REKAP OPNAME MANDOR PT.

PRIMA SUKSES BERSAMA

Nama Proyek : Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok Indah Town House
Type : All Unit (10 Unit)
SPK : RE/PS22020032
Kontraktor : PT. PRIMA SUKSES BERSAMA
Periode : 13 Oktober 2022 s/d 22 November 2022

No Description Total Progress Total Pekerjaan Progress Keterangan


Pekerjaan Percentage

1 Unit C-05 Type Standart 4 Lantai isi 34,065,500 122,498,594 27.81%

2 Unit C-07 Type Standart 4 Lantai isi 32,038,500 122,498,600 26.15%

3 Unit C-09 Type Standart 4 Lantai isi 33,777,500 122,498,600 27.57%

4 Unit A-08 Type Sudut 4 Lantai isi 24,686,000 127,403,600 19.38%

5 Unit C-25 Type Standart 4 Bare 38,315,450 44,735,600 85.65% Ada Pekerjaan Tambah

6 Unit C-01 Type Bare 4 Lantai - 44,735,600 0.00%

7 Unit A-06 Type Bare 4 Lantai - 44,735,600 0.00%

8 Unit C-03 Type Bare 4 Lantai - 44,735,600 0.00%

9 Unit C-11 Type Bare 4 Lantai - 44,735,600 0.00%

10 Unit C-23 Type Bare 4 Lantai - 44,735,600 0.00%

162,882,950 763,312,994 21.34% -

REKAP PEMBAYARAN

No Description Jumlah Tgl Keterangan

1 Invoice I 002/PSB/MK/VI/2022 28,400,739 Area Unit C-25,C-05,C-07 & C-09

2 Invoice II 003/PSB/MK/VIII/2022 11,455,191 Area Unit C-25,C-05,C-07 & C-09

3 Invoice III 004/PSB/MK/IX/2022 28,739,650 Area Unit C-25,C-05,C-07,C-09 & A-08

4 Invoice IV 005/PSB/MK/IX/2022 40,059,277 Area Unit C-25,C-05,C-07,C-09 & A-08

6 -

7 -
108,654,857

Sisa belum Terbayar (54,228,093)


Rounded (54,228,000)

Project Control Project Direktur


PT. PRIMA SUKSES BERSAMA PT. METROPOLITAN KENTJANA, Tbk.

Henry Chandra Hendrikus Ridwan


PROGRESS PEKERJAAN

Nama Proyek Pekerjaan Finishing BataPekerjaan Finishing Bata PITH


Lokasi Proyek Pondok Indah Town HouPondok Indah Town House
Type Unit C-05 Type Standart 4 Lantai isi
Periode 13 Oktober 2022 s/d 22 November 2022
PT. PRIMA SUKSES BERSAMA

Total Progress
No Description Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan 1,648,000 3,620,000 PRELIM 45.52%


2 Pekejaan Arsitek Lt. Dasar 13,897,500 25,077,002 PA LT. DSR 55.42%
3 Pekejaan Arsitek Lt. 2 18,520,000 29,103,672 PA LT. 2 63.63%
4 Pekejaan Arsitek Lt. 3 - 32,258,960 PA LT. 3 0.00%
5 Pekejaan Arsitek Lt. 4 - 32,258,960 PA LT. 4 0.00%
6 Pekerjaan Lain-lain - 180,000 PLL 0.00%
7 Pekerjaan Tambah - - - 0%

34,065,500 122,498,594 28%

13 Oktober 2022 s/d 22 November 2022


Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan 1,648,000 3,620,000


1 Langsiran Material 1.00 ls 2,000,000 40.00% 0.4 800,000 10.00% 0.1 200,000 50.00% 0.50 1,000,000 2,000,000
2 Pasang dan bongkar Scafolding 1.00 ls 1,620,000 0.00% 0 - 40.00% 0.4 648,000 40.00% 0.40 648,000 1,620,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar 13,897,500 25,077,002


