BACK UP DATA

NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3


NAMA RUAS : KOMPLEK KAYU BULAN
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN : 7.1 (7) a Beton mutu sedang fc’20 MPa
SATUAN PEMBAYARAN : M3

LEBAR TEBAL
POSISI PANJANG LUAS VOLUME
No STA. Individu Rata2 Individu Rata2 Ket.
L/R (m) ( M2 ) ( M3 )
(m) (m) (m) (m)

1 0+ 000 L/R 3.00 0.10


100.00 3.00 300.00 0.10 30.00
2 0+ 100 L/R 3.00 0.10
56.00 3.00 168.00 0.10 16.80
3 0+ 156 L/R 3.00 0.10

Jumlah 156.00 46.80


BACK UP DATA

NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3


NAMA RUAS : KOMPLEK KAYU BULAN
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN : 7.1 (8) Beton mutu rendah fc’15 MPa
SATUAN PEMBAYARAN : M3

LEBAR TEBAL
POSISI PANJANG LUAS VOLUME
No STA. Individu Rata2 Individu Rata2 Ket.
L/R (m) ( M2 ) ( M3 )
(m) (m) (m) (m)

1 0+ 000 L/R 3.00 0.10


100.00 3.00 300.00 0.10 30.00
2 0+ 100 L/R 3.00 0.10
56.00 3.00 168.00 0.10 16.80
3 0+ 156 L/R 3.00 0.10

Jumlah 156.00 46.80


BACK UP DATA QUANTITY

Instansi : Dinas Bina Marga Kota Banjarmasin


Nama Paket : Perencanaan Kegiatan Peningkatan Jalan Lingkungan Paket 3
Nama Ruas : Jl. Kol. Sugiono Ke Pegadaian
No. Item Pemb. : 5.1.2 Lapis Pondasi Agregat Kelas B
Satuan Pemb. : M3
Lokasi : RT. `
VOLUME
Posisi PANJANG Lebar Luas Tebal
No. STA/RUAS KETERANGAN
L/R (m) Levelling (m) (m2) Rencana (m) ( m3 )
1 2 3 4 6 7=4x6 8 9=7x8 10

1 0+003 s/d 0+011 L/R 8.00 5.00 40.00 0.10 4.00 Full Badan Jalan

2 0+015 s/d 0+020 L/R 5.00 5.00 25.00 0.10 2.50 Full Badan Jalan

3 0+021 s/d 0+023 L 2.00 2.50 5.00 0.10 0.50 Posisi Kiri

4 0+023 s/d 0+027 R 4.00 2.50 10.00 0.10 1.00 Posisi Kanan

5 0+041 s/d 0+060 L/R 19.00 5.00 95.00 0.15 14.25 Full Badan Jalan

6 0+069 s/d 0+086 L/R 17.00 5.00 85.00 0.15 12.75 Full Badan Jalan

7 0+093 s/d 0+097 L/R 3.50 5.00 17.50 0.10 1.75 Full Badan Jalan

58.50 36.75
0.00 0.00
58.50 36.75

SKETS :

Badan Jalan

Levelling Agregat Kelas B


BACK UP DATA

NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3


NAMA RUAS : KOMPLEK KAYU BULAN
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN : 5.1.(1) Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3

LEBAR TEBAL
POSISI PANJANG LUAS VOLUME
No STA. Individu Rata2 Individu Rata2 Ket.
L/R (m) ( M2 ) ( M3 )
(m) (m) (m) (m)

1 0+ 000 L/R 4.00 0.10


200.00 4.00 800.00 0.10 80.00
2 0+ 200 L/R 4.00 0.10

3 0+ 200 L/R 3.50 0.10


300.00 3.50 1050.00 0.10 105.00
4 0+ 500 L/R 3.50 0.10

5 0+ 500 L/R 3.50 0.10


481.00 3.50 1683.50 0.10 168.35
6 0+ 981 L/R 3.50 0.10

Jumlah 981.00 353.35


BACK UP DATA

NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3


NAMA RUAS : KOMPLEK KAYU BULAN
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN : 5.1.(2) Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3

LEBAR TEBAL
POSISI PANJANG LUAS VOLUME
No STA. Individu Rata2 Individu Rata2 Ket.
L/R (m) ( M2 ) ( M3 )
(m) (m) (m) (m)

1 0+ 000 L/R 4.00 0.15


200.00 4.00 800.00 0.15 120.00
2 0+ 200 L/R 4.00 0.15

3 0+ 200 L/R 3.50 0.15


300.00 3.50 1050.00 0.15 157.50
4 0+ 500 L/R 3.50 0.15

3 0+ 500 L/R 3.50 0.15


481.00 3.50 1683.50 0.15 252.53
4 0+ 981 L/R 3.50 0.15

Jumlah 981.00 530.03


BACK UP DATA

NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3


NAMA RUAS : KOMPLEK KAYU BULAN
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN : 6.1 (2)(a) Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN : Liter

LEBAR
PANJANG
POSISI LUAS Koef. JUMLAH
No STA. Individu Rata2 Ket.
L/R ( M2 ) (Liter/m2) ( Liter )
(m)
(m) (m)

17 1+ 084 L/R 3.00


16.00 3.00 48.00 1.00 48.00
18 1+ 100 L/R 3.00
100.00 3.00 300.00 1.00 300.00
19 1+ 200 L/R 3.00
100.00 3.00 300.00 1.00 300.00
20 1+ 300 L/R 3.00
100.00 3.00 300.00 1.00 300.00
21 1+ 400 L/R 3.00

Jumlah 316.00 948.00


BACK UP DATA

NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3


NAMA RUAS : KOMPLEK KAYU BULAN
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN : 6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter

LEBAR
PANJANG
POSISI LUAS Koef. JUMLAH
No STA. Individu Rata2 Ket.
L/R ( M2 ) (Liter/m2) ( Liter )
(m)
(m) (m)

1 0+ 000 L/R 4.00


200.00 4.00 800.00 0.80 640.00
2 0+ 200 L/R 4.00

1 0+ 200 L/R 3.50


300.00 3.50 1050.00 0.80 840.00
2 0+ 500 L/R 3.50

1 0+ 500 L/R 3.50


481.00 3.50 1683.50 0.80 1,346.80
2 0+ 981 L/R 3.50

Jumlah 981.00 2,826.80


BACK UP DATA

NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3


NAMA RUAS : KOMPLEK KAYU BULAN
PROP / KAB / KODYA : KOTA BANJARMASIN
Item Pembayaran : 6.3 (4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)

Berat Total Anti Striping Agent (0,30)


Tebal Lebar rata-
Panjang Luas
BJ Bulk Tebal
Camp. % x berat aspal
Lataston Lapis Pondasi KONTROL
rata Campuran
Kadar Aspal
No. STA Posisi Lebar Rata2 HRS-Base
(m') Kadar Thd Prosentase
Design Berat Berat Total
Ton
total Kadar Thd Total Berat Total
(m') (m1) (m2) (m)
cm' g t/m3
% % Kg % Ton % Ton
A B C D E F G H I J K L M N O P Q R

100*(100 - M) /
- - - - - - - F*G - - L*M*N - 0,30*P/100 K*M*10 T * O / 100 M+N R = (N/1000)+P
100

1 0+ 000 Kr/Kn 4 4.00


4.00 200.00 800.00 2.230 0.04 71.36 6.00 0.0180 12.84 99.982 71.347 100.00 71.36
2 0+ 200 Kr/Kn 4 4.00

3 0+ 200 Kr/Kn 4 3.50


3.50 300.00 1,050.00 2.230 0.04 93.66 6.00 0.0180 16.86 99.982 93.643 100.00 93.66
4 0+ 500 Kr/Kn 4 3.50

5 0+ 500 Kr/Kn 4 3.50


3.50 481.00 1,683.50 2.230 0.04 150.17 6.00 0.0180 27.03 99.982 150.141 100.00 150.17
6 0+ 981 Kr/Kn 4 3.50

Jumlah 315.19 56.73 315.13


INFORMASI UMUM
No. URAIAN INFORMASI

1. Nomor Paket Kontrak :

2. Nama Paket : PENINGKATAN JALAN LINGKUNGAN PAKET 3

3. Nama Ruas : KOMPLEK KAYU BULAN

4. Propinsi / Kabupaten / Kotamadya : KOTA BANJARMASIN

5. Lokasi pekerjaan Periksa lampiran

6. Kondisi jalan lama Perkerasan Agregat

7. Panjang efektif ( lihat sketsa di bawah ) 0.10 Kilometer ( Leff = a + b )

8. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 0.00 + 3.80 + 0.00 ) meter

9. Lebar Rencana ( bahu + perkerasan + bahu ) ( 0.00 + 3.50 + 0.00 ) meter

10. Penampang jalan, jenis dan volume pekerjaan pokok Lihat lampiran.

11. Jangka waktu pelaksanaan pekerjaan 165 hari kalender


Atau : 5.50 bulan (Periode Pelaksanaan)

12. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 18.50 Kilometer

Perhitungan didasarkan pada sketsa di bawah ini : L = { (c+a/2)*a + (c+b/2)*b } / (a+b)

0.00 Km = a C 1.00 Km = b

A B
18.0 Km = c
Base Camp --------->
D
Kalkulasi Jarak Rata-Rata =

13. Jam kerja efektif dalam 1 hari 7.0 jam


14. Asuransi, Pajak, dsb. untuk Peralatan 0.002 x Harga Pokok Alat
15. Tingkat Suku Bunga Investasi Alat 10.00 %
16. Biaya Umum dan Keuntungan 10.00 % x Biaya Langsung
###

REKAPITULASI
PERKIRAAN HARGA PEKERJAAN

Proyek / Bagpro :
No. Paket Kontrak :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
NAMA RUAS : KOMPLEK KAYU BULAN
PROP / KAB / KODYA : KOTA BANJARMASIN

Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)

1 Umum 14,590,410.71
2 Drainase -
3 Pekerjaan Tanah -
4 Pelebaran Perkerasan dan Bahu Jalan -
5 Pekerasan Non Aspal 542,279,360.70
6 Perkerasan Aspal 523,953,809.71
7 Struktur -
8 Pengembalian Kondisi dan Pekerjaan Minor -
9 Pekerjaan Harian -
10 Pekerjaan Pemeliharaan Rutin -

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 1,080,823,581.12
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 108,082,358.11
(C) Jumlah Total Harga Pekerjaan = (A) + (B) 1,188,905,939.23
(D) Dibulatkan 1,188,905,000.00

Terbilang : Satu Milyar Seratus Delapan Puluh Delapan Juta Sembilan Ratus Lima Ribu Rupiah.

Banjarmasin, April 2014


Diperiksa Oleh : Dibuat Oleh :
PPTK Konsultan Perencana,
Dinas Bina Marga Kota Banjarmasin PT. BIJAK INDONESIA KONSULTAN

DAMAYANTI, ST Ir. Syaifuddin


NIP. 19750902 200604 2 010 Team Leader

Disetujui Oleh : Mengetahui :


Pejabat Pembuat Komitmen Pengguna Anggaran
Dinas Bina Marga Kota Banjarmasin Dinas Bina Marga Kota Banjarmasin

H. RUSTAM, ST Ir. H. GUSTI RIDWAN SYOFYANI, MM


NIP. 19620317 198303 1 016 NIP. 19580929 198206 1 001
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI 2010 Revisi 3
PPK : ………………………………………………
No. Paket Kontrak :
Nama Paket : PENINGKATAN JALAN LINGKUNGAN PAKET 3
Nama Ruas : KOMPLEK KAYU BULAN
Prop / Kab / Kodya : KOTA BANJARMASIN

No. Mata Uraian Satuan Perkiraan Harga Jumlah


Pembayaran Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
a b c d e f = (d x e)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 12,455,000.00 12,455,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 2,135,410.71 2,135,410.71

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 14,590,410.71

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 - 50,878.07 -
2.2.(1) Pasangan Batu dengan Mortar M3 - 747,681.13 -
2.3.(1) Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm M1 - 413,030.99 -
2.3.(2) Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm M1 - 591,528.29 -
2.3.(3) Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M1 - 1,253,975.88 -
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M1 - 1,513,778.51 -

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 3. PEKERJAAN TANAH


3.1.(1a) Galian Biasa M3 - 38,616.55 -
3.1.(1b) Galian Batu Lunak M3 - 212,911.66 -
3.1.(2) Galian Batu M 3
- 205,942.11 -
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M 3
- 17,522.49 -
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M 3
- 781,435.10 -
3.1.(5) Galian Struktur dengan kedalaman 4 - 6 meter M 3
- 783,822.92 -
3.1.(6) Galian Perkerasan Beraspal dengan Cold Milling Machine M 3
- 250,049.22 -
3.1.(7) Galian Perkerasan Beraspal tanpa Cold Milling Machine M 3
- 1,024,200.61 -
3.1.(8) Galian Perkerasan berbutir M 3
- 177,850.66 -
3.1.(9). Galian Perkerasan Beton M 3
- 204,759.49 -
3.2.(1a) Timbunan Biasa dari sumber galian M 3
- 310,420.18 -
3.2.(1b) Timbunan Biasa dari galian M 3
- 219,336.38 -
3.2.(2a) Timbunan Pilihan dari sumber galian M 3
- 315,747.83 -
3.2.(2b) Timbunan Pilihan dari galian M 3
- 235,595.44 -
3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M 3
- 265,655.05 -
3.2.(3b) Timbunan Pilihan (diukur dengan rod & plate) M 3
- 265,655.05 -
3.3.(1) Penyiapan Badan Jalan M 2
- 744.24 -

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN


4.2.(1) Lapis Pondasi Agregat Kelas A M3 - 761,601.00 -
4.2.(2a) Lapis Pondasi Agregat Kelas B M3 - 744,677.27 -
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 - 729,610.34 -

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A M3 353.35 625,434.28 220,997,203.77
5.1.(2) Lapis Pondasi Agregat Kelas B M3 530.03 606,164.16 321,282,156.93
5.2,(1) Lapis Permukaan Agregat Tanpa Penutup Aspal M3 - 621,936.48 -
5.2,(2) Lapis Pondasi Agregat Tanpa Penutup Aspal M3 - 576,574.99 -

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 542,279,360.70
DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 2,826.80 14,604.05 41,282,737.53
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter - 15,322.38 -
6.3 (1) Latasir Kelas A (SS-A) Ton - 1,960,848.92 -
6.3 (2) Latasir Kelas B (SS-B) Ton - 1,665,336.55 -
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton 315.13 1,509,595.91 475,721,172.37
6.3.(4b) Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang) Ton - 1,550,066.62 -
6.3.(8) Bahan anti pengelupasan Kg 56.73 122,500.00 6,949,899.81

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 523,953,809.71

DIVISI 7. STRUKTUR
7.1 (7) a Beton mutu sedang fc’20 MPa M3 - 1,577,261.56 -
7.1 (8) Beton mutu rendah fc’15 MPa M3 - 1,208,003.13 -
7.1 (10) Beton mutu rendah fc’10 Mpa M3 - 1,148,808.38 -
7.3 (1) Baja Tulangan U 24 Polos Kg - 19,181.04 -
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1 - 10,270.67 -
7.13.(1) Sandaran (Railing) M1 - 198,822.00 -
7.15.(1) Pembongkaran Pasangan Batu M3 - 357,702.23 -
7.15.(8) Pembongkaran Jembatan Kayu M2 - 127,086.33 -
7.16.(2).a Pipa Drainase Baja diameter 75 mm M' - 112,500.00 -
- Pekerjaan Cat - Catan LS - 5,250,000.00 -

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR


8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3 - 691,639.30 -
8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3 - 720,700.79 -
8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur) - 535,145.87 -
8.1 (4) Waterbound Macadam untuk Pekerjaan Minor M3 - 729,610.34 -
8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor M3 - 3,680,020.93 -
8.1 (6) Lasbutag atau Latasbusir untuk Pekerjaan Minor M3 - 1,559,666.51 -
8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3 - 2,261,608.12 -
8.1 (8) Campuran Aspal Dingin untuk Pekerjaan Minor M3 - 780,925.01 -
8.1 (9) Residu Bitumen untuk Pekerjaan Minor Liter - 16,850.27 -
8.2.(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3 -
8.5(3) Pengembalian Kondisi Pelapisan Permukaan Baja Struktur M2 - 43,079.37 -

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 9. PEKERJAAN HARIAN


9.1.(1) Mandor Jam - 19,838.10 -
9.1.(2) Pekerja Biasa Jam - 11,195.24 -
9.1.(3) Tukang Kayu, Tukang Batu, dsb Jam - 15,909.52 -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam - 345,385.39 -
9.1.(4) b Dump Truck, kapasitas 6 - 8 m³ Jam -
9.1.(5) a Truk Bak Datar 3 - 4 ton Jam - 534,143.77 -
9.1.(5) b Truk Bak Datar 6 - 8 ton Jam -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam - 317,013.02 -

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN


10.1 (1) Pemeliharaan Rutin Perkerasan LS - 21,301,784.28 -
10.1 (2) Pemeliharaan Rutin Bahu Jalan LS - 10,607,130.83 -
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan LS - 29,018,979.15 -
10.1 (4) Pemeliharaan Rutin Perlengkapan Jalan LS - 3,527,748.90 -
10.1 (5) Pemeliharaan Rutin Jembatan LS - 36,239,779.14 -

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
No. Mata Perkiraan Harga % Thd. Jumlah
Uraian Satuan
Pembayaran Kuantitas Satuan Total Biaya Harga-Harga
(Rupiah) (%) (Rupiah)
a b c d e f g = (d x e)

1.2 Mobilisasi LS 1.00 12,455,000.00 #REF! 12,455,000.00


1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 2,135,410.71 #REF! 2,135,410.71
1.8.(2) Jembatan Sementara LS - 148,416,405.71 #REF! -
1.17 Pengamanan Lingkungan Hidup LS - 40,080,000.00 #REF! -
1.20.(1) Pengeboran, termasuk SPT dan Laporan M1 - 508,750.00 #REF! -
1.20.(2) Sondir termasuk Laporan M1 - 257,583.33 #REF! -
1.21 Manajemen Mutu LS - 231,600,000.00 #REF! -
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 - 50,878.07 #REF! -
2.2.(1) Pasangan Batu dengan Mortar M3 - 747,681.13 #REF! -
2.3.(1) Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm M1 - 413,030.99 #REF! -
2.3.(2) Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm M1 - 591,528.29 #REF! -
2.3.(3) Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M1 - 1,253,975.88 #REF! -
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M1 - 1,513,778.51 #REF! -
2.3.(5) Gorong2 Pipa Baja Bergelombang Ton - 2,404,727.38 #REF! -
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1 - 122,393.12 #REF! -
2.3.(7) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1 - 126,733.24 #REF! -
2.3.(8) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1 - 131,202.71 #REF! -
2.3.(9) Saluran berbentuk U Tipe DS 1 M1 - 246,515.00 #REF! -
2.3.(10) Saluran berbentuk U Tipe DS 2 M1 - 287,600.00 #REF! -
2.3.(11) Saluran berbentuk U Tipe DS 3 M1 - 345,120.00 #REF! -
2.3.(12) Beton K250 (fc’ 20) untuk struktur drainase beton minor M3 - 862,237.23 #REF! -
2.3.(13) Baja Tulangan untuk struktur drainase beton minor Kg - 2,877.67 #REF! -
2.3.(14) Pasangan Batu tanpa Adukan (Aanstamping) M3 - 431,038.00 #REF! -
2.4.(1) Bahan Porous untuk Bahan Penyaring (Filter) M3 - 155,114.87 #REF! -
2.4.(2) Anyaman Filter Plastik M2 - 33,603.67 #REF! -
2.4.(3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M1 - 51,450.41 #REF! -
3.1.(1a) Galian Biasa M3 - 38,616.55 #REF! -
3.1.(1b) Galian Batu Lunak M3 - 212,911.66 #REF! -
3.1.(2) Galian Batu M3 - 205,942.11 #REF! -
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3 - 17,522.49 #REF! -
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3 - 781,435.10 #REF! -
3.1.(5) Galian Struktur dengan kedalaman 4 - 6 meter M3 - 783,822.92 #REF! -
3.1.(6) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 - 250,049.22 #REF! -
3.1.(7) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 - 1,024,200.61 #REF! -
3.1.(8) Galian Perkerasan berbutir M3 - 177,850.66 #REF! -
3.1.(9). Galian Perkerasan Beton M3 - 204,759.49 #REF! -
3.2.(1a) Timbunan Biasa dari sumber galian M3 - 310,420.18 #REF! -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 - 315,747.83 #REF! -
3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M3 - 265,655.05 #REF! -
3.3.(1) Penyiapan Badan Jalan M2 - 744.24 #REF! -
3.4.(1) Pembersihan dan Pengupasan Lahan M2 - 94,064.96 #REF! -
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm buah - 158,261.59 #REF! -
3.4.(3) Pemotongan Pohon Pilihan diameter 30 – 50 cm buah - 214,164.05 #REF! -
3.4.(4) Pemotongan Pohon Pilihan diameter 50 – 75 cm buah - 326,188.97 #REF! -
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm buah - 672,547.25 #REF! -
3.5.(1) Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2) M2 - 20,110.74 #REF! -
3.5.(2a) Geotekstil Separator Kelas 1 M2 - 20,110.74 #REF! -
3.5.(2b) Geotekstil Separator Kelas 2 M2 - 20,110.74 #REF! -
3.5.(2c) Geotekstil Separator Kelas 3 M2 - 20,110.74 #REF! -
3.5.(3) Geotekstil Stabilisator (Kelas 1) M2 - 20,110.74 #REF! -
4.2.(1) Lapis Pondasi Agregat Kelas A M3 - 761,601.00 #REF! -
4.2.(2a) Lapis Pondasi Agregat Kelas B M3 - 744,677.27 #REF! -
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 - 729,610.34 #REF! -
4.2.(3) Semen untuk Lapis Pondasi Semen Tanah Ton - 1,936,514.14 #REF! -
4.2.(4) Lapis Pondasi Semen Tanah M3 - 541,036.19 #REF! -
4.2.(5) Agregat Penutup BURTU M2 - 11,467.85 #REF! -
4.2.(6) Bahan Aspal untuk Pekerjaan Pelaburan Liter - 17,082.47 #REF! -
4.2.(7) Lapis Resap Pengikat Liter - 15,201.16 #REF! -
4.2.(8) Lapis Resap Perekat Liter - 15,322.38 #REF! -
4.2.(9) Laston Lapis Antara (AC-BC) Ton - 1,502,606.83 #REF! -
4.2.(10) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton - 627,786.00 #REF! -
4.2.(11) Laston Lapis Pondasi (AC-Base) Ton - 1,371,894.41 #REF! -
4.2.(12) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton - 627,264.46 #REF! -
4.2.(13) Bahan anti pengelupasan Kg - 122,500.00 #REF! -
4.2.(14) Perkerasan Beton Semen M3 - 1,730,204.39 #REF! -
4.2.(15) Perkerasan Beton Semen dengan anyaman Tulangan Tunggal M3 - 1,827,602.40 #REF! -
4.2.(16) Lapis Pondasi Bawah Beton Kurus M3 - 1,199,430.19 #REF! -
5.1.(1) Lapis Pondasi Agregat Kelas A M3 353.35 625,434.28 #REF! 220,997,203.77
5.1.(2) Lapis Pondasi Agregat Kelas B M3 530.03 606,164.16 #REF! 321,282,156.93
5.2,(1) Lapis Permukaan Agregat Tanpa Penutup Aspal M3 - 621,936.48 #REF! -
5.2,(2) Lapis Pondasi Agregat Tanpa Penutup Aspal M3 - 576,574.99 #REF! -
5.3.(1) Perkerasan Beton Semen M3 - 1,730,204.39 #REF! -
5.3.(2) Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal M3 - 1,827,602.40 #REF! -
5.3.(3) Lapis Pondasi bawah Beton Kurus M3 - 1,199,430.19 #REF! -
5.4.(1) Semen untuk Lapis Pondasi Semen Tanah Ton - 2,001,273.90 #REF! -
5.4.(2) Lapis Pondasi Semen Tanah M3 - 428,272.17 #REF! -
5.5.(1) Lapis Pondasi Agregat Semen Kelas A (Cement Treated Base) (CTB) M3 - 395,036.81 #REF! -
5.5.(2) Lapis Pondasi Agregat Semen Kelas B (Cement Treated Sub Base) (CTSB) M3 - 415,349.30 #REF! -
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 2,826.80 14,604.05 #REF! 41,282,737.53 ###
6.1 (1)(b) Lapis Resap Pengikat - Aspal Emulsi Liter - 174.17 #REF! - ###
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter - 15,322.38 #REF! - ###
6.1 (2)(b) Lapis Perekat - Aspal Emulsi Liter - 1,478.95 #REF! - ###
6.1 (2)(c) Lapis Perekat - Aspal Emulsi Modifikasi Liter - 174.17 #REF! - ###
6.2 (1) Agregat Penutup BURTU M2 - 22,818.78 #REF! - ###
6.2 (2) Agregat Penutup BURDA M2 - 36,417.65 #REF! - ###
6.2 (3a) Bahan Aspal untuk Pekerjaan Pelaburan Liter - 15,676.21 #REF! - ###
6.2 (3b) Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan Liter - 728.88 #REF! - ###
6.2 (4a) Aspal Cair Emulsi untuk Precoated Liter - 31,505.32 #REF! - ###
6.2 (4b) Aspal Emulsi untuk Precoated Liter - 31,720.85 #REF! - ###
6.2 (4c) Aspal Emulsi Modifikasi untuk Precoated Liter - 31,166.13 #REF! - ###
6.2 (4d) Bahan anti pengelupasan Kg - 35,000.00 #REF! - ###
6.3 (1) Latasir Kelas A (SS-A) Ton - 1,960,848.92 #REF! - ###
6.3 (2) Latasir Kelas B (SS-B) Ton - 1,665,336.55 #REF! - ###
6.3(3a) Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) Ton - 1,769,267.34 #REF! - ###
6.3(3b) Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang) Ton - 1,489,416.91 #REF! - ###
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton 315.13 1,509,595.91 #REF! 475,721,172.37 ###
6.3.(4b) Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang) Ton - 1,550,066.62 #REF! - ###
6.3(5a) Laston Lapis Aus (AC-WC) Ton - 1,583,208.79 #REF! - ###
6.3(5b) Laston Lapis Aus Modifikasi (AC-WC Mod) Ton - 632,684.30 #REF! - ###
6.3(5c) Laston Lapis Aus Perata (AC-WC(L)) Ton - 1,583,208.79 #REF! - ###
6.3(5d) Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod) Ton - 630,318.37 #REF! - ###
6.3(6a) Laston Lapis Antara (AC-BC) Ton - 1,502,606.83 #REF! - ###
6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton - 627,786.00 #REF! - ###
6.3(6c) Laston Lapis Antara Perata (AC-BC(L) Ton - 1,502,606.83 #REF! - ###
6.3(6d) Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling Ton - 627,786.00 #REF! - ###
6.3(7a) Laston Lapis Pondasi (AC-Base) Ton - 1,371,894.41 #REF! - ###
6.3(7b) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton - 627,264.46 #REF! - ###
6.3(7c) Laston Lapis Pondasi Perata (AC-Base(L)) Ton - 1,371,894.41 #REF! - ###
6.3(7d) Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod) Ton - 627,264.46 #REF! - ###
6.3.(8) Bahan anti pengelupasan Kg 56.73 122,500.00 #REF! 6,949,899.81 ###
6.5.(1) Campuran Aspal Dingin untuk Pelapisan M3 - 808,941.09 #REF! - ###
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 - 2,266,935.34 #REF! - ###
6.6.(2) Lapis Pondasi/Perata Penetrasi Macadam M3 - 2,396,541.06 #REF! - ###
7.1 (1) Beton mutu tinggi fc’50 Mpa M3 - - - - ###
7.1 (2) Beton mutu tinggi fc’45 Mpa M3 - 3,040,127.42 #REF! - ###
7.1 (3) a Beton mutu tinggi fc’40 Mpa dengan traveler M3 - - - - ###
7.1 (3) b Beton mutu tinggi fc’40 Mpa perancah M3 - - - - ###
7.1 (4) Beton mutu tinggi fc’35 Mpa M3 - 2,850,715.97 #REF! - ###
7.1 (5) a Beton mutu sedang fc’30 MPa lantai jembatan M3 - 2,776,927.84 #REF! - ###
7.1 (5) b Beton mutu sedang fc’30 MPa untuk ……… M3 - - - - ###
7.1 (6) Beton mutu sedang fc’25 Mpa M3 - 2,224,561.94 #REF! - ###
7.1 (7) a Beton mutu sedang fc’20 MPa M3 - 1,577,261.56 #REF! - ###
7.1 (7) b Beton mutu sedang fc’20 MPa yang dilaksanakan di air M3 - - - - ###
7.1 (8) Beton mutu rendah fc’15 MPa M3 - 1,208,003.13 #REF! - ###
7.1 (9) Beton Siklop fc’15 Mpa M3 - 1,028,519.05 #REF! - ###
7.1 (10) Beton mutu rendah fc’10 Mpa M3 - 1,148,808.38 #REF! - ###
7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah - 16,500,000.00 #REF! - ###
7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah - 22,000,000.00 #REF! - ###
7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah - - - - ###
7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah - 10,815,593.47 #REF! - ###
7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah - 16,016,340.98 #REF! - ###
7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah - 21,794,949.32 #REF! - ###
7.2 (3)a Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah - 16,500,000.00 #REF! - ###
7.2 (3)b Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah - - - - ###
7.2 (4)a Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah - 1,569,820.12 #REF! - ###
7.2 (4)b Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah - 1,569,820.12 #REF! - ###
7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah - - - - ###
7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah - - - - ###
7.2.(7) Baja Prategang Kg - 357,534.27 #REF! - ###
7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah - 17,682,531.80 #REF! - ###
7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah - 17,473,518.03 #REF! - ###
7.2.(10) Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension) m3 - 1,655,240.53 #REF! - ###
7.3 (1) Baja Tulangan U 24 Polos Kg - 19,181.04 #REF! - ###
7.3 (2) Baja Tulangan U 32 Polos Kg - 2,877.67 #REF! - ###
7.3 (3) Baja Tulangan U 32 Ulir Kg - 20,846.17 #REF! - ###
7.3 (4) Baja Tulangan U 39 Ulir Kg - 2,877.67 #REF! - ###
7.3 (5) Baja Tulangan U 48 Ulir Kg - 2,877.67 #REF! - ###
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg - 55,034.00 #REF! - ###
7.4 (1) a Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg - 27,887.65 #REF! - ###
7.4 (1) b Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg - 27,887.65 #REF! - ###
7.4 (1) c Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg - 387.65 #REF! - ###
7.4 (2) a Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg - 1,194.42 #REF! - ###
7.4 (2) b Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg - 1,194.42 #REF! - ###
7.4 (2) c Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg - 1,194.42 #REF! - ###
7.4 (3) a Pengadaan Struktur Jembatan Rangka Baja Panjang 40 m, Lebar 9 m Buah - - - - ###
7.4 (3) b Pengadaan Struktur Jembatan Rangka Baja Panjang 50 m, Lebar 9 m Buah - - - - ###
7.4 (3) c Pengadaan Struktur Jembatan Rangka Baja Panjang 60 m, Lebar 9 m Buah - - - - ###
7.4 (3) d Pengadaan Struktur Jembatan Rangka Baja Panjang .... m, Lebar .. m Buah - - - - ###
7.4.(4).a Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m Buah - - - - ###
7.4.(4).b Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m Buah - - - - ###
7.4.(4).c Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m Buah - - - - ###
7.4.(4).d Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m Buah - - - - ###
7.5 (1) Pemasangan jembatan Rangka Baja Kg - 1,214.98 #REF! - ###
7.5 (2) Pengangkutan Bahan Jembatan Kg - 679.69 #REF! - ###
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1 - 10,270.67 #REF! - ###
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2 - 57,836.51 #REF! - ###
7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2 - 67,500.00 #REF! - ###
7.6 (4) Dinding Turap Baja M2 - 6,130.88 #REF! - ###
7.6 (5) Dinding Turap Beton M2 - 922,814.82 #REF! - ###
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm M1 - 57,836.51 #REF! - ###
7.6 (7) Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm M1 - 62,000.00 #REF! - ###
7.6 (8) a Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm M1 - 133,080.54 #REF! - ###
7.6 (8) b Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm M1 - 133,080.54 #REF! - ###
7.6 (8) c Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm M1 - 158,441.65 #REF! - ###
7.6 (9) a Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1 - - - - ###
7.6 (9) b Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1 - - - - ###
7.6 (10) a Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 - - - - ###
7.6 (10) b Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1 - - - - ###
7.6 (11) a Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 - - - - ###
7.6 (11) b Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1 - - - - ###
7.6 (12) a Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 - - - - ###
7.6 (12) b Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……mm M1 - - - - ###
7.6 (13) Pemancangan Tiang Pancang Kayu Ukuran …. mm M1 - 129,095.69 #REF! - ###
7.6 (14) a Pemancangan Tiang Pancang Baja Diameter 500 mm M1 - 43,031.90 #REF! - ###
7.6 (14) b Pemancangan Tiang Pancang Baja Diameter ..… mm M1 - 43,031.90 #REF! - ###
7.6 (15) a Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1 - - - - ###
7.6 (15) b Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1 - - - - ###
7.6 (16) a Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 - - - - ###
7.6 (16) b Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1 - - - - ###
7.6 (17) a Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 - - - - ###
7.6 (17) b Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1 - - - - ###
7.6 (18) a Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 - - - - ###
7.6 (18) b Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter …... mm M1 - - - - ###
7.6 (19) a Tiang Bor Beton, diameter 800 mm M1 - 897,122.17 #REF! - ###
7.6 (19) b Tiang Bor Beton, diameter ….. mm M1 - 1,400,701.47 #REF! - ###
7.6 (20) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dikerjakan M1 - 4,254.51 #REF! - ###
di Tempat Yang Berair. 0 - - - - ###
7.6 (21) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton dikerjakan M1 - 20,839.19 #REF! - ###
di Tempat Yang Berair. 0 - - - - ###
7.6 (22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm buah - - - - ###
7.6 (23) Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm buah - - - - ###
7.6 (24) Tiang Uji jenis …… ukuran ……. M1 - - - - ###
7.6 (25) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Siklik buah - - - - ###
7.6 (25) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Bert buah - - - - ###
7.6 (26) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah - - - - ###
Cara Beban Siklik 0 - - - - ###
7.6 (26) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah - - - - ###
Cara Beban Bertahap 0 - - - - ###
7.6 (27) a Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... buah - - - - ###
7.6 (27) b Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada Tiangukuran / diameter .. buah - - - - ###
7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) buah - - - - ###
7.7.(1) Dinding Sumuran Silinder terpasang, Diameter ……………. M1 - - - - ###
7.9.(1) Pasangan Batu M3 - 928,733.67 #REF! - ###
7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3 - 818,030.59 #REF! - ###
7.10.(2) Pasangan Batu Kosong M3 - 431,038.00 #REF! - ###
7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis M3 - 573,295.83 #REF! - ###
7.10.(3) b. Bronjong dengan kawat yang dilapisi PVC M3 - - - - ###
7.10.(3) c. Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC M2 - - - - ###
7.11.(1) a. Expansion Joint Tipe Asphaltic Plug, Fixed M1 - - - - ###
7.11.(1) b. Expansion Joint Tipe Asphaltic Plug, Moveable M1 - - - - ###
7.11.(2) Expansion Joint Tipe Rubber 1 M1 - - - - ###
7.11.(3) Expansion Joint Tipe Rubber 2 M1 - - - - ###
7.11.(4) Expansion Joint Tipe Rubber 2 M1 - - - - ###
7.11.(5) Joint Filler untuk Sambungan Konstruksi M1 - - - - ###
7.11.(6) Expansion Joint Tipe Baja Bersudut M1 - - - - ###
7.11.(7) Expansion Joint Tipe Modular Lebar …… M1 - - - - ###
7.12.(1a) Perletakan Logam Tipe Fixed 150 Ton buah - - - - ###
7.12.(1b) Perletakan Logam Tipe Moveable 150 Ton buah - - - - ###
7.12.(1c) Perletakan Logam Tipe ….. buah - - - - ###
7.12.(2) Perletakan Elastomerik Alam Ukuran ……mm x ……. mm x ……. mm buah - - - - ###
7.12.(3) Perletakan Elastomerik Sintetis Ukuran ……mm x ……. mm x ……. mm buah - - - - ###
7.12.(4) Perletakan Strip M1 - - - - ###
7.13.(1) Sandaran (Railing) M1 - 198,822.00 #REF! - ###
7.14.(1) Papan Nama Jembatan buah - 295,600.00 #REF! - ###
7.15.(1) Pembongkaran Pasangan Batu M3 - 357,702.23 #REF! - ###
7.15.(2) Pembongkaran Beton M3 - 651,612.38 #REF! - ###
7.15.(3) Pembongkaran Beton Pratekan M3 - 347,237.81 #REF! - ###
7.15.(4) Pembongkaran Bangunan Gedung M2 - 128,903.30 #REF! - ###
7.15.(5) Pembongkaran Rangka Baja M2 - 440,580.63 #REF! - ###
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M' - 298,803.12 #REF! - ###
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2 - 130,825.48 #REF! - ###
7.15.(8) Pembongkaran Jembatan Kayu M2 - 127,086.33 #REF! - ###
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 per Km - - - - ###
7.16.(1) Deck drain Unit - - - - ###
7.16.(2).a Pipa Drainase Baja diameter 75 mm M' - 112,500.00 #REF! - ###
7.16.(2).b Pipa Drainase Baja diameter ….. mm M' - - - - ###
7.16.(3).a Pipa Drainase PVC diameter 75 mm M' - - - - ###
7.16.(3).a Pipa Drainase PVC diameter …. mm M' - - - - ###
7.16.(4) Pipa Penyalur PVC M' - - - - ###
8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3 - 691,639.30 #REF! - ###
8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3 - 720,700.79 #REF! - ###
8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur) - 535,145.87 #REF! - ###
8.1 (4) Waterbound Macadam untuk Pekerjaan Minor M3 - 729,610.34 #REF! - ###
8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor M3 - 3,680,020.93 #REF! - ###
8.1 (6) Lasbutag atau Latasbusir untuk Pekerjaan Minor M3 - 1,559,666.51 #REF! - ###
8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3 - 2,261,608.12 #REF! - ###
8.1 (8) Campuran Aspal Dingin untuk Pekerjaan Minor M3 - 780,925.01 #REF! - ###
8.1 (9) Residu Bitumen untuk Pekerjaan Minor Liter - 16,850.27 #REF! - ###
8.2.(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3 - - - - ###
8.3.(1a) Stabilisasi dengan Tanaman M2 - 6,750.67 #REF! - ###
8.3.(1b) Stabilisasi dengan Tanaman VS M2 - 14,909.90 #REF! - ###
8.3.(2) Semak / Perdu…………………. M2 - 6,090.67 #REF! - ###
8.3.(3) Pohon Jenis ……………………. Buah - 6,090.67 #REF! - ###
8.4.(1) Marka Jalan Termoplastik M2 - 133,306.04 #REF! - ###
8.4.(2) Marka Jalan Bukan Termoplastik M2 - 122,581.04 #REF! - ###
8.4.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah - 592,068.15 #REF! - ###
8.4.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah - 594,385.56 #REF! - ###
8.4.(4a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah - 592,068.15 #REF! - ###
8.4.(4b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah - 592,068.15 #REF! - ###
8.4.(5) Patok Pengarah Buah - 148,223.06 #REF! - ###
8.4.(6a) Patok Kilometer Buah - 379,855.44 #REF! - ###
8.4.(6b) Patok Hektometer Buah - 199,762.06 #REF! - ###
8.4.(7) Rel Pengaman M1 - 194,219.07 #REF! - ###
8.4.(8) Paku Jalan Buah - 57,471.67 #REF! - ###
8.4.(9) Mata Kucing Buah - 37,671.67 #REF! - ###
8.4.(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 - 40,389.94 #REF! - ###
8.4.(10b) Kerb Pracetak Jenis 2 (Penghalang/Barrier) M1 - 42,625.94 #REF! - ###
8.4.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) M1 - 42,625.94 #REF! - ###
8.4.(10d) Kerb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm M1 - 45,420.94 #REF! - ###
8.4.(10e) Kerb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm M1 - 45,420.94 #REF! - ###
8.4.(10f) Kerb Pracetak Jenis 6 (Kerb dengan Bukaan) Buah - 45,420.94 #REF! - ###
8.4.(10g) Kerb Pracetak Jenis 7a (Kerb pada Pelandaian Trotoar) Buah - 70,575.99 #REF! - ###
8.4.(10h) Kerb Pracetak Jenis 7b (Kerb pada Pelandaian Trotoar) Buah - - - - ###
8.4.(10i) Kerb Pracetak Jenis 7c (Kerb pada Pelandaian Trotoar) Buah - - - - ###
8.4.(11) Kerb yang digunakan kembali M1 - 63,359.76 #REF! - ###
8.4.(12) Perkerasan Blok Beton pada Trotoar dan Median M2 - 100,600.30 #REF! - ###
8.4.(13) Beton Pemisah Jalur (Concrete Barrier) Buah - - - - ###
8.4.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah - - - - ###
8.4.(15) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Buah - - - - ###
8.4.(16) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah - - - - ###
8.4.(17) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah - - - - ###
8.4.(18) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah - - - - ###
8.4.(19) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah - - - - ###
8.4.(20) Pagar Pemisah Pedestrian Carbon Steel M' - - - - ###
8.4.(21) Pagar Pemisah Pedestrian Galvanised M' - - - - ###
8.4.(22) Pagar Pemisah Pedestrian Carbon Steel M' - - - - ###
8.4.(23) Pagar Pemisah Pedestrian Galvanisasi M' - - - - ###
8.5(1) Pengembalian Kondisi Lantai Jembatan Beton M2 - 145,145.52 #REF! - ###
8.5(2) Pengembalian Kondisi Lantai Jembatan Kayu M2 - 371,079.05 #REF! - ###
8.5(3) Pengembalian Kondisi Pelapisan Permukaan Baja Struktur M2 - 43,079.37 #REF! - ###
9.1.(1) Mandor Jam - 19,838.10 #REF! - ###
9.1.(2) Pekerja Biasa Jam - 11,195.24 #REF! - ###
9.1.(3) Tukang Kayu, Tukang Batu, dsb Jam - 15,909.52 #REF! - ###
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam - 345,385.39 #REF! - ###
9.1.(4) b Dump Truck, kapasitas 6 - 8 m³ Jam - - - - ###
9.1.(5) a Truk Bak Datar 3 - 4 ton Jam - 534,143.77 #REF! - ###
9.1.(5) b Truk Bak Datar 6 - 8 ton Jam - - - - ###
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam - 317,013.02 #REF! - ###
9.1.(7) Bulldozer 100 - 150 PK Jam - 925,609.52 #REF! - ###
9.1.(8) Motor Grader min 100 PK Jam - 829,191.32 #REF! - ###
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam - 671,766.86 #REF! - ###
9.1.(10) Loader Roda Berantai 75 - 100 PK Jam - 263,111.24 #REF! - ###
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam - 630,610.61 #REF! - ###
9.1.(12) Crane 10 - 15 Ton Jam - 722,710.52 #REF! - ###
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam - 368,168.66 #REF! - ###
9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam - 450,903.47 #REF! - ###
9.1.(15) Pemadat Bervibrasi 1.5 - 3.0 PK Jam - 54,316.49 #REF! - ###
9.1.(16) Penggilas Roda Karet 8 - 10 Ton Jam - 440,782.50 #REF! - ###
9.1.(17) Kompresor 4000 - 6500 Ltr/mnt Jam - 218,899.94 #REF! - ###
9.1.(18) Mesin Pengaduk beton (Molen) 0.3 - 0.6 M3 Jam - 128,458.33 #REF! - ###
9.1.(19) Pompa Air 70 - 100 mm Jam - 53,725.42 #REF! - ###
9.1.(20) Jack Hammer Jam - 43,743.68 #REF! - ###
10.1 (1) Pemeliharaan Rutin Perkerasan LS - 21,301,784.28 #REF! - ###
10.1 (2) Pemeliharaan Rutin Bahu Jalan LS - 10,607,130.83 #REF! - ###
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan LS - 29,018,979.15 #REF! - ###
10.1 (4) Pemeliharaan Rutin Perlengkapan Jalan LS - 3,527,748.90 #REF! - ###
10.1 (5) Pemeliharaan Rutin Jembatan LS - 36,239,779.14 #REF! - ###
Cumm
% Thd. No. Mata Perkiraan Harga Jumlah % for
Uraian Satuan
Total Pembayaran Kuantitas Satuan Harga-Harga Major
Biaya (Rupiah) (Rupiah) Items
a c d e f g h i

