SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS

KEMENTERIAN PUPERA - 2015

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
I. BIAYA LANGSUNG PERSONIL

HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)

1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000

TOTAL BIAYA 1,564,600,000

455412889.xlsx 1 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)

1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 1,585,081,000
2.1. Biaya Survey ke Perbatasan Kalimantan Timur (Jakarta-Balikpapan, PP)
2.1.1. Tiket pesawat (Jakarta - Balikpapan) ### org x 1 kali Org-Kali 19 3,797,000 72,143,000
2.1.2. Transport Balikpapan - Samarinda ### org x 1 kali Org-Kali 19 1,000,000 19,000,000
2.1.3. Tiket pesawat Samarinda - Sendawar (Melak) ### org x 1 kali Org-Kali 19 1,200,000 22,800,000
2.1.4. Perjalanan darat Sendawar (Melak) - Tering ### org x 1 kali Org-Kali 19 1,200,000 22,800,000
2.1.5. Spead Boat Tering - Long Apari ### org x 1 kali Org-Kali 19 5,000,000 95,000,000
2.1.6. Penginapan ### org x 1 kali x 12 hari Org-Hari 228 550,000 125,400,000
2.1.7. Uang harian ### org x 1 kali x 13 hari Org-Hari 247 430,000 106,210,000
2.2. Biaya Pengawasan Berkala (Jakarta-Balikpapan, PP)
2.2.1. Tiket pesawat (Jakarta - Balikpapan) 4 org x 16 kali Org-Kali 64 3,797,000 243,008,000
2.2.2. Transport Balikpapan - Samarinda 4 org x 16 kali Org-Kali 64 1,000,000 64,000,000
2.2.3. Tiket pesawat Samarinda - Sendawar (Melak) 4 org x 16 kali Org-Kali 64 1,200,000 76,800,000
2.2.4. Perjalanan darat Sendawar (Melak) - Tering 4 org x 16 kali Org-Kali 64 1,200,000 76,800,000
2.2.5. Spead Boat Tering - Long Apari 4 org x 16 kali Org-Kali 64 5,000,000 320,000,000
2.2.6. Penginapan 4 org x 16 kali x 5 hari Org-Hari 320 550,000 176,000,000
2.2.7. Uang harian 4 org x 16 kali x 6 hari Org-Hari 384 430,000 165,120,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 98,435,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Balikpapan) 5 org x 1 kali Org-Kali 5 3,797,000 18,985,000
2.2.2. Transport Balikpapan - Samarinda 5 org x 1 kali Org-Kali 5 1,000,000 5,000,000
2.2.3. Tiket pesawat Samarinda - Sendawar (Melak) 5 org x 1 kali Org-Kali 5 1,200,000 6,000,000
2.2.4. Perjalanan darat Sendawar (Melak) - Tering 5 org x 1 kali Org-Kali 5 1,200,000 6,000,000
2.2.5. Spead Boat Tering - Long Apari 5 org x 1 kali Org-Kali 5 5,000,000 25,000,000
4.1.3. Penginapan 5 org x 1 kali x 5 hari Org-Kali 25 550,000 13,750,000
4.1.4. Uang harian 5 org x 1 kali x 6 hari Org-Hari 30 430,000 12,900,000
4.1.6. Penggandaan materi ### org x 1 set set 20 75,000 1,500,000
4.1.7. Pembuatan spanduk 1 bh x 1 kali bh 1 500,000 500,000
4.1.8. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 20 335,000 6,700,000
4.1.9. Uang harian peserta rapat 20 org x 1 kali Org-Hari 20 105,000 2,100,000
5 SONDIR DAN BORING 104,500,000
5.1. Sondir dan Boring LS 1 100,000,000 100,000,000
5.2. Laporan Sondir dan Boring LS 1 4,500,000 4,500,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 1,902,251,000

455412889.xlsx 2 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
SEBATIK TENGAH KAB. NUNUKAN
LOKASI : KAB. SAMBAS PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2015
REKAPITULASI

TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)

1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.45%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,342,000 38.55%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 739,741,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 72,366,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000

TOTAL 2,545,942,000 100%


PPn (10%) 254,594,200

GRAND TOTAL 2,800,536,200

PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus

Ir. Juhari Sianturi, MT


NIP. 19611222 199203 1001

455412889.xlsx 3 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
SEBATIK TENGAH KAB. NUNUKAN
LOKASI : KAB. SAMBAS PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2015
I. BIAYA LANGSUNG PERSONIL

HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)

1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000

TOTAL BIAYA 1,564,600,000

455412889.xlsx 4 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
SEBATIK TENGAH KAB. NUNUKAN
LOKASI : KAB. SAMBAS PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2015
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)

