Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Dibulatkan : =
Bahan
1.05000 Kg Besi beton @ Rp. =
0.01500 Kg Kawat beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
2 x pakai =
Dibulatkan : =
Upah
0.30000 Oh Pekerja @ Rp. =
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
6 1 m3 Urugan tanah merah Bahan
9 1m2 wiremesh M6
Bahan
1.05000 m2 wermesh M6 @ Rp. =
0.01500 kg Kawat Bendrat @ Rp. =
Sub total : =
Dibulatkan : =
U
p 0.00700 Oh Pekerja @ Rp. =
a 0.00700 Oh Tukang besi @ Rp. =
h 0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
10 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
U
p 1.65000 Oh Pekerja @ Rp. =
a 0.25000 Oh Tukang batu @ Rp. =
h 0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
11 M² Pasangan bata merah tebal ½ bata 1 Pc : 3 Kp : 5 Ps
Baha
70.00000 Bh Batu bata merah 5 x 11 x 22 Cm @ Rp. =
4.50000 Kg Semen portland @ Rp. =
0.05100 M³ Pasir pasang @ Rp. =
0.01370 Kg Kapur bubuk @ Rp. =
U Sub total : =
p Dibulatkan : =
a
h
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.32500 Oh Pekerja @ Rp. =
0.10000 Oh Tukang batu @ Rp. =
0.01000 Oh Kepala Tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Dibulatkan : = Rp -
15 Pasang jalusi aluminium
Baha
11.00000 m Jalusi aluminium @ Rp. =
Sub total : =
Dibulatkan : =
U
p 0.78750 Oh Pekerja @ Rp. =
a 0.78750 Oh Tukang batu @ Rp. =
h 0.07875 Oh Kepala tukang @ Rp. =
0.00390 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
III. Pekerjaan Canopy Selasar
1 1 m2 Bongkaran dinding tembok bata merah/partisi/kaca Upah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp ###
Rp ###
Rp ###
Rp -
Rp ###
Rp ###
Rp ###
Rp ###
Rp ###
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Upah
0.62500 Oh Pekerja @ Rp. =
0.06200 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 1 Kg Pembesian dengan besi polos
Bahan
1.05000 Kg Besi beton @ Rp. =
0.01500 Kg Kawat beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
7 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
=
Dibulatkan : =
Upah
0.30000 Oh Pekerja @ Rp. =
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Upah 0.10400 Oh Pekerja @ Rp. =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.01370 Kg Kapur bubuk @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.32500 Oh Pekerja @ Rp. =
0.10000 Oh Tukang batu @ Rp. =
0.01000 Oh Kepala Tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
16 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm
Bahan
6.48000 Kg Semen portland @ Rp. =
0.01900 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.20000 Oh Pekerja @ Rp. =
0.15000 Oh Tukang batu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.01000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Upah
0.15000 Oh Pekerja @ Rp. =
0.40000 Oh Tukang kayu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.00125 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
20 1 m2 pasang ACP
Bahan
1.10000 m2 acp @ Rp. =
6.00000 m Hollow @ Rp. =
4.00000 m sealent @ Rp. =
0.20000 kg skrup @ Rp. =
Sub total : =
Dibulatkan =
Upah
0.01500 Oh Pekerja @ Rp. =
0.15000 Oh Tukang kayu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.00075 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
21 Memasang 1 m' pipa PVC tipe D ø 4"
Bahan
1.20000 m' Pipa PVC 4" @ Rp. =
35.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
0.08100 Oh Pekerja @ Rp. =
0.13500 Oh Tukang batu @ Rp. =
0.01350 Oh Kepala tukang @ Rp. =
0.00410 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
22 Membuat taman
Bahan
1.00000 m2 Rumput gajah mini dan tanaman @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.76532 Oh Pekerja @ Rp. =
0.12000 Oh Tukang batu @ Rp. =
0.01000 Oh Kepala tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
0.01500
Kg Kawat beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00700
Oh Pekerja @ Rp. =
0.00700
Oh Tukang besi @ Rp. =
0.00070
Oh Kepala tukang @ Rp. =
0.00030
Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1 m2 Pasang bekisting
Bahan
