Anda di halaman 1dari 4

Data target Produksi: 1560000

Persentase bahan baku


No.
karet alam olahan 30%
dakron 30% 11
pentil bola 5% 10
benang polyester 5% 9
lateks 10% 8
kulit sintetis 20% 7
6
Jam kerja: 48 jam/minggu 5
2496 jam/tahun 4
Efisiensi kerja: 80% 3
Demand rate: 781.25 produk/jam 2
1
0
PERHITUNGAN JUMLAH MESIN
Bahan yang Bahan sebenarnya Jumlah Mesin
Nama mesin Scrap (%) Efisiensi Kapasitas
Dibutuhkan yang dibutuhkan Teoritis
Cutting 3 98 90 805.412371134 821.849358300021 9.1316595
Cutting press 2 97 100 821.8493583 847.267379690743 8.4726738
Vulcanizing 2 98 90 838.621794184 855.73652467724 9.5081836
Pelapis 1 99 50 847.092721398 855.649213533002 17.112984
Spraying 1 99 70 855.649213533 864.29213488182 12.34703
Pendingin 1 98 60 864.292134882 881.930749879408 14.698846
Press 3 97 90 891.022819466 918.580226253395 10.206447
Jahit 3 97 70 918.580226253 946.989923972572 13.528427
Cooling press 1 98 100 927.858814397 946.794708568744 9.4679471
Quality Control 0 100 80 927.858814397 927.858814397369 11.598235
GUD
Jumlah Mesin
Praktis
10
9
10
18
13
15
11
14
10
12
Data target Produksi: 1872000 PERHITUNGAN JUMLAH BAHAN BAKU JUMLAH MESIN JUMLAH OPERATOR
Persentase bahan baku Jumlah Mesin
No. Nama mesin Scrap (%) Efisiensi Kapasitas Jumlah Output Bahan yang Dibutuhkan Jlh. OP/Mesin Jlh Total
biji plastik abs 30% Teoritis Praktis Operator
biji styrofoam 25% 11 Mesin Helm Safety Impact 0% 100% 250 1872000 1872000 1.50 2 2 8
flat visor 15% 10 Mesin Coating 1% 99% 180 280800 286501.38 0.32 1 1 2
kain 10% 9 Mesin Visor Press 2% 98% 60 286501.38 298314.64 1.00 1 1 2
busa 10% 8 Mesin Jahit 2% 98% 90 374400.00 389837.57 0.87 1 1 2
tali helm 5% 7 Mesin Cutting 2% 99% 90 194918.78 200905.78 0.45 1 1 2
baut 5% 6 Mesin Linen Fabric Cutting 3% 98% 90 100452.89 105673.14 0.24 1 1 2
Jam kerja: (1 shift) 48 jam/minggu 5 Mesin Helmet Linear Molding 3% 98% 90 48033.25 468000.00 1.04 2 1 4
4992 jam/tahun 4 Mesin Drying 1% 99% 80 561600.00 573002.75 1.43 2 1 4
2 shift 998400% 3 Mesin Air Brush Compressor 2% 98% 80 28650.14 29831.46 0.07 1 1 2
Demand rate: 375 produk/jam 2 Mesin Washing 2% 98% 80 29831.46 31061.50 0.08 1 1 2
1 Mesin Injection Molding 3% 97% 200 31061.50 33012.54 0.03 1 2 4
4288140.75703 14 13 34

JUMLAH BAHAN BAKU output input

Persentase Jumlah Bahan Baku


No. Nama Bahan
Bahan Baku yang Dibutuhkan
mesin linen fabric cutting 100452.89 105673.14
1 biji plastik abs 30% 9903.76205763339 175792.55 184928.00
2 biji styrofoam 25% 8253.13504802782 3430.95 3609.24
3 flat visor 15% 4951.88102881669 44602.30 46920.16
4 kain 10% 3301.25401921113
5 busa 10% 3301.25401921113 44077.13
6 tali helm 5% 1650.62700960556 264462.81
7 baut 5% 1650.62700960556
mesin helm safety impact 1684800
mesin jahit 1404000
mesin helmet linear molding 1029600

Anda mungkin juga menyukai