1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 739,741,000
2.1. Biaya Survey ke Perbatasan Kalimantan Timur (Jakarta-Balikpapan, PP)
2.1.1. Tiket pesawat (Jakarta - Balikpapan) ### org x 1 kali Org-Kali 19 3,797,000 72,143,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 550,000 73,150,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 800,000 19,200,000
2.2. Biaya Pengawasan Berkala (Jakarta-Balikpapan, PP)
2.2.1. Tiket pesawat (Jakarta - Balikpapan) 4 org x 16 kali Org-Kali 64 3,797,000 243,008,000
2.2.2. Penginapan 4 org x 16 kali x 3 hari Org-Hari 192 550,000 105,600,000
2.2.3. Uang harian 4 org x 16 kali x 4 hari Org-Hari 256 430,000 110,080,000
2.2.4. Sewa mobil 1 unit x 16 kali x 4 hari Unit-Hari 64 800,000 51,200,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 72,366,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Balikpapan) 8 org x 1 kali Org-Kali 8 3,797,000 30,376,000
4.1.2. Penginapan 8 org x 1 kali x 3 hari Org-Kali 24 550,000 13,200,000
4.1.3. Uang harian 8 org x 1 kali x 4 hari Org-Hari 32 430,000 13,760,000
4.1.4. Sewa mobil 1 unit x 4 hari Unit-Hari 4 800,000 3,200,000
4.1.5. Penggandaan materi ### org x 1 set set 22 75,000 1,650,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 22 335,000 7,370,000
4.1.8. Uang harian peserta rapat 22 org x 1 kali Org-Hari 22 105,000 2,310,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,342,000

455412889.xlsx 5 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
ENTIKONG KAB. SANGGAU
LOKASI : KAB. SANGGAU PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN 2015
REKAPITULASI

TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)

1 2 3
I BIAYA LANGSUNG PERSONIL 3,564,900,000 64.28%
1.1. TEAM LEADER 144,900,000
1.2. TIM TENAGA AHLI 1,398,600,000
1.3. TENAGA PENDUKUNG 2,021,400,000
II BIAYA LANGSUNG NON PERSONIL 1,981,243,000 35.72%
1 BIAYA KANTOR 45,300,000
2 SURVEY DAN PENGAWASAN BERKALA 1,660,203,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 55,040,000
4 PRESENTASI/EXPOSE 66,825,000
5 SONDIR DAN BORING 115,000,000
6 PELAPORAN 38,875,000

TOTAL 5,546,143,000 100%


PPn (10%) 554,614,300

GRAND TOTAL 6,100,757,300

PEMBULATAN 6,100,000,000
6,100,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus

Ir. Juhari Sianturi, MT


NIP. 19611222 199203 1001

455412889.xlsx 6 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
ENTIKONG KAB. SANGGAU
LOKASI : KAB. SANGGAU PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN 2015
I. BIAYA LANGSUNG PERSONIL

HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)

1 2 3 4 4 5 6
1 TENAGA AHLI 3,564,900,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 2 6 16,650,000 199,800,000
1.2.2. Arsitektur Orang-Bulan 2 6 16,650,000 199,800,000
1.2.3. Lansekap Orang-Bulan 2 6 16,650,000 199,800,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 2 6 16,650,000 199,800,000
1.2.5. Lingkungan Orang-Bulan 2 6 16,650,000 199,800,000
1.2.6. Planologi Orang-Bulan 2 6 16,650,000 199,800,000
1.2.7. Geodesi Orang-Bulan 2 6 16,650,000 199,800,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 3 6 9,400,000 169,200,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 3 6 9,400,000 169,200,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 3 6 9,400,000 169,200,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 3 6 9,400,000 169,200,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 3 6 9,400,000 169,200,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 3 6 9,400,000 169,200,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 2 6 9,400,000 112,800,000
1.3.8. Estimator Orang-Bulan 6 6 9,400,000 338,400,000
1.3.9. Tenaga Surveyor Orang-Bulan 6 5 7,000,000 210,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 6 6 7,600,000 273,600,000
1.3.11. Operator Komputer Orang-Bulan 1 6 7,600,000 45,600,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000

TOTAL BIAYA 3,564,900,000

455412889.xlsx 7 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
ENTIKONG KAB. SANGGAU
LOKASI : KAB. SANGGAU PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN 2015
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)

1 2 3 4 5 6 7
1 BIAYA KANTOR 45,300,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 6 unit x 1 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. GPS 6 unit x 1 bulan unit-bulan 6 700,000 4,200,000
2 SURVEY DAN PENGAWASAN BERKALA 1,660,203,000
2.1. Biaya Survey ke Perbatasan Kalimantan Barat (Jakarta-Pontianak, PP)
2.1.1. Tiket pesawat (Jakarta - Pontianak) ### org x 1 kali Org-Kali 53 2,781,000 147,393,000
2.1.3. Penginapan ### org x 1 kali x 7 hari Org-Hari 371 430,000 159,530,000
2.1.4. Uang harian ### org x 1 kali x 8 hari Org-Hari 424 380,000 161,120,000
2.1.5. Sewa mobil 8 unit x 1 kali x 8 hari Unit-Hari 64 750,000 48,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Pontianak, PP)
2.2.1. Tiket pesawat (Jakarta - Balikpapan) ### org x 16 kali Org-Kali 160 2,781,000 444,960,000
2.2.2. Penginapan ### org x 16 kali x 4 hari Org-Hari 640 430,000 275,200,000
2.2.3. Uang harian ### org x 16 kali x 5 hari Org-Hari 800 380,000 304,000,000
2.2.4. Sewa mobil 2 unit x 16 kali x 5 hari Unit-Hari 160 750,000 120,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 55,040,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 32 250,000 8,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 32 50,000 1,600,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 32 130,000 4,160,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 64 250,000 16,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 64 50,000 3,200,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 64 130,000 8,320,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 32 250,000 8,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 32 50,000 1,600,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 32 130,000 4,160,000
4 PRESENTASI/EXPOSE 66,825,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Pontianak) 8 org x 1 kali Org-Kali 8 2,781,000 22,248,000
4.1.3. Penginapan 8 org x 1 kali x 4 hari Org-Kali 32 430,000 13,760,000
4.1.4. Uang harian 8 org x 1 kali x 5 hari Org-Hari 40 380,000 15,200,000
4.1.5. Sewa mobil 1 unit x 5 hari Unit-Hari 5 750,000 3,750,000
4.1.6. Penggandaan materi ### org x 1 set set 27 75,000 2,025,000
4.1.7. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.8. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 27 251,000 6,777,000
4.1.9. Uang harian peserta rapat 27 org x 1 kali Org-Hari 27 95,000 2,565,000
5 SONDIR DAN BORING 115,000,000
5.1. Sondir dan Boring LS 1 100,000,000 100,000,000
5.2. Laporan Sondir dan Boring LS 1 15,000,000 15,000,000
6 PELAPORAN 38,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 3,000,000 15,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 1,981,243,000