#REF! 1.2 ###Mobilisasi LS 1.0 12,455,000 12,455,000


#REF! 1.8.(1) ###Manajemen dan Keselamatan Lalu Lintas LS 1.0 2,135,411 2,135,411 #REF!
#REF! 1.8.(2) ###Jembatan Sementara LS - 148,416,406 0 #REF!
#REF! 1.17 ###Pengamanan Lingkungan Hidup LS - 40,080,000 0 #REF!
#REF! 1.20.(1) ###Pengeboran, termasuk SPT dan Laporan M1 - 508,750 0 #REF!
#REF! 1.20.(2) ###Sondir termasuk Laporan M1 - 257,583 0 #REF!
#REF! 1.21 ###Manajemen Mutu LS - 231,600,000 0 #REF!
#REF! 2.1.(1) ###Galian untuk Selokan Drainase dan Saluran Air M3 - 50,878 0 #REF!
#REF! 2.2.(1) ###Pasangan Batu dengan Mortar M3 - 747,681 0 #REF!
#REF! 2.3.(1) ###Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm M1 - 413,031 0 #REF!
#REF! 2.3.(2) ###Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm M1 - 591,528 0 #REF!
#REF! 2.3.(3) ###Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M1 - 1,253,976 0 #REF!
#REF! 2.3.(4) ###Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M1 - 1,513,779 0 #REF!
#REF! 2.3.(5) ###Gorong2 Pipa Baja Bergelombang Ton - 2,404,727 0 #REF!
#REF! 2.3.(6) ###Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1 - 122,393 0 #REF!
#REF! 2.3.(7) ###Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1 - 126,733 0 #REF!
#REF! 2.3.(8) ###Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1 - 131,203 0 #REF!
#REF! 2.3.(9) ###Saluran berbentuk U Tipe DS 1 M1 - 246,515 0 #REF!
#REF! 2.3.(10) ###Saluran berbentuk U Tipe DS 2 M1 - 287,600 0 #REF!
#REF! 2.3.(11) ###Saluran berbentuk U Tipe DS 3 M1 - 345,120 0 #REF!
#REF! 2.3.(12) ###Beton K250 (fc’ 20) untuk struktur drainase beton minor M3 - 862,237 0 #REF!
#REF! 2.3.(13) ###Baja Tulangan untuk struktur drainase beton minor Kg - 2,878 0 #REF!
#REF! 2.3.(14) ###Pasangan Batu tanpa Adukan (Aanstamping) M3 - 431,038 0 #REF!
#REF! 2.4.(1) ###Bahan Porous untuk Bahan Penyaring (Filter) M3 - 155,115 0 #REF!
#REF! 2.4.(2) ###Anyaman Filter Plastik M2 - 33,604 0 #REF!
#REF! 2.4.(3) ###Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Baw M1 - 51,450 0 #REF!
#REF! 3.1.(1a) ###Galian Biasa M3 - 38,617 0 #REF!
#REF! 3.1.(1b) ###Galian Batu Lunak M3 - 212,912 0 #REF!
#REF! 3.1.(2) ###Galian Batu M3 - 205,942 0 #REF!
#REF! 3.1.(3) ###Galian Struktur dengan kedalaman 0 - 2 meter M3 - 17,522 0 #REF!
#REF! 3.1.(4) ###Galian Struktur dengan kedalaman 2 - 4 meter M3 - 781,435 0 #REF!
#REF! 3.1.(5) ###Galian Struktur dengan kedalaman 4 - 6 meter M3 - 783,823 0 #REF!
#REF! 3.1.(6) ###Galian Perkerasan Beraspal dengan Cold Milling Machine M3 - 250,049 0 #REF!
#REF! 3.1.(7) ###Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 - 1,024,201 0 #REF!
#REF! 3.1.(8) ###Galian Perkerasan berbutir M3 - 177,851 0 #REF!
#REF! 3.1.(9). ###Galian Perkerasan Beton M3 - 204,759 0 #REF!
#REF! 3.2.(1a) ###Timbunan Biasa dari sumber galian M3 - 310,420 0 #REF!
#REF! 3.2.(2a) ###Timbunan Pilihan dari sumber galian M3 - 315,748 0 #REF!
#REF! 3.2.(3a) ###Timbunan Pilihan (diukur diatas bak truk) M3 - 265,655 0 #REF!
#REF! 3.3.(1) ###Penyiapan Badan Jalan M2 - 744 0 #REF!
#REF! 3.4.(1) ###Pembersihan dan Pengupasan Lahan M2 - 94,065 0 #REF!
#REF! 3.4.(2) ###Pemotongan Pohon Pilihan diameter 15 – 30 cm buah - 158,262 0 #REF!
#REF! 3.4.(3) ###Pemotongan Pohon Pilihan diameter 30 – 50 cm buah - 214,164 0 #REF!
#REF! 3.4.(4) ###Pemotongan Pohon Pilihan diameter 50 – 75 cm buah - 326,189 0 #REF!
#REF! 3.4.(5) ###Pemotongan Pohon Pilihan diameter > 75 cm buah - 672,547 0 #REF!
#REF! 3.5.(1) ###Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2) M2 - 20,111 0 #REF!
#REF! 3.5.(2a) ###Geotekstil Separator Kelas 1 M2 - 20,111 0 #REF!
#REF! 3.5.(2b) ###Geotekstil Separator Kelas 2 M2 - 20,111 0 #REF!
#REF! 3.5.(2c) ###Geotekstil Separator Kelas 3 M2 - 20,111 0 #REF!
#REF! 3.5.(3) ###Geotekstil Stabilisator (Kelas 1) M2 - 20,111 0 #REF!
#REF! 4.2.(1) ###Lapis Pondasi Agregat Kelas A M3 - 761,601 0 #REF!
#REF! 4.2.(2a) ###Lapis Pondasi Agregat Kelas B M3 - 744,677 0 #REF!
#REF! 4.2.(2b) ###Lapis Pondasi Agregat Kelas S M3 - 729,610 0 #REF!
#REF! 4.2.(3) ###Semen untuk Lapis Pondasi Semen Tanah Ton - 1,936,514 0 #REF!
#REF! 4.2.(4) ###Lapis Pondasi Semen Tanah M3 - 541,036 0 #REF!
#REF! 4.2.(5) ###Agregat Penutup BURTU M2 - 11,468 0 #REF!
#REF! 4.2.(6) ###Bahan Aspal untuk Pekerjaan Pelaburan Liter - 17,082 0 #REF!
#REF! 4.2.(7) ###Lapis Resap Pengikat Liter - 15,201 0 #REF!
#REF! 4.2.(8) ###Lapis Resap Perekat Liter - 15,322 0 #REF!
#REF! 4.2.(9) ###Laston Lapis Antara (AC-BC) Ton - 1,502,607 0 #REF!
#REF! 4.2.(10) ###Laston Lapis Antara Modifikasi (AC-BC Mod) Ton - 627,786 0 #REF!
#REF! 4.2.(11) ###Laston Lapis Pondasi (AC-Base) Ton - 1,371,894 0 #REF!
#REF! 4.2.(12) ###Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton - 627,264 0 #REF!
#REF! 4.2.(13) ###Bahan anti pengelupasan Kg - 122,500 0 #REF!
#REF! 4.2.(14) ###Perkerasan Beton Semen M3 - 1,730,204 0 #REF!
#REF! 4.2.(15) ###Perkerasan Beton Semen dengan anyaman Tulangan Tunggal M3 - 1,827,602 0 #REF!
#REF! 4.2.(16) ###Lapis Pondasi Bawah Beton Kurus M3 - 1,199,430 0 #REF!
#REF! 5.1.(1) ###Lapis Pondasi Agregat Kelas A M3 353.4 625,434 220,997,204 #REF!
#REF! 5.1.(2) ###Lapis Pondasi Agregat Kelas B M3 530.0 606,164 321,282,157 #REF!
#REF! 5.2,(1) ###Lapis Permukaan Agregat Tanpa Penutup Aspal M3 - 621,936 0 #REF!
#REF! 5.2,(2) ###Lapis Pondasi Agregat Tanpa Penutup Aspal M3 - 576,575 0 #REF!
#REF! 5.3.(1) ###Perkerasan Beton Semen M3 - 1,730,204 0 #REF!
#REF! 5.3.(2) ###Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal M3 - 1,827,602 0 #REF!
#REF! 5.3.(3) ###Lapis Pondasi bawah Beton Kurus M3 - 1,199,430 0 #REF!
#REF! 5.4.(1) ###Semen untuk Lapis Pondasi Semen Tanah Ton - 2,001,274 0 #REF!
#REF! 5.4.(2) ###Lapis Pondasi Semen Tanah M3 - 428,272 0 #REF!
#REF! 5.5.(1) ###Lapis Pondasi Agregat Semen Kelas A (Cement Treated Base) (CTB) M3 - 395,037 0 #REF!
#REF! 5.5.(2) ###Lapis Pondasi Agregat Semen Kelas B (Cement Treated Sub Base) (CTSB M3 - 415,349 0 #REF!
#REF! 6.1 (1)(a) ###Lapis Resap Pengikat - Aspal Cair Liter 2,826.8 14,604 41,282,738 #REF!
#REF! 6.1 (1)(b) ###Lapis Resap Pengikat - Aspal Emulsi Liter - 174 0 #REF!
#REF! 6.1 (2)(a) ###Lapis Perekat - Aspal Cair Liter - 15,322 0 #REF!
#REF! 6.1 (2)(b) ###Lapis Perekat - Aspal Emulsi Liter - 1,479 0 #REF!
#REF! 6.1 (2)(c) ###Lapis Perekat - Aspal Emulsi Modifikasi Liter - 174 0 #REF!
#REF! 6.2 (1) ###Agregat Penutup BURTU M2 - 22,819 0 #REF!
#REF! 6.2 (2) ###Agregat Penutup BURDA M2 - 36,418 0 #REF!
#REF! 6.2 (3a) ###Bahan Aspal untuk Pekerjaan Pelaburan Liter - 15,676 0 #REF!
#REF! 6.2 (3b) ###Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan Liter - 729 0 #REF!
#REF! 6.2 (4a) ###Aspal Cair Emulsi untuk Precoated Liter - 31,505 0 #REF!
#REF! 6.2 (4b) ###Aspal Emulsi untuk Precoated Liter - 31,721 0 #REF!
#REF! 6.2 (4c) ###Aspal Emulsi Modifikasi untuk Precoated Liter - 31,166 0 #REF!
#REF! 6.2 (4d) ###Bahan anti pengelupasan Kg - 35,000 0 #REF!
#REF! 6.3 (1) ###Latasir Kelas A (SS-A) Ton - 1,960,849 0 #REF!
#REF! 6.3 (2) ###Latasir Kelas B (SS-B) Ton - 1,665,337 0 #REF!
#REF! 6.3(3a) ###Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) Ton - 1,769,267 0 #REF!
#REF! 6.3(3b) ###Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang) Ton - 1,489,417 0 #REF!
#REF! 6.3.(4a) ###Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton 315.1 1,509,596 475,721,172 #REF!
#REF! 6.3.(4b) ###Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senj Ton - 1,550,067 0 #REF!
#REF! 6.3(5a) ###Laston Lapis Aus (AC-WC) Ton - 1,583,209 0 #REF!
#REF! 6.3(5b) ###Laston Lapis Aus Modifikasi (AC-WC Mod) Ton - 632,684 0 #REF!
#REF! 6.3(5c) ###Laston Lapis Aus Perata (AC-WC(L)) Ton - 1,583,209 0 #REF!
#REF! 6.3(5d) ###Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod) Ton - 630,318 0 #REF!
#REF! 6.3(6a) ###Laston Lapis Antara (AC-BC) Ton - 1,502,607 0 #REF!
#REF! 6.3(6b) ###Laston Lapis Antara Modifikasi (AC-BC Mod) Ton - 627,786 0 #REF!
#REF! 6.3(6c) ###Laston Lapis Antara Perata (AC-BC(L) Ton - 1,502,607 0 #REF!
#REF! 6.3(6d) ###Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling Ton - 627,786 0 #REF!
#REF! 6.3(7a) ###Laston Lapis Pondasi (AC-Base) Ton - 1,371,894 0 #REF!
#REF! 6.3(7b) ###Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton - 627,264 0 #REF!
#REF! 6.3(7c) ###Laston Lapis Pondasi Perata (AC-Base(L)) Ton - 1,371,894 0 #REF!
#REF! 6.3(7d) ###Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod) Ton - 627,264 0 #REF!
#REF! 6.3.(8) ###Bahan anti pengelupasan Kg 56.7 122,500 6,949,900 #REF!
#REF! 6.5.(1) ###Campuran Aspal Dingin untuk Pelapisan M3 - 808,941 0 #REF!
#REF! 6.6.(1) ###Lapis Permukaan Penetrasi Macadam M3 - 2,266,935 0 #REF!
#REF! 6.6.(2) ###Lapis Pondasi/Perata Penetrasi Macadam M3 - 2,396,541 0 #REF!
0.0000 7.1 (1) ###Beton mutu tinggi fc’50 Mpa M3 - - 0 #REF!
#REF! 7.1 (2) ###Beton mutu tinggi fc’45 Mpa M3 - 3,040,127 0 #REF!
0.0000 7.1 (3) a ###Beton mutu tinggi fc’40 Mpa dengan traveler M3 - - 0 #REF!
0.0000 7.1 (3) b ###Beton mutu tinggi fc’40 Mpa perancah M3 - - 0 #REF!
#REF! 7.1 (4) ###Beton mutu tinggi fc’35 Mpa M3 - 2,850,716 0 #REF!
#REF! 7.1 (5) a ###Beton mutu sedang fc’30 MPa lantai jembatan M3 - 2,776,928 0 #REF!
0.0000 7.1 (5) b ###Beton mutu sedang fc’30 MPa untuk ……… M3 - - 0 #REF!
#REF! 7.1 (6) ###Beton mutu sedang fc’25 Mpa M3 - 2,224,562 0 #REF!
#REF! 7.1 (7) a ###Beton mutu sedang fc’20 MPa M3 - 1,577,262 0 #REF!
0.0000 7.1 (7) b ###Beton mutu sedang fc’20 MPa yang dilaksanakan di air M3 - - 0 #REF!
#REF! 7.1 (8) ###Beton mutu rendah fc’15 MPa M3 - 1,208,003 0 #REF!
#REF! 7.1 (9) ###Beton Siklop fc’15 Mpa M3 - 1,028,519 0 #REF!
#REF! 7.1 (10) ###Beton mutu rendah fc’10 Mpa M3 - 1,148,808 0 #REF!
#REF! 7.2 (1a) ###Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah - 16,500,000 0 #REF!
#REF! 7.2 (1b) ###Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah - 22,000,000 0 #REF!
0.0000 7.2 (1c) ###Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah - - 0 #REF!
#REF! 7.2 (2a) ###Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah - 10,815,593 0 #REF!
#REF! 7.2 (2b) ###Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah - 16,016,341 0 #REF!
#REF! 7.2 (2c) ###Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah - 21,794,949 0 #REF!
#REF! 7.2 (3)a ###Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah - 16,500,000 0 #REF!
0.0000 7.2 (3)b ###Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah - - 0 #REF!
#REF! 7.2 (4)a ###Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah - 1,569,820 0 #REF!
#REF! 7.2 (4)b ###Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah - 1,569,820 0 #REF!
0.0000 7.2.(5) ###Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah - - 0 #REF!
0.0000 7.2.(6) ###Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……mete Buah - - 0 #REF!
#REF! 7.2.(7) ###Baja Prategang Kg - 357,534 0 #REF!
#REF! 7.2.(8) ###Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah - 17,682,532 0 #REF!
#REF! 7.2.(9) ###Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah - 17,473,518 0 #REF!
#REF! 7.2.(10) ###Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah peng m3 - 1,655,241 0 #REF!
#REF! 7.3 (1) ###Baja Tulangan U 24 Polos Kg - 19,181 0 #REF!
#REF! 7.3 (2) ###Baja Tulangan U 32 Polos Kg - 2,878 0 #REF!
#REF! 7.3 (3) ###Baja Tulangan U 32 Ulir Kg - 20,846 0 #REF!
#REF! 7.3 (4) ###Baja Tulangan U 39 Ulir Kg - 2,878 0 #REF!
#REF! 7.3 (5) ###Baja Tulangan U 48 Ulir Kg - 2,878 0 #REF!
#REF! 7.3 (6) ###Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg - 55,034 0 #REF!
#REF! 7.4 (1) a ###Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg - 27,888 0 #REF!
#REF! 7.4 (1) b ###Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg - 27,888 0 #REF!
#REF! 7.4 (1) c ###Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg - 388 0 #REF!
#REF! 7.4 (2) a ###Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg - 1,194 0 #REF!
#REF! 7.4 (2) b ###Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg - 1,194 0 #REF!
#REF! 7.4 (2) c ###Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg - 1,194 0 #REF!
0.0000 7.4 (3) a ###Pengadaan Struktur Jembatan Rangka Baja Panjang 40 m, Lebar 9 m Buah - - 0 #REF!
0.0000 7.4 (3) b ###Pengadaan Struktur Jembatan Rangka Baja Panjang 50 m, Lebar 9 m Buah - - 0 #REF!
0.0000 7.4 (3) c ###Pengadaan Struktur Jembatan Rangka Baja Panjang 60 m, Lebar 9 m Buah - - 0 #REF!
0.0000 7.4 (3) d ###Pengadaan Struktur Jembatan Rangka Baja Panjang .... m, Lebar .. m Buah - - 0 #REF!
0.0000 7.4.(4).a ###Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m Buah - - 0 #REF!
0.0000 7.4.(4).b ###Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m Buah - - 0 #REF!
0.0000 7.4.(4).c ###Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m Buah - - 0 #REF!
0.0000 7.4.(4).d ###Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m Buah - - 0 #REF!
#REF! 7.5 (1) ###Pemasangan jembatan Rangka Baja Kg - 1,215 0 #REF!
#REF! 7.5 (2) ###Pengangkutan Bahan Jembatan Kg - 680 0 #REF!
#REF! 7.6 (1) ###Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1 - 10,271 0 #REF!
#REF! 7.6 (2) ###Dinding Turap Kayu Tanpa Pengawetan M2 - 57,837 0 #REF!
#REF! 7.6 (3) ###Dinding Turap Kayu Dengan Pengawetan M2 - 67,500 0 #REF!
#REF! 7.6 (4) ###Dinding Turap Baja M2 - 6,131 0 #REF!
#REF! 7.6 (5) ###Dinding Turap Beton M2 - 922,815 0 #REF!
#REF! 7.6 (6) ###Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm M1 - 57,837 0 #REF!
#REF! 7.6 (7) ###Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm M1 - 62,000 0 #REF!
#REF! 7.6 (8) a ###Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm M1 - 133,081 0 #REF!
#REF! 7.6 (8) b ###Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm M1 - 133,081 0 #REF!
#REF! 7.6 (8) c ###Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm M1 - 158,442 0 #REF!
0.0000 7.6 (9) a ###Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 M1 - - 0 #REF!
0.0000 7.6 (9) b ###Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x … M1 - - 0 #REF!
0.0000 7.6 (10) a ###Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x M1 - - 0 #REF!
0.0000 7.6 (10) b ###Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x … M1 - - 0 #REF!
0.0000 7.6 (11) a ###Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 4 M1 - - 0 #REF!
0.0000 7.6 (11) b ###Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x … M1 - - 0 #REF!
0.0000 7.6 (12) a ###Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 - - 0 #REF!
0.0000 7.6 (12) b ###Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……mm M1 - - 0 #REF!
#REF! 7.6 (13) ###Pemancangan Tiang Pancang Kayu Ukuran …. mm M1 - 129,096 0 #REF!
#REF! 7.6 (14) a ###Pemancangan Tiang Pancang Baja Diameter 500 mm M1 - 43,032 0 #REF!
#REF! 7.6 (14) b ###Pemancangan Tiang Pancang Baja Diameter ..… mm M1 - 43,032 0 #REF!
0.0000 7.6 (15) a ###Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x M1 - - 0 #REF!
0.0000 7.6 (15) b ###Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x M1 - - 0 #REF!
0.0000 7.6 (16) a ###Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm M1 - - 0 #REF!
0.0000 7.6 (16) b ###Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x M1 - - 0 #REF!
0.0000 7.6 (17) a ###Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm M1 - - 0 #REF!
0.0000 7.6 (17) b ###Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x M1 - - 0 #REF!
0.0000 7.6 (18) a ###Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 - - 0 #REF!
0.0000 7.6 (18) b ###Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter …... mm M1 - - 0 #REF!
#REF! 7.6 (19) a ###Tiang Bor Beton, diameter 800 mm M1 - 897,122 0 #REF!
#REF! 7.6 (19) b ###Tiang Bor Beton, diameter ….. mm M1 - 1,400,701 0 #REF!
#REF! 7.6 (20) ###Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila M1 - 4,255 0 #REF!
0.0000 0 ###di Tempat Yang Berair. - - - 0 #REF!
#REF! 7.6 (21) ###Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Be M1 - 20,839 0 #REF!
0.0000 0 ###di Tempat Yang Berair. - - - 0 #REF!
0.0000 7.6 (22) ###Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm buah - - 0 #REF!
0.0000 7.6 (23) ###Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm buah - - 0 #REF!
0.0000 7.6 (24) ###Tiang Uji jenis …… ukuran ……. M1 - - 0 #REF!
0.0000 7.6 (25) a ###Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan be buah - - 0 #REF!
0.0000 7.6 (25) b ###Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan b buah - - 0 #REF!
0.0000 7.6 (26) a ###Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan me buah - - 0 #REF!
0.0000 0 ###Cara Beban Siklik - - - 0 #REF!
0.0000 7.6 (26) b ###Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan me buah - - 0 #REF!
0.0000 0 ###Cara Beban Bertahap - - - 0 #REF!
0.0000 7.6 (27) a ###Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .. buah - - 0 #REF!
0.0000 7.6 (27) b ###Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) p buah - - 0 #REF!
0.0000 7.6 (28) ###Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) buah - - 0 #REF!
0.0000 7.7.(1) ###Dinding Sumuran Silinder terpasang, Diameter ……………. M1 - - 0 #REF!
#REF! 7.9.(1) ###Pasangan Batu M3 - 928,734 0 #REF!
#REF! 7.10.(1) ###Pasangan Batu Kosong yang Diisi Adukan M3 - 818,031 0 #REF!
#REF! 7.10.(2) ###Pasangan Batu Kosong M3 - 431,038 0 #REF!
#REF! 7.10.(3) a. ###Bronjong dengan kawat yang dilapisi galvanis M3 - 573,296 0 #REF!
0.0000 7.10.(3) b. ###Bronjong dengan kawat yang dilapisi PVC M3 - - 0 #REF!
0.0000 7.10.(3) c. ###Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang M2 - - 0 #REF!
0.0000 7.11.(1) a. ###Expansion Joint Tipe Asphaltic Plug, Fixed M1 - - 0 #REF!
0.0000 7.11.(1) b. ###Expansion Joint Tipe Asphaltic Plug, Moveable M1 - - 0 #REF!
0.0000 7.11.(2) ###Expansion Joint Tipe Rubber 1 M1 - - 0 #REF!
0.0000 7.11.(3) ###Expansion Joint Tipe Rubber 2 M1 - - 0 #REF!
0.0000 7.11.(4) ###Expansion Joint Tipe Rubber 2 M1 - - 0 #REF!
0.0000 7.11.(5) ###Joint Filler untuk Sambungan Konstruksi M1 - - 0 #REF!
0.0000 7.11.(6) ###Expansion Joint Tipe Baja Bersudut M1 - - 0 #REF!
0.0000 7.11.(7) ###Expansion Joint Tipe Modular Lebar …… M1 - - 0 #REF!
0.0000 7.12.(1a) ###Perletakan Logam Tipe Fixed 150 Ton buah - - 0 #REF!
0.0000 7.12.(1b) ###Perletakan Logam Tipe Moveable 150 Ton buah - - 0 #REF!
0.0000 7.12.(1c) ###Perletakan Logam Tipe ….. buah - - 0 #REF!
0.0000 7.12.(2) ###Perletakan Elastomerik Alam Ukuran ……mm x ……. mm x ……. mm buah - - 0 #REF!
0.0000 7.12.(3) ###Perletakan Elastomerik Sintetis Ukuran ……mm x ……. mm x ……. mm buah - - 0 #REF!
0.0000 7.12.(4) ###Perletakan Strip M1 - - 0 #REF!
#REF! 7.13.(1) ###Sandaran (Railing) M1 - 198,822 0 #REF!
#REF! 7.14.(1) ###Papan Nama Jembatan buah - 295,600 0 #REF!
#REF! 7.15.(1) ###Pembongkaran Pasangan Batu M3 - 357,702 0 #REF!
#REF! 7.15.(2) ###Pembongkaran Beton M3 - 651,612 0 #REF!
#REF! 7.15.(3) ###Pembongkaran Beton Pratekan M3 - 347,238 0 #REF!
#REF! 7.15.(4) ###Pembongkaran Bangunan Gedung M2 - 128,903 0 #REF!
#REF! 7.15.(5) ###Pembongkaran Rangka Baja M2 - 440,581 0 #REF!
#REF! 7.15.(6) ###Pembongkaran Balok Baja (Steel Stringers) M' - 298,803 0 #REF!
#REF! 7.15.(7) ###Pembongkaran Lantai Jembatan Kayu M2 - 130,825 0 #REF!
#REF! 7.15.(8) ###Pembongkaran Jembatan Kayu M2 - 127,086 0 #REF!
0.0000 7.15.(9) ###Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 per Km - - 0 #REF!
0.0000 7.16.(1) ###Deck drain Unit - - 0 #REF!
#REF! 7.16.(2).a ###Pipa Drainase Baja diameter 75 mm M' - 112,500 0 #REF!
0.0000 7.16.(2).b ###Pipa Drainase Baja diameter ….. mm M' - - 0 #REF!
0.0000 7.16.(3).a ###Pipa Drainase PVC diameter 75 mm M' - - 0 #REF!
0.0000 7.16.(3).a ###Pipa Drainase PVC diameter …. mm M' - - 0 #REF!
0.0000 7.16.(4) ###Pipa Penyalur PVC M' - - 0 #REF!
#REF! 8.1 (1) ###Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3 - 691,639 0 #REF!
#REF! 8.1 (2) ###Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3 - 720,701 0 #REF!
#REF! 8.1 (3) ###Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan MinorM3 (vol. gembur) - 535,146 0 #REF!
#REF! 8.1 (4) ###Waterbound Macadam untuk Pekerjaan Minor M3 - 729,610 0 #REF!
#REF! 8.1 (5) ###Campuran Aspal Panas untuk Pekerjaan Minor M3 - 3,680,021 0 #REF!
#REF! 8.1 (6) ###Lasbutag atau Latasbusir untuk Pekerjaan Minor M3 - 1,559,667 0 #REF!
#REF! 8.1 (7) ###Penetrasi Macadam untuk Pekerjaan Minor M3 - 2,261,608 0 #REF!
#REF! 8.1 (8) ###Campuran Aspal Dingin untuk Pekerjaan Minor M3 - 780,925 0 #REF!
#REF! 8.1 (9) ###Residu Bitumen untuk Pekerjaan Minor Liter - 16,850 0 #REF!
0.0000 8.2.(1) ###Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3 - - 0 #REF!
#REF! 8.3.(1a) ###Stabilisasi dengan Tanaman M2 - 6,751 0 #REF!
#REF! 8.3.(1b) ###Stabilisasi dengan Tanaman VS M2 - 14,910 0 #REF!
#REF! 8.3.(2) ###Semak / Perdu…………………. M2 - 6,091 0 #REF!
#REF! 8.3.(3) ###Pohon Jenis ……………………. Buah - 6,091 0 #REF!
#REF! 8.4.(1) ###Marka Jalan Termoplastik M2 - 133,306 0 #REF!
#REF! 8.4.(2) ###Marka Jalan Bukan Termoplastik M2 - 122,581 0 #REF!
#REF! 8.4.(3a) ###Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah - 592,068 0 #REF!
#REF! 8.4.(3b) ###Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah - 594,386 0 #REF!
#REF! 8.4.(4a) ###Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah - 592,068 0 #REF!
#REF! 8.4.(4b) ###Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah - 592,068 0 #REF!
#REF! 8.4.(5) ###Patok Pengarah Buah - 148,223 0 #REF!
#REF! 8.4.(6a) ###Patok Kilometer Buah - 379,855 0 #REF!
#REF! 8.4.(6b) ###Patok Hektometer Buah - 199,762 0 #REF!
#REF! 8.4.(7) ###Rel Pengaman M1 - 194,219 0 #REF!
#REF! 8.4.(8) ###Paku Jalan Buah - 57,472 0 #REF!
#REF! 8.4.(9) ###Mata Kucing Buah - 37,672 0 #REF!
#REF! 8.4.(10a) ###Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 - 40,390 0 #REF!
#REF! 8.4.(10b) ###Kerb Pracetak Jenis 2 (Penghalang/Barrier) M1 - 42,626 0 #REF!
#REF! 8.4.(10c) ###Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) M1 - 42,626 0 #REF!
#REF! 8.4.(10d) ###Kerb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm M1 - 45,421 0 #REF!
#REF! 8.4.(10e) ###Kerb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm M1 - 45,421 0 #REF!
#REF! 8.4.(10f) ###Kerb Pracetak Jenis 6 (Kerb dengan Bukaan) Buah - 45,421 0 #REF!
#REF! 8.4.(10g) ###Kerb Pracetak Jenis 7a (Kerb pada Pelandaian Trotoar) Buah - 70,576 0 #REF!
0.0000 8.4.(10h) ###Kerb Pracetak Jenis 7b (Kerb pada Pelandaian Trotoar) Buah - - 0 #REF!
0.0000 8.4.(10i) ###Kerb Pracetak Jenis 7c (Kerb pada Pelandaian Trotoar) Buah - - 0 #REF!
#REF! 8.4.(11) ###Kerb yang digunakan kembali M1 - 63,360 0 #REF!
#REF! 8.4.(12) ###Perkerasan Blok Beton pada Trotoar dan Median M2 - 100,600 0 #REF!
0.0000 8.4.(13) ###Beton Pemisah Jalur (Concrete Barrier) Buah - - 0 #REF!
0.0000 8.4.(14) ###Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah - - 0 #REF!
0.0000 8.4.(15) ###Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Buah - - 0 #REF!
0.0000 8.4.(16) ###Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah - - 0 #REF!
0.0000 8.4.(17) ###Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah - - 0 #REF!
0.0000 8.4.(18) ###Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah - - 0 #REF!
0.0000 8.4.(19) ###Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah - - 0 #REF!
0.0000 8.4.(20) ###Pagar Pemisah Pedestrian Carbon Steel M' - - 0 #REF!
0.0000 8.4.(21) ###Pagar Pemisah Pedestrian Galvanised M' - - 0 #REF!
0.0000 8.4.(22) ###Pagar Pemisah Pedestrian Carbon Steel M' - - 0 #REF!
0.0000 8.4.(23) ###Pagar Pemisah Pedestrian Galvanisasi M' - - 0 #REF!
#REF! 8.5(1) ###Pengembalian Kondisi Lantai Jembatan Beton M2 - 145,146 0 #REF!
#REF! 8.5(2) ###Pengembalian Kondisi Lantai Jembatan Kayu M2 - 371,079 0 #REF!
#REF! 8.5(3) ###Pengembalian Kondisi Pelapisan Permukaan Baja Struktur M2 - 43,079 0 #REF!
#REF! 9.1.(1) ###Mandor Jam - 19,838 0 #REF!
#REF! 9.1.(2) ###Pekerja Biasa Jam - 11,195 0 #REF!
#REF! 9.1.(3) ###Tukang Kayu, Tukang Batu, dsb Jam - 15,910 0 #REF!
#REF! 9.1.(4) a ###Dump Truck, kapasitas 3 - 4 m³ Jam - 345,385 0 #REF!
0.0000 9.1.(4) b ###Dump Truck, kapasitas 6 - 8 m³ Jam - - 0 #REF!
#REF! 9.1.(5) a ###Truk Bak Datar 3 - 4 ton Jam - 534,144 0 #REF!
0.0000 9.1.(5) b ###Truk Bak Datar 6 - 8 ton Jam - - 0 #REF!
#REF! 9.1.(6) ###Truk Tangki 3000 - 4500 Liter Jam - 317,013 0 #REF!
#REF! 9.1.(7) ###Bulldozer 100 - 150 PK Jam - 925,610 0 #REF!
#REF! 9.1.(8) ###Motor Grader min 100 PK Jam - 829,191 0 #REF!
#REF! 9.1.(9) ###Loader Roda Karet 1.0 - 1.6 M3 Jam - 671,767 0 #REF!
#REF! 9.1.(10) ###Loader Roda Berantai 75 - 100 PK Jam - 263,111 0 #REF!
#REF! 9.1.(11) ###Alat Penggali (Excavator) 80 - 140 PK Jam - 630,611 0 #REF!
#REF! 9.1.(12) ###Crane 10 - 15 Ton Jam - 722,711 0 #REF!
#REF! 9.1.(13) ###Penggilas Roda Besi 6 - 9 Ton Jam - 368,169 0 #REF!
#REF! 9.1.(14) ###Penggilas Bervibrasi 5 - 8 Ton Jam - 450,903 0 #REF!
#REF! 9.1.(15) ###Pemadat Bervibrasi 1.5 - 3.0 PK Jam - 54,316 0 #REF!
#REF! 9.1.(16) ###Penggilas Roda Karet 8 - 10 Ton Jam - 440,783 0 #REF!
#REF! 9.1.(17) ###Kompresor 4000 - 6500 Ltr/mnt Jam - 218,900 0 #REF!
#REF! 9.1.(18) ###Mesin Pengaduk beton (Molen) 0.3 - 0.6 M3 Jam - 128,458 0 #REF!
#REF! 9.1.(19) ###Pompa Air 70 - 100 mm Jam - 53,725 0 #REF!
#REF! 9.1.(20) ###Jack Hammer Jam - 43,744 0 #REF!
#REF! 10.1 (1) ###Pemeliharaan Rutin Perkerasan LS - 21,301,784 0 #REF!
#REF! 10.1 (2) ###Pemeliharaan Rutin Bahu Jalan LS - 10,607,131 0 #REF!
#REF! 10.1 (3) ###Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan LS - 29,018,979 0 #REF!
#REF! 10.1 (4) ###Pemeliharaan Rutin Perlengkapan Jalan LS - 3,527,749 0 #REF!
#REF! 10.1 (5) ###Pemeliharaan Rutin Jembatan LS - 36,239,779 0 #REF!

#REF!
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = 1.05 %


Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2 0 - -

B. PERALATAN
Periksa lembar 1.2-2 9,350,000.00

C. MOBILISASI FASILITAS KONTRAKTOR 0 - -


1 Base Camp
2 Kantor
3 Barak
4 Bengkel
5 Gudang, dan lain-lain
6 ...................... ....

D. MOBILISASI FASILITAS LABORATORIUM set 0 - -


1 Ruang Laboratorium (sesuai Gambar)

2 Soil & Aggregate Testing


Compaction Test
CBR Test
Specific Gravity
Atterberg Limits
Grain Size Analysis
Field Density Test by Sand Cone Methode
Moisture Content
Abrasion of Aggregate by Los Angeles Machine

3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor

4 Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine

5 Pendukung (Periksa Fasilitas Laboratorium)

6 Operasional (Periksa Fasilitas Laboratorium)


E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT LS 0 100,000.00 -
1 Perkuatan Jembatan Lama
2 Pemeliharaan Jalan Kerja / Samping
3 ...................... ....
4 ...................... ....
5 ...................... ....
6 ...................... ....

E.II. LAIN-LAIN LS 0 300,000.00 -


1 Papan Nama Proyek .... 1 300,000.00 300,000.00
2 ...................... ....
3 ...................... ....
4 ...................... ....
5 ...................... ....
6 ...................... ....

F. Manajemen dan Keselamatan lalu lintas LS -

G. DEMOBILISASI LS 1 2,805,000.00 2,805,000.00

Total Biaya Mobilisasi 12,455,000.00

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT MIXING PLANT E01 Unit 0 200,000,000.00 -


2 ASPHALT FINISHER E02 Unit 1 2,250,000.00 2,250,000.00
3 ASPHALT SPRAYER E03 Unit 1 200,000.00 200,000.00
4 BULLDOZER 100-150 HP E04 Unit 0 500,000.00 -
5 COMPRESSOR 4000-6500 L\M E05 Unit 1 150,000.00 150,000.00
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 0 250,000.00 -
7 CRANE 10-15 TON E07 Unit 0 150,000.00 -
8 DUMP TRUCK 3.5 TON E08 Unit 2 250,000.00 500,000.00
9 DUMP TRUCK 10 TON E09 Unit 0 150,000.00 -
10 EXCAVATOR 80-140 HP E10 Unit 0 500,000.00 -
11 FLAT BED TRUCK 3-4 M3 E11 Unit 0 150,000.00 -
12 GENERATOR SET E12 Unit 0 300,000.00 -
13 MOTOR GRADER >100 HP E13 Unit 1 2,000,000.00 2,000,000.00
14 TRACK LOADER 75-100 HP E14 Unit 0 500,000.00 -
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 0 500,000.00 -
16 THREE WHEEL ROLLER 6-8 T E16 Unit 0 500,000.00 -
17 TANDEM ROLLER 6-8 T. E17 Unit 1 2,000,000.00 2,000,000.00
18 TIRE ROLLER 8-10 T. E18 Unit 1 2,000,000.00 2,000,000.00
19 VIBRATORY ROLLER 5-8 T. E19 Unit 0 500,000.00 -
20 CONCRETE VIBRATOR E20 Unit 0 250,000.00 -
21 STONE CRUSHER E21 Unit 0 40,000,000.00 -
22 WATER PUMP 70-100 mm E22 Unit 0 100,000.00 -
23 WATER TANKER 3000-4500 L. E23 Unit 1 250,000.00 250,000.00
24 PEDESTRIAN ROLLER E24 Unit 0 50,000.00 -
25 TAMPER E25 Unit 0 50,000.00 -
26 JACK HAMMER E26 Unit 0 50,000.00 -
27 FULVI MIXER E27 Unit 0 500,000.00 -
28 CONCRETE PUMP E28 Unit 0 500,000.00 -
29 TRAILER 20 TON E29 Unit 0 1,000,000.00 -
30 PILE DRIVER + HAMMER E30 Unit 0 1,000,000.00 -
31 CRANE ON TRACK 35 TON E31 Unit 0 1,000,000.00 -
32 WELDING SET E32 Unit 0 200,000.00 -
33 BORE PILE MACHINE E33 Unit 0 500,000.00 -
34 ASPHALT LIQUID MIXER E34 Unit 0 300,000.00 -
35 TRONTON E35 Unit -
36 COLD MILLING MACHINE E37 Unit -
37 ROCK DRILL BREAKER E36 Unit -
38 COLD RECYCLER E38 Unit -
39 HOT RECYCLER E39 Unit -
40 AGGREGAT (CHIP) SPREADER E40 Unit -
41 ASPHALT DISTRIBUTOR E41 Unit -
42 SLIP FORM PAVER E42 Unit -
43 CONCRETE PAN MIXER E43 Unit -
44 CONCRETE BREAKER E44 Unit -
45 ASPAHLT TANKER E45 Unit -
46 CEMENT TANKER E46 Unit -
47 CONDRETE MIXER (350) E47 Unit -
48 VIBRATING RAMMER E48 Unit -
49 TRUK MIXER (AGITATOR) E49 Unit -
50 BORE PILE MACHINE E50 Unit -
51 CRANE ON TRACK 75-100 TON E51 Unit -
52
53

Total untuk Item B pada Lembar 1 9,350,000.00


MOBILISASI FASILITAS LABORATORIUM

SATUAN PENGUKURAN : Lump sum


HARGA SATUAN : Rp. 55,940,000.00

HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN

I. Laboratory Building
1. Laboratory Building m2 108.00 55,000.00 5,940,000.00

II. Soil & Aggregate Testing 10,000,000.00


1. Compaction Test
2. CBR Test
3 Specifc Gravity
4 Atterberg Limits
5 Grain Size Analysis
6 Field Density Test by Sand Cone Methode
7 Moisture Content
8 Abrasion of Aggregate by Los Angeles Machine

III. Bituminous Testing 10,000,000.00


1. Marshall Asphalt Test
2. Extraction Test, Centrifuge/Reflux Method
3 Specific Gravity of Coarse Aggregate
4 Specific Gravity of Fine Aggregate
5 Mix Air Viod Content (Accurate Method)
6 Core Drill
7 Metal Thermometer
8 Accessories and Tolls
9 Penetration Test
10 Softening Point
11 Refusal Density Compactor

IV. Concrete Testing 10,000,000.00


1 Slump Cone
2 Cylinder/Cube Mould for Compressive Strength
3 Beam Mould for Flexural Strength
4 Crushing Machine

V. Peralatan pendukung 10,000,000.00


1 Mobil Pick Up
2 Komputer + Printer
3 Furniture

VI. Operasional

VII. Test Luar 10,000,000.00


Test Luar, sesuai kebutuhan atau atas
perintah Direksi

TOTAL BIAYA MOBILISASI Rp 55,940,000.00

Catatan :
1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
MOBILISASI FASILITAS LABORATORIUM

KETERANGAN
MANAJEMEN DAN KESELAMATAN LALU LINTAS
SATUAN PENGUKURAN : Lump sum
HARGA SATUAN : Rp. 0.00
NO. RAMBU KONSTRUKSI DAN PENGALIHAN SATUAN ZONA 1 VOLUME ZONA 2

Rambu Tetap
1 Rambu batas kecepatan buah 8 8
2 Rambu perintah mengikuti lajur buah 2
3 Rambu pengarah tikungan buah
4 Rambu larangan berjalan terus (give away) buah 1
5 Rambu larangan menyalip kendaraan lain buah 2
6 Rambu peringatan jalan licin buah
7 Rambu pengarah tikungan ganda buah
8 Rambu APILL buah

Rambu Peringatan Sementara


1 Rambu Peringatan dengan kata kata buah 8 8
2 Rambu Peringatan pekerjaan di jalan buah 4 4
3 Rambu Peringatan lalu liontas dua arah buah
4 Water barier buah
5 Traffic Cone buah
6 Police line buah
7 Concrete Barier buah
8 Lampu sementara buah
9 APILL sementara buah
10 Marka jalan sementara buah

Catatan :
Kolom volume adalah jumlah kebutuhan zona di lapangan dikalikan kolom ZONA 1, 2, dstnya
contoh : misal di lapangan dibutuhkan dua ZONE 1
maka volume diisi dengan 2 dikali 8 = 16
MANAJEMEN DAN KESELAMATAN LALU LINTAS

VOLUME
ZONA 3 VOLUME ZONA 4 VOLUME ZONA 5 VOLUME ZONA 6 VOLUME ZONA 7 VOLUME ZONA 8

8 4 4 8 20 12
2 2 1 4 1

2 4
4
2
4

8 4 4 16 24 10
4 2 2 4 4 4
2

2
Biaya
VOLUME ZONA 9 VOLUME TOTAL KETERANGAN
mobilisasi

12 -
1 -
- lihat spesifikasi
-
-
-
-
-

10 -
4 -
4 -
- lihat spesifikasi
- lihat spesifikasi
- lihat spesifikasi
- lihat spesifikasi
- lihat spesifikasi
-
- lihat spesifikasi
ITEM PEMBAYARAN NO. : 1.8 (1)
JENIS PEKERJAAN : Pemeliharaan & Perlindungan Lalu Lintas

% TERHADAP TOTAL BIAYA PROYEK = 0.18 %

HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

I. Data & Asumsi

1 Jumlah lokasi pekerjaan Lokasi 1


2 Total Masa Pelaksanaan Proyek Hari 165
3 Masa Pemeliharaan & Perlindungan Lalin Hari 124
4 Sudah termasuk persiapan/pemasangan
5 Pembongkaran termasuk Demobilisasi

II. Pekerja Pengatur Lalu Lintas


Jumlah lokasi pekerjaan Lokasi 1
1 Petugas Rambu "Stop-Jalan" 1 Org/hari 124 11,195 1,385,411
2 Pengendali kecepatan kendaraan 2 Org/hari 248 11,195 0
3 Pemimpin Regu (Mandor) 1 Org/hari 124 19,838 0

III. Bahan & Perlengkapan


Jumlah lokasi pekerjaan Lokasi 1
1 Rambu "Stop-Jalan" Buah 2 25,000 50,000
2 Rambu lain (Batas kec., hati2, dll) Buah 2 100,000 200,000
3 Bendera Kuning/Hijau/Merah Buah 6 15,000 0
4 Barikade Kayu 1/2 lebar jalan Buah 2 100,000 0
5 Traffic Cone, jumlah per lokasi = 5 Buah 2 100,000 200,000
6 Bahan Cat Pantul + Pengencer + Kuas Set 1 40,000 0
7 Perlengkapan Keamanan Pekerja Set 1 50,000 50,000
8 Perlengkapan lainnya LS 1 250,000 250,000

Total Biaya Pemeliharaan & Perlindungan Lalu Lintas 2,135,411

Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ANALISA K3
No Jenis Peralatan Satuan Harga

1 Helmet Buah 55,000.00


2 Rompi Buah 100,000.00
3 Sepatu Buah 50,000.00
4 Dll Buah -

Total 205,000.00

Periode Konstruksi Hari 165.00


Jam Pemakaian jam 7.00

Koefesian jam 177.49


Bahan : Aspal

Biaya Jumlah Kombinasi


No Uraian Kegiatan
Rp/satuan Jumlah (Rp) (Rp)

1 Harga di pelabuhan Rp/ton 12,133,333.33 12,133,333.33


dari Jakarta

2 Handling Rp/ton 600,000.00 600,000.00

3 Transport ke proyek Rp/ton 500,000.00 500,000.00

4 Pembongkaran, gudang Rp/ton 300,000.00 300,000.00

5 Waste 2% Rp/ton 242,666.67 242,666.67

subtotal Rp/ton 13,776,000.00

6 Keuntungan & Overhead Rp/ton 0.00


5 % (hanya utk pekerjaan
harian)

total jumlah Rp/ton 13,776,000.00


Rp/kg 13,776.00

7 Harga Netto Rp/kg 13,776.00


7 Harga setelah ditambah Rp/kg 13,776.00
8 Harga Dibulatkan Rp/kg 13,750.00
Formulir Penentuan Harga Bahan
Bahan : Semen

Biaya Jumlah Kombinasi


No Uraian Kegiatan
Rp/satuan Jumlah (Rp) (Rp)

1 Harga di Pelabuhan Trisakti Rp/ton 1,240,000.00 1,240,000.00


dari Jakarta

2 Handling - - -

3 Transport ke proyek Rp/ton 70,000.00 70,000.00

4 Pembongkaran, gudang Rp/ton 40,000.00 40,000.00

5 Waste 5% Rp/ton 62,000.00 62,000.00

subtotal Rp/ton 1,412,000.00

6 Keuntungan & Overhead Rp/ton 0.00


5 % (hanya utk pekerjaan
harian)

total jumlah Rp/ton 1,412,000.00


Rp/zak 70,600.00

7 Harga Netto Rp/zak 70,600.00


8 Harga setelah ditambah Rp/zak 70,600.00
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT E01
2. Tenaga Pw 294.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 2,844,577,725.0 Rupiah

5 Kapastas tangki aspal Ca 30,000.00 liter

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 284,457,773 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.16275 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 277,765.16 Rupiah
W

b. Asuransi, dll = 0.002 x B F 3,792.77 Rupiah


W

Biaya Pasti per Jam = (E+F) G 281,557.93 Rupiah

C. BIAYA OPERASI PER JAM KERJA


1. Bahan Bakar = (12%-15%) x Pw x Ms H1 418,950.00 Rupiah
Bahan Bakar Pemanasan Material = 12 ltr x Ms H2 4,788,000.00 Rupiah Khusus AMP
dan aspal (Oil Heater)
Bahan Bakar Pemanas Aspal =1/1000 *Ca*Ms H3 285,000.00

2. Pelumas = (2.5%-3%) x Pw x Mp I 352,800.00 Rupiah

3. Biaya bengkel (6.25% dan 8.75%) x B J 165,934


W
4. Biaya perbaikan (12,5 % - 17,5 %) x B K 331,867.40 Rupiah
W
5 Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
6 Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,675.32 Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P 6,395,403.92 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 6,676,961.84 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Rp./liter
5. Bahan Bakar Solar Ms 9,500.00 Rp./liter
6. Minyak Pelumas Mp 40,000.00 Rp./liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Bahan bakar Batubara 0.00 Rp/kg
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER E02
2. Tenaga Pw 72.4 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,400.0 Jam
c. Harga Alat B 1,116,900,600 Rupiah
5.

