Toaz - Info Rab Jembatn Kayu Ulin PR
Toaz - Info Rab Jembatn Kayu Ulin PR
Toaz - Info Rab Jembatn Kayu Ulin PR
m3 37,025.00 18,327.38
m3 673,685.00 242,526.60
m3 176,810.00 11,492.65
bh 350,000.00 700.00
bh 45,000.00 135.00
bh 45,000.00 135.00
NO URAIAN PEKERJAAN
1 2
I PEKERJAAN PENDAHULUAN
IV Err:509
V Err:509
VI Err:509
VII Err:509
IX Err:509
X Err:509
JUMLAH TOTAL
Rekapitulasi
Lembar 4
M PEKERJAAN
HARGA
( Rp )
3
2,760,000.00
11,976,111.50
10,057,504.40
Err:509
Err:509
Err:509
Err:509
1,358,334.00
Err:509
Err:509
Err:509
Rekapitulasi
Lembar 5
RENCANA ANGGARAN BIAYA
Kegiatan : Pengembangan Kawasan Kumuh
1 2 3 4 5
I PEKERJAAN PENDAHULUAN
1.1 Pembongkaran dan pembersihan lokasi SNI-ABK.A.2.2.1.9. 30.00 ls
JUMLAH TOTAL
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
6 7
92,000.00 2,760,000.00
30,072.50 2,886,960.00
205,332.50 4,927,980.00
205,332.50 2,463,990.00
5,650.09 135,602.25
5,650.09 271,204.50
16,949.28 135,594.20
33,898.55 847,463.75
19,207.30 307,316.80
40,514.50 3,079,102.00
40,514.50 648,232.00
66,332.00 1,061,312.00
66,332.00 1,326,640.00
66,332.00 2,653,280.00
64,446.92 1,288,938.40
37,731.50 1,358,334.00
26,151,949.90
rangka badang
Kayu Ulin 1.120 M3
Paku ulin 3.000 Kg
I PEKERJAAN PENDAHULUAN
1 Pembongkaran dan pembersihan lokasi 1
JUMLAH TOTAL
Dimensi Analisis
Elivasi pjg lbr Tggi luas Lebar Volume Berat Pipa pvc Jumlah
T2 atas bwh dia.
12.00 96.00
12.00 24.00
2.00 12.00
3.00 24.00
24.00 48.00
8.00 8.00
5.00 25.00
2.00 16.00
1.8 20 36.00
Volume
Satuan
Pek.
30.00 m2
96.00 btg
24.00 ptg
12.00 ptg
24.00 ptg
48.00 ptg
8.00 ptg
25.00 ptg
16.00 btg
76.00 kpg
16.00 kpg
20.00 btg
40.00 btg
60.00 btg
2.00 btg
36.00 m2
DAFTAR HARGA SATUAN UPAH & BAHAN
B Bahan
1 Air bersih/ PDAM Ltr
2 Floordrain Bh
3 Kerikil cor M3
4 Pasir beton/ pasang M3
5 Pasir urug M3
6 Tanah timbunan M3
7 Portland cement (PC) Kg
8 Papan meranti 1,5/20 - 2 m Kpg
9 Semen warna Kg
10 Lantai keramik /porselin (20x20) Merk Asia Tile Bh
11 Roster Kerawang Bj
12 Pipa dia 4" Bh
13 Besi Strip/begel Kg
14 Besi Kawat Bendrat Kg
15 Besi Polos U24 Kg
16 Kawat Harmonika Rol
17 Kerikil/koral M3
18 Kerikil/koral (1,350 kg/m3) Kg
19 Kayu Bekisting M3
20 Minyak Bekisting lt
21 Tiang Kayu Ulin 5/10 - 2m btg
22 Sunduk Ulin 5/10 - 0,5 m btg
23 Kalang/Lapak Ulin 5/10 - 0,5 m btg
24 Sloof Ulin 5/7 - 4 m btg
25 Balok kayu Ulin 5/7 - 2 m btg
26 Balok Kayu Ulin 5/10 - 4m btg
27 Papan Kayu Ulin 1,5/20 - 2m Kpg
28 Daun Pintu kayu meranti ukuran 90 x 210 cm Bh
Harga
100,000.00
75,000.00
85,000.00
85,000.00
80,000.00
85,000.00
