PROSES BISNIS KELISTRIKAN SUMATERA UTARA

INDUSTRI

BISNIS

PLTA
PLTD RUMAH
PLTP
PLTG
PLTU SOSIAL/
PLTGU TRAFO PUBLIK
TRAFO TRAFO
STEP DOWN
STEP-UP STEP DOWN
SISTEM PEMBANGKIT SISTEM TRANSMISI SISTEM DISTRIBUSI KONSUMEN
SUTT 275 kV PLGN. TR
SUTM 20 kV
SUTT 150 kV PLGN. TM
SKTM 20 kV
SKTT 150 kV PLGN. TT
SUTR 220 V
SUTT 70 kV

UIK SUMBAGUT UIP3B SUMATERA UIW SUMATERA UTARA

www.pln.co.id | 01
SISTEM KELISTRIKAN SUMATERA UTARA
Langsa PLTU
NERACA DAYA Wampu
P.Brandan
T.Pura
P.Susu

HEPP PLTU /GU


Binjai
Daya Mampu 2.953 MW Mabar
P .Pasir
Belawan

P.Geli
Labuhan
Beban Puncak 1.851 MW Namorambe KIM
Glugur
Lamhotma
Sei. Rotan
P.Batu Denai K.Tanjung
Titi Kuning K.Namu Perbaungan
Cadangan 1.102 MW (37,3%) T.Morawa
T .Tinggi Kisaran
Brastagi Galang
Renun
JARINGAN TRANSMISI HEPP
Pangu
G .Para
P.Siantar
Aek Kanopan
Sidikalang
ruran
SUTET 275 kV GI Payakumbuh – Pkl. Susu Tele
Porsea

R. Prapat
SUTT 150 kV GI Bagan Batu Riau – GI Kt.Pinang – GI D.Sanggul Asahan I
HEPP

Pkl. Brandan – GI Tualang Cut Langsa PLTP


P.Bukit
Tarutung Simangkok Asahan III
HEPP
PLTP
Sarulla&
PLTU Sipaholon K.Pinang
L .Angin Sibolga
RENCANA PENGEMBANGAN SISTEM SUMBAGUT (RUPTL
G. Tua
2020 – 2029) Sipan HEPP

• Penambahan Pembangkit : 5.129 MW Pd . Sidempuan

• Penambahan Gardu Induk : 8.330 MVA (101 Lokasi)


• Penambahan Transmisi : 3.944 kms
150 kV
275 kV
www.pln.co.id | 02
DAERAH PELAYANAN PLN WILSU Pkl.Susu
Pkl.Brandan
Stabat
Binjai
MEDAN
Sibolangit L.Pakam
Brastagi Galang Perbaungan
Kabanjahe
T.Tinggi
TigaPanah Perdagangan
Tongging P.Siantar Kisaran
Tjg.Balai
Sumbul Pulaurakyat
Parapat AekKanopan
Sidikalang
Porsea Lbh.Bilik
AekKotabatu
Balige R.Prapat
Siborong-borong KotaPinang
Tarutung
Sibolga Sipirok LanggaPayung
BatangToru GunungTua
P.Sidimpuan
G.Sitoli
Siabu
Panyabungan
Natal
MuaraSipongi

PulauTelo

WILAYAH KERJA PLN UIW SUMUT MELIPUTI 33 KAB & KOTA, 440 KEC , SERTA 6.110 DESA DAN KELURAHAN

www.pln.co.id | 03
KINERJA KEANDALAN PLN UIW SUMUT 2020
250 SAIDI (menit/plg)
2,81
SAIFI (kali/plg)
(kali/ FGTM (kali/100 kms)
203,41 3 3 2,68
193,04
200
TARGET = 154,52 2,5 2,5
2,08 1,96 1,99
1,88
150 2 1,70 TARGET = 1,86 2
120,50
100,72 93,10 96,52 1,5 1,35 1,5 1,27 TARGET = 1,28
100 1,07 1,16
1,02
1 1
50
0,5 0,5

0 0 0
JAN FEB MAR APR MAY JUN JAN FEB MAR APR MAY JUN JAN FEB MAR APR MAY JUN
TARGET SEM I 2020 = 927,12 TARGET SEM I 2020 = 11,18 TARGET SEM I 2020 = 7,68
REALISASI SEM I 2020 = 801,52 REALISASI SEM I 2020 = 11,72 REALISASI SEM I 2020 = 6,98

PENYEBAB GANGGUAN
E-4
I1-14%
7% I-3
E3-15% I-2 1%  Faktor Penyebab Gangguan :
5% I-4 E-1 = Pohon (44%)
1% binatang (15%)
E-3 = Pekerjaan pihak III/binatang
I-1 = Komponen JTM (14%)
E2-13%
E-2 = Bencana alam (13%)
I-4 = Lain-lain (14 %)
E1-44%

www.pln.co.id | 04
MIMPI PLN UNIT INDUK WILAYAH SUMATERA UTARA
Melistriki Seluruh Wilayah Sumatera Utara ( RD & RE 100%) Tahun
2023

Listrik Yang Andal, Berkualitas dan Ber-estetika

Electrifying Life Style (Mobil Listrik,


Listrik Motor Listrik, Sepeda
Listrik, Kompor Induksi, dll)

Upaya Mewujudkan Mimpi di atas


1 • Seluruh Kota dan Ibu Kota Kabupaten Memiliki Kawasan Zero Down Time (ZDT)
2 • Penambahan Gardu Hubung di pusat-pusat
pusat beban

3 • Konfigurasi Jaringan TM saling terhubung (Spindle)


4 • Otomatisasi Sistem Pengaturan dengan SCADA
5 • Penggantian Penghantar SUTM menjadi SKTM di daerah perkotaan

www.pln.co.id | 05
NEW PLN MOBILE

TERIMA KASIH

Mauliate

Anda mungkin juga menyukai