JUMLAH
No. URAIAN
(Rp.)
I. BIAYA LANGSUNG PERSONIL
A. TENAGA AHLI 22,518,833.33
B. TENAGA TEKNIK 10,673,666.67
C. TENAGA PENDUKUNG 8,330,666.67
II. BIAYA LANGSUNG NON PERSONIL
A. AKOMODASI & TRANSPORTASI 6,950,000.00
B. BIAYA SEWA PERALATAN 380,000.00
C. BIAYA ADMINISTRASI, DOKUMENTASI DAN PELAPORAN 1,780,000.00
III. JUMLAH 50,633,166.67
IV. PPN (10% x III) 5,063,316.67
V. JUMLAH TOTAL 55,696,483.33
DIBULATKAN 55,690,000.00
Terbilang : Lima puluh lima juta enam ratus sembilan puluh ribu rupiah
I. BIAYA PERSONIL
Jumah Jumlah
No. Uraian Orang Hari Org/Bln Harga Satuan Jumlah Biaya
( Rp.) ( Rp.)
Kerja ( M/M )
A. TENAGA AHLI
1 Team Leader (S1 Teknik Sipil) 1.00 55.00 1.83 6,319,000.00 11,584,833.33
2 Tenaga Ahli Jalan/ (S1 Teknik Sipil) 1.00 55.00 1.83 5,964,000.00 10,934,000.00
Jumlah 22,518,833.33
B. TENAGA TEKNIK
1 Inspector 1.00 55.00 1.83 2,840,000.00 5,206,666.67
2 Chief Inspector 1.00 55.00 1.83 2,982,000.00 5,467,000.00
Jumlah 10,673,666.67
c. TENAGA PENDUKUNG
1 Operator Komputer 1.00 55.00 1.83 2,272,000.00 4,165,333.33
2 Administrator 1.00 55.00 1.83 2,272,000.00 4,165,333.33
Jumlah 8,330,666.67
Jumlah I ( A + B + C )