BIAYA LANGSUNG PERSONEL

PERENCANAAN PEMBANGUNAN GEDUNG NICU


RUMAH SAKIT KABUPATEN KOLAKA TIMUR

Harga Satuan Jumlah Waktu Kerja/ Jumlah


No Tenaga Ahli Orang/Bulan Orang Bulan (Rp)
(Rp)

1 Ahli Arsitektur (Team Leader)


10,000,000.00 1.00 1.00 10,000,000.00
2 Ahli Sipil 8,000,000.00 1.00 1.00 8,000,000.00
3 Ahli Mekanikal Elelektrikal 8,000,000.00 1.00 1.00 8,000,000.00
4 Surveyor 2,500,000.00 2.00 0.50 2,500,000.00
5
Drafter/CAD 3,250,000.00 2.00 1.00 6,500,000.00
6
Operator Komputer 2,500,000.00 1.00 1.00 2,500,000.00
7
Administrator 2,500,000.00 1.00 1.00 2,500,000.00

TOTAL BIAYA 40,000,000.00

Kendari, Februari 2022


CV All Design Consultan

Suardin, ST
Direktur
BIAYA LANGSUNG NON PERSONEL
PERENCANAAN PEMBANGUNAN GEDUNG NICU
RUMAH SAKIT KABUPATEN KOLAKA TIMUR

Jumlah
No Uraian Biaya Harga satuan Satuan (Rp)

Biaya ATK 7,000,000.00 1.00 7,000,000.00


1 Biaya Komputer 10,000,000.00 1.00 10,000,000.00
Biaya Komunikasi 2,700,000.00 1.00 2,700,000.00
Biaya Perjalanan Survey Lokasi/ 2,500,000.00 1.00 2,500,000.00
2
Kendaraan ( 1 lokasi x 1 kali ) 350,000.00 1.00 350,000.00
3 Dokumen Perencanaan 3,500,000.00 1.00 3,500,000.00

TOTAL BIAYA 26,050,000.00

Kendari, Februari 2022


CV All Design Consultan

Suardin, ST
Direktur
REKAPITULASI
PERENCANAAN PEMBANGUNAN GEDUNG NICU
RUMAH SAKIT KABUPATEN KOLAKA TIMUR

No Total Harga (Rp)

I BIAYA LANGSUNG PERSONEL


40,000,000.00
II REKAPITULASI 26,050,000.00
SUB TOTAL 66,050,000.00
PPn 10% 6,605,000.00
TOTAL
72,655,000.00
Terbilang :

Kendari, Februari 2022


CV All Design Consultan

Suardin, ST
Direktur
0.605601817

0.394398183