Anda di halaman 1dari 16

Kabupaten : Serang Jenis Prasarana : TPT

Kecamatan : Waringin Kurung TAKE OF SHEET Lokasi : Jl. Poros Desa


Desa : Melati Ukuran : 45M x 2.30M
VOLUME TPT BAGIAN KANAN VOLUME TPT BAGIAN KIRI

No Patok ba bb h1 h2 ht A Ar L V No Patok ba bb h1 h2 ht A Ar L V

1 Po 0.3 0.5 2.00 0.3 2.3 0.92 1 Po 0.3 0.5 2.00 0.3 2.3 0.92
0.92 45.00 41.40 0.92 - `
2 P1 0.3 0.5 2.00 0.3 2.3 0.92 2 P1 0.3 0.5 2.00 0.3 2.3 0.92
0.92 - - 0.92 - -
3 P2 0.3 0.5 2.00 0.3 2.3 0.92 3 P2 0.3 0.5 2.00 0.3 2.3 0.92
0.92 - - 0.92 - -
4 P3 0.3 0.5 2.00 0.3 2.3 0.92 4 P3 0.3 0.5 2.00 0.3 2.3 0.92
0.92 - - 0.92 - -
5 P4 0.3 0.5 2.00 0.3 2.3 0.92 5 P4 0.3 0.5 2.00 0.3 2.3 0.92
0.92 - - 0.92 - -
6 P5 0.3 0.5 2.00 0.3 2.3 0.92 6 P5 0.3 0.5 2.00 0.3 2.3 0.92
0.92 - - 0.92 - -
7 P6 0.3 0.5 2.00 0.3 2.3 0.92 7 P6 0.3 0.5 2.00 0.3 2.3 0.92
0.92 - - 0.92 - -
8 P7 0.3 0.5 2.00 0.3 2.3 0.92 6 P5 0.3 0.5 2.00 0.3 2.3 0.92
0.92 - - 0.92 - -
9 P8 0.3 0.5 2.00 0.3 2.3 0.92 7 P6 0.3 0.5 2.00 0.3 2.3 0.92
0.92 - - #REF!
10 P9 0.3 0.5 2.00 0.3 2.3 0.92 2.00
JUMLAH KIRI 45 41.40 M3 - -
45 41.40
h1 = Tinggi dari permukaan tanah atas s/d permukaan tanah bawah ( m ) 270
h2 = Tinggi dari permukaan tanah bagian bawah s/d tanah keras ( m ) -270 #REF!
ht = tinggi total = h1 + h2 (m)
A = Luas penampang TPT ( m2 )
Ar = Luas penampang TPT rata-rata = (Ao+A1)/2 dst.
L = Panjang Antar Patok, sesua kondisi di lapangan ( m )
Va = Volume Badan Jalan yang diurug = hi x L ( m3)
V = Volume TPT = Ar x L ( m3)
ANALISA HARGA SATUAN PEKERJAAN VOLUME PEKERJAAN
SNI DT-91-0007-2007 ba = 0.3 Plesetaran 1:4
1 Pasangan Batubelah 1 : 4, per m3 Satuan Volume Harga Satuan Kebutuhan Harga / m³ 41.40 M³
Batu belah, 15-20 cm 1.200 m3 41.40 190,000.00 49.68 228,000.00
Semen 3.260 Zak 41.40 63,000.00 134.96 205,380.00
Pasir Pasang 0.520 m3 41.40 215,000.00 21.53 111,800.00
Pekerja 1.500 HOK 41.40 100,000.00 62.10 150,000.00 Pas. Batu belah 1:4 h1 =
Tukang 0.600 HOK 41.40 120,000.00 24.84 72,000.00
Kepala Tukang 0.060 HOK 41.40 125,000.00 2.48 7,500.00
Mandor 0.075 HOK 41.40 125,000.00 3.11 9,375.00
784,055.00 ht
SNI DT-91-0010-2007
2 Plesteran 1:4, t= 15mm, per m2 Satuan Volume Harga Satuan Kebutuhan Harga / m³
Semen 0.125 sak 103.50 63,000.00 12.92 7,900.00
Pasir Pasang 0.024 m3 103.50 215,000.00 2.48 5,200.00 h2 = 0.3
Pekerja 0.2 HOK 103.50 100,000.00 20.70 20,000.00 103.50 M²
Tukang 0.15 HOK 103.50 120,000.00 15.53 18,000.00
Kepala Tukang 0.015 HOK 103.50 125,000.00 1.55 1,900.00
Mandor 0.01 HOK 103.50 125,000.00 1.04 1,300.00 bb= 0.5
54,300.00
SNI 2010 DIY Panjang = 45 M
3 Pengecatan Satuan Volume Harga Satuan Kebutuhan Harga / m³ 13.50 M² Lebar Plesteran = ba+0.5 = 2.3 M
Cat genteng 0.30 Kg 13.50 150,000.00 4.05 45,000.00 F = Panjang x lebar = 103.50 M²
Pekerja 0.05 HOK 13.50 100,000.00 0.68 5,000.00
Tukang 0.075 HOK 13.50 125,000.00 1.01 9,375.00 Lebar Pengecatan = ba = 0.3 M
59,375.00 F = Panjang x lebar = 13.50 M²