455412889.xlsx 8 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
ARUK (SANJINGAN BESAR) KAB. SAMBAS
LOKASI : KAB. SAMBAS PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN 2015
REKAPITULASI

TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)

1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.46%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,127,000 38.54%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 757,869,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 54,023,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000

TOTAL 2,545,727,000 100%


PPn (10%) 254,572,700

GRAND TOTAL 2,800,299,700

PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus

Ir. Juhari Sianturi, MT


NIP. 19611222 199203 1001

455412889.xlsx 9 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
ARUK (SANJINGAN BESAR) KAB. SAMBAS
LOKASI : KAB. SAMBAS PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN 2015
I. BIAYA LANGSUNG PERSONIL

HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)

1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000

TOTAL BIAYA 1,564,600,000

455412889.xlsx 10 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
ARUK (SANJINGAN BESAR) KAB. SAMBAS
LOKASI : KAB. SAMBAS PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN 2015
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)

1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 757,869,000
2.1. Biaya Survey ke Perbatasan Kalimantan Barat (Jakarta-Pontianak, PP)
2.1.1. Tiket pesawat (Jakarta - Pontianak) ### org x 1 kali Org-Kali 19 2,781,000 52,839,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 430,000 57,190,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 380,000 57,760,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 750,000 18,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Pontianak, PP)
2.2.1. Tiket pesawat (Jakarta - Pontianak) 5 org x 16 kali Org-Kali 80 2,781,000 222,480,000
2.2.2. Penginapan 5 org x 16 kali x 4 hari Org-Hari 320 430,000 137,600,000
2.2.3. Uang harian 5 org x 16 kali x 5 hari Org-Hari 400 380,000 152,000,000
2.2.4. Sewa mobil 1 unit x 16 kali x 5 hari Unit-Hari 80 750,000 60,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 54,023,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Pontianak) 6 org x 1 kali Org-Kali 6 2,781,000 16,686,000
4.1.2. Penginapan 6 org x 1 kali x 4 hari Org-Kali 24 430,000 10,320,000
4.1.3. Uang harian 6 org x 1 kali x 5 hari Org-Hari 30 380,000 11,400,000
4.1.4. Sewa mobil 1 unit x 5 hari Unit-Hari 5 750,000 3,750,000
4.1.5. Penggandaan materi ### org x 1 set set 27 75,000 2,025,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 27 251,000 6,777,000
4.1.8. Uang harian peserta rapat 27 org x 1 kali Org-Hari 27 95,000 2,565,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,127,000

455412889.xlsx 11 dari 28
I. BIAYA LANGSUNG PERSONIL

KEBUTUHAN PERSONIL
KONSULTAN TEKNIK PENGENDALIAN KEGIATAN PSPPOP WILAYAH TIMUR
DATA CALON TA & ASISTEN TA
Pengalaman
Pendidikan Pengalaman Berkas
No TA & Asisten Lokasi Penugasan Pendidikan Jurusan SKA (Tahun) Alamat Rumah / Tempat CV
**) Nama Perguruan Tinggi / Bekerja No HP Alamat Email Ijazah, dll
Tinggal Sekarang S1 / D3 Jurusan (Ada / Tdk)
Th. Lulus (Tahun) (Ada / Tdk)

