DAFTAR ANALISA HARGA SATUAN

PEMBANGUNAN : RUMAH KOST


PEMOHON : HABIB MUHAMMAD ALHABSY
LOKASI : JL. ORINUNGGU, KEL. PADALEU, KEC. KAMBU, KOTA KENDARI

I. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN BETON

Anl. SNI. I.6.13 1 M3 Bongkaran Beton Bertulang


6.667 Oh Pekerja @ Rp. 50,000.00 = Rp. 333,350.00
0.333 Oh Mandor @ Rp. 50,000.00 = Rp. 16,650.00
Jumlah Harga Per satuan pekerjaan 350,000.00

Anl. SNI. I.6.14 1 M3 Bongkaran Dinding Tembok Batu Merah


6.667 Oh Pekerja @ Rp. 50,000.00 = Rp. 333,350.00
0.033 Oh Mandor @ Rp. 50,000.00 = Rp. 1,650.00
Jumlah Harga Per satuan pekerjaan 335,000.00

Anl. SNI. I.6.14 1 M' Pasang Pagar Kawat Jaring Galvanis, tinggi 1,00 M'
6.667 Lbr Kawat Jaring @ Rp. 30,000.00 = Rp. 200,010.00
0.042 Oh Pekerja @ Rp. 50,000.00 = Rp. 2,100.00
0.004 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 320.00
0.042 Oh Tukang @ Rp. 70,000.00 = Rp. 2,940.00
0.002 Oh Mandor @ Rp. 60,000.00 = Rp. 120.00
Jumlah Harga Per satuan pekerjaan 205,490.00

Anl. SNI. 6.4 1 M' Pengukuran dan pemasangan bouwplank


0.012 M3 Kayu 5/7 @ Rp. 2,000,000.00 = Rp. 24,000.00
0.020 Kg Paku biasa 2" - 5" @ Rp. 15,000.00 = Rp. 300.00
0.007 M3 Kayu papan 3/20 @ Rp. 2,000,000.00 = Rp. 14,000.00
0.100 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.100 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp. 300.00
Jumlah Harga Per satuan pekerjaan 51,400.00

II. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN PONDASI

. Anl. SNI. II.6.1. 1 M3 Galian Tanah Biasa 1, 00 M'


0.750 Oh Pekerja @ Rp. 50,000.00 = Rp. 37,500.00
0.025 Oh Mandor @ Rp. 60,000.00 = Rp. 1,500.00
Jumlah Harga Per satuan pekerjaan 39,000.00

. Anl. SNI. II.6.2. 1 M3 Galian Tanah Biasa 2,00 M'


0.900 Oh Pekerja @ Rp. 50,000.00 = Rp. 45,000.00
0.045 Oh Mandor @ Rp. 60,000.00 = Rp. 2,700.00
Jumlah Harga Per satuan pekerjaan 47,700.00

Anl. SNI. II.6.3 1 M3 Galian Tanah Biasa 3,00 M'


1.050 Oh Pekerja @ Rp. 50,000.00 = Rp. 52,500.00
0.067 Oh Mandor @ Rp. 60,000.00 = Rp. 4,020.00
Jumlah Harga Per satuan pekerjaan 56,520.00

Anl. SNI. II.6.9. 1 M3 Mengurug kembali galian dihitung dari 1/3 kali dari indeks pekerjaan Galian

Jumlah Harga Per satuan pekerjaan 13,000.00

. Anl. SNI. II.6.10+11. 1 M3 Urugan Tanah Alas Lantai Dipadatkan


1.200 M3 Tanah Urugan Didatangkan @ Rp. 45,000.00 = Rp. 54,000.00
0.500 Oh Pekerja @ Rp. 50,000.00 = Rp. 25,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp. 3,000.00
Jumlah Harga Per satuan pekerjaan 82,000.00
. Anl. SNI. II.6.11. 1 M3 Lapis Pasir Alas
1.200 M3 Pasir Urug @ Rp. 150,000.00 = Rp. 180,000.00
0.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp. 600.00
Jumlah Harga Per satuan pekerjaan 195,600.00

. Anl. SNI. II.6.14. 1 M3 Pemasangan Lapisan Ijuk


1.200 M3 Ijuk @ Rp. 180,000.00 = Rp. 216,000.00
0.150 Oh Pekerja @ Rp. 50,000.00 = Rp. 7,500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp. 900.00
Jumlah Harga Per satuan pekerjaan 224,400.00

. Anl. SNI. II.6.15. 1 M3 Urugan Sirtu


1.200 M3 Sirtu @ Rp. 90,000.00 = Rp. 108,000.00
0.250 Oh Pekerja @ Rp. 50,000.00 = Rp. 12,500.00
0.025 Oh Mandor @ Rp. 60,000.00 = Rp. 1,500.00
Jumlah Harga Per satuan pekerjaan 122,000.00

III. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN PONDASI

. Anl. SNI. III.6.4. 1 M3 Pasangan Pondasi Batu Gunung /Kali Adukan 1 PC : 3 Psr
1.100 M3 Batu Gunung @ Rp. 170,000.00 = Rp. 187,000.00
4.040 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 282,800.00
0.485 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 82,450.00
0.600 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 42,000.00
0.060 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 4,800.00
1.500 Oh Pekerja @ Rp. 50,000.00 = Rp. 75,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp. 4,500.00
Jumlah Harga Per satuan pekerjaan 678,550.00

. Anl. SNI. III.6.6. 1 M3 Pasangan Pondasi Batu Gunung /Kali Adukan 1 PC : 5 Psr
1.100 M3 Batu Gunung @ Rp. 170,000.00 = Rp. 187,000.00
2.720 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 190,400.00
0.544 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 92,480.00
0.600 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 42,000.00
0.060 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 4,800.00
1.500 Oh Pekerja @ Rp. 50,000.00 = Rp. 75,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp. 4,500.00
Jumlah Harga Per satuan pekerjaan 596,180.00

. Anl. SNI. III.6.14. 1 M3 Pasangan Batu Kosong


1.200 M3 Batu Gunung @ Rp. 170,000.00 = Rp. 204,000.00
0.300 M3 Pasir Urug @ Rp. 150,000.00 = Rp. 45,000.00
0.780 Oh Pekerja @ Rp. 50,000.00 = Rp. 39,000.00
0.390 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 27,300.00
0.039 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 3,120.00
0.039 Oh Mandor @ Rp. 60,000.00 = Rp. 2,340.00
Jumlah Harga Per satuan pekerjaan 320,760.00

. IV. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN DINDING

Anl. SNI. IV.6.9. 1 M2 Pasangan Batu Bata tebal 1/2 Bata , Adukan 1 Pc : 2 Ps
85.000 Bh Batu Merah/Bata @ Rp. 600.00 = Rp. 51,000.00
0.379 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 26,530.00
0.038 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 6,460.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.320 Oh Pekerja @ Rp. 50,000.00 = Rp. 16,000.00
0.016 Oh Mandor @ Rp. 60,000.00 = Rp. 960.00
Jumlah Harga Per satuan pekerjaan 108,750.00
. Anl. SNI. IV.6.10. 1 M2 Pasangan Batu Bata tebal 1/2 Bata , Adukan 1 Pc : 3 Ps
85.000 Bh Batu Merah/Bata @ Rp. 600.00 = Rp. 51,000.00
14.370 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 20,118.00
0.040 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 6,800.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp. 900.00
Jumlah Harga Per satuan pekerjaan 101,618.00

. Anl. SNI. IV.6.12. 1 M2 Pasangan Batu Bata tebal 1/2 Bata , Adukan 1 Pc : 5 Ps
85.000 Bh Batu Merah/Bata @ Rp. 600.00 = Rp. 51,000.00
9.680 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 13,552.00
0.045 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 7,650.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp. 900.00
Jumlah Harga Per satuan pekerjaan 95,902.00

Anl. SNI. IV.6.25. 1 M2 Pasangan Dinding Roster Adukan 1 Pc : 5 Ps


1.000 M2 Roster @ Rp. 13,750.00 = Rp. 13,750.00
0.256 Zak Semen Portland (PC) @ Rp. 1,400.00 = Rp. 358.40
0.035 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 5,950.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp. 900.00
Jumlah Harga Per satuan pekerjaan 43,758.40

V. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN PLASTERAN

Anl. SNI. V.6.2. 1 M2 Plasteran 1 Pc : 2 Ps, Tebal 15 mm


10.224 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 14,313.60
0.016 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 2,720.00
0.150 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,200.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp. 600.00
Jumlah Harga Per satuan pekerjaan 39,333.60

. Anl. SNI. V.6.3. 1 M2 Plasteran 1 Pc : 3 Ps, Tebal 15 mm


7.776 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 10,886.40
0.023 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 3,910.00
0.150 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,200.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp. 600.00
Jumlah Harga Per satuan pekerjaan 37,096.40

. Anl. SNI. V.6.5. 1 M2 Plasteran 1 Pc : 5 Ps, Tebal 15 mm


5.184 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 7,257.60
0.027 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 4,590.00
0.150 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,200.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp. 600.00
Jumlah Harga Per satuan pekerjaan 34,147.60
. Anl. SNI. V.6.35. 1 M2 Plasteran Mata Sapi / Siaran 1 Pc : 2 Ps
6.340 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 8,876.00
0.012 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 2,040.00
0.140 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 9,800.00
0.014 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,120.00
0.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp. 900.00
Jumlah Harga Per satuan pekerjaan 37,736.00

Anl. Tambahan 1 M2 Pekerjaan Waterproofing dengan air semen


6.500 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 9,100.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.015 Oh Pekerja @ Rp. 50,000.00 = Rp. 750.00
0.0008 Oh Mandor @ Rp. 60,000.00 = Rp. 45.00
Jumlah Harga Per satuan pekerjaan 17,695.00

Anl. SNI. V.6.20. 1 M' Plesteran Profil Beton 1 : 2 Max. Lebar 20 cm


0.500 Kg Semen Portland (PC) @ Rp. 1,400.00 Rp. 700.00
0.015 M3 Pasir Pasang @ Rp. 170,000.00 Rp. 2,550.00
0.780 Oh Tukang Batu @ Rp. 70,000.00 Rp. 54,600.00
0.078 Oh Kepala Tukang @ Rp. 80,000.00 Rp. 6,240.00
0.057 Oh Pekerja @ Rp. 50,000.00 Rp. 2,850.00
0.003 Oh Mandor @ Rp. 60,000.00 Rp. 180.00
Jumlah Harga Per satuan pekerjaan 67,120.00

Anl. SNI. V.6.27. 1 M2 Pelicinan Dengan Air Semen ACIAN


3.250 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 4,550.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.150 Oh Pekerja @ Rp. 50,000.00 = Rp. 7,500.00
0.008 Oh Mandor @ Rp. 60,000.00 = Rp. 480.00
Jumlah Harga Per satuan pekerjaan 20,330.00

Anl. SNI. V.6.5. 1 M2 Plasteran Penebalan 1 Pc : 3 Ps, Tebal 20 mm


10.368 Kg Portland Cement @ Rp. 1,400.00 = Rp. 14,515.20
0.031 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 5,270.00
0.260 Oh Pekerja @ Rp. 50,000.00 = Rp. 13,000.00
0.200 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 14,000.00
0.020 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,600.00
0.130 Oh Mandor @ Rp. 60,000.00 = Rp. 7,800.00
Jumlah Harga Per satuan pekerjaan 56,185.20

Anl. Tambahan 1 M1 Pasangan Saluran Air Hujan ( Batu Gunung )


0.165 M3 Pas. Pondasi Batu Gunung 1 : 5 @ Rp. 596,180.00 = Rp. 98,369.70
0.900 M2 Plasteran 1 : 2 @ Rp. 39,333.60 = Rp. 35,400.24
0.700 M2 Pelicinan Dengan Air Semen @ Rp. 20,330.00 = Rp. 14,231.00
Jumlah Harga Per satuan pekerjaan 148,000.94

Anl. Tambahan 1 BH Memasang Bak Kontrol Ukuran 50x50 cm


0.230 M3 Pas. Pondasi Batu Gunung 1 : 5 @ Rp. 596,180.00 = Rp. 137,121.40
1.430 M2 Plasteran 1 : 2 @ Rp. 39,333.60 = Rp. 56,247.05
1.430 M2 Pelicinan Dengan Air Semen @ Rp. 20,330.00 = Rp. 29,071.90
Jumlah Harga Per satuan pekerjaan 222,440.35
VI. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN
PEKERJAAN KAYU

Anl. SNI. VI.6.1. 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelapi
1.100 M3 Kayu Kelapi @ Rp. 3,500,000.00 = Rp. 3,850,000.00
1.125 Kg Paku 10 cm @ Rp. 15,000.00 = Rp. 16,875.00
0.500 Kg Lem kayu @ Rp. 25,000.00 = Rp. 12,500.00
20.000 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 1,400,000.00
2.000 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 160,000.00
6.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 300,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp. 18,000.00
Jumlah Harga Per satuan pekerjaan 5,757,375.00

Anl. Tambahan 1 M3 Pasang Rangka Dinding Partis Kayu Silae dan sejenis
1.100 M3 Kayu Klas II @ Rp. 2,000,000.00 = Rp. 2,200,000.00
0.100 Kg Paku biasa @ Rp. 15,000.00 Rp. 1,500.00
18.000 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 1,260,000.00
1.600 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 128,000.00
4.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 200,000.00
0.180 Oh Mandor @ Rp. 60,000.00 = Rp. 10,800.00
Jumlah Harga Per satuan pekerjaan 3,800,300.00