4 Menggali 1m3 tanah Satuan Volume Harga Satuan Kebutuhan Harga / m³ 6.75 M³ Panjang (Pj)= 45
Pekerja 0.75 HOK 6.75 100,000.00 5.06 75,000.00 Lebar (L) = 0.5
Tinggi (t)= 0.3
Volume (V)= 6.75 M³
KEBUTUHAN BAHAN & HOK

1 Semen 147.88 = 148 Zak


2 Batu belah 49.68 = 50.00 M³
3 Cat genteng 4.05 = 4.00 Kg
4 Pasir Pasang 24.01 = 24.00 M³
5 Pekerja 88.54 = 89 HOK
6 Tukang 41.38 = 41 HOK
7 Kepala Tukang 4.04 = 4 HOK
8 Mandor 4.14 = 4 HOK
UU Desa

RENCANA ANGGARAN BIAYA ( RAB ) TPT


Propinsi : Banten No. RAB : 04.1
Kabupaten : Serang Jenis Kegiatan : TPT
Kecamatan : Waringin Kurung Ukuran : 45M x 2.30M
Desa : Melati Lokasi : Jl. Poros Desa

Volume
Harga Satuan Jumlah
URAIAN Dari Dari Dana Satuan Rp. Swadaya Rp. Jumlah Dana Desa Rp.
Total
Swadaya Desa
I. BAHAN
1.1. Batubelah 50.00 0.00 50.00 M³ 190,000.00 0.00 9,500,000
1.2. Pasir Pasang 24.00 0.00 24.00 M³ 215,000.00 0.00 5,160,000
1.3. Semen 148.00 0.00 148.00 Sak 63,000.00 0.00 9,324,000
1.4. Cat genteng 4.00 0.00 4.00 Kg 150,000.00 0.00 600,000

Sub Total 1) 0.00 24,584,000


II. ALAT
2.1. Prasasti 1.00 0.00 1.00 Buah 500,000.00 0.00 500,000
2.2. Papan Proyek 1.00 0.00 1.00 Buah 150,000.00 0.00 150,000
2.3. Cangkul 2.00 0.00 2.00 Buah 70,000.00 0.00 140,000
2.4. Sekop 2.00 0.00 2.00 Buah 70,000.00 0.00 140,000
2.5. Pengki 5.00 0.00 5.00 Buah 17,000.00 0.00 85,000
2.6. Ember 5.00 0.00 5.00 Buah 15,000.00 0.00 75,000
2.7. Palu pemecah Batu 2.00 0.00 2.00 Buah 150,000.00 0.00 300,000
2.8. Benang 10.00 0.00 10.00 Rol 12,000.00 0.00 120,000
2.9. Meteran 5 M 1.00 0.00 1.00 Buah 20,000.00 0.00 20,000

Sub Total 2) 0.00 1,530,000


III. UPAH
3.1. Pekerja 89.00 0.00 89.00 HOK 100,000.00 0.00 8,900,000
3.2. Tukang 41.00 0.00 41.00 HOK 120,000.00 0.00 4,920,000
3.3. Mandor 8.00 0.00 8.00 HOK 125,000.00 0.00 1,000,000

Sub Total 3) 0.00 14,820,000


IV. HONOR TPK
4.1. Ketua 1.00 0.00 1.00 Ls 500,000.00 0.00 500,000
4.2. Sekretaris 1.00 0.00 1.00 Ls 350,000.00 0.00 350,000
4.3. Anggota 3.00 0.00 3.00 Ls 200,000.00 0.00 600,000

Sub Total 4) 0.00 1,450,000


Jumlah 42,384,000
V. JASA KONSULTAN
5.1. Perencanaan ( 1.5% ) 1.00 0.00 1.00 Ls 635,800.00 0.00 635,800