1 TENAGA AHLI
A Penugasan Pusat
Madya
1.1 Team Leader / Ahli Manajemen Proyek Jakarta S2 Arsitek/Sipil/MP 5 TH
(601 atau 602)
1.2 Tenaga Ahli Sipil Jakarta S1 Sipil Muda (201) 5 TH
1.3 Tenaga Ahli Arsitektur Jakarta S1 Arsitektur Muda (102) 5 TH
Muda
1.4 Tenaga Ahli Mekanikal Elektrikal Jakarta S1 Teknik Mesin/Elektro 5 TH
(301 atau 401)
1.5 Tenaga Ahli Manajemen Kontrak Jakarta S1 Teknik/Hukum - 5 TH
B Penugasan Provinsi
1.1 Tenaga Ahli Sipil Sulawesi Utara S1 Sipil Muda (201) 4 TH
1.2 Tenaga Ahli Sipil Sulawesi Tengah S1 Sipil Muda (201) 4 TH
1.3 Tenaga Ahli Sipil Sulawesi Tenggara S1 Sipil Muda (201) 4 TH
1.4 Tenaga Ahli Sipil Sulawesi Selatan S1 Sipil Muda (201) 4 TH
1.5 Tenaga Ahli Sipil Sulawesi Barat S1 Sipil Muda (201) 4 TH
1.6 Tenaga Ahli Sipil Gorontalo S1 Sipil Muda (201) 4 TH
1.7 Tenaga Ahli Sipil Maluku S1 Sipil Muda (201) 4 TH
1.8 Tenaga Ahli Sipil Maluku Utara S1 Sipil Muda (201) 4 TH
1.9 Tenaga Ahli Sipil Papua S1 Sipil Muda (201) 4 TH
1.10 Tenaga Ahli Sipil Papua Barat S1 Sipil Muda (201) 4 TH

2 C ASISTEN TENAGA AHLI


2.1 Asisten Tenaga Ahli Sulawesi Utara S1/D3 Arsitektur - 2 TH
2.2 Asisten Tenaga Ahli Sulawesi Tengah S1/D3 Arsitektur - 2 TH
2.3 Asisten Tenaga Ahli Sulawesi Tenggara S1/D3 Arsitektur - 2 TH
2.4 Asisten Tenaga Ahli Sulawesi Selatan S1/D3 Arsitektur - 2 TH
2.5 Asisten Tenaga Ahli Sulawesi Barat S1/D3 Arsitektur - 2 TH
2.6 Asisten Tenaga Ahli Gorontalo S1/D3 Arsitektur - 2 TH
2.7 Asisten Tenaga Ahli Maluku S1/D3 Arsitektur - 2 TH
2.8 Asisten Tenaga Ahli Maluku Utara S1/D3 Arsitektur - 2 TH
2.9 Asisten Tenaga Ahli Papua S1/D3 Arsitektur - 2 TH
2.10 Asisten Tenaga Ahli Papua Barat S1/D3 Arsitektur - 2 TH
**)
CATATAN ; Kode SKA :
*) Agar berkas (CV, Scan Ijazah, KTP, NPWP, Refrensi Kerja, dll), di email ke : ktpwiltim@gmail.com DAN gitosby02@gmail.com Kode SKA (601) = Manajemen Konstruksi
Paling lambat tgl. 20 Juli 2019 Jam 24.00 WIB Kode SKA (602) = Ahli Manajemen Proyek
Kode SKA (201) = Ahli Teknik Bangunan Gedung
**) Pengalaman Kerja di bidang Manajemen Proyek terkait konstruksi bangunan gedung atau konsultan manajemen dibidang ke-Cipta Karya-an Kode SKA (102) = Arsitektur, subklasifikasi Arsitek
Kode SKA (301) = Mekanikal, subklasifikasi SKA Mekanikal
PT. Surya Abadi Konsultan Kode SKA (401) = Teknik Tenaga Listrik

Sugito
HP/WA : 081 2563 82 123 / 087 8180 72 123
II. BIAYA LANGSUNG NON PERSONIL

HARGA SATUAN Index


NO. URAIAN SATUAN VOL TOTAL (Rp.)
(RP.) Provinsi

1 2 3 4 5 6

1 BIAYA KANTOR 367,000,000


1.1. Biaya Oprasional dan Peralatan Kantor
1.1.1 Sewa Laptop (Tenaga Ahli) 13 unit x 4 bulan Unit-Bulan 52 2,000,000 1.000 104,000,000
1.1.2 Sewa Komputer Desk Top (Asisten Ahli & Pendukung) 12 unit x 4 bulan Unit-Bulan 48 1,250,000 1.000 60,000,000
1.1.3 Sewa Printer Color A-3 2 unit x 4 bulan Unit-Bulan 8 950,000 1.000 7,600,000
1.1.4 Sewa Scanner A-3 2 unit x 4 bulan Unit-Bulan 8 600,000 1.000 4,800,000
1.1.5 Sewa Digital Camera 4 unit x 4 bulan Unit-Bulan 16 500,000 1.000 8,000,000
1.1.6 Sewa Kendaraan Roda 4 (termasuk O&M) 2 unit x 4 bulan Unit-Bulan 8 14,950,000 1.000 119,600,000
1.1.7 Biaya komunikasi dan Internet (termasuk pemasangan) 1 unit x 4 bulan Bulan 4 7,750,000 1.000 31,000,000
1.1.8 Biaya kantor (office comsumable) 4 bulan Bulan 4 8,000,000 1.000 32,000,000

2 BIAYA PELAKSANAAN KEGIATAN 319,340,000


2.1 KEGIATAN RAKORNIS
2.1.1 Rakornis Pembahsan Program di Pusat (3 kali per pulau)
a. Paket Meeting Fullboard 30 Org x 3 kali x 2 Hari Orang-Hari 180 1,197,000 1.000 215,460,000
b. Penggandaan Materi 30 Org x 3 Set x 2 Hari Set 180 50,000 1.000 9,000,000
c. Honor Narasumber Eselon III kebawah 3 Org x 3 kali x 2 Jam Orang-Jam 18 900,000 1.000 16,200,000
d. Honor Moderator 1 Org x 3 kali Orang-Kali 3 700,000 1.000 2,100,000
e. Laporan Pelaksanaan / Proceding 5 exs x 3 kali Eksemplar 15 100,000 1.000 1,500,000
f. Materi Kits 30 Org x 3 kali Set 90 500,000 1.000 45,000,000

