3.2 0
VOL
KAYU
Jendela Lebar tinggi Luas luas kaca JENDELA VOL daun JENDELA
0 0.0676 0 -0.00078 -0.00078
50 0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
kanan 0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
belakang 0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
wc 0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
dapur 0 0.0676 0 -0.00078 -0.00078
0 0.0676 0 -0.00078 -0.00078
0 1.0816 0 -0.02509
Luas seluruh plong jendela dan pintu beserta loster
Jendela
WC tinggi plong tinggi
3.2 0 1.200 2.000 2.400 pintu
panjang
dinding 3.2 0 Pintu dan 1.500 1.000 1.500 jendela
horizontal 3.2 0 loster 1.500 1.000 1.500 jendela
3.2 0 1.500 1.000 1.500 jendela
3.2 0 1.500 1.000 1.500 jendela
3.2 0 1.500 1.000 1.500 jendela
- plong
-
-
-
-
-
-
- 7.500
72 m3 0 0 M3 8.700 9.900 M3
24 m 8.700 7.000 31.400
kurangi plong) 62.100 Luas Bersih dinding Wc 9.900
0 0 0
ntu beserta loster 0 0
1,250,000 7 178,571
300000 7 42,857
221,429
m3
ANALISA HARGA SATUAN PEKERJAAN
Kegiatan : Bangunan PAUD Ukuran : 5 X 7 m
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
B-01 1 m3 GALIAN TANAH BIASA SEDALAM 1 METER
Pekerja 0.4000 HOK
C PEKERJAAN PONDASI
D PEKERJAAN DINDING
D-01 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps
Bata merah ( 5x11x22 ) cm 70.0000 Bh
Semen PC (50 kg) 0.1936 Zak
Pasir pasang 0.0450 m3
Pekerja 0.3200 HOK
Tukang batu 0.1000 HOK
F PEKERJAAN KAYU
F-03 1 m3 PASANG DAUN JENDELA KACA KAYU GUNUNG KELAS II (Tanpa Kaca)
Papan Strip 3/7 1.2000 m3
Pekerja 6.0000 HOK
Tukang kayu 18.0000 HOK
F-04 1 m3 PASANG KONSTRUKSI KUDA-KUDA KAYU GUNUNG KELAS II
Balok 8/12 1.1000 m3
Besi strip 15.0000 Kg
Paku biasa 2"-5" 0.8000 Kg
Pekerja 4.0000 HOK
Tukang kayu 12.0000 HOK
F-10 1 m' PASANG LISTPLANK UKURAN 3/25 cm, KAYU GUNUNG KELAS II
Papan 3/20 0.0075 m3
Paku biasa 2"-5" 0.0600 Kg
Pekerja 0.1000 HOK
Tukang kayu 0.1000 HOK
G PEKERJAAN BETON
G-01 1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 5 Kr
Semen PC (50 kg) 4.3600 Zak
Pasir beton 0.5200 m3
Koral beton 0.8700 m3
Pekerja 1.6500 HOK
Tukang batu 0.2500 HOK
H-02 1 m2 LANGIT-LANGIT GRC (2.4 X 1.2 )m, RANGKA KAYU GUNUNG KELAS II
Kaso 5/7 0.0120 m3
Paku biasa 0.0600 Kg
Triplek 3 mm 1.1000 Lbr
GRC 2.8800 lbr
Pekerja 0.1800 HOK
Tukang kayu 0.3200 HOK
J PEKERJAAN PENGECATAN
J-01 1 m2 PENGECATAN BIDANG TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis
Plamir ( jarang digunakan ) 0.1000 Kg
Cat dasar 0.1000 Kg
Cat Penutup ( 2 kali ) 0.2600 Kg
Pekerja 0.0200 HOK
Tukang cat 0.0630 HOK
J-02 1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat
Cat meni 0.2000 Kg
Plamir 0.1500 Kg
Cat dasar 0.1700 Kg
Cat Penutup ( 2 kali ) 0.2600 Kg
Pekerja 0.1000 HOK
Tukang cat 0.1000 HOK
8. Lansir
1 Semen 50 Kg 90 zak
Harga Lansir 3,000 zak
Jumlah 271,200
1. Pekerja 0.05 90
2 Pasir pasang 10 m3
Kapasitas angkut 3 truk
Harga Lansir truk
Jumlah -
1. Pekerja - 3
3 Pasir dan split 9 m3
Kapasitas angkut 2 truk
Harga Lansir - truk
Jumlah -
1. Pekerja - 2
4 Bata 4,809 Buah
Harga Lansir 100 Buah
Jumlah 480,900
1. Pekerja 0.0015 4,809
35
3.5 HOK
15.84
6.336 HOK
3.96
0.76032 HOK
3.96
1.98 HOK
11.52
13.82 m3
3.46 HOK
8.40
9.24 m3
22.85 Zak
4.57 m3
12.60 HOK
5.04 HOK
68.7
4809 Bh
13.30032 Zak
3.0915 m3
21.984 HOK
6.87 HOK
137.4
11.87136 Zak
3.0228 m3
27.48 HOK
20.61 HOK
4.80
0.68 Zak
0.10 m3
1.25 HOK
0.96 HOK
284.4
22.752 Zak
40.6692 HOK
30.4308 HOK
0.3843
0.46116 m3
2.3058 HOK
6.9174 HOK
2.4
0.096 m3
1.92 HOK
4.8 HOK
0.49
0.0735 m3
2.94 HOK
8.82 HOK
0.8218
0.903936 m3
12.3264 Kg
0.657408 Kg
3.28704 HOK
9.86112 HOK
0.4608
0.50688 m3
6.912 Kg
0.36864 Kg
1.8432 HOK
5.5296 HOK
49
0.3111111 m3
7.35 Kg
4.9 HOK
4.9 HOK
49
0.0384 m3
7.35 Kg
4.9 HOK
4.9 HOK
9
0.3 m3
1.35 Kg
0.9 HOK
0.9 HOK
49
0.035 m3
4.9 Kg
7.35 HOK
12.25 HOK
36
0.27 m3
2.16 Kg
3.6 HOK
3.6 HOK
tiang
1.68
7.3248 Zak
0.8736 m3
1.4616 m3
2.772 HOK
0.42 HOK
14.4
2.88 Zak
0.3744 m3
0.6336 m3
16.56 HOK
0.288 HOK
1.8
0.0720 m3
2.7000 Kg
0.7200 Ltr
4.2000 Lente
4.0500 Kg
11.6280 Zak
0.9360 m3
1.4040 m3
7.0200 HOK
0.6300 HOK
1.8720 HOK
1.8900 HOK
9.6
0.432 m3
2.88 Kg
0.96 Ltr
2.88 HOK
2.496 HOK
1.0
0.0384 m3
0.384 Kg
0.192 Ltr
0.0144 m3
0.288 HOK
0.3168 HOK
9.6
0.384 m3
3.84 Kg
1.92 Ltr
0.1728 m3
3.072 HOK
3.168 HOK
0.6
8.0 Lente
3.3958333 Lente
1.728 Kg
3.72096 Zak
0.29952 m3
0.44928 m3
2.7936 HOK
0.2016 HOK
0.8064 HOK
0.7
10.00 Lente
3.89 Lente
2.16 Kg
4.65 Zak
0.37 m3
0.56 m3
3.49 HOK
0.25 HOK
