Anl. SNI. I.6.14 1 M' Pasang Pagar Kawat Jaring Galvanis, tinggi 1,00 M'
6.667 Lbr Kawat Jaring @ Rp. 30,000.00 = Rp. 200,010.00
0.042 Oh Pekerja @ Rp. 50,000.00 = Rp. 2,100.00
0.004 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 320.00
0.042 Oh Tukang @ Rp. 70,000.00 = Rp. 2,940.00
0.002 Oh Mandor @ Rp. 60,000.00 = Rp. 120.00
Jumlah Harga Per satuan pekerjaan 205,490.00
Anl. SNI. II.6.9. 1 M3 Mengurug kembali galian dihitung dari 1/3 kali dari indeks pekerjaan Galian
. Anl. SNI. III.6.4. 1 M3 Pasangan Pondasi Batu Gunung /Kali Adukan 1 PC : 3 Psr
1.100 M3 Batu Gunung @ Rp. 170,000.00 = Rp. 187,000.00
4.040 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 282,800.00
0.485 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 82,450.00
0.600 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 42,000.00
0.060 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 4,800.00
1.500 Oh Pekerja @ Rp. 50,000.00 = Rp. 75,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp. 4,500.00
Jumlah Harga Per satuan pekerjaan 678,550.00
. Anl. SNI. III.6.6. 1 M3 Pasangan Pondasi Batu Gunung /Kali Adukan 1 PC : 5 Psr
1.100 M3 Batu Gunung @ Rp. 170,000.00 = Rp. 187,000.00
2.720 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 190,400.00
0.544 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 92,480.00
0.600 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 42,000.00
0.060 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 4,800.00
1.500 Oh Pekerja @ Rp. 50,000.00 = Rp. 75,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp. 4,500.00
Jumlah Harga Per satuan pekerjaan 596,180.00
Anl. SNI. IV.6.9. 1 M2 Pasangan Batu Bata tebal 1/2 Bata , Adukan 1 Pc : 2 Ps
85.000 Bh Batu Merah/Bata @ Rp. 600.00 = Rp. 51,000.00
0.379 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 26,530.00
0.038 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 6,460.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.320 Oh Pekerja @ Rp. 50,000.00 = Rp. 16,000.00
0.016 Oh Mandor @ Rp. 60,000.00 = Rp. 960.00
Jumlah Harga Per satuan pekerjaan 108,750.00
. Anl. SNI. IV.6.10. 1 M2 Pasangan Batu Bata tebal 1/2 Bata , Adukan 1 Pc : 3 Ps
85.000 Bh Batu Merah/Bata @ Rp. 600.00 = Rp. 51,000.00
14.370 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 20,118.00
0.040 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 6,800.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp. 900.00
Jumlah Harga Per satuan pekerjaan 101,618.00
. Anl. SNI. IV.6.12. 1 M2 Pasangan Batu Bata tebal 1/2 Bata , Adukan 1 Pc : 5 Ps
85.000 Bh Batu Merah/Bata @ Rp. 600.00 = Rp. 51,000.00
9.680 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 13,552.00
0.045 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 7,650.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp. 900.00
Jumlah Harga Per satuan pekerjaan 95,902.00
Anl. SNI. VI.6.1. 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelapi
1.100 M3 Kayu Kelapi @ Rp. 3,500,000.00 = Rp. 3,850,000.00
1.125 Kg Paku 10 cm @ Rp. 15,000.00 = Rp. 16,875.00
0.500 Kg Lem kayu @ Rp. 25,000.00 = Rp. 12,500.00
20.000 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 1,400,000.00
2.000 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 160,000.00
6.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 300,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp. 18,000.00
Jumlah Harga Per satuan pekerjaan 5,757,375.00
Anl. Tambahan 1 M3 Pasang Rangka Dinding Partis Kayu Silae dan sejenis
1.100 M3 Kayu Klas II @ Rp. 2,000,000.00 = Rp. 2,200,000.00
0.100 Kg Paku biasa @ Rp. 15,000.00 Rp. 1,500.00