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat 182.00 m2 30,000 94.51% 172 5,160,000 0.00% - 94.51% 172.00 5,160,000 5,460,000
- Plasteran dengan mortar 276.31 m2 35,000 13.57% 37.5 1,312,500 48.86% 135 4,725,000 62.43% 172.50 6,037,500 9,670,752
- Acian dengan mortar 222.81 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 5,570,370
2 Pekerjaan Kolom Praktis 105.30 m' 30,000 85.47% 90 2,700,000 0.00% - 85.47% 90.00 2,700,000 3,159,000
3 Finishing Opening Pintu dan Jendela 46.33 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 694,980
4 Finishing Sekonengan Sudut 56.04 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 420,300
5 Tali Air diatas Granite tile ( saat ini di area GF ) 50.80 m' 2,000 0.00% 0 - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 18,520,000 29,103,672


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat 212.00 m2 30,000 92.45% 196 5,880,000 0.00% - 92.45% 196.00 5,880,000 6,360,000
13 Oktober 2022 s/d 22 November 2022
Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal
- Plasteran dengan mortar 321.96 m2 35,000 31.37% 101 3,535,000 51.25% 165 5,775,000 82.62% 266.00 9,310,000 11,268,768
- Acian dengan mortar 259.63 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 6,490,830
2 Pekerjaan Kolom Praktis 122.70 m' 30,000 77.42% 95 2,850,000 13.04% 16 480,000 90.46% 111.00 3,330,000 3,681,000
3 Finishing Opening Pintu dan Jendela 53.99 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 809,820
4 Finishing Sekonengan Sudut 65.77 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 493,254

PA LT. 3 Pekejaan Arsitek Lt. 3 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat 235.00 m2 30,000 0.00% 0 - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% 0 - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% 0 - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 546,720

PA LT. 4 Pekejaan Arsitek Lt. 4 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat 235.00 m2 30,000 0.00% - - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35000 0.00% 0 - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25000 0.00% 0 - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30000 0.00% 0 - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15000 0.00% 0 - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7500 0.00% 0 - 0.00% - 0.00% - - 546,720
0.00%
PLL Pekerjaan Lain-lain - 180,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 18.00 m' 10000 0.00% 0 - 0.00% - 0.00% - - 180,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
9.66% 11,828,000 27.81% 34,065,500 122,498,594
PROGRESS PEKERJAAN

Nama Proyek : Pekerja Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok Pondok Indah Town House
Type : Unit C-07 Type Standart 4 Lantai isi
Periode : 13 Oktober 2022 s/d 22 November 2022
PT. PRIMA SUKSES BERSAMA

Total Progress
No Description Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan 1,486,000 3,620,000 PRELIM 41%


2 Pekejaan Arsitek Lt. Dasar 12,367,500 25,077,008 PA LT. DSR 49%
3 Pekejaan Arsitek Lt. 2 18,185,000 29,103,672 PA LT. 2 62%
4 Pekejaan Arsitek Lt. 3 - 32,258,960 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 32,258,960 PA LT. 4 0%
6 Pekerjaan Lain-lain - 180,000 PLL 0%
7 Pekerjaan Tambah - - - 0%

32,038,500 122,498,600 26%

13 Oktober 2022 s/d 22 November 2022


Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan 1,486,000 3,620,000


1 Langsiran Material 1.00 ls 2,000,000 40.00% 0.4 800,000 10.00% 0.1 200,000 50.00% 0.50 1,000,000 2,000,000
2 Pasang dan bongkar Scafolding 1.00 ls 1,620,000 0.00% 0 - 30.00% 0.3 486,000 30.00% 0.30 486,000 1,620,000