0.04500
M³ Papan begesting (MC) terentang @ Rp. =
0.30000
Kg Paku usuk kayu 7 cm @ Rp. =
0.10000
Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
=
Dibulatkan : =
Upah
0.30000
Oh Pekerja @ Rp. =
Oh Tukang kayu @ Rp. =
0.26000
0.02600
Oh Kepala tukang @ Rp. =
Oh Mandor @ Rp. =
0.00500
Sub total : =
Dibulatkan : =
6 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000
Kg Semen portland @ Rp. =
0.52000
m3 Pasir beton @ Rp. =
0.87000
m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000
Oh Pekerja @ Rp. =
0.25000
Oh Tukang batu @ Rp. =
0.02500
Oh Kepala tukang @ Rp. =
0.08000
Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
7 1 m2 Pasang bondek
Bahan
1.10000
m2 bondek @ Rp. =
0.05000
Kg paku sekrup @ Rp. =
Sub total : =
Dibulatkan : =
Upah
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.10000 Oh Pekerja @ Rp. =
0.05000 Oh Tukang kayu @ Rp. =
0.00500 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
8 1m2 wiremesh M6
Bahan
1.05000 m2 wermesh M6 @ Rp. =
0.01500 kg Kawat Bendrat @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
9 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Bahan
6.48000 Kg Semen portland @ Rp. =
0.01900 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.20000 Oh Pekerja @ Rp. =
0.15000 Oh Tukang batu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.01000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
12 1 m2 Pasang partisi gypsum
Bahan
0.40000 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. =
0.67000 ljr Truss C75.75 SNI BMT @ Rp. =
0.05000 Kg Skrup gypsum @ Rp. =
0.40000 Kg kompon gypsum @ Rp. =
Sub total : 1sisi =
=
Dibulatkan : =
Upah
0.10000 Oh Pekerja @ Rp. =
0.05000 Oh Tukang @ Rp. =
0.00500 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
13 1 m2 Pasang plafon gypsum rangka metalstud/baja ringan
Bahan
0.40000 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. =
0.67000 ljr Truss C75.75 SNI BMT @ Rp. =
0.05000 Kg Skrup @ Rp. =
0.40000 Kg kompon gypsum @ Rp. =
Sub total : 1sisi =
Dibulatkan : =
Upah
0.10000 Oh Pekerja @ Rp. =
0.05000 Oh Tukang @ Rp. =
0.00500 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
14 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup ) Watershild
Bahan
0.10000 Kg Plamir @ Rp. =
0.25000 Lbr Ampelas @ Rp. =
0.02000 Bh Kuwas / roll @ Rp. =
0.10000 Kg Cat dasar @ Rp. =
0.26000 Kg Cat penutup 2x @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.02000 Oh Pekerja @ Rp. =
0.06300 Oh Tukang cat @ Rp. =
0.00630 Oh Kepala tukang @ Rp. =
0.00250 Oh Mandor @ Rp. =
. Sub total : =
Dibulatkan : =
15 1 m2 Pasang atap tripleks
Bahan
0.37500 Lbr Triplek tebal 9mm @ Rp. =
0.03000 Kg Paku skrup @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.07000 Oh Pekerja @ Rp. =
0.10000 Oh Tukang kayu @ Rp. =
0.01000 Oh Kepala tukang @ Rp. =
0.00350 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
16 1 unit Pagar Besi B.R.C. T.150.
Baha 1.00000 lbr Pagar besi BRC T.150 @ Rp. =
2.00000 bh Tiang Brc T.150-200 @ Rp. =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Watershild
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Sub total : =
Dibulatkan : =
Upah
0.10400 Oh Pekerja @ Rp. =
0.10400 Oh Tukang besi @ Rp. =
0.00100 Oh Kepala tukang besi @ Rp. =
0.00005 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Bahan
1,0 Tangga plat bordes railing hollow lengkap @ Rp. =
00 Sub total : =
00 Dibulatkan : =
M
II. Pekerjaan
Interior
1 1 m2 pasang ACP Bahan
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
= Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
1.05000 M2 GRANIT 60 x 60 Cm @ Rp. =
1.06250 Kg Semen portland @ Rp. =
0.00275 Kg Kapur bubuk @ Rp. =
0.04200 m3 Pasir pasang @ Rp. =
0.20000 Kg Semen warna @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.23000 Oh Pekerja @ Rp. =
0.20000 Oh Tukang batu @ Rp. =
0.02000 Oh Kepala tukang @ Rp. =
0.01250 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1M2 Pasang daun jendela aluminium 3" putih ( Silver) UKURAN 1.00 X 1.00 Mtr.