18.000 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 1,260,000.00
1.600 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 128,000.00
4.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 200,000.00
0.180 Oh Mandor @ Rp. 60,000.00 = Rp. 10,800.00
Jumlah Harga Per satuan pekerjaan 3,800,300.00
. Anl. SNI. VI.6.19. 1 M2 Pasang Pintu Doubel Taekwood, Rangka Kayu Jati
0.020 M3 Papan Jati @ Rp. 2,000,000.00 = Rp. 39,200.00
0.300 Kg Paku Campur @ Rp. 15,000.00 = Rp. 4,500.00
0.300 Ltr Lem Kayu @ Rp. 21,000.00 = Rp. 6,300.00
1.000 Lbr Tekwood 120 x 240 cm @ Rp. 75,000.00 = Rp. 75,000.00
2.000 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 140,000.00
0.200 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 16,000.00
0.600 Oh Pekerja @ Rp. 50,000.00 = Rp. 30,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp. 1,800.00
Jumlah Harga Per satuan pekerjaan 312,800.00
Anl. Tambahan 1 M3 Pasang Gording, Balok jepit, balok angin, skor Kayu Wola
1.100 M3 Balok Kayu Wola @ Rp. 3,250,000.00 = Rp. 3,575,000.00
2.200 Kg Paku Campur @ Rp. 15,000.00 = Rp. 33,000.00
6.000 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 420,000.00
0.600 Oh Kepala Tukang Kayu @ Rp. 80,000.00 = Rp. 48,000.00
2.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 100,000.00
0.100 Oh Mandor @ Rp. 60,000.00 = Rp. 6,000.00
Jumlah Harga Per satuan pekerjaan 4,182,000.00
Anl. SNI. VI.6.35. 1 M2 Pasang Kaso + Reng Kayu Silae atau sejenis
0.014 M3 Balok Kayu Meranti @ Rp. 3,250,000.00 = Rp. 45,500.00
0.150 Kg Paku Campur @ Rp. 15,000.00 = Rp. 2,250.00
0.100 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.100 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp. 300.00
Jumlah Harga Per satuan pekerjaan 60,850.00
Anl. SNI. VI.6.43.a 1 M2 Pasang Rangka Plapond Kayu Meranti Silae atau sejenis
0.018 M3 Balok Kayu Meranti @ Rp. 3,250,000.00 = Rp. 56,875.00
0.150 Kg Paku Campur @ Rp. 15,000.00 = Rp. 2,250.00
0.300 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 21,000.00
0.030 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,400.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp. 600.00
Jumlah Harga Per satuan pekerjaan 93,125.00
Anl. SNI. VII.6.23. 1 M3 Membuat Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting )
0.200 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 310,000.00
1.500 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 22,500.00
157.500 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 2,677,500.00
2.250 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 45,000.00
336.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
5.800 Oh Pekerja @ Rp. 50,000.00 = Rp. 290,000.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.300 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 91,000.00
0.050 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 3,500.00
0.262 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 20,960.00
0.265 Oh Mandor @ Rp. 60,000.00 = Rp. 15,900.00
Jumlah Harga Per satuan pekerjaan 4,341,310.00
. Anl. SNI. VII.6.29. 1 M3 Membuat Sloof Beton Bertulang ( 200 Kg Besi + Bekisting )
0.270 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 418,500.00
0.200 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 3,000.00
210.000 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 3,570,000.00
3.000 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 60,000.00
336.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
5.650 Oh Pekerja @ Rp. 50,000.00 = Rp. 282,500.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.560 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 109,200.00