. Anl. SNI. VI. 6.5 1 M2 Pasang Pintu Panel Kayu Jati


0.040 M3 Papan Jati @ Rp. 2,750,000.00 = Rp. 110,000.00
0.500 Kg Lem kayu @ Rp. 25,000.00 = Rp. 12,500.00
2.500 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 175,000.00
0.250 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 20,000.00
1.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 50,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp. 3,000.00
Jumlah Harga Per satuan pekerjaan 370,500.00

. Anl. SNI. VI.6.16. 1 M2 Pasang Jalusi Mati Papan Kayu maranti


0.060 M3 Papan Maranti @ Rp. 2,000,000.00 = Rp. 120,000.00
0.150 Kg Paku Biasa @ Rp. 15,000.00 = Rp. 2,250.00
2.000 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 140,000.00
0.200 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 16,000.00
0.800 Oh Pekerja @ Rp. 50,000.00 = Rp. 40,000.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp. 2,400.00
Jumlah Harga Per satuan pekerjaan 320,650.00

. Anl. SNI. VI.6.19. 1 M2 Pasang Pintu Doubel Taekwood, Rangka Kayu Jati
0.020 M3 Papan Jati @ Rp. 2,000,000.00 = Rp. 39,200.00
0.300 Kg Paku Campur @ Rp. 15,000.00 = Rp. 4,500.00
0.300 Ltr Lem Kayu @ Rp. 21,000.00 = Rp. 6,300.00
1.000 Lbr Tekwood 120 x 240 cm @ Rp. 75,000.00 = Rp. 75,000.00
2.000 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 140,000.00
0.200 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 16,000.00
0.600 Oh Pekerja @ Rp. 50,000.00 = Rp. 30,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp. 1,800.00
Jumlah Harga Per satuan pekerjaan 312,800.00

. Anl. SNI. VI.6.6. 1 M2 Pasang Bingkai Jendela Kaca


0.024 M3 Papan Jati @ Rp. 2,750,000.00 = Rp. 66,000.00
0.300 Kg Lem kayu @ Rp. 25,000.00 = Rp. 7,500.00
2.000 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 140,000.00
0.200 Oh Kepala Tukang Kayu @ Rp. 80,000.00 = Rp. 16,000.00
0.800 Oh Pekerja @ Rp. 50,000.00 = Rp. 40,000.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp. 2,400.00
Jumlah Harga Per satuan pekerjaan 271,900.00
Anl. Tambahan 1 M2 Memasang Rolling door alluminium
1.000 M2 Rolling door alluminium @ Rp. 350,000.00 = Rp. 350,000.00
1.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 50,000.00
1.000 Oh Tukang besi @ Rp. 70,000.00 = Rp. 70,000.00
0.100 Oh kepala tukang @ Rp. 80,000.00 = Rp. 8,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp. 3,000.00
Jumlah Harga Per satuan pekerjaan 481,000.00

Anl. SNI. VI.6.27. 1 M3 Konstruksi Kuda-Kuda Kayu Wola


1.100 M3 Balok Kayu Wola @ Rp. 3,250,000.00 = Rp. 3,575,000.00
15.000 Kg Besi Strip @ Rp. 7,000.00 = Rp. 105,000.00
0.800 Kg Paku Campur @ Rp. 15,000.00 = Rp. 12,000.00
12.000 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 840,000.00
1.200 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 96,000.00
4.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 200,000.00
0.200 Oh Mandor @ Rp. 60,000.00 = Rp. 12,000.00
Jumlah Harga Per satuan pekerjaan 4,840,000.00

Anl. Tambahan 1 M3 Pasang Gording, Balok jepit, balok angin, skor Kayu Wola
1.100 M3 Balok Kayu Wola @ Rp. 3,250,000.00 = Rp. 3,575,000.00
2.200 Kg Paku Campur @ Rp. 15,000.00 = Rp. 33,000.00
6.000 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 420,000.00
0.600 Oh Kepala Tukang Kayu @ Rp. 80,000.00 = Rp. 48,000.00
2.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 100,000.00
0.100 Oh Mandor @ Rp. 60,000.00 = Rp. 6,000.00
Jumlah Harga Per satuan pekerjaan 4,182,000.00

Anl. SNI. VI.6.35. 1 M2 Pasang Kaso + Reng Kayu Silae atau sejenis
0.014 M3 Balok Kayu Meranti @ Rp. 3,250,000.00 = Rp. 45,500.00
0.150 Kg Paku Campur @ Rp. 15,000.00 = Rp. 2,250.00
0.100 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.100 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp. 300.00
Jumlah Harga Per satuan pekerjaan 60,850.00

Anl. SNI. VI.6.43.a 1 M2 Pasang Rangka Plapond Kayu Meranti Silae atau sejenis
0.018 M3 Balok Kayu Meranti @ Rp. 3,250,000.00 = Rp. 56,875.00
0.150 Kg Paku Campur @ Rp. 15,000.00 = Rp. 2,250.00
0.300 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 21,000.00
0.030 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,400.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp. 600.00
Jumlah Harga Per satuan pekerjaan 93,125.00

Anl. SNI. VI.6.49. 1 M' Pasang Listplank 3 X 30 cm Papan Silae


0.0072 M3 Papan Silea @ Rp. 2,000,000.00 = Rp. 14,400.00
0.050 Kg Paku Campur @ Rp. 15,000.00 = Rp. 750.00
0.200 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 14,000.00
0.025 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,000.00
0.100 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.0050 Oh Mandor @ Rp. 60,000.00 = Rp. 300.00
Jumlah Harga Per satuan pekerjaan 36,450.00

Anl. SNI. VI.6.51. 1 M' Pasang Listplank 2 x ( 3 X 20) cm Papan Silae


0.0145 M3 Papan Silea @ Rp. 2,000,000.00 = Rp. 29,000.00
0.060 Kg Paku Campur @ Rp. 15,000.00 = Rp. 900.00
0.250 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 17,500.00
0.025 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,000.00
0.750 Oh Pekerja @ Rp. 50,000.00 = Rp. 37,500.00
0.0750 Oh Mandor @ Rp. 60,000.00 = Rp. 4,500.00
Jumlah Harga Per satuan pekerjaan 91,400.00
Anl. SNI. VI.6.57. 1 M2 Pasang Dinding Partisi Double Taekwood, Rangka Kayu Meranti
0.5600 Ltr Lem Kayu @ Rp. 21,000.00 = Rp. 11,760.00
0.100 Kg Paku Biasa @ Rp. 15,000.00 = Rp. 1,500.00
1.000 Lbr Taekwood 120 x 240 cm @ Rp. 75,000.00 = Rp. 75,000.00
0.600 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 42,000.00
0.060 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 4,800.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp. 600.00
Jumlah Harga Per satuan pekerjaan 145,660.00

Anl. SNI. VI.6.60. 1 M' Pasang List Plapond Papan 1 x 4 cm


1.0500 M' M' List Plapon Papan @ Rp. 12,000.00 = Rp. 12,600.00
0.021 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,050.00
0.021 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 1,470.00
0.002 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 160.00
0.001 Oh Mandor @ Rp. 60,000.00 = Rp. 60.00
Jumlah Harga Per satuan pekerjaan 15,340.00

Anl. SNI. VI.6.60. 1 M' Pasang List Plapond kayu pofil


1.0500 M' List kayu profil 3,5-5 cm @ Rp. 5,500.00 = Rp. 5,775.00
0.0100 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 150.00
0.050 Oh Pekerja @ Rp. 50,000.00 = Rp. 2,500.00
0.050 Oh Tukang kayu @ Rp. 70,000.00 = Rp. 3,500.00
0.005 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 400.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp. 180.00
Jumlah Harga Per satuan pekerjaan 12,505.00

VII. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN BETON

Anl. SNI. VII.6.1. 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr


247.000 Kg Semen Portland (PC) @ Rp. 1,400.00 = Rp. 345,800.00
0.520 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 88,400.00
0.870 M3 Kerikil @ Rp. 350,000.00 = Rp. 304,500.00
1.650 Oh Pekerja @ Rp. 50,000.00 = Rp. 82,500.00
0.275 Oh Tukang batu @ Rp. 70,000.00 = Rp. 19,250.00
0.028 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,240.00
0.083 Oh Mandor @ Rp. 60,000.00 = Rp. 4,980.00
Jumlah Harga Per satuan pekerjaan 847,670.00

Anl. SNI. VII.6.5. 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Kr


4.640 Zak Semen Portland (PC) @ Rp. 1,400.00 = Rp. 6,496.00
0.520 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 88,400.00
0.780 M3 Kerikil @ Rp. 350,000.00 = Rp. 273,000.00
0.650 Oh Pekerja @ Rp. 50,000.00 = Rp. 32,500.00
0.250 Oh Tukang batu @ Rp. 70,000.00 = Rp. 17,500.00
0.025 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,000.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp. 4,800.00
Jumlah Harga Per satuan pekerjaan 424,696.00

Anl. SNI. VII.6.23. 1 M3 Membuat Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting )
0.200 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 310,000.00
1.500 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 22,500.00
157.500 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 2,677,500.00
2.250 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 45,000.00
336.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
5.800 Oh Pekerja @ Rp. 50,000.00 = Rp. 290,000.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.300 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 91,000.00
0.050 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 3,500.00
0.262 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 20,960.00
0.265 Oh Mandor @ Rp. 60,000.00 = Rp. 15,900.00
Jumlah Harga Per satuan pekerjaan 4,341,310.00
. Anl. SNI. VII.6.29. 1 M3 Membuat Sloof Beton Bertulang ( 200 Kg Besi + Bekisting )
0.270 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 418,500.00
0.200 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 3,000.00
210.000 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 3,570,000.00
3.000 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 60,000.00
336.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
5.650 Oh Pekerja @ Rp. 50,000.00 = Rp. 282,500.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.560 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 109,200.00
1.400 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 98,000.00
0.323 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 25,840.00
0.283 Oh Mandor @ Rp. 60,000.00 = Rp. 16,980.00
Jumlah Harga Per satuan pekerjaan 5,448,970.00

. Anl. SNI. VII.6.40. 1 M3 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting )
0.320 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 496,000.00
3.200 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 48,000.00
200.000 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 3,400,000.00
3.000 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 60,000.00
6.460 Kg Semen Portland @ Rp. 1,400.00 = Rp. 9,044.00
0.520 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 88,400.00
0.780 M3 Kerikil @ Rp. 350,000.00 = Rp. 273,000.00
0.140 M3 Balok kayu klas III @ Rp. 1,550,000.00 = Rp. 217,000.00
16.000 Btg Dolken @ Rp. 10,000.00 = Rp. 160,000.00
7.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 365,000.00
0.350 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 24,500.00
3.300 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 231,000.00
2.100 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 147,000.00
0.570 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 45,600.00
0.250 Oh Mandor @ Rp. 60,000.00 = Rp. 15,000.00
Jumlah Harga Per satuan pekerjaan 5,579,544.00

Anl. SNI. VII.6.30. 1 M3 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting )
0.400 M3 Papan Bekisiting @ Rp. 1,550,000.00 = Rp. 620,000.00
4.000 Kg Paku campu 5 cm - 12 cm @ Rp. 15,000.00 = Rp. 60,000.00
315.000 Kg Besi beton polos @ Rp. 17,000.00 = Rp. 5,355,000.00
4.500 Kg Kawat beton @ Rp. 20,000.00 = Rp. 90,000.00
336.000 Kg Portland cement (PC) @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
0.150 M3 Balok kayu klas III @ Rp. 1,550,000.00 = Rp. 232,500.00
20.000 Btg Dolken @ Rp. 10,000.00 = Rp. 200,000.00
7.050 Oh Pekerja @ Rp. 50,000.00 = Rp. 352,500.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.650 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 115,500.00
2.100 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 147,000.00
0.403 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 32,240.00
0.353 Oh Mandor @ Rp. 60,000.00 = Rp. 21,180.00
Jumlah Harga Per satuan pekerjaan 8,090,870.00
. Anl. SNI. VII.6.31. 1 M3 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting )
0.320 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 496,000.00
3.200 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 48,000.00
210.000 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 3,570,000.00
3.000 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 60,000.00
336.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
0.140 M3 Balok kayu klas III @ Rp. 1,550,000.00 = Rp. 217,000.00
16.000 Btg Dolken @ Rp. 10,000.00 = Rp. 160,000.00
6.350 Oh Pekerja @ Rp. 50,000.00 = Rp. 317,500.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.650 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 115,500.00
1.400 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 98,000.00
0.333 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 26,640.00
0.316 Oh Mandor @ Rp. 60,000.00 = Rp. 18,960.00
Jumlah Harga Per satuan pekerjaan 5,992,550.00

. Anl. SNI. VII.6.32. 1 M3 Membuat kolom beton bertulang (150 Kg Besi + Bekisting )
0.320 M3 Papan Bekisting @ Rp. 1,550,000.00 = Rp. 496,000.00
3.200 Kg Paku campur 5 cm - 10 cm @ Rp. 15,000.00 = Rp. 48,000.00
157.500 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp. 2,677,500.00
2.250 Kg Kawat Beton @ Rp. 20,000.00 = Rp. 45,000.00
336.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 470,400.00
0.540 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 91,800.00
0.810 M3 Kerikil @ Rp. 350,000.00 = Rp. 283,500.00
0.120 M3 Balok kayu klas III @ Rp. 1,550,000.00 = Rp. 186,000.00
32.000 Btg Dolken @ Rp. 10,000.00 = Rp. 320,000.00
5.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 265,000.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.300 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 91,000.00
1.050 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 73,500.00
0.265 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 21,200.00
0.265 Oh Mandor @ Rp. 60,000.00 = Rp. 15,900.00
Jumlah Harga Per satuan pekerjaan 5,104,050.00