1.01 HOK
0.6
8.0 Lente
2.6713889 Lente
1.728 Kg
3.72096 Zak
0.29952 m3
0.44928 m3
2.7936 HOK
0.2016 HOK
0.8064 HOK
48
52.8 m'
0.48 Kg
2.4 HOK
2.4 HOK
35
0.42 m3
2.1 Kg
Lbr
12.152778 lbr
6.3 HOK
11.2 HOK
43.4
43.834 Dus
9.87784 Zak
1.8228 m3
26.908 HOK
15.19 HOK
8.68
0.868 Dus
0.0868 Zak
0.0434 m3
13.02 Kg
5.3816 HOK
144
14.4 Kg
14.4 Kg
37.44 Kg
2.88 HOK
9.072 HOK
0.255
0.051 Kg
0.03825 Kg
0.04335 Kg
0.0663 Kg
0.0255 HOK
0.0255 HOK
1 buah
1 bh
0.06 HOK
0.6 HOK
2
2 bh
0.03 HOK
0.3 HOK
5 buah
5 bh
0.075 HOK
0.75 HOK
5
5 bh
0.075 HOK
0.75 HOK
7.5
8.25 m2
0.1125 HOK
1.125 HOK
0.1125 HOK
0.005625 HOK
72
1800 Bh
10.8 HOK
5.4 HOK
9
45 Bh
1.44 Zak
0.288 m3
3.6 HOK
1.8 HOK
0.0462
4.17 HOK
-
###
0.00 HOK
###
0.00 HOK
0.0015
7.40 HOK
0.0015
2.84 HOK
RENCANA ANGGARAN BIAYA ( RAB )
Terbilang :
ppn pph
7,085,469 1,417,094 8,502,563
PEMERINTAH KABUPATEN TASIKMALAYA
KECAMATAN CINEAM
DESA CISARUA
BIDANG PELAKSANAAN
PEMBANGUNAN DESA
Kegiatan :
PEMBANGUNAN
PAUD
Lokasi : DUSUN CIMANUK
Volume : 5 X7 meter
Judul Gambar :
Gambar Struktur Pondasi
Digambar oleh,
RIKI PERDIANDI
Diperiksa oleh,
PENDAMPING DESA
Disetujui oleh,
PEMERINTAH KABUPATEN TASIKMALAYA
KECAMATAN CINEAM
DESA CISARUA
BIDANG PELAKSANAAN
PEMBANGUNAN DESA
Kegiatan :
PEMBANGUNAN
PAUD
Lokasi : DUSUN CIMANUK
Volume : 5 X7 meter
Judul Gambar :
Gambar Struktur Pondasi
Digambar oleh,
RIKI PERDIANDI
Diperiksa oleh,
PENDAMPING DESA
Disetujui oleh,
Denah Pondasi
Kegiatan :
PEMBANGUNAN
PAUD
Lokasi : DUSUN CIMANUK
Volume : 5 X7 meter
Judul Gambar :
TAMPAK DEPAN
Gambar Struktur Pondasi
Digambar oleh,
RIKI PERDIANDI
Diperiksa oleh,
PENDAMPING DESA
Disetujui oleh,
TAMPAK KANAN
RIKI PERDIANDI
Diperiksa oleh,
PENDAMPING DESA
Disetujui oleh,
TAMPAK KIRI
BUKU KAS PEMBANTU PAJAK
DESA CISARUA KECAMATAN CINEAM
TAHUN ANGGARAN 2019
No. TANGGAL URAIAN
1 2 3
1 Semen 50 Kg Zak 90 @ Rp 60,000 = 5,424,000 PPn
PPh
Batu Belah m³ 8 @ Rp 203,000 = 1,624,000 PPn
PPh
Pasir pasang m³ 10 @ Rp 203,000 = 2,111,200 PPn
PPh
Pasir Cor m³ 5 @ Rp 203,000 = 1,015,000 PPn
PPh
Batu Split m³ 4 @ Rp 292,000 = 1,168,000 PPn
PPh
Pasir Urug m³ 5 @ Rp 225,000 = 1,125,000 PPn
PPh
Besi Ø 10 Lente 31 @ Rp 73,000 = 2,263,000 PPn
PPh
Besi Ø 6 Lente 10 @ Rp 36,000 = 360,000 PPn
PPh
Kawat tali Kg 7 @ Rp 23,000 = 161,000 PPn
PPh
Papan Begisting m³ 1 @ Rp 1,123,000 = 1,123,000 PPn
PPh
Plat besi (Kuda-kuda) Kg 13 @ Rp 17,000 = 221,000 PPn
PPh
Mur+Baut Ø 12 mm Bh 48 @ Rp 9,000 = 432,000 PPn
PPh
Angkur Mur+Baut Ø 12 Bh 2 @ Rp 23,000 = 46,000 PPn
PPh
Paku Campuran Kg 11 @ Rp 17,000 = 187,000 PPn
PPh
Bata Merah Bh 4,809 @ Rp 1,000 = 4,809,000 PPn
PPh
Genteng Bh 1,800 @ Rp 3,000 = 5,400,000 PPn
PPh
Genteng Bubung Bh 45 @ Rp 6,000 = 270,000 PPn
PPh
Reng kayu 2/3 m³ 1 @ Rp 2,245,000 = 1,122,500 PPn
PPh
Balok Kayu 8/12 m³ 2 @ Rp 2,245,000 = 3,367,500 PPn
PPh
Balok Kayu 7/15 (kusen)m³ 1 @ Rp 2,245,000 = 2,245,000 PPn
PPh
Kaso 5/7 m³ 0 @ Rp 2,245,000 = 898,000 PPn
PPh
Kayu Strip 3/5 m³ 0 @ Rp 2,245,000 = 224,500 PPn
PPh
Papan 4/20 (pintu) m³ 0 @ Rp 2,245,000 = 449,000 PPn
PPh
Papan 3/20 (listpang) m³ 0 @ Rp 2,245,000 = 606,150 PPn
PPh
Keramik 40x40 cm Dus 45 @ Rp 62,000 = 2,790,000 PPn
PPh
GRC Lbr 13 @ Rp 57,000 = 741,000 PPn
PPh
Kaca 3 mm m² 8 @ Rp 135,000 = 1,080,000 PPn
PPh
Engsel Pintu Bh 2 @ Rp 34,000 = 68,000 PPn
PPh
Engsel Jendela Bh 5 @ Rp 23,000 = 115,000 PPn
PPh
Slot Jendela Bh 5 @ Rp 12,150 = 60,750 PPn
PPh
Slot Pintu Bh 1 @ Rp 6,000 = 6,000 PPn
PPh
Pegangan Pintu Bh 2 @ Rp 51,000 = 102,000 PPn
PPh
List Plafon m 53 @ Rp 17,000 = 901,000 PPn
PPh
Kunci Tanam Biasa Bh 1 @ Rp 96,000 = 96,000 PPn
PPh
Plamir Tembok Kg 14 @ Rp 29,000 = 406,000 PPn
PPh
Cat dasar tembok Kg 14 @ Rp 69,000 = 966,000 PPn
PPh
Cat Tembok Kg 27 @ Rp 43,000 = 1,161,000 PPn
PPh
Amplas m 2 @ Rp 12,000 = 24,000 PPn
PPh
Cat Kayu Kg 1 @ Rp 62,000 = 62,000 PPn
PPh
Err:509 Err:509 Err:509 @ Err:509 = Err:509 PPn
PPh
Pipa 1/2 Inchi Lente 3 @ Rp 21,000 = 63,000 PPn
PPh
Asessories Pipa Set 1 @ Rp 20,000 = 20,000 PPn
PPh
Saklar Doubel Bh 1 @ Rp 29,000 = 29,000 PPn
PPh
Dudukan lampu Bh 3 @ Rp 23,000 = 69,000 PPn
PPh
Lampu Bh 3 @ Rp 43,000 = 129,000 PPn
PPh
Kabel m 30 @ Rp 8,000 = 240,000 PPn
PPh
Stop Kontak Bh 1 @ Rp 23,000 = 23,000 PPn
PPh
Mangkok/DUSIMBOW Bh 2 @ Rp 3,000 = 6,000 PPn
PPh
Paralon listrik lente 2 @ Rp 17,000 = 34,000 PPn
PPh
Err:509 Err:509 Err:509 @ Err:509 = Err:509 PPn
PPh
Roll Cat Tembok Bh 1 @ Rp 57,000 = 57,000 PPn
PPh
