I. BIAYA LANGSUNG PERSONIL
HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)
1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000
455412889.xlsx 1 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
II. BIAYA LANGSUNG NON PERSONIL
HARGA
LUMPSUM
NO. URAIAN SATUAN VOLUME SATUAN TOTAL
(RP.)
(RP.)
1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 1,585,081,000
2.1. Biaya Survey ke Perbatasan Kalimantan Timur (Jakarta-Balikpapan, PP)
2.1.1. Tiket pesawat (Jakarta - Balikpapan) ### org x 1 kali Org-Kali 19 3,797,000 72,143,000
2.1.2. Transport Balikpapan - Samarinda ### org x 1 kali Org-Kali 19 1,000,000 19,000,000
2.1.3. Tiket pesawat Samarinda - Sendawar (Melak) ### org x 1 kali Org-Kali 19 1,200,000 22,800,000
2.1.4. Perjalanan darat Sendawar (Melak) - Tering ### org x 1 kali Org-Kali 19 1,200,000 22,800,000
2.1.5. Spead Boat Tering - Long Apari ### org x 1 kali Org-Kali 19 5,000,000 95,000,000
2.1.6. Penginapan ### org x 1 kali x 12 hari Org-Hari 228 550,000 125,400,000
2.1.7. Uang harian ### org x 1 kali x 13 hari Org-Hari 247 430,000 106,210,000
2.2. Biaya Pengawasan Berkala (Jakarta-Balikpapan, PP)
2.2.1. Tiket pesawat (Jakarta - Balikpapan) 4 org x 16 kali Org-Kali 64 3,797,000 243,008,000
2.2.2. Transport Balikpapan - Samarinda 4 org x 16 kali Org-Kali 64 1,000,000 64,000,000
2.2.3. Tiket pesawat Samarinda - Sendawar (Melak) 4 org x 16 kali Org-Kali 64 1,200,000 76,800,000
2.2.4. Perjalanan darat Sendawar (Melak) - Tering 4 org x 16 kali Org-Kali 64 1,200,000 76,800,000
2.2.5. Spead Boat Tering - Long Apari 4 org x 16 kali Org-Kali 64 5,000,000 320,000,000
2.2.6. Penginapan 4 org x 16 kali x 5 hari Org-Hari 320 550,000 176,000,000
2.2.7. Uang harian 4 org x 16 kali x 6 hari Org-Hari 384 430,000 165,120,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 98,435,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Balikpapan) 5 org x 1 kali Org-Kali 5 3,797,000 18,985,000
2.2.2. Transport Balikpapan - Samarinda 5 org x 1 kali Org-Kali 5 1,000,000 5,000,000
2.2.3. Tiket pesawat Samarinda - Sendawar (Melak) 5 org x 1 kali Org-Kali 5 1,200,000 6,000,000
2.2.4. Perjalanan darat Sendawar (Melak) - Tering 5 org x 1 kali Org-Kali 5 1,200,000 6,000,000
2.2.5. Spead Boat Tering - Long Apari 5 org x 1 kali Org-Kali 5 5,000,000 25,000,000
4.1.3. Penginapan 5 org x 1 kali x 5 hari Org-Kali 25 550,000 13,750,000
4.1.4. Uang harian 5 org x 1 kali x 6 hari Org-Hari 30 430,000 12,900,000
4.1.6. Penggandaan materi ### org x 1 set set 20 75,000 1,500,000
4.1.7. Pembuatan spanduk 1 bh x 1 kali bh 1 500,000 500,000
4.1.8. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 20 335,000 6,700,000
4.1.9. Uang harian peserta rapat 20 org x 1 kali Org-Hari 20 105,000 2,100,000
5 SONDIR DAN BORING 104,500,000
5.1. Sondir dan Boring LS 1 100,000,000 100,000,000
5.2. Laporan Sondir dan Boring LS 1 4,500,000 4,500,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 1,902,251,000
455412889.xlsx 2 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)
1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.45%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,342,000 38.55%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 739,741,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 72,366,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000
PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus
455412889.xlsx 3 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)
1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000
455412889.xlsx 4 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 739,741,000
2.1. Biaya Survey ke Perbatasan Kalimantan Timur (Jakarta-Balikpapan, PP)
2.1.1. Tiket pesawat (Jakarta - Balikpapan) ### org x 1 kali Org-Kali 19 3,797,000 72,143,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 550,000 73,150,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 800,000 19,200,000
2.2. Biaya Pengawasan Berkala (Jakarta-Balikpapan, PP)