. Anl. SNI. VII.6.33. 1 M3 membuat Plat lantai beton bertulang (150 Kg besi + Bekisting)
0.240 M3 Kayu Bekisting @ Rp. 1,550,000.00 = Rp. 372,000.00
3.200 Kg Paku campur @ Rp. 15,000.00 = Rp. 48,000.00
151.000 Kg Besi beton polos @ Rp. 17,000.00 = Rp. 2,567,000.00
2.250 Kg Kawat beton @ Rp. 20,000.00 = Rp. 45,000.00
323.000 Kg Semen @ Rp. 1,400.00 = Rp. 452,200.00
0.520 Kg Pasir beton @ Rp. 170,000.00 = Rp. 88,400.00
0.780 M3 Batu pecah @ Rp. 350,000.00 = Rp. 273,000.00
0.160 M3 Kayu balok klas III @ Rp. 1,550,000.00 = Rp. 248,000.00
24.000 Btg Kayu dolken @ Rp. 10,000.00 = Rp. 240,000.00
5.300 Oh Pekerja @ Rp. 50,000.00 = Rp. 265,000.00
0.275 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 19,250.00
1.300 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 91,000.00
1.050 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 73,500.00
0.265 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 21,200.00
0.265 Oh Mandor @ Rp. 60,000.00 = Rp. 15,900.00
Jumlah Harga Per satuan pekerjaan 4,819,450.00
. Anl. SNI. VII.6.35. Membuat 1 m' kolom praktis beton bertulang ( 11 x 11 ) cm
0.002 M3 Kayu Bekisting @ Rp. 1,550,000.00 = Rp. 3,100.00
0.010 Kg Paku campur @ Rp. 15,000.00 = Rp. 150.00
3.000 Kg Besi beton polos @ Rp. 17,000.00 = Rp. 51,000.00
0.450 Kg Kawat beton @ Rp. 20,000.00 = Rp. 9,000.00
4.000 Kg Semen @ Rp. 1,400.00 = Rp. 5,600.00
0.006 Kg Pasir beton @ Rp. 170,000.00 = Rp. 1,020.00
0.009 M3 Batu pecah @ Rp. 350,000.00 = Rp. 3,150.00
0.180 Oh Pekerja @ Rp. 50,000.00 = Rp. 9,000.00
0.020 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 1,400.00
0.020 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 1,400.00
0.020 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 1,400.00
0.006 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.003 Oh Mandor @ Rp. 70,000.00 = Rp. 210.00
Jumlah Harga Per satuan pekerjaan 86,910.00

. Anl. SNI. VII.6.36. 1 M' Membuat Ring Balk Beton Bertulang ( 13 x 20 ) cm


0.0030 M3 Kayu Bekisting @ Rp. 1,550,000.00 = Rp. 4,650.00
0.020 Kg Paku campur @ Rp. 15,000.00 = Rp. 300.00
3.600 Kg Besi beton polos @ Rp. 17,000.00 = Rp. 61,200.00
0.050 Kg Kawat beton @ Rp. 20,000.00 = Rp. 1,000.00
5.500 Kg Semen @ Rp. 1,400.00 = Rp. 7,700.00
0.009 Zak Pasir beton @ Rp. 170,000.00 = Rp. 1,530.00
0.015 M3 Batu pecah @ Rp. 350,000.00 = Rp. 5,250.00
0.297 Oh Pekerja @ Rp. 50,000.00 = Rp. 14,850.00
0.033 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 2,310.00
0.033 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 2,310.00
0.033 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 2,310.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.015 Oh Mandor @ Rp. 70,000.00 = Rp. 1,050.00
Jumlah Harga Per satuan pekerjaan 105,260.00
. Anl. Tambahan 1 M2 Pasangan Paving Blok
1.000 M2 Pas. Paving Blok @ Rp. 75,000.00 = Rp. 75,000.00
0.025 M3 Pasir Urug @ Rp. 150,000.00 = Rp. 3,750.00
0.500 Oh Pekerja @ Rp. 50,000.00 = Rp. 25,000.00
0.250 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 17,500.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.005 Oh Mandor @ Rp. 70,000.00 = Rp. 350.00
Jumlah Harga Per satuan pekerjaan 122,400.00

VIII. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN PENUTUP ATAP

. Anl. SNI. VIII.6.30. 1 M2 Pasang Atap Genteng Beton


11.000 Bh Genteng Beton @ Rp. 6,000.00 = Rp. 66,000.00
0.030 Kg Paku campur @ Rp. 15,000.00 = Rp. 450.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.010 Oh Mandor @ Rp. 70,000.00 = Rp. 700.00
Jumlah Harga Per satuan pekerjaan 84,950.00

. Anl. SNI. VIII.6.34. 1 M2 Pasang Nok Atap Genteng Beton


3.500 Bh Genteng Beton @ Rp. 6,000.00 = Rp. 21,000.00
0.050 Kg Paku campur @ Rp. 15,000.00 = Rp. 750.00
0.216 Zak Semen Portland @ Rp. 70,000.00 = Rp. 15,120.00
0.032 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 5,440.00
1.000 Kg Semen Warna @ Rp. 4,500.00 = Rp. 4,500.00
0.400 Oh Pekerja @ Rp. 50,000.00 = Rp. 20,000.00
0.200 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 14,000.00
0.020 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,600.00
0.020 Oh Mandor @ Rp. 70,000.00 = Rp. 1,400.00
Jumlah Harga Per satuan pekerjaan 83,810.00
. Anl. SNI. VIII.6.32. 1 M2 Pasang Atap Genteng Metal Zincalume Multi roof
1.650 Lbr Atap Multi Roof @ Rp. 73,250.00 = Rp. 120,862.50
0.200 Kg Paku Anti Karat @ Rp. 25,000.00 = Rp. 5,000.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.001 Oh Mandor @ Rp. 70,000.00 = Rp. 70.00
Jumlah Harga Per satuan pekerjaan 143,732.50

. Anl. SNI. VIII.6.36. 1 M' Pasang Nok Genteng Metal Multi roof
1.100 Lbr Lbr Nok Multi Roof Model C @ Rp. 55,000.00 = Rp. 60,500.00
0.050 Kg Kg Paku Anti Karat @ Rp. 25,000.00 = Rp. 1,250.00
0.250 Oh Pekerja @ Rp. 50,000.00 = Rp. 12,500.00
0.150 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,200.00
0.013 Oh Mandor @ Rp. 70,000.00 = Rp. 910.00
Jumlah Harga Per satuan pekerjaan 86,860.00

. Anl. SNI. VIII.6.38. 1 M2 Pasang Atap Seng Gelombang


5.500 KK Seng Gelombang @ Rp. 7,200.00 = Rp. 39,600.00
0.020 Kg Paku Seng @ Rp. 22,000.00 = Rp. 440.00
0.120 Oh Pekerja @ Rp. 50,000.00 = Rp. 6,000.00
0.060 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 4,200.00
0.006 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.006 Oh Mandor @ Rp. 70,000.00 = Rp. 420.00
Jumlah Harga Per satuan pekerjaan 51,140.00

. Anl. H. 10 1 M' Pasang Nok Atap Seng Plat


0.440 Lbr Seng Plat @ Rp. 33,000.00 = Rp. 14,520.00
0.040 Kg Paku Seng @ Rp. 22,000.00 = Rp. 880.00
0.004 M3 Papan Kayu Meranti @ Rp. 2,000,000.00 = Rp. 8,000.00
0.005 Oh Pekerja @ Rp. 50,000.00 = Rp. 250.00
0.010 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 700.00
0.001 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 80.00
0.0005 Oh Mandor @ Rp. 70,000.00 = Rp. 35.00
Jumlah Harga Per satuan pekerjaan 24,465.00

. Anl. 6.18 1 M2 Memasang Talang/Jurai dalam lebar 0,50 M' (Seng Plat Uk. 1X1,8 BJLS 0,20)
0.556 Lbr Seng Plat @ Rp. 57,000.00 = Rp. 31,692.00
0.040 Kg Paku Seng @ Rp. 22,000.00 = Rp. 880.00
0.014 M3 Papan Kayu Meranti @ Rp. 2,000,000.00 = Rp. 28,000.00
0.019 Oh Pekerja @ Rp. 50,000.00 = Rp. 950.00
0.400 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 28,000.00
0.025 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,000.00
0.0100 Oh Mandor @ Rp. 70,000.00 = Rp. 700.00
Jumlah Harga Per satuan pekerjaan 92,222.00

IX. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN LANGIT - LANGIT / PLAPOND

. Anl. SNI. IX.6.1. 1 M2 Plapond Eternit ( 1,00 x 1,00 m ), tebal 6 mm


1.100 Lbr Eternit tebal 6 mm @ Rp. 35,000.00 = Rp. 38,500.00
0.010 Kg Paku Campur @ Rp. 15,000.00 = Rp. 150.00
0.030 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,500.00
0.070 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 4,900.00
0.007 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 560.00
0.0015 Oh Mandor @ Rp. 70,000.00 = Rp. 105.00
Jumlah Harga Per satuan pekerjaan 45,715.00
. Anl. SNI. IX.6.7. 1 M2 Plapond Akustik
1.500 Lbr Akustik arm strong @ Rp. 90,000.00 = Rp. 135,000.00
0.050 Kg Paku Campur @ Rp. 15,000.00 = Rp. 750.00
0.060 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,000.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.0030 Oh Mandor @ Rp. 70,000.00 = Rp. 210.00
Jumlah Harga Per satuan pekerjaan 146,760.00

. Anl. SNI. IX.6.13. 1 M2 Plapond Taekwood


0.375 Lbr Taekwood 3 mm @ Rp. 75,000.00 = Rp. 28,125.00
0.030 Kg Paku Campur @ Rp. 15,000.00 = Rp. 450.00
0.070 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,500.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.0035 Oh Mandor @ Rp. 70,000.00 = Rp. 245.00
Jumlah Harga Per satuan pekerjaan 40,120.00

. Anl. SNI.6,5. 1 M2 Plapond Tripleks 3mm


0.375
Lbr Tripleks 3 mm @ Rp. 60,000.00 = Rp. 22,500.00
0.030
Kg Paku Tripleks @ Rp. 24,000.00 = Rp. 720.00
0.070
Oh Pekerja @ Rp. 50,000.00 = Rp. 3,500.00
0.100
Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010
Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.0040 Oh Mandor @ Rp. 70,000.00 = Rp. 280.00
Jumlah Harga Per satuan pekerjaan 34,800.00

. Anl. SNI. XI.6.24. 1 M2 Plapond Gipsum Board tebal 9 mm


0.364 Lbr Gipsum Board t = 9 mm @ Rp. 90,000.00 = Rp. 32,760.00
0.110 Kg Paku skrup @ Rp. 24,000.00 = Rp. 2,640.00
0.100 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.050 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 3,500.00
0.005 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 400.00
0.0050 Oh Mandor @ Rp. 70,000.00 = Rp. 350.00
Jumlah Harga Per satuan pekerjaan 44,650.00

Anl. TAMBAHAN 1 M2 Pekerjaan Plapond Lambrising Kayu papan Cendana


0.001 M3 Kayu papan cendana papan uk. 2 cm x 5 cm @ Rp. 3,000,000.00 Rp. 3,600.00
4.000 Btg Kayu dolken @ Rp. 10,000.00 Rp. 40,000.00
0.010 Kg Paku Tripleks @ Rp. 24,000.00 Rp. 240.00
0.300 Oh Pekerja @ Rp. 50,000.00 Rp. 15,000.00
0.600 Oh Tukang Kayu @ Rp. 70,000.00 Rp. 42,000.00
0.060 Oh Kepala Tukang @ Rp. 80,000.00 Rp. 4,800.00
0.020 Oh Mandor @ Rp. 70,000.00 Rp. 1,400.00
Jumlah Harga Per satuan pekerjaan 107,040.00

TAMBAHAN 1 M2 Pekerjaan Plapond Zincalume


3.750 KK Aluminium (Zincalume) @ Rp. 15,000.00 Rp. 56,250.00
4.000 Btg Kayu dolken @ Rp. 6,000.00 Rp. 24,000.00
0.010 Kg Sekrup @ Rp. 22,500.00 Rp. 225.00
0.300 Oh Pekerja @ Rp. 50,000.00 Rp. 15,000.00
0.600 Oh Tukang Kayu @ Rp. 70,000.00 Rp. 42,000.00
0.060 Oh Kepala Tukang @ Rp. 80,000.00 Rp. 4,800.00
0.020 Oh Mandor @ Rp. 70,000.00 Rp. 1,400.00
Jumlah Harga Per satuan pekerjaan 143,675.00
X. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN
PEKERJAAN SANITASI

. Anl. SNI. 6.1. Memasang 1 Bh Kloset Jongkok


1.000 Bh Kloset Jongkok @ Rp. 95,000.00 = Rp. 95,000.00
6.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 8,400.00
0.010 M3 Pasir pasang @ Rp. 170,000.00 = Rp. 1,700.00
1.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 50,000.00
1.500 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 105,000.00
1.500 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 120,000.00
0.160 Oh Mandor @ Rp. 70,000.00 = Rp. 11,200.00
Jumlah Harga Per satuan pekerjaan 391,300.00

