REKAP OPNAME MANDOR PT.

PRIMA SUKSES BERSAMA

Nama Proyek : Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok Indah Town House
Type : All Unit (10 Unit)
SPK : RE/PS22020032
Kontraktor : PT. PRIMA SUKSES BERSAMA
Periode : 25 Agustus 2022 s/d 13 Oktober 2022

No Description Total Progress Total Pekerjaan Progress Keterangan


Pekerjaan Percentage

1 Unit C-05 Type Standart 4 Lantai isi 22,237,500 122,498,594 18.15%

2 Unit C-07 Type Standart 4 Lantai isi 21,222,500 122,498,600 17.32%

3 Unit C-09 Type Standart 4 Lantai isi 25,622,500 122,498,600 20.92%

4 Unit A-08 Type Sudut 4 Lantai isi 14,272,500 127,403,600 11.20%

5 Unit C-25 Type Standart 4 Bare 41,241,450 58,781,856 70.16% Ada Pekerjaan Tambah

6 Unit C-01 Type Bare 4 Lantai - 44,735,600 0.00%

7 Unit A-06 Type Bare 4 Lantai - 44,735,600 0.00%

8 Unit C-03 Type Bare 4 Lantai - 44,735,600 0.00%

9 Unit C-11 Type Bare 4 Lantai - 44,735,600 0.00%

10 Unit C-23 Type Bare 4 Lantai - 44,735,600 0.00%

124,596,450 777,359,250 16.03% -

REKAP PEMBAYARAN

No Description Jumlah Tgl Keterangan

1 Invoice I 002/PSB/MK/VI/2022 28,400,739 Area Unit C-25,C-05,C-07 & C-09

2 Invoice II 003/PSB/MK/VIII/2022 11,455,191 Area Unit C-25,C-05,C-07 & C-09

3 Invoice III 004/PSB/MK/IX/2022 28,739,650 Area Unit C-25,C-05,C-07,C-09 & A-08

6 -

7 -
68,595,580

Sisa belum Terbayar (56,000,870)


Rounded (56,001,000)

Project Control Project Direktur


PT. PRIMA SUKSES BERSAMA PT. METROPOLITAN KENTJANA, Tbk.

Henry Chandra Hendrikus Ridwan


PROGRESS PEKERJAAN

Nama Proyek Pekerjaan Finishing BataPekerjaan Finishing Bata PITH


Lokasi Proyek Pondok Indah Town HouPondok Indah Town House
Type Unit C-05 Type Standart 4 Lantai isi
Periode 25 Agustus 2022 s/d 13 Oktober 2022
PT. PRIMA SUKSES BERSAMA

Total Progress
No Description Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan 800,000 3,620,000 PRELIM 22.10%


2 Pekejaan Arsitek Lt. Dasar 9,172,500 25,077,002 PA LT. DSR 36.58%
3 Pekejaan Arsitek Lt. 2 12,265,000 29,103,672 PA LT. 2 42.14%
4 Pekejaan Arsitek Lt. 3 - 32,258,960 PA LT. 3 0.00%
5 Pekejaan Arsitek Lt. 4 - 32,258,960 PA LT. 4 0.00%
6 Pekerjaan Lain-lain - 180,000 PLL 0.00%
7 Pekerjaan Tambah - - - 0%

22,237,500 122,498,594 18%

25 Agustus 2022 s/d 13 Oktober 2022


Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan 800,000 3,620,000


1 Langsiran Material 1.00 ls 2,000,000 40.00% 0.4 800,000 0.00% - 40.00% 0.40 800,000 2,000,000
2 Pasang dan bongkar Scafolding 1.00 ls 1,620,000 0.00% - 0.00% - 0.00% - - 1,620,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar 9,172,500 25,077,002