2.2.1. Tiket pesawat (Jakarta - Balikpapan) 4 org x 16 kali Org-Kali 64 3,797,000 243,008,000
2.2.2. Penginapan 4 org x 16 kali x 3 hari Org-Hari 192 550,000 105,600,000
2.2.3. Uang harian 4 org x 16 kali x 4 hari Org-Hari 256 430,000 110,080,000
2.2.4. Sewa mobil 1 unit x 16 kali x 4 hari Unit-Hari 64 800,000 51,200,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 72,366,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Balikpapan) 8 org x 1 kali Org-Kali 8 3,797,000 30,376,000
4.1.2. Penginapan 8 org x 1 kali x 3 hari Org-Kali 24 550,000 13,200,000
4.1.3. Uang harian 8 org x 1 kali x 4 hari Org-Hari 32 430,000 13,760,000
4.1.4. Sewa mobil 1 unit x 4 hari Unit-Hari 4 800,000 3,200,000
4.1.5. Penggandaan materi ### org x 1 set set 22 75,000 1,650,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 22 335,000 7,370,000
4.1.8. Uang harian peserta rapat 22 org x 1 kali Org-Hari 22 105,000 2,310,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,342,000
455412889.xlsx 5 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)
1 2 3
I BIAYA LANGSUNG PERSONIL 3,564,900,000 64.28%
1.1. TEAM LEADER 144,900,000
1.2. TIM TENAGA AHLI 1,398,600,000
1.3. TENAGA PENDUKUNG 2,021,400,000
II BIAYA LANGSUNG NON PERSONIL 1,981,243,000 35.72%
1 BIAYA KANTOR 45,300,000
2 SURVEY DAN PENGAWASAN BERKALA 1,660,203,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 55,040,000
4 PRESENTASI/EXPOSE 66,825,000
5 SONDIR DAN BORING 115,000,000
6 PELAPORAN 38,875,000
PEMBULATAN 6,100,000,000
6,100,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
455412889.xlsx 6 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)
1 2 3 4 4 5 6
1 TENAGA AHLI 3,564,900,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 2 6 16,650,000 199,800,000
1.2.2. Arsitektur Orang-Bulan 2 6 16,650,000 199,800,000
1.2.3. Lansekap Orang-Bulan 2 6 16,650,000 199,800,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 2 6 16,650,000 199,800,000
1.2.5. Lingkungan Orang-Bulan 2 6 16,650,000 199,800,000
1.2.6. Planologi Orang-Bulan 2 6 16,650,000 199,800,000
1.2.7. Geodesi Orang-Bulan 2 6 16,650,000 199,800,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 3 6 9,400,000 169,200,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 3 6 9,400,000 169,200,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 3 6 9,400,000 169,200,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 3 6 9,400,000 169,200,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 3 6 9,400,000 169,200,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 3 6 9,400,000 169,200,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 2 6 9,400,000 112,800,000
1.3.8. Estimator Orang-Bulan 6 6 9,400,000 338,400,000
1.3.9. Tenaga Surveyor Orang-Bulan 6 5 7,000,000 210,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 6 6 7,600,000 273,600,000
1.3.11. Operator Komputer Orang-Bulan 1 6 7,600,000 45,600,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000
455412889.xlsx 7 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
1 2 3 4 5 6 7
1 BIAYA KANTOR 45,300,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 6 unit x 1 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. GPS 6 unit x 1 bulan unit-bulan 6 700,000 4,200,000
2 SURVEY DAN PENGAWASAN BERKALA 1,660,203,000
2.1. Biaya Survey ke Perbatasan Kalimantan Barat (Jakarta-Pontianak, PP)
2.1.1. Tiket pesawat (Jakarta - Pontianak) ### org x 1 kali Org-Kali 53 2,781,000 147,393,000
2.1.3. Penginapan ### org x 1 kali x 7 hari Org-Hari 371 430,000 159,530,000
2.1.4. Uang harian ### org x 1 kali x 8 hari Org-Hari 424 380,000 161,120,000
2.1.5. Sewa mobil 8 unit x 1 kali x 8 hari Unit-Hari 64 750,000 48,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Pontianak, PP)
2.2.1. Tiket pesawat (Jakarta - Balikpapan) ### org x 16 kali Org-Kali 160 2,781,000 444,960,000
2.2.2. Penginapan ### org x 16 kali x 4 hari Org-Hari 640 430,000 275,200,000
2.2.3. Uang harian ### org x 16 kali x 5 hari Org-Hari 800 380,000 304,000,000