Anl. SNI. X.6.2. Memasang 1 Bh Kloset duduk


1.000 Bh Kloset duduk @ Rp. 400,000.00 = Rp. 400,000.00
0.120 Zak Semen Portland @ Rp. 1,400.00 = Rp. 168.00
0.010 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 1,700.00
1.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 50,000.00
1.500 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 105,000.00
1.500 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 120,000.00
0.160 Oh Mandor @ Rp. 70,000.00 = Rp. 11,200.00
Jumlah Harga Per satuan pekerjaan 688,068.00

. Anl. SNI. X.6.4. Memasang 1 Bh Urinoir


1.000 Bh Urinoir @ Rp. 350,000.00 = Rp. 350,000.00
0.300 Perlengkapan (30% x Hrg. Urinoir ) @ Rp. 350,000.00 = Rp. 105,000.00
0.120 Kg Semen Portland @ Rp. 1,400.00 = Rp. 168.00
0.010 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 1,700.00
1.000 Oh Pekerja @ Rp. 50,000.00 = Rp. 50,000.00
1.000 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 70,000.00
0.100 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 8,000.00
0.100 Oh Mandor @ Rp. 70,000.00 = Rp. 7,000.00
Jumlah Harga Per satuan pekerjaan 591,868.00

. Anl. SNI. X.6.5. Memasang 1 Bh Wastafel


1.000 Bh Wastafel @ Rp. 450,000.00 = Rp. 450,000.00
0.120 Perlengkapan (12% x Hrg. Wast. ) @ Rp. 450,000.00 = Rp. 54,000.00
1.000 Set Kaca cermin lengkap dengan bingkai @ Rp. 325,000.00 = Rp. 325,000.00
6.000 Kg Semen Portland @ Rp. 1,400.00 = Rp. 8,400.00
0.010 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 1,700.00
1.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 60,000.00
1.450 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 101,500.00
0.150 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 12,000.00
0.100 Oh Mandor @ Rp. 70,000.00 = Rp. 7,000.00
Jumlah Harga Per satuan pekerjaan 1,019,600.00

. Anl. SNI. X.6.25. Memasang 1 M' Pipa PVC AW diameter 1/2"


1.200 M1 Pipa PVC 1/2 " @ Rp. 7,500.00 = Rp. 9,000.00
0.350 Perlengkapan (35% x Hrg. Pipa ) @ Rp. 7,500.00 = Rp. 900.00
0.036 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,800.00
0.060 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 4,200.00
0.006 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.0018 Oh Mandor @ Rp. 70,000.00 = Rp. 126.00
Jumlah Harga Per satuan pekerjaan 16,506.00

. Anl. SNI. X.6.26. Memasang 1 M' Pipa PVC AW diameter 3/4"


1.200 M1 Pipa PVC 3/4 " @ Rp. 15,000.00 = Rp. 18,000.00
0.350 Perlengkapan (35% x Hrg. Pipa ) @ Rp. 15,000.00 = Rp. 1,800.00
0.036 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,800.00
0.060 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 4,200.00
0.006 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.0018 Oh Mandor @ Rp. 70,000.00 = Rp. 126.00
Jumlah Harga Per satuan pekerjaan 26,406.00
. Anl. SNI. X.6.27. Memasang 1 M' Pipa PVC AW diameter 1"
1.200 M1 Pipa PVC 1" @ Rp. 17,500.00 = Rp. 21,000.00
0.350 Perlengkapan (35% x Hrg. Pipa ) @ Rp. 17,500.00 = Rp. 2,100.00
0.036 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,800.00
0.060 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 4,200.00
0.006 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.0018 Oh Mandor @ Rp. 70,000.00 = Rp. 126.00
Jumlah Harga Per satuan pekerjaan 29,706.00

. Anl. SNI. X.6.31. Memasang 1 M' Pipa PVC AW diameter 3"


1.200 M1 Pipa PVC 3" @ Rp. 30,000.00 = Rp. 36,000.00
0.350 Perlengkapan (35% x Hrg. Pipa ) @ Rp. 30,000.00 = Rp. 3,600.00
0.810 Oh Pekerja @ Rp. 50,000.00 = Rp. 40,500.00
0.135 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 9,450.00
0.0135 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,080.00
0.0041 Oh Mandor @ Rp. 70,000.00 = Rp. 287.00
Jumlah Harga Per satuan pekerjaan 90,917.00

. Anl. SNI. X.6.35. Memasang 1 Bh Kran Air diameter 3/4" atau 1/2"
1.000 Bh Kran Air @ Rp. 22,000.00 = Rp. 22,000.00
0.025 Bh Seal Type @ Rp. 9,000.00 = Rp. 1,080.00
0.010 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.005 Oh Mandor @ Rp. 70,000.00 = Rp. 350.00
Jumlah Harga Per satuan pekerjaan 31,730.00

. Anl. SNI. X.6.36. Memasang 1 Bh Floor Drain


1.000 Bh Floor Drain @ Rp. 36,000.00 = Rp. 36,000.00
0.010 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.100 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.005 Oh Mandor @ Rp. 70,000.00 = Rp. 350.00
Jumlah Harga Per satuan pekerjaan 44,650.00

XI. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN BESI DAN ALMUNIUM

. Anl. SNI. XI.6.1. 1 Kg Pasang Rangka Atap Baja


1.100 Kg Besi Baja Profil WF @ Rp. - = Rp. -
0.080 Kg Meny Besi @ Rp. 12,000.00 = Rp. 1,440.00
0.060 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,000.00
0.006 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 420.00
0.006 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.0003 Oh Mandor @ Rp. 70,000.00 = Rp. 21.00
Jumlah Harga Per satuan pekerjaan 5,361.00

. Anl. SNI. XI.6.1. 1 Kg Pasang Strack Stang Dia. 16


1.100 Kg Besi Dia. 16 @ Rp. 17,000.00 = Rp. 18,700.00
0.080 Kg Meny Besi @ Rp. 12,000.00 = Rp. 1,440.00
0.060 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,000.00
0.006 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 420.00
0.006 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.0003 Oh Mandor @ Rp. 70,000.00 = Rp. 21.00
Jumlah Harga Per satuan pekerjaan 24,061.00

. Anl. SNI. XI.6.1. 1 Kg Pasang Plat Rangka Baja


1.100 Kg Besi Plat @ Rp. - = Rp. -
0.080 Kg Meny Besi @ Rp. 12,000.00 = Rp. 1,440.00
0.060 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,000.00
0.006 Oh Tukang Besi @ Rp. 70,000.00 = Rp. 420.00
0.006 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.0003 Oh Mandor @ Rp. 70,000.00 = Rp. 21.00
Jumlah Harga Per satuan pekerjaan 5,361.00
. Anl. SNI. XI.6.12. 1 M2 Pasang Terali Besi
11.500 M' Besi Strip @ Rp. - = Rp. -
1.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 60,000.00
1.200 Oh Tukang Las @ Rp. 70,000.00 = Rp. 84,000.00
0.012 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 960.00
0.0006 Oh Mandor @ Rp. 70,000.00 = Rp. 42.00
Jumlah Harga Per satuan pekerjaan 145,002.00

. Anl. SNI. XI.6.13. 1 M2 Pasang Kawat Harmonika


1.100 M2 Kawat Harmonika @ Rp. 33,000.00 = Rp. 36,300.00
0.020 Kg Paku campur @ Rp. 15,000.00 = Rp. 300.00
0.0018 M3 Papan Meranti @ Rp. 2,000,000.00 = Rp. 3,600.00
0.100 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.0005 Oh Mandor @ Rp. 70,000.00 = Rp. 35.00
Jumlah Harga Per satuan pekerjaan 53,035.00

. Anl. SNI. XI.6.14. 1 M2 Pasang Kawat Nyamuk


1.100 M2 Kawat Nyamuk @ Rp. 33,000.00 = Rp. 36,300.00
0.020 Kg Paku campur @ Rp. 15,000.00 = Rp. 300.00
0.0018 M3 Papan Meranti @ Rp. 2,000,000.00 = Rp. 3,600.00
0.100 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.0005 Oh Mandor @ Rp. 70,000.00 = Rp. 35.00
Jumlah Harga Per satuan pekerjaan 53,035.00

. Anl. SNI. XI.6.15. 1 M2 Pasang Kawat Kassa


1.100 M2 Kawat Kassa @ Rp. 36,000.00 = Rp. 39,600.00
0.020 Kg Paku campur @ Rp. 15,000.00 = Rp. 300.00
0.0018 M3 Papan Meranti @ Rp. 2,000,000.00 = Rp. 3,600.00
0.100 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.0005 Oh Mandor @ Rp. 70,000.00 = Rp. 35.00
Jumlah Harga Per satuan pekerjaan 56,335.00

. Anl. SNI. XI.6.17. 1 M2 Pasang Jendela Nako dan Teralis


1.100 M2 Jendela Nako @ Rp. = Rp. -
0.020 Kg Paku campur @ Rp. 15,000.00 = Rp. 300.00
1.1000 M' Besi Strip @ Rp. 7,000.00 = Rp. 7,700.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.200 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 14,000.00
0.020 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,600.00
0.0010 Oh Mandor @ Rp. 70,000.00 = Rp. 70.00
Jumlah Harga Per satuan pekerjaan 33,670.00

. Anl. SNI. XI.6.19. 1 M' Pasang Talang Seng Plat BJLS 28


0.500 Lbr Seng Plat 3" x 6 " @ Rp. 33,000.00 = Rp. 16,500.00
0.015 Kg Paku campur @ Rp. 15,000.00 = Rp. 225.00
0.019 M3 Papan Meranti @ Rp. 2,000,000.00 = Rp. 38,000.00
0.300 Kg Meni Besi @ Rp. 12,000.00 = Rp. 3,600.00
0.040 Oh Pekerja @ Rp. 50,000.00 = Rp. 2,000.00
0.400 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 28,000.00
0.025 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,000.00
0.00125 Oh Mandor @ Rp. 70,000.00 = Rp. 87.50
Jumlah Harga Per satuan pekerjaan 90,412.50
XII. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN
PEKERJAAN KUNCI DAN KACA

. Anl. SNI. XII.6.1. 1 Buah Pasang Kunci Tanam


1.000 Bh Kunci Tanam @ Rp. 102,000.00 = Rp. 102,000.00
0.010 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.500 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 35,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.005 Oh Mandor @ Rp. 70,000.00 = Rp. 350.00
Jumlah Harga Per satuan pekerjaan 138,650.00

. Anl. SNI. XII.6.5. 1 Buah Pasang Engsel Pintu


1.000 Bh Engsel Pintu @ Rp. 17,500.00 = Rp. 17,500.00
0.015 Oh Pekerja @ Rp. 50,000.00 = Rp. 750.00
0.150 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,200.00
0.00075 Oh Mandor @ Rp. 70,000.00 = Rp. 52.50
Jumlah Harga Per satuan pekerjaan 30,002.50

. Anl. SNI. XII.6.6. 1 Buah Pasang Engsel Jendela


1.000 Bh Engsel Jendela @ Rp. 10,000.00 = Rp. 10,000.00
0.010 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.00050 Oh Mandor @ Rp. 70,000.00 = Rp. 35.00
Jumlah Harga Per satuan pekerjaan 18,335.00

. Anl. SNI. XII.6.7. 1 Buah Pasang Grendel Pintu


1.000 Bh Grendel Pintu @ Rp. 15,000.00 = Rp. 15,000.00
0.010 Oh Tukang Kayu @ Rp. 50,000.00 = Rp. 500.00
0.100 Oh Kepala Tukang @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.00050 0 Mandor @ Rp. 70,000.00 = Rp. 35.00
Jumlah Harga Per satuan pekerjaan 23,335.00

. Anl. SNI. XII.6.7. 1 Buah Pasang Grendel Jendela


1.000 Bh Grendel Jendela @ Rp. 9,000.00 = Rp. 9,000.00
0.010 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.00050 Oh Mandor @ Rp. 70,000.00 = Rp. 35.00
Jumlah Harga Per satuan pekerjaan 17,335.00

. Anl. SNI. XII.6.9. 1 Buah Pasang Kait Angin


1.000 Bh Bh Kait Angin @ Rp. 9,000.00 = Rp. 9,000.00
0.010 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.100 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 7,000.00
0.010 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 800.00
0.0005 Oh Mandor @ Rp. 70,000.00 = Rp. 35.00
Jumlah Harga Per satuan pekerjaan 17,335.00
. Anl. SNI. XII.6.17. 1 M2 Pasang Kaca, tebal 5 mm
1.100 M2 Kaca @ Rp. 115,000.00 = Rp. 126,500.00
0.015 Oh Pekerja @ Rp. 50,000.00 = Rp. 750.00
0.150 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,200.00
0.00075 Oh Mandor @ Rp. 70,000.00 = Rp. 52.50
Jumlah Harga Per satuan pekerjaan 139,002.50
. Anl. SNI. XII.6.24. 1 M2 Pasang Kaca Patri, tebal 5 mm
1.100 M2 Kaca Patri @ Rp. = Rp. -
0.015 Oh Pekerja @ Rp. 50,000.00 = Rp. 750.00
0.150 Oh Tukang Kayu @ Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,200.00
0.00075 Oh Mandor @ Rp. 70,000.00 = Rp. 52.50
Jumlah Harga Per satuan pekerjaan 12,502.50
. Anl. SNI. XII.6.24. 1 M2 Pasang Kaca Rayben, tebal 5 mm
1.100 M2 Kaca Rayben @ Rp. 120,000.00 = Rp. 132,000.00
0.015 Oh Tukang Kayu @ Rp. 50,000.00 = Rp. 750.00
0.150 Oh Kepala Tukang @ Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,200.00
0.00075 Oh Mandor @ Rp. 70,000.00 = Rp. 52.50
Jumlah Harga Per satuan pekerjaan 144,502.50

