KURVA S

Proyek : Pembangunan Jalan Tol Sumatera 15 km


Perencana : CV. Abhipraya Cidhatama
Lokasi : Provinsi Sumatera 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Luas : Sepanjan 15 km
01/01/2020 08/01/2020 15/01/2020 22/01/2020 29/01/2020 05/02/2020 12/02/2020 19/02/2020 26/02/2020 04/03/2020 11/03/2020 18/03/2020 25/03/2020 01/04/2020 08/04/2020 15/04/2020 22/04/2020 29/04/2020 06/05/2020 13/05/2020 20/05/2020 27/05/2020 03/06/2020 10/06/2020 17/06/2020 24/06/2020 01/07/2020 08/07/2020 15/07/2020 22/07/2020 29/07/2020 05/08/2020 12/08/2020 19/08/2020 26/08/2020 02/09/2020 09/09/2020 16/09/2020 23/09/2020 30/09/2020 07/10/2020 14/10/2020 21/10/2020 28/10/2020 04/11/2020 11/11/2020 18/11/2020 25/11/2020 02/12/2020 09/12/2020 16/12/2020 23/12/2020 30/12/2020 06/01/2021 13/01/2021 20/01/2021 27/01/2021 03/02/2021 10/02/2021 17/02/2021 24/02/2021 03/03/2021 10/03/2021 17/03/2021 24/03/2021 31/03/2021 07/04/2021 14/04/2021 21/04/2021 28/04/2021 05/05/2021 12/05/2021 19/05/2021 26/05/2021 02/06/2021 09/06/2021 16/06/2021 23/06/2021

Hari Ke-n
No. Uraian Pekerjaan Sat Volume Harga Satuan JUMLAH HARGA BOBOT DURASI (HARI)PREDECESSOR
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 182 189 196 203 210 217 224 231 238 245 252 259 266 273 280 287 294 301 308 315 322 329 336 343 350 357 364 371 378 385 392 399 406 413 420 427 434 441 448 455 462 469 476 483 490 497 504 511 518 525 532 539 546

A BIAYA DESIGN (15 KM) ls 1,00

BAB 1 UMUM
1,13 KESELAMATAN DAN KESEHATAN KERJA
1,1 Pemeliharaan dan Perlindungan Lalu Lintas ls 1,00 Rp 1.545.000.000 Rp 1.545.000.000 0,160% 120 114 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
1,2 Mobilisasi ls 1,00 Rp 1.364.590.000 Rp 1.364.590.000 0,141% 7 1 0,03% 0,03% 0,03% 0,03% 0,03%
1,3 Pekerjaan dan Penanganan Aliran Air yang sudah ada ls 1,00 Rp 1.237.000.000 Rp 1.237.000.000 0,128% 14 2 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
1,4 Pengamanan Lingkungan Hidup ls 1,00 Rp 900.000.000 Rp 900.000.000 0,093% 7 3 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
1,5 Manajemen Mutu ls 1,00 Rp 1.350.000.000 Rp 1.350.000.000 0,140% 3 4 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%

BAB 2 PEMBERSIHAN TEMPAT KERJA


2.01 (1) Pembersihan Tempat Kerja m2 1.162.443,38 Rp12.965 Rp 15.071.112.906 1,561% 14 114 0,78% 0,78%
2.01 (2) Pemotongan Pohon, dia. 30 cm - 50 cm buah 41.460,00 Rp180.209 Rp 7.471.455.935 0,774% 7 6 0,77%
2.01 (3) Pemotongan Pohon, dia. >50 cm - 75 cm buah 31.090,00 Rp268.815 Rp 8.357.446.845 0,865% 7 7 0,87%

BAB 3 PEMBONGKARAN
3.01 (1) Pembongkaran Pasangan Batu atau Bata m3 41,28 Rp139.328 Rp 5.751.470 0,001% 1 6 0,00%
3.01 (2) Pembongkaran Struktur Beton m3 15,36 Rp152.601 Rp 2.343.957 0,000% 1 9 0,00%
3.01 (6) Pembongkaran Rumah m2 5.300,00 Rp231.545 Rp 1.227.187.443 0,127% 7 10 0,06% 0,06%