1.400 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 98,000.00
0.323 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 25,840.00
0.283 Oh Mandor @ Rp. 60,000.00 = Rp. 16,980.00
Jumlah Harga Per satuan pekerjaan 5,448,970.00
. Anl. SNI. VII.6.40. 1 M3 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting )
0.320 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 496,000.00
3.200 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 48,000.00
200.000 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 3,400,000.00
3.000 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 60,000.00
6.460 Kg Semen Portland @ Rp. 1,400.00 = Rp. 9,044.00
0.520 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 88,400.00
0.780 M3 Kerikil @ Rp. 350,000.00 = Rp. 273,000.00
0.140 M3 Balok kayu klas III @ Rp. 1,550,000.00 = Rp. 217,000.00
16.000 Btg Dolken @ Rp. 10,000.00 = Rp. 160,000.00
7.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 365,000.00
0.350 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 24,500.00
3.300 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 231,000.00
2.100 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 147,000.00
0.570 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 45,600.00
0.250 Oh Mandor @ Rp. 60,000.00 = Rp. 15,000.00
Jumlah Harga Per satuan pekerjaan 5,579,544.00
Anl. SNI. VII.6.30. 1 M3 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting )
0.400 M3 Papan Bekisiting @ Rp. 1,550,000.00 = Rp. 620,000.00
4.000 Kg Paku campu 5 cm - 12 cm @ Rp. 15,000.00 = Rp. 60,000.00
315.000 Kg Besi beton polos @ Rp. 17,000.00 = Rp. 5,355,000.00
4.500 Kg Kawat beton @ Rp. 20,000.00 = Rp. 90,000.00
336.000 Kg Portland cement (PC) @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
0.150 M3 Balok kayu klas III @ Rp. 1,550,000.00 = Rp. 232,500.00
20.000 Btg Dolken @ Rp. 10,000.00 = Rp. 200,000.00
7.050 Oh Pekerja @ Rp. 50,000.00 = Rp. 352,500.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.650 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 115,500.00
2.100 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 147,000.00
0.403 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 32,240.00
0.353 Oh Mandor @ Rp. 60,000.00 = Rp. 21,180.00
Jumlah Harga Per satuan pekerjaan 8,090,870.00
. Anl. SNI. VII.6.31. 1 M3 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting )
0.320 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 496,000.00
3.200 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 48,000.00
210.000 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 3,570,000.00
3.000 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 60,000.00
336.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
0.140 M3 Balok kayu klas III @ Rp. 1,550,000.00 = Rp. 217,000.00
16.000 Btg Dolken @ Rp. 10,000.00 = Rp. 160,000.00
6.350 Oh Pekerja @ Rp. 50,000.00 = Rp. 317,500.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.650 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 115,500.00
1.400 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 98,000.00
0.333 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 26,640.00
0.316 Oh Mandor @ Rp. 60,000.00 = Rp. 18,960.00
Jumlah Harga Per satuan pekerjaan 5,992,550.00
. Anl. SNI. VII.6.32. 1 M3 Membuat kolom beton bertulang (150 Kg Besi + Bekisting )
0.320 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 496,000.00
3.200 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 48,000.00
157.500 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 2,677,500.00
