Anda di halaman 1dari 14

CV.

DIDE JAYA
Kontraktor & Leveransir
Jln. Safri Darwin Wamena

REKAPITULASI
PEKERJAAN : PENGADAAN DAN PEMASANGAN UNINTERRUPTABLE POWER SUPPLY (
LOKASI PEKERJAAN : PERUM LPPNPI KANTOR CABANG WAMENA
TAHUN ANGGARAN : 2019
:

NO. URAIAN

I PENGADAAN

II PERALATAN PENDUKUNG

REAL COST FISIK


P P N 10%
TOTAL COST
DIBULATKAN

Terbilang : Seratus Tujuh Juta Tujuh Ratus Enam Puluh Tujuh Ribu Rupiah

Wamena, 26 Agustus 2019


Kontraktor Pelaksana
CV. DIDE JAYA

MAHAVIRA KRISHNA
Direktur
APITULASI
ANGAN UNINTERRUPTABLE POWER SUPPLY (UPS) 5KVA DI CABANG WAMENA

JUMLAH HARGA
( Rp )

Rp 68,170,000

Rp 29,800,000

Rp 97,970,000
Rp 9,797,000
Rp 107,767,000
Rp 107,767,000

Wamena, 26 Agustus 2019


Kontraktor Pelaksana
CV. DIDE JAYA

MAHAVIRA KRISHNA
Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : PENGADAAN DAN PEMASANGAN UNINTERRUPTABLE POWER SUPPLY (UPS)
LOKASI PEKERJAAN : PERUM LPPNPI KANTOR CABANG WAMENA
TAHUN ANGGARAN : 2019
:

HARGA
NO. URAIAN VOLUME SATUAN SATUAN
( Rp )

I PENGADAAN
A PERALATAN UTAMA
1 Uniterruptable Power Suplly 5KVA 2.00 Unit 30,800,000.00
B PERALATAN PENDUKUNG
1 Steker Outlet UPS 2.00 Buah 72,000.00
2 MCB 25 Amper 2.00 Buah 78,000.00
3 Kabel NYM 3 x 2.5 mm 1.00 Roll 750,000.00
4 Box MCB 2.00 Buah 2,400,000.00
5 Ducting Kabel 5.00 Batang 144,000.00
JUMLAH I
II JASA PENGIRIMAN
1 Ongkos Kirim UPS Jakarta - Wamena 2 UPS 220.00 Kg 90,000.00
2 Biaya Packing 2.00 Bh 5,000,000.00
JUMLAH II
GGARAN BIAYA
N UNINTERRUPTABLE POWER SUPPLY (UPS) 5KVA DI CABANG WAMENA

JUMLAH HARGA
( Rp )