100,000.00
300,000.00
125,000.00
93,700.00
50.00
17,500.00
400,000.00
280,000.00
210,000.00
110,000.00
1,560.00
13,000.00
5,000.00
2,200.00
5,000.00
55,000.00
20,000.00
22,700.00
15,000.00
189,200.00
210,000.00
155.56
1,200,000.00
20,000.00
75,000.00
7,500.00
7,500.00
135,000.00
45,000.00
150,000.00
25,000.00
400,000.00
118,750.00
0.04
25
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA MEMANCANG
1 Pekerja L.01 OH 0.160
2 Tukang Kayu L.02 OH 0.080
3 Kepala Tukang L.03 OH 0.008
4 Mandor L.04 OH 0.100
Jumlah
JUMLAH TENAGA KERJA 1/4
B TENAGA MERUNCING
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.005
Jumlah
JUMLAH TENAGA KERJA 1/4
C BAHAN
1 Kayu Galam dia. 10/12 - 4m Btg 1.000
JUMLAH HARGA BAHAN
D PERALATAN
E Jumlah (A+B+C+D)
F Overhead & profit (Contoh 15%) 15% x D
G Harga Satuan Pekerjaan (E+F)
4 A.E.1.2 Memancang Tonkat ulin 5/10 - 2m
E Jumlah (A+B+C+D)
F Overhead & profit (Contoh 15%) 15% x D
G Harga Satuan Pekerjaan (E+F)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
7 A.E.1.5 Pek. Pemasangan Sloof 5/7 - 2m /Btg
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
10 A.E.1.8 Pek. Pemasangan Lantai ulin 1,5/20 - 2m /Kpg
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
13 A.E.1.11 Pek. Pemasangan Rangka Atap Kayu ulin 5/7 - 2m /Btg
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
16 A.E.1.14 Memancang Tiang Pancang galam dia.10/12 - 2m
E Jumlah (A+B+C+D)
F Overhead & profit (Contoh 15%) 15% x D
G Harga Satuan Pekerjaan (E+F)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
19 A.4.4.2.3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
21 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 daun pintu klamp sederhana, kayu kelas III
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
22 A.4.6.2.11. Pemasangan 1 buah kunci slot
B BAHAN
1 Kunci slot psg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
B BAHAN
1 Engsel pintu Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
B BAHAN
1 Kunci tanam Bh 1.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
25 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat pen
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
B BAHAN
1 Kran air Bh 1.000
2 Sealtape Bh 0.025
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
27 A.5.1.1.2. Pemasangan 1 buah closet jongkok porslen
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
28 A.5.1.1.14 Pemasangan 1 buah floor drain
B BAHAN
1 Floor drain Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
B BAHAN
1 Bak air Fiber bh 1.000