PA LT. D Pekejaan Arsitek Lt. Dasar 12,367,500 25,077,008


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan per 182.00 m2 30,000 91.21% 166 4,980,000 0.00% - 91.21% 166.00 4,980,000 5,460,000
- Plasteran dengan mortar 276.31 m2 35,000 21.53% 59.5 2,082,500 25.70% 71 2,485,000 47.23% 130.50 4,567,500 9,670,752
- Acian dengan mortar 222.81 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 5,570,370
2 Pekerjaan Kolom Praktis 105.30 m' 30,000 89.27% 94 2,820,000 0.00% - 89.27% 94.00 2,820,000 3,159,000
3 Finishing Opening Pintu dan Jendela 46.33 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 694,980
4 Finishing Sekonengan Sudut 56.04 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 420,306
5 Tali Air diatas Granite tile ( saat ini di are 50.80 m' 2,000 0.00% 0 - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 18,185,000 29,103,672


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan per 212.00 m2 30,000 92.92% 197 5,910,000 0.00% - 92.92% 197.00 5,910,000 6,360,000
- Plasteran dengan mortar 321.96 m2 35,000 11.80% 38 1,330,000 66.78% 215 7,525,000 78.58% 253.00 8,855,000 11,268,768
- Acian dengan mortar 259.63 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 6,490,830
2 Pekerjaan Kolom Praktis 122.70 m' 30,000 89.65% 110 3,300,000 3.26% 4 120,000 92.91% 114.00 3,420,000 3,681,000
3 Finishing Opening Pintu dan Jendela 53.99 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 809,820
4 Finishing Sekonengan Sudut 65.77 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 493,254
13 Oktober 2022 s/d 22 November 2022
Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PA LT. 3 Pekejaan Arsitek Lt. 3 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan per 235.00 m2 30,000 0.00% 0 - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% 0 - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% 0 - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 546,720

PA LT. 4 Pekejaan Arsitek Lt. 4 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan per 235.00 m2 30,000 0.00% 0 - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% 0 - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% 0 - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 546,720
0.00%
PLL Pekerjaan Lain-lain - 180,000
1 Pekerjaan Plaster Aci Exterior Dengan Tal 18.00 m' 10,000 0.00% 0 - 0.00% - 0.00% - - 180,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
8.83% 10,816,000 26.15% 32,038,500 122,498,600
PROGRESS PEKERJAAN

Nama Proyek : Pekerjaan Fin Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok Inda Pondok Indah Town House
Type : Unit C-09 Type Standart 4 Lantai isi
Periode : 13 Oktober 2022 s/d 22 November 2022
PT. PRIMA SUKSES BERSAMA

No Description Total Progress Total Pekerjaan Keterangan


Pekerjaan

1 Pekerjaan Persiapan 1,810,000 3,620,000 PRELIM 50%


2 Pekejaan Arsitek Lt. Dasar 12,252,500 25,077,008 PA LT. DSR 49%
3 Pekejaan Arsitek Lt. 2 19,715,000 29,103,672 PA LT. 2 68%
4 Pekejaan Arsitek Lt. 3 - 32,258,960 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 32,258,960 PA LT. 4 0%
6 Pekerjaan Lain-lain - 180,000 PLL 0%
7 Pekerjaan Tambah - - - 0%

33,777,500 122,498,600 28%

13 Oktober 2022 s/d 22 November 2022


sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan 1,810,000 3,620,000


1 Langsiran Material 1.00 ls 2,000,000 40.00% 0.4 800,000 10.00% 0.1 200,000 50.00% 0.50 1,000,000 2,000,000
2 Pasang dan bongkar Scafolding 1.00 ls 1,620,000 0.00% 0 - 50.00% 0.5 810,000 50.00% 0.50 810,000 1,620,000

PA LT. DSPekejaan Arsitek Lt. Dasar 12,252,500 25,077,008


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 182.00 m2 30,000 91.76% 167 5,010,000 2.20% 4 120,000 93.96% 171.00 5,130,000 5,460,000
- Plasteran dengan mortar 276.31 m2 35,000 19.36% 53.5 1,872,500 23.89% 66 2,310,000 43.25% 119.50 4,182,500 9,670,752
- Acian dengan mortar 222.81 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 5,570,370
2 Pekerjaan Kolom Praktis 105.30 m' 30,000 93.07% 98 2,940,000 0.00% - 93.07% 98.00 2,940,000 3,159,000
3 Finishing Opening Pintu dan Jendela 46.33 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 694,980
4 Finishing Sekonengan Sudut 56.04 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 420,306
5 Tali Air diatas Granite tile ( saat ini di area 50.80 m' 2,000 0.00% 0 - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 19,715,000 29,103,672


