HARGA SATUAN PEKERJAAN KONSTRUKSI BETON BERTULANG

1 1 M3 MEMBUAT BETON K-175 SITE MIX …………………… Analisa 773,062.13


2 1 M3 MEMBUAT BETON K-225 SITE MIX …………………… Analisa 812,987.13
3 1 M3 MEMBUAT BETON K-225 READY MIX …………………… Analisa 1,278,570.00
4 1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR …………………… Analisa 13,496.00
5 1 M2 PEMASANGAM BEKISTING UNTUK SLOOF …………………… Analisa 165,700.00
6 1 M2 PEMASANGAM BEKISTING UNTUK KOLOM …………………… Analisa 311,150.00
7 1 M2 PEMASANGAM BEKISTING UNTUK BALOK …………………… Analisa 316,550.00
8 1 M2 PEMASANGAM BEKISTING UNTUK PLAT LANTAI …………………… Analisa 409,150.00
HARGA
NO. URAIAN PEKERJAAN KOEFISIEN SAT JUMLAH (Rp)
SATUAN (Rp)
1 1M3 SLOOF 15 X 20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 773,062.13 773,062.13
- Bekisting sloof 3.7778 m2 165,700.00 625,977.78
- Besi beton terpasang 149.9622 kg 13,496.00 2,023,889.85
JUMLAH 3,422,929.76
2 1M3 KOLOM PRAKTIS 12X12 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 773,062.13 773,062.13
- Bekisting kolom 3.3333 m2 311,150.00 1,037,166.67
- Besi beton terpasang 228.0386 kg 13,496.00 3,077,608.95
JUMLAH 4,887,837.74
3 1M3 KOLOM STRUKTUR 14X17 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 773,062.13 773,062.13
- Bekisting kolom 4.2017 m2 311,150.00 1,307,352.94
- Besi beton terpasang 192.1814 kg 13,496.00 2,593,680.17
JUMLAH 4,674,095.24
4 1M3 KOLOM TERAS 14X17 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 773,062.13 773,062.13
- Bekisting kolom 8.6835 m2 311,150.00 2,701,862.75
- Besi beton terpasang 192.1814 kg 13,496.00 2,593,680.17
JUMLAH 6,068,605.05
5 1M3 BALOK LINTEL 12X15 CM, SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 773,062.13 773,062.13
- Bekisting balok 5.8333 m2 316,550.00 1,846,541.67
- Besi beton terpasang 171.5230 kg 13,496.00 2,314,874.41
JUMLAH 4,934,478.20
6 1M3 BALOK TERAS 11X20 CM, SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 773,062.13 773,062.13
- Bekisting balok 5.7955 m2 316,550.00 1,834,551.14
- Besi beton terpasang 207.9053 kg 13,496.00 2,805,889.93
JUMLAH 5,413,503.19
7 1M3 RINGBALK 12X20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 773,062.13 773,062.13
- Bekisting sloof 3.5417 m2 165,700.00 586,854.17
- Besi beton terpasang 153.2442 kg 13,496.00 2,068,183.72
JUMLAH 3,428,100.02
8 1M3 KOLOM 20X20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.225) 1.0000 m3 812,987.13 812,987.13
- Bekisting kolom 6.6667 m2 311,150.00 2,074,333.33
- Besi beton terpasang 150.5883 kg 13,496.00 2,032,339.70
JUMLAH 4,919,660.16
8 1M3 SLOOF 20X30 CM, BETON SITE MIX K.225
- Adukan Beton (Site Mix K.225) 1.0000 m3 812,987.13 812,987.13
- Bekisting sloof 6.6667 m2 165,700.00 1,104,666.67
- Besi beton terpasang 148.1847 kg 13,496.00 1,999,900.71
JUMLAH 3,917,554.51
9 1M3 KOLOM 25X25 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.225) 1.0000 m3 812,987.13 812,987.13
- Bekisting kolom 5.3333 m2 311,150.00 1,659,466.67
- Besi beton terpasang 142.2573 kg 13,496.00 1,919,904.52
JUMLAH 4,392,358.32
10 1M3 KOLOM 30X40 CM, BETON SITE MIX K.225
- Adukan Beton (Site Mix K.225) 1.0000 m3 812,987.13 812,987.13
- Bekisting kolom 3.8889 m2 311,150.00 1,210,027.78
- Besi beton terpasang 155.3917 kg 13,496.00 2,097,166.38
JUMLAH 4,120,181.29
11 1M3 BALOK 20X65 CM, BETON READY MIX K.225
- Adukan Beton (Ready Mix K.225) 1.0000 m3 1,278,570.00 1,278,570.00
- Bekisting balok 7.4872 m2 311,150.00 2,329,635.90
- Besi beton terpasang 164.4263 kg 13,496.00 2,219,097.34
JUMLAH 5,827,303.24
12 1M3 BALOK 20X30 CM, BETON READY MIX K.225
- Adukan Beton (Ready Mix K.225) 1.0000 m3 1,278,570.00 1,278,570.00
- Bekisting balok 8.4444 m2 311,150.00 2,627,488.89
- Besi beton terpasang 174.3389 kg 13,496.00 2,352,877.79
JUMLAH 6,258,936.68
13 1M3 PLAT BETON T=12 CM, BETON READY MIX K.225
- Adukan Beton (Ready Mix K.225) 1.0000 m3 1,278,570.00 1,278,570.00
- Bekisting plat lantai beton 5.5556 m2 409,150.00 2,273,055.56
- Besi beton terpasang 102.7778 kg 13,496.00 1,387,089.19
JUMLAH 4,938,714.74
14 1M3 PLAT BETON KANOPI T=10 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 773,062.13 773,062.13
- Bekisting plat lantai beton 5.0000 m2 409,150.00 2,045,750.00
- Besi beton terpasang 123.3333 kg 13,496.00 1,664,506.22
JUMLAH 4,483,318.35
15 1M3 FOOT PLATE+PEDESTAL, BETON SITE MIX K.225
- Adukan Beton (Site Mix K.225) 1.0000 m3 812,987.13 812,987.13
- Bekisting 6.6667 m2 165,700.00 1,104,666.67
- Besi beton terpasang 142.2573 kg 13,496.00 1,919,904.52
JUMLAH 3,837,558.32
PEKERJAAN KUSEN

NO URAIAN KODE

1 Pemasangan 1 m kusen alluminium 4.2.1


2 Pemasangan 1 m2 Daun Pintu Rangka Alumunium 4.2.1
3 Kunci Pintu Bottom patch Loock + Colinder
4 Top Patch / bottom patch fitting M.07034
5 Handle Stainless Steell M.07024
7 Ongkos pasang (10% x bahan)

Jumlah Harga
Jumlah
Dibulatkan

NO URAIAN

1 Kusen Alumunium Warna 1,3 mm 3 " M.07014


2 Daun Jendela Alumunium Natural 1,3 mm M.07017
5 Kaca Rayben 5 mm M.07003
6 Handle Jendela Alumunium M.07023
7 Engsel Jendela tophung M.07030
8 Karet Acsesoris M.07045
9 Silent M.07044
10 Ongkos pasang (10% x bahan)

Jumlah Harga
Jumlah
Dibulatkan

NO URAIAN

1 Kusen Alumunium Warna 1,3 mm 3 " M.07014


2 Daun Jendela Alumunium Natural 1,3 mm M.07017
5 Kaca Rayben 5 mm M.07003
6 Handle Jendela Alumunium M.07023
7 Engsel Jendela tophung M.07030
8 Karet Acsesoris M.07045
9 Silent M.07044
10 Ongkos pasang (10% x bahan)

Jumlah Harga
Jumlah
Dibulatkan

NO URAIAN

1 Pemasangan 1 m kusen alluminium 4.2.1


2 Pemasangan 1 m2 Daun Pintu Rangka Alumunium 4.2.1
5 Kaca Rayben 5 mm M.07003
3 Kunci Pintu Bottom patch Loock + Colinder
4 Top Patch / bottom patch fitting M.07034
5 Handle Stainless Steell M.07024
7 Ongkos pasang (10% x bahan)

Jumlah Harga
Jumlah
Dibulatkan

NO URAIAN

1 Kusen alumunium warna


2 Daun Pintu Rangka Kayu+Double Teakwood
3 Kaca 5 mm Setara Asahi
4 Kunci Pintu
5 Handle Jendela
6 Engsel Jendela tophung
7 Karet asesoris
8 Sealent
9 Ongkos pasang (15% x bahan)

Jumlah Harga
Keuntungan 10 %
Jumlah
Dibulatkan
ALM 01 Tipe P1 ALM 02
SAT HARGA SATUAN
VOL BIAYA VOL

m' 102,173.50 5.210 532,323.94 4.150


m' 356,433.00 5.81 2,070,875.73 1.80
bh 750,000.00 1.00 750,000.00 1.00
bh 150,000.00 4.00 600,000.00 2.00
bh 141,750.00 4.00 567,000.00 2.00
ls - 1.00 452,019.97 1.00

4,972,219.63
4,972,219.63
4,972,200.00

ALM 03 J1 ALM 04
SAT HARGA SATUAN
VOL BIAYA VOL

m' 73,500.00 7.45 547,575.00 5.80


m' 115,000.00 0.97 111,228.00 0.97
m2 165,000.00 1.37 226,462.50 0.47
bh 21,000.00 3.00 63,000.00 3.00
bh 57,750.00 6.00 346,500.00 6.00
m' 4,200.00 6.60 27,720.00 6.84
m' 2,625.00 13.44 35,280.00 6.84
ls - 1.00 135,776.55 1.00

1,493,542.05
1,493,542.05
1,493,500.00

ALM 06 BV1 ALM 07


SAT HARGA SATUAN
VOL BIAYA VOL

m' 73,500.00 5.65 415,275.00 4.85


m' 115,000.00 0.81 93,150.00 0.65
m2 165,000.00 -
bh 21,000.00 -
bh 57,750.00 -
m' 4,200.00 -
m' 2,625.00 -
ls - 1.00 50,842.50 1.00

559,267.50
559,267.50
559,200.00

ALM 09 P.UTAMA ALM 10


SAT HARGA SATUAN
VOL BIAYA VOL

m' 102,173.50 30.46 3,112,204.81 7.20


m' 356,433.00 3.20 1,140,585.60
m2 165,000.00 4.96 818,400.00
bh 750,000.00 1.00 750,000.00
bh 165,000.00 4.00 660,000.00
bh 141,750.00 4.00 567,000.00
ls - 1.00 704,819.04

7,753,009.45
7,753,009.45
7,753,000.00

ALM 05 Tipe J3 ALM 06


SAT HARGA SATUAN
VOL BIAYA VOL

m' 73,500.00 9.08 667,012.50 10.28


m2 450,000.00 - - 1.40
m2 165,000.00 2.00 329,175.00 1.26
bh 281,057.50 1.00
bh 21,000.00 - - 4.00
bh 57,750.00 - - 8.00
m' 4,200.00 9.90 41,580.00 7.10
m' 2,625.00 9.90 25,987.50 7.10
ls - 1.00 159,563.25 1.00

1,223,318.25
122,331.83
1,345,650.08
1,345,600.00
Tipe P2 ALM 03 Tipe P3
BIAYA VOL BIAYA

424,020.03 3.400 347,389.90


641,579.40 1.40 499,006.20
750,000.00 1.00 750,000.00
300,000.00 -
283,500.00 -
119,954.97 1.00 79,819.81

2,519,054.40 1,676,215.91
2,519,054.40 1,676,215.91
2,519,000.00 1,676,200.00

J2 ALM 05 J.KACA
BIAYA VOL BIAYA

426,300.00 19.20 1,411,200.00


111,228.00 -
77,962.50 9.20 1,518,000.00
63,000.00 -
346,500.00 -
28,728.00 38.40 161,280.00
17,955.00 38.40 100,800.00
107,167.35 1.00 319,128.00

1,178,840.85 3,510,408.00
1,178,840.85 3,510,408.00
1,178,800.00 3,510,400.00

BV2 ALM 08 BV3


BIAYA VOL BIAYA

356,475.00 1.15 84,525.00


75,037.50 0.27 31,050.00
- -
- -
- -
- -
- -
43,151.25 1.00 11,557.50

474,663.75 127,132.50
474,663.75 127,132.50
474,600.00 127,100.00

BV4
BIAYA

735,649.20
-
- -
-
-
-
73,564.92

809,214.12
809,214.12
809,200.00

Tipe PJ1
BIAYA

755,212.50
630,000.00
207,900.00

84,000.00
462,000.00
29,820.00
18,637.50
328,135.50

2,515,705.50
251,570.55
2,767,276.05
2,767,200.00
10.12

11.00
11,000,000.00
1,100,000.00
12,100,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Program : Program Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)
Kegiatan : Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)
Pekerjaan : Pembangunan MCK
Sumber Dana : DAU-T - Tahun 2019