BAB 4 PEKERJAAN TANAH


4.03 (1) Galian Biasa untuk Timbunan m3 880.905,85 Rp21.634 Rp 19.057.131.101 1,974% 30 8 0,49% 0,49% 0,49% 0,49%
4.03 (3) Galian Biasa untuk Dibuang [Waste] m3 1.426.519,05 Rp22.130 Rp 31.569.257.311 3,269% 60 12 0,54% 0,54% 0,54% 0,54% 0,54% 0,54%
4.05 (1) Common Borrow Material m3 962.877,26 Rp60.583 Rp 58.334.254.874 6,041% 60 20 0,76% 0,76% 0,76% 0,76% 0,76% 0,76% 0,76% 0,76%
4,09 Urugan Material berbutir (Granular Backfill) m3 21.437,78 Rp5.380 Rp 115.333.577 0,012% 4 14 0%
4.12 (5) Geotekstil Stabilisator (Kelas 1) m2 26.250,00 Rp191.628 Rp 5.030.243.422 0,521% 45 49 0% 0% 0% 0% 0% 0% 0%
4,15 Borrow dari Row m3 -

BAB 5 GALIAN STRUKTUR


5.01 (1) Galian Struktur kedalaman >0 - 2 m m3 12.429,84 Rp23.068 Rp 286.725.617 0,030% 1 12 0,03%
5.01 (2) Galian Struktur kedalaman >2 - 4 m m3 4.015,71 Rp129.769 Rp 521.114.156 0,054% 4 18 0,03% 0,03%
5.01 (3) Galian Struktur kedalaman >4 - 6 m m3 1.864,64 Rp172.615 Rp 321.864.570 0,033% 14 19 0,02% 0,02%
5.01 (6) Pasangan Batu Kosong (Blinding Stone) m3 1.949,77 Rp320.746 Rp 625.381.769 0,065% 26 84
5.01 (7) Cerucuk Dolken buah 9.808,00 Rp10.248 Rp 100.509.660 0,010% 21 57 0,00% 0,00% 0,00%

BAB 6 DRAINASE
6.05 (1 ) Pipa Gorong-gorong Beton Tak Bertulang Ø 40 cm, Tipe A m' 982,00 Rp420.830 Rp 413.255.355 0,043% 3 14 0,04%
6.05 (5) Pipa Gorong-gorong Beton Bertulang Ø 60 cm, Tipe B m' 259,00 Rp930.253 Rp 240.935.483 0,025% 4 14 0,02%
6.05 (21) Pipa Gorong-gorong Beton Bertulang 2 Ø 120 cm, Tipe B m' 79,20 Rp1.744.391 Rp 138.155.749 0,014% 3 14 0,01%
6.06 (1) Saluran U, Tipe DS-1 m' 187,00 Rp678.351 Rp 126.851.638 0,013% 3 14 0,01%
6.06 (3) Saluran U, Tipe DS-3 m' 9.749,00 Rp761.010 Rp 7.419.086.882 0,768% 14 14 0,26% 0,26% 0,26%
6.06 (4) Saluran U, Tipe DS-4 m' -
6.06 (5) Saluran U, Tipe DS-5 m' 43.032,00 Rp3.813.510 Rp 164.102.964.048 16,994% 14 14 8,50% 8,50%
6.06 (8) Saluran U, Tipe DS-8 m' 7.200,98 Rp3.939.460 Rp 28.367.962.233 2,938% 3 14 2,94%
6.06 (14) Cathbasin, Tipe DC-1 buah 70,00 Rp6.578.686 Rp 460.508.023 0,048% 2 14 0,05%
6.06 (18) Cathbasin, Tipe DC-5 buah 70,00 Rp8.573.847 Rp 600.169.324 0,062% 1 14 0,06%
6.06 (29) Outlet Drain , Tipe DO-1 buah -
6.08 (1 ) Side Ditch, DS-4 m' -
6.08 (2) Side Ditch, DS-8 m' -

BAB 7 PERSIAPAN TANAH DASAR


7,01 Persiapan Tanah Dasar m2 587.865,55 Rp50.735 Rp 29.825.485.268 3,089% 60 8 0,34% 0,34% 0,34% 0,34% 0,34% 0,34% 0,34% 0,34% 0,34%

