LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018

ANALISA HARGA SATUAN

PEMBUATAN HALL BARU STASIUN RANGKAS


A. PERSIAPAN UMUM
1 1 m2 Pembuatan bedeng buruh
Bahan
1.70000 Btg Kayu dolken 8 / 10 cm panjang 4 meter @ Rp. =
0.21000 M³ Kayu klas 1 usuk ukuran 4/6 ; 5/7 panjang 2 @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
10.50000 Kg Semen portland @ Rp. =
0.03000 M³ Pasir beton @ Rp. =
0.05000 M³ Koral beton 1-3 cm @ Rp. =
1.50000 Lbr Seng plat BJLS 30 diameter 90 cm @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.00000 Oh Pekerja @ Rp. =
2.00000 Oh Tukang Kayu @ Rp. =
0.20000 Oh Kepala Tukang @ Rp. =
0.05000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
2 1 m' Pengukuran dan Pasang Papan Bowplank
Baha
0.01200 M³ Kayu klas 1 usuk ukuran 4/6 ; 5/7 panjang 2 meter @ Rp. =

0.02000 Kg Paku usuk kayu 7 cm @ Rp. =


0.00700 M³ Papan begesting (MC) terentang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.10000 Oh Pekerja @ Rp. =
0.10000 Oh Tukang Kayu @ Rp. =
0.01000 Oh Kepala Tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
3 Saftey APD
Bahan
1.00000 bh rompi spotlight Rp. =
1.00000 bh helm Rp. =
1.00000 bh safety shoes Rp. =
1.00000 bh Sarung tangan Rp. =
Sub total : =
Dibulatkan : =
4 Listrik TDR PLN
Upah
3.50000 Kva Listrik TDR-PLN @ Rp. =
Sub total : =
Dibulatkan : =
5 Transportasi alat dan bahan per hari
Upah
1.00000 hr Sewa Pick Up @ Rp. =
Sub total : =
Dibulatkan : =
6 Safety line
Upah
1.00000 roll Safety line @ Rp. =
Sub total : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Dibulatkan : =

B. PEKERJAAN STRUKTUR HALL


I. Pekerjaan Struktur Hall
1 1 m3 Galian Untuk Tanah keras sedalam 1 m
Upah
0.62500 Oh Pekerja @ Rp. =
0.06200 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
2 1 m3 Urugan sirtu
Bahan
1.20000 m3 Sirtu @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.25000 Oh Pekerja @ Rp. =
0.02500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
3 1 Kg Pembesian dengan besi polos

Bahan
1.05000 Kg Besi beton @ Rp. =
0.01500 Kg Kawat beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
2 x pakai =
Dibulatkan : =
Upah
0.30000 Oh Pekerja @ Rp. =
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
6 1 m3 Urugan tanah merah Bahan

1.20000 m3 tanah merah @ Rp. =


Sub total : =
Dibulatkan : =
U
p 0.25000 Oh Pekerja @ Rp. =
a 0.02500 Oh Mandor @ Rp. =
h Sub total : =
Dibulatkan : =
7 1 m3 Pemadatan tanah
Upah
0,50000 Oh Pekerja @ Rp. = Rp
0,05000 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

8 1 m3 Urugan sirtu Bahan

1,20000 m3 Sirtu @ Rp. = Rp


Sub total : = Rp
Dibulatkan : = Rp
0,25000 Oh Pekerja @ Rp. = Rp
Upa 0,02500 Oh Mandor @ Rp. = Rp
h
Sub total : = Rp
Dibulatkan : = Rp

9 1m2 wiremesh M6
Bahan
1.05000 m2 wermesh M6 @ Rp. =
0.01500 kg Kawat Bendrat @ Rp. =
Sub total : =
Dibulatkan : =
U
p 0.00700 Oh Pekerja @ Rp. =
a 0.00700 Oh Tukang besi @ Rp. =
h 0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
10 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
U
p 1.65000 Oh Pekerja @ Rp. =
a 0.25000 Oh Tukang batu @ Rp. =
h 0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
11 M² Pasangan bata merah tebal ½ bata 1 Pc : 3 Kp : 5 Ps
Baha
70.00000 Bh Batu bata merah 5 x 11 x 22 Cm @ Rp. =
4.50000 Kg Semen portland @ Rp. =
0.05100 M³ Pasir pasang @ Rp. =
0.01370 Kg Kapur bubuk @ Rp. =
U Sub total : =
p Dibulatkan : =
a
h
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

= Rp -
= Rp -
= Rp -
= Rp -

= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.32500 Oh Pekerja @ Rp. =
0.10000 Oh Tukang batu @ Rp. =
0.01000 Oh Kepala Tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