1 M' PEK. PENGUKURAN DAN PAS. BOUWPLANK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 85,000.00 4,250.00
Tukang Kayu L.02 OH 0.0500 110,000.00 5,500.00
Kepala Tukang Kayu L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH HARGA TENAGA KERJA 11,600.00
B BAHAN
Kayu Balok 5/7 Klas III M3 0.0100 1,800,000.00 18,000.00
Kayu Papan 3/20 Klas III M3 0.0010 1,800,000.00 1,800.00
Paku Biasa 2" - 3" Kg 0.0070 14,500.00 101.50
JUMLAH HARGA BAHAN 19,901.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,501.50


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 31,501.50

1 M2 PEK. PEMBERSIHAN DAN PERATAAN LAPANGAN


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Mandor L.04 OH 0.0500 130,000.00 6,500.00
JUMLAH HARGA TENAGA KERJA 15,000.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,000.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 15,000.00

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 1 M


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 85,000.00 34,000.00
Mandor L.04 OH 0.0250 130,000.00 3,250.00
JUMLAH HARGA TENAGA KERJA 37,250.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
Alat bantu (Cangkul) Ls 1.0000 860.00 860.00
JUMLAH HARGA ALAT 860.00

D Jumlah (A+B+C) 38,110.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 38,110.00
1 M3 PENGURUGAN, PEMADATAN DAN PENGADAAN TANAH
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Upah Urugan M3 1.0000 15,000.00 15,000.00
Biaya Upah Pemadatan Tanah (Tiap 20 cm) M3 1.0000 38,110.00 38,110.00
JUMLAH HARGA TENAGA KERJA 53,110.00
B BAHAN
Tanah Urug M3 1.1000 65,000.00 71,500.00
JUMLAH HARGA BAHAN 71,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 124,610.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 124,610.00

1 M3 URUGAN PASIR URUG


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Mandor L.04 OH 0.0100 130,000.00 1,300.00
JUMLAH HARGA TENAGA KERJA 18,300.00
B BAHAN
Pasir urug M3 1.2000 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 138,300.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 138,300.00

1 M3 LANTAI KERJA, BETON MUTU K-125


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 85,000.00 102,000.00
Tk. Batu L.02 OH 0.2000 110,000.00 22,000.00
Kep. Tukang batu L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0600 130,000.00 7,800.00
JUMLAH HARGA TENAGA KERJA 134,200.00
B BAHAN
PC Kg 230.0000 1,125.00 258,750.00
Pasir Beton M3 0.5500 150,000.00 82,500.00
Split pecah mesin 2/3 M3 0.9300 160,000.00 148,800.00
JUMLAH HARGA BAHAN 490,050.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 624,250.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 624,250.00
1 M3 PAS. AANSTAMPING BATU BELAH
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5800 85,000.00 49,300.00
Tk. Batu L.02 OH 0.2900 110,000.00 31,900.00
Kep. Tukang batu L.03 OH 0.2900 120,000.00 34,800.00
Mandor L.04 OH 0.0390 130,000.00 5,070.00
JUMLAH HARGA TENAGA KERJA 121,070.00
B BAHAN
Batu belah M3 1.2000 166,666.67 200,000.00
Pasir urug M3 0.4320 100,000.00 43,200.00
JUMLAH HARGA BAHAN 243,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 364,270.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 364,270.00

1 M3 PAS. BATU BELAH 1:4


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 85,000.00 68,000.00
Tk. batu L.02 OH 0.6500 110,000.00 71,500.00
Kepala tukang batu L.03 OH 0.0750 120,000.00 9,000.00
Mandor L.04 OH 0.0750 130,000.00 9,750.00
JUMLAH HARGA TENAGA KERJA 158,250.00
B BAHAN
Batu belah M3 1.1000 166,666.67 183,333.33
P.C Kg 163.0000 1,125.00 183,375.00
Pasir pasang M3 0.5200 135,000.00 70,200.00
JUMLAH HARGA BAHAN 436,908.33
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 595,158.33


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 595,158.33

1 M2 PAS. DINDING BATA MERAH 1:4


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2700 85,000.00 22,950.00
Tk. Batu L.02 OH 0.1000 110,000.00 11,000.00
Kep. tukang batu L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH HARGA TENAGA KERJA 37,100.00
B BAHAN
Bata merah Bh 70.0000 550.00 38,500.00
P.C Kg 11.5000 1,125.00 12,937.50
Pasir pasang M3 0.0430 135,000.00 5,805.00
JUMLAH HARGA BAHAN 57,242.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 94,342.50


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 94,342.50
1 M2 PLESTERAN DINDING 1:4 + ACIAN
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tk. Batu L.02 OH 0.1300 110,000.00 14,300.00
Kep. tukang batu L.03 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH HARGA TENAGA KERJA 35,050.00
B BAHAN
P.C Kg 6.2400 1,125.00 7,020.00
Pasir Pasang M3 0.0240 135,000.00 3,240.00
JUMLAH HARGA BAHAN 10,260.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,310.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 45,310.00

1 M2 DINDING KERAMIK 20/25 DN CORAK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 85,000.00 76,500.00
Tk. Batu L.02 OH 0.4500 110,000.00 49,500.00
Kepala Tk. Batu L.03 OH 0.0450 120,000.00 5,400.00
Mandor L.04 OH 0.0450 130,000.00 5,850.00
JUMLAH HARGA TENAGA KERJA 137,250.00
B BAHAN
Keramik 20/25 KW II DN Corak M2 1.0600 68,000.00 72,080.00
P.C Kg 9.3000 1,125.00 10,462.50
Pasir Pasang M3 0.0180 135,000.00 2,430.00
Semen Warna Kg 1.9400 12,000.00 23,280.00
JUMLAH HARGA BAHAN 108,252.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 245,502.50


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 245,502.50

1 M2 LANTAI KERAMIK 40/40 PUTIH POLOS


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.4500 85,000.00 38,250.00
Tk. Batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala Tk. Batu L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH HARGA TENAGA KERJA 85,500.00
B BAHAN
Keramik 40 x 40 KW I Putih polos M2 1.0500 60,000.00 63,000.00
P.C Kg 8.1900 1,125.00 9,213.75
Pasir Pasang M3 0.0450 135,000.00 6,075.00
Semen Warna Kg 0.5000 12,000.00 6,000.00
JUMLAH HARGA BAHAN 84,288.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 169,788.75


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 169,788.75

1 M2 LANTAI KERAMIK 30/30 PUTIH POLOS


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.4500 85,000.00 38,250.00
Tk. Batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala Tk. Batu L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH HARGA TENAGA KERJA 85,500.00
B BAHAN
Keramik 30 x 30 KW I Putih polos M2 1.0500 60,000.00 63,000.00
P.C Kg 8.1900 1,125.00 9,213.75
Pasir Pasang M3 0.0450 135,000.00 6,075.00
Semen Warna Kg 0.5000 12,000.00 6,000.00
JUMLAH HARGA BAHAN 84,288.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 169,788.75


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 169,788.75

1 M2 LANTAI KERAMIK 20/20 ANTI SLIP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 85,000.00 59,500.00
Tk. Batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala Tk. Batu L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH HARGA TENAGA KERJA 106,750.00
B BAHAN
Keramik 20 x 20 KW I Anti slip M2 1.0500 65,000.00 68,250.00
P.C Kg 10.4000 1,125.00 11,700.00
Pasir Pasang M3 0.0450 135,000.00 6,075.00
Semen Warna Kg 0.5000 12,000.00 6,000.00
JUMLAH HARGA BAHAN 92,025.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 198,775.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 198,775.00

1 M2 PEMASANGAM BEKISTING UNTUK SLOOF


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 85,000.00 44,200.00
Tk. Kayu L.02 OH 0.2600 110,000.00 28,600.00
Kepala Tukang Kayu L.03 OH 0.0260 120,000.00 3,120.00
Mandor L.04 OH 0.0260 130,000.00 3,380.00
JUMLAH HARGA TENAGA KERJA 79,300.00
B BAHAN
Kayu Klas III M3 0.0450 1,800,000.00 81,000.00
Paku 5 - 10 cm M3 0.3000 14,500.00 4,350.00
Minyak Bekisting Ltr 0.1000 10,500.00 1,050.00
JUMLAH HARGA BAHAN 86,400.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 165,700.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 165,700.00
1 M2 PEMASANGAM BEKISTING UNTUK KOLOM
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 85,000.00 56,100.00
Tk. Kayu L.02 OH 0.3300 110,000.00 36,300.00
Kepala Tukang Kayu L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 130,000.00 4,290.00
JUMLAH HARGA TENAGA KERJA 100,650.00
B BAHAN
Kayu Klas III M3 0.0400 1,800,000.00 72,000.00
Balok Kayu Klas III M3 0.0150 1,800,000.00 27,000.00
Paku 5 - 10 cm M3 0.4000 14,500.00 5,800.00
Minyak Bekisting Ltr 0.2000 10,500.00 2,100.00
Multiplex 9mm Lbr 0.3500 156,000.00 54,600.00
Dolken Kayu Ø 8 - 10 cm - pjg 4 m Btg 2.0000 24,500.00 49,000.00
JUMLAH HARGA BAHAN 210,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 311,150.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 311,150.00

1 M2 PEMASANGAM BEKISTING UNTUK BALOK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 85,000.00 56,100.00
Tk. Kayu L.02 OH 0.3300 110,000.00 36,300.00
Kepala Tukang Kayu L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 130,000.00 4,290.00
JUMLAH HARGA TENAGA KERJA 100,650.00
B BAHAN
Kayu Klas III M3 0.0400 1,800,000.00 72,000.00
Balok Kayu Klas III M3 0.0180 1,800,000.00 32,400.00
Paku 5 - 10 cm M3 0.4000 14,500.00 5,800.00
Minyak Bekisting Ltr 0.2000 10,500.00 2,100.00
Multipldex 9mm Lbr 0.3500 156,000.00 54,600.00
Dolken Kayu Ø 8 - 10 cm - pjg 4 m Btg 2.0000 24,500.00 49,000.00
JUMLAH HARGA BAHAN 215,900.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 316,550.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 316,550.00
1 M2 PEMASANGAM BEKISTING UNTUK PLAT LANTAI

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 85,000.00 56,100.00
Tk. Kayu L.02 OH 0.3300 110,000.00 36,300.00
Kepala Tukang Kayu L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 130,000.00 4,290.00
JUMLAH HARGA TENAGA KERJA 100,650.00
B BAHAN
Kayu Klas III M3 0.0400 1,800,000.00 72,000.00
Balok Kayu Klas III M3 0.0150 1,800,000.00 27,000.00
Paku 5 - 10 cm M3 0.4000 14,500.00 5,800.00
Minyak Bekisting Ltr 0.2000 10,500.00 2,100.00
Multipldex 9mm Lbr 0.3500 156,000.00 54,600.00
Dolken Kayu Ø 8 - 10 cm - pjg 4 m Btg 6.0000 24,500.00 147,000.00
JUMLAH HARGA BAHAN 308,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 409,150.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 409,150.00

1 M3 MEMBUAT BETON fc' 9,8 SITE MIX


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tk. Batu L.02 OH 0.2750 110,000.00 30,250.00
Kep. Tukang batu L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 130,000.00 10,790.00
JUMLAH HARGA TENAGA KERJA 184,650.00
B BAHAN
PC Kg 218.0000 1,125.00 245,250.00
Pasir beton M3 0.5200 150,000.00 78,000.00
Split pecah mesin 2/3 M3 0.8700 160,000.00 139,200.00
JUMLAH HARGA BAHAN 462,450.00
C PERALATAN
Peralatan Ls 0.7000 11,231.61 7,862.13
JUMLAH HARGA ALAT 7,862.13

D Jumlah (A+B+C) 654,962.13


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 654,962.13

1 M3 MEMBUAT BETON K-175 SITE MIX


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tk. Batu L.02 OH 0.2750 110,000.00 30,250.00
Kep. Tukang batu L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 130,000.00 10,790.00
JUMLAH HARGA TENAGA KERJA 184,650.00
B BAHAN
PC Kg 326.0000 1,125.00 366,750.00
Pasir beton M3 0.5400 150,000.00 81,000.00
Split pecah mesin 2/3 M3 0.8300 160,000.00 132,800.00
JUMLAH HARGA BAHAN 580,550.00
C PERALATAN
Peralatan Ls 0.7000 11,231.61 7,862.13
JUMLAH HARGA ALAT 7,862.13
D Jumlah (A+B+C) 773,062.13
E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 773,062.13
1 M3 MEMBUAT BETON K-225 SITE MIX
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tk. Batu L.02 OH 0.2750 110,000.00 30,250.00
Kep. Tukang batu L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 130,000.00 10,790.00
JUMLAH HARGA TENAGA KERJA 184,650.00
B BAHAN
PC Kg 371.0000 1,125.00 417,375.00
Pasir beton M3 0.4900 150,000.00 73,500.00
Split pecah mesin 2/3 M3 0.8100 160,000.00 129,600.00
JUMLAH HARGA BAHAN 620,475.00
C PERALATAN
Peralatan Ls 0.7000 11,231.61 7,862.13
JUMLAH HARGA ALAT 7,862.13

