DATA EXISTING
Panjang Efektif = 1.46 KM
Lebar Badan Jalan = 4.50 M
Lebar Bahu Jalan = Variasi M
Perkerasan = HRS-Base
DATA RENCANA
Panjang Efektif = 1.46 KM
Lebar Badan Jalan = 4.50 M
Lebar Bahu Jalan = 1.00 M
Perkerasan = HRS-Base
KRITERIA PERENCANAAN
DIVISI III
3.1 (1) Galian Biasa
Widening
NGGARA TIMUR
0.185
1635
Badan Jalan
Tebal
HRS-Base = 0.05 M
Agregat A = 0.2 M
Agregat B = 0.15 M
Timbunan Pilihan = 0.20 M
Pelebaran Perkerasan
Tebal
HRS-Base = 0M
Agregat A = 0M
Agregat B = 0.00 M
Timbunan Pilihan = 0.00 M
H (dalam)
0.00
Tipe I Tipe I (Gendong) Tipe II Tipe II (Gendong)
a
t A t
B
H1 H
H2
C
a
t A
B
H H1 Pasangan Batu
H2
C
Lapis Perekat
a
t A t
B
H1 H
H2
C
a
t A
B
H1
Pasangan Batu
H2
C
Kota Kupang
Kupang
TTS
TTU
Belu
Malaka
Rote Ndao
Sabu Raijua
Alor
Sumba Timur
Sumba Tengah
Sumba Barat
Sumba Barat Daya
Lembata
Flores Timur
Sikka
Ende
Ngekeo
Ngada
Manggarai Timur
Manggarai
Manggarai Barat
0.35
0.15
Kota Kupang HIDE
AC-WC
AC-BC
HRS-WC
HRS-Base
Lasbutag
Rote Ndao Lapen
Sabu Raijua Urpil
Jalan Tanah
Sumba Timur No Trase
Sumba Tengah
Sumba Barat
Sumba Barat Daya
Flores Timur
Manggarai Timur
Manggarai
Manggarai Barat
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI 2010 (revisi 2)
A. PEKERJAAN KONSTRUKSI
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Panjang Efektif : 1.46
Kabupaten : Malaka
Sta. : 02+500 s/d 03+000
a b c d
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00
1.18.(3) Relokasi Tiang Listrik yang ada, Tegangan menengah LS -
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 120.39
2.2 Pasangan Batu dengan Mortar M3 51.60
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata Uraian Satuan Perkiraan
Pembayaran Kuantitas
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (7) Beton mutu sedang dengan fc’= 20 MPa (K-250) M3 4.42
7.1 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) M3 -
7.3 (1) Baja Tulangan BJ 24 Polos Kg 525.00
7.3 (3) Baja Tulangan BJ 32 Ulir Kg 209.29
7.9 Pasangan Batu M 3
Err:509
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
REKAPITULASI KUANTITAS
Peningkatan Jalan ke Pantai Metamauk
No. Mata
Pembayaran Uraian Satuan Kuantitas Total
a b c g
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.0
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 405.9
2.2 Pasangan Batu dengan Mortar M3 151.32
2.3.2a Gorong-gorong Beton Bertulang (Box Culvert), lebar dalam 60 cm M' 16.0
2 Saluran U-Dicth 60 x 60 cm M' 2,920.0
DIVISI 3. PEKERJAAN TANAH
3.1.1 Galian Biasa M3 258.7
3.2.1 Timbunan Biasa M3 -
3.2.2 Timbunan Pilihan M3 3,839.3
3.3 Penyiapan Badan Jalan M2 6,570.0
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 1,314.0
5.1.2 Lapis Pondasi Agregat Kelas B M3
DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 6,570.0
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter
6.3.4a Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton 692.1
6.3.8.a Aspal Minyak Ton 48.9
6.3.9 Aditif anti pengelupasan Kg 146.7
6.3.10 Bahan Pengisi (Filler) Tambahan Kg 11,284.0
DIVISI 7. STRUKTUR
7.1 (7) Beton mutu sedang dengan fc’= 20 MPa (K-250) M3 13.4
7.2 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) M3 11.8
7.3 (1) Baja Tulangan BJ 24 Polos Kg
7.3 (3) Baja Tulangan BJ 32 Ulir Kg
7.9 Pasangan Batu M3 1,513.2
7.10 (3) Bronjong M3