2.2.4. Sewa mobil 2 unit x 16 kali x 5 hari Unit-Hari 160 750,000 120,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 55,040,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 32 250,000 8,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 32 50,000 1,600,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 32 130,000 4,160,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 64 250,000 16,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 64 50,000 3,200,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 64 130,000 8,320,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 32 250,000 8,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 32 50,000 1,600,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 32 130,000 4,160,000
4 PRESENTASI/EXPOSE 66,825,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Pontianak) 8 org x 1 kali Org-Kali 8 2,781,000 22,248,000
4.1.3. Penginapan 8 org x 1 kali x 4 hari Org-Kali 32 430,000 13,760,000
4.1.4. Uang harian 8 org x 1 kali x 5 hari Org-Hari 40 380,000 15,200,000
4.1.5. Sewa mobil 1 unit x 5 hari Unit-Hari 5 750,000 3,750,000
4.1.6. Penggandaan materi ### org x 1 set set 27 75,000 2,025,000
4.1.7. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.8. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 27 251,000 6,777,000
4.1.9. Uang harian peserta rapat 27 org x 1 kali Org-Hari 27 95,000 2,565,000
5 SONDIR DAN BORING 115,000,000
5.1. Sondir dan Boring LS 1 100,000,000 100,000,000
5.2. Laporan Sondir dan Boring LS 1 15,000,000 15,000,000
6 PELAPORAN 38,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 3,000,000 15,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 1,981,243,000
455412889.xlsx 8 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)
1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.46%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,127,000 38.54%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 757,869,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 54,023,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000
PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus
455412889.xlsx 9 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)
1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000
455412889.xlsx 10 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 757,869,000
2.1. Biaya Survey ke Perbatasan Kalimantan Barat (Jakarta-Pontianak, PP)
2.1.1. Tiket pesawat (Jakarta - Pontianak) ### org x 1 kali Org-Kali 19 2,781,000 52,839,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 430,000 57,190,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 380,000 57,760,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 750,000 18,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Pontianak, PP)
2.2.1. Tiket pesawat (Jakarta - Pontianak) 5 org x 16 kali Org-Kali 80 2,781,000 222,480,000
2.2.2. Penginapan 5 org x 16 kali x 4 hari Org-Hari 320 430,000 137,600,000
2.2.3. Uang harian 5 org x 16 kali x 5 hari Org-Hari 400 380,000 152,000,000
2.2.4. Sewa mobil 1 unit x 16 kali x 5 hari Unit-Hari 80 750,000 60,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 54,023,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Pontianak) 6 org x 1 kali Org-Kali 6 2,781,000 16,686,000
4.1.2. Penginapan 6 org x 1 kali x 4 hari Org-Kali 24 430,000 10,320,000
4.1.3. Uang harian 6 org x 1 kali x 5 hari Org-Hari 30 380,000 11,400,000
4.1.4. Sewa mobil 1 unit x 5 hari Unit-Hari 5 750,000 3,750,000
4.1.5. Penggandaan materi ### org x 1 set set 27 75,000 2,025,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 27 251,000 6,777,000
4.1.8. Uang harian peserta rapat 27 org x 1 kali Org-Hari 27 95,000 2,565,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,127,000
455412889.xlsx 11 dari 28
I. BIAYA LANGSUNG PERSONIL
KEBUTUHAN PERSONIL
KONSULTAN TEKNIK PENGENDALIAN KEGIATAN PSPPOP WILAYAH TIMUR
DATA CALON TA & ASISTEN TA
Pengalaman