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 212.00 m2 30,000 91.51% 194 5,820,000 1.89% 4 120,000 93.40% 198.00 5,940,000 6,360,000
- Plasteran dengan mortar 321.96 m2 35,000 52.18% 168 5,880,000 39.45% 127 4,445,000 91.62% 295.00 10,325,000 11,268,768
- Acian dengan mortar 259.63 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 6,490,830
2 Pekerjaan Kolom Praktis 122.70 m' 30,000 89.65% 110 3,300,000 4.07% 5 150,000 93.72% 115.00 3,450,000 3,681,000
3 Finishing Opening Pintu dan Jendela 53.99 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 809,820
4 Finishing Sekonengan Sudut 65.77 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 493,254

PA LT. 3 Pekejaan Arsitek Lt. 3 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 235.00 m2 30,000 0.00% 0 - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% 0 - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% 0 - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 546,720
13 Oktober 2022 s/d 22 November 2022
sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal
PA LT. 4 Pekejaan Arsitek Lt. 4 - 32,258,960
1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 235.00 m2 30,000 0.00% 0 - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% 0 - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% 0 - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 546,720
0.00%
PLL Pekerjaan Lain-lain - 180,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali 18.00 m' 10,000 0.00% 0 - 0.00% - 0.00% - - 180,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
6.66% 8,155,000 27.57% 33,777,500 122,498,600

Note:
Terdapat Pekerjaan Tambah Dinding Penahan Tanah Area Sisi C-09
PROGRESS PEKERJAAN

Nama Proyek : Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok Indah Town House
Type : Unit A-08 Type Sudut 4 Lantai isi
Periode : 13 Oktober 2022 s/d 22 November 2022

No Description Total Progress Total Pekerjaan Keterangan


Pekerjaan

1 Pekerjaan Persiapan 1,893,500 5,645,000 PRELIM 34%


2 Pekejaan Arsitek Lt. Dasar 13,602,500 25,431,936 PA LT. DSR 53%
3 Pekejaan Arsitek Lt. 2 9,190,000 29,515,976 PA LT. 2 31%
4 Pekejaan Arsitek Lt. 3 - 32,715,344 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 32,715,344 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

24,686,000 127,403,600 19%

13 Oktober 2022 s/d 22 November 2022


sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal
PRELIM Pekerjaan Persiapan 1,893,500 5,645,000
1 Langsiran Material 1.00 ls 2,000,000 40.00% 0.4 800,000 0.00% - 40.00% 0.40 800,000 2,000,000
2 Pasang dan bongkar Scafolding 1.00 ls 3,645,000 30.00% 0.3 1,093,500 0.00% - 30.00% 0.30 1,093,500 3,645,000

PA LT. DSPekejaan Arsitek Lt. Dasar 13,602,500 25,431,936


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 179.01 m2 30,000 87.15% 156 4,680,000 2.79% 5 150,000 89.94% 161.00 4,830,000 5,370,300
- Plasteran dengan mortar 287.89 m2 35,000 35.95% 103.5 3,622,500 24.31% 70 2,450,000 60.27% 173.50 6,072,500 10,076,157
- Acian dengan mortar 224.29 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 5,607,225
2 Pekerjaan Kolom Praktis 105.30 m' 30,000 85.47% 90 2,700,000 0.00% - 85.47% 90.00 2,700,000 3,159,000
3 Finishing Opening Pintu dan Jendela 46.33 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 694,980
4 Finishing Sekonengan Sudut 56.36 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 422,674
5 Tali Air diatas Granite tile ( saat ini di area 50.80 m' 2,000 0.00% 0 - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 9,190,000 29,515,976