XIII. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN PENUTUP LANTAI DAN DINDING

. Anl. SNI. XIII.6.3. 1 M2 Pasang Lantai PC Abu - Abu 20 x 20 cm


26.500 Bh Pc Abu - Abu 20 x 20 cm @ Rp. = Rp. -
0.208 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 14,560.00
0.014 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 2,295.00
0.270 Oh Pekerja @ Rp. 50,000.00 = Rp. 13,500.00
0.135 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 9,450.00
0.0135 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,080.00
0.0135 Oh Mandor @ Rp. 70,000.00 = Rp. 945.00
Jumlah Harga Per satuan pekerjaan 41,830.00

. Anl. SNI. XIII.6.16. 1 M' Pasang Plint PC Abu - Abu 15 x 20 cm


5.300 Bh Plint Pc Abu - Abu 15 x 20 cm @ Rp. = Rp. -
0.031 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 2,184.00
0.004 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 680.00
0.060 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,000.00
0.030 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 2,100.00
0.003 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 240.00
0.003 Oh Mandor @ Rp. 70,000.00 = Rp. 210.00
Jumlah Harga Per satuan pekerjaan 8,414.00

. Anl. SNI. XIII.6.22. 1 M' Pasang Plint Keramik 10 x 30 cm


3.530 Bh Tegel Keramik 10 x 30 cm @ Rp. 1,925.00 = Rp. 6,795.25
0.033 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 2,310.00
0.0030 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 510.00
0.190 Oh Semen Warna @ Rp. 4,500.00 = Rp. 855.00
0.080 Oh Pekerja @ Rp. 50,000.00 = Rp. 4,000.00
0.040 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 2,800.00
0.004 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 320.00
0.00400 Oh Mandor @ Rp. 70,000.00 = Rp. 280.00
Jumlah Harga Per satuan pekerjaan 17,870.25

. Anl. SNI. XIII.6.44. 1 M2 Pasang Lantai Keramik 20 x 20 cm


25.000 Bh Tegel Keramik 20 x 20 cm @ Rp. 6,250.00 = Rp. 156,250.00
0.042 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 7,140.00
0.228 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 15,932.00
1.500 Kg Semen Warna @ Rp. 4,500.00 = Rp. 6,750.00
0.620 Oh Pekerja @ Rp. 50,000.00 = Rp. 31,000.00
0.350 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 24,500.00
0.035 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,800.00
0.030 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 246,472.00

. Anl. SNI. XIII.6.47. 1 M2 Pasang Lantai Keramik 30 x 30 cm


11.000 Bh Tegel Keramik 30 x 30 cm @ Rp. 3,850.00 = Rp. 42,350.00
0.228 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 15,932.00
0.042 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 7,140.00
1.500 Kg Semen Warna @ Rp. 4,500.00 = Rp. 6,750.00
0.620 Oh Pekerja @ Rp. 50,000.00 = Rp. 31,000.00
0.350 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 24,500.00
0.035 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,800.00
0.030 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 132,572.00
. Anl. SNI. XIII.6.41. 1 M2 Pasang Lantai Keramik 40 x 40 cm
6.250 Bh Tegel Keramik 40 x 40 cm @ Rp. 12,500.00 = Rp. 78,125.00
10.000 Kg Portland cement @ Rp. 1,400.00 = Rp. 14,000.00
0.045 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 7,650.00
1.500 Kg Semen warna @ Rp. 4,500.00 = Rp. 6,750.00
0.620 Oh Pekerja @ Rp. 50,000.00 = Rp. 31,000.00
0.350 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 24,500.00
0.035 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,800.00
0.030 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 166,925.00

Anl. SNI. XIII.6.42. 1 M2 Pasang Lantai Keramik 20 x 40 cm


12.500 Bh Tegel Keramik 20 x 40 cm @ Rp. 6,250.00 = Rp. 78,125.00
10.000 Kg Portland cement @ Rp. 1,400.00 = Rp. 14,000.00
0.045 Zak Pasir Pasang @ Rp. 170,000.00 = Rp. 7,650.00
1.500 Kg Semen warna @ Rp. 4,500.00 = Rp. 6,750.00
0.620 Oh Pekerja @ Rp. 50,000.00 = Rp. 31,000.00
0.350 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 24,500.00
0.035 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,800.00
0.030 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 166,925.00

Anl. SNI. XIII.6.40. 1 M' Pasang Plint Keramik 10 x 40 cm


2.400 Bh Tegel Keramik 10 x 40 cm @ Rp. 2,350.00 = Rp. 5,640.00
1.140 Kg Portland cement @ Rp. 1,400.00 = Rp. 1,596.00
0.003 Zak Pasir Pasang @ Rp. 170,000.00 = Rp. 510.00
0.050 Kg Semen warna @ Rp. 4,500.00 = Rp. 225.00
0.090 Oh Pekerja @ Rp. 50,000.00 = Rp. 4,500.00
0.090 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 6,300.00
0.009 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 720.00
0.005 Oh Mandor @ Rp. 70,000.00 = Rp. 350.00
Jumlah Harga Per satuan pekerjaan 19,841.00

. Anl. SNI. XIII.6.48. 1 M2 Pasang Lantai Keramik Anti Slip 20 x 20 cm


25.000 Bh Tegel Anti Slip Keramik 20 x 20 cm @ Rp. 2,800.00 = Rp. 70,000.00
0.228 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 15,932.00
0.042 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 7,140.00
1.500 Kg Semen Warna @ Rp. 4,500.00 = Rp. 6,750.00
0.620 Oh Pekerja @ Rp. 50,000.00 = Rp. 31,000.00
0.350 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 24,500.00
0.035 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,800.00
0.03000 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 160,222.00

. Anl. SNI. XIII.6.63. 1 M2 Pasang Dinding Porselin 20 x 20 cm Warna


25.000 Bh Tegel Porselin 20 x 20 cm @ Rp. 2,800.00 = Rp. 70,000.00
9.300 Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 651,000.00
0.018 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 3,060.00
2.750 Kg Semen Warna @ Rp. 4,500.00 = Rp. 12,375.00
0.600 Oh Pekerja @ Rp. 50,000.00 = Rp. 30,000.00
0.450 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 31,500.00
0.045 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 3,600.00
0.030 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 803,635.00

. Anl. SNI. XIII.6.50. 1 M2 Pasang Tegel Keramik 20 x 25 cm untuk Dinding


20.000 Bh Tegel Keramik 20 x 25 cm @ Rp. 6,250.00 = Rp. 125,000.00
9.300 Zak Semen Portland (PC) @ Rp. 1,400.00 = Rp. 13,020.00
0.018 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 3,060.00
2.750 Kg Semen Warna @ Rp. 4,500.00 = Rp. 12,375.00
0.600 Oh Pekerja @ Rp. 50,000.00 = Rp. 30,000.00
0.450 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 31,500.00
0.045 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 3,600.00
0.030 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 220,655.00
. Anl. SNI. XIII.6.69. 1 M2 Pasang Tegel Keramik 10 x 20 cm untuk Dinding
50.000 Bh Tegel Keramik 10 x 20 cm @ Rp. 1,250.00 = Rp. 62,500.00
9.300 Zak Semen Portland (PC) @ Rp. 1,400.00 = Rp. 13,020.00
0.018 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 3,060.00
2.750 Kg Semen Warna @ Rp. 4,500.00 = Rp. 12,375.00
0.600 Oh Pekerja @ Rp. 50,000.00 = Rp. 30,000.00
0.450 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 31,500.00
0.045 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 3,600.00
0.030 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 158,155.00

Anl. SNI. XIII.6.45. 1 M2 Pasang Lantai Keramik 60 x 60 cm


2.777 Bh Tegel Keramik 60 x 60 cm @ Rp. 40,000.00 = Rp. 111,080.00
10.000 Kg Portland cement @ Rp. 1,400.00 = Rp. 14,000.00
0.045 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 7,650.00
1.500 Kg Semen warna @ Rp. 4,500.00 = Rp. 6,750.00
0.620 Oh Pekerja @ Rp. 50,000.00 = Rp. 31,000.00
0.350 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 24,500.00
0.035 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,800.00
0.030 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 199,880.00

Anl. SNI. XIII.6.17. 1 M' Pasang plint Keramik 15 x 60 cm


1.600 Bh Tegel Keramik 15 x 60 cm @ Rp. 7,000.00 = Rp. 11,200.00
1.140 Kg Portland cement @ Rp. 1,400.00 = Rp. 1,596.00
0.003 M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 510.00
0.050 Kg Semen warna @ Rp. 4,500.00 = Rp. 225.00
0.090 Oh Pekerja @ Rp. 50,000.00 = Rp. 4,500.00
0.090 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 6,300.00
0.009 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 720.00
0.005 Oh Mandor @ Rp. 70,000.00 = Rp. 350.00
Jumlah Harga Per satuan pekerjaan 25,401.00

. Anl. SNI. VII.6.74. 1 M2 Pasang Dinding Batu Tempel (batu Palimanan)


1.000M2 Batu Tempel (batu palimanan) @ Rp. 200,000.00 = Rp. 200,000.00
0.235Zak Semen Portland (PC) @ Rp. 70,000.00 = Rp. 16,450.00
0.035M3 Pasir Pasang @ Rp. 170,000.00 = Rp. 5,950.00
0.620Oh Pekerja @ Rp. 50,000.00 = Rp. 31,000.00
0.350Oh Tukang Batu @ Rp. 70,000.00 = Rp. 24,500.00
0.035 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 2,800.00
0.030 Oh Mandor @ Rp. 70,000.00 = Rp. 2,100.00
Jumlah Harga Per satuan pekerjaan 282,800.00

XIV. ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN PENGECETAN

. Anl. SNI. XIV.6.6. 1 M2 Mendempul dan Menggosok kayu


0.080 Kg Dempul Jadi @ Rp. 12,000.00 = Rp. 960.00
0.020 Kg Minyak Cat @ Rp. 12,000.00 = Rp. 240.00
0.010 Kg Batu Apung @ Rp. 35,000.00 = Rp. 350.00
0.040 Oh Pekerja @ Rp. 50,000.00 = Rp. 2,000.00
0.040 Oh Tukang Batu @ Rp. 70,000.00 = Rp. 2,800.00
0.004 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 320.00
0.00250 Oh Mandor @ Rp. 70,000.00 = Rp. 175.00
Jumlah Harga Per satuan pekerjaan 6,845.00
. Anl. SNI. XIV.6.8. 1 M2 Cat Kilap Bidang Kayu Baru ( 1 lapis Plamir,1 Lapis cat dasar, 2 Lapis Cat Penutup )
0.200 Kg Cat Many @ Rp. 12,000.00 = Rp. 2,400.00
0.150 Kg Plamir Kayu @ Rp. 7,000.00 = Rp. 1,050.00
0.170 Kg Cat Dasar ( Cat Kilap ) @ Rp. 35,000.00 = Rp. 5,950.00
0.260 Kg Cat Penutup 2 Kali ( Cat Kilap ) @ Rp. 35,000.00 = Rp. 9,100.00
0.070 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,500.00
0.009 Oh Tukang Cat @ Rp. 70,000.00 = Rp. 630.00
0.0060 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 480.00
0.00250 Oh Mandor @ Rp. 70,000.00 = Rp. 175.00
Jumlah Harga Per satuan pekerjaan 23,285.00

. Anl. SNI. XIV.6.13. 1 M2 Pelaburan Bidang Kayu dengan Vernis


0.150
Ltr Vernis @ Rp. 35,000.00 = Rp. 5,250.00
0.050
Kg Dempul @ Rp. 12,000.00 = Rp. 600.00
0.100
Lbr Amplas @ Rp. 4,800.00 = Rp. 480.00
0.010
Bh Kuas @ Rp. 12,000.00 = Rp. 120.00
0.160
Oh Pekerja @ Rp. 50,000.00 = Rp. 8,000.00
0.160
Oh Tukang Cat @ Rp. 70,000.00 = Rp. 11,200.00
0.0160 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,280.00
0.0025 Oh Mandor @ Rp. 70,000.00 = Rp. 175.00
Jumlah Harga Per satuan pekerjaan 27,105.00

. Anl. SNI. XIV.6.11. 1 M2 Pelaburan Bidang Kayu dengan Politur


0.150 Ltr Politur @ Rp. 24,000.00 = Rp. 3,600.00
0.050 Ltr Politur Jadi @ Rp. 30,000.00 = Rp. 1,500.00
0.100 Lbr Amplas @ Rp. 4,800.00 = Rp. 480.00
0.160 Oh Pekerja @ Rp. 50,000.00 = Rp. 8,000.00
0.160 Oh Tukang Cat @ Rp. 70,000.00 = Rp. 11,200.00
0.0160 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 1,280.00
0.00250 Oh Mandor @ Rp. 70,000.00 = Rp. 175.00
Jumlah Harga Per satuan pekerjaan 26,235.00

. Anl. SNI. XIV.6.14. 1 M2 Pengecetan Tembok Baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
0.100Kg Plamir @ Rp. 12,000.00 = Rp. 1,200.00
0.100Kg Cat Dasar ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 3,300.00
0.260Kg Cat Penutup 2 Kali ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 8,580.00
0.020Oh Pekerja @ Rp. 50,000.00 = Rp. 1,000.00
0.063Oh Tukang Cat @ Rp. 70,000.00 = Rp. 4,410.00
0.0063Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 504.00
0.0025 Oh Mandor @ Rp. 70,000.00 = Rp. 175.00
Jumlah Harga Per satuan pekerjaan 19,169.00

