KONSULTAN PENGAWAS
BOBOT
PEK.
NO. URAIAN
PROGRES
(%)
B PEKERJAAN PERSIAPAN
TOTAL PEKERJAAN PERSIAPAN 6.6625 83%
C PEKERJAAN STRUKTUR
1 PEKERJAAN TANAH
0.1287 100%
2 PEKERJAAN PERBAIKAN STRUKTUR LANTAI I & STRUKTUR LANTAI 2
17.4802 100%
3 PEKERJAAN LAIN-LAIN
3.4581 93,8%
D PEKERJAAN ARSITEKTUR
PEKERJAAN ARSITEKTUR LANTAI 1
TOTAL PEKERJAAN ARSITEKTUR LT 1 15.3532 90,6%
PEKERJAAN ARSITEKTUR LANTAI 2
TOTAL PEKERJAAN ARSITEKTUR LT 2 17.4923 93,3%
PEKERJAAN SANITAIR
TOTAL PEKERJAAN SANITAIR 1.8936 92,4%
E PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING
A SISTEM PLUMBING
TOTAL PEKERJAAN SISTEM PLUMBING 3.0409 69,6%
B SISTEM TATA UDARA DAN VENTILASI
TOTAL PEKERJAAN SISTEM TATA UDARA & VENTILASI 5.0156 98%
C SISTEM LISTRIK
TOTAL PEKERJAAN SISTEM LISTRIK 11.5544 78,9%
D SISTEM PENANGKAL PETIR
TOTAL PEKERJAAN SISTEM PENANGKAL PETIR 0.1756 100%
E SISTEM PENGINDERA API
TOTAL PEKERJAAN SISTEM PENGINDERA API 1.0122 30,8%
F SISTEM JARINGAN CCTV
TOTAL PEKERJAAN SISTEM JARINGAN CCTV 0.5143 100%
G SISTEM TELEPON
TOTAL PEKERJAAN SISTEM TELEPON & PABX 0.5088 25,2%
H SISTEM JARINGAN DATA
TOTAL PEKERJAAN SISTEM JARINGAN DATA 1.1589 87,6%
I SISTEM TATA SUARA
TOTAL PEKERJAAN SISTEM TATA SUARA 0.1941 19,9
J SISTEM JARINGAN MATV
TOTAL PEKERJAAN SISTEM JARINGAN MATV 0.5316 21,4%
K SISTEM AKSES PINTU DIGITAL
TOTAL PEKERJAAN SISTEM AKSES PINTU DIGITAL 1.3251 0%
F PEKERJAAN LANDSCAPE
TOTAL PEKERJAAN LANDSCAPE 3.5859 67,1%
G INTERIOR FIXTURES & SIGNAGE
TOTAL PEKERJAAN INTERIOR FIXTURES & SIGNAGE 8.9140 20,4%
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
B PEKERJAAN PERSIAPAN
1 Biaya Manajemen dan Koordinasi Lapangan 3.0226 74,9%
2 Biaya Pembuatan Dokumen Kontrak 0.0154 50%
3 Gambar Kerja (Shop Drawing) 0.0924 76,6%
4 Gambar Terlaksana (As Built Drawing) 0.0770 0%
6 Mobilisasi dan Demobilisasi 0.1385 78,4%
7 Papan Nama Proyek 0.0231 0%
8 Pengukuran (Bouwplank) dan Pembersihan Area Proyek 0.1155 82,7%
9 Pengadaan Air Kerja 0.1155 76,6%
9 Pengadaan Listrik Kerja 0.1924 94,9%
10 Photo -Photo Kemajuan Pekerjaan 0.0154 79,7%
11 Kebersihan dan Kerapian 0.2771 93,1%
12 Peralatan dan Perlengkapan kerja 0.5234 80,3%
13 Contoh - Contoh Bahan 0.0770 50%
15 Alat Pelindung Diri, Perlengkapan K3 & P3K 0.7697 79,6%
Laporan Pembuatan laporan dan penggandaannya sesuai Petunjuk MK (dengan persetujuan Pemberi Tugas) wajib
0.0924 79,6%
dibuat Pemborong termasuk laporan harian.mingguan dan ataupun bulanan. i
TOTAL PEKERJAAN PERSIAPAN 6.6625 83%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
C PEKERJAAN STRUKTUR
3 PEKERJAAN LAIN-LAIN
- Beton 0.0669 90% 7-Feb-21
2. Tangga Depan
- Beton 0.0191 90% 7-Feb-21
3. Tangga Dalam
- Beton 0.0083 0% 7-Feb-21
3.4581 93,8%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
D PEKERJAAN ARSITEKTUR
PEKERJAAN ARSITEKTUR LANTAI 1
1 Akses Jalan, Pos Satpam, Saluran & Pagar Lingkungan
1 Pek. Bongkaran Pagar 0.0493 50%
2 Pek. Perapihan Bekas Bongkaran Pagar 0.1254 50%
6 Pek. Metal Facade Panel 0.4796 25% 9-Feb-21
2 Amphitheatre & Tangga Luar & Dalam
2 Pek. WPC Floor SG25H Amphitheatre 0.3137 0%
3 Pek. Railing Tangga 0.3654 0% 14-Feb-21
4 Pek. Pengecatan Beton 0.0571 0% 14-Feb-21
4 Ramp
2 Pek. Railing Tangga 0.6605 75% 9-Feb-21
5 Area Retail 1 - 6 & lounge
18 Pek. Rekondisi & Refinish Jendela Eksisting Retail 1-6 0.2463 90% 9-Feb-21