2.2 RAPAT PEMBAHASAN


2.2.1 Rapat Pembahasan Laporan Pendahuluan
a. Konsumsi Rapat (Snack & Makan Siang) 20 Org x 1 kali x 1 Hari Orang-Hari 20 69,000 1.000 1,380,000
b. Penggandaan Materi/Bahan paparan 20 Org x 1 Set Set 20 25,000 1.000 500,000
2.2.2 Rapat Pembahasan Laporan Mingguan
a. Konsumsi Rapat (Snack & Makan Siang) 20 Org x 12 kali x 1 Hari Orang-Hari 240 69,000 1.000 16,560,000
b. Penggandaan Materi/Bahan paparan 20 Org x 12 Set Set 240 25,000 1.000 6,000,000
2.2.3 Rapat Pembahasan Laporan Bulanan
a. Konsumsi Rapat (Snack & Makan Siang) 20 Org x 2 kali x 1 Hari Orang-Hari 40 69,000 1.000 2,760,000
b. Penggandaan Materi/Bahan paparan 20 Org x 2 Set Set 40 25,000 1.000 1,000,000
2.2.1 Rapat Pembahasan Laporan Akhir
a. Konsumsi Rapat (Snack & Makan Siang) 20 Org x 1 kali x 1 Hari Orang-Hari 20 69,000 1.000 1,380,000
b. Penggandaan Materi/Bahan paparan 20 Org x 1 Set Set 20 25,000 1.000 500,000

3 MONITORING PENGENDALIAN KEGIATAN DI PROVINSI 100,310,000


3.1 Banten
a. Penginapan 1 Org x 1 kali x 3 Hari Orang-Hari 3 718,000 1.000 2,154,000
3.2 Jawa Barat
a. Penginapan 1 Org x 1 kali x 3 Hari Orang-Hari 3 570,000 1.000 1,710,000
3.3 Jawa Tengah
a. Tiket Pesawat (Jkt-Smrg-Jkt) 1 Org x 1 kali Orang-Kali 1 2,182,000 1.000 2,182,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 2 Hari Orang-Hari 2 486,000 1.000 972,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 3 Hari Unit-Hari 3 1,016,000 1.000 3,048,000
3.4 Jawa DIY
a. Tiket Pesawat (Jkt-Jogja-Jkt) 1 Org x 1 kali Orang-Kali 1 2,268,000 1.000 2,268,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 2 Hari Orang-Hari 2 845,000 1.000 1,690,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 3 Hari Unit-Hari 3 905,000 1.000 2,715,000
3.5 Jawa Jawa Timur
a. Tiket Pesawat (Jkt-Sby-Jkt) 1 Org x 1 kali Orang-Kali 1 2,674,000 1.000 2,674,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 2 Hari Orang-Hari 2 664,000 1.000 1,328,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 3 Hari Unit-Hari 3 966,000 1.000 2,898,000
3.6 Kalimantan Barat
a. Tiket Pesawat (Jkt-Pontianak-Jkt) 1 Org x 1 kali Orang-Kali 1 2,781,000 1.000 2,781,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 3 Hari Orang-Hari 3 538,000 1.000 1,614,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 4 Hari Unit-Hari 4 868,000 1.000 3,472,000
3.7 Kalimantan Tengah
a. Tiket Pesawat (Jkt-Palangkaraya-Jkt) 1 Org x 1 kali Orang-Kali 1 2,984,000 1.000 2,984,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 2 Hari Orang-Hari 2 659,000 1.000 1,318,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 3 Hari Unit-Hari 3 1,177,000 1.000 3,531,000
3.8 Kalimantan Tiimur
a. Tiket Pesawat (Jkt-Balikpapan-Jkt) 1 Org x 1 kali Orang-Kali 1 3,797,000 1.000 3,797,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 3 Hari Orang-Hari 3 804,000 1.000 2,412,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 4 Hari Unit-Hari 4 1,100,000 1.000 4,400,000
3.9 Kalimantan Selatan
a. Tiket Pesawat (Jkt-Banjarmasin-Jkt) 1 Org x 1 kali Orang-Kali 1 2,995,000 1.000 2,995,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 2 Hari Orang-Hari 2 540,000 1.000 1,080,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 3 Hari Unit-Hari 3 778,000 1.000 2,334,000
3.10 Kalimantan Utara
a. Tiket Pesawat (Jkt-Balikpapan-Jkt) 1 Org x 1 kali Orang-Kali 1 3,797,000 1.000 3,797,000
b. Tiket Pesawat (Balikpapan - Tarakan - Balikpapan) 1 Org x 1 kali Orang-Kali 1 2,660,000 1.000 2,660,000
c. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
d. Penginapan 1 Org x 1 kali x 3 Hari Orang-Hari 3 804,000 1.000 2,412,000
e. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 4 Hari Unit-Hari 4 1,100,000 1.000 4,400,000
3.11 Bali
a. Tiket Pesawat (Jkt-Denpasar-Jkt) 1 Org x 1 kali Orang-Kali 1 3,262,000 1.000 3,262,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 2 Hari Orang-Hari 2 910,000 1.000 1,820,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 3 Hari Unit-Hari 3 925,000 1.000 2,775,000
3.12 Nusa Tenggara Barat
a. Tiket Pesawat (Jkt-Mataram-Jkt) 1 Org x 1 kali Orang-Kali 1 3,230,000 1.000 3,230,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 2 Hari Orang-Hari 2 580,000 1.000 1,160,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 3 Hari Unit-Hari 3 882,000 1.000 2,646,000
3.13 Nusa Tenggara Timur
a. Tiket Pesawat (Jkt-Kupang-Jkt) 1 Org x 1 kali Orang-Kali 1 5,081,000 1.000 5,081,000
b. Taksi Menuju Bandara di Jakarta 1 Org x 1 kali Orang-Kali 1 512,000 1.000 512,000
c. Penginapan 1 Org x 1 kali x 3 Hari Orang-Hari 3 550,000 1.000 1,650,000
d. Sewa Kendaraan Roda 4 1 Unit x 1 kali x 4 Hari Unit-Hari 4 857,000 1.000 3,428,000

