Anda di halaman 1dari 8

Lampiran : 9.8.

2
No. Dok. : WIKA-K0-05-IK-001
No. Rev. : 00

LEMBAR DISTRIBUSI GAMBAR SALINAN TERKENDALI


INTERNAL WIKA

PT. WIJAYA KARYA Tanggal 24 Maret 2021


DEPARTEMEN SIPIL UMUM 3
Proyek Pembangunan Jalan
Seksi 2, Seksi 3, dan Seksi 4
Alamat :Perumahan Balikpapan Baru Dikirim oleh PPD Teknik 2.1
Cluster Mediterania Blok T3 Nomor 20, Balikpapan

PT. WIJAYA KARYA


Pekerjaan lanjutan pembangunan Bendungan pengendali
( BENDALI ) Banjir III gunung bahagia kota balikpapan DISTRIBUSI KEPADA :

Nama
Unit Kerja Pelaksana
Diterima Tanggal 24 Maret 2021

Tanda Tangan

Jumlah Salinan 1 Rangkap

DOKUMEN

No. Nomor Dokumen Judul Dokumen Revisi Keterangan

1 Layout Rest Area B DED

2 WIKA-SD-TBS-RAB-007-00 Plan Profil Ramp Off Rest Area B Kilometer 26 00

WIKA-SD-TBS-RAB-007A-00 s.d WIKA-SD-TBS- Cross Section Ramp Off Rest Area B STA 0+000 s.d.
3 RAB-007E-00
00
0+198.66
4 WIKA-SD-TBS-RAB-008-00 Plan Profil Ramp On Rest Area B Kilometer 26 00
WIKA-SD-TBS-RAB-008A-00 s.d WIKA-SD-TBS- Cross Section Ramp Off Rest Area B STA 0+000 s.d.
5 RAB-008E-00
00
0+185.062
6 Elevasi Rest Area B DED

7 Potongan dan Detail Rest Area B KM 26 DED

8 Plan Drainase Rest Area B KM 26 DED

9 Pembesian Drainase Rest Area B DED

10 Pembesian Bak Kontrol Rest Area B DED

11

12

13

14

15

* Setelah ditanda tangan harap lembar ini

PT. WIJAYA KARYA


Pekerjaan lanjutan pembangunan Bendungan pengendali
( BENDALI ) Banjir III gunung bahagia kota balikpapan
Lampiran : 9.8.2
No. Dok. : WIKA-K0-05-IK-001
No. Rev. : 00

LEMBAR DISTRIBUSI GAMBAR SALINAN TERKENDALI


INTERNAL WIKA

PT. WIJAYA KARYA


DEPARTEMEN SIPIL UMUM 3 Tanggal 24 Maret 2021
Proyek Pembangunan Jalan
Seksi 2, Seksi 3, dan Seksi 4
Alamat :Perumahan Balikpapan Baru
Cluster Mediterania Blok T3 Nomor 20, Balikpapan Dikirim oleh : PPD Teknik 2.1

DISTRIBUSI KEPADA :

Penerima 1 Penerima 2 Penerima 3 Penerima 4 Penerima 5 Penerima 6 Penerima 7 Penerima 8


Nama Hari Purnama Mayidin Jatmiko Niam Affandi Marbono W.D. Gamar A.G.S. Edwin Agus Prawoto
Unit Kerja MK Pelut Pelut Pelut Pelut Pelut Pelaksana Pelaksana
Diterima Tanggal

Tanda Tangan

Jumlah Salinan Rangkap 1 Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap

Penerima 9 Penerima 10 Penerima 11 Penerima 12 Penerima 13 Penerima 14 Penerima 15 Penerima 16


Nama Dirin Fikri Agus P. Alan Maulana Hanafi Putut Eko Marni
Unit Kerja Pelaksana Scheduler Pelaksana Pelaksana Pelaksana Pelaksana Pelaksana
Diterima Tanggal

