R E N C A N A A N G G A R A N B I AYA

(R A B)

KEGIATAN :
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN
DI DAERAH KABUPATEN/KOTA

PEKERJAAN :
PEMBANGUNAN TPS/TPST/SPA/TPS-3R/TPS

LOKASI :
DESA PEREAN KANGIN, KECAMATAN BATURITI,
KABUPATEN TABANAN

TAHUN ANGGARAN :
2021

DIAJUKAN

KSM
RESIK LOKHA BALI
REKAPITULASI RENCANA ANGGARAN BIAYA
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN / KOTA
TAHUN ANGGARAN 2021
KSM RESIK LOKHA BALI, BANJAR BASANGBE, DESA PEREAN KANGIN, KEC. BATURITI KABUPATEN TABANAN

PEMKAB MASYARAKAT
NO PEKERJAAN JUMLAH HARGA
In-Cash In-Kind In-Cash
1 RENCANA ANGGARAN BIAYA BANGUNAN HANGGAR Rp. 270,686,683 270,686,683 - -

2 RENCANA ANGGARAN BIAYA BANGUNAN KANTOR KSM Rp. 199,765,524 199,765,524 - -

3 RENCANA ANGGARAN BIAYA TEMBOK PAGAR DAN HALAMAN Rp. 38,494,811 38,494,811 - -

4 RENCANA ANGGARAN BIAYA BOP Rp. 26,053,546 26,053,546 - -


Jumlah Konstruksi Rp. 535,000,564 535,000,564 - -

Jumlah Total dibulatkan Rp. 535,000,000 535,000,000 - -

Terbilang : --- Lima ratus tiga puluh lima juta rupiah ---
DIPERIKSA
TABANAN, OKTOBER 2021
DIAJUKAN : TFL TEKNIK TFL PEMBERDAYAAN KOORDINATOR TFL PENGAWAS
KSM RESIK LOKHA BALI

I NYOMAN ALIT SUMBERDANA, SE I GEDE RESTU PRASTIA NI MADE REIKA PARAMITA GEDE BUDA KARTIKA, ST I KADEK AFRIADI, ST
KETUA NIP : 19920412 201903 1 008

DISAHKAN :
KEPALA DINAS PEKERJAAN UMUM
DISETUJUI : PENATAAN RUANG PERUMAHAN
PEJABAT PEMBUAT KOMITMEN DAN KAWASAN PERMUKIMAN
KEPALA PENGAWAS BIDANG CIPTA KARYA KABUPATEN TABANAN

I MD PALGUNA KW, A.Md I GEDE ADNYANA, ST, M.Si I MADE YUDIANA, ST, MT
NIP : 19771119 200902 1 002 NIP. 19790927 2009021 1 003 NIP. 19690619 199803 1 005
RENCANA ANGGARAN BIAYA BANGUNAN HANGGAR
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN / KOTA
TAHUN ANGGARAN 2021
KSM RESIK LOKHA BALI, BANJAR BASANGBE, DESA PEREAN KANGIN, KEC. BATURITI KABUPATEN TABANAN

Harga Satuan Jumlah Harga PEMKAB MASYARAKAT


No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.

A PEKERJAAN AWAL
I. PEKERJAAN PERSIAPAN DAN PEMBONGKARAN
1 Papan nama proyek 1.00 Ls 300,000 300,000 - 300,000 300,000
2 Pekerjaan Pasang Papan Bowplank 64.00 M¹ 5,440 21,200 348,160 1,356,800 1,704,960 1,704,960
3 Direksikit / Gudang Peralatan 4.00 M² 613,225 322,000 2,452,900 1,288,000 3,740,900 3,740,900
Sub Total I 3,101,060 2,644,800 5,745,860 5,745,860 - -
B PEKERJAAN BANGUNAN HANGGAR
I. PEKERJAAN TANAH DAN PONDASI
1 Pekerjaan Galian tanah biasa pondasi menerus 20.16 M³ - 74,750 - 1,506,960 1,506,960 1,506,960
2 Pekerjaan Galian tanah biasa pondasi foot plat 13.00 M³ - 109,130 - 1,418,690 1,418,690 1,418,690
3 Pekerjaan Urugan peninggian lantai bekas galian pondasi 7.25 M³ - 58,000 - 420,500 420,500 420,500
4 Pekerjaan Urugan tanah peninggian lantai 33.38 M³ 93,333 58,000 3,115,467 1,936,040 5,051,507 5,051,507
5 Pekerjaan Urugan pasir bawah lantai dan pondasi 8.80 M³ 213,333 29,900 1,877,333 263,120 2,140,453 2,140,453
6 Pekerjaan Pasangan batu kosong 6.72 M³ 343,467 122,460 2,308,096 822,931 3,131,027 3,131,027
7 Pekerjaan Pondasi batu kali 1Pc : 6Psr 9.97 M³ 528,042 235,500 5,264,575 2,347,935 7,612,510 7,612,510
Sub Total I 12,565,471 8,716,176 21,281,648 21,281,648 - -
II. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan dinding batako (Camp. 1pc : 4psr) 118.08 M² 66,013 41,600 7,794,822 4,912,128 12,706,950 12,706,950
2 Pekerjaan Plesteran dinding 1pc : 4ps 244.80 M² 12,756 47,100 3,122,669 11,530,080 14,652,749 14,652,749
3 Pekerjaan Plesteran Pondasi 1pc : 4ps 17.34 M² 12,756 47,100 221,189 816,714 1,037,903 1,037,903
4 Pekerjaan Acian dinding 244.80 M² 4,144 31,400 1,014,390 7,686,720 8,701,110 8,701,110
5 Pekerjaan Acian pondasi 29.58 M² 4,144 31,400 122,572 928,812 1,051,384 1,051,384
Sub Total II 12,275,642 25,874,454 38,150,096 38,150,096 - -
III. PEKERJAAN BETON
1 Pekerjaan Beton lantai t = 80mm (Campuran 1Pc:2Psr:3Krl) 12.68 M³ 590,467 195,450 7,487,117 2,478,306 9,965,423 9,965,423
2 Pekerjaan Pembesian (Wiremesh) M-6 1 Lapis 160.00 M² 32,200 14,910 5,152,000 2,385,600 7,537,600 7,537,600
3 Pekerjaan Beton Lantai kerja Foot plat (Campuran 1Pc:3Psr:5Krl) 0.50 M³ 572,617 195,450 286,308 97,725 384,033 384,033
4 Pekerjaan Pondasi Foot Plat (P1)
- Pekerjaan Pembesian 700.60 Kg 10,760 1,477 7,538,129 1,034,786 8,572,915 8,572,915
- Pekerjaan Begesting Pondasi (3x Pakai) 4.66 M² 107,800 81,640 502,348 380,442 882,790 882,790
- Pekerjaan Beton (Campuran 1Pc:2Psr:3Krl) 3.50 M³ 590,467 195,450 2,066,633 684,075 2,750,708 2,750,708
5 Pekerjaan Sloof 200x300mm (S1)
- Pekerjaan Pembesian 498.87 Kg 10,760 1,477 5,367,608 736,831 6,104,439 6,104,439
- Pekerjaan Begesting (3x Pakai) 11.20 M² 107,800 81,640 1,207,360 914,368 2,121,728 2,121,728
- Pekerjaan Beton (Campuran 1Pc:2Psr:3Krl) 3.36 M³ 590,467 195,450 1,983,968 656,712 2,640,680 2,640,680
Harga Satuan Jumlah Harga PEMKAB MASYARAKAT
No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.
6 Pekerjaan Kolom Pedestal 200x200mm (K1)
- Pekerjaan Pembesian 302.08 Kg 10,760 1,477 3,250,240 446,172 3,696,412 3,696,412
- Pekerjaan Begesting (3x Pakai) 7.06 M² 198,450 103,620 1,401,057 731,557 2,132,614 2,132,614
- Pekerjaan Beton (Campuran 1Pc:2Psr:3Krl) 1.69 M³ 590,467 195,450 997,889 330,311 1,328,199 1,328,199
7 Pekerjaan Kolom Penguat/Praktis (11/11) 26.24 M¹ 51,790 24,960 1,358,972 654,950 2,013,922 2,013,922
8 Pekerjaan Ring Balok 150x200mm (RB)
- Pekerjaan Pembesian 197.88 Kg 10,760 1,477 2,129,096 292,269 2,421,365 2,421,365
- Pekerjaan Begesting (3x Pakai) 10.26 M² 205,950 103,620 2,113,047 1,063,141 3,176,188 3,176,188
- Pekerjaan Beton (Campuran 1Pc:2Psr:3Krl) 1.68 M³ 590,467 195,450 991,984 328,356 1,320,340 1,320,340
Sub Total III 43,833,756 13,215,602 57,049,358 57,049,358 - -
IV. PEKERJAAN STRUKTUR BAJA
1 Pekerjaan Kolom baja WF 150.75.5.7mm (K1) 420.00 Kg 18,585 12,720 7,805,700 5,342,400 13,148,100 13,148,100
2 Pekerjaan Regel baja CNP 100.50.20.2,3mm 364.00 Kg 18,585 12,720 6,764,940 4,630,080 11,395,020 11,395,020
3 Pekerjaan Besi Ø12mm 101.34 Kg 10,760 1,477 1,090,371 149,679 1,240,050 1,240,050
4 Pekerjaan Kuda-Kuda dan konsol/overstek baja WF 150.75.5.7mm 563.36 Kg 18,585 12,720 10,470,046 7,165,939 17,635,985 17,635,985
5 Pekerjaan Gording baja CNP 100.50.20.2,3mm 715.00 Kg 18,585 12,720 13,288,275 9,094,800 22,383,075 22,383,075
6 Pekerjaan Bantalan Gording, baja siku (100.50.1.6mm) 272.84 Kg 18,585 12,720 5,070,731 3,470,525 8,541,256 8,541,256
7 Pekerjaan Baut Angker 5/8''x 30 cm 48.00 Bh 93,500 - 4,488,000 - 4,488,000 4,488,000
8 Pekerjaan End plate 15.75 Kg 18,585 12,720 292,714 200,340 493,054 493,054
9 Pekerjaan Rip 291.20 Kg 18,585 12,720 5,411,952 3,704,064 9,116,016 9,116,016
Sub Total IV 54,682,729 33,757,827 88,440,556 88,440,556 - -
V. PEKERJAAN ATAP
1 Pekerjaan Seling/trek stang (Ø8mm) lengkap dengan ulir 36.19 Kg 10,760 1,477 389,387 53,453 442,840 442,840
2 Pekerjaan Kait angin Besi Ø8 lengkap dengan ulir pengunci 3.79 Kg 10,760 1,477 40,779 5,598 46,376 46,376
3 Pekerjaan Baut Simpul 1/2''x7 cm 180.00 Bh 4,950 - 891,000 - 891,000 891,000
4 Pekerjaan Baut Gording 3/8'x 5cm 200.00 Bh 2,970 - 594,000 - 594,000 594,000
5 Pekerjaan Penutup Atap spandek 0.30mm 254.46 M² 71,810 53,590 18,272,773 13,636,511 31,909,284 31,909,284
6 Pekerjaan Bubungan Spandek 0.30mm 22.00 M¹ 36,600 126,500 805,200 2,783,000 3,588,200 3,588,200
Sub Total V 20,993,139 16,478,562 37,471,701 37,471,701 - -
VI. PEKERJAAN MEKANIKAL ELEKTRIKAL
1 Pekerjaan Instalasi titik lampu 5.00 Ttk 197,225 18,909 986,125 94,545 1,080,670 1,080,670
2 Pekerjaan Instalasi stop kontak 1.00 Ttk 197,225 18,909 197,225 18,909 216,134 216,134
3 Pekerjaan Instalasi stop kontak 3 phase 3.00 Ttk 220,000 55,000 660,000 165,000 825,000 825,000
4 Pekerjaan Instalasi penyalur petir 1.00 Ttk 1,824,520 1,357,000 1,824,520 1,357,000 3,181,520 3,181,520
Sub Total VI 3,667,870 1,635,454 5,303,324 5,303,324 - -
VII. PEKERJAAN PEMASANGAN LAMPU DAN ACESSORIES
1 Pekerjaan Pasang Lampu SL Led 10watt 5.00 Bh 64,500 24,000 322,500 120,000 442,500 442,500
2 Pekerjaan Pasang Stop kontak 1.00 Bh 25,500 24,000 25,500 24,000 49,500 49,500
3 Pekerjaan Pasang Stop kontak 3 phase 3.00 Bh 70,500 24,000 211,500 72,000 283,500 283,500
4 Pekerjaan Pasang Saklar Double 1.00 Bh 26,500 24,000 26,500 24,000 50,500 50,500
5 Pekerjaan MCB 4 group 1.00 Unit 350,000 18,965 350,000 18,965 368,965 368,965
6 Pekerjaan Pasang gantungan lampu (pipa galvanis Ø1") 5.00 M¹ 74,313 24,000 371,563 120,000 491,563 491,563
Sub Total VII 1,307,563 378,965 1,686,528 1,686,528 - -
Harga Satuan Jumlah Harga PEMKAB MASYARAKAT
No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.
VIII. PEKERJAAN FINISHING
1 Pekerjaan Pengecatan dinding baru exterior (sekwalitas Vinilex) 133.20 M² 9,790 9,250 1,304,028 1,232,100 2,536,128 2,536,128
2 Pekerjaan Pengecatan dinding baru interior (sekwalitas vinilex) 123.94 M² 9,790 9,250 1,213,373 1,146,445 2,359,818 2,359,818
3 Pekerjaan Pengecatan bidang baja (Cat antikarat) 147.29 M² 3,900 49,550 574,431 7,298,220 7,872,651 7,872,651
Sub Total VIII 3,091,832 9,676,765 12,768,596 12,768,596 - -
IX. PEKERJAAN PLUMBING AIR BERSIH DAN AIR KOTOR
Instalasi air bersih menggunakan pipa PVC AW
1 Pekerjaan Instalasi pipa PVC Ø ¾" 21.59 M¹ 18,225 11,950 393,478 258,001 651,478 651,478
2 Pekerjaan Instalasi pipa PVC Ø ½" 4.00 M¹ 11,340 10,300 45,360 41,200 86,560 86,560
Instalasi air kotor menggunakan pipa PVC AW - - - -
3 Pekerjaan Instalasi pipa PVC Ø 3" AW 20.45 M¹ 42,625 23,105 871,681 472,497 1,344,179 1,344,179
Sub Total IX 1,310,519 771,698 2,082,217 2,082,217 - -
X. PEKERJAAN SANITAIR DAN ACESSORIES
1 Pekerjaan Bak Lindi 1.00 Bh 400,000 100,000 400,000 100,000 500,000 500,000
2 Pekerjaan Kran air 2.00 Bh 35,100 45,650 70,200 91,300 161,500 161,500
3 Pekerjaan Floor drain 2.00 Bh 10,000 12,650 20,000 25,300 45,300 45,300
Sub Total X 490,200 216,600 706,800 706,800 - -

Jumlah 157,319,780 113,366,902 270,686,683 270,686,683 - -

PPN/PPH 11.5%

RENCANA ANGGARAN BIAYA BANGUNAN HANGGAR 157,319,780 113,366,902 270,686,683 270,686,683 - -


RENCANA ANGGARAN BIAYA BANGUNAN KANTOR KSM
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN / KOTA
TAHUN ANGGARAN 2021
KSM RESIK LOKHA BALI, BANJAR BASANGBE, DESA PEREAN KANGIN, KEC. BATURITI KABUPATEN TABANAN

Harga Satuan Jumlah Harga PEMKAB MASYARAKAT


No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.

C PEKERJAAN BANGUNAN GEDUNG KANTOR


I. PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian tanah biasa pondasi menerus 18.13 M³ - 74,750 - 1,355,218 1,355,218 1,355,218
2 Pekerjaan Urugan tanah kembali 2.82 M³ - 58,000 - 163,560 163,560 163,560
3 Pekerjaan Urugan tanah peninggian lantai (hasil galian) 16.35 M³ - 58,000 - 948,300 948,300 948,300
4 Pekerjaan Urugan tanah peninggian lantai 10.61 M³ 93,333 58,000 990,267 615,380 1,605,647 1,605,647
5 Pekerjaan Urugan pasir bawah pondasi & lantai 3.70 M³ 213,333 29,900 789,333 110,630 899,963 899,963
Sub Total I 1,779,600 3,193,088 4,972,688 4,972,688 - -
II. PEKERJAAN PONDASI, DINDING, PLESTERAN & ACIAN
1 Pekerjaan Pondasi batu kosong 6.45 M³ 343,467 122,460 2,215,360 789,867 3,005,227 3,005,227
2 Pekerjaan Pondasi batu kali 1pc : 6ps 12.32 M³ 528,042 235,500 6,505,473 2,901,360 9,406,833 9,406,833
3 Pekerjaan dinding batako (camp. 1pc : 4psr) 128.84 M² 66,013 41,600 8,505,123 5,359,744 13,864,867 13,864,867
4 Pekerjaan Plesteran pondasi 1pc : 4ps 10.94 M² 12,756 47,100 139,551 515,274 654,825 654,825
5 Pekerjaan Plesteran dinding 1pc : 4ps 257.68 M² 12,756 47,100 3,286,966 12,136,728 15,423,694 15,423,694
6 Pekerjaan Acian pondasi 10.94 M² 4,144 31,400 45,333 343,516 388,849 388,849
7 Pekerjaan Acian dinding 257.68 M² 4,144 31,400 1,067,762 8,091,152 9,158,914 9,158,914
Sub Total II 21,765,567 30,137,641 51,903,208 51,903,208 - -
III. PEKERJAAN STRUKTUR BETON
1 Pekerjaan Besi Wiremash M-6 48.00 M² - - - -
2 Pekerjaan Beton rabat untuk lantai, t = 50mm, (Campuran 1Pc:3Psr:5Krl) 2.52 M³ 572,617 195,450 1,442,994 492,534 1,935,528 1,935,528
3 Pekerjaan Sloof beton praktis 120x200mm (SP)
- Pekerjaan Pembesian 167.92 Kg 10,760 1,477 1,806,741 248,018 2,054,759 2,054,759
- Pekerjaan Begesting (3x pakai) 8.49 M² 107,800 81,640 915,222 693,124 1,608,346 1,608,346
- Pekerjaan Beton (Campuran 1Pc:2Psr:3Krl) 1.17 M³ 590,467 195,450 690,846 228,677 919,523 919,523
4 Pekerjaan Kolom Penguat/Praktis (11/11) 51.20 M¹ 51,790 24,960 2,651,653 1,277,952 3,929,605 3,929,605
5 Pekerjaan Ring balok 150x200mm (RB)
- Pekerjaan Pembesian 175.23 Kg 10,760 1,477 1,885,393 258,815 2,144,208 2,144,208
- Pekerjaan Begesting (3x pakai) 8.49 M² 205,950 103,620 1,748,516 879,734 2,628,249 2,628,249
- Pekerjaan Beton (Campuran 1Pc:2Psr:3Krl) 1.47 M³ 590,467 195,450 867,986 287,312 1,155,298 1,155,298
Harga Satuan Jumlah Harga PEMKAB MASYARAKAT
No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.
6 Pekerjaan Meja plat beton T = 80mm
- Pekerjaan Pembesian 39.08 Kg 10,759.53 1,477.00 420,483 57,721 478,204 478,204
- Pekerjaan Begesting 2.81 M² 238,450 103,620 670,045 291,172 961,217 961,217
- Pekerjaan Beton (Campuran 1Pc:2Psr:3Krl) 0.22 M³ 590,467 195,450 129,903 42,999 172,902 172,902
Sub Total III 13,229,780 4,758,056 17,987,836 17,987,836 - -
IV. PEKERJAAN KAP DAN ATAP
1 Pekerjaan Rangka kap baja ringan profil C-75 (galvalum) 80.00 M² 52,412 161,202 4,192,941 12,896,160 17,089,101 17,089,101
2 Pekerjaan Genteng plentong 94.35 M² 20,000 23,620 1,887,000 2,228,547 4,115,547 4,115,547
3 Pekerjaan Bubungan genteng plentong 29.16 M¹ 22,600 60,280 659,016 1,757,765 2,416,781 2,416,781
4 Pekerjaan Ikut celedu paras 4.00 Bh 80,017 8,250 320,066 33,000 353,066 353,066
5 Pekerjaan Murda paras 2.00 Bh 140,017 8,250 280,033 16,500 296,533 296,533
6 Pekerjaan Papan listplank 3/20 kayu kamper 36.00 M¹ 76,700 32,200 2,761,200 1,159,200 3,920,400 3,920,400
7 Pekerjaan Papan tatab 2/10 kayu kamper 36.00 M¹ 38,350 16,100 1,380,600 579,600 1,960,200 1,960,200
Sub Total IV 11,480,857 18,670,772 30,151,628 30,151,628 - -
V. PEKERJAAN PLAFOND
1 Pekerjaan Rangka plafond hollow 4x4 69.16 M² 57,500 74,270 3,976,700 5,136,513 9,113,213 9,113,213
2 Pekerjaan Penutup plafond kalsiboard 4.5mm 69.16 M² 25,132 18,450 1,738,129 1,276,002 3,014,131 3,014,131
3 Pekerjaan List plafond 4/6 kayu profil 119.82 M¹ 10,064 10,670 1,205,839 1,278,479 2,484,318 2,484,318
Sub Total V 6,920,668 7,690,995 14,611,662 14,611,662 - -
VI. PEKERJAAN KUSEN, DAUN & ACESSORIES (PINTU, JENDELA & VENTILASI)
1 Pekerjaan Kusen pintu, jendela dan ventilasi kayu kamper 5/11cm 0.43 M³ 8,437,500 2,592,000 3,602,813 1,106,784 4,709,597 4,709,597
2 Pekerjaan Daun pintu panil kayu kamper 7.59 M² 285,000 432,000 2,163,150 3,278,880 5,442,030 5,442,030
3 Pekerjaan Daun pintu double teackwood lapis aluminium jeruk (pintu toilet) 1.44 M² 233,660 302,400 336,470 435,456 771,926 771,926
4 Pekerjaan Daun jendela kaca rangka kayu kamper 7.42 M² 286,500 345,600 2,125,830 2,564,352 4,690,182 4,690,182
5 Pekerjaan Daun ventilasi kaca rangka kayu kamper 3.25 M² 286,500 345,600 931,125 1,123,200 2,054,325 2,054,325
6 Pekerjaan Ventilasi kaca bening 5mm 0.31 M² 184,000 18,037 57,040 5,591 62,631 62,631
7 Pekerjaan Kunci pintu 4.00 Bh 190,000 56,650 760,000 226,600 986,600 986,600
8 Pekerjaan Engsel pintu 5.00 Ps 60,000 18,037 300,000 90,185 390,185 390,185
9 Pekerjaan Grendel tanam (pintu doble) 4.00 Bh 40,000 24,040 160,000 96,160 256,160 256,160
10 Pekerjaan Engsel jendela 9.00 Ps 30,000 12,020 270,000 108,180 378,180 378,180
11 Pekerjaan Grendel jendela 9.00 Bh 40,000 24,040 360,000 216,360 576,360 576,360
12 Pekerjaan Kait angin jendela 9.00 Bh 50,000 19,045 450,000 171,405 621,405 621,405
13 Pekerjaan Engsel ventilasi 13.00 Ps 30,000 12,020 390,000 156,260 546,260 546,260
14 Pekerjaan Grendel ventilasi 13.00 Bh 40,000 24,040 520,000 312,520 832,520 832,520
15 Pekerjaan Kait angin ventilasi 13.00 Bh 50,000 19,045 650,000 247,585 897,585 897,585
16 Pekerjaan List daun pintu kayu profil 4.00 M¹ 10,064 10,670 40,255 42,680 82,935 82,935
17 Pekerjaan Angker kusen besi Ø10 47.00 Bh 5,000 235,000 - 235,000 235,000
Sub Total VI 13,351,683 10,182,198 23,533,881 23,533,881 - -
Harga Satuan Jumlah Harga PEMKAB MASYARAKAT
No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.
VII. PEKERJAAN LANTAI DAN DINDING
1 Pekerjaan Keramik lantai 40/40 cm 41.31 M² 75,510 109,900 3,119,318 4,539,969 7,659,287 7,659,287
2 Pekerjaan Keramik lantai 40/40 cm antislip 4.16 M² 75,510 109,900 314,122 457,184 771,306 771,306
3 Pekerjaan Plin keramik 10/40 cm 44.87 M¹ 22,334 19,150 1,002,104 859,261 1,861,365 1,861,365
4 Pekerjaan Keramik lantai toilet dan meja beton 20x20 cm 5.07 M² 59,760 109,900 302,983 557,193 860,176 860,176
5 Pekerjaan Keramik dinding toilet dan meja beton 20x25 cm 10.03 M² 124,738 141,300 1,251,117 1,417,239 2,668,356 2,668,356
6 Pekerjaan border Keramik dinding toilet dan meja beton 10x20 warna tua 9.10 M¹ 29,504 19,150 268,482 174,265 442,747 442,747
Sub Total VII 6,258,126 8,005,111 14,263,237 14,263,237 - -
VIII. PEKERJAAN MEKANIKAL ELEKTRIKAL
1 Pekerjaan Instalasi titik lampu 9.00 Ttk 197,225 18,909 1,775,025 170,181 1,945,206 1,945,206
2 Pekerjaan Instalasi stop kontak 5.00 Ttk 197,225 18,909 986,125 94,545 1,080,670 1,080,670
3 Penyambungan Baru Listrik PLN 10600 watt (3 phase, termasuk SLO) 1.00 unit 17,000,000 17,000,000 - 17,000,000 17,000,000
Sub Total VIII 19,761,150 264,726 20,025,876 20,025,876 - -
IX. PEKERJAAN PEMASANGAN LAMPU DAN ACESSORIES
1 Pekerjaan Lampu downlight + LED Ø 125mm 9.00 Bh 102,500 24,000 922,500 216,000 1,138,500 1,138,500
2 Pekerjaan kabel feeder 4x10mm 10.00 M¹ - - - -
3 Pekerjaan MCB 4 group 1.00 Unit 350,000 18,965 350,000 18,965 368,965 368,965
4 Pekerjaan Stop kontak 5.00 Bh 25,500 24,000 127,500 120,000 247,500 247,500
5 Pekerjaan Saklar double 4.00 Bh 26,500 24,000 106,000 96,000 202,000 202,000
Sub Total IX 1,506,000 450,965 1,956,965 1,956,965 - -
X. PEKERJAAN FINISHING
1 Pekerjaan Pengecatan dinding baru exterior (sekwalitas Vinilex) 75.60 M² 9,790 9,250 740,124 699,300 1,439,424 1,439,424
2 Pekerjaan Pengecatan dinding baru interior (sekwalitas vinilex) 142.71 M² 9,790 9,250 1,397,131 1,320,068 2,717,198 2,717,198
3 Pekerjaan Pengecatan plafond baru(sekwalitas vinilex) 69.16 M² 9,790 9,250 677,076 639,730 1,316,806 1,316,806
4 Pekerjaan Polituran bidang kayu 84.47 M² 38,406 10,820 3,244,155 913,965 4,158,120 4,158,120
Sub Total X 6,058,486 3,573,063 9,631,549 9,631,549 - -
XI. PEKERJAAN PLUMBING AIR BERSIH DAN AIR KOTOR
Instalasi air bersih menggunakan pipa PVC AW
1 Pekerjaan Instalasi pipa PVC Ø ¾" 28.82 M¹ 18,225 11,950 525,245 344,399 869,644 869,644
2 Pekerjaan Instalasi pipa PVC Ø ½" 4.00 M¹ 11,340 10,300 45,360 41,200 86,560 86,560
Instalasi air kotor menggunakan pipa PVC AW
3 Pekerjaan Instalasi pipa PVC Ø 4" AW 7.19 M¹ 60,063 23,105 431,849 166,125 597,974 597,974
4 Pekerjaan Instalasi pipa PVC Ø 3" AW 12.81 M¹ 42,625 23,105 546,026 295,975 842,001 842,001
5 Pekerjaan septiktank dan peresapan 1.00 Unit 3,500,000 3,500,000 - 3,500,000 3,500,000
Sub Total XI 5,048,480 847,699 5,896,179 5,896,179 - -
Harga Satuan Jumlah Harga PEMKAB MASYARAKAT
No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.
XII. PEKERJAAN SANITAIR DAN ACESSORIES
1 Penyambungan Baru Air PDAM 1.00 Unit 3,000,000 3,000,000 - 3,000,000 3,000,000
2 Pekerjaan Closet jongkok (porselin) 1.00 Bh 159,650 282,400 159,650 282,400 442,050 442,050
3 Pekerjaan Bak fibreglass 1.00 Bh 280,000 204,000 280,000 204,000 484,000 484,000
4 Pekerjaan Washtafel (sekwalitas KIA) 1.00 Bh 170,765 281,900 170,765 281,900 452,665 452,665
5 Pekerjaan Zink Royal 1.00 Bh 230,000 37,950 230,000 37,950 267,950 267,950
6 Pekerjaan Kran air 2.00 Bh 35,100 45,650 70,200 91,300 161,500 161,500
7 Pekerjaan Floor drain 1.00 Bh 10,000 12,650 10,000 12,650 22,650 22,650
Sub Total XII 3,920,615 910,200 4,830,815 4,830,815 - -

Jumlah 111,081,011 88,684,513 199,765,524 199,765,524 - -

PPN/PPH 11.5%

RENCANA ANGGARAN BIAYA BANGUNAN KANTOR KSM 111,081,011 88,684,513 199,765,524 199,765,524 - -
RENCANA ANGGARAN BIAYA TEMBOK PAGAR DAN HALAMAN
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN / KOTA
TAHUN ANGGARAN 2021
KSM RESIK LOKHA BALI, BANJAR BASANGBE, DESA PEREAN KANGIN, KEC. BATURITI KABUPATEN TABANAN

Harga Satuan Jumlah Harga PEMKAB MASYARAKAT


No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.

D PEKERJAAN TEMBOK PAGAR DAN HALAMAN


I. PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian tanah biasa pondasi bantalan tiyang pagar BRC 2.01 M³ - 74,750 - 150,248 150,248 150,248
Sub Total I - 150,248 150,248 150,248 - -
II. PEKERJAAN STRUKTUR BETON
1 Pekerjaan jalan Setapak beton T = 120mm
- Pekerjaan Beton (Campuran 1Pc:2Psr:3Krl) 9.56 M³ 590,467 195,450 5,644,861 1,868,502 7,513,363 7,513,363
2 Pekerjaan Pondasi beton tiang pagar BRC (300x300x700mm)
- Pekerjaan Begesting (3x pakai) 8.96 M² 107,800 81,640 965,888 731,494 1,697,382 1,697,382
- Pekerjaan Beton (Campuran 1Pc:2Psr:3Krl) 2.02 M³ 590,467 195,450 1,190,381 394,027 1,584,408 1,584,408
Sub Total II 7,801,130 2,994,024 10,795,154 10,795,154 - -
III PEKERJAAN PAGAR DAN PINTU
1 Pekerjaan pintu besi minimalis + finishing 6.45 M² 280,000 70,000 1,806,000 451,500 2,257,500 2,257,500
2 Pekerjaan pagar BRC 60.42 M¹ 123,000 262,500 7,431,660 15,860,250 23,291,910 23,291,910
Sub Total III 9,237,660 16,311,750 25,549,410 25,549,410 - -
IV. PEKERJAAN STYLE BALI
1 Pekerjaan Pelinggih Tugu 1.00 Unit 2,000,000 2,000,000 - 2,000,000 2,000,000
Sub Total IV 2,000,000 - 2,000,000 2,000,000 - -

Jumlah 19,038,790 19,456,021 38,494,811 38,494,811 - -

PPN/PPH 11.5%

RENCANA ANGGARAN BIAYA TEMBOK PAGAR DAN HALAMAN 19,038,790 19,456,021 38,494,811 38,494,811 - -
RENCANA ANGGARAN BIAYA BOP
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN / KOTA
KSM RESIK LOKHA BALI, BANJAR BASANGBE, DESA PEREAN KANGIN, KEC. BATURITI KABUPATEN TABANAN

Harga Satuan Jumlah Harga PEMKAB MASYARAKAT


No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.
I. Biaya Operasional (BOP) KSM
1 Upakara Ngeruak 1.00 ls 1,000,000 1,000,000 - 1,000,000 1,000,000
2 Papan Nama TPS 3R 1.00 ls 1,000,000 1,000,000 - 1,000,000 1,000,000
3 Stempel Trodat Bulat untuk KSM 1.00 bh 80,000 80,000 - 80,000 80,000
4 Map Kertas folio 20.00 bh 1,000 20,000 - 20,000 20,000
5 Spidol Snowman Permanen 10.00 bh 9,000 90,000 - 90,000 90,000
6 Spidol Snowman White Board 5.00 bh 10,000 50,000 - 50,000 50,000
7 Pensil Faber Castel 4.00 bh 5,000 20,000 - 20,000 20,000
8 Penggaris Besi 60 Cm 1.00 bh 35,546 35,546 - 35,546 35,546
9 Penggaris Mika 30 Cm 2.00 bh 3,000 6,000 - 6,000 6,000