BAB 8 LAPIS PONDASI AGREGAT


8.01 (1) Lapis Pondasi Agregat Kelas A m3 76.711,02 Rp289.575 Rp 22.213.601.305 2,300% 60 49 0% 0% 0% 0% 0% 0% 0% 0% 0%

BAB 9 PERKERASAN
9.02 (2) Galian Perkerasan Beraspal Lama tanpa Cold Milling Machine m3 - 0,00% 0,00% 0,00% 0,00%
9,04 Bitumen Lapis Resap Pengikat (Prime Coat) kg 22.531,29 Rp10.351 Rp233.210.168 0,024% 30 12 0,00% 0% 0%
9,05 Bitumen Lapis Perekat (Tack Coat) kg 5.894,48 Rp10.351 Rp61.010.870 0,006% 45 43 0% 0%
9.07 (2) Asphalt Concrete Binder Course ton 3.174,26 Rp1.198.567 Rp3.804.557.546 0,394% 60 40 0% 0%
9.07 (3) Asphalt Concrete Wearing Course ton 2.989,86 Rp1.364.883 Rp4.080.814.363 0,423% 45 39 0% 0%
9.07 (4) Aspal pen.60/70 ton 308,21 Rp9.136 Rp2.815.764 0,000% 3 46 0%
9.07 (5) Bahan Anti Pengelupas Kg 22.788,80 Rp150.000 Rp3.418.320.251 0,354% 7 42 0,05%
9.08 (1) Perkerasan Beton m3 123.783,00 Rp2.364.962 Rp292.742.124.604 30,316% 7 46
9.08 (2) Perkerasan Beton Double Wire Mesh m3 900,00 Rp606.463 Rp545.816.891 0,057% 3 47 8% 8% 8% 8%
9.08 (3) Perkerasan Beton Single Wire Mesh m3 153,00 Rp552.013 Rp84.458.022 0,009% 3 48 0%
9,09 Lean Concrete m2 416.020,00 Rp102.193 Rp42.514.270.860 4,403% 45 85 0%
1% 1% 1%
BAB 10 STRUKTUR BETON
10,01 Beton Struktur
10.01 (4a) Beton Struktur Kelas B-1-1a (Lantai Beton Bertulang dari Gelagar Beton Pratekan U/I) m3 1.029,37 Rp997.138 Rp1.026.425.039 0,106% 12 51 0% 0% 0% 0% 0% 0% 0%
10.01 (5) Beton Struktur Kelas B-1-2 (Diafragma dari Gelagar Beton Pratekan U/I) m3 213,48 Rp4.361.747 Rp931.139.202 0,096% 21 53 0% 0% 0% 0% 0%
10.01 (5a) Beton Struktur Kelas B-1-3 (Kepala Pier Beton Bertulang) m3 74,76 Rp1.767.952 Rp132.172.105 0,014% 21 53 0% 0% 0% 0% 0%
10.01 (6) Beton Isian Kelas B untuk Rongga Beton Pratekan m3 607,62 Rp12.494.566 Rp7.591.998.169 0,786% 30 87 0% 0% 0% 0% 0%
10.01 (7f) Beton Struktur Kelas B-1-4f (Kolom Beton Bertulang dari Pier) m3 443,22 Rp1.767.952 Rp783.591.763 0,081% 60 52 0% 0% 0% 0% 0% 0% 0% 0% 0%
10.01(8) Beton Struktur Kelas B-1-5 (Pelat Beton Bertulang di atas Tiang Pancang) m3 -
10.01(9) Beton Struktur Kelas B-1-6 (Beton Penghalang/Barrier ) m3 288,47 Rp1.638.738 Rp472.724.593 0,049% 1 46
10.01(9a) Beton Struktur Kelas B-1-7 (Kerb) m3 -
10.01(10) Beton Struktur Kelas C-1 (Abutments, Telapak Pier, Dinding Penahan Tanah,Pelat Injak,Kotak Tanaman) m3 6.320,64 Rp4.130.828 Rp26.109.455.364 2,704% 60 32 0% 0% 0% 0% 0% 0% 0% 0% 0%
10.01(11) Beton Struktur Kelas C-2 (Gorong-gorong Kotak) m3 8.011,99 Rp2.687.888 Rp21.535.338.871 2,230% 60 57 0% 0% 0% 0% 0% 0% 0% 0% 0%
10.01(13) Beton Struktur Kelas D m3 541,61 Rp1.144.208 Rp619.714.741 0,064% 21 67 0% 0% 0%
10.01(14) Beton Struktur Kelas E m3 1.062,46 Rp1.062.588 Rp1.128.959.620 0,117% 45 37 0% 0% 0% 0% 0% 0% 0%
10.01(16) Bondex Hot Dip Galvanized T=1.20 mm Standar JIS m2 2.444,96 Rp303.881 Rp742.976.883 0,077% 0% 0%
10,02 Besi Beton -
10.02 (2) Batang Baja Tulangan Ulir BJTD-40 Kg 3.397.800,00 Rp12.402 Rp42.138.617.707 4,364% 60 84 1% 1% 1% 1% 1% 1%
10,03 Gelagar Over Pass -
10.03 (19) Gelagar PC-I bentang nominal 16,60m, H=1,25m, penyediaan buah 18,00 Rp49.505.288 Rp891.095.183 0,092% 1 37 0%
10.03 (20) Gelagar PC-I bentang nominal 16,60m, H=1,25m, pemasangan buah 18,00 Rp4.795.249 Rp86.314.482 0,009% 1 67 0%