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 208.59 m2 30,000 74.31% 155 4,650,000 7.67% 16 480,000 81.98% 171.00 5,130,000 6,257,700
- Plasteran dengan mortar 335.46 m2 35,000 0.00% 0 - 13.12% 44 1,540,000 13.12% 44.00 1,540,000 11,741,163
- Acian dengan mortar 261.35 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 6,533,775
2 Pekerjaan Kolom Praktis 122.70 m' 30,000 48.90% 60 1,800,000 19.56% 24 720,000 68.46% 84.00 2,520,000 3,681,000
3 Finishing Opening Pintu dan Jendela 53.99 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 809,820
4 Finishing Sekonengan Sudut 65.67 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 492,518

PA LT. 3 Pekejaan Arsitek Lt. 3 - 32,715,344


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 231.20 m2 30,000 0.00% 0 - 0.00% - 0.00% - - 6,936,000
- Plasteran dengan mortar 371.82 m2 35,000 0.00% 0 - 0.00% - 0.00% - - 13,013,840
- Acian dengan mortar 289.68 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 7,242,000
13 Oktober 2022 s/d 22 November 2022
sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% 0 - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.79 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 545,904

PA LT. 4 Pekejaan Arsitek Lt. 4 - 32,715,344


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 231.20 m2 30,000 0.00% 0 - 0.00% - 0.00% - - 6,936,000
- Plasteran dengan mortar 371.82 m2 35,000 0.00% 0 - 0.00% - 0.00% - - 13,013,840
- Acian dengan mortar 289.68 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 7,242,000
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% 0 - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.79 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 545,904
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali 138.00 m' 10,000 0.00% 0 - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
4.19% 5,340,000 19.38% 24,686,000 127,403,600

Note:
Pekerjaan Plesteran Luar menjadi 2 sisi yang diperhitungan sebelumnya adalah 1 sisi saja, dikarenakan posisi bangunan yg baru berdiri sendiri jadi diutamakan terlebih dahulu plester luar sisi kanan dan kiri.
item pekerjaan belum termasuk pembersihan bongkaran bekisting dan scafolding dari pihak kontraktor struktur
Adapun Pekerjaan tambah lainnya (pasangan dinding toren area atap finish plaster) dan juga pekerjaan tanggulan beton area opening tampak depan dan belakang
PROGRESS PEKERJAAN

Nama Proyek : Pekerjaa Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok Pondok Indah Town House
Type : Unit C-25 Type Standart 4 Bare
Periode : 13 Oktober 2022 s/d 22 November 2022

Total
No Description Progress Total Pekerjaan Keterangan
Pekerjaan

1 Pekerjaan Persiapan 4,178,250 4,845,000 PRELIM 86%


2 Pekejaan Arsitek Lt. Dasar 7,350,000 8,190,535 PA LT. DSR 90%
3 Pekejaan Arsitek Lt. 2 8,982,200 9,425,569 PA LT. 2 95%
4 Pekejaan Arsitek Lt. 3 8,460,000 10,447,248 PA LT. 3 81%
5 Pekejaan Arsitek Lt. 4 9,345,000 10,447,248 PA LT. 4 89%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

38,315,450 44,735,600 86%

13 Oktober 2022 s/d 22 November 2022


sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan 4,178,250 4,845,000


1 Langsiran Material 1.00 ls 1,200,000 70.00% 0.7 840,000 20.00% 0.2 240,000 90.00% 0.90 1,080,000 1,200,000
2 Pasang dan bongkar Scafolding 1.00 ls 3,645,000 65.00% 0.65 2,369,250 20.00% 0.2 729,000 85.00% 0.85 3,098,250 3,645,000

