KONAWE TEAM AGUS

Tanggal 31/03/2021 shift 1

TOTAL PENYELESAIAN
NO Tanggal UNIT KERUSAKAN Jam masuk STATUS ACTION
HARI
1 10/03/2021 RKM 201 Insident 20.39 BD ON PROGRES 20 HARI
2 31/03/2021 RKM 212 karet stoper kaca kendor BD
3 RKM 225 RFU
4 31/03/2021 RKM 226 low power BD
5 RKM 228 RFU
6 RKM 229 PUMP PTO 21.00 BD
7 RKM 230 ganti exesel BD
8 RKM 231 RFU
9 RKM 232 RFU
10 28/03/2021 RKM 233 ganti ring piston ( waiting part) 07.00 BD
11 20/02/2021 RKM 235 O/H NAIKAN TRANSMISI BD ON PROGRES 38 HARI
12 RKM 237 RFU
13 25/03/2021 RKM 238 RFU
14 RKM 239 RFU
15 10/03/2021 RKM 240 Insident ( STOPER KABIN PATAH ) KENTENG BD ON PROGRES 20 HARI
16 20/03/2021 RKM 241 Insident ( STOPER KABIN PATAH ) KENTENG BD 10 HARI
17 RKM 242 RFU
18 RKM 243 RFU
19 RKM 244 RFU
20 RKM 248 RFU

Total BD 9 UNIT
total RFU 11 UNIT

KETERANGAN BREACK DOWN LEBIH DARI 2 HARI


RFU HARI INI
BREACK DOWN BARU