 163 Lembar


Multi Roof 2x5 daun, ukuran 0,77 x 1 m

M² 15.56 M²
+

ngka Plafond M² 338.500 M²


Lembar
22 x 2,44 m

M² M² 323.00 M²

1
set 18 set

akan di pasang

akan di pasang

e engsel pintu

engsel jendela

ung volume gendel pintu set 12 set

ng volume gendell jendela st 22 st

ume kait angin jendela (2 buah) set 44 set

set
set

set

set

1
titik

g = luasan plesteran M² 1062.49 M²

g = volume plafond M² 338.500 M²

= luas kusen x 0.20 M² 6.012 M²

1
M3 33.24 M3

M3 5.40 M3

M3 50.0388 M3

C diameter ½ inci
m 62.7 m
m

Buah

C diameter 2 inci m 87.1 m

Buah

Buah 7 Buah

Buah 6 Buah

1
Buah 8 Buah

Buah 5.56842 Buah

Buah 5.56842 Buah

1
DAFTAR HARGA SATUAN DAN UPAH KERJA

A. DAFTAR HARGA BAHAN

HARGA
No. NAMA BAHAN SATUAN No. NAMA BAHAN
(Rp)

1 Amplas Lbr Rp. 7,500.00 64 Ornamesh F3035


2 Aluminium plat Lbr Rp. 134,000.00 65 Paku segala ukuran
3 Arang M3 Rp. 580,000.00 66 Paku seng
4 Arde / Pertanahan Ttk Rp. 450,000.00 67 Pasir pasang
5 Atap Seng Galvalum M' Rp. 82,500.00 68 Pasir beton
6 Atap fibreglass B-800 M' Rp. 160,000.00 69 Pasir urug
7 Batu kali m3 Rp. 545,000.00 70 Penangkal Petir
8 Batu kerikil/koral m3 Rp. 560,000.00 71 Pipa PVC 1/2"
9 Batu pecah m3 Rp. 1,040,000.00 72 Pipa PVC 1"
10 Batu tela Bh Rp. 4,000.00 73 Pipa PVC 2"
11 Batu Kerawang Bh Rp. 8,500.00 74 Pipa PVC 4"
12 Besi Profil/Baja Ø22 Kg Rp. 18,000.00 75 Pipa GIP 1 1/2 "
13 Besi beton (Ulir) kg Rp. 20,000.00 76 Pipa GIP 1 "
14 Besi beton (Polos) kg Rp. 20,000.00 77 Pipa GIP 2 "
15 Besi Plat Kg Rp. 17,800.00 78 Pipa GIP 4 "
16 Cat Tembok Kg Rp. 27,300.00 79 Pipa GIP 1/2 "
17 Cat Kilap Kg Rp. 65,000.00 80 Pipa GIP 3/4 "
18 Cat Menie Kg Rp. 20,000.00 81 Plat Aluminium t = 1 cm
19 Cat Besi Kg Rp. 65,000.00 82 Plamur tembok
20 Closet duduk Kg Rp. 2,700,000.00 83 Saklar Tunggal
21 Closet jongkok Bh Rp. 635,000.00 84 Saklar Ganda
22 Dempul Kg Rp. 24,500.00 85 Sambungan Pipa
23 Engsel Bh Rp. 32,300.00 86 Semen PC
24 Engsel Baja Bh Rp. 67,300.00 87 Semen warna
25 Engsel Pintu Kuningan Bh Rp. 42,800.00 88 Seng Plat
26 Floor drain stainless Psg Rp. 69,000.00 89 Slot Baja
27 Fisher Bh Rp. 29,500.00 90 Solar
28 Gerendel jendela Bh Rp. 23,500.00 91 Soda Api
29 Gerendel Baja Bh Rp. 85,300.00 92 Split Tembaga
30 Handel Baja Bh Rp. 71,300.00 93 Stop Kontak putar 200 W
31 Mata Gurinda Bh Rp. 124,300.00 94 Stop Kontak khusus AC
32 Isilatif Gypsum Roll Rp. 15,300.00 95 Stop Kran
33 Kabel BC 50 mm M' Rp. 69,300.00 96 Tangki air fiberglass 2000
34 Kabel BC 70 mm M' Rp. 84,300.00 97 Karang urug / Urpil
35 Kabel NYM 2 x 2,5 mm M' Rp. 21,700.00 98 Teakwood
36 Keramik 60 x 60 Bh Rp. 41,442.86 99 Teak Oil
37 Keramik 40 x 40 Bh Rp. 15,483.33 100 Tripleks 12 mm
38 Keramik 20 x 20 Bh Rp. 4,200.00 101 Tripleks 9 mm
39 Keramik 20 x 25 Bh Rp. 6,325.00 102 Tripleks 6 mm
40 Klem besi Strip Bh Rp. 19,300.00 103 Triplek 3 mm
41 Kaca Bening 5 mm M2 Rp. 124,300.00 104 Wastafel Lengkap acesso
42 Kawat ikat kg Rp. 25,500.00 105 Alat Bantu
43 Kawat Las / Elektroda 2,5 kg Rp. 35,300.00
44 Rezor Wire Cosertina 60 cm kg Rp. 1,100,000.00
45 Kayu besi balok M3 Rp. 5,450,000.00 B. DAFTAR UPAH
46 Kayu besi papan M3 Rp. 5,450,000.00
47 Kayu Matoa M3 Rp. 3,150,000.00 No.
JENIS KEAHLIAN
48 Kayu perancah/begesting m3 Rp. 3,000,000.00
49 Kayu Railling M' Rp. 42,000.00
50 Kayu List Profil M' Rp. 52,300.00 1 Mandor
51 Kran Bh Rp. 89,300.00 2 Kepala tukang batu
52 Kunci Tanam 2 slaag Set Rp. 251,300.00 3 Kepala tukang kayu
53 Kunci Tanam 2 slaag KM/W Set Rp. 135,800.00 4 Kepala tukang besi
54 Kuas rol Bh Rp. 21,300.00 5 Kepala tukang Las
55 Kuas Plat Bh Rp. 8,300.00 6 Kepala tukang cat
56 Lp SL 18 Watt Bh Rp. 64,300.00 7 Kelapa tukang listrik
57 Lp SL 20 Watt Set Rp. 253,300.00 8 Tukang batu
58 Lampu SL 2 x 40 watt + Kap Set Rp. 429,300.00 9 Tukang kayu
59 Line Conector/Telp. bh Rp. 119,300.00 10 Tukang besi
60 Lem Kayu Kg Rp. 38,000.00 11 Tukang Las
61 Minyak cat Ltr Rp. 31,500.00 12 Tukang cat
62 Minyak Pelumas Ltr Rp. 45,000.00 13 Tukang listrik
63 Bok Panel Bh Rp. 3,499,400.00 14 Pekerja
N UPAH KERJA

HARGA
NAMA BAHAN SATUAN
(Rp)

Ornamesh F3035 Lbr Rp. 727,300.00


Paku segala ukuran kg Rp. 31,375.00
Paku seng kg Rp. 33,150.00
Pasir pasang m3 Rp. 545,000.00
Pasir beton m3 Rp. 500,000.00
Pasir urug m3 Rp. 490,000.00
Penangkal Petir Bh Rp. 420,000.00
Pipa PVC 1/2" M' Rp. 17,250.00
Pipa PVC 1" M' Rp. 10,850.00
Pipa PVC 2" M' Rp. 16,588.33
Pipa PVC 4" M' Rp. 72,275.00
Pipa GIP 1 1/2 " M' Rp. 47,400.00
Pipa GIP 1 " M' Rp. 78,440.00
Pipa GIP 2 " M' Rp. 162,680.00
Pipa GIP 4 " M' Rp. 410,733.33
Pipa GIP 1/2 " M' Rp. 39,233.33
Pipa GIP 3/4 " M' Rp. 50,400.00
Plat Aluminium t = 1 cm Lbr Rp. 399,400.00
Plamur tembok Kg Rp. 32,775.00
Saklar Tunggal Bh Rp. 39,675.00
Saklar Ganda Bh Rp. 39,675.00
Sambungan Pipa Bh Rp. 11,400.00
Semen PC zak Rp. 105,000.00
Semen warna kg Rp. 23,000.00
Seng Plat Lbr Rp. 79,400.00
Slot Baja Lbr Rp. 82,900.00
Kg Rp. 6,500.00
Soda Api Kg Rp. 45,000.00
Split Tembaga Bh Rp. 179,500.00
Stop Kontak putar 200 Wa Set Rp. 30,000.00
Stop Kontak khusus AC Bh Rp. 128,000.00
Stop Kran Bh Rp. 94,400.00
Tangki air fiberglass 2000 Bh Rp. 5,564,400.00
Karang urug / Urpil m3 Rp. 340,900.00
Teakwood Lbr Rp. 190,000.00
Teak Oil Ltr Rp. 52,000.00
Tripleks 12 mm Lbr Rp. 285,000.00
Tripleks 9 mm Lbr Rp. 220,000.00
Tripleks 6 mm Lbr Rp. 158,000.00
Triplek 3 mm Lbr Rp. 230,000.00
Wastafel Lengkap acesso Lbr Rp. 2,215,000.00
Alat Bantu Pkt Rp. 250,000.00

DAFTAR UPAH

SATUAN UPAH
JENIS KEAHLIAN
(Rp)

Mandor h/o Rp. 193,000.00


Kepala tukang batu h/o Rp. 170,000.00
Kepala tukang kayu h/o Rp. 170,000.00
Kepala tukang besi h/o Rp. 170,000.00
Kepala tukang Las h/o Rp. 170,000.00
Kepala tukang cat h/o Rp. 170,000.00
Kelapa tukang listrik h/o Rp. 170,000.00
Tukang batu h/o Rp. 155,000.00
Tukang kayu h/o Rp. 155,000.00
Tukang besi h/o Rp. 155,000.00
Tukang Las h/o Rp. 155,000.00
Tukang cat h/o Rp. 155,000.00
Tukang listrik h/o Rp. 155,000.00
Pekerja h/o Rp. 117,000.00
DAFTAR ANALISA HARGA DAN UPAH KERJA

PEKERJAAN : PEMBANGUNAN RUMAH SEDERHANA TYPE 117 M3


LOKASI : JAYAPURA
T.A. : 2018

No URAIAN PEKERJAAN VOLUME

1 1M' PASANG BOUWPLANK


Kayu bouwplank 0.0120 M3
Paku 0.0200 Kg
Pekerja 0.1000 Kg
Tukang kayu 0.1000 h/o
Kepala tukang kayu 0.0100 h/o
Mandor 0.0050 h/o

2 1M3 GALIAN TANAH BIASA


Pekerja 0.6250 h/o
Mandor 0.0620 h/o

3 1M3 GALIAN TANAH PAKAI ALAT


Pekerja 0.1560 ho
Mandor 0.0520 ho
Excavator 0.0520 Jam
Dump Truck 0.1113 Jam
Alat Bantu 1.0000 Ls

4 1 M3 URUGAN TANAH KEMBALI


Pekerja 0.1920 h/o
Mandor 0.0190 h/o

5 1M3 URUGAN TANAH


Tanah urug 1.2000 M3
Pekerja 0.3000 h/o
Mandor 0.0100 h/o

6 1M3 URUGAN PASIR


Pasir urug 1.2000 M3
Pekerja 0.3000 h/o
Mandor 0.0100 h/o

7 1M3 PASANGAN BATU KOSONG


Batu kali 1.2000 M3
Pekerja 0.7800 h/o
Tukang batu 0.3900 h/o
Kepala tukang 0.0390 h/o
Mandor 0.0390 h/o
8 1M3 PASANGAN BATU KALI 1:4
Batu kali 1.1000 M3
Semen PC 3.2000 Zak
Pasir pasang 0.5200 M3
Pekerja 1.5000 h/o
Tukang batu 0.6000 h/o
Kepala tukang 0.0600 h/o
Mandor 0.0750 h/o

9 1M3 PASANGAN BATU TELA 1:2


Batu tela 25,000 Bh
Semen PC 43.5000 Zak
Pasir pasang 0.0800 M3
Pekerja 0.6500 h/o
Tukang batu 0.2000 h/o
Kepala tukang batu 0.0600 h/o
Mandor 0.0750 h/o
No URAIAN PEKERJAAN VOLUME

10 1M3 PASANGAN BATU TELA 1:4


Batu tela 110 Bh
Semen PC 3.2000 Zak
Pasir pasang 0.5200 M3
Pekerja 1.5000 h/o
Tukang batu 0.6000 h/o
Kepala tukang batu 0.0600 h/o
Mandor 0.0750 h/o

11 1M2 PLESTERAN 1:2 tebal 1,5 cm


Semen PC 8.5200 Zak
Pasir pasang 0.0170 M3
Pekerja 0.2000 h/o
Tukang batu 0.1500 h/o
Kepala tukang batu 0.0150 h/o
Mandor 0.0100 h/o

12 1M2 PLESTERAN 1:4 tebal 1,5 cm


Semen PC 0.1040 Zak
Pasir pasang 0.0200 M3
Pekerja 0.2000 h/o
Tukang batu 0.1500 h/o
Kepala tukang batu 0.0150 h/o
Mandor 0.0100 h/o

13 1 M2 PLESTERAN 1 : 3
Semen PC 0.1296 zak
Pasir pasang 0.0190 m3
Tukang batu 0.2000 ho
Kep. tukang batu 0.0150 ho
Pekerja 0.1500 ho
Mandor 0.0100 ho

14 1M3 BETON 1Pc : 3Psr : 5Kr


Batu Pecah 0.8700 M3
Semen PC 4.3600 Zak
Pasir pasang 0.5200 M3
Pekerja 1.6500 h/o
Tukang batu 0.2500 h/o
Kepala tukang batu 0.0250 h/o
Mandor 0.0800 h/o

15a 1M3 BETON 1 Pc : 1,5 Psr : 2,5 Bp


Batu Pecah 0.8000 M3
Semen PC 8.0000 Zak
Pasir pasang 0.4800 M3
Pekerja 2.0000 h/o
Tukang batu 0.3500 h/o
Kepala tukang batu 0.0350 h/o
Mandor 1.0000 h/o

b 1KG BESI BETON ( POTONG, BENGKOK, PASANG )


Besi beton 1.1000 Kg
Kawat ikat 0.0200 Kg
Pekerja 0.0400 h/o
Tukang besi 0.0600 h/o
Kepala tukang besi 0.0300 h/o
Mandor 0.0100 h/o
No URAIAN PEKERJAAN VOLUME

c BEGESTING PER M2
Kayu begesting 0.0400 M3
Paku 0.4000 Kg
Pekerja 0.5000 h/o
Tukang kayu 0.5000 h/o
Kepala tukang kayu 0.0500 h/o
Mandor 0.0100 h/o

16 1 M2 STUT WERK
Kayu Begesting 0.0350 M3
Paku 0.4000 kg
Pekerja 0.3800 h/o
Tukang 0.5000 h/o
Kepala tukang 0.1000 h/o
Mandor 0.0100 h/o

17 1 M2 BEGESTING LAPIS MULTIPLEKS 9 MM


Kayu Begesting 0.0250 m3
Multipleks 0.3750 lbr.
Paku 0.4000 kg
Pekerja 0.3800 h/o
Tukang 0.5000 h/o
Kepala tukang 0.1000 h/o
Mandor 0.0100 h/o

18 1 M3 KOLOM UTAMA 35 x 35
Beton Cor 1.0000 M3
Besi beton 203.3613 kg
Bekisting 12.3790 M2
Stut werk 2.5000 M2
Bongkar/ siram 2.0000 h/o

19 1 M3 KOLOM UTAMA 35 x 35
Beton Cor 1.0000 M3
Besi beton 203.3613 kg
Bekisting 12.3177 M2
Stut werk 2.5000 M2
Bongkar/ siram 2.0000 h/o

20 1 M3 KOLOM UTAMA 20 x 20
Beton Cor 1.0000 M3
Besi beton 100.0000 kg
Bekisting 12.3790 M2
Stut werk 2.5000 M2
Bongkar/ siram 2.0000 h/o