II. Pekerjaan Besi Struktur dan Atap


1 Pasang angkur Ø 22mm
Bahan
1.00000 bh Angkur Ø 22 mm @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
2 1 Kg Pekerjaan base plate
Bahan
1.10000 Kg Besi plat strip @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
3 1 Kg Pekerjaan Besi Profil
Bahan
1.10000 Kg Besi profil @ Rp. =
0.08000 kg Meni besi @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 1 Kg Pekerjaan Besi Profil
Bahan
1.10000 Kg Besi profil @ Rp. =
0.08000 kg Meni besi @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1 Kg Pekerjaan Besi Profil
Bahan
1.10000 Kg Besi profil @ Rp. =
0.08000 kg Meni besi @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 1 Kg Pekerjaan Besi Profil
Bahan
1.10000 Kg Besi profil @ Rp. =
0.08000 kg Meni besi @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
7 1 Kg Pekerjaan gording CNP
Bahan
1.10000 Kg Besi profil @ Rp. =
0.08000 kg Meni besi @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
8 Pasang baut hex M.22x60 mm
Bahan
1.00000 Kg Baut M.22x60 mm @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
9 1 Kg Pekerjaan stffner
Bahan
1.10000 Kg Besi plat strip @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
10 Pengelasan las listrik untuk tiap 10 Cm
Bahan
0.40000 Kg Kawat Las @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.04000 Oh Pekerja @ Rp. =
0.02000 Oh Tukang Las @ Rp. =
0.00200 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
11 1 m2 Pengecatan Besi
Bahan
0.15000 lbr Amplas @ Rp. =
0.20000 Kg Cat meni @ Rp. =
0.15000 ltr Minyak cat @ Rp. =
0.03000 bh Kuas 4" @ Rp. =
0.17000 Kg Cat dasar @ Rp. =
0.26000 Kg Cat penutup 2x @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.07000 Oh Pekerja @ Rp. =
0.00900 Oh Tukang cat @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00250 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
12 1 m2 Pasang atap spandex
Bahan
1.10000 Lbr Spandek @ Rp. =
0.05000 Kg paku sekrup @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.10000 Oh Pekerja @ Rp. =
0.05000 Oh Tukang kayu @ Rp. =
0.00500 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
13 1 m' Pasang talang datar zincalume rangka hollow
Baha
0.50000 Lbr Seng plat BJLS 30 diameter 90 cm @ Rp. =
0.01500 Kg Paku biasa @ Rp. =
0.25000 Btg Besi hollow uk 40 X 40 2 mm Panjang 6 m @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.15000 Oh Pekerja @ Rp. =
0.40000 Oh Tukang kayu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.00125 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
14 Memasang 1 m' pipa PVC tipe D ø 4"
Bahan
1.20000 m' Pipa PVC 4" @ Rp. =
35.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
0.08100 Oh Pekerja @ Rp. =
0.13500 Oh Tukang batu @ Rp. =
0.01350 Oh Kepala tukang @ Rp. =
0.00410 Oh Mandor @ Rp. =
Sub total : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Dibulatkan : = Rp -
15 Pasang jalusi aluminium
Baha
11.00000 m Jalusi aluminium @ Rp. =
Sub total : =
Dibulatkan : =
U
p 0.78750 Oh Pekerja @ Rp. =
a 0.78750 Oh Tukang batu @ Rp. =
h 0.07875 Oh Kepala tukang @ Rp. =
0.00390 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
III. Pekerjaan Canopy Selasar
1 1 m2 Bongkaran dinding tembok bata merah/partisi/kaca Upah

0,250 Pekerja @ Rp. =


00 Mandor @ Rp. =
Oh Sub total : =
0,033 Dibulatkan : =
00
2 1 m2 Pasang kaso + reng atap sirap kayu kruwing / bengkirai / kempas.
Oh
Bahan
0.01400 m3 Ky. kruw/beng/kempas, usuk @ Rp. =
0.15000 Kg Paku biasa @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.12000 Oh Pekerja @ Rp. =
0.12000 Oh Tukang kayu @ Rp. =
0.01200 Oh Kepala tukang @ Rp. =
0.00600 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
3 1m2 wiremesh M6
Bahan
1.05000 m2 wermesh M6 @ Rp. =
0.01500 kg Kawat Bendrat @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
U Dibulatkan : =
p @ Rp. =
a
h 1.65000 Oh Pekerja
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1 m3 Galian Untuk Tanah keras sedalam 1 m
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp ###
Rp ###
Rp ###
Rp -

Rp ###
Rp ###
Rp ###
Rp ###
Rp ###
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Upah
0.62500 Oh Pekerja @ Rp. =
0.06200 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 1 Kg Pembesian dengan besi polos
Bahan
1.05000 Kg Besi beton @ Rp. =
0.01500 Kg Kawat beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
7 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
=
Dibulatkan : =
Upah
0.30000 Oh Pekerja @ Rp. =
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

8 Pasang angkur Ø 19mm pj. 60cm


Bahan
1.00000 bh Angkur Ø 19 mm pj. 60 cm @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
9 1 Kg Pekerjaan base plate/stiffner
Bahan
1.10000 Kg Besi plat strip @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
10 1 M' Pasang Besi Hollow 100.100
Bahan
1.10000 M1 Hollow 100.100 @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Upah 0.10400 Oh Pekerja @ Rp. =

0.10400 Oh Tukang besi @ Rp. =


0.00100 Oh Kepala tukang besi @ Rp. =
0.00005 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
11 1 M' Pasang Besi Hollow 50.100
Bahan
1.10000 M1 Hollow 50.100 @ Rp. =
Sub total : =
Dibulatkan : =

Upah 0.10400 Oh Pekerja @ Rp. =


0.10400 Oh Tukang besi @ Rp. =
0.00100 Oh Kepala tukang besi @ Rp. =
0.00005 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

12 Pengelasan las listrik untuk tiap 10 Cm


Bahan
0.40000 Kg Kawat Las @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.04000 Oh Pekerja @ Rp. =
0.02000 Oh Tukang Las @ Rp. =
0.00200 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
13 1 m2 Pasang atap spandex
Bahan
1.10000 Lbr Spandek @ Rp. =
0.05000 Kg paku sekrup @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.10000 Oh Pekerja @ Rp. =
0.05000 Oh Tukang kayu @ Rp. =
0.00500 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
14 1 m2 pasang kaca tempered, tebal 10 mm
Bahan
1.10000 m2 Kaca tempered 10 mm @ Rp. =
4.00000 m Karet penjepit kaca @ Rp. =
4.00000 m Sealent @ Rp. =
10.00000 % Perlengkapan @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.01500 Oh Pekerja @ Rp. =
0.15000 Oh Tukang kayu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.00075 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
15 M² Pasangan bata merah tebal ½ bata 1 Pc : 3 Kp : 5 Ps
Baha
70.00000 Bh Batu bata merah 5 x 11 x 22 Cm @ Rp. =
4.50000 Kg Semen portland @ Rp. =
0.05100 M³ Pasir pasang @ Rp. =
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.01370 Kg Kapur bubuk @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.32500 Oh Pekerja @ Rp. =
0.10000 Oh Tukang batu @ Rp. =
0.01000 Oh Kepala Tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
16 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm
Bahan
6.48000 Kg Semen portland @ Rp. =
0.01900 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.20000 Oh Pekerja @ Rp. =
0.15000 Oh Tukang batu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.01000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