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 111,690,060 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.22961 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 164,859.83 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,595.57 Rupiah


W

Biaya Pasti per Jam = (E+F) G 166,455.40 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 103,170.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 86,880.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 49,862


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 139,612.58 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 410,593.47 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 577,048.87 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E03
2. Tenaga Pw 4.0 HP
3. Kapasitas Cp 850.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 195,091,650 Rupiah

5 Kapastas tangki aspal Ca 850 Liter

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 19,509,165 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 23,159.11 Rupiah
W

b. Asuransi, dll = 0.002 x B F 195.09 Rupiah


W

Biaya Pasti per Jam = (E+F) G 23,354.20 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 4,560.00 Rupiah


Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms H3 8,075.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 4,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 8,535 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 12,193.23 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 68,432.75 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 91,786.95 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP E04
2. Tenaga Pw 155.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,256,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 225,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 267,807.20 Rupiah
W

b. Asuransi, dll = 0.002 x B F 2,256.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 270,063.20 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 176,700.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 155,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 98,700


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 141,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 602,469.26 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 872,532.47 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E05
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 5,000.0 CPM/(L/m)
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 174,946,350 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 17,494,635 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 20,767.68 Rupiah
W

b. Asuransi, dll = 0.002 x B F 174.95 Rupiah


W

Biaya Pasti per Jam = (E+F) G 20,942.63 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 68,400.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 60,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 7,654


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 10,934.15 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 178,057.31 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 198,999.94 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E06
2. Tenaga Pw 20.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 63,616,875 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 6,361,688 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.57619 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 21,993.26 Rupiah
W

b. Asuransi, dll = 0.002 x B F 84.82 Rupiah


W

Biaya Pasti per Jam = (E+F) G 22,078.09 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 28,500.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 24,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 3,711 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 7,421.97 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 94,702.22 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 116,780.30 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 10-15 TON E07
2. Tenaga Pw 138.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,463,187,975 Rupiah
5.

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 146,318,798 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 173,693.39 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,463.19 Rupiah


W

Biaya Pasti per Jam = (E+F) G 175,156.57 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 157,320.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 138,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 64,014 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 91,449.25 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 481,852.99 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 657,009.56 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3.5 TON E08
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 305,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 30,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 36,206.20 Rupiah
W

b. Asuransi, dll = 0.002 x B F 305.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 36,511.20 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 114,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 100,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 13,344


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 19,062.50 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 277,475.51 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 313,986.72 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 TON E09
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 330,241,575 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 33,024,158 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 39,202.60 Rupiah
W

b. Asuransi, dll = 0.002 x B F 330.24 Rupiah


W

Biaya Pasti per Jam = (E+F) G 39,532.84 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 216,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 190,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 14,448 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 20,640.10 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 472,757.43 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 512,290.28 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP E10
2. Tenaga Pw 133.0 HP
3. Kapasitas Cp 0.93 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,140,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 114,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 135,328.11 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,140.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 136,468.11 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 151,620.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 133,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 49,875 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 71,250.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 436,814.26 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 573,282.37 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3 E11
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 10.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 212,056,200 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 21,205,620 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 25,172.95 Rupiah
W

b. Asuransi, dll = 0.002 x B F 212.06 Rupiah


W

Biaya Pasti per Jam = (E+F) G 25,385.01 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 216,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 190,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 9,277 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 13,253.51 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 460,200.24 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 485,585.24 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E12
2. Tenaga Pw 180.0 HP
3. Kapasitas Cp 135.0 KVA
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 504,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 50,400,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 59,829.27 Rupiah
W

b. Asuransi, dll = 0.002 x B F 504.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 60,333.27 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 205,200.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 180,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 22,050 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 31,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 469,819.26 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 530,152.53 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER >100 HP E13
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 10,800.0 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,920,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 192,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 227,921.02 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,920.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 229,841.02 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 153,900.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 135,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 84,000 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 120,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 523,969.26 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 753,810.29 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRACK LOADER 75-100 HP E14
2. Tenaga Pw 70.0 HP
3. Kapasitas Cp 0.8 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 258,112,350 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 25,811,235 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 30,640.22 Rupiah
W

b. Asuransi, dll = 0.002 x B F 258.11 Rupiah


W

Biaya Pasti per Jam = (E+F) G 30,898.34 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 79,800.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 70,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 11,292 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 16,132.02 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 208,293.70 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 239,192.04 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E15
2. Tenaga Pw 96.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,656,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 165,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 196,581.88 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,656.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 198,237.88 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 109,440.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 96,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 72,450 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 103,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 412,459.26 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 610,697.15 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T E16
2. Tenaga Pw 55.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 636,168,750 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 63,616,875 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 75,518.87 Rupiah
W

b. Asuransi, dll = 0.002 x B F 636.17 Rupiah


W

Biaya Pasti per Jam = (E+F) G 76,155.04 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 62,700.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 55,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 27,832 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 39,760.55 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 216,362.19 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 292,517.23 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T. E17
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 8.1 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 567,136,500 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 56,713,650 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 67,324.13 Rupiah
W

b. Asuransi, dll = 0.002 x B F 567.14 Rupiah


W

Biaya Pasti per Jam = (E+F) G 67,891.27 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 93,480.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 82,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 24,812 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 35,446.03 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 266,807.52 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 334,698.78 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER 8-10 T. E18
2. Tenaga Pw 100.5 HP
3. Kapasitas Cp 9.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 684,071,850 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 68,407,185 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 81,205.39 Rupiah
W

b. Asuransi, dll = 0.002 x B F 684.07 Rupiah


W

Biaya Pasti per Jam = (E+F) G 81,889.47 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 114,570.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 100,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 29,928 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 42,754.49 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 318,821.90 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 400,711.36 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 7.050 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 106,837.98 Rupiah
W

b. Asuransi, dll = 0.002 x B F 900.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 107,737.98 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 93,480.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 82,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 39,375 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 56,250.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 302,174.26 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 409,912.24 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR E20
2. Tenaga Pw 5.5 HP
3. Kapasitas Cp 25.0 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 11,409,225 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 1,140,923 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.31547 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 3,239.35 Rupiah
W

b. Asuransi, dll = 0.002 x B F 22.82 Rupiah


W

Biaya Pasti per Jam = (E+F) G 3,262.17 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 7,837.50 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 6,600.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 713 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,996.61 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 48,216.46 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 51,478.62 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER E21
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,449,249,500 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 244,924,950 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 290,747.63 Rupiah
W

b. Asuransi, dll = 0.002 x B F 2,449.25 Rupiah


W

Biaya Pasti per Jam = (E+F) G 293,196.88 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 250,800.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 220,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 107,155 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 153,078.09 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 2 Orang / Jam ) x U2 M 21,783.55 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 772,993.80 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 1,066,190.68 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E22
2. Tenaga Pw 6.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 17,113,125 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 1,711,313 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.40211 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 3,096.65 Rupiah
W

b. Asuransi, dll = 0.002 x B F 17.11 Rupiah


W

Biaya Pasti per Jam = (E+F) G 3,113.76 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 6,840.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 6,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 749 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,069.57 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 45,727.53 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 48,841.30 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E23
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 190,850,625 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 19,085,063 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 22,655.66 Rupiah
W

b. Asuransi, dll = 0.002 x B F 190.85 Rupiah


W

Biaya Pasti per Jam = (E+F) G 22,846.51 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 114,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 100,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 8,350 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 11,928.16 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 265,347.14 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 288,193.65 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan PEDESTRIAN ROLLER E24
2. Tenaga Pw 8.8 HP
3. Kapasitas Cp 835.000 Ton
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 35,784,450 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 3,578,445 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.40211 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 6,475.26 Rupiah
W

b. Asuransi, dll = 0.002 x B F 35.78 Rupiah


W

Biaya Pasti per Jam = (E+F) G 6,511.04 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 10,032.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 8,800.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,566 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 2,236.53 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 53,703.36 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 60,214.40 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TAMPER E25
2. Tenaga Pw 4.7 HP
3. Kapasitas Cp 121.000 Ton
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 11,409,225 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 1,140,923 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.31547 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 3,239.35 Rupiah
W

b. Asuransi, dll = 0.002 x B F 22.82 Rupiah


W

Biaya Pasti per Jam = (E+F) G 3,262.17 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 6,697.50 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 5,640.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 713 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,996.61 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 46,116.46 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 49,378.62 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan JACK HAMMER E26
2. Tenaga Pw 0.0 HP
3. Kapasitas Cp 1,330.000 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 38,492,475 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 3,849,248 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 4,569.40 Rupiah
W

b. Asuransi, dll = 0.002 x B F 38.49 Rupiah


W

Biaya Pasti per Jam = (E+F) G 4,607.89 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 0.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 0.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,684 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 2,405.78 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 35,159.09 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 39,766.98 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan FULVI MIXER E27
2. Tenaga Pw 345.0 HP
3. Kapasitas Cp 2,005 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 126,733,725 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 12,673,373 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.31547 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 35,982.71 Rupiah
W

b. Asuransi, dll = 0.002 x B F 253.47 Rupiah


W

Biaya Pasti per Jam = (E+F) G 36,236.18 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 491,625.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 414,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 7,921 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 22,178.40 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 966,793.52 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 1,003,029.70 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PUMP E28
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 8.00 M3
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 156,543,750 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 15,654,375 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.22961 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 16,174.62 Rupiah
W

b. Asuransi, dll = 0.002 x B F 156.54 Rupiah


W

Biaya Pasti per Jam = (E+F) G 16,331.16 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 114,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 100,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 6,849 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 9,783.98 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 261,702.04 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 278,033.20 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRAILER 20 TON E29
2. Tenaga Pw 175.0 HP
3. Kapasitas Cp 20.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 834,900,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 83,490,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.22961 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 86,264.64 Rupiah
W

b. Asuransi, dll = 0.002 x B F 834.90 Rupiah


W

Biaya Pasti per Jam = (E+F) G 87,099.54 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 199,500.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 175,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 36,527 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 52,181.25 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 494,277.39 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 581,376.93 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER + HAMMER E30
2. Tenaga Pw 25.0 HP
3. Kapasitas Cp 2.50 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 207,143,750 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 20,714,375 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 24,589.80 Rupiah
W

b. Asuransi, dll = 0.002 x B F 207.14 Rupiah


W

Biaya Pasti per Jam = (E+F) G 24,796.94 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 28,500.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 25,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 9,063 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 12,946.48 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 106,578.29 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 131,375.23 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 35 TON E31
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 35.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,613,385,807 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 161,338,581 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.22961 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 166,700.38 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,613.39 Rupiah


W

Biaya Pasti per Jam = (E+F) G 168,313.77 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 142,500.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 125,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 70,586 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 100,836.61 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 469,991.51 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 638,305.27 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WELDING SET E32
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 250.00 Amp
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 24,351,250 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,435,125 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 2,890.71 Rupiah
W

b. Asuransi, dll = 0.002 x B F 24.35 Rupiah


W

Biaya Pasti per Jam = (E+F) G 2,915.06 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 45,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 40,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,065 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,521.95 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 119,256.58 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 122,171.64 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E33
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 2,000.00 Meter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,619,843,750 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 261,984,375 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.22961 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 270,690.96 Rupiah
W

b. Asuransi, dll = 0.002 x B F 2,619.84 Rupiah


W

Biaya Pasti per Jam = (E+F) G 273,310.80 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 171,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 150,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 114,618 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 163,740.23 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 630,427.66 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 903,738.46 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER E34
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 1,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 22,781,250 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,278,125 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.31547 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 3,234.07 Rupiah
W

b. Asuransi, dll = 0.002 x B F 22.78 Rupiah


W

Biaya Pasti per Jam = (E+F) G 3,256.85 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 5,700.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 5,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 997 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,423.83 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 44,189.77 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 47,446.62 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER E34a
2. Tenaga Pw 40.0 HP Kapasitas 20.000
3. Kapasitas Cp 20,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun Khusus digunakan
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam untuk Asphalt
c. Harga Alat B 22,781,250 Rupiah Modifikasi

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,278,125 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.31547 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 3,234.07 Rupiah
W

b. Asuransi, dll = 0.002 x B F 22.78 Rupiah


W

Biaya Pasti per Jam = (E+F) G 3,256.85 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 45,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 40,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 997 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,423.83 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 119,089.77 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 122,346.62 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRONTON E35
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 15.0 Ton ###
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 625,175,000 Rupiah
5.

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 62,517,500 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.16275 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 61,046.61 Rupiah
W

b. Asuransi, dll 0.002 x B F 833.57 Rupiah ###


W

Biaya Pasti per Jam (E+F) G 61,880.18 Rupiah ###

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 213,750.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 180,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 36,469 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 72,937.08 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 3 Orang / Jam ) x U2 M 32,675.32 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 556,008.44 Rupiah ###

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 617,888.62 Rupiah


###

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.


###

A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE E37 ###
2. Tenaga Pw 248.0 HP
3. Kapasitas Cp 1,000 m
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 6,880,967,500 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 688,096,750 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 816,831.85 Rupiah
W ###

b. Asuransi, dll 0.002 x B F 6,880.97 Rupiah


W ###

Biaya Pasti per Jam (E+F) G 823,712.82 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 282,720.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 248,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 301,042 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 430,060.47 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 3 Orang / Jam ) x U2 M 32,675.32 Rupiah ###

Biaya Operasi per Jam (H+I+K+L+M) P 1,314,675.61 Rupiah


###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 2,138,388.43 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

###
No. URAIAN KODE KOEF. SATUAN KET.

###
A. URAIAN PERALATAN
1. Jenis Peralatan ROCK DRILL BREAKER E36
2. Tenaga Pw 3.0 HP
3. Kapasitas Cp - -
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,252,350,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 125,235,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.16275 -


(1 + i)^A - 1
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Mod( B - C ) x D E 122,288.52 Rupiah
W
###
b. Asuransi, dll 0.002 x B F 1,669.80 Rupiah
W

Biaya Pasti per Jam (E+F) G 123,958.32 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 4,275.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 3,600.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 73,054 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 146,107.50 Rupiah


perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 3 Orang / Jam ) x U2 M 32,675.32 Rupiah
###
Biaya Operasi per Jam (H+I+K+L+M) P 279,889.06 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 403,847.38 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT ###

###
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan COLD RECYCLER E38
2. Tenaga Pw 900.0 HP
3. Kapasitas Cp 2,200 M
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 27,134,250,000 Rupiah
5.

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,713,425,000 Rupiah
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -
(1 + i)^A - 1
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Mod( B - C ) x D E 3,221,076.06 Rupiah
W

b. Asuransi, dll 0.002 x B F 27,134.25 Rupiah


W

Biaya Pasti per Jam (E+F) G 3,248,210.31 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 1,026,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 900,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,187,123 Rupiah


W ###

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,695,890.63 Rupiah


perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 3 Orang / Jam ) x U2 M 32,675.32 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 4,861,866.88 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 8,110,077.18 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan ###
URAIAN ANALISA ALAT ###

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan HOT RECYCLER E39
2. Tenaga Pw 400.0 HP
3. Kapasitas Cp 3 M
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 40,701,375,000 Rupiah

B. BIAYA PASTI PER JAM KERJA ###


1. Nilai Sisa Alat = 10 % x B C 4,070,137,500 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 - ###


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 4,831,614.09 Rupiah
W

b. Asuransi, dll 0.002 x B F 40,701.38 Rupiah


W

Biaya Pasti per Jam (E+F) G 4,872,315.46 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 456,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 400,000.00 Rupiah


###
Biaya bengkel (6.25% dan 8.75%) x B J 1,780,685 Rupiah
W
###
3. Perawatan dan (12,5 % - 17,5 %) x B K 2,543,835.94 Rupiah
perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 3 Orang / Jam ) x U2 M 32,675.32 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 5,233,373.91 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 10,105,689.37 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
###
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER E40
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 M
4. Alat Baru a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 549,642,500.0 Rupiah

###

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 54,964,250 Rupiah ###

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.31547 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 156,056.55 Rupiah
W

b. Asuransi, dll 0.002 x B F 1,099.29 Rupiah


W

Biaya Pasti per Jam (E+F) G 157,155.83 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 163,875.00 Rupiah

###
2. Pelumas = (2.5%-3%) x Pw x Mp I 138,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 34,353 Rupiah ###


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 96,187.44 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 13 Orang / Jam ) x U2 M 32,675.32 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 485,267.91 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 642,423.74 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT DISTRIBUTOR E41
2. Tenaga Pw 115 HP
3. Kapasitas Cp 4,000 Liter
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 549,642,500 Rupiah

###
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 54,964,250 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 65,247.44 Rupiah
W

b. Asuransi, dll 0.002 x B F 549.64 Rupiah


W

Biaya Pasti per Jam (E+F) G 65,797.08 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 131,100.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 115,000.00 Rupiah ###

Biaya bengkel (6.25% dan 8.75%) x B J 24,047 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 34,352.66 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 3 Orang / Jam ) x U2 M 32,675.32 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 357,352.33 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 423,149.41 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter ###
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan SLIP FORM PAVER E42
2. Tenaga Pw 105 HP
3. Kapasitas Cp 2.50 M
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,860,634,285 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 186,063,429 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.22961 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 192,246.91 Rupiah
W

b. Asuransi, dll 0.002 x B F 1,860.63 Rupiah


W

Biaya Pasti per Jam (E+F) G 194,107.55 Rupiah

C. BIAYA OPERASI PER JAM KERJA ###

1. Bahan Bakar = (12%-15%) x Pw x Ms H 119,700.00 Rupiah


###

2. Pelumas = (2.5%-3%) x Pw x Mp I 105,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 81,403 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 116,289.64 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 3 Orang / Jam ) x U2 M 32,675.32 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 475,245.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 669,352.75 Rupiah

E. LAIN - LAIN ###


1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam ###
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER E43
2. Tenaga Pw 134 HP
3. Kapasitas Cp 600.00 Liter
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,391,500,000 Rupiah ###

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 139,150,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.16275 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 135,876.13 Rupiah
W

b. Asuransi, dll 0.002 x B F 1,855.33 Rupiah


W

Biaya Pasti per Jam (E+F) G 137,731.46 Rupiah

C. BIAYA OPERASI PER JAM KERJA


###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 190,950.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 160,800.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 81,171 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 162,341.67 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 32,675.32 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 648,115.31 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 785,846.78 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun ###
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE BREAKER E44 ###
2. Tenaga Pw 290 HP
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,252,350,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 125,235,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 148,665.05 Rupiah
W

b. Asuransi, dll 0.002 x B F 1,252.35 Rupiah


W

Biaya Pasti per Jam (E+F) G 149,917.40 Rupiah


###
C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 330,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 290,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 54,790 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 78,271.88 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 32,675.32 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 806,515.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 956,432.40 Rupiah

###
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPAHLT TANKER E45
2. Tenaga Pw 190 HP ###
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 695,750,000 Rupiah

5. Kapasitas tangki air Ca 4,000.00 liter

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 69,575,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.22961 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 71,887.20 Rupiah
W

b. Asuransi, dll 0.002 x B F 695.75 Rupiah


W
###
Biaya Pasti per Jam (E+F) G 72,582.95 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H1 216,600.00 Rupiah


Bahan Bakar Pemanas Aspal = 1/1000 x ca x Ms H2 38,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 190,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 30,439 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 43,484.38 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah
###
Biaya Operasi per Jam (H+I+K+L+M) P 549,592.70 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 622,175.65 Rupiah ###

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET. ###

A. URAIAN PERALATAN ###


1. Jenis Peralatan CEMENT TANKER E46
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 695,750,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 69,575,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.22961 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 71,887.20 Rupiah ###
W

b. Asuransi, dll 0.002 x B F 695.75 Rupiah ###


W

Biaya Pasti per Jam (E+F) G 72,582.95 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 216,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 190,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 30,439 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 43,484.38 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah ###
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 511,592.70 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 584,175.65 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONDRETE MIXER (350) E47
2. Tenaga Pw 20 HP
3. Kapasitas Cp 350.00 liter
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 48,702,500 Rupiah ###

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 4,870,250 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.57619 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 12,627.86 Rupiah
W

b. Asuransi, dll 0.002 x B F 48.70 Rupiah


W

Biaya Pasti per Jam (E+F) G 12,676.57 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 22,800.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 20,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 2,131 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 3,043.91 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 79,043.90 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 91,720.47 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER E48
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 27,830,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,783,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.31547 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 7,901.60 Rupiah
W

b. Asuransi, dll 0.002 x B F 55.66 Rupiah


W

Biaya Pasti per Jam (E+F) G 7,957.26 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 5,985.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 5,040.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,739 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 4,870.25 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 48,703.89 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 56,661.15 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRUK MIXER (AGITATOR) E49
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,043,625,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 104,362,500 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 123,887.54 Rupiah
W

b. Asuransi, dll 0.002 x B F 1,043.63 Rupiah


W

Biaya Pasti per Jam (E+F) G 124,931.17 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 250,800.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 220,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 45,659 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 65,226.56 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 612,754.42 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 737,685.59 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E50
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,628,055,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 162,805,500 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.16275 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 158,975.07 Rupiah
W

b. Asuransi, dll 0.002 x B F 2,170.74 Rupiah


W

Biaya Pasti per Jam (E+F) G 161,145.81 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 178,125.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 150,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 94,970 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 189,939.75 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 644,103.89 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 805,249.70 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON E51
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,252,350,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 125,235,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 148,665.05 Rupiah
W

b. Asuransi, dll 0.002 x B F 1,252.35 Rupiah


W

Biaya Pasti per Jam (E+F) G 149,917.40 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 228,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 200,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 54,790 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 78,271.88 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 592,131.45 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 742,048.85 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT E52
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 695,750,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 69,575,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.16275 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 67,938.07 Rupiah
W

b. Asuransi, dll 0.002 x B F 927.67 Rupiah


W

Biaya Pasti per Jam (E+F) G 68,865.73 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 71,250.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 60,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 40,585 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 0.0000 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 202,904.68 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 271,770.41 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BAR BENDER
2. Tenaga Pw 3 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 8 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,250 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.18744 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod
( B' - C ) x D E 0.01 Rupiah
W'

b. Asuransi, dll 0.002 x B' F 0.00 Rupiah


W'

Biaya Pasti per Jam (E+F) G 0.01 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 4,275.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 3,600.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B' K 0.01 Rupiah


perbaikan W'

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 0.00 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 28,052.51 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 28,052.52 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BAR CUTTER
2. Tenaga Pw 3 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 8 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,250 Jam
c. Harga Alat B 100 Rupiah
5.

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.18744 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod
( B' - C ) x D E 0.01 Rupiah
W'

b. Asuransi, dll 0.002 x B' F 0.00 Rupiah


W'

Biaya Pasti per Jam (E+F) G 0.01 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 4,275.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 3,600.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B' K 0.01 Rupiah


perbaikan W'

4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah


5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 0.00 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 28,052.51 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 28,052.52 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BREAKER
2. Tenaga Pw 80 HP
3. Kapasitas Cp 3 m3/jam
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod
( B' - C ) x D E 0.01 Rupiah
W'

b. Asuransi dan Lain-lain 0.002 x B F 0.00 Rupiah


W'

Biaya Pasti per Jam (E+F) G 0.01 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 91,200.00 Rupiah

2. Pelumas = (0.0035-0.006 Ltr/HP/Jam) x Pw x Mp I 80,000.00 Rupiah

3. Workshop = (6,25 % - 8,75 %) x B' J 0.00 Rupiah


W'
4. Sparepart = (12,5 % - 17,5 %) x B' K 0.01 Rupiah
W'
5. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
6. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+J+K+L+M) P 202,269.27 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 202,269.29 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A URAIAN PERALATAN
1. Jenis Peralatan GROUTING PUMP
2. Tenaga Pw 100 HP
3. Kapasitas Cp 15 Ton
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 0.01 Rupiah
W

b. Asuransi, dll 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam (E+F) G 0.01 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 114,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 100,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 0.0063 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 245,069.27 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 245,069.29 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A URAIAN PERALATAN
1. Jenis Peralatan JACK HIDROLIC
2. Tenaga Pw 3 HP
3. Kapasitas Cp 150 Ton
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 0.01 Rupiah
W

b. Asuransi, dll 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam (E+F) G 0.01 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 3,420.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 3,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 0.0063 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 37,489.27 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 37,489.29 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A URAIAN PERALATAN
1. Jenis Peralatan MESIN LAS
2. Tenaga Pw 3.0 Hp
3. Kapasitas Cp 0.17 Ton
4. Alat Baru a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 900 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.40211 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 0.04 Rupiah
W

b. Asuransi, dll 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam (E+F) G 0.04 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 4,275.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 3,600.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 0.0194 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 38,944.29 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 38,944.33 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER LEADER, 75 kw
2. Tenaga Pw 70.0 HP
3. Kapasitas Cp 75.0 kw
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 9,600.0 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 0.00 Rupiah
W

b. Asuransi, dll 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam (E+F) G 0.00 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 79,800.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 70,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 0.0013 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 180,869.27 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 180,869.27 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A URAIAN PERALATAN
1. Jenis Peralatan PILE HAMMER
2. Tenaga Pw 10.0 Hp
3. Kapasitas Cp 0.0 0
4. Alat Baru a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 800.0 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.40211 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 0.05 Rupiah
W

b. Asuransi, dll 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam (E+F) G 0.05 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 14,250.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 12,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 0.0219 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 57,319.29 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 57,319.34 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A URAIAN PERALATAN
1. Jenis Peralatan PILE HAMMER, 2,5 Ton
2. Tenaga Pw 1.0 HP
3. Kapasitas Cp 2.5 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 8,000.0 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 0.00 Rupiah
W

b. Asuransi, dll 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam (E+F) G 0.00 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 1,140.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 1,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 0.0016 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 33,209.27 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 33,209.27 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A URAIAN PERALATAN
1. Jenis Peralatan STRESSING JACK
2. Tenaga Pw 89.0 Hp
3. Kapasitas Cp 15.0 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,800.0 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 0.01 Rupiah
W

b. Asuransi, dll 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam (E+F) G 0.01 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 101,460.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 89,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 0.0069 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 221,529.28 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 221,529.29 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A URAIAN PERALATAN
1. Jenis Peralatan WELDING MACHINE, 300 A
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 10,000.0 Jam
c. Harga Alat B 100 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Mod( B - C ) x D E 0.00 Rupiah
W

b. Asuransi, dll 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam (E+F) G 0.00 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 5,700.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 5,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 0 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 0.0013 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 20,177.49 Rupiah
5. Pembantu Opera= ( 1 Orang / Jam ) x U2 M 10,891.77 Rupiah

Biaya Operasi per Jam (H+I+K+L+M) P 41,769.27 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 41,769.27 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 20,177.49 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,891.77 Rp./Jam
4. Bahan Bakar Bensin Mb 9,500.00 Liter
5. Bahan Bakar Solar Ms 9,500.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS untuk bahan lapis Agregat dan lapis Aspal
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEFISIEN SATUAN KETERANGAN

I ASUMSI
1 Bahan dasar Sirtu (material Batu bercampur pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
4 Berat Isi Bahan : - Batu / Gravel D1 1.200 Ton/M3 Berongga
- Pasir D2 1.400 Ton/M3 Berongga
- Batu Pecah D3 1.350 Ton/M3 Berongga
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1 240,000.00 Rp./M3
- Sirtu Rp2 176,800.00 Rp./M3
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3 1,066,190.68 Rp./Jam
- Wheel Loader Rp4 610,697.15 Rp./Jam
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1 60.00 Ton/Jam
- Wheel Loader Cp2 1.50 M3 Kap. Bucket
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1 0.70 -
- Wheel Loader Fa2 0.85 -
9 Faktor Kehilangan Material Fh 1.10 -

II METHODE PELAKSANAAN
1 Wheel Loader mengangkut Sirtu dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.
2 Bahan dasar yang digunakan Sirtu (material Batu bercampur kerikil dan pasir)
3 Dilokasi hooper/Feeder dipasang penyiram air (water sprayer)
berfungsi sebagai pencucian bahan dari kotoran (lumpur)
4 Setelah disemprot air Sirtu dimasukkan kedalam pemecah pertama
(primary crusher) kapasitas 60 ton/jam (bukaan Jaw 10 cm s.d 20 cm tergantung
ukuran boulder)
6 Hasil Primary Crusher disaring memakai Scalping Screen(screen 1) dengan
ukuran ayakan #1,5 inch (3,75 cm) atau #2,0 inch (5,00 cm)
yg menghasilkan lolos ayakan agregat ukuran (0 - 50) dan tdk lolos agg.(50 - 200)
Asumsi material yang lolos saringan (screen1) 20 %
Asumsi keseluruhannya menghasilkan ukuran (0 - 50) 8.57 m3
7 Hasil yang lolos saringan(screen1) sebagai fraksi halus tidak boleh dipakai
langsung untuk bahan campuran lapisan perkerasan aspal, tetapi dapat digunakan
untuk bahan campuran Agregat kelas B dan S, khusus untuk Agregat A yang
digunakan hanya ukuran (0 - 5)
8 Hasil yang tidak lolos screen1 dimasukan ke pemecah kedua (Secondary Crusher) 80 %
kemudian dipisahkan mempergunakan Screen2 yang menghasilkan ukuran 35.56 m3
(0 - 5), (5 - 3/8"=9,50mm) dan (3/8" - 3/4"=19mm atau 1"=2,54mm))
yang dapat langsung digunakan untuk kebutuhan Agregat Kasar Lapis pondasi
Agregat A (ukuran 5 - 1") dan Agg.Kasar dan Agg.Halus lapisan perkerasan Aspal
Asumsi proporsi hasil pemisahan saringan (screen2)
- menghasilkan ukuran (0 - 5) 20 %
- menghasilkan ukuran (5 - 3/8"=9,5mm) 30 %
- menghasilkan ukuran (3/8" - 3/4"=19mm) 50 %
9 Hasil yang tidak lolos dimasukan kedalam pemecah ketiga (Tertiary crusher)
atau (secondary Crusher) dan hasilnya dimasukan kembali ke saringan screen2

III ANALISA ALAT


1.a. Kerja Stone Crusher memecah gravel :
- Waktu kerja Stone Crusher Tst 1.00 Jam
- Produksi Stone Crusher 1 jam = (Fa1 x Cp1) : D3 Qb 31.11 M3/Jam Batu pecah
- Kebutuhan batu/gravel 1 jam = (Fa1 x Cp1) : D1 Qg 35.00 M3/Jam

1.b. Kerja Wheel Loader melayani Stone Crusher :


- Kap. Angkut / rit = (Fa2 x Cp2) Ka 1.28 M3
- Waktu Siklus (Muat, Tuang, Tunggu, dll) Ts 5.00 menit
- Waktu kerja W.Loader memasok gravel
= {(Qg : Ka) x Ts} : 60 menit Tw 2.29 Jam

1.c. Biaya Produksi Batu Pecah stone crusher 1 set dgn wheel loader
= {(Tst x Rp3) + (Tw x Rp4)} Bp 2,463,210.30 Rp./Jam

1.d. Harga Satuan Batu Pecah Produksi St.Crusher / M3


= {(Qg : Qb) x Fh x Rp1} + Bp HSb 2,760,210.30 Rp.
IV PERHITUNGAN
1 Primary Crusher
Produksi Primary Crusher + scalping Screen 1 Prod 60.00 Ton/Jam
Lolos scalping screen (sreen1) LSc 1 20.00 %
Tidak lolos scalping screen(screen1) ( 100 - LSc 1 ) TLSc1 80.00 %
Asumsi % Biaya proses scalping screen ukuran # 2"=50 mm thdp biaya produksi LSc2 20.00 %
Biaya Produksi scalping Screen BPSc 492,642.06 Rp.
Volume (0 - 50) = ((Prod x LSc 1) x LSc2))/D1 V1 8.57 m3

2 Secondary Crusher
Produksi Secondary Crusher + scalping Screen 2 Prod 48.00 Ton/Jam
Asumsi % Biaya proses produksi Batu Pecah thdp BOP S.Crusher 1 set LSc3 80.00 %
Biaya Produksi = LSc3 : 100 x BP + BPSc : 2 Bprod 2,216,889.27 Rp.
kapasitas yang diproduksi = Prod x TLSc1/100 : D3 CpSC1 35.56 m3
Lolos screen2 ukuran ( 0 - 5) LSc4 20.00 %
Volume ukuran ( 0 - 5) = (CpSC1 x LSc4/100) V2 7.11 m3
Lolos screen2 ukuran ( 5 - 9,5) LSc5 30.00 %
Volume ukuran ( 5 - 9,5) = (CpSC1 x LSc5/100) V3 10.67 m3
Lolos screen2 ukuran ( 9.5 - 19,0) LSc6 50.00 %
Volume ukuran ( 9,5 - 19.0) = (CpSC1 x LSc6/100) V4 17.78 m3

III.2. HARGA SATUAN AGREGAT


Primary Crusher
Harga Satuan Agregat Halus+Kasar untuk Lapis Pondasi / M3
dengan asumsi memerlukan biaya setengah biaya proses scalping screen 1,
setengah masuk ke screen1, setengahnya lagi masuk ke Secunder Crusher
= ((BPSc : 2) : V1) + Rp2 Hs1 205,537.45 Rp

Secondary Crusher
Asumsi %Biaya produksi per fraksi (untuk tiap lengan conveyor 1/3 biaya produksi) LSc2 33.33 %
Biaya Produksi per Fraksi = Hs 1 : 3 PF 920,070.10 Rp.
Agregat pecah mesin ( 0 - 5) = PF : V2 + Rp2 Hs2 306,184.86 Rp./M3
Agregat pecah mesin (5 - 9.5) = PF : V3 + Rp2 Hs3 263,056.57 Rp./M3
Agregat pecah mesin (9.5 - 19) = PF : V4 + Rp2 Hs4 228,553.94 Rp./M3

Agregat pecah kasar = PF x 2/(V3 + V4) + Rp2 241,492.43


FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : AGREGAT KELAS A (kondisi lepas) :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A :
SATUAN PEMBAYARAN : M3 :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0630 10,177.49 641.15


2. Mandor (L03) jam 0.0315 18,034.63 568.06

JUMLAH HARGA TENAGA 1,209.22

B. BAHAN

0.00
1 Agregat Pecah Kasar M3 0.7334 241,492.43 177,116.58
2 Agg. Halus Lapis Pondasi A M3 0.3166 205,537.45 65,068.02

JUMLAH HARGA BAHAN 242,184.60

C. PERALATAN
1. Wheel Loader (E15) jam 0.0315 610,697.15 19,236.07
2. Blending Equpment (E52) jam 0.0482 271,770.41 13,097.37
3 Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN 32,833.44

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 276,227.26


ITEM PEMBAYARAN : AGREGAT KELAS A (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEFISIEN SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Kasar APK 69.85 % memenuhi Spec.
- Aggregat Halus Lapis pondasi A PU 30.15 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Faktor kehilangan - Agregat Pecah Kasar Fh1 1.05
- Aggregat Halus Lapis pondasi A Fh2 1.05

II. URUTAN KERJA


1 Wheel Loader memuat material bahan campuran dari
stockpile ke alat blending
2 Blending equipment melakukan pencampuran (blending)
proses pembuatan agregat kelas A

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Agregat Pecah Kasar = APK x 1 M3 x Fh1 M92 0.7334 M3
Aggregat Halus Lapis pond A = PU x 1 M3 x Fh2 M44 0.3166 M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit jarak 50 meter

Ts1 2.00 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 31.75 M3 padat


Ts1
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0315 jam

2.b. BLENDING EQIPMENT (E52)


Kapasitas V 25.00 M3/jam
Faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = V x Fa Q2 20.75 M3

Koefisien Alat / M3 = 1 : Q2 0.0482 jam

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : AGREGAT KELAS B (kondisi lepas) :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B :
SATUAN PEMBAYARAN : M3 :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0630 10,177.49 641.15


2. Mandor (L03) jam 0.0315 18,034.63 568.06

JUMLAH HARGA TENAGA 1,209.22

B. BAHAN

1. Agregat Pecah Kasar M93 M3 0.4158 241,492.43 100,412.55


2. Fraksi lolos Scalping S M16 M3 0.6342 205,537.45 130,351.85
3

JUMLAH HARGA BAHAN 230,764.40

C. PERALATAN
1. Wheel Loader (E15) jam 0.0315 610,697.15 19,236.07
2. Blending Equpment (E52) jam 0.0482 271,770.41 13,097.37
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 32,333.44

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 264,307.06


ITEM PEMBAYARAN : AGREGAT KELAS B (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEFISIEN SATUAN KETERANGAN

I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l 50.00 M
3 Jam kerja effektif perhari Tk 7.00 jam
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip 1.81
6 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : Fraksi lolos Scalping Screen 0 - 50 mm 20-30 39.60 % Gradasi harus
Fraksi lolos Scalping Screen 0 - 50 mm St 60.40 % memenuhi
9 Berat volume agregat (lepas) Bil 1.51 ton/m3 Spesifikasi
- Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
- Agregat Pecah Mesin 5 - 10 & 10 - 20 m Fh2 1.05
Fraksi lolos Scalping Screen 0 - 50 mm Fh3 1.05

II URUTAN PEKERJAAN

1 Wheel Loader memuat material bahan campuran dari


stockpile ke alat blending
2 Blending equipment melakukan pencampuran (blending)
Aggregat kasar, aggregat halus dan pasir alam menjadi
Aggregat B

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Agregat Pecah Kasar = "20-30" x 1 M3 x Fh1 M93 0.4158 M3
Fraksi lolos Scalping Screen 0 - 50 mm = St x 1 M3 x Fh3 M16 0.6342 M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat belending T1 2.00 menit jarak 50 meter

Ts1 2.00 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 31.75 M3 padat


(Bip/Bil) x Ts1
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0315 jam

2.b. BLENDING EQUIPMENT (E52)


Kapasitas V 25.00 M3/jam
Faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = V x Fa Q2 20.75 M3

Koefisien Alat / M3 = 1 : Q2 0.0482 jam

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : AGREGAT KELAS S :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS S :
SATUAN PEMBAYARAN : M3 :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0630 10,177.49 641.15


2. Mandor (L03) jam 0.0315 18,034.63 568.06

JUMLAH HARGA TENAGA 1,209.22

B. BAHAN

1. Agregat Pecah Kasar M3 0.1890 241,492.43 45,642.07


2. Agregat Lolos # 1 " M3 0.1922 263,056.57 50,546.32
3 - Fraksi lolos Scalping 0 - 37,5 mm M3 0.6689 205,537.45 137,473.73
Screen 0 - 37,5 mm

JUMLAH HARGA BAHAN 233,662.12

C. PERALATAN
1. Wheel Loader (E15) jam 0.0315 610,697.15 19,236.07
2. Blending Equpment (E52) jam 0.0482 271,770.41 13,097.37
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 32,333.44

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 267,204.77


ITEM PEMBAYARAN : AGREGAT KELAS S
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS S
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEFISIEN SATUAN KETERANGAN

I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l 50.00 M
3 Jam kerja effektif perhari Tk 7.00 jam
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip 1.81
6 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : Agregat Pecah Kasar 20-30 18.00 % Gradasi harus
Agregat Lolos # 1 " 5-10&10-20 18.30 % memenuhi
- Fraksi lolos Scalping 0 - 37,5 mm St 63.70 % Spesifikasi
Screen 0 - 37,5 mm
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
Agregat Pecah Kasar Fh1 1.05
Agregat Lolos # 1 " Fh2 1.05
- Fraksi lolos Scalping 0 - 37,5 mm Fh3 1.05
Screen 0 - 37,5 mm
II URUTAN PEKERJAAN

1 Wheel Loader memuat material bahan campuran dari


stockpile ke alat blending
2 Blending equipment melakukan pencampuran (blending)
Aggregat kasar, aggregat halus dan pasir alam menjadi
Aggregat B

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Agregat Pecah Kasar = "20-30" x 1 M3 x Fh1 M93 0.1890 M3
Agregat Lolos # 1 " = "5-10 & 10-20" x 1 M3 x Fh2 M92 0.1922 M3
- Fraksi lolos Scalping 0 - 37,5 mm = St x 1 M3 x Fh3 M16 0.6689 M3
Screen 0 - 37,5 mm
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat belending T1 2.00 menit jarak 50 meter

Ts1 2.00 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 31.75 M3 padat


(Bip/Bil) x Ts1
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0315 jam

2.b. BLENDING EQUIPMENT (E52)


Kapasitas V 25.00 M3/jam
Faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = V x Fa Q2 20.75 M3

Koefisien Alat / M3 = 1 : Q2 0.0482 jam

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
ITEM PEMBAYARAN : AGREGAT KELAS C
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS C
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEFISIEN SATUAN KETERANGAN

I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 32.50 %
- Pasir Ps 67.50 %

4 Harga Satuan : - Agregat Kasar HSAk 263,056.57 Rp./M3


- Pasir HSPs 174,200.00 Rp./M3

5 Biaya Operasi Alat : - Wheel Loader Rp1 610,697.15 Rp./Jam


6 Faktor Efisiensi Alat : - Wheel Loader Fa1 0.83 -
7 Kapasitas Alat : - Wheel Loader Cp2 1.50 M3 Kap. Bucket

II METHODE PELAKSANAAN

1 Wheel Loader melakukan pencampuran (blending)


Agregat Kasar, Pasir & Tanah menjadi Agregat Kelas C.

III.1 PROSES PENCAMPURAN AGREGAT KELAS C

Untuk setiap 1 M3 Agregat Kelas C, diperlukan :

1.a. - Agregat Kasar = Ak x 1 M3 Vk 0.325 M3


- Pasir = Ps x 1 M3 Vp 0.675 M3
- Tanah = Tn x 1 M3 Vt 0.000 M3
- Total volume agregat = Vk + Vp + Vt Va 1.000 M3

1.b. Waktu pencampuran (blending) oleh Blending Equipmen Tc 0.083 Jam/M3

III.2 HARGA SATUAN BAHAN AGREGAT KELAS C

2.a. Agregat Kasar = Vk x HSAk Hs1 56,615.00 Rupiah

2.b. Pasir = Vh x HSPs Hs2 177,563.19 Rupiah

2.c. Tanah = Vs x HSTn Hs3 0.00 Rupiah

2.d. Biaya Pencampuran = Tc x Rp1 Hs4 50,891.43 Rupiah

2.e. Harga Satuan Agregat Kelas C / M3


= Hs1 + Hs2 + Hs3 + Hs4 HSAB 285,069.61 Rupiah Di luar PPN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : LAPIS PONDASI AGREGAT (kondisi lepas) :
JENIS PEKERJAAN : PENGADAAN LAPIS PONDASI AGREGAT (CBR 60%) :
SATUAN PEMBAYARAN : M3 :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0630 10,177.49 641.15


2. Mandor (L03) jam 0.0315 18,034.63 568.06

JUMLAH HARGA TENAGA 1,209.22

B. BAHAN

1. Agregat Pecah Kasar M3 0.2520 241,492.43 60,856.09


2. Agregat Lolos # 1 " M3 0.2230 263,056.57 58,666.88
3 Fraksi lolos Scalping 0 - 37,5 mm M3 0.5750 228,553.94 131,413.95

JUMLAH HARGA BAHAN 250,936.91

C. PERALATAN
1. Wheel Loader (E15) jam 0.0315 610,697.15 19,236.07
2. Blending Equpment (E52) jam 0.0482 271,770.41 13,097.37
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 32,333.44

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 284,479.57


ITEM PEMBAYARAN : LAPIS PONDASI AGREGAT (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN LAPIS PONDASI AGREGAT (CBR 60%)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEFISIEN SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.20 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : Agregat Pecah Kasar A20-30 24.00 % Gradasi harus
Agregat Lolos # 1 " A5-10&10-20 21.24 % memenuhi Spec.
Fraksi lolos Scalping 0 - 37,5 mm St 54.76 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Faktor kehilangan Agregat Pecah Kasar Fh1 1.05
Agregat Lolos # 1 " Fh2 1.05
Fraksi lolos Scalping 0 - 37,5 mm Fh3 1.05

II. URUTAN KERJA


1 Wheel Loader memuat material bahan campuran dari
stockpile ke alat blending
2 Blending equipment melakukan pencampuran (blending)
Aggregat 20-30, 10-20, 5-10 dan Sirtu menjadi
Lapis Pondasi Agregat (CBR 60%)

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Agregat Pecah Kasar = "20-30" x 1 M3 x Fh1 M93 0.2520 M3
Agregat Lolos # 1 " = "5-10 & 10-20" x 1 M3 x Fh2 M92 0.2230 M3
Fraksi lolos Scalping 0 = St x 1 M3 x Fh3 M16 0.5750 M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit jarak 50 meter

Ts1 2.00 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 31.75 M3 padat


Ts1
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0315 jam

2.b. BLENDING EQIPMENT (E52)


Kapasitas V 25.00 M3/jam
Faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = V x Fa Q2 20.75 M3

Koefisien Alat / M3 = 1 : Q2 0.0482 jam

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : LAPIS PERMUKAAN AGREGAT (kondisi lepas) :
JENIS PEKERJAAN : PENGADAAN LAPIS PERMUKAAN AGREGAT (CBR 60%) :
SATUAN PEMBAYARAN : M3 :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0630 10,177.49 641.15


2. Mandor (L03) jam 0.0315 18,034.63 568.06

JUMLAH HARGA TENAGA 1,209.22

B. BAHAN

1. Agregat 5-10 & 10-20 (M92) M3 0.4788 241,492.43 115,626.57


2. Pasir Urug (M44) M3 0.5712 165,400.00 94,476.48

JUMLAH HARGA BAHAN 210,103.05

C. PERALATAN
1. Wheel Loader (E15) jam 0.0315 610,697.15 19,236.07
2. Blending Equpment (E52) jam 0.0482 271,770.41 13,097.37
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 32,333.44

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 243,645.71


ITEM PEMBAYARAN : LAPIS PERMUKAAN AGREGAT (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN LAPIS PERMUKAAN AGREGAT (CBR 60%)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEFISIEN SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.10 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam

8 Proporsi Campuran : - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 45.60 % Gradasi harus
- Pasir Urug PU 54.40 % memenuhi Spec.
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh1 1.05
- Pasir Urug Fh2 1.05

II. URUTAN KERJA


1 Wheel Loader memuat material bahan campuran dari
stockpile ke alat blending
2 Blending equipment melakukan pencampuran (blending)
Aggregat 10-20, 5-10 dan Pasir Urug menjadi
Lapis Permukaan Agregat (CBR 60%)

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN

- Agr 5 - 10 & 10 - 20 = "5-10 & 10-20" x 1 M3 x Fh2 M92 0.4788 M3


- Pasir Urug = PU x 1 M3 x Fh3 M44 0.5712 M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit jarak 50 meter

Ts1 2.00 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 31.75 M3 padat


Ts1
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0315 jam

2.b. BLENDING EQIPMENT (E52)


Kapasitas V 25.00 M3/jam
Faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = V x Fa Q2 20.75 M3

Koefisien Alat / M3 = 1 : Q2 0.0482 jam

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)
HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY KET.
(Rp) ( Km )

1. M01 - P a s i r Pasang M3 77,500.00 20.00 Ke Base Camp


M01 - P a s i r Beton M3 125,000.00 5.00 Ke Lokasi Pek.
2. M02 - Batu Kali M3 95,000.00 35.00 Ke Lokasi Pek.