21 1 M3 KOLOM UTAMA 30 x 30
Beton Cor 1.0000 M3
Besi beton 231.3234 kg
Bekisting 12.3177 M2
Stut werk 2.5000 M2
Bongkar/ siram 2.0000 h/o

22 1 M3 KAKI PONDASI 30 x 30
Beton Cor 1.0000 M3
Besi beton 289.4978 kg
Bekisting 10.9586 M2
Bongkar/ siram 2.0000 h/o

23 1 M3 KAKI PONDASI 35 x 35
Beton Cor 1.0000 M3
Besi beton 242.7037 kg
Bekisting 10.9586 M2
Bongkar/ siram 2.0000 h/o

24 1 M3 PONDASI 1.30 x 1.30


Beton Cor 1.0000 M3
Besi beton 100.0000 kg
Bekisting 3.5933 M2
Bongkar/ siram 2.0000 h/o
No URAIAN PEKERJAAN VOLUME

25 1 M3 PONDASI 1.50 x 1.50


Beton Cor 1.0000 M3
Besi beton 200.2311 kg
Bekisting 3.6667 M2
Bongkar/ siram 2.0000 M2

26 1 M3 SLOOF 20 x 25
Beton Cor 1.0000 M3
Besi beton 10.0000 kg
Bekisting 14.6667 M2
Bongkar/ siram 2.0000 h/o

27 1 M3 SLOOF 30 x 40
Beton Cor 1.0000 M3
Besi beton 254.3547 kg
Bekisting 11.6947 M2
Bongkar/ siram 2.0000 h/o

28 1 M3 BALOK 30 x 60
Beton Cor 1.0000 M3
Besi beton 10.0000 kg
Bekisting 9.8915 M2
Stut werk 2.7907 M2
Bongkar/ siram 2.0000 h/o

29 1 M3 BALOK 30 x 50
Beton Cor 1.0000 M3
Besi beton 211.3308 kg
Bekisting 9.8915 M2
Stut werk 2.3256 M2
Bongkar/ siram 2.0000 h/o

30 1 M3 BALOK 25 x 50
Beton Cor 1.0000 M3
Besi beton 191.0098 kg
Bekisting 11.6947 M2
Stut werk 2.6316 M2
Bongkar/ siram 2.0000 h/o

31 1 M3 BALOK 30 x 60
Beton Cor 1.0000 M3
Besi beton 181.2283 kg
Bekisting 9.8915 M2
Stut werk 3.5714 M2
Bongkar/ siram 2.0000 h/o

32 1 M3 BALOK 30 x 40
Beton Cor 1.0000 M3
Besi beton 220.6121 kg
Bekisting 12.7286 M2
Stut werk 3.5714 M2
Bongkar/ siram 2.0000 h/o

33 1 M3 BALOK GRID 20 x 30
Beton Cor 1.0000 M3
Besi beton 215.3194 kg
Bekisting 17.1111 M2
Stut werk 5.5556 M2
Bongkar/ siram 2.0000 h/o

34 1 M3 BALOK ANAK C 20 x 30
Beton Cor 1.0000 M3
Besi beton 223.6795 kg
Bekisting 17.1111 M2
Stut werk 5.5556 M2
Bongkar/ siram 2.0000 h/o
No URAIAN PEKERJAAN VOLUME

35 1 M3 BALOK 25 x 40
Beton Cor 1.0000 M3
Besi beton 242.3533 kg
Bekisting 12.7286 M2
Stut werk 3.5714 M2
Bongkar/ siram 2.0000 h/o

36 1 M3 BALOK ANAK E 25 x 40
Beton Cor 1.0000 M3
Besi beton 191.3449 kg
Bekisting 12.7286 M2
Stut werk 3.5714 M2
Bongkar/ siram 2.0000 h/o

37 1 M3 BALOK ANAK DAK 25 x 35


Beton Cor 1.0000 M3
Besi beton 141.5123 kg
Bekisting 12.7286 M2
Stut werk 3.5714 M2
Bongkar/ siram 2.0000 h/o

38 1 M3 BALOK TANGGA F 25 x 45
Beton Cor 1.0000 M3
Besi beton 219.7905 kg
Bekisting 12.1333 M2
Stut werk 3.0303 M2
Bongkar/ siram 2.0000 h/o

39 1 M3 BALOK ANAK 15/30


Beton Cor 1.0000 M3
Besi beton 234.0311 kg
Bekisting 22.9167 M2
Stut werk 4.1667 M2
Bongkar/ siram 2.0000 h/o

40 1 M3 PLAT LANTAI T = 12 CM
Beton Cor 1.0000 M3
Besi beton 96.0994 kg
Bekisting 9.1667 M2
Stut werk 9.1667 M2
Bongkar/ siram 2.0000 h/o

41 1 M3 LISTPLANK
Beton Cor 1.0000 M3
Besi beton 115.3010 kg
Bekisting 20.5346 M2
Stut werk 0.5500 M2
Bongkar/ siram 2.0000 h/o

42 1 M3 KAKI PONDASI TANGGA


Beton Cor 1.0000 M3
Besi beton 156.1647 kg
Bekisting 6.5930 M2
Stut werk 2.5000 M2
Bongkar/ siram 2.0000 h/o

43 1 M3 PONDASI TANGGA
Beton Cor 1.0000 M3
Besi beton 156.1647 kg
Bekisting 2.6736 M2
Bongkar/ siram 2.0000 h/o

44 1 M3 PLAT TANGGA
Beton Cor 1.0000 M3
Besi beton 173.5720 kg
Bekisting 7.3333 M2
Stut werk 7.3330 M2
Bongkar/ siram 2.0000 h/o
No URAIAN PEKERJAAN VOLUME

45 1 M3 PLAT BORDES t = 20 cm
Beton Cor 1.0000 M3
Besi beton 163.8632 kg
Bekisting 5.5000 M2
Stut werk 5.5000 M2
Bongkar/ siram 2.0000 h/o

46 STEK KOLOM 1 TIANG


Kolom 35 X 40 15.5232 Kg
Kolom 35 X 35 13.3056 Kg

47 1 M3 BETON PRAKTIS
Cor Beton 1.0000 m3
Besi Beton 110.0000 kg
Bekisting 6.2000 m2
Bongkar/siram 2.0000 ho

48 1 M2 ACIAN
Semen PC 0.0200 zak
Tukang batu 0.0100 ho
Pekerja 0.0600 ho
Mandor 0.0200 ho

49 1 M3_PEKERJAAN KUSEN
Kayu Besi 1.1000 m3
Paku 0.2000 kg
Tukang Kayu 20.0000 ho
Kep. tukang Kayu 3.2000 ho
Pekerja 6.0000 ho
Mandor 0.6000 ho

50 1 M2 PINTU PANEL PAPAN


Papan kayu besi 0.0350 m3
Tukang Kayu 7.2000 ho
Kep. tukang Kayu 0.7200 ho
Pekerja 2.4000 ho
Mandor 0.2400 ho

51 1 M2 PAS. PINTU DAN JENDELA KACA


Kaca 5 mm 0.8000 m2
Kayu Besi 0.0350 m3
Tukang Kayu 7.2000 ho
Kep. tukang Kayu 0.7200 ho
Pekerja 2.4000 ho
Mandor 0.2400 ho

52 1 M2_PASANG KACA MATI 5 MM


Kaca Bening 5 mm 1.1000 m2
Pekerja 0.0150 ho
Tukang Kayu 0.1500 ho
Kepala Tukang 0.0150 ho
Mandor 0.0008 ho

53 1 M2 PLAFOND TRIPLEK (6 MM )+ RANGKA


Tripleks 6 mm 0.3750 Lbr
Rangka Kayu matoa 0.0100 m3
Paku 0.0200 kg
Tukang Kayu 0.2500 ho
Kep. tukang Kayu 0.0600 ho
Pekerja 0.4000 ho
Mandor 0.0400 ho

54 1 M' LIST PLAFOND


List profil 1.0000 M'
Paku 0.0800 Kg
Pekerja 0.1200 ho
Tukang 0.0600 ho
Mandor 0.0060 ho
No URAIAN PEKERJAAN VOLUME

55 1 M2 CAT TEMBOK 1 PLAMIR 2X PENUTUP


Plamir 0.1000 Kg
Cat dasar 0.1000 Kg
Cat penutup 2 x 0.2600 Kg
Amplas 0.2500 Lbr
Kuas Rol 0.0100 Bh
Pekerja 0.0200 OH
Tukang cat 0.0630 OH
Kepala tukang 0.0063 OH
Mandor 0.0025 OH

56 1 M2_CAT PLAFOND
Cat tembok 0.1100 Kg
Pekerja 0.0800 OH
Tukang cat 0.1100 OH
Kepala tukang 0.0110 OH
Mandor 0.0050 OH

57 1 M2 CAT KILAT
Cat kilat kayu 0.2500 Kg
Minyak cat 0.1000 Kg
Dempul 0.0800 Kg
Amplas kayu 0.5000 Lbr
Pekerja 0.1000 OH
Tukang cat 0.2000 OH
Kepala tukang 0.0200 OH
Mandor 0.0100 OH

58 1 M2 CAT BESI
Cat besi 0.2500 Kg
Minyak cat 0.1000 Kg
Amplas 0.5000 Lbr
Pekerja 0.2500 OH
Tukang cat 0.2250 OH
Kepala tukang 0.0225 OH
Mandor 0.0075 OH

59 1 M2 CAT MENIE
Meny kayu 0.2500 Kg
Minyak cat 0.1000 Bh
Pekerja 0.1000 OH
Tukang cat 0.2000 OH
Kepala tukang 0.0200 OH
Mandor 0.0100 OH
60 1 M3 PEK. KUDA-KUDA KAYU BESI
Kayu Besi 1.1000 m3
Besi Strip 15.0000 Kg
Paku 0.8000 Kg
Pekerja 4.0000 ho
Tukang Kayu 12.0000 ho
Kep. tukang Kayu 1.2000 ho
Mandor 0.2000 ho

61 1 M3_PEK. GORDING KAYU MATOA


Kayu matoa 1.1000 m3
Paku 0.2500 Kg
Pekerja 3.0000 ho
Tukang Kayu 9.0000 ho
Kep. tukang Kayu 0.9000 ho
Mandor 0.1500 ho

62 1 M2 PAS. LISTPLANK 2/20


Papan Kayu Besi 0.0100 m3
Paku 0.0300 Kg
Pekerja 0.0800 ho
Tukang Kayu 0.2400 ho
Kep. tukang Kayu 0.0240 ho
Mandor 0.0040 ho
No URAIAN PEKERJAAN VOLUME

63 1 M2_PAS. JALUSI
Papan Kayu Besi 0.0240 m3
Paku 0.0150 Kg
Pekerja 0.3000 ho
Tukang Kayu 0.8000 ho
Kep. tukang Kayu 0.0800 ho
Mandor 0.0300 ho

64 1M2 PASANG ATAP SENG GALVALUM


Seng gelombang Galvanis 1.4700 lbr
Paku seng 0.0200 Kg
Pekerja 0.1200 h/o
Tukang kayu 0.0700 h/o
Kepala tukang kayu 0.0080 h/o
Mandor 0.0060 h/o

65 1M' PASANG NOK SENG PLAT BJLS 30


Nok seng plat BJLS 30 0.3000 M'
Papang Nok 0.0040 M3
Paku seng 0.0400 Kg
Pekerja 0.1500 h/o
Tukang kayu 0.0700 h/o
Kepala tukang kayu 0.0080 h/o
Mandor 0.0060 h/o

66 1 BH PASANG ENGSEL PINTU


Engsel Baja 1.0000 bh
Tukang Las 0.3000 ho

67 1 BH PASANG ENGSEL JENDELA


Engsel Jendela 1.0000 bh
Tukang Kayu 0.2000 ho

68 1 BH PASANG KUNCI TANAM 2 SLAAG


Kunci Tanam 2 Slaag 1.0000 bh
Tukang Kayu 1.1000 ho

69 1 BH PASANG KUNCI SELOT BESI


Kunci Selot 1.0000 bh
Tukang Kunci 1.1000 ho

69 1 BH PASANG ENGSEL BESI


Engsel besi 1.0000 bh
Tukang Las 1.1000 ho
70 1 BH PASANG GERENDEL PINTU/JENDELA
Gerendel Jendela 1.0000 bh
Tukang Kayu 0.2500 ho

71 1 BH PASANG CLOSET JONGKOK


Closet Jongkok 1.0000 bh
Tukang 1.6000 ho
Mandor 0.1600 ho

72 1 BH PASANG WESTAFEL
Wastafel 1.0000 bh
Perlengkapan Pipa 1.0000 Set
Semen PC 0.1200 zak
Pasir Pasang 0.0100 M3
Pekerja 0.6200 ho
Tukang batu 0.3500 ho
Kep. tukang batu 0.0350 ho
Mandor 0.0300 ho

73 1 BH_PASANG KRAN
Kran 1.0000 bh
Tukang 0.8000 ho
Mandor 0.0400 ho

74 1 BH PASANG STOP KRAN


Stop Kran 1.0000 bh
Tukang 0.2000 ho
Mandor 0.0400 ho
No URAIAN PEKERJAAN VOLUME

75 1 BH PASANG FLOOR DRAIN


Floor Drain 1.0000 bh
Tukang 0.6000 ho
Mandor 0.0400 ho

76 1 M' PEMB. SALURAN AIR HUJAN


Galian Tanah 0.4800 m3
Pasir Pasang 0.0300 m3
Pas. Batu Tela 1 : 4 0.1200 m3
Plesteran 1 : 2 1.2000 m2

77 1 UNIT_PASANG PENANGKAL PETIR


Penangkal Petir 5.0000 Set
Kabel BC 70 mm 12.0000 m'
Pipa GIP dia 1" 15.0000 m'
Split Tembaga 14.0000 bh
Plat Aluminium 80 x 80 1.0000 Lbr
Arang 0.2500 Kg
Pentanahan Penangkal Petir 1.0000 ttk
Klem Besi Strip 50.0000 bh
Upah kerja 1.0000 ls

78 1 UNIT BAK MANDI


Batu Tela 1 : 2 0.2520 m3
Plesteran 1 : 3 3.4300 m3
Acian 2.3100 m2

79 1 UNIT BAK MANDI BESAR


Batu Tela 1 : 2 0.5920 m3
Cor rangka beton 1 : 1,5 : 2,5 0.1757 M3
Plesteran 1 : 3 5.9200 m3
Acian 9.7600 m2

80 1 UNIT PAS. SEPTICTANK & PERESAPAN


Galian Tanah 10.0700 m3
Pasir Urug 0.4950 m3
Beton Camp. 1 : 3 : 5 0.2868 m3
Beton Camp. 1 : 1,5 : 2,5 0.2972 m3
Batu Tela 1 : 2 1.0419 m3
Plesteran 1 : 2 13.0240 m3
Kerikil 2.2000 m3
Tanah Timbunan 1.3750 m3
Pipa GIP dia 2" Ventilasi 1.5000 m'
Ijuk untuk Peresapan 0.1000 ls
Upah kerja 0.1000 ls

81 1 M' PEK. TALANG


Papan Kayu Besi 0.0090 m3
Seng Plat 1.1000 m'
Cat Meni 0.2000 kg
Kuas plat 0.0200 bh
Paku 0.0150 kg
Tukang 0.2000 ho
Kepala Tukang 0.0200 ho
Pekerja 0.2000 ho
Mandor 0.0200 ho

82 1 TTK INSTALASI LISTRIK


Pipa PVC Ø 1/2" 1.0000 Btg
Kabel 8.0000 m'
Pekerja 0.2500 ho
Tukang Listrik 0.4000 ho
Kepala Tukang 0.0600 ho
Mandor 0.0050 ho

83 1 TTK INSTALASI STOP KONTAK


Stop Kontak 1.0000 Bh
Pipa PVC Ø 1/2" 1.0000 Btg
Kabel 3.0000 m'
Pekerja 0.2000 ho
Tukang Listrik 0.2500 ho
Kepala Tukang 0.0600 ho
Mandor 0.0050 ho
No URAIAN PEKERJAAN VOLUME