17 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )


Bahan
0.01000 Kg Plamir @ Rp. =
0.12000 Lbr Ampelas @ Rp. =
0.03333 Bh Kuwas / roll @ Rp. =
0.11000 Kg Cat dasar @ Rp. =
0.22000 Kg Cat penutup 2x @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.02800 Oh Pekerja @ Rp. =
0.04200 Oh Tukang cat @ Rp. =
0.00420 Oh Kepala tukang @ Rp. =
0.00250 Oh Mandor @ Rp. =
. Sub total : =
Dibulatkan : =
18 1 m2 Pengecatan Besi
Bahan
0.15000 lbr Amplas @ Rp. =
0.20000 Kg Cat meni @ Rp. =
0.15000 ltr Minyak cat @ Rp. =
0.03000 bh Kuas 4" @ Rp. =
0.17000 Kg Cat dasar @ Rp. =
0.26000 Kg Cat penutup 2x @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.07000 Oh Pekerja @ Rp. =
0.00900 Oh Tukang cat @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00250 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
19 1 m' Pasang talang datar zincalume rangka hollow
Baha
0.50000 Lbr Seng plat BJLS 30 diameter 90 cm @ Rp. =
0.01500 Kg Paku biasa @ Rp. =
0.25000 Btg Besi hollow uk 40 X 40 2 mm Panjang 6 m @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Upah
0.15000 Oh Pekerja @ Rp. =
0.40000 Oh Tukang kayu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.00125 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
20 1 m2 pasang ACP
Bahan
1.10000 m2 acp @ Rp. =
6.00000 m Hollow @ Rp. =
4.00000 m sealent @ Rp. =
0.20000 kg skrup @ Rp. =
Sub total : =
Dibulatkan =
Upah
0.01500 Oh Pekerja @ Rp. =
0.15000 Oh Tukang kayu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.00075 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
21 Memasang 1 m' pipa PVC tipe D ø 4"
Bahan
1.20000 m' Pipa PVC 4" @ Rp. =
35.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
0.08100 Oh Pekerja @ Rp. =
0.13500 Oh Tukang batu @ Rp. =
0.01350 Oh Kepala tukang @ Rp. =
0.00410 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
22 Membuat taman
Bahan
1.00000 m2 Rumput gajah mini dan tanaman @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.76532 Oh Pekerja @ Rp. =
0.12000 Oh Tukang batu @ Rp. =
0.01000 Oh Kepala tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

C. PEKERJAAN ARSITEKTUR HALL


I. Pekerjaan Dinding/Partisi dan Pagar
1 1 m2 Bongkaran dinding tembok bata merah/partisi/kaca
Upah
0.25000 Oh Pekerja @ Rp. =
0.03300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
2 1 m2 Pembersihan Lapangan dan Peralatan
Upah
0.10000 Oh Pekerja @ Rp. =
0.05000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
3 1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps
Bahan
1.10000
m3 Batu belah ( 15/20 ) @ Rp. =
202.00000
Kg Semen porland @ Rp. =
0.48500
m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.50000
Oh Pekerja @ Rp. =
0.60000
Oh Tukang batu @ Rp. =
0.06000
Oh Kepala tukang @ Rp. =
0.07500
Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 1 Kg Pembesian dengan besi polos
Bahan
Kg Besi beton @ Rp. =
1.05000

0.01500
Kg Kawat beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00700
Oh Pekerja @ Rp. =
0.00700
Oh Tukang besi @ Rp. =
0.00070
Oh Kepala tukang @ Rp. =
0.00030
Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1 m2 Pasang bekisting
Bahan
0.04500
M³ Papan begesting (MC) terentang @ Rp. =
0.30000
Kg Paku usuk kayu 7 cm @ Rp. =
0.10000
Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
=
Dibulatkan : =
Upah
0.30000
Oh Pekerja @ Rp. =
Oh Tukang kayu @ Rp. =
0.26000

0.02600
Oh Kepala tukang @ Rp. =
Oh Mandor @ Rp. =
0.00500

Sub total : =
Dibulatkan : =
6 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000
Kg Semen portland @ Rp. =
0.52000
m3 Pasir beton @ Rp. =
0.87000
m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000
Oh Pekerja @ Rp. =
0.25000
Oh Tukang batu @ Rp. =
0.02500
Oh Kepala tukang @ Rp. =
0.08000
Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

7 1 m2 Pasang bondek
Bahan
1.10000
m2 bondek @ Rp. =
0.05000
Kg paku sekrup @ Rp. =
Sub total : =
Dibulatkan : =
Upah
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.10000 Oh Pekerja @ Rp. =
0.05000 Oh Tukang kayu @ Rp. =
0.00500 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
8 1m2 wiremesh M6
Bahan
1.05000 m2 wermesh M6 @ Rp. =
0.01500 kg Kawat Bendrat @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
9 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

10 1 m2 Pasangan Hebel dengan Campuran 1 : 4


Bahan
12.50000 Bh Hebel uk 10 x 20 x 60 @ Rp. =
4.50000 Kg Mu 380 (Perekat bata ringan ) 174 000 40 kg @ Rp. =
0.04000 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.48000 Oh Pekerja @ Rp. =
0.16000 Oh Tukang batu @ Rp. =
0.01600 Oh Kepala tukang @ Rp. =
0.04800 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