. Anl. SNI. XIV.6.15. 1 M2 Pengecetan Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
0.120 Kg Cat Dasar ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 3,960.00
0.180 Kg Kg Cat Penutup 2 Kali ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 5,940.00
0.028 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,400.00
0.042 Oh Tukang Cat @ Rp. 70,000.00 = Rp. 2,940.00
0.0042 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 336.00
0.0025 Oh Mandor @ Rp. 70,000.00 = Rp. 175.00
Jumlah Harga Per satuan pekerjaan 14,751.00

. Anl. K.1 + K. 23 1 M2 Pengecetan Atap / Seal Coat Atap


0.250 Kg Cat Atap Seng @ Rp. = Rp. -
0.075 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,750.00
0.008 Oh Tukang Cat @ Rp. 70,000.00 = Rp. 560.00
0.050 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 4,000.00
0.003 Oh Mandor @ Rp. 70,000.00 = Rp. 210.00
Jumlah Harga Per satuan pekerjaan 8,520.00
. Anl. G.53+K.30 1 M2 Pek. Acian tembok 1 Ps : 8 Kpr
0.002 Kg Portland Cement @ Rp. 70,000.00 = Rp. 112.00
0.020 Kg Kapur Tonasa @ Rp. 3,600.00 = Rp. 72.00
0.500 Lbr Amplas Kayu @ Rp. 4,800.00 = Rp. 2,400.00
0.010 Oh Tukang Cat @ Rp. 70,000.00 = Rp. 700.00
0.001 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 80.00
0.060 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,000.00
Jumlah Harga Per satuan pekerjaan 6,364.00

Anl. 1 M2 Pengecetan Plafond ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )


1.500 Btg Kayu dolken @ Rp. 10,000.00 = Rp. 15,000.00
0.080 Kg Paku campur @ Rp. 15,000.00 = Rp. 1,200.00
0.100 Kg Cat Dasar ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 3,300.00
0.260 Kg Cat Penutup 2 Kali ( Cat Tembok ) @ Rp. 33,000.00 = Rp. 8,580.00
0.020 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,000.00
0.063 Oh Tukang Cat @ Rp. 70,000.00 = Rp. 4,410.00
0.0063 Oh Kepala Tukang @ Rp. 80,000.00 = Rp. 504.00
0.0025 Oh Mandor @ Rp. 70,000.00 = Rp. 175.00
Jumlah Harga Per satuan pekerjaan 34,169.00

Analisa Instalasi Per Satu Titk Lampu


4.00 m' Kabel NYM 3x2,5 mm2 @ Rp. 6,000.00 = Rp. 24,000.00
2.00 m' conduit @ Rp. 2,500.00 = Rp. 5,000.00
1.00 bh Tee Doos @ Rp. 3,000.00 = Rp. 3,000.00
1.00 bh One way doos @ Rp. 3,000.00 = Rp. 3,000.00
3.00 bh soket @ Rp. 500.00 = Rp. 1,500.00
8.00 bh klem @ Rp. 500.00 = Rp. 4,000.00
3.00 bh lasdop @ Rp. 500.00 = Rp. 1,500.00
1.00 m' pipa fleksible @ Rp. 2,750.00 = Rp. 2,750.00
12.00 bh paku @ Rp. 100.00 = Rp. 1,200.00
4.00 bh sekrup @ Rp. 100.00 = Rp. 400.00
4.00 bh fisher @ Rp. 500.00 = Rp. 2,000.00
2.00 bh elbow @ Rp. 750.00 = Rp. 1,500.00
0.20 org/hr tukang listrik @ Rp. 70,000.00 = Rp. 14,000.00
0.15 org/hr pekerja @ Rp. 50,000.00 = Rp. 7,500.00
0.02 org/hr mandor @ Rp. 70,000.00 = Rp. 1,400.00
Jumlah Harga Per satuan pekerjaan 72,750.00

Analisa Instalasi Exhousefan


12.00 m' Kabel NYM 3x2,5 mm2 @ Rp. 6,000.00 = Rp. 72,000.00
10.00 m' conduit @ Rp. 2,500.00 = Rp. 25,000.00
1.00 bh Tee Doos @ Rp. 3,000.00 = Rp. 3,000.00
1.00 bh One way doos @ Rp. 3,000.00 = Rp. 3,000.00
3.00 bh soket @ Rp. 500.00 = Rp. 1,500.00
8.00 bh klem @ Rp. 500.00 = Rp. 4,000.00
3.00 bh lasdop @ Rp. 500.00 = Rp. 1,500.00
1.00 m' pipa fleksible @ Rp. 2,750.00 = Rp. 2,750.00
16.00 bh paku @ Rp. 100.00 = Rp. 1,600.00
4.00 bh sekrup @ Rp. 100.00 = Rp. 400.00
4.00 bh fisher @ Rp. 500.00 = Rp. 2,000.00
2.00 bh elbow @ Rp. 750.00 = Rp. 1,500.00
0.30 org/hr tukang listrik @ Rp. 70,000.00 = Rp. 21,000.00
0.15 org/hr pekerja @ Rp. 50,000.00 = Rp. 7,500.00
0.02 org/hr mandor @ Rp. 70,000.00 = Rp. 1,400.00
Jumlah Harga Per satuan pekerjaan 148,150.00

Kendari, September 2020


0 Dihitung Oleh :
0 0

0 Sujaswan, ST
0 0
RENCANA ANGGARAN BIAYA

PEMBANGUNAN : RUMAH KOST


PEMOHON : HABIB MUHAMMAD ALHABSY
LOKASI : JL. ORINUNGGU, KEL. PADALEU, KEC. KAMBU, KOTA KENDARI
TAHUN : 2020

I. PEKERJAAN TANAH
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pek. Galian Tanah Alur Pondasi M3 41.25 39,000.00 1,608,750.00
2 Pek. Urugan Tanah Alur Pondasi M3 0.13 13,000.00 1,666.64
3 Pek. Urugan Pasir Alas Pondasi M3 5.78 195,600.00 1,129,590.00
4 Pek. Urugan Tanah Alas Lantai M3 30.00 82,000.00 2,460,000.00

Sub Total II 5,200,006.64

II. PEKERJAAN PONDASI DAN SLOEF


HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pas. Batu Kosong M3 2.97 320,760.00 952,657.20
2 Pas. Pondasi Batu Gunung 1 : 5 M3 41.25 596,180.00 24,592,425.00
3 Pas. Pondasi Poer Plat M3 2.00 3,500,000.00 7,000,000.00
4 Pek. Sloef 30x40cm Beton Bertulang M3 16.50 3,500,000.00 57,750,000.00

Sub Total III 90,295,082.20

III. PEKERJAAN BETON


HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6

1 Pek. Kolom Utama 15 x 50 M3 7.560 3,500,000.00 26,460,000.00


2 pek. Kolom Praktis 15x15 cm Beton Bertulang M' 270.00 70,000.00 18,900,000.00
3 pek. Balok Utama M3 16.50 3,500,000.00 57,750,000.00
4 Pek. Ring Balk 15x15 cm Beton Bertulang 1 : 2 : 3 M' 165.00 80,000.00 13,200,000.00
5 Pek. Rabat Beton Pada Lantai 1 : 3 : 5 M3 9.00 424,696.00 3,822,264.00
6 Pek. Plat Beton 1 : 2 : 3 M3 21.60 3,500,000.00 75,600,000.00

Sub Total IV 195,732,264.00


IV. PEKERJAAN DINDING DAN PLESTERAN
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pas. Dinding Batu Bata M2 780.000 75,000.00 58,500,000.00
2 Pek. Plesteran Tembok 1: 5 M2 1,560.00 20,000.00 31,200,000.00

Sub Total V 89,700,000.00

V. PEKERJAAN PENUTUP LANTAI, DINDING DAN SALURAN


HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pas. Lantai Tegel Keramik 40 x 40 cm M2 260.00 100,000.00 26,000,000.00
2 Pas. Dinding Keramik 20 x 25 cm KM/WC M2 130.00 110,000.00 14,300,000.00
3 Pas. Lantai Keramik anti selip 20x20 cm KM/WC M2 28.00 100,000.00 2,800,000.00
4 Pas, Kuku tegel P.10 cm M' 40.00 7,500.00 300,000.00

Sub Total VI 43,400,000.00

VI. PEK. KUSEN, PINTU, JENDELA, DAUN PINTU, DAUN JENDELA DAN KACA
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pek. Kusen Pintu dan Jendela Kayu Kelapi M3 2.14 2,500,000.00 5,350,000.00
2 Pek. Pintu Panil Jati M2 76.00 320,000.00 24,320,000.00
3 Pek. Pintu PVC KM Bh 20.00 250,000.00 5,000,000.00
4 Pek. Bingkai Jendela Jati M2 12.60 271,900.00 3,425,940.00
5 Pas. Kaca 5 mm (Bening) M2 24.00 139,002.50 3,336,060.00

Sub Total VII 41,432,000.00

VII. PEKERJAAN KUDA - KUDA DAN ATAP (KAP)


HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6

1 Pek. Kuda Kuda baja Ringan + Atap metal Ls 165.00 250,000.00 41,250,000.00

Sub Total VIII 41,250,000.00

VIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI


HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pas. Kunci Pintu (Kunci Slot) pintu depan Bh 20.00 175,000.00 3,500,000.00
2 Pas. Tarikan daun Pintu (pintu depan) Pasang 20.00 150,000.00 3,000,000.00
3 Pas. Kunci Pintu 2 x Putar Bh 20.00 102,000.00 2,040,000.00
4 Pas. Engsel Pintu Kuningan Bh 40.00 17,500.00 700,000.00
5 Pas. Grendel Pintu Besar Bh 40.00 15,000.00 600,000.00
6 Pas. Grendel Jendela Bh 40.00 9,000.00 360,000.00
7 Pas. Engsel Jendela Kuningan Bh 80.00 10,000.00 800,000.00
8 Pas. Kait Angin Bh 80.00 9,000.00 720,000.00

Sub Total IX 11,720,000.00


IX. PEKERJAAN LISTRIK
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pas. Titik Instalasi Listrik Ttk 100.00 50,000.00 5,000,000.00
3 Pas. Pitting Down Lihgt Bh 40.00 60,000.00 2,400,000.00
4 Lampu SL 20 Watt Bh 20.00 35,000.00 700,000.00
5 Pas. Stop Kontak Merk Broco Bh 40.00 18,000.00 720,000.00
6 Pas. Saklar Ganda Merk Broco Bh 20.00 18,000.00 360,000.00
7 Pas. Saklar tunggal Merk Broco Bh 20.00 15,000.00 300,000.00
8 Main Circuit Breaker (MCB) Bh 1.000 122,000.00 122,000.00

Sub Total X 9,602,000.00

X. PEKERJAAN INSTALASI AIR DAN SANITASI AIR


HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6

1 Instalasi Air Bersih PVC 1/2 " Dalam Gedung M' 40.00 26,406.00 1,056,240.00
2 Instalasi Air Buangan PVC 3" Luar Gedung M' 40.00 90,917.00 3,636,680.00
3 Instalasi Air Bersih PVC 3/4 " Luar Gedung M' 40.00 26,406.00 1,056,240.00
4 Instalasi Air Kotor PVC 4" Luar Gedung M' 40.00 90,917.00 3,636,680.00
5 Pas. Kloset jongkok standard Bh 20.00 200,000.00 4,000,000.00
6 Pas. Kran Air Bh 40.00 31,730.00 1,269,200.00
7 Pas. Floor Drain Aluminium Bh 20.00 44,650.00 893,000.00
8 Pas. Septiktank + Peresapan Unit 1.00 1,500,000.00 1,500,000.00

SUB JUMLAH XI 17,048,040.00

XI. PEKERJAAN LELANGIT


HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pas. Plapond calciboard rangka Hollow fin. Cat M2 288.00 80,000.00 23,040,000.00

Sub Total XII 23,040,000.00

XII. PEKERJAAN FINISHING


HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1 Pek. Cat / Plamur Dinding Tembok M2 1,560.00 15,000.00 23,400,000.00
2 Pek. Cat Kusen Pintu/jendela M2 70.000 23,285.00 1,629,950.00

Sub Total XIII 25,029,950.00


REKAPITULASI
RENCANA ANGGARAN BIAYA

PEMBANGUNAN : RUMAH KOST


PEMOHON : HABIB MUHAMMAD ALHABSY
LOKASI : JL. ORINUNGGU, KEL. PADALEU, KEC. KAMBU, KOTA KENDARI
TAHUN : 2020

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

1 I. PEKERJAAN TANAH Rp. 5,200,006.64


2 II. PEKERJAAN PONDASI DAN SLOEF Rp. 90,295,082.20
3 III. PEKERJAAN BETON Rp. 195,732,264.00
4 IV. PEKERJAAN DINDING DAN PLESTERAN Rp. 89,700,000.00
5 V. PEKERJAAN PENUTUP LANTAI, DINDING DAN SALURAN Rp. 43,400,000.00
6 VI. PEK. KUSEN, PINTU, JENDELA, DAUN PINTU, DAUN JENDELA DAN KACA Rp. 41,432,000.00
7 VII. PEKERJAAN KUDA - KUDA DAN ATAP (KAP) Rp. 41,250,000.00
8 VIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI Rp. 11,720,000.00
9 IX. PEKERJAAN LISTRIK Rp. 9,602,000.00
10 X. PEKERJAAN INSTALASI AIR DAN SANITASI AIR Rp. 17,048,040.00
11 XI. PEKERJAAN LELANGIT Rp. 23,040,000.00
12 XII. PEKERJAAN FINISHING Rp. 25,029,950.00
REAL COST Rp. 593,449,342.84
DIBULATKAN Rp. 593,449,000.00
Terbilang : Lima Ratus Sembilan Puluh Tiga Juta Empat Ratus Empat Puluh Sembilan Ribu Rupiah