84 1 TTK INSTALASI STOP KONTAK AC


Stop Kontak 1.0000 Bh
Pipa PVC Ø 1/2" 1.0000 Btg
Kabel 3.0000 m'
Pekerja 0.2000 ho
Tukang Listrik 0.2500 ho
Kepala Tukang 0.0600 ho
Mandor 0.0050 ho

85 1 TTK INSTALASI LINE/TELP. CONECTOR


Line Conector 1.0000 Bh
Pipa PVC Ø 1/2" 1.0000 Btg
Kabel 3.0000 m'
Pekerja 0.2000 ho
Tukang Listrik 0.2500 ho
Kepala Tukang 0.0600 ho
Mandor 0.0050 ho

86 1 TTK INSTALASI SAKLAR GANDA


Saklar Ganda 1.0000 Bh
Pipa PVC Ø 1/2" 1.0000 Btg
Kabel 3.0000 m'
Pekerja 0.2000 ho
Tukang Listrik 0.2500 ho
Kepala Tukang 0.0600 ho
Mandor 0.0050 ho

87 1 TTK INSTALASI SAKLAR TUNGGAL


Saklar Tunggal 1.0000 Bh
Pipa PVC Ø 1/2" 1.0000 Btg
Kabel 3.0000 m'
Pekerja 0.2000 ho
Tukang Listrik 0.2500 ho
Kepala Tukang 0.0600 ho
Mandor 0.0050 ho

88 1 TTK CFL 18 WATT


Lampu CFL 18 Watt 1.0000 Bh
Tukang Listrik 0.7500 ho
Mandor 0.0080 ho

89 1 TTK CFL 18 WATT DOWN LIGHT


Lampu CFL 18 Watt + Kap 1.0000 Bh
Tukang Listrik 0.7500 ho
Mandor 0.0080 ho

90 1 TTK LAMPU TL 2 X 40 WATT + KAP


Lampu SL 2 X 40 Watt + Kap 1.0000 Bh
Tukang Listrik 0.7500 ho
Mandor 0.0080 ho

91 1 M' PASANG PIPA 2"


Pipa Gip 2" 1.0000 M'
Sambungan 0.2000 Bh
Isolatif 0.0110 Rol
Pekerja 0.2200 ho
Tukang Pipa 0.0540 ho
Kepala Tukang 0.0054 ho
Mandor 0.0160 ho
Alat Bantu 1.0000 Ls

92 1 M' PASANG PIPA 3/4"


Pipa Gip 3/4" 1.0000 M'
Sambungan 0.2000 Bh
Isolatif 0.0110 Rol
Pekerja 0.0800 ho
Tukang Pipa 0.2900 ho
Kepala Tukang 0.0029 ho
Mandor 0.0400 ho
No URAIAN PEKERJAAN VOLUME

93 1 M' PASANG PIPA 1/2"


Pipa Gip 1/2" 1.0000 M'
Sambungan 0.2000 Bh
Isolatif 0.0110 Rol
Pekerja 0.0750 ho
Tukang Pipa 0.2500 ho
Kepala Tukang 0.0025 ho
Mandor 0.0300 ho

94 1 M' PASANG PIPA 6"


Pipa Gip 6" 1.0000 M'
Isolatif 0.0110 Rol
Pekerja 0.4900 ho
Tukang Pipa 0.0980 ho
Kepala Tukang 0.0098 ho
Mandor 0.0240 ho
Alat Bantu 1.0000 Ls

95 1 M' PASANG PIPA 3"


Pipa Gip 6" 1.0000 M'
Isolatif 0.0110 Rol
Pekerja 0.4900 ho
Tukang Pipa 0.0980 ho
Kepala Tukang 0.0098 ho
Mandor 0.0240 ho
Alat Bantu 1.0000 Ls

96 1 M' PASANG PIPA 1,5"


Pipa Gip 1,5" 1.0000 M'
Isolatif 0.0110 Rol
Pekerja 0.2200 ho
Tukang Pipa 0.0540 ho
Kepala Tukang 0.0054 ho
Mandor 0.0160 ho
Alat Bantu 1.0000 Ls

97 1 M' PASANG PIPA PVC 4"


Pipa Gip PVC 4" 1.0000 M'
Sambungan 0.2000 Bh
Isolatif 0.0110 Rol
Pekerja 0.2200 ho
Tukang Pipa 0.0540 ho
Kepala Tukang 0.0054 ho
Mandor 0.0160 ho
98 1 M' PASANG PIPA PVC 2"
Pipa Gip PVC 2" 1.2000 M'
Sambungan 0.3500 %
Isolatif 0.0110 Rol
Pekerja 0.0540 ho
Tukang Pipa 0.0900 ho
Kepala Tukang 0.0090 ho
Mandor 0.0027 ho

99 10 CM PENGELASAN LISTRIK
Kawat las Listrik 0.1000 m1
Solar 0.3000 Liter
Minyak Pelumas 0.0400 Liter
Pekerja 0.0200 ho
Tukang las 0.0400 ho
Kepala Tukang 0.0020 ho
Mandor 0.0020 ho
Sewa Alat 0.1700 Jam

Pengelasan 1 titik
100 MELUBANGI 1 TITIK PLAT BAJA
Pekerja 0.0300 ho
Tukang las 0.0200 ho
Kepala Tukang 0.0030 ho
Mandor 0.0010 ho
Sewa Alat 0.0333 Jam
No URAIAN PEKERJAAN VOLUME

101 1 M' TIANG PAGAR PIPA GIP MEDIUM 4"


Pipa besi med dia 4" 1.2000 m'
Perlengkapan (35% harga barang) 1.0000 set
Pekerja 0.1350 ho
Tukang besi 0.2250 ho
Kepala Tukang 0.0225 ho
Mandor 0.0058 ho

102 1 KG PEKERJAAN BESI


Baja Profil 1.1000 kg
Menie 0.0800 Kg
Kawat Las 0.0750 kg
Gurinda 0.0600 Bh
Pekerja 0.0650 ho
Tukang Las 0.0650 ho
Kepala Tukang 0.0070 ho
Mandor 0.0003 ho
Sewa Alat Bantu 0.0075 Jam

103 PAS 1 M1 KUSEN PINTU BAJA UNP


Baja UNP 10 27.2200 kg
Bourstek/Angkur 1.7500 kg
Mengelas 50.0000 ttk
Pekerja 1.0500 OH
Tukang besi 1.0500 OH
Kepala Tukang 0.1050 OH
Mandor 0.0053 OH
Sewa Alat Bantu 0.7500 Jam

104 1M2 PAS PINTU PLAT BESI DOUBLE


Plat Strip 5 cm tebal 10 mm 6.0300 kg
Besi Plat tebal 4 mm 60.0000 kg
Besi Hollow 50.50.5 15.0000 kg
Engsel 4.0000 bh
Handle 2.0000 set
Gerendel 4.0000 set
Slot 2.0000 set
Besi Siku 1.5000 kg
Mengelas 152.0000 ttk
Pekerja 0.6500 ho
Tukang Las 0.6500 ho
Kepala Tukang 0.0650 ho
Mandor 0.0320 ho
Sewa Alat Bantu 0.0650 Jam
105 1 M2 TRALIS BESI DIA 22 MM RANGKA BESI PLAT STRIP TEBAL 5 MM
Besi Pejal dia 22 mm 22.8354 kg
Plat Strip 5 cm tebal 5 mm 2.9795 kg
Melobangi Platstrip 28.0000 ttk
Mengelas 185.0000 ttk
Besi Siku 1.0300 kg
Pekerja 1.2000 ho
Tukang Las 1.2000 ho
Kepala Tukang 0.2120 ho
Mandor 0.0060 ho
Sewa Alat Bantu 0.5000 Jam

106 1 M2 PAS PAGAR ORNAMESH


Besi plat strip 40.3 10.6920 kg
Ornamesh F3035 120 x 240 cm 0.3472 Lbr
Mengelas 56.0000 ttk
Pekerja 1.2000 ho
Tukang 1.2000 ho
Kepala Tukang 0.0120 ho
Mandor 0.0060 ho
Sewa Alat Bantu 0.2500 Jam
No URAIAN PEKERJAAN VOLUME

107 1M' PAS KAWAT REZOR WIRE (CONSERTINA 60 CM)


Kawat Rezor Wire dia 60 cm 0.1467 roll
Besi beton 6 mm 7.4500 kg
Pengelasan 6.0000 ttk
Pekerja 0.1000 ho
Tukang besi 0.1000 ho
Kepala Tukang 0.0010 ho
Mandor 0.0050 ho
Sewa Alat Bantu 0.2120 Jam

108 1 M2 PASANG DINDING MULTIPLEK RANGKAP


Balok Kayu Besi 0.0195 M3
Papan Kayu Besi 0.0070 M3
Paku biasa 2" - 5" 0.1000 Kg
Lem kayu 0.5600 Ltr
Multiplek 9 mm 1.0000 Lbr
Pekerja 0.1500 ho
Tukang Kayu 0.4500 ho
Kepala Tukang Kayu 0.0450 ho
Mandor 0.0750 ho

109 1 M3 BONGKARAN BETON BERTULANG


Pekerja 6.6670 ho
Mandor 0.3330 ho

110 1 M3 BONGKARAN DINDING TEMBOK BATU TELA


Pekerja 6.6670 ho
Mandor 0.0330 ho

111 1 M2 PEMBONGKARAN ATAP/PLAFOND


Pekerja 0.1200 ho
Mandor 0.0600 ho

112 1 M2 PEMBONGKARAN LANTAI


Pekerja 0.5000 ho
Mandor 0.0250 ho

113 1 M2 PENGEROKAN PERMUKAAN CAT LAMA


Soda Api 0.0500 Kg
Pekerja 0.1500 ho
Mandor 0.0025 ho

114 1 M'_PEMEBUATAN PAGAR BANGUNAN


Galian 0.0840 M3
Kayu matoa 0.0234 m3
Seng Gelombang 1.6750 Lbr
Paku 0.1700 Kg
Pekerja 0.2500 ho
Tukang Kayu 0.3300 ho
Kep. tukang Kayu 0.0330 ho
Mandor 0.0125 ho

115 1 M2 PAS._KERAMIK ANTI SLIP 60 X 60


Keramik 60 x 60 4.0000 Bh
Semen PC 0.2276 zak
Pasir pasang 0.0420 m3
Semen warna 1.5000 Kg
Pekerja 0.6200 ho
Tukang batu 0.3500 ho
Kep. tukang batu 0.0350 ho
Mandor 0.0300 ho

116 1 M2 PAS._KERAMIK ANTI SLIP 20 X 20


Keramik 20 x 20 25.0000 Bh
Semen PC 0.2276 zak
Pasir pasang 0.0420 m3
Semen warna 1.5000 Kg
Pekerja 0.6200 ho
Tukang batu 0.3500 ho
Kep. tukang batu 0.0350 ho
Mandor 0.0300 ho
No URAIAN PEKERJAAN VOLUME

117 1 M2 PAS._KERAMIK 20 X 25
Keramik 20 x 25 20.0000 Bh
Semen PC 0.2276 zak
Pasir pasang 0.0420 m3
Semen warna 1.5000 Kg
Pekerja 0.6200 ho
Tukang batu 0.3500 ho
Kep. tukang batu 0.0350 ho
Mandor 0.0300 ho

118 1 M2 PAS._KERAMIK 40 X 40
Keramik 30 x 30 7.0000 Bh
Semen PC 0.2276 zak
Pasir pasang 0.0420 m3
Semen warna 1.5000 Kg
Pekerja 0.6200 ho
Tukang batu 0.3500 ho
Kep. tukang batu 0.0350 ho
Mandor 0.0300 ho
N UPAH KERJA

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

Rp 3,150,000.00 Rp 37,800.00
Rp 31,337.50 Rp 626.75
Rp 117,000.00 Rp 11,700.00
Rp 155,000.00 Rp 15,500.00
Rp 170,000.00 Rp 1,700.00
Rp 193,000.00 Rp 965.00
Rp 68,291.75

Rp 117,000.00 Rp 73,125.00
Rp 193,000.00 Rp 11,966.00
Rp 85,091.00

Rp 117,000.00 Rp 18,252.00
Rp 193,000.00 Rp 10,036.00
Rp 525,000.00 Rp 27,300.00
Rp 130,000.00 Rp 14,469.00
Rp 2,500.00 Rp 2,500.00
Rp 72,557.00

Rp 117,000.00 Rp 22,464.00
Rp 193,000.00 Rp 3,667.00
Rp 22,464.00

Rp 300,000.00 Rp 360,000.00
Rp 117,000.00 Rp 35,100.00
Rp 193,000.00 Rp 1,930.00
Rp 397,030.00

Rp 490,000.00 Rp 588,000.00
Rp 117,000.00 Rp 35,100.00
Rp 193,000.00 Rp 1,930.00
Rp 625,030.00

Rp 400,000.00 Rp 480,000.00
Rp 117,000.00 Rp 91,260.00
Rp 155,000.00 Rp 60,450.00
Rp 170,000.00 Rp 6,630.00
Rp 193,000.00 Rp 7,527.00
Rp 645,867.00

Rp 400,000.00 Rp 440,000.00
Rp 105,000.00 Rp 336,000.00
Rp 545,000.00 Rp 283,400.00
Rp 117,000.00 Rp 175,500.00
Rp 155,000.00 Rp 93,000.00
Rp 170,000.00 Rp 10,200.00
Rp 193,000.00 Rp 14,475.00
Rp 1,352,575.00

Rp 4,000.00 Rp 100,000,000
Rp 2,100.00 Rp 91,350.00
Rp 545,000.00 Rp 43,600.00
Rp 117,000.00 Rp 76,050.00
Rp 155,000.00 Rp 31,000.00
Rp 170,000.00 Rp 10,200.00
Rp 193,000.00 Rp 14,475.00
Rp 100,266,675.00
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 4,000.00 Rp 440,000.00
Rp 2,100.00 Rp 6,720.00
Rp 545,000.00 Rp 283,400.00
Rp 117,000.00 Rp 175,500.00
Rp 155,000.00 Rp 93,000.00
Rp 170,000.00 Rp 10,200.00
Rp 193,000.00 Rp 14,475.00
Rp 1,023,295.00

Rp 2,100.00 Rp 17,892.00
Rp 545,000.00 Rp 9,265.00
Rp 117,000.00 Rp 23,400.00
Rp 155,000.00 Rp 23,250.00
Rp 170,000.00 Rp 2,550.00
Rp 193,000.00 Rp 1,930.00
Rp 78,287.00

Rp 2,100.00 Rp 218.40
Rp 545,000.00 Rp 10,900.00
Rp 117,000.00 Rp 23,400.00
Rp 155,000.00 Rp 23,250.00
Rp 170,000.00 Rp 2,550.00
Rp 193,000.00 Rp 1,930.00
Rp 62,248.40

Rp 2,100.00 Rp 272.16
Rp 545,000.00 Rp 10,355.00
Rp 155,000.00 Rp 31,000.00
Rp 170,000.00 Rp 2,550.00
Rp 117,000.00 Rp 17,550.00
Rp 193,000.00 Rp 1,930.00
Rp 63,657.16

Rp 1,040,000.00 Rp 904,800.00
Rp 2,100.00 Rp 9,156.00
Rp 545,000.00 Rp 283,400.00
Rp 117,000.00 Rp 193,050.00
Rp 155,000.00 Rp 38,750.00
Rp 170,000.00 Rp 4,250.00
Rp 193,000.00 Rp 15,440.00
Rp 1,448,846.00

Rp 1,040,000.00 Rp 832,000.00
Rp 2,100.00 Rp 16,800.00
Rp 545,000.00 Rp 261,600.00
Rp 117,000.00 Rp 234,000.00
Rp 155,000.00 Rp 54,250.00
Rp 170,000.00 Rp 5,950.00
Rp 193,000.00 Rp 193,000.00
Rp 1,597,600.00