11 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm

Bahan
6.48000 Kg Semen portland @ Rp. =
0.01900 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.20000 Oh Pekerja @ Rp. =
0.15000 Oh Tukang batu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.01000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
12 1 m2 Pasang partisi gypsum
Bahan
0.40000 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. =
0.67000 ljr Truss C75.75 SNI BMT @ Rp. =
0.05000 Kg Skrup gypsum @ Rp. =
0.40000 Kg kompon gypsum @ Rp. =
Sub total : 1sisi =
=
Dibulatkan : =
Upah
0.10000 Oh Pekerja @ Rp. =
0.05000 Oh Tukang @ Rp. =
0.00500 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
13 1 m2 Pasang plafon gypsum rangka metalstud/baja ringan
Bahan
0.40000 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. =
0.67000 ljr Truss C75.75 SNI BMT @ Rp. =
0.05000 Kg Skrup @ Rp. =
0.40000 Kg kompon gypsum @ Rp. =
Sub total : 1sisi =
Dibulatkan : =
Upah
0.10000 Oh Pekerja @ Rp. =
0.05000 Oh Tukang @ Rp. =
0.00500 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
14 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup ) Watershild
Bahan
0.10000 Kg Plamir @ Rp. =
0.25000 Lbr Ampelas @ Rp. =
0.02000 Bh Kuwas / roll @ Rp. =
0.10000 Kg Cat dasar @ Rp. =
0.26000 Kg Cat penutup 2x @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.02000 Oh Pekerja @ Rp. =
0.06300 Oh Tukang cat @ Rp. =
0.00630 Oh Kepala tukang @ Rp. =
0.00250 Oh Mandor @ Rp. =
. Sub total : =
Dibulatkan : =
15 1 m2 Pasang atap tripleks
Bahan
0.37500 Lbr Triplek tebal 9mm @ Rp. =
0.03000 Kg Paku skrup @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.07000 Oh Pekerja @ Rp. =
0.10000 Oh Tukang kayu @ Rp. =
0.01000 Oh Kepala tukang @ Rp. =
0.00350 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
16 1 unit Pagar Besi B.R.C. T.150.
Baha 1.00000 lbr Pagar besi BRC T.150 @ Rp. =
2.00000 bh Tiang Brc T.150-200 @ Rp. =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Watershild

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Sub total : =
Dibulatkan : =
Upah
0.10400 Oh Pekerja @ Rp. =
0.10400 Oh Tukang besi @ Rp. =
0.00100 Oh Kepala tukang besi @ Rp. =
0.00005 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

17 1 m Pasang tangga plat bordes railling hollow lengkap

Bahan
1,0 Tangga plat bordes railing hollow lengkap @ Rp. =
00 Sub total : =
00 Dibulatkan : =
M
II. Pekerjaan
Interior
1 1 m2 pasang ACP Bahan

1.10000 m2 acp @ Rp. =


6.00000 m Hollow @ Rp. =
4.00000 m sealent @ Rp. =
0.20000 kg skrup @ Rp. =
Sub total : =
Dibulatkan =
Upah
0.01500 Oh Pekerja @ Rp. =
0.15000 Oh Tukang kayu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.00075 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
2 1 m2 pasang tampias acrilyc hollow 75.75
Bahan
1.10000 m2 Acrylic tebal 5mm @ Rp. =
4.00000 m' Hollow 75.75 @ Rp. =
0.20000 kg skrup @ Rp. =
Sub total : =
Dibulatkan =
U
p 0.01500 Oh Pekerja @ Rp. =
a 0.15000 Oh Tukang kayu @ Rp. =
h 0.01500 Oh Kepala tukang @ Rp. =
0.00075 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
3 1 m2 Pasang lantai GRANIT 60 x 60 cm
Bahan
1.05000 M2 GRANIT 60 x 60 Cm @ Rp. =
1.06250 Kg Semen portland @ Rp. =
0.00275 Kg Kapur bubuk @ Rp. =
0.04200 m3 Pasir pasang @ Rp. =
0.20000 Kg Semen warna @ Rp. =
U
Sub total : =
Dibulatkan : =
p
@ Rp. =
a
h
0.22000 Oh Pekerja
0.10000 Oh Tukang batu @ Rp. =
0.01200 Oh Kepala tukang @ Rp. =
0.01250 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : = Rp
4 1 m2 Pasang dinding GRANIT 60 x 60 cm
Bahan
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
= Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
1.05000 M2 GRANIT 60 x 60 Cm @ Rp. =
1.06250 Kg Semen portland @ Rp. =
0.00275 Kg Kapur bubuk @ Rp. =
0.04200 m3 Pasir pasang @ Rp. =
0.20000 Kg Semen warna @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.23000 Oh Pekerja @ Rp. =
0.20000 Oh Tukang batu @ Rp. =
0.02000 Oh Kepala tukang @ Rp. =
0.01250 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1M2 Pasang daun jendela aluminium 3" putih ( Silver) UKURAN 1.00 X 1.00 Mtr.
( Jendela isian kaca 5mm).
Bahan
4.80000 M1 Rangka alumunium @ Rp. =
8.50000 M1 Karet penjepit kaca/ tripleks. @ Rp. =
1.00000 set Engsel jendela. @ Rp. =
1.00000 Bh Hak window @ Rp. =
0.90250 M2 Kaca bening 5 mm @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.05000 Oh Pekerja @ Rp. =
1.05000 Oh Tukang besi @ Rp. =
0.10500 Oh Kepala tukang besi @ Rp. =
0.00520 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
6 1 m2 pasang kaca loket, tebal 8 mm
Bahan
1.10000 m2 Kaca tebal 8 mm @ Rp. =
3.80000 M1 Aluminium putih 3" @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.01500 Oh Pekerja @ Rp. =
0.15000 Oh Tukang kayu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.00075 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
7 Pasang baru pintu kaca 12mm ukuran 90x240cm tempered,per pintu
Bahan
2.16000 M2 Kaca bening 12mm tempered @ Rp. =
7.00000 M1 Jasa poles sisi samping @ Rp. =
2.00000 Luban Jasa bor kaca @ Rp. =
2.00000 Luban Jasa coak untuk floorhinges @ Rp. =
1.00000 Set Floor hinges ex.Dorma @ Rp. =
1.00000 Set Handle stainless @ Rp. =
1.00000 Set Kunci pintu kaca @ Rp. =
Sub total : =
Dibulatkan : =
Upah
2.00000 Oh Pekerja @ Rp. =
2.00000 Oh Tukang kayu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.07500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
15.00000 % Jasa poles sisi samping @ Rp. =
35.00000 % Jasa bor kaca @ Rp. =
35.00000 % Jasa coak untuk floorhinges @ Rp. =
8 Pintu HPL,per daun Pintu
Bahan
0.04320 M3 Kayu kamper Samarinda Oven Rp. =
2.00000 Lbr Plywood 18mm Rp. =
2.00000 Lbr HPL Rp. =
7.00000 M1 PVC Edging Rp. =
0.05000 kg Sekrup Rp. =
1.00000 Klg Lem kuning ex.Fox Prima D Rp. =
1.00000 Set Handle+ Lock case ex.Dekkson Rp. =
35.00000 % perlengkapan Rp. =
Sub total : =
Dibulatkan : =
Upah
1.00000 Oh Pekerja Rp. =
1.00000 Oh Tukang kayu Rp. =
0.02500 Oh Kepala tukang Rp. =
0.07500 Oh Mandor Rp. =
Sub total : =
Dibulatkan : =
9 pasang meja lapis hpl/m2
Bahan:
0.01500 m3 Kayu meranti Rp. =
0.70000 lbr Triplek tebal 18 mm Rp. =
0.05000 kg Paku 5-12cm Rp. =
0.30000 ltr Lem kayu Rp. =
0.50000 m2 HPL Taco woodgrain Rp. =
2.00000 bh Rel Rp. =
Sub total : =
Dibulatkan =
Upah.
0.35000 oh Pekerja Rp. =
1.05000 oh Tukang Rp. =
0.10500 oh Kepela tukang Rp. =
0.01800 oh Mandor Rp. =
Sub total : =
Dibulatkan =
10 Pasang laci loket/unit
Bahan:
0.50000 ltr Lem kayu Rp. =
4.00000 bh engsel sendok Rp. =
2.28000 m list edging alumunium Rp. =
1.43000 lbr Triplek tebal 18 mm Rp. =
1.33000 m2 HPL Taco woodgrain Rp. =
2.00000 bh Rel Rp. =
Sub total : =
Dibulatkan =
Upah.
0.35000 oh Pekerja Rp. =
1.05000 oh Tukang Rp. =
0.10500 oh Kepela tukang Rp. =
0.01800 oh Mandor Rp. =
Sub total : =
Dibulatkan =

