Anda di halaman 1dari 4

 

GAMBAR RENCANA 
PEMBANGUNAN PENGENDALIAN BANJIR  
SUNGAI RONGKONG KABUPATEN LUWU UTARA 
 

  Makassar,  Desember 2020 
  Disahkan Oleh 
Pejabat Pembuat Komitmen 
 
Sungai dan Pantai II 
 
 
 
 
   
A. Sulfikar, ST., MT 
 
NIP.  198310012010121001 
 
UNIT DESAIN BALAI BESAR WILAYAH SUNGAI POMPENGAN JENEBERANG 
TAHUN 2020 
93.260
93.263 92.150 93.231
93.236 92.134
92.153 93.257 93.254 92.139
93.265 92.149 92.146 93.251 93.248 93.239
92.155 92.143 92.140 93.24593.242 92.131
92.13792.134

93.226 93.220
92.130 92.125
91.117

U
91.114
91.119

91.111 91.108 91.106


91.994 91.992 91.108
92.768 92.766
P0 P1 91.989 91.090
92.763
P2 91.096 91.079
91.084
91.102
91.982
91.986 92.758 91.105
91.097
92.761 P4
P3 91.979
92.755
P5
91.976
92.752
91.956
P6
92.737

91.973
P12 91.951
91.960 92.733
92.751 91.964 92.741
P7 92.745 P13
P11
91.971 P10
92.750
P8 l
l gu
u ng
102 gg Ta
an 91.967 hir
a lT Ak
Aw 92.746
101 P9

L 100
IP
TL a 99

98
TM TA

97
R R
96

95

94
0 2 4 6 8 10 12 14 16 18 20
SV = 1 : 200
0 40 80 120 160 200 240 280 320 360 400
SH = 1 : 4000
bidang persamaan / reference level
+ 90.00 meter
PATOK HEKTOMETER
Hm 0 Hm 1 Hm 2 Hm 3 Hm 4 Hm 5 Hm 6 Hm 7 Hm 8 Hm 9 Hm 10 Hm 11
HECTOMETER STONE
NOMOR PROFIL
P1 P2 P3 P4 P5 P6 P7
P0

PROFILE NUMBER

1109.0
280.0

569.0

664.0

854.0

924.0
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
90.0
0.0

90.0 190.0 289.0 95.0 190.0 70.0 185.0


ACCUMULATED DISTANCE

ELEVASI TANGGUL KIRI


LEFT BANK LEVEL
YANG ADA
EXISTING

ELEVASI TANGGUL KANAN


RIGHT BANK LEVEL
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE
93.12

93.12

93.11

93.11

93.11

93.11

93.11
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE
99.17 100.17

99.16 100.16

99.16 100.16

99.14 100.14

99.14 100.14

99.13 100.13

99.12 100.12

99.11 100.11
ELEVASI TANGGUL
BANK LEVEL
ELEVASI MUKA AIR RENCANA
DESIGN WATER LEVEL
RENCANA / DESIGN

ELEVASI DASAR SALURAN


BED LEVEL
KEM ENTER IAN PEKE RJAA N UMU M DAN PE RUMAHAN RAK YAT Provinsi :
TRASE SALURAN R X Y L
ALIGNMENT TL a
D I R E K T O R A T S U M B E R D A Y A A I R SULAWESI SELATAN
ELEVASI DASAR SALURAN PEMBUANG SISI KIRI
BED LEVEL SIDE DRAIN LEFT SIDE SATKER BALAI BESAR WILAYAH SUNGAI POMPENGAN JENEBERANG Pekerjaan :
ELEVASI DASAR SALURAN PEMBUANG SISI KANAN Jln Sekolah Guru Perawat No. 3 Telp (0411) 868792-868781 Makassar Sulawesi Selatan 90222
BED LEVEL SIDE DRAIN RIGHT SIDE
PEMBANGUNAN PENGENDALIAN BANJIR
SUNGAI RONGKONG KAB. LUWU UTARA
TIPE BANGUNAN
TYPE OF STRUCTURE
Q v k
Kabupaten :

LONG SECTION
DIMENSI SALURAN DAN DATA TAMBAHAN
CANAL DIMENSION AND ADDITIONAL DATA
b h w
m I A
LUWU UTARA
No. Lembar : 1/3

SUNGAI RONGKONG
Tanggal :
Kepala Bidang Keterpaduan Rahayu, ST., MT
Pemb. Infrastruktur SDA
23/12/2020
Di Periksa Ir. Hj. Nurlaela, SP1
Kepala Bidang PJSA
dan Di
Sahkan PPK Program & Andi Muhammad Ratmiadi,
Perencanaan ST., MT
TANGGUL TANAH 124.55 M2
URUGAN BATU 39.75 M2
CROS
Tanggul Tanah Dipadatkan
3.00 3.00
+100.170 +100.170
100.00 1 1
1
1
1
3.50
Urugan Batu P0 1
1
1
98.00
+97.096
3.50
2 2 +96.754
96.00
1 1
92.119
94.00