2.250 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 45,000.00
336.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
0.120 M3 Balok kayu klas III @ Rp. 1,550,000.00 = Rp. 186,000.00
32.000 Btg Dolken @ Rp. 10,000.00 = Rp. 320,000.00
5.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 265,000.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.300 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 91,000.00
1.050 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 73,500.00
0.265 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 21,200.00
0.265 Oh Mandor @ Rp. 60,000.00 = Rp. 15,900.00
Jumlah Harga Per satuan pekerjaan 5,104,050.00
. Anl. SNI. VII.6.33. 1 M3 membuat Plat lantai beton bertulang (150 Kg besi + Bekisting)
0.240 M3 Kayu Bekisting @ Rp. 1,550,000.00 = Rp. 372,000.00
3.200 Kg Paku campur @ Rp. 15,000.00 = Rp. 48,000.00
151.000 Kg Besi beton polos @ Rp. 17,000.00 = Rp. 2,567,000.00
2.250 Kg Kawat beton @ Rp. 20,000.00 = Rp. 45,000.00
323.000 Kg Semen @ Rp. 1,400.00 = Rp. 452,200.00
0.520 Kg Pasir beton @ Rp. 170,000.00 = Rp. 88,400.00
0.780 M3 Batu pecah @ Rp. 350,000.00 = Rp. 273,000.00
0.160 M3 Kayu balok klas III @ Rp. 1,550,000.00 = Rp. 248,000.00
24.000 Btg Kayu dolken @ Rp. 10,000.00 = Rp. 240,000.00
5.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 265,000.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.300 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 91,000.00
1.050 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 73,500.00
0.265 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 21,200.00
0.265 Oh Mandor @ Rp. 60,000.00 = Rp. 15,900.00
Jumlah Harga Per satuan pekerjaan 4,819,450.00
. Anl. SNI. VII.6.35. Membuat 1 m' kolom praktis beton bertulang ( 11 x 11 ) cm
0.002 M3 Kayu Bekisting @ Rp. 1,550,000.00 = Rp. 3,100.00
0.010 Kg Paku campur @ Rp. 15,000.00 = Rp. 150.00
3.000 Kg Besi beton polos @ Rp. 17,000.00 = Rp. 51,000.00
0.450 Kg Kawat beton @ Rp. 20,000.00 = Rp. 9,000.00
4.000 Kg Semen @ Rp. 1,400.00 = Rp. 5,600.00
0.006 Kg Pasir beton @ Rp. 170,000.00 = Rp. 1,020.00
0.009 M3 Batu pecah @ Rp. 350,000.00 = Rp. 3,150.00
0.180 Oh Pekerja @ Rp. 50,000.00 = Rp. 9,000.00
0.020 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 1,400.00
0.020 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 1,400.00
0.020 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 1,400.00
0.006 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.003 Oh Mandor @ Rp. 70,000.00 = Rp. 210.00
Jumlah Harga Per satuan pekerjaan 86,910.00
. Anl. SNI. VIII.6.36. 1 M' Pasang Nok Genteng Metal Multi roof
1.100 Lbr Lbr Nok Multi Roof Model C @ Rp. 55,000.00 = Rp. 60,500.00
0.050 Kg Kg Paku Anti Karat @ Rp. 25,000.00 = Rp. 1,250.00
0.250 Oh Pekerja @ Rp. 50,000.00 = Rp. 12,500.00
0.150 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,200.00
0.013 Oh Mandor @ Rp. 70,000.00 = Rp. 910.00
Jumlah Harga Per satuan pekerjaan 86,860.00
. Anl. 6.18 1 M2 Memasang Talang/Jurai dalam lebar 0,50 M' (Seng Plat Uk. 1X1,8 BJLS 0,20)
0.556 Lbr Seng Plat @ Rp. 57,000.00 = Rp. 31,692.00
0.040 Kg Paku Seng @ Rp. 22,000.00 = Rp. 880.00
0.014 M3 Papan Kayu Meranti @ Rp. 2,000,000.00 = Rp. 28,000.00
0.019 Oh Pekerja @ Rp. 50,000.00 = Rp. 950.00
0.400 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 28,000.00
0.025 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,000.00
0.0100 Oh Mandor @ Rp. 70,000.00 = Rp. 700.00
Jumlah Harga Per satuan pekerjaan 92,222.00
. Anl. SNI. X.6.35. Memasang 1 Bh Kran Air diameter 3/4" atau 1/2"
1.000 Bh Kran Air @ Rp. 22,000.00 = Rp. 22,000.00
0.025 Bh Seal Type @ Rp. 9,000.00 = Rp. 1,080.00