Pendidikan Pengalaman Berkas
No TA & Asisten Lokasi Penugasan Pendidikan Jurusan SKA (Tahun) Alamat Rumah / Tempat CV
**) Nama Perguruan Tinggi / Bekerja No HP Alamat Email Ijazah, dll
Tinggal Sekarang S1 / D3 Jurusan (Ada / Tdk)
Th. Lulus (Tahun) (Ada / Tdk)
1 TENAGA AHLI
A Penugasan Pusat
Madya
1.1 Team Leader / Ahli Manajemen Proyek Jakarta S2 Arsitek/Sipil/MP 5 TH
(601 atau 602)
1.2 Tenaga Ahli Sipil Jakarta S1 Sipil Muda (201) 5 TH
1.3 Tenaga Ahli Arsitektur Jakarta S1 Arsitektur Muda (102) 5 TH
Muda
1.4 Tenaga Ahli Mekanikal Elektrikal Jakarta S1 Teknik Mesin/Elektro 5 TH
(301 atau 401)
1.5 Tenaga Ahli Manajemen Kontrak Jakarta S1 Teknik/Hukum - 5 TH
B Penugasan Provinsi
1.1 Tenaga Ahli Sipil Sulawesi Utara S1 Sipil Muda (201) 4 TH
1.2 Tenaga Ahli Sipil Sulawesi Tengah S1 Sipil Muda (201) 4 TH
1.3 Tenaga Ahli Sipil Sulawesi Tenggara S1 Sipil Muda (201) 4 TH
1.4 Tenaga Ahli Sipil Sulawesi Selatan S1 Sipil Muda (201) 4 TH
1.5 Tenaga Ahli Sipil Sulawesi Barat S1 Sipil Muda (201) 4 TH
1.6 Tenaga Ahli Sipil Gorontalo S1 Sipil Muda (201) 4 TH
1.7 Tenaga Ahli Sipil Maluku S1 Sipil Muda (201) 4 TH
1.8 Tenaga Ahli Sipil Maluku Utara S1 Sipil Muda (201) 4 TH
1.9 Tenaga Ahli Sipil Papua S1 Sipil Muda (201) 4 TH
1.10 Tenaga Ahli Sipil Papua Barat S1 Sipil Muda (201) 4 TH
Sugito
HP/WA : 081 2563 82 123 / 087 8180 72 123
II. BIAYA LANGSUNG NON PERSONIL
1 2 3 4 5 6
4 PELAPORAN 122,250,000
4.1. Laporan Pendahuluan 10 buku x 1 kali Buku 10 150,000 1.000 1,500,000
4.2. Laporan Mingguan 10 buku x 12 kali Buku 120 100,000 1.000 12,000,000
4.3. Laporan Bulanan 10 buku x 2 kali Buku 20 100,000 1.000 2,000,000
4.4. Buku Profil Kegiatan 45 buku x 1 kali Buku 45 1,000,000 1.000 45,000,000
4.5. Laporan Executive Summary 15 buku x 1 kali Buku 15 100,000 1.000 1,500,000
4.6. Laporan Akhir 10 buku x 1 kali Buku 10 300,000 1.000 3,000,000
4.7 Laporan Khusus Pelaksanan Kegiatan Wilayah Tengah 25 buku x 3 kali Buku 75 750,000 1.000 56,250,000
4.8 Hard Disk External 1 TB 1 Unit x 1 kali Unit 1 1,000,000 1.000 1,000,000
TOTAL BIAYA LANGSUNG NON PERSONIL: 908,900,000
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)
1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.46%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,139,000 38.54%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 74,609,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000
PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus
455412889.xlsx 14 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)
1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000
455412889.xlsx 15 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
2.1. Biaya Survey ke Perbatasan NTT (Jakarta-Kupang, PP)
2.1.1. Tiket pesawat (Jakarta - Kupang) ### org x 1 kali Org-Kali 19 5,081,000 96,539,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 662,000 88,046,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 750,000 18,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Kupang, PP)
2.2.1. Tiket pesawat (Jakarta - Kupang) 5 org x 10 kali Org-Kali 50 5,081,000 254,050,000
2.2.2. Penginapan 5 org x 10 kali x 3 hari Org-Hari 150 662,000 99,300,000
2.2.3. Uang harian 5 org x 10 kali x 4 hari Org-Hari 200 430,000 86,000,000
2.2.4. Sewa mobil 1 unit x 10 kali x 4 hari Unit-Hari 40 750,000 30,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 74,609,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Kupang) 7 org x 1 kali Org-Kali 7 5,081,000 35,567,000
4.1.2. Penginapan 7 org x 1 kali x 3 hari Org-Kali 21 662,000 13,902,000
4.1.3. Uang harian 7 org x 1 kali x 4 hari Org-Hari 28 430,000 12,040,000
4.1.4. Sewa mobil 1 unit x 4 hari Unit-Hari 4 750,000 3,000,000
4.1.5. Penggandaan materi ### org x 1 set set 20 75,000 1,500,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 20 305,000 6,100,000
4.1.8. Uang harian peserta rapat 20 org x 1 kali Org-Hari 20 100,000 2,000,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,139,000