Koas 2" Bh 3 @ Rp 17,000 = 51,000 PPn
PPh
Prasasti Bh 1 @ Rp 393,000 = 393,000 PPn
PPh
Papan Proyek Bh 1 @ Rp 113,000 = 113,000 PPn
PPh
Pekerja Hok 129 @ Rp 79,000 = 10,191,000 PPn
PPh
Tukang Hok 97 @ Rp 102,000 = 9,894,000 PPn
PPh
Mandor Hok 15 @ Rp 113,000 = 1,695,000 PPn
PPh
Lansir Hok 15 @ Rp 79,000 = 1,185,000 PPn
PPh
JUMLAH Err:509
MENGETAHUI
KEPALA DESA,
KEPALA DESA,
JUMLAH 21,676,800
MENGETAHUI
KEPALA DESA,
KEPALA DESA,
BUKU KAS PEMBANTU PAJAK
DESA CISARUA KECAMATAN CINEAM
TAHUN ANGGARAN 2019
No. TANGGAL URAIAN
1 2 3
1 11 Juli 2019 Semen 50 Kg Zak 20 @ Rp 60,000 = 1,200,000 PPn
PPh
Besi Ø 10 Lente 24 @ Rp 73,000 = 1,752,000 PPn
PPh
Besi Ø 6 Lente 8 @ Rp 36,000 = 288,000 PPn
PPh
Kawat tali Kg 6 @ Rp 23,000 = 138,000 PPn
PPh
Paku Campuran Kg 6 @ Rp 17,000 = 102,000 PPn
PPh
Bata Merah Bh 2,000 @ Rp 1,000 = 2,000,000 PPn
PPh
Genteng Bh 1,400 @ Rp 3,000 = 4,200,000 PPn
PPh
Genteng Bubung Bh 10 @ Rp 6,000 = 60,000 PPn
PPh
Engsel Pintu Bh 6 @ Rp 34,000 = 204,000 PPn
PPh
Engsel Jendela Bh 2 @ Rp 23,000 = 46,000 PPn
PPh
Slot Jendela Bh 1 @ Rp 12,150 = 12,150 PPn
PPh
Slot Pintu Bh 1 @ Rp 6,000 = 6,000 PPn
PPh
Pegangan Pintu Bh 2 @ Rp 51,000 = 102,000 PPn
PPh
Err:509 Err:509 1 @ Err:509 = Err:509 PPn
PPh
Pipa 1/2 Inchi Lente 3 @ Rp 21,000 = 63,000 PPn
PPh
Asessories Pipa Set 1 @ Rp 20,000 = 20,000 PPn
PPh
Saklar Doubel Bh 1 @ Rp 29,000 = 29,000 PPn
PPh
Dudukan lampu Bh 2 @ Rp 23,000 = 46,000 PPn
PPh
Kabel m 15 @ Rp 8,000 = 120,000 PPn
PPh
Stop Kontak Bh 1 @ Rp 23,000 = 23,000 PPn
PPh
Mangkok/DUSIMBOW Bh 2 @ Rp 3,000 = 6,000 PPn
PPh
Paralon listrik lente 2 @ Rp 17,000 = 34,000 PPn
PPh
Tukang Hok 45 @ Rp 79,000 = 3,555,000 PPn
PPh
Pekerja Hok 42 @ Rp 102,000 = 4,284,000 PPn
PPh
Mandor Hok 6 @ Rp 113,000 = 678,000 PPn
PPh
Lansir Hok 8 @ Rp 79,000 = 632,000 PPn
PPh
JUMLAH Err:509
MENGETAHUI
KEPALA DESA,
KEPALA DESA,
KEPALA DESA,
MENGETAHUI
KEPALA DESA,
KEPALA DESA,
JUMLAH Err:509
MENGETAHUI
KEPALA DESA,
KEPALA DESA,
JUMLAH (687,000)
MENGETAHUI
KEPALA DESA,
SAHMAN
semen dengan pajak 5,377,878
semen tanpa pajak 5,062,400
PEMOTONGA PENYETORAN SALDO 586,678
N
(Rp.) (Rp.) (Rp.) pajak BKPP 591,709
4 5 selisih 586,678
10% 493,091 493,091 - 56000 5,032
2.0% 98,618 98,618
10% 147,636 147,636 -
2.0% 29,527 29,527
10% 191,927 191,927 -
2.0% 38,385 38,385
10% 92,273 92,273 - jumlah pajak PPN
2.0% 18,455 18,455 Jumlah pajak PPh
10% 106,182 106,182 -
2.0% 21,236 21,236
10% 102,273 102,273 -
2.0% 20,455 20,455
10% 205,727 205,727 -
2.0% 41,145 41,145
10% 32,727 32,727 -
2.0% 6,545 6,545
10% 14,636 14,636 -
2.0% 2,927 2,927
10% 102,091 102,091 -
2.0% 20,418 20,418
10% 20,091 20,091 -
2.0% 4,018 4,018
10% 39,273 39,273 -
2.0% 7,855 7,855
10% 4,182 4,182 -
2.0% 836 836
10% 17,000 17,000 -
2.0% 3,400 3,400
10% 437,182 437,182 -
2.0% 87,436 87,436
10% 490,909 490,909 -
2.0% 98,182 98,182
10% 24,545 24,545 -
2.0% 4,909 4,909
10% 102,045 102,045
2.0% 20,409 20,409
10% 306,136 306,136
2.0% 61,227 61,227
10% 204,091 204,091
2.0% 40,818 40,818
10% 81,636 81,636
2.0% 16,327 16,327
10% 20,409 20,409
2.0% 4,082 4,082
10% 40,818 40,818
2.0% 8,164 8,164
10% 55,105 55,105
2.0% 11,021 11,021
10% 253,636 253,636
2.0% 50,727 50,727
10% 67,364 67,364
2.0% 13,473 13,473
10% 98,182 98,182
2.0% 19,636 19,636
10% 6,182 6,182
2.0% 1,236 1,236
10% 10,455 10,455
2.0% 2,091 2,091
10% 5,523 5,523
2.0% 1,105 1,105
10% 545 545
2.0% 109 109
10% 9,273 9,273
2.0% 1,855 1,855
10% 81,909 81,909
2.0% 16,382 16,382
10% 8,727 8,727
2.0% 1,745 1,745
10% 36,909 36,909
2.0% 7,382 7,382
10% 87,818 87,818
2.0% 17,564 17,564
10% 105,545 105,545
2.0% 21,109 21,109
10% 2,182 2,182
2.0% 436 436
10% 5,636 5,636
2.0% 1,127 1,127
10% Err:509 Err:509
2.0% Err:509 Err:509
10% 5,727 5,727
2.0% 1,145 1,145
10% 1,818 1,818
2.0% 364 364
10% 2,636 2,636
2.0% 527 527
10% 6,273 6,273
2.0% 1,255 1,255
10% 11,727 11,727
2.0% 2,345 2,345
10% 21,818 21,818
2.0% 4,364 4,364
10% 2,091 2,091
2.0% 418 418
10% 545 545
2.0% 109 109
10% 3,091 3,091
2.0% 618 618
10% Err:509 Err:509
2.0% Err:509 Err:509
10% 5,182 5,182
2.0% 1,036 1,036
10% 4,636 4,636
2.0% 927 927
10% 35,727 35,727
2.0% 7,145 7,145
10% 10,273 10,273
2.0% 2,055 2,055
10% 926,455 926,455 BAHAN UMUM
2.0% 185,291 185,291 ALAT UMUM
10% 899,455 899,455 UPAH UMUM
2.0% 179,891 179,891
10% 154,091 154,091
2.0% 30,818 30,818
10% 107,727 107,727
2.0% 21,545 21,545
Err:509 Err:509 -
KAUR KEUANGAN
RIMA SRIAGUSTINA,S.Sos.