3. M06 - Batu Belah/Batu Quarry Besar M3 95,000.00 35.00 Ke Lokasi Pek.

4. M07 - G r a v e l M3 95,000.00 20.00 Ke Base Camp

5. M10 - Aspal Cement (Pelabuhan) KG 14,000.00 23.00 Ke Base Camp

6. M16 - S i r t u M3 55,000.00 28.00 Ke Lokasi Pek.

7. M44 - Pasir Urug M3 50,000.00 28.00 Ke Lokasi Pek.

8 M08 - Tanah Timbun M3 35,000.00 35.00 Ke Lokasi Pek.

9 M09 - Material Pilihan M3 40,000.00 35.00 Ke Lokasi Pek.

Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3

Lokasi Quarry
- Gravel
Pelaihari
- Batu Belah/Batu Gunung

18-20 km
Lokasi Quarry Cempaka Lokasi Quarry
- Batu Kali - Pasir Beton
- Pasir Pasang
Quarry :
- Kerikil
- Agg. Kasar Base A
- Agg. Halus Base B
Base Camp - Agregat Kasar
AMP - Agregat Halus
Stone Crusher
10,00 km 10,00 km
Ke Martapura Bjm

km 0+020 18,00 km 5,00 km

Tanah Pilihan = 10.00 km


Sirtu = 10.00 km
Material Pilihan = 10.00 km

Catatan :

Banjarbaru - Banjarmasin = 30.00 km


Banjarmasin - Lokasi Proyek = 5.00 km
Total Sumber Quarry Cempaka s/d Lokasi Proyek = 35.00 km

Lokasi Proyek - Base Camp = 18.00 km


Total Sumber Quarry Martadah s/d Base Camp = 30.00 km

Jarak Quarry Bt. Kali/Belah ke B. Camp diperkirakan = 20.00 km


Jarak Quarry Bt. Kali/Belah ke Lokasi Proyek diperkirakan = 35.00 km
Jarak Quarry Pasir ke Base Camp diperkirakan = 20.00 km
Jarak Quarry Pasir ke Lokasi Proyek diperkirakan = 5.00 km
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3 77,500.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 512,290.28
7 Berat volume pasir Bil 1.42 ton/m3

II. URUTAN KERJA


1 Pasir digali dengan Excavator
2 Excavator sekaligus memuat pasir hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.85 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 35.5725 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/Q1 x Bil) T1 11.88 menit
- Waktu tempuh isi = (L/v1) x 60 T2 30.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 20.00 menit
- Lain-lain T4 1.00 menit
Ts2 62.88 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 5.71 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 89,687.93 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar Pasir =

( RpM01 + Rp1 + Rp2 ) M01 167,187.93 Rupiah

Dibulatkan : M01 167,200.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan : Lokasi Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Base Camp L 35.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3 95,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 512,290.28
7 Berat volume batu kali Bil 1.44 ton/m3

II. URUTAN KERJA


1 Batu kali digali dengan Excavator
2 Excavator sekaligus memuat batu kali
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut batu kali ke
lokasi Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.85 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 35.5725 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 11.71 menit
- Waktu tempuh isi = (L/v1) x 60 T2 52.50 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 35.00 menit
- Lain-lain T4 1.00 menit
Ts2 100.21 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan : Lokasi Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 3.53 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 144,955.01 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Batu kali =

( RpM02 + Rp1 + Rp2 ) M02 239,955.01 Rupiah

Dibulatkan : M02 240,000.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Base Camp L 35.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3 95,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 512,290.28
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 610,697.15
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 10,177.49
9 Berat volume batu belah Bil 1.60 ton/m3

II. URUTAN KERJA


1 Batu kali digali dengan Excavator
2 Batu kali dibelah oleh Pekerja
3 Dengan Wheel Loader batu belah dimuat
ke Dump Truck yang mengangkut batu
belah ke lokasi Base Camp
III. PERHITUNGAN

3.a EXCAVATOR (E10)


Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.85 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 35.5725 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

3.b WHEEL LOADER (E15)


Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi Alat Fa 0.85 -
Waktu sklus Ts1
- Muat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kapasitas Produksi / Jam =
V x Fb x Fa x 60 Q2 45.9 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q2) x RpE15 Rp2 13,304.95 Rupiah

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

3.c DUMP TRUCK (E09)


Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 10.54 menit
- Waktu tempuh isi = (L/v1) x 60 T2 52.50 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 35.00 menit
- Lain-lain T4 1.00 menit
Ts2 99.04 menit

Kapasitas Produksi / Jam =


V x Fa x 60 Q3 3.22 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q3) x RpE08 Rp3 159,178.60 Rupiah

3.d PEKERJA

Produksi menentukan : Excavator Q1 35.5725 M3 / Jam


Hasil galian batu / hari = Q1 x 7 Jam Qt 249.0075 M3 / 7 jam
Kebutuhan Pekerja P 10.00 Orang

Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 2,861.06 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Batu belah =

( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) M06 270,344.60 Rupiah

Dibulatkan : M06 270,300.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Base Camp L 20.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3 95,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 512,290.28
7 Berat volume gravel Bil 2.20 ton/m3

II. URUTAN KERJA


1 Gravel digali dengan Excavator
2 Excavator sekaligus memuat gravel
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut gravel ke
lokasi Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.85 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 28.458 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 9.58 menit
- Waktu tempuh isi = (L/v1) x 60 T2 30.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 20.00 menit
- Lain-lain T4 1.00 menit
Ts2 60.58 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 3.83 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 133,882.24 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar Gravel =

( RpM07 + Rp1 + Rp2 ) M07 228,882.24 Rupiah

Dibulatkan : M07 228,900.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 28.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 55,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 512,290.28
7 Berat volume sirtu Bil 1.51 ton/m3

II. URUTAN KERJA


1 Sirtu digali dengan Excavator
2 Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut sirtu ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 42.687 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 9.31 menit
- Waktu tempuh isi = (L/v1) x 60 T2 42.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 28.00 menit
- Lain-lain T4 1.00 menit
Ts2 80.31 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 4.21 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 121,810.37 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Sirtu =

( RpM16 + Rp1 + Rp2 ) M16 176,810.37 Rupiah

Dibulatkan : M16 176,800.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 28.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 50,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 512,290.28
7 Berat volume pasir urug Bil 1.42 ton/m3

II. URUTAN KERJA


1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 42.687 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 9.90 menit
- Waktu tempuh isi = (L/v1) x 60 T2 42.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 28.00 menit
- Lain-lain T4 1.00 menit
Ts2 80.90 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 4.44 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 115,391.68 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 ) M44 165,391.68 Rupiah

Dibulatkan : M44 165,400.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 5.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 125,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 512,290.28
7 Berat isi volume pasir beton Bil 1.69 ton/m3

II. URUTAN KERJA


1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir beton
ke Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.95 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 15.47 menit
- Waktu tempuh isi = (L/v1) x 60 T1 7.50 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 5.00 menit
- Lain-lain T4 1.00 menit
Ts2 28.97 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 10.42 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 49,178.65 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar pasir beton =

( RpM44 + Rp1 + Rp2 ) M44 174,178.65 Rupiah

Dibulatkan : M44 174,200.00 Rupiah


HARGA DASAR SATUAN UPAH
HARGA HARGA
No. URAIAN KODE SATUAN YG DIGUNAKAN SATUAN KETERANGAN
( Rp.) ( Rp.)

1. Pekerja (L01) Jam 10,177.49 70,000.00


2. Tukang (L02) Jam 14,463.20 100,000.00
3. Mandor (L03) Jam 18,034.63 125,000.00
4. Operator (L04) Jam 20,177.49 140,000.00
5. Pembantu Operator (L05) Jam 10,891.77 75,000.00
6. Sopir / Driver (L06) Jam 20,177.49 140,000.00
7. Pembantu Sopir / Driver (L07) Jam 10,891.77 75,000.00
8. Mekanik (L08) Jam 19,463.20 135,000.00
9. Pembantu Mekanik (L09) Jam 12,320.35 85,000.00
10. Kepala Tukang (L10) Jam 18,034.63 125,000.00
11.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1 Pasir Pasang (Sedang) M01b M3 167,200.00 Base Camp


2 Pasir Beton (Kasar) M01a M3 174,200.00 Base Camp
3 Pasir Halus (untuk HRS) M01c M3 213,500.00 Base Camp
4 Pasir Urug (ada unsur lempung) M01d M3 174,200.00 Base Camp
5 Batu Kali M02 M3 240,000.00 Base Camp
6 Agregat Pecah Kasar M3 241,492.43 Base Camp
7 Agg. Halus LP A M3 205,537.45 Base Camp
8 Agregat Lolos # 1 " M3 263,056.57 Base Camp
9 Lolos screen1 ukuran ( 0 - 5) M3 205,537.45 Base Camp
10 Lolos screen2 ukuran ( 0 - 5) M3 306,184.86 Base Camp
11 Lolos screen2 ukuran ( 5 - 9,5) M3 263,056.57 Base Camp
12 Lolos screen2 ukuran ( 9.5 - 19,0) M3 228,553.94 Base Camp
13 Filler M05 Kg 1,412.00 Proses/Base Camp
14 Batu Belah / Kerakal M06 M3 270,300.00 Lokasi Pekerjaan
15 Gravel M07 M3 228,900.00 Base Camp
16 Bahan Tanah Timbunan (Tanah Merah) M08 M3 69,600.00 Borrow Pit/quarry
17 Bahan Pilihan M09 M3 40,600.00 Quarry
18 Aspal M10 KG 13,750.00 Base Camp
19 Kerosen / Minyak Tanah M11 LITER 10,200.00 Base Camp
20 Semen / PC (50kg) M12 Zak 70,600.00 Base Camp
21 Semen / PC (kg) M12 Kg 1,412.00 Base Camp
22 Besi Beton M13 Kg 11,900.00 Lokasi Pekerjaan
23 Kawat Beton M14 Kg 20,500.00 Lokasi Pekerjaan
24 Kawat Bronjong M15 Kg 0.00 Lokasi Pekerjaan
25 Sirtu M16 M3 176,800.00 Lokasi Pekerjaan
26 Cat Marka (Non Thermoplas) M17a Kg 22,500.00 Lokasi Pekerjaan
27 Cat Marka (Thermoplastic) M17b Kg 27,500.00 Lokasi Pekerjaan
28 Paku M18 Kg 18,000.00 Lokasi Pekerjaan
29 Kayu Perancah M19 M3 2,312,500.00 Lokasi Pekerjaan
30 Bensin M20 LITER 9,500.00 Pertamina
31 Solar M21 LITER 9,500.00 Pertamina
32 Minyak Pelumas / Olie M22 LITER 40,000.00 Pertamina
33 Plastik Filter M23 M2 15,000.00 Lokasi Pekerjaan
34 Pipa Galvanis Dia. 1.6" M24 Batang 450,000.00 Lokasi Pekerjaan
35 Pipa Porus M25 M' 15,000.00 Lokasi Pekerjaan
36 Agr.Base Kelas A M26 M3 276,227.26 Base Camp
37 Agr.Base Kelas B M27 M3 264,307.06 Base Camp
38 Agr.Base Kelas C M28 M3 285,069.61 Base Camp
39 Agr.Base Kelas C2 M29 M3 0.00 Tidak tersedia
40 Geotextile M30 M2 13,900.00 Lokasi Pekerjaan
41 Aspal Emulsi M31 Kg 0.00 Base Camp
42 Gebalan Rumput M32 M2 0.00 Lokasi Pekerjaan
43 Thinner M33 LITER 17,500.00 Lokasi Pekerjaan
44 Glass Bead M34 Kg 0.00 Lokasi Pekerjaan
45 Pelat Rambu (Eng. Grade) M35a BH 0.00 Lokasi Pekerjaan
46 Pelat Rambu (High I. Grade) M35b BH 0.00 Lokasi Pekerjaan
47 Rel Pengaman M36 M' 0.00 Lokasi Pekerjaan
48 Beton K-250 M37 M3 1,577,261.56 Lokasi Pekerjaan
49 Baja Tulangan (Polos) U24 M39a Kg 13,800.00 Lokasi Pekerjaan
50 Baja Tulangan (Ulir) D32 M39b Kg 14,850.00 Lokasi Pekerjaan
51 Kapur M40 M3 0.00 Hasil Proses
52 Chipping M41 M3 241,492.43 Base Camp
53 Chipping (kg) M41kg Kg 128.13 Base Camp
54 Cat M42 Kg 50,300.00 Base Camp
55 Pemantul Cahaya (Reflector) M43 Bh. 0.00 Base Camp
56 Pasir Urug M44 M3 165,400.00 Base Camp
57 Arbocell M45 Kg. 0.00 Base Camp
58 Baja Bergelombang M46 Kg 0.00 Lokasi Pekerjaan
59 Beton K-125 M47 M3 1,044,371.26 Lokasi Pekerjaan
60 Baja Struktur M48 Kg 25,000.00 Pelabuhan terdekat
61 Tiang Pancang Baja M49 M' 0.00 Lokasi Pekerjaan
62 Tiang Pancang Beton Pratekan M50 M3 0.00 Pelabuhan terdekat
63 Kawat Las M51 Dos 0.00 Lokasi Pekerjaan
64 Pipa Baja M52 Kg 0.00 Pelabuhan terdekat
65 Minyak Fluks M53 Liter 0.00 Base Camp
66 Bunker Oil M54 Liter 0.00 Base Camp
67 Asbuton Halus M55 Ton 0.00 Base Camp
68 Baja Prategang M56 Kg 0.00 Base Camp
69 Baja Tulangan (Polos) U32 M57a Kg 0.00 Lokasi Pekerjaan
70 Baja Tulangan (Ulir) D39 M39c Kg 0.00 Lokasi Pekerjaan
71 Baja Tulangan (Ulir) D48 M39d Kg 0.00 Lokasi Pekerjaan
72 PCI Girder L=17m M58a Buah 0.00 Pelabuhan terdekat
73 PCI Girder L=21m M58b Buah 0.00 Pelabuhan terdekat
74 PCI Girder L=26m M58c Buah 0.00 Pelabuhan terdekat
75 PCI Girder L=32m M58d Buah 0.00 Pelabuhan terdekat
76 PCI Girder L=36m M58e Buah 0.00 Pelabuhan terdekat
77 PCI Girder L=41m M58f Buah 0.00 Pelabuhan terdekat
78 Beton K-300 M59 M3 0.00 Lokasi Pekerjaan
79 Beton K-175 M60 M3 0.00 Lokasi Pekerjaan
80 Cerucuk M61 M 3,000.00
81 Elastomer M62 buah 0.00
82 Bahan pengawet: kreosot M63 liter 0.00
83 Mata Kucing M64 buah 0.00
84 Anchorage M65 buah 0.00
85 Anti strpping agent M66 Kg 35,000.00
86 Bahan Modifikasi M67 Kg 0.00
87 Beton K-500 M68 M3 0.00
88 Beton K-400 M69 M3 0.00
89 Ducting (Kabel prestress) M70 M' 0.00
90 Ducting (Strand prestress) M71 M' 0.00
91 Beton K-350 M72 M3 0.00
92 Multipleks 12 mm M73 Lbr 0.00
93 Elastomer jenis 1 M74a buah 0.00 Base Camp
94 Elastomer jenis 2 M74b buah 0.00 Base Camp
95 Elastomer jenis 3 M74c buah 0.00 Base Camp
96 Expansion Tipe Joint Asphaltic Plug M75d M 0.00 Base Camp
97 Expansion Join Tipe Rubber M75e M 0.00 Base Camp
98 Expansion Join Baja Siku M75f M 0.00 Base Camp
99 Marmer M76 Buah 0.00 Base Camp
100 Kerb Type A M77 Buah 0.00 Base Camp
101 Paving Block M78 Buah 0.00 Lokasi Pekerjaan
102 Mini Timber Pile M79 Buah 0.00 Lokasi Pekerjaan
103 Expansion Joint Tipe Torma M80 M1 0.00 Lokasi Pekerjaan
104 Strip Bearing M81 Buah 0.00 Lokasi Pekerjaan
105 Joint Socket Pile 35x35 M82 Set 0.00 Lokasi Pekerjaan
106 Joint Socket Pile 16x16x16 M83 Set 0.00 Lokasi Pekerjaan
107 Mikro Pile 16x16x16 M84 M1 0.00 Lokasi Pekerjaan
108 Matras Concrete M85 Buah 0.00 Lokasi Pekerjaan
109 Assetilline M86 Botol 0.00 Lokasi Pekerjaan
110 Oxygen M87 Botol 0.00 Lokasi Pekerjaan
111 Batu Bara M88 Kg 0.00 Lokasi Pekerjaan
112 Pipa Galvanis Dia 3" M24a M 112,500.00
113 Pipa Galvanis Dia 1,5" M24b M 0.00
114 Agregat Pecah Mesin 0-5 mm M91 M3 0.00
115 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 0.00
116 Agregat Pecah Mesin 20-30 mm M93 M3 0.00
117 Joint Sealent M94 Kg 0.00
118 Cat Anti Karat M95 Kg 0.00
119 Expansion Cap M96 M2 0.00
120 Polytene 125 mikron M97 Kg 0.00
121 Curing Compound M98 Ltr 0.00
122 Kayu Acuan M99 M3 0.00
123 Additive M67a Ltr 0.00
124 Casing M100 M2 0.00
125 Pasir Tailing M3 0.00 Base Camp
126 Polimer 0.00 Base Camp
127 Batubara kg 0.00 Base Camp
128 Kerb jenis 1 Buah 0.00
129 Kerb jenis 2 Buah 0.00
130 Kerb jenis 3 Buah 0.00
131 Bahan Modifikasi Kg 0.00
132 Aditif anti pengelupasan Kg 122,500.00
133 Bahan Pengisi (Filler) Tambahan Kg 1,412.00
134 Asbuton yang diproses Kg 0.00
135 Elastomer Alam Kg 0.00
136 Elastomer Sintesis Kg 0.00
137 Anchorage 0.00
138 - hidup bh 0.00
139 - mati bh 0.00
140 Kabel Prategang Kg
141 - Selongsong M' 0.00
142 - Baja Prategang Kg 0.00
143 - Grouting M2 0.00
144 Angkur Kabel Prategang, Tipe............... M2 0.00
145 Angkur Kabel Prategang, Tipe............ buah 0.00
146 Baja Profil Kg 0.00
147 Baja Tulangan BJTP 24 (epoxy coated) Kg 0.00
148 Epoxy coated Kg 0.00
149 Cairan Perekat (Epoxy Resin) Kg 0.00
150 Epoxy Bahan Penutup (sealant) Kg 0.00
151 Alat Penyuntik Anti Gravitasi Kg 0.00 alat penyuntik epoxy
152 Polymer Mortar Kg 0.00
153 Anti Korosif Baja Kg 0.00
154 Acuan/multipleks M3 0.00
155 Concrete Grouting Kg 0.00
156 Acuan/multipleks M3 0.00
157 Pelat Baja Kg 0.00
158 Baut Angkur Kg 0.00
159 Pipa Aluminium M' 0.00
160 Cat Galvanis Kg 0.00
161 Baut Mutu Tinggi Buah 0.00
162 Baja Struktur Titik leleh 2500 kg/cm2 Kg 0.00
163 Baja Struktur Titik leleh 2800 kg/cm2 Kg 0.00
164 Baja Struktur Titik leleh 3500 kg/cm2 Kg 0.00
165 Bahan Grouting Kg 0.00
166 Kayu Kelas 1 Kg 0.00
167 Pelat Baja (Klem) Kg 0.00
168 Timbunan Porous M3 0.00
169 Bahan pengaman tebing galian (kayu) M3 0.00
170 Bahan Curing M2 0.00
171 Gelagar baja Kg 0.00
172 Fibre jenis e-glass M2 0.00
173 Bahan Geosynthetic M2 0.00
174 Bahan Baja Profil Kg 0.00
175 Bahan Baja Profil, Mutu BJ 32 Kg 0.00
176 Bahan Baja Profil, Mutu BJ 41 Kg 0.00
177 Bahan Baja Profil, Mutu BJ 52 Kg 0.00
178 Petrolium jelly Kg 0.00
179 Bahan anti rayap Kg 0.00
180 Pelat Baja Galvanis Kg 0.00
181 Baja Struktur Lantai Ortotropik Kg 0.00
182 Aspal Modifikasi kg 0.00
HARGA PEROLEHAN ALAT
Harga Harga Sumber
No. Jenis Alat yang Data Keterangan
digunakan

1 Asphalt Mixing Plant 2,844,577,725 2,844,577,725 Sesuai dengan peraturan


2 Asphalt Finisher 1,116,900,600 1,116,900,600 dan ketentuan yang
3 Asphalt Sprayer 195,091,650 195,091,650 berlaku
4 Bulldozer 100-150 Hp 2,256,000,000 2,256,000,000 (Perpres yg berlaku)
5 Compressor 4000-6500 L\M 174,946,350 174,946,350
6 Concrete Mixer 0.3-0.6 M3 63,616,875 63,616,875
7 Crane 10-15 Ton 1,463,187,975 1,463,187,975
8 Dump Truck 3-4 M3 305,000,000 305,000,000
9 Dump Truck 330,241,575 330,241,575
10 Excavator 80-140 Hp 1,140,000,000 1,140,000,000
11 Flat Bed Truck 3-4 M3 212,056,200 212,056,200
12 Generator Set 504,000,000 504,000,000
13 Motor Grader >100 Hp 1,920,000,000 1,920,000,000
14 Track Loader 75-100 Hp 258,112,350 258,112,350
15 Wheel Loader 1.0-1.6 M3 1,656,000,000 1,656,000,000
16 Three Wheel Roller 6-8 T 636,168,750 636,168,750
17 Tandem Roller 6-8 T. 567,136,500 567,136,500
18 Tire Roller 8-10 T. 684,071,850 684,071,850
19 Vibratory Roller 5-8 T. 900,000,000 900,000,000
20 Concrete Vibrator 11,409,225 11,409,225
21 Stone Crusher 2,449,249,500 2,449,249,500
22 Water Pump 70-100 Mm 17,113,125 17,113,125
23 Water Tanker 3000-4500 L. 190,850,625 190,850,625
24 Pedestrian Roller 35,784,450 35,784,450
25 Tamper 11,409,225 11,409,225
26 Jack Hammer 38,492,475 38,492,475
27 Fulvi Mixer 126,733,725 126,733,725
28 Concrete Pump 156,543,750 156,543,750
29 Trailer 20 Ton 834,900,000 834,900,000
30 Pile Driver + Hammer 207,143,750 207,143,750
31 Crane On Track 35 Ton 1,613,385,807 1,613,385,807
32 Welding Set 24,351,250 24,351,250
33 Bore Pile Machine 2,619,843,750 2,619,843,750

34 Asphalt Liquid Mixer 22,781,250 22,781,250

35 Trailler 15 Ton 625,175,000 625,175,000


36 Rock Drill Breaker 1,252,350,000 1,252,350,000
37 Cold Milling 6,880,967,500 6,880,967,500
38 Cold Recycler 27,134,250,000 27,134,250,000
39 Hot Recycler 40,701,375,000 40,701,375,000
40 Aggregat (chip) Spreader 549,642,500 549,642,500
41 Asphalt Distribution 549,642,500 549,642,500
42 Split Form Paver 1,860,634,285 1,860,634,285
43 Concrete Pan Mixer 1,391,500,000 1,391,500,000
44 Concrete Breaker 1,252,350,000 1,252,350,000
45 Asphalt Tanker 695,750,000 695,750,000
46 Cement Tanker 695,750,000 695,750,000
47 Concrete Mixer (350) 48,702,500 48,702,500
48 Vibrating Rammer 27,830,000 27,830,000
49 Truk Mixer 1,043,625,000 1,043,625,000
50 Bore Pile Machine Dia 60 1,628,055,000 1,628,055,000
51 Crane On Track 75 - 100Ton 1,252,350,000 1,252,350,000
52 Blending Equipment 695,750,000 695,750,000
53 Asphalt Liquid Mixer (kap 20000) 208,725,000 208,725,000
54 Alat tambahan Batubara Direct 100 100
55 Alat tambahan Gas Batubara 100 100
56 Chain Saw 100 100
57 Bar Bender 100 100
58 Bar Cutter 100 100
59 Breaker 100 100
60 Grouting Pump 100 100
61 Jack Hidrolic 100 100
62 Mesin Las 100 100
63 Pile Driver Leader, 75 Kw 100 100
64 Pile Hammer 100 100
65 Pile Hammer, 2,5 Ton 100 100
66 Stressing Jack 100 100
67 Welding Machine, 300 A 100 100
68 Stressing Machine 100 100
69 Gerinda dan bor beton 100 100
70 Penarik kabel 100 100
71 Alat Grouting 100 100
72 Scalping Screen 100 100
Analisa EI-221

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.2.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pasangan Batu dengan Mortar TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.0161 10,177.49 40,873.45


2. Tukang Batu (L02) jam 1.2048 14,463.20 17,425.55
3. Mandor (L03) jam 0.4016 18,034.63 7,242.82

JUMLAH HARGA TENAGA 65,541.82

B. BAHAN

1. Batu (M02) M3 1.0800 240,000.00 259,200.00


2. Semen (PC) (M12) zak 161.0000 1,412.00 227,332.00
3. Pasir (M01) M3 0.4829 167,200.00 80,736.57

JUMLAH HARGA BAHAN 567,268.57

C. PERALATAN

1. Conc. Mixer (E06) jam 0.4016 116,780.30 46,899.72


2. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 46,899.72

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 679,710.12


E. OVERHEAD & PROFIT 10.0 % x D 67,971.01
F. HARGA SATUAN PEKERJAAN ( D + E ) 747,681.13
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.1.(1) Analisa EI-211
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3

II. URUTAN KERJA


1 Penggalian dilakukan dengan menggunakan Excavator
2 Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
3 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh L 2.00 Km
4 Sekelompok pekerja akan merapikan hasil galian

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor Konversi
Waktu siklus = T1 + T2 Ts1 0.42 menit masuk dalam
- Menggali, memuat dan berputar T1 0.32 menit waktu siklus
- Lain lain T2 0.10 menit disesuaikan dgn
Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1 132.33 M3 lapangan
Ts1

Koefisien Alat / M3 = 1 : Q1 - 0.0076 Jam

2.b. DUMP TRUCK (E08)


Kaasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts2
- Muat = (V x 60)/ D x Q1 T1 0.99 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 1.00 menit
11.99 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 7.57 M3


D x Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 - 0.1321 Jam

Berlanjut ke halaman berikut


Analisa EI-211

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.1.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan SaluTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0302 10,177.49 307.65


2. Mandor (L03) jam 0.0076 18,034.63 136.29

JUMLAH HARGA TENAGA 443.94

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) jam 0.0076 573,282.37 4,332.36


2. Dump Truck (E08) jam 0.1321 313,986.72 41,476.50
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 45,808.85

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 46,252.79


E. OVERHEAD & PROFIT 10.0 % x D 4,625.28
F. HARGA SATUAN PEKERJAAN ( D + E ) 50,878.07
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.1.(1) Analisa EI-211
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang + Sapu

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 132.33 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 926.28 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0302 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0076 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 50,878.07 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
ITEM PEMBAYARAN NO. : 2.2.(1) Analisa EI-221
JENIS PEKERJAAN : Pasangan Batu dengan Mortar
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.5 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20 % Kuat Tekan min.
: - Volume Pasir Ps 80 % 50 kg/cm2
7 Perbandingan Batu & Mortar :
- Batu Bt 60 %
- Mortar (campuran semen & pasir) Mr 40 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.44 ton/M3

II. URUTAN KERJA


1 Semen, pasir dan air dicampur dan diaduk menjadi
mortar dengan menggunakan alat bantu
2 Batu dibersihkan dan dibasahi seluruh permukaannya
sebelum dipasang
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1 M3 Lepas
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 0.1120
x {D5 x (1000)} (M12) 161 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.4829 M3

2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 Liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 5.00 menit
- Mengaduk T2 3.00 menit
- Menuang T3 1.00 menit
- Menunggu, dll. T4 1.00 menit
Ts1 10.00 menit

Kap. Prod. / jam = V x Fa x 60 Q1 2.490 M3


1000 x Ts1

Koefisien Alat / M3 = 1 : Q1 (E06) 0.4016 jam

2.a. ALAT BANTU Lump Sum


Diperlukan :
- Sekop = 4 buah
- Pacul = 4 buah
- Sendok Semen = 4 buah
- Ember Cor = 8 buah
- Gerobak Dorong = 3 buah

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 2.2.(1) Analisa EI-221
JENIS PEKERJAAN : Pasangan Batu dengan Mortar
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi Pas. Batu yang menentukan( Prod. C. Mixer ) Q1 2.49 M3/Jam
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 17.43 M3

Kebutuhan tenaga : - Mandor M 1.00 orang


- Tukang Batu Tb 3.00 orang
- Pekerja P 10.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.2048 jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 747,681.13 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-231

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, d TOTAL HARGA (Rp.) : 413,030.99
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.3333 10,177.49 23,747.47


2. Tukang (L02) jam 0.9333 14,463.20 13,498.99
3. Mandor (L03) jam 0.4667 18,034.63 8,416.16

JUMLAH HARGA TENAGA 45,662.63

B. BAHAN

1. Beton K-300 (M59) M3 0.1052 0.00 0.00


2. Baja Tulangan (M39a) Kg 11.5681 13,800.00 159,640.19
3. Urugan Porus (EI-241) M3 0.1239 141,013.52 17,471.58
4. Mat. Pilihan (M09) M3 0.8128 40,600.00 32,999.27

JUMLAH HARGA BAHAN 210,111.04

C. PERALATAN

1. Tamper (E25) jam 1.0091 49,378.62 49,828.98


2. Flat Bed Truck (E11) jam 0.1439 485,585.24 69,880.07
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 119,709.05

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 375,482.71


E. OVERHEAD & PROFIT 10.0 % x D 37,548.27
F. HARGA SATUAN PEKERJAAN ( D + E ) 413,030.99
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : : 2.3.(1) Analisa EI-231
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.45 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm

II. URUTAN KERJA


1 Gorong-gorong dicetak di Base Camp
2 Flat Bed Truck mengangkut gorong-gorong jadi
ke lapangan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper
4 Tebal lapis porus pada dasar gorong-gorong pipa tp 0.10 M Sand bedding
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
7 Lebar galian rata-rata lg 1.00 M

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Untuk mendapatkan 1 M' gorong-gorong diperlukan
- Beton K-300 = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1 (EI-714) 0.1052 M3
- Baja Tulangan (asumsi 100kg/m3) (M39) 11.5681 Kg
- Timbunan Porus = {(tp*(0.3+2*tg/100+d+0.3)*1)*1.05} (EI-241) 0.1239 M3/M'
- Material Pilihan = ((2*tg/100+d+0.3)*(0.3+2*tg/100+d+0.3) (M09) 0.8128 M3/M'
-(22/7*(0.5*(2*tg/100+d))^2))*1*1.05
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 33.49 M' / Jam
n x (El-241)

Koefisien Alat / m' = 1 : Q1 (E25) 0.0299 jam

2.b. TAMPER (pemadatan timbunan) (E25)


Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Jumlah lapisan timbunan N 5 lintasan
Tebal lapis rata-rata tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 1.02 M' / Jam
n x N x (M-09)

Koefisien Alat / m' = 1 : Q1 (E25) 0.9793 jam

2.c. FLAT BED TRUCK (E11)


Kapasitas bak sekali muat V 15.00 M'
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 55.50 menit
- Waktutempuh kosong = (L : v2) x 60 T2 37.00 menit
- Muat, bongkar dan lain-lain T3 15.00 menit
Ts1 107.50 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : : 2.3.(1) Analisa EI-231
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kapasitas Produksi / Jam = V x Fa x 60 Q2 6.949 M' / Jam


Ts1

Koefisien Alat / m' = 1 : Q2 (E11) 0.1439 jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah
- Pacul = 3 buah
- Alat-alat kecil lain

3. TENAGA
Produksi Gorong-gorong / hari Qt 15.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M1 :
Pekerja = (Tk x P) : Qt (L01) 2.3333 Jam
Tukang = (Tk x T) : Qt (L02) 0.9333 Jam
Mandor = (Tk x M) : Qt (L03) 0.4667 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 413,030.99 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M'
Analisa EI-232

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 0 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.9000 10,177.49 49,869.70


2. Tukang (L02) jam 1.4000 14,463.20 20,248.48
3. Mandor (L03) jam 0.7000 18,034.63 12,624.24

JUMLAH HARGA TENAGA 82,742.42

B. BAHAN

1. Beton K-300 (M59) M3 0.1460 0.00 0.00


2. Baja Tulangan (M39) Kg 16.0606 13,800.00 221,636.38
3. Timbunan Porus (EI-241) M3 0.1449 141,013.52 20,432.86
4. Mat. Pilihan (M09) M3 1.0630 40,600.00 43,157.39

JUMLAH HARGA BAHAN 285,226.63

C. PERALATAN

1. Tamper (E25) Jam 1.3156 49,378.62 64,963.83


2. Flat Bed Truck (E11) Jam 0.2159 485,585.24 104,820.11
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 169,783.93

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 537,752.99


E. OVERHEAD & PROFIT 10.0 % x D 53,775.30
F. HARGA SATUAN PEKERJAAN ( D + E ) 591,528.29
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(2) Analisa EI-232
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.65 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm

II. URUTAN KERJA


1 Gorong-gorong dicetak di Base Camp
2 Flat Bed Truck mengangkut gorong-gorong jadi
ke lapangan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper
4 Tebal lapis porus pada dasar gorong-gorong pipa tp 0.10 M Sand bedding
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Untuk mendapatkan 1 M' gorong-gorong diperlukan
- Beton K-300 = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1 (EI-714) 0.1460 M3/M'
- Baja Tulangan (asumsi 100kg/m3) (M39) 16.0606 Kg/M'
- Timbunan Porus = {(tp*(0.3+2*tg/100+d+0.3)*1)*1.05} (EI-241) 0.1449 M3/M'
- Material Pilihan = ((2*tg/100+d+0.3)*(0.3+2*tg/100+d+0.3) (M09) 1.0630 M3/M'
-(22/7*(0.5*(2*tg/100+d))^2))*1*1.05
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 28.64 M' / Jam
n x (El-241)

Koefisien Alat / m' = 1 : Q1 (E25) 0.0349 jam

2.b. TAMPER (pemadatan timbunan) (E25)


Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Jumlah lapisan timbunan N 5 lintasan
Tebal lapis rata-rata tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 0.78 M' / Jam
n x N x (M-09)

Koefisien Alat / m' = 1 : Q1 (E25) 1.2807 jam

2.c. FLAT BED TRUCK (E11)


Kapasitas bak sekali muat V 10.00 M'
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts
- Waktu tempuh isi = (L : v1 ) x 60 T1 55.50 menit
- Waktutempuh kosong = (L : v2) x 60 T2 37.00 menit
- Muat, bongkar dan lain-lain T3 15.00 menit
Ts 107.50 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 2.3.(2) 490 Analisa EI-232
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kapasitas Produksi / Jam = V x Fa x 60 Q2 4.6326 M' / Jam


Ts

Koefisien Alat / m' = 1 : Q2 (E11) 0.2159 jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah
- Pacul = 3 buah
- Alat-alat kecil lain

3. TENAGA
Produksi Gorong-gorong / hari Qt 10.00 M'
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Tukang T 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M' :


- Pekerja = (Tk x P) : Qt (L01) 4.9000 jam
- Tukang = (Tk x T) : Qt (L02) 1.4000 jam
- Mandor = (Tk x M) : Qt (L03) 0.7000 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 591,528.29 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M'
Analisa EI-233

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, d TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000 10,177.49 142,484.85


2. Tukang (L02) Jam 1.7500 14,463.20 25,310.61
3. Mandor (L03) Jam 1.7500 18,034.63 31,560.61

JUMLAH HARGA TENAGA 199,356.06

B. BAHAN

1. Beton K-300 (M59) M3 0.2897 0.00 0.00


2. Baja Tulangan (M39) Kg 31.8707 13,800.00 439,815.27
3. Urugan Porus (EI-241) M3 0.3103 141,013.52 43,752.97
4. Mat. Pilihan (M09) M3 1.9114 40,600.00 77,600.91

JUMLAH HARGA BAHAN 561,169.16

C. PERALATAN

1. Tamper (E25) Jam 2.3776 49,378.62 117,402.58


2. Flat Bed Truck (E11) Jam 0.5397 485,585.24 262,050.27
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 379,452.85

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,139,978.07


E. OVERHEAD & PROFIT 10.0 % x D 113,997.81
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,253,975.88
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(3) Analisa EI-233
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 1.00 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 8.50 Cm

II. URUTAN KERJA


1 Gorong-gorong dicetak di Base Camp
2 Flat Bed Truck mengangkut gorong-gorong jadi
ke lapangan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper
4 Tebal lapis porus pada dasar gorong-gorong pipa tp 0.15 M Sand bedding
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Untuk mendapatkan 1 M' gorong-gorong diperlukan
- Beton K-300 = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1 (EI-714) 0.2897 M3
- Baja Tulangan (asumsi 100kg/m3) (M39) 31.8707 Kg
- Timbunan Porus = {(tp*(0.4+2*tg/100+d+0.4)*1)*1.05} (EI-241) 0.3103 M3
- Material Pilihan = ((2*tg/100+d+0.3)*(0.4+2*tg/100+d+0.4) (M09) 1.9114 M3
-(22/7*(0.5*(2*tg/100+d))^2))*1*1.05
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 13.38 M' / Jam
n x (El-241)

Koefisien Alat / m' = 1 : Q1 (E25) 0.0748 jam

2.b. TAMPER (pemadatan timbunan) (E25)


Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Jumlah lapisan timbunan N 5 lintasan
Tebal lapis rata-rata tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 0.43 M' / Jam
n x N x (M-09)

Koefisien Alat / m' = 1 : Q1 (E25) 2.3028 jam

2.c. FLAT BED TRUCK (E11)


Kapasitas bak sekali muat V 4.00 M'
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts
- Waktu tempuh isi = (L : v1 ) x 60 T1 55.50 menit
- Waktutempuh kosong = (L : v2) x 60 T2 37.00 menit
- Muat, bongkar dan lain-lain T3 15.00 menit
Ts 107.50 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 2.3.(3) Analisa EI-233
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.8530 M' / Jam


Ts

Koefisien Alat / m' = 1 : Q2 (E11) 0.5397 jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil
- Sekop = 3 buah
- Pacul = 3 buah
- Alat-alat kecil lain

3. TENAGA
Produksi Gorong-gorong / hari Qt 4.00 M'
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M' :


- Pekerja = (Tk x P) : Qt (L01) 14.0000 jam
- Tukang = (Tk x T) : Qt (L02) 1.7500 jam
- Mandor = (Tk x M) : Qt (L03) 1.7500 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,253,975.88 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M'
Analisa EI-234

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, d TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000 10,177.49 142,484.85


2. Tukang (L02) Jam 1.7500 14,463.20 25,310.61
3. Mandor (L03) Jam 1.7500 18,034.63 31,560.61

JUMLAH HARGA TENAGA 199,356.06

B. BAHAN

1. Beton K-300 (M59) M3 0.4084 0.00 0.00


2. Baja Tulangan (M39) Kg 44.9248 13,800.00 619,961.89
3. Urugan Porus (EI-241) M3 0.4158 141,013.52 58,633.42
4. Mat. Pilihan (M09) M3 2.3100 40,600.00 93,786.00

JUMLAH HARGA BAHAN 772,381.32

C. PERALATAN

1. Tamper (E25) Jam 2.8833 49,378.62 142,374.63


2. Flat Bed Truck (E11) Jam 0.5397 485,585.24 262,050.27
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 404,424.90

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,376,162.28


E. OVERHEAD & PROFIT 10.0 % x D 137,616.23
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,513,778.51
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(4) Analisa EI-234
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 1.20 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 10.00 Cm

II. URUTAN KERJA


1 Gorong-gorong dicetak di Base Camp
2 Flat Bed Truck mengangkut gorong-gorong jadi
ke lapangan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper
4 Tebal lapis porus pada dasar gorong-gorong pipa tp 0.18 M Sand bedding
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Untuk mendapatkan 1 M' gorong-gorong diperlukan
- Beton K-300 = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1 (EI-714) 0.4084 M3/M'
- Baja Tulangan (asumsi 100kg/m3) (M39) 44.9248 Kg/M'
- Timbunan Porus = {(tp*(0.4+2*tg/100+d+0.4)*1)*1.05} (EI-241) 0.4158 M3/M'
- Material Pilihan = ((2*tg/100+d+0.3)*(0.4+2*tg/100+d+0.4) (M09) 2.3100 M3/M' = Vp
-(22/7*(0.5*(2*tg/100+d))^2))*1*1.05
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 9.98 M' / Jam
n x (El-241)

Koefisien Alat / m' = 1 : Q1 (E25) 0.1002 jam

2.b. TAMPER (pemadatan timbunan) (E25)


Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Jumlah lapisan timbunan N 5 lintasan
Tebal lapis rata-rata tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 0.36 M' / Jam
n x N x (M-09)

Koefisien Alat / m' = 1 : Q1 (E25) 2.7831 jam

2.c. FLAT BED TRUCK (E11)


Kapasitas bak sekali muat V 4.00 M'
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts
- Waktu tempuh isi = (L : v1 ) x 60 T1 55.50 menit
- Waktutempuh kosong = (L : v2) x 60 T2 37.00 menit
- Muat, bongkar dan lain-lain T3 15.00 menit
Ts 107.50 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 2.3.(4) Analisa EI-234
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.8530 M' / Jam


Ts

Koefisien Alat / m' = 1 : Q2 (E08) 0.5397 jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah
- Pacul = 3 buah
- Alat-alat kecil lain

3. TENAGA
Produksi Gorong-gorong / hari Qt 4.00 M'
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M' :


- Pekerja = (Tk x P) : Qt (L01) 14.0000 jam
- Tukang = (Tk x T) : Qt (L02) 1.7500 jam
- Mandor = (Tk x M) : Qt (L03) 1.7500 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,513,778.51 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M'
Analisa EI-235

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Gorong2 Pipa Baja Bergelombang TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 64.6154 10,177.49 657,622.38


2. Tukang (L02) Jam 5.3846 14,463.20 77,878.79
3. Mandor (L03) Jam 5.3846 18,034.63 97,109.56

JUMLAH HARGA TENAGA 832,610.72

B. BAHAN

1. Pipa Baja Glb. (M46) Kg 1,050.00 0.00 0.00


2. Urugan Porus (EI-241) M3 8.0351 141,013.52 1,133,057.74
3. Mat. Pilihan (M09) M3 2.5374 40,600.00 103,017.80

JUMLAH HARGA BAHAN 1,236,075.54

C. PERALATAN

1. Tamper (E25) Jam 2.3781 49,378.62 117,429.54


2. Alat Bantu Ls 1.0000 0.00 0.00
,

JUMLAH HARGA PERALATAN 117,429.54

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,186,115.80


E. OVERHEAD & PROFIT 10.0 % x D 218,611.58
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,404,727.38
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(5) Analisa EI-235
JENIS PEKERJAAN : Gorong2 Pipa Baja Bergelombang
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter dalam gorong-gorong baja d 1.00 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 0.25 Cm
7 BJ Pipa Baja Bergelombang BJp 7.90 T/m3
BJp1 0.12445 T/m'
II. URUTAN KERJA
1 Gorong-gorong baja diterima dari pemasok
di lokasi pekerjaan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper
4 Tebal lapis porus pada dasar gorong-gorong baja tp 0.15 M
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Pipa Baja Gelombang 1 x 1.05 x 1000
Untuk mendapatkan 1 ton gorong gorong diperlukan (M46) 1,050.00 Kg
- Panjang Baja Bergelombang = 1 ton/BJp1 Pbb 8.0351 M'/T
- Urugan Porus = {(tp*(0.5+2*tg/100+d+0.5)*1)*1.05} x Pbb (EI-241) 2.5374 M3/T
- Mat. Pilihan = {((2*tg/100+d+0.5)*(0.5+2*tg/100+d+0.5) (M09) 18.7630 M3/T
-(22/7*(0.5*(2*tg/100+d))^2)*1)*1.05} x Pbb

2. ALAT
2.a. TAMPER (untuk pemadatan lapis dasar) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.15 M

Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 2.4533 ton / Jam


n x (EL-241)

Koefisien Alat / T = 1 : Q1 (E25) 0.4076 jam

2.b. TAMPER (untuk pemadatan timbunan) (E25)


Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Jumlah lapisan timbunan N 5 lapis
Tebal lapisan rata-rata tp 0.15 M

Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 0.5075 ton / Jam


n x N x (M-09)