2 Perlengkapan % 20.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
30 A.4.1.1.7. Membuat 1 m³ beton mutu f''̹ = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58
B BAHAN
1 Semen Portland Kg 371.000
2 Pasir Beton M3 0.698
3 Kerikil (Maks 30mm) M3 1.0310
4 Air Liter 215
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
31 A.4.1.1.1. Membuat 1 m³ beton mutu f' '̹ = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87
B BAHAN
1 Semen Portland Kg 247.000
2 Pasir Beton M3 0.869
3 Kerikil (Maks 30mm) M3 0.999
4 Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
G (F/10) =Harga = 1kg
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
TUAN
75,000.00 75,000.00
100,000.00 5,000.00
JUMLAH TENAGA KERJA Rp 80,000.00
80,000.00
12,000.00
Rp 92,000.00
75,000.00 67,500.00
100,000.00 4,500.00
JUMLAH TENAGA KERJA Rp 72,000.00
72,000.00
10,800.00
Rp 82,800.00
75,000.00 12,000.00
85,000.00 6,800.00
100,000.00 800.00
100,000.00 10,000.00
Jumlah 29,600.00
JUMLAH TENAGA KERJA 1/4 upah Rp 7,400.00
75,000.00 7,500.00
85,000.00 17,000.00
100,000.00 2,000.00
100,000.00 500.00
Jumlah 27,000.00
JUMLAH TENAGA KERJA 1/4 upah Rp 6,750.00
12,000.00 12,000.00
JUMLAH HARGA BAHAN Rp 12,000.00
26,150.00
3,922.50
Rp 30,072.50
Harga Satuan (Rp) Jumlah Harga (Rp)
75,000.00 120,000.00
85,000.00 6,800.00
100,000.00 800.00
100,000.00 9,000.00
Jumlah 136,600.00
JUMLAH TENAGA KERJA 1/2 upah Rp 68,300.00
75,000.00 7,500.00
85,000.00 17,000.00
100,000.00 2,000.00
100,000.00 500.00
Jumlah 27,000.00
JUMLAH TENAGA KERJA 1/4 upah Rp 6,750.00
85,000.00 51,000.00
100,000.00 6,000.00
Jumlah 57,000.00
JUMLAH TENAGA KERJA 1/2 upah Rp 28,500.00
75,000.00 75,000.00
JUMLAH HARGA BAHAN Rp 75,000.00
178,550.00
26,782.50
Rp 205,332.50
75,000.00 937.50
85,000.00 3,187.50
100,000.00 375.00
100,000.00 62.50
JUMLAH TENAGA KERJA Rp 4,562.50
7,500.00 20.63
22,000.00 330.00
JUMLAH HARGA BAHAN Rp 350.63
75,000.00 937.50
85,000.00 3,187.50
100,000.00 375.00
100,000.00 62.50
JUMLAH TENAGA KERJA Rp 4,562.50
7,500.00 20.63
22,000.00 330.00
JUMLAH HARGA BAHAN Rp 350.63
4,913.13
736.97
5,650.09
Harga Satuan (Rp) Jumlah Harga (Rp)
75,000.00 2,625.00
85,000.00 8,925.00
100,000.00 1,050.00
100,000.00 175.00
JUMLAH TENAGA KERJA Rp 12,775.00
135,000.00 1,039.50
22,000.00 924.00
JUMLAH HARGA BAHAN Rp 1,963.50
14,738.50
2,210.78
16,949.28
75,000.00 2,625.00
85,000.00 8,925.00
100,000.00 1,050.00
100,000.00 175.00
JUMLAH TENAGA KERJA Rp 12,775.00
135,000.00 2,079.00
22,000.00 1,848.00
JUMLAH HARGA BAHAN Rp 3,927.00
16,702.00
2,505.30