11 Pasang plin kayu


Bahan:
1.10000 M Plin kayu Rp. =
Sub total : =
Dibulatkan =
Upah.
0.07000 oh Pekerja Rp. =
0.04500 oh Tukang Rp. =
0.02500 oh Kepela tukang Rp. =
0.00500 oh Mandor Rp. =
Sub total : =
Dibulatkan =
12 Memasang patisi kaca uk. 2.4 x 1.6 satu unit
Bahan
3.50000 M2 Kaca bening 12mm tempered @ Rp. =
7.00000 M1 Jasa poles sisi samping @ Rp. =
2.00000 Luban Jasa bor kaca @ Rp. =
2.00000 Luban Jasa coak untuk floorhinges @ Rp. =
1.00000 Set Engsel stainless @ Rp. =
1.00000 Set Handle stainless @ Rp. =
6.00000 Bh Siku bracket @ Rp. =
4.00000 M Lem silen @ Rp. =
Sub total : =
Dibulatkan : =
Upah
2.00000 Oh Pekerja @ Rp. =
2.00000 Oh Tukang kayu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.07500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
15.00000 % Jasa poles sisi samping @ Rp. =
35.00000 % Jasa bor kaca @ Rp. =
35.00000 % Jasa coak untuk floorhinges @ Rp. =
7 Pasang rolling grill/m2
Bahan
1.00000 m2 Rollgrill set Rp. =
. S ub total : =
Dibulatkan =
Upah
0.20000 Oh Pekerja Rp. =
0.20000 Oh Tukang kaca Rp. =
0.02298 Oh Kepala tukang Rp. =
0.01241 Oh Mandor   Rp.                                  =
      total :
S ub =
Dibulatkan =

III. Pekerjaan Sanitasi


1 Memasang 1 m' pipa PVC tipe AW ø 1"
Bahan
1.20000 m' Pipa PVC 1' @ Rp. =
35.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
0.03600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang batu @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00180 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
2 Memasang 1 m' pipa PVC tipe D ø 4"
Bahan
1.20000 m' Pipa PVC 4" @ Rp. =
35.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
0.08100 Oh Pekerja @ Rp. =
0.13500 Oh Tukang batu @ Rp. =
0.01350 Oh Kepala tukang @ Rp. =
0.00410 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
3 Memasang 1 buah kran air
Bahan
1.00000 Bh Kran tembok toto T 23 B13 @ Rp. =
0.02500 Bh Seal tape @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.01000 Oh Pekerja @ Rp. =
0.10000 Oh Tukang batu @ Rp. =
0.01000 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 Memasang 1 buah kloset jongkok porselen
Bahan
1.00000 Bh Kloset jongkok porselen @ Rp. =
6.00000 Kg Semen portland @ Rp. =
0.01000 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.00000 Oh Pekerja @ Rp. =
1.50000 Oh Tukang batu @ Rp. =
0.15000 Oh Kepala tukang @ Rp. =
0.16000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 Memasang Biotank uk. 1400L
Bahan
1.00000 Bh Biotank 1400L @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.01000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 unit saluran u-ditch 40x40
Bahan
0.41667 bh u-ditch 40.40.120 @ Rp. =
0.41667 bh tutup u-ditch 30.30.120 @ Rp. =
Sub total : =
Dibulatkan =
upah
0.12000 Oh Pekerja @ Rp. =
0.06000 Oh Tukang @ Rp. =
0.00600 Oh kepala tukang @ Rp. =
0.00600 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
7 Memasang pompa air
Bahan
1.00000 bh Pompa shimizu PC-260 BIT @ Rp. =
10.00000 % Perlengkapan @ Rp. =
Sub total : =
Dibulatkan =
upah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
                    
Rp - 
     
Rp  -
 
 
 
 