Tanda Tangan

Jumlah Salinan 1 Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap

Penerima 17 Penerima 18 Penerima 19 Penerima 20 Penerima 21 Penerima 22 Penerima 23 Penerima 24


Nama Saepul Sujono Fery Burhamzah Doni R Arief Putut Dwi
Unit Kerja Pel. Pembesian Surveyor Pelaksana Surveyor Surveyor QC QS Komersial
Diterima Tanggal

Tanda Tangan

Jumlah Salinan Rangkap 1 Rangkap Rangkap Rangkap Rangkap 1 Rangkap Rangkap 1 Rangkap

DOKUMEN

No. Nomor Dokumen Judul Dokumen Revisi KET

1 Penulangan Pilecap, Kolom, Balok Kanopi Masjid Rest Area B 00

2 Penulangan Balok Portal A - A & F - F 00

10

11

12

13

14

15

* Setelah ditanda tangan harap lembar ini


dikembalikan kepada pusat pengendalian dokumen.
Lampiran : 9.8.2
No. Dok. : WIKA-K0-05-IK-001
No. Rev. : 00

LEMBAR DISTRIBUSI MATERIAL APPROVAL SALINAN TERKENDALI


INTERNAL WIKA

PT. WIJAYA KARYA


Tanggal 24 Maret 2021
DEPARTEMEN SIPIL UMUM 3
Proyek Pembangunan Jalan
Seksi 2, Seksi 3, dan Seksi 4
Alamat :Perumahan Balikpapan Baru
Cluster Mediterania Blok T3 Nomor 20, Balikpapan Dikirim oleh : PPD Teknik 2.1

DISTRIBUSI KEPADA :

Penerima 1 Penerima 2 Penerima 3 Penerima 4 Penerima 5 Penerima 6 Penerima 7 Penerima 8


Nama Hari Purnama Mayidin Jatmiko Niam Affandi Marbono W.D. Gamar A.G.S. Edwin Agus Prawoto
Unit Kerja MK Pelut Pelut Pelut Pelut Pelut Pelaksana Pelaksana
Diterima Tanggal

Tanda Tangan

Jumlah Salinan Rangkap Rangkap 1 Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap

Penerima 9 Penerima 10 Penerima 11 Penerima 12 Penerima 13 Penerima 14 Penerima 15 Penerima 16


Nama Dirin Fikri Agus P. Alan Maulana Hanafi Putut Eko Marni
Unit Kerja Pelaksana Scheduler Pelaksana Pelaksana Pelaksana Pelaksana Pelaksana
Diterima Tanggal

Tanda Tangan

Jumlah Salinan Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap

Penerima 17 Penerima 18 Penerima 19 Penerima 20 Penerima 21 Penerima 22 Penerima 23 Penerima 24


Nama Saepul Sujono Fery Burhamzah Doni R Arief Putut Dwi
Unit Kerja Pel. Pembesian Surveyor Pelaksana Surveyor Surveyor QC QS Komersial
Diterima Tanggal

Tanda Tangan

Jumlah Salinan Rangkap Rangkap Rangkap Rangkap Rangkap 1 Rangkap Rangkap Rangkap

DOKUMEN

No. Nomor Dokumen Judul Dokumen Revisi KET

1 Plafond

2 Daun Pintu Kayu Solid Engner

3 Sanitary Type American Standart

4 Kusen Pintu dan Jendela (Mati dan Geser)

5 Keramik 60x60 cm

6 Electrical

Keramik Lantai 30x30 Roman Permukaan Halus, Keramik Lantai 30x30


7 Roman Permukaan Kasar, Keramik Lantai Parkit Motif kayu, Keramik 60x60
Lantai Border Gelap Granito, Keramik Lantai Dinding 30x60 Roman