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat 182.00 m2 30,000 77.47% 141 4,230,000 17.03% 31 930,000 94.51% 172.00 5,160,000 5,460,000
- Plasteran dengan mortar 276.31 m2 35,000 13.57% 37.5 1,312,500 0.00% - 13.57% 37.50 1,312,500 9,670,752
- Acian dengan mortar 222.81 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 5,570,370
2 Pekerjaan Kolom Praktis 105.30 m' 30,000 68.38% 72 2,160,000 17.09% 18 540,000 85.47% 90.00 2,700,000 3,159,000
3 Finishing Opening Pintu dan Jendela 46.33 m' 15,000 0.00% - 0.00% - 0.00% - - 694,980
4 Finishing Sekonengan Sudut 56.04 m' 7,500 0.00% - 0.00% - 0.00% - - 420,300
5 Tali Air diatas Granite tile ( saat ini di area GF ) 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 12,265,000 29,103,672


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat 212.00 m2 30,000 46.23% 98 2,940,000 46.23% 98 2,940,000 92.45% 196.00 5,880,000 6,360,000
25 Agustus 2022 s/d 13 Oktober 2022
Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal
- Plasteran dengan mortar 321.96 m2 35,000 11.80% 38 1,330,000 19.57% 63 2,205,000 31.37% 101.00 3,535,000 11,268,768
- Acian dengan mortar 259.63 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 6,490,830
2 Pekerjaan Kolom Praktis 122.70 m' 30,000 26.89% 33 990,000 50.53% 62 1,860,000 77.42% 95.00 2,850,000 3,681,000
3 Finishing Opening Pintu dan Jendela 53.99 m' 15,000 0.00% - 0.00% - 0.00% - - 809,820
4 Finishing Sekonengan Sudut 65.77 m' 7,500 0.00% - 0.00% - 0.00% - - 493,254

PA LT. 3 Pekejaan Arsitek Lt. 3 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat 235.00 m2 30,000 0.00% - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% - 0.00% - 0.00% - - 546,720

PA LT. 4 Pekejaan Arsitek Lt. 4 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat 235.00 m2 30,000.00 0.00% - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35000 0.00% - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25000 0.00% - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30000 0.00% - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15000 0.00% - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7500 0.00% - 0.00% - 0.00% - - 546,720
0.00%
PLL Pekerjaan Lain-lain - 180,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 18.00 m' 10000 0.00% - 0.00% - 0.00% - - 180,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
6.92% 8,475,000 18.15% 22,237,500 122,498,594
PROGRESS PEKERJAAN

Nama Proyek : Pekerja Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok Pondok Indah Town House
Type : Unit C-07 Type Standart 4 Lantai isi
Periode : 25 Agustus 2022 s/d 13 Oktober 2022
PT. PRIMA SUKSES BERSAMA

Total Progress
No Description Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan 800,000 3,620,000 PRELIM 22%


2 Pekejaan Arsitek Lt. Dasar 9,882,500 25,077,008 PA LT. DSR 39%
3 Pekejaan Arsitek Lt. 2 10,540,000 29,103,672 PA LT. 2 36%
4 Pekejaan Arsitek Lt. 3 - 32,258,960 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 32,258,960 PA LT. 4 0%
6 Pekerjaan Lain-lain - 180,000 PLL 0%
7 Pekerjaan Tambah - - - 0%

21,222,500 122,498,600 17%

25 Agustus 2022 s/d 13 Oktober 2022


Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan 800,000 3,620,000


1 Langsiran Material 1.00 ls 2,000,000 40.00% 0.4 800,000 0.00% - 40.00% 0.40 800,000 2,000,000
2 Pasang dan bongkar Scafolding 1.00 ls 1,620,000 0.00% 0 - 0.00% - 0.00% - - 1,620,000

PA LT. DSPekejaan Arsitek Lt. Dasar 9,882,500 25,077,008


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 182.00 m2 30,000 77.47% 141 4,230,000 13.74% 25 750,000 91.21% 166.00 4,980,000 5,460,000
- Plasteran dengan mortar 276.31 m2 35,000 13.57% 37.5 1,312,500 7.96% 22 770,000 21.53% 59.50 2,082,500 9,670,752
- Acian dengan mortar 222.81 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 5,570,370
2 Pekerjaan Kolom Praktis 105.30 m' 30,000 68.38% 72 2,160,000 20.89% 22 660,000 89.27% 94.00 2,820,000 3,159,000
3 Finishing Opening Pintu dan Jendela 46.33 m' 15,000 0.00% - 0.00% - 0.00% - - 694,980
4 Finishing Sekonengan Sudut 56.04 m' 7,500 0.00% - 0.00% - 0.00% - - 420,306
5 Tali Air diatas Granite tile ( saat ini di area 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 10,540,000 29,103,672