D Jumlah (A+B+C) 812,987.13


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 812,987.13

1 M3 MEMBUAT BETON K-225 READY MIX

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 2.5000 85,000.00 212,500.00
Tk. Batu L.02 OH 0.2500 110,000.00 27,500.00
Kep. Tukang batu L.03 OH 0.1000 120,000.00 12,000.00
Mandor L.04 OH 0.0100 130,000.00 1,300.00
JUMLAH HARGA TENAGA KERJA 253,300.00
B BAHAN
Adukan K-225 Readymix M3 1.0000 1,000,000.00 1,000,000.00
JUMLAH HARGA BAHAN 1,000,000.00
C PERALATAN
Peralatan Ls 0.7000 36,100.00 25,270.00
JUMLAH HARGA ALAT 25,270.00

D Jumlah (A+B+C) 1,278,570.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 1,278,570.00

1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0070 85,000.00 595.00
Tk. Besi beton L.02 OH 0.0070 110,000.00 770.00
Kepala tukang besi beton L.03 OH 0.0007 120,000.00 84.00
Mandor L.04 OH 0.0004 130,000.00 52.00
JUMLAH HARGA TENAGA KERJA 1,501.00
B BAHAN
Besi Beton Rata-Rata Kg 1.0500 11,000.00 11,550.00
Kawat Beton Kg 0.0150 19,500.00 292.50
JUMLAH HARGA BAHAN 11,842.50
C PERALATAN
Peralatan Specer Ls 1.0000 152.50 152.50
JUMLAH HARGA ALAT 152.50

D Jumlah (A+B+C) 13,496.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 13,496.00
1 M2 RANGKA BAJA RINGAN ZINCALUME, C.75.75
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1550 85,000.00 13,175.00
Tk. Besi L.02 OH 0.1530 110,000.00 16,830.00
Kepala tukang besi L.03 OH 0.0155 120,000.00 1,860.00
Mandor L.04 OH 0.0090 130,000.00 1,170.00
JUMLAH HARGA TENAGA KERJA 33,035.00
B BAHAN
Truss C.75.75 M' 4.2200 12,000.00 50,640.00
Roof Batten / Reng M' 3.8000 9,500.00 36,100.00
Screw/Dynabolt Pcs 15.0000 1,000.00 15,000.00
JUMLAH HARGA BAHAN 101,740.00
C PERALATAN
Peralatan % 5.0000 6,738.75
JUMLAH HARGA ALAT 6,738.75

D Jumlah (A+B+C) 141,513.75


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 141,513.75

1 M2 REPOSISI RENG BAJA RINGAN ZINCALUME (BAHAN RENG BARU)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1550 85,000.00 13,175.00
Tk. Besi L.02 OH 0.1440 110,000.00 15,840.00
Kepala tukang besi L.03 OH 0.0155 120,000.00 1,860.00
Mandor L.04 OH 0.0090 130,000.00 1,170.00
JUMLAH HARGA TENAGA KERJA 32,045.00
B BAHAN
Roof Batten / Reng M' 2.7800 9,500.00 26,410.00
Screw/Dynabolt Pcs 9.0000 1,000.00 9,000.00
JUMLAH HARGA BAHAN 35,410.00

C Jumlah (A+B+C) 67,455.00


D Overhead & Profit 0.00% -
E Harga Satuan Pekerjaan (C+D) 67,455.00

1 M2 REPOSISI RENG BAJA RINGAN ZINCALUME (BAHAN RENG LAMA)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0940 85,000.00 7,990.00
Tk. Besi L.02 OH 0.0940 110,000.00 10,340.00
Kepala tukang besi L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH HARGA TENAGA KERJA 20,180.00
B BAHAN
Screw/Dynabolt Pcs 8.5500 1,000.00 8,550.00
JUMLAH HARGA BAHAN 8,550.00

C Jumlah (A+B+C) 28,730.00


D Overhead & Profit 0.00% -
E Harga Satuan Pekerjaan (C+D) 28,730.00
1 M' PEKERJAAN LISPLANK GRC L. 20 CM
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 85,000.00 5,950.00
Tukang kayu L.02 OH 0.2000 110,000.00 22,000.00
Kepala Tukang kayu L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0040 130,000.00 520.00
JUMLAH HARGA TENAGA KERJA 30,870.00
B BAHAN
Listplank GRC, L.20 cm M' 1.0000 26,500.00 26,500.00
Paku GRC Kg 0.0100 14,500.00 145.00
JUMLAH HARGA BAHAN 26,645.00
C PERALATAN
Peralatan
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 57,515.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 57,515.00

1 M2 PEMASANGAN RANGKA BESI HOLLOW, MODUL 60x120 cm, UNTUK PLAFOND (Hanya Rangka)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1900 85,000.00 16,150.00
Tk. Besi L.02 OH 0.2300 110,000.00 25,300.00
Kep. tukang besi L.03 OH 0.0250 120,000.00 3,000.00
Mandor L.04 OH 0.0130 130,000.00 1,690.00
JUMLAH HARGA TENAGA KERJA 46,140.00
B BAHAN
Rangka Besi Hollow Galvanis 20x40 + 40x40 btg 1.0000 26,000.00 26,000.00
Asesories (perkuatan dll) Ls 75%xRngk 19,500.00 19,500.00
JUMLAH HARGA BAHAN 45,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 91,640.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 91,640.00

1 M2 PEMASANGAN RANGKA KAYU KLS III, MODUL 60x120 cm, UNTUK PLAFOND (Hanya Rangka)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1900 85,000.00 16,150.00
Tk. Besi L.02 OH 0.2300 110,000.00 25,300.00
Kep. tukang besi L.03 OH 0.0250 120,000.00 3,000.00
Mandor L.04 OH 0.0130 130,000.00 1,690.00
JUMLAH HARGA TENAGA KERJA 46,140.00
B BAHAN
Rangka Kayu Kls III, 5/7 m3 0.0066 1,800,000.00 11,880.00
Paku Kg 0.2200 14,500.00 14,500.00
JUMLAH HARGA BAHAN 26,380.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 72,520.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 72,520.00
1 M2 PAS. PEMASANGAN PLAFOND GYPSUM 120x240 cm (Tidak Berikut Rangka)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Tk. Kayu L.02 OH 0.0500 110,000.00 5,500.00
Kep. tukang kayu L.03 OH 0.0050 120,000.00 600.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH HARGA TENAGA KERJA 15,250.00
B BAHAN
Gypsum (120x240) mm Lbr 0.3640 65,000.00 23,660.00
Skrup Sunray Elephant, M6 x 1 (Dus = 2000 Pcs) dus 0.1100 75,000.00 8,250.00
Compoun (20 kg) zak 0.0500 55,000.00 2,750.00
Plastik penutup gypsum m2 1.1000 2,500.00 2,750.00
JUMLAH HARGA BAHAN 37,410.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 52,660.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 52,660.00

1 M2 PAS. PEMASANGAN PLAFOND GRC 120x240 cm (Tidak Berikut Rangka)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Tk. Kayu L.02 OH 0.0500 110,000.00 5,500.00
Kep. tukang kayu L.03 OH 0.0050 120,000.00 600.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH HARGA TENAGA KERJA 15,250.00
B BAHAN
GRC (120x240x3) mm Lbr 0.3640 55,500.00 20,202.00
Skrup Sunray Elephant, M6 x 1 (Dus = 2000 Pcs) dus 0.1100 75,000.00 8,250.00
Compoun (20 kg) zak 0.0500 55,000.00 2,750.00
JUMLAH HARGA BAHAN 31,202.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 46,452.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 46,452.00

1 M2 PAS. PEMASANGAN PLAFOND GRC 120x240 cm + RANGKA BESI HOLLOW


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Analisa Pemasangan Rangka Besi Hollow 40x40 1.0000 46,140.00 46,140.00
Analisa Pemasangan Plafond GRC 120x240 cm 1.0000 15,250.00 15,250.00
JUMLAH HARGA TENAGA KERJA 61,390.00
B BAHAN
Analisa Pemasangan Rangka Besi Hollow 40x40 1.0000 45,500.00 45,500.00
Analisa Pemasangan Plafond GRC 120x240 cm 1.0000 31,202.00 31,202.00
JUMLAH HARGA BAHAN 76,702.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 138,092.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 138,092.00
1 M2 PAS. PEMASANGAN PLAFOND GRC 120x240 cm + RANGKA KAYU KLS III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Analisa Pemasangan Kayu kls III 1.0000 46,140.00 46,140.00
Analisa Pemasangan Plafond GRC 120x240 cm 1.0000 15,250.00 15,250.00
JUMLAH HARGA TENAGA KERJA 61,390.00
B BAHAN
Analisa Pemasangan Rangka Kayu kls III 1.0000 26,380.00 26,380.00
Analisa Pemasangan Plafond GRC 120x240 cm 1.0000 31,202.00 31,202.00
JUMLAH HARGA BAHAN 57,582.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 118,972.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 118,972.00

1 M2 PAS. PEMASANGAN PLAFOND GYPSUM 120x240 cm + RANGKA BESI HOLLOW


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Analisa Pemasangan Rangka Besi Hollow 40x40 1.0000 46,140.00 46,140.00
Analisa Pemasangan Plafond Gypsum 120x240 cm 1.0000 15,250.00 15,250.00
JUMLAH HARGA TENAGA KERJA 61,390.00
B BAHAN
Analisa Pemasangan Rangka Besi Hollow 40x40 1.0000 45,500.00 45,500.00
Analisa Pemasangan Plafond Gypsum 120x240 cm 1.0000 37,410.00 37,410.00
JUMLAH HARGA BAHAN 82,910.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 144,300.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 144,300.00

1 M' PASANG LIST PLAFOND GYPSUM


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 85,000.00 4,250.00
Tukang Kayu L.02 OH 0.0500 110,000.00 5,500.00
Kepala Tukang Kayu L.03 OH 0.0050 120,000.00 600.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH HARGA TENAGA KERJA 10,740.00
B BAHAN
List gypsum M' 1.0500 11,500.00 12,075.00
Paku Kg 0.0100 17,800.00 178.00
JUMLAH HARGA BAHAN 12,253.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 22,993.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 22,993.00
1 M' PASANG LIST PLAFOND KAYU
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 85,000.00 4,250.00
Tukang Kayu L.02 OH 0.0500 110,000.00 5,500.00
Kepala Tukang Kayu L.03 OH 0.0050 120,000.00 600.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH HARGA TENAGA KERJA 10,740.00
B BAHAN
List kayu M' 1.0500 9,000.00 9,450.00
Paku Kg 0.0100 17,800.00 178.00
JUMLAH HARGA BAHAN 9,628.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 20,368.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 20,368.00

1 M2 PEK. ATAP GENTENG METAL ROOF LAPIS PASIR


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala tukang kayu L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0010 130,000.00 130.00
JUMLAH HARGA TENAGA KERJA 29,330.00
B BAHAN
Genteng Metal Roof Lapis Pasir M2 1.0499 70,000.00 73,493.00
Paku Genteng Kg 0.2000 33,500.00 6,700.00
JUMLAH HARGA BAHAN 80,193.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 109,523.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 109,523.00

1 M1 PEK. NOK GENTENG METAL ROOF LAPIS PASIR


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 85,000.00 21,250.00
Tukang kayu L.02 OH 0.1500 110,000.00 16,500.00
Kepala tukang kayu L.03 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0130 130,000.00 1,690.00
JUMLAH HARGA TENAGA KERJA 41,240.00
B BAHAN
Nok Genteng Metal Roof M' 1.1000 40,000.00 44,000.00
Paku sekrup Kg 0.0500 33,500.00 1,675.00
JUMLAH HARGA BAHAN 45,675.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 86,915.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 86,915.00
1 M2 PENGECATAN TEMBOK
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 85,000.00 1,700.00
Tukang cat L.02 OH 0.0630 110,000.00 6,930.00
Kepala tukang cat L.03 OH 0.0063 120,000.00 756.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH HARGA TENAGA KERJA 9,776.00
B BAHAN
Cat Dasar set No-Drop Kg 0.1000 54,000.00 5,400.00
Cat Penutup set No-Drop Kg 0.2600 54,000.00 14,040.00
JUMLAH HARGA BAHAN 19,440.00
C PERALATAN
Rol cat Bh 0.0100 35,000.00 350.00
Hamplas Lbr 0.5000 3,500.00 1,750.00
JUMLAH HARGA ALAT 2,100.00

D Jumlah (A+B+C) 31,316.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 31,316.00

1 M2 PENGECATAN PLAFOND
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 85,000.00 2,380.00
Tukang cat L.02 OH 0.0420 110,000.00 4,620.00
Kepala tukang cat L.03 OH 0.0042 120,000.00 504.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH HARGA TENAGA KERJA 7,894.00
B BAHAN
Cat Dasar set metrolite Kg 0.1200 25,000.00 3,000.00
Cat Penutup Interior set metrolite Kg 0.1800 25,000.00 4,500.00
JUMLAH HARGA BAHAN 7,500.00
C PERALATAN
Rol cat Bh 0.0100 35,000.00 350.00
Hamplas Lbr 0.5000 3,500.00 1,750.00
JUMLAH HARGA ALAT 2,100.00