10

11

12

13

14

15

* Setelah ditanda tangan harap lembar ini


dikembalikan kepada pusat pengendalian dokumen.
08. Seksi 2.1 - Penulangan Pulau Tol Gerbang Tol Samboja
09. Seksi 2.1 - Penulangan Bullnose dan Bumper Block Gerbang Tol Samboja
10. Seksi 2.1 - Penulangan Proteksi Pipa Mekanikal Electrikal Gerbang Tol Samboja
Seksi 2.1 - (Rev 01) Layout, Detail Bullnose dan Bumperblock Gerbang Tol samboja
Seksi 2.1 - ACP dan Ornamen Gerbang Tol Samboja
Seksi 2.1 - Drainase Gerbang Tol Samboja
Seksi 2.1 - Letter Gerbang Tol Samboja
Seksi 2.1 - Pembesian PHT & Rangka Baja Gerbang Tol Samboja (6 Pintu)
4 Seksi 2.1 - Pondasi & Pedestal Gerbang Tol Samboja (6 Pintu)
2 Seksi 2.1 - Pulau Gerbang Tol Samboja (6 Pintu)
Seksi 2.1 - Rangka Atap Gerbang Tol Samboja
5 Seksi 2.1 - Rev (01) - Pilecap dan Sloof Gerbang Tol Samboja
3 Seksi 2.1 - Rev (01) Koordinat Pondasi dan Island Gerbang Tol Samboja
Seksi 2.1 - Rev (01) Mekanikal Electrikal Gerbang Tol Samboja
Seksi 2.1 - Rev (01) Pembesian Proteksi Pipa ME Gerbang Tol Samboja
Seksi 2.1 - Rev (01) Penulangan Pulau Gerbang Tol Samboja
Tahap 2
1 Seksi 2.1 - Situasi Gerbang Tol Samboja (6 Pintu)
Kantor
Wilayah
(Operasio
nal Tol)
Samboja
(Denah,
Tampak,
dan Detail
Tahap 1 Kantor Wilayah (Operasional Tol) Samboja (Layout, Koordinat dan Cross Section)
Fondasi, 1
Slab,
Kolom
dan
WIKA-SD-TBS-KTR1-01Balok)
Tahap 3 Kantor Wilayah (Operasional Tol) Samboja (Penulangan Fondasi, Slab, dan Kolom) Tanpa Balok

V Seksi 2.1 - (Rev 01) Layout, Detail Bullnose dan Bumperblock Gerbang Tol samboja 22.739 58.62 0.5862 22.1528
V Seksi 2.1 - Rev (01) Koordinat Pondasi dan Island Gerbang Tol Samboja 22.739 142.63 1.4263 21.3127
V Seksi 2.1 - Pondasi & Pedestal Gerbang Tol Samboja (6 Pintu) 22.739 193.81 1.9381 20.8009
Seksi 2.1 - Rev (01) - Pilecap dan Sloof Gerbang Tol Samboja 22.739 213.81 2.1381 20.6009
V Seksi 2.1 - Rev (01) Penulangan Pulau Gerbang Tol Samboja 22.739 89.01 0.8901 21.8489
V Seksi 2.1 - Pembesian PHT & Rangka Baja Gerbang Tol Samboja (6 Pintu) 22.739 173.03 1.7303 21.0087
Seksi 2.1 - Rangka Atap Gerbang Tol Samboja 22.739 223.76 2.2376 20.5014
Seksi 2.1 - Rev (01) Mekanikal Electrikal Gerbang Tol Samboja 22.739 23.4 0.234 22.505
Seksi 2.1 - Rev (01) Pembesian Proteksi Pipa ME Gerbang Tol Samboja
Seksi 2.1 - ACP dan Ornamen Gerbang Tol Samboja
Seksi 2.1 - Letter Gerbang Tol Samboja 0.84
Seksi 2.1 - Drainase Gerbang Tol Samboja