PEMOTONGA PENYETORAN SALDO
N
(Rp.) (Rp.) (Rp.)
4 5
10% 109,091 109,091 - 109,091
2.0% 21,818 21,818 21,818
10% 110,727 110,727 110,727
2.0% 22,145 22,145 22,145
10% 166,091 166,091 - 166,091
2.0% 33,218 33,218 33,218
10% 55,364 55,364 55,364
2.0% 11,073 11,073 11,073
10% 106,182 106,182 - 106,182
2.0% 21,236 21,236 21,236
10% 245,455 245,455 245,455
2.0% 49,091 49,091 49,091
10% 91,882 91,882 - 91,882
2.0% 18,376 18,376 18,376
10% 7,727 7,727 - 7,727
2.0% 1,545 1,545 1,545
10% 102,045 102,045 - 102,045
2.0% 20,409 20,409 20,409
10% 102,045 102,045 102,045
2.0% 20,409 20,409 20,409
10% 142,864 142,864 - 142,864
2.0% 28,573 28,573 28,573
10% 142,864 142,864 142,864
2.0% 28,573 28,573 28,573
10% 40,818 40,818 - 40,818
2.0% 8,164 8,164 8,164
10% 40,818 40,818 40,818
2.0% 8,164 8,164 8,164
10% 36,736 36,736 - 36,736
2.0% 7,347 7,347 7,347
10% 10,273 10,273 10,273
2.0% 2,055 2,055 2,055
10% 459,636 459,636 459,636
2.0% 91,927 91,927 91,927
- -
2,364,742 2,364,742 - 1,970,618 394,124 2364741.8182
-
KAUR KEUANGAN -
-
-
RIMA SRIAGUSTINA,S.Sos.
PEMOTONGA PENYETORAN SALDO
N
(Rp.) (Rp.) (Rp.)
4 5
10% 109,091 109,091 109,091
2.0% 21,818 21,818 21,818
10% 159,273 159,273 159,273
2.0% 31,855 31,855 31,855
10% 26,182 26,182 26,182
2.0% 5,236 5,236 5,236
10% 12,545 12,545 12,545
2.0% 2,509 2,509 2,509
10% 9,273 9,273 9,273
2.0% 1,855 1,855 1,855
10% 181,818 181,818 181,818
2.0% 36,364 36,364 36,364
10% 381,818 381,818 381,818
2.0% 76,364 76,364 76,364
10% 5,455 5,455 5,455
2.0% 1,091 1,091 1,091
10% 18,545 18,545 18,545
2.0% 3,709 3,709 3,709
10% 4,182 4,182 4,182
2.0% 836 836 836
10% 1,105 1,105 1,105
2.0% 221 221 221
10% 545 545 545
2.0% 109 109 109
10% 9,273 9,273 9,273
2.0% 1,855 1,855 1,855
10% Err:509 Err:509 Err:509
2.0% Err:509 Err:509 Err:509
10% 5,727 5,727 5,727
2.0% 1,145 1,145 1,145
10% 1,818 1,818 1,818
2.0% 364 364 364
10% 2,636 2,636 2,636
2.0% 527 527 527
10% 4,182 4,182 4,182
2.0% 836 836 836
10% 10,909 10,909 10,909
2.0% 2,182 2,182 2,182
10% 2,091 2,091 2,091
2.0% 418 418 418
10% 545 545 545
2.0% 109 109 109
10% 3,091 3,091 3,091
2.0% 618 618 618
10% 323,182 323,182 323,182
2.0% 64,636 64,636 64,636
10% 389,455 389,455 389,455
2.0% 77,891 77,891 77,891
10% 61,636 61,636 61,636
2.0% 12,327 12,327 12,327
10% 57,455 57,455 57,455
2.0% 11,491 11,491 11,491
Err:509 Err:509 - Err:509 Err:509 Err:509
KAUR KEUANGAN
RIMA SRIAGUSTINA,S.Sos.
RIMA SRIAGUSTINA,S.Sos.
KAUR KEUANGAN
RIMA SRIAGUSTINA,S.Sos.
KAUR KEUANGAN
RIMA SRIAGUSTINA,S.Sos.
Err:509
RIMA SRIAGUSTINA,S.Sos.