D Jumlah (A+B+C) 17,494.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 17,494.00

1 M2 PENGECATAN KAYU
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 85,000.00 5,950.00
Tukang cat L.02 OH 0.0090 110,000.00 990.00
Kepala tukang cat L.03 OH 0.0060 120,000.00 720.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH HARGA TENAGA KERJA 8,050.00
B BAHAN
Cat menie Kg 0.2000 28,000.00 5,600.00
Cat dasar set Glotex Kg 0.1700 60,000.00 10,200.00
Cat penutup set Glotex Kg 0.2600 60,000.00 15,600.00
Minyak cat terpentin Ltr 0.0300 24,500.00 735.00
JUMLAH HARGA BAHAN 32,135.00
C PERALATAN
Kwas Bh 0.0100 14,000.00 140.00
Amplas kayu Lbr 0.2000 3,500.00 700.00
JUMLAH HARGA ALAT 840.00

D Jumlah (A+B+C) 41,025.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 41,025.00
1 M' SALURAN AIR HUJAN + PASANGAN BATA L=20 CM
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Analisa Pekerjaan Galian tanah M3 0.1650 38,110.00 6,288.15
Analisa Pekerjaan Pasang bata 1:4 M2 0.3500 94,342.50 33,019.88
Analisa Pekerjaan Plesteran 1:4 + Acian M2 0.5000 45,310.00 22,655.00
JUMLAH HARGA TENAGA KERJA 61,963.03
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 61,963.03


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 61,963.03

1 UNIT PEMASANGAN TITIK LAMPU / STOP KONTAK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah (50 % x bahan) % 50 96,675.00 48,337.50
JUMLAH HARGA TENAGA KERJA 48,337.50
B BAHAN
Pipa listrik 5/8 " Btg 1.0000 12,000.00 12,000.00
Kabel M' 16.0000 7,000.00 112,000.00
T Dus Bh 2.0000 2,000.00 4,000.00
L Bow Bh 2.0000 16,000.00 32,000.00
Las Dop Bh 6.0000 350.00 2,100.00
Solatip Bh 0.2500 11,000.00 2,750.00
Mangkok Saklar/Stop Kontak Bh 1.0000 1,000.00 1,000.00
Fiting Bh 1.0000 27,500.00 27,500.00
JUMLAH HARGA BAHAN 193,350.00
C PERALATAN
Alat (10% x bahan) % 10.0000 19,335.00 19,335.00
JUMLAH HARGA ALAT 19,335.00

D Jumlah (A+B+C) 261,022.50


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 261,022.50

1 BH PEMASANGAN MCB
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah (35 % x bahan) % 35 113,820.00 113,820.00
JUMLAH HARGA TENAGA KERJA 113,820.00
B BAHAN
Pipa listrik 5/8 " Btg 1.0000 12,000.00 12,000.00
Kabel M' 15.0000 7,000.00 105,000.00
T Dus Bh 1.0000 2,000.00 2,000.00
L Bow Bh 2.0000 16,000.00 32,000.00
Klem Bh 24.0000 300.00 7,200.00
MCB 1 PHASE + Box Panel Bh 1.0000 167,000.00 167,000.00
JUMLAH HARGA BAHAN 325,200.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 439,020.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 439,020.00
1 BH PEMASANGAN SAKLAR DOUBLE
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Listrik L.02 OH 0.0100 110,000.00 1,100.00
Kepala Tukang Listrik L.03 OH 0.0020 120,000.00 240.00
Mandor L.04 OH 0.0002 130,000.00 26.00
JUMLAH HARGA TENAGA KERJA 2,216.00
B BAHAN
Saklar double set. Broco Bh 1.0000 20,600.00 20,600.00
JUMLAH HARGA BAHAN 20,600.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,816.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 22,816.00

1 BH PEMASANGAN SAKLAR TUNGGAL


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Listrik L.02 OH 0.0100 110,000.00 1,100.00
Kepala Tukang Listrik L.03 OH 0.0020 120,000.00 240.00
Mandor L.04 OH 0.0002 130,000.00 26.00
JUMLAH HARGA TENAGA KERJA 2,216.00
B BAHAN
Saklar tunggal set. Broco Bh 1.0000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 16,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 18,216.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 18,216.00

1 BH PEMASANGAN STOP KONTAK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Listrik L.02 OH 0.0100 110,000.00 1,100.00
Kepala Tukang Listrik L.03 OH 0.0020 120,000.00 240.00
Mandor L.04 OH 0.0002 130,000.00 26.00
JUMLAH HARGA TENAGA KERJA 2,216.00
B BAHAN
Stop kontak set. Broco Bh 1.0000 31,000.00 31,000.00
JUMLAH HARGA BAHAN 31,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 33,216.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 33,216.00
1 BH PEMASANGAN LAMPU TL 1 x 20 WATT
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Listrik L.02 OH 0.0100 110,000.00 1,100.00
Kepala Tukang Listrik L.03 OH 0.0020 120,000.00 240.00
Mandor L.04 OH 0.0002 130,000.00 26.00
JUMLAH HARGA TENAGA KERJA 2,216.00
B BAHAN
Lampu TL 1x20 watt set. Philips bh 1.0000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 182,216.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 182,216.00

1 BH PEMASANGAN LAMPU SL 11 WATT


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Listrik L.02 OH 0.0100 110,000.00 1,100.00
Kepala Tukang Listrik L.03 OH 0.0020 120,000.00 240.00
Mandor L.04 OH 0.0002 130,000.00 26.00
JUMLAH HARGA TENAGA KERJA 2,216.00
B BAHAN
Lampu SL 11 watt set. Philips bh 1.0000 61,000.00 61,000.00
JUMLAH HARGA BAHAN 61,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 63,216.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 63,216.00

1 BH PEMASANGAN 1 BH CLOSET JONGKOK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 85,000.00 63,750.00
Tukang Batu L.02 OH 1.0000 110,000.00 110,000.00
Kepala Tukang Batu L.03 OH 0.1500 120,000.00 18,000.00
Mandor L.04 OH 0.1600 130,000.00 20,800.00
JUMLAH HARGA TENAGA KERJA 212,550.00
B BAHAN
Closet Jongkok bh 1.0000 412,000.00 412,000.00
PC bh 6.0000 1,125.00 6,750.00
Pasir Pasang bh 0.0100 135,000.00 1,350.00
JUMLAH HARGA BAHAN 420,100.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 632,650.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 632,650.00
1 BH PEMASANGAN FLOOR DRAIN
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0500 120,000.00 6,000.00
JUMLAH HARGA TENAGA KERJA 17,000.00
B BAHAN
Floor drain bh 1.0000 39,000.00 39,000.00
JUMLAH HARGA BAHAN 39,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,000.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 56,000.00

1 BH PEMASANGAN KRAN AIR


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0500 120,000.00 6,000.00
JUMLAH HARGA TENAGA KERJA 17,000.00
B BAHAN
Kran Air 1/2" bh 1.0000 31,000.00 31,000.00
JUMLAH HARGA BAHAN 31,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 48,000.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 48,000.00

1M' PASANG PIPA PVC Ø 4"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang L.02 OH 0.1500 110,000.00 16,500.00
JUMLAH HARGA TENAGA KERJA 16,500.00
B BAHAN
PVC AW dia. 4" btg 0.1800 278,000.00 50,040.00
Lem PVC bh 0.1000 13,000.00 1,300.00
JUMLAH HARGA BAHAN 51,340.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 67,840.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 67,840.00
1M' PASANG PIPA PVC Ø 3"
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang L.02 OH 0.1500 110,000.00 16,500.00
JUMLAH HARGA TENAGA KERJA 16,500.00
B BAHAN
PVC AW dia. 3" btg 0.1800 178,000.00 32,040.00
Lem PVC bh 0.1000 13,000.00 1,300.00
JUMLAH HARGA BAHAN 33,340.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,840.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 49,840.00

1M' PASANG PIPA PVC Ø 1/2"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang L.02 OH 0.1500 110,000.00 16,500.00
JUMLAH HARGA TENAGA KERJA 16,500.00
B BAHAN
PVC AW dia. 1/2" btg 0.1800 19,500.00 3,510.00
Lem PVC bh 0.1000 13,000.00 1,300.00
JUMLAH HARGA BAHAN 4,810.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 21,310.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 21,310.00

1 BH PEMASANGAN 1 BH BAK MANDI BATU BATA + KERAMIK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 85,000.00 255,000.00
Tukang Batu L.02 OH 1.0000 110,000.00 110,000.00
Kepala Tukang Batu L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.3000 130,000.00 39,000.00
JUMLAH HARGA TENAGA KERJA 405,200.00
B BAHAN
Bata bh 150.0000 550.00 82,500.00
PC kg 110.0000 1,125.00 123,750.00
Pasir Pasang m3 0.3000 135,000.00 40,500.00
Keramik 20x25 m2 2.8000 68,000.00 190,400.00
JUMLAH HARGA BAHAN 437,150.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 842,350.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 842,350.00
1 UNIT PEMBUATAN SEPTICTANK (2 X 1 X 1,5 M)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A PEKERJAAN ( UPAH+BAHAN+PROFIT )
Pek. Galian Tanah M3 4.5000 38,110.00 171,495.00
Pek. Pasir Urug M3 0.2142 138,300.00 29,623.86
Pek. Pas. bata 1 PC : 4 PS + Plesteran M2 15.0000 94,342.50 1,415,137.50
Pek. Plat Beton penutup + balok M3 0.1800 4,483,318.35 806,997.30
Pek. Pipa PVC 4" M1 6.0000 67,840.00 407,040.00
Tambahan Upah Ls 1.0000 964,382.17 964,382.17
JUMLAH HARGA TENAGA KERJA 3,794,675.83
B

JUMLAH HARGA BAHAN -


C
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 3,794,675.83


E Overhead & Profit 0.00%
F Harga Satuan Pekerjaan (D+E) 3,794,675.83

1M' PASANG PINTU PVC


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang L.02 OH 0.2500 110,000.00 27,500.00
JUMLAH HARGA TENAGA KERJA 27,500.00
B BAHAN
Pintu PVC bh 1.0000 400,000.00 400,000.00
JUMLAH HARGA BAHAN 400,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 427,500.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 427,500.00

MEMASANG TANGKI AIR FIBER KAP 500 LTR + ACESORIES LENGKAP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang L.02 OH 1.9500 110,000.00 214,500.00
JUMLAH HARGA TENAGA KERJA 214,500.00
B BAHAN
Tangki air fiber kap. 500 Ltr + tracessories lengkap bh 1.0000 1,100,000.00 1,100,000.00
JUMLAH HARGA BAHAN 1,100,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,314,500.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 1,314,500.00
1 M2 PASANGAN PAVING BLOCK NATURAL, t : 6 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1875 85,000.00 15,937.50
Tukang Batu L.02 OH 0.3750 110,000.00 41,250.00
Kepala Tukang Batu L.03 OH 0.0500 120,000.00 6,000.00
Mandor L.04 OH 0.0013 130,000.00 169.00
JUMLAH HARGA TENAGA KERJA 63,356.50
B BAHAN
Paving Block m2 1.0100 55,000.00 55,550.00
Abu batu m3 0.1000 150,000.00 15,000.00
JUMLAH HARGA BAHAN 70,550.00
C PERALATAN
Peralatan standar % 10.0000 133,906.50 13,390.65
JUMLAH HARGA ALAT 13,390.65

D Jumlah (A+B+C) 147,297.15


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 147,297.15

1 M' PASANGAN KANSTEEN BETON (40X20X10)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 85,000.00 12,750.00
Tukang Batu L.02 OH 0.0175 110,000.00 1,925.00
Kepala Tukang Batu L.03 OH 0.0018 120,000.00 216.00
Mandor L.04 OH 0.0080 130,000.00 1,040.00
JUMLAH HARGA TENAGA KERJA 15,931.00
B BAHAN
Kansteen Beton m2 2.5000 16,000.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
C PERALATAN
Peralatan standar % 10.0000 55,931.00 5,593.10
JUMLAH HARGA ALAT 5,593.10

D Jumlah (A+B+C) 61,524.10


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 61,524.10

1 M3 MEMASANG LAPISAN BASE COURSE A , t : 5 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1250 85,000.00 10,625.00
Mandor L.04 OH 0.0085 130,000.00 1,105.00
JUMLAH HARGA TENAGA KERJA 11,730.00
B BAHAN
Base Course A m3 1.2500 200,000.00 250,000.00
JUMLAH HARGA BAHAN 250,000.00
C PERALATAN
Baby Roller Hari 0.0180 1,000,000.00 18,000.00
Pengki Hari 0.1500 13,000.00 1,950.00
Blencong Hari 0.0200 94,000.00 1,880.00
Cangkul Hari 0.0250 71,000.00 1,775.00
JUMLAH HARGA ALAT 23,605.00