TOTAL PEKERJAAN ARSITEKTUR LT 1 15.3532 90,6%
PEKERJAAN SANITAIR
1 Lantai 1
Area Lounge
Toilet Wanita
5 Cermin 0.0085 0% 11-Feb-21
Lavatory Wanita
5 Cermin 0.0170 0% 11-Feb-21
Toilet Pria
Lavatory Pria
5 Cermin 0.0085 0% 11-Feb-21
Urinal Pria
4 Divider 0.0273 0% 3-Feb-21
Toilet Disabled
Lavatory Disabled
6 Cermin 0.0085 0% 11-Feb-21
TOTAL PEEKRJAAN SANITAIR LT 1 1.5580 95%
2 Lantai 2
Toilet Wanita
5 Double Roob Hook 0.0064 0% 3-Feb-21
Lavatory Wanita/Pria
5 Cermin 0.0085 0% 11-Feb-21
Toilet Pria
5 Double Roob Hook 0.0064 0% 3-Feb-21
Area Even Hall, Common Space, Roff Top
1 Floor/Roof Drain 0.0445 0% 9-Feb-21
TOTAL PEKERJAAN SANITAIR LT 2 0.3356 81%
TOTAL PEKERJAAN SANITAIR 1.8936 92,4%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
c. sitem Filter RWH ( kontruksi bak filter + RWH by sipil ) 0.0159 0% 15-Feb-21
0.2992
TOTAL PEKERJAAN SISTEM PLUMBING 3.0409 69,6%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
2.2847
III. PENTANAHAN
0.1495
IV. KABEL DISTRIBUSI
0.7330
V. INSTALASI & FIXTURES GEDUNG
A. SITE PLAN
- Instalasi Penerangan land scape NYY 3 x 2.5mm 0.0693 0% 9-Feb-21
- Instalasi floor light tangga 0.1031 0% 9-Feb-21
3.4376
VI. KABEL LADDER & KABEL TRAY
0.9355
TOTAL PEKERJAAN SISTEM LISTRIK 11.5544 78,9%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
I. PERALATAN UTAMA
TOTAL PEKERJAAN SISTEM PENANGKAL PETIR 0.1756 100%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
c. Fixtures
- Optical Smoke Detector 0.0562 0% 14-Feb-21
- Optical Heat Detector,Rate Of Rase Type 0.0281 0% 14-Feb-21
- Optical Heat Detector,Fixed Type 0.0030 0% 14-Feb-21
- Alarm Bell 0.0040 0% 14-Feb-21
- Flashing Signal Lamp 0.0035 0% 14-Feb-21
- Manual Call Point 0.0084 0% 14-Feb-21
- Multi Purpose Dry Chemical Fire Extinguisher 3 kg 0.1316 0% 14-Feb-21
2 Lantai Atas
a. Terminal Boks
- TB-FA.2 0.0059 0% 10-Feb-21
c. Fixtures
- Optical Smoke Detector 0.1265 0% 16-Feb-21
- Optical Heat Detector,Rate Of Rase Type 0.0035 0% 16-Feb-21
- Alarm Bell 0.0040 0% 16-Feb-21
- Flashing Signal Lamp 0.0035 0% 16-Feb-21
- Manual Call Point 0.0084 0% 16-Feb-21
- Multi Purpose Dry Chemical Fire Extinguisher 0.1410 0% 16-Feb-21
3 Kg
0.7951
TOTAL PEKERJAAN SISTEM PENGINDERA API 1.0122 30,8%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN KETERANGAN
PROGRESS SELESAI PERBAIKAN
(%)
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
0.4176
II. PEKERJAAN INSTALASI & FIXTUIRES
0.1141
TOTAL PEKERJAAN SISTEM JARINGAN MATV 0.5316 21,4%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
F PEKERJAAN LANDSCAPE
I SOFTSCAPE AREA
Pek. Leveling Tanah Eksisting 0.0793 75% 11-Feb-21
Pek. Pas. Tanaman Pennisetum Rubrum 0.1309 0% 16-Feb-21
Pek. Pas. Tanaman Lee kwan Yu 0.1937 0% 16-Feb-21
Pek. Pas. Tanaman Thunbergia White 0.0124 0% 16-Feb-21
Pek. Pas. Tanaman Rumput Gajah Mini 0.1906 0% 16-Feb-21
Pek. Pas. Tanaman Bambu Cypres 0.2645 0% 16-Feb-21
Pek. Pas. Batu Bronjol 0.3335 50% 16-Feb-21
1.2049 18,7%
II HARDSCAPE AREA
Pek. Pas. Paving Block Ex. Cisangkan 0.2966 90% 11-Feb-21
Pek. Pas. Kansteen 1.7089 90% 11-Feb-21
2.3810 91,5%
TOTAL PEKERJAAN LANDSCAPE 3.5859 67,1%
LEMBAGA MANAJEMEN ASET NEGARA (LMAN)
KONSULTAN PENGAWAS
BOBOT
HASIL CEK LIST
PEK.
NO. URAIAN TARGET
PROGRESS SELESAI PERBAIKAN
(%)
II INTERIOR SIGNAGE