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 212.00 m2 30,000 46.23% 98 2,940,000 46.70% 99 2,970,000 92.92% 197.00 5,910,000 6,360,000
- Plasteran dengan mortar 321.96 m2 35,000 11.80% 38 1,330,000 0.00% - 11.80% 38.00 1,330,000 11,268,768
- Acian dengan mortar 259.63 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 6,490,830
2 Pekerjaan Kolom Praktis 122.70 m' 30,000 26.89% 33 990,000 62.75% 77 2,310,000 89.65% 110.00 3,300,000 3,681,000
3 Finishing Opening Pintu dan Jendela 53.99 m' 15,000 0.00% - 0.00% - 0.00% - - 809,820
4 Finishing Sekonengan Sudut 65.77 m' 7,500 0.00% - 0.00% - 0.00% - - 493,254
25 Agustus 2022 s/d 13 Oktober 2022
Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PA LT. 3 Pekejaan Arsitek Lt. 3 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 235.00 m2 30,000 0.00% - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% - 0.00% - 0.00% - - 546,720

PA LT. 4 Pekejaan Arsitek Lt. 4 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 235.00 m2 30,000 0.00% - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% - 0.00% - 0.00% - - 546,720
0.00%
PLL Pekerjaan Lain-lain - 180,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali 18.00 m' 10,000 0.00% - 0.00% - 0.00% - - 180,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
6.09% 7,460,000 17.32% 21,222,500 122,498,600
PROGRESS PEKERJAAN

Nama Proyek : Pekerjaan Fin Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok IndahPondok Indah Town House
Type : Unit C-09 Type Standart 4 Lantai isi
Periode : 25 Agustus 2022 s/d 13 Oktober 2022
PT. PRIMA SUKSES BERSAMA

No Description Total Progress Total Pekerjaan Keterangan


Pekerjaan

1 Pekerjaan Persiapan 800,000 3,620,000 PRELIM 22%


2 Pekejaan Arsitek Lt. Dasar 9,822,500 25,077,008 PA LT. DSR 39%
3 Pekejaan Arsitek Lt. 2 15,000,000 29,103,672 PA LT. 2 52%
4 Pekejaan Arsitek Lt. 3 - 32,258,960 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 32,258,960 PA LT. 4 0%
6 Pekerjaan Lain-lain - 180,000 PLL 0%
7 Pekerjaan Tambah - - - 0%

25,622,500 122,498,600 21%

25 Agustus 2022 s/d 13 Oktober 2022


sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan 800,000 3,620,000


1 Langsiran Material 1.00 ls 2,000,000 40.00% 0.4 800,000 0.00% - 40.00% 0.40 800,000 2,000,000
2 Pasang dan bongkar Scafolding 1.00 ls 1,620,000 0.00% 0 - 0.00% - 0.00% - - 1,620,000

PA LT. DSPekejaan Arsitek Lt. Dasar 9,822,500 25,077,008


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perek 182.00 m2 30,000 77.47% 141 4,230,000 14.29% 26 780,000 91.76% 167.00 5,010,000 5,460,000
- Plasteran dengan mortar 276.31 m2 35,000 13.57% 37.5 1,312,500 5.79% 16 560,000 19.36% 53.50 1,872,500 9,670,752
- Acian dengan mortar 222.81 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 5,570,370
2 Pekerjaan Kolom Praktis 105.30 m' 30,000 68.38% 72 2,160,000 24.69% 26 780,000 93.07% 98.00 2,940,000 3,159,000
3 Finishing Opening Pintu dan Jendela 46.33 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 694,980
4 Finishing Sekonengan Sudut 56.04 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 420,306
5 Tali Air diatas Granite tile ( saat ini di area 50.80 m' 2,000 0.00% 0 - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 15,000,000 29,103,672


