PEKERJAAN TANAH
9 1 m' Galian tanah pondasi strous Pembulatan Rp 146.500,00
10 1 m³ Galian tanah BIASA sedalam 1 m (RSNI : 3.7) Pembulatan Rp 82.600,00
11 1 m³ Galian tanah BIASA sedalam 2 m (RSNI : 3.7) Pembulatan Rp 101.100,00
12 1 m' Galian bor strouss Pembulatan Rp 146.500,00
13 1 m³ Urugan PASIR (RSNI : 4.7) Lt. 1 = Koef Upah Kerja X 1,000 Rp 58.723,00
Lt. 2 = Koef Upah Kerja X 1,090 Rp 61.696,87
Lt. 3 = Koef Upah Kerja X 1,120 Rp 62.688,16
21 1 m² Pasangan bata merah tbl 1/2 bata, 1pc:4ps (RSNI:5.11) Lt. 1 = Koef Upah Kerja X 1,000 Rp 130.458,70
Lt. 2 = Koef Upah Kerja X 1,090 Rp 134.695,50
Lt. 3 = Koef Upah Kerja X 1,120 Rp 136.107,76
22 1 m² Pasangan bata merah tbl 1/2 bata, 1pc:6ps (RSNI:6.11) Lt. 1 = Koef Upah Kerja X 1,000 Rp 127.581,10
Lt. 2 = Koef Upah Kerja X 1,090 Rp 131.817,90
Lt. 3 = Koef Upah Kerja X 1,120 Rp 133.230,16
23 1 m² Plesteran dinding 1pc:4ps, tbl 15 mm (RSNI:4.11) Lt. 1 = Koef Upah Kerja X 1,000 Rp 57.555,60
Lt. 2 = Koef Upah Kerja X 1,090 Rp 61.382,58
Lt. 3 = Koef Upah Kerja X 1,120 Rp 62.658,24
24 1 m² Plesteran dinding 1pc:6ps, tbl 15 mm (RSNI:7.11) Lt. 1 = Koef Upah Kerja X 1,000 Rp 55.789,20
Lt. 2 = Koef Upah Kerja X 1,090 Rp 59.616,18
Lt. 3 = Koef Upah Kerja X 1,120 Rp 60.891,84
25 1 m² Finishing dinding / Acian (RSNI : 9.11) Lt. 1 = Koef Upah Kerja X 1,000 Rp 34.837,40
Lt. 2 = Koef Upah Kerja X 1,090 Rp 37.563,27
Lt. 3 = Koef Upah Kerja X 1,120 Rp 38.471,89
PEKERJAAN BETON
Spesi Beton :
29 1 m³ Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87 (RSNI:4.16) Pembulatan Rp 682.600,00
30 1 m³ Membuat beton mutu f'c = 7,4 Mpa (K.100), slump (12±2) cm, w/c = 0,87 (RSNI:3.16) Pembulatan Rp 761.700,00
31 1 m³ Membuat beton mutu f'c = 14,5 Mpa (K.175), slump (12±2) cm, w/c =Lt.0,66
1 = (RSNI:4.16)
Koef Upah Kerja X 1,000 Rp 875.776,23
Lt. 2 = Koef Upah Kerja X 1,090 Rp 895.782,62
Lt. 3 = Koef Upah Kerja X 1,120 Rp 902.451,42
32 1 m³ Membuat beton mutu f'c = 21,7 Mpa (K.250), slump (12±2) cm, Lt. 1 = Koef Upah Kerja X 1,000 Rp 957.568,08
w/c = 0,56 (RSNI:5.16) Lt. 2 = Koef Upah Kerja X 1,090 Rp 977.574,47
Lt. 3 = Koef Upah Kerja X 1,120 Rp 984.243,27
33 1 m³ Membuat beton mutu f'c = 24,0 Mpa (K.275), slump (12±2) cm, Lt. 1 = Koef Upah Kerja X 1,000 Rp 985.906,33