Sub Total 5) 0.00 635,800


SUMBER DANA : DD Total Biaya 43,019,800

Kemuning, Desember 2018


Disetujui / Mengesahkan Pelaksana Kegiatan
Kepala Desa FT Kecamatan Ketua TPK

( Halusi ) ( ……………........ )
HARGA SATUAN BAHAN, ALAT DAN UPAH

NO NAMA BAHAN / ALAT SPESIFIKASI SATUAN HARGA SATUAN

1 Semen Merk Tigaroda, HolCim atau yang setara sak 63,000.00


2 Batu Pecah / Spleet Batu pecah mesin, uk. Max 2,5 cm M3 267,000.00
3 Pasir Beton Keras, Hitam, bersih dari lumpur/tanah M3 250,000.00
4 Pasir Urug Hitam, agak merah M3 110,000.00
5 Pasir Pasang Keras, Hitam, bersih dari lumpur/tanah M3 215,000.00
6 Batu Belah Keras, Abu-abu,Hitam, Bid. Pecah Min.3, Uk.20-30 M3 190,000.00
7 Sirtu Pasir Halus,Putih M3 130,000.00
8 Tanah Timbunan Padat,berbutir, bersih M3 90,000.00
9 Pipa PVC 1.5" Btg 72,000.00
10 Kayu Terentang Papan M3 3,179,000.00
11 Paku Medan 3-5 cm Ex. Pabrik Kg 23,400.00
12 Minyak Bekesting Ex. Pabrik Liter 16,500.00
13 Cat Genteng Ex. Pabrik Kg 150,000.00
14 Besi Ø10 mm Ukuran Sigmat bukan ukuran dagang, Krakatau Steel, U24 Batang 63,000.00
15 Kawat Beton Ex. Pabrik Kg 16,000.00
16 Papan Cor Kelas III ( Mahoni daun kecil , Meranti, kering, tua ) Lembar 25,000.00
17 Pipa Kuat, Kokoh, dia. 5-8 cm Batang 15,000.00
18 Papan proyek KW2 Buah 150,000.00
19 Prasasti Marmer Ukuran 40 cm x 30 cm Buah 500,000.00
20 Waterpass Ex. Pabrik, Kuat, Kokoh Buah 20,000.00
21 Sendok semen Buah 30,000.00
22 Selang air Ex. Pabrik, Kuat, Kokoh Meter 2,500.00
23 Ember Ex. Pabrik, Kuat, Kokoh Buah 15,000.00
24 Pengki Ex. Pabrik, Kuat, Kokoh Buah 17,000.00
25 Molen Ex. Pabrik Unit/Hari 450,000.00
26 Gerobak Ex. Pabrik Buah 1,000,000.00
27 Cangkul Ex. Pabrik Buah 70,000.00
28 Sekop Ex. Pabrik Buah 70,000.00
29 Meteran 5 M Ex. Pabrik Buah 20,000.00
30 Kuas Ex. Pabrik Buah 10,000.00
31 Blencong Ex. Pabrik Buah 100,000.00
32 Benang Rol 12,000.00
33 Palu Pemecah Batu Ex. Pabrik Buah 150,000.00

HARGA SATUAN UPAH

NO KLASIFIKASI PEKERJA SPESIFIKASI SATUAN HARGA SATUAN

1 Pekerja Pekerja biasa, penduduk biasa yang dilatih HOK 100,000.00


2 Tukang Batu Memilki pengalaman sebagai tukang, siap dilatih HOK 120,000.00
3 Kepala Tukang Batu Memilki pengalaman sebagai tukang HOK 125,000.00
4 Mandor Memilki pengalaman sebagai kepala tukang HOK 125,000.00
UU Desa

RENCANA ANGGARAN BIAYA ( RAB ) TPT


Propinsi : Banten No. RAB : 04
Kabupaten : Serang Jenis Kegiatan : TPT
Kecamatan : Waringin Kurung Ukuran : Variatif
Desa : Melati Lokasi : Variatif

Volume
URAIAN Satuan Harga Satuan Jumlah Jumlah Dana Desa Rp.
Dari Dari Dana Rp. Swadaya Rp.
Total Swadaya Desa