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perek 212.00 m2 30,000 71.23% 151 4,530,000 20.28% 43 1,290,000 91.51% 194.00 5,820,000 6,360,000
- Plasteran dengan mortar 321.96 m2 35,000 11.49% 37 1,295,000 40.69% 131 4,585,000 52.18% 168.00 5,880,000 11,268,768
- Acian dengan mortar 259.63 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 6,490,830
2 Pekerjaan Kolom Praktis 122.70 m' 30,000 39.12% 48 1,440,000 50.53% 62 1,860,000 89.65% 110.00 3,300,000 3,681,000
3 Finishing Opening Pintu dan Jendela 53.99 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 809,820
4 Finishing Sekonengan Sudut 65.77 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 493,254

PA LT. 3 Pekejaan Arsitek Lt. 3 - 32,258,960


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perek 235.00 m2 30,000 0.00% - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% - 0.00% - 0.00% - - 546,720
25 Agustus 2022 s/d 13 Oktober 2022
sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal
PA LT. 4 Pekejaan Arsitek Lt. 4 - 32,258,960
1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perek 235.00 m2 30,000 0.00% - 0.00% - 0.00% - - 7,050,000
- Plasteran dengan mortar 356.86 m2 35,000 0.00% - 0.00% - 0.00% - - 12,490,240
- Acian dengan mortar 287.78 m2 25,000 0.00% - 0.00% - 0.00% - - 7,194,400
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.90 m' 7,500 0.00% - 0.00% - 0.00% - - 546,720
0.00%
PLL Pekerjaan Lain-lain - 180,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali 18.00 m' 10,000 0.00% - 0.00% - 0.00% - - 180,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
8.04% 9,855,000 20.92% 25,622,500 122,498,600

Note:
Terdapat Pekerjaan Tambah Dinding Penahan Tanah Area Sisi C-09
PROGRESS PEKERJAAN

Nama Proyek : Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok Indah Town House
Type : Unit A-08 Type Sudut 4 Lantai isi
Periode : 25 Agustus 2022 s/d 13 Oktober 2022

No Description Total Progress Total Pekerjaan Keterangan


Pekerjaan

1 Pekerjaan Persiapan - 5,645,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar 10,192,500 25,431,936 PA LT. DSR 40%
3 Pekejaan Arsitek Lt. 2 4,080,000 29,515,976 PA LT. 2 14%
4 Pekejaan Arsitek Lt. 3 - 32,715,344 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 32,715,344 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%
7 Pekerjaan Tambah - - PT 0%

14,272,500 127,403,600 11%

25 Agustus 2022 s/d 13 Oktober 2022


sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal
PRELIM Pekerjaan Persiapan - 5,645,000
1 Langsiran Material 1.00 ls 2,000,000 0.00% - 0.00% - 0.00% - - 2,000,000
2 Pasang dan bongkar Scafolding 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSPekejaan Arsitek Lt. Dasar 10,192,500 25,431,936


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perek 179.01 m2 30,000 70.39% 126 3,780,000 10.06% 18 540,000 80.44% 144.00 4,320,000 5,370,300
- Plasteran dengan mortar 287.89 m2 35,000 13.03% 37.5 1,312,500 22.93% 66 2,310,000 35.95% 103.50 3,622,500 10,076,157
- Acian dengan mortar 224.29 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 5,607,225
2 Pekerjaan Kolom Praktis 105.30 m' 30,000 55.08% 58 1,740,000 16.14% 17 510,000 71.23% 75.00 2,250,000 3,159,000
3 Finishing Opening Pintu dan Jendela 46.33 m' 15,000 0.00% - 0.00% - 0.00% - - 694,980
4 Finishing Sekonengan Sudut 56.36 m' 7,500 0.00% - 0.00% - 0.00% - - 422,674
5 Tali Air diatas Granite tile ( saat ini di area 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 4,080,000 29,515,976