Rp 20,000.00 Rp 22,000.00
Rp 32,000.00 Rp 640.00
Rp 117,000.00 Rp 4,680.00
Rp 155,000.00 Rp 9,300.00
Rp 170,000.00 Rp 5,100.00
Rp 193,000.00 Rp 1,930.00
Rp 43,650.00
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 3,000,000.00 Rp 120,000.00
Rp 31,337.50 Rp 12,535.00
Rp 117,000.00 Rp 58,500.00
Rp 155,000.00 Rp 77,500.00
Rp 170,000.00 Rp 8,500.00
Rp 193,000.00 Rp 1,930.00
Rp 278,965.00

Rp 3,000,000.00 Rp 105,000.00
Rp 31,337.50 Rp 12,535.00
Rp 117,000.00 Rp 44,460.00
Rp 155,000.00 Rp 77,500.00
Rp 170,000.00 Rp 17,000.00
Rp 193,000.00 Rp 1,930.00
Rp 258,425.00

Rp 3,000,000.00 Rp 75,000.00
Rp 220,000.00 Rp 82,500.00
Rp 31,377.50 Rp 12,551.00
Rp 117,000.00 Rp 44,460.00
Rp 155,000.00 Rp 77,500.00
Rp 170,000.00 Rp 17,000.00
Rp 193,000.00 Rp 1,930.00
Rp 310,941.00

Rp 1,448,846.00 Rp 1,448,846.00
Rp 43,650.00 Rp 8,876,719.51
Rp 278,965.00 Rp 3,453,310.17
Rp 258,425.00 Rp 646,062.50
Rp 80,000.00 Rp 160,000.00
Rp 14,584,938.19

Rp 1,448,846.00 Rp 1,448,846.00
Rp 43,650.00 Rp 8,876,719.51
Rp 278,965.00 Rp 3,436,195.32
Rp 258,425.00 Rp 646,062.50
Rp 80,000.00 Rp 160,000.00
Rp 14,567,823.34

Rp 1,448,846.00 Rp 1,448,846.00
Rp 43,650.00 Rp 4,365,000.00
Rp 278,965.00 Rp 3,453,310.17
Rp 258,425.00 Rp 646,062.50
Rp 80,000.00 Rp 160,000.00
Rp 10,073,218.67

Rp 1,448,846.00 Rp 1,448,846.00
Rp 43,650.00 Rp 10,097,265.03
Rp 278,965.00 Rp 3,436,195.32
Rp 258,425.00 Rp 646,062.50
Rp 80,000.00 Rp 160,000.00
Rp 15,788,368.86

Rp 1,448,846.00 Rp 1,448,846.00
Rp 43,650.00 Rp 12,636,578.00
Rp 278,965.00 Rp 3,057,078.85
Rp 80,000.00 Rp 160,000.00
Rp 17,302,502.85

Rp 1,448,846.00 Rp 1,448,846.00
Rp 43,650.00 Rp 10,594,015.35
Rp 278,965.00 Rp 3,057,078.85
Rp 80,000.00 Rp 160,000.00
Rp 15,259,940.20

Rp 1,448,846.00 Rp 1,448,846.00
Rp 43,650.00 Rp 4,365,000.00
Rp 278,965.00 Rp 1,002,414.23
Rp 80,000.00 Rp 160,000.00
Rp 6,976,260.23
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 8,740,087.00
Rp 278,965.00 Rp 1,022,871.67
Rp 80,000.00 Rp 160,000.00
Rp 11,520,558.67

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 436,500.00
Rp 278,965.00 Rp 4,091,486.67
Rp 80,000.00 Rp 160,000.00
Rp 6,285,586.67

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 11,102,581.20
Rp 278,965.00 Rp 3,262,422.26
Rp 80,000.00 Rp 160,000.00
Rp 16,122,603.46

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 436,500.00
Rp 310,941.00 Rp 3,075,664.47
Rp 258,425.00 Rp 721,186.05
Rp 115,000.00 Rp 230,000.00
Rp 6,060,950.51

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 9,224,590.74
Rp 310,941.00 Rp 3,075,664.47
Rp 258,425.00 Rp 600,988.37
Rp 80,000.00 Rp 160,000.00
Rp 14,658,843.57

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 8,337,578.30
Rp 310,941.00 Rp 3,636,373.17
Rp 258,425.00 Rp 680,065.79
Rp 80,000.00 Rp 160,000.00
Rp 14,411,617.26

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 7,910,617.05
Rp 310,941.00 Rp 3,075,664.47
Rp 258,425.00 Rp 922,946.43
Rp 80,000.00 Rp 160,000.00
Rp 13,666,827.95

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 9,629,716.23
Rp 310,941.00 Rp 3,957,834.73
Rp 258,425.00 Rp 922,946.43
Rp 80,000.00 Rp 160,000.00
Rp 16,268,097.39

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 9,398,691.36
Rp 310,941.00 Rp 5,320,546.00
Rp 258,425.00 Rp 1,435,694.44
Rp 80,000.00 Rp 160,000.00
Rp 17,912,531.81

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 9,763,608.46
Rp 310,941.00 Rp 5,320,546.00
Rp 258,425.00 Rp 1,435,694.44
Rp 80,000.00 Rp 160,000.00
Rp 18,277,448.90
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 10,578,720.67
Rp 310,941.00 Rp 3,957,834.73
Rp 258,425.00 Rp 922,946.43
Rp 80,000.00 Rp 160,000.00
Rp 17,217,101.83

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 8,352,204.01
Rp 310,941.00 Rp 3,957,834.73
Rp 258,425.00 Rp 922,946.43
Rp 80,000.00 Rp 160,000.00
Rp 14,990,585.17

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 6,177,012.77
Rp 310,941.00 Rp 3,957,834.73
Rp 258,425.00 Rp 922,946.43
Rp 80,000.00 Rp 160,000.00
Rp 12,815,393.93

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 9,593,855.00
Rp 310,941.00 Rp 3,772,750.80
Rp 258,425.00 Rp 783,106.06
Rp 80,000.00 Rp 160,000.00
Rp 15,907,311.86

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 10,215,458.00
Rp 310,941.00 Rp 7,125,731.25
Rp 258,425.00 Rp 1,076,770.83
Rp 80,000.00 Rp 160,000.00
Rp 20,175,560.08

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 4,194,738.94
Rp 310,941.00 Rp 2,850,292.50
Rp 258,425.00 Rp 2,368,895.83
Rp 80,000.00 Rp 160,000.00
Rp 11,171,527.27

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 5,032,889.52
Rp 278,965.00 Rp 5,728,428.51
Rp 258,425.00 Rp 142,133.75
Rp 80,000.00 Rp 160,000.00
Rp 12,661,051.78

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 6,816,587.25
Rp 310,941.00 Rp 2,050,034.01
Rp 258,425.00 Rp 646,062.50
Rp 80,000.00 Rp 160,000.00
Rp 11,270,283.76

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 6,816,587.25
Rp 310,941.00 Rp 831,335.31
Rp 80,000.00 Rp 160,000.00
Rp 9,405,522.56

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 7,576,419.53
Rp 310,941.00 Rp 2,280,234.00
Rp 258,425.00 Rp 1,895,030.53
Rp 80,000.00 Rp 160,000.00
Rp 13,509,284.05
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 7,152,629.74
Rp 310,941.00 Rp 1,710,175.50
Rp 258,425.00 Rp 1,421,337.50
Rp 80,000.00 Rp 160,000.00
Rp 12,041,742.74

Rp 43,650.00 Rp 677,587.68
Rp 43,650.00 Rp 580,789.44

Rp 1,597,600.00 Rp 1,597,600.00
Rp 43,650.00 Rp 4,801,500.00
Rp 278,965.00 Rp 1,729,583.00
Rp 80,000.00 Rp 160,000.00
Rp 8,288,683.00

Rp 105,000.00 Rp 2,100.00
Rp 105,000.00 Rp 1,050.00
Rp 117,000.00 Rp 7,020.00
Rp 193,000.00 Rp 3,860.00
Rp 14,030.00

Rp 3,800,000.00 Rp 4,180,000.00
Rp 31,375.00 Rp 6,275.00
Rp 155,000.00 Rp 3,100,000.00
Rp 170,000.00 Rp 544,000.00
Rp 117,000.00 Rp 702,000.00
Rp 193,000.00 Rp 115,800.00
Rp 8,648,075.00

Rp 3,800,000.00 Rp 133,000.00
Rp 155,000.00 Rp 1,116,000.00
Rp 170,000.00 Rp 122,400.00
Rp 117,000.00 Rp 280,800.00
Rp 193,000.00 Rp 46,320.00
Rp 1,698,520.00

Rp 124,300.00 Rp 99,440.00
Rp 3,800,000.00 Rp 133,000.00
Rp 155,000.00 Rp 1,116,000.00
Rp 170,000.00 Rp 122,400.00
Rp 117,000.00 Rp 280,800.00
Rp 193,000.00 Rp 46,320.00
Rp 1,797,960.00

Rp 124,300.00 Rp 136,730.00
Rp 117,000.00 Rp 1,755.00
Rp 155,000.00 Rp 23,250.00
Rp 170,000.00 Rp 2,550.00
Rp 193,000.00 Rp 144.75
Rp 164,429.75

Rp 158,000.00 Rp 59,250.00
Rp 3,150,000.00 Rp 31,500.00
Rp 31,375.00 Rp 627.50
Rp 155,000.00 Rp 38,750.00
Rp 170,000.00 Rp 10,200.00
Rp 117,000.00 Rp 46,800.00
Rp 193,000.00 Rp 7,720.00
Rp 194,847.50

Rp 11,300.00 Rp 11,300.00
Rp 31,375.00 Rp 2,510.00
Rp 117,000.00 Rp 14,040.00
Rp 155,000.00 Rp 9,300.00
Rp 193,000.00 Rp 1,158.00
Rp 38,308.00
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 32,775.00 Rp 3,277.50
Rp 27,300.00 Rp 2,730.00
Rp 45,000.00 Rp 11,700.00
Rp 7,500.00 Rp 1,875.00
Rp 21,300.00 Rp 213.00
Rp 117,000.00 Rp 2,340.00
Rp 155,000.00 Rp 9,765.00
Rp 170,000.00 Rp 1,071.00
Rp 193,000.00 Rp 482.50
Rp 33,454.00

Rp 27,300.00 Rp 3,003.00
Rp 117,000.00 Rp 9,360.00
Rp 155,000.00 Rp 17,050.00
Rp 170,000.00 Rp 1,870.00
Rp 193,000.00 Rp 965.00
Rp 32,248.00

Rp 65,000.00 Rp 16,250.00
Rp 31,500.00 Rp 3,150.00
Rp 24,500.00 Rp 1,960.00
Rp 7,500.00 Rp 3,750.00
Rp 117,000.00 Rp 11,700.00
Rp 155,000.00 Rp 31,000.00
Rp 170,000.00 Rp 3,400.00
Rp 193,000.00 Rp 1,930.00
Rp 73,140.00

Rp 65,000.00 Rp 16,250.00
Rp 31,500.00 Rp 3,150.00
Rp 7,500.00 Rp 3,750.00
Rp 117,000.00 Rp 29,250.00
Rp 155,000.00 Rp 34,875.00
Rp 170,000.00 Rp 3,825.00
Rp 193,000.00 Rp 1,447.50
Rp 92,547.50

Rp 24,500.00 Rp 6,125.00
Rp 31,500.00 Rp 3,150.00
Rp 117,000.00 Rp 11,700.00
Rp 155,000.00 Rp 31,000.00
Rp 170,000.00 Rp 3,400.00
Rp 193,000.00 Rp 1,930.00
Rp 57,305.00

Rp 5,450,000.00 Rp 5,995,000.00
Rp 17,800.00 Rp 267,000.00
Rp 31,375.00 Rp 25,100.00
Rp 117,000.00 Rp 468,000.00
Rp 155,000.00 Rp 1,860,000.00
Rp 170,000.00 Rp 204,000.00
Rp 193,000.00 Rp 38,600.00
Rp 8,857,700.00

Rp 3,150,000.00 Rp 3,465,000.00
Rp 31,375.00 Rp 7,843.75
Rp 117,000.00 Rp 351,000.00
Rp 155,000.00 Rp 1,395,000.00
Rp 170,000.00 Rp 153,000.00
Rp 193,000.00 Rp 28,950.00
Rp 5,400,793.75

Rp 5,450,000.00 Rp 54,500.00
Rp 31,375.00 Rp 941.25
Rp 117,000.00 Rp 9,360.00
Rp 155,000.00 Rp 37,200.00
Rp 170,000.00 Rp 4,080.00
Rp 193,000.00 Rp 772.00
Rp 106,853.25
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 5,450,000.00 Rp 130,800.00
Rp 31,375.00 Rp 470.63
Rp 117,000.00 Rp 35,100.00
Rp 155,000.00 Rp 124,000.00
Rp 170,000.00 Rp 13,600.00
Rp 193,000.00 Rp 5,790.00
Rp 309,760.63

Rp 82,500.00 Rp 121,275.00
Rp 33,150.00 Rp 663.00
Rp 117,000.00 Rp 14,040.00
Rp 155,000.00 Rp 10,850.00
Rp 170,000.00 Rp 1,360.00
Rp 193,000.00 Rp 1,158.00
Rp 149,346.00

Rp 79,400.00 Rp 23,820.00
Rp 3,800,000.00 Rp 15,200.00
Rp 76,000.00 Rp 3,040.00
Rp 117,000.00 Rp 17,550.00
Rp 155,000.00 Rp 10,850.00
Rp 170,000.00 Rp 1,360.00
Rp 193,000.00 Rp 1,158.00
Rp 72,978.00

Rp 62,500.00 Rp 62,500.00
Rp 155,000.00 Rp 46,500.00
Rp 109,000.00

Rp 32,300.00 Rp 32,300.00
Rp 155,000.00 Rp 31,000.00
Rp 63,300.00

Rp 251,300.00 Rp 251,300.00
Rp 155,000.00 Rp 170,500.00
Rp 421,800.00

Rp 135,800.00 Rp 135,800.00
Rp 155,000.00 Rp 170,500.00
Rp 306,300.00

Rp 67,300.00 Rp 67,300.00
Rp 155,000.00 Rp 170,500.00
Rp 237,800.00

Rp 23,500.00 Rp 23,500.00
Rp 155,000.00 Rp 38,750.00
Rp 62,250.00

Rp 635,000.00 Rp 635,000.00
Rp 155,000.00 Rp 248,000.00
Rp 193,000.00 Rp 30,880.00
Rp 913,880.00

Rp 2,215,000.00 Rp 2,215,000.00
Rp - Rp -
Rp 105,000.00 Rp 12,600.00
Rp 545,000.00 Rp 5,450.00
Rp 117,000.00 Rp 72,540.00
Rp 155,000.00 Rp 54,250.00
Rp 170,000.00 Rp 5,950.00
Rp 193,000.00 Rp 5,790.00
Rp 2,371,580.00

Rp 89,300.00 Rp 89,300.00
Rp 170,000.00 Rp 136,000.00
Rp 193,000.00 Rp 7,720.00
Rp 233,020.00

Rp 94,400.00 Rp 94,400.00
Rp 155,000.00 Rp 31,000.00
Rp 193,000.00 Rp 7,720.00
Rp 133,120.00
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 67,500.00 Rp 67,500.00
Rp 155,000.00 Rp 93,000.00
Rp 193,000.00 Rp 7,720.00
Rp 168,220.00

Rp 85,091.00 Rp 40,843.68
Rp 545,000.00 Rp 16,350.00
Rp 1,023,295.00 Rp 122,795.40
Rp 78,287.00 Rp 93,944.40
Rp 273,933.48

Rp 420,000.00 Rp 2,100,000.00
Rp 84,300.00 Rp 1,011,600.00
Rp 78,440.00 Rp 1,176,600.00
Rp 179,500.00 Rp 2,513,000.00
Rp 399,400.00 Rp 399,400.00
Rp 580,000.00 Rp 145,000.00
Rp 450,000.00 Rp 450,000.00
Rp 19,300.00 Rp 965,000.00
Rp 250,000.00 Rp 250,000.00
Rp 8,760,600.00