I. BAHAN
1.1. Batubelah 92.50 0.00 92.50 M³ 190,000.00 0.00 17,575,000
1.2. Pasir Pasang 43.20 0.00 43.20 M³ 215,000.00 0.00 9,288,000
1.3. Semen 171.00 0.00 171.00 Sak 63,000.00 0.00 10,773,000
1.4. Cat genteng Err:509 0.00 Err:509 Kg 150,000.00 0.00 Err:509
Sub Total 1) 0.00 Err:509
II. ALAT
2.1. Prasasti 3.00 0.00 3.00 Buah 500,000.00 0.00 1,500,000
2.2. Papan Proyek 3.00 0.00 3.00 Buah 150,000.00 0.00 450,000
2.3. Cangkul 3.00 0.00 3.00 Buah 70,000.00 0.00 210,000
2.4. Sekop 3.00 0.00 3.00 Buah 70,000.00 0.00 210,000
2.5. Pengki 10.00 0.00 10.00 Buah 17,000.00 0.00 170,000
2.6. Ember 10.00 0.00 10.00 Buah 15,000.00 0.00 150,000
2.7. Palu pemecah Batu 4.00 0.00 4.00 Buah 150,000.00 0.00 600,000
2.8. Benang 17.00 0.00 17.00 Rol 12,000.00 0.00 204,000
2.9. Meteran 5 M 4.00 0.00 4.00 Buah 20,000.00 0.00 80,000
Sub Total 2) 0.00 3,574,000
III. UPAH
3.1. Pekerja 188.00 0.00 188.00 HOK 100,000.00 0.00 18,800,000
3.2. Tukang 71.00 0.00 71.00 HOK 120,000.00 0.00 8,520,000
3.3. Mandor 15.00 0.00 15.00 HOK 125,000.00 0.00 1,875,000
Sub Total 3) 0.00 29,195,000
IV. HONOR TPK
4.1. Ketua 2.00 0.00 2.00 Ls 500,000.00 0.00 1,000,000
4.2. Sekretaris 2.00 0.00 2.00 Ls 350,000.00 0.00 700,000
4.3. Anggota 4.00 0.00 4.00 Ls 200,000.00 0.00 800,000
Sub Total 4) 0.00 2,500,000
Jumlah Err:509
V. JASA KONSULTAN
5.1. Perencanaan ( 1.5% ) 1.00 0.00 1.00 Ls Err:509 Err:509 Err:509

Sub Total 5) Err:509 Err:509


SUMBER DANA : DD Total Biaya Err:509

Kemuning, Desember 2018


Disetujui / Mengesahkan Pelaksana Kegiatan
Kepala Desa FT Kecamatan Ketua TPK

( Halusi ) ( ……………........ )
Kabupaten : Serang Jenis Prasarana : TPT
Kecamatan : Waringinkurung TAKE OF SHEET Lokasi : Kp. Pasir Dangdor RT 07
Desa : Sambilawang Ukuran : 43M x 1.8M x 0.3M
VOLUME TPT BAGIAN KANAN VOLUME TPT BAGIAN KIRI

No Patok ba bb h1 h2 ht A Ar L V No Patok ba bb h1 h2 ht A Ar L V

1 Po 0.3 0.5 1.9 0.3 2.2 0.88 1 Po 0.3 0.5 1.9 0.3 2.2 0.88
0.88 10.00 8.80 0.88 - `
2 P0+10 0.3 0.5 1.9 0.3 2.2 0.88 2 P1 0.3 0.5 1.9 0.3 2.2 0.88
0.88 - -
3 P0+10 0.3 0.5 1.8 0.3 2.1 0.84 3 P2 0.3 0.5 1.9 0.3 2.2 0.88
0.84 10.00 8.40 0.88 - -
4 P0+20 0.3 0.5 1.8 0.3 2.1 0.84 4 P3 0.3 0.5 1.9 0.3 2.2 0.88
0.88 - -
5 P0+20 0.3 0.5 1.5 0.3 1.8 0.72 5 P4 0.3 0.5 1.9 0.3 2.2 0.88
0.72 11.00 7.92 0.88 - -
6 P0+31 0.3 0.5 1.5 0.3 1.8 0.72 6 P5 0.3 0.5 1.9 0.3 2.2 0.88
0.88 - -
7 P0+31 0.3 0.5 0.8 0.3 1.1 0.44 7 P6 0.3 0.5 1.9 0.3 2.2 0.88
0.44 12.00 5.28 0.88 - -
8 P0+43 0.3 0.5 0.8 0.3 1.1 0.44 6 P5 0.3 0.5 1.9 0.3 2.2 0.88
0.66 - - 0.88 - -
9 P8 0.3 0.5 1.9 0.3 2.2 0.88 7 P6 0.3 0.5 1.9 0.3 2.2 0.88
0.88 - - #REF!
10 P9 0.3 0.5 1.9 0.3 2.2 0.88 1.9 0.3
JUMLAH KIRI 43 30.40 M3 - -
43 30.40