Kendari, September 2020

Dihitung Oleh :

Sujaswan, ST
70.00
jendelah kaca
V 4.7376 2.3436 2.394 19,400,000 p3 5.0592 j1 5.2731
51 p1 0.9118 0.5084 0.4034 3.0752 1.566
21675000 j2 2.9592 2.1402 0.819 1.5872 j3 18
425000 j4 1.9728 1.4268 0.546 2.6624 5.22
j3 10.152 5.22 4.932 v 2.3436 j2 2.124

24.192 8.352 15.84 p2 0.4692 0.4752


j1 3.0456 1.566 1.4796 p1 0.4692 j4 0.3168
26.414 0.5208
16.1868 32.9751 49.1619
-
1,608,750.00
1,666.64
1,129,590.00
2,460,000.00
-

-
952,657.20
24,592,425.00
7,000,000.00
57,750,000.00
-

13,200,000.00
3,822,264.00
75,600,000.00
-

-
-

31,200,000.00
-

-
26,000,000.00
14,300,000.00
2,800,000.00
300,000.00
-

5,350,000.00
24,320,000.00

3,425,940.00
3,336,060.00

41,250,000.00
-

3,500,000.00
3,000,000.00
2,040,000.00
700,000.00
600,000.00
360,000.00
800,000.00
720,000.00
5,000,000.00
2,400,000.00
700,000.00
720,000.00
360,000.00
300,000.00
122,000.00

1,056,240.00
3,636,680.00

4,000,000.00
1,269,200.00
893,000.00
1,500,000.00

23,040,000.00

23,400,000.00
1,629,950.00

422,146,422.84
42,214,642.28
DAFTAR HARGA BAHAN DAN UPAH KERJA

#NAME? : #NAME?
PEMBANGUNAN : RUMAH KOST
PEMOHON : HABIB MUHAMMAD ALHABSY
LOKASI : JL. ORINUNGGU, KEL. PADALEU, KEC. KAMBU, KOTA KENDARI

UPAH KERJA

No. URAIAN SATUAN HARGA


1 2 3 4

1 Kepala Tukang Kayu Hari Rp. 80,000.00


2 Tukang Kayu Hari Rp. 70,000.00
3 Kepala Tukang Besi Hari Rp. 80,000.00
4 Tukang Besi Hari Rp. 70,000.00
5 Kepala Tukang Cat Hari Rp. 80,000.00
6 Tukang Cat Hari Rp. 70,000.00
7 Kepala Tukang Batu Hari Rp. 80,000.00
8 Tukang Batu Hari Rp. 70,000.00
9 Mandor Hari Rp. 60,000.00
10 Pekerja Hari Rp. 50,000.00

HARGA BAHAN

No. NAMA BAHAN SATUAN HARGA


1 2 3 4
MATERIAL KASAR
1 Pasir Urug M3 Rp. 150,000.00
2 Tanah Urug M3 Rp. 45,000.00
3 Tasirtu M3 Rp. 60,000.00
4 Sirtu M3 Rp. 90,000.00
5 Pasir Pasang M3 Rp. 170,000.00
6 Batu Gunung / Kali (batu belah) M3 Rp. 170,000.00
7 Batu Bata Buah Rp. 600.00
8 Semen Portland ( Netto 50 Kg) Zak Rp. 70,000.00
9 Semen Portland ( Netto 50 Kg) Kg Rp. 1,400.00
10 Roster M2 Rp. 13,750.00
11 Paving Blok K.200 M2 Rp. 75,000.00
12 Neut Beton Kusen Bh Rp. 15,000.00
13 Bak Kontrol Bh Rp. 150,000.00
14 Semen Warna Kg Rp. 4,500.00
15 Batu Pecah /Suplit M3 Rp. 350,000.00

BAHAN BESI DAN KACA


16 Besi Beton Kg Rp. 17,000.00
17 Besi Strip Kg Rp. 7,000.00
18 Kawat Beton Kg Rp. 20,000.00
19 Kawat Jaring Lbr Rp. 30,000.00
20 Paku Tripleks Kg Rp. 24,000.00
21 Paku Campur 5 Cm - 10 Cm Kg Rp. 15,000.00
22 Angker Buah Rp. 4,000.00
23 Baut /Mur Buah Rp. 4,000.00
24 Paku Seng Kg Rp. 22,000.00
25 Paku Anti Karat untuk Sakura Roof Kg Rp. 25,000.00
26 Paku Sekrup Kg Rp. 22,500.00
27 Kaca Bening 5 mm M2 Rp. 115,000.00
36 Kaca cermin lengkap dengan bingkai Set Rp. 325,000.00
37 Kaca Rayben M2 Rp. 120,000.00
Bersambung
Lanjutan
No. NAMA BAHAN SATUAN HARGA
1 2 3 4
BAHAN KAYU DAN PANEL BOARD
38 Kayu Balok Jati Lokal M3 Rp. 2,750,000.00
39 Kayu Papan Jati Lokal M3 Rp. 2,750,000.00
40 Kayu Balok Kalapi M3 Rp. 3,500,000.00
41 Kayu Papan Kalapi M3 Rp. 3,500,000.00
42 Kayu Papan Cendana M3 Rp. 3,000,000.00
43 Kayu Balok Silae/Pontoh/Meranti M3 Rp. 2,000,000.00
44 Kayu Balok Bitti/Wola M3 Rp. 3,250,000.00
45 Kayu Papan Silae/Pontoh/Meranti M3 Rp. 2,000,000.00
46 Kayu Papan kayu cina untuk lambrisiring M3 Rp. 2,000,000.00
47 Kayu Papan Bekisting M3 Rp. 1,550,000.00
48 Balok Kayu klas III M3 Rp. 1,550,000.00
49 Kayu Dolken Btg Rp. 10,000.00
50 Kayu Besi diameter 18 cm - 25 cm Btg Rp. 45,000.00
51 Tripleks Tebal 3 mm Lembar Rp. 60,000.00
52 Tackwood Lembar Rp. 75,000.00
53 Zincalume board L.90 cm KK Rp. 15,000.00
54 Fly Wood Lembar Rp. 75,000.00
55 Eternit T = 6 mm Lembar Rp. 35,000.00
56 Rolling Dor aluminium M2 Rp. 350,000.00
57 Accoustic board Lembar Rp. 90,000.00
58 Gipsum Board T = 9 mm Lembar Rp. 90,000.00
59 List Plafond Gipsum M' Rp. 55,000.00
60 List Plafond Kayu 1x4 cm M' Rp. 6,000.00
61 List kayu 3,5 - 5 cm M' Rp. 5,500.00
62 Lis Plapond Kayu 5 cm diprofil M' Rp. 12,000.00

BAHAN PENUTUP ATAP DAN LANTAI


63 Seng Gelombang Kaki Rp. 7,200.00
64 Seng Plat Bjls 0,20 M2 Rp. 33,000.00
65 Seng Plat Uk. 1 x 1,8 M Lembar Rp. 57,000.00
66 Sakura Roof Lembar Rp. 42,500.00
67 Multiroof Lembar Rp. 73,250.00
68 Genteng Beton Bh Rp. 6,000.00
69 Nok Multi Roof Model C Panjang 40 Cm Bh Rp. 55,000.00
70 Nok Sakura Roof Model C Panjang 40 Cm Bh Rp. 42,000.00
71 Pek. Pasangan atap Zinc Aluminium M2 Rp. -
72 Tegel Keramik 40 x 40 cm Essenza Buah Rp. 12,500.00
73 Tegel Keramik 20 x 40 cm Buah Rp. 6,250.00
74 Tegel Plint 10 x 40 cm Buah Rp. 2,500.00
75 Tegel Keramik 60 x 60 cm Essenza Buah Rp. 40,000.00
76 Tegel Keramik 15 x 60 cm Buah Rp. 7,000.00
77 Kuku tegel keramik P. 10 cm M' Rp. 7,500.00
78 Tegel Keramik 30 x 30 cm Buah Rp. 3,850.00
79 Tegel Keramik 15 x 30 cm Buah Rp. 1,925.00
80 Tegel Keramik 20 x 20 cm Buah Rp. 6,250.00
81 Tegel Keramik 20 x 20 cm Anti Slip Buah Rp. 2,800.00
82 Tegel Keramik 10 x 20 cm Buah Rp. 1,250.00
83 Tegel Porselin 20 x 20 cm Buah Rp. 2,800.00
84 Batu Tempel / Alam (batu palimanan) 10 x 20 cm M2 Rp. 200,000.00

BAHAN CAT DAN FINISHING


85 Cat Kilap Kayu Standar Glotex Kg Rp. 35,000.00
86 Vernis Kayu Standar Glotex Ltr Rp. 35,000.00
87 Cat Tembok Standar Mowileks Kg Rp. 33,000.00
88 Plamur Tembok Kg Rp. 12,000.00
89 Plamur Kayu Kg Rp. 7,000.00
90 Lem Fox Putih Kg Rp. 25,000.00
91 Lem Kayu Ltr Rp. 21,000.00
92 Residu Jadi Kg Rp. 7,200.00
93 Politur Ltr Rp. 24,000.00
94 Politur Jadi Ltr Rp. 30,000.00
95 Dempul Kg Rp. 12,000.00
96 Kapur Tonasa Kg Rp. 3,600.00
97 Minyak Cat / Tenner Kg Rp. 12,000.00
98 Minyak Bekisting Ltr Rp. 2,500.00
99 Meni Besi Kg Rp. 12,000.00
100 Meni Kayu Kg Rp. 12,000.00
101 Batu Apung Kg Rp. 35,000.00
102 Amplas Lembar Rp. 4,800.00
Bersambung
Lanjutan
No. NAMA BAHAN SATUAN HARGA
1 2 3 4
UNIT ELEKTRIKAL

103 Pas Pitting Down Light Buah Rp. 25,000.00


104 Lampu Pijar 25 Watt Buah Rp. 3,500.00
105 Pas. Lampu TL 2x20 Watt (tanam/type RM)) Buah Rp. 65,000.00
106 Pas. Lampu SL 20 Watt Buah Rp. 35,000.00
107 Pas. Stop Kontak Merk Broco Buah Rp. 18,000.00
108 Pas. Saklar Ganda Merk Broco Buah Rp. 18,000.00
109 Pas. Saklar tunggal Merk Broco Buah Rp. 15,000.00
110 Box. Sekring MCB Buah Rp. 65,000.00

KABEL :
111 Kabel NYM 2 x 1.5 supreme mtr Rp. 36,000.00
112 Kabel NYM 2 x 2.5 supreme mtr Rp. 4,950.00
113 Kabel NYM 3 x 2,5 supreme mtr Rp. 6,000.00
114 Kabel NYM 3 x 4 supreme mtr Rp. 8,800.00

115 Kabel NYY 3 x 2.5 supreme mtr Rp. 9,100.00


116 Kabel NYY 3 x 4 supreme mtr Rp. 13,000.00
117 Kabel NYY 4 x 2.5 supreme mtr Rp. 11,200.00
118 Kabel NYY 4 x 4 supreme mtr Rp. 16,000.00
119 Kabel NYY4 x 6 supreme mtr Rp. 21,500.00
120 Kabel NYY 4 x 10 supreme mtr Rp. 32,500.00
121 Kabel NYY 4 x 16 supreme mtr Rp. 51,600.00

122 Kabel NYFGbY 4 x 2,5 supreme mtr Rp. 22,000.00


123 Kabel NYFGbY 4 x 4 supreme mtr Rp. 27,500.00
124 Kabel NYFGbY 4 x 6 supreme mtr Rp. 33,400.00
125 Kabel NYFGbY 4 x 10 supreme mtr Rp. 45,000.00
126 Kabel NYFGbY 4 x 16 supreme mtr Rp. 67,500.00
127 Kabel NYFGbY 4 x 25 supreme mtr Rp. 94,000.00
128 Kabel NYFGbY 4 x 35 supreme mtr Rp. 125,000.00
129 Kabel NYFGbY 4 x 50 supreme mtr Rp. 161,000.00
130 Kabel NYFGbY 4 x 80 supreme mtr Rp. 219,000.00

131 Kabel NYAMHY 2x 1,5 mm supreme mtr Rp. 5,400.00

132 BC 16 mm mtr Rp. 10,000.00


133 Spit Tembaga 2' , tinggi 88 cm Asli bh Rp. 525,000.00
134 Arde 4 mtr Asli btg Rp. 124,000.00
135 Reducer 2' x 1 1/2' bh Rp. 30,000.00
136 Socket 2" bh Rp. 500.00
137 Conector BC 16 mm bh Rp. 4,000.00

PIPA :
138 Fleksibel mtr Rp. 2,750.00
139 Conduit Clipsal mtr Rp. 2,500.00
140 L Bow 3/4 bh Rp. 750.00
141 Klem Kabel Clipsal 20 mm bh Rp. 500.00
142 Sok/Sambungan Clipsal bh Rp. 500.00
143 Tedos Clipsal bh Rp. 3,000.00
144 Inbow Dos Decker bh Rp. 3,000.00
145 Dos Inbow Asli bh Rp. 3,000.00
146 Lasdoop bh Rp. 500.00
147 Sekrup bh Rp. 100.00
148 paku bh Rp. 100.00
149 Fisher bh Rp. 500.00