Rp 1,038,675.00 Rp 261,746.10
Rp 63,657.16 Rp 218,344.06
Rp 14,030.00 Rp 32,409.30
Rp 512,499.46

Rp 100,266,675.00 Rp 59,357,871.60
Rp 8,288,683.00 Rp 1,456,155.83
Rp 283,400.00 Rp 1,677,728.00
Rp 14,030.00 Rp 136,932.80
Rp 62,628,688.23

Rp 85,091.00 Rp 856,866.37
Rp 490,000.00 Rp 242,550.00
Rp 1,448,846.00 Rp 415,529.03
Rp 8,288,683.00 Rp 2,463,396.59
Rp 1,038,675.00 Rp 1,082,216.26
Rp 78,287.00 Rp 1,019,609.89
Rp 560,000.00 Rp 1,232,000.00
Rp 434,380.00 Rp 597,272.50
Rp 205,744.30 Rp 308,616.45
Rp 200,000.00 Rp 20,000.00
Rp 200,000.00 Rp 20,000.00
Rp 8,258,057.08

Rp 3,800,000.00 Rp 34,200.00
Rp 79,400.00 Rp 87,340.00
Rp 24,500.00 Rp 4,900.00
Rp 8,300.00 Rp 166.00
Rp 31,375.00 Rp 470.63
Rp 117,000.00 Rp 23,400.00
Rp 170,000.00 Rp 3,400.00
Rp 155,000.00 Rp 31,000.00
Rp 193,000.00 Rp 3,860.00
Rp 188,736.63

Rp 17,250.00 Rp 17,250.00
Rp 21,700.00 Rp 173,600.00
Rp 117,000.00 Rp 29,250.00
Rp 155,000.00 Rp 62,000.00
Rp 170,000.00 Rp 10,200.00
Rp 193,000.00 Rp 965.00
Rp 293,265.00

Rp 128,000.00 Rp 128,000.00
Rp 17,250.00 Rp 17,250.00
Rp 21,700.00 Rp 65,100.00
Rp 117,000.00 Rp 23,400.00
Rp 155,000.00 Rp 38,750.00
Rp 170,000.00 Rp 10,200.00
Rp 193,000.00 Rp 965.00
Rp 283,665.00
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 128,000.00 Rp 128,000.00
Rp 17,250.00 Rp 17,250.00
Rp 21,700.00 Rp 65,100.00
Rp 117,000.00 Rp 23,400.00
Rp 155,000.00 Rp 38,750.00
Rp 170,000.00 Rp 10,200.00
Rp 193,000.00 Rp 965.00
Rp 283,665.00

Rp 119,300.00 Rp 119,300.00
Rp 17,250.00 Rp 17,250.00
Rp 21,700.00 Rp 65,100.00
Rp 117,000.00 Rp 23,400.00
Rp 155,000.00 Rp 38,750.00
Rp 170,000.00 Rp 10,200.00
Rp 193,000.00 Rp 965.00
Rp 274,965.00

Rp 29,300.00 Rp 29,300.00
Rp 17,250.00 Rp 17,250.00
Rp 21,700.00 Rp 65,100.00
Rp 117,000.00 Rp 23,400.00
Rp 155,000.00 Rp 38,750.00
Rp 170,000.00 Rp 10,200.00
Rp 193,000.00 Rp 965.00
Rp 184,965.00

Rp 29,300.00 Rp 29,300.00
Rp 8,250.00 Rp 8,250.00
Rp 21,700.00 Rp 65,100.00
Rp 117,000.00 Rp 23,400.00
Rp 155,000.00 Rp 38,750.00
Rp 170,000.00 Rp 10,200.00
Rp 193,000.00 Rp 965.00
Rp 175,965.00

Rp 64,300.00 Rp 64,300.00
Rp 155,000.00 Rp 116,250.00
Rp 193,000.00 Rp 1,544.00
Rp 182,094.00

Rp 253,300.00 Rp 253,300.00
Rp 155,000.00 Rp 116,250.00
Rp 193,000.00 Rp 1,544.00
Rp 371,094.00

Rp 429,300.00 Rp 429,300.00
Rp 155,000.00 Rp 116,250.00
Rp 193,000.00 Rp 1,544.00
Rp 547,094.00

Rp 162,680.00 Rp 162,680.00
Rp 11,400.00 Rp 2,280.00
Rp 15,300.00 Rp 168.30
Rp 117,000.00 Rp 25,740.00
Rp 155,000.00 Rp 8,370.00
Rp 170,000.00 Rp 918.00
Rp 193,000.00 Rp 3,088.00
Rp 2,500.00 Rp 2,500.00
Rp 205,744.30

Rp 50,400.00 Rp 50,400.00
Rp 11,400.00 Rp 2,280.00
Rp 15,300.00 Rp 168.30
Rp 117,000.00 Rp 9,360.00
Rp 155,000.00 Rp 44,950.00
Rp 170,000.00 Rp 493.00
Rp 193,000.00 Rp 7,720.00
Rp 115,371.30
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 39,233.33 Rp 39,233.33
Rp 11,400.00 Rp 2,280.00
Rp 15,300.00 Rp 168.30
Rp 117,000.00 Rp 8,775.00
Rp 155,000.00 Rp 38,750.00
Rp 170,000.00 Rp 425.00
Rp 193,000.00 Rp 5,790.00
Rp 95,421.63

Rp 470,800.00 Rp 470,800.00
Rp 15,300.00 Rp 168.30
Rp 117,000.00 Rp 57,330.00
Rp 155,000.00 Rp 15,190.00
Rp 170,000.00 Rp 1,666.00
Rp 193,000.00 Rp 4,632.00
Rp 30,000.00 Rp 30,000.00
Rp 579,786.30

Rp 263,300.00 Rp 263,300.00
Rp 15,300.00 Rp 168.30
Rp 117,000.00 Rp 57,330.00
Rp 155,000.00 Rp 15,190.00
Rp 170,000.00 Rp 1,666.00
Rp 193,000.00 Rp 4,632.00
Rp 30,000.00 Rp 30,000.00
Rp 372,286.30

Rp 47,400.00 Rp 47,400.00
Rp 15,300.00 Rp 168.30
Rp 117,000.00 Rp 25,740.00
Rp 155,000.00 Rp 8,370.00
Rp 170,000.00 Rp 918.00
Rp 193,000.00 Rp 3,088.00
Rp 30,000.00 Rp 30,000.00
Rp 115,684.30

Rp 410,733.33 Rp 410,733.33
Rp 11,400.00 Rp 2,280.00
Rp 15,300.00 Rp 168.30
Rp 117,000.00 Rp 25,740.00
Rp 155,000.00 Rp 8,370.00
Rp 170,000.00 Rp 918.00
Rp 193,000.00 Rp 3,088.00
Rp 451,297.63

Rp 16,588.33 Rp 19,906.00
Rp 16,588.33 Rp 5,805.92
Rp 15,300.00 Rp 168.30
Rp 117,000.00 Rp 6,318.00
Rp 155,000.00 Rp 13,950.00
Rp 170,000.00 Rp 1,530.00
Rp 193,000.00 Rp 521.10
Rp 48,199.31

Rp 35,300.00 Rp 3,530.00
Rp 6,500.00 Rp 1,950.00
Rp 45,000.00 Rp 1,800.00
Rp 117,000.00 Rp 2,340.00
Rp 155,000.00 Rp 6,200.00
Rp 170,000.00 Rp 340.00
Rp 193,000.00 Rp 386.00
Rp 250,000.00 Rp 42,500.00
Rp 59,046.00
Rp 5,904.60

Rp 117,000.00 Rp 3,510.00
Rp 155,000.00 Rp 3,100.00
Rp 170,000.00 Rp 510.00
Rp 193,000.00 Rp 193.00
Rp 250,000.00 Rp 8,333.33
Rp 15,646.33
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 410,733.33 Rp 492,880.00
Rp 143,756.67 Rp 143,756.67
Rp 117,000.00 Rp 15,795.00
Rp 155,000.00 Rp 34,875.00
Rp 170,000.00 Rp 3,825.00
Rp 193,000.00 Rp 1,119.40
Rp 692,251.07

Rp 18,000.00 Rp 19,800.00
Rp 20,000.00 Rp 1,600.00
Rp 35,300.00 Rp 2,647.50
Rp 124,300.00 Rp 7,458.00
Rp 117,000.00 Rp 7,605.00
Rp 155,000.00 Rp 10,075.00
Rp 170,000.00 Rp 1,190.00
Rp 193,000.00 Rp 57.90
Rp 250,000.00 Rp 1,875.00
Rp 52,308.40

Rp 18,000.00 Rp 489,960.00
Rp 17,500.00 Rp 30,625.00
Rp 5,904.60 Rp 295,230.00
Rp 117,000.00 Rp 122,850.00
Rp 155,000.00 Rp 162,750.00
Rp 170,000.00 Rp 17,850.00
Rp 193,000.00 Rp 1,013.25
Rp 250,000.00 Rp 187,500.00
Rp 1,307,778.25

Rp 17,800.00 Rp 107,334.00
Rp 17,800.00 Rp 1,068,000.00
Rp 18,000.00 Rp 270,000.00
Rp 67,300.00 Rp 269,200.00
Rp 71,300.00 Rp 142,600.00
Rp 85,300.00 Rp 341,200.00
Rp 82,900.00 Rp 165,800.00
Rp 18,000.00 Rp 27,000.00
Rp 5,904.60 Rp 897,499.20
Rp 117,000.00 Rp 76,050.00
Rp 155,000.00 Rp 100,750.00
Rp 170,000.00 Rp 11,050.00
Rp 193,000.00 Rp 6,176.00
Rp 250,000.00 Rp 16,250.00
Rp 3,498,909.20

Rp 17,500.00 Rp 399,619.50
Rp 17,800.00 Rp 53,035.10
Rp 15,646.33 Rp 438,097.33
Rp 5,904.60 Rp 1,092,351.00
Rp 18,000.00 Rp 18,540.00
Rp 117,000.00 Rp 140,400.00
Rp 155,000.00 Rp 186,000.00
Rp 170,000.00 Rp 36,040.00
Rp 193,000.00 Rp 1,158.00
Rp 250,000.00 Rp 125,000.00
Rp 2,490,240.93

Rp 17,800.00 Rp 190,317.60
Rp 727,300.00 Rp 252,518.56
Rp 5,904.60 Rp 330,657.60
Rp 117,000.00 Rp 140,400.00
Rp 155,000.00 Rp 186,000.00
Rp 170,000.00 Rp 2,040.00
Rp 193,000.00 Rp 1,158.00
Rp 250,000.00 Rp 62,500.00
Rp 1,103,091.76
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 1,100,000.00 Rp 161,370.00
Rp 20,000.00 Rp 149,000.00
Rp 5,904.60 Rp 35,427.60
Rp 117,000.00 Rp 11,700.00
Rp 155,000.00 Rp 15,500.00
Rp 170,000.00 Rp 170.00
Rp 193,000.00 Rp 965.00
Rp 250,000.00 Rp 53,000.00
Rp 427,132.60

Rp 5,450,000.00 Rp 106,275.00
Rp 5,450,000.00 Rp 38,150.00
Rp 24,000.00 Rp 2,400.00
Rp 38,000.00 Rp 21,280.00
Rp 220,000.00 Rp 220,000.00
Rp 117,000.00 Rp 17,550.00
Rp 155,000.00 Rp 69,750.00
Rp 170,000.00 Rp 7,650.00
Rp 193,000.00 Rp 14,475.00
Rp 497,530.00

Rp 117,000.00 Rp 780,039.00
Rp 193,000.00 Rp 64,269.00
Rp 844,308.00

Rp 117,000.00 Rp 780,039.00
Rp 193,000.00 Rp 6,369.00
Rp 786,408.00

Rp 117,000.00 Rp 14,040.00
Rp 193,000.00 Rp 11,580.00
Rp 25,620.00

Rp 117,000.00 Rp 58,500.00
Rp 193,000.00 Rp 4,825.00
Rp 63,325.00

Rp 45,000.00 Rp 2,250.00
Rp 117,000.00 Rp 17,550.00
Rp 193,000.00 Rp 482.50
Rp 20,282.50

Rp 85,091.00 Rp 7,147.64
Rp 3,150,000.00 Rp 73,631.25
Rp 82,500.00 Rp 138,187.50
Rp 31,375.00 Rp 5,333.75
Rp 117,000.00 Rp 29,250.00
Rp 155,000.00 Rp 51,150.00
Rp 170,000.00 Rp 5,610.00
Rp 193,000.00 Rp 2,412.50
Rp 312,722.64

Rp 41,442.86 Rp 165,771.43
Rp 105,000.00 Rp 23,898.00
Rp 545,000.00 Rp 22,890.00
Rp 23,000.00 Rp 34,500.00
Rp 117,000.00 Rp 72,540.00
Rp 155,000.00 Rp 54,250.00
Rp 170,000.00 Rp 5,950.00
Rp 193,000.00 Rp 5,790.00
Rp 385,589.43

Rp 3,800.00 Rp 95,000.00
Rp 105,000.00 Rp 23,898.00
Rp 545,000.00 Rp 22,890.00
Rp 23,000.00 Rp 34,500.00
Rp 117,000.00 Rp 72,540.00
Rp 155,000.00 Rp 54,250.00
Rp 170,000.00 Rp 5,950.00
Rp 193,000.00 Rp 5,790.00
Rp 314,818.00
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)

Rp 5,100.00 Rp 102,000.00
Rp 105,000.00 Rp 23,898.00
Rp 545,000.00 Rp 22,890.00
Rp 23,000.00 Rp 34,500.00
Rp 117,000.00 Rp 72,540.00
Rp 155,000.00 Rp 54,250.00
Rp 170,000.00 Rp 5,950.00
Rp 193,000.00 Rp 5,790.00
Rp 321,818.00

Rp 15,483.33 Rp 108,383.33
Rp 105,000.00 Rp 23,898.00
Rp 545,000.00 Rp 22,890.00
Rp 23,000.00 Rp 34,500.00
Rp 117,000.00 Rp 72,540.00
Rp 155,000.00 Rp 54,250.00
Rp 170,000.00 Rp 5,950.00
Rp 193,000.00 Rp 5,790.00
Rp 328,201.33
RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PEMBANGUNAN RUMAH SEDERHANA TYPE 117 M3


LOKASI : JAYAPURA
T.A : 2018

NO URAIAN PEKERJAAN VOLUME

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.000 Ls
2 Pemasangan Bowplank 45.200 M¹

II PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Pondasi Menerus 10.560 M³
2 Pek. Galian Pondasi Telapak 21.600 M³
3 Urugan Kembali Pondasi Menerus 12.000 M³
4 Urugan Kembali Pondasi Telapak 14.076 M³
5 Urugan Pasir Pondasi Menerus 1.200 M³
6 Urugan Pasir Pondasi Telapak 21.600 M³
7 Urugan Tanah Peninggian Lantai 35.856 M³
8 Alas Pasir Bawah Lantai 0.611 M³

III PEKERJAAN BATU


1 Pas. Batu Kosong 3.600 M³
2 Pas. Batu Kali Menerus 1:4 10.560 M³
4 Pas. Batu Tela 1 : 4 70.552 M³
6 Plesteran 1 : 4 1,062.490 M³

IV PEKERJAAN BETON
1 Lantai Cor Beton 1 : 3 : 5 12.227 M³
PEK. PONDASI FOOTPLAT 7.524 M³
PAS. BETON BERTULANG
2 Sloof 20/30 5.220 M³
3 Sloof 15/30 3.915 M³
4 RingBalk 20/30 5.220 M³
5 RingBalk 15/30 3.915 M³
6 Kolom 15/15 3.139 M³
7 Kolom 20/20 5.580 M³
8 Pek. Tangga 1.178 M³

V PEKERJAAN KAYU
1 Kusen Ky. Besi 5/10 1.249 M3
2 Daun Pintu Panil 33.240 M3
4 Daun Jendela Panil 5.400 M3
5 Gording Ky. Matoa 5/10 1.781 M3
6 Listplank Ky. Besi 2/20 23.828 M3
7 Kuda-Kuda Ky. Besi 5/10 1.094 M3
8 Rangka Plafond 338.500 M3
NO URAIAN PEKERJAAN VOLUME
VI PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Atap Seng 124.863 M²
2 Nok Seng Plat 15.560 M²
3 Plafond Tripleks 119.720 M²
4 List Pinggir Plafond 136.480 M²

VII PEKERJAAN KERAMIK


1 Pas. Keramik Lantai 40 x 40 151.250 M2
2 Pas. Keramik Lantai 25 x 25 18.000 M2
3 Pas. Keramik Dinding 20 x 20 18.000 M2

VIII PEKERJAAN ALAT GANTUNG


1 Kunci Pintu 2 Slaag 18.000 set
2 Grendel Pintu 12.000 set
3 Grendel Jendela 22.000 set
5 Engsel Pintu 66.000 set
6 Engsel Jendela 44.000 set

IX PEKERJAAN PENGECATAN
1 Cat Dinding Luar Dalam 1,062.490 M²
2 Cat Plafond 338.500 M²
3 Cat Kusen 6.012 M²
4 Cat Daun Pintu 33.240 M²
5 Cat Daun Jendela 5.400 M²
6 Cat Listplank 50.039 M²

X PEKERJAAN INSTALASI LISTRIK


1 Lampu Philips 18 Watt 37.000 set
3 Saklar Tunggal 1.000 set
4 Saklar Ganda 15.000 set
5 Stop Kontak 10.000 set
6 Sekring Box 1.000 set

XI PEKERJAAN SANITAIR
1 Stop Kran 8.000 bh
2 Bak KM/WC 6.000 unit
3 Closet Jongkok 6.000 bh
4 Pipa GIP 1/2" 62.700 M1
5 Pipa PVC 2" 87.100 M1
6 Septictank + Peresapan 2.000 unit

XII PEKERJAAN AKHIR


1 Finishing 1.000 ls
AN BIAYA ( RAB )

YPE 117 M3

HARGA SATUAN JUMLAH HARGA


(Rp.) (Rp.)