Note : ba = Lebar atas ( m )


bb = Lebar bawah (m ) 558
h1 = Tinggi dari permukaan tanah atas s/d permukaan tanah bawah ( m ) 270
h2 = Tinggi dari permukaan tanah bagian bawah s/d tanah keras ( m ) 288 #REF!
ht = tinggi total = h1 + h2 (m)
A = Luas penampang TPT ( m2 )
Ar = Luas penampang TPT rata-rata = (Ao+A1)/2 dst.
L = Panjang Antar Patok, sesua kondisi di lapangan ( m )
Va = Volume Badan Jalan yang diurug = hi x L ( m3)
V = Volume TPT = Ar x L ( m3)
ANALISA HARGA SATUAN PEKERJAAN VOLUME PEKERJAAN
Permen PUPR 28 TH 2016 ; A.3.2.1.2 ba = 0.3 Plesetaran 1:4
1 Pasangan Batubelah 1 : 4, per m3 Satuan Volume Harga Satuan Kebutuhan Harga / m³ 30.40 M³
Batu belah, 15-20 cm 1.200 m3 30.40 190,000.00 36.48 198,000.00
Semen 3.260 Zak 30.40 63,000.00 99.10 260,800.00
Pasir Pasang 0.520 m3 30.40 215,000.00 15.81 130,000.00
Pekerja 1.500 HOK 30.40 100,000.00 45.60 112,500.00 Pas. Batu belah 1:4 h1 =
Tukang 0.750 HOK 30.40 120,000.00 22.80 54,000.00
Kepala Tukang 0.075 HOK 30.40 125,000.00 2.28 6,000.00
Mandor 0.075 HOK 30.40 125,000.00 2.28 7,500.00
768,800.00 ht

Permen PUPR 28 TH 2016 ; A.4.4.2.4. h2 = 0.3


2 Plesteran 1:4, t= 15mm, per m2 Satuan Volume Harga Satuan Kebutuhan Harga / m³ 17.20 M²
Semen 0.125 sak 17.20 63,000.00 2.15 10,000.00
Pasir Pasang 0.024 m3 17.20 215,000.00 0.41 6,000.00
Pekerja 0.300 HOK 17.20 100,000.00 5.16 15,000.00 bb= 0.5
Tukang 0.150 HOK 17.20 120,000.00 2.58 13,500.00
Kepala Tukang 0.015 HOK 17.20 125,000.00 0.26 1,500.00 Panjang = 43.00 M
Mandor 0.015 HOK 17.20 125,000.00 0.26 1,000.00
47,000.00 Luasan Plsteran 17.20 M²

Lebar Atas Tinggi Panjang Luas Volume Tanah


Lebar Timbunan
M' M' M' M² Timbunan
0.3 1.2 10 4 1.00 12.00
0.3 1.8 10 4 1.00 18.00
0.3 1.5 11 4.4 1.00 16.50
0.3 0.8 12 4.8 1.00 9.60
43 17.2 1.00 56.10
Permen PUPR 28 TH 2016 ; A.2.2.1.9
4 Pembersihan 1M2 Satuan Volume Harga Satuan Kebutuhan Harga / m³ 43.00 M² Panjang (Pj)= 43.00
Pekerja 0.100 HOK 43.00 100,000.00 4.30 56,300.00 Lebar (L) = 1
Mandor 0.050 HOK 43.00 125,000.00 2.15 6,300.00 Luasan 43.00 M²

Permen PUPR 28 TH 2016 ; T.06.a.1)


5 Menggali 1m3 tanah Satuan Volume Harga Satuan Kebutuhan Harga / m³ 6.45 M³ Panjang (Pj)= 43.00
Pekerja 0.5630 HOK 6.45 100,000.00 3.63 56,300.00 Lebar (L) = 0.5
Mandor 0.0563 HOK 6.45 125,000.00 0.36 7,000.00 Tinggi (t)= 0.3
Volume (V)= 6.45 M³

Permen PUPR 28 TH 2016 ; P.16


6 1 M' Pasangan Pipa Suling Satuan Volume Harga Satuan Kebutuhan Harga / m³ 21.50 M'
Pipa PVC Ø1.5" 1.050 M 21.50 72,000.00 22.58 56,300.00
Pekerja 0.100 HOK 21.50 100,000.00 2.15 56,300.00
Mandor 0.010 HOK 21.50 125,000.00 0.22 1,300.00

HPS 2020 (Analisa Spec 2018)DPMD ; 3.2 (1)c


7 Timbunan Biasa Satuan Volume Harga Satuan Kebutuhan Harga / m³ 56.10 M³
Bahan Timbunan 1.200 M³ 56.10 90,000.00 67.32 56,300.00
Pekerja 0.504 HOK 56.10 100,000.00 28.26 56,300.00
Mandor 0.010 HOK 56.10 125,000.00 0.57 1,300.00

Biaya Ongkos Angkut Material


1 Batu Belah 36.50 M³
2 Pasir Pasang 16.20 M³

52.70 M³

Upah angkut bahan material = Rp. 300,000 / 4 M³


Maka Upah angkut keseluruhan bahan = 53.7 M³ / 4 M³ x Rp. 300.000
= 3,952,500
= 3,953,000 = 4,000,000
= 40 HOK
PDPM Gerbang Utama
REKAPITULASI KEBUTUHAN BAHAN, ALAT DAN UPAH