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4 (1) Marka Jalan Termoplastik M2 292.00
8.4.(10)(b) Kerb Pracetak Jenis 2 (Penghalang/Barrier) Buah 4,722.0
8.4.(10)(f) Kerb Pracetak Jenis 6 (Kerb dengan Bukaan) Buah 146.0
8.4 (12) Perkerasan Blok Beton pada Trotoar dan Median M2 2,190.0
DIVISI 9. PEKERJAAN HARIAN
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
SK. DIVISI 10 PEKERJAAN PELAYANAN PEMELIHARAAN JALAN (BIAYA LUMP SUM)
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 1. UMUM
Item Pekerjaan : 1.2. Mobilisasi
B. PERALATAN
Periksa lembar 1.2-2
C. FASILITAS KONTRAKTOR
1 Base Camp M2 150
2 Kantor M2 100
3 Barak M2 75
4 Bengkel M2 -
5 Gudang, dan lain-lain M2 -
6 ...................... .... 0
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 -
3 Bituminous Testing
Marshall Asphalt Test Set 1.00
Extraction Test, Centrifuge/Refflux Method Set 1.00
Specific Gravity for Coarse Aggregate Set 1.00
Specific Gravity for Fine Aggregate Set 1.00
Mix Air Viod Content (Accurate Method) Set 1.00
Core Drill Set 1.00
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 1. UMUM
Item Pekerjaan : 1.2. Mobilisasi
Metal Thermometer Set 1.00
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 1. UMUM
Item Pekerjaan : 1.2. Mobilisasi
4 Concrete Testing
Slump Cone Set 1.00
Cylinder/Cube Mould for Compressive Strength Set 1.00
Beam Mould for Flexural Strength (RIGID) Set 1.00
Crushing Machine Set 1.00
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS
2 Pemeliharaan Jalan Kerja / Samping LS
E.II. LAIN-LAIN
1 Pelaporan dan Administrasi Kontrak Bulan 5.00
2 Papan Proyek buah 2.00
3 Dokumentasi Ls 1.00
4 As Build Drawing Ls 1.00
F. DEMOBILISASI LS 1.00
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 1. UMUM
Item Pekerjaan : 1.2. Mobilisasi
KODE
No. JENIS ALAT ALAT SATUAN VOL.
B. PERALATAN
Gambar/Sket :
Volume ( Posisi
NO STA KETERANGAN
Buah) ( L/R)
1 2 3 4 5
1 00+771 0.00 R
2 00+851 0.00 R
3 00+530 0.00 R
4 01+628 0.00 R
5 01+728 0.00 R
6 01+777 0.00 R
Gambar/Sket :
TINGGI
LEBAR
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
LEBAR TINGGI (M2) (M2)
Page 20 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
Gambar/Sket :
TINGGI
LEBAR
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
LEBAR TINGGI (M2) (M2)
Page 21 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
Gambar/Sket :
TINGGI
LEBAR
Pindahan M3
Total STA. 03+000 s/d STA. 04+000 46.75 M3
Page 22 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
Gambar/Sket : A
KET :
H
A : Lebar Atas Galian
B : Lebar Bawah Galian
C
H : Tinggi/Kedalaman
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA LEBAR PENAMPANG RATA-RATA (M) (M3) (L/R) KET.
TINGGI (M2) (M2)
ATAS BAWAH
1 2 3 4 5 6 7 8 9 10 11
Page 23 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
Gambar/Sket : A
KET :
H
A : Lebar Atas Galian
B : Lebar Bawah Galian
C
H : Tinggi/Kedalaman
DIMENSI (M)
LUAS LUAS PANJANG VOLUME POSISI
NO STA LEBAR PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
TINGGI (M2) (M2)
ATAS BAWAH
1 2 3 4 5 6 7 8 9 10 11
Page 24 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
Gambar/Sket : A
KET :
H
A : Lebar Atas Galian
B : Lebar Bawah Galian
C
H : Tinggi/Kedalaman
DIMENSI (M)
LUAS LUAS PANJANG VOLUME POSISI
NO STA LEBAR PENAMPANG RATA-RATA (M) (M3) (L/R) KET.