Rp 500,000.00 500,000.00
Rp 68,291.75 Rp 3,086,787.10
Rp 3,586,787.10

Rp 85,091 Rp 898,560.96
Rp 85,091 Rp 1,837,965.60
Rp 22,464 Rp 269,568.00
Rp 22,464 Rp 316,203.26
Rp 625,030 Rp 750,036.00
Rp 625,030 Rp 13,500,648.00
Rp 397,030 Rp 14,235,907.68
Rp 625,030 Rp 381,893.33
Rp 32,190,782.83

Rp 645,867 Rp 2,325,121.20
Rp 1,352,575 Rp 14,283,192.00
Rp 1,023,295 Rp 72,195,253.0
Rp 62,248 Rp 66,138,302.52
Rp 154,941,868.73

Rp 1,448,846 Rp 17,715,040.04
Rp 6,976,260 Rp 52,489,382.00

Rp 6,285,587 Rp 32,810,762.40
Rp 6,285,587 Rp 24,608,071.80
Rp 6,060,951 Rp 31,638,161.67
Rp 6,060,951 Rp 23,728,621.25
Rp 10,073,219 Rp 31,617,315.12
Rp 10,073,219 Rp 56,208,560.21
Rp 13,509,284.05 Rp 15,913,936.61
Rp 286,729,851.10

Rp 8,648,075.00 Rp 10,803,175.29
Rp 1,698,520.00 Rp 56,458,804.80
Rp 1,698,520.00 Rp 9,172,008.00
Rp 5,400,793.75 Rp 9,617,733.51
Rp 106,853.25 Rp 2,546,099.24
Rp 8,857,700.00 Rp 9,688,552.26
Rp 194,847.50 Rp 65,955,878.75
Rp 164,242,251.85
HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

Rp 149,346.00 Rp 18,647,789.60
Rp 72,978.00 Rp 1,135,537.68
Rp 194,847.50 Rp 23,327,142.70
Rp 38,308.00 Rp 5,228,275.84
Rp 48,338,745.82

Rp 328,201.33 Rp 49,640,451.67
Rp 321,818.00 Rp 5,792,724.00
Rp 314,818.00 Rp 5,666,724.00
Rp 61,099,899.67

Rp 421,800.00 Rp 7,592,400.00
Rp 62,250.00 Rp 747,000.00
Rp 62,250.00 Rp 1,369,500.00
Rp 63,300.00 Rp 4,177,800.00
Rp 63,300.00 Rp 2,785,200.00
Rp 19,457,100.00

Rp 33,454.00 Rp 35,544,540.46
Rp 32,248.00 Rp 10,915,948.00
Rp 57,305.00 Rp 344,517.66
Rp 57,305.00 Rp 1,904,818.20
Rp 57,305.00 Rp 309,447.00
Rp 57,305.00 Rp 2,867,473.43
Rp 51,886,744.75

Rp 182,094.00 Rp 6,737,478.00
Rp 175,965.00 Rp 175,965.00
Rp 184,965.00 Rp 2,774,475.00
Rp 283,665.00 Rp 2,836,650.00
Rp 293,265.00 Rp 293,265.00
Rp 12,817,833.00

Rp 133,120.00 Rp 1,064,960.00
Rp 512,499.46 Rp 3,074,996.75
Rp 913,880.00 Rp 5,483,280.00
Rp 95,421.63 Rp 5,982,936.41
Rp 48,199.31 Rp 4,198,160.03
Rp 8,258,057.08 Rp 16,516,114.17
Rp 36,320,447.36

Rp 500,000.00 Rp 500,000.00
Rp 500,000.00
REKAPITULASI

PEKERJAAN : PEMBANGUNAN RUMAH SEDERHANA TYPE 117 M3


LOKASI : JAYAPURA
T.A. : 2018

JUMLAH TOTAL
NO URAIAN PEKERJAAN
( Rp )

I PEKERJAAN PERSIAPAN Rp 3,586,787.10


II PEKERJAAN TANAH DAN PASIR Rp 32,190,782.83
III PEKERJAAN BATU Rp 154,941,868.73
IV PEKERJAAN BETON Rp 286,729,851.10
V PEKERJAAN KAYU Rp 164,242,251.85
VI PEKERJAAN ATAP DAN PLAFOND Rp 48,338,745.82
VII PEKERJAAN KERAMIK Rp 61,099,899.67
VIII PEKERJAAN ALAT GANTUNG Rp 19,457,100.00
IX PEKERJAAN PENGECATAN Rp 51,886,744.75
X PEKERJAAN INSTALASI LISTRIK Rp 12,817,833.00
XI PEKERJAAN SANITAIR Rp 36,320,447.36
XII PEKERJAAN AKHIR Rp 500,000.00

REAL COST Rp 872,112,312.21


PPN 10% Rp 87,211,231.22
SUB JUMLAH Rp 959,323,543.44
DIBULATKAN Rp 959,320,000.00

Terbilang : SEMBILAN RATUS LIMA PULUH SEMBILAN JUTA


TIGA RATUS DUA PULUH RIBU RUPIAH

Jayapura, 23 Februari 2018


Di Rencana

NASRULLAH
URAIAN BOBOT PEKERJAAN

PEKERJAAN : PEMBANGUNAN RUMAH SEDERHANA TYPE 110


LOKASI :
T.A : 2018

JUMLAH HARGA BOBOT


NO URAIAN PEKERJAAN VOLUME
(Rp.) (%)

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 Ls Rp 500,000.00 Err:509
2 Pemasangan Bowplank 45.20 M¹ Rp 3,086,787.10 Err:509
Rp 3,586,787.10 Err:509
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Pondasi Menerus 10.56 M³ Rp 898,560.96 Err:509
2 Pek. Galian Pondasi Titik 21.60 M³ Rp 1,837,965.60 Err:509
3 Urugan Kembali Pondasi Menerus 12.00 M³ Rp 269,568.00 Err:509
4 Urugan Kembali Pondasi Titik 14.08 M³ Rp 316,203.26 Err:509
5 Urugan Pasir Pondasi Menerus 1.20 M³ Rp 750,036.00 Err:509
6 Urugan Pasir Pondasi Titik 21.60 M³ Rp 13,500,648.00 Err:509
7 Urugan Tanah Peninggian Lantai 35.86 M³ Rp 14,235,907.68 Err:509
8 Alas Pasir Bawah Lantai 0.61 M³ Rp 381,893.33 Err:509
Rp 32,190,782.83 Err:509
III PEKERJAAN BATU
1 Pas. Batu Kosong 3.60 M³ Rp 2,325,121.20 Err:509
2 Pas. Batu Kali Menerus 1:4 10.56 M³ Rp 14,283,192.00 Err:509
3 Pas. Batu Kali Titik 1:4 - M³ Rp - Err:509
4 Pas. Batu Tela 1 : 4 70.55 M³ Rp 72,195,253.02 Err:509
5 Pas. Batu Tela 1 : 2 - M³ Rp - Err:509
6 Plesteran 1 : 4 1,062.49 M³ Rp 66,138,302.52 Err:509
7 Plesteran 1 : 2 0.61 M³ Rp 47,833.36 Err:509
Rp 154,989,702.09 Err:509
IV PEKERJAAN BETON
1 Lantai Cor Beton 1 : 3 : 5 12.23 M³ Rp 19,533,855.20 Err:509
PAS. BETON BERTULANG
2 Sloof 12/15 5.22 M³ Rp 32,810,762.40 Err:509
3 RingBalk 10/12 3.92 M³ Rp 23,728,621.25 Err:509
4 Kolom 12/12 3.14 M³ Rp 31,617,315.12 Err:509
Rp 107,690,553.97 Err:509
V PEKERJAAN KAYU
1 Kusen Ky. Besi 5/10 1.25 M3 Rp 10,803,175.29 Err:509
2 Daun Pintu Panil 33.24 M3 Rp 56,458,804.80 Err:509
3 Jalusi - M3 Rp - Err:509
4 Daun Jendela Panil 5.40 M3 Rp 9,172,008.00 Err:509
5 Gording Ky. Matoa 5/10 1.78 M3 Rp 9,617,733.51 Err:509
6 Listplank Ky. Besi 2/20 23.83 M3 Rp 2,546,099.24 Err:509
7 Kuda-Kuda Ky. Besi 5/10 1.09 M3 Rp 9,688,552.26 Err:509
8 Rangka Plafond 338.50 M3 Rp 20,056,125.00 Err:509
Rp 118,342,498.10 Err:509
JUMLAH HARGA BOBOT
NO URAIAN PEKERJAAN VOLUME
(Rp.) (%)
VI PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Atap Seng 124.86 M² Rp 18,647,789.60 Err:509
2 Nok Seng Plat 15.56 M² Rp 1,135,537.68 Err:509
3 Plafond Tripleks 119.72 M² Rp 23,327,142.70 Err:509
4 List Pinggir Plafond 136.48 M² Rp 5,228,275.84 Err:509
Rp 48,338,745.82 Err:509
VII PEKERJAAN KERAMIK
1 Pas. Keramik Lantai 40 x 40 151.25 M² Rp 899,937.50 Err:509
2 Pas. Keramik Lantai 20 x 20 18.00 M² Rp 5,666,724.00 Err:509
3 Pas. Keramik Dinding 20 x 20 18.00 M² Rp 5,666,724.00 Err:509
Rp 12,233,385.50 Err:509
VIII PEKERJAAN ALAT GANTUNG
1 Kunci Pintu 2 Slaag 18.00 set Rp 7,592,400.00 Err:509
2 Grendel Pintu 12.00 set Rp 747,000.00 Err:509
3 Grendel Jendela 22.00 set Rp 1,369,500.00 Err:509
4 Kait Angin 44.00 set Rp 2,785,200.00 Err:509
5 Engsel Pintu 66.00 set Rp 7,194,000.00 Err:509
6 Engsel Jendela 44.00 set Rp 2,785,200.00 Err:509
Rp 22,473,300.00 Err:509
IX PEKERJAAN PENGECATAN
1 Cat Dinding Luar Dalam 1,062.49 M² Rp 35,544,540.46 Err:509
2 Cat Plafond 338.50 M² Rp 10,915,948.00 Err:509
3 Cat Kusen 6.01 M² Rp 344,517.66 Err:509
4 Cat Daun Pintu 33.24 M² Rp 1,904,818.20 Err:509
5 Cat Daun Jendela 5.40 M² Rp 309,447.00 Err:509
6 Cat Listplank 50.04 M² Rp 2,867,473.43 Err:509
7 Cat Gording Err:509 M² Err:509 Err:509
8 Cat Kuda-Kuda Err:509 M² Err:509 Err:509
Err:509 Err:509
X PEKERJAAN INSTALASI LISTRIK
1 Lampu Philips 8 Watt 37.00 set Rp 6,737,478.00 Err:509
2 Lampu Philips 5 Watt Err:509 set Err:509 Err:509
3 Saklar Tunggal 1.00 set Rp 175,965.00 Err:509
4 Saklar Ganda 15.00 set Rp 2,774,475.00 Err:509
5 Stop Kontak 10.00 set Rp 2,836,650.00 Err:509
6 Sekring Box 1.00 set Rp 293,265.00 Err:509
Err:509 Err:509
XI PEKERJAAN SANITAIR
1 Stop Kran 8.00 bh Rp 1,064,960.00 Err:509
2 Bak KM/WC 6.00 Unit Rp 3,074,996.75 Err:509
3 Closet Jongkok 6.00 bh Rp 5,483,280.00 Err:509
4 Pipa PVC 2" 87.10 M1 Rp 4,198,160.03 Err:509
5 Pipa GIP 1/2" 62.70 M1 Rp 5,982,936.41 Err:509
6 Septictank + Peresapan 2.00 unit Rp 16,516,114.17 Err:509
Rp 36,320,447.36 Err:509
XII PEKERJAAN AKHIR
1 Finishing 1.00 ls Rp 500,000.00 Err:509
Rp 500,000.00 Err:509
REAL COST Err:509 Err:509
ANALISA PRODUKTIFITAS KERJA

PEKERJAAN : PEMBANGUNAN 1 UNIT RUMAH TINGGAL TYPE 130 M2


LOKASI : KABUPATEN JAYAPURA

NO TENAGA KOEF JUMLAH JUMLAH PRODUKTIVITAS

1 2 3 4 5
1 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK Volume = 45.200 M'
1 Tim Kerja
Pekerja 0.100 o/h 4.000 4.000 Orang
Tukang kayu 0.100 o/h 4.000 4.000 Orang 40.000
Jumlah Tim Kerja = Tim
Pekerja 0.100 o/h 40.000 40.000 Orang
Tukang kayu 0.010 o/h 4.000 4.000 Orang 400.000
2 1M3 GALIAN TANAH Volume = 32.160 M3
1 Tim Kerja
Pekerja 0.625 o/h 10.081 11.000 Orang
Mandor 0.062 o/h 1.000 1.000 Orang 16.129
3 1M3 URUGAN TANAH KEMBALI Volume = 26.076 M3
1 Tim Kerja
Pekerja 0.192 o/h 10.105 11.000 Orang
Mandor 0.019 o/h 1.000 1.000 Orang 52.632
4 1M URUGAN PASIR
3
Volume = 22.8 M3

1 Tim Kerja
Pekerja 0.300 o/h 2.571 3.000 Orang
Tukang batu 0.350 o/h 3.000 3.000 Orang 8.571
5 1 M3 URUGAN TANAH PENINGGIAN LANTAI Volume = 35.856 M3
1 Tim Kerja
Pekerja 0.300 o/h 30.000 30.000 Orang
Mandor 0.010 o/h 1.000 1.000 Orang 100.000
6 1 M3 ALAS PASIR BAWAH LANTAI Volume = 0.611 M3
1 Tim Kerja
Pekerja 0.300 o/h 2.308 3.000 Orang
Tukang batu 0.390 o/h 3.000 3.000 Orang 7.692
Jumlah Tim Kerja = 4 Tim
Pekerja 5.000 o/h 30.000 30.000 Orang
Tukang batu 0.500 o/h 3.000 3.000 Orang 6.000
7 1 M PASANGAN BATU KOSONG
3
Volume = 3.600 M3