dpt ss samboja
No. X Y
at point X=498844.4154 Y=9890216.7763 Z= 0.0000 1 498844.415 9890216.776
at point X=498848.3599 Y=9890213.0370 Z= 0.0000 2 498848.359 9890213.037
at point X=498850.6284 Y=9890208.0978 Z= 0.0000 3 498850.628 9890208.097
at point X=498850.8948 Y=9890202.6690 Z= 0.0000 4 498850.894 9890202.669
at point X=498849.1206 Y=9890197.5315 Z= 0.0000 5 498849.120 9890197.531
at point X=498845.5610 Y=9890193.4240 Z= 0.0000 6 498845.561 9890193.424
at point X=498832.2974 Y=9890178.7177 Z= 0.0000 7 498832.297 9890178.717
at point X=498829.7262 Y=9890173.7412 Z= 0.0000 8 498829.726 9890173.741
at point X=498825.7484 Y=9890169.7976 Z= 0.0000 9 498825.748 9890169.797
at point X=498820.7500 Y=9890167.2693 Z= 0.0000 10 498820.750 9890167.269
at point X=498815.2162 Y=9890166.4020 Z= 0.0000 11 498815.216 9890166.402
at point X=498809.6840 Y=9890167.2797 Z= 0.0000 12 498809.684 9890167.279
at point X=498932.4305 Y=9890181.8669 Z= 0.0000 13 498932.430 9890181.866
at point X=498929.3646 Y=9890181.9057 Z= 0.0000 14 498929.364 9890181.905
at point X=498925.3544 Y=9890181.4770 Z= 0.0000 15 498925.354 9890181.477 11.7 18.155 6.887 2 9.119 9.13 8.913 9.211 15.263 1.56 7.198 3.177 3.124 8.255 6.828 7.237 3.643 6.457 1.604 6.134 2.896 4.484 1.82 4.174
at point X=498921.4389 Y=9890180.5107 Z= 0.0000 16 498921.438 9890180.510 0.357 0.307 0.599 1 1.099 6.09 0.307 0.679 0.915 1.178 0.231 0.266 0.476 0.411 0.377 0.952 0.244 5.247 1.982 6.19 4.125 5.354 2.08 5.96
at point X=498917.6897 Y=9890179.0246 Z= 0.0000 17 498917.689 9890179.024 0.030513 0.01691 0.086975 0.5 0.120518 0.667032 0.034444 0.073716 0.059949 0.755128 0.032092 0.083727 0.152369 0.049788 0.055214 0.131546 0.066978 0.812606 1.235661 1.009129 1.424378 1.194023 1.142857 1.427887
at point X=498914.1755 Y=9890177.0459 Z= 0.0000 18 498914.175 9890177.045
at point X=498910.9606 Y=9890174.6109 Z= 0.0000 19 498910.960 9890174.610
at point X=498904.4249 Y=9890167.2301 Z= 0.0000 20 498904.424 9890167.230 7 6.248
at point X=498897.8892 Y=9890159.8493 Z= 0.0000 21 498897.889 9890159.849 0.6 0.952
at point X=498897.8288 Y=9890155.4196 Z= 0.0000 22 498897.828 9890155.419
at point X=498899.0987 Y=9890151.1755 Z= 0.0000 23 498899.098 9890151.175
at point X=498901.5823 Y=9890147.5072 Z= 0.0000 24 498901.582 9890147.507
at point X=498905.0512 Y=9890144.7518 Z= 0.0000 25 498905.051 9890144.751
at point X=498909.1743 Y=9890143.1341 Z= 0.0000 26 498909.174 9890143.134
at point X=498912.0198 Y=9890142.3156 Z= 0.0000 27 498912.019 9890142.315
Lampiran : 9.8.2
No. Dok. : WIKA-K0-05-IK-001
No. Rev. : 00

LEMBAR DISTRIBUSI GAMBAR FOR INFORMATION


INTERNAL WIKA

PT. WIJAYA KARYA Tanggal 24 Maret 2021


DEPARTEMEN SIPIL UMUM 3
Proyek Pembangunan Jalan
Seksi 2, Seksi 3, dan Seksi 4
Alamat :Perumahan Balikpapan Baru Dikirim oleh PPD Teknik 2.1
Cluster Mediterania Blok T3 Nomor 20, Balikpapan