SADEL :
150 Sadel Klem (Besi) dos Rp. 26,000.00
151 Sadel Klem (Plastik) bks Rp. 15,000.00
152 Sadel Beton dos Rp. 17,500.00
153 Sadel 3/4 biji Rp. 12,500.00
154 Sadel/Klem No. 19 bks Rp. 13,500.00

ISOLASI :
155 Isolasi Bond rol Rp. 6,000.00
156 Isolasi Bond 3 m 2.3 rol Rp. 4,000.00
157 Isolasi 3 m Scowat rol Rp. 5,000.00
Bersambung
Lanjutan
No. NAMA BAHAN SATUAN HARGA
1 2 3 4

LAMPU :
158 Down Light halogen bh Rp. 175,000.00
159 Down Light lengkap esensial 23 watt bh Rp. 95,000.00
160 Lampu TL 1x 20 watt Philips TKO bh Rp. 125,000.00
161 Lampu TL 1 x 40 watt Philips TKO bh Rp. 158,000.00
162 Reflektor lamp 100 watt bh Rp. 225,000.00
163 Reflektor lamp 150 watt bh Rp. 275,000.00
164 Lampu sorot HPIT 200 watt komplit bh Rp. 450,000.00
165 Lampu sorot HPIT 400 watt komplit bh Rp. 785,000.00
166 Lampu Taman Globe 12', esensial 18 watt set Rp. 450,000.00
167 Candelair Lamp 200 watt set Rp. 5,000,000.00
168 Candelair Lamp 300 watt set Rp. 6,000,000.00
169 Lampu Softone 40 watt Philips bh Rp. 6,000.00
170 Lampu TL 2 x 20 watt Philips RMI bh Rp. 285,000.00
171 Lampu TL 2 x 40 watt Philips RMI bh Rp. 325,000.00
172 Lampu Baret TL 32 watt CCB Krs Ufo bh Rp. 325,000.00

PANEL :
173 MCB NS 45a, 4,5 KA, 1 Phasa,MG 6 A bh Rp. 35,000.00
174 MCB NS 45a, 4,5 KA, 1 Phasa,MG 10 A bh Rp. 35,000.00
175 MCB NS 45a, 4,5 KA, 1 Phasa,MG 16 A bh Rp. 35,000.00
176 MCB NS 45a, 4,5 KA, 1 Phasa,MG 20 A bh Rp. 35,000.00
177 MCB NS 45a, 4,5 KA, 1 Phasa,MG 25 A bh Rp. 42,500.00
178 MCB NS 45a, 4,5 KA, 1 Phasa,MG 32 A bh Rp. 46,000.00
179 MCB NS 45a, 4,5 KA, 1 Phasa,MG 40 A bh Rp. 52,500.00
180 MCB NS 45H, 10 KA, 1 Phasa,MG 6 A bh Rp. 122,000.00
181 MCB NS 45H, 10 KA, 1 Phasa,MG 10 A bh Rp. 122,000.00
182 MCB NS 45H, 10 KA, 1 Phasa,MG 16 A bh Rp. 122,000.00
183 MCB NS 45H, 10 KA, 1 Phasa,MG 20 A bh Rp. 122,000.00
184 MCB NS 45H, 10 KA, 1 Phasa,MG 25 A bh Rp. 136,500.00
185 MCB NS 45H, 10 KA, 1 Phasa,MG 32 A bh Rp. 143,000.00
186 MCB NS 45H, 10 KA, 1 Phasa,MG 40 A bh Rp. 153,500.00
187 MCB C 120 N, 10 KA, 3 Phasa,MG 10 A bh Rp. 455,000.00
188 MCB C 120 N, 10 KA, 3 Phasa,MG 16 A bh Rp. 455,000.00
189 MCB C 120 N, 10 KA, 3 Phasa,MG 20 A bh Rp. 455,000.00
190 MCB C 120 N, 10 KA, 3 Phasa,MG 25 A bh Rp. 471,000.00
191 MCB C 120 N, 10 KA, 3 Phasa,MG 32 A bh Rp. 471,000.00
192 MCB C 120 N, 10 KA, 3 Phasa,MG 40 A bh Rp. 471,000.00
193 MCB C 60 L, 25 KA, 3 Phasa,MG 10 A bh Rp. 761,500.00
194 MCB C 60 L, 25 KA, 3 Phasa,MG 16 A bh Rp. 761,500.00
195 MCB C 60 L, 25 KA, 3 Phasa,MG 20 A bh Rp. 761,500.00
196 MCB C 60 L, 25 KA, 3 Phasa,MG 25 A bh Rp. 761,500.00
197 MCB C 60 L, 25 KA, 3 Phasa,MG 32 A bh Rp. 761,500.00
198 MCB C 60 L, 25 KA, 3 Phasa,MG 40 A bh Rp. 761,500.00
199 MCCB NS 100N, 36 KA, 3 Phasa,MG 13/16 A bh Rp. 1,510,500.00
200 MCCB NS 100N, 36 KA, 3 Phasa,MG 20/25 A bh Rp. 1,510,500.00
201 MCCB NS 100N, 36 KA, 3 Phasa,MG 25/32 A bh Rp. 1,510,500.00
202 MCCB NS 100N, 36 KA, 3 Phasa,MG 32/40 A bh Rp. 1,510,500.00
203 MCCB NS 100N, 36 KA, 3 Phasa,MG 40/50 A bh Rp. 1,510,500.00
204 MCCB NS 100N, 36 KA, 3 Phasa,MG 50/63 A bh Rp. 1,510,500.00
205 MCCB NS 100N, 36 KA, 3 Phasa,MG 64/80 A bh Rp. 1,510,500.00
206 MCCB NS 100N, 36 KA, 3 Phasa,MG 80/100 A bh Rp. 1,510,500.00
207 MCCB NS 100H, 70 KA, 3 Phasa,MG 13/16 A bh Rp. 2,193,500.00
208 MCCB NS 100H, 70 KA, 3 Phasa,MG 20/25 A bh Rp. 2,193,500.00
209 MCCB NS 100H, 70 KA, 3 Phasa,MG 25/32 A bh Rp. 2,193,500.00
210 MCCB NS 100H, 70 KA, 3 Phasa,MG 32/40 A bh Rp. 2,193,500.00
211 MCCB NS 100H, 70 KA, 3 Phasa,MG 40/50 A bh Rp. 2,193,500.00
212 MCCB NS 100H, 70 KA, 3 Phasa,MG 50/63 A bh Rp. 2,193,500.00
213 MCCB NS 100H, 70 KA, 3 Phasa,MG 64/80 A bh Rp. 2,193,500.00
214 MCCB NS 100H, 70 KA, 3 Phasa,MG 80/100 A bh Rp. 2,193,500.00

215 Sisir MCB Legrand bh Rp. 75,000.00


216 Panel Kas 30 x 40 x 20 cm, t 3mm unit Rp. 575,000.00
217 Panel Kas 60 x 80 x 25 cm, t 3 mm unit Rp. 950,000.00
218 Panel Kas 120 x 80 x 40 cm,t 3 mm unit Rp. 1,500,000.00
219 Pilot lamp + fuse set Rp. 45,000.00
220 Ampere meter bh Rp. 250,000.00
221 Current transformer bh Rp. 215,000.00
222 Volt meter bh Rp. 235,000.00
Bersambung
Lanjutan
No. NAMA BAHAN SATUAN HARGA
1 2 3 4
223 Volt selector switch 8 posisi bh Rp. 175,000.00
224 KW Meter bh Rp. 750,000.00
225 Stop Kontak 16 A, Clipsal bh Rp. 32,000.00
226 Saklar Seri Clipsal bh Rp. 31,500.00
227 Saklar Engkel Clipsal bh Rp. 28,000.00
228 Stop Kontak Khusus AC bh Rp. 78,000.00
229 Contaktor 32 A bh Rp. 350,000.00
230 Time switch bh Rp. 225,000.00
231 Bata press pelindung kabel bh Rp. 1,500.00
232 Rel tembaga 1 set bh Rp. 750,000.00
233 Elektroda pentanahan bh 124,000.00
234 Bak kontrol + tutup bh 120,000.00
235 Pipa Gip diameter 2" bh 40,000.00

SOUND SYSTEM
236 Ceiling speaker 6 watt bh Rp. 135,000.00
237 Coloumb speaker 10 watt bh Rp. 450,000.00
238 Potentiope bh Rp. 98,000.00

239 Pompa Air 500 watt bh Rp. 4,500,000.00

240 AC 2 pk skw Nasional bh Rp. 7,600,000.00


241 AC 1 1/2 pk skw Nasional bh Rp. 5,600,000.00
242 AC 1 pk skw Nasional bh Rp. 3,500,000.00
243 AC 3/4 pk skw Nasional bh Rp. 2,800,000.00

244 Exhaush fan 10" skw Nasional bh Rp. 325,000.00

BAHAN - BAHAN PENGGANTUNG, PENGUNCI DAN SANITARI


245 Kunci Pintu Merk Anchor 2x Putar Buah Rp. 102,000.00
246 Engsel Pintu H Kuningan Buah Rp. 17,500.00
247 Engsel Jendela Kupu-kupu Standar Buah Rp. 10,000.00
248 Grendel Pintu H Kuningan (besar) Buah Rp. 15,000.00
249 Grendel Jendela Kuningan Buah Rp. 9,000.00
250 Hak Angin Jendela Standar Psg Rp. 9,000.00
251 Kunci Pintu (Kunci Slot) pintu depan Buah Rp. 175,000.00
252 Tarikan daun Pintu (pintu depan) Pasang Rp. 150,000.00
253 Pipa PVC 1/2 " M' Rp. 7,500.00
254 Pipa PVC 3/4" M' Rp. 15,000.00
255 Pipa PVC 1 " M' Rp. 17,500.00
256 Pipa PVC 3 " M' Rp. 30,000.00
257 Valve Bh Rp. 65,000.00
258 Waterproof Superflex Dinding M2 Rp. 25,000.00
259 Bak Mandi Fibre Glass 70x70x66 Bh Rp. 343,200.00
260 Tangki air Fibreglass Kaf. 1.200 Liter Bh Rp. 1,750,000.00
261 Pek. Tower air rangka besi siku 80,80,8 T, 4 M Unit Rp. 15,000,000.00
262 Closet Jongkok keramik Bh Rp. 95,000.00
263 Closet Duduk standar Bh Rp. 400,000.00
264 Septiktank dan Resapan Unit Rp. 3,000,000.00
265 Kran Air Bh Rp. 22,000.00
266 Floor Drain Bh Rp. 36,000.00
267 Urinoir Bh Rp. 350,000.00
268 Wastafel lengkap dengan cermin Bh Rp. 450,000.00
269 Teak Oil Kg Rp. -
270 List Kaca M' Rp. 2,500.00
271 Kawat Harmonika M2 Rp. 33,000.00
272 Kawat Nyamuk M2 Rp. 33,000.00
273 Kawat Kassa M2 Rp. 36,000.00
274 Karet Pelapis M' Rp. 6,000.00
275 Kuas Bh Rp. 12,000.00
276 Seal Tipe / Isolasi Pipa Bh Rp. 9,000.00
277 Ijuk M3 Rp. 180,000.00

Kendari, September 2020

0 Dihitung Oleh :
0 0

0 Sujaswan, ST
0 0
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE)
PEMBANGUNAN : RUMAH KOST
PEMOHON : HABIB MUHAMMAD ALHABSY
LOKASI : JL. ORINUNGGU, KEL. PADALEU, KEC. KAMBU, KOTA KENDARI

WAKTU PELAKSANAAN
Nomor Uraian Pekerjaan Bobot BULAN I BULAN II BULAN III BULAN IV BULAN V BLN VI Ket.
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

100
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
90
1 I. PEKERJAAN TANAH 0.00% - - - -

2 II. PEKERJAAN PONDASI DAN SLOEF 0.00% - - - - - 80

3 III. PEKERJAAN BETON 0.00% 0.000 0.000 0.000 0.000 0.000 0.000 0.000
70
4 IV. PEKERJAAN DINDING DAN PLESTERAN 0.00% - - - - - - - -
60
5 V. PEKERJAAN PENUTUP LANTAI, DINDING DAN SALURAN 0.00% - - - - - - - - - - - - - - -

6 VI. PEK. KUSEN, PINTU, JENDELA, DAUN PINTU, DAUN JENDELA DAN KACA 0.00% - - - - - - 50

7 VII. PEKERJAAN KUDA - KUDA DAN ATAP (KAP) 0.00% - - - - - - - - - - - - - - - 40

8 VIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI 0.00% - - - -


30
9 IX. PEKERJAAN LISTRIK 0.00% - - - -
20
10 X. PEKERJAAN INSTALASI AIR DAN SANITASI AIR 0.00% - - - - - - - - - -

11 XI. PEKERJAAN LELANGIT 0.00% - - - - - - - - 10

12 XII. PEKERJAAN FINISHING 0.00% - - - -


0

Jumlah #NAME?
Rencana #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rencana Komulatif 0 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Realisasi
Realisasi Komulatif
Deviasi

S
Kendari, September 2020
o
r
0 Dihitung Oleh : o
0 0 n
g
,

0 Sujaswan, ST
0 0