Koefisien Alat / T = 1 : Q1 (E25) 1.9705 jam

2.c. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah
- Pacul = 3 buah
- Alat-alat kecil lain

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 2.3.(5) Analisa EI-235
JENIS PEKERJAAN : Gorong2 Pipa Baja Bergelombang
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi Gorong-gorong / hari Qt 1.30 Ton 10.00
M' per hari
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / Ton :


- Pekerja = (Tk x P) : Qt (L01) 64.6154 jam
- Tukang = (Tk x T) : Qt (L02) 5.3846 jam
- Mandor = (Tk x M) : Qt (L03) 5.3846 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 2,404,727 / ton

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 ton
Analisa EI-236
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(6) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa TulanTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : 2.3.(6) 0 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.7500 10,177.49 17,810.61


2. Tukang (L02) jam 0.0000 14,463.20 0.00
3. Mandor (L03) jam 0.3500 18,034.63 6,312.12

JUMLAH HARGA TENAGA 24,122.73

B. BAHAN

1. Beton K-175 (EI-716) M3 0.0541 0.00 0.00


2. Urugan Porus (EI-241) M3 0.0662 141,013.52 9,328.04
3. Mat. Pilihan (M09) M3 0.2277 40,600.00 9,243.71

JUMLAH HARGA BAHAN 18,571.75

C. PERALATAN

1. Tamper (E25) jam 0.0036 49,378.62 179.20


2. Tamper (E25) jam 0.2743 49,378.62 13,545.06
3 Flat Bed Truck (E11) jam 0.1130 485,585.24 54,847.73
4 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 68,571.99

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 111,266.47


E. OVERHEAD & PROFIT 10.0 % x D 11,126.65
F. HARGA SATUAN PEKERJAAN ( D + E ) 122,393.12
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(6) Analisa EI-236
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm
SATUAN PEMBAYARAN : 2.3.(6) URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.20 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm

II. URUTAN KERJA


1 Gorong-gorong dicetak di Base Camp
2 Flat Bed Truck mengangkut gorong-gorong jadi
ke lapangan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper + Rammer
4 Tebal lapis porus pada dasar gorong-gorong pipa baja tp 0.10 M Sand bedding
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Untuk mendapatkan 1 M' gorong-gorong diperlukan
- Beton K-175 = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1 (EI-716) 0.0541 M3/M'
- Timbunan Porus = {(tp*(0.15+2*tg/100+d+0.15)*1)*1.05} (EI-241) 0.0662 M3/M'
- Material Pilihan = ((2*tg/100+d+0.15)*(0.15+2*tg/100+d+0.15) (M09) 0.2277 M3/M'
-(22/7*(0.5*(2*tg/100+d))^2))*1*1.05

2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00 Km / Jam Diperhitungkan
Efisiensi alat Fa 0.83 - hanya tamper
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M

Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 62.7362 M' / Jam


n x (El241)

Koefisien Alat / m' = 1 : Q1 x Vp (E25) 0.0036 jam

2.b. TAMPER (Material pilihan) (E25)


Kecepatan v 1.00 Km / Jam Diperhitungkan
Efisiensi alat Fa 0.83 - hanya tamper
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Jumlah lapisan timbunan N 5
Tebal lapis hamparan tp 0.10 M

Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 3.6455 M3 / Jam


n x N x (M09)

Koefisien Alat / m' = 1 : Q1 x Vp (E25) 0.2743 jam

2.c. FLAT BED TRUCK (E11)


Kapasitas bak sekali muat V 20.00 M'
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 55.50 menit
- Waktutempuh kosong = (L : v2) x 60 T2 37.00 menit
- Muat, bongkar dan lain-lain T3 20.00 menit
Ts1 112.50 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 8.853 M' / Jam


Ts1

Koefisien Alat / m' = 1 : Q2 (E08) 0.1130 jam


Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 2.3.(6) Analisa EI-236
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm
SATUAN PEMBAYARAN : 2.3.(6) URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah
- Pacul = 3 buah
- Alat-alat kecil lain

3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T 0.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.7500 Jam
- Tukang = (Tk x T) : Qt (L02) 0.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 122,393.12 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M'
Analisa EI-237
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa TulanTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 0 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.7500 10,177.49 17,810.61


2. Tukang (L02) jam 0.0000 14,463.20 0.00
3. Mandor (L03) jam 0.3500 18,034.63 6,312.12

JUMLAH HARGA TENAGA 24,122.73

B. BAHAN

1. Beton K-175 (EI-716) M3 0.0643 0.00 0.00


2. Urugan Porus (EI-241) M3 0.0714 141,013.52 10,068.37
3. Mat. Pilihan (M09) M3 0.2593 40,600.00 10,527.17

JUMLAH HARGA BAHAN 20,595.54

C. PERALATAN

1. Tamper (E25) jam 0.0045 49,378.62 220.28


2. Tamper (E25) jam 0.3124 49,378.62 15,425.76
3 Flat Bed Truck (E11) jam 0.1130 485,585.24 54,847.73
4 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 70,493.77

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 115,212.04


E. OVERHEAD & PROFIT 10.0 % x D 11,521.20
F. HARGA SATUAN PEKERJAAN ( D + E ) 126,733.24
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(7) Analisa EI-237
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.25 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm

II. URUTAN KERJA


1 Gorong-gorong dicetak di Base Camp
2 Flat Bed Truck mengangkut gorong-gorong jadi
ke lapangan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper + Rammer
4 Tebal lapis porus pada dasar gorong-gorong pipa baja tp 0.10 M Sand bedding
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Untuk mendapatkan 1 M' gorong-gorong diperlukan
- Beton K-175 = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1 (EI-716) 0.0643 M3/M'
- Timbunan Porus = {(tp*(0.15+2*tg/100+d+0.15)*1)*1.05} (EI-241) 0.0714 M3/M'
- Material Pilihan = ((2*tg/100+d+0.15)*(0.15+2*tg/100+d+0.15) (M09) 0.2593 M3/M'
-(22/7*(0.5*(2*tg/100+d))^2))*1*1.05

2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00 Km / Jam Diperhitungkan
Efisiensi alat Fa 0.83 - hanya tamper
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M

Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 58.1232 M' / Jam


n x (El241)

Koefisien Alat / m' = 1 : Q1 x Vp (E25) 0.0045 jam

2.b. TAMPER (Material pilihan) (E25)


Kecepatan v 1.00 Km / Jam Diperhitungkan
Efisiensi alat Fa 0.83 - hanya tamper
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Jumlah lapisan timbunan N 5
Tebal lapis hamparan tp 0.10 M

Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 3.2010 M3 / Jam


n x N x (M09)

Koefisien Alat / m' = 1 : Q1 x Vp (E25) 0.3124 jam

2.c. FLAT BED TRUCK (E11)


Kapasitas bak sekali muat V 20.00 M'
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 55.50 menit
- Waktutempuh kosong = (L : v2) x 60 T2 37.00 menit
- Muat, bongkar dan lain-lain T3 20.00 menit
Ts1 112.50 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 8.853 M' / Jam


Ts1

Koefisien Alat / m' = 1 : Q2 (E08) 0.1130 jam


Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 2.3.(7) Analisa EI-237
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah
- Pacul = 3 buah
- Alat-alat kecil lain

3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T 0.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.7500 Jam
- Tukang = (Tk x T) : Qt (L02) 0.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 126,733.24 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M'
Analisa EI-238
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa TulanTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 0 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.7500 10,177.49 17,810.61


2. Tukang (L02) jam 0.0000 14,463.20 0.00
3. Mandor (L03) jam 0.3500 18,034.63 6,312.12

JUMLAH HARGA TENAGA 24,122.73

B. BAHAN

1. Beton K-175 (EI-716) M3 0.0745 0.00 0.00


2. Urugan Porus (EI-241) M3 0.0767 141,013.52 10,808.69
3. Mat. Pilihan (M09) M3 0.2920 40,600.00 11,856.32

JUMLAH HARGA BAHAN 22,665.00

C. PERALATAN

1. Tamper (E25) jam 0.0054 49,378.62 266.33


2. Tamper (E25) jam 0.3518 49,378.62 17,373.39
3 Flat Bed Truck (E11) jam 0.1130 485,585.24 54,847.73
4 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 72,487.46

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 119,275.19


E. OVERHEAD & PROFIT 10.0 % x D 11,927.52
F. HARGA SATUAN PEKERJAAN ( D + E ) 131,202.71
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(8) Analisa EI-238
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.30 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm

II. URUTAN KERJA


1 Gorong-gorong dicetak di Base Camp
2 Flat Bed Truck mengangkut gorong-gorong jadi
ke lapangan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper + Rammer
4 Tebal lapis porus pada dasar gorong-gorong pipa baja tp 0.10 M Sand bedding
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Untuk mendapatkan 1 M' gorong-gorong diperlukan
- Beton K-175 = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1 (EI-716) 0.0745 M3/M'
- Timbunan Porus = {(tp*(0.15+2*tg/100+d+0.15)*1)*1.05} (EI-241) 0.0767 M3/M'
- Material Pilihan = ((2*tg/100+d+0.15)*(0.15+2*tg/100+d+0.15) (M09) 0.2920 M3/M'
-(22/7*(0.5*(2*tg/100+d))^2))*1*1.05

2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00 Km / Jam Diperhitungkan
Efisiensi alat Fa 0.83 - hanya tamper
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M

Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 54.1422 M' / Jam


n x (El241)

Koefisien Alat / m' = 1 : Q1 x Vp (E25) 0.0054 jam

2.b. TAMPER (Material pilihan) (E25)


Kecepatan v 1.00 Km / Jam Diperhitungkan
Efisiensi alat Fa 0.83 - hanya tamper
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Jumlah lapisan timbunan N 5
Tebal lapis hamparan tp 0.10 M

Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 2.8422 M3 / Jam


n x N x (M09)

Koefisien Alat / m' = 1 : Q1 x Vp (E25) 0.3518 jam

2.c. FLAT BED TRUCK (E11)


Kapasitas bak sekali muat V 20.00 M'
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 55.50 menit
- Waktutempuh kosong = (L : v2) x 60 T2 37.00 menit
- Muat, bongkar dan lain-lain T3 20.00 menit
Ts1 112.50 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 8.853 M' / Jam


Ts1

Koefisien Alat / m' = 1 : Q2 (E08) 0.1130 jam


Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 2.3.(8) Analisa EI-238
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah
- Pacul = 3 buah
- Alat-alat kecil lain

3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T 0.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.7500 Jam
- Tukang = (Tk x T) : Qt (L02) 0.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 131,202.71 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M'
Analisa LI - 239

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK
No. PAKET KONTRAK
NAMA PAKET

PROP / KAB / KODYA


ITEM PEMBAYARAN NO. : 2.3.(9) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 1 TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 4.0161 10,177.49 40,873.45


2. Tukang (L02) Jam 0.8032 14,463.20 11,617.03
3. Mandor (L03) Jam 0.1147 18,034.63 2,069.38

Sub Total Tenaga 54,559.86

B. MATERIAL

1. Semen Kg 370.8000 1,412.00 523,569.60


2. Pasir Beton M3 0.5250 174,200.00 91,455.00
3. Aggregat Kasar M3 0.7425 0.00 0.00
5. Formworks Ls 0.2000 45,000.00 9,000.00
6 Paku Kg 1.2000 18,000.00 21,600.00
7 Besi Beton Kg 45.0000 0.00 0.00
8 Kawat beton Kg 0.0250 20,500.00 512.50
Sub Total Material 646,137.10

C. PERALATAN

1. Beton Mixer (E06) Jam 0.4016 116,780.30 46,899.72


2. Water Tanker (E23) Jam 0.0558 288,193.65 16,093.71
3. Concrete Vibrator (E20) Jam 0.4016 51,478.62 20,674.15
4. Alat Bantu Ls 1.0000 0.00 0.00

Sub Total Peralatan 83,667.57

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 784,364.53


E. OVERHEAD & PROFIT 10.0 % x D 78,436.45
F. TOTAL HARGA PEKERJAAN ( D + E ) 862,800.98
G. HARGA SATUAN ( D + E ) Per Meter 246,515.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(9) Analisa LI - 239
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 1
SATUAN PEMBAYARAN : M1

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base
Camp seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Maksimum ukuran agregat Ag 19 mm
8 Perbandingan Air dengan Semen Wcr 0.50 -
9 Perbandingan Campuran : Semen Sm 360.0 Kg/M3 Sesuai JMF
: Pasir Ps 650.0 Kg/M3
: Agregat Kasar Kr 990.0 Kg/M3
10 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
11 Berat Isi : - Beton D1 2.40 Ton/M3
- Semen D2 1.25 Ton/M3
- Pasir D3 1.30 Ton/M3
- Agregat Kasar D4 1.40 Ton/M3

II. URUTAN KERJA


1 Galian lokasi saluran sesuai elevasi dan dimensi rencana
2 Semen, pasir, agregat dan air diaduk dengan komposisi
sesuai rancangan mutu dengan menggunakan beton mixer
3 Beton di-cor ke dalam bekisting dan diratakan dg vibrator
4 Penyelesaian dan perapihan setelah pengecoran

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Panjang Saluran dengan Volume Beton per M3 3.50 Ln.m Lihat Gambar
1.a. Semen Sm x 1.03 (M12) 370.800 Kg sesuai dimensi
1.b. Pasir Beton (Ps/1000 : D3) x 1.05 (M01) 0.5250 M3
1.c. Aggregat Kasar (Kr/1000 : D4) x 1.05 (M03) 0.7425 M3
1.d. Formworks (M19) 0.2000 Ls
1.e. Paku (M18) 1.2000 Kg
1.f. Besi Beton (M57a) 45.0000 Kg Lihat Gambar
1.g. Kawat beton (M14) 0.0250 Kg
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 5.00 Menit
- Mengaduk T2 3.00 Menit
- Menuang T3 1.00 Menit
- Tunggu, dll. T4 1.00 Menit
Ts 10.00 Menit

Kap. Prod. / jam = V x Fa x 60 Q1 2.490 M3


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.4016 Jam

Berlanjut ke halaman berikut


PAY ITEM NUMBER : 2.3.(9) Analisa LI - 239
WORK ITEM : Saluran berbentuk U Tipe DS 1
UNIT : M1 0
next page

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air n 1.00 Kali

Kap. Prod. / jam = V x Fa x n Q2 17.91 M3


Wc

Koefisien Alat / M3 = 1 : Q2 (E23) 0.0558 Jam

2.c. CONCRETE VIBRATOR (E20)


Penggunaan concrete vibrator sesuai dengan kapasitas
produksi beton yang diperlukan dalam pengecoran

Kap. Prod. / jam = Prod.Ca./hour Concrete Mixer Q3 2.490 M3

Koefisien Alat / M3 = 1 : Q3 (E20) 0.4016 Jam

2.c. ALAT BANTU


Alat bantu yang diperlukan
- Sekop = 2 each
- Pacul = 2 each
- Sendok Semen = 2 each
- Ember = 4 each
- Gerobak Dorong = 1 each

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43 M3

Kebutuhan tenaga : - Mandor M 1.00 Orang


- Tukang : Tb 2.00 Orang
- Pekerja P 10.00 Orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1147 Jam
- Tukang = (Tk x Tb) : Qt (L02) 0.8032 Jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

continued
PAY ITEM NUMBER : 2.3.(9) Analisa LI - 239
WORK ITEM : Saluran berbentuk U Tipe DS 1
UNIT : M1 0
next page

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Didapat Harga Satuan Pekerjaan :

Rupiah 246,515.00 / M1

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : Bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : M1
Analisa LI - 2310

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK
No. PAKET KONTRAK
NAMA PAKET

PROP / KAB / KODYA


ITEM PEMBAYARAN NO. : 2.3.(10) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 2 TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 4.0161 10,177.49 40,873.45


2. Tukang (L02) Jam 0.8032 14,463.20 11,617.03
3. Mandor (L03) Jam 0.1147 18,034.63 2,069.38

Sub Total Tenaga 54,559.86

B. MATERIAL

1. Semen Kg 370.8000 1,412.00 523,569.60


2. Pasir Beton M3 0.5250 174,200.00 91,455.00
3. Aggregat Kasar M3 0.7425 0.00 0.00
5. Formworks Ls 0.2000 45,000.00 9,000.00
6 Paku Kg 1.2000 18,000.00 21,600.00
7 Besi Beton Kg 45.0000 0.00 0.00
8 Kawat beton Kg 0.0250 20,500.00 512.50
Sub Total Material 646,137.10

C. PERALATAN

1. Beton Mixer (E06) Jam 0.4016 116,780.30 46,899.72


2. Water Tanker (E23) Jam 0.0558 288,193.65 16,093.71
3. Concrete Vibrator (E20) Jam 0.4016 51,478.62 20,674.15
4. Alat Bantu Ls 1.0000 0.00 0.00

Sub Total Peralatan 83,667.57

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 784,364.53


E. OVERHEAD & PROFIT 10.0 % x D 78,436.45
F. TOTAL HARGA PEKERJAAN ( D + E ) 862,800.98
G. HARGA SATUAN ( D + E ) Per Meter 287,600.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(10) Analisa LI - 2310
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 2
SATUAN PEMBAYARAN : M1

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base
Camp seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Maksimum ukuran agregat Ag 19 mm
8 Perbandingan Air dengan Semen Wcr 0.50 -
9 Perbandingan Campuran : Semen Sm 360.0 Kg/M3 Sesuai JMF
: Pasir Ps 650.0 Kg/M3
: Agregat Kasar Kr 990.0 Kg/M3
10 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
11 Berat Isi :
- Beton D1 2.40 Ton/M3
- Semen D2 1.25 Ton/M3
- Pasir D3 1.30 Ton/M3
- Agregat Kasar D4 1.40 Ton/M3

II. URUTAN KERJA


1 Galian lokasi saluran sesuai elevasi dan dimensi rencana
2 Semen, pasir, agregat dan air diaduk dengan komposisi
sesuai rancangan mutu dengan menggunakan beton mixer
3 Beton di-cor ke dalam bekisting dan diratakan dg vibrator
4 Penyelesaian dan perapihan setelah pengecoran

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Panjang Saluran dengan Volume Beton per M3 3.00 M' Lihat Gambar
1.a. Semen Sm x 1.03 (M12) 370.800 Kg sesuai dimensi
1.b. Pasir Beton (Ps/1000 : D3) x 1.05 (M01) 0.5250 M3
1.c. Aggregat Kasar (Kr/1000 : D4) x 1.05 (M03) 0.7425 M3
1.d. Formworks (M19) 0.2000 Ls
1.e. Paku (M18) 1.2000 Kg
1.f. Besi Beton (M57a) 45.0000 Kg Lihat Gambar
1.g. Kawat beton (M14) 0.0250 Kg Lihat Gambar
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 5.00 Menit
- Mengaduk T2 3.00 Menit
- Menuang T3 1.00 Menit
- Tunggu, dll. T4 1.00 Menit
Ts 10.00 Menit

Kap. Prod. / jam = V x Fa x 60 Q1 2.490 M3


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.4016 Jam

Berlanjut ke halaman berikut


PAY ITEM NUMBER : 2.3.(10) Analisa LI - 2310
WORK ITEM : Saluran berbentuk U Tipe DS 2
UNIT : M1 0
next page

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air n 1.00 Kali

Kap. Prod. / jam = V x Fa x n Q2 17.91 M3


Wc

Koefisien Alat / M3 = 1 : Q2 (E23) 0.0558 Jam

2.c. CONCRETE VIBRATOR (E20)


Penggunaan concrete vibrator sesuai dengan kapasitas
produksi beton yang diperlukan dalam pengecoran

Kap. Prod. / jam = Prod.Ca./hour Concrete Mixer Q3 2.490 M3

Koefisien Alat / M3 = 1 : Q3 (E20) 0.4016 Jam

2.c. ALAT BANTU


Alat bantu yang diperlukan
- Sekop = 2 each
- Pacul = 2 each
- Sendok Semen = 2 each
- Ember = 4 each
- Gerobak Dorong = 1 each

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43 M3

Kebutuhan tenaga : - Mandor M 1.00 Orang


- Tukang : Tb 2.00 Orang
- Pekerja P 10.00 Orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1147 Jam
- Tukang = (Tk x Tb) : Qt (L02) 0.8032 Jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

continued
PAY ITEM NUMBER : 2.3.(10) Analisa LI - 2310
WORK ITEM : Saluran berbentuk U Tipe DS 2
UNIT : M1
next page

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Didapat Harga Satuan Pekerjaan :

Rupiah 287,600.00 / M1

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : Bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : M1
Analisa LI - 2311

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK
No. PAKET KONTRAK
NAMA PAKET

PROP / KAB / KODYA


ITEM PEMBAYARAN NO. : 2.3.(11) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 3 TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 4.0161 10,177.49 40,873.45


2. Tukang (L02) Jam 0.8032 14,463.20 11,617.03
3. Mandor (L03) Jam 0.1147 18,034.63 2,069.38

Sub Total Tenaga 54,559.86

B. MATERIAL

1. Semen Kg 370.8000 1,412.00 523,569.60


2. Pasir Beton M3 0.5250 174,200.00 91,455.00
3. Aggregat Kasar M3 0.7425 0.00 0.00
5. Formworks Ls 0.2000 45,000.00 9,000.00
6 Paku Kg 1.2000 18,000.00 21,600.00
7 Besi Beton Kg 45.0000 0.00 0.00
8 Kawat beton Kg 0.0250 20,500.00 512.50
Sub Total Material 646,137.10

C. PERALATAN

1. Beton Mixer (E06) Jam 0.4016 116,780.30 46,899.72


2. Water Tanker (E23) Jam 0.0558 288,193.65 16,093.71
3. Concrete Vibrator (E20) Jam 0.4016 51,478.62 20,674.15
4. Alat Bantu Ls 1.0000 0.00 0.00

Sub Total Peralatan 83,667.57

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 784,364.53


E. OVERHEAD & PROFIT 10.0 % x D 78,436.45
F. TOTAL HARGA PEKERJAAN ( D + E ) 862,800.98
G. HARGA SATUAN ( D + E ) Per Meter 345,120.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(11) Analisa LI - 2311
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 3
SATUAN PEMBAYARAN : M1

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base
Camp seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Maksimum ukuran agregat Ag 19 mm
8 Perbandingan Air dengan Semen Wcr 0.50 -
9 Perbandingan Campuran : Semen Sm 360.0 Kg/M3 Sesuai JMF
: Pasir Ps 650.0 Kg/M3
: Agregat Kasar Kr 990.0 Kg/M3
10 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
11 Berat Isi : - Beton D1 2.40 Ton/M3
- Semen D2 1.25 Ton/M3
- Pasir D3 1.30 Ton/M3
- Agregat Kasar D4 1.40 Ton/M3

II. URUTAN KERJA


1 Galian lokasi saluran sesuai elevasi dan dimensi rencana
2 Semen, pasir, agregat dan air diaduk dengan komposisi
sesuai rancangan mutu dengan menggunakan beton mixer
3 Beton di-cor ke dalam bekisting dan diratakan dg vibrator
4 Penyelesaian dan perapihan setelah pengecoran

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Panjang Saluran dengan Volume Beton per M3 2.5000 Ln.m Lihat Gambar
1.a. Semen Sm x 1.03 (M12) 370.800 Kg sesuai dimensi
1.b. Pasir Beton (Ps/1000 : D3) x 1.05 (M01) 0.5250 M3
1.c. Aggregat Kasar (Kr/1000 : D4) x 1.05 (M03) 0.7425 M3
1.d. Formworks (M19) 0.2000 Ls
1.e. Paku (M18) 1.2000 Kg
1.f. Besi Beton (M57a) 45.0000 Kg Lihat Gambar
1.g. Kawat beton (M14) 0.0250 Kg
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 5.00 Menit
- Mengaduk T2 3.00 Menit
- Menuang T3 1.00 Menit
- Tunggu, dll. T4 1.00 Menit
Ts 10.00 Menit

Kap. Prod. / jam = V x Fa x 60 Q1 2.490 M3


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.4016 Jam

Berlanjut ke halaman berikut


PAY ITEM NUMBER : 2.3.(11) Analisa LI - 2311
WORK ITEM : Saluran berbentuk U Tipe DS 3
UNIT : M1 0
next page

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air n 1.00 Kali

Kap. Prod. / jam = V x Fa x n Q2 17.91 M3


Wc

Koefisien Alat / M3 = 1 : Q2 (E23) 0.0558 Jam

2.c. CONCRETE VIBRATOR (E20)


Penggunaan concrete vibrator sesuai dengan kapasitas
produksi beton yang diperlukan dalam pengecoran

Kap. Prod. / jam = Prod.Ca./hour Concrete Mixer Q3 2.490 M3

Koefisien Alat / M3 = 1 : Q3 (E20) 0.4016 Jam

2.c. ALAT BANTU


Alat bantu yang diperlukan
- Sekop = 2 each
- Pacul = 2 each
- Sendok Semen = 2 each
- Ember = 4 each
- Gerobak Dorong = 1 each

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43 M3

Kebutuhan tenaga : - Mandor M 1.00 Orang


- Tukang : Tb 2.00 Orang
- Pekerja P 10.00 Orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1147 Jam
- Tukang = (Tk x Tb) : Qt (L02) 0.8032 Jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

continued
PAY ITEM NUMBER : 2.3.(11) Analisa LI - 2311
WORK ITEM : Saluran berbentuk U Tipe DS 3
UNIT : M1 0
next page

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Didapat Harga Satuan Pekerjaan :

Rupiah 345,120.00 / M1

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : Bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : M1
Analisa LI - 2312

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK
No. PAKET KONTRAK
NAMA PAKET

PROP / KAB / KODYA


ITEM PEMBAYARAN NO. : 2.3.(12) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Beton K250 (fc’ 20) untuk struktur TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 4.0161 10,177.49 40,873.45


2. Tukang (L02) Jam 0.8032 14,463.20 11,617.03
3. Mandor (L03) Jam 0.1147 18,034.63 2,069.38

Sub Total Tenaga 54,559.86

B. MATERIAL

1. Semen Kg 370.8000 1,412.00 523,569.60


2. Pasir Beton M3 0.5250 174,200.00 91,455.00
3. Aggregat Kasar M3 0.7425 0.00 0.00
5. Formworks Ls 0.2000 45,000.00 9,000.00
6 Paku Kg 1.2000 18,000.00 21,600.00
7 Besi Beton Kg 45.0000 0.00 0.00

Sub Total Material 645,624.60

C. PERALATAN

1. Beton Mixer (E06) Jam 0.4016 116,780.30 46,899.72


2. Water Tanker (E23) Jam 0.0558 288,193.65 16,093.71
3. Concrete Vibrator (E20) Jam 0.4016 51,478.62 20,674.15
4. Alat Bantu Ls 1.0000 0.00 0.00

Sub Total Peralatan 83,667.57

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 783,852.03


E. OVERHEAD & PROFIT 10.0 % x D 78,385.20
F. HARGA SATUAN PEKERJAAN ( D + E ) 862,237.23

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(12) Analisa LI - 2312
JENIS PEKERJAAN : Beton K250 (fc’ 20) untuk struktur drainase beton minor
SATUAN PEMBAYARAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base
Camp seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Maksimum ukuran agregat Ag 19 mm
8 Perbandingan Air dengan Semen Wcr 0.50 -
9 Perbandingan Campuran : Semen Sm 360.0 Kg/M3 Sesuai JMF
: Pasir Ps 650.0 Kg/M3
: Agregat Kasar Kr 990.0 Kg/M3
10 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
11 Berat Isi : - Beton D1 2.40 Ton/M3
- Semen D2 1.25 Ton/M3
- Pasir D3 1.30 Ton/M3
- Agregat Kasar D4 1.40 Ton/M3

II. URUTAN KERJA


1 Galian lokasi drainase sesuai elevasi dan dimensi rencana
2 Semen, pasir, agregat dan air diaduk dengan komposisi
sesuai rancangan mutu dengan menggunakan beton mixer
3 Beton di-cor ke dalam bekisting dan diratakan dg vibrator
4 Penyelesaian dan perapihan setelah pengecoran

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Volume Beton per M3 untuk drainase minor Lihat Gambar
1.a. Semen Sm x 1.03 (M12) 370.800 Kg sesuai dimensi
1.b. Pasir Beton (Ps/1000 : D3) x 1.05 (M01) 0.5250 M3
1.c. Aggregat Kasar (Kr/1000 : D4) x 1.05 (M03) 0.7425 M3
1.d. Formworks (M19) 0.2000 Ls
1.e. Paku (M18) 1.2000 Kg
1.f. Besi Beton 45.0000 Kg Lihat Gambar

2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 5.00 Menit
- Mengaduk T2 3.00 Menit
- Menuang T3 1.00 Menit
- Tunggu, dll. T4 1.00 Menit
Ts 10.00 Menit

Kap. Prod. / jam = V x Fa x 60 Q1 2.490 M3


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.4016 Jam

Berlanjut ke halaman berikut


PAY ITEM NUMBER : 2.3.(12) Analisa LI - 2312
WORK ITEM : Beton K250 (fc’ 20) untuk struktur drainase beton minor
UNIT : M3 0
next page

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air n 1.00 Kali

Kap. Prod. / jam = V x Fa x n Q2 17.91 M3


Wc

Koefisien Alat / M3 = 1 : Q2 (E23) 0.0558 Jam

2.c. CONCRETE VIBRATOR (E20)


Penggunaan concrete vibrator sesuai dengan kapasitas
produksi beton yang diperlukan dalam pengecoran

Kap. Prod. / jam = Prod.Ca./hour Concrete Mixer Q3 2.490 M3

Koefisien Alat / M3 = 1 : Q3 (E20) 0.4016 Jam

2.c. ALAT BANTU


Alat bantu yang diperlukan
- Sekop = 2 each
- Pacul = 2 each
- Sendok Semen = 2 each
- Ember = 4 each
- Gerobak Dorong = 1 each

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43 M3

Kebutuhan tenaga : - Mandor M 1.00 Orang


- Tukang : Tb 2.00 Orang
- Pekerja P 10.00 Orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1147 Jam
- Tukang = (Tk x Tb) : Qt (L02) 0.8032 Jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

continued
PAY ITEM NUMBER : 2.3.(12) Analisa LI - 2312
WORK ITEM : Beton K250 (fc’ 20) untuk struktur drainase beton minor
UNIT : M3 0
next page

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Didapat Harga Satuan Pekerjaan :

Rupiah 862,237.23 / M1

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : Bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : M1
Analisa LI - 2313

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(13) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Baja Tulangan untuk struktur drainase b TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0.1050 10,177.49 1,068.64


2. Tukang (L02) jam 0.0350 14,463.20 506.21
3. Mandor (L03) jam 0.0350 18,034.63 631.21

JUMLAH HARGA TENAGA 2,206.06

B. BAHAN

1. Baja Tulangan (Polos) U32 (M57a) Kg 1.0500 0.00 0.00


2. Kawat Beton (M14) Kg 0.0200 20,500.00 410.00

JUMLAH HARGA BAHAN 410.00

C. PERALATAN

1. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,616.06


E. OVERHEAD & PROFIT 10.0 % x D 261.61
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,877.67
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(13) Analisa LI - 2313
JENIS PEKERJAAN : Baja Tulangan untuk struktur drainase beton minor
SATUAN PEMBAYARAN : Kg URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.05 -

II. URUTAN KERJA


1 Besi tulangan dipotong dan dibengkokkan sesuai
dengan yang diperlukan
2 Batang tulangan dipasang / disusun sesuai dengan
Gambar Pelaksanaan dan persilangannya diikat kawat

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Baja Tulangan (Polos) U32 (M57a) 1.0500 Kg Lihat Gambar
1.b. Kawat beton (M14) 0.0200 Kg

2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya

3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang

Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 2,877.67 / Kg

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 Kg.
Analisa LI - 2314

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.3.(14) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pasangan Batu tanpa Adukan (Aanstamp
TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 5.2500 10,177.49 53,431.82


2. Tukang (L02) jam 1.7500 14,463.20 25,310.61
3. Mandor (L03) jam 0.8750 18,034.63 15,780.30

JUMLAH HARGA TENAGA 94,522.73

B. BAHAN

1. Batu Belah (M06) M3 1.1000 270,300.00 297,330.00

JUMLAH HARGA BAHAN 297,330.00

C. PERALATAN

1. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 391,852.73


E. OVERHEAD & PROFIT 10.0 % x D 39,185.27
F. HARGA SATUAN PEKERJAAN ( D + E ) 431,038.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.3.(14) Analisa LI - 2314
JENIS PEKERJAAN : Pasangan Batu tanpa Adukan (Aanstamping)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu dan pasir) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan material Fh 1.10 -

II. URUTAN KERJA


1 Batu disusun sesuai dengan gambar dan kokoh Lihat Gambar
saling mengunci satu sama lain

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Batu Belah (M06) 1.1000 M3

2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gerobak Dorong = 4 buah
- Palu Batu = 2 buah

3. TENAGA
Produksi pasangan batu kosong dalam 1 hari Qt 8.00 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.8750 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.7500 jam
- Pekerja = (Tk x P) : Qt (L01) 5.2500 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 431,038.00 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-241
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 2.4.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Bahan Porous untuk Bahan Penyaring (Fi
TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.8000 10,177.49 28,496.97


2. Mandor (L03) Jam 0.7000 18,034.63 12,624.24

JUMLAH HARGA TENAGA 41,121.21

B. BAHAN

1. Agregat Kasar (M03) M3 0.5500 0.00 0.00


2. Pasir (M01) M3 0.5500 167,200.00 91,960.00

JUMLAH HARGA BAHAN 91,960.00

C. PERALATAN

1. Tamper (E25) Jam 0.1606 49,378.62 7,932.31


2. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 7,932.31

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 141,013.52


E. OVERHEAD & PROFIT 10.0 % x D 14,101.35
F. HARGA SATUAN PEKERJAAN ( D + E ) 155,114.87
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 2.4.(1) Analisa EI-241
JENIS PEKERJAAN : Bahan Porous untuk Bahan Penyaring (Filter)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Material Porous terdiri dari batu pecah dan pasir

II. URUTAN KERJA


1 Material Porous diterima dilokasi pekerjaan
2 Material dipadatkan dengan menggunakan
Tamper
3 Pemadatan dilakukan lapis demi lapis t 0.15 M
4 Pekerjaan galian dilaksanakan oleh pekerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Material Porous terdiri dari :
- Batu pecah Bt 50.00 %
- Pasir Ps 50.00 %

Kebutuhan Batu Pecah / M3 = (Bt : 100) x Fh (M03) 0.5500 M3 Agregat Kasar


Kebutuhan Pasir / M3 = (Ps : 100) x Fh (M01) 0.5500 M3

2. ALAT
2.a. TAMPER (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan b 0.50 M
Banyak lintasan n 10 lintasan

Kap. Prod. / Jam = v x 1000 x Fa x b x t Q1 6.2250 M3 / Jam


n

Koefisien Alat / M3 = 1 : Q1 (E25) 0.1606 Jam

2.b. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah
- Alat-alat kecil lain

3. TENAGA
Produksi yang dapat diselesaikan / hari Qt 10.00 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.8000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.7000 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke halaman berikut


Analisa EI-311a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(1a) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2495 10,177.49 2,539.19


2. Mandor (L03) Jam 0.0249 18,034.63 449.95

JUMLAH HARGA TENAGA 2,989.13

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0249 573,282.37 14,302.85


2. Dump Truck (E08) Jam 0.0567 313,986.72 17,813.97
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 32,116.82

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 35,105.95


E. OVERHEAD & PROFIT 10.0 % x D 3,510.60
F. HARGA SATUAN PEKERJAAN ( D + E ) 38,616.55
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(1a) Analisa EI-311a
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.60 ton/m3 1.40 - 1.80

II. URUTAN KERJA


1 Tanah yang dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan menggunakan Excavator
3 Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh L 0.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.85
Faktor konversi , kedalaman < 40 % Fv 0.90 Faktor konversi
Waktu siklus Ts1 menit dihapus, masuk
- Menggali , memuat T1 1.320 menit dalam waktu siklus
- Lain lain T2 0.100 menit disesuaikam
Waktu siklus = T1 x Fv Ts1 1.42 menit

Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1 40.08 M3/Jam


Ts1

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0249 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2 menit
- Muat = (V x 60)/(D x Q1 ) T1 3.27 menit
- Waktu tempuh isi = (L : v1) x 60 T2 0.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 0.00 menit
- Lain-lain T4 2.00 menit
Ts2 5.27 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 17.63 M3/Jam


D x Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.0567 Jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop
- Keranjang

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(1a) Analisa EI-311a
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 40.08 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 280.57 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2495 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0249 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 38,616.55 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-311b

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(1b) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian batu lunak TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.4462 10,177.49 4,541.49


2. Mandor (L03) Jam 0.0558 18,034.63 1,005.95

JUMLAH HARGA TENAGA 5,547.44

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Compressor (E05) Jam 0.0558 198,999.94 11,099.95
2. Jack Hammer (E26) Jam 0.0558 39,766.98 2,218.15
3. Wheel Loader (E15) Jam 0.0558 610,697.15 34,063.87
4. Excavator (E10) Jam 0.0558 573,282.37 31,976.93
5 Dump Truck (E08) Jam 0.3460 313,986.72 108,649.71
Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 188,008.61

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 193,556.06


E. OVERHEAD & PROFIT 10.0 % x D 19,355.61
F. HARGA SATUAN PEKERJAAN ( D + E ) 212,911.66
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(1b) Analisa EI-311b
JENIS PEKERJAAN : Galian batu lunak
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.80 ton/m3

II. URUTAN KERJA


1 Cadas muda yg dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan Excavator yang dilengkapi dengan kuku
baja khusus, Compresor dan Jack Hammer, dimuat ke dlm Truk dengan
loader
3 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh : L 5.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER (E05/26/10/15)
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90 Faktor konversi
Waktu siklus Ts1 menit dihapus, masuk
- Menggali , memuat T1 3.000 menit dalam waktu siklus
- Lain lain T2 0.100 menit disesuaikam
Waktu siklus = T1 x Fv Ts1 3.10 menit

Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1 17.93 M3/Jam


Ts1

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0558 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktu siklus Ts1 menit
- Muat = (V x 60)/D x Q1 T1 6.51 menit
- Waktu tempuh isi = (L : v1) x 60 T2 15.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 10.00 menit
- Lain-lain T4 2.00 menit
Ts1 33.51 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 2.89 M3 / Jam


D x Ts1

Koefisien Alat / m3 = 1 : Q2 (E08) 0.3460 Jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Pahat / Tatah = 2 buah
- Palu Besar = 2 buah

3. TENAGA
Produksi menentukan : JACK HAMMER Q1 17.93 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 125.50 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.4462 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0558 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(1b) Analisa EI-311b
JENIS PEKERJAAN : Galian batu lunak
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 212,911.66 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-312
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Batu TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.5902 10,177.49 6,006.49


2. Mandor (L03) Jam 0.0738 18,034.63 1,330.45

JUMLAH HARGA TENAGA 7,336.94

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Compressor (E05) Jam 0.0738 198,999.94 14,680.58
2. Jack Hammer (E26) Jam 0.0738 39,766.98 2,933.68
3. Wheel Loader (E15) Jam 0.0738 610,697.15 45,052.22
4. Excavator (E10) Jam 0.0738 573,282.37 42,292.07
5 Dump Truck (E08) Jam 0.2386 313,986.72 74,924.61
Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 179,883.16

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 187,220.10


E. OVERHEAD & PROFIT 10.0 % x D 18,722.01
F. HARGA SATUAN PEKERJAAN ( D + E ) 205,942.11
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(2) Analisa EI-312
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.80 ton/m3

II. URUTAN KERJA


1 Batu yg dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan Excavator, Compresor
dan Jack Hammer, dimuat ke dlm Truk dengan Loader.
3 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh : L 5.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER (E05/26/10/15)
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90
Waktu siklus Ts1 menit
- Menggali , memuat T1 4.000 menit
- Lain lain T2 0.100 menit
Waktu siklus = T1 x Fv Ts1 4.10 menit

Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1 13.56 M3/Jam


Ts1

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0738 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts1 menit
- Muat = (V x 60)/D x Q1 T1 8.61 menit
- Waktu tempuh isi = (L : v1) x 60 T2 7.50 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 5.00 menit
- Lain-lain T4 2.00 menit
Ts1 23.11 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 4.19 M3 / Jam


D x Ts1

Koefisien Alat / m3 = 1 : Q2 (E08) 0.2386 Jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Pahat / Tatah = 2 buah
- Palu Besar = 2 buah

3. TENAGA
Produksi menentukan : JACK HAMMER Q1 13.56 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 94.89 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.5902 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0738 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(2) Analisa EI-312
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 205,942.11 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-313

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 0 - 2TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0207 10,177.49 210.96


2. Mandor (L03) Jam 0.0052 18,034.63 93.46

JUMLAH HARGA TENAGA 304.42

B. BAHAN

1. Urugan Pilihan (EI-322) M3 0.5000 1.00 0.50

JUMLAH HARGA BAHAN 0.50

C. PERALATAN
1. Excavator (E10) Jam 0.0052 573,282.37 2,970.76
2. Bulldozer (E04) Jam 0.014502 872,532.47 12,653.86
3. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 15,624.62

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 15,929.54


E. OVERHEAD & PROFIT 10.0 % x D 1,592.95
F. HARGA SATUAN PEKERJAAN ( D + E ) 17,522.49
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(3) Analisa EI-313
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 0 - 2 meter
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
7 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3

II. METHODE PELAKSANAAN


1 Tanah yang dipotong berada disekitar lokasi
2 Penggalian dilakukan dengan menggunakan alat
Excavator
3 Bulldozer mengangkut/mengusur hasil galian ke tempat
pembuangan di sekitar lokasi pekerjaan L 0.1000 Km
4 Bahan pengaman tebing galian (bahan kayu)

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 (EI-322) 0.50 M3
M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman < 40 %) Fv 0.90 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali, memuat, lain-lain (standar) T1 0.32 menit
Waktu siklus = T1 x Fv Ts1 0.29 menit

Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1 192.98 M3/Jam


Ts1

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0052 Jam

2.a. BULLDOZER (E04)


Faktor pisau (blade) Fb 1.00 -
Faktor efisiensi kerja Fa 0.83 -
Kecepatan mengupas Vf 3.00 Km/Jam
Kecepatan mundur Vr 5.00 Km/Jam
Kapasitas pisau q 5.40 M3
` Faktor kemiringan (grade) Fm 1.00

Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit

Kapasitas Produksi / Jam = q x Fb x Fm x Fa x 60/Ts Q2 68.95 M3


Fk

Koefisien Alat / M3 = 1 : Q2 (E04) 0.014502 Jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Pacul = 2 buah
- Sekop = 2 buah

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(3) Analisa EI-313
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 0 - 2 meter
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 192.98 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 1,350.83 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0207 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0052 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 17,522.49 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-314

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 2 - 4TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0576 10,177.49 586.00


2. Mandor (L03) Jam 0.0058 18,034.63 103.84

JUMLAH HARGA TENAGA 689.84

B. BAHAN

1. Urugan Pilihan (EI-322) M3 1.0000 1.00 1.00


2 Bahan pengaman tebing galian Ls 1.0000 693,750.00 693,750.00

JUMLAH HARGA BAHAN 693,751.00

C. PERALATAN
1. Excavator (E10) Jam 0.0058 573,282.37 3,300.84
2. Bulldozer (E04) Jam 0.014502 872,532.47 12,653.86
3. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 15,954.71

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 710,395.55


E. OVERHEAD & PROFIT 10.0 % x D 71,039.55
F. HARGA SATUAN PEKERJAAN ( D + E ) 781,435.10
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(4) Analisa EI-314
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 2 - 4 meter
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
7 Faktor pembayaran Fp 2.00 1.5 - 2

II. METHODE PELAKSANAAN


1 Tanah yang dipotong berada disekitar jembatan
2 Penggalian dilakukan dengan menggunakan alat
Excavator
3 Bulldozer mengangkut/mengusur hasil galian ke tempat
pembuangan di sekitar lokasi pekerjaan L 0.1000 Km
4 Bahan pengaman tebing galian (bahan kayu)
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 1.00 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman 40 - 75%) Fv 1.00 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit

Waktu Siklus = T1 x Fv Ts1 0.32 menit

Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1 173.68 M3/Jam


Ts1

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0058 Jam

2.a. BULLDOZER (E04)


Faktor pisau (blade) Fb 1.00 -
Faktor efisiensi kerja Fa 0.83 -
Kecepatan mengupas Vf 3.00 Km/Jam
Kecepatan mundur Vr 5.00 Km/Jam
Kapasitas pisau q 5.40 M3 panduan =datar
` Faktor kemiringan (grade) Fm 1.00

Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit

Kapasitas Produksi / Jam = q x Fb x Fm x Fa x 60/Ts Q2 68.95 M3


Fk

Koefisien Alat / M3 = 1 : Q2 (E04) 0.0145 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(4) Analisa EI-314
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 2 - 4 meter
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Pacul = 2 buah
- Sekop = 2 buah

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 173.68 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 1,215.74 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0576 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0058 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 781,435.10 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-315

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 4 - 6TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1036 10,177.49 1,054.80


2. Mandor (L03) Jam 0.0086 18,034.63 155.76

JUMLAH HARGA TENAGA 1,210.56

B. BAHAN

1. Urugan Pilihan (EI-322) M3 0.6000 1.00 0.60


2 Bahan pengaman tebing galian Ls 1.0000 693,750.00 693,750.00

JUMLAH HARGA BAHAN 693,750.60

C. PERALATAN
1. Excavator (E10) Jam 0.0086 573,282.37 4,951.27
2. Bulldozer (E04) Jam 0.014502 872,532.47 12,653.86
3. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 17,605.13

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 712,566.29


E. OVERHEAD & PROFIT 10.0 % x D 71,256.63
F. HARGA SATUAN PEKERJAAN ( D + E ) 783,822.92
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(5) Analisa EI-315
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 4 - 6 meter
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 30.00 %/M3
7 Faktor pembayaran Fp 2.00 1.5 - 2

II. METHODE PELAKSANAAN


1 Tanah / batu yang dipotong berada disekitar jembatan
2 Penggalian dilakukan dengan mgenggunakan alat
Excavator
3 Bulldozer mengangkut/mengusur hasil galian ke tempat
pembuangan dilokasi sekitar jembatan L 0.1000 Km
4 Bahan pengaman tebing galian (bahan kayu)
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 0.60 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman > 75%) Fv 1.50 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit

waktu siklus = T1 x Fv Ts1 0.48 menit

Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1 115.79 M3/Jam


Ts1

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0086 Jam

2.a. BULLDOZER (E04)