( Jendela isian kaca 5mm).
Bahan
4.80000 M1 Rangka alumunium @ Rp. =
8.50000 M1 Karet penjepit kaca/ tripleks. @ Rp. =
1.00000 set Engsel jendela. @ Rp. =
1.00000 Bh Hak window @ Rp. =
0.90250 M2 Kaca bening 5 mm @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.05000 Oh Pekerja @ Rp. =
1.05000 Oh Tukang besi @ Rp. =
0.10500 Oh Kepala tukang besi @ Rp. =
0.00520 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
6 1 m2 pasang kaca loket, tebal 8 mm
Bahan
1.10000 m2 Kaca tebal 8 mm @ Rp. =
3.80000 M1 Aluminium putih 3" @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.01500 Oh Pekerja @ Rp. =
0.15000 Oh Tukang kayu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.00075 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
7 Pasang baru pintu kaca 12mm ukuran 90x240cm tempered,per pintu
Bahan
2.16000 M2 Kaca bening 12mm tempered @ Rp. =
7.00000 M1 Jasa poles sisi samping @ Rp. =
2.00000 Luban Jasa bor kaca @ Rp. =
2.00000 Luban Jasa coak untuk floorhinges @ Rp. =
1.00000 Set Floor hinges ex.Dorma @ Rp. =
1.00000 Set Handle stainless @ Rp. =
1.00000 Set Kunci pintu kaca @ Rp. =
Sub total : =
Dibulatkan : =
Upah
2.00000 Oh Pekerja @ Rp. =
2.00000 Oh Tukang kayu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.07500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
15.00000 % Jasa poles sisi samping @ Rp. =
35.00000 % Jasa bor kaca @ Rp. =
35.00000 % Jasa coak untuk floorhinges @ Rp. =
8 Pintu HPL,per daun Pintu
Bahan
0.04320 M3 Kayu kamper Samarinda Oven Rp. =
2.00000 Lbr Plywood 18mm Rp. =
2.00000 Lbr HPL Rp. =
7.00000 M1 PVC Edging Rp. =
0.05000 kg Sekrup Rp. =
1.00000 Klg Lem kuning ex.Fox Prima D Rp. =
1.00000 Set Handle+ Lock case ex.Dekkson Rp. =
35.00000 % perlengkapan Rp. =
Sub total : =
Dibulatkan : =
Upah
1.00000 Oh Pekerja Rp. =
1.00000 Oh Tukang kayu Rp. =
0.02500 Oh Kepala tukang Rp. =
0.07500 Oh Mandor Rp. =
Sub total : =
Dibulatkan : =
9 pasang meja lapis hpl/m2
Bahan:
0.01500 m3 Kayu meranti Rp. =
0.70000 lbr Triplek tebal 18 mm Rp. =
0.05000 kg Paku 5-12cm Rp. =
0.30000 ltr Lem kayu Rp. =
0.50000 m2 HPL Taco woodgrain Rp. =
2.00000 bh Rel Rp. =
Sub total : =
Dibulatkan =
Upah.
0.35000 oh Pekerja Rp. =
1.05000 oh Tukang Rp. =
0.10500 oh Kepela tukang Rp. =
0.01800 oh Mandor Rp. =
Sub total : =
Dibulatkan =
10 Pasang laci loket/unit
Bahan:
0.50000 ltr Lem kayu Rp. =
4.00000 bh engsel sendok Rp. =
2.28000 m list edging alumunium Rp. =
1.43000 lbr Triplek tebal 18 mm Rp. =
1.33000 m2 HPL Taco woodgrain Rp. =
2.00000 bh Rel Rp. =
Sub total : =
Dibulatkan =
Upah.