4 PELAPORAN 122,250,000
4.1. Laporan Pendahuluan 10 buku x 1 kali Buku 10 150,000 1.000 1,500,000
4.2. Laporan Mingguan 10 buku x 12 kali Buku 120 100,000 1.000 12,000,000
4.3. Laporan Bulanan 10 buku x 2 kali Buku 20 100,000 1.000 2,000,000
4.4. Buku Profil Kegiatan 45 buku x 1 kali Buku 45 1,000,000 1.000 45,000,000
4.5. Laporan Executive Summary 15 buku x 1 kali Buku 15 100,000 1.000 1,500,000
4.6. Laporan Akhir 10 buku x 1 kali Buku 10 300,000 1.000 3,000,000
4.7 Laporan Khusus Pelaksanan Kegiatan Wilayah Tengah 25 buku x 3 kali Buku 75 750,000 1.000 56,250,000
4.8 Hard Disk External 1 TB 1 Unit x 1 kali Unit 1 1,000,000 1.000 1,000,000
TOTAL BIAYA LANGSUNG NON PERSONIL: 908,900,000
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
MOTAMASSIN (KOBALIMA TIMUR) KAB. BELU
LOKASI : KAB. KAPUAS HULU PROVINSI NUSA TENGGARA TIMUR
TAHUN ANGGARAN 2015
REKAPITULASI

TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)

1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.46%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,139,000 38.54%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 74,609,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000

TOTAL 2,545,739,000 100%


PPn (10%) 254,573,900

GRAND TOTAL 2,800,312,900

PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus

Ir. Juhari Sianturi, MT


NIP. 19611222 199203 1001

455412889.xlsx 14 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
MOTAMASSIN (KOBALIMA TIMUR) KAB. BELU
LOKASI : KAB. KAPUAS HULU PROVINSI NUSA TENGGARA TIMUR
TAHUN ANGGARAN 2015
I. BIAYA LANGSUNG PERSONIL

HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)

1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000

TOTAL BIAYA 1,564,600,000

455412889.xlsx 15 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
MOTAMASSIN (KOBALIMA TIMUR) KAB. BELU
LOKASI : KAB. KAPUAS HULU PROVINSI NUSA TENGGARA TIMUR
TAHUN ANGGARAN 2015
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)

1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
2.1. Biaya Survey ke Perbatasan NTT (Jakarta-Kupang, PP)
2.1.1. Tiket pesawat (Jakarta - Kupang) ### org x 1 kali Org-Kali 19 5,081,000 96,539,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 662,000 88,046,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 750,000 18,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Kupang, PP)
2.2.1. Tiket pesawat (Jakarta - Kupang) 5 org x 10 kali Org-Kali 50 5,081,000 254,050,000
2.2.2. Penginapan 5 org x 10 kali x 3 hari Org-Hari 150 662,000 99,300,000
2.2.3. Uang harian 5 org x 10 kali x 4 hari Org-Hari 200 430,000 86,000,000
2.2.4. Sewa mobil 1 unit x 10 kali x 4 hari Unit-Hari 40 750,000 30,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 74,609,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Kupang) 7 org x 1 kali Org-Kali 7 5,081,000 35,567,000
4.1.2. Penginapan 7 org x 1 kali x 3 hari Org-Kali 21 662,000 13,902,000
4.1.3. Uang harian 7 org x 1 kali x 4 hari Org-Hari 28 430,000 12,040,000
4.1.4. Sewa mobil 1 unit x 4 hari Unit-Hari 4 750,000 3,000,000
4.1.5. Penggandaan materi ### org x 1 set set 20 75,000 1,500,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 20 305,000 6,100,000
4.1.8. Uang harian peserta rapat 20 org x 1 kali Org-Hari 20 100,000 2,000,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,139,000

455412889.xlsx 16 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
MOTAAIN (KOBALIMA TIMUR) KAB. BELU
LOKASI : KAB. KAPUAS HULU PROVINSI NUSA TENGGARA TIMUR
TAHUN ANGGARAN 2015
REKAPITULASI

TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)

1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.46%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,139,000 38.54%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 74,609,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000