1 Tim Kerja
Pekerja 0.780 o/h 2.000 2.000 Orang
Tukang batu 0.390 o/h 1.000 1.000 Orang 2.564
Jumlah Tim Kerja = 3 Tim
Pekerja 0.780 o/h 6.000 6.000 Orang
Tukang batu 0.390 o/h 3.000 3.000 Orang 7.692
8 1 M3 PASANGAN BATU KALI 1:4 Volume = 10.560 M3
1 Tim Kerja
Pekerja 1.500 o/h 2.500 3.000 Orang
Tukang batu 0.600 o/h 1.000 1.000 Orang 1.667
Jumlah Tim Kerja = 3 Tim
Pekerja 1.500 o/h 7.500 8.000 Orang
Tukang batu 0.600 o/h 3.000 3.000 Orang 5.000
9 1 M PASANGAN BATU TELA 1:2
3
Volume = 0.000 M3

1 Tim Kerja
Pekerja 0.650 o/h 3.250 4.000 Orang
Tukang batu 0.200 o/h 1.000 1.000 Orang 5.000
Jumlah Tim Kerja = 3 Tim
Pekerja 0.650 o/h 9.750 10.000 Orang
Tukang batu 0.200 o/h 3.000 3.000 Orang 15.000
10 1 M PASANGAN BATU TELA 1:4
3
Volume = 70.552 M3

1 Tim Kerja
Pekerja 1.500 o/h 2.500 3.000 Orang
Tukang batu 0.600 o/h 1.000 1.000 Orang 1.667
Jumlah Tim Kerja = 3 Tim
Pekerja 1.500 o/h 7.500 8.000 Orang
Tukang batu 0.600 o/h 3.000 3.000 Orang 5.000
11 1 M² PLESTERAN 1:2 Volume = 0.000 M²
1 Tim Kerja
Pekerja 0.200 o/h 1.333 2.000 Orang
Tukang batu 0.150 o/h 1.000 1.000 Orang 6.667
Jumlah Tim Kerja = 3 Tim
Pekerja 0.200 o/h 4.000 4.000 Orang
Tukang batu 0.150 o/h 3.000 3.000 Orang 20.000
12 1 M² PLESTERAN 1:4 Volume = 1062.490 M²
1 Tim Kerja
Pekerja 0.200 o/h 1.333 2.000 Orang
Tukang Batu 0.150 o/h 1.000 1.000 Orang 6.667
Jumlah Tim Kerja = 3 Tim
Pekerja 0.200 o/h 4.000 4.000 Orang
Tukang Batu 0.150 o/h 3.000 3.000 Orang 20.000
13 1 M LANTAI COR BETON
3
Volume = 12.227 M3

3 Tim Kerja
Pekerja 1.650 o/h 19.800 20.000 Orang
Tukang Batu 0.250 o/h 3.000 3.000 Orang 12.000
14 1 M SLOOF 12/15
3
Volume = 5.220 M3

3 Tim Kerja
Pekerja 2.000 o/h 17.143 18.000 Orang
Tukang batu 0.350 o/h 3.000 3.000 Orang 8.571
15 1 M3 RING BALOK 10/20 Volume = 3.915 M3
3 Tim Kerja
Pekerja 2.000 o/h 17.143 18.000 Orang
Tukang batu 0.350 o/h 3.000 3.000 Orang 8.571
16 1 M KOLOM 12/12
3
Volume = 3.139 M3

1 Tim Kerja
Pekerja 2.000 o/h 22.857 23.000 Orang
Tukang kayu 0.350 o/h 4.000 4.000 Orang 11.429
17 1 M KUSEN KAYU BESI
3
Volume = 1.249 M3

1 Tim Kerja
Pekerja 2.400 o/h 1.333 2.000 Orang
Tukang kayu 7.200 o/h 4.000 4.000 Orang 0.556
Jumlah Tim Kerja = Tim
Pekerja 2.400 o/h 1.333 2.000 Orang
Tukang kayu 7.200 o/h 4.000 4.000 Orang 0.556
18 1 M DAUN PINTU PANIL KAYU
2
Volume = 33.240 M²
1 Tim Kerja
Pekerja 2.400 o/h 0.333 1.000 Orang
Tukang kayu 7.200 o/h 1.000 1.000 Orang 0.139
Jumlah Tim Kerja = 4 Tim
Pekerja 2.400 o/h 1.333 2.000 Orang
Tukang kayu 7.200 o/h 4.000 4.000 Orang 0.556
19 1 M2 DAUN JENDELA PANIL KAYU Volume = 5.400 M2
1 Tim Kerja
Pekerja 0.015 o/h 0.100 1.000 Orang
Tukang kayu 0.150 o/h 1.000 1.000 Orang 6.667
Jumlah Tim Kerja = 4 Tim
Pekerja 0.015 o/h 0.400 1.000 Orang
Tukang kayu 0.150 o/h 4.000 4.000 Orang 26.667
20 1 M JALUSI
2
Volume = 0.000 M2

1 Tim Kerja
Pekerja 0.300 o/h 0.375 1.000 Orang
Tukang kayu 0.800 o/h 1.000 1.000 Orang 1.250
Jumlah Tim Kerja = 4 Tim
Pekerja 0.300 o/h 1.500 2.000 Orang
Tukang kayu 0.800 o/h 4.000 4.000 Orang 5.000
21 1 M GORDING KAYU MATOA 5/10
3
Volume = 1.781 M3

1 Tim Kerja
Pekerja 3.000 o/h 0.333 1.000 Orang
Tukang kayu 9.000 o/h 1.000 1.000 Orang 0.111
Jumlah Tim Kerja = 4 Tim
Pekerja 3.000 o/h 1.333 2.000 Orang
Tukang kayu 9.000 o/h 4.000 4.000 Orang 0.444
22 1 M2 LISTPLANK 2/20 Volume = 23.828 M2
1 Tim Kerja
Pekerja 0.080 o/h 0.333 1.000 Orang
Tukang kayu 0.240 o/h 1.000 1.000 Orang 4.167
Jumlah Tim Kerja = 4 Tim
Pekerja 0.080 o/h 1.333 2.000 Orang
Tukang kayu 0.240 o/h 4.000 4.000 Orang 16.667
23 1 M KUDA-KUDA KAYU BESI 5/10
3
Volume = 1.094 M3

1 Tim Kerja
Pekerja 4.000 o/h 0.333 1.000 Orang
Tukang kayu 12.000 o/h 1.000 1.000 Orang 0.083
Jumlah Tim Kerja = 4 Tim
Pekerja 4.000 o/h 1.333 2.000 Orang
Tukang kayu 12.000 o/h 4.000 4.000 Orang 0.333
24 1 M PLAFOND TRIPLEKS + RANGKA
2
Volume = 338.500 M 2

1 Tim Kerja
Pekerja 0.400 o/h 1.600 2.000 Orang
Tukang kayu 0.250 o/h 1.000 1.000 Orang 4.000
Jumlah Tim Kerja = 4 Tim
Pekerja 0.400 o/h 6.400 7.000 Orang
Tukang kayu 0.250 o/h 4.000 4.000 Orang 16.000
25 1 M2 ATAP SENG Volume = 124.863 M2
1 Tim Kerja
Pekerja 0.150 o/h 2.143 3.000 Orang
Tukang kayu 0.070 o/h 1.000 1.000 Orang 14.286
Jumlah Tim Kerja = 4 Tim
Pekerja 0.150 o/h 8.571 9.000 Orang
Tukang kayu 0.070 o/h 4.000 4.000 Orang 57.143
26 1 M' PASANG NOK SENG PLAT Volume = 15.560 M'
1 Tim Kerja
Pekerja 0.150 o/h 8.571 9.000 Orang
Tukang kayu 0.070 o/h 4.000 4.000 Orang 57.143
27 1 M' LIST PINGGIR PLAFOND Volume = 136.480 M'
1 Tim Kerja
Pekerja 0.400 o/h 1.600 2.000 Orang
Tukang kayu 0.250 o/h 1.000 1.000 Orang 4.000
Jumlah Tim Kerja = 4 Tim
Pekerja 0.400 o/h 6.400 7.000 Orang
Tukang kayu 0.250 o/h 4.000 4.000 Orang 16.000
28 1 M PASANG KERAMIK LANTAI 40 X 40 CM
2
Volume = 151.250 M 2

1 Tim Kerja
Pekerja 0.620 o/h 1.771 2.000 Orang
Tukang batu 0.350 o/h 1.000 1.000 Orang 2.857
Jumlah Tim Kerja = 3 Tim
Pekerja 0.620 o/h 5.314 6.000 Orang
Tukang batu 0.350 o/h 3.000 3.000 Orang 8.571
29 1 M2 PASANG KERAMIK 20 X 20 CM ANTI SLIP Volume = 18.000 M2
1 Tim Kerja
Pekerja 0.620 o/h 5.314 6.000 Orang
Tukang batu 0.350 o/h 3.000 3.000 Orang 8.571
30 1 M2 PASANG KERAMIK DINDING 20 X 20 CM Volume = 18.000 M2

1 Tim Kerja
Pekerja 0.620 o/h 5.314 6.000 Orang
Tukang batu 0.350 o/h 3.000 3.000 Orang 8.571
Jumlah Tim Kerja = 2 Tim
Pekerja 0.620 o/h 5.314 6.000 Orang
Tukang batu 0.350 o/h 3.000 3.000 Orang 8.571
31 1 BH KUNCI PINTU 2 SLAAG Volume = 18.000 Bh
1 Tim Kerja

Tukang kayu 1.100 o/h 1.000 1.000 Orang 0.909

Jumlah Tim Kerja = 4 Tim

Tukang kayu 1.100 o/h 4.000 4.000 Orang 3.636

32 1 BH PASANG GRENDEL PINTU/JENDELA Volume = 34.000 Bh


1 Tim Kerja
Tukang kayu 0.250 o/h 1.000 1.000 Orang 4.000
Jumlah Tim Kerja = 4 Tim
Tukang kayu 0.250 o/h 4.000 4.000 Orang 16.000
33 1 BH PASANG KAIT ANGIN Volume = 44.000 Bh
1 Tim Kerja
Tukang kayu 0.250 o/h 4.000 4.000 Orang 16.000

Jumlah Tim Kerja = 12 Tim


Tukang kayu 0.250 o/h 4.000 4.000 Orang 16.000

34 1 BH PASANG ENGSEL PINTU JENDELA Volume = 110.000 Bh


1 Tim Kerja
Tukang kayu 0.200 o/h 1.000 1.000 Orang 5.000

Jumlah Tim Kerja = 4 Tim


Tukang kayu 0.200 o/h 4.000 4.000 Orang 20.000

35 1 M2 CAT DINDING LUAR DALAM Volume = 1062.490 M2


1 Tim Kerja
Pekerja 0.020 o/h 0.317 1.000 Orang
Tukang cat 0.063 o/h 1.000 1.000 Orang 15.873
Jumlah Tim Kerja = 3 Tim
Pekerja 0.020 o/h 0.952 1.000 Orang
Tukang cat 0.063 o/h 3.000 3.000 Orang 47.619
36 1 M2 CAT PLAFOND Volume = 338.500 M2
1 Tim Kerja
Pekerja 0.080 o/h 0.727 1.000 Orang
Tukang cat 0.110 o/h 1.000 1.000 Orang 9.091
Jumlah Tim Kerja = 3 Tim
Pekerja 0.080 o/h 2.182 3.000 Orang
Tukang cat 0.110 o/h 3.000 3.000 Orang 27.273
37 1 M2 CAT KUSEN Volume = 6.012 M2
1 Tim Kerja
Pekerja 0.100 o/h 0.008 1.000 Orang
Tukang cat 12.000 o/h 1.000 1.000 Orang 0.083
Jumlah Tim Kerja = 3 Tim
Pekerja 0.100 o/h 0.025 1.000 Orang
Tukang cat 12.000 o/h 3.000 3.000 Orang 0.250
38 1 M2 CAT RESIDU KUDA-KUDA Volume = Err:509 M2
1 Tim Kerja
Pekerja 4.000 o/h 20.000 20.000 Orang 5.000
Mandor 0.200 o/h 1.000 1.000 Orang
Jumlah Tim Kerja = 3 Tim
Pekerja 4.000 o/h 60.000 60.000 Orang
Tukang cat 0.200 o/h 3.000 3.000 Orang 15.000
39 1 M CAT DAUN PINTU/JENDELA
2
Volume = 38.640 M2

1 Tim Kerja
Pekerja 0.100 o/h 0.500 1.000 Orang
Tukang cat 0.200 o/h 1.000 1.000 Orang 5.000
Jumlah Tim Kerja = Tim
Pekerja 0.100 o/h 1.500 2.000 Orang
Tukang cat 0.200 o/h 3.000 3.000 Orang 15.000
40 1 M CAT GORDING
2
Volume = Err:509 M 2

1 Tim Kerja
Pekerja 0.100 o/h 0.500 1.000 Orang
Tukang cat 0.200 o/h 1.000 1.000 Orang 5.000
Jumlah Tim Kerja = 12 Tim
Pekerja 0.100 o/h 6.000 6.000 Orang
Tukang cat 0.200 o/h 12.000 12.000 Orang 60.000
41 1 M CAT LISTPLANK
2
Volume = 50.039 M2

1 Tim Kerja
Pekerja 0.100 o/h 0.500 1.000 Orang
Tukang cat 0.200 o/h 1.000 1.000 Orang 5.000
Jumlah Tim Kerja = 12 Tim
Pekerja 0.100 o/h 6.000 6.000 Orang
Tukang cat 0.200 o/h 12.000 12.000 Orang 60.000
42 1 TTK LAMPU PHILIPS 8 WATT Volume = 37.000 Ttk
1 Tim Kerja
Tukang listrik 0.750 o/h 1.000 1.000 Orang 1.333
Jumlah Tim Kerja = 2 Tim
Tukang listrik 0.750 o/h 2.000 2.000 Orang 2.667
43 1 TTK LAMPU PHILIPS 5 WATT Volume = Err:509 Ttk
1 Tim Kerja
Tukang listrik 0.750 o/h 1.000 1.000 Orang 1.333
Jumlah Tim Kerja = 2 Tim
Tukang listrik 0.750 o/h 2.000 2.000 Orang 2.667
44 1 TTK SAKLAR TUNGGAL Volume = 1.000 Ttk
1 Tim Kerja
Tukang listrik 0.250 o/h 1.000 1.000 Orang 4.000
45 1 TTK SAKLAR GANDA Volume = 15.000 Ttk
1 Tim Kerja
Tukang listrik 0.250 o/h 2.000 2.000 Orang 8.000
46 1 TTK STOP KONTAK Volume = 10.000 Ttk
1 Tim Kerja
Tukang listrik 0.250 o/h 1.000 1.000 Orang 4.000
47 1 UNIT SEKRING BOX Volume = 1.000 Unit
1 Tim Kerja
Tukang listrik 0.400 o/h 2.000 2.000 Orang 5.000
48 1 BH PASANG STOP KRAN Volume = 8.000 Ttk
1 Tim Kerja
Tukang pipa 0.200 o/h 2.000 2.000 Orang 10.000
49 1 Unit PASANG BAK KM/WC
Batu Tela 1:2 Volume = 0.635 M3
1 Tim Kerja
Pekerja 0.650 o/h 8.667 9.000 Orang 13.333
Mandor 0.075 o/h 1.000 1.000 Orang
Plesteran 1:3 Volume = 1.270 M3
1 Tim Kerja
Pekerja 0.150 o/h 15.000 15.000 Orang 100.000
Mandor 0.010 o/h 1.000 1.000 Orang
Acian Volume = 1.270 M3
1 Tim Kerja
Pekerja 5.000 o/h 30.000 30.000 Orang
Tukang batu 0.500 o/h 3.000 3.000 Orang 6.000
50 1 BH KLOSET JONGKOK Volume = 6.000 Bh
1 Tim Kerja
Tukang batu 1.600 o/h 3.000 3.000 Orang 1.875
Jumlah Tim Kerja = 4 Tim
Tukang batu 1.600 o/h 3.000 3.000 Orang 1.875
51 1 M' PASANG PIPA PVC 2" Volume = 87.100 M'
1 Tim Kerja
Pekerja 0.220 o/h 8.148 9.000 Orang
Tukang Pipa 0.054 o/h 2.000 2.000 Orang 37.037
52 1 M' PASANG PIPA GIP1/2" Volume = 62.700 M'
1 Tim Kerja
Pekerja 0.054 o/h 1.200 2.000 Orang
Tukang Pipa 0.090 o/h 2.000 2.000 Orang 22.222
53 1 UNIT SEPTICTANK DAN RESAPAN
Galian Tanah Volume = 6.776 M3
1 Tim Kerja
Pekerja 0.625 o/h 10.081 11.000 Orang 16.129
Mandor 0.062 o/h 1.000 1.000 Orang
Pasir Urug Volume = 0.350 M3
1 Tim Kerja
Pekerja 0.300 o/h 30.000 30.000 Orang 100.000
Mandor 0.010 o/h 1.000 1.000 Orang
Beton camp 1:3:5 Volume = 0.231 M3
1 Tim Kerja
Pekerja 1.650 o/h 14.143 15.000 Orang
Tukang batu 0.350 o/h 3.000 3.000 Orang 8.571
Beton camp 1:1.5:2.5 Volume = 0.231 M3
1 Tim Kerja
Pekerja 2.000 o/h 17.143 18.000 Orang
Tukang Batu 0.350 o/h 3.000 3.000 Orang 8.571
Batu tela 1:2 Volume = 0.768 M3