Faktor pisau (blade) Fb 1.00 -
Faktor efisiensi kerja Fa 0.83 -
Kecepatan mengupas Vf 3.00 Km/Jam
Kecepatan mundur Vr 5.00 Km/Jam
Kapasitas pisau q 5.40 M3
` Faktor kemiringan (grade) Fm 1.00

Waktu Siklus
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit

Kapasitas Produksi / Jam = q x Fb x Fm x Fa x 60/Ts Q2 68.95 M3


Fk

Koefisien Alat / M3 = 1 : Q2 (E04) 0.014502 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(5) Analisa EI-315
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 4 - 6 meter
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Pacul = 2 buah
- Sekop = 2 buah

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 115.79 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 810.50 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1036 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0086 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 783,822.92 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-316

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(6) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Perkerasan Beraspal dengan ColTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0741 10,177.49 753.89


2. Mandor (L03) Jam 0.0370 18,034.63 667.95

JUMLAH HARGA TENAGA 1,421.84

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Cold Milling (E36) Jam 0.0370 2,138,388.43 79,199.57
2 Dump Truck (E08) Jam 0.4672 313,986.72 146,696.07
3. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 225,895.64

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 227,317.48


E. OVERHEAD & PROFIT 10.0 % x D 22,731.75
F. HARGA SATUAN PEKERJAAN ( D + E ) 250,049.22
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(6) Analisa EI-316
JENIS PEKERJAAN : Galian Perkerasan Beraspal dengan Cold Milling Machine
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Berat volume bahan (lepas) D 2.20 Ton/M3

II. URUTAN KERJA


1 Aspal yg dikeruk umumnya berada di badan jalan
2 Pengerukan dilakukan dengan Cold Milling
dimuat ke dlm Truk
3 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh : L 5.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. COLD MILLING (E36)

Kapasitas lebar galian/pembongkaran b 1 m


tebal galian/pembongkaran t 0.15 m
kecepatan laju pembongkaran v 5.00 m/menit
Faktor effesiensi kerja Fa 0.60 grafik cold
miling
Kapasitas prod/jam = v x b x Fa x t x 60 Q1 27.00 M3

Koefisien Alat / m3 = 1 : Q1 (E36) 0.0370 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktu siklus Ts1 menit
- Muat = (V x 60)/(D x Q1 x Fk) T1 2.85 menit
- Waktu tempuh isi = (L : v1) x 60 T2 15.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 10.00 menit
- Lain-lain T4 2.00 menit
Ts1 29.85 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 2.14 M3 / Jam


D x Fk x Ts1

Koefisien Alat / m3 = 1 : Q2 (E08) 0.4672 Jam

2.c ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Pahat / Tatah = 2 buah
- Palu Besar = 2 buah

3. TENAGA
Produksi menentukan : COLD MILLING Q1 27.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 189.00 M2
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(6) Analisa EI-316
JENIS PEKERJAAN : Galian Perkerasan Beraspal dengan Cold Milling Machine
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0741 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0370 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 250,049.22 / M2

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-317

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Perkerasan Beraspal tanpa ColdTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.3333 10,177.49 3,392.50


2. Mandor (L03) Jam 0.1667 18,034.63 3,005.77

JUMLAH HARGA TENAGA 6,398.27

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Jack Hammer E26 Jam 2.4096 39,766.98 95,824.05
2. Compresor E05 Jam 2.4096 198,999.94 479,517.93
3. Dump Truck E08 Jam 1.1126 313,986.72 349,351.21
4 Motor Greder E15 Jam 0.0000 610,697.15 0.00

JUMLAH HARGA PERALATAN 924,693.19

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 931,091.46


E. OVERHEAD & PROFIT 10.0 % x D 93,109.15
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,024,200.61
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(7) Analisa EI-317
JENIS PEKERJAAN : Galian Perkerasan Beraspal tanpa Cold Milling Machine
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.30 -
6 Tebal perkerasan aspal t 0.05 M
7 Berat volume perkerasan aspal (lepas) D 2.20 Ton/M3
8 Memakai Motor Grader ( yes = 1 , No = 0 ) 0

II. URUTAN KERJA


1 Perkerasan beton yg dibongkar umumnya adalah perkerasan jalan
2 Pembongkaran dilakukan dengan Jack Hammer
dan dimuat ke dalam truck secara manual.
3 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh : L 3.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk 6.00 m3/jam
Effesiensi kerja Fa 0.83
Kapa. Prod/jam = Fa x t x 60 Q1 0.415 M3
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260 2.4096 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktu siklus Ts1
- Muat = (V x 60)/(D x Q1 x Fk) T1 176.93 menit
- Waktu tempuh isi = (L : v1) x 60 T2 9.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 6.00 menit
- Lain-lain T4 2.00 menit
Ts1 193.93 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 0.90 M3 / Jam


Ts1
Koefisien Alat / m3 = 1 : Q2 (E08) 1.1126 Jam

MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar Overlap bo 0.30 M
Faktor Efisiensi kerja Fa 0.80 -
Kecepatan rata-rata alat v 0.60 Km / Jam
Jumlah lintasan n 2 lintasan
Jumlah lajur lintasan N 1.00
Lebar pisau effektif b 1.6 M
Waktu siklus Ts3
- Perataan 1 kali lintasan Lh x 60 T1 5.00 menit
- Lain-lain v x 1000 T2 1.0 menit
Ts3 6.00 menit

Kapasitas Prod / Jam = Lh x (N x (b-bo)+bo) x t x Fa x 60 Q3 16.00 M3


Ts3 x n
Koefisien Alat / M3 = 1 : Q3 (E13) 0.0000 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(7) Analisa EI-317
JENIS PEKERJAAN : Galian Perkerasan Beraspal tanpa Cold Milling Machine
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi menentukan : JACK HAMMER Q1 6.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 42.00 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.3333 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1667 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,024,200.61 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-321

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.2.(1a) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0403 10,177.49 410.20


2. Mandor (L02) Jam 0.0101 18,034.63 181.72

JUMLAH HARGA TENAGA 591.92

B. BAHAN

1. Bahan timbunan (M08) M3 1.1100 69,600.00 77,256.00

JUMLAH HARGA BAHAN 77,256.00

C. PERALATAN
1. Excavator (E15) Jam 0.0101 610,697.15 6,153.47
2. Dump Truck (E08) Jam 0.6103 313,986.72 191,639.75
3. Motor Grader (E13) Jam 0.0037 753,810.29 2,818.74
4 Vibro Roller (E19) Jam 0.0042 409,912.24 1,714.83
5. Water tank truck (E23) Jam 0.0070 288,193.65 2,025.46
6 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 204,352.25

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 282,200.17


E. OVERHEAD & PROFIT 10.0 % x D 28,220.02
F. HARGA SATUAN PEKERJAAN ( D + E ) 310,420.18
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.2.(1a) Analisa EI-321
JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan (padat ke asli) Fv 1.11 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3

II. URUTAN KERJA


1 Excavator menggali dan memuat ke dalam dump truck
2 Dump Truck mengangkut ke lapangan dengan jarak
dari sumber galian ke lapangan L 10.00 Km
3 Material diratakan dengan menggunakan Motor Grader
4 Material dipadatkan menggunakan Vibratory Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan timbunan = 1 x Fv (M08) 1.11 M3

2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi asli ke padat Fv1 0.90
Waktu sklus Ts1
- Menggali, memuat T1 0.32 menit
- Lain lain T2 0.10 menit
Waktu Siklus = T1 x Fv Ts1 0.42 menit

Kapasitas Produksi / Jam = V x Fb x Fa xFv1x 60 Q1 99.24 M3 kondisi padat


Ts1

Koefisien alat / M3 = 1 : Q1 (E10) 0.0101 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.83 -
Faktor Konversi asli ke lepas Fv2 1.25
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktusiklus : Ts2
- Waktu muat = = (V x 60)/(D x Fk x Q1) T1 1.19 menit
- Waktu tempuh isi = (L : v1) x 60 T2 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 20.00 menit
- Lain-lain T4 2.00 menit
Ts2 53.19 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.64 M3


D x Fv2 x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.6103 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(1a) Analisa EI-321
JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar Overlap bo 0.30 M
Faktor Efisiensi kerja Fa 0.80 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 2 lintasan
Jumlah lajur lintasan N 1.00
Lebar pisau effektif b 2.6 M
Waktu siklus Ts3
- Perataan 1 kali lintasan Lh x 60 T1 0.75 menit
- Lain-lain v x 1000 T2 1.00 menit
Ts3 1.75 menit

Kapasitas Prod / Jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 267.43 M3


Ts3 x n

Koefisien Alat / M3 = 1 : Q3 (E13) 0.0037 Jam

2.d. VIBRATOR ROLLER (E19)


Kecepatan rata-rata alat v 4.00 Km / Jam
Lebar efektif pemadatan b 1.48 M
Jumlah lintasan n 8.00 lintasan
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Faktor efisiensi alat Fa 0.83 -

Kapasitas Prod./Jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 239.04 M3


n

Koefisien Alat / M3 = 1 : Q4 (E19) 0.0042 Jam

2.e. WATER TANK TRUCK (E32)


Volume tangki air V 5.00 M3
Kebutuhan air/M3 material padat Wc 0.07 M3
Kapasitas pompa air pa 200.00 liter/menit
Faktor efisiensi alat Fa 0.83

Kapasitas Prod./Jam = pa x Fa x 60 Q5 142.29 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q5 0.0070 jam

2.e. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 99.24 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 694.71 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0403 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0101 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 3.2.(1a) Analisa EI-321
JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 310,420.18 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-321

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.2.(1b) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Biasa Dari Galian TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1056 10,177.49 1,074.33


2. Mandor (L02) Jam 0.0264 18,034.63 475.93

JUMLAH HARGA TENAGA 1,550.26

B. BAHAN
Retribusi

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Excavator (E15) Jam 0.0264 610,697.15 16,116.24
2. Dump Truck (E08) Jam 0.5579 313,986.72 175,171.18
3. Motor Grader (E13) Jam 0.0037 753,810.29 2,818.74
4 Vibro Roller (E19) Jam 0.0042 409,912.24 1,714.83
5. Water tank truck (E23) Jam 0.0070 288,193.65 2,025.46
6 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 197,846.45

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 199,396.71


E. OVERHEAD & PROFIT 10.0 % x D 19,939.67
F. HARGA SATUAN PEKERJAAN ( D + E ) 219,336.38
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.2.(1b) Analisa EI-321
JENIS PEKERJAAN : Timbunan Biasa Dari Galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan (padat ke asli) Fv 1.11 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
8 Retribusi bahan timbunan Ret 5,000.00 Rp

II. URUTAN KERJA


1 Excavator menggali dan memuat ke dalam dump truck
2 Dump Truck mengangkut ke lapangan dengan jarak
dari galian ke lapangan L 8.70 Km
3 Material diratakan dengan menggunakan Motor Grader
4 Material dipadatkan menggunakan Vibratory Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan timbunan = 1 x Fv (M08) 1.11 M3 tidak dibayar

2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi asli ke padat Fv1 0.90
Waktu sklus Ts1
- Menggali, memuat T1 1.00 menit
- Lain lain T2 0.10 menit
Waktu Siklus = T1 x Fv Ts1 1.10 menit

Kapasitas Produksi / Jam = V x Fb x Fa xFv1x 60 Q1 37.89 M3 kondisi padat


Ts1

Koefisien alat / M3 = 1 : Q1 (E10) 0.0264 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.83 -
Faktor Konversi asli ke lepas Fv2 1.25
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktusiklus : Ts2
- Waktu muat = = (V x 60)/(D x Fk x Q1) T1 3.12 menit
- Waktu tempuh isi = (L : v1) x 60 T2 26.10 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 17.40 menit
- Lain-lain T4 2.00 menit
Ts2 48.62 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.79 M3


D x Fv2 x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.5579 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(1b) Analisa EI-321
JENIS PEKERJAAN : Timbunan Biasa Dari Galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar Overlap bo 0.30 M
Faktor Efisiensi kerja Fa 0.80 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 2 lintasan
Jumlah lajur lintasan N 1.00
Lebar pisau effektif b 2.6 M
Waktu siklus Ts3
- Perataan 1 kali lintasan Lh x 60 T1 0.75 menit
- Lain-lain v x 1000 T2 1.00 menit
Ts3 1.75 menit

Kapasitas Prod / Jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 267.43 M3


Ts3 x n

Koefisien Alat / M3 = 1 : Q3 (E13) 0.0037 Jam

2.d. VIBRATOR ROLLER (E19)


Kecepatan rata-rata alat v 4.00 Km / Jam
Lebar efektif pemadatan b 1.48 M
Jumlah lintasan n 8.00 lintasan
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Faktor efisiensi alat Fa 0.83 -

Kapasitas Prod./Jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 239.04 M3


n

Koefisien Alat / M3 = 1 : Q4 (E19) 0.0042 Jam

2.e. WATER TANK TRUCK (E32)


Volume tangki air V 5.00 M3
Kebutuhan air/M3 material padat Wc 0.07 M3
Kapasitas pompa air pa 200.00 liter/menit
Faktor efisiensi alat Fa 0.83

Kapasitas Prod./Jam = pa x Fa x 60 Q5 142.29 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q5 0.0070 jam

2.e. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 37.89 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 265.25 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1056 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0264 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 3.2.(1b) Analisa EI-321
JENIS PEKERJAAN : Timbunan Biasa Dari Galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 219,336.38 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-322

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.2.(2a) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Pilihan Dari Sumber Gaian TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.4294 10,177.49 24,725.02


2. Mandor (L03) Jam 0.6073 18,034.63 10,953.26

JUMLAH HARGA TENAGA 35,678.28

B. BAHAN

1. Bahan pilihan (M09) (M09) M3 1.1100 40,600.00 45,066.00

JUMLAH HARGA BAHAN 45,066.00

C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 610,697.15 5,193.74
2. Dump Truck (E08) Jam 0.6073 313,986.72 190,698.53
3. Motor Grader (E13) Jam 0.0040 753,810.29 2,991.31
3. Tandem (E17) Jam 0.0161 334,698.78 5,390.16
4. Water Tanker (E23) Jam 0.0070 288,193.65 2,025.46
5. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 206,299.20

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 287,043.48


E. OVERHEAD & PROFIT 10.0 % x D 28,704.35
F. HARGA SATUAN PEKERJAAN ( D + E ) 315,747.83
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.2.(2a) Analisa EI-322
JENIS PEKERJAAN : Timbunan Pilihan Dari Sumber Gaian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Faktor pengembangan bahan (padat ke asli) Fv 1.11 -
7 Tebal hamparan padat t 0.15 M
8 Berat volume bahan (lepas) D 1.60 Ton/M3

II. URUTAN KERJA


1 Whell Loader memuat ke dalam Dump Truck
2 Dump Truck mengangkut ke lapangan dengan jarak
sumber galian ke lapangan L 10.00 Km
3 Material dihampar dengan menggunakan Motor Grader
4 Hamparan material disiram air dengan Watertank Truck
(sebelum pelaksanaan pemadatan) dan dipadatkan
dengan menggunakan Tandem Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan pilihan = 1 x Fv (M09) 1.11 M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.45 menit
Ts1 0.45 menit

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 117.58 M3


Fk x Ts1

Koefisienalat / M3 = 1 = 1 : Q1 (E15) 0.0085 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 M3
Faktor efisiensi alat Fa 0.83 -
Faktor Konversi asli ke lepas Fv2 1.25
Kecepatan rata-rata bermuatan v1 20.00 Km / Jam
Kecepatan rata-rata kosong v2 30.00 Km / Jam
Waktusiklus : Ts2
- Waktu muat = = (V x 60)/(D x Fk x Q1) T1 0.93 menit
- Waktu tempuh isi = (L : v1) x 60 T2 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 20.00 menit
- Lain-lain T4 2.00 menit
Ts2 52.93 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.65 M3


D x Fv2 x Ts2

Koefisien Alat / m3 = 1 : Q2 (E08) 0.6073 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(2a) Analisa EI-322
JENIS PEKERJAAN : Timbunan Pilihan Dari Sumber Gaian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 m
Lebar Efektif kerja Blade b 2.60 m
Lebar overlap bo 0.30 m Panduan
Faktor Efisiensi Alat Fa 0.80 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 4.00 lintasan
Jumlah lajur lintasan N 2.00
Waktu siklus Ts3
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 1.00 menit
Ts3 1.75 menit

Kapasitas Produksi/Jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 252.00 M3


Ts3 x n

Koefisien Alat / m3 = 1 : Q3 (E13) 0.0040 Jam

2.d. TANDEM (E17)


Kecepatan rata-rata alat v 1.50 Km / jam
Lebar efektif pemadatan b 1.48 M
Jumlah lintasan n 8.00 lintasan
Jumlah lajur lintasan N 2.00
Lebar overlap bo 0.30 m
Waktu siklus Ts3
Faktor efisiensi alat Fa 0.83 -
Kapasitas Prod./Jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 62.09 M3
n

Koefisien Alat / m3 = 1 : Q4 (E17) 0.0161 Jam

2.e. WATER TANK TRUCK (E23)


Volume tangki air V 4.00 M3
Kebutuhan air / M3 material padat Wc 0.07 M3
Kapasitas pompa air pa 200.00 liter/menit
Faktor efisiensi alat Fa 0.83 -

Kapasitas Produksi / Jam = pa x Fa x 60 Q5 142.29 M3


1000 x Wc

Koefisien Alat / m3 = 1 : Q5 (E23) 0.0070 Jam

2.f. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah

3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 1.65 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 11.53 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.4294 Jam
- Mandor = (Tk x M) : Qt (L03) 0.6073 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(2a) Analisa EI-322
JENIS PEKERJAAN : Timbunan Pilihan Dari Sumber Gaian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 315,747.83 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-322

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.2.(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Pilihan dari galian TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.1310 10,177.49 21,688.71


2. Mandor (L03) Jam 0.5328 18,034.63 9,608.16

JUMLAH HARGA TENAGA 31,296.87

B. BAHAN

1. Retribusi Rp 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 610,697.15 5,193.74
2. Dump Truck (E08) Jam 0.5328 313,986.72 167,280.13
3. Motor Grader (E13) Jam 0.0040 753,810.29 2,991.31
3. Tandem (E17) Jam 0.0161 334,698.78 5,390.16
4. Water Tanker (E23) Jam 0.0070 288,193.65 2,025.46
5. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 182,880.80

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 214,177.67


E. OVERHEAD & PROFIT 10.0 % x D 21,417.77
F. HARGA SATUAN PEKERJAAN ( D + E ) 235,595.44
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.2.(2) Analisa EI-322
JENIS PEKERJAAN : Timbunan Pilihan dari galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Faktor pengembangan bahan (padat ke asli) Fv 1.11 -
7 Tebal hamparan padat t 0.15 M
8 Berat volume bahan (lepas) D 1.60 Ton/M3
9 Retibusi Ret Rp

II. URUTAN KERJA


1 Whell Loader memuat ke dalam Dump Truck
2 Dump Truck mengangkut ke lapangan dengan jarak
dari galian ke lapangan L 8.70 Km
3 Material dihampar dengan menggunakan Motor Grader
4 Hamparan material disiram air dengan Watertank Truck
(sebelum pelaksanaan pemadatan) dan dipadatkan
dengan menggunakan Tandem Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan pilihan = 1 x Fv (M09) 1.11 M3 tidak dibayar

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.45 menit
Ts1 0.45 menit

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 117.58 M3


Fk x Ts1

Koefisienalat / M3 = 1 = 1 : Q1 (E15) 0.0085 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 M3
Faktor efisiensi alat Fa 0.83 -
Faktor Konversi asli ke lepas Fv2 1.25
Kecepatan rata-rata bermuatan v1 20.00 Km / Jam
Kecepatan rata-rata kosong v2 30.00 Km / Jam
Waktusiklus : Ts2
- Waktu muat = = (V x 60)/(D x Fk x Q1) T1 0.93 menit
- Waktu tempuh isi = (L : v1) x 60 T2 26.10 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 17.40 menit
- Lain-lain T4 2.00 menit
Ts2 46.43 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.88 M3


D x Fv2 x Ts2

Koefisien Alat / m3 = 1 : Q2 (E08) 0.5328 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(2) Analisa EI-322
JENIS PEKERJAAN : Timbunan Pilihan dari galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 m
Lebar Efektif kerja Blade b 2.60 m
Lebar overlap bo 0.30 m Panduan
Faktor Efisiensi Alat Fa 0.80 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 4.00 lintasan
Jumlah lajur lintasan N 2.00
Waktu siklus Ts3
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 1.00 menit
Ts3 1.75 menit

Kapasitas Produksi/Jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 252.00 M3


Ts3 x n

Koefisien Alat / m3 = 1 : Q3 (E13) 0.0040 Jam

2.d. TANDEM (E17)


Kecepatan rata-rata alat v 1.50 Km / jam
Lebar efektif pemadatan b 1.48 M
Jumlah lintasan n 8.00 lintasan
Jumlah lajur lintasan N 2.00
Lebar overlap bo 0.30 m
Waktu siklus Ts3
Faktor efisiensi alat Fa 0.83 -
Kapasitas Prod./Jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 62.09 M3
n

Koefisien Alat / m3 = 1 : Q4 (E17) 0.0161 Jam

2.e. WATER TANK TRUCK (E23)


Volume tangki air V 4.00 M3
Kebutuhan air / M3 material padat Wc 0.07 M3
Kapasitas pompa air pa 200.00 liter/menit
Faktor efisiensi alat Fa 0.83 -

Kapasitas Produksi / Jam = pa x Fa x 60 Q5 142.29 M3


1000 x Wc

Koefisien Alat / m3 = 1 : Q5 (E23) 0.0070 Jam

2.f. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah

3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 1.88 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 13.14 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.1310 Jam
- Mandor = (Tk x M) : Qt (L03) 0.5328 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(2) Analisa EI-322
JENIS PEKERJAAN : Timbunan Pilihan dari galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 235,595.44 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-323

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.2.(3a) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Pilihan (diukur diatas bak trukTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0142 10,177.49 144.26


2. Mandor (L02) Jam 0.0071 18,034.63 127.81

JUMLAH HARGA TENAGA 272.07

B. BAHAN

1. Bahan pilihan (M09) (M09) M3 1.0000 40,600.00 40,600.00

JUMLAH HARGA BAHAN 40,600.00

C. PERALATAN
1. Dump Truck (E08) Jam 0.6252 313,986.72 196,304.40
2. Whell Loader (E15) Jam 0.0071 610,697.15 4,328.12
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 200,632.52

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 241,504.59


E. OVERHEAD & PROFIT 10.0 % x D 24,150.46
F. HARGA SATUAN PEKERJAAN ( D + E ) 265,655.05
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.2.(3a) Analisa EI-323
JENIS PEKERJAAN : Timbunan Pilihan (diukur diatas bak truk)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : di atas tanah rawa
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan (lepas) D 1.69 Ton/M3

II. URUTAN KERJA


1 Whell Loader memuat ke dalam Dump Truck
2 Dump Truck mengangkut material pilihan
ke lapangan dimana : jarak quari ke lapangan L 10.00 Km
3 Dump Truck menuang material pilihan di lokasi rawa
yang telah ditetapkan mulai dari tepian rawa hingga
permukaan timbunan mencapai permukaan air rawa.
4 Sekelompok pekerja merapikan timbunan
5 Geotekstil atau batangan kayu (bila diperlukan)
dianggap telah terpasang

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan pilihan (M09) 1.00 M3

2. ALAT

2.a. DUMP TRUCK (E09)


Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktusiklus : Ts2
- Waktu muat = = (V x 60)/(D xFk x Q1) T1 0.73 menit
- Waktu tempuh isi = (L : v1) x 60 T2 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 20.00 menit
- Lain-lain T4 3.00 menit
Ts2 53.73 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.60 M3/Jam


D x Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.6252 Jam

2.b. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah

2.c. WHELL LOADER (E15)


Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1 menit
- Muat T1 0.45 menit
Ts1 0.45 menit

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 141.10 M3


Ts1

Koefisienalat / M3 = 1 : Q1 (E15) 0.0071 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(3a) Analisa EI-323
JENIS PEKERJAAN : Timbunan Pilihan (diukur diatas bak truk)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 987.70 M3
Asumsi permukaan hamparan di permukaan rawa :

Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0142 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0071 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 265,655.05 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-323

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.2.(3b) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Pilihan (diukur dengan rod daTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0142 10,177.49 144.26


2. Mandor (L02) Jam 0.0071 18,034.63 127.81

JUMLAH HARGA TENAGA 272.07

B. BAHAN

1. Bahan pilihan (M09) (M09) M3 1.0000 40,600.00 40,600.00


Plate 0.0000 2.00 0.00

JUMLAH HARGA BAHAN 40,600.00

C. PERALATAN
1. Dump Truck (E08) Jam 0.6252 313,986.72 196,304.40
2. Whell Loader (E15) Jam 0.0071 610,697.15 4,328.12
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 200,632.52

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 241,504.59


E. OVERHEAD & PROFIT 10.0 % x D 24,150.46
F. HARGA SATUAN PEKERJAAN ( D + E ) 265,655.05
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.2.(3b) Analisa EI-323
JENIS PEKERJAAN : Timbunan Pilihan (diukur dengan rod dan plate)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : di atas tanah rawa
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan (lepas) D 1.69 Ton/M3

II. URUTAN KERJA


1 Whell Loader memuat ke dalam Dump Truck
2 Dump Truck mengangkut material pilihan
ke lapangan dimana : jarak quari ke lapangan L 10.00 Km
3 Alat Rod dan plate dipasang, disesuaikan dengan kebutuhan
3 Dump Truck menuang material pilihan di lokasi rawa (plate tertimbun)
yang telah ditetapkan mulai dari tepian rawa hingga
permukaan timbunan mencapai permukaan air rawa.
4 Sekelompok pekerja merapikan timbunan dan alat (rod dan plate)
5 Geotekstil atau batangan kayu (bila diperlukan)
dianggap telah terpasang

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan pilihan (M09) 1.00 M3
Plate 2.00 lembar

2. ALAT

2.a. DUMP TRUCK (E09)


Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktusiklus : Ts2
- Waktu muat = = (V x 60)/(D xFk x Q1) T1 0.73 menit
- Waktu tempuh isi = (L : v1) x 60 T2 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 20.00 menit
- Lain-lain T4 3.00 menit
Ts2 53.73 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.60 M3/Jam


D x Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.6252 Jam

2.b. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah

2.c. WHELL LOADER (E15)


Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1 menit
- Muat T1 0.45 menit
Ts1 0.45 menit

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 141.10 M3


Ts1

Koefisienalat / M3 = 1 : Q1 (E15) 0.0071 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(3b) Analisa EI-323
JENIS PEKERJAAN : Timbunan Pilihan (diukur dengan rod dan plate)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 987.70 M3
Asumsi permukaan hamparan di permukaan rawa :

Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0142 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0071 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 265,655.05 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.3.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 0 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0024 10,177.49 24.23


2. Mandor (L02) jam 0.0006 18,034.63 10.73

JUMLAH HARGA TENAGA 34.97

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Motor Grader (E13) jam 0.0006 753,810.29 448.70
2. Vibro Roller (E19) jam 0.0005 409,912.24 192.92
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 641.61

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 676.58


E. OVERHEAD & PROFIT 10.0 % x D 67.66
F. HARGA SATUAN PEKERJAAN ( D + E ) 744.24
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.3.(1) #REF!
JENIS PEKERJAAN : Penyiapan Badan Jalan
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7.00 Jam

II. URUTAN KERJA


1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan yang telah
dipotong/diratakan oleh Motor Grader
3 Sekelompok pekerja akan membantu meratakan
badan jalan dengan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Tidak diperlukan bahan / material

2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 50.00 M
Lebar Efektif kerja Blade b 2.60 M
Lebae overlap bo 0.30
Faktor Efisiensi Alat Fa 0.80 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 4.00 lintasan
Jumlah lajur lintasan N 2.00 lajur
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 1.00 menit
Ts1 1.75 menit

Kapasitas Produksi / Jam = Lh x (N(b-bo)+bo) x Fa x 60 Q1 1,680.00 M2


n x Ts1

Koefisien Alat / m2 = 1 : Q1 (E13) 0.0006 Jam

2.b. VIBRATOR ROLLER (E19)


Kecepatan rata-rata alat v 4.00 Km / jam
Lebar efektif pemadatan b 1.48 M
Jumlah lintasan n 6.00 lintasan
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Faktor efisiensi alat Fa 0.83 -

Kapasitas Produksi / Jam = (v x 1000) x (N(b-bo)+bo) x Fa Q2 2,124.80 M2


n

Koefisien Alat / m2 = 1 : Q2 (E19) 0.0005 Jam


2.d. ALAT BANTU
Diperlukan alat-alat bantu kecil Lump Sum
- Sekop = 3 buah

3. TENAGA
Produksi menentukan : MOTOR GRADER Q1 1,680.00 M2/Jam
Produksi Pekerjaan / hari = Tk x Q1 Qt 11,760.00 M2
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.0024 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0006 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.3.(1) #REF!
JENIS PEKERJAAN : Penyiapan Badan Jalan
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 744.24 / M2

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M2
Analisa EI-341

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
MATA PEMBAYARAN NO. : 3.4.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pembersihan dan Pengupasan Lahan TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 (diameter < 30 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0700 10,177.49 712.42


2. Mandor (L03) jam 0.0140 18,034.63 252.48

JUMLAH HARGA TENAGA 964.91

B. BAHAN

1. Bahan timbunan (M08) M3 1.2000 69,600.00 83,520.00

JUMLAH HARGA BAHAN 83,520.00

C. PERALATAN

1 Dump Truck E09 jam 0.0020 512,290.28 1,028.70


2 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 1,028.70

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 85,513.60


E. OVERHEAD & PROFIT 10.0 % x D 8,551.36
F. HARGA SATUAN PEKERJAAN ( D + E ) 94,064.96
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.4.(1) Analisa EI-341
JENIS PEKERJAAN : Pembersihan dan Pengupasan Lahan
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor pengembangan bahan Fk 1.20 -
7 Tebal hamparan padat t 0.15 M
8 Hasil bongkaran per M2 luas area d 0.50 ton

II. URUTAN KERJA


1 Alat penyapu mekanis atau kompresor atau alat sapu yang lebih kaku
membersihkan kotoran di lokasi
2 Gergaji listrik atau alat tebang manual lainnya digunakan untuk menebang
tanaman, dipotong mulai dari atas ke bawah
3 Pembersihan dan pengangkatan akar tanaman dengan linggis dan sekop
4 Dump truck membawa tanaman bongkaran ke tempat pembuangan sejauh l 2.00 km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1a Bahan timbunan = 1 x Fk (M08) 1.20 M3 Borrow Pit

2. ALAT
2.a DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 30.00 KM/jam
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit T1 0.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 0.00 menit
- Lain-lain (termasuk dumping setempat-setempat) T3 2.00 menit
Ts2 2.00 menit
Kap. Prod. / jam = V x Fa x 60 Q2 498.00 M2
Ts2 x d
Koefisien Alat / M3 = 1 : Q2 (E09) 0.0020 jam

2.b ALAT BANTU Lump Sum


Diperlukan :
- Linggis = 2 buah
- Sekop = 2 buah
- Garpu = 2 buah
- Gergaji listrik = 2 buah

TENAGA
Produksi pembersihan dan pembongkaran/hari Qt 500.00 M2 asumsi

Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Mandor M 1.00 orang

3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0700 jam
- Mandor = (Tk x M) : Qt (L03) 0.0140 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.
Analisa EI-342
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.4.(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 15TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : buah % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 3.5000 10,177.49 35,621.21


2. Mandor (L03) Jam 0.3500 18,034.63 6,312.12

JUMLAH HARGA TENAGA 41,933.33

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E09 Jam 0.1988 512,290.28 101,840.84


2. Chainsaw Jam 1.0000 100.00 100.00
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 101,940.84

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 143,874.17


E. OVERHEAD & PROFIT 10.0 % x D 14,387.42
F. HARGA SATUAN PEKERJAAN ( D + E ) 158,261.59
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.4.(2) Analisa EI-342
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 15 – 30 cm
SATUAN PEMBAYARAN : buah URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 15-30 cm setara dengan volume Vp 2.00 M3
6 Berat Jenis Kayu BjK 0.90 ton/M3

II. URUTAN KERJA


1 Pemotongon Pohon dilakukan menggunakan peralatan alat
bantu Chainsaw, Kampak dan Parang
2 Pohon ditebang dimulai dari atas
2 Penggalian akar pohon dilakukan menggunakan pekerja
3 Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
4 Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh L 2.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 TON
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts 55.00

Kapasitas Produksi / Jam = V x Fa x 60 Q1 5.03 Buah/Jam


Vp x Ts x Bjk

Koefisien Alat / buah = 1 : Q1 (E09) 0.1988 jam

'2.b. ALAT PEMOTONG (Chainsaw)


Poduksi Menentukan
Dalam 1 hari dapat memotong H 7 buah

Kapasitas Produksi / Jam = H : Tk Q2 1.0000 Buah / Jam

Koefisien Alat / Buah = 1 : Q2 (E08) 1.00 jam

2.d. ALAT BANTU (menggali Akar pohon dan menutup kembali)


Diperlukan alat-alat bantu kecil Lump Sum
- Sekop
- Kampak, parang
- Pacul
- Tali
- Dan alat bantu ringan lainnya

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.4.(2) Analisa EI-342
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 15 – 30 cm
SATUAN PEMBAYARAN : buah URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA

Produksi Galian akar pohon / hari = Qt 20.00 buah


Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / buah :


- Pekerja = (Tk x P) : Qt (L01) 3.50 jam
- Mandor = (Tk x M) : Qt (L03) 0.35 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 158,261.59 / Buah

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ........... bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-343

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.4.(3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 30TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : buah % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 3.5000 10,177.49 35,621.21


2. Mandor (L03) Jam 0.3500 18,034.63 6,312.12

JUMLAH HARGA TENAGA 41,933.33

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E09 Jam 0.2982 512,290.28 152,761.26


2. Chainsaw Jam 1.0000 0.00 0.00
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 152,761.26

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 194,694.59


E. OVERHEAD & PROFIT 10.0 % x D 19,469.46
F. HARGA SATUAN PEKERJAAN ( D + E ) 214,164.05
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.4.(3) Analisa EI-343
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 30 – 50 cm
SATUAN PEMBAYARAN : buah URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 30-50 cm setara dengan volume Vp 3.00 M3
6 Berat Jenis Kayu BjK 0.90 ton/M3

II. URUTAN KERJA


1 Pemotongon Pohon dilakukan menggunakan peralatan alat
bantu Chainsaw, Kampak dan Parang
2 Pohon ditebang dimulai dari atas
2 Penggalian akar pohon dilakukan menggunakan pekerja
3 Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
4 Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh L 2.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 TON
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts 55.00

Kapasitas Produksi / Jam = V x Fa x 60 Q1 3.35 Buah / Jam


Vp x Ts x Bjk

Koefisien Alat / M3 = 1 : Q1 (E09) 0.2982 jam

'2.b. ALAT PEMOTONG (Chainsaw)


Poduksi Menentukan
Dalam 1 hari dapat memotong H 7 buah

Kapasitas Produksi / Jam = H : Tk Q2 1.0000 Buah / Jam

Koefisien Alat / Buah = 1 : Q2 (E08) 1.00 jam

2.d. ALAT BANTU (menggali Akar pohon dan menutup kembali)


Diperlukan alat-alat bantu kecil Lump Sum
- Sekop
- Kampak, parang
- Pacul
- Tali
- Dan alat bantu ringan lainnya

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.4.(3) Analisa EI-343
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 30 – 50 cm
SATUAN PEMBAYARAN : buah URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA

Produksi Galian akar pohon / hari = Qt 20.00 buah


Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / buah :


- Pekerja = (Tk x P) : Qt (L01) 3.50 jam
- Mandor = (Tk x M) : Qt (L03) 0.35 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 214,164.05 / Buah

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ........... bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-344
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.4.(4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 50TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : buah % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 3.5000 10,177.49 35,621.21


2. Mandor (L03) Jam 0.3500 18,034.63 6,312.12

JUMLAH HARGA TENAGA 41,933.33

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E09 Jam 0.4970 512,290.28 254,602.09


2. Chainsaw Jam 1.0000 0.00 0.00
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 254,602.09

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 296,535.43


E. OVERHEAD & PROFIT 10.0 % x D 29,653.54
F. HARGA SATUAN PEKERJAAN ( D + E ) 326,188.97
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.4.(4) Analisa EI-344
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 50 – 75 cm
SATUAN PEMBAYARAN : buah URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 50 - 75 cm setara dengan volume Vp 5.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3

II. URUTAN KERJA


1 Pemotongon Pohon dilakukan menggunakan peralatan
Chainsaw, Kampak dan Parang
2 Pohon ditebang dimulai dari atas
2 Penggalian akar pohon dilakukan menggunakan pekerja
3 Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
4 Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh L 2.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts2 55.00

Kapasitas Produksi / Jam = V x Fa x 60 Q1 2.01 Buah / Jam


Vp x Ts2 x bjk

Koefisien Alat / M3 = 1 : Q1 (E09) 0.4970 jam

'2.b. ALAT PEMOTONG (Chainsaw)

Kapasitas Produksi / Jam Q2 1.00 Buah / Jam

Koefisien Alat / buah = 1 : Q2 1.00 jam

2.d. ALAT BANTU (menggali Akar pohon dan menutup kembali)


Diperlukan alat-alat bantu kecil Lump Sum
- Sekop
- Kampak, parang
- Pacul
- Tali
- Dan alat bantu ringan lainnya

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.4.(4) Analisa EI-344
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 50 – 75 cm
SATUAN PEMBAYARAN : buah URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA

Produksi Galian akar pohon / hari = Qt 20.00 M2


Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 3.5000 jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 326,188.97 / Buah

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ........... bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 buah
Analisa EI-345

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.4.(5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter > TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : buah % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 4.6667 10,177.49 47,494.95


2. Mandor (L03) Jam 0.4667 18,034.63 8,416.16

JUMLAH HARGA TENAGA 55,911.11

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E09 Jam 1.0843 512,290.28 555,495.48


2. Chainsaw Jam 1.0843 0.00 0.00
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 555,495.48

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 611,406.59


E. OVERHEAD & PROFIT 10.0 % x D 61,140.66
F. HARGA SATUAN PEKERJAAN ( D + E ) 672,547.25
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.4.(5) Analisa EI-345
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter > 75 cm
SATUAN PEMBAYARAN : buah URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter > 75 cm setara dengan volume Vp 10.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3

II. URUTAN KERJA


1 Pemotongon Pohon dilakukan menggunakan peralatan
Chainsaw, Kampak dan Parang
2 Pohon ditebang dimulai dari atas
2 Penggalian akar pohon dilakukan menggunakan pekerja
3 Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
4 Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh L 2.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 15.00 menit
Ts 60.00 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q1 0.92 Buah


Vp x Ts x Bjk

Koefisien Alat / M3 = 1 : Q1 (E08) 1.0843 jam

'2.b. ALAT PEMOTONG (Chainsaw)

Kapasitas Produksi / Jam Q2 0.75 Buah

Koefisien Alat / M3 = 1 : Q2 (E08) 1.33 jam

2.d. ALAT BANTU (menggali Akar pohon dan menutup kembali)


Diperlukan alat-alat bantu kecil Lump Sum
- Sekop
- Kampak, parang
- Pacul
- Tali
- Dan alat bantu ringan lainnya

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.4.(5) Analisa EI-345
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter > 75 cm
SATUAN PEMBAYARAN : buah URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA

Produksi Galian akar pohon / hari = Qt 15.00 buah


Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 4.6667 jam
- Mandor = (Tk x M) : Qt (L03) 0.4667 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 672,547.25 / Buah

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ........... bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 buah
Analisa EI-318

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Perkerasan berbutir TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.5000 10,177.49 15,266.23


2. Mandor (L03) Jam 0.2500 18,034.63 4,508.66

JUMLAH HARGA TENAGA 19,774.89

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Jack Hammer E26 Jam 0.2677 39,766.98 10,647.12
2. Compresor E05 Jam 0.2677 198,999.94 53,279.77
3. Dump Truck E08 Jam 0.2260 313,986.72 70,950.97

JUMLAH HARGA PERALATAN 134,877.86

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 154,652.75


E. OVERHEAD & PROFIT 10.0 % x D 23,197.91
F. HARGA SATUAN PEKERJAAN ( D + E ) 177,850.66
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(8) Analisa EI-318
JENIS PEKERJAAN : Galian Perkerasan berbutir
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang/rusak
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal perkerasan berbutir t 0.30 M
7 Berat volume perkerasan berbutir D 1.81 Ton/M3
8 Memakai Drill Breaker ( yes = 1 , No = 0 ) 0

II. URUTAN KERJA


1 Perkerasan berbutir yg dibongkar umumnya adalah perkerasan jalan
2 Pembongkaran dilakukan dengan Jack Hammer dan ganco kemudian
dimuat ke dalam truck secara manual dengan sekop
3 Dump Truck membuang material hasil galian keluar diluar lokasi
pekerjaan atau sesuai perintah Direksi L 3.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk 4.00 menit/m2
Effesiensi kerja Fa 0.83
Kapa. Prod/jam = Fa x t x 60 Q1 3.735 M3
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260 0.2677 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktu siklus Ts1
- Muat = (V x 60)/(D x Q1 x Fk) T1 25.89 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.50 menit
- Lain-lain T4 3.00 menit
Ts1 39.39 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 4.43 M3 / Jam


Ts1
Koefisien Alat / m3 = 1 : Q2 (E08) 0.2260 Jam

3. TENAGA
Produksi menentukan : JACK HAMMER Q1 4.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 28.00 M3
Kebutuhan tenaga :
- Pekerja P 6.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.5000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.2500 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(8) Analisa EI-318
JENIS PEKERJAAN : Galian Perkerasan berbutir
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 177,850.66 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-319

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 3.1.(9). PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Perkerasan Beton TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.0000 10,177.49 10,177.49


2. Mandor (L03) Jam 0.1667 18,034.63 3,005.77

JUMLAH HARGA TENAGA 13,183.26

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Jack Hammer E26 Jam 0.4016 39,766.98 15,970.67
2. Compresor E05 Jam 0.4016 198,999.94 79,919.66
3. Dump Truck E08 Jam 0.2455 313,986.72 77,071.40

JUMLAH HARGA PERALATAN 172,961.73

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 186,144.99


E. OVERHEAD & PROFIT 10.0 % x D 18,614.50
F. HARGA SATUAN PEKERJAAN ( D + E ) 204,759.49
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 3.1.(9). Analisa EI-319
JENIS PEKERJAAN : Galian Perkerasan Beton
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang/rusak
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal perkerasan beton t 0.30 M
7 Berat volume perkerasan beton D 2.40 Ton/M3
8 Memakai Drill Breaker ( yes = 1 , No = 0 ) 0

II. URUTAN KERJA


1 Perkerasan beton yg dibongkar umumnya adalah perkerasan jalan
2 Pembongkaran dilakukan dengan Jack Hammer dan ganco kemudian
dimuat ke dalam truck secara manual.
3 Dump Truck membuang material hasil galian keluar diluar lokasi
pekerjaan atau sesuai perintah Direksi L 3.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk 6.00 menit/m2
Effesiensi kerja Fa 0.83
Kapa. Prod/jam = Fa x t x 60 Q1 2.490 M3
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260 0.4016 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktu siklus Ts1
- Muat = (V x 60)/(D x Q1 x Fk) T1 29.28 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.50 menit
- Lain-lain T4 3.00 menit
Ts1 42.78 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 4.07 M3 / Jam


Ts1
Koefisien Alat / m3 = 1 : Q2 (E08) 0.2455 Jam

3. TENAGA
Produksi menentukan : JACK HAMMER Q1 6.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 42.00 M3
Kebutuhan tenaga :
- Pekerja P 6.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1667 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1.(9). Analisa EI-319
JENIS PEKERJAAN : Galian Perkerasan Beton
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 204,759.49 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-351

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN :
PEKERJAAN :
KABUPATEN :
PROPINSI :
ITEM PEMBAYARAN : 3.5.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Geotekstil Filler untuk Drainase Bawa TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1 Mandor (L03) jam 0.0313 18,034.63 563.58
2 Pekerja (L01) jam 0.2500 10,177.49 2,544.37
3

JUMLAH HARGA TENAGA 3,107.95


###

B. BAHAN
1 Geotekstile filler GF M2 1.0000 0.0 -

JUMLAH HARGA BAHAN -

C. PERALATAN
1 Flat Bed Truck jam 0.0313 485,585.24 15,174.54
Alat Bantu Ls 1.0000 0.0 -

JUMLAH HARGA PERALATAN 15,174.54


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C) 18,282.49
E. OVERHEAD & PROFIT 10.0 % x D 1,828.25
F. HARGA SATUAN PEKERJAAN (D + E) 20,110.74
`
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-351

URAIAN ANALISA HARGA SATUAN

ITEM PEMBAYARAN NO : 3.5.(1)


JENIS PEKERJAAN : Geotekstil Filler untuk Drainase Bawah Permukaan (Kelas 2)
SATUAN PEMBAYARAN : M2

NO URAIAN KODE KOEF SATUAN KETERANGAN

I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L 18.5 Km
5 Jam kerja efektif per hari Tk 7.0 jam
6 Faktor kehilangan bahan Fh 1.05
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi

II URUTAN KERJA
1 Saluran lokasi pemasangan geotekstile digali
sampai permukaan galiannya rata
2 Geotekstile dihamparkan secara lepas tanpa kerutan
atau lipatan, dan tidak ada rongga antara geotekstile
dan permukaan tanah
3 Agregat drainase segera dihamparkan di atas
hamparan geotekstile, kemudian dipadatkan dengan
menggunakan pemadat getar
4 Pembayaran untuk persiapan lereng, penggalian, dan
pengurugan, lapisan dasar (bedding) jika ada dan bahan
penutup merupakan mata pembayaran terpisah