0.010 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.005 Oh Mandor @ Rp. 70,000.00 = Rp. 350.00
Jumlah Harga Per satuan pekerjaan 31,730.00
. Anl. SNI. XIV.6.14. 1 M2 Pengecetan Tembok Baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
0.100Kg Plamir @ Rp. 12,000.00 = Rp. 1,200.00
0.100Kg Cat Dasar ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 3,300.00
0.260Kg Cat Penutup 2 Kali ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 8,580.00
0.020Oh Pekerja @ Rp. 50,000.00 = Rp. 1,000.00
0.063Oh Tukang Cat @ Rp. 70,000.00 = Rp. 4,410.00
0.0063Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 504.00
0.0025 Oh Mandor @ Rp. 70,000.00 = Rp. 175.00
Jumlah Harga Per satuan pekerjaan 19,169.00
. Anl. SNI. XIV.6.15. 1 M2 Pengecetan Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
0.120 Kg Cat Dasar ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 3,960.00
0.180 Kg Kg Cat Penutup 2 Kali ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 5,940.00
0.028 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,400.00
0.042 Oh Tukang Cat @ Rp. 70,000.00 = Rp. 2,940.00
0.0042 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 336.00
0.0025 Oh Mandor @ Rp. 70,000.00 = Rp. 175.00
Jumlah Harga Per satuan pekerjaan 14,751.00
0 Sujaswan, ST
0 0
RENCANA ANGGARAN BIAYA
I. PEKERJAAN TANAH
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pek. Galian Tanah Alur Pondasi M3 41.25 39,000.00 1,608,750.00
2 Pek. Urugan Tanah Alur Pondasi M3 0.13 13,000.00 1,666.64
3 Pek. Urugan Pasir Alas Pondasi M3 5.78 195,600.00 1,129,590.00
4 Pek. Urugan Tanah Alas Lantai M3 30.00 82,000.00 2,460,000.00
VI. PEK. KUSEN, PINTU, JENDELA, DAUN PINTU, DAUN JENDELA DAN KACA
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pek. Kusen Pintu dan Jendela Kayu Kelapi M3 2.14 2,500,000.00 5,350,000.00
2 Pek. Pintu Panil Jati M2 76.00 320,000.00 24,320,000.00
3 Pek. Pintu PVC KM Bh 20.00 250,000.00 5,000,000.00
4 Pek. Bingkai Jendela Jati M2 12.60 271,900.00 3,425,940.00
5 Pas. Kaca 5 mm (Bening) M2 24.00 139,002.50 3,336,060.00
1 Pek. Kuda Kuda baja Ringan + Atap metal Ls 165.00 250,000.00 41,250,000.00
1 Instalasi Air Bersih PVC 1/2 " Dalam Gedung M' 40.00 26,406.00 1,056,240.00
2 Instalasi Air Buangan PVC 3" Luar Gedung M' 40.00 90,917.00 3,636,680.00
3 Instalasi Air Bersih PVC 3/4 " Luar Gedung M' 40.00 26,406.00 1,056,240.00
4 Instalasi Air Kotor PVC 4" Luar Gedung M' 40.00 90,917.00 3,636,680.00
5 Pas. Kloset jongkok standard Bh 20.00 200,000.00 4,000,000.00
6 Pas. Kran Air Bh 40.00 31,730.00 1,269,200.00
7 Pas. Floor Drain Aluminium Bh 20.00 44,650.00 893,000.00
8 Pas. Septiktank + Peresapan Unit 1.00 1,500,000.00 1,500,000.00
1 2 3
Dihitung Oleh :
Sujaswan, ST
70.00
jendelah kaca
V 4.7376 2.3436 2.394 19,400,000 p3 5.0592 j1 5.2731
51 p1 0.9118 0.5084 0.4034 3.0752 1.566
21675000 j2 2.9592 2.1402 0.819 1.5872 j3 18
425000 j4 1.9728 1.4268 0.546 2.6624 5.22
j3 10.152 5.22 4.932 v 2.3436 j2 2.124
-
952,657.20
24,592,425.00
7,000,000.00
57,750,000.00
-
13,200,000.00
3,822,264.00
75,600,000.00
-
-
-
31,200,000.00
-
-
26,000,000.00
14,300,000.00
2,800,000.00
300,000.00
-
5,350,000.00
24,320,000.00
3,425,940.00
3,336,060.00
41,250,000.00
-
3,500,000.00
3,000,000.00
2,040,000.00
700,000.00
600,000.00
360,000.00
800,000.00
720,000.00
5,000,000.00
2,400,000.00
700,000.00
720,000.00
360,000.00
300,000.00
122,000.00
1,056,240.00
3,636,680.00
4,000,000.00
1,269,200.00
893,000.00
1,500,000.00
23,040,000.00
23,400,000.00
1,629,950.00
422,146,422.84
42,214,642.28
DAFTAR HARGA BAHAN DAN UPAH KERJA
#NAME? : #NAME?