0.35000 oh Pekerja Rp. =
1.05000 oh Tukang Rp. =
0.10500 oh Kepela tukang Rp. =
0.01800 oh Mandor Rp. =
Sub total : =
Dibulatkan =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
-
-
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
-
-
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
1.01000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang @ Rp. =
0.02500 Oh kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
8 m' Membuat sumur bor
Bahan
1.20000 m Pipa PVC 4" @ Rp. =
1.20000 m Pipa PVC 1 1/4" @ Rp. =
35.00000 % Perlengkapan @ Rp. =
S ub total : =
Dibulatka =
Upah n:
0.94118 Oh Pekerja @ Rp. =
0.94118 Oh Tukang @ Rp. =
0.18824 Oh Kepala tukang @ Rp. =
0.08061 Oh Mandor @ Rp. =
S ub total : =
Dibulatka =
n:
D. PEKERJAAN PEMBUATAN SHELTER GENSET
1 1 m3 Galian Untuk Tanah keras sedalam 1 m
Upah
0.62500 Oh Pekerja @ Rp. =
0.06200 Oh Mandor @ Rp. =
Sub total : =
Dibulatka =
n:
2 1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps
Bahan
1.10000 m3 Batu belah ( 15/20 ) @ Rp. =
202.00000 Kg Semen porland @ Rp. =
0.48500 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatka =
Upah n:
1.50000 Oh Pekerja @ Rp. =
0.60000 Oh Tukang batu @ Rp. =
0.06000 Oh Kepala tukang @ Rp. =
0.07500 Oh Mandor @ Rp. =
Sub total : =
Dibulatka =
n:
3 1m2 wiremesh M8
Bahan
1.05000 m2 wermesh M8 @ Rp. =
0.01500 kg Kawat Bendrat @ Rp. =
Sub total : =
Dibulatka =
Upah n:
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatka =
n:
4 1 Kg Pembesian dengan besi polos
Bahan
1.05000 Kg Besi beton @ Rp. =
0.01500 Kg Kawat beton @ Rp. =
Sub total : =
Dibulatka =
Upah n:
0.00700 Oh Pekerja @ Rp. =
0.00700 Oh Tukang besi @ Rp. =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
=
Dibulatkan : =
Upah
0.30000 Oh Pekerja @ Rp. =
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
5 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
=
Dibulatkan : =
Upah
0.30000 Oh Pekerja @ Rp. =
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
7 1 m2 Pasangan Batako dengan Campuran 1 : 4
Bahan
12.50000 Bh Hebel uk 10 x 20 x 60 @ Rp. =
4.50000 Kg Mu 380 (Perekat bata ringan ) 174 000 40 kg @ Rp. =
0.04000 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.48000 Oh Pekerja @ Rp. =
0.16000 Oh Tukang batu @ Rp. =
0.01600 Oh Kepala tukang @ Rp. =
0.04800 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
8 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm
Bahan
6.48000 Kg Semen portland @ Rp. =
0.01900 m3 Pasir pasang @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.20000 Oh Pekerja @ Rp. =
0.15000 Oh Tukang batu @ Rp. =
0.01500 Oh Kepala tukang @ Rp. =
0.01000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
9 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup ) Watershild
Bahan
0.10000 Kg Plamir @ Rp. =
0.25000 Lbr Ampelas @ Rp. =
0.02000 Bh Kuwas / roll @ Rp. =
0.10000 Kg Cat dasar @ Rp. =
0.26000 Kg Cat penutup 2x @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.02000 Oh Pekerja @ Rp. =
0.06300 Oh Tukang cat @ Rp. =
0.00630 Oh Kepala tukang @ Rp. =
0.00250 Oh Mandor @ Rp. =
. Sub total : =
Dibulatkan : =
10 Pasang jalusi aluminium
Bahan
11.00000 M Kisi kisi aluminium white @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.78750 Oh Pekerja @ Rp. =
0.78750 Oh Tukang besi @ Rp. =
0.07875 Oh Kepala tukang besi @ Rp. =
0.00390 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
11 1 unit Pasang pintu besi baja
Bahan