61,600,000.00

144,000.00
156,000.00
750,000.00
4,800,000.00
720,000.00
68,170,000.00

19,800,000.00
10,000,000.00
29,800,000.00
DAFTAR HARGA BAHAN DAN UPAH

DAFTAR BAHAN
HARGA
NO. JENIS BAHAN SAT. SATUAN
(Rp.)
1 2 3 4
1 Batu kali / gunung M3 879,854.55
2 Pasir pasang M3 1,049,290.18
3 Pasir beton M3 1,049,290.18
4 Pasir urug M3 821,675.64
5 Kerikil Sungai tanpa pasir M3 807,648.73
6 Kerikil pecah / Ciping 2/3 M3 1,380,032.73
7 Sirtu M3 679,416.00
8 Tanah timbunan M3 506,394.18
9 Batako Bh. 9,500.00
10 Bata merah Bh. 3,825.45
11 Batu kerawang Bh. 73,807.27
12 Glass blok 20x20 Bh. 81,000.00
13 Kayu Kelas I M3 4,352,727.27
14 Kayu Kelas II M3 3,469,090.91
15 Kayu Kls III (Bekisting) M3 3,272,727.27
16 Kayu Dolken Btg 58,181.82
17 Papan untuk meubel 2 x 0,3 x 0,03 Lbr 69,381.82
18 Papan untuk meubel 2 x 0,2 x 0,03 Lbr 65,454.55
19 Besi beton polos Ø6 mm Kg. 34,339.43
20 Besi beton polos Ø8 mm Kg. 32,053.13
21 Besi beton polos Ø10 mm Kg. 29,295.85
22 Besi beton polos Ø12 mm Kg. 28,073.01
23 Besi beton polos Ø16 mm Kg. 29,084.95
24 Besi beton ulir Ø6 mm Kg. 34,652.03
25 Besi beton ulir Ø8 mm Kg. 32,458.86
26 Besi beton ulir Ø10 mm Kg. 28,772.29
27 Besi beton ulir Ø12 mm Kg. 28,321.37
28 Besi beton ulir Ø16 mm Kg. 28,750.00
29 Kawat Beton Kg. 36,818.18
30 Semen PC Kg. 15,838.64
31 Semen warna Kg. 19,500.45
32 Tripleks 3 mm Lbr 101,622.55
33 Tripleks/multypleks 6 mm Lbr 192,954.18
34 Teakwood 3 mm Lbr 187,808.73
35 Gypsumboard Lbr 479,557.76
36 Kayu lis plafon M' 90,925.82
37 Gypsum frofil untuk lis plafon M' 145,454.55
38 Almunium partisi M' 0.00
39 Almunium untuk kusen M' 119,621.25
40 Hollow zink alumunium 4 x 4 M' 47,848.50
41 Hollow zink alumunium 2 x 4 M' 43,860.83
42 Join compount M' 59,090.91
43 Paper tape M' 0.00
44 Lem / lakban (sambungan) Bh 73,636.36
45 Melamin / Formika 3 mm Lbr 168,181.82
46 Kaca polos 3 mm M2 570,710.00
47 Kaca polos 5 mm M2 834,545.45
48 Kaca polos 8 mm M2 1,000,154.91
49 Kaca buram 3 mm M2 570,710.00
50 Kaca buram 5 mm M2 834,545.45
51 Cermin 5 mm M2 454,545.45
52 Kaca naco 7 daun Set 290,909.09
53 Kawat harmonika M2 78,545.45
54 Silikon / silent Tube 101,430.00
55 Atap Zincallum (sakuraroof) Lbr 77,181.82
56 Nok Zincalium M' 73,636.36
57 Atap Seng Gelombang BJLS 30 Lbr 115,772.73
58 Seng Plat BJLS 30 Lbr 61,854.55
59 Paku biasa Kg. 28,145.45
60 Paku Seng Kg. 34,363.64
61 Paku Skrup Dos 343,636.36
62 Paku tripleks Kg. 32,007.27
63 Tegel keramik 20x25 Bh. 12,284.98
64 Tegel keramik 10x20 Bh. 8,547.37
65 Tegel keramik 20x20 Bh. 10,192.00
66 Tegel keramik 30x30 Bh. 26,623.14
67 Tegel keramik 40x40 Bh 55,151.52
68 Tegel keramik 60x60 Bh. 223,363.64
69 List dinding keramik Bh. 6,698.79
70 Kloset Jongkok KIA Bh. 466,363.64
71 Klosed duduk Set 2,945,454.55
72 Urinoir Set 2,179,074.55
73 Wastafel 2 lubang Bh 981,818.18
74 Wastafel keramik Bh 1,374,545.45
75 Bak Fiberglass Bh. 785,454.55
76 Bak mandi sudut (Fiberglass) Bh 0.00
77 Bak penampungan (fiber 500 ltr) Bh. 2,315,454.55
78 Bak penampungan (fiber 1000 ltr) Bh. 3,344,545.45
79 Bak penampungan (fiber 2000 ltr) Bh. 6,689,090.91
1 2 3 4
80 Bak cuci Alminium Bh. 0.00
81 Saringan Air Bersih Unt 0.00
82 Cat Minyak Kg. 44,181.82
83 Teak oil Ltr 71,181.82
84 Vernis Kg. 71,181.82
85 Politur Ltr 66,272.73
86 Politur jadi Kg. 66,272.73
87 Plamur Kg. 64,615.91
88 Cat Tembok Kg. 70,331.56
89 Minyak Cat Ltr 44,734.09
90 Cat meni Kg. 59,645.45
91 Residu Ltr 22,367.05
92 Dempul Kg. 64,615.91
93 Batu apung Kg. 0.00
94 Kuas Bh. 14,911.36
95 Kertas gosok / amplas Lbr 4,970.45
96 Kunci Tanam + door holder Set 0.00
97 Kunci Tanam Royal besar Set 173,965.91
98 Kunci Tanam Royal kecil Set 84,497.73
99 Kunci Pintu Aluminium Set 193,786.43
100 Engsel Jendela Aluminium Set 96,893.22
99 Engsel Pintu Set 54,675.00
100 Engsel Jendela Set 37,278.41
101 Engsel Angin Set 0.00
102 Kait Angin Set 0.00
103 Grendel pintu Psg 0.00
104 Grendel jendela Psg 0.00
105 Grendel Aluminium Psg 0.00
105 Door Holder Set 0.00
106 Water drain + Asesories Set 99,409.09
107 Afta kran Bh. 49,704.55
108 Stop kran 3/4" Bh. 49,704.55
109 Floor drain Bh. 69,954.55
110 Shower Kran Bh. 1,453,398.19
110 Jet washer Bh. 0.00
111 Pipa GIP 3 " M 0.00
112 Pipa GIP 2 " M 99,853.98
113 Pipa GIP 1.5 " M 0.00
114 Pipa GIP 1 " M 0.00
115 Pipa GIP 3/4 " M 0.00
116 Pipa GIP 1/2 " M 0.00
117 Pipa PVC 1/2 " M 17,396.59
118 Pipa PVC 3/4 " M 21,124.43
119 Pipa PVC 1 " M 26,094.89
120 Pipa PVC 1,5 " M 37,278.41
121 Pipa PVC 2 " M 43,491.48
122 Pipa PVC 2,5 " M 44,734.09
123 Pipa PVC 3 " M 73,314.20
124 Pipa PVC 4 " M 105,622.16
125 Ijuk Ikat 0.00
126 Minyak Bekisting Kg. 18,409.09
127 Seal tip Bh. 12,886.36
128 Lem kayu Kg. 74,556.82
129 Besi Strip 30.3 M' 19,102.50
130 Baut Mur Bh. 4,844.68
131 Angker Bh. 0.00
132 Lampu XL 18 watt Set 67,101.14
133 Lampu XL 20 watt Set 81,205.74
134 Mangkuk downlight lengkap Bh. 96,882.17
135 Lampu tanam downlight SL 20 watt Bh. 165,031.02
136 Lampu TL 2x40 Watt + kisi-kisi + ram Set 813,902.99
137 Lampu dinding Set 484,466.07
138 Lampu TL 1x40 watt Set 223,670.45
139 Lampu TL 1x20 watt Set 173,965.91
140 Bolam pijar Bh. 19,881.82
141 Sakelar tunggal Bh. 24,852.27
142 Sakelar ganda Bh. 29,822.73
1 2 3 4