PA LT. DSPekejaan Arsitek Lt. Dasar 7,350,000 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 114.78 m2 30,000 95.84% 110 3,300,000 0.00% - 95.84% 110.00 3,300,000 3,443,310
- Plasteran dengan mortar 60.78 m2 35,000 87.20% 53 1,855,000 8.23% 5 175,000 95.43% 58.00 2,030,000 2,127,271
- Acian dengan mortar 31.34 m2 25,000 0.00% 0 - 70.20% 22 550,000 70.20% 22.00 550,000 783,432
2 Pekerjaan Kolom Praktis 43.30 m' 30,000 94.69% 41 1,230,000 0.00% - 94.69% 41.00 1,230,000 1,298,981
3 Finishing Opening Pintu dan Jendela 26.54 m' 15,000 0.00% 0 - 60.30% 16 240,000 60.30% 16.00 240,000 398,034
4 Finishing Sekonengan Sudut 5.05 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di are 50.80 m' 2,000 0.00% 0 - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 8,982,200 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 133.74 m2 30,000 97.01% 129.74 3,892,200 0.00% - 97.01% 129.74 3,892,200 4,012,290
- Plasteran dengan mortar 70.82 m2 35,000 94.60% 67 2,345,000 0.00% - 94.60% 67.00 2,345,000 2,478,785
- Acian dengan mortar 36.52 m2 25,000 0.00% 0 - 90.37% 33 825,000 90.37% 33.00 825,000 912,888
2 Pekerjaan Kolom Praktis 50.45 m' 30,000 97.12% 49 1,470,000 0.00% - 97.12% 49.00 1,470,000 1,513,627
3 Finishing Opening Pintu dan Jendela 30.92 m' 15,000 58.21% 18 270,000 38.81% 12 180,000 97.02% 30.00 450,000 463,806
4 Finishing Sekonengan Sudut 5.89 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 8,460,000 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 148.24 m2 30,000 95.12% 141 4,230,000 0.00% - 95.12% 141.00 4,230,000 4,447,200
- Plasteran dengan mortar 78.50 m2 35,000 0.00% 0 - 44.59% 35 1,225,000 44.59% 35.00 1,225,000 2,747,472
- Acian dengan mortar 40.47 m2 25,000 0.00% 0 - 93.89% 38 950,000 93.89% 38.00 950,000 1,011,840
2 Pekerjaan Kolom Praktis 55.92 m' 30,000 94.77% 53 1,590,000 0.00% - 94.77% 53.00 1,590,000 1,677,696
3 Finishing Opening Pintu dan Jendela 34.27 m' 15,000 55.44% 19 285,000 35.01% 12 180,000 90.45% 31.00 465,000 514,080
4 Finishing Sekonengan Sudut 6.53 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 48,960
13 Oktober 2022 s/d 22 November 2022
sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PA LT. 4 Pekejaan Arsitek Lt. 4 9,345,000 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 148.24 m2 30,000 90.39% 134 4,020,000 0.00% - 90.39% 134.00 4,020,000 4,447,200
- Plasteran dengan mortar 78.50 m2 35,000 42.04% 33 1,155,000 44.59% 35 1,225,000 86.63% 68.00 2,380,000 2,747,472
- Acian dengan mortar 40.47 m2 25,000 0.00% 0 - 93.89% 38 950,000 93.89% 38.00 950,000 1,011,840
2 Pekerjaan Kolom Praktis 55.92 m' 30,000 91.20% 51 1,530,000 0.00% - 91.20% 51.00 1,530,000 1,677,696
3 Finishing Opening Pintu dan Jendela 34.27 m' 15,000 55.44% 19 285,000 35.01% 12 180,000 90.45% 31.00 465,000 514,080
4 Finishing Sekonengan Sudut 6.53 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali 138.00 m' 10,000 0.00% 0 - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
17.10% 7,649,000 85.65% 38,315,450 44,735,600