D Jumlah (A+B+C) 285,335.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 285,335.00
1 M3 MEMASANG BATU SKRAP , t : 20 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1650 85,000.00 14,025.00
Mandor L.04 OH 0.0525 130,000.00 6,825.00
JUMLAH HARGA TENAGA KERJA 20,850.00
B BAHAN
Batu Skrap m3 1.2590 211,000.00 265,649.00
JUMLAH HARGA BAHAN 265,649.00
C PERALATAN
Baby Roller Hari 0.0260 1,000,000.00 26,000.00
Blencong Hari 0.0350 94,000.00 3,290.00
JUMLAH HARGA ALAT 29,290.00

D Jumlah (A+B+C) 315,789.00


E Overhead & Profit 0.00% -
F Harga Satuan Pekerjaan (D+E) 315,789.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH

Program : Program Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)


Kegiatan : Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)
Pekerjaan : Pembangunan MCK
Sumber Dana : DAU-T - Tahun 2019

HARGA SATUAN
NO JENIS BAHAN DAN UPAH SATUAN
(Rp)

I B A H A N :

A BAHAN AGREGAT KASAR, BAHAN PEREKAT


DAN BAHAN LAINNYA
1 Bata merah bh 550.00
2 Batu kali/belah m3 166,666.67
3 Batu Skrap m3 211,000.00
4 Base course A m3 200,000.00
5 Batu pecah/split 1/2 m3 160,000.00
6 Batu pecah/split 2/3 m3 160,000.00
7 Abu Batu m3 150,000.00
8 Pasir pasang m3 135,000.00
9 Pasir urug m3 100,000.00
10 Semen PC @50 kg (per zak) zak 56,250.00
11 Semen PC (per kg) kg 1,125.00
12 Semen putih kg 1,800.00
13 Semen warna Kg 12,000.00
14 Compoun (20 kg) zak 55,000.00
15 Tanah urug m3 65,000.00
16 Ready Mix Beton K-225 (Price List) m3 1,000,000.00
17 Paving Block Natural, t : 6 cm K-250 m2 55,000.00
18 Kansteen Beton 40x20x10 bh 16,000.00

B BAHAN FINISHING DAN LABURAN, PENGISI DAN ALATNYA


1 Ampelas lbr 3,500.00
2 Cat kayu kg 60,000.00
3 Cat tembok (PRIMER) kg 54,000.00
4 Cat tembok (LAPIS) kg 25,000.00
5 Plamur Tembok kg 31,000.00
6 Kwas 3 " bh 14,000.00
7 Lem putih [fox] kg 21,000.00
8 Lem pipa bh 13,000.00
9 Meni kayu / besi [ Nippon ] kg 28,000.00
10 Rool cat tembok bh 35,000.00
11 Terpentin ltr 24,500.00
12 Minyak Bekisting ltr 10,500.00

C BAHAN KAYU BERIKUT BAHAN JADINYA


1 Kayu Albasia m3 1,800,000.00
2 Kayu Kls III m3 1,800,000.00
3 Kayu papan terentang m3 1,800,000.00
4 Multiplex 9mm lbr 156,000.00
5 Kayu Dolken Ø 8 - 10 cm - pjg 4 m btg 24,500.00
HARGA SATUAN
NO JENIS BAHAN DAN UPAH SATUAN
(Rp)

D BAHAN PENUTUP RANGKA PLAFOND


1 GRC 4 mm ex. Atrisco lbr 55,500.00
2 Gypsum 9 mm [ Elephant 120x240 ] lbr 65,000.00
3 List Gypsum m' 11,500.00
4 List kayu L : 4 cm m' 9,000.00
5 Listplank GRC L : 20 cm m' 26,500.00
6 Plastik penutup plafond m2 2,500.00

E BAHAN LANTAI DAN PELAPIS DINDING


1 Keramik 25 x 25 anti slip KW I bercorak/berwarna m2 65,000.00
2 Keramik 25X40 (Dinding) KW I bercorak/berwarna m2 68,000.00
3 Keramik 40 x 40 KW I Bercorak/Berwarna m2 60,000.00
4 Keramik 30 x 30 KW I Putih polos m2 60,000.00
5 Roster bh 22,000.00
6 Glass block bh 45,000.00

F BAHAN LOGAM DAN BAHAN JADINYA


1 Besi beton U 24 rata-rata kg 11,000.00
2 Kawat beton kg 19,500.00
3 Plat Alumunium tebal 0,3 mm m2 128,000.00
4 Kusen Pintu Alluminium 3" Warna Ex Alexsindo 0,3mm m' 122,500.00
5 Daun Pintu Aluminium Warna Ex Alexsindo m' 111,500.00
6 Daun Jendela Aluminium Warna Ex Alexsindo m' 100,300.00
7 Kisi-kisi Aluminium Warna 0,3 mm m' 39,000.00
8 Sekrup Aluminium 2" bh 650.00
9 Door stop bh 8,500.00
10 Silicone Sealent (btl) btl 31,000.00
11 Silicone Sealent (m1) m' 4,500.00
12 Karet Kaca m' 7,000.00
13 Plat strip dia. 3 mm - 3 cm btg 13,900.00
14 Rangka Hollow Galvanis 40/40 btg 26,000.00
15 Truss C.75.75 (rangka bajaringan) m' 12,000.00
16 Reng TS 40 (rangka bajaringan) m' 9,500.00
17 Screw/Dynabolt (rangka bajaringan) Pcs 1,000.00
18 Talang jurai Dalam (rangka bajaringan) m' 50,000.00

G BAHAN PENGGANTUNG DAN KUNCI


1 Engsel jendela casement bh 72,000.00
2 Engsel pintu ring unilon 4" bh 15,000.00
3 Grendel 5 cm bh 9,000.00
4 Handle jendela alumunium bh 16,500.00
5 Kunci pintu 2 slaag tanam Anchor Standart bh 178,000.00
6 Sloot Pintu Tanam standar bh 24,500.00

H BAHAN PENUTUP ATAP


1 Genteng metal lapis pasir m2 70,000.00
2 Nok/ubung metal lapis pasir m' 40,000.00

I BAHAN KACA
1 Kaca polos 5 mm m2 150,000.00

J BAHAN PAKU DAN MUR BAUT


1 Skrup Sunray [ Elephant, M6 x 1 (Dus = 2000 Pcs) ] dus 75,000.00
2 Paku 1 cm s/d 3 cm kg 17,800.00
3 Paku 4 cm s/d 7 cm kg 14,500.00
4 Paku Skrup bh 350.00
5 Paku GRC/Genteng kg 33,500.00
HARGA SATUAN
NO JENIS BAHAN DAN UPAH SATUAN
(Rp)

K BAHAN ELEKTRIKAL
1 Pipa listrik 5/8 " standar btg 12,000.00
2 Kabel Listrik Set. Eterna m' 7,000.00
3 Solatip bh 11,000.00
4 T Dus standar bh 2,000.00
5 L Bow standar bh 16,000.00
6 Las Dop standar bh 350.00
7 Klem standar bh 300.00
8 Mangkok set. Broco bh 1,000.00
9 Fiting set. Broco bh 27,500.00
10 Saklar tunggal set. Broco bh 16,000.00
11 Saklar ganda set. Broco bh 20,600.00
12 Stop Kontak set. Broco bh 31,000.00
13 Lampu SL 11 Watt set. Phillips bh 61,000.00
14 Lampu TL 1x20 Watt set. Phillips bh 180,000.00
15 MCB 1 PHASE + Box Panel bh 167,000.00

L. BAHAN SANITAIR
1 Closet Jongkok standard lengkap Set. Toto unit 412,000.00
2 Floor Drain bh 39,000.00
3 Kran air biasa 1/2" bh 31,000.00
4 Pipa PVC Ø 1/2" set. Wavin btg 19,500.00
5 Pipa PVC Ø3" set. Wavin btg 178,000.00
6 Pipa PVC Ø. 4" set. Wavin btg 278,000.00
7 Pintu PVC + asesories bh 400,000.00
8 Tangki air fiber kap. 500 Ltr + tracessories lengkap bh 1,100,000.00
9 Mesin Pompa Air Jet Pump + Asesories unit 4,500,000.00

II PERALATAN :
1 Cangkul Bh 71,000.00
2 Blencong Bh 94,000.00
3 Pengki Plastik Bh 13,000.00
4 Benang Bh 9,000.00
5 Meteran 50m Bh 110,000.00
6 Meteran 5m Bh 49,000.00
7 Sewa Gerobak hari 22,000.00
8 Sewa Stemper hari 350,000.00
9 Sewa Baby Roller hari 1,000,000.00

III U P A H :
1 Pekerja Org/hr 85,000.00
2 Tukang Batu Org/hr 110,000.00
3 Kepala Tukang Batu Org/hr 120,000.00
3 Tukang Kayu Org/hr 110,000.00
4 Kepala Tukang Kayu Org/hr 120,000.00
4 Tukang Cat/Pelitur Org/hr 110,000.00
5 Kepala Tukang Cat/Pelitur Org/hr 120,000.00
5 Tukang Besi Beton Org/hr 110,000.00
6 Kepala Tukang Besi Beton Org/hr 120,000.00
6 Tukang Besi Profil Org/hr 110,000.00
7 Kepala Tukang Besi Profil Org/hr 120,000.00
8 Mand or Org/hr 130,000.00
DAFTAR HARGA SATUAN PEKERJAAN
Program : Program Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)
Kegiatan : Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)
Pekerjaan : Pembangunan MCK
Sumber Dana : DAU-T - Tahun 2019

NO URAIAN PEKERJAAN HARGA SATUAN (Rp)

1 1 M' PEK. PENGUKURAN DAN PAS. BOUWPLANK 31,501.50


2 1 M2 PEK. PEMBERSIHAN DAN PERATAAN LAPANGAN 15,000.00
3 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 1 M 38,110.00
4 1 M3 PENGURUGAN, PEMADATAN DAN PENGADAAN TANAH 124,610.00
5 1 M3 URUGAN PASIR URUG 138,300.00
6 1 M3 LANTAI KERJA, BETON MUTU K-125 624,250.00
7 1 M3 PAS. AANSTAMPING BATU BELAH 364,270.00
8 1 M3 PAS. BATU BELAH 1:4 595,158.33
9 1 M2 PAS. DINDING BATA MERAH 1:4 94,342.50
10 1 M2 PLESTERAN DINDING 1:4 + ACIAN 45,310.00
11 1 M2 DINDING KERAMIK 20/25 DN CORAK 245,502.50
12 1 M2 LANTAI KERAMIK 20/20 ANTI SLIP 198,775.00
13 1 M2 LANTAI KERAMIK 40/40 PUTIH POLOS 169,788.75
14 1 M2 LANTAI KERAMIK 30/30 PUTIH POLOS 169,788.75
15 1 M2 RANGKA BAJA RINGAN ZINCALUME, C.75.75 141,513.75
16 1 M2 REPOSISI RENG BAJA RINGAN ZINCALUME (BAHAN RENG BARU) 67,455.00
17 1 M2 REPOSISI RENG BAJA RINGAN ZINCALUME (BAHAN RENG LAMA) 28,730.00
18 1 M' PEKERJAAN LISPLANK GRC L. 20 CM 57,515.00
19 1 M2 PAS. PEMASANGAN PLAFOND GRC 120x240 cm + RANGKA BESI HOLLOW 138,092.00
20 1 M2 PAS. PEMASANGAN PLAFOND GRC 120x240 cm + RANGKA KAYU KLS III 118,972.00
21 1 M2 PAS. PEMASANGAN PLAFOND GYPSUM 120x240 cm + RANGKA BESI HOLLOW 144,300.00
22 1 M' PASANG LIST PLAFOND GYPSUM 22,993.00
23 1 M' PASANG LIST PLAFOND KAYU 20,368.00
24 1 M2 PEK. ATAP GENTENG METAL ROOF LAPIS PASIR 109,523.00
25 1 M1 PEK. NOK GENTENG METAL ROOF LAPIS PASIR 86,915.00
26 1 M2 PEK. ATAP SPANDEX + RANGKA BAJA RINGAN 138,070.21
27 1 M2 PENGECATAN TEMBOK 31,316.00
28 1 M2 PENGECATAN PLAFOND 17,494.00
29 1 M2 PENGECATAN KAYU 41,025.00
30 1 M' SALURAN AIR HUJAN + PASANGAN BATA L=20 CM 61,963.03
31 1 TITIK INSTALASI TITIK LAMPU/STOP KONTAK 261,022.50
32 1 BH PEMASANGAN MCB 439,020.00
33 1 BH PEMASANGAN SAKLAR DOUBLE 22,816.00
34 1 BH PEMASANGAN SAKLAR TUNGGAL 18,216.00
35 1 BH PEMASANGAN STOP KONTAK 33,216.00
36 1 BH PEMASANGAN LAMPU TL 1 x 20 WATT 182,216.00
37 1 BH PEMASANGAN LAMPU SL 11 WATT 63,216.00
38 1 BH PEMASANGAN 1 BH CLOSET JONGKOK 632,650.00
39 1 BH PEMASANGAN FLOOR DRAIN 56,000.00
40 1 BH PEMASANGAN KRAN AIR 48,000.00
41 1M' PASANG PIPA PVC Ø 4" 67,840.00
42 1M' PASANG PIPA PVC Ø 3" 49,840.00
43 1M' PASANG PIPA PVC Ø 1/2" 21,310.00
44 1 BH PEMASANGAN 1 BH BAK MANDI BATU BATA + KERAMIK 842,350.00
45 1 UNIT PEMBUATAN SEPTICTANK (2 X 1 X 1,5 M) 3,794,675.83
46 1M' PASANG PINTU PVC 427,500.00
47 MEMASANG TANGKI AIR FIBER KAP 500 LTR + ACESORIES LENGKAP 1,314,500.00
NO URAIAN PEKERJAAN HARGA SATUAN (Rp)