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

-
-
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

-
-
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
1.01000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang @ Rp. =
0.02500 Oh kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
8 m' Membuat sumur bor
Bahan
1.20000 m Pipa PVC 4" @ Rp. =
1.20000 m Pipa PVC 1 1/4" @ Rp. =
35.00000 % Perlengkapan @ Rp. =
S ub total : =
Dibulatka =
Upah n:
0.94118 Oh Pekerja @ Rp. =
0.94118 Oh Tukang @ Rp. =
0.18824 Oh Kepala tukang @ Rp. =
0.08061 Oh Mandor @ Rp. =
S ub total : =
Dibulatka =
n:
D. PEKERJAAN PEMBUATAN SHELTER GENSET
1 1 m3 Galian Untuk Tanah keras sedalam 1 m
Upah
0.62500 Oh Pekerja @ Rp. =
0.06200 Oh Mandor @ Rp. =
Sub total : =
Dibulatka =
n:
2 1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps
Bahan
1.10000 m3 Batu belah ( 15/20 ) @ Rp. =
202.00000 Kg Semen porland @ Rp. =
0.48500 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatka =
Upah n:
1.50000 Oh Pekerja @ Rp. =
0.60000 Oh Tukang batu @ Rp. =
0.06000 Oh Kepala tukang @ Rp. =
0.07500 Oh Mandor @ Rp. =
Sub total : =
Dibulatka =
n:
3 1m2 wiremesh M8
Bahan
1.05000 m2 wermesh M8 @ Rp. =
0.01500 kg Kawat Bendrat @ Rp. =
Sub total : =
Dibulatka =
Upah n:
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatka =
n:
4 1 Kg Pembesian dengan besi polos
Bahan
1.05000 Kg Besi beton @ Rp. =
0.01500 Kg Kawat beton @ Rp. =
Sub total : =
Dibulatka =
Upah n:
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
=
Dibulatkan : =
Upah
0.30000 Oh Pekerja @ Rp. =
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

5 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
=
Dibulatkan : =
Upah
0.30000 Oh Pekerja @ Rp. =
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
7 1 m2 Pasangan Batako dengan Campuran 1 : 4
Bahan
12.50000 Bh Hebel uk 10 x 20 x 60 @ Rp. =
4.50000 Kg Mu 380 (Perekat bata ringan ) 174 000 40 kg @ Rp. =
0.04000 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.48000 Oh Pekerja @ Rp. =
0.16000 Oh Tukang batu @ Rp. =
0.01600 Oh Kepala tukang @ Rp. =
0.04800 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
8 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm
Bahan
6.48000 Kg Semen portland @ Rp. =
0.01900 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.20000 Oh Pekerja @ Rp. =
0.15000 Oh Tukang batu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.01000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
9 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup ) Watershild
Bahan
0.10000 Kg Plamir @ Rp. =
0.25000 Lbr Ampelas @ Rp. =
0.02000 Bh Kuwas / roll @ Rp. =
0.10000 Kg Cat dasar @ Rp. =
0.26000 Kg Cat penutup 2x @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.02000 Oh Pekerja @ Rp. =
0.06300 Oh Tukang cat @ Rp. =
0.00630 Oh Kepala tukang @ Rp. =
0.00250 Oh Mandor @ Rp. =
. Sub total : =
Dibulatkan : =
10 Pasang jalusi aluminium
Bahan
11.00000 M Kisi kisi aluminium white @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.78750 Oh Pekerja @ Rp. =
0.78750 Oh Tukang besi @ Rp. =
0.07875 Oh Kepala tukang besi @ Rp. =
0.00390 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
11 1 unit Pasang pintu besi baja

Bahan
1.00000 unit Pintu besi baja @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.65000 Oh Tukang besi @ Rp. =
0.65000 Oh Pekerja @ Rp. =
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Watershild

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0,065 Kepala tukang @ Rp. =
00 Mandor @ Rp. =
Oh Sub total : =
0,032 Dibulatkan : =
00
D. PEKERJAAN AREA DEPAN Oh HALL
1 M² Pasang paving blok
Baha
1.10000 M² Paving block @ Rp. =
0.12100 M³ Pasir urug / tanah katel @ Rp. =
Sub total : =
Dibulatkan : =
U
p 0.32000 Oh Pekerja @ Rp. =
a 0.10000 Oh Tukang @ Rp. =
h
0.01000 Oh Kepala Tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
2 M¹ Pembuatan kanstin
Baha
1.60000 Bh Kanstin 15 x 30 x 40 cm @ Rp. =
2.00000 Kg Semen portland @ Rp. =
0.00300 M³ Pasir pasang @ Rp. =
U Sub total : =
p Dibulatkan : =
a @ Rp. =
h
0.32000 Oh Pekerja
0.10000 Oh Tukang batu @ Rp. =
0.01000 Oh Kepala Tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
3 1 Kg Pembesian dengan besi polos
Bahan
1.05000 Kg Besi beton @ Rp. =
0.01500 Kg Kawat beton @ Rp. =
Sub total : =
Dibulatkan : =
U
p 0.00700 Oh Pekerja @ Rp. =
a 0.00700 Oh Tukang besi @ Rp. =
h 0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
U Dibulatkan : =
p @ Rp. =
a =
h
0.30000 Oh Pekerja
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : = Rp
5 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp Rp Rp -
Rp -
-
-

Rp -
Rp -
Rp -
Rp -
= Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

6 Pasang angkur Ø 19mm pj. 60cm

Bahan
1.00000 bh Angkur Ø 19 mm pj. 60 cm @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

7 1 Kg Pekerjaan base plate

Bahan
1.10000 Kg Besi plat strip @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

8 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr

Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

9 M² Pengaspalan hotmix tebal 2 Cm

Baha
0.04762 Ton Aspal hotmix @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.04762 Oh Upah angkut dan gelar aspal @ Rp. =
Sub total : =
Dibulatkan : =
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018