Note:
Pekerjaan Plesteran Luar menjadi 2 sisi yang diperhitungan sebelumnya adalah 1 sisi saja, dikarenakan posisi bangunan yg baru berdiri sendiri jadi diutamakan terlebih dahulu plester luar sisi kanan dan kiri.
item pekerjaan belum termasuk pembersihan bongkaran bekisting dan scafolding dari pihak kontraktor struktur
Adapun Pekerjaan tambah lainnya (pasangan dinding toren area atap finish plaster) dan juga pekerjaan tanggulan beton area opening tampak depan dan belakang
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit C-01 Type Bare 4 Lantai
Periode : 13 Oktober 2022 s/d 22 November 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

13 Oktober 2022 s/d 22 November 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit A-06 Type Bare 4 Lantai
Periode : 13 Oktober 2022 s/d 22 November 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

13 Oktober 2022 s/d 22 November 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit C-03 Type Bare 4 Lantai
Periode : 13 Oktober 2022 s/d 22 November 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

13 Oktober 2022 s/d 22 November 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit C-11 Type Bare 4 Lantai
Periode : 13 Oktober 2022 s/d 22 November 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

13 Oktober 2022 s/d 22 November 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit C-23 Type Bare 4 Lantai
Periode : 13 Oktober 2022 s/d 22 November 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

13 Oktober 2022 s/d 22 November 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit C-025Type Standart 4 Lantai Bare
SI No : 098/SI/PSB/PITH/VIII/2022
Tgl : 10/27/2022
Kontraktor : PT. PRIMA SUKSES BERSAMA

No Item Pekerjaan Vol Unit Harga Satuan Total Harga Keterangan

1 Pekerjaan Finishing Dinding Tambahan Unit C-25


- Pekerjaan Pasangan Dinding Atap dinding Toren Unit C-25 37.5 m2 Rp 30,000 Rp 1,125,000 Harga berdasarkan Scoup Kontrak Pekerjaan
- Plesteran Dinding Atap Dinding Toren Unit C-25 75 m2 Rp 35,000 Rp 2,625,000 Harga berdasarkan Scoup Kontrak Pekerjaan
- Plesteran Dinding Sisi Dalam Atap Dinding Unit C-25 87 m2 Rp 35,000 Rp 3,045,000 Harga berdasarkan Scoup Kontrak Pekerjaan
- Pekerjaan Kolom Praktis Dinding Toren 10.8 m' Rp 30,000 Rp 324,000 Harga berdasarkan Scoup Kontrak Pekerjaan
- Plesteran Dinding Sisi luar Lt.1 Unit C-25 44.16 m2 Rp 35,000 Rp 1,545,600 Harga berdasarkan Scoup Kontrak Pekerjaan
- Plesteran Dinding Sisi luar Lt.2 Unit C-25 60.72 m2 Rp 35,000 Rp 2,125,200 Harga berdasarkan Scoup Kontrak Pekerjaan
2 Pekerjaan Sipil

- Cor Tanggulan Openingan Jendela Tampak depan lt.2 s/d lt.4 Berdasarkan 098/SI/PSB/PITH/VIII/2022 (Harga Satuan
9.15 m' Rp 127,500 Rp 1,166,625 Baru)

- Cor Tanggulan Openingan Jendela Tampak belakang lt.2 s/d lt.4 Berdasarkan 098/SI/PSB/PITH/VIII/2022 (Harga Satuan
11.25 m' Rp 127,500 Rp 1,434,375 Baru)
3 Pekerjaan Suporting Tambahan
- Bongkar Pasang Scafolding Pekerjaan Dinding Atap dan Toren 164.54 m2 Rp 18,000 Rp 2,961,720 Suport Pekerjaan Tambah Dinding Toren (unit C-25)
- Bongkar Pasang Scafolding Pekerjaan Dinding Sisi Samping S/D Lt.2 142.4 m2 Rp 18,000 Rp 2,563,200 Suport Pekerjaan Tambah Dinding Toren (unit C-25)

Total Harga Penawaran Rp 18,915,720 Rp -

Project Control Project Direktur


PT. PRIMA SUKSES BERSAMA PT. METROPOLITAN KENTJANA, Tbk.
Henry Chandra Hendrikus Ridwan