455412889.xlsx 16 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)
1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.46%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,139,000 38.54%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 74,609,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000
PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus
455412889.xlsx 17 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)
1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000
455412889.xlsx 18 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
2.1. Biaya Survey ke Perbatasan NTT (Jakarta-Kupang, PP)
2.1.1. Tiket pesawat (Jakarta - Kupang) ### org x 1 kali Org-Kali 19 5,081,000 96,539,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 662,000 88,046,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 750,000 18,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Kupang, PP)
2.2.1. Tiket pesawat (Jakarta - Kupang) 5 org x 10 kali Org-Kali 50 5,081,000 254,050,000
2.2.2. Penginapan 5 org x 10 kali x 3 hari Org-Hari 150 662,000 99,300,000
2.2.3. Uang harian 5 org x 10 kali x 4 hari Org-Hari 200 430,000 86,000,000
2.2.4. Sewa mobil 1 unit x 10 kali x 4 hari Unit-Hari 40 750,000 30,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 74,609,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Kupang) 7 org x 1 kali Org-Kali 7 5,081,000 35,567,000
4.1.2. Penginapan 7 org x 1 kali x 3 hari Org-Kali 21 662,000 13,902,000
4.1.3. Uang harian 7 org x 1 kali x 4 hari Org-Hari 28 430,000 12,040,000
4.1.4. Sewa mobil 1 unit x 4 hari Unit-Hari 4 750,000 3,000,000
4.1.5. Penggandaan materi ### org x 1 set set 20 75,000 1,500,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 20 305,000 6,100,000
4.1.8. Uang harian peserta rapat 20 org x 1 kali Org-Hari 20 100,000 2,000,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,139,000
455412889.xlsx 19 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)
1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 61.46%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 981,139,000 38.54%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 74,609,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000
PEMBULATAN 2,800,000,000
2,800,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus
455412889.xlsx 20 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)
1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000
455412889.xlsx 21 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 737,295,000
2.1. Biaya Survey ke Perbatasan NTT (Jakarta-Kupang, PP)
2.1.1. Tiket pesawat (Jakarta - Kupang) ### org x 1 kali Org-Kali 19 5,081,000 96,539,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 662,000 88,046,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 750,000 18,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Kupang, PP)
2.2.1. Tiket pesawat (Jakarta - Kupang) 5 org x 10 kali Org-Kali 50 5,081,000 254,050,000
2.2.2. Penginapan 5 org x 10 kali x 3 hari Org-Hari 150 662,000 99,300,000
2.2.3. Uang harian 5 org x 10 kali x 4 hari Org-Hari 200 430,000 86,000,000
2.2.4. Sewa mobil 1 unit x 10 kali x 4 hari Unit-Hari 40 750,000 30,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 74,609,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Kupang) 7 org x 1 kali Org-Kali 7 5,081,000 35,567,000
4.1.2. Penginapan 7 org x 1 kali x 3 hari Org-Kali 21 662,000 13,902,000
4.1.3. Uang harian 7 org x 1 kali x 4 hari Org-Hari 28 430,000 12,040,000
4.1.4. Sewa mobil 1 unit x 4 hari Unit-Hari 4 750,000 3,000,000
4.1.5. Penggandaan materi ### org x 1 set set 20 75,000 1,500,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 20 305,000 6,100,000
4.1.8. Uang harian peserta rapat 20 org x 1 kali Org-Hari 20 100,000 2,000,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 981,139,000
455412889.xlsx 22 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)
1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 #REF!