TOTAL 2,545,739,000 100%


PPn (10%) 254,573,900

GRAND TOTAL 2,800,312,900

PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus

Ir. Juhari Sianturi, MT


NIP. 19611222 199203 1001

455412889.xlsx 17 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
MOTAAIN (KOBALIMA TIMUR) KAB. BELU
LOKASI : KAB. KAPUAS HULU PROVINSI NUSA TENGGARA TIMUR
TAHUN ANGGARAN 2015
I. BIAYA LANGSUNG PERSONIL

HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)

1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000

TOTAL BIAYA 1,564,600,000

455412889.xlsx 18 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
MOTAAIN (KOBALIMA TIMUR) KAB. BELU
LOKASI : KAB. KAPUAS HULU PROVINSI NUSA TENGGARA TIMUR
TAHUN ANGGARAN 2015
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)

1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
2.1. Biaya Survey ke Perbatasan NTT (Jakarta-Kupang, PP)
2.1.1. Tiket pesawat (Jakarta - Kupang) ### org x 1 kali Org-Kali 19 5,081,000 96,539,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 662,000 88,046,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 750,000 18,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Kupang, PP)
2.2.1. Tiket pesawat (Jakarta - Kupang) 5 org x 10 kali Org-Kali 50 5,081,000 254,050,000
2.2.2. Penginapan 5 org x 10 kali x 3 hari Org-Hari 150 662,000 99,300,000
2.2.3. Uang harian 5 org x 10 kali x 4 hari Org-Hari 200 430,000 86,000,000
2.2.4. Sewa mobil 1 unit x 10 kali x 4 hari Unit-Hari 40 750,000 30,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 74,609,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Kupang) 7 org x 1 kali Org-Kali 7 5,081,000 35,567,000
4.1.2. Penginapan 7 org x 1 kali x 3 hari Org-Kali 21 662,000 13,902,000
4.1.3. Uang harian 7 org x 1 kali x 4 hari Org-Hari 28 430,000 12,040,000
4.1.4. Sewa mobil 1 unit x 4 hari Unit-Hari 4 750,000 3,000,000
4.1.5. Penggandaan materi ### org x 1 set set 20 75,000 1,500,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 20 305,000 6,100,000
4.1.8. Uang harian peserta rapat 20 org x 1 kali Org-Hari 20 100,000 2,000,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,139,000

455412889.xlsx 19 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
WINI (INSANA UTARA) KAB. TIMUR TENGAH UTARA
LOKASI : KAB. TIMUR TENGAH UTARA PROVINSI NUSA TENGGARA TIMUR
TAHUN ANGGARAN 2015
REKAPITULASI

TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)

1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.46%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,139,000 38.54%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 74,609,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000

TOTAL 2,545,739,000 100%


PPn (10%) 254,573,900

GRAND TOTAL 2,800,312,900

PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus

Ir. Juhari Sianturi, MT


NIP. 19611222 199203 1001

455412889.xlsx 20 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
WINI (INSANA UTARA) KAB. TIMUR TENGAH UTARA
LOKASI : KAB. TIMUR TENGAH UTARA PROVINSI NUSA TENGGARA TIMUR
TAHUN ANGGARAN 2015
I. BIAYA LANGSUNG PERSONIL

HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)

1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000

TOTAL BIAYA 1,564,600,000

455412889.xlsx 21 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
WINI (INSANA UTARA) KAB. TIMUR TENGAH UTARA
LOKASI : KAB. TIMUR TENGAH UTARA PROVINSI NUSA TENGGARA TIMUR
TAHUN ANGGARAN 2015
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)

1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
2.1. Biaya Survey ke Perbatasan NTT (Jakarta-Kupang, PP)
2.1.1. Tiket pesawat (Jakarta - Kupang) ### org x 1 kali Org-Kali 19 5,081,000 96,539,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 662,000 88,046,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 750,000 18,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Kupang, PP)
2.2.1. Tiket pesawat (Jakarta - Kupang) 5 org x 10 kali Org-Kali 50 5,081,000 254,050,000
2.2.2. Penginapan 5 org x 10 kali x 3 hari Org-Hari 150 662,000 99,300,000
2.2.3. Uang harian 5 org x 10 kali x 4 hari Org-Hari 200 430,000 86,000,000
2.2.4. Sewa mobil 1 unit x 10 kali x 4 hari Unit-Hari 40 750,000 30,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 74,609,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Kupang) 7 org x 1 kali Org-Kali 7 5,081,000 35,567,000
4.1.2. Penginapan 7 org x 1 kali x 3 hari Org-Kali 21 662,000 13,902,000
4.1.3. Uang harian 7 org x 1 kali x 4 hari Org-Hari 28 430,000 12,040,000
4.1.4. Sewa mobil 1 unit x 4 hari Unit-Hari 4 750,000 3,000,000
4.1.5. Penggandaan materi ### org x 1 set set 20 75,000 1,500,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 20 305,000 6,100,000
4.1.8. Uang harian peserta rapat 20 org x 1 kali Org-Hari 20 100,000 2,000,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,139,000

455412889.xlsx 22 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
SKOUW (MUARA TAMI) KOTA JAYAPURA
LOKASI : KOTA JAYAPURA PROVINSI PAPUA
TAHUN ANGGARAN 2015
REKAPITULASI

TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)

1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 #REF!
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL #REF! #REF!
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA #REF!
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 88,383,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000

TOTAL #REF! #REF!