w/c = 0,53 (RSNI:5.16) Lt. 2 = Koef Upah Kerja X 1,090 Rp 1.005.912,71
Lt. 3 = Koef Upah Kerja X 1,120 Rp 1.012.581,51
Pembesian :
34 1 kg Pembesian polos (RSNI:7.16) Lt. 1 = Koef Upah Kerja X 1,000 Rp 16.809,84
Lt. 2 = Koef Upah Kerja X 1,090 Rp 16.965,44
Lt. 3 = Koef Upah Kerja X 1,120 Rp 17.017,30
36 1 kg Pembesian jaring kawat baja / Wire mesh (RSNI:7.16) Lt. 1 = Koef Upah Kerja X 1,000 Rp 25.829,83
Lt. 2 = Koef Upah Kerja X 1,090 Rp 25.912,34
Lt. 3 = Koef Upah Kerja X 1,120 Rp 25.939,85
37 1 kg Pembesian baja profil + cat Zincromate Lt. 1 = Koef Upah Kerja X 1,000 Rp 49.099,46
Membuat Begisting :
38 1 m² Pasang begisting PONDASI, 1x pakai (RSNI:7.16) Jumlah Rp 471.541,40
39 1 m² Pasang begisting SLOOF, 2x pakai (RSNI:8.16) 1,00 Rp 306.797,65
40 1 m² Pasang begisting KOLOM, 2x pakai (RSNI:8.16) Lt. 1 = Koef Upah Kerja X 1,000 Rp 435.986,45
Lt. 2 = Koef Upah Kerja X 1,090 Rp 446.630,63
Lt. 3 = Koef Upah Kerja X 1,120 Rp 450.178,69
41 1 m² Pasang begisting BALOK, 2x pakai (RSNI:8.16) Lt. 1 = Koef Upah Kerja X 1,000 Rp 441.451,25
Lt. 2 = Koef Upah Kerja X 1,090 Rp 452.095,43
Lt. 3 = Koef Upah Kerja X 1,120 Rp 455.643,49
43 1 m² Pasang begisting PLAT LANTAI, 2x pakai (RSNI:9.16) Lt. 1 = Koef Upah Kerja X 1,00 Rp 634.278,95
Lt. 2 = Koef Upah Kerja X 1,09 Rp 644.923,13
Lt. 3 = Koef Upah Kerja X 1,12 Rp 648.471,19
44 1 m² Pasang begisting TANGGA, 2x pakai (RSNI:9.16) Lt. 1 = Koef Upah Kerja X 1,00 Rp 388.358,95
Lt. 2 = Koef Upah Kerja X 1,09 Rp 399.003,13
Lt. 3 = Koef Upah Kerja X 1,12 Rp 402.551,19
45 1 m² Pasang begisting DINDING, 2x pakai (RSNI : 9.16) Lt. 1 = Koef Upah Kerja X 1,00 Rp 447.455,08
Lt. 2 = Koef Upah Kerja X 1,09 Rp 458.099,26
Lt. 3 = Koef Upah Kerja X 1,12 Rp 461.647,32
51 1 m³ Beton KOLOM PRAKTIS 15/15 cm, mutu K.175 Jumlah Lt.1 Rp 7.347.400,00
Jumlah Lt.2 Rp 7.471.300,00
52 1 m³ Beton BALOK INDUK 30/50 cm, mutu K.250 Jumlah Lt.1 Rp 7.247.300,00
Jumlah Lt.2 Rp 7.346.300,00
53 1 m³ Beton BALOK ATAP (1) 30/50 cm, mutu K.250 Jumlah Lt.1 Rp 7.247.300,00
Jumlah Lt.2 Rp 7.346.300,00
55 1 m³ Beton BALOK KONSOL LANTAI 30/30 - 30/50 cm, mutu K.250 Jumlah Lt.1 Rp 7.789.400,00
Jumlah Lt.2 Rp 7.893.200,00