- - - @ Rp - = 9,254,500 PPn
PPh
10% 841,318 841,318
2.0% 168,264 168,264
1,009,582
cikamuning ` Err:509
Sumber Dana Harga Jumlah
APBN Satuan Biaya
No Uraian
Volume Rp. Rp. 1 2 3 4 5 jml Rp. 6 7 8 9 10 11 12 jml
NBAHAN
1 Semen 50 Kg 60.00 60,000 3,600,000 20 20 1,200,000 20 20
2 Batu Belah 8.00 203,000 1,624,000 6 6 1,218,000 -
3 Pasir pasang 10.40 203,000 2,111,200 9 9 1,827,000 -
4 Pasir Cor 5.00 203,000 1,015,000 3 3 609,000 -
5 Batu Split 4.00 292,000 1,168,000 4 4 1,168,000 -
6 Pasir Urug 5.00 225,000 1,125,000 12 12 2,700,000 -
7 Besi Ø 10 31.00 73,000 2,263,000 - - 24 24
8 Besi Ø 8 - 59,000 - - - -
9 Besi Ø 6 10.00 36,000 360,000 - - 8 8
10 Kawat tali 7.00 23,000 161,000 - - 6 6
11 Papan Begisting 1.00 1,123,000 1,123,000 0.9 1 1,010,700 -
12 Plat besi (Kuda-k 13.00 17,000 221,000 - - -
13 Mur+Baut Ø 12 48.00 9,000 432,000 - - -
14 Angkur Mur+Bau 2.00 23,000 46,000 - - -
15 Paku Campuran 11.00 17,000 187,000 5 5 85,000 6 6
16 Bata Merah 4,809.00 1,000 4,809,000 - - 2000 2,000
17 Genteng 1,800.00 3,000 5,400,000 - - 1400 1,400
18 Genteng Bubung 45.00 6,000 270,000 - - 10 10
19 Reng kayu 2/3 0.50 2,245,000 1,122,500 0.5 1 1,122,500 -
20 Balok Kayu 8/12 1.50 2,245,000 3,367,500 0.5 1 1,122,500 -
21 Balok Kayu 7/15 1.00 2,245,000 2,245,000 0.7 1 1,571,500 -
22 Kaso 5/7 0.40 2,245,000 898,000 0.7 1 1,571,500 -
23 Kayu Strip 3/5 0.10 2,245,000 224,500 0.2 0 449,000 -
24 Papan 4/20 (pintu 0.20 2,245,000 449,000 0.2 0 449,000 -
25 Papan 3/20 (listp 0.27 2,245,000 606,150 0.18 0 404,100 -
26 Keramik 40x40 c 45.00 62,000 2,790,000 - - -
27 GRC 13.00 57,000 741,000 - - -
28 Bambu - 4,000 - - - -
29 Kaca 3 mm 8.00 135,000 1,080,000 - - -
30 Loster - 17,000 - - - -
31 Engsel Pintu 2.00 34,000 68,000 - - 6 6
32 Engsel Jendela 5.00 23,000 115,000 - - 2 2
33 Slot Jendela 5.00 12,150 60,750 - - 1 1
34 Slot Pintu 1.00 6,000 6,000 - - 1 1
35 Pegangan Pintu 2.00 51,000 102,000 - - 2 2
36 List Plafon 53.00 17,000 901,000 - - -
37 Kunci Tanam Bia - 96,000 - - - -
38 Plamir Tembok 14.00 29,000 406,000 - - -
39 Cat dasar tembok 14.00 69,000 966,000 - - -
40 Cat Tembok 27.00 43,000 1,161,000 - - -
41 Amplas 2.00 12,000 24,000 - - -
42 Cat meni - 45,000 - - - -
43 Cat Kayu - 62,000 - - - -
44 Err:509 Err:509 Err:509 Err:509 - Err:509 1 1
45 Pipa 1/2 Inchi 3.00 21,000 63,000 - - 3 3
46 Asessories Pipa 1.00 20,000 20,000 - - 1 1
47 Saklar Doubel 1.00 29,000 29,000 - - 1 1
48 Dudukan lampu 3.00 23,000 69,000 - - 2 2
49 Lampu - 43,000 - - - -
50 Kabel 30.00 8,000 240,000 - - 15 15
51 Stop Kontak 1.00 23,000 23,000 - - 1 1
52 Mangkok/DUSI 2.00 3,000 6,000 - - 2 2
53 Paralon listrik 2.00 17,000 34,000 - - 2 2
54 Err:509 Err:509 Err:509 Err:509 - Err:509 -
55 - - - - - -
56 - - - - - -
57 - - - -
58 - - - -
59 - - - -
60 - - - -
61 meteran (5meter) - 25,000 - - -
62 - - 3,000 - - -
63 - - - - -
64 - - - - -
65 - - - - -
66 - - - - -
67 Arco - 550,000 - - -
68 Roll Cat Tembok 1.00 57,000 57,000 - - -
69 Koas 2" 3.00 17,000 51,000 - - -
70 Prasasti 1.00 393,000 393,000 - - -
71 Papan Proyek 1.00 113,000 113,000 1 1 113,000 -
72 - - - - - -
73 - - - - - - -
74 Tukang 135.00 79,000 10,665,000 - - 8 7 8 7 7 8 45
75 Pekerja 122.00 102,000 12,444,000 - - 7 7 6 7 7 8 42
76 Mandor 13.00 113,000 1,469,000 - - 1 1 1 1 1 1 6
77 Lansir 15.00 79,000 1,185,000 64 64 5,056,000 8 8
- - -
Jumlah Err:509 Err:509 3,615
1,200,000 20 20 1,200,000 - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1,752,000 - - - -
- - - - -
288,000 - - - -
138,000 - - - -
- - - - -
- 4 4 68,000 - -
- 32 32 288,000 - -
- 2 2 46,000 - -
102,000 - - - -
2,000,000 919 919 919,000 - -
4,200,000 58 58 174,000 - -
60,000 - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 26 26 1,612,000 - -
- 13 13 741,000 - -
- - - - -
- 4 4 540,000 - -
- - - - -
204,000 - - - -
46,000 - - - -
12,150 - - - -
6,000 - - - -
102,000 - - - -
- 44 44 748,000 - -
- - - - -
- 11 11 319,000 - -
- 11 11 759,000 - -
- 21 21 903,000 - -
- 2 2 24,000 - -
- - - - -
- - - - -
Err:509 - Err:509 - Err:509
63,000 - - - -
20,000 - - - -
29,000 - - - -
46,000 - - - -
- - - - -
120,000 - - - -
23,000 - - - -
6,000 - - - -
34,000 - - - -
Err:509 1 1 Err:509 - Err:509
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 1 1 57,000 - -
- 3 3 51,000 - -
- 1 1 393,000 - -
- - - - -
- - - - -
- - - - -
3,555,000 7 8 8 7 8 7 45 3,555,000 7 8 8 7 8 7 45 3,555,000
4,284,000 5 7 6 5 7 6 36 3,672,000 8 7 8 6 7 8 44 4,488,000
678,000 1 1 1 1 4 452,000 1 1 1 3 339,000
632,000 8 8 632,000 - -
- - - - -
Err:509 1,266 Err:509 92 Err:509
- - 60 3,600,000 - -
- - 6 1,218,000 406,000 2.00
- - 9 1,827,000 284,200 1.40
- - 3 609,000 406,000 2.00
- - 4 1,168,000 - -
- - 12 2,700,000 (1,575,000) - 7.00
- - 24 1,752,000 511,000 7.00
- - - - - -
- - 8 288,000 72,000 2.00