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perek 208.59 m2 30,000 0.00% - 46.98% 98 2,940,000 46.98% 98.00 2,940,000 6,257,700
- Plasteran dengan mortar 335.46 m2 35,000 0.00% - 0.00% - 0.00% - - 11,741,163
- Acian dengan mortar 261.35 m2 25,000 0.00% - 0.00% - 0.00% - - 6,533,775
2 Pekerjaan Kolom Praktis 122.70 m' 30,000 0.00% - 30.97% 38 1,140,000 30.97% 38.00 1,140,000 3,681,000
3 Finishing Opening Pintu dan Jendela 53.99 m' 15,000 0.00% - 0.00% - 0.00% - - 809,820
4 Finishing Sekonengan Sudut 65.67 m' 7,500 0.00% - 0.00% - 0.00% - - 492,518

PA LT. 3 Pekejaan Arsitek Lt. 3 - 32,715,344


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perek 231.20 m2 30,000 0.00% - 0.00% - 0.00% - - 6,936,000
- Plasteran dengan mortar 371.82 m2 35,000 0.00% - 0.00% - 0.00% - - 13,013,840
25 Agustus 2022 s/d 13 Oktober 2022
sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal
- Acian dengan mortar 289.68 m2 25,000 0.00% - 0.00% - 0.00% - - 7,242,000
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.79 m' 7,500 0.00% - 0.00% - 0.00% - - 545,904

PA LT. 4 Pekejaan Arsitek Lt. 4 - 32,715,344


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perek 231.20 m2 30,000 0.00% - 0.00% - 0.00% - - 6,936,000
- Plasteran dengan mortar 371.82 m2 35,000 0.00% - 0.00% - 0.00% - - 13,013,840
- Acian dengan mortar 289.68 m2 25,000 0.00% - 0.00% - 0.00% - - 7,242,000
2 Pekerjaan Kolom Praktis 136.00 m' 30,000 0.00% - 0.00% - 0.00% - - 4,080,000
3 Finishing Opening Pintu dan Jendela 59.84 m' 15,000 0.00% - 0.00% - 0.00% - - 897,600
4 Finishing Sekonengan Sudut 72.79 m' 7,500 0.00% - 0.00% - 0.00% - - 545,904
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
5.84% 7,440,000 11.20% 14,272,500 127,403,600

Note:
Pekerjaan Plesteran Luar menjadi 2 sisi yang diperhitungan sebelumnya adalah 1 sisi saja, dikarenakan posisi bangunan yg baru berdiri sendiri jadi diutamakan terlebih dahulu plester luar sisi kanan dan kiri.
item pekerjaan belum termasuk pembersihan bongkaran bekisting dan scafolding dari pihak kontraktor struktur
Adapun Pekerjaan tambah lainnya (pasangan dinding toren area atap finish plaster) dan juga pekerjaan tanggulan beton area opening tampak depan dan belakang
PROGRESS PEKERJAAN

Nama Proyek : Pekerjaa Pekerjaan Finishing Bata PITH


Lokasi Proyek : Pondok Pondok Indah Town House
Type : Unit C-25 Type Standart 4 Bare
Periode : 25 Agustus 2022 s/d 13 Oktober 2022

Total
No Description Progress Total Pekerjaan Keterangan
Pekerjaan

1 Pekerjaan Persiapan 3,209,250 4,845,000 PRELIM 66%


2 Pekejaan Arsitek Lt. Dasar 6,385,000 8,190,535 PA LT. DSR 78%
3 Pekejaan Arsitek Lt. 2 7,977,200 9,425,569 PA LT. 2 85%
4 Pekejaan Arsitek Lt. 3 6,105,000 10,447,248 PA LT. 3 58%
5 Pekejaan Arsitek Lt. 4 6,990,000 10,447,248 PA LT. 4 67%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%
7 Pekerjaan Tambah 10,575,000 14,046,256 PT 75%