III PEMAKAIAN BAHAN, ALAT DAN BAHAN


1 BAHAN
1 Geotekstile filler untuk Drainase bawah permukaan GF 1.00 M2

2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp 2 rol
60 M2
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1 10.00 menit
Waktu angkut
Berangkat isi = L/20 x 60 T2 55.50 menit
Kembali kosong = L/30 x 60 T3 37.00 menit
lain-lain, bongkar T4 10.00 menit
Ts 112.50 menit

Kapasitas produksi/jam = Cp x 60 Q1 32.00 M²


Ts
Koefisien alat/M³ E11 0.0313 jam

2.b Alat Bantu


Pacul, sekop, kereta dorong, dll Ls 0.00

3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt 224.00 M²
mandor (M) M 1.00 orang
pekerja (P) P 8.00 orang

Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03 0.0313 jam
pekerja (P) = (Tk x P) : Qt L01 0.2500 jam

4 HARGA DASAR SATUAN UPAH, BAHAN & ALAT


(Lihat lampiran)

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam Formulir Standar Untuk
Perekaman Analisa Masing-Masing Harga Satuan.
Didapat Harga Satuan Pekerjaan:
Rp

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Waktu pelaksanaan : …………bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan : ……………. M3
Analisa EI-352a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN :
PEKERJAAN :
KABUPATEN :
PROPINSI :
ITEM PEMBAYARAN : 3.5.(2a) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Geotekstile Separator Kelas 1 TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1 Mandor (L03) jam 0.0313 18,034.63 563.58
2 Pekerja (L01) jam 0.2500 10,177.49 2,544.37
3

JUMLAH HARGA TENAGA 3,107.95


###

B. BAHAN
1 Geotekstile separator GSp M2 1.0000 0.0 -
kelas 1

JUMLAH HARGA BAHAN -

C. PERALATAN
1 Flat Bed Truck jam 0.0313 485,585.24 15,174.54
Alat Bantu Ls 1.0000 0.0 -

JUMLAH HARGA PERALATAN 15,174.54


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C) 18,282.49
E. OVERHEAD & PROFIT 10.0 % x D 1828.2493377498
F. HARGA SATUAN PEKERJAAN (D + E) 20,110.74
`
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-352a

URAIAN ANALISA HARGA SATUAN

ITEM PEMBAYARAN NO : 3.5.(2a)


JENIS PEKERJAAN : Geotekstile Separator Kelas 1
SATUAN PEMBAYARAN : M2

NO URAIAN KODE KOEF SATUAN KETERANGAN

I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L 18.5 Km
5 Jam kerja efektif per hari Tk 7.0 jam
6 Faktor kehilangan bahan Fh 1.05
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi

II URUTAN KERJA
1 Lokasi pemasangan geotekstile diratakan
2 Geotekstile digelar secara lepas tanpa kerutan atau
lipatan di atas tanah dasar yang sudah disisipkan
3 Penumpukan lapis pondasi bawah di atas gotekstile
dengan cara penumpukan ujung

III PEMAKAIAN BAHAN, ALAT DAN BAHAN


1 BAHAN
1 Geotekstile filler Saparator GSp 1.00 M2

2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp 2 rol
60 M2
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1 10.00 menit
Waktu angkut
Berangkat isi = L/20 x 60 T2 55.50 menit
Kembali kosong = L/30 x 60 T3 37.00 menit
lain-lain, bongkar T4 10.00 menit
Ts 112.50 menit

Kapasitas produksi/jam = Cp x 60 Q1 32.00 M²


Ts
Koefisien alat/M³ E11 0.0313 jam

2.b Alat Bantu


Pacul, sekop, kereta dorong, dll Ls 0.00

3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt 224.00 M²
mandor (M) M 1.00 orang
pekerja (P) P 8.00 orang

Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03 0.0313 jam
pekerja (P) = (Tk x P) : Qt L01 0.2500 jam

4 HARGA DASAR SATUAN UPAH, BAHAN & ALAT


(Lihat lampiran)

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam Formulir Standar Untuk
Perekaman Analisa Masing-Masing Harga Satuan.
Didapat Harga Satuan Pekerjaan:
Rp

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Waktu pelaksanaan : …………bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan : ……………. M3
Analisa EI-352b

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN :
PEKERJAAN :
KABUPATEN :
PROPINSI :
ITEM PEMBAYARAN : 3.5.(2b) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Geotekstile Separator Kelas 2 TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1 Mandor (L03) jam 0.0313 18,034.63 563.58
2 Pekerja (L01) jam 0.2500 10,177.49 2,544.37
3

JUMLAH HARGA TENAGA 3,107.95

B. BAHAN
1 Geotekstile separator GSp M2 1.0000 0.0 -
kelas 2

JUMLAH HARGA BAHAN -

C. PERALATAN
1 Flat Bed Truck jam 0.0313 485,585.24 15,174.54
Alat Bantu Ls 1.0000 0.0 -

JUMLAH HARGA PERALATAN 15,174.54


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C) 18,282.49
E. OVERHEAD & PROFIT 10.0 % x D 1828.2493377498
F. HARGA SATUAN PEKERJAAN (D + E) 20,110.74
`
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-352b

URAIAN ANALISA HARGA SATUAN

ITEM PEMBAYARAN NO : 3.5.(2b)


JENIS PEKERJAAN : Geotekstile Separator Kelas 2
SATUAN PEMBAYARAN : M2

NO URAIAN KODE KOEF SATUAN KETERANGAN

I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L 18.5 Km
5 Jam kerja efektif per hari Tk 7.0 jam
6 Faktor kehilangan bahan Fh 1.05
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi

II URUTAN KERJA
1 Lokasi pemasangan geotekstile diratakan
2 Geotekstile digelar secara lepas tanpa kerutan atau
lipatan di atas tanah dasar yang sudah disisipkan
3 Penumpukan lapis pondasi bawah di atas gotekstile
dengan cara penumpukan ujung

III PEMAKAIAN BAHAN, ALAT DAN BAHAN


1 BAHAN
1 Geotekstile filler Saparator GSp 1.00 M2

2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp 2 rol
60 M2
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1 10.00 menit
Waktu angkut
Berangkat isi = L/20 x 60 T2 55.50 menit
Kembali kosong = L/30 x 60 T3 37.00 menit
lain-lain, bongkar T4 10.00 menit
Ts 112.50 menit

Kapasitas produksi/jam = Cp x 60 Q1 32.00 M²


Ts
Koefisien alat/M³ E11 0.0313 jam

2.b Alat Bantu


Pacul, sekop, kereta dorong, dll Ls 0.00

3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt 224.00 M²
mandor (M) M 1.00 orang
pekerja (P) P 8.00 orang

Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03 0.0313 jam
pekerja (P) = (Tk x P) : Qt L01 0.2500 jam

4 HARGA DASAR SATUAN UPAH, BAHAN & ALAT


(Lihat lampiran)

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam Formulir Standar Untuk
Perekaman Analisa Masing-Masing Harga Satuan.
Didapat Harga Satuan Pekerjaan:
Rp

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Waktu pelaksanaan : …………bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan : ……………. M3
Analisa EI-352c

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN :
PEKERJAAN :
KABUPATEN :
PROPINSI :
ITEM PEMBAYARAN : 3.5.(2c) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Geotekstile Separator Kelas 3 TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1 Mandor (L03) jam 0.0313 18,034.63 563.58
2 Pekerja (L01) jam 0.2500 10,177.49 2,544.37
3

JUMLAH HARGA TENAGA 3,107.95


###

B. BAHAN
1 Geotekstile separator GSp M2 1.0000 0.0 -
kelas 3

JUMLAH HARGA BAHAN -

C. PERALATAN
1 Flat Bed Truck jam 0.0313 485,585.24 15,174.54
Alat Bantu Ls 1.0000 0.0 -

JUMLAH HARGA PERALATAN 15,174.54


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C) 18,282.49
E. OVERHEAD & PROFIT 10.0 % x D 1828.2493377498
F. HARGA SATUAN PEKERJAAN (D + E) 20,110.74
`
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-352c

URAIAN ANALISA HARGA SATUAN

ITEM PEMBAYARAN NO : 3.5.(2c)


JENIS PEKERJAAN : Geotekstile Separator Kelas 3
SATUAN PEMBAYARAN : M2

NO URAIAN KODE KOEF SATUAN KETERANGAN

I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L 18.5 Km
5 Jam kerja efektif per hari Tk 7.0 jam
6 Faktor kehilangan bahan Fh 1.05
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi

II URUTAN KERJA
1 Lokasi pemasangan geotekstile diratakan
2 Geotekstile digelar secara lepas tanpa kerutan atau
lipatan di atas tanah dasar yang sudah disisipkan
3 Penumpukan lapis pondasi bawah di atas gotekstile
dengan cara penumpukan ujung

III PEMAKAIAN BAHAN, ALAT DAN BAHAN


1 BAHAN
1 Geotekstile filler Saparator GSp 1.00 M2

2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp 2 rol
60 M2
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1 10.00 menit
Waktu angkut
Berangkat isi = L/20 x 60 T2 55.50 menit
Kembali kosong = L/30 x 60 T3 37.00 menit
lain-lain, bongkar T4 10.00 menit
Ts 112.50 menit

Kapasitas produksi/jam = Cp x 60 Q1 32.00 M²


Ts
Koefisien alat/M³ E11 0.0313 jam

2.b Alat Bantu


Pacul, sekop, kereta dorong, dll Ls 0.00

3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt 224.00 M²
mandor (M) M 1.00 orang
pekerja (P) P 8.00 orang

Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03 0.0313 jam
pekerja (P) = (Tk x P) : Qt L01 0.2500 jam

4 HARGA DASAR SATUAN UPAH, BAHAN & ALAT


(Lihat lampiran)

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam Formulir Standar Untuk
Perekaman Analisa Masing-Masing Harga Satuan.
Didapat Harga Satuan Pekerjaan:
Rp

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Waktu pelaksanaan : …………bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan : ……………. M3
Analisa EI-353

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN :
PEKERJAAN :
KABUPATEN :
PROPINSI :
ITEM PEMBAYARAN : 3.5.(3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Geotekstile Stabilisator (Kelas 1) TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1 Mandor (L03) jam 0.0313 18,034.63 563.58
2 Pekerja (L01) jam 0.2500 10,177.49 2,544.37
3

JUMLAH HARGA TENAGA 3,107.95


###

B. BAHAN
1 Geotekstile stabilisator GSp M2 1.0000 0.0 -
kelas 1

JUMLAH HARGA BAHAN -

C. PERALATAN
1 Flat Bed Truck jam 0.0313 485,585.24 15,174.54
Alat Bantu Ls 1.0000 0.0 -

JUMLAH HARGA PERALATAN 15,174.54


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C) 18,282.49
E. OVERHEAD & PROFIT 10.0 % x D 1828.2493377498
F. HARGA SATUAN PEKERJAAN (D + E) 20,110.74
`
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-353

Geotekstil Stabilisator (Kelas 1) URAIAN ANALISA HARGA SATUAN

ITEM PEMBAYARAN NO : 3.5.(3)


JENIS PEKERJAAN : Geotekstile Stabilisator (Kelas 1)
SATUAN PEMBAYARAN : M2

NO URAIAN KODE KOEF SATUAN KETERANGAN

I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L 18.5 Km
5 Jam kerja efektif per hari Tk 7.0 jam
6 Faktor kehilangan bahan Fh 1.05
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi

II URUTAN KERJA
1 Lokasi pemasangan geotekstile diratakan
2 Geotekstile digelar secara lepas tanpa kerutan atau
lipatan di atas tanah dasar yang sudah disisipkan
3 Penumpukan lapis pondasi bawah di atas gotekstile
dengan cara penumpukan ujung

III PEMAKAIAN BAHAN, ALAT DAN BAHAN


1 BAHAN
1 Geotekstile filler Saparator GSp 1.00 M2

2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp 2 rol
60 M2
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1 10.00 menit
Waktu angkut
Berangkat isi = L/20 x 60 T2 55.50 menit
Kembali kosong = L/30 x 60 T3 37.00 menit
lain-lain, bongkar T4 10.00 menit
Ts 112.50 menit

Kapasitas produksi/jam = Cp x 60 Q1 32.00 M²


Ts
Koefisien alat/M³ E11 0.0313 jam

2.b Alat Bantu


Pacul, sekop, kereta dorong, dll Ls 0.00

3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt 224.00 M²
mandor (M) M 1.00 orang
pekerja (P) P 8.00 orang

Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03 0.0313 jam
pekerja (P) = (Tk x P) : Qt L01 0.2500 jam

4 HARGA DASAR SATUAN UPAH, BAHAN & ALAT


(Lihat lampiran)

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam Formulir Standar Untuk
Perekaman Analisa Masing-Masing Harga Satuan.
Didapat Harga Satuan Pekerjaan:
Rp

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Waktu pelaksanaan : …………bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan : ……………. M3
Analisa EI-511

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.1.(1) PERKIRAAN VOL. PEK. : 353.35
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A TOTAL HARGA : 220,997,203.77
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 18.59

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0425 10,177.49 432.30


2. Mandor (L03) jam 0.0085 18,034.63 153.21

JUMLAH HARGA TENAGA 585.51

B. BAHAN

1. Aggrgat A M26 M3 1.2586 276,227.26 347,662.19

JUMLAH HARGA BAHAN 347,662.19

C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 610,697.15 5,188.01
2. Dump Truck (E08) jam 0.6478 313,986.72 203,398.60
3. Motor Grader (E13) jam 0.0043 753,810.29 3,210.83
4. Tandem Roller (E17) jam 0.0134 334,698.78 4,480.57
5. Water Tanker (E23) jam 0.0141 288,193.65 4,050.91
6. Alat Bantu Ls 1.0000 0.00 0.00
7.

JUMLAH HARGA PERALATAN 220,328.92

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 568,576.62


E. OVERHEAD & PROFIT 10.0 % x D 56,857.66
F. HARGA SATUAN PEKERJAAN ( D + E ) 625,434.28
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.1.(1) Analisa EI-511
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Fraksi lolos Scalping Screen 0 - 5 mm PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh1 1.05

II. URUTAN KERJA


1 Wheel Loader memuat Agregat campuran ke
dalam Dump Truck di Base Camp
2 Dump Truck mengangkut Agregat kelas A ke lokasi
pekerjaan dan dihampar dengan Motor Grader
3 Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Tandem
Roller
4 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) ### M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit panduan

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 117.71 M3


Ts1 x Bip/Bil
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0085 jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
Waktu Siklus :
- Waktu memuat = V x 60/Q1 x Bil T1 1.18 menit
- Waktu tempuh isi = (L : v1) x 60 menit T2 37.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T3 22.20 menit
- lain-lain T4 2.00 menit
Ts2 62.38 menit

Kap. Prod. / jam = V x Fa x 60 Q2 1.54 M3


Ts2 x Bip
Koefisien Alat / M3 = 1 : Q2 (E08) 0.6478 jam

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.1.(1) Analisa EI-511
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar efektif kerja blade b 2.40 M
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata alat v 4.00 KM/jam
Jumlah lintasan n 6.00 lintasan 1 x pp
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Waktu Siklus : Ts3
- Perataan 1 lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 1.00 menit
Ts3 1.75 menit

Kap. Prod. / jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 234.77 M3


n x Ts3

Koefisien Alat / M3 = 1 : Q3 (E13) 0.0043 jam

2.d. TANDEM ROLLER (E17)


Kecepatan rata-rata alat v 1.50 KM/jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 6.00 lintasan
Jumlah lajur lintasan N 3.00
Lebar overlap bo 0.30 m
Faktor Efisiensi alat Fa 0.83 -

Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 74.70 M3


n
Koefisien Alat / M3 = 1 : Q4 (E19) 0.0134 jam

2.e. WATER TANK TRUCK (E23)


Volume tanki air V 4.00 M3
Kebutuhan air / M3 agregat padat Wc 0.07 M3
Kapasitas pompa air pa 100.00 liter/menit
Faktor Efisiensi alat Fa 0.83 -

Kap. Prod. / jam = pa x Fa x 60 Q5 71.14 M3


1000 x Wc
Koefisien Alat / M3 = 1 : Q5 (E23) 0.0141 jam

2.g. ALAT BANTU Lump Sum


Diperlukan :
- Kereta dorong = 2 buah.
- Sekop = 3 buah.
- Garpu = 2 buah.

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0425 jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.1.(1) Analisa EI-511
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 625,434.28 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 5.50 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 353.35 M3
Analisa EI-512

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.1.(2) PERKIRAAN VOL. PEK. : 530.03
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B TOTAL HARGA : 321,282,156.93
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 27.02

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0595 10,177.49 605.22


2. Mandor (L03) jam 0.0085 18,034.63 153.21

JUMLAH HARGA TENAGA 758.43

B. BAHAN

1. Aggregat B M27 M3 1.2586 264,307.06 332,659.32

JUMLAH HARGA BAHAN 332,659.32

C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 610,697.15 5,188.01
2. Dump Truck (E08) jam 0.6478 313,986.72 203,398.60
3. Motor Grader (E13) jam 0.0043 753,810.29 3,210.83
4. Tandem Roller (E17) jam 0.0054 334,698.78 1,792.23
5. Water Tanker (E23) jam 0.0141 288,193.65 4,050.91
6. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 217,640.58

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 551,058.32


E. OVERHEAD & PROFIT 10.0 % x D 55,105.83
F. HARGA SATUAN PEKERJAAN ( D + E ) 606,164.16
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.1.(2) Analisa EI-512
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 22.00 % memenuhi
- Fraksi lolos Scalping Screen 0 - 5 mm St 60.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Fraksi lolos Scalping Screen 0 - 5 mm Fh3 1.05

II. URUTAN KERJA


1 Wheel Loader mencampur dan memuat Agregat ke
dalam Dump Truck di Base Camp
2 Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan Motor Grader
3 Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Tandem
Roller
4 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
Agregat B = 1 M3 x (Bip/Bil) x Fh (M27) 1.2586 M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - lepas
Faktor Efisiensi alat Fa 0.83 - kondisi sedang
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
Ts1 0.45 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 117.71 M3


Ts1 x Bip/Bil
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0085 jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
Waktu Siklus :
- Waktu memuat = V x 60/Q1 x Bil T1 1.18 menit
- Waktu tempuh isi = (L : v1) x 60 menit T2 37.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T3 22.20 menit
- dan lain-lain T4 2.00 menit
Ts2 62.38 menit

Kap. Prod. / jam = V x Fa x 60 Q2 1.54 M3


Ts2 x Bip
Koefisien Alat / M3 = 1 : Q2 - 0.6478 jam

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.1.(2) Analisa EI-512
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar efektif kerja blade b 2.40 M
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata alat v 4.00 KM/jam
Jumlah lintasan n 6.00 lintasan 1 x pp
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Waktu Siklus : Ts3
- Perataan 1 lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 1.00 menit
Ts3 1.75 menit

Kap. Prod. / jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 234.77 M3


n x Ts3
Koefisien Alat / M3 = 1 : Q3 (E13) 0.0043 jam

2.d. TANDEM ROLLER (E17)


Kecepatan rata-rata alat v 3.00 KM/jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 6.00 lintasan
Jumlah lajur lintasan N 3.00
Lebar overlap bo 0.30 m
Faktor Efisiensi alat Fa 0.83 -

Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 186.75 M3


n
Koefisien Alat / M3 = 1 : Q4 (E17) 0.0054 jam

2.e. WATER TANK TRUCK (E23)


Volume tanki air V 4.00 M3
Kebutuhan air / M3 agregat padat Wc 0.07 M3
Kapasitas pompa air pa 100.00 liter/menit
Faktor Efisiensi alat Fa 0.83 -

Kap. Prod. / jam = pa x Fa x 60 Q6 71.14 M3


Wc x 1000
Koefisien Alat / M3 = 1 : Q6 (E23) 0.0141 jam

2.g. ALAT BANTU Lump Sum


Diperlukan :
- Kereta dorong = 2 buah.
- Sekop = 3 buah.
- Garpu = 2 buah.

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0595 jam
- Mandor = (Tk x M) : Qt - 0.0085 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.1.(2) Analisa EI-512
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 606,164.16 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 5.50 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 530.03 M3
Analisa EI-521

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.2,(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lapis Permukaan Agregat Tanpa PenutupTOTAL HARGA : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0595 10,177.49 605.22


2. Mandor (L03) Jam 0.0085 18,034.63 153.21

JUMLAH HARGA TENAGA 758.43

B. BAHAN

1. Agregat Kelas C1 (M28) M3 1.2586 285,069.61 358,791.26

JUMLAH HARGA BAHAN 358,791.26

C. PERALATAN

1. Wheel Loader (E15) Jam 0.0085 610,697.15 5,188.01


2. Dump Truck (E08) Jam 0.6045 313,986.72 189,812.91
3. Motor Grader (E13) Jam 0.0043 753,810.29 3,210.83
4. Tandem Roller (E17) Jam 0.0107 334,698.78 3,584.46
5. Water Tanker (E23) Jam 0.0141 288,193.65 4,050.91
6. Alat Bantu Ls 1.0000 0.00 0.00
7.

JUMLAH HARGA PERALATAN 205,847.11

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 565,396.80


E. OVERHEAD & PROFIT 10.0 % x D 56,539.68
F. HARGA SATUAN PEKERJAAN ( D + E ) 621,936.48
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.2,(1) Analisa EI-521
JENIS PEKERJAAN : Lapis Permukaan Agregat Tanpa Penutup Aspal
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Berat isi agregat (lepas) Bil 1.51 ton/M3
Faktor kehilangan - Agregat C Fh 1.05

II. URUTAN KERJA


1 Wheel Loader memuat Agregat ke dalam Dump
Tuck di Base Camp
2 Dump Truck mengangkut Agregat ke lokasi
pekerjaandan dihampar dengan Motor Grader
3 Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Tandem
Roller
4 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material Agregat Kelas C hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x (Bip/Bil) x Fh (M28) 1.2586 M3 Agregat lepas

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - Pemuatan sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Muat T1 0.45 menit panduan
Ts1 0.45 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 117.71 M3


Ts1 x Bip/Bil
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0085 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 6.00 ton
Faktor Efisiensi alat Fa 0.80 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 30.00 KM/jam
Waktu Siklus :
- Waktu memuat = (V x 60)/(Q1 x Bip) T1 1.69 menit
- Waktu tempuh isi = (L : v1) x 60 menit T2 55.50 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T3 37.00 menit
- lain-lain T4 2.00 menit
Ts2 96.19 menit

Kap. Prod./jam = V x Fa x 60 Q2 1.65 M3


Ts2 x Bip
Koefisien Alat / M3 = 1 : Q2 (E08) 0.6045 Jam

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.2,(1) Analisa EI-521
JENIS PEKERJAAN : Lapis Permukaan Agregat Tanpa Penutup Aspal
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar efektif kerja blade b 2.40 M
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata alat v 4.00 KM / Jam
Jumlah lintasan n 6.00 lintasan
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Waktu Siklus Ts3
- Perataan 1 lintasan = (Lh x 60) : (v x 1000) T1 0.75 menit
- Lain-lain T2 1.00 menit
Ts3 1.75 menit

Kap. Prod. / jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 234.77 M3


n x Ts3
Koefisien Alat / M3 = 1 : Q3 (E13) 0.0043 Jam

2.d. TANDEM ROLLER (E17)


Kecepatan rata-rata v 1.50 KM / Jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 6.00 lintasan
Jumlah lajur lintasan N 3.00
Lebar overlap bo 0.30 m
Faktor Efisiensi alat Fa 0.83 -

Kap.Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 93.38 M3


n
Koefisien Alat / M3 = 1 : Q4 (E17) 0.0107 Jam

2.e. WATERTANK TRUCK (E23)


Volume tangki air V 4.00 M3
Kebutuhan air / M3 agregat padat Wc 0.07 M3
Kapasitas pompa air pa 100.00 liter/menit
Faktor Efisiensi alat Fa 0.83 -

Kap.Prod. / jam = pa x Fa x 60 Q5 71.14 M3


Wc x 1000
Koefisien Alat / M3 = 1 : Q5 (E23) 0.0141 Jam

2.g. ALAT BANTU


diperlukan : Lump Sum
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3 / Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.2,(1) Analisa EI-521
JENIS PEKERJAAN : Lapis Permukaan Agregat Tanpa Penutup Aspal
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 621,936.48 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-542

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.4.(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lapis Pondasi Semen Tanah TOTAL HARGA : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1784 10,177.49 1,815.66


2. Mandor (L03) Jam 0.0085 18,034.63 153.21

JUMLAH HARGA TENAGA 1,968.87

B. BAHAN

1. Tanah Timbunan (M08) M3 1.2000 69,600.00 83,520.00


Curing membran liter 1.3333 13,953.50
Chipping M3 0.0057 0.00

JUMLAH HARGA BAHAN 83,520.00

C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 610,697.15 5,188.01
2. Dump Truck (E08) Jam 0.8881 313,986.72 278,857.58
3. Motor Grader (E13) Jam 0.0043 753,810.29 3,210.83
4. Vibrator Roller (E19) Jam 0.0107 409,912.24 4,389.96
5. P. Tyre Roller (E18) Jam 0.0036 400,711.36 1,438.46
6. Water Tanker (E23) Jam 0.0141 288,193.65 4,050.91
7. Pulvi Mixer (E27) Jam 0.0067 1,003,029.70 6,713.72
8. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 303,849.47

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 389,338.34


E. OVERHEAD & PROFIT 10.0 % x D 38,933.83
F. HARGA SATUAN PEKERJAAN ( D + E ) 428,272.17
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.4.(2) Analisa EI-542
JENIS PEKERJAAN : Lapis Pondasi Semen Tanah
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata sumber material ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Berat isi padat Bip 1.81 ton/m3
7 Berat Isi lepas Bil 1.51 ton/m3
8 Harga pembayaran tidak termasuk semen ( semen
dibayar dalam item tersendiri)
9 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00 M
10 Faktor kembang material (padat - lepas) Fk 1.20 -
11 Tebal hamparan padat t 0.15 M
12 Berat volume tanah (lepas) Bj 1.30 ton/m3
13 Berat volume chip = Agg Kasar Bjc 1.40 ton/m3

II. URUTAN KERJA


1 Whell Loader memuat tanah/material ke dalam
Dump Truck di lokasi sumber bahan
2 Dump Truck mengangkut material ke lokasi pekerjaan
3 Motor Grader menghampar material di lokasi pekerjaan
4 Semen dan material tanah diaduk ditempat dengan
menggunakan Pulvi Mixer
5 Sebelum pemadatan material dibasahi dengan
menggunakan Water Tank Truck
6 Pemadatan dilakukan dengan menggunakan
Vibrator Roller dan Pneumatic Tire Roller
7 Selama pelaksanaan pekerjaan sekelompok pekerja
akan merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Setiap M3 Soil Cement padat diperlukan = 1 x Fk (M08) 1.20 M3
Curing membran = (1/t) x 0,2 1.33 liter
Chipping = ((1/t) x 1,2)/1000)/bjc 0.01 m3

2. ALAT
2.a. WHELL LOADER (E15)
Kapasitas bucket V 1.50 M3 lepas
Faktor bucket Fb 0.85 - Pemuatan sedang
Faktor efisiensi alat Fa 0.83 -
Waktu siklus : Ts1
- Muat T1 0.45 menit panduan
Ts1 0.45 menit

Kap. Prod. / Jam = V x Fb x Fa x 60 Q1 117.71 M3


Ts1 x Bip/Bil

Koefisien Alat / M3 = 1 / Q1 (E15) 0.0085 Jam

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.4.(2) Analisa EI-542
JENIS PEKERJAAN : Lapis Pondasi Semen Tanah
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 ton
Faktor Efisiensi alat Fa 0.80 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 30.00 KM/jam
Waktu Siklus :
- Waktu memuat = (V x 60)/(Q1 x Bj x Fk) T1 1.14 menit
- Waktu tempuh isi = (L : v1) x 60 menit T2 55.50 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T3 37.00 menit
- lain-lain T4 2.00 menit
Ts2 95.64 menit

Kapasitas Prod. / jam = V x Fa x 60 Q2 1.13 M3


Bj x Fk x Ts2

Koefisien Alat / M3 = 1 / Q2 (E08) 0.8881 Jam

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar efektif kerja blade b 2.40 M
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 6.00 lintasan
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Waktu siklus Ts3
- Perataan 1 lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 1.00 menit
Ts3 1.75 menit

Kap. Prod. / jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 234.77 M3


n x Ts3

Koefisien Alat / M3 = 1 / Q3 (E13) 0.0043 Jam

2.d. VIBRATOR ROLLER (VIBRA. COMPECTOR) (E19)


Kecepatan rata-rata alat v 1.50 Km / Jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 6.00 lintasan 3 x pp
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Faktor efisiensi alat Fa 0.83 -
Kap. Prod. / Jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 93.38 M3
n

Koefisien Alat / M3 = 1 / Q4 (E19) 0.0107 Jam

2.e. PNEUMATIC TIRE ROLLER (E18)


Kecepatan rata-rata alat v 2.50 Km / Jam panduan
Lebar efektif pemadatan b 1.99 M
Jumlah lintasan n 6.00 lintasan 2 x pp
Jumlah lajur lintasan N 3.00
Lebar overlap bo 0.30 m
Faktor efisiensi alat Fa 0.83 -

Kap. Prod. / Jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q5 278.57 M3


n

Koefisien Alat / M3 = 1 / Q5 (E18) 0.0036 Jam

2.e. WATER TANK TRUCK (E23)


Volume tangki air V 4.00 M3
Kebutuhan air / M3 agregat padat Wc 0.07 M3
Kapasitas pompa air pa 100.00 liter/menit
Faktor Efisiensi alat Fa 0.83 -
Kap.Prod. / jam = pa x Fa x 60 Q5 71.14 M3
Wc x 1000
Berlanjut ke hal. berikut
ITEM PEMBAYARAN NO. : 5.4.(2) Analisa EI-542
JENIS PEKERJAAN : Lapis Pondasi Semen Tanah
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Koefisien Alat / M3 = 1 / Q6 (E23) 0.0141 Jam

2.f. PULVI MIXER (E36)


Kecepatan rata-rata alat v 1.20 Km / Jam
Lebar efektif pengadukan b 2.00 M
Jumlah lintasan n 2.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Kap. Prod. / Jam = v x 1000 x b x t x Fa Q7 149.40 M3
n

Koefisien Alat / M3 = 1 / Q7 (E27) 0.0067 Jam

2.g. ALAT BANTU


Diperlukan : Lump Sump
- Kereta dorong = 2 buah
- Sekop = 3 buah
- untuk pekerjaan curing dan chipping

3. TENAGA
Produksi menetukan : WHEEL LOADER Q1 117.71 M3/Jam
Produksi Soil Cement / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 21.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1784 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.4.(2) Analisa EI-542
JENIS PEKERJAAN : Lapis Pondasi Semen Tanah
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 428,272.17 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-541

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.4.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Semen untuk Lapis Pondasi Semen TanaTOTAL HARGA : 0.00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.4306 10,177.49 24,736.95


2. Mandor (L03) Jam 0.1620 18,034.63 2,922.28

JUMLAH HARGA TENAGA 27,659.23

B. BAHAN
1. Semen (M12) Kg 1,050.0000 1,412.00 1,482,600.00

JUMLAH HARGA BAHAN 1,482,600.00

C. PERALATAN
1. Dump Truck (E08) Jam 0.9844 313,986.72 309,080.68

JUMLAH HARGA PERALATAN 309,080.68

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,819,339.91


E. OVERHEAD & PROFIT 10.0 % x D 181,933.99
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,001,273.90
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.4.(1) Analisa EI-541
JENIS PEKERJAAN : Semen untuk Lapis Pondasi Semen Tanah
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Semen diangkut dari Base Camp ke lapangan
dengan menggunakan Dump Truck
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00 M
8 Faktor hilang Material Fh 1.05 -
9 Tebal hamparan t 0.15 M

II. URUTAN KERJA


1 Dump Truck mengangkut semen dari Base Camp
ke lokasi Pekerjaan
2 Semen diatur/disusun di tempat hamparan
soil/tanah oleh tenaga manusia

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Bahan yang diperlukan / ton = (1 x Fh x 1000) (M12) 1,050.00 Kg

2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.80 -
Kecepatan rata-rata bermuatan v1 20.00 Km / Jam
Kecepatan rata-rata kosong v2 30.00 Km / Jam
Waktu siklus Ts1
- Waktu mengisi T1 30.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 55.50 menit
- Waktu bongkar T3 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T4 37.00 menit
- Lain-lain T5 5.00 menit
Ts1 157.50 menit

Kapasitas Prod. / jam = V x Fa x 60 Q1 1.02 Ton/Jam


Fh x Ts1

Koefisien Alat/Ton = 1 / Q1 (E08) 0.9844 Jam

3. TENAGA
Lebar Soil Cement b 6.00 M
Kadar semen : Spesifikasi 5.4.3 (1) = ( 3 - 12 ) % s 7.50 %
Berat jenis tanah Bj 1.60 ton / M3
Setiap hari dengan produksi = {(s : 100) x t x b x Ls} x Bj Qt 43.20 Ton

Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / Ton :


- Pekerja = (Tk x P) : Qt (L01) 2.4306 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1620 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.4.(1) Analisa EI-541
JENIS PEKERJAAN : Semen untuk Lapis Pondasi Semen Tanah
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 2,001,273.90 / Ton

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 Ton
Analisa EI-532
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.3.(2) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Perkerasan Beton Semen dengan An TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 1.4056 10,177.49 14,305.71
2. Tukang (L02) jam 0.7028 14,463.20 10,164.90
3. Mandor (L03) jam 0.1506 18,034.63 2,716.06

JUMLAH HARGA TENAGA 27,186.67

B. BAHAN
1. Semen (M12) Kg 410.0000 1,412.00 578,920.00
2 Pasir (M01a) M3 0.6237 174,200.00 108,643.85
3 Agregat Kasar (M03) M3 0.7885 0.00 0.00
4 Baja Tulangan Polos (M39a) Kg 45.0000 13,800.00 621,000.00
5 Joint Sealent (M94) Kg 0.9900 0.00 0.00
6 Cat Anti Karat (M95) Kg 0.0200 0.00 0.00
7 Expansion Cap (M96) M2 0.1700 0.00 0.00
8 Polytene 125 mikron (M97) Kg 0.3281 0.00 0.00
9 Curing Compound (M98) Ltr 0.6525 0.00 0.00
10 Formwork Plate M2 0.5700 0.00 0.00
11 Paku (M18) Kg 0.3500 18,000.00 6,300.00
12 Additive (M67a) Ltr 0.8568 0.00 0.00

JUMLAH HARGA BAHAN 1,314,863.85

C. PERALATAN
1 Wheel Loader E15 jam 0.0244 610,697.15 14,907.95
2 Batching Plant E43 jam 0.0502 785,846.78 39,450.14
3 Truck Mixer E49 jam 0.3326 737,685.59 245,333.02
4 Con. Vibrator E20 jam 0.0502 51,478.62 2,584.27
5 Water Tank Truck E23 jam 0.0422 288,193.65 12,152.74
6 Conc. Paver E42 jam 0.0074 669,352.75 4,978.08
7 Alat Bantu Ls 1.0000 0.00 0.00
8

JUMLAH HARGA PERALATAN 319,406.20


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,661,456.72
E. OVERHEAD & PROFIT 10.0 % x D 166,145.67
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,827,602.40
G. HARGA SATUAN PEKERJAAN / M3 1,827,602.40
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.3.(2) Analisa El-532
JENIS PEKERJAAN : Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.5 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Tebal Lapis perkerasan beton padat t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp. : Semen Sm 400.0 Kg/M3 Berdasarkan
: Pasir Ps 791.0 Kg/M3 JMF & sesuai
: Agregat Kasar Kr 1,077.0 Kg/M3 dgn Spesifikasi
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
II. URUTAN KERJA
1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Batching Plant
2 Pemasangan bekesting dan tulangan anyaman tunggal
3 Beton di-cor ke dalam bekisting dengan Slipform Paver
4 Beton setelah setting langsung digrooving dengan merata

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


Bahan untuk 1 m2 perkerasan beton t = 30 cm
1. BAHAN
1.a. Semen (PC) = Sm x 1.025 (M12) 410.000 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.025 (M01a) 0.6237 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.025 (M03) 0.7885 M3
1.d. Baja Tulangan Polos (M39a) 45.0000 Kg Lihat Gambar
1.e. Joint Sealent (M94) 0.9900 Kg
1.f. Cat Anti Karat (M95) 0.0200 Kg
1.g. Expansion Cap (M96) 0.1700 M2
1.h. Polytene 125 mikron (M97) 0.3281 Kg
1.i. Curing Compound (M98) 0.6525 Ltr
1.j. Formwork Plate 0.5700 M2
1.l. Paku (M18) 0.350 Kg
1.m. Additive (M67a) 0.8568 Ltr

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 40.96 M3


Ts1

Koefisien Alat/M2 = 1 : Q1 0.0244 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.3.(2) Analisa El-532
JENIS PEKERJAAN : Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. BATCHING PLANT (CONCRETE PAN MIXER) (E43)


Kapasitas produksi V 600.0 liter
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus pencampuran : Ts 2
- mengisi T1 0.50 menit
- mengaduk T2 0.50 menit
- menuang T3 0.25 menit
- menunggu dll T4 0.25 menit
Ts2 1.50 menit

Kap.Prod. / jam = V x Fa x 60 Q2 19.92 M2


1000 x Ts2
Koefisien Alat/M2 = 1 : Q2 0.0502 Jam

2.c. TRUCK MIXER (E49)


Kapasitas drum V 5.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata isi v1 30.00 KM / Jam
Kecepatan rata-rata kosong v2 40.00 KM / Jam
Waktu Siklus
- mengisi = (V : Q2) x 60 T1 15.06 menit
- mengangkut = (L : v1) x 60 menit T2 37.00 menit
- Kembali = (L : v2) x 60 menit T3 27.75 menit
- menumpahkan dll T4 3.00 menit
Ts3 82.81 menit

Kap.Prod. / jam = V x Fa x 60 Q3 3.0069 M3


Ts3

Koefisien Alat/M2 = 1 : Q3 0.3326 Jam

2.d. CONCRETE VIBRATOR (E20)


Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas BATCHING PLANT

Kap. Prod. / jam = Q4 19.920 M3

Koefisien Alat / M2 = 1 : Q4 0.0502 jam

2.e. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.21 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q5 23.71 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q5 (E23) 0.0422 jam

2.f. CONCRETTE PAVING MACHINE (SLIPFORM PAVER) (E42)


Kapasitas (lebar hamparan) b 3.00 M
Tebal hamparan t 0.30 M
Kecepatan menghampar v 3.00 M/menit
faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = b x t Fa x v x 60 Q6 134.460 M3

Koefisien Alat / M2 = 1 : Q6 0.0074 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.3.(2) 0
JENIS PEKERJAAN : Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.h. ALAT BANTU


Diperlukan :
- Concrete Cutter = 2 buah
- Bar Bending Machine = 2 buah
- Bar Cutting Machine = 2 buah
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 3 buah
- Ember Cor = 8 buah

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3

Kebutuhan tenaga : - Mandor M 3.00 orang


- Tukang Tb 14.00 orang
- Pekerja P 28.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7028 jam
- Pekerja = (Tk x P) : Qt (L01) 1.4056 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,827,602.40 / M2

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 0.00 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 1,827,602.40 M2
Analisa EI-533
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.3.(3) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Lapis Pondasi bawah Beton Kurus TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 1.5060 10,177.49 15,327.54
2. Tukang (L02) jam 0.4016 14,463.20 5,808.52
3. Mandor (L03) jam 0.1004 18,034.63 1,810.71

JUMLAH HARGA TENAGA 22,946.77

B. BAHAN
1. Semen (M12) Kg 309.5500 1,412.00 437,084.60
2 Pasir (M01a) M3 0.4991 174,200.00 86,942.55
3 Agregat Kasar (M03) M3 0.8837 0.00 0.00
4 Multiplex 12 mm (M73) Lbr 0.1600 0.00 0.00
5 Kayu Acuan (M99) M3 0.0960 2,312,500.00 222,000.00
6 Paku (M18) Kg 0.2500 18,000.00 4,500.00

JUMLAH HARGA BAHAN 750,527.15

C. PERALATAN
1 Wheel Loader E15 jam 0.0244 610,697.15 14,907.95
2 Batching Plant E43 jam 0.0502 785,846.78 39,450.14
3 Truck Mixer E49 jam 0.3326 737,685.59 245,333.02
4 Con. Vibrator E20 jam 0.0502 51,478.62 2,584.27
5 Water Tank Truck E23 jam 0.0422 288,193.65 12,152.74
6 Conc. Paver E42 jam 0.0037 669,352.75 2,489.04
7 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 316,917.16


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,090,391.08
E. OVERHEAD & PROFIT 10.0 % x D 109,039.11
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,199,430.19
G. HARGA SATUAN PEKERJAAN / M3 1,199,430.19
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.3.(3) Analisa El-533
JENIS PEKERJAAN : Lapis Pondasi bawah Beton Kurus
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.5 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Tebal Lapis pondasi bawah beton kurus t 0.10 m
7 Kadar Semen Minimum (Spesifikasi) Ks 250 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.60 -
10 Perbandingan Camp. : Semen Sm 302.0 Kg/M3 Berdasarkan
: Pasir Ps 633.0 Kg/M3 JMF & sesuai
: Agregat Kasar Kr 1,207.0 Kg/M3 dgn Spesifikasi
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Batching Plant
2 Pembersihan lokasi dan Pemasangan bekesting.
3 Beton di-cor ke dalam bekisting dengan Slipform Paver
4 Penyelesaian dan perapihan setelah pemasangan
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
Bahan untuk 1 m2 perkerasan beton t = 10 cm
1. BAHAN
1.a. Semen (PC) = Sm x 1.025 (M12) 309.550 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.025 (M01a) 0.4991 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.025 (M03) 0.8837 M3
1.d. Multiplex 12 mm (M63) 0.1600 Lbr
1.e. Kayu Acuan (M99) 0.096 M3
1.f. Paku (M18) 0.250 Kg

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 40.96 M3


Ts1

Koefisien Alat/M2 = 1 : Q1 0.0244 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.3.(3) Analisa El-533
JENIS PEKERJAAN : Lapis Pondasi bawah Beton Kurus
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. BATCHING PLANT (CONCRETE PAN MIXER) (E43)


Kapasitas produksi V 600.0 Liter
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus pencampuran : Ts 2
- mengisi T1 0.50 menit
- mengaduk T2 0.50 menit
- menuang T3 0.25 menit
- menunggu dll T4 0.25 menit
Ts2 1.50 menit

Kap.Prod. / jam = V x Fa x 60 Q2 19.92 M2


1000 x Ts2
Koefisien Alat/M2 = 1 : Q2 0.0502 Jam

2.c. TRUCK MIXER (E49)


Kapasitas drum V 5.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata isi v1 30.00 KM / Jam
Kecepatan rata-rata kosong v2 40.00 KM / Jam
Waktu Siklus
- mengisi = (V : Q2) x 60 T1 15.06 menit
- mengangkut = (L : v1) x 60 menit T2 37.00 menit
- Kembali = (L : v2) x 60 menit T3 27.75 menit
- menumpahkan dll T4 3.00 menit
Ts3 82.81 menit

Kap.Prod. / jam = V x Fa x 60 Q3 3.0069 M3


Ts3

Koefisien Alat/M2 = 1 : Q3 0.3326 Jam

2.d. CONCRETE VIBRATOR (E20)


Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas BATCHING PLANT

Kap. Prod. / jam = Q4 19.920 M3

Koefisien Alat / M2 = 1 : Q4 0.0502 jam

2.e. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.21 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q5 23.71 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q5 (E23) 0.0422 jam

2.f. CONCRETTE PAVING MACHINE (SLIPFORM PAVER) (E42)


Kapasitas (lebar hamparan) b 3.00 M
Tebal hamparan t 0.30 M
Kecepatan menghampar v 6.00 M/menit
faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = b x t Fa x v x 60 Q6 268.920 M3

Koefisien Alat / M2 = 1 : Q6 0.0037 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.3.(3) Analisa El-533
JENIS PEKERJAAN : Lapis Pondasi bawah Beton Kurus
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.h. ALAT BANTU


Diperlukan :
- Concrete Cutter = 2 buah
- Bar Bending Machine = 2 buah
- Bar Cutting Machine = 2 buah
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 3 buah
- Ember Cor = 8 buah

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3

Kebutuhan tenaga : - Mandor M 2.00 orang


- Tukang Tb 8.00 orang
- Pekerja P 30.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4016 jam
- Pekerja = (Tk x P) : Qt (L01) 1.5060 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,199,430.19 / M2

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 0.00 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 1,199,430.19 M2
Analisa EI-551
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.5.(1) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Lapis Pondasi Atas Bersemen (Cemen
TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 1.0542 10,177.49 10,729.28
2. Tukang (L02) jam 0.3012 14,463.20 4,356.39
3. Mandor (L03) jam 0.1506 18,034.63 2,716.06

JUMLAH HARGA TENAGA 17,801.73

B. BAHAN
1. Semen (M12) Kg 87.1250 1,412.00 123,020.50

2 Agregat Kasar (M03) M3 1.2586 0.00 0.00

JUMLAH HARGA BAHAN 123,020.50

C. PERALATAN
1 Wheel Loader E15 jam 0.0244 610,697.15 14,907.95
2 Batching Plant E43 jam 0.0753 785,846.78 59,175.21
3 Dump Truck E08 jam 0.4794 313,986.72 150,532.14
4 Vibrator Roller jam 0.0054 0.00 0.00
5 Water Tank Truck E23 jam 0.0422 288,193.65 12,152.74
6 Screed Paver jam 0.0096 0.00 0.00
7 Alat Bantu Ls 1.0000 0.00 0.00
8

JUMLAH HARGA PERALATAN 236,768.05


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 377,590.27
E. OVERHEAD & PROFIT 10.0 % x D 37,759.03
F. HARGA SATUAN PEKERJAAN ( D + E ) 415,349.30
G. HARGA SATUAN PEKERJAAN / M3 415,349.30
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.5.(1) Analisa El-551
JENIS PEKERJAAN : Lapis Pondasi Atas Bersemen (Cement Treated Base) (CTB)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar CTSB (agregat, semen dan air) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.5 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Tebal Lapis CTSB t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 85.00 Kg/M3
8 Ukuran Agregat Maksimum Ag 37 mm
9 Berat isi padat Bip 1.81 -
10 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
11 Perbandingan Camp. : Semen Sm 6.0 Kg/M3 Berdasarkan
: Agregat Kasar Kr 94.0 Kg/M3 JMF & sesuai
dgn Spesifikasi
12 Faktor Kehilangan Material :
- Semen Fh1 1.02 T/M3
- Agregat Kasar Fh2 1.05 T/M3