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL #REF! #REF!
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA #REF!
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 88,383,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000
PEMBULATAN #REF!
3,500,000,000
#REF!
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus
455412889.xlsx 23 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)
1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000
455412889.xlsx 24 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA #REF!
2.1. Biaya Survey ke Perbatasan Jayapura (Jakarta-Jayapura, PP)
2.1.1. Tiket pesawat (Jakarta - Jayapura) ### org x 1 kali Org-Kali 19 8,193,000 155,667,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 460,000 61,180,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 1,000,000 24,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Jayapura, PP)
2.2.1. Tiket pesawat (Jakarta - Jayapura) 5 org x 16 kali Org-Kali 80 8,193,000 655,440,000
2.2.2. Penginapan 5 org x 16 kali x 4 hari Org-Hari 320 460,000 147,200,000
2.2.3. Uang harian 5 org x 16 kali x 5 hari Org-Hari 400 430,000 172,000,000
2.2.4. Sewa mobil 1 unit x 16 kali x 5 hari Unit-Hari 80 1,000,000 80,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 88,383,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Jayapura) 6 org x 1 kali Org-Kali 6 8,193,000 49,158,000
4.1.2. Penginapan 6 org x 1 kali x 4 hari Org-Kali 24 460,000 11,040,000
4.1.3. Uang harian 6 org x 1 kali x 5 hari Org-Hari 30 430,000 12,900,000
4.1.4. Sewa mobil 1 unit x 5 hari Unit-Hari 5 1,000,000 5,000,000
4.1.5. Penggandaan materi ### org x 1 set set 19 75,000 1,425,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 19 300,000 5,700,000
4.1.8. Uang harian peserta rapat 19 org x 1 kali Org-Hari 19 140,000 2,660,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE #REF!
455412889.xlsx 25 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
TOTAL PROSENTASE
NO. URAIAN
(RP.) ( %)
1 2 3
I BIAYA LANGSUNG PERSONIL 1,564,600,000 49.15%
1.1. Team Leader (Sipil/Arsitektur/Planologi) 144,900,000
1.2. Tim Tenaga Ahli 699,300,000
1.3. Tenaga Pendukung: 720,400,000
II BIAYA LANGSUNG NON PERSONIL 1,618,465,000 50.85%
1 BIAYA KANTOR 37,200,000
2 SURVEY DAN PENGAWASAN BERKALA 1,360,847,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
4 PRESENTASI/EXPOSE 88,383,000
5 SONDIR DAN BORING 55,000,000
6 PELAPORAN 28,875,000
PEMBULATAN 3,500,000,000
3,500,000,000
-
Jakarta, Maret 2015
Pejabat Pembuat Komitmen
Pengembangan Kawasan Pemukiman Khusus
Satker Pengembangan Kawasan Pemukiman Khusus
455412889.xlsx 26 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
HARGA TOTAL
NO. URAIAN SATUAN Org VOLUME
SATUAN (RP.) (RP.)