10.03 (21) Gelagar PC-I bentang nominal 39,00m to 41,00, H=2,10m, penyediaan buah 16,00 Rp73.705.288 Rp1.179.284.607 0,122% 1 37 0%
10.03 (22) Gelagar PC-I bentang nominal 39,00m to 41,00m, H=2,10m, pemasangan buah 16,00 Rp4.795.249 Rp76.723.984 0,008% 14 67 0% 0%
10.03 (23) Gelagar PC-I bentang nominal 50.80m, H=2,30m, penyediaan buah 22,00 Rp51.150 Rp1.125.300 0,000% 2 37 0%
10.03 (24) Gelagar PC-I bentang nominal 50.80m, H=2,30m, pemasangan buah 22,00 Rp4.823.743 Rp106.122.345 0,011% 18 67 0% 0% 0%
10,05 Pekerjaan Tiang Pancang -
10.05 (1) Penyediaan Tiang Pancang Beton Bulat Pretensioned , dia 60 cm m' 14.502,00 Rp660.442 Rp9.577.726.506 0,992% 14 58 0% 0%
10.05 (2) Pemancangan Tiang Pancang Beton Bulat Pretensioned , dia 60 cm m' 13.898,00 Rp303.777 Rp4.221.896.414 0,437% 45 69 0% 0% 0% 0% 0% 0% 0%
10.05 (7) Pengujian Pembebanan Dinamis untuk tiang pancang beton bulat pretensioned, dia. 50 - 60 cm (PDA) buah 12,00 Rp2.420.000 Rp29.040.000 0,003% 7 58 0% 0% 0% 0%
10,06 TIANG PANCANG BAJA -
10,07 TIANG BOR BETON CAST-IN-PLACE -
10,08 PENGEBORAN PERCOBAAN (TEST DRILLING) -
10,08 Pengeboran Percobaan m' -
10,09 RAILLING JEMBATAN DAN PAGAR KAWAT DAN PEGANGAN TANGGA -
10,10 SAMBUNGAN EKSPANSI JEMBATAN (BRIDGE EXPANSION JOINT) -
10.10 (1) Sambungan Ekaspansi Tipe A (Surface Rubber Joint With Load-Supporting Tipe) m' 168,00 Rp2.629.888 Rp441.821.171 0,046% 16 99 0,02% 0,02% 0,02%
10,11 BRIDGE BEARINGS -
10.11 (5) Elastomeric Bearing Pad 460 x 550 x 49 (Fix ) buah 16,00 Rp519.393 Rp8.310.280 0,001% 1 99 0,00%
10.11 (25) Rubber Bearing Sheet 200 x 200 x 20 buah 308,00 Rp437.058 Rp134.613.710 0,014% 7 99 0,01% 0,01%
10.11 (26) Rubber Bearing Sheet 250 x 25 m' 406,40 Rp1.328.058 Rp539.722.568 0,056% 18 99 0,02% 0,02% 0,02%
10.11 (45) Elastomeric Bearing Pad 750x450x86 buah 18,00 Rp816.558 Rp14.698.035 0,002% 1 99 0,00%
10.11 (46) Elastomeric Bearing Pad 650x300x33 buah 36,00 Rp757.158 Rp27.257.670 0,003% 1 99 0,00%
10.11 (47) Elastomeric Bearing Pad 650x450x86 buah 26,00 Rp793.458 Rp20.629.895 0,002% 1 99 0,00% 0,00%
10.11 (48) Elastormeric Bearing Pad 400x600x67 buah 16,00 Rp517.358 Rp8.277.720 0,001% 1 99 0,00% 0,00%
10.11 (49) Angkur dan Aksesoris Fix Dia. 45 buah 114,00 Rp195.000 Rp22.230.000 0,002% 1 99 0,00% 0,00%
10.11 (50) Angkur dan Aksesoris Move Dia. 32 buah 330,00 Rp180.000 Rp59.400.000 0,006% 1 99 0,00% 0,00%
10.11 (51) Angkur dan Aksesoris Fix Dia. 19 buah 342,00 Rp156.000 Rp53.352.000 0,006% 1 99 0,00% 0,00%
10,12 FASILITAS JEMBATAN INSIDENTIL LAINNYA -
10.12 (1) Pipa Drainase D=20cm dengan perlengkapan dan dukungan m' 729,26 Rp137.324 Rp100.144.351 0,010% 3 59 0%
10.12 (2) Pipa Drainase D=15cm dengan perlengkapan dan dukungan m' 38,40 Rp120.824 Rp4.639.642 0,000% 1 59 0% 0%
10.12 (3) Deck Drain Tipe 1 dengan perlengkapan buah 110,00 Rp335.324 Rp36.885.640 0,004% 3 84 0%
10,13 TURAP BETON PRATEGANG BERGELOMBANG -
10.13 (1) Pengadaan Corrugated Sheet Pile W-400-1000-B, (L=11m) m' 814,00 Rp727.836 Rp592.458.172 0,061% 14 71 0% 0%
10.13 (2) Pemancangan Corrugated Sheet Pile W-400-1000-B, (L=11m) m' 814,00 Rp134.548 Rp109.522.176 0,011% 21 86 0% 0% 0% 0%