41,241,450 58,781,856 70%

25 Agustus 2022 s/d 13 Oktober 2022


Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan 3,209,250 4,845,000


1 Langsiran Material 1.00 ls 1,200,000 70.00% 0.7 840,000 0.00% - 70.00% 0.70 840,000 1,200,000
2 Pasang dan bongkar Scafolding 1.00 ls 3,645,000 65.00% 0.65 2,369,250 0.00% - 65.00% 0.65 2,369,250 3,645,000

PA LT. DSPekejaan Arsitek Lt. Dasar 6,385,000 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 114.78 m2 30,000 86.25% 99 2,970,000 9.58% 11 330,000 95.84% 110.00 3,300,000 3,443,310
- Plasteran dengan mortar 60.78 m2 35,000 87.20% 53 1,855,000 0.00% - 87.20% 53.00 1,855,000 2,127,271
- Acian dengan mortar 31.34 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis 43.30 m' 30,000 71.59% 31 930,000 23.10% 10 300,000 94.69% 41.00 1,230,000 1,298,981
3 Finishing Opening Pintu dan Jendela 26.54 m' 15,000 0.00% 0 - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut 5.05 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area 50.80 m' 2,000 0.00% 0 - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 7,977,200 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 133.74 m2 30,000 97.01% 129.74 3,892,200 0.00% - 97.01% 129.74 3,892,200 4,012,290
- Plasteran dengan mortar 70.82 m2 35,000 94.60% 67 2,345,000 0.00% - 94.60% 67.00 2,345,000 2,478,785
- Acian dengan mortar 36.52 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis 50.45 m' 30,000 97.12% 49 1,470,000 0.00% - 97.12% 49.00 1,470,000 1,513,627
3 Finishing Opening Pintu dan Jendela 30.92 m' 15,000 0.00% 0 - 58.21% 18 270,000 58.21% 18.00 270,000 463,806
4 Finishing Sekonengan Sudut 5.89 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 6,105,000 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 148.24 m2 30,000 83.65% 124 3,720,000 11.47% 17 510,000 95.12% 141.00 4,230,000 4,447,200
- Plasteran dengan mortar 78.50 m2 35,000 0.00% 0 - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar 40.47 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis 55.92 m' 30,000 87.62% 49 1,470,000 7.15% 4 120,000 94.77% 53.00 1,590,000 1,677,696
3 Finishing Opening Pintu dan Jendela 34.27 m' 15,000 0.00% 0 - 55.44% 19 285,000 55.44% 19.00 285,000 514,080
25 Agustus 2022 s/d 13 Oktober 2022
sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak
No. Item Pekerjaan Volume Unit Harga Satuan (Rp. )
% Volume Nominal % Volume Nominal % Volume Nominal
4 Finishing Sekonengan Sudut 6.53 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 6,990,000 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan pere 148.24 m2 30,000 24.28% 36 1,080,000 66.11% 98 2,940,000 90.39% 134.00 4,020,000 4,447,200
- Plasteran dengan mortar 78.50 m2 35,000 0.00% 0 - 42.04% 33 1,155,000 42.04% 33.00 1,155,000 2,747,472
- Acian dengan mortar 40.47 m2 25,000 0.00% 0 - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis 55.92 m' 30,000 28.61% 16 480,000 62.59% 35 1,050,000 91.20% 51.00 1,530,000 1,677,696
3 Finishing Opening Pintu dan Jendela 34.27 m' 15,000 0.00% 0 - 55.44% 19 285,000 55.44% 19.00 285,000 514,080
4 Finishing Sekonengan Sudut 6.53 m' 7,500 0.00% 0 - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali 138.00 m' 10,000 0.00% 0 - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
PT Pekerjaan Tambah 10,575,000 14,046,256
1 Pekerjaan Sipil dan Prelime Tambahan
- Plasteran dengan mortar 60.78 m2 35,000 80.62% 49 1,715,000 0.00% - 80.62% 49.00 1,715,000 2,127,271
- Plasteran dengan mortar 70.82 m2 35,000 77.66% 55 1,925,000 0.00% - 77.66% 55.00 1,925,000 2,478,785
- Pasang Bongkar Scafolding 364.50 m2 5,000 38.96% 142 710,000 0.00% - 38.96% 142.00 710,000 1,822,500
2 Pekerjaan Finishing Dinding Atap & Toren
- Pasangan Dinding bata ringan dengan pere 37.50 m2 30,000 0.00% - 80.00% 30 900,000 80.00% 30.00 900,000 1,125,000
- Plasteran dengan mortar sisi dalam atap 87.00 m2 35,000 0.00% - 86.21% 75 2,625,000 86.21% 75.00 2,625,000 3,045,000
- Plasteran dengan mortar area dinding toren 75.00 m2 35,000 0.00% - 80.00% 60 2,100,000 80.00% 60.00 2,100,000 2,625,000
- Pasang Bongkar Scafolding area atap 164.54 m2 5,000 0.00% - 72.93% 120 600,000 72.93% 120.00 600,000 822,700
22.92% 13,470,000 70.16% 41,241,450 58,781,856