- - 6 138,000 23,000 1.00
- - 1 1,010,700 112,300 0.10
- - 4 68,000 153,000 9.00
- - 32 288,000 144,000 16.00
- - 2 46,000 - -
- - 11 187,000 - -
- - 2,919 2,919,000 1,890,000 1,890.00
- - 1,458 4,374,000 1,026,000 342.00
- - 10 60,000 210,000 35.00
- - 1 1,122,500 - -
- - 1 1,122,500 2,245,000 1.00
- - 1 1,571,500 673,500 0.30
- - 1 1,571,500 (673,500) - 0.30
- - 0 449,000 (224,500) - 0.10
- - 0 449,000 - -
- - 0 404,100 202,050 0.09
- - 26 1,612,000 1,178,000 19.00
- - 13 741,000 - -
- - - - - -
- - 4 540,000 540,000 4.00
- - - - - -
- - 6 204,000 (136,000) - 4.00
- - 2 46,000 69,000 3.00
- - 1 12,150 48,600 4.00
- - 1 6,000 - -
- - 2 102,000 - -
- - 44 748,000 153,000 9.00
- - - - - -
- - 11 319,000 87,000 3.00
- - 11 759,000 207,000 3.00
- - 21 903,000 258,000 6.00
- - 2 24,000 - -
- - - - - -
- - - - - -
- - 1 Err:509 Err:509 Err:509
- - 3 63,000 - -
- - 1 20,000 - -
- - 1 29,000 - -
- - 2 46,000 23,000 1.00
- - - - - -
- - 15 120,000 120,000 15.00
- - 1 23,000 - -
- - 2 6,000 - -
- - 2 34,000 - -
- - 1 Err:509 Err:509 Err:509
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - 1 57,000 - -
- - 3 51,000 - -
- - 1 393,000 - -
- - 1 113,000 - -
- - - - - -
- - - - - -
135 10,665,000 - -
- - 122 12,444,000 - -
- - 13 1,469,000 - -
- - 80 6,320,000 (5,135,000) - 65.00
- - - - - -
Err:509 Err:509
cikamuning `
Sumber Dana Harga Jumlah
APBN Satuan Biaya
No Uraian
Volume Rp. Rp. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
NBAHAN
1 Semen 50 Kg 30.40 60,000 1,824,000 18
2 Batu Belah - 203,000 -
3 Pasir pasang - 203,000 -
4 Pasir Cor - 203,000 -
5 Batu Split - 292,000 -
6 Pasir Urug - 225,000 -
7 Besi Ø 10 - 73,000 -
8 Besi Ø 8 - 59,000 -
9 Besi Ø 6 - 36,000 -
10 Kawat tali - 23,000 -
11 Papan Begisting - 1,123,000 -
12 Plat besi (Kuda-k - 17,000 -
13 Mur+Baut Ø 12 - 9,000 -
14 Angkur Mur+Bau - 23,000 -
15 Paku Campuran - 17,000 - 2
16 Bata Merah - 1,000 -
17 Genteng - 3,000 -
18 Genteng Bubung - 6,000 -
19 Reng kayu 2/3 - 2,245,000 -
20 Balok Kayu 8/12 - 2,245,000 -
21 Balok Kayu 7/15 - 2,245,000 -
22 Kaso 5/7 - 2,245,000 -
23 Kayu Strip 3/5 - 2,245,000 -
24 Papan 4/20 (pintu - 2,245,000 -
25 Papan 3/20 (listp - 2,245,000 -
26 Keramik 40x40 c - 62,000 -
27 GRC - 57,000 -
28 Bambu - 4,000 -
29 Kaca 3 mm - 135,000 -
30 Loster - 17,000 -
31 Engsel Pintu - 34,000 -
32 Engsel Jendela - 23,000 -
33 Slot Jendela - 12,150 -
34 Slot Pintu - 6,000 -
35 Pegangan Pintu - 51,000 -
36 List Plafon - 17,000 -
37 Kunci Tanam Bia 1.00 96,000 96,000 1
38 Plamir Tembok - 29,000 -
39 Cat dasar tembok - 69,000 -
40 Cat Tembok - 43,000 -
41 Amplas - 12,000 -
42 Cat meni - 45,000 -
43 Cat Kayu 1.00 62,000 62,000 1
44 Err:509 Err:509 Err:509 Err:509
45 Pipa 1/2 Inchi - 21,000 -
46 Asessories Pipa - 20,000 -
47 Saklar Doubel - 29,000 -
48 Dudukan lampu - 23,000 -
49 Lampu 3.00 43,000 129,000 2
50 Kabel - 8,000 -
51 Stop Kontak - 23,000 -
52 Mangkok/DUSI - 3,000 -
53 Paralon listrik - 17,000 -
54 Err:509 Err:509 Err:509 Err:509
55 - - - -
56 - - - -
57 - -
58 - -
59 - -
60 - -
61 meteran (5meter) - 25,000 -
62 - - 3,000 -
63 - - -
64 - - -
65 - - -
66 - - -
67 Arco - 550,000 -
68 Roll Cat Tembok - 57,000 -
69 Koas 2" - 17,000 -
70 Prasasti - 393,000 -
71 Papan Proyek - 113,000 -
72 - - - -
73 - - - -
74 Tukang (6.00) 79,000 (474,000) 6 6 6 6 6 6 5 6 6
75 Pekerja (25.00) 102,000 (2,550,000) 4 4 4 3 3 3 4 4 4
76 Mandor 2.00 113,000 226,000 1 1
77 Lansir - 79,000 -
Jumlah Err:509
Err:509
18 1,080,000 - - 20 20 1,200,000
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - 4 4 68,000
- - - - 32 32 288,000
- - - - 2 2 46,000
2 34,000 - - - -
- - - - 919 919 919,000
- - - - 58 58 174,000
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - 26 26 1,612,000
- - - - 13 13 741,000
- - - - - -
- - - - 4 4 540,000
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - 44 44 748,000
1 96,000 - - - -
- - - - 11 11 319,000
- - - - 11 11 759,000
- - - - 21 21 903,000
- - - - 2 2 24,000
- - - - - -
1 62,000 - - - -
- Err:509 - Err:509 - Err:509
- - - - - -
- - - - - -
- - - - - -
- - - - - -
2 86,000 - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- Err:509 - Err:509 1 1 Err:509
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - 1 1 57,000
- - - - 3 3 51,000
- - - - 1 1 393,000
- - - - - -
- - - - - -
- - - - - -
53 4,187,000 - - 7 8 8 7 8 7 45 3,555,000 7
33 3,366,000 - - 5 7 6 5 7 6 36 3,672,000 8
2 226,000 - - 1 1 1 1 4 452,000 1
- - - - 8 8 632,000
- - - - - -
Err:509 - Err:509 1,266 Err:509
-
- 7,679,000
46 47 48 49 50 51 jml Rp. 52 53 54 55 56 jml Rp. jumlah totaRp. Total selisih
8,382,000
BUKU KAS PEMBANTU KEGIATAN
DESA CISARUA KECAMATAN CINEAM
TAHUN ANGGARAN 2019
1. Bidang : Pembangunan Infrastruktur Desa
2. Kegiatan : Pembangunan POSYANDU
Penerimaan (Rp.) Pengeluaran (Rp.)