BAB 12 PEKERJAAN LAIN-LAIN


12.01 (1) Solid Sodding m2 308.358,73 Rp16.687 Rp5.145.582.160 0,533% 30 85 0% 0% 0% 0%
12.02 (1) Pasangan Batu Kali Tipe A m3 -
12.03 (4) Perlindungan Lereng Dengan Blok Beton m2 1.753,20 Rp1.979.114 Rp3.469.782.481 0,359% 6 48 0%
12.05 (5) Pasangan Batu dengan Mortar Tipe DS.5 m3 -
12.06 (1) Guardrail Kendaraan Tipe A m' 24.754,00 Rp1.114.652 Rp27.592.085.764 2,857% 31 99 0,57% 0,57% 0,57% 0,57% 0,57%
12.06 (11) Bagian Ujung Guardrail buah 504,00 Rp99.504 Rp50.149.915 0,005% 1 92 0,01%
12.06 (12) Pagar Kawat H=2.60m/Chainlink Fence m' 493,70 Rp672.980 Rp332.250.226 0,034% 9 92 0,02% 0,02%
12.07 (1) Rambu Pengaturan dan Peringatan, Tipe A-1 buah 6,00 Rp762.626 Rp4.575.757 0,000% 1 94 0,00%
12.07 (2) Rambu Pengaturan dan Peringatan, Tipe A-2 buah 36,00 Rp1.132.686 Rp40.776.710 0,004% 1 94
12.08 (1) Rambu Petunjuk Tipe A-1 buah 10,00 Rp5.158.445 Rp51.584.445 0,005% 1 94
12.09 (1) Marka Jalan, Tipe A (Penerapan Umum) m2 14.628,65 Rp317.650 Rp4.646.788.286 0,481% 17 44 0,16% 0,16% 0,16%
12.09 (4) Marka Pengaduh (Rumble Strip) m2 36,00 Rp312.098 Rp11.235.510 0,001% 1 98 0,01% 0,01%
12.10 (1) Delineator Tipe A buah 873,00 Rp110.135 Rp96.147.676 0,010% 4 97 0,00% 0,00%
12.10 (2) Delineator Tipe B buah 1.332,00 Rp85.402 Rp113.755.102 0,012% 1 97 0,01%
12.15 (1) Concrete Barrier , Tipe-A m' 19.772,00 Rp1.054.192 Rp20.843.492.410 2,159% 21 46 1% 1% 1%
12.19 (5) Patok Kilometer buah 111,00 Rp423.915 Rp47.054.511 0,005% 1 46
12.20 (1) Pagar RUMIJA, Tipe 1 (Panel Beton) m' 1.950,00 Rp576.428 Rp1.124.033.625 0,116% 6 47 0% 0%
12.20 (2) Pagar RUMIJA, Tipe 2 (Kawat Berduri) m' 38.426,00 Rp8.295 Rp318.762.307 0,033% 4 46 0% 0%