Kabupaten : Serang Jenis Prasarana


Kecamatan : Waringinkurung Volume
Desa : Sambilawang Lokasi

Pasir Pasang

Pipa Suling
Batu Belah

Timbunan

Pekerja

Tukang
Semen

Tanah

dia.2"
Pekerjaan

M³ Zak M³ M³ Btg HOK HOK


I PEKERJAAN PAS BATU BELAH 36.48 99.10 15.81 5.64 47.75 22.80

II PEKERJAAN PLESTERAN 2.15 0.41 5.16 2.58

III PEKERJAAN TIMBUNAN 67.32 28.26

2,00
1,50
IV PEKERJAAN GALIAN 3.63
0,05
0,05
V PEMBERSIHAN SEMAK 4.30

TOTAL 36.48 101.25 16.22 67.32 5.64 89.10 25.38


: TPT
: 43M x 1.8M x 0.3M
: Kp. Pasir Dangdor RT 07
Kepala Tukang

Mandor

HOK HOK
2.28 2.50

0.26 0.26

0.08

0.36

2.15

2.54 5.35
UU Desa

RENCANA ANGGARAN BIAYA ( RAB ) TPT


Propinsi : Banten No. RAB : 05
Kabupaten : Serang Jenis Kegiatan : TPT
Kecamatan : Waringinkurung Ukuran : 43M x 1.8M x 0.3M
Desa : Sambilawang Lokasi : Kp. Pasir Dangdor RT 07

Volume
Jumlah Swadaya Jumlah Dana
URAIAN Dari Dari Dana Satuan Harga Satuan Rp.
Total Rp. Desa Rp.
Swadaya Desa

I. BAHAN
1.1. Batubelah 36.50 0.00 36.50 M³ 190,000.00 0.00 6,935,000
1.2. Pasir Pasang 16.20 0.00 16.20 M³ 215,000.00 0.00 3,483,000
1.3. Semen 101.00 0.00 101.00 Sak 63,000.00 0.00 6,363,000
1.4. Tanah Timbunan 67.30 0.00 67.30 M³ 90,000.00 0.00 6,057,000
1.5. Pipa Suling dia.1.5" 6.00 0.00 6.00 btg 72,000.00 0.00 432,000
Sub Total 1) 0.00 23,270,000
II. ALAT
2.1. Prasasti 1.00 0.00 1.00 Buah 500,000.00 0.00 500,000
2.2. Papan Proyek 1.00 0.00 1.00 Buah 150,000.00 0.00 150,000
2.3. Cangkul 1.00 0.00 1.00 Buah 70,000.00 0.00 70,000
2.4. Sekop 1.00 0.00 1.00 Buah 70,000.00 0.00 70,000
2.5. Pengki 5.00 0.00 5.00 Buah 17,000.00 0.00 85,000
2.6. Ember 5.00 0.00 5.00 Buah 15,000.00 0.00 75,000
2.7. Palu pemecah Batu 1.00 0.00 1.00 Buah 150,000.00 0.00 150,000
2.8. Benang 5.00 0.00 5.00 Rol 12,000.00 0.00 60,000
2.9. Sendok semen 3.00 0.00 3.00 Buah 30,000.00 0.00 90,000
2.10. Gerobak 1.00 0.00 1.00 Buah 1,000,000.00 0.00 1,000,000
2.11. Pengadaan Air 1.00 0.00 1.00 ls 300,000.00 0.00 300,000
Sub Total 2) 0.00 2,550,000
III. UPAH
3.1. Pekerja 89.00 0.00 89.00 HOK 100,000.00 0.00 8,900,000
3.2. Tukang 25.00 0.00 25.00 HOK 120,000.00 0.00 3,000,000
3.3. Mandor 6.00 0.00 6.00 HOK 125,000.00 0.00 750,000
3.4. Upah Angkut/Lansir 40.00 0.00 40.00 HOK 100,000.00 0.00 4,000,000
Sub Total 3) 0.00 16,650,000
IV. HONOR TPK
4.1. Ketua - 0.00 0.00 Ls 650,000.00 0.00 0
4.2. Sekretaris - 0.00 0.00 Ls 500,000.00 0.00 0
4.3. Anggota - 0.00 0.00 Ls 400,000.00 0.00 0
Sub Total 4) 0.00 0
V. JASA KONSULTAN
5.1. Perencanaan (1,5%) 1.00 0.00 1.00 Ls 637,100.00 0.00 637,100
Sub Total 5) 0.00 637,100
SUMBER DANA : DD Total Biaya 43,107,100
Kabupaten : Serang Jenis Prasarana : TPT
Kecamatan : Waringin Kurung TAKE OF SHEET Lokasi : Kp. Cakar 2
Desa : Melati Ukuran : 6M x 2M
VOLUME TPT BAGIAN KANAN VOLUME TPT BAGIAN KIRI