48 1 UNIT PENGEBORAN AIR 40M' + PIPA CASSING 3,500,000.00


49 1 UNIT PASANG MESING POMPA AIR JET PUMP + PIPA 5,400,000.00
50 1 UNIT PASANG TEMPAT CUCI TANGAN + PIPA PVC 1/2" 1,649,000.00
51 1 UNIT PASANG TEMPAT SAMPAH 1,551,000.00
52 1 M2 PASANG FOLDING GATE (SEKAT DINDING) 730,000.00
53 1M3 SLOOF 15 X 20 CM, BETON SITE MIX K.175 3,422,929.76
54 1M3 KOLOM STRUKTUR 14X17 CM, BETON SITE MIX K.175 4,674,095.24
55 1M3 KOLOM TERAS 14X17 CM, BETON SITE MIX K.175 6,068,605.05
56 1M3 KOLOM PRAKTIS 12X12 CM, BETON SITE MIX K.175 4,887,837.74
57 1M3 BALOK TERAS 11X20 CM, SITE MIX K.175 5,413,503.19
58 1M3 BALOK LINTEL 12X15 CM, SITE MIX K.175 4,934,478.20
59 1M3 RINGBALK 12X20 CM, BETON SITE MIX K.175 3,428,100.02
60 1M3 KOLOM 20X20 CM, BETON SITE MIX K.175 4,919,660.16
61 1M3 SLOOF 20X30 CM, BETON SITE MIX K.225 3,917,554.51
62 1M3 KOLOM 25X25 CM, BETON SITE MIX K.175 4,392,358.32
63 1M3 KOLOM 30X40 CM, BETON SITE MIX K.225 4,120,181.29
64 1M3 BALOK 20X65 CM, BETON READY MIX K.225 5,827,303.24
65 1M3 BALOK 20X30 CM, BETON READY MIX K.225 6,258,936.68
66 1M3 PLAT BETON T=12 CM, BETON READY MIX K.225 4,938,714.74
67 1M3 PLAT BETON KANOPI T=10 CM, BETON SITE MIX K.175 4,483,318.35
68 1M3 FOOT PLATE+PEDESTAL, BETON SITE MIX K.225 3,837,558.32
KUSEN ALUMUNIUM (Lengkap terpasang):
69 1 UNIT PINTU ALUMUNIUM, TIPE PJ1 (R.Kelas) #REF!
70 1 UNIT PINTU ALUMUNIUM, TIPE PJ1a (R.Kelas) #REF!
71 1 UNIT JENDELA ALUMUNIUM, TIPE J1 (R.Kelas) #REF!
72 1 UNIT BOUVENLIGHT ALUMUNIUM, TIPE BV1 (R.Kelas) #REF!
73 1 UNIT PINTU ALUMUNIUM, TIPE P1 (R.Kelas) #REF!
74 1 UNIT BOUVENLIGHT ALUMUNIUM, TIPE BV2 (R.Kelas) #REF!
KUSEN KAYU (Lengkap terpasang + cat) :
75 1 UNIT RANGKA KUSEN PINTU KAYU, TIPE PJ1 #REF!
76 1 UNIT RANGKA KUSEN PINTU KAYU, TIPE PJ1a #REF!
77 1 UNIT RANGKA KUSEN PINTU KAYU, TIPE P1 #REF!
78 1 UNIT RANGKA KUSEN JENDELA KAYU, TIPE J1 #REF!
79 1 UNIT RANGKA KUSEN BOUVENLIGHT KAYU, TIPE BV1 #REF!
80 1 UNIT RANGKA KUSEN BOUVENLIGHT KAYU, TIPE BV2 #REF!
PENUTUP KUSEN KAYU (Hanya daun) :
81 1 BH DAUN PINTU PANIL KAYU KLAS II 650,000.00
82 1 BH DAUN JENDELA KAYU KLAS II + KACA 5 MM 450,000.00
ENGSEL, KUNCI DAN ASESORIES KUSEN KAYU :
83 1 BH PASANG ENGSEL PINTU RING UNILON 4" #REF!
84 1 BH PASANG ENGSEL JENDELA #REF!
85 1 BH PASANG SLOT JENDELA #REF!
86 1 BH PASANG KAIT ANGIN #REF!
87 1 BH PASANG KUNCI PINTU 2 SLAAG STANDART #REF!
VOLUME / BACKUP DATA
Program : Program Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)
Kegiatan : Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)
Pekerjaan : Pembangunan MCK
Lokasi
Link / Kp. : Kp. Pekijing Rt. 007 / 003
Kelurahan : Kalang Anyar
Kecamatan : Taktakan
Kota : Kota Serang
Provinsi : Banten
Sumber Dana : DAU-T - Tahun 2019 Volume : 13.50 m2

Lebar (m')
Jml/
Tinggi/T
No Uraian Pekerjaan Ruas Pjg (m') L Rata- Unit Volume Sat
L1 L2 ebal
rata /Titik
(m')

I PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan 1.00 bh
2 Dokumentasi dan Pelaporan 1.00 ls
3 Pengadaan dan Pasang Prasasti 1.00 bh
4 Pengukuran dan Pembersihan Lahan 1.00 ls

II PEKERJAAN TANAH
1 Pek. Galian Tanah Untuk Pondasi R1 12.00 - - 0.60 0.70 1.00 5.04 m3
R2 9.00 - - 0.60 0.70 1.00 3.78 m3
Jumlah 21.00 8.82 m3

2 Pek. Urugan Tanah Bawah Lantai, Dipadat R1 1.82 - 0.20 1.00 0.36 m3
R2 1.82 - 0.20 1.00 0.36 m3
R3 3.85 - 0.20 1.00 0.77 m3
R4 3.85 - 0.20 1.00 0.77 m3
Jumlah 11.34 2.27 m3

3 Pek. Urugan Pasir Dibawah Pondasi R1 12.00 0.60 0.05 1.00 0.36 m3
R2 9.00 0.60 0.05 1.00 0.27 m3
Jumlah 21.00 0.63 m3

4 Pek. Urugan Pasir Dibawah Lantai R1 1.82 - 0.05 1.00 0.09 m3


R2 1.82 - 0.05 1.00 0.09 m3
R3 3.85 - 0.05 1.00 0.19 m3
R4 3.85 - 0.05 1.00 0.19 m3
Jumlah 11.34 0.57 m3

III PEKERJAAN PONDASI DAN BETON


1 Pek. Pondasi Batu Belah Ad 1:4 R1 12.00 0.30 0.60 0.45 0.60 1.00 3.24 m3
R2 9.00 0.30 0.60 0.45 0.60 1.00 2.43 m3
Jumlah 21.00 5.67 m3

2 Pek. Sloof 15/20 Beton K-175 R1 12.00 - - 0.15 0.20 1.00 0.36 m3
R2 9.00 - - 0.15 0.20 1.00 0.27 m3
Jumlah 21.00 0.63 m3

3 Pek. Kolom Praktis 12/12 Beton K-175 R1 2.60 - - 0.12 0.12 12.00 0.45 m3
Jumlah 2.60 0.45 m3

4 Pek. Ringbalk 12/20 Beton K-175 R1 12.00 - - 0.12 0.20 1.00 0.29 m3
R2 9.00 - - 0.12 0.20 1.00 0.22 m3
Jumlah 21.00 0.50 m3

5 Pek. Balok Lintel 12/15 Beton K-175 R1 6.50 - - 0.12 0.15 1.00 0.12 m3
Jumlah 6.50 0.12 m3
Lebar (m')
Jml/
Tinggi/T
No Uraian Pekerjaan Ruas Pjg (m') L Rata- Unit Volume Sat
L1 L2 ebal
rata /Titik
(m')
6 Pek. Plat beton t 12cm Beton K-225 R1 2.25 - - - 0.12 1.00 0.27 m3
Jumlah 2.25 0.27 m3
Lebar (m')
Jml/
Tinggi/T
No Uraian Pekerjaan Ruas Pjg (m') L Rata- Unit Volume Sat
L1 L2 ebal
rata /Titik
(m')
IV PEKERJAAN DINDING DAN PLESTERAN
1 Pek. Dinding Bata, ad 1:4 R1 12.00 - - - 2.60 1.00 31.20 m2
R2 9.00 - - - 2.60 1.00 23.40 m2
Jumlah (a) 21.00 54.60 m2
Lubang Pintu - - - 0.65 1.90 2.00 2.47 m2
Lubang Roster+Glassblock - - - 0.80 0.40 3.00 0.96 m2
Lubang Opening Ventilasi - - - 0.50 1.00 4.00 2.00 m2
Lubang Opening Pintu Akses - - - 1.35 2.00 1.00 2.70 m2
Jumlah (b) - 8.13 m2
Jumlah (a - b) - 46.47 m2

2 Pek. Plesteran Dinding, ad 1:4 - - - 46.47 - 2.00 92.94 m3


Jumlah (a) 2x Luas Dinding - 92.94 m3
Luas Keramik Dinding KM/WC 4.61 - - - 2.00 3.00 27.66 m2
Luas Keramik Dinding T.Cuci 5.55 1.00 1.00 5.55 m2
Jumlah (b) 10.16 33.21 m3
Jumlah (a - b) 59.73 m2

3 Pek. Ban Profi Dinding 9.00 - - - - - 9.00 m'


Jumlah 9.00 9.00 m'

V PEKERJAAN PASANGAN KERAMIK


1 Pek. Pas Keramik Lantai KM/WC 25X25, kw R 1 1.82 - - 1.00 1.82 m2
R2 1.82 - - 1.00 1.82 m2
R3 3.85 - - 1.00 3.85 m2
R4 3.85 - - 1.00 3.85 m2
Jumlah 11.34 11.34 m2
3 Pek. Pas Keramik Dinding 25X40, kw I
Luas Keramik Dinding KM/WC 4.61 - - - 2.00 3.00 27.66 m2
Luas Keramik Dinding T.Cuci 5.55 1.00 1.00 5.55 m2
Jumlah 10.16 33.21 m2

VI PEKERJAAN PINTU DAN VENTILASI


1 Pek. Pasang Pimtu PVC Km/Wc 2.00 bh
Jumlah 2.00 bh
2 Pek. Roster 4.00 3.00 12.00 bh
Jumlah 12.00 bh
3 Pek. Glasblock 4.00 3.00 12.00 bh
Jumlah 12.00 bh

VII PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


1 Pek. Rangka Baja Ringan Zincalume C.75 AZ 100, G550
Luas Datar : R1 3.80 4.60 17.48 m2
R2 2.30 2.30 5.29
Jumlah Luas Datar 22.77 m2
Sudut Atap 20 ° 0.9397 Cos
Jumlah Luas Atap 24.23 m2
2 Pek. Atap metal roof lapis pasir Sama Dengan Luas Rangka 24.23 m2
3 Pek. Pas Nok samping metal roof lapis pasir 6.90 0.9397 Cos 7.34 m'
4 Pek. Listplank GRC, L.20 cm
Listplank Miring 6.90 0.9397 Cos 7.34 m'
Listplank Datar 6.10 6.10 m'
Jumlah Listplank 13.44 m'
Lebar (m')
Jml/
Tinggi/T
No Uraian Pekerjaan Ruas Pjg (m') L Rata- Unit Volume Sat
L1 L2 ebal
rata /Titik
(m')
VIII PEKERJAAN PLAFOND/LANGIT-LANGIT
1 Pek. Plafond GRC+rangka hollow galvanis
a Luas Ruangan : R1 1.82 - - 1.00 1.82 m2
R2 1.82 - - 1.00 1.82 m2
R3 3.85 - - 1.00 3.85 m2
R4 3.85 - - 1.00 3.85 m2
11.34 11.34 m2
b Luas Luar (Listplank) : R1 0.80 0.73 - - 0.58 m2
R2 2.30 0.73 - - 1.67 m2
R3 3.00 0.73 - - 2.18 m2
R4 6.10 0.73 - - 4.42 m2
R4 1.50 0.73 - - 1.09 m2
R4 0.80 0.73 - - 0.58 m2
14.50 10.51 m2
Jumlah (a+b) 21.85 m2
2 Pek. List plafond gypsum
Pjg Dinding : 21.00 2.00 42.00 m'
Jumlah 46.42 m'