BAB 13 PENCAHAYAAN, LAMPU LALU LINTAS DAN PEKERJAAN LISTRIK


13,01 PENERANGAN JALAN UMUM (PJU)
13.01(1) Lampu (termasuk Grounding ), Kabel dan Material Bantu
13.01(1).48 Lampu PJU, Tinggi 13 m, Tipe A (2 x 157- 185 Watt), Jenis LED, Dimming System buah 105,00 Rp25.722.782 Rp2.700.892.119 0,280% 3 107 0,14% 0,14%
13.01(1).49 Lampu Penerangan Bawah Jembatan / Tunnel (1 x 150 Watt) buah 48,00 Rp334.840 Rp16.072.320 0,002% 1 108 0,00% 0,00%
13.01(1).50 Kabel NYFGBY 5 x 4 mm² m' 6.160,00 Rp246.114 Rp1.516.062.240 0,157% 30 97 0,03% 0,03% 0,03% 0,03% 0,03%
13.01(2) Panel PJU -
13.01(2).1 Panel PJU (Termasuk Box dan Pondasi) unit 4,00 Rp15.262.742 Rp61.050.968 0,006% 1 106 0,00%
13.01(3) Pasokan Tenaga Listrik dari PLN
13.01(4) Lampu Pengatur Lalu Lintas
13,02 PEKERJAAN SIPIL UNTUK HAL-HAL KELISTRIKAN
13,03 SALURAN POMPA
13,04 GENERATOR UNTUK POMPA DRAINASE DENGAN PANEL LISTRIK

BAB 14 PLASA TOL


14.05 (1) Gerbang Tol m2 -
14.05 (2) Pulau Tol m2 -
14.05 (3) Gardu Tol m2 -
14.05 (4) Plasa Tol m2 -

BAB 15 PENGALIHAN DAN PERLINDUNGAN UTILITAS YANG ADA


15,1 Pengalihan dan Perlindungan Utilitas yang ada ls 1,00 Rp5.000.000.000 Rp5.000.000.000 0,518% 21 0,02% 0,02% 0,02%

BAB 16 KANTOR DAN FASILITAS TOL


16.04 (15) REST AREA TYPE-A ls 1,00 Rp15.000.000.000 Rp15.000.000.000 1,553% 45 109 0% 0% 0% 0% 0% 0% 0%

BAB 17 PEKERJAAN HARIAN

0,06% 0,06% 0,81% 0,79% 0,84% 1,43% 0,84% 0,84% 1,39% 0,97% 0,99% 1,81% 1,81% 2,43% 1,72% 1,37% 1,34% 1,34% 0,80% 0,36% 0,31% 11,84% 8,54% 0,34% 0,34% 0,45% 0,45% 0,56% 0,56% 0,56% 0,56% 0,56% 0,25% 0,25% 0,75% 0,75% 0,07% 0,07% 0,07% 0,07% 0,07% 0,07% 0,07% 0,19% 0,19% 0,18% 0,20% 0,20% 0,04% 0,04% 0,04% 0,03% 0,03% 0,29% 0,28% 0,35% 0,35% 0,35% 0,34% 0,34% 0,46% 0,39% 1,52% 1,52% 1,59% 8,39% 8,33% 8,45% 8,45% 0,87% 1,79% 1,17% 1,60% 0,50% 0,23% 0,25% 0,25% 0,25%