No Patok ba bb h1 h2 ht A Ar L V No Patok ba bb h1 h2 ht A Ar L V

1 Po 0.3 0.5 1.7 0.3 2.00 0.80 1 Po 0.3 0.5 1.1 0.3 1.4 0.56
0.80 6.00 4.80 0.56 - `
2 P1 0.3 0.5 1.7 0.3 2.00 0.80 2 P1 0.3 0.5 1.1 0.3 1.4 0.56
0.80 - - 0.56 - -
3 P2 0.3 0.5 1.7 0.3 2.00 0.80 3 P2 0.3 0.5 1.1 0.3 1.4 0.56
0.80 - - 0.56 - -
4 P3 0.3 0.5 1.7 0.3 2.00 0.80 4 P3 0.3 0.5 1.1 0.3 1.4 0.56
0.80 - - 0.56 - -
5 P4 0.3 0.5 1.7 0.3 2.00 0.80 5 P4 0.3 0.5 1.1 0.3 1.4 0.56
0.80 - - 0.56 - -
6 P5 0.3 0.5 1.7 0.3 2.00 0.80 6 P5 0.3 0.5 1.1 0.3 1.4 0.56
0.80 - - 0.56 - -
7 P6 0.3 0.5 1.7 0.3 2.00 0.80 7 P6 0.3 0.5 1.1 0.3 1.4 0.56
0.80 - - 0.56 - -
8 P7 0.3 0.5 1.7 0.3 2.00 0.80 6 P5 0.3 0.5 1.1 0.3 1.4 0.56
0.80 - - 0.56 - -
9 P8 0.3 0.5 1.7 0.3 2.00 0.80 7 P6 0.3 0.5 1.1 0.3 1.4 0.56
0.80 - - #REF!
10 P9 0.3 0.5 1.7 0.3 2.00 0.80 1.1 0.3
JUMLAH KIRI 6 4.80 M3 - -
6 4.80

Note : ba = Lebar atas ( m )


bb = Lebar bawah (m ) 558
h1 = Tinggi dari permukaan tanah atas s/d permukaan tanah bawah ( m ) 270
h2 = Tinggi dari permukaan tanah bagian bawah s/d tanah keras ( m ) 288 #REF!
ht = tinggi total = h1 + h2 (m)
A = Luas penampang TPT ( m2 )
Ar = Luas penampang TPT rata-rata = (Ao+A1)/2 dst.
L = Panjang Antar Patok, sesua kondisi di lapangan ( m )
Va = Volume Badan Jalan yang diurug = hi x L ( m3)
V = Volume TPT = Ar x L ( m3)
ANALISA HARGA SATUAN PEKERJAAN VOLUME PEKERJAAN
SNI DT-91-0007-2007 ba = 0.3 Plesetaran 1:4
1 Pasangan Batubelah 1 : 4, per m3 Satuan Volume Harga Satuan Kebutuhan Harga / m³ 4.80 M³
Batu belah, 15-20 cm 1.200 m3 4.80 165,000.00 5.76 198,000.00
Semen 3.260 Zak 4.80 80,000.00 15.65 260,800.00
Pasir Pasang 0.520 m3 4.80 250,000.00 2.50 130,000.00
Pekerja 1.500 HOK 4.80 75,000.00 7.20 112,500.00 Pas. Batu belah 1:4 h1 =
Tukang 0.600 HOK 4.80 90,000.00 2.88 54,000.00
Kepala Tukang 0.060 HOK 4.80 100,000.00 0.29 6,000.00
Mandor 0.075 HOK 4.80 100,000.00 0.36 7,500.00
768,800.00 ht
SNI DT-91-0010-2007
2 Plesteran 1:4, t= 15mm, per m2 Satuan Volume Harga Satuan Kebutuhan Harga / m³
Semen 0.125 sak 12.00 80,000.00 1.50 10,000.00
Pasir Pasang 0.024 m3 12.00 250,000.00 0.29 6,000.00 h2 = 0.3
Pekerja 0.2 HOK 12.00 75,000.00 2.40 15,000.00 12.00 M²
Tukang 0.15 HOK 12.00 90,000.00 1.80 13,500.00
Kepala Tukang 0.015 HOK 12.00 100,000.00 0.18 1,500.00
Mandor 0.01 HOK 12.00 100,000.00 0.12 1,000.00 bb= 0.5
47,000.00
SNI 2010 DIY Panjang = 6.00 M
3 Pengecatan Satuan Volume Harga Satuan Kebutuhan Harga / m³ 1.80 M² Lebar Plesteran = ba+0.5 = 2.0 M
Cat genteng 0.30 Kg 1.80 150,000.00 0.54 45,000.00 F = Panjang x lebar = 12.00 M²
Pekerja 0.05 HOK 1.80 75,000.00 0.09 3,750.00
Tukang 0.075 HOK 1.80 100,000.00 0.14 7,500.00 Lebar Pengecatan = ba = 0.3 M
20,850.00 F = Panjang x lebar = 1.80 M²