1 2 3 4 4 5 6
1 TENAGA AHLI 1,564,600,000
1.1. Team Leader (Sipil/Arsitektur/Planologi) Orang-Bulan 1 6 24,150,000 144,900,000
1.2. Tim Tenaga Ahli -
1.2.1. Sipil Orang-Bulan 1 6 16,650,000 99,900,000
1.2.2. Arsitektur/Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.3. Lansekap Orang-Bulan 1 6 16,650,000 99,900,000
1.2.4. Mekanikal/Elektrikal Orang-Bulan 1 6 16,650,000 99,900,000
1.2.5. Lingkungan Orang-Bulan 1 6 16,650,000 99,900,000
1.2.6. Planologi Orang-Bulan 1 6 16,650,000 99,900,000
1.2.7. Geodesi Orang-Bulan 1 6 16,650,000 99,900,000
1.3. Tenaga Pendukung: -
1.3.1. Asisten Tenaga Ahli Sipil Orang-Bulan 1 6 9,400,000 56,400,000
1.3.2. Asisten Tenaga Ahli Arsitektur/Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.3. Asisten Tenaga Ahli Lansekap Orang-Bulan 1 6 9,400,000 56,400,000
1.3.4. Asisten Tenaga Ahli Mekanikal/Elektrikal Orang-Bulan 1 6 9,400,000 56,400,000
1.3.5. Asisten Tenaga Ahli Lingkungan Orang-Bulan 1 6 9,400,000 56,400,000
1.3.6. Asisten Tenaga Ahli Planologi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.7. Asisten Tenaga Ahli Geodesi Orang-Bulan 1 6 9,400,000 56,400,000
1.3.8. Estimator Orang-Bulan 2 6 9,400,000 112,800,000
1.3.9. Tenaga Surveyor Orang-Bulan 2 5 7,000,000 70,000,000
1.3.10. Operator CAD/Drafter Orang-Bulan 2 6 7,600,000 91,200,000
1.3.11. Operator Komputer Orang-Bulan 1 6 4,300,000 25,800,000
1.3.12. Tenaga Administrasi Orang-Bulan 1 6 4,300,000 25,800,000
455412889.xlsx 27 dari 28
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
KEMENTERIAN PUPERA - 2015
1 2 3 4 5 6 7
1 BIAYA KANTOR 37,200,000
1.1. Biaya kantor (Sewa):
1.1.1. Printer A3 (colour) 2 unit x 6 bulan unit-bulan 12 250,000 3,000,000
1.1.2. In-focus 1 unit x 6 bulan unit-bulan 6 750,000 4,500,000
1.1.3. Digital Camera 3 unit x 6 bulan unit-bulan 18 200,000 3,600,000
1.2. Komunikasi:
1.2.1. Biaya komunikasi 1 unit x 6 bulan unit-bulan 6 2,000,000 12,000,000
1.3.2. Biaya internet 1 unit x 6 bulan unit-bulan 6 1,000,000 6,000,000
1.3. Sewa Alat survey
1.3.1. Total station 3 unit x 1 bulan unit-bulan 3 2,000,000 6,000,000
1.3.2. GPS 3 unit x 1 bulan unit-bulan 3 700,000 2,100,000
2 SURVEY DAN PENGAWASAN BERKALA 1,360,847,000
2.1. Biaya Survey ke Perbatasan Jayapura (Jakarta-Jayapura, PP)
2.1.1. Tiket pesawat (Jakarta - Jayapura) ### org x 1 kali Org-Kali 19 8,193,000 155,667,000
2.1.2. Penginapan ### org x 1 kali x 7 hari Org-Hari 133 460,000 61,180,000
2.1.3. Uang harian ### org x 1 kali x 8 hari Org-Hari 152 430,000 65,360,000
2.1.4. Sewa mobil 3 unit x 1 kali x 8 hari Unit-Hari 24 1,000,000 24,000,000
2.2. Biaya Pengawasan Berkala (Jakarta-Jayapura, PP)
2.2.1. Tiket pesawat (Jakarta - Jayapura) 5 org x 16 kali Org-Kali 80 8,193,000 655,440,000
2.2.2. Penginapan 5 org x 16 kali x 4 hari Org-Hari 320 460,000 147,200,000