TINGGI (M2) (M2)
ATAS BAWAH
1 2 3 4 5 6 7 8 9 10 11
Page 25 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
Gambar/Sket : A
KET :
H
A : Lebar Atas Galian
B : Lebar Bawah Galian
C
H : Tinggi/Kedalaman
Page 26 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
a
a
t A t t A
TYPE I B B
TYPE II
H1 H H H1
Pasangan Batu
H2
H2
C C
DIMENSI (M)
LUAS LUAS
NO STA PANJANG VOLUME POSISI
LEBAR TINGGI TEBAL PENAMPANG RATA-RATA (M) (M3) (L/R)
KET.
(M2) (M2)
A B C a H H1 H2 t
1 2 3 4 5 10 7 8 9 6 12 13 14 15 16 17
1 02+800 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
0.26 200.00 51.60 L TYPE 2
03+000 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
a
a
t A t t A
TYPE I B B TYPE II
H H1
H1 H Pasangan Batu
H2
H2
C C
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA LEBAR TINGGI TEBAL PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
A B C a H H1 H2 t
1 2 3 4 5 10 7 8 9 6 12 13 14 15 16 17
2 03+000 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
0.26 75.00 19.35 L TYPE 2
03+075 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
3 03+075 0.70 0.50 0.83 1.10 0.80 0.60 0.20 0.20 0.41
0.41 75.00 30.90 L TYPE 1
03+150 0.70 0.50 0.83 1.10 0.80 0.60 0.20 0.20 0.41
4 03+150 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
0.26 228.00 58.82 L TYPE 2
03+378 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
5 03+379 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
0.26 93.00 23.99 L TYPE 2
03+472 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
6 03+473 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
0.26 147.00 37.93 L TYPE 2
03+620 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
7 03+621 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
0.26 84.00 21.67 L TYPE 2
03+705 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
a
a
t A t t A
TYPE I B B TYPE II
H H1
H1 H Pasangan Batu
H2
H2
C C
8 03+705 0.70 0.50 0.83 1.10 0.80 0.60 0.20 0.20 0.41
0.41 83.00 34.20 L TYPE 1
03+788 0.70 0.50 0.83 1.10 0.80 0.60 0.20 0.20 0.41
9 03+789 0.70 0.50 0.83 1.10 0.80 0.60 0.20 0.20 0.41
0.34 141.00 47.24 L TYPE 1
03+930 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
0.26 58.00 14.96 L TYPE 2
03+988 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA LEBAR TINGGI TEBAL PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
A B C a H H1 H2 t
1 2 3 4 5 10 7 8 9 6 12 13 14 15 16 17
10 04+000 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
0.26 70.00 18.06 L TYPE 2
04+070 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
11 04+070 0.70 0.50 0.83 1.10 0.80 0.60 0.20 0.20 0.41
0.41 15.00 6.18 L TYPE 1
04+085 0.70 0.50 0.83 1.10 0.80 0.60 0.20 0.20 0.41
12 04+210 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
0.26 45.00 11.61 R TYPE 2
04+255 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
13 04+255 0.70 0.50 0.83 1.10 0.80 0.60 0.20 0.20 0.41
0.41 175.00 72.10 R TYPE 1
04+430 0.70 0.50 0.83 1.10 0.80 0.60 0.20 0.20 0.41
14 04+718 0.60 0.50 0.67 0.80 0.80 0.60 0.20 0.20 0.26
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
a
a
t A t t A
TYPE I B B
TYPE II
H1 H H H1
Pasangan Batu
H2
H2
C C
B
Galian Tebing
H1
H2
DIMENSI (M)
LUAS LUAS GALIAN GALIAN GALIAN
PANJANG POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA BIASA CADAS BATU KET.
(M) (L/R)
(M2) (M2) (M3) (M3) (M3)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Page 31 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B
Galian Tebing
H1
H2
Page 32 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B
Galian Tebing
H1
H2
Pindahan
Err:509 459.94 0.00 0.00
DIMENSI (M)
LUAS LUAS GALIAN GALIAN GALIAN
PANJANG POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA BIASA CADAS BATU KET.