1.00000 unit Pintu besi baja @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.65000 Oh Tukang besi @ Rp. =
0.65000 Oh Pekerja @ Rp. =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Watershild
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0,065 Kepala tukang @ Rp. =
00 Mandor @ Rp. =
Oh Sub total : =
0,032 Dibulatkan : =
00
D. PEKERJAAN AREA DEPAN Oh HALL
1 M² Pasang paving blok
Baha
1.10000 M² Paving block @ Rp. =
0.12100 M³ Pasir urug / tanah katel @ Rp. =
Sub total : =
Dibulatkan : =
U
p 0.32000 Oh Pekerja @ Rp. =
a 0.10000 Oh Tukang @ Rp. =
h
0.01000 Oh Kepala Tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
2 M¹ Pembuatan kanstin
Baha
1.60000 Bh Kanstin 15 x 30 x 40 cm @ Rp. =
2.00000 Kg Semen portland @ Rp. =
0.00300 M³ Pasir pasang @ Rp. =
U Sub total : =
p Dibulatkan : =
a @ Rp. =
h
0.32000 Oh Pekerja
0.10000 Oh Tukang batu @ Rp. =
0.01000 Oh Kepala Tukang @ Rp. =
0.01500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
3 1 Kg Pembesian dengan besi polos
Bahan
1.05000 Kg Besi beton @ Rp. =
0.01500 Kg Kawat beton @ Rp. =
Sub total : =
Dibulatkan : =
U
p 0.00700 Oh Pekerja @ Rp. =
a 0.00700 Oh Tukang besi @ Rp. =
h 0.00070 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 1 m2 Pasang bekisting
Bahan
0.04500 M³ Papan begesting (MC) terentang @ Rp. =
0.30000 Kg Paku usuk kayu 7 cm @ Rp. =
0.10000 Ltr Minyak bekesting / residu @ Rp. =
Sub total : =
U Dibulatkan : =
p @ Rp. =
a =
h
0.30000 Oh Pekerja
0.26000 Oh Tukang kayu @ Rp. =
0.02600 Oh Kepala tukang @ Rp. =
0.00500 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : = Rp
5 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp Rp Rp -
Rp -
-
-
Rp -
Rp -
Rp -
Rp -
= Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Bahan
1.00000 bh Angkur Ø 19 mm pj. 60 cm @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Bahan
1.10000 Kg Besi plat strip @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.00600 Oh Pekerja @ Rp. =
0.06000 Oh Tukang besi @ Rp. =
0.00600 Oh Kepala tukang @ Rp. =
0.00030 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Bahan
232.00000 Kg Semen portland @ Rp. =
0.52000 m3 Pasir beton @ Rp. =
0.87000 m3 Koral beton @ Rp. =
Sub total : =
Dibulatkan : =
Upah
1.65000 Oh Pekerja @ Rp. =
0.25000 Oh Tukang batu @ Rp. =
0.02500 Oh Kepala tukang @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Baha
0.04762 Ton Aspal hotmix @ Rp. =
Sub total : =
Dibulatkan : =
Upah
0.04762 Oh Upah angkut dan gelar aspal @ Rp. =
Sub total : =
Dibulatkan : =
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Upah
1.00000 hari Sewa baby roller @ Rp. =
Sub total : =
Dibulatkan : =
Pekerjaan ME
1 Btg Memasang kabel tray U 200 x 100 x 2400 x 1.4 mm
Bahan
1.00000 Btg Cable Tray U 200 x 100 x 2400 x 1.4 mm @ Rp. =
2.00000 m Besi siku 40x40x4 @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.16000 Oh Pembantu tukang listrik @ Rp. =
0.16000 Oh Tukang listrik @ Rp. =
0.03200 Oh Kepala tukang listrik @ Rp. =
0.01600 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
2 M¹ Memasang kabel line input sumber PLN dengan kabel NYFGBY 4 x 16 mm lengkap dengan pipa dan asesoris intsalsinya,
Baha
1.00000 M¹ Kabel NYFGBY 4 x 16 mm @ Rp. =
0.25000 Btg Pipa vinilon PVC diameter 1" panjang 4 m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
3 M¹ Memasangan kabel line output genset dengan kabel NYFGBY 4 x 4 mm lengkap dengan pipa dan asesoris intsalsinya,
Baha
1.00000 M¹ Kabel NYFGBY 4 x 4 mm @ Rp. =
0.33333 Btg Pipa Conduit Clipsal 25mm panjang 3m @ Rp. =