92.00 Bidang Persamaan


Reference Level +90.00

91.119
92.155
93.265

91.994
92.768
Elevasi Tanah Asli (m)
Original Ground Level
Jarak (m)
4.44 2.87 106.92 106.92 1.64 8.92
Distance

TANGGUL TANAH 124.23 M2


URUGAN BATU 39.68 M2

3.00 3.00
100.00 +100.160 +100.160
1 1
1 1
98.00 1
1
3.50
P1 3.50
1
1
+97.091
2 2 +96.749
96.00
1 1
94.00
92.117

92.00 Bidang Persamaan


Reference Level +90.00

91.117
92.153
93.263

91.992
92.766
Elevasi Tanah Asli (m)
Original Ground Level
Jarak (m)
4.44 2.87 115.45 115.45 1.64 8.92
Distance

KEM ENTER IAN PEKE RJAA N UMU M DAN PE RUMAHAN RAK YAT Provinsi :
D I R E K T O R A T S U M B E R D A Y A A I R SULAWESI SELATAN
SATKER BALAI BESAR WILAYAH SUNGAI POMPENGAN JENEBERANG Pekerjaan :
Jln Sekolah Guru Perawat No. 3 Telp (0411) 868792-868781 Makassar Sulawesi Selatan 90222
PEMBANGUNAN PENGENDALIAN BANJIR
SUNGAI RONGKONG KAB. LUWU UTARA

Kabupaten :
0 10 20 30 40 m LUWU UTARA
CROSS SECTION
No. Lembar : 2/3
SCALE V & H, 1 : 400
SUNGAI RONGKONG
Tanggal :
Kepala Bidang Keterpaduan Rahayu, ST., MT
Pemb. Infrastruktur SDA
23/12/2020
Di Periksa Ir. Hj. Nurlaela, SP1
Kepala Bidang PJSA
dan Di
Sahkan PPK Program & Andi Muhammad Ratmiadi,
Perencanaan ST., MT
SS
TANGGUL TANAH 123.91 M2
URUGAN BATU 39.61 M2

3.00 Tanggul Tanah Dipadatkan


3.00

100.00 +100.150 +100.150


1 1
1 3.50 1
98.00 1
1 Urugan Batu
P2 3.50
1
1
+97.086
2 2 +96.744
96.00
1 1
92.114
94.00

92.00 Bidang Persamaan


Reference Level +90.00

91.114
92.150
93.260

91.989
92.763
Elevasi Tanah Asli (m)
Original Ground Level
Jarak (m)
4.44 2.87 170.65 170.65 1.64 8.92
Distance

TANGGUL TANAH 123.59 M2


URUGAN BATU 39.52 M2

3.00
3.00

100.00 +100.140
1
P3 1
+100.140
1 1
1 3.50 1
98.00 1 3.50 1
+97.081
2 2 +96.739
96.00
1 1
92.111
94.00

92.00 Bidang Persamaan


Reference Level +90.00

91.111
92.149
93.257

92.761
91.986
Elevasi Tanah Asli (m)
Original Ground Level
Jarak (m)
4.44 2.87 265.16 265.16 1.64 8.92
Distance

KEM ENTER IAN PEKE RJAA N UMU M DAN PE RUMAHAN RAK YAT Provinsi :
D I R E K T O R A T S U M B E R D A Y A A I R SULAWESI SELATAN
SATKER BALAI BESAR WILAYAH SUNGAI POMPENGAN JENEBERANG Pekerjaan :
Jln Sekolah Guru Perawat No. 3 Telp (0411) 868792-868781 Makassar Sulawesi Selatan 90222
PEMBANGUNAN PENGENDALIAN BANJIR
SUNGAI RONGKONG KAB. LUWU UTARA

Kabupaten :
0 10 20 30 40 m LUWU UTARA
CROSS SECTION
No. Lembar : 3/3
SCALE V & H, 1 : 400
SUNGAI RONGKONG
Tanggal :
Kepala Bidang Keterpaduan Rahayu, ST., MT
Pemb. Infrastruktur SDA
23/12/2020
Di Periksa Ir. Hj. Nurlaela, SP1
Kepala Bidang PJSA
dan Di
Sahkan PPK Program & Andi Muhammad Ratmiadi,
Perencanaan ST., MT

Anda mungkin juga menyukai