(M) (L/R)
(M2) (M2) (M3) (M3) (M3)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Page 33 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B
Galian Tebing
H1
H2
Page 34 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
H2 H1
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 35 of 103
Total 0.00
Page 36 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
H2 H1
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 37 of 103
Total 5.83
Page 38 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
h2
h1
Timbunan Biasa
B
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Timbunan Biasa Pada Pasangan Batu
1 00+000 1.00 0.65 0.90 1.00 0.78
0.77 50.00 38.72 R Pada Pas. Batu
00+050 1.00 0.70 0.90 0.90 0.77
0.74 50.00 37.19 R Pada Pas. Batu
00+100 1.00 0.70 0.90 0.80 0.72
0.70 50.00 34.94 R Pada Pas. Batu
00+150 1.00 0.50 0.90 0.90 0.68
Page 39 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
h2
h1
Timbunan Biasa
B
Total 402.44
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Timbunan Biasa Dibawah Bahu Jalan
### 02+625 1.00 1.00 0.15 0.15 0.15
0.15 275.00 82.50 L&R Bawah Bahu Jalan
02+900 1.00 1.00 0.15 0.15 0.15
Page 40 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
h2
h1
Timbunan Biasa
B
Pindahan 402.44
Err:509 527.44
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Timbunan Biasa Pada Pasangan Batu
6 Err:509 1.00 0.80 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.70 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.70 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.65 ### ### Err:509
Page 41 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
h2
h1
Timbunan Biasa
B
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Timbunan Biasa Pada Pasangan Batu
9 Err:509 1.00 0.80 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.70 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.70 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.75 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.75 ### ### Err:509
Page 42 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
h2
h1
Timbunan Biasa
B
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Timbunan Biasa Dibawah Bahu Jalan
14 03+425 1.00 1.00 0.15 0.15 0.15
0.15 60.00 18.00 L&R Bawah Bahu Jalan
03+485 1.00 1.00 0.15 0.15 0.15
Page 43 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
h2
h1
Timbunan Biasa
B
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Timbunan Biasa Pada Pasangan Batu
18 Err:509 1.00 0.80 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.70 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.70 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.65 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.70 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.65 ### ### Err:509
Page 44 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
h2
h1
Timbunan Biasa
B
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Timbunan Biasa Pada Pasangan Batu
Err:509 1.00 0.80 ### ### Err:509
Err:509 Err:509 Err:509 Err:509 Pada Pas. Batu
Err:509 1.00 0.70 ### ### Err:509
Page 45 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
h2
h1
Timbunan Biasa
B
Page 46 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 3. PEKERJAAN TANAH
Item Pekerjaan : 3.2.2 Timbunan Pilihan
Gambar/Sket :
A
H1 H2
B
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 47 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 3. PEKERJAAN TANAH
Item Pekerjaan : 3.2.2 Timbunan Pilihan
Gambar/Sket :
A
H1 H2
B
DIMENSI (M)
LUAS LUAS PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 48 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 3. PEKERJAAN TANAH
Item Pekerjaan : 3.2.2 Timbunan Pilihan
Gambar/Sket :
A
H1 H2
B
Page 49 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 3. PEKERJAAN TANAH
Item Pekerjaan : 3.2.2 Timbunan Pilihan
Gambar/Sket :
A
H1 H2
B
DIMENSI (M)
LUAS LUAS PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 50 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 3. PEKERJAAN TANAH
Item Pekerjaan : 3.2.2 Timbunan Pilihan
Gambar/Sket :
A
H1 H2
B