143 Stop Kontak Bh. 29,822.73


144 Sekring Box 2 group Set 208,759.09
145 Sekring Box 1 group Set 124,261.36
146 Kabel NYM 2x2.5 M' 13,585.91
147 Kabel NYM 3x4 M' 12,859.56
148 Kabel NYM 4x4 M' 14,734.92
149 Kabel NYM 4x6 M' 19,646.55
150 Kebel NYM 3x2.5 M' 14,322.27
151 Kabel NYM 2x1.5 M' 11,045.45
152 Profil Aluminium untuk kusen setara YKK Brown + profil pengumci din M' 121,116.52
153 Fitting broco Bh. 29,822.73
154 Limit Bh. 114,320.45
155 Tralis jendela M2 0.00

DAFTAR UPAH
HARGA
NO. URAIAN SAT. SATUAN
(Rp.)

1 Mandor Org./Hr. 263,000.00


2 Kepala Tukang Org./Hr. 242,363.63
3 Tukang kayu Org./Hr. 197,250.00
4 Tukang batu Org./Hr. 197,250.00
5 Tukang besi Org./Hr. 197,250.00
6 Tukang listrik Org./Hr. 197,250.00
7 Tukang cat Org./Hr. 197,250.00
8 Tukang pipa Org./Hr. 197,250.00
9 Tukang las Org./Hr. 197,250.00
10 Operator Org./Hr. 433,950.00
11 Pemb. Operator Org./Hr. 210,400.00
12 Sopir terampil Org./Hr. 263,000.00
13 Pembantu sopir Org./Hr. 157,338.84
14 Buruh tidak terampil / pekerja Org./Hr. 137,477.27
15 Buruh terampil Org./Hr. 151,225.00
16 Buruh semi terampil Org./Hr. 142,975.20
BAHAN DAN UPAH

KETERANGAN

5
5
5

KETERANGAN

Anda mungkin juga menyukai