Pekerjaan Tanggulan Beton Opening C-25

Pekerjaan
Plesteran
dalam
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit A-08,C-05/C-07/C-09
SI No : 098/SI/PSB/PITH/VIII/2022
Tgl : 10/27/2022
Kontraktor : PT. PRIMA SUKSES BERSAMA

No Item Pekerjaan Vol Unit Harga Satuan Total Harga Keterangan

2 Pekerjaan Sipil

- Cor Tanggulan Lt. Dasar As 19 area Depan Berdasarkan 098/SI/PSB/PITH/VIII/2022 (Harga Satuan
6.15 m' Rp 127,500 Rp 784,125 Baru) Unit A-08

- Cor Tanggulan Lt. Dasar As K/5-10 area samping Berdasarkan 098/SI/PSB/PITH/VIII/2022 (Harga Satuan
16 m' Rp 127,500 Rp 2,040,000 Baru) Unit C-09

- Cor Tanggulan Openingan Jendela Tampak depan & Belakang lt.2 Berdasarkan 098/SI/PSB/PITH/VIII/2022 (Harga Satuan
6.8 m' Rp 127,500 Rp 867,000 Baru) Unit C-05

- Cor Tanggulan Openingan Jendela Tampak depan & Belakang lt.2 Berdasarkan 098/SI/PSB/PITH/VIII/2022 (Harga Satuan
6.8 m' Rp 127,500 Rp 867,000 Baru) Unit C-07

- Cor Tanggulan Openingan Jendela Tampak depan & Belakang lt.2 Berdasarkan 098/SI/PSB/PITH/VIII/2022 (Harga Satuan
6.8 m' Rp 127,500 Rp 867,000 Baru) Unit C-09

Total Harga Penawaran Rp 5,425,125 Rp -

Project Control Project Direktur


PT. PRIMA SUKSES BERSAMA PT. METROPOLITAN KENTJANA, Tbk.

Henry Chandra Hendrikus Ridwan


Pekerjaan Tanggulan Beton Opening C-05/07/09
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit B-26
SI No : 098/SI/PSB/PITH/VIII/2022
Tgl : 10/27/2022
Kontraktor : PT. PRIMA SUKSES BERSAMA

No Item Pekerjaan Vol Unit Harga Satuan Total Harga Keterangan

1 Pekerjaan Sipil

- Plesteran Dinding 3 unit Toilet tebal : 50mm Berdasarkan 098/SI/PSB/PITH/VIII/2022 (Harga Satuan
39.2 m2 Rp 87,500 Rp 3,430,000 Baru) Unit B-26

- Screed lantai 1 unit Toilet Berdasarkan 098/SI/PSB/PITH/VIII/2022 (Harga Satuan


4.93 m2 Rp 82,000 Rp 404,260 Baru) Unit B-26

Total Harga Penawaran Rp 3,834,260 Rp -

Project Control Project Direktur


PT. PRIMA SUKSES BERSAMA PT. METROPOLITAN KENTJANA, Tbk.

Henry Chandra Hendrikus Ridwan


DOKUMENTASI PROGRESS PEKERJAAN SAMPAI DENGAN 24 AGUSTUS 2022

1 Unit C-09 Type Standart 4 Lantai isi

2
3 Unit C-25 Plester dinding sopi-sopi sisi dalam

4 Unit A-08
5 Unit C-07 Unit C-07

6 Unit C-09 Unit C-09


7 Tampak Depan C-05 Unit C-09

8 Area Dalam C-05 Unit C-05

MARKING PROGRESS PEKERJAAN SAMPAI DENGAN 24 AGUSTUS 2022


1 Block C-25 LT.1
2 Block C-25 LT.2
3 Block C-25 LT.1
4 Block C-25 LT.2
5 Block C-25 LT.3
6 Block C-05
7 Block C-07
8 Block C-09
9 Block C-25 Dinding Sopi-sopi atap
10 Block A-08