Page 51 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 3. PEKERJAAN TANAH
Item Pekerjaan : 3.2.2 Timbunan Pilihan
Gambar/Sket :
A
H1 H2
B
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 52 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
Galian Widening
B
H2 H1
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
2 35+715
TIDAK PERLU GALIAN
35+730
4 35+840
TIDAK PERLU GALIAN
35+880
Page 53 of 103
Total 0.00
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 54 of 103
Pindahan 0.00
Err:509 0.00
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 55 of 103
Sub Total 229.50
Pindahan
Err:509 0.00
Page 56 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
1 2 3 4 5 6
1 35+700 1.50
15.00 22.50 Daerah Pelebaran
35+715 1.50
2 35+715
TIDAK PERLU GALIAN
35+730
3 35+730 1.50
110.00 165.00 Daerah Pelebaran
35+840 1.50
4 35+840
TIDAK PERLU GALIAN
35+880
5 35+880 1.50
95.00 128.25 Daerah Pelebaran
35+975 1.20
6 35+975 1.20
250.00 337.50 Daerah Pelebaran
36+225 1.50
7 36+225 1.50
225.00 303.75 Daerah Pelebaran
36+450 1.20
Page 57 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
Total 0.00
1 2 3 4 5 6
8 36+450 1.20
30.00 40.50 Daerah Pelebaran
36+480 1.50
9 36+480 1.50
20.00 30.00 Daerah Pelebaran
36+500 1.50
Page 58 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
1 2 3 4 5 6
10 36+500 1.50
25.00 33.75 Daerah Pelebaran
36+525 1.20
11 36+500 1.20
25.00 33.75 Daerah Pelebaran
36+525 1.50
12 36+525 1.50
45.00 67.50 Daerah Pelebaran
36+570 1.50
13 36+585 1.50
90.00 135.00 Daerah Pelebaran
36+675 1.50
14 36+675 1.50
25.00 33.75 Daerah Pelebaran
36+700 1.20
15 36+675 1.20
25.00 33.75 Daerah Pelebaran
36+700 1.50
16 36+700 1.20
25.00 30.00 Daerah Pelebaran
36+725 1.20
545.00 735.75 Daerah Pelebaran
37+270 1.50
17 37+270 1.50
10.00 13.50 Daerah Pelebaran
37+280 1.20
20.00 27.00 Daerah Pelebaran
37+300 1.50
Page 59 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
Page 60 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 3. PEKERJAAN TANAH
Item Pekerjaan : 3.3(a) Penyiapan Badan Jalan ( Agg. A)
Gambar/Sket :
LEBAR
1 2 3 4 5 6
1 00+000 4.50
100.00 450.00
00+100 4.50
100.00 450.00
00+200 4.50
100.00 450.00
00+300 4.50
100.00 450.00
00+400 4.50
100.00 450.00
00+500 4.50
100.00 450.00
00+600 4.50
100.00 450.00
00+700 4.50
100.00 450.00
00+800 4.50
100.00 450.00
00+900 4.50
100.00 450.00
01+000 4.50
100.00 450.00
01+100 4.50
100.00 450.00
01+200 4.50
100.00 450.00
01+300 4.50
160.00 720.00
01+460 4.50
Sub Total 6570.00
Pindahan
Page 61 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 3. PEKERJAAN TANAH
Item Pekerjaan : 3.3(a) Penyiapan Badan Jalan ( Agg. A)
Gambar/Sket :
LEBAR
Total 6570.00
Page 62 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
LEBAR
TEBAL
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA LEBAR TEBAL PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M)
1 2 3 4 5 6 7 8 9 10
Page 63 of 103
Total STA. 02+500 s/d STA. 03+000 0.00
Page 64 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
LEBAR
PANJANG LUAS
KADAR
LEBAR LEBAR RATA2 ASPAL VOLUME POSISI
NO STA KET.
1 00+000 1.50
1.50 0.00 0.00 1.00 0.00 L
00+000 1.50
2 00+000 1.50
1.50 0.00 0.00 1.00 0.00 L
00+000 1.50
3 00+000 1.50
1.50 0.00 0.00 1.00 0.00 R
00+000 1.50
4 00+000 1.50
1.50 0.00 0.00 1.00 0.00 R
00+000 1.50
Page 65 of 103
Total STA. 02+500 s/d STA. 03+000 0.00
Page 66 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
TEBAL
LEBAR
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA LEBAR TEBAL PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M)
1 2 3 4 5 6 7 8 9 10
Page 67 of 103
Total 0.00
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA LEBAR TEBAL PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M)
1 2 3 4 5 6 7 8 9 10
Page 68 of 103
Pindahan 0.00
Err:509 0.00
Page 69 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana: PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 5. PERKERASAN BERBUTIR
Item Pekerjaan : 5.1.1 Lapis Pondasi Agregat Kelas A
Gambar/Sket :
L EBAR
TEBAL
DIMENSI (M)
LUAS LUAS
PANJANG
NO STA LEBAR TEBAL PENAMPANG RATA-RATA VOLUME (M3) KET.