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
dengan menggunakan Batching Plant
2 Penyiapan lokasi penghamparan CTSB dilapangan
3 CTSB dihampar dengan menggunakan Screed Paver
4 Setelah dihampar dipadatkan merata dengan vibrator roller
5 Dilakukan perawatan kekeringannya setelah pemadatan
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
Untuk 1 M3 CTSB
1. BAHAN
1.a. Semen (PC) = Sm x 1.02 (M12) 87.125 Kg

1.b. Agregat Kasar = = 1 M3 x (Bip/Bil) x Fh (M03) 1.2586 M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 40.96 M3


Ts1

Koefisien Alat/M2 = 1 : Q1 0.0244 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.5.(1) Analisa El-551
JENIS PEKERJAAN : Lapis Pondasi Atas Bersemen (Cement Treated Base) (CTB)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. BATCHING PLANT (E53)


Kapasitas bucket V 400.0 Liter
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus pencampuran : Ts 2
- mengisi T1 0.50 menit
- mengaduk T2 0.50 menit
- menuang T3 0.25 menit
- menunggu dll T4 0.25 menit
Ts2 1.50 menit

Kap.Prod. / jam = V x Fa x 60 Q2 13.28 M3


1000 x Ts2
Koefisien Alat/M3 = 1 : Q2 0.0753 Jam

2.c. DUMP TRUCK (E08)


Kapasitas drum V 3.50 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata isi v1 30.00 KM / Jam
Kecepatan rata-rata kosong v2 40.00 KM / Jam
Waktu Siklus
- mengisi = (V : Q2) x 60 T1 15.81 menit
- mengangkut = (L : v1) x 60 menit T2 37.00 menit
- Kembali = (L : v2) x 60 menit T3 27.75 menit
- menumpahkan dll T4 3.00 menit
Ts3 83.56 menit

Kap.Prod. / jam = V x Fa x 60 Q3 2.0858 M3


Ts3
Koefisien Alat/M2 = 1 : Q3 0.4794 Jam

2.d. VIBRATOR ROLLER (E55)


Kecepatan rata-rata alat v 2.00 Km / Jam
Lebar efektif pemadatan b 1.48 M
Jumlah lintasan n 4.00 lintasan
Lajur lintasan N 1.00
Lebar Overlap bo 0.30 M
Faktor efisiensi alat Fa 0.83 -

Kapasitas Prod./Jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 184.26 M3


n

Koefisien Alat / M3 = 1 : Q4 (E19) 0.0054 Jam

2.e. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.21 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q5 23.71 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q5 (E23) 0.0422 jam

2.f. SCREED PAVER (E54)


Kapasitas (lebar hamparan) b 3.50 M
Tebal hamparan t 0.20 M
Kecepatan menghampar v 3.00 M/menit
faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = b x t Fa x v x 60 Q6 104.580 M3

Koefisien Alat / M2 = 1 : Q6 0.0096 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.5.(1) Analisa El-551
JENIS PEKERJAAN : Lapis Pondasi Atas Bersemen (Cement Treated Base) (CTB)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.h. ALAT BANTU


Diperlukan :
- Mistar Pengecek Kerataan = 2 buah
- Alat Perata Permukaan = 2 buah
- Penghalus Permukaan dari kayu = 2 buah
- Sekop = 2 buah
- Pacul = 2 buah
- Acuan Tepi = 1 buah

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 92.96 M3

Kebutuhan tenaga : - Mandor M 2.00 orang


- Tukang Tb 4.00 orang
- Pekerja P 14.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3012 jam
- Pekerja = (Tk x P) : Qt (L01) 1.0542 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 415,349.30 / M2

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 0.00 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 415,349.30 M2
Analisa EI-552
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.5.(2) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Lapis Pondasi Bawah (Cement Treat TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 1.0542 10,177.49 10,729.28
2. Tukang (L02) jam 0.3012 14,463.20 4,356.39
3. Mandor (L03) jam 0.1506 18,034.63 2,716.06

JUMLAH HARGA TENAGA 17,801.73

B. BAHAN
1. Semen (M12) Kg 112.7500 1,412.00 159,203.00

2 Agregat Kasar (M03) M3 1.2586 0.00 0.00

JUMLAH HARGA BAHAN 159,203.00

C. PERALATAN
1 Wheel Loader E15 jam 0.0244 610,697.15 14,907.95
2 Batching Plant E53 jam 0.0753 38,944.30 2,932.55
3 Dump Truck E08 jam 0.4794 313,986.72 150,532.14
4 Vibrator Roller E55 jam 0.0054 202,269.29 1,097.74
5 Water Tank Truck E23 jam 0.0422 288,193.65 12,152.74
6 Screed Paver E54 jam 0.0127 38,944.30 496.52
7 Alat Bantu Ls 1.0000 0.00 0.00
8

JUMLAH HARGA PERALATAN 182,119.64


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 359,124.37
E. OVERHEAD & PROFIT 10.0 % x D 35,912.44
F. HARGA SATUAN PEKERJAAN ( D + E ) 395,036.81
G. HARGA SATUAN PEKERJAAN / M3 395,036.81
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.5.(2) Analisa EI-552
JENIS PEKERJAAN : Lapis Pondasi Bawah (Cement Treated Sub Base) (CTSB)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar CTB (agregat, semen dan air) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.5 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Tebal Lapis CTB t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 110.00 Kg/M3
8 Ukuran Agregat Maksimum Ag 37 mm
9 Berat isi padat Bip 1.81 -
10 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
11 Perbandingan Camp. : Semen Sm 7.0 Kg/M3 Berdasarkan
: Agregat Kasar Kr 93.0 Kg/M3 JMF & sesuai
dgn Spesifikasi
12 Faktor Kehilangan Material :
- Semen Fh1 1.02 T/M3
- Agregat Kasar Fh2 1.05 T/M3

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
dengan menggunakan Batching Plant
2 Penyiapan lokasi penghamparan CTB dilapangan
3 CTSB dihampar dengan menggunakan Screed Paver
4 Setelah dihampar dipadatkan merata dengan vibrator roller
5 Dilakukan perawatan kekeringannya setelah pemadatan
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
Untuk 1 M3 CTB
1. BAHAN
1.a. Semen (PC) = Sm x 1.02 (M12) 112.750 Kg

1.c. Agregat Kasar = = 1 M3 x (Bip/Bil) x Fh (M03) 1.2586 M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 40.96 M3


Ts1

Koefisien Alat/M2 = 1 : Q1 0.0244 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.5.(2) Analisa EI-552
JENIS PEKERJAAN : Lapis Pondasi Bawah (Cement Treated Sub Base) (CTSB)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. BATCHING PLANT (E53)


Kapasitas bucket V 400.0 Liter
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus pencampuran : Ts 2
- mengisi T1 0.50 menit
- mengaduk T2 0.50 menit
- menuang T3 0.25 menit
- menunggu dll T4 0.25 menit
Ts2 1.50 menit

Kap.Prod. / jam = V x Fa x 60 Q2 13.28 M3


1000 x Ts2
Koefisien Alat/M3 = 1 : Q2 0.0753 Jam

2.c. DUMP TRUCK (E08)


Kapasitas drum V 3.50 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata isi v1 30.00 KM / Jam
Kecepatan rata-rata kosong v2 40.00 KM / Jam
Waktu Siklus
- mengisi = (V : Q2) x 60 T1 15.81 menit
- mengangkut = (L : v1) x 60 menit T2 37.00 menit
- Kembali = (L : v2) x 60 menit T3 27.75 menit
- menumpahkan dll T4 3.00 menit
Ts3 83.56 menit

Kap.Prod. / jam = V x Fa x 60 Q3 2.0858 M3


Ts3
Koefisien Alat/M2 = 1 : Q3 0.4794 Jam

2.d. VIBRATOR ROLLER (E55)


Kecepatan rata-rata alat v 2.00 Km / Jam
Lebar efektif pemadatan b 1.48 M
Jumlah lintasan n 4.00 lintasan
Lajur lintasan N 1.00
Lebar Overlap bo 0.30 M
Faktor efisiensi alat Fa 0.83 -

Kapasitas Prod./Jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 184.26 M3


n

Koefisien Alat / M3 = 1 : Q4 (E19) 0.0054 Jam

2.e. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.21 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q5 23.71 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q5 (E23) 0.0422 jam

2.f. SCREED PAVER (E54)


Kapasitas (lebar hamparan) b 3.50 M
Tebal hamparan t 0.15 M
Kecepatan menghampar v 3.00 M/menit
faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = b x t Fa x v x 60 Q6 78.435 M3

Koefisien Alat / M2 = 1 : Q6 0.0127 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.5.(2) Analisa EI-552
JENIS PEKERJAAN : Lapis Pondasi Bawah (Cement Treated Sub Base) (CTSB)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.h. ALAT BANTU


Diperlukan :
- Mistar Pengecek Kerataan = 2 buah
- Alat Perata Permukaan = 2 buah
- Penghalus Permukaan dari kayu = 2 buah
- Sekop = 2 buah
- Pacul = 2 buah
- Acuan Tepi = 1 buah

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 92.96 M3

Kebutuhan tenaga : - Mandor M 2.00 orang


- Tukang Tb 4.00 orang
- Pekerja P 14.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3012 jam
- Pekerja = (Tk x P) : Qt (L01) 1.0542 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 395,036.81 / M2

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 0.00 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 395,036.81 M2
Analisa EI-522

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : ……………………… PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lapis Pondasi Agregat Tanpa Penutup AsTOTAL HARGA : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0595 10,177.49 605.22


2. Mandor (L03) jam 0.0085 18,034.63 153.21

JUMLAH HARGA TENAGA 758.43

B. BAHAN

1. Lps Pondasi Agr (M27a) M3 1.2586 284,479.57 358,048.63

JUMLAH HARGA BAHAN 358,048.63

C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 610,697.15 5,188.01
2. Dump Truck (E08) jam 0.4863 313,986.72 152,696.86
3. Motor Grader (E13) jam 0.0032 753,810.29 2,408.12
4. Tandem Vibro Roller (E17) jam 0.0030 334,698.78 1,008.13
5. Water Tanker (E23) jam 0.0141 288,193.65 4,050.91
6. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 165,352.03

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 524,159.09


E. OVERHEAD & PROFIT 10.0 % x D 52,415.91
F. HARGA SATUAN PEKERJAAN ( D + E ) 576,574.99
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.2,(2) Analisa EI-522
JENIS PEKERJAAN : Lapis Pondasi Agregat Tanpa Penutup Aspal
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.20 M
6 Berat isi padat Bip 1.81 ton/m3
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm A20-30 24.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm A5-10&10-20 21.24 % memenuhi Spec.
- Fraksi lolos Scalping Screen 0 - 5 mm PU 54.76 %
9 Berat Isi lepas Bil 1.51 ton/m3
Faktor kehilangan - Lapis Pondasi Agregat Fh1 1.05

II. URUTAN KERJA


1 Wheel Loader memuat Agregat campuran ke
dalam Dump Truck di Base Camp
2 Dump Truck mengangkut Lapis Pondasi Agregat ke lokasi
pekerjaan dan dihampar dengan Motor Grader
3 Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Tandem
Roller
4 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Lps Pondasi Agr = 1 M3 x (Bip/Bil) x Fh (M26) ### M3

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit panduan

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 117.71 M3


Ts1 x Bip/Bil
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0085 jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 30.00 KM/jam
Waktu Siklus :
- Waktu memuat = V x 60/Q1 x Bil T1 1.18 menit
- Waktu tempuh isi = (L : v1) x 60 menit T2 26.19 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T3 17.46 menit
- lain-lain T4 2.00 menit
Ts2 46.83 menit

Kap. Prod. / jam = V x Fa x 60 Q2 2.06 M3


Ts2 x Bip
Koefisien Alat / M3 = 1 : Q2 (E08) 0.4863 jam

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.2,(2) Analisa EI-522
JENIS PEKERJAAN : Lapis Pondasi Agregat Tanpa Penutup Aspal
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar efektif kerja blade b 2.40 M
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata alat v 4.00 KM/jam
Jumlah lintasan n 6.00 lintasan
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Waktu Siklus : Ts3
- Perataan 1 lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 1.00 menit
Ts3 1.75 menit

Kap. Prod. / jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 313.03 M3


n x Ts3

Koefisien Alat / M3 = 1 : Q3 (E13) 0.0032 jam

2.d. TANDEM VIBRO ROLLER (E17)


Kecepatan rata-rata alat v 4.00 KM/jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 6.00 lintasan
Jumlah lajur lintasan N 3.00
Lebar overlap bo 0.30 m
Faktor Efisiensi alat Fa 0.83 -

Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 332.00 M3


n
Koefisien Alat / M3 = 1 : Q4 (E19) 0.0030 jam

2.e. WATER TANK TRUCK (E23)


Volume tanki air V 4.00 M3
Kebutuhan air / M3 agregat padat Wc 0.07 M3
Kapasitas pompa air pa 100.00 liter/menit
Faktor Efisiensi alat Fa 0.83 -

Kap. Prod. / jam = pa x Fa x 60 Q5 71.14 M3


1000 x Wc
Koefisien Alat / M3 = 1 : Q5 (E23) 0.0141 jam

2.g. ALAT BANTU Lump Sum


Diperlukan :
- Kereta dorong = 2 buah.
- Sekop = 3 buah.
- Garpu = 2 buah.

3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595 jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke hal. berikut


ITEM PEMBAYARAN NO. : 5.2,(2) Analisa EI-522
JENIS PEKERJAAN : Lapis Pondasi Agregat Tanpa Penutup Aspal
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 576,574.99 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-531
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 5.3.(1) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Perkerasan Jalan Beton TOTAL HARGA (Rp.) : -
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 1.4056 10,177.49 14,305.71
2. Tukang (L02) jam 0.7028 14,463.20 10,164.90
3. Mandor (L03) jam 0.1506 18,034.63 2,716.06

JUMLAH HARGA TENAGA 27,186.67

B. BAHAN
1. Semen (M12) Kg 410.0000 1,412.00 578,920.00
2 Pasir (M01a) M3 0.6237 174,200.00 108,643.85
3 Agregat Kasar (M03) M3 0.7885 0.00 0.00
4 Baja Tulangan Polos (M39a) Kg 15.8750 13,800.00 219,075.00
5 Joint Sealent (M94) Kg 0.9900 0.00 0.00
6 Cat Anti Karat (M95) Kg 0.0200 0.00 0.00
7 Expansion Cap (M96) M2 0.1700 0.00 0.00
8 Polytene 125 mikron (M97) Kg 0.4375 0.00 0.00
9 Curing Compound (M98) Ltr 0.8700 0.00 0.00
10 Multiplex 12 mm (M73) Lbr 0.1600 0.00 0.00
11 Kayu Acuan (M99) M3 0.0960 2,312,500.00 222,000.00
12 Paku (M18) Kg 1.0240 18,000.00 18,432.00
13 Additive (M67a) Ltr 0.9139 0.00 0.00
JUMLAH HARGA BAHAN 1,147,070.85

C. PERALATAN
1 Wheel Loader E15 jam 0.0244 610,697.15 14,907.95
2 Batching Plant E43 jam 0.0502 785,846.78 39,450.14
3 Truck Mixer E49 jam 0.4400 737,685.59 324,582.37
4 Con. Vibrator E20 jam 0.0502 51,478.62 2,584.27
5 Water Tank Truck E23 jam 0.0422 288,193.65 12,152.74
6 Conc. Paver E42 jam 0.0074 669,352.75 4,978.08
7 Alat Bantu Ls 1.0000 0.00 0.00
8

JUMLAH HARGA PERALATAN 398,655.56


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,572,913.08
E. OVERHEAD & PROFIT 10.0 % x D 157,291.31
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,730,204.39
G. HARGA SATUAN PEKERJAAN / M3 1,730,204.39
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 5.3.(1) Analisa EI-531
JENIS PEKERJAAN : Perkerasan Beton Semen
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.5 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal Lapis perkerasan beton padat t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp. : Semen Sm 400.0 % Berdasarkan
: Pasir Ps 791.0 % JMF & sesuai
: Agregat Kasar Kr 1,077.0 % dgn Spesifikasi
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Batching Plant
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


Bahan untuk 1 m2 perkerasan beton t = 30 cm
1. BAHAN
1.a. Semen (PC) = Sm x 1.025 (M12) 410.000 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.025 (M01a) 0.6237 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.025 (M03) 0.7885 M3
1.d. Baja Tulangan Polos (M39a) 15.8750 Kg
1.e. Joint Sealent (M94) 0.9900 Kg
1.f. Cat Anti Karat (M95) 0.0200 Kg
1.g. Expansion Cap (M96) 0.1700 M2
1.h. Polytene 125 mikron (M97) 0.4375 Kg
1.i. Curing Compound (M98) 0.8700 Ltr
1.j. Multiplex 12 mm (M63) 0.1600 Lbr
1.k. Kayu Acuan (M99) 0.096 M3
1.l. Paku (M18) 1.024 Kg
1.m. Additive (M67a) 0.9139 Ltr

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 40.96 M3


Ts1

Koefisien Alat/M2 = 1 : Q1 0.0244 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.3.(1) Analisa EI-531
JENIS PEKERJAAN : Perkerasan Beton Semen
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. BATCHING PLANT (CONCRETE PAN MIXER) (E43)


Kapasitas produksi V 600.0 liter
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus pencampuran : Ts 2
- mengisi T1 0.50 menit
- mengaduk T2 0.50 menit
- menuang T3 0.25 menit
- menunggu dll T4 0.25 menit
Ts2 1.50 menit

Kap.Prod. / jam = V x Fa x 60 Q2 19.92 M2


1000 x Ts2
Koefisien Alat/M2 = 1 : Q2 0.0502 Jam

2.c. TRUCK MIXER (E49)


Kapasitas drum V 5.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata isi v1 20.00 KM / Jam
Kecepatan rata-rata kosong v2 30.00 KM / Jam
Waktu Siklus
- mengisi = (V : Q2) x 60 T1 15.06 menit
- mengangkut = (L : v1) x 60 menit T2 55.50 menit
- Kembali = (L : v2) x 60 menit T3 37.00 menit
- menumpahkan dll T4 2.00 menit
Ts3 109.56 menit

Kap.Prod. / jam = V x Fa x 60 Q3 2.2727 M3


Ts3

Koefisien Alat/M2 = 1 : Q3 0.4400 Jam

2.d. CONCRETE VIBRATOR (E20)


Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas BATCHING PLANT

Kap. Prod. / jam = Q4 19.920 M3

Koefisien Alat / M2 = 1 : Q4 0.0502 jam

2.e. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.21 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q5 23.71 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q5 (E23) 0.0422 jam

2.f. CONCRETTE PAVING MACHINE (SLIPFORM PAVER) (E42)


Kapasitas (lebar hamparan) b 3.00 M
Tebal hamparan t 0.30 M
Kecepatan menghampar v 3.00 M/menit
faktor effesiensi alat Fa 0.83

Kap. Prod. / jam = b x t Fa x v x 60 Q6 134.460 M3

Koefisien Alat / M2 = 1 : Q6 0.0074 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 5.3.(1) Analisa EI-531
JENIS PEKERJAAN : Perkerasan Beton Semen
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.h. ALAT BANTU


Diperlukan :
- Concrete Cutter = 2 buah
- Bar Bending Machine = 2 buah
- Bar Cutting Machine = 2 buah
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 3 buah
- Ember Cor = 8 buah

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3

Kebutuhan tenaga : - Mandor M 3.00 orang


- Tukang Tb 14.00 orang
- Pekerja P 28.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7028 jam
- Pekerja = (Tk x P) : Qt (L01) 1.4056 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M2

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 0.00 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 1,730,204.39 M2
Analisa EI-611a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 6.1 (1)(a) PERKIRAAN VOL. PEK. : 2,826.80
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair TOTAL HARGA (Rp.) : 41,282,737.53
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 3.47

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 10,177.49 21.20


2. Mandor (L03) Jam 0.0004 18,034.63 7.51

JUMLAH HARGA TENAGA 28.72

B. BAHAN

1. Aspal (M10) Kg 0.6790 13,750.00 9,335.92


2. Kerosene (M11) liter 0.3708 10,200.00 3,782.16

JUMLAH HARGA BAHAN 13,118.08

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 423,149.41 88.16


2. Compressor E05 Jam 0.0002 198,999.94 41.46

JUMLAH HARGA PERALATAN 129.61

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,276.41


E. OVERHEAD & PROFIT 10.0 % x D 1,327.64
F. HARGA SATUAN PEKERJAAN ( D + E ) 14,604.05
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 6.1 (1)(a) Analisa EI-611a
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 64 % terhadap volume
- Kerosene K 36 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 2 D1 1.03 Kg / liter
- Kerosene D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan

II. URUTAN KERJA


1 Aspal dan Minyak Flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
3 Campuran aspal cair disemprotkan dengan Asphalt
Distributor ke atas permukaan yang akan dilapis.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.03 liter

1.a. Aspal = As x PC x D1 (M10) 0.6790 Kg.


1.b. Kerosene = K x PC (M11) 0.3708 Liter

2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Kecepatan penyemprotan V 30.00 m/menit Asumsi
Kapasitas pompa aspal pas 100 liter/menit Panduan
Faktor effisiensi kerja Fa 0.80 Sedang

Kap. Prod. / jam = pas x Fa x 60 Q1 4,800.00 liter

Koefisien Alat / Ltr = 1 : Q1 (E41) 0.0002 Jam

2.b. AIR COMPRESSOR (E05)

Kap. Prod. / jam = Asphalt Distributor Q2 4,800.00 liter

Koefisien Alat / Ltr = 1 : Q2 (E05) 0.0002 Jam

3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4 4,800.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 33,600.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 6.1 (1)(a) Analisa EI-611a
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Koefisien tenaga / liter :


- Pekerja = (Tk x P) : Qt (L01) 0.0021 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0004 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 14,604.05 / liter.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 5.50 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 2,826.80 Liter
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 6.1 (2)(a) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 10,177.49 21.20


2. Mandor (L03) Jam 0.0004 18,034.63 7.51

JUMLAH HARGA TENAGA 28.72

B. BAHAN

1. Aspal (M10) Kg 0.8487 13,750.00 11,669.90


2. Kerosene (M11) liter 0.2060 10,200.00 2,101.20

JUMLAH HARGA BAHAN 13,771.10

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 423,149.41 88.16


2. Compressor E05 Jam 0.0002 198,999.94 41.46

JUMLAH HARGA PERALATAN 129.61

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,929.43


E. OVERHEAD & PROFIT 10.0 % x D 1,392.94
F. HARGA SATUAN PEKERJAAN ( D + E ) 15,322.38
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 6.1 (2)(a) Analisa EI-612a
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN : Liter URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran (Spesifikasi) :
- Aspal Pen 60 atau Pen 80 As 80 % terhadap volume
- Kerosene K 20 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Kerosene D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan

II. URUTAN KERJA


1 Aspal dan Minyak Flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
3 Campuran aspal cair disemprotkan dengan Asphalt
Distributor ke atas permukaan yang akan dilapis.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.03 liter

1.a. Aspal = As x PC x D1 (M10) 0.8487 Kg


1.b. Kerosene = K x PC (M11) 0.2060 liter

2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Kecepatan penyemprotan v 30.00 M/menit asumsi
Kapasitas pompa aspal pas 100 liter/menit Panduan
Faktor effesiensi kerja Fa 0.80 sedang

Kap. Prod. / jam = pas x Fa x 60 Q1 4,800.00 liter

Koefisien Alat / Ltr = 1 : Q1 (E41) 0.0002 Jam

2.b. AIR COMPRESSOR (E05)

Kap. Prod. / jam = Asphalt Distributor Q1 4,800.00 liter

Koefisien Alat / Ltr = 1 : Q2 (E05) 0.0002 Jam

3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q4 4,800.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 33,600.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang

Koefisien tenaga / liter :


- Pekerja = (Tk x P) : Qt (L01) 0.0021 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0004 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 6.1 (2)(a) Analisa EI-612a
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN : Liter URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 15,322.38 / liter.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 Liter
Analisa EI-634a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

No. PAKET KONTRAK :


NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 6.3.(4a) PERKIRAAN VOL. PEK. : 315.13
JENIS PEKERJAAN : Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) TOTAL HARGA (Rp.) : 475,721,172.37
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 40.01

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0260 10,177.49 264.11


2. Mandor (L03) Jam 0.0037 18,034.63 66.86

JUMLAH HARGA TENAGA 330.97

B. BAHAN

1. Agr 5-10 & 10-15 (M92) M3 0.2958 263,056.57 77,805.46


2. Lolos screen2 ukuran ( 0 - 5) (M91) M3 0.1404 306,184.86 43,002.40
3 Pasir Halus (M01c) M3 0.2265 213,500.00 48,366.52
4 Semen (M05) Kg 15.7500 1,412.00 22,239.00
5 Aspal (M10) Kg 61.8000 13,750.00 849,750.00

JUMLAH HARGA BAHAN 1,041,163.38

C. PERALATAN
1. Wheel Loader E15 Jam 0.0099 610,697.15 6,064.41
2. AMP E01 Jam 0.0208 6,676,961.84 139,103.37
3. Genset E12 Jam 0.0208 530,152.53 11,044.84
4. Dump Truck E08 Jam 0.5253 313,986.72 164,936.48
5. Asphalt Finisher E02 Jam 0.0037 577,048.87 2,139.27
6. Tandem Roller E17 Jam 0.0143 334,698.78 4,786.01
7 P. Tyre Roller E18 Jam 0.0045 400,711.36 1,791.18
8 Alat Bantu Ls 1.0000 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 330,865.56

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,372,359.92


E. OVERHEAD & PROFIT 10.0 % x D 137,235.99
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,509,595.91
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 6.3.(4a) Analisa EI-634a
JENIS PEKERJAAN : Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 18.50 KM
5 Tebal Lapis (HRS BASE) padat t 0.040 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran HRS BASE :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 40.00 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 21.00 % memenuhi -
- Pasir Halus PH 31.50 % Spesifikasi
- Semen FF 1.50 %
- Asphalt As 6.00 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat isi bahan :
- HRS BASE D1 2.23 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
- Pasir Halus D4 1.46 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km

II. URUTAN KERJA


1 Wheel Loader memuat Agregat ke dalam
Cold Bin AMP
2 Agregat dan aspal dicampur dan dipanaskan
dengan AMP untuk dimuat langsung ke dalam
Dump Truck dan diangkut ke lokasi pekerjaan
3 Campuran panas ATB dihampar dengan Finisher
dan dipadatkan dengan Tandem (Awal & Akhir) dan
Pneumatic Tire Roller (Intermediate Rolling)
4 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparaan dengan menggunakan
Alat Bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92) 0.2958 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91) 0.1404 M3
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c) 0.2265 M3
1.d. Semen = (FF x Fh1) x 1000 (M05) 15.7500 Kg
1.e. Aspal = (As x Fh2) x 1000 (M10) 61.8000 Kg

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.80 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 6.3.(4a) Analisa EI-634a
JENIS PEKERJAAN : Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kap. Prod./jam = V x Fb x Fa x 60 x Bip Q1 100.70 ton


Ts1

Koefisien Alat / ton = 1 : Q1 (E15) 0.0099 Jam

2.b. ASPHALT MIXING PLANT (AMP) (E01)


Kapasitas produksi V 60.00 ton / Jam
Faktor Efisiensi alat Fa 0.80 -

Kap.Prod. / jam = V x Fa Q2 48.00 ton

Koefisien Alat / ton = 1 : Q2 (E01) 0.0208 Jam

2.c. GENERATORSET ( GENSET ) (E12)


Kap.Prod. / Jam = SAMA DENGAN AMP Q3 48.00 ton
Koefisien Alat / ton = 1 : Q3 (E12) 0.0208 Jam

2.d. DUMP TRUCK (DT) (E08)


Kapasitas bak V 3.50 ton
Faktor Efisiensi alat Fa 0.80 -
Kecepatan rata-rata bermuatan v1 30.00 Km / Jam
Kecepatan rata-rata kosong v2 40.00 Km / Jam
Kapasitas AMP / batch Q2b 1.00 ton
Waktu menyiapkan 1 batch ATB Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi Bak = (V : Q2b) x Tb T1 3.50 menit
- Angkut = (L : v1) x 60 menit T2 37.00 menit
- Tunggu + dump + Putar T3 20.00 menit
- Kembali = (L : v2) x 60 menit T4 27.75 menit
Ts2 88.25 menit

Kap.Prod. / jam = V x Fa x 60 Q4 1.90 ton


Ts2

Koefisien Alat / ton = 1 : Q4 (E08) 0.5253 Jam

2.e. ASPHALT FINISHER (E02)


Kecepatan menghampar V 20.00 m/menit
Faktor efisiensi alat Fa 0.80 -
Lebar hamparan b 3.15 meter
Kap.Prod. / jam = V x b x 60 x Fa x t x D1 Q5 269.74 ton

Koefisien Alat / ton = 1 : Q5 (E02) 0.0037 Jam

2.f. TANDEM ROLLER (E17)


Kecepatan rata-rata alat v 3.50 Km / Jam
Lebar efektif pemadatan b 1.68 M
Jumlah lintasan n 6.00 lintasan 2 Awal & 4 Akhir
Jumlah lajur lintasan N 1.00
Lebar overlap bo 0.30 m
Faktor Efisiensi alat Fa 0.80 -

Kap. Prod./jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q6 69.93 ton


n
Koefisien Alat / ton = 1 : Q6 (E17) 0.0143 Jam

2.g. PNEUMATIC TIRE ROLLER (E18)


Kecepatan rata-rata v 4.00 KM / Jam
Lebar efektif pemadatan b 2.29 M
Jumlah lintasan n 8.00 lintasan
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Faktor Efisiensi alat Fa 0.80 -

Kap.Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q7 223.71 ton


n

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 6.3.(4a) Analisa EI-634a
JENIS PEKERJAAN : Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Koefisien Alat / ton = 1 : Q7 (E18) 0.0045 Jam

2.h. ALAT BANTU


diperlukan : Lump Sum
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
- Tongkat Kontrol ketebalan hanparan

3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 269.74 ton
Produksi HRS BASE / hari = Tk x Q5 Qt 1,888.19 ton
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / ton :


- Pekerja = (Tk x P) / Qt (L01) 0.0260 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0037 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,509,595.91 / TON

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 5.50 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 315.13 ton
Analisa EI-7110

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. :7.1 (10) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN :Beton mutu rendah fc’= 10 Mpa TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.3333 10,177.49 13,569.99


2. Tukang (L02) jam 1.3333 14,463.20 19,284.27
3. Mandor (L03) jam 0.6667 18,034.63 12,023.09

JUMLAH HARGA TENAGA 44,877.34

B. BAHAN

1. Semen (M12) Kg 311.0600 1,765.00 549,020.90


2. Pasir beton (M01a) M3 0.4154 174,200.00 72,363.77
3. Agregat Kasar (M03) M3 0.6851 241,492.43 165,435.37
4 Kayu Perancah (M19) M3 0.0500 2,312,500.00 115,625.00
5 Paku (M18) Kg 0.4000 18,000.00 7,200.00

JUMLAH HARGA BAHAN 909,645.04

C. PERALATAN

1. Conc. Mixer E06 jam 0.6667 116,780.30 77,853.53


2. Water Tanker E23 jam 0.0382 288,193.65 10,995.34
3. Alat Bantu Ls 1.0000 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 89,848.88

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,044,371.26


E. OVERHEAD & PROFIT 10.0 % x D 104,437.13
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,148,808.38
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. :7.1 (10) Analisa EI-7110
JENIS PEKERJAAN :Beton mutu rendah fc’= 10 Mpa
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 250 Kg/M3

7 Perbandingan Air/Semen Maksimum Wcr 0.60 -


8 Perbandingan Camp. : Semen Sm 302.0 Kg/M3 Berdasarkan
: Pasir Ps 633.0 Kg/M3 JMF dari EE
: Kerikil Pecah Kr 1,207.0 Kg/M3
9 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 3.10 T/M3
- Pasir D3 1.60 T/M3
- Kerikil Pecah (Agregat Kasar) D4 1.85 T/M3

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 311.060 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.4154 M3
1.c. Kerikil Pecah = (Kr/1000 : D4) x 1.05 (M03) 0.6851 M3 Agregat Kasar
1.e. Kayu Perancah (M19) 0.0500 M3
1.f Paku (M18) 0.4000 Kg

2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.85 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit

Kap. Prod. / jam = V x Fa x 60 Q1 1.500 M3


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.6667 jam

2.b. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q2 26.21 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q2 (E23) 0.0382 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. :7.1 (10) Analisa EI-7110
JENIS PEKERJAAN :Beton mutu rendah fc’= 10 Mpa
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. ALAT BANTU (E20)


Alat bantu

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.50 M3

Kebutuhan tenaga : - Mandor M 1.00 orang


- Tukang Tb 2.00 orang
- Tk Batu = 1 1 Tk = 20 m3 btn
- Tk Kayu = 1 1 Tk = 2 m3 kayu
- Pekerja P 2.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6667 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3333 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3333 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,148,808.4 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-731

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 7.3 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN :Baja Tulangan U 24 Polos TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0.1050 10,177.49 1,068.64


2. Tukang (L02) jam 0.0350 14,463.20 506.21
3. Mandor (L03) jam 0.0350 18,034.63 631.21

JUMLAH HARGA TENAGA 2,206.06

B. BAHAN

1. Baja Tulangan (Polos) U24 (M39a) Kg 1.1000 13,800.00 15,180.00


2. Kawat Beton (M14) Kg 0.0025 20,500.00 51.25

JUMLAH HARGA BAHAN 15,231.25

C. PERALATAN

1. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 17,437.31


E. OVERHEAD & PROFIT 10.0 % x D 1,743.73
F. HARGA SATUAN PEKERJAAN ( D + E ) 19,181.04
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.3 (1) Analisa EI-731
JENIS PEKERJAAN :Baja Tulangan U 24 Polos
SATUAN PEMBAYARAN : Kg URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -

II. URUTAN KERJA


1 Besi tulangan dipotong dan dibengkokkan sesuai
dengan yang diperlukan
2 Batang tulangan dipasang / disusun sesuai dengan
Gambar Pelaksanaan dan persilangannya diikat kawat

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0025 Kg

2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya

3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang

Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 19,181.04 / Kg

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 Kg.
Analisa EI-718

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. :7.1 (8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN :Beton mutu rendah fc’= 15 MPa TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.0482 10,177.49 20,845.46


2. Tukang (L02) jam 2.0482 14,463.20 29,623.43
3. Mandor (L03) jam 0.6827 18,034.63 12,312.80

JUMLAH HARGA TENAGA 62,781.69

B. BAHAN

1. Semen (M12) Kg 327.5400 1,412.00 462,486.48


2. Pasir beton (M01a) M3 0.4082 174,200.00 71,106.26
3. Agregat Kasar (M03) M3 0.6851 241,492.43 165,435.37
4. Kayu Perancah (M19) M3 0.1000 2,312,500.00 231,250.00
5. Paku (M18) Kg 0.8000 18,000.00 14,400.00

JUMLAH HARGA BAHAN 944,678.11

C. PERALATAN

1. Conc. Mixer E06 jam 0.6827 116,780.30 79,729.52


2. Water Tanker E23 jam 0.0382 288,193.65 10,995.34
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 90,724.86

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,098,184.66


E. OVERHEAD & PROFIT 10.0 % x D 109,818.47
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,208,003.13
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. :7.1 (8) Analisa EI-718
JENIS PEKERJAAN :Beton mutu rendah fc’= 15 MPa
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 300 Kg/M3

7 Perbandingan Air/Semen Maksimum Wcr 0.57 -


8 Perbandingan Camp. : Semen Sm 318.0 Kg/M3 Berdasarkan
: Pasir Ps 622.0 Kg/M3 JMF dari EE
: Agregat Kasar Kr 1,207.0 Kg/M3
9 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 3.10 T/M3
- Pasir D3 1.60 T/M3
- Agregat Kasar D4 1.85 T/M3

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 327.540 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.4082 M3 653.10
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.6851 M3 1,267.35
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1000 M3
1.e. Paku (M18) 0.8000 Kg

2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit

Kap. Prod. / jam = V x Fa x 60 Q1 1.465 M3/jam


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.6827 jam

2.b. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q2 26.21 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q2 (E23) 0.0382 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. :7.1 (8) Analisa EI-718
JENIS PEKERJAAN :Beton mutu rendah fc’= 15 MPa
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. ALAT BANTU


Alat bantu

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3

Kebutuhan tenaga : - Mandor M 1.00 orang


- Tukang Tb 3.00 orang
- Tk Batu = 2 1 Tk = 20 m3 btn
- Tk Kayu = 1 1 Tk = 2 m3 kayu
- Pekerja P 3.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.0482 jam
- Pekerja = (Tk x P) : Qt (L01) 2.0482 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,208,003.1 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-761

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 7.6 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Fondasi Cerucuk Penyedian dan Pema TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.2800 10,177.49 2,849.70


2. Tukang (L02) jam 0.1400 14,463.20 2,024.85
3. Mandor (L03) jam 0.0700 18,034.63 1,262.42

JUMLAH HARGA TENAGA 6,136.97

B. BAHAN

1. Cerucuk M61 M1 1.0000 3,000.00 3,000.00

JUMLAH HARGA BAHAN 3,000.00

C. PERALATAN

1 Alat Bantu Ls 1.0000 200.00 200.00

JUMLAH HARGA PERALATAN 200.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 9,336.97


E. OVERHEAD & PROFIT 10.0 % x D 933.70
F. HARGA SATUAN PEKERJAAN ( D + E ) 10,270.67
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.6 (1) Analisa EI-761
JENIS PEKERJAAN : Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Dilakukan secara manual
2 Bahan diterima di lokasi Jembatan
3 Jam kerja efektif per-hari Tk 7.00 jam

II. URUTAN KERJA


1 Melakukan persiapan bahan cerucuk
2 Dilakukan pemancangan secara manual

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Bahan pondasi cerucuk (M52) 1.0000 M1

2. ALAT
2.e. ALAT BANTU
Diperlukan alat bantu untuk pek pondasi cerucuk Lumpsum
- 1 set palu tripot
- Alat pertukangan

3. TENAGA
Produksi Tiang dalam 1 hari Qt 100.00 M1

Kebutuhan tenaga tambahan di lokasi ::


- Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 4.00 orang

Koefisien Tenaga kerja


- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1400 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2800 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Didapat Harga Satuan Pekerjaan :

Rp. 10,270.67 / M1

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 Kg
Analisa EI-713

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 7.13.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Sandaran (Railing) TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.68 10,177.49 17,098.18


2. Tukang (L02) jam 0.56 14,463.20 8,099.39
3. Mandor (L03) jam 0.28 18,034.63 5,049.70

JUMLAH HARGA TENAGA 30,247.27

B. BAHAN

1. Pipa d = 8.91 cm Galvanised M 1.00 112,500.00 112,500.00


2. Dudukan, mur, baut dll 0.75 50,000.00 37,500.00

JUMLAH HARGA BAHAN 150,000.00

C. PERALATAN

1. Alat bantu LS 1.00 500.00 500.00

JUMLAH HARGA PERALATAN 500.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 180,747.27


E. OVERHEAD & PROFIT 10.0 % x D 18,074.73
F. HARGA SATUAN PEKERJAAN ( D + E ) 198,822.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.13.(1) Analisa EI-713
JENIS PEKERJAAN : Sandaran (Railing)
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jembatan
3 Bahan / material diterima seluruhnya di lokasi
pekerjaan proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.5 KM
5 Jam kerja efektif per-hari Tk 7.00 jam

II. URUTAN KERJA


1 Material dan peralatan disiapkan
2 Railing dipasang dengan seksama
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Pipa d = 8.91 cm Galvanised (MXX) 1.000 M

1.b. Dudukan, mur, baut dll, diasumsikan 75 % pipa

2. ALAT
2.a. Alat pertukangan dan lain-lain

3. TENAGA
Produksi pasang Railingk dalam 1 hari
= Tk x Q1 = Qt 25.00 M

Kebutuhan tenaga : - Mandor M 1.00 orang


- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.280 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.560 jam
- Pekerja = (Tk x P) : Qt (L01) 1.680 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 198,822 / M1

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M1
Analisa EI-7151

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK
No. PAKET KONTRAK :
NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3
0
PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. : 7.15 (8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pembongkaran Jembatan Kayu TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.0420 10,177.49 20,782.86


2. Mandor (L03) Jam 0.2553 18,034.63 4,603.43

JUMLAH HARGA TENAGA 25,386.29

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1 Chain Saw E07 Jam 0.5000 - 0.00


2 Crane E07 Jam 0.0000 - 0.00
3 Dump Truck E08 Jam 0.2553 313,986.72 80,146.74
4 Alat bantu Ls 1.0000 10,000.00 10,000.00

JUMLAH HARGA PERALATAN 90,146.74

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 115,533.03


E. OVERHEAD & PROFIT 10.0 % x D 11,553.30
F. HARGA SATUAN PEKERJAAN ( D + E ) 127,086.33
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.15 (8) Analisa EI-7151
JENIS PEKERJAAN : Pembongkaran Jembatan Kayu
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.0 Jam
5 Faktor pengembangan bahan Fk 1.10 -
6 Berat volume kayu D1 1.50 Ton/M3

II. URUTAN KERJA


1 Bidang yang akan dibongkar ditandai dengan cat/kapur
2 Pembongkaran dilakukan dengan, linggis, palu, ganco
dan crane, dimuat ke dlm Truk dengan Loader.
3 Dump Truck menyimpan material hasil bongkaran
lokasi base camp/kantor Proyek L 5.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. Mesin potong kayu (chainsaw)
Memotong diperkirakan = 0.50 jam per m2 0.50 jam

2.b. CRANE (E07)


Kapasitas V1 6.00 M2
Faktor Efisiensi alat Fa 0.85 -
Waktu siklus
- Waktu muat T1 12.00 menit
- Waktu bongkar T2 8.00 menit
- Lain-Lain T3 5.00 menit
Ts2 25.00 menit
(padat)

Koefisien Alat / M2 = 1 : Q2 (E07) 0.2400 jam

2.c. DUMP TRUCK (E08)


Kapasitas bak V 4.00 M3
Faktor efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktu siklus Ts2 menit
- Muat = (V x D1)/Fa T1 7.06 menit
- Waktu tempuh isi = (L : v1) x 60 T2 10.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 7.50 menit
- Lain-lain T4 7.00 menit
Ts2 31.56 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q3 3.92 M3 padat


D1 x Fk x Ts2

Koefisien Alat / m3 = 1 : Q3 (E08) 0.2553 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 7.15 (8) Analisa EI-7151
JENIS PEKERJAAN : Pembongkaran Jembatan Kayu
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Pahat / Tatah = 2 buah
- Palu Besar = 2 buah

3. TENAGA
Produksi menentukan : alat bantu Q3 3.92 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 27.42 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.0420 Jam
- Mandor = (Tk x M) : Qt (L03) 0.2553 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 127,086.33 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-715

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :

NAMA PAKET : PENINGKATAN JALAN LINGKUNGAN PAKET 3


PROP / KAB / KODYA : KOTA BANJARMASIN
ITEM PEMBAYARAN NO. :7.1 (7) a PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN :Beton mutu sedang fc’= 20 MPa TOTAL HARGA (Rp.) : 1,577,261.56
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.13

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 1.3333 10,177.49 13,569.99


2. Tukang (L02) jam 1.3333 14,463.20 19,284.27
3. Mandor (L03) jam 0.6667 18,034.63 12,023.09

JUMLAH HARGA TENAGA 44,877.34

B. BAHAN

1. Semen (M12) Kg 422.3000 1,412.00 596,287.60


2. Pasir beton (M01a) M3 0.4397 174,200.00 76,593.56
3. Agregat Kasar (M03) M3 0.5630 241,492.43 135,966.76
4. Kayu Perancah (M19) M3 0.2000 2,312,500.00 462,500.00
5. Paku (M18) Kg 1.6000 18,000.00 28,800.00

JUMLAH HARGA BAHAN 1,300,147.93

C. PERALATAN

1. Con. Mixer E06 jam 0.6667 116,780.30 77,853.53


2 Water Tanker E23 jam 0.0382 288,193.65 10,995.34
3 Alat Bantu Ls 1.0000 0.00 0.00
4 Con. Vibrator E20 Jam 0.6667 51,478.62 0.00

JUMLAH HARGA PERALATAN 88,848.88

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,433,874.15


E. OVERHEAD & PROFIT 10.0 % x D 143,387.41
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,577,261.56
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. :7.1 (7) a Analisa EI-715
JENIS PEKERJAAN :Beton mutu sedang fc’= 20 MPa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 18.50 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 340 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
9 Perbandingan Camp. : Semen Sm 410.0 Kg/M3 Berdasarkan
: Pasir Ps 670.0 Kg/M3 JMF dari EE
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 3.10 T/M3
- Pasir D3 1.60 T/M3
- Agregat Kasar D4 1.85 T/M3

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 422.300 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.4397 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.5630 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000 M3
1.e. Paku (M18) 1.6000 Kg

2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.85 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit

Kap. Prod. / jam = V x Fa x 60 Q1 1.500 M3


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.6667 jam

2.b. CONCRETE VIBRATOR (E20)


Kebutuhan Alat Penggetar Beton ini disesuaikan dengan
kapasitas produksi Alat Pencampur (Concrete Mixer)

Kap. Prod. / jam = Kap. Prod./jam Alat Concrete Mixer Q3 1.500 M3

Koefisien Alat / M3 = 1 : Q3 (E20) 0.6667 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. :7.1 (7) a Analisa EI-715
JENIS PEKERJAAN :Beton mutu sedang fc’= 20 MPa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q3 26.21 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q3 (E23) 0.0382 jam

2.c. ALAT BANTU


Alat bantu

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.50 M3

Kebutuhan tenaga : - Mandor M 1.00 orang


- Tukang Tb 2.00 orang
- Tk Batu = 1 1 Tk = 20 m3 btn
- Tk Kayu = 1 1 Tk = 2 m3 kayu
- Pekerja P 2.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6667 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3333 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3333 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,577,261.56 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3