0.02000 Pack Sok Pipa Conduit 25 mm @ Rp. =
0.01000 Pack Klem Pipa Conduit 25 mm @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
4 M¹ Memasang kabel power dengan menggunakan kabel NYFGBY 4 x 10 mm lengkap dengan pengamannya
Baha
1.00000 M¹ Kabel NYFGBY 4 X 10 mm @ Rp. =
0.25000 Btg Pipa vinilon PVC diameter 1" panjang 4 m @ Rp. =
5.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
Sub total : =
Dibulatkan : =
5 Titik Memasang lampu T8 16-18 watt untuk penerangan ruangan termassuk pemasangan balak
Baha
1.00000 Bh Lampu T8 LED 16-18 Watt @ Rp. =
1.00000 Unit Ballak T8 16 - 18 Watt Led @ Rp. =
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
1.00000 Bh T-Dos Clipsal 20mm 3 Lubang @ Rp. =
0.33333 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan lampu LED =
Sub total : =
Dibulatkan : =
Upah
0.29629 Oh Pembantu tukang listrik @ Rp. =
0.29629 Oh Tukang listrik @ Rp. =
0.05920 Oh Kepala tukang listrik @ Rp. =
0.03365 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
6 M¹ Instalasi line lampu highbay dengan kabel NYM 4 x 2.5 mm sumber pln
Baha
1.00000 M¹ Kabel NYM 4 x 2,5 mm @ Rp. =
0.33333 Btg Pipa Conduit 20mm panjang 3m @ Rp. =
0.01000 Pack Sok Pipa 20 mm @ Rp. =
0.01000 Pack Klem Pipa Conduit 20 mm @ Rp. =
5.00000 % Perlengkapan =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
7 Titik Memasang instalasi stop kontak untuk ruangan dengan menggunakan kabel NYM 3 x 2.5 mm lengkap dengan pipa pengaman stan
Baha
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
2.66667 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
8 Titik Memasang instalasi saklar tunggal untuk ruangan dengan menggunakan kabel NYM 3 x 2.5 mm len
Baha
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
2.66667 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
9 Titik Memasang instalasi saklar ganda untuk ruangan dengan menggunakan kabel NYM 3 x 2.5 mm lengk
Baha
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
2.66667 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
10 Titik Memasang instalasi stop kontak Ac untuk ruangan dengan menggunakan kabel NYM 3 x 2.5 mm len
Baha
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
2.66667 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
11 M¹ Memasang instalasi stop kontak hal dengan menggunakan kabel NYM 4 x 2.5 mm lengkap dengan p
Baha
1.00000 M¹ Kabel NYM 4 x 2,5 mm @ Rp. =
0.33333 Btg Pipa Conduit Clipsal 20mm panjang 3m @ Rp. =
0.01000 Pack Sok Pipa 20 mm @ Rp. =
0.01000 Pack Klem Pipa Conduit 20 mm @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. =
0.04570 Oh Tukang listrik @ Rp. =
0.00910 Oh Kepala tukang listrik @ Rp. =
0.00300 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp. -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
salsinya,
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
sinya,
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
ipa pengaman stan
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
1,00000 Unit
Tiang PJU octagonal Doble ornamen tinggi 6 @ Rp. = Rp -
meter
5,00000 % Perlengkapan panel dan wairing panel = Rp
Sub total : = Rp
Dibulatkan : = Rp
0,66667 Oh Pembantu tukang listrik @ Rp. = Rp
0,50000 Oh Tukang listrik @ Rp. = Rp
Upa 0,16666 Oh Kepala tukang listrik @ Rp. = Rp
h 0,14388 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
14 Bh Pemasangan lampu ditiang PJU menggunakan jenis lampu cobra 2 x 20 watt 220volt
Baha