(M)
(M2) (M2)
(M) (M)
1 2 3 4 5 6 7 8 9
Page 70 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana: PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 5. PERKERASAN BERBUTIR
Item Pekerjaan : 5.1.1 Lapis Pondasi Agregat Kelas A
Gambar/Sket :
L EBAR
TEBAL
Total 1314.00
Page 71 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
LEBAR
TEBAL
DIMENSI (M)
LUAS LUAS
VOLUME
NO STA LEBAR TEBAL PENAMPANG RATA-RATA PANJANG (M) KET.
(M3)
(M2) (M2)
(M) (M)
1 2 3 4 5 6 7 8 9
Page 72 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
LEBAR
TEBAL
Total 235.04
DIMENSI (M)
LUAS LUAS
VOLUME
NO STA LEBAR TEBAL PENAMPANG RATA-RATA PANJANG (M) KET.
(M3)
(M2) (M2)
(M) (M)
1 2 3 4 5 6 7 8 9
Page 73 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
LEBAR
TEBAL
Pindahan
Err:509 334.73
Page 74 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 6. PERKERASAN ASPAL
Item Pekerjaan : 6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair
Gambar/Sket :
LE BA R
PANJANG LUAS
KADAR
LEBAR LEBAR RATA2 ASPAL VOLUME
NO STA KET.
1 00+000 4.50
4.50 100.00 450.00 1.00 450.00
00+100 4.50
4.50 100.00 450.00 1.00 450.00
00+200 4.50
4.50 100.00 450.00 1.00 450.00
00+300 4.50
4.50 100.00 450.00 1.00 450.00
00+400 4.50
4.50 100.00 450.00 1.00 450.00
00+500 4.50
4.50 100.00 450.00 1.00 450.00
00+600 4.50
4.50 100.00 450.00 1.00 450.00
00+700 4.50
4.50 100.00 450.00 1.00 450.00
00+800 4.50
4.50 100.00 450.00 1.00 450.00
00+900 4.50
4.50 100.00 450.00 1.00 450.00
01+000 4.50
4.50 100.00 450.00 1.00 450.00
01+100 4.50
4.50 100.00 450.00 1.00 450.00
01+200 4.50
4.50 100.00 450.00 1.00 450.00
01+300 4.50
4.50 160.00 720.00 1.00 720.00
01+460 4.50
Sub Total 6570.00
Pindahan
Page 75 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 6. PERKERASAN ASPAL
Item Pekerjaan : 6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair
Gambar/Sket :
LE BA R
Total 6570.00
Page 76 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
LEBAR
PANJANG LUAS
1 01+927 4.50
4.50 90.00 405.00 0.35 141.75 Full
02+017 4.50
Page 77 of 103
Total 0.00
Page 78 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1
Konsultan Peren : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 6. PERKERASAN ASPAL
Item Pekerjaan : 6.3.4a Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)
6.3.8.a Aspal Minyak
6.3.9 Aditif anti pengelupasan
6.3.10a Bahan Pengisi (Filler) Tambahan (Semen)
Gambar/Sket :
C
L Lataston Lapis Pondasi (HRS - Base)
Tebal 3,5 cm
4% 2% 2% 4%
Lebar
LUAS
RATA2
HRS- ASPAL
DIMENSI LUAS BERAT ADITIF FILLER
BERAT BASE MINYAK
PENAMPA PANJANG TOTAL
JENIS 92% x 6.5% x 0.3% x
NO STA LEBAR TEBAL NG HRS 1.5% x Total KET.
Total Total Asmin
(M) (M) (M2) (M2) (M) (TON/M3) (TON) (TON) (TON) (KG) (KG)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Page 79 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1
Konsultan Peren : PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 6. PERKERASAN ASPAL
Item Pekerjaan : 6.3.4a Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)
6.3.8.a Aspal Minyak
6.3.9 Aditif anti pengelupasan
6.3.10a Bahan Pengisi (Filler) Tambahan (Semen)
Gambar/Sket :
C
L Lataston Lapis Pondasi (HRS - Base)
Tebal 3,5 cm
4% 2% 2% 4%
Lebar
Page 80 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
L
P
DIMENSI (M)
LUAS LUAS
VOLUME
NO STA LEBAR TEBAL PENAMPANG RATA-RATA PANJANG (M) KET.