10 hari Sewa baby roller

Upah
1.00000 hari Sewa baby roller @ Rp. =
Sub total : =
Dibulatkan : =

Pekerjaan ME
1 Btg Memasang kabel tray U 200 x 100 x 2400 x 1.4 mm
Bahan
1.00000 Btg Cable Tray U 200 x 100 x 2400 x 1.4 mm @ Rp. =
2.00000 m Besi siku 40x40x4 @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.16000 Oh Pembantu tukang listrik @ Rp. =
0.16000 Oh Tukang listrik @ Rp. =
0.03200 Oh Kepala tukang listrik @ Rp. =
0.01600 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
2 M¹ Memasang kabel line input sumber PLN dengan kabel NYFGBY 4 x 16 mm lengkap dengan pipa dan asesoris intsalsinya,
Baha
1.00000 M¹ Kabel NYFGBY 4 x 16 mm @ Rp. =
0.25000 Btg Pipa vinilon PVC diameter 1" panjang 4 m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor   @ Rp.                              =
      
Sub total : =
Dibulatkan : =
3 M¹ Memasangan kabel line output genset dengan kabel NYFGBY 4 x 4 mm lengkap dengan pipa dan asesoris intsalsinya,
Baha
1.00000 M¹ Kabel NYFGBY 4 x 4 mm @ Rp. =
0.33333 Btg Pipa Conduit Clipsal 25mm panjang 3m @ Rp. =
0.02000 Pack Sok Pipa Conduit 25 mm @ Rp. =
0.01000 Pack Klem Pipa Conduit 25 mm @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 M¹ Memasang kabel power dengan menggunakan kabel NYFGBY 4 x 10 mm lengkap dengan pengamannya
Baha
1.00000 M¹ Kabel NYFGBY 4 X 10 mm @ Rp. =
0.25000 Btg Pipa vinilon PVC diameter 1" panjang 4 m @ Rp. =
5.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Sub total : =
Dibulatkan : =
5 Titik Memasang lampu T8 16-18 watt untuk penerangan ruangan termassuk pemasangan balak
Baha
1.00000 Bh Lampu T8 LED 16-18 Watt @ Rp. =
1.00000 Unit Ballak T8 16 - 18 Watt Led @ Rp. =
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
1.00000 Bh T-Dos Clipsal 20mm 3 Lubang @ Rp. =
0.33333 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan lampu LED =
Sub total : =
Dibulatkan : =
Upah
0.29629 Oh Pembantu tukang listrik @ Rp. =
0.29629 Oh Tukang listrik @ Rp. =
0.05920 Oh Kepala tukang listrik @ Rp. =
0.03365 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 M¹ Instalasi line lampu highbay dengan kabel NYM 4 x 2.5 mm sumber pln
Baha
1.00000 M¹ Kabel NYM 4 x 2,5 mm @ Rp. =
0.33333 Btg Pipa Conduit 20mm panjang 3m @ Rp. =
0.01000 Pack Sok Pipa 20 mm @ Rp. =
0.01000 Pack Klem Pipa Conduit 20 mm @ Rp. =
5.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
7 Titik Memasang instalasi stop kontak untuk ruangan dengan menggunakan kabel NYM 3 x 2.5 mm lengkap dengan pipa pengaman stan

Baha
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
2.66667 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
8 Titik Memasang instalasi saklar tunggal untuk ruangan dengan menggunakan kabel NYM 3 x 2.5 mm len
Baha
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
2.66667 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
9 Titik Memasang instalasi saklar ganda untuk ruangan dengan menggunakan kabel NYM 3 x 2.5 mm lengk
Baha
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
2.66667 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
10 Titik Memasang instalasi stop kontak Ac untuk ruangan dengan menggunakan kabel NYM 3 x 2.5 mm len
Baha
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
2.66667 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
11 M¹ Memasang instalasi stop kontak hal dengan menggunakan kabel NYM 4 x 2.5 mm lengkap dengan p

Baha
1.00000 M¹ Kabel NYM 4 x 2,5 mm @ Rp. =
0.33333 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
0.01000 Pack Sok Pipa 20 mm @ Rp. =
0.01000 Pack Klem Pipa Conduit 20 mm @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

12 Bh Memasang lampu highbay 30 watt standart philips untuk penerangan hall


Baha
1.00000 Unit Lampu Highbay 30 watt @ Rp. =
1.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
1.00000 Set Breacket led 110 @ Rp. =
5.00000 % Perlengkapan pemasangan lampu LED =
Sub total : =
Dibulatkan : =
Upah
0.29629 Oh Pembantu tukang listrik @ Rp. =
0.29629 Oh Tukang listrik @ Rp. =
0.05920 Oh Kepala tukang listrik @ Rp. =
0.03365 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
13 Unit Pemasangan tiang lampu Pju tipe Otagonal doble ornament 6 meter H-6 m
Baha
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp. -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
salsinya,

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
                    
Rp - 
     
Rp  -
 
sinya,  
 
 
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
ipa pengaman stan

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
1,00000 Unit
Tiang PJU octagonal Doble ornamen tinggi 6 @ Rp. = Rp -

meter
5,00000 % Perlengkapan panel dan wairing panel = Rp

Sub total : = Rp
Dibulatkan : = Rp
0,66667 Oh Pembantu tukang listrik @ Rp. = Rp
0,50000 Oh Tukang listrik @ Rp. = Rp
Upa 0,16666 Oh Kepala tukang listrik @ Rp. = Rp
h 0,14388 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

14 Bh Pemasangan lampu ditiang PJU menggunakan jenis lampu cobra 2 x 20 watt 220volt
Baha
1.00000 Unit Lampu jenis cobra 2 x 20 watt 220Volt @ Rp. =
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
5.00000 % Perlengkapan =

U
Sub total : =
Dibulatkan : =
p
@ Rp. =
a
h
0.16000 Oh Pembantu tukang listrik
0.16000 Oh Tukang listrik @ Rp. =
0.03200 Oh Kepala tukang listrik @ Rp. =
0.01600 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
15 Bh Memasang stop kontak dengan menggunakan Nbowdus kotak standart panassonic
Baha
1.00000 bh Stop kontak E3426/101S-WW @ Rp. =
1.00000 Bh Inbow Dos @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =

U
Sub total : =
Dibulatkan : =
p
@ Rp. =
a
h
0.03200 Oh Pembantu tukang listrik
0.03200 Oh Tukang listrik @ Rp. =
0.00411 Oh Kepala tukang listrik @ Rp. =
0.00160 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
16 Bh Memasang saklar tunggal dengan menggunakan Nbowdus kotak standart panassonic
Baha
1.00000 Bh Saklar Engkel @ Rp. =
1.00000 Bh Inbow Dos @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =

U
Sub total : =
Dibulatkan : =
p
@ Rp. =
a
h
0.03200 Oh Pembantu tukang listrik
0.03200 Oh Tukang listrik @ Rp. =
0.00411 Oh Kepala tukang listrik @ Rp. =
0.00160 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
17 Bh Memasang saklar ganda/seri dengan menggunakan Nbowdus kotak standart panassonic
Baha
1,000 Saklar Seri @ Rp. =
00 Inbow Dos @ Rp. =
5.00000 %Bh Perlengkapan pemasangan instalasi =
1,000
Sub total : =
00
Dibulatkan : =
Bh
Upah
= Rp -

= Rp -

= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.03200 Oh Pembantu tukang listrik @ Rp. =
0.03200 Oh Tukang listrik @ Rp. =
0.00411 Oh Kepala tukang listrik @ Rp. =
0.00160 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

18 Bh Memasang stop kontak ac dengan menggunakan Nbowdus kotak standart panassonic


Baha
1.00000 bh Stop kontak Ac Clipsal @ Rp. =
1.00000 Bh Inbow Dos @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.03200 Oh Pembantu tukang listrik @ Rp. =
0.03200 Oh Tukang listrik @ Rp. =
0.00411 Oh Kepala tukang listrik @ Rp. =
0.00160 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

19 Unit Memasang AC 1 PK setara mitsubishi


Baha
1.00000 Unit Ac split 1 pk setara mitsubishi @ Rp. =
5.00000 M¹ Pipa Ac 0.5 - 1 Pk @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
1.14286 Oh Pembantu tukang listrik @ Rp. =
1.14286 Oh Tukang listrik @ Rp. =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.18514 Oh Kepala tukang listrik @ Rp. =
0.11371 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
20 Unit Memasang AC 2 PK setara mitsubishi
Baha
1.00000 Unit Ac split 2 pk setara mitshubishi @ Rp. =
5.00000 M¹ Pipa Ac 1.5 - 2 Pk @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
1.14286 Oh Pembantu tukang listrik @ Rp. =
1.14286 Oh Tukang listrik @ Rp. =
0.18514 Oh Kepala tukang listrik @ Rp. =
0.11371 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =

21 Unit Pemasangan panel ukuran 600 x 400 x 200 tebal 1.8 mm


Baha
1.00000 Unit Panel Indoor 600 X 400 X 200 mm @ Rp. =
3.00000 Bh MCB 20A 3F @ Rp. =
1.00000 Bh MCB 16A 3F @ Rp. =
1.00000 Bh MCB 6A 3F @ Rp. =
6.00000 Bh MCB 6A 1F @ Rp. =
3.00000 Bh MCB 4A 1F @ Rp. =
3.00000 Bh MCB 10A 1F @ Rp. =
3.00000 Bh MCB 16A 1F @ Rp. =
1.00000 Bh Panel multimeter VAF39A-1 @ Rp. =
3.00000 Bh TAB CT MSQ60 1200/5A @ Rp. =
1.00000 Bh Timer theben sul 181 coil 220v @ Rp. =
1.00000 Bh kontaktor 25 amper coil 220v @ Rp. =
3.00000 Bh Fuse 10 amp + Rumahnya @ Rp. =
3.00000 Bh Cylindrical Fuse GAE @ Rp. =
2.00000 Bh selector 3 posisi @ Rp. =
3.00000 Bh Pilot lamp 220 v @ Rp. =
5.00000 M¹ Kabel NYAF 1 X 16 mm @ Rp. =
20.00000 M¹ Kabel NYAF 1 X 1,5 mm @ Rp. =
5.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
2.00000 Oh Pembantu tukang listrik @ Rp. =
2.00000 Oh Tukang listrik @ Rp. =
1.00000 Oh Kepala tukang listrik @ Rp. =
Sub total : =
Dibulatkan : =

22 Unit Pemasangan panel ukuran 300 x 200 x 150, MCB dan pemasangan kabel NYY 4x4 dari genset ke R. Server
Baha
1.00000 Unit Panel Indoor 300 X 200 X 150 mm @ Rp. =
3.00000 Bh MCB 6A 1F @ Rp. =
10.00000 m' Kabel NYY 4 x 4 dari genset ke server @ Rp. =
Sub total : =
Dibulatkan : =
Upah
2.00000 Oh Pembantu tukang listrik @ Rp. =
2.00000 Oh Tukang listrik @ Rp. =
1.00000 Oh Kepala tukang listrik @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
23 Jasa pemindahan tiang FO
Upah
0.66667 Oh Pembantuk tukang listrik @ Rp. =
0.50000 Oh Tukang listrik @ Rp. =
0.16666 Oh Kepala tukang istrik @ Rp. =
0.14388 Oh Mandor   @ Rp.                                      =  
Sub total : =
Dibulatkan =
24 Memasang 1 unit motor rolling grill
Bahan
1.00000 unit Motor Rolling grill @ Rp. =
5.00000 % Perlengkapan instalasi             
Sub total :             =
            
Dibula =
            
Upah tkan =  
1.01000 Oh Pembantuk tukang listrik @ Rp. =
0.25000 Oh Tukang listrik @ Rp. =
0.02500 Oh Kepala tukang istrik @ Rp. =
0.08000 Oh Mandor   @ Rp.                                      =  
Sub total : =
Dibula =
tkan
PT. ...............
Ttd, Cap / Stempel Perusahaan
Rp -
Rp -
Rp -
Rp                  -
           
Rp  -
Rp  -
 
 
 
 
Rp -
Rp                  -
           
Rp  -
 
Rp -
 
 
Rp - 
Rp - 
Rp -
Rp                  -
           
Rp - 
Rp  -
 
  J
  a
k
 
a
r
t
a
,
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.