1 Tim Kerja
Pekerja 0.650 o/h 9.750 10.000 Orang
Tukang batu 0.200 o/h 3.000 3.000 Orang 15.000
Plesteran 1:2 Volume = 1.536 M2

1 Tim Kerja
Pekerja 0.200 o/h 4.000 4.000 Orang
Tukang batu 0.150 o/h 3.000 3.000 Orang 20.000
Tanah Timbunan Volume = 0.112 M2
1 Tim Kerja
Pekerja 0.300 o/h 90.000 90.000 Orang
Tukang batu 0.010 o/h 3.000 3.000 Orang 300.000
Pipa PVC dia 2" Ventilasi Volume = 2.200 M1

1 Tim Kerja
Pekerja 0.220 o/h 12.222 13.000 Orang
Tukang pipa 0.054 o/h 3.000 3.000 Orang 55.556
PRODUKTIVITAS

M'/Hari

M'/Hari

M3/Hari

M3/Hari

M3/Hari

M3/Hari

M3/Hari

M3/Hari

M3/Hari

M3/Hari
M3/Hari

M3/Hari

M3/Hari

M3/Hari

M3/Hari

M3/Hari

M²/Hari

M²/Hari

M²/Hari

M²/Hari

M3/Hari

M3/Hari
M3/Hari

M3/Hari

M3/Hari

M3/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M3/Hari

M3/Hari
M2/Hari

M2/Hari

M3/Hari

M3/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M'/Hari

M'/Hari

M'/Hari

M2/Hari

M2/Hari
M2/Hari

M2/Hari

M2/Hari

Bh/Hari

Bh/Hari

Bh/Hari

Bh/Hari

Bh/Hari

Bh/Hari

Bh/Hari

Bh/Hari

M2/Hari

M2/Hari
M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari

Ttk/Hari
Ttk/Hari
Ttk/Hari

Ttk/Hari

Ttk/Hari

Ttk/Hari

Ttk/Hari

Unit/Hari

Ttk/Hari

M3/Hari

M3/Hari

M3/Hari

Bh/Hari

Bh/Hari

M'/Hari

M'/Hari
M3/Hari

M3/Hari

M3/Hari

M3/Hari

M2/Hari

M2/Hari

M2/Hari

M2/Hari
URAIAN DURASI PEERJAAN

PEKERJAAN : PEMBANGUNAN RUMAH SEDERHANA TYPE 36


LOKASI :
T.A : 2018

PRODUKTIVITAS
NO URAIAN PEKERJAAN VOLUME
1 Tim Kerja > 1 Tim Kerja

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.000 Ls 1.000 1.000
2 Pemasangan Bowplank 45.200 M¹ 40.000 400.000

II PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Pondasi 32.160 M³ 16.129
2 Urugan Kembali Pondasi Bt. Kali 26.076 M³ 52.632
3 Urugan Pasir Bawah Pondasi 22.800 M³ 8.571
4 Urugan Tanah Peninggian Lantai 35.856 M³ 100.000
5 Alas Pasir Bawah Lantai 0.611 M³ 7.692 6.000

III PEKERJAAN BATU


1 Pas. Batu Kosong 3.600 M³ 2.564 7.692
2 Pas. Batu Kali Menerus 1:4 10.560 M³ 1.667 5.000
3 Pas. Batu Tela 1 : 4 70.552 M³ 1.667 5.000
4 Pas. Batu Tela 1 : 2 - M³ 5.000 15.000
5 Plesteran 1 : 4 1,062.490 M³ 6.67 20.00
6 Plesteran 1 : 2 - M³ 6.67 20.00

IV PEKERJAAN BETON
1 Lantai Cor Beton 1 : 3 : 5 12.227 M³ 12.000
PAS. BETON BERTULANG
2 Sloof 12/15 5.220 M³ 8.571
3 RingBalk 12/14 3.915 M³ 8.571
4 Kolom 12/12 3.139 M³ 11.429

V PEKERJAAN KAYU
1 Kusen Ky. Besi 5/10 1.249 M3 0.556 0.556
2 Daun Pintu Panil 33.240 M3 0.139 0.556
3 Jalusi - M3 1.25 5.000
4 Daun Jendela Panil 5.400 M3 6.667 26.667
5 Gording Ky. Matoa 5/10 5.400 M3 0.111 0.444
6 Listplank Ky. Besi 2/20 1.781 M3 4.167 16.667
7 Kuda-Kuda Ky. Besi 5/10 1.094 M3 0.083 0.333
8 Rangka Plafond 338.500 M3 4.000 16.000
NO URAIAN PEKERJAAN VOLUME PRODUKTIVITAS
1 Tim Kerja > 1 Tim Kerja
VI PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Atap Seng 124.863 M² 14.286 57.143
2 Nok Seng Plat 15.560 M² 57.143
3 Plafond Tripleks 119.720 M² 4.000 16.000
4 List Pinggir Plafond 136.480 M² 4.000 16.000

VII PEKERJAAN KERAMIK


1 Pas. Keramik Lantai 40 x 40 151.250 M² 2.857 8.571
2 Pas. Keramik Lantai 20 x 20 18.000 M² 8.571
3 Pas. Keramik Dinding 20 x 20 18.000 M² 8.571 8.571

VIII PEKERJAAN ALAT GANTUNG


1 Kunci Pintu 2 Slaag 18.000 set 0.909 3.636
2 Grendel Pintu/Jendela 34.000 set 4.000 16.000
3 Kait Angin 44.000 set 16.000 16.000
4 Engsel Pintu/Jendela 110.000 set 5.000 20.000

IX PEKERJAAN PENGECATAN
1 Cat Dinding Luar Dalam 1,062.490 M² 15.873 47.619
2 Cat Plafond 338.500 M² 9.091 27.273
3 Cat Kusen 6.012 M² 0.083 0.250
4 Cat Daun Pintu/Jendela 38.640 M² 5.000 15.000
5 Cat Listplank 50.039 M² 5.000 60.000
6 Cat Gording Err:509 M² 5.000 60.000
7 Cat Kuda-Kuda Err:509 M² 5.000 15.000

X PEKERJAAN INSTALASI LISTRIK


1 Lampu Philips 8 Watt 37.000 Bh 1.333 2.667
2 Lampu Philips 5 Watt Err:509 Bh 1.333 2.667
3 Saklar Tunggal 1.000 Bh 4.000
4 Saklar Ganda 15.000 Bh 8.000
5 Stop Kontak 10.000 Bh 4.000
6 Sekring Box 1.000 Bh 5.000

XI PEKERJAAN SANITAIR
1 Stop Kran 8.000 Bh 10.000
2 Bak KM/WC 6.000 Unit 119.333
3 Closet Jongkok 6.000 bh 1.875 1.875
4 Pipa GIP 1/2" 62.700 M² 22.222
5 Pipa PVC 2" 2.000 M² 37.037
6 Septictank + Peresapan 2.000 Bh 523.827

XII PEKERJAAN AKHIR


1 Finishing 1.000 ls 1.000 1.000
REAL COST
PRODUKTIVITAS DURASI

1.000 Hari 1.000 Hari


40.000 M'/Hari 2.000 Hari
3.000 Hari

16.129 M³/Hari 2.000 Hari


52.632 M³/Hari 1.000 Hari
8.571 M³/Hari 3.000 Hari
100.000 M³/Hari 1.000 Hari
7.692 M³/Hari 1.000 Hari
8.000 Hari

7.692 M³/Hari 1.000 Hari


5.000 M³/Hari 3.000 Hari
5.000 M³/Hari 15.000 Hari
5.000 M³/Hari 0.000 Hari
20.000 M³/Hari 54.000 Hari
6.667 M³/Hari 0.000 Hari
73.000 Hari

12.000 M³/Hari 2.000 Hari

8.571 M³/Hari 1.000 Hari


8.571 M³/Hari 1.000 Hari
11.429 M³/Hari 1.000 Hari
5.000 Hari

0.556 M³/Hari 3.000 Hari


0.556 M²/Hari 60.000 Hari
1.250 M²/Hari 0.000 Hari
26.667 M²/Hari 1.000 Hari
0.444 M³/Hari 13.000 Hari
4.167 M²/Hari 1.000 Hari
0.333 M³/Hari 4.000 Hari
16.000 M²/Hari 22.000 Hari
104.000 Hari
PRODUKTIVITAS DURASI

57.143 M²/Hari 3.000 Hari


57.143 M'/Hari 1.000 Hari
16.000 M²/Hari 8.000 Hari
16.000 M'/Hari 9.000 Hari
21.000 Hari

8.571 M²/Hari 18.000 Hari


8.571 M²/Hari 3.000 Hari
8.571 M²/Hari 3.000 Hari
24.000 Hari

3.636 Bh/Hari 5.000 Hari


16.000 Bh/Hari 3.000 Hari
16.000 Bh/Hari 3.000 Hari
20.000 Bh/Hari 6.000 Hari
6.000 Hari

47.619 M²/Hari 23.000 Hari


27.273 M²/Hari 13.000 Hari
0.250 M²/Hari 25.000 Hari
15.000 M²/Hari 3.000 Hari
60.000 M²/Hari 1.000 Hari
Err:509 M²/Hari Err:509 Hari
Err:509 M²/Hari Err:509 Hari
Err:509 Hari

2.667 Bh/Hari 14.000 Hari


Err:509 Bh/Hari Err:509 Hari
4.000 Bh/Hari 1.000 Hari
8.000 Bh/Hari 2.000 Hari
4.000 Bh/Hari 3.000 Hari
5.000 Bh/Hari 1.000 Hari
4.000 Hari

10.000 Bh/Hari 1.000 Hari


119.333 Bh/Hari 1.000 Hari
1.875 Bh/Hari 4.000 Hari
22.222 Bh/Hari 3.000 Hari
37.037 Bh/Hari 1.000 Hari
523.827 Bh/Hari 1.000 Hari
11.000 Hari

1.000 Hari 1.000 Hari


1.000 Hari
Err:509 Hari
TABEL SALING KETERGANTUNGAN PEKERJAAN

Pekerjaan : Pembangunan Rumah Type 110


Lokasi : Kabupaten Jayapura

Pekerjaan Uraian Pekerjaan Jumlah Bobot Durasi Mendahului

A PEKERJAAN PENDAHULUAN Rp 3,586,787.10 Err:509 3.00 Hari 1.00 Minggu -

B PEKERJAAN TANAH DAN PASIR Rp 32,190,782.83 Err:509 8.00 Hari 2.00 Minggu A,C

C PEKERJAAN BATU Rp 154,941,868.73 Err:509 73.00 Hari 11.00 Minggu B,D

D PEKERJAAN BETON Rp 286,729,851.10 Err:509 5.00 Hari 1.00 Minggu B

E PEKERJAAN KAYU Rp 164,242,251.85 Err:509 104.00 Hari 15.00 Minggu C

F PEKERJAAN ATAP DAN PLAFOND Rp 48,338,745.82 Err:509 24.00 Hari 4.00 Minggu E

G PEKERJAAN KRAMIK Rp 61,099,899.67 Err:509 24.00 Hari 4.00 Minggu K

H PEKERJAAN ALAT GANTUNG Rp 19,457,100.00 Err:509 6.00 Hari 1.00 Minggu E

I PEKERJAAN PENGECATAN Rp 51,886,744.75 Err:509 Err:509 Hari Err:509 Minggu F

J PEKERJAAN INSTALASI LISTRIK Rp 12,817,833.00 Err:509 4.00 Hari 1.00 Minggu F

K PEKERJAAN SANITAIR Rp 36,320,447.36 Err:509 11.00 Hari 2.00 Minggu D


L PEKERJAAN AKHIR Rp 500,000.00 Err:509 1.00 Hari 1.00 Minggu B,G,H,I,J

Err:509
"ARROW DIAGRAM METHOD"

3 12 12
2
### ### ###
12 ### 28 28 28
B 2 9
### ### ###
H 1
1 ### 12 ### 27 ### ### 28 ### 12
Sta 0 0 A 1 1 1 C 12 12 12 E 27 27 27 F 31 31 31 J 32 32 32 32 ### ### L ### Fin ###
rt ###### 1 ### 1 ### ### 11 ### 3 ### ### 15 ### 5 ###### 4 ###
6
### ### 1 ###
10
### ### ###
12
### ### 1 ### ish ###
### 1 2 ### ### 31 ###### 8 ###
D 1
2 ###
2 2 I ### ### ###
4 11
### ### ### ### ### ###
### 2

K 4 4 4 G 8 8 8
7 8
2 ### ###### 4 ### ### ###

Keterangan
= Garis Kritis

= Waktu Paling Cepat Start Dan Finish

= Waktu Paling Lambat Start Dan Finish


DIAG
PEKERJAAN : PEMBANGUNAN 1 UNIT RUMAH TINGGAL TYPE 130 M2
LOKASI : KABUPATEN JAYAPURA

KODE URAIAN PEKERJAAN BOBOT DURASI


1 2 3 4 5 6 7

A PEKERJAAN PENDAHULUAN Err:509 1.00 Minggu Err:509


Err:509
B PEKERJAAN TANAH DAN PASIR Err:509 2.00 Minggu Err:509 Err:509

C PEKERJAAN BATU Err:509 11.00 Minggu Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
D PEKERJAAN BETON Err:509 1.00 Minggu Err:509
Err:509
E PEKERJAAN KAYU Err:509 15.00 Minggu Err:509
Err:509
F PEKERJAAN ATAP DAN PLAFOND Err:509 4.00 Minggu

G PEKERJAAN KRAMIK Err:509 4.00 Minggu Err:509 Err:509 Err:509

H PEKERJAAN ALAT GANTUNG Err:509 1.00 Minggu

I PEKERJAAN PENGECATAN Err:509 ### Minggu

J PEKERJAAN INSTALASI LISTRIK Err:509 1.00 Minggu

K PEKERJAAN SANITAIR Err:509 2.00 Minggu Err:509

L PEKERJAAN AKHIR Err:509 1.00 Minggu

Bobot Minggu Paling Cepat Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Prestasi Komulatif Paling Cepat Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Bobot Minggu Paling Lambat Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Prestasi Komulatif Paling Lambat Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
DIAGRAM KURVA S

MINGGU
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Prestasi Prestasi
Komulatif Komulatif
Paling Cepat Paling Lambat Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

Err:509 Err:509 Err:509


Err:509
Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509
Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
SKALA
24 (%)

10
0

90

80

70

60

50

40

30

20

10
Err:509
1
Err:509
Err:509
Err:509
Err:509
Err:509

Anda mungkin juga menyukai