Swadaya Nomor Belanja
No. Tanggal Uraian Dari Bukti
Masyarak Barang dan Belanja Modal
Bendahara at Jasa
1 2 3 4 5 6 7 8
Pindahan Jumlah dari halaman sebelumnya
1 3 Juli 2019 Terima dari Bendahara Desa 24,244,800 DM/DD/4
Belanja Modal, Barang dan Jasa Pembangunan
2 3 Juli 2019 01.DK/DD/19
POSYANDU
3 3 Juli 2019 Semen 50 Kg 20 Zak @ Rp 60,000 01. DK 1,200,000
4 3 Juli 2019 Batu Belah 6 m³ @ Rp 203,000 01. DK 1,218,000
5 3 Juli 2019 Pasir pasang 9 m³ @ Rp 203,000 01. DK 1,827,000
6 3 Juli 2019 Pasir Cor 3 m³ @ Rp 203,000 01. DK 609,000
7 3 Juli 2019 Batu Split 4 m³ @ Rp 292,000 01. DK 1,168,000
8 3 Juli 2019 Pasir Urug 12 m³ @ Rp 225,000 01. DK 2,700,000
9 3 Juli 2019 Papan Begisting 0.9 m³ @ ### 01. DK 1,010,700
10 3 Juli 2019 Paku Campuran 5.0 Kg @ Rp 17,000 01. DK 85,000
11 3 Juli 2019 Reng kayu 2/3 0.5 m³ @ ### 02.DK 1,122,500
12 3 Juli 2019 Balok Kayu 8/12 0.5 m³ @ ### 02.DK 1,122,500
13 3 Juli 2019 Balok Kayu 7/15 (ku 0.7 m³ @ ### 02.DK 1,571,500
14 3 Juli 2019 Kaso 5/7 0.7 m³ @ ### 02.DK 1,571,500
15 3 Juli 2019 Kayu Strip 3/5 0.2 m³ @ ### 02.DK 449,000
16 3 Juli 2019 Papan 4/20 (pintu) 0.2 m³ @ ### 02.DK 449,000
17 3 Juli 2019 Papan 3/20 (listpan 0.18 m³ @ ### 02.DK 404,100
18 5 Juli 2019 Papan Proyek 1 Bh @ Rp 113,000 03.DK 113,000
19 6 Juli 2019 Lansir 64 Hok @ Rp 79,000 04.DK 5,056,000
1 2 3 4 5 6 7 8
Pindahan Jumlah dari halaman sebelumnya 24,244,800 5,169,000 16,507,800
1 11 Juli 2019 Terima dari Bendahara Desa 22,053,150 DM/DD/6
2 11 Juli 2019 Belanja Modal, Barang dan Jasa Pembangunan
02.DK/DD/19
POSYANDU
3 11 Juli 2019 Semen 50 Kg 20 Zak @ 60,000 05.DK 1,200,000
4 11 Juli 2019 Besi Ø 10 24 Lente @ 73,000 05.DK 1,752,000
5 11 Juli 2019 Besi Ø 6 8 Lente @ 36,000 05.DK 288,000
6 11 Juli 2019 Kawat tali 6 Kg @ 23,000 05.DK 138,000
7 11 Juli 2019 Paku Campuran 6 Kg @ 17,000 05.DK 102,000
8 11 Juli 2019 Bata Merah 2,000 Bh @ 1,000 05.DK 2,000,000
9 11 Juli 2019 Genteng 1,400 Bh @ 3,000 05.DK 4,200,000
10 11 Juli 2019 Genteng Bubung 10 Bh @ 6,000 05.DK 60,000
11 11 Juli 2019 Engsel Pintu 6 Bh @ 34,000 05.DK 204,000
12 11 Juli 2019 Engsel Jendela 2 Bh @ 23,000 05.DK 46,000
13 11 Juli 2019 Slot Jendela 1 Bh @ 12,150 05.DK 12,150
14 11 Juli 2019 Slot Pintu 1 Bh @ 6,000 05.DK 6,000
15 11 Juli 2019 Pegangan Pintu 2 Bh @ 51,000 05.DK 102,000
16 11 Juli 2019 Err:509 Err:50
1 @ Err:509 05.DK Err:509
9
17 11 Juli 2019 Pipa 1/2 Inchi 3 Lente @ 21,000 05.DK 63,000
18 11 Juli 2019 Asessories Pipa 1 Set @ 20,000 05.DK 20,000
19 11 Juli 2019 Saklar Doubel 1 Bh @ 29,000 05.DK 29,000
20 11 Juli 2019 Dudukan lampu 2 Bh @ 23,000 05.DK 46,000
21 11 Juli 2019 Kabel 15 m @ 8,000 05.DK 120,000
22 11 Juli 2019 Stop Kontak 1 Bh @ 23,000 05.DK 23,000
23 11 Juli 2019 Mangkok/DUSIMBO 2 Bh @ 3,000 05.DK 6,000
24 11 Juli 2019 W
Paralon listrik 2 lente @ 17,000 05.DK 34,000
25 11 Juli 2019 Tukang 45 Hok @ 79,000 06.DK 3,555,000
26 11 Juli 2019 Pekerja 42 Hok @ 102,000 06.DK 4,284,000
27 11 Juli 2019 Mandor 6 Hok @ 113,000 06.DK 678,000
28 12 Juli 2019 Lansir 8 Hok @ 79,000 07.DK 632,000
9 10
nota 1 16,507,800
24,244,800 nota 2 Err:509
3 8,735,000
23,044,800
21,826,800
19,999,800
19,390,800
18,222,800
15,522,800
14,512,100
14,427,100
13,304,600
12,182,100
10,610,600
9,039,100 8,807,000
8,590,100
8,141,100 7,700,800
7,737,000
7,624,000
2,568,000
#REF!
21,676,800
as 21,676,800
gan
NA,S.Sos.
9 10
22,053,150
20,853,150
19,101,150
18,813,150
18,675,150
18,573,150
16,573,150
12,373,150
12,313,150
12,109,150
12,063,150
12,051,000 10,002,150
12,045,000
11,943,000
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
as Err:509
gan
NA,S.Sos.
Jumlah Saldo Kas
Pengembalian
ke Bendahara (Rp.)
9 10
21,012,000
19,812,000
19,744,000
19,456,000
19,410,000
18,491,000
18,317,000
16,419,000
15,678,000
15,138,000
14,390,000
14,071,000
13,312,000
12,409,000
12,385,000
12,328,000 7,082,000
12,277,000 1,653,000
11,435,000 8,735,000
11,042,000
7,487,000
3,815,000
3,363,000 1,235,000
2,731,000
18,281,000
Err:509
as Err:509 Err:509
gan
NA,S.Sos.
Jumlah Saldo Kas
Pengembalian
ke Bendahara (Rp.)
9 10
8,141,000
8,141,000
4,586,000
98,000
(241,000)
8,382,000
Err:509
as Err:509
gan
NA,S.Sos.
Jumlah Saldo Kas
Pengembalian
ke Bendahara (Rp.)
9 10
(687,000)
(687,000)
(1,821,000)
(1,863,000)
(1,880,000)
(1,942,000) 1,341,000
(2,028,000)
(1,554,000)
996,000
770,000
1,255,000
Err:509
as Err:509
gan
NA,S.Sos.
DAFTAR HADIR DAN TANDA TERIMA INSENTIF PEKERJA
Program Dana Desa
Desa/Kecamatan : Cisarua/Cineam
Jenis Kegiatan : Pembangunan Posyandu
Insentif HOK Lansir 73,000
BAHAN MATERIAL
JUMLAH JUMLAH Rp.
NO NAMA PASIR
PASANG PASIR COR SPLIT PASIR URUG KAYU BATU BATA GENTENG G. BUBUNG SEMEN HOK
JUMLAH
Cisarua,
Menyetujui Pantia Pelaksana Kegiatan Desa Dibayar Tanggal :
Kepala Desa Kasi Kesra Kaur Keuangan
SAHMAN KURNIAWAN RAHMAYUDHA,ST. RIMA SRIAGUSTINA,S.Sos.
BAHAN MATERIAL
JUMLAH JUMLAH Rp.
NO NAMA PASIR
PASANG PASIR COR SPLIT PASIR URUG KAYU BATU BATA GENTENG G.BUBUNG SEMEN HOK
3 4 3 10 730,000
5 2 7 6 20 1,460,000
5 24 29 2,117,000
5 5 365,000
0 -
0 -
0 -
0 -
0 -
0 -
JUMLAH 18 2 7 24 4 6 - - - 3 64 4,672,000
Cisarua,
Menyetujui KASI KESRA Kaur Keuangan
Kepala Desa
SAHMAN KURNIAWAN RAHMAYUDHA,ST. RIMA SRIAGUSTINA,S.Sos.