(M3)
(M2) (M2)
(M) (M)
1 2 3 4 5 6 7 8 9
Page 81 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
L
P
Page 82 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
L
P
Pindahan
Total STA. 03+000 s/d STA. 04+000 25.12
Page 83 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
L
P
DIMENSI (M)
LUAS LUAS
VOLUME
NO STA LEBAR TEBAL PENAMPANG RATA-RATA PANJANG (M) KET.
(M3)
(M2) (M2)
(M) (M)
1 2 3 4 5 6 7 8 9
Page 84 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
L
P
Page 85 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
L
P
Pindahan
0 0.00
Page 86 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B1 P2 P4
P3 P5
P1
Page 87 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B1 P2 P4
P3 P5
P1
Page 88 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B1 P2 P4
P3 P5
P1
Pindahan
Total 1118.03
PANJANG POTONGAN JUMLAH TOTAL TOTAL
DIAMETER BERAT/ M
NO STA (M) TULANGAN PANJANG BERAT KET.
a b c (buah) (m) (mm) (kg) (kg)
1 2 3 4 5 6 7 8 9 10 11
Page 89 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B1 P2 P4
P3 P5
P1
Page 90 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B1 P2 P4
P3 P5
P1
Page 91 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B2
B3
Page 92 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B2
B3
Page 93 of 103
PEMERINTAH PROVINSI NUSA TENGGARA TIMUR
DINAS PEKERJAAN UMUM
BIDANG BINA MARGA
SEKSI PERENCANAAN DAN PENGENDALIAN JALAN DAN JEMBATAN
Jalan W. J. Lalamentik No. 20 Kupang - NTT
B2
B3
Page 94 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana: PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 7. STRUKTUR
Item Pekerjaan : 7.9 Pasangan Batu
Gambar/Sket :
H1
H2
B
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 95 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana: PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 7. STRUKTUR
Item Pekerjaan : 7.9 Pasangan Batu
Gambar/Sket :
H1
H2
B
Total 357.00
Page 96 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana: PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 7. STRUKTUR
Item Pekerjaan : 7.9 Pasangan Batu
Gambar/Sket :
H1
H2
B
Page 97 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana: PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 7. STRUKTUR
Item Pekerjaan : 7.9 Pasangan Batu
Gambar/Sket :
H1
H2
B
DIMENSI (M)
LUAS LUAS
PANJANG VOLUME POSISI
NO STA A B H1 H2 PENAMPANG RATA-RATA KET.
(M) (M3) (L/R)
(M2) (M2)
(M) (M) (M) (M)
1 2 3 4 5 6 7 8 9 10 11 12
Page 98 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana: PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 7. STRUKTUR
Item Pekerjaan : 7.9 Pasangan Batu
Gambar/Sket :
H1
H2
B
Total 1113.60
Page 99 of 103
BACKUP VOLUME PEKERJAAN
Nama Paket : Peningkatan Jalan ke Pantai Metamauk
Kabupaten : Malaka
Panjang Efektif : 1.46
Konsultan Perencana: PT. GAFA MULTI CONSULTANS
DIVISI : DIVISI 7. STRUKTUR
Item Pekerjaan : 7.9 Pasangan Batu
Gambar/Sket :
H1
H2
B
Gambar/Sket :
POHON
POHON DIAMETER POHON DIAMETER POHON DIAMETER
NO STA DIAMETER >7CM KETERANGAN
15-30 CM (BUAH) 30-50 CM (BUAH) 50-75 CM (BUAH)
(BUAH)
1 2 3 4 5 6 7
1 06+390
4.00 19.00 3.00 1.00
07+390
POHON
POHON DIAMETER POHON DIAMETER POHON DIAMETER
NO STA DIAMETER >7CM KETERANGAN
15-30 CM (BUAH) 30-50 CM (BUAH) 50-75 CM (BUAH)
(BUAH)
1 2 3 4 5 6 7
2 07+390
1.00 1.00 0.00
08+025
Sub Total 1.00 1.00 0.00 0.00
Pindahan
Total 1.00 1.00 0.00 0.00