1.00000 Unit Lampu jenis cobra 2 x 20 watt 220Volt @ Rp. =
8.00000 M¹ Kabel NYM 3 x 2,5 mm @ Rp. =
5.00000 % Perlengkapan =
U
Sub total : =
Dibulatkan : =
p
@ Rp. =
a
h
0.16000 Oh Pembantu tukang listrik
0.16000 Oh Tukang listrik @ Rp. =
0.03200 Oh Kepala tukang listrik @ Rp. =
0.01600 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
15 Bh Memasang stop kontak dengan menggunakan Nbowdus kotak standart panassonic
Baha
1.00000 bh Stop kontak E3426/101S-WW @ Rp. =
1.00000 Bh Inbow Dos @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
U
Sub total : =
Dibulatkan : =
p
@ Rp. =
a
h
0.03200 Oh Pembantu tukang listrik
0.03200 Oh Tukang listrik @ Rp. =
0.00411 Oh Kepala tukang listrik @ Rp. =
0.00160 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
16 Bh Memasang saklar tunggal dengan menggunakan Nbowdus kotak standart panassonic
Baha
1.00000 Bh Saklar Engkel @ Rp. =
1.00000 Bh Inbow Dos @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
U
Sub total : =
Dibulatkan : =
p
@ Rp. =
a
h
0.03200 Oh Pembantu tukang listrik
0.03200 Oh Tukang listrik @ Rp. =
0.00411 Oh Kepala tukang listrik @ Rp. =
0.00160 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
17 Bh Memasang saklar ganda/seri dengan menggunakan Nbowdus kotak standart panassonic
Baha
1,000 Saklar Seri @ Rp. =
00 Inbow Dos @ Rp. =
5.00000 %Bh Perlengkapan pemasangan instalasi =
1,000
Sub total : =
00
Dibulatkan : =
Bh
Upah
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
= Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.03200 Oh Pembantu tukang listrik @ Rp. =
0.03200 Oh Tukang listrik @ Rp. =
0.00411 Oh Kepala tukang listrik @ Rp. =
0.00160 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
0.18514 Oh Kepala tukang listrik @ Rp. =
0.11371 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
20 Unit Memasang AC 2 PK setara mitsubishi
Baha
1.00000 Unit Ac split 2 pk setara mitshubishi @ Rp. =
5.00000 M¹ Pipa Ac 1.5 - 2 Pk @ Rp. =
5.00000 % Perlengkapan pemasangan instalasi =
Sub total : =
Dibulatkan : =
Upah
1.14286 Oh Pembantu tukang listrik @ Rp. =
1.14286 Oh Tukang listrik @ Rp. =
0.18514 Oh Kepala tukang listrik @ Rp. =
0.11371 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan : =
22 Unit Pemasangan panel ukuran 300 x 200 x 150, MCB dan pemasangan kabel NYY 4x4 dari genset ke R. Server
Baha
1.00000 Unit Panel Indoor 300 X 200 X 150 mm @ Rp. =
3.00000 Bh MCB 6A 1F @ Rp. =
10.00000 m' Kabel NYY 4 x 4 dari genset ke server @ Rp. =
Sub total : =
Dibulatkan : =
Upah
2.00000 Oh Pembantu tukang listrik @ Rp. =
2.00000 Oh Tukang listrik @ Rp. =
1.00000 Oh Kepala tukang listrik @ Rp. =
Sub total : =
Dibulatkan : =
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
LAMPIRAN III RKS NO : 32/LL/NONSAR/KCI/RKS/III/2018 Tanggal 02 Maret 2018
23 Jasa pemindahan tiang FO
Upah
0.66667 Oh Pembantuk tukang listrik @ Rp. =
0.50000 Oh Tukang listrik @ Rp. =
0.16666 Oh Kepala tukang istrik @ Rp. =
0.14388 Oh Mandor @ Rp. =
Sub total : =
Dibulatkan =
24 Memasang 1 unit motor rolling grill
Bahan
1.00000 unit Motor Rolling grill @ Rp. =
5.00000 % Perlengkapan instalasi
Sub total : =
Dibula =
Upah tkan =
1.01000 Oh Pembantuk tukang listrik @ Rp. =
0.25000 Oh Tukang listrik @ Rp. =
0.02500 Oh Kepala tukang istrik @ Rp. =
0.08000 Oh Mandor @ Rp. =
Sub total : =
Dibula =
tkan
PT. ...............
Ttd, Cap / Stempel Perusahaan
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
J
a
k
a
r
t
a
,
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.