Nama Objek : CPU

Nomor Pe ta :1
Dipetakan oleh : LuthfyAditiar
Tanggal Dipetakan : 2 Agustus 2016
Outer Case SATA Cable DVD Drive Power Suppl y Processor Soundcard VGA RAM Mother board Main Case

Memotong Memotong Cable Visual Inspecti on Visua l Inspecti on Visua lInspecti on Layout Forming Layout Forming Layout For ming Layout Forming Memotong
2" O-19 (CNC Machining) 0,5" O-17 0,5" I-11 (QA Divission) 0,5" I-8 (QA Divission) 0,5" I-5 5" O-14 5" O-11 5" 0-8 (Chemical Division) 5" 0-5 2" O -1 (CNC Machining)
(Mesin) (QA Divission) (Chemical Division) (Chemical Division) (Chemical Division)

Dat aChe ck Dat aCheck Dat aChe ck Pemasangan Pemasangan Pemasangan Pemasangan
Membentuk Mera kit Cable I-9 I-6 O-15 kompone n O-12 kompone n O-9 kompone n 0-6 kompone n O Membentuk
2" O-20 (High Pressure Formi ng) 0,5" O-18 (Mesin) 0,5" I-12 (QA Divission) 0,5" (QA Divission) 0,5" (QA Divission) 5" 5" 5" 5" 2" -2 (High Pressure Formi ng)
(Mesin) (Mesin) (Mesin) (Mesin)

1" O-21 Membuat lubang baut 1" I-14 Working Test 5" I-13 Performance Test 5" I-10 Performance Test 5" I-7 Performance Test 5" O-16 Solder 5" O-13 Solder 5" O-10 Solder 5" 0-7 Solder 0-3 Membuatl ubang baut
1"
(Mesin Bor) (QA Divi ssi on) (QA Divi ssi on) (QA Divission) (QA Divission) (Mesin) (Mesin ) (Mesin) (Mesin) (Mesin Bor)

Mera kit
5" I-4 Performance Test 5" I-3 Performance Test 5" I-2 Performance Test 10" I-1 Performance Test 10" 0 -4
(QA Divi ssi on) (QA Divission) (QA Divission) (QA Divission) (Spot Wel di ng)

2" O-22 Perakitan 1

2" O-23 Perakitan 2

2" O-24 Perakitan 3

2" O-25 Perakitan 4

2" O-26 Perakitan 5

2" O-27 Perakitan 6

2" O-28 Perakitan 7

2" O-29 Perakitan 8

2" O-30 Perakitan 9


RIN GKASAN

KEGIATAN JUMLAH WAKTU (MENIT)


20" I-15 Final Inspection
(QC Divi ssion)
OPERASI 30 59

PEMERIKSAAN 15 61
Penyi mpanan

TOTAL 45 120