PEMBANGUNAN : RUMAH KOST
PEMOHON : HABIB MUHAMMAD ALHABSY
LOKASI : JL. ORINUNGGU, KEL. PADALEU, KEC. KAMBU, KOTA KENDARI
UPAH KERJA
HARGA BAHAN
KABEL :
111 Kabel NYM 2 x 1.5 supreme mtr Rp. 36,000.00
112 Kabel NYM 2 x 2.5 supreme mtr Rp. 4,950.00
113 Kabel NYM 3 x 2,5 supreme mtr Rp. 6,000.00
114 Kabel NYM 3 x 4 supreme mtr Rp. 8,800.00
PIPA :
138 Fleksibel mtr Rp. 2,750.00
139 Conduit Clipsal mtr Rp. 2,500.00
140 L Bow 3/4 bh Rp. 750.00
141 Klem Kabel Clipsal 20 mm bh Rp. 500.00
142 Sok/Sambungan Clipsal bh Rp. 500.00
143 Tedos Clipsal bh Rp. 3,000.00
144 Inbow Dos Decker bh Rp. 3,000.00
145 Dos Inbow Asli bh Rp. 3,000.00
146 Lasdoop bh Rp. 500.00
147 Sekrup bh Rp. 100.00
148 paku bh Rp. 100.00
149 Fisher bh Rp. 500.00
SADEL :
150 Sadel Klem (Besi) dos Rp. 26,000.00
151 Sadel Klem (Plastik) bks Rp. 15,000.00
152 Sadel Beton dos Rp. 17,500.00
153 Sadel 3/4 biji Rp. 12,500.00
154 Sadel/Klem No. 19 bks Rp. 13,500.00
ISOLASI :
155 Isolasi Bond rol Rp. 6,000.00
156 Isolasi Bond 3 m 2.3 rol Rp. 4,000.00
157 Isolasi 3 m Scowat rol Rp. 5,000.00
Bersambung
Lanjutan
No. NAMA BAHAN SATUAN HARGA
1 2 3 4
LAMPU :
158 Down Light halogen bh Rp. 175,000.00
159 Down Light lengkap esensial 23 watt bh Rp. 95,000.00
160 Lampu TL 1x 20 watt Philips TKO bh Rp. 125,000.00
161 Lampu TL 1 x 40 watt Philips TKO bh Rp. 158,000.00
162 Reflektor lamp 100 watt bh Rp. 225,000.00
163 Reflektor lamp 150 watt bh Rp. 275,000.00
164 Lampu sorot HPIT 200 watt komplit bh Rp. 450,000.00
165 Lampu sorot HPIT 400 watt komplit bh Rp. 785,000.00
166 Lampu Taman Globe 12', esensial 18 watt set Rp. 450,000.00
167 Candelair Lamp 200 watt set Rp. 5,000,000.00
168 Candelair Lamp 300 watt set Rp. 6,000,000.00
169 Lampu Softone 40 watt Philips bh Rp. 6,000.00
170 Lampu TL 2 x 20 watt Philips RMI bh Rp. 285,000.00
171 Lampu TL 2 x 40 watt Philips RMI bh Rp. 325,000.00
172 Lampu Baret TL 32 watt CCB Krs Ufo bh Rp. 325,000.00
PANEL :
173 MCB NS 45a, 4,5 KA, 1 Phasa,MG 6 A bh Rp. 35,000.00
174 MCB NS 45a, 4,5 KA, 1 Phasa,MG 10 A bh Rp. 35,000.00
175 MCB NS 45a, 4,5 KA, 1 Phasa,MG 16 A bh Rp. 35,000.00
176 MCB NS 45a, 4,5 KA, 1 Phasa,MG 20 A bh Rp. 35,000.00
177 MCB NS 45a, 4,5 KA, 1 Phasa,MG 25 A bh Rp. 42,500.00
178 MCB NS 45a, 4,5 KA, 1 Phasa,MG 32 A bh Rp. 46,000.00
179 MCB NS 45a, 4,5 KA, 1 Phasa,MG 40 A bh Rp. 52,500.00
180 MCB NS 45H, 10 KA, 1 Phasa,MG 6 A bh Rp. 122,000.00
181 MCB NS 45H, 10 KA, 1 Phasa,MG 10 A bh Rp. 122,000.00
182 MCB NS 45H, 10 KA, 1 Phasa,MG 16 A bh Rp. 122,000.00
183 MCB NS 45H, 10 KA, 1 Phasa,MG 20 A bh Rp. 122,000.00
184 MCB NS 45H, 10 KA, 1 Phasa,MG 25 A bh Rp. 136,500.00
185 MCB NS 45H, 10 KA, 1 Phasa,MG 32 A bh Rp. 143,000.00
186 MCB NS 45H, 10 KA, 1 Phasa,MG 40 A bh Rp. 153,500.00
187 MCB C 120 N, 10 KA, 3 Phasa,MG 10 A bh Rp. 455,000.00
188 MCB C 120 N, 10 KA, 3 Phasa,MG 16 A bh Rp. 455,000.00
