Tenaga Terampil
- QA/QC 1 -
- QC 1 -
- HSE Manager 1 -
- Welder 6 -
Total 13 -
DAFTAR PERALATAN DAN PENGALAMAN KERJA TERLAMPIR
DAFTAR PERALATAN DAN PENGALAMAN KERJA
PT. CITRA PANJI MANUNGGAL
DAFTAR PERALATAN
NO. NAMA ALAT MEREK/TIPE JUMLAH TAHUN KONDISI STATUS
PEMBUATAN ALAT KEPEMILIKAN
1 Crane Crane Grove 18 T 1 1984 Baik Milik sendiri
2 Pipe Layer Cat pipe layer, 35 19873-2012 Baik Milik sendiri
kapasitas 20-40 Ton
3 Vacum Lift 8 Ton SP 10000 2 1995 Baik Milik sendiri
4 Wheel Loader CAT 966C 1 1985 Baik Milik sendiri
5 CAT Excavator CAT 320D 3 1984-2004 Baik Milik sendiri
(SWAMP BUGGY)
6 Link Belt EXC LS 2650 1 1991 Baik Milik sendiri
(SWAMP BUGGY)
7 Cooper Heat 2000 RP 12-H 1 1992 Baik Milik sendiri
Treatment Machine
8 CLEMCO Portable CLEMCO 2452 3 2006 Baik Milik sendiri
Pressure
9 Internal Pncumatic 3018 A5, PROLINE, 13 2006 Baik Milik sendiri
Line Up Clamp 640
10 IPCO MANDREL PWM 24-28-02 1 1994 Baik Milik sendiri
11 SUPERIOR HYD HWM 32 1 2005 Baik Milik sendiri
WEDGE MANDREL
12 NEW SABRE 16”- 3046 A1 1 1994 Baik Milik sendiri
18”POWERED
INTERNAL
13 Volvo Treler FL1064R 4 1996 Baik Milik sendiri
14 Caterpillar Twin Arch D6D 2 1996 Baik Milik sendiri
15 WATCH Portable 02-000-03 2 1995 Baik Milik sendiri
Cutting Pipe
DAFTAR PENGALAMAN
NO. NAMA PROYEK LINGKUP LOKASI PERIODE PELANGGAN CAPAIAN
/LINGKUP PEKERJAAN TKDN
PEKERJAAN
1 Pembangunan Pipa Engineering, Arun, 20 Mei PT. Pertamina -
Transmisi Gas dari procurement 14 Provinsi 2013 s/d Gas
Arun, Aceh – Belawan set LBCV dan Aceh- 12 Agust
SUMUT lainnya (pipa Belawan 2014
disediakan oleh Sumatera
PERTAGAS) Utara
and
Constraction for
24’ -340 km
onshore buried
Gas Pipeline
2 EPC Contract for Engineering, S. Kenawang Maret JOB Pertamina -
Sales Gas Pipeline procurement & (SKN)-Gresik 2013 s/d Talisman
SKKN-Gresik Constraction for Mei 2015
16’-26 km
onshore Buried
Gas Pipeline
3 Engineering, (EPCC) of Pray Pulo Penang Oktober PT. Petronas -
Procurement, II Lateral Gas – Malaysia 2013 s/d
Constraction and Pipeline project Nop 2015
Commisioning
4 Jasa perancangan EPC for 12’ – Medan, Nort Juni 2014 PT. Pertamina -
pengadaan & 126 km & 16’ - Sumatera s/d Juni Gas
konstruksi jalur pipa 12.5 km 2014
Belawang KIM-KEK
5 EPC-2 Oil Constraction of Mudi, Cepu Des 2012 PT. IKPT, Kelsri -
Transfortation onshor Gas to palang s/d Juni jo/Mobile Cepu
onshore pipeline Pipeline w/pu Tuban Jawa 2014 Ltd (MCL)
Thermal Timur
Insulation and
3LPE
EXTERNAL
Coating
NO. NAMA PROYEK LINGKUP LOKASI PERIODE PELANGGAN CAPAIAN
/LINGKUP PEKERJAAN TKDN
PEKERJAAN
6 Constraction for Detail Randu, Feb 2012 PT. Sumber -
Supply Gas for Engineering & Biatung to s/d Juni Petrindo Perkasa
Tambak Lorok Power Construction for Semarang, 2014
Plant Gas Receiving Central Java
and Booster
Gas
Compression
Station at
Randu Blatung,
Gas Receifer at
Tambak Lorok
and 20”-130 km
Onshor pipeline
7 LNG Regesification Constraction of Malaka, Juni 2011 Algotech SDH -
Project Lekas-2 Onshor Pipeline Malaysia s/d feb BHD Petronas
2014 Gas BHD
8 LTRO Gasa 12”X52 km Gas Sungai Lilin, 2011 s/d Conoco Philips -
Development Project Pipeline Project South 2012 (S. Sumatera)
Sumatera Ltd