PT. WIJAYA KARYA


Pekerjaan lanjutan pembangunan Bendungan pengendali
( BENDALI ) Banjir III gunung bahagia kota balikpapan DISTRIBUSI KEPADA :

Nama SAEPUL
Unit Kerja
Diterima Tanggal 24 Maret 2021

Tanda Tangan

Jumlah Salinan 1 Rangkap

DOKUMEN

No. Nomor Dokumen Judul Dokumen Revisi Keterangan

1 WIKA-TBS-KTR1-090-01 Siteplan Drainase Kantor Tol Samboja FOR INFO

Detail dan Penulangan Drainase Terbuka dan


2 FOR INFO
Tertutup Rest Area B Kilometer 26

Tampak Bak Kontrol Terbuka dan Tertutup Rest Area


3 FOR INFO
B Kilometer 26
Detail dan Penulangan Bak Kontrol Terbuka dan
4 FOR INFO
Tertutup Rest Area B Kilometer 26

10

11

12

13

14

15

* Setelah ditanda tangan harap lembar ini

PT. WIJAYA KARYA


Pekerjaan lanjutan pembangunan Bendungan pengendali
( BENDALI ) Banjir III gunung bahagia kota balikpapan
Lampiran : 9.8.2
No. Dok. : WIKA-K0-05-IK-001
No. Rev. : 00

LEMBAR DISTRIBUSI GAMBAR FOR INFORMATION


INTERNAL WIKA

PT. WIJAYA KARYA


Tanggal 24 Maret 2021
DEPARTEMEN SIPIL UMUM 3
Proyek Pembangunan Jalan
Seksi 2, Seksi 3, dan Seksi 4
Alamat :Perumahan Balikpapan Baru
Cluster Mediterania Blok T3 Nomor 20, Balikpapan Dikirim oleh : PPD Teknik 2.1

DISTRIBUSI KEPADA :

Penerima 1 Penerima 2 Penerima 3 Penerima 4 Penerima 5 Penerima 6 Penerima 7 Penerima 8


Nama Hari Purnama Mayidin Jatmiko Niam Affandi Marbono W.D. Gamar A.G.S. Edwin Agus Prawoto
Unit Kerja MK Pelut Pelut Pelut Pelut Pelut Pelaksana Pelaksana
Diterima Tanggal

Tanda Tangan

Jumlah Salinan Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap

Penerima 9 Penerima 10 Penerima 11 Penerima 12 Penerima 13 Penerima 14 Penerima 15 Penerima 16


Nama Dirin Fikri Setio Alan Maulana Hanafi Putut Eko
Unit Kerja Pelaksana Scheduler Pelaksana Pelaksana Pelaksana Pelaksana Pelaksana
Diterima Tanggal

Tanda Tangan

Jumlah Salinan Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap

Penerima 17 Penerima 18 Penerima 19 Penerima 20 Penerima 21 Penerima 22 Penerima 23 Penerima 24


Nama Saepul Sujono Iis Burhamzah Doni R Arief Putut Dwi
Unit Kerja Pel. Pembesian Surveyor Surveyor Surveyor Surveyor QC QS Komersial
Diterima Tanggal

Tanda Tangan

Jumlah Salinan Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap Rangkap

DOKUMEN

No. Nomor Dokumen Judul Dokumen Revisi Keterangan

10

11

12

13

14

15

* Setelah ditanda tangan harap lembar ini


dikembalikan kepada pusat pengendalian dokumen.
Lampiran : 9.8.2
No. Dok. : WIKA-K0-05-IK-001
No. Rev. : 00

LEMBAR DISTRIBUSI GAMBAR SALINAN TERKENDALI


EKSTERNAL WIKA

PT. WIJAYA KARYA Tanggal 24 Maret 2021


DEPARTEMEN SIPIL UMUM 3
Proyek Pembangunan Jalan
Seksi 2, Seksi 3, dan Seksi 4
Alamat :Perumahan Balikpapan Baru Dikirim oleh PPD Teknik Seksi 2.1
Cluster Mediterania Blok T3 Nomor 20, Balikpapan