56 1 m³ Beton BALOK KONSOL ATAP 30/30 - 30/50 cm, mutu K.250 Jumlah Lt.1 Rp 7.789.400,00
Jumlah Lt.2 Rp 7.893.200,00
57 1 m³ Beton RING BALK & GEWEL 15/20 cm (BR.2), mutu K.175 Jumlah Lt.1 Rp 6.657.800,00
Jumlah Lt.2 Rp 6.775.100,00
58 1 m³ Beton BALOK LEUFEL 15/30 cm, mutu K.175 Jumlah Lt.1 Rp 7.167.600,00
Jumlah Lt.2 Rp 7.293.200,00
59 1 m³ Beton BALOK LATEI 15/20 cm, mutu K.175 Jumlah Lt.1 Rp 7.761.500,00
Jumlah Lt.2 Rp 7.905.300,00
60 1 m³ Beton PLAT LANTAI DASAR Tbl 10 cm, mutu K.250 (Tul. Wire Mesh_Tunggal) Pembulatan Rp 2.644.100,00
61 1 m³ Beton PLAT LANTAI Tbl 12 cm, mutu K.250 (Tul. Konvensional_Tump-Lap) Jumlah Lt.1 Rp 6.558.400,00
Jumlah Lt.2 Rp 6.654.100,00
62 1 m³ Beton PLAT ATAP Tbl 12 cm, mutu K.250 (Tul. Konvensional_Tump-Lap) Jumlah Lt.1 Rp 6.558.400,00
Jumlah Lt.2 Rp 6.654.100,00
63 1 m³ Beton PLAT CANOPI tbl 10 cm, mutu K.175 (Tul. Tunggal) Jumlah Lt.1 Rp 5.380.800,00
Jumlah Lt.2 Rp 5.467.900,00
PEKERJAAN PENGECATAN
1 m² Pengecatan dinding / plafond BARU (1 lapis plamir, 1 lapis cat
66 Lt. 1 = Koef Upah Kerja X 1,000 Rp 21.403,83
dasar, 2 lapis), (SNI:9.14)
Lt. 2 = Koef Upah Kerja X 1,090 Rp 22.381,93
Lt. 3 = Koef Upah Kerja X 1,120 Rp 22.707,97
1 m² Pengecatan kayu BARU (1 lap plamir, 1 lap cat dasar, 2 lap cat
68 Lt. 1 = Koef Upah Kerja X 1,000 Rp 64.074,75
penutup) (SNI:7.14)
Lt. 2 = Koef Upah Kerja X 1,090 Rp 64.941,16
No JENIS PEKERJAAN HARGA SATUAN
Lt. 3 = Koef Upah Kerja X 1,120 Rp 65.229,96
69 1 m² Pengecatan besi (1 lap meni, 1 lap cat dasar, 2 lap cat penutup) Lt. 1 = Koef Upah Kerja X 1,000 Rp 39.856,75
Lt. 2 = Koef Upah Kerja X 1,090 Rp 40.723,16
Lt. 3 = Koef Upah Kerja X 1,120 Rp 41.011,96
72 1 Titik Pasang saklar tunggal, setara merk Panasonic Lt. 1 = Koef Upah Kerja X 1,00 Rp 257.913,00
Lt. 2 = Koef Upah Kerja X 1,09 Rp 263.854,17
Lt. 3 = Koef Upah Kerja X 1,12 Rp 265.834,56
73 1 Titik Pasang saklar ganda, setara merk Panasonic Lt. 1 = Koef Upah Kerja X 1,00 Rp 255.213,00
Lt. 2 = Koef Upah Kerja X 1,09 Rp 261.154,17
Lt. 3 = Koef Upah Kerja X 1,12 Rp 263.134,56
PEKERJAAN SANITAIR
74 1 m' Pasang pipa air Galvanis Ø 4" Lt. 1 = Koef Upah Kerja X 1,00 Rp 721.204,44
Lt. 2 = Koef Upah Kerja X 1,09 Rp 725.276,89
Lt. 3 = Koef Upah Kerja X 1,12 Rp 726.634,37