IX PEKERJAAN SANITASI
1 Pas. Pipa PVC 3" 28.00 28.00 m'
2 Pas. Pipa PVC 1/2" 17.50 17.50 m'
3 Pas. Closet Jongkok 2.00 2.00 bh
4 Pas. Kran Air Stainlees 5.00 5.00 bh
5 Pas. Floor Drain Stainlees 3.00 3.00 bh
6 Pas. Tangki Air Fiber Kap. 500 ltr + Asesories Lengkap 1.00 1.00 unit
7 Pek. Septictank 1.00 1.00 unit
8 Pek. Pengeboran Pompa Air + Pipa Cassing 1.00 1.00 unit
9 Pas. Pompa Air Jet Pump 1.00 1.00 unit
X PEKERJAAN PENGECATAN
1 Pek. Cat Dinding set. No-Drop Luas Plesteran 59.73 m2
2 Pek. Cat Langit-langit set. Metrolite Luas Plafond 21.85 m2
3 Pek. Cat Listplank set. Glotex 13.44 0.20 2.69 m2
RENCANA ANGGARAN BIAYA ( RAB)

Program : Program Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)


Kegiatan : Penyediaan Sarana dan Prasarana Infrastruktur Kelurahan (DAU-T)
Pekerjaan : Pembangunan MCK
Lokasi
Link / Kp. : Kp. Pekijing Rt. 007 / 003
Kelurahan : Kalang Anyar
Kecamatan : Taktakan
Kota : Kota Serang
Provinsi : Banten
Sumber Dana : DAU-T - Tahun 2019 Volume : 13.50 m2

HARGA SATUAN JUMLAH HARGA


N0 URAIAN PEKERJAAN VOLUME
(Rp) (Rp)

1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan 1.00 bh 160,000.00 160,000.00
2 Dokumentasi dan Pelaporan 1.00 ls 600,000.00 600,000.00
3 Pengadaan dan Pasang Prasasti 1.00 bh 550,000.00 550,000.00
4 Pengukuran dan Pembersihan Lahan 1.00 ls 650,000.00 650,000.00
Jumlah - I 1,960,000.00
II PEKERJAAN TANAH
1 Pek. Galian Tanah Untuk Pondasi 8.82 m3 38,110.00 336,130.20
2 Pek. Urugan Tanah Bawah Lantai, Dipadatkan 2.27 m3 124,610.00 282,615.48
3 Pek. Urugan Pasir Dibawah Pondasi 0.63 m3 138,300.00 87,129.00
4 Pek. Urugan Pasir Dibawah Lantai 0.57 m3 138,300.00 78,416.10
Jumlah - II 784,290.78
III PEKERJAAN PONDASI DAN BETON
1 Pek. Pondasi Batu Belah Ad 1:4 5.67 m3 595,158.33 3,374,547.75
2 Pek. Sloof 15/20 Beton K-175 0.63 m3 3,422,929.76 2,156,445.75
3 Pek. Kolom Praktis 12/12 Beton K-175 0.45 m3 4,887,837.74 2,196,007.74
4 Pek. Ringbalk 12/20 Beton K-175 0.50 m3 3,428,100.02 1,727,762.41
5 Pek. Balok Lintel 12/15 Beton K-175 0.12 m3 4,934,478.20 577,333.95
6 Pek. Plat beton t 12cm Beton K-225 0.27 m3 4,938,714.74 1,333,452.98
Jumlah - III 11,365,550.58
IV PEKERJAAN DINDING DAN PLESTERAN
1 Pek. Dinding Bata, ad 1:4 46.47 m2 94,342.50 4,384,095.98
2 Pek. Plesteran Dinding, ad 1:4 59.73 m2 45,310.00 2,706,366.30
3 Pek. Ban Profi Dinding 9.00 m' 170,000.00 1,530,000.00
Jumlah - IV 8,620,462.28
V PEKERJAAN PASANGAN KERAMIK
1 Pek. Pas Keramik Lantai KM/WC 25X25, kw I 11.34 m2 198,775.00 2,254,108.50
2 Pek. Pas Keramik Dinding 25X40, kw I 33.21 m2 245,502.50 8,153,138.03
Jumlah - V 10,407,246.53
VI PEKERJAAN PINTU DAN VENTILASI
1 Pek. Pasang Pimtu PVC Km/Wc 2.00 unit 427,500.00 855,000.00
2 Pek. Roster 12.00 bh 26,400.00 316,800.00
3 Pek. Glasblock 12.00 bh 54,000.00 648,000.00
Jumlah - VI 1,819,800.00
1 2 3 4 5
VII PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1 Pek. Rangka Baja Ringan Zincalume C.75 AZ 100, G550 24.23 m2 141,513.75 3,429,039.15
2 Pek. Atap metal roof lapis pasir 24.23 m2 109,523.00 2,653,866.88
3 Pek. Pas Nok samping metal roof lapis pasir 7.34 m' 86,915.00 638,196.76
4 Pek. Listplank GRC, L.20 cm 13.44 m' 57,515.00 773,160.86
Jumlah - VII 7,494,263.65
VIII PEKERJAAN PLAFOND/LANGIT-LANGIT
1 Pek. Plafond GRC+rangka hollow galvanis 21.85 m2 138,092.00 3,017,655.43
2 Pek. List plafond gypsum 46.42 m' 22,993.00 1,067,392.54
Jumlah - VIII 4,085,047.97
IX PEKERJAAN SANITASI
1 Pas. Pipa PVC 3" 28.00 m' 49,840.00 1,395,520.00
2 Pas. Pipa PVC 1/2" 17.50 m' 21,310.00 372,925.00
3 Pas. Closet Jongkok 2.00 unit 632,650.00 1,265,300.00
4 Pas. Kran Air Stainlees 5.00 unit 48,000.00 240,000.00
5 Pas. Floor Drain Stainlees 3.00 unit 56,000.00 168,000.00
6 Pas. Tangki Air Fiber Kap. 500 ltr + Asesories Lengkap 1.00 unit 1,314,500.00 1,314,500.00
7 Pek. Septictank 1.00 unit 3,794,675.83 3,794,675.83
8 Pek. Pengeboran Pompa Air + Pipa Cassing 1.00 unit 3,500,000.00 3,500,000.00
9 Pas. Pompa Air Jet Pump 1.00 unit 5,400,000.00 5,400,000.00
Jumlah - IX 17,450,920.83
X PEKERJAAN PENGECATAN
1 Pek. Cat Dinding set. No-Drop 59.73 m2 31,316.00 1,870,504.68
2 Pek. Cat Langit-langit set. Metrolite 21.85 m2 17,494.00 382,287.64
3 Pek. Cat Listplank set. Glotex 2.69 m2 41,025.00 110,297.92
Jumlah - X 2,363,090.23
JUMLAH TOTAL 66,350,672.85

DIBULATKAN 66,350,000.00

Terbilang : --- ---

Serang, Juli 2019


Menyetujui, Dibuat Oleh,
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PERENCANA
( PPTK ) PT. DECO MULTIPILAR

………………………… BUDI ADI, S.Kom


NIP. ………………………………… Direktur Utama

PEJABAT PEMBUAT KOMITMEN


( PPK )

…………………………..
NIP. ………………………………….
OWNER ENGINEERING (OE)
PROGRAM : PENYEDIAAN SARANA DAN PRASARANA INFASTRUKTUR KELURA
KEGIATAN : PENYEDIAAN SARANA DAN PRASARANA INFASTRUKTUR KELURA
PEKERJAAN : PEMBANGUNAN POSYANDU
VOLUME : 1 (SATU) UNIT
LOKASI : RT 02 RW 07 KELURAHAN TAKTAKAN, KECAMATAN TAKTAKA
DANA ANGGARAN : DANA ALOKASI UMUM TAMBAHAN (DAU-T)
TAHUN ANGGARAN : TA.2019

KODE
NO URAIAN PEKERJAAN
ANALISA
1 2
II PEMBANGUNAN POSYANDU
A PEKERJAAN PERSIAPAN
1 Pengukuran dan Bowuplank A. 2.2.1 .1
2 Papan Nama Proyek 1.5 x 1 m 2.2.1

3 Pembersihan Lahan
4 Gambar Kerja, Dokumentasi dan Pelaporan

B PEKERJAAN STRUKTUR
B.1 PEKERJAAN TANAH & URUGAN
1 Pek. Galian Tanah Pondasi A. 2.3.1 .1
2 Pek Pasir Urug Bawah Pondasi Pondasi A. 2.3.1 .4
3 Pek Urugan Peninggi Lantai (Tanah Pilihan) A. 2.3.1 .5
4 Pek. Urugan Tanah Bekas galian A. 2.3.1 .3

B.2 PEKERJAAN PONDASI


1 Pek. Aanstamping batu Kosong A. 3.2.1 .9
2 Pek Pas. pondasi batu belah camp 1PC : 4PP A. 3.2.1 .1

B.3 PEKERJAAN BETON STRUKTUR


1 Pek Sloof (S1) 15/20 Beton Bertulang
Beton A.4.1.1.5
Besi beton (tulangan) A.4.1.1.17.A
Bekisting Sloof 30% A.4.1.1.21
2 Pek Kolom (K1) 20/20 Beton Bertulang
Beton A.4.1.1.5
Besi beton (tulangan) A.4.1.1.17.A
Bekisting Kolom 50% A.4.1.1.22
5 Pek Ringalk 12/20 Beton Bertulang
Beton A.4.1.1.5
Besi beton (tulangan) A.4.1.1.17.A
Bekisting balok 50% A.4.1.1.23
5 Pek Balok Lintel 12/15 Beton Bertulang
Beton A.4.1.1.5
Besi beton (tulangan) A.4.1.1.17.A
Bekisting balok 50% A.4.1.1.23

B.4 PEKERJAAN ATAP


1 Pek. Rangka Baja Ringan Zincalume C.75 AZ 100, G550 A.4.2.1.26
2 Pek. Atap metal roof lapis pasir A.4.5.2.33
3 Pek. Pas Nok samping metal roof lapis pasir A.4.5.2.37

4 Pek. Lisplank GRC 2x20x2 lapis A.4.6.1.21a

C PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN DINDING
1 Pek Pas dinding bata merah ad. 1:4 A.4.4.1.10
2 Pek Plesteran dinding 4.4.2
3 Pek. Pemasangan Aci Dinding A.4.4.2.27
4 Pek Pas Keramik dinding 25x40 WC Motif A.4.4.3.36a

C.2 PEKERJAAN KUSEN PINTU, JENDELA & KACA


1 Pek. Pintu Alumunium+Assesoris (P1) ALM 01
2 Pek Jendela Alumunium (J1) ALM 03
3 Pek. Pintu Kamar Mandi (PVC)
4 Pek. Roster

C.3 PEKERJAAN ATAP DAN PLAFOND


1 Pek Pas. Rangka Plafond Hollow Galfanis t: 0,3 mm A.4.2.1.25
2 Pek Pas plafond GRC uk. (120x240x9) mm A.4.5.1.7

C.3 PEKERJAAN LANTAI


1 Pek Pas lantai keramik 40 X 40 cm A.4.4.3.36c
2 Pek Pas Keramik 25x25 A.4.4.3.36
3 Pek. Rabat Beton .4.1.1.4
C.4 PEKERJAAN PENGECATAN
1 Pek Pengecatan Tembok A.4.7.1.10
1 Pek Pengecatan Plafond A.4.7.1.10

D PEKERJAAN MEKANIKAL/PLUMBING
1 Pek Pas pipa PVC 1/2" AW A.5.1.1.25
2 Pek Pas pipa PVC 4" AW A.5.1.1.32
3 Pek Pas closet Jongkok+ Aksesoris A.5.1.1.2
4 Pek Pas Floordrain A.5.1.1.36/14
5 Pek Pas kran air type tanam A.5.1.1.35/19
6 Pek. Septiktank

E PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik
2 Pek Pas Instalasi titik Lampu Kabel NYM 3x2.5 mm EL.5.1.1.4
3 Pek Pas Instalasi stop kontak saklar Kabel NYM 3x2.5 mm EL.5.1.1.4
4 Pek Pas saklar Enkle EL.5.1.1.5
5 Pek Pas stop kontak EL.5.1.1.8
6 Pek Pas Lampu Down Light SL 18 watt EL.5.1.1.11
7 Pek Pas MCB + Box EL.5.1.1.13

Diperiksa Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

HARYANTO, S.Pd
NIP. 19781015 201101 1 001

Menyetujui
Selaku KUASA PENGGUNA ANGGARAN (KPA)

ERLINAWATI, S.AP, M.Si


NIP. 19720520 200906 2 001
ERLINAWATI, S.AP, M.Si
NIP. 19720520 200906 2 001
INEERING (OE)
NFASTRUKTUR KELURAHAN
NFASTRUKTUR KELURAHAN TAKTAKAN

KECAMATAN TAKTAKAN, KOTA SERANG

HARGA JUMLAH
VOLUME
SATUAN HARGA
4 5 6

14.00 m' 63,306.00 886,284.00


1.00 bh 160,000.00 160,000.00
1.00 ls 500,000.00 500,000.00
1.00 ls 600,000.00 600,000.00
JUMLAH A 2,146,284.00