2.2.3. Uang harian 5 org x 16 kali x 5 hari Org-Hari 400 430,000 172,000,000
2.2.4. Sewa mobil 1 unit x 16 kali x 5 hari Unit-Hari 80 1,000,000 80,000,000
3 RAPAT KOORDINASI DAN PEMBAHASAN 48,160,000
3.1. Biaya Pembahasan Laporan Pendahuluan
3.1.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.1.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.1.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
3.2. Biaya Pembahasan Laporan (Preliminary design dan Development Design, Master Plan, & DED)
3.2.1. Paket meeting half day ### org x 2 kali x 1 hari Org-Kali 56 250,000 14,000,000
3.2.2. Penggandaan bahan rapat ### org x 2 set set 56 50,000 2,800,000
3.2.3. Uang harian peserta rapat ### org x 2 kali x 1 hari Org-Hari 56 130,000 7,280,000
3.3. Biaya Pembahasan Laporan Akhir
3.3.1. Paket meeting half day ### org x 1 kali Org-Kali 28 250,000 7,000,000
3.3.2. Penggandaan bahan rapat ### org x 1 set set 28 50,000 1,400,000
3.3.3. Uang harian peserta rapat ### org x 1 kali Org-Hari 28 130,000 3,640,000
4 PRESENTASI/EXPOSE 88,383,000
4.1. Biaya Presentasi/Expose di lokasi kegiatan
4.1.1. Tiket pesawat (Jakarta - Jayapura) 6 org x 1 kali Org-Kali 6 8,193,000 49,158,000
4.1.2. Penginapan 6 org x 1 kali x 4 hari Org-Kali 24 460,000 11,040,000
4.1.3. Uang harian 6 org x 1 kali x 5 hari Org-Hari 30 430,000 12,900,000
4.1.4. Sewa mobil 1 unit x 5 hari Unit-Hari 5 1,000,000 5,000,000
4.1.5. Penggandaan materi ### org x 1 set set 19 75,000 1,425,000
4.1.6. Pembuatan spanduk 1 Bh x 1 kali bh 1 500,000 500,000
4.1.7. Paket fullday meeting ### org x 1 kali x 1 hari Org-Kali 19 300,000 5,700,000
4.1.8. Uang harian peserta rapat 19 org x 1 kali Org-Hari 19 140,000 2,660,000
5 SONDIR DAN BORING 55,000,000
5.1. Sondir dan Boring LS 1 50,000,000 50,000,000
5.2. Laporan Sondir dan Boring LS 1 5,000,000 5,000,000
6 PELAPORAN 28,875,000
6.1. Laporan Pendahuluan 5 exs x 1 kali exs 5 75,000 375,000
6.2. Laporan Antara 5 exs x 1 kali exs 5 100,000 500,000
6.3. Laporan Preliminary Desain 5 exs x 1 kali exs 5 200,000 1,000,000
6.4. Laporan Akhir Sementara 5 exs x 1 kali exs 5 200,000 1,000,000
6.5. Laporan Akhir 5 exs x 1 kali exs 5 200,000 1,000,000
6.6. Gambar DED 5 exs x 1 kali exs 5 1,000,000 5,000,000
6.7. Bill of Quantity, Engineer Estimate & Analisa Harga Satuan 5 exs x 1 kali exs 5 100,000 500,000
6.8. Rencana kerja dan syarat-syarat 5 exs x 1 kali exs 5 100,000 500,000
6.9. 3D Kawasan (kualitas Rendering V ray HD) 1 bh x 1 kali bh 1 15,000,000 15,000,000
6.10. Laporan Executive Summary 5 exs x 1 kali exs 5 100,000 500,000
6.11. Laporan Pengawasan Berkala 5 exs x 5 kali exs 25 100,000 2,500,000
6.12. Hard Disk External 1 TB 1 bh x 1 kali bh 1 1,000,000 1,000,000
TOTAL REIMBURSABLE 1,618,465,000