189 MCB C 120 N, 10 KA, 3 Phasa,MG 20 A bh Rp. 455,000.00
190 MCB C 120 N, 10 KA, 3 Phasa,MG 25 A bh Rp. 471,000.00
191 MCB C 120 N, 10 KA, 3 Phasa,MG 32 A bh Rp. 471,000.00
192 MCB C 120 N, 10 KA, 3 Phasa,MG 40 A bh Rp. 471,000.00
193 MCB C 60 L, 25 KA, 3 Phasa,MG 10 A bh Rp. 761,500.00
194 MCB C 60 L, 25 KA, 3 Phasa,MG 16 A bh Rp. 761,500.00
195 MCB C 60 L, 25 KA, 3 Phasa,MG 20 A bh Rp. 761,500.00
196 MCB C 60 L, 25 KA, 3 Phasa,MG 25 A bh Rp. 761,500.00
197 MCB C 60 L, 25 KA, 3 Phasa,MG 32 A bh Rp. 761,500.00
198 MCB C 60 L, 25 KA, 3 Phasa,MG 40 A bh Rp. 761,500.00
199 MCCB NS 100N, 36 KA, 3 Phasa,MG 13/16 A bh Rp. 1,510,500.00
200 MCCB NS 100N, 36 KA, 3 Phasa,MG 20/25 A bh Rp. 1,510,500.00
201 MCCB NS 100N, 36 KA, 3 Phasa,MG 25/32 A bh Rp. 1,510,500.00
202 MCCB NS 100N, 36 KA, 3 Phasa,MG 32/40 A bh Rp. 1,510,500.00
203 MCCB NS 100N, 36 KA, 3 Phasa,MG 40/50 A bh Rp. 1,510,500.00
204 MCCB NS 100N, 36 KA, 3 Phasa,MG 50/63 A bh Rp. 1,510,500.00
205 MCCB NS 100N, 36 KA, 3 Phasa,MG 64/80 A bh Rp. 1,510,500.00
206 MCCB NS 100N, 36 KA, 3 Phasa,MG 80/100 A bh Rp. 1,510,500.00
207 MCCB NS 100H, 70 KA, 3 Phasa,MG 13/16 A bh Rp. 2,193,500.00
208 MCCB NS 100H, 70 KA, 3 Phasa,MG 20/25 A bh Rp. 2,193,500.00
209 MCCB NS 100H, 70 KA, 3 Phasa,MG 25/32 A bh Rp. 2,193,500.00
210 MCCB NS 100H, 70 KA, 3 Phasa,MG 32/40 A bh Rp. 2,193,500.00
211 MCCB NS 100H, 70 KA, 3 Phasa,MG 40/50 A bh Rp. 2,193,500.00
212 MCCB NS 100H, 70 KA, 3 Phasa,MG 50/63 A bh Rp. 2,193,500.00
213 MCCB NS 100H, 70 KA, 3 Phasa,MG 64/80 A bh Rp. 2,193,500.00
214 MCCB NS 100H, 70 KA, 3 Phasa,MG 80/100 A bh Rp. 2,193,500.00
SOUND SYSTEM
236 Ceiling speaker 6 watt bh Rp. 135,000.00
237 Coloumb speaker 10 watt bh Rp. 450,000.00
238 Potentiope bh Rp. 98,000.00
0 Dihitung Oleh :
0 0
0 Sujaswan, ST
0 0
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE)
PEMBANGUNAN : RUMAH KOST
PEMOHON : HABIB MUHAMMAD ALHABSY
LOKASI : JL. ORINUNGGU, KEL. PADALEU, KEC. KAMBU, KOTA KENDARI
WAKTU PELAKSANAAN
Nomor Uraian Pekerjaan Bobot BULAN I BULAN II BULAN III BULAN IV BULAN V BLN VI Ket.
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
100
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
90
1 I. PEKERJAAN TANAH 0.00% - - - -
3 III. PEKERJAAN BETON 0.00% 0.000 0.000 0.000 0.000 0.000 0.000 0.000
70
4 IV. PEKERJAAN DINDING DAN PLESTERAN 0.00% - - - - - - - -
60
5 V. PEKERJAAN PENUTUP LANTAI, DINDING DAN SALURAN 0.00% - - - - - - - - - - - - - - -
6 VI. PEK. KUSEN, PINTU, JENDELA, DAUN PINTU, DAUN JENDELA DAN KACA 0.00% - - - - - - 50
Jumlah #NAME?
Rencana #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rencana Komulatif 0 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Realisasi
Realisasi Komulatif
Deviasi
S
Kendari, September 2020
o
r
0 Dihitung Oleh : o
0 0 n
g
,
0 Sujaswan, ST
0 0