2.64 m3 38,110.00 100,610.40


0.44 m3 138,300.00 60,852.00
3.72 m3 124,610.00 463,580.35
0.55 m3 52,500.00 28,875.00
JUMLAH B.1 653,917.75

0.88 m3 433,680.00 381,638.40


1.82 m3 595,158.33 1,080,212.38
JUMLAH B.2 1,461,850.78

0.66 m3 773,062.13 510,221.00


58.58 kg 13,496.00 790,643.31
8.80 m2 49,710.00 437,448.00

1.09 m3 773,062.13 841,091.60


73.71 kg 13,496.00 994,733.22
21.76 m2 155,575.00 3,385,312.00

0.53 m3 773,062.13 408,176.80


43.97 kg 13,496.00 593,444.81
8.80 m2 158,275.00 1,392,820.00

0.05 m3 773,062.13 36,179.31


5.47 kg 13,496.00 73,774.29
1.02 m2 158,275.00 161,440.50
JUMLAH B.3 9,625,284.84

17.53 m2 141,513.75 2,480,503.13


17.53 m2 109,523.00 1,919,757.93
6.60 m' 86,915.00 573,639.00
23.82 m' 57,515.00 1,370,193.93
JUMLAH B.4 6,344,094.00
JUMLAH B 18,085,147.37

56.58 m2 94,342.50 5,338,340.45


113.17 m2 45,310.00 5,127,703.97
107.53 m2 37,025.00 3,981,274.77
5.64 m2 245,502.50 1,384,634.10
JUMLAH C.1 15,831,953.29

1.00 Unit 2,000,000.00 2,000,000.00


3.00 Unit 750,000.00 2,250,000.00
1.00 Unit 427,500.00 427,500.00
8.00 Buah 26,400.00 211,200.00
JUMLAH C.2 4,888,700.00

14.69 m2 59,250.00 870,530.63


14.69 m2 42,646.50 626,583.70

12.87 m2 211,295.00 2,719,366.65


1.82 m2 198,775.00 362,267.44
1.40 m3 784,189.29 1,097,865.00
JUMLAH C.3 4,179,499.09

107.53 m2 31,316.00 3,367,389.62


14.69 m2 17,494.00 257,030.60
JUMLAH C.4 3,624,420.22
JUMLAH C 28,524,572.59

25.00 m' 21,310.00 532,750.00


10.00 m' 115,693.33 1,156,933.33
1.00 bh 632,650.00 632,650.00
1.00 bh 56,000.00 56,000.00
1.00 bh 48,000.00 48,000.00
1.00 unit 3,794,675.83 3,794,675.83
JUMLAH D 6,221,009.16

1.00 Ls 1,500,000.00 1,500,000.00


3.00 ttk 178,684.00 536,052.00
2.00 ttk 178,684.00 357,368.00
3.00 bh 26,862.00 80,586.00
2.00 bh 32,362.00 64,724.00
3.00 bh 101,468.40 304,405.20
1.00 bh 439,020.00 439,020.00
JUMLAH E 3,282,155.20
JUMLAH II 58,259,168.32

Dibuat Oleh
Konsultan Perencana

etujui
UNA ANGGARAN (KPA)

I, S.AP, M.Si
200906 2 001
I, S.AP, M.Si
200906 2 001
8.00
52,244,000.00
#REF! - 6,015,168.32

64,085,085.15
#REF!
OWNER ENGINEERING
PROGRAM : PENYEDIAAN SARANA DAN PRASARANA INFASTRUKTUR KELURA
KEGIATAN : PENYEDIAAN SARANA DAN PRASARANA INFASTRUKTUR KELURA
PEKERJAAN : PEMBANGUNAN JALAN PAVING BLOCK
VOLUME : 290,5 m'
LOKASI : RT 01/03, RT 02/03 & RT 03/03, KELURAHAN TAKTAKAN, KE
DANA ANGGARAN : DANA ALOKASI UMUM TAMBAHAN (DAU-T)
TAHUN ANGGARAN : TA.2019

NO URAIAN PEKERJAAN
1 2
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.5 x 1 m
2 Pembersihan Semak Belukar
3 Biaya Mobilisasi Dan Demobilisasi
4 Gambar Kerja, Dokumentasi dan Pelaporan

II PEKERJAAN PEMASANGAN PAVING BLOCK


1 Pemasangan Paving Block 1 m2
2 Pekerjaan Galian kansteen
3 Pemasangan Kansteen 1 m'

Diperiksa Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

HARYANTO, S.Pd
NIP. 19781015 201101 1 001

Menyetujui
Selaku KUASA PENGGUNA ANGGAR

ERLINAWATI, S.AP, M.Si


Selaku KUASA PENGGUNA ANGGAR

ERLINAWATI, S.AP, M.Si


NIP. 19720520 200906 2 001
OWNER ENGINEERING (OE)
ARANA INFASTRUKTUR KELURAHAN
ARANA INFASTRUKTUR KELURAHAN TAKTAKAN

3, KELURAHAN TAKTAKAN, KECAMATAN TAKTAKAN, KOTA SERANG


HAN (DAU-T)

KODE HARGA
SPESIFIKASI VOLUME
ANALISA SATUAN
3 4 5

Biner Cetak 2.2.1 1.00 bh 160,000.00


A. 2.2.1 .8 1.00 ls 500,000.00
1.00 ls 500,000.00
1.00 ls 600,000.00

K-225; Persegi; t=
6 cm
A.7.1.1.1 290.50 m2 147,297.15
A. 2.3.1 .1 5.81 m3 18,700.00
K-225; Uk
40x20x10
A.7.1.1.2 581.00 m' 61,524.10
JUMLAH

Dibuat Oleh
Konsultan Perencana

ADITYA ISKANDAR

Menyetujui
aku KUASA PENGGUNA ANGGARAN (KPA)

ERLINAWATI, S.AP, M.Si


aku KUASA PENGGUNA ANGGARAN (KPA)

ERLINAWATI, S.AP, M.Si


NIP. 19720520 200906 2 001

420
JUMLAH
HARGA
6

160,000.00
500,000.00
500,000.00
600,000.00

42,789,822.08
108,647.00
35,745,502.10
80,403,971.175

Perencana

SKANDAR
#REF!

138.333333333333
405
88,444,368.293
OWNER ENGINEERING
PROGRAM : PENYEDIAAN SARANA DAN PRASARANA INFASTRUKTUR KELURA
KEGIATAN : PENYEDIAAN SARANA DAN PRASARANA INFASTRUKTUR KELURA
PEKERJAAN : PEMBANGUNAN SALURAN AIR
VOLUME : 217 m'
LOKASI : RT 01 RW 01, KELURAHAN TAKTAKAN, KECAMATAN TAKTAK
DANA ANGGARAN : DANA ALOKASI UMUM TAMBAHAN (DAU-T)
TAHUN ANGGARAN : TA.2019

NO URAIAN PEKERJAAN
1 2
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.5 x 1 m
1 Persiapan Lahan
2 Biaya Mobilisasi Dan Demobilisasi
3 Gambar Kerja, Dokumentasi dan Pelaporan
4 Pengukuran dan Bowuplank

II PEKERJAAN PEMASANGAN PASANGAN BATU BELAH SALURAN


1 Pekerjaan Galian Tanah
2 Pekerjaan Pasangan Batu Belah
3 Pekerjaan Beton Tumbuk
4 Pekerjaan Acian

Diperiksa Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

HARYANTO, S.Pd
NIP. 19781015 201101 1 001

Menyetujui
Selaku KUASA PENGGUNA ANGGAR

ERLINAWATI, S.AP, M.Si


Menyetujui
Selaku KUASA PENGGUNA ANGGAR

ERLINAWATI, S.AP, M.Si


NIP. 19720520 200906 2 001
WNER ENGINEERING (OE)
ARANA INFASTRUKTUR KELURAHAN
ARANA INFASTRUKTUR KELURAHAN TAKTAKAN

TAKAN, KECAMATAN TAKTAKAN, KOTA SERANG


HAN (DAU-T)

KODE HARGA
SPESIFIKASI VOLUME
ANALISA SATUAN
3 4 5

Biner Cetak 2.2.1 1.00 bh 160,000.00


A. 2.2.1 .8 1.00 ls 500,000.00
1.00 ls 1,000,000.00
1.00 ls 3,000,000.00
Kayu klas II A. 2.2.1 .1 217.00 m' 28,823.30

AH SALURAN
A. 2.3.1 .1 106.33 m3 38,110.00
t = 20 cm A. 3.2.1 .1 75.95 m3 595,158.33
t = 7 cm A. 2.3.1 .1 4.56 m3 654,962.13
A.7.1.1.2 108.50 m2 37,025.00
JUMLAH

Dibuat Oleh
Konsultan Perencana

ADITYA ISKANDAR

Menyetujui
aku KUASA PENGGUNA ANGGARAN (KPA)

ERLINAWATI, S.AP, M.Si


Menyetujui
aku KUASA PENGGUNA ANGGARAN (KPA)

ERLINAWATI, S.AP, M.Si


NIP. 19720520 200906 2 001
JUMLAH
HARGA
6

160,000.00
500,000.00
1,000,000.00
3,000,000.00
6,254,656.10

4,052,236.30 217.00
45,202,275.42
2,984,662.42 157.00
4,017,212.50
67,171,042.737

Perencana

SKANDAR
#REF!
73,888,147.011
OWNER ENGINEERING
PROGRAM : PENYEDIAAN SARANA DAN PRASARANA INFASTRUKTUR KELURA
KEGIATAN : PENYEDIAAN SARANA DAN PRASARANA INFASTRUKTUR KELURA
PEKERJAAN : PEMBANGUNAN DRAINASE
VOLUME : 142 m'
LOKASI : RT 01 RW 02, KELURAHAN TAKTAKAN, KECAMATAN TAKTAK
DANA ANGGARAN : DANA ALOKASI UMUM TAMBAHAN (DAU-T)
TAHUN ANGGARAN : TA.2019

NO URAIAN PEKERJAAN
1 2
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.5 x 1 m
1 Persiapan Lahan
2 Biaya Mobilisasi Dan Demobilisasi
3 Gambar Kerja, Dokumentasi dan Pelaporan
4 Pengukuran dan Bowuplank

II PEKERJAAN PEMASANGAN PASANGAN BATU BELAH SALURAN


1 Pekerjaan Galian Tanah
2 Pekerjaan Pasangan Batu Belah
3 Pekerjaan Beton Tumbuk
4 Pekerjaan Acian

Diperiksa Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

HARYANTO, S.Pd
NIP. 19781015 201101 1 001

Menyetujui
Selaku KUASA PENGGUNA ANGGAR

ERLINAWATI, S.AP, M.Si


Menyetujui
Selaku KUASA PENGGUNA ANGGAR

ERLINAWATI, S.AP, M.Si


NIP. 19720520 200906 2 001
WNER ENGINEERING (OE)
ARANA INFASTRUKTUR KELURAHAN
ARANA INFASTRUKTUR KELURAHAN TAKTAKAN

TAKAN, KECAMATAN TAKTAKAN, KOTA SERANG


HAN (DAU-T)

KODE HARGA
SPESIFIKASI VOLUME
ANALISA SATUAN
3 4 5

Biner Cetak 2.2.1 1.00 bh 160,000.00


A. 2.2.1 .8 1.00 ls 500,000.00
1.00 ls 1,000,000.00
1.00 ls 3,000,000.00
Kayu klas II A. 2.2.1 .1 142.00 m' 28,823.30

AH SALURAN
A. 2.3.1 .1 44.73 m3 38,110.00
t = 20 cm A. 3.2.1 .1 49.70 m3 595,158.33
t = 7 cm A. 2.3.1 .1 3.98 m3 654,962.13
A.7.1.1.2 71.00 m2 37,025.00
JUMLAH

Dibuat Oleh
Konsultan Perencana

ADITYA ISKANDAR

Menyetujui
aku KUASA PENGGUNA ANGGARAN (KPA)

ERLINAWATI, S.AP, M.Si


Menyetujui
aku KUASA PENGGUNA ANGGARAN (KPA)

ERLINAWATI, S.AP, M.Si


NIP. 19720520 200906 2 001
JUMLAH
HARGA
6

160,000.00
500,000.00
1,000,000.00
3,000,000.00
4,092,908.60

1,704,660.30 142.00
29,579,369.17
2,604,129.42 157.00
2,628,775.00
45,269,842.491

Perencana

SKANDAR
224,000,000.00 0.01 0.00

posyandu 52,244,000.00
paving 90,000,000.00
drainase 55,000,000.00
selokan 79,000,000.00
276,244,000.00
251,104,024.73
25,139,975.27

49,796,826.740
64,085,085.15
88,444,368.29
49,796,826.74
73,888,147.01
13,812,200.00 8,287,320.00 276,214,427.20

29,572.80
0.000107053193737
3.5684397912301E-05