PPn (10%) #REF!

GRAND TOTAL #REF!

PEMBULATAN #REF!
3,500,000,000
#REF!
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus

Ir. Juhari Sianturi, MT


NIP. 19611222 199203 1001

455412889.xlsx 23 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
SKOUW (MUARA TAMI) KOTA JAYAPURA
LOKASI : KOTA JAYAPURA PROVINSI PAPUA
TAHUN ANGGARAN 2015
I. BIAYA LANGSUNG PERSONIL

HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)

1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000

TOTAL BIAYA 1,564,600,000

455412889.xlsx 24 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
SKOUW (MUARA TAMI) KOTA JAYAPURA
LOKASI : KOTA JAYAPURA PROVINSI PAPUA
TAHUN ANGGARAN 2015
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)

1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA #REF!
2.1. Biaya Survey ke Perbatasan Jayapura (Jakarta-Jayapura, PP)
2.1.1. Tiket pesawat (Jakarta - Jayapura) ### org x 1 kali Org-Kali 19 8,193,000 155,667,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 460,000 61,180,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 1,000,000 24,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Jayapura, PP)
2.2.1. Tiket pesawat (Jakarta - Jayapura) 5 org x 16 kali Org-Kali 80 8,193,000 655,440,000
2.2.2. Penginapan 5 org x 16 kali x 4 hari Org-Hari 320 460,000 147,200,000
2.2.3. Uang harian 5 org x 16 kali x 5 hari Org-Hari 400 430,000 172,000,000
2.2.4. Sewa mobil 1 unit x 16 kali x 5 hari Unit-Hari 80 1,000,000 80,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 88,383,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Jayapura) 6 org x 1 kali Org-Kali 6 8,193,000 49,158,000
4.1.2. Penginapan 6 org x 1 kali x 4 hari Org-Kali 24 460,000 11,040,000
4.1.3. Uang harian 6 org x 1 kali x 5 hari Org-Hari 30 430,000 12,900,000
4.1.4. Sewa mobil 1 unit x 5 hari Unit-Hari 5 1,000,000 5,000,000
4.1.5. Penggandaan materi ### org x 1 set set 19 75,000 1,425,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 19 300,000 5,700,000
4.1.8. Uang harian peserta rapat 19 org x 1 kali Org-Hari 19 140,000 2,660,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE #REF!

455412889.xlsx 25 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KAB. MERAUKE
LOKASI : KOTA JAYAPURA PROVINSI PAPUA
TAHUN ANGGARAN 2015
REKAPITULASI

TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)

1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 49.15%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 1,618,465,000 50.85%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 1,360,847,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 88,383,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000

TOTAL 3,183,065,000 100%


PPn (10%) 318,306,500

GRAND TOTAL 3,501,371,500

PEMBULATAN 3,500,000,000
3,500,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus

Ir. Juhari Sianturi, MT


NIP. 19611222 199203 1001

455412889.xlsx 26 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KAB. MERAUKE
LOKASI : KOTA JAYAPURA PROVINSI PAPUA
TAHUN ANGGARAN 2015
I. BIAYA LANGSUNG PERSONIL

HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)

1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000

TOTAL BIAYA 1,564,600,000

455412889.xlsx 27 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015

OWNER ESTIMATE (OE)


SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
PAKET PEKERJAAN : MASTERPLAN, SITE PLAN, DED PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KAB. MERAUKE
LOKASI : KOTA JAYAPURA PROVINSI PAPUA
TAHUN ANGGARAN 2015
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)

1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 1,360,847,000
2.1. Biaya Survey ke Perbatasan Jayapura (Jakarta-Jayapura, PP)
2.1.1. Tiket pesawat (Jakarta - Jayapura) ### org x 1 kali Org-Kali 19 8,193,000 155,667,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 460,000 61,180,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 1,000,000 24,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Jayapura, PP)
2.2.1. Tiket pesawat (Jakarta - Jayapura) 5 org x 16 kali Org-Kali 80 8,193,000 655,440,000
2.2.2. Penginapan 5 org x 16 kali x 4 hari Org-Hari 320 460,000 147,200,000
2.2.3. Uang harian 5 org x 16 kali x 5 hari Org-Hari 400 430,000 172,000,000
2.2.4. Sewa mobil 1 unit x 16 kali x 5 hari Unit-Hari 80 1,000,000 80,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 88,383,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Jayapura) 6 org x 1 kali Org-Kali 6 8,193,000 49,158,000
4.1.2. Penginapan 6 org x 1 kali x 4 hari Org-Kali 24 460,000 11,040,000
4.1.3. Uang harian 6 org x 1 kali x 5 hari Org-Hari 30 430,000 12,900,000
4.1.4. Sewa mobil 1 unit x 5 hari Unit-Hari 5 1,000,000 5,000,000
4.1.5. Penggandaan materi ### org x 1 set set 19 75,000 1,425,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 19 300,000 5,700,000
4.1.8. Uang harian peserta rapat 19 org x 1 kali Org-Hari 19 140,000 2,660,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 1,618,465,000

455412889.xlsx 28 dari 28

Anda mungkin juga menyukai