19,207.30
75,000.00 5,250.00
85,000.00 17,850.00
100,000.00 2,100.00
100,000.00 350.00
JUMLAH TENAGA KERJA Rp 25,550.00
135,000.00 2,079.00
22,000.00 1,848.00
JUMLAH HARGA BAHAN Rp 3,927.00
29,477.00
4,421.55
33,898.55
Harga Satuan (Rp) Jumlah Harga (Rp)
75,000.00 19,500.00
85,000.00 11,900.00
100,000.00 1,400.00
100,000.00 1,300.00
JUMLAH TENAGA KERJA Rp 34,100.00
25,000.00 250.00
22,000.00 880.00
JUMLAH HARGA BAHAN Rp 1,130.00
35,230.00
5,284.50
40,514.50
75,000.00 9,000.00
85,000.00 34,000.00
100,000.00 4,000.00
100,000.00 6,000.00
JUMLAH TENAGA KERJA Rp 53,000.00
150,000.00 3,360.00
22,000.00 1,320.00
JUMLAH HARGA BAHAN Rp 4,680.00
57,680.00
8,652.00
66,332.00
75,000.00 9,000.00
85,000.00 34,000.00
100,000.00 4,000.00
100,000.00 6,000.00
JUMLAH TENAGA KERJA Rp 53,000.00
135,000.00 2,116.80
22,000.00 924.00
JUMLAH HARGA BAHAN Rp 3,040.80
56,040.80
8,406.12
64,446.92
Harga Satuan (Rp) Jumlah Harga (Rp)
75,000.00 3,150.00
85,000.00 11,900.00
100,000.00 1,400.00
100,000.00 2,100.00
JUMLAH TENAGA KERJA Rp 18,550.00
45,000.00 352.80
22,000.00 462.00
JUMLAH HARGA BAHAN Rp 814.80
19,364.80
2,904.72
22,269.52
75,000.00 3,150.00
85,000.00 11,900.00
100,000.00 1,400.00
100,000.00 2,100.00
JUMLAH TENAGA KERJA Rp 18,550.00
75,000.00 840.00
22,000.00 660.00
JUMLAH HARGA BAHAN Rp 1,500.00
20,050.00
3,007.50
23,057.50
75,000.00 9,375.00
85,000.00 21,250.00
100,000.00 25,000.00
100,000.00 6,000.00
JUMLAH TENAGA KERJA Rp 61,625.00
48,000.00 33,600.00
22,000.00 4,400.00
JUMLAH HARGA BAHAN Rp 38,000.00
99,625.00
14,943.75
114,568.75
Harga Satuan (Rp) Jumlah Harga (Rp)
75,000.00 6,000.00
85,000.00 3,400.00
100,000.00 400.00
100,000.00 5,000.00
Jumlah 14,800.00
JUMLAH TENAGA KERJA 1/4 upah Rp 3,700.00
75,000.00 7,500.00
85,000.00 17,000.00
100,000.00 2,000.00
100,000.00 500.00
Jumlah 27,000.00
JUMLAH TENAGA KERJA 1/4 upah Rp 6,750.00
7,500.00 7,500.00
JUMLAH HARGA BAHAN Rp 7,500.00
17,950.00
2,692.50
Rp 20,642.50
75,000.00 22,500.00
100,000.00 1,000.00
JUMLAH TENAGA KERJA Rp 23,500.00
110,000.00 132,000.00
JUMLAH HARGA BAHAN Rp 132,000.00
155,500.00
23,325.00
178,825.00
75,000.00 22,500.00
100,000.00 1,000.00
JUMLAH TENAGA KERJA Rp 23,500.00
210,000.00 252,000.00
JUMLAH HARGA BAHAN Rp 252,000.00
275,500.00
41,325.00
316,825.00
Harga Satuan (Rp) Jumlah Harga (Rp)
75,000.00 22,500.00
85,000.00 12,750.00
100,000.00 1,500.00
100,000.00 1,500.00
JUMLAH TENAGA KERJA Rp 38,250.00
1,560.00 13,291.20
280,000.00 4,760.00
JUMLAH HARGA BAHAN Rp 18,051.20
56,301.20
8,445.18
64,746.38
75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
100,000.00 3,500.00
JUMLAH TENAGA KERJA Rp 89,250.00
2,200.00 58,300.00
1,560.00 16,224.00
280,000.00 12,600.00
5,000.00 8,100.00
JUMLAH HARGA BAHAN Rp 95,224.00
184,474.00
27,671.10
212,145.10
400,000.00 400,000.00
22,000.00 1,100.00
JUMLAH HARGA BAHAN Rp 401,100.00
528,900.00
79,335.00
608,235.00
Harga Satuan (Rp) Jumlah Harga (Rp)
75,000.00 1,500.00
85,000.00 17,000.00
100,000.00 2,000.00
100,000.00 100.00
JUMLAH TENAGA KERJA Rp 20,600.00
58,000.00 58,000.00
JUMLAH HARGA BAHAN Rp 58,000.00
78,600.00
11,790.00
90,390.00
75,000.00 1,125.00
85,000.00 12,750.00
100,000.00 1,500.00
100,000.00 80.00
JUMLAH TENAGA KERJA Rp 15,455.00
23,900.00 23,900.00
JUMLAH HARGA BAHAN Rp 23,900.00
39,355.00
5,903.25
45,258.25
75,000.00 3,750.00
85,000.00 42,500.00
100,000.00 5,000.00
100,000.00 300.00
JUMLAH TENAGA KERJA Rp 51,550.00
58,000.00 58,000.00
JUMLAH HARGA BAHAN Rp 58,000.00
109,550.00
16,432.50
125,982.50
pis cat dasar, 2 lapis cat penutup)
75,000.00 5,250.00
85,000.00 765.00
100,000.00 600.00
100,000.00 300.00
JUMLAH TENAGA KERJA Rp 6,915.00
15,000.00 3,000.00
20,000.00 3,000.00
25,000.00 4,250.00
55,000.00 14,300.00
12,000.00 120.00
7,500.00 225.00
5,000.00 1,000.00
JUMLAH HARGA BAHAN Rp 25,895.00
32,810.00
4,921.50
37,731.50
75,000.00 750.00
85,000.00 34,000.00
100,000.00 4,000.00
100,000.00 500.00
JUMLAH TENAGA KERJA Rp 39,250.00
15,000.00 15,000.00
5,000.00 125.00
JUMLAH HARGA BAHAN Rp 15,125.00
54,375.00
8,156.25
62,531.25
Harga Satuan (Rp) Jumlah Harga (Rp)
75,000.00 75,000.00
85,000.00 127,500.00
100,000.00 15,000.00
100,000.00 16,000.00
JUMLAH TENAGA KERJA Rp 233,500.00
250,000.00 250,000.00
1,560.00 9,360.00
280,000.00 2,800.00
JUMLAH HARGA BAHAN Rp 262,160.00
495,660.00
15% x D 74,349.00
570,009.00
Harga Satuan (Rp) Jumlah Harga (Rp)
75,000.00 750.00
85,000.00 8,500.00
100,000.00 1,000.00
100,000.00 500.00
JUMLAH TENAGA KERJA Rp 10,750.00
17,500.00 17,500.00
JUMLAH HARGA BAHAN Rp 17,500.00
28,250.00
4,237.50
32,487.50
75,000.00 22,500.00
85,000.00 38,250.00
100,000.00 4,500.00
100,000.00 1,500.00
JUMLAH TENAGA KERJA Rp 66,750.00
300,000.00 300,000.00
60,000.00 60,000.00
JUMLAH HARGA BAHAN Rp 360,000.00
426,750.00
64,012.50
490,762.50
1,560.00 578,760.00
280,000.00 195,440.00
400,000.00 412,400.00
50.00 10,750.00
JUMLAH HARGA BAHAN Rp 1,197,350.00
1,355,575.00
203,336.25
1,558,911.25
12 ± 2) cm, w/c = 0,87
75,000.00 123,750.00
85,000.00 23,375.00
100,000.00 2,800.00
100,000.00 8,300.00
JUMLAH TENAGA KERJA Rp 158,225.00
1,560.00 385,320.00
280,000.00 243,320.00
400,000.00 399,600.00
50.00 10,750.00
JUMLAH HARGA BAHAN Rp 1,038,990.00
1,197,215.00
179,582.25
1,376,797.25
75,000.00 5,250.00
85,000.00 5,950.00
100,000.00 700.00
100,000.00 700.00
JUMLAH TENAGA KERJA Rp 12,600.00
15,000.00 157,500.00
22,700.00 3,405.00
173,505.00
26,025.75
199,530.75
19,953.08
75,000.00 26,250.00
85,000.00 22,100.00
100,000.00 2,600.00
100,000.00 500.00
JUMLAH TENAGA KERJA Rp 51,450.00
1,200,000.00 48,000.00
17,500.00 5,250.00
20,000.00 2,000.00
JUMLAH HARGA BAHAN Rp 55,250.00
106,700.00
16,005.00
122,705.00
92,000.00
82,800.00
30,072.50
Galam panjang 4m
4 0.040
0.020
0.002
0.025
205,332.50
5,650.09
sunduk 5/10-50cm
0.0025 5.000
15.000
1.500
0.250
paku 6.000
1.100
6.000
5,650.09
sunduk 5/10-50cm
0.0025 5.000
15.000
1.500
0.250
paku 6.000
1.100
6.000
16,949.28
sloof 5/7-400cm
0.007 5.000
15.000
1.500
0.250
paku 6.000
1.100
6.000
19,207.30
suai 5/7-400cm
0.014 5.000
15.000
1.500
0.250
paku 6.000
1.100
6.000
33,898.55
Gelagar 5/7-400cm
0.014 5.000
15.000
1.500
0.250
paku 6.000
1.100
6.000
40,514.50
0.025
0.100
66,332.00
1.120
3.000
64,446.92
1.120
3.000
22,269.52
1.120
3.000
23,057.50
1.120
3.000
114,568.75
1.120
3.000
20,642.50
Galam panjang 2m
2 0.040
0.020
0.002
0.025
178,825.00
316,825.00
64,746.38
212,145.10
1
0.09
11.1111111111
608,235.00
1
0.09
11.1111111111
90,390.00
45,258.25
125,982.50
37,731.50
62,531.25
570,009.00
32,487.50
490,762.50
1,558,911.25
78000.000.00
1,376,797.25
78000.000.00
19,953.08
122,705.00
Papan 2/20-2m
0.008
1 m3
125 Kpg
8000
1,000,000.00
0.040
0.300
0.100
DAFTAR ANALISA BIAYA PEKERJAAN
HARGA UPAH
ANALISA URAIAN SATUAN (Rp)
(Rp)
1 2 3 4
SNI 7394:2008/6.8/M³ Lantai Kerja Beton mutu f'c = 7,4 Mpa (K 100), slump (3 - 6) cm, w/c = 0,87
247.000 Kg Portland Cement 1,500.00
0.621 M3 Pasir Beton 100,000.00
0.740 M3 Kerikil (maks. 30 mm) 200,000.00
215.000 Lt. Air 100.00
1.650 Pekerja 65,000.00 107,250.00
SNI 7394:2008/6.8/M³ Beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56
384.000 Kg Portland Cement 1,500.00
0.494 M3 Pasir Beton 100,000.00
0.770 M3 Kerikil (maks. 30 mm) 200,000.00
215.000 Lt. Air 100.00
1.650 Pekerja 65,000.00 107,250.00
0.275 Tukang Batu 75,000.00 20,625.00
0.028 Kepala Tukang 85,000.00 2,380.00
0.083 Mandor 85,000.00 7,055.00
Jumlah 137,310.00
SNI Pipa dan Sanitasi 10.15a Memasang 1m' Pipa Beton, diameter 30 - 100 cm
1.100 Gorong-2 beton D = 60 cm 280,000.00
10.300 Kg Portland Cement 1,500.00
0.061 M3 Pasir Beton 100,000.00
0.069 M3 pasir Urug 60,000.00
0.140 Pekerja 65,000.00 9,100.00
0.007 Tukang Batu 75,000.00 525.00
0.070 Kepala Tukang 85,000.00 5,950.00
0.007 Mandor 85,000.00 595.00
HARGA JUMLAH
BAHAN (Rp)
(Rp)
5 6
48,750.00
212.50
48,962.50
12,480.00
1,615.00
14,095.00
37,500.00 37,500.00
16,250.00
850.00
37,500.00 54,600.00
72,000.00 72,000.00
19,500.00
850.00
72,000.00 92,350.00
33,000.00 33,000.00
6,800.00 6,800.00
4,000.00 4,000.00
18,750.00 18,750.00
58,380.00 58,380.00
42,000.00 42,000.00
42,900.00
24,750.00
2,805.00
2,805.00
162,930.00 236,190.00
576,000.00 576,000.00
49,428.57 49,428.57
153,925.93 153,925.93
21,500.00 21,500.00
107,250.00
20,625.00
2,380.00
7,055.00
800,854.50 938,164.50
172,200.00 172,200.00
2,700.00 2,700.00
4,550.00
5,250.00
595.00
340.00
174,900.00 185,635.00
17,490.00 18,563.50
8,429.16 8,429.16
900.00 900.00
1,625.00
1,875.00
170.00
85.00
9,329.16 13,084.16
180,000.00 180,000.00
303,000.00 303,000.00
48,500.00 148,500.00
97,500.00
5,625.00
63,750.00
6,375.00
531,500.00 704,750.00
308,000.00 308,000.00
15,450.00 15,450.00
6,100.00 106,100.00
4,140.00 64,140.00
9,100.00
525.00
5,950.00
595.00
No. PEKERJAAN
1 2
I PEKERJAAN PENDAHULUAN
IV Err:509
V Err:509
VI Err:509
VII Err:509
IX Err:509
X Err:509
Pajak-Pajak 10%
TERBILANG : Err:509
No. PEKERJAAN
1 2
I PEKERJAAN PENDAHULUAN
X Err:509
Pajak-Pajak 10%
TERBILANG : Err:509
No. PEKERJAAN
1 2
I PEKERJAAN PENDAHULUAN
VI Err:509
VII Err:509
Pajak-Pajak 10%
TERBILANG : Err:509
REKAPITULASI RENCANA ANGGARAN BIAYA
No. PEKERJAAN
1 2
I PEKERJAAN PENDAHULUAN
X Err:509
Pajak-Pajak 10%
TERBILANG : Err:509
No. PEKERJAAN
1 2
I PEKERJAAN PENDAHULUAN
VI Err:509
VII Err:509
X Err:509
Pajak-Pajak 10%
TERBILANG : Err:509
NA ANGGARAN BIAYA
Total Biaya
JUMLAH BIAYA
( Rp )
3 4
2,760,000.00 Rp 2,760,000.00
11,976,111.50 Rp 11,976,111.50
10,057,504.40 Rp 10,057,504.40
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
1,358,334.00 Rp 1,358,334.00
Err:509 Err:509
Err:509 Err:509
Err:509
NA ANGGARAN BIAYA
2,760,000.00 Rp 2,760,000.00
Err:509 Err:509
Err:509
NA ANGGARAN BIAYA
Total Biaya
JUMLAH BIAYA
( Rp )
3 4
2,760,000.00 Rp 2,760,000.00
10,057,504.40 Rp 10,057,504.40
Err:509 Err:509
Err:509 Err:509
1,358,334.00 Rp 1,358,334.00
Err:509 Err:509
Err:509
NA ANGGARAN BIAYA
Total Biaya
JUMLAH BIAYA
( Rp )
3 4
2,760,000.00 Rp 2,760,000.00
731,149.76 Rp 731,149.76
Err:509 Err:509
Err:509
NA ANGGARAN BIAYA
Total Biaya
JUMLAH BIAYA
( Rp )
3 4
731,149.76 Rp 731,149.76
10,057,504.40 Rp 10,057,504.40
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
1,358,334.00 Rp 1,358,334.00
Err:509 Err:509
Err:509