Note:
Pekerjaan Plesteran Luar menjadi 2 sisi yang diperhitungan sebelumnya adalah 1 sisi saja, dikarenakan posisi bangunan yg baru berdiri sendiri jadi diutamakan terlebih dahulu plester luar sisi kanan dan kiri.
item pekerjaan belum termasuk pembersihan bongkaran bekisting dan scafolding dari pihak kontraktor struktur
Adapun Pekerjaan tambah lainnya (pasangan dinding toren area atap finish plaster) dan juga pekerjaan tanggulan beton area opening tampak depan dan belakang
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit C-01 Type Bare 4 Lantai
Periode : 25 Agustus 2022 s/d 13 Oktober 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

25 Agustus 2022 s/d 13 Oktober 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit A-06 Type Bare 4 Lantai
Periode : 25 Agustus 2022 s/d 13 Oktober 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

25 Agustus 2022 s/d 13 Oktober 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit C-03 Type Bare 4 Lantai
Periode : 25 Agustus 2022 s/d 13 Oktober 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

25 Agustus 2022 s/d 13 Oktober 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit C-11 Type Bare 4 Lantai
Periode : 25 Agustus 2022 s/d 13 Oktober 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

25 Agustus 2022 s/d 13 Oktober 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
PROGRESS PEKERJAAN
Nama Proyek : Pekerjaan Finishing Bata PITH
Lokasi Proyek : Pondok Indah Town House
Type : Unit C-23 Type Bare 4 Lantai
Periode : 25 Agustus 2022 s/d 13 Oktober 2022

No Description Total Progress Pekerjaan Total Pekerjaan Keterangan

1 Pekerjaan Persiapan - 4,845,000 PRELIM 0%


2 Pekejaan Arsitek Lt. Dasar - 8,190,535 PA LT. DSR 0%
3 Pekejaan Arsitek Lt. 2 - 9,425,569 PA LT. 2 0%
4 Pekejaan Arsitek Lt. 3 - 10,447,248 PA LT. 3 0%
5 Pekejaan Arsitek Lt. 4 - 10,447,248 PA LT. 4 0%
6 Pekerjaan Lain-lain - 1,380,000 PLL 0%

- 44,735,600 0%

25 Agustus 2022 s/d 13 Oktober 2022


No. Item Pekerjaan Spesifikasi bahan & Pekerjaan Volume Unit Harga Satuan sd Minggu Lalu Minggu Ini Total Pekerjaan Total Kontrak (Rp. ) Remarks
% Volume Nominal % Volume Nominal % Volume Nominal

PRELIM Pekerjaan Persiapan - 4,845,000


1 Langsiran Material Menggunakan Gondola by Owner 1.00 ls 1,200,000 0.00% - 0.00% - 0.00% - - 1,200,000
2 Pasang dan bongkar Scafolding Manual Work 1.00 ls 3,645,000 0.00% - 0.00% - 0.00% - - 3,645,000