DAFTAR HADIR DAN TANDA TERIMA INSENTIF PEKERJA
Program Dana Desa
Desa/Kecamatan : Cisarua/Cineam
Jenis Kegiatan : Pembangunan Posyandu
Insentif HOK Lansir 73,000
BAHAN MATERIAL
JUMLAH JUMLAH Rp.
NO NAMA PASIR
PASANG PASIR COR SPLIT PASIR URUG KAYU BATU BATA GENTENG G. BUBUNG SEMEN HOK
3 2 3 8 584,000
0 -
0 -
0 -
0 -
0 -
0 -
0 -
0 -
0 -
JUMLAH 8 584,000
Cisarua,
Menyetujui KASI KESRA Kaur Keuangan
Kepala Desa
BAHAN MATERIAL
JUMLAH JUMLAH Rp.
NO NAMA PASIR
PASANG PASIR COR SPLIT PASIR URUG KAYU BATU BATA GENTENG G.BUBUNG SEMEN HOK
2 3 3 8 584,000
0 -
0 -
0 -
0 -
0 -
0 -
0 -
0 -
0 -
JUMLAH 8 584,000
Cisarua,
Menyetujui KASI KESRA Kaur Keuangan
Kepala Desa
r Keuangan
AGUSTINA,S.Sos.
64
TANDA
TANGAN
Semen 50 Kg 20
Batu Belah 6
Pasir pasang 9
Pasir Cor 3
Batu Split 4
Pasir Urug 12
Papan Begisting 0.9
Paku Campuran 5
Reng kayu 2/3 0.5
Balok Kayu 8/1 0.5
Belanja Modal 0
Semen 50 Kg 20
Besi Ø 10 24
r Keuangan Besi Ø 6 8
Kawat tali 6
Paku Campuran 6
Bata Merah 2000
Genteng 1400
AGUSTINA,S.Sos. Genteng Bubun 10
Engsel Pintu 6
Engsel Jendela 2
Slot Jendela 1
Slot Pintu 1
Pegangan Pintu 2
Err:509 1
TANDA Pipa 1/2 Inchi 3
TANGAN
Asessories Pipa 1
Saklar Doubel 1
Dudukan lampu 2
Kabel 15
Stop Kontak 1
r Keuangan
AGUSTINA,S.Sos.
3
SURAT PERMINTAAN PEMBAYARAN ( SPP )
PROGRAM DANA DESA
DESA CISARUA TAHUN ANGGARAN 2019
AGENDA
1. Titik LOKASI
2. Hari Pertama mulai
3. Lansir
4. HOK
Tukang Rp.
Laden Rp.
Rencana 2 Tukang 4 laden
5. Bahan material persiapan
6. Alat Persiapan
7. ..
PERNYATAAN TANGGUNGJAWAB BELANJA
DESA CISARUA KECAMATAN CINEAM
TAHUN ANGGARAN 2019
1. Bidang : Pembangunan Infrastruktur
2. Kegiatan : Pembangunan POSYANDU
3. Waktu Pelaksanaan : 60 Hari
JUMLAH 21,676,800
( KURNIAWAN RAHMAYUDHA,ST.)
PERNYATAAN TANGGUNGJAWAB BELANJA
DESA CISARUA KECAMATAN CINEAM
TAHUN ANGGARAN 2019
JUMLAH (1,377,000)
Bukti-bukti pengeluaran atau belanja tersebut diatas sebagai terlampir, untuk
kelengkapan administrasi dan pemerikasaan sesuai peraturan perundang-undangan.
Demikian surat pernyataan ini dibuat dengan sebenarnya.
( KURNIAWAN RAHMAYUDHA,ST.)
BUKU MATERIAL / BAHAN
Desa / Kecamatan / Kabupaten : Cisarua / Cineam/Tasikmalaya
Jumlah
m³
IKDAR, S.Ag.
: 1 dari ......
bayar
bayaran
Jumlah
Zak
Zak
Zak
: 1 dari ......
bayar
bayaran
Jumlah
m³
14 Juni 2016
: 1 dari ......
bayar
bayaran
mlah Volume
Bh
Bh
juli 2019
: 1 dari ......
bayar
bayaran
mlah Volume
Kg
Kg
Juli 2019
: 1 dari ......
bayar
bayaran
mlah Volume
Bh
Bh
Juli 2019
BUKTI PENERIMAAN MATERIAL / BAHAN No :
Cisarua,
Yang menyerahkan: Yang menerima:
Panitia
(…………………………………...) ( …………………………………)
Cisarua,
Yang menyerahkan: Yang menerima:
Panitia
(…………………………………...) ( …………………………………)
Cisarua,
Yang menyerahkan: Yang menerima:
Panitia
(…………………………………...) ( …………………………………)
BUKTI PENERIMAAN MATERIAL / BAHAN No :
Cisarua,
Yang menyerahkan: Yang menerima:
Panitia
(…………………………………...) ( …………………………………)
Cisarua,
Yang menyerahkan: Yang menerima:
Panitia
(…………………………………...) ( …………………………………)
Cisarua,
Yang menyerahkan: Yang menerima:
Panitia
(…………………………………...) ( …………………………………)
Cisarua, 29-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 30-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 30-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 16-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 16-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 18-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 18-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 19-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 19-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 20-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 20-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 21-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 24-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 24-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 25-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 25-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 26-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 19-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 23-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 28-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 28-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 17-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 17-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 23-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 23-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 27-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 27-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 28-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 29-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-07-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 21-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 28-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 25-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 25-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 26-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 26-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 27-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 27-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 19-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-06-2016
Yang menyerahkan: Yang menerima:
Panitia
Cisarua, 15-06-2016
Yang menyerahkan: Yang menerima:
Panitia
JUMLAH Err:509
MENGETAHUI
KEPALA DESA,
AJAK
N CINEAM
016
PEMOTONGA PENYETORAN SALDO
N
(Rp.) (Rp.) (Rp.)
4 5
PPn 10% 8,699,818 8,699,818 -
PPh 1.5% 1,304,973 1,304,973 -
PPn 10% 7,936,527 7,936,527 -
PPh 1.5% 1,190,479 1,190,479 -
PPn 10% -
PPh 1.5% 784,245 784,245 -
PPn 10% 272,727 272,727 -
PPh 1.5% 40,909 40,909 -
PPn 10% 56,455 56,455 -
PPh 1.5% 8,468 8,468 -
PPn 10% -
PPh 1.5% 301,392 301,392 -
PPn 10% Err:509 Err:509 Err:509
PPh 1.5% Err:509 Err:509 Err:509
PPn 10% -
PPh 1.5% Err:509 Err:509 Err:509
PPn 10% Err:509 Err:509 Err:509
PPh 1.5% Err:509 Err:509 Err:509
PPn 10% 10,909 10,909
PPh 1.5% 1,636 1,636
PPn 10%
PPh 4.0% 666,000 666,000
PPn 10% 354,545 354,545
PPh 1.5% 53,182 53,182
PPn 10% 27,273 27,273
PPh 1.5% 4,091 4,091
PPn 10% 18,182 18,182
PPh 1.5% 2,727 2,727
BENDAHARA DESA,