4 Menggali 1m3 tanah Satuan Volume Harga Satuan Kebutuhan Harga / m³ 0.90 M³ Panjang (Pj)= 6.00
Pekerja 0.75 HOK 0.90 75,000.00 0.68 56,300.00 Lebar (L) = 0.5
Tinggi (t)= 0.3
Volume (V)= 0.90 M³
KEBUTUHAN BAHAN & HOK

1 Semen 17.15 = 17 Zak


2 Batu belah 5.76 = 6.00 M³
3 Cat genteng 0.54 = 1.00 Kg
4 Pasir Pasang 2.78 = 3.00 M³
5 Pekerja 10.37 = 10 HOK
6 Tukang 4.82 = 5 HOK
7 Kepala Tukang 0.47 = 1 HOK
8 Mandor 0.48 = - HOK
UU Desa

RENCANA ANGGARAN BIAYA ( RAB ) TPT


Propinsi : Banten No. RAB : 04.3
Kabupaten : Serang Jenis Kegiatan : TPT
Kecamatan : Waringin Kurung Ukuran : 6M x 2M
Desa : Melati Lokasi : Kp. Cakar 2

Volume
URAIAN Satuan Harga Satuan Jumlah Jumlah Dana Desa Rp.
Dari Dari Dana Rp. Swadaya Rp.
Total Swadaya Desa

I. BAHAN
1.1. Batubelah 6.00 0.00 6.00 M³ 190,000.00 0.00 1,140,000
1.2. Pasir Pasang 3.00 0.00 3.00 M³ 215,000.00 0.00 645,000
1.3. Semen 17.00 0.00 17.00 Sak 63,000.00 0.00 1,071,000
1.4. Cat genteng 1.00 0.00 1.00 Kg 150,000.00 0.00 150,000
Sub Total 1) 0.00 3,006,000
II. ALAT
2.1. Prasasti 1.00 0.00 1.00 Buah 500,000.00 0.00 500,000
2.2. Papan Proyek 1.00 0.00 1.00 Buah 150,000.00 0.00 150,000
2.3. Cangkul - 0.00 - Buah 70,000.00 0.00 0
2.4. Sekop - 0.00 - Buah 70,000.00 0.00 0
2.5. Pengki - 0.00 - Buah 17,000.00 0.00 0
2.6. Ember - 0.00 - Buah 15,000.00 0.00 0
2.7. Palu pemecah Batu 1.00 0.00 1.00 Buah 150,000.00 0.00 150,000
2.8. Benang 2.00 0.00 2.00 Rol 12,000.00 0.00 24,000
2.9. Meteran 5 M - 0.00 - Buah 20,000.00 0.00 0
Sub Total 2) 0.00 824,000
III. UPAH
3.1. Pekerja 10.00 0.00 10.00 HOK 100,000.00 0.00 1,000,000
3.2. Tukang 5.00 0.00 5.00 HOK 120,000.00 0.00 600,000
3.3. Mandor 1.00 0.00 1.00 HOK 125,000.00 0.00 125,000
Sub Total 3) 0.00 1,725,000
IV. HONOR TPK
4.1. Ketua 1.00 0.00 1.00 Ls 500,000.00 0.00 500,000
4.2. Sekretaris 1.00 0.00 1.00 Ls 350,000.00 0.00 350,000
4.3. Anggota 1.00 0.00 1.00 Ls 200,000.00 0.00 200,000
Sub Total 4) 0.00 1,050,000
Jumlah 6,605,000
V. JASA KONSULTAN
5.1. Perencanaan ( 1.5% ) 1.00 0.00 1.00 Ls 99,000.00 0.00 99,000

Sub Total 5) 0.00 99,000


SUMBER DANA : DD Total Biaya 6,704,000

Kemuning, Desember 2018


Disetujui / Mengesahkan Pelaksana Kegiatan
Kepala Desa FT Kecamatan Ketua TPK

( Halusi ) ( ……………........ )