PA LT. DSR Pekejaan Arsitek Lt. Dasar - 8,190,535


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 114.78 m2 30,000 0.00% - 0.00% - 0.00% - - 3,443,310
- Plasteran dengan mortar Material By Owner 60.78 m2 35,000 0.00% - 0.00% - 0.00% - - 2,127,271
- Acian dengan mortar Material By Owner 31.34 m2 25,000 0.00% - 0.00% - 0.00% - - 783,432
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 43.30 m' 30,000 0.00% - 0.00% - 0.00% - - 1,298,981
3 Finishing Opening Pintu dan Jendela Material By Owner 26.54 m' 15,000 0.00% - 0.00% - 0.00% - - 398,034
4 Finishing Sekonengan Sudut Material By Owner 5.05 m' 7,500 0.00% - 0.00% - 0.00% - - 37,908
5 Tali Air diatas Granite tile ( saat ini di area GF ) Material By Owner 50.80 m' 2,000 0.00% - 0.00% - 0.00% - - 101,600

PA LT. 2 Pekejaan Arsitek Lt. 2 - 9,425,569


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 133.74 m2 30,000 0.00% - 0.00% - 0.00% - - 4,012,290
- Plasteran dengan mortar Material By Owner 70.82 m2 35,000 0.00% - 0.00% - 0.00% - - 2,478,785
- Acian dengan mortar Material By Owner 36.52 m2 25,000 0.00% - 0.00% - 0.00% - - 912,888
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 50.45 m' 30,000 0.00% - 0.00% - 0.00% - - 1,513,627
3 Finishing Opening Pintu dan Jendela Material By Owner 30.92 m' 15,000 0.00% - 0.00% - 0.00% - - 463,806
4 Finishing Sekonengan Sudut Material By Owner 5.89 m' 7,500 0.00% - 0.00% - 0.00% - - 44,172

PA LT. 3 Pekejaan Arsitek Lt. 3 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960

PA LT. 4 Pekejaan Arsitek Lt. 4 - 10,447,248


1 Pekerjaan Finishing Dinding
- Pasangan Dinding bata ringan dengan perekat Material By Owner 148.24 m2 30,000 0.00% - 0.00% - 0.00% - - 4,447,200
- Plasteran dengan mortar Material By Owner 78.50 m2 35,000 0.00% - 0.00% - 0.00% - - 2,747,472
- Acian dengan mortar Material By Owner 40.47 m2 25,000 0.00% - 0.00% - 0.00% - - 1,011,840
2 Pekerjaan Kolom Praktis Material By Owner (bekisting,besi dan cor) 55.92 m' 30,000 0.00% - 0.00% - 0.00% - - 1,677,696
3 Finishing Opening Pintu dan Jendela Material By Owner 34.27 m' 15,000 0.00% - 0.00% - 0.00% - - 514,080
4 Finishing Sekonengan Sudut Material By Owner 6.53 m' 7,500 0.00% - 0.00% - 0.00% - - 48,960
0.00%
PLL Pekerjaan Lain-lain - 1,380,000
1 Pekerjaan Plaster Aci Exterior Dengan Tali Air 138.00 m' 10,000 0.00% - 0.00% - 0.00% - - 1,380,000
- Plaster Aci sudah termasuk item di atas
- Harga ini adalah tambahan untuk tali air saja
0.00% - 0.00% - 44,735,600 WRK
DOKUMENTASI PROGRESS PEKERJAAN SAMPAI DENGAN 24 AGUSTUS 2022

1 Unit C-09 Type Standart 4 Lantai isi

2
3 Unit C-25 Plester dinding sopi-sopi sisi dalam

4 Unit A-08
5 Unit C-07 Unit C-07

6 Unit C-09 Unit C-09


7 Tampak Depan C-05 Unit C-09

8 Area Dalam C-05 Unit C-05

MARKING PROGRESS PEKERJAAN SAMPAI DENGAN 24 AGUSTUS 2022


1 Block C-25 LT.1
2 Block C-25 LT.2
3 Block C-25 LT.1
4 Block C-25 LT.2
5 Block C-25 LT.3
6 Block C-05
7 Block C-07
8 Block C-09
9 Block C-25 Dinding Sopi-sopi atap
10 Block A-08

Anda mungkin juga menyukai