PT. WIJAYA KARYA


Pekerjaan lanjutan pembangunan Bendungan pengendali
( BENDALI ) Banjir III gunung bahagia kota balikpapan DISTRIBUSI KEPADA :

Nama
Unit Kerja PT. Eskapindo Matra KSO

Diterima Tanggal 24 Maret 2021

Tanda Tangan

Jumlah Salinan 1 Salinan

DOKUMEN

No. Nomor Dokumen Judul Dokumen Revisi Keterangan

1 Layout Rest Area B DED

2 WIKA-SD-TBS-RAB-007-00 Plan Profil Ramp Off Rest Area B Kilometer 26 00

WIKA-SD-TBS-RAB-007A-00 s.d WIKA-


3 SD-TBS-RAB-007E-00
Cross Section Ramp Off Rest Area B STA 0+000 s.d. 0+198.66 00

4 WIKA-SD-TBS-RAB-008-00 Plan Profil Ramp On Rest Area B Kilometer 26 00

WIKA-SD-TBS-RAB-008A-00 s.d WIKA-


5 SD-TBS-RAB-008E-00
Cross Section Ramp Off Rest Area B STA 0+000 s.d. 0+185.062 00

6 Elevasi Rest Area B DED

7 Potongan dan Detail Rest Area B KM 26 DED

8 Plan Drainase Rest Area B KM 26 DED

9 Pembesian Drainase Rest Area B DED

10 Pembesian Bak Kontrol Rest Area B DED

11

12

13

* Setelah ditanda tangan harap lembar ini


dikembalikan kepada pusat pengendalian dokumen.

PT. WIJAYA KARYA


Pekerjaan lanjutan pembangunan Bendungan pengendali
( BENDALI ) Banjir III gunung bahagia kota balikpapan
Lampiran : 9.8.2
No. Dok. : WIKA-K0-05-IK-001
No. Rev. : 00

LEMBAR PENARIKAN DOKUMEN GAMBAR


JASA PEMBORONGAN (Design & Build)
PEKERJAAN PEMBANGUNAN JALAN TOL BALIKPAPAN - SAMARINDA
SEKSI 2, SEKSI 3 DAN SEKSI 4

PT. WIJAYA KARYA Tanggal : 24 Maret 2021


DEPARTEMEN SIPIL UMUM 3
Proyek Pembangunan Jalan
Seksi 2, Seksi 3, dan Seksi 4
Alamat :Perumahan Balikpapan Baru Dikirim oleh : PPD Teknik 2.1
Cluster Mediterania Blok T3 Nomor 20, Balikpapan

Ditarik Dari
No Nama Jabatan Unit Kerja Tanggal Tertanda
1 Pelaksana Utama Balsam Seksi 2.1

2 Pelaksana Balsam Seksi 2.1

3 Pelaksana Balsam Seksi 2.1

4 Surveyor Balsam Seksi 2.1

5 Quality Control (QC) Balsam Seksi 2.1

6 Komersial Balsam Seksi 2.1

7 Pelaksana Pembesian Balsam Seksi 2.1

8 Manajer Konstruksi Balsam Seksi 2.1

9 Subkon / Mandor Balsam Seksi 2.1


Tahap 3 Kantor Wilayah (Operasional Tol) Sambo
PENGECUALIAN

Unit Kerja
Uraian Sebab
Atasan Tertanda

DOKUMEN

No No. Dokumen Judul Dokumen Revisi Keterangan


WIKA-SD-TBS-STR1/OP31A-112-00 SD Diganti Gambar Salinan
1 Penulangan Diaphragma, Plat Lantai, dan Parapet 00
WIKA-SD-TBS-STR1/OP31A-137-00 Terkendali

dikembalikan kepada pusat pengendalian dokumen.

Anda mungkin juga menyukai