Anda di halaman 1dari 17

LEMBAGA MANAJEMEN ASET NEGARA (LMAN)

KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA

CHECK LIST PEKERJAAN

BOBOT
PEK.
NO. URAIAN
PROGRES
(%)

B PEKERJAAN PERSIAPAN
TOTAL PEKERJAAN PERSIAPAN 6.6625 83%
C PEKERJAAN STRUKTUR
1 PEKERJAAN TANAH
0.1287 100%
2 PEKERJAAN PERBAIKAN STRUKTUR LANTAI I & STRUKTUR LANTAI 2
17.4802 100%
3 PEKERJAAN LAIN-LAIN
3.4581 93,8%
D PEKERJAAN ARSITEKTUR
PEKERJAAN ARSITEKTUR LANTAI 1
TOTAL PEKERJAAN ARSITEKTUR LT 1 15.3532 90,6%
PEKERJAAN ARSITEKTUR LANTAI 2
TOTAL PEKERJAAN ARSITEKTUR LT 2 17.4923 93,3%
PEKERJAAN SANITAIR
TOTAL PEKERJAAN SANITAIR 1.8936 92,4%
E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING
A SISTEM PLUMBING
TOTAL PEKERJAAN SISTEM PLUMBING 3.0409 69,6%
B SISTEM TATA UDARA DAN VENTILASI
TOTAL PEKERJAAN SISTEM TATA UDARA & VENTILASI 5.0156 98%
C SISTEM LISTRIK
TOTAL PEKERJAAN SISTEM LISTRIK 11.5544 78,9%
D SISTEM PENANGKAL PETIR
TOTAL PEKERJAAN SISTEM PENANGKAL PETIR 0.1756 100%
E SISTEM PENGINDERA API
TOTAL PEKERJAAN SISTEM PENGINDERA API 1.0122 30,8%
F SISTEM JARINGAN CCTV
TOTAL PEKERJAAN SISTEM JARINGAN CCTV 0.5143 100%
G SISTEM TELEPON
TOTAL PEKERJAAN SISTEM TELEPON & PABX 0.5088 25,2%
H SISTEM JARINGAN DATA
TOTAL PEKERJAAN SISTEM JARINGAN DATA 1.1589 87,6%
I SISTEM TATA SUARA
TOTAL PEKERJAAN SISTEM TATA SUARA 0.1941 19,9
J SISTEM JARINGAN MATV
TOTAL PEKERJAAN SISTEM JARINGAN MATV 0.5316 21,4%
K SISTEM AKSES PINTU DIGITAL
TOTAL PEKERJAAN SISTEM AKSES PINTU DIGITAL 1.3251 0%
F PEKERJAAN LANDSCAPE
TOTAL PEKERJAAN LANDSCAPE 3.5859 67,1%
G INTERIOR FIXTURES & SIGNAGE
TOTAL PEKERJAAN INTERIOR FIXTURES & SIGNAGE 8.9140 20,4%

GRAND TOTAL 100.00 81%


LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA

CHECK LIST PEKERJAAN

SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

B PEKERJAAN PERSIAPAN
1 Biaya Manajemen dan Koordinasi Lapangan 3.0226 74,9%
2 Biaya Pembuatan Dokumen Kontrak 0.0154 50%
3 Gambar Kerja (Shop Drawing) 0.0924 76,6%
4 Gambar Terlaksana (As Built Drawing) 0.0770 0%
6 Mobilisasi dan Demobilisasi 0.1385 78,4%
7 Papan Nama Proyek 0.0231 0%
8 Pengukuran (Bouwplank) dan Pembersihan Area Proyek 0.1155 82,7%
9 Pengadaan Air Kerja 0.1155 76,6%
9 Pengadaan Listrik Kerja 0.1924 94,9%
10 Photo -Photo Kemajuan Pekerjaan 0.0154 79,7%
11 Kebersihan dan Kerapian 0.2771 93,1%
12 Peralatan dan Perlengkapan kerja 0.5234 80,3%
13 Contoh - Contoh Bahan 0.0770 50%
15 Alat Pelindung Diri, Perlengkapan K3 & P3K 0.7697 79,6%
Laporan Pembuatan laporan dan penggandaannya sesuai Petunjuk MK (dengan persetujuan Pemberi Tugas) wajib
0.0924 79,6%
dibuat Pemborong termasuk laporan harian.mingguan dan ataupun bulanan. i
TOTAL PEKERJAAN PERSIAPAN 6.6625 83%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA

CHECK LIST PEKERJAAN

SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

C PEKERJAAN STRUKTUR
3 PEKERJAAN LAIN-LAIN
- Beton 0.0669 90% 7-Feb-21
2. Tangga Depan
- Beton 0.0191 90% 7-Feb-21
3. Tangga Dalam
- Beton 0.0083 0% 7-Feb-21
3.4581 93,8%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA

CHECK LIST PEKERJAAN

SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

D PEKERJAAN ARSITEKTUR
PEKERJAAN ARSITEKTUR LANTAI 1
1 Akses Jalan, Pos Satpam, Saluran & Pagar Lingkungan
1 Pek. Bongkaran Pagar 0.0493 50%
2 Pek. Perapihan Bekas Bongkaran Pagar 0.1254 50%
6 Pek. Metal Facade Panel 0.4796 25% 9-Feb-21
2 Amphitheatre & Tangga Luar & Dalam
2 Pek. WPC Floor SG25H Amphitheatre 0.3137 0%
3 Pek. Railing Tangga 0.3654 0% 14-Feb-21
4 Pek. Pengecatan Beton 0.0571 0% 14-Feb-21
4 Ramp
2 Pek. Railing Tangga 0.6605 75% 9-Feb-21
5 Area Retail 1 - 6 & lounge
18 Pek. Rekondisi & Refinish Jendela Eksisting Retail 1-6 0.2463 90% 9-Feb-21
TOTAL PEKERJAAN ARSITEKTUR LT 1 15.3532 90,6%

PEKERJAAN ARSITEKTUR LANTAI 2


1 Area Event Hall, Common Space & Rental Office
13 Pek. Pas. Gravel 0.0271 0% 14-Feb-21
14 Pek. Pas. Plafond Gypsum 9mm 0.7767 95% 9-Feb-21
15 Pek. Pas. Shadowline 0.1148 95% 9-Feb-21
16 Pek. Pengecatan Plafond 0.2870 90% 11-Feb-21
17 Pek. Pas. Kusen & Pintu Kaca Tempered 12mm Frameless incl. Accessories 1.3659 85% 14-Feb-21
18 Pek. Pas. Kusen & Pintu Folding Kaca Tempered 12mm Frameless incl. Accessories 1.3650 85% 14-Feb-21
19 Pek. Pas. Partisi Kaca 5mm Framed Steel Hollow 20x40 1.9735 85% 14-Feb-21
23 Pek. Pas GRC Woodplank 0.1106 75% 11-Feb-21
6 Area FabLab
9 Pek. Pas. Kusen & Pintu Panel fin. HPL 0.2829 0% 14-Feb-21
10 Pek. Pas. Partisi Kaca 5mm Framed Steel Hollow 20x40 0.2360 75% 14-Feb-21
TOTAL PEKERJAAN ARSITEKTUR LT 2 17.4923 93,3%

PEKERJAAN SANITAIR
1 Lantai 1
Area Lounge
Toilet Wanita
5 Cermin 0.0085 0% 11-Feb-21
Lavatory Wanita
5 Cermin 0.0170 0% 11-Feb-21
Toilet Pria
Lavatory Pria
5 Cermin 0.0085 0% 11-Feb-21
Urinal Pria
4 Divider 0.0273 0% 3-Feb-21
Toilet Disabled
Lavatory Disabled
6 Cermin 0.0085 0% 11-Feb-21
TOTAL PEEKRJAAN SANITAIR LT 1 1.5580 95%

2 Lantai 2
Toilet Wanita
5 Double Roob Hook 0.0064 0% 3-Feb-21
Lavatory Wanita/Pria
5 Cermin 0.0085 0% 11-Feb-21
Toilet Pria
5 Double Roob Hook 0.0064 0% 3-Feb-21
Area Even Hall, Common Space, Roff Top
1 Floor/Roof Drain 0.0445 0% 9-Feb-21
TOTAL PEKERJAAN SANITAIR LT 2 0.3356 81%
TOTAL PEKERJAAN SANITAIR 1.8936 92,4%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA

CHECK LIST PEKERJAAN

SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


A SISTEM PLUMBING
I. PERALATAN UTAMA SISTEM DISTRIBUSI AIR BERSIH
a. POMPA BOOSTER ( BP.1 & BP.2 ) 0.5045 0% 11-Feb-21
a. POMPA TRANSFER 0.1595 0% 11-Feb-21
i. PEKERJAAN RISER SISTEM DISTRIBUSI AIR BERSIH
1.1694
II. PEKERJAAN PEMIPAAN SISTEM DISTRIBUSI AIR BERSIH
0.2348
III. PEKERJAAN PEMIPAAN DAN FITTING
SISTEM DISTRIBUSI AIR KOTOR, AIR BUANGAN & VENT
1.3375
IRIGASI TAMAN
4 Pemipaan
- rotary springkler Taman 0.0144 0% 15-Feb-21
- water spray gun (le kwan yew planter 1&2) 0.1195 0% 15-Feb-21
- accesories, Fiting - Fiting 0.0077 0% 15-Feb-21

b. Pompa multi starge 0,5 hp 0.1002 0% 15-Feb-21

c. sitem Filter RWH ( kontruksi bak filter + RWH by sipil ) 0.0159 0% 15-Feb-21

0.2992
TOTAL PEKERJAAN SISTEM PLUMBING 3.0409 69,6%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA

CHECK LIST PEKERJAAN

SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


B SISTEM TATA UDARA DAN VENTILASI
I. INSTALASI & FIXTURE
1 LANTAI DASAR
Fixtures
- Ceiling Exhaust Fan 100cfm 0.0502 0% 15-Feb-21
2 LANTAI ATAS
- Ceiling Exhaust Fan 124.2 cfm 0.0201 0% 15-Feb-21
- Wall Exhaust axial Fan 35.5 cfm 0.0201 0% 15-Feb-21
5.0156
TOTAL PEKERJAAN SISTEM TATA UDARA & VENTILASI 5.0156 98%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA
CHECK LIST PEKERJAAN
SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


C SISTEM LISTRIK
I. PERALATAN UTAMA
b. Generator Set (Genset) Kap. 80 KVA 4.0141 75% 10-Feb-21
Incl. Instalasi & Pondasi
4.0141
II. PANEL PENERANGAN, PANEL DAYA
1 Lantai Dasar
- Panel Utama Tegangan Rendah (PUTR) 0.8475 0% 4-Feb-21
- PP/LP - A 0.0786 90% 4-Feb-21
- PP/LP - B 0.1838 90% 4-Feb-21
- PP/LP - C 0.2480 90% 4-Feb-21
- PP - FABLAB 0.2480 90% 4-Feb-21
- panel pompa transfer / PP-AB 0.0802 90% 4-Feb-21
- PP/LP -outdoor 0.0602 90% 4-Feb-21
- PP/RITEL 0.1064 90% 4-Feb-21
- PP/LP - OL 0.0535 90% 4-Feb-21
- Panel kontrol pompa irigasi / RWH 0.0702 90% 4-Feb-21
2 Lantai Atas
- PP-LP C 0.2480 90% 7-Feb-21
- panel pompa booster ( posisi area torn ) 0.0602 90% 7-Feb-21

2.2847
III. PENTANAHAN
0.1495
IV. KABEL DISTRIBUSI
0.7330
V. INSTALASI & FIXTURES GEDUNG
A. SITE PLAN
- Instalasi Penerangan land scape NYY 3 x 2.5mm 0.0693 0% 9-Feb-21
- Instalasi floor light tangga 0.1031 0% 9-Feb-21

Fixtures & Armatures Lampu


- Flood Light LED 20 w 220V 0.0140 0% 12-Feb-21
- Spot Light cob LED 5 w 220V 0.0379 0% 12-Feb-21
- Floor Light LED 2 w 220V 0.0819 0% 12-Feb-21
A. LANTAI dasar
- Stop Kontak Under Floor IPh,13-16A,250V 0.0039 75% 22-Feb-21
B. ZONE RETAIL
- Stop Kontak Under Floor IPh,13-16A,250V 0.0104 75% 22-Feb-21
B. LANTAI ATAS
Fixtures & Armatures Lampu
- Recessed Mounted TypeSMART BRIGHT 29W 0.0783 0% 16-Feb-21
- Recessed Mounted Down Light SMART BRIGHT LED 9W 0.0058 0% 16-Feb-21
- Surface Mounted LED Type Balk 1x16W /220V 0.0100 0% 16-Feb-21

Fixtures Saklar & Stop Kontak


- Stop Kontak Under Floor IPh,13-16A,250V 0.0313 75% 22-Feb-21
- Saklar Tukar Tunggal/ Engkel,1 Gang,1 Way 0.0008 0% 16-Feb-21
- Saklar Ganda/ Serie,2 Gang,1 Way 0.0111 0% 16-Feb-21

3.4376
VI. KABEL LADDER & KABEL TRAY
0.9355
TOTAL PEKERJAAN SISTEM LISTRIK 11.5544 78,9%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA
CHECK LIST PEKERJAAN
SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


D SISTEM PENANGKAL PETIR

I. PERALATAN UTAMA
TOTAL PEKERJAAN SISTEM PENANGKAL PETIR 0.1756 100%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA
CHECK LIST PEKERJAAN
SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


E SISTEM PENGINDERA API
I. PERALATAN UTAMA
1. Master/ Main Control Fire Alarm (MCFA) Type 0.1191 0% 10-Feb-21
2 Announciator 5 zone 0.0471 0% 10-Feb-21
0.1662
II. KABEL DISTRIBUSI
0.0510
III. PEKERJAAN INSTALASI & FIXTURES
1 Lantai dasar
a. Terminal Boks
- TB-FA.1 0.0059 0% 10-Feb-21

c. Fixtures
- Optical Smoke Detector 0.0562 0% 14-Feb-21
- Optical Heat Detector,Rate Of Rase Type 0.0281 0% 14-Feb-21
- Optical Heat Detector,Fixed Type 0.0030 0% 14-Feb-21
- Alarm Bell 0.0040 0% 14-Feb-21
- Flashing Signal Lamp 0.0035 0% 14-Feb-21
- Manual Call Point 0.0084 0% 14-Feb-21
- Multi Purpose Dry Chemical Fire Extinguisher 3 kg 0.1316 0% 14-Feb-21

2 Lantai Atas
a. Terminal Boks
- TB-FA.2 0.0059 0% 10-Feb-21
c. Fixtures
- Optical Smoke Detector 0.1265 0% 16-Feb-21
- Optical Heat Detector,Rate Of Rase Type 0.0035 0% 16-Feb-21
- Alarm Bell 0.0040 0% 16-Feb-21
- Flashing Signal Lamp 0.0035 0% 16-Feb-21
- Manual Call Point 0.0084 0% 16-Feb-21
- Multi Purpose Dry Chemical Fire Extinguisher 0.1410 0% 16-Feb-21
3 Kg
0.7951
TOTAL PEKERJAAN SISTEM PENGINDERA API 1.0122 30,8%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA
CHECK LIST PEKERJAAN
SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN KETERANGAN
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


F SISTEM JARINGAN CCTV
I. PERALATAN UTAMA
0.2181
II. PEKERJAAN INSTALASI & FIXTUIRES
0.2961
TOTAL PEKERJAAN SISTEM JARINGAN CCTV 0.5143 100%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA
CHECK LIST PEKERJAAN
SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


G SISTEM TELEPON
I. PERALATAN UTAMA
a. PABX
Kapasitas : 8 Line, 24 Extension 0.3017 0% 18-Feb-21
- Jasa Instalasi beserta penambahan aksesoris lainnya 0.0789 0% 18-Feb-21
0.3806
II. PEKERJAAN INSTALASI & FIXTURES
0.1282
TOTAL PEKERJAAN SISTEM TELEPON & PABX 0.5088 25,2%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA
CHECK LIST PEKERJAAN
SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


H SISTEM JARINGAN DATA
I. PERALATAN UTAMA
a. SERVER (BY OWNER)
1. Lantai dasar
- Switch Hub 24 Ports,10/100/1000 Mbps, 0.0604 75% 5-Feb-21
- Patch Panel 24 Ports,RG 45 Cat 6 0.0313 75% 5-Feb-21
- Patch Cord,RG 45 Cat 6 0.0301 75% 5-Feb-21
- Rack Close 9U,Depth=600 mm Lengkap Dengan 0.1495 75% 5-Feb-21
Roof Fan Dan Power Outlet
2 Lantai atas
- Switch Hub 24 Ports,10/100/1000 Mbps, 0.0604 75% 5-Feb-21
- Patch Panel 24 Ports,RG 45 Cat 6 0.0313 75% 5-Feb-21
- Patch Cord,RG 45 Cat 6 0.0301 75% 5-Feb-21
- Rack Close 20U,Depth=600 mm Lengkap Dengan 0.1785 75% 5-Feb-21
Roof Fan Dan Power Outlet
0.5717
II. PEKERJAAN INSTALASI & FIXTUIRES
0.5872
TOTAL PEKERJAAN SISTEM JARINGAN DATA 1.1589 87,6%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA
CHECK LIST PEKERJAAN
SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


I SISTEM TATA SUARA
I. PERALATAN UTAMA PUBLIC ADRESS
- Power Amplifier, 240W/220V/1Ph/50 Hz cw USB port 0.0742 0% 18-Feb-21
- Paging Microphone 0.0369 0% 18-Feb-21
- Dari Main Distribution Frame ( MDF ) Lantai 1 ke :
- MDF-SS 0.0059 0% 18-Feb-21
0.1171
II. INSTALASI & FIXTURES
1 Lantai Dasar
c. Fixtures
- Ceiling Speaker 3 Watt rms 0.0191 0% 10-Feb-21
2 Lantai Atas
c. Fixtures
- Ceiling Speaker 3 Watt rms 0.0191 0% 10-Feb-21
0.0770
TOTAL PEKERJAAN SISTEM TATA SUARA 0.1941 19,9
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA
CHECK LIST PEKERJAAN
SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


J SISTEM JARINGAN MATV
I. PERALATAN UTAMA (MATV 16 Channel)
1 Antenna Parabola (UHF/VHF) 0.0363 0% 18-Feb-21
2 Modulator 8 Channel 0.1056 0% 18-Feb-21
3 Receiver 0.1429 0% 18-Feb-21
4 Tap 0.0166 0% 18-Feb-21
5 Powerpass 0.0126 0% 18-Feb-21
6 Booster 0.0301 0% 18-Feb-21
7 Gross Connector 0.0066 0% 18-Feb-21
8 Power Terminal 6 Lubang 0.0044 0% 18-Feb-21
9 Rack 0.0159 0% 18-Feb-21
10 LED TV 32" incl. bracket 0.0466 0% 18-Feb-21

0.4176
II. PEKERJAAN INSTALASI & FIXTUIRES
0.1141
TOTAL PEKERJAAN SISTEM JARINGAN MATV 0.5316 21,4%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA
CHECK LIST PEKERJAAN
SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


K SISTEM AKSES PINTU DIGITAL
I. PERALATAN UTAMA & INSTALASI
1 Lantai 1
- Digital Glass Door Lock 0.3939 0% 22-Feb-21
- Digital Door Lock 0.0646 0% 22-Feb-21
2 LANTAI 2
- Digital Glass Door Lock 0.8666 0% 22-Feb-21
1.3251
TOTAL PEKERJAAN SISTEM AKSES PINTU DIGITAL 1.3251 0%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA

CHECK LIST PEKERJAAN

SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

F PEKERJAAN LANDSCAPE
I SOFTSCAPE AREA
Pek. Leveling Tanah Eksisting 0.0793 75% 11-Feb-21
Pek. Pas. Tanaman Pennisetum Rubrum 0.1309 0% 16-Feb-21
Pek. Pas. Tanaman Lee kwan Yu 0.1937 0% 16-Feb-21
Pek. Pas. Tanaman Thunbergia White 0.0124 0% 16-Feb-21
Pek. Pas. Tanaman Rumput Gajah Mini 0.1906 0% 16-Feb-21
Pek. Pas. Tanaman Bambu Cypres 0.2645 0% 16-Feb-21
Pek. Pas. Batu Bronjol 0.3335 50% 16-Feb-21
1.2049 18,7%
II HARDSCAPE AREA
Pek. Pas. Paving Block Ex. Cisangkan 0.2966 90% 11-Feb-21
Pek. Pas. Kansteen 1.7089 90% 11-Feb-21
2.3810 91,5%
TOTAL PEKERJAAN LANDSCAPE 3.5859 67,1%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS

Proyek : Pekerjaan Terintegrasi Rancang dan Bangun Aset Kelolaan LMAN


PT. ARTDEEZIGN SUKSES BERKAH
Lingkup : Pekerjaan Renovasi Co&Co Space Working
Lokasi : Jl. Dipatiukur No.33 Bandung
Tahun : 2020 - 2021 KONTRAKTOR PELAKSANA

CHECK LIST PEKERJAAN

SEBAGAI LAMPIRAN BERITA ACARA SERAH TERIMA PERTAMA (BAST I)

BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)

G INTERIOR FIXTURES & SIGNAGE


I INTERIOR FIXTURES
1 CW-DU.FF.01 Meja Resepsionis 2700 x 1200 x 660 0.2278 0% 11-Feb-21
2 CW-DU.FF.02 Backdrop Resepsionis + Logo 7300 x 2600 0.2032 75% 6-Feb-21
3 CW-DU.FF.03 Meja Bar Outdoor (Common Space) 6050 x 1100 x 600 0.1873 0% 18-Feb-21
4 CW-DU.FF.04 Ambalan Kolom 1 (650 x 640) dan 2 (750 x 580) 0.1135 0% 18-Feb-21
5 CW-DU.FF.05 Bangku/Bench Koridor 1 3500 x 650 x 400 0.0847 0% 21-Feb-21
6 CW-DU.FF.06 Bangku/Bench Koridor 2 5000 x 650 x 400 0.1232 0% 21-Feb-21
7 CW-DU.FF.07 Meja Bar Parapet 8190 x1000 x 300 0.2699 0% 21-Feb-21
8 CW-DU.FF.08 Meja Bar Prefunction 5550 x 940 x 550 0.3225 0% 21-Feb-21
10 CW-DU.FF.10 Kabinet Penyimpanan R. Rapat 0.0835 0% 18-Feb-21
12 CW-DU.FF.12 Backdrop Event Hall 1.2590 50% 21-Feb-21
13 CW-DU.FF.13 Double Side Wall Partition & Folding Door System 2.1490 0% 21-Feb-21
TOTAL PEKERJAAN INTERIOR FIXTURES 6.0622

II INTERIOR SIGNAGE

1 CW-DU.SG.01 Logo Sign 2425 x 630 x 50 0.1655 0% 13-Feb-21


2 CW-DU.SG.02 Tenant Sign 900 x 150 x 50 0.2725 0% 13-Feb-21
3 CW-DU.SG.03 Retail Sign 500 x 500 x 50 0.2857 0% 13-Feb-21
4 CW-DU.SG.04 Wayfinding amphiteater 1700 x 300 x 50 0.4314 0% 13-Feb-21
5 CW-DU.SG.05 Wayfinding entrance 1700 x 300 x 50 0.4413 0% 13-Feb-21
6 CW-DU.SG.06 Wayfinding toilet taman 450 x 300 0.0255 0% 13-Feb-21
7 CW-DU.SG.07 Wayfinding ramp 0.0243 0% 13-Feb-21
8 CW-DU.SG.08 Wayfinding lounge 0.0289 0% 13-Feb-21
9 CW-DU.SG.09 Wayfinding maps 0.0471 0% 13-Feb-21
10 CW-DU.SG.10 Wayfinding kolom 0.0246 0% 13-Feb-21
11 CW-DU.SG.11 Wayfinding tangga 0.0229 0% 13-Feb-21
12 CW-DU.SG.12 Sign entrance+CO&CO 0.0211 0% 13-Feb-21
13 CW-DU.SG.13 Logo Sign (indoor) 0.0326 0% 13-Feb-21
14 CW-DU.SG.14 Sign resepsionis 0.0051 0% 13-Feb-21
15 CW-DU.SG.15 Sign office 0.0294 0% 13-Feb-21
16 CW-DU.SG.16 Sign meeting room 0.0065 0% 13-Feb-21
17 CW-DU.SG.17 Sign pantry 0.0039 0% 13-Feb-21
18 CW-DU.SG.18 Cubicle 1150 x 600 0.1491 0% 13-Feb-21
19 CW-DU.SG.19 Sign toilet 1 (Pria) 0.0066 0% 13-Feb-21
20 CW-DU.SG.20 Sign toilet 1 (Wanita) 0.0066 0% 13-Feb-21
21 CW-DU.SG.21 Sign toilet 2 (pria) 0.0132 0% 13-Feb-21
22 CW-DU.SG.22 Sign toilet 2 (wanita) 0.0132 0% 13-Feb-21
23 CW-DU.SG.23 Sign toilet 2 (difabel) 0.0066 0% 13-Feb-21
24 CW-DU.SG.24 Sign janitor 0.0066 0% 13-Feb-21
25 CW-DU.SG.25 Sign musholla 0.0023 0% 13-Feb-21
26 CW-DU.SG.26 Sign wudhu 0.0043 0% 13-Feb-21
27 CW-DU.SG.27 Sign gudang 0.0018 0% 13-Feb-21
28 CW-DU.SG.28 Sign R. Panel 0.0019 0% 13-Feb-21
29 CW-DU.SG.29 Sign Server 0.0039 0% 13-Feb-21
30 CW-DU.SG.30 Wayfinding Prefunction 0.0060 0% 13-Feb-21
31 CW-DU.SG.31 Wayfinding Common Space (indoor) 0.0088 0% 13-Feb-21
32 CW-DU.SG.32 Wayfinding tangga lt 2 0.0078 0% 13-Feb-21
33 CW-DU.SG.33 Sign event hall 0.0150 0% 13-Feb-21
34 CW-DU.SG.34 Sign common space (indoor) 0.0028 0% 13-Feb-21
35 CW-DU.SG.35 Sign Fablab 0.0034 0% 13-Feb-21
36 CW-DU.SG.36 Dilarang Merokok 0.0902 0% 13-Feb-21
37 CW-DU.SG.37 Peminjaman alat sholat 0.0040 0% 13-Feb-21
38 CW-DU.SG.38 Cuci kembali peralatan makan 0.0043 0% 13-Feb-21
39 CW-DU.SG.39 Staff Only 0.0101 0% 13-Feb-21
40 CW-DU.SG.40 Jalur evakuasi 0.0101 0% 13-Feb-21
41 CW-DU.SG.41 Area kumpul 2000 x 400 0.0701 0% 13-Feb-21
42 CW-DU.SG.42 Sign masuk dan keluar kendaraan + arah menuju parkir 0.4615 0% 13-Feb-21
43 CW-DU.SG.43 Drop only 2000 x 400 0.0691 0% 13-Feb-21
44 CW-DU.SG.44 Sign trash bin 0.0020 0% 13-Feb-21
45 CW-DU.SG.45 Security sign 0.0020 0% 13-Feb-21
TOTAL PEKERJAAN INTERIOR SIGNAGE 2.8517
TOTAL PEKERJAAN INTERIOR FIXTURES & SIGNAGE 8.9140 20,4%

Anda mungkin juga menyukai