TERAS
+15
600 300 300
1200
SKALA 1:50
SKALA 1:50
DENAH POS JAGA, TOILET
1 : 50
& GUDANG
- ARS 02
RUMAH SAKIT UMUM
Jl. Jend. Gatot Subroto KM. 1,5, Ngembat Padas, Gemolong
PENUTUP ATAP GENTENG METAL SETARA RAINBOW ROOF
RANGKA KUDA KUDA BAJA RINGAN EX EKG
USUK LIP CHANNEL 75 TEBAL 0.75mm + RENG 35 TEBAL 0.45mm
JARAK USUK 80cm (AS TO AS), JARAK RENG 36,5cm
RANGKA ATAP TERAS KUDA-KUDA BAJA RINGAN BALOK GUNUNGAN 12/12
USUK LIP CHANNEL 75 #0.75mm, RENG 35 #0.45mm EX EKG
PEMBANGUNAN GEDUNG RSU ASSALAM
PLAFOND KALSIBOARD #3,5mm
RANGKA HOLLOW 36x36mm + 18x36mm #0,6mm
LISPLANK Ex WOODPLANK LEBAR 20cm #8mm PEMBANGUNAN TEMPAT PARKIR & GEDUNG
RSU ASSALAM
LOKASI :
PLAFOND KALSIBOARD #3,5mm KECAMATAN GEMOLONG
LANTAI KERAMIK WARNA 40X40cm, Ex IKAD
COR RABAT BETON, TEBAL 5cm
PASIR URUG, TEBAL 5cm
LANTAI KERAMIK 40X40cm WARNA EX IKAD
±0.00
PAVING K-300
-15
PAVING K-300, TEBAL 8cm
PASIR URUG, TEBAL 5cm
SIRTU, TEBAL 20cm
PONDASI BATU KALI 1:6 PONDASI BATU KALI 1:6
PASIR URUG, TEBAL 5cm PASIR URUG, TEBAL 5cm
SKALA 1:25
POTONGAN 1 : 25
- ARS 03
RUMAH SAKIT UMUM
Jl. Jend. Gatot Subroto KM. 1,5, Ngembat Padas, Gemolong
PEMBANGUNAN GEDUNG RSU ASSALAM
-30 -30
-10 PEMBANGUNAN TEMPAT PARKIR & GEDUNG
RSU ASSALAM
2 Ø10
Ø8 - 150 LOKASI :
KECAMATAN GEMOLONG
2 Ø10
2 Ø10 2 Ø10
Ø8 - 150 Ø8 - 150
2 Ø10 2 Ø10
2 Ø10
Ø8 - 150
2 Ø10
2 Ø10 2 Ø10
Ø8 - 150 Ø8 - 150
2 Ø10 2 Ø10
SKALA 1:10
2 Ø10 2 Ø10
Ø8 - 150 Ø8 - 150
2 Ø10 2 Ø10
DETAIL PENULANGAN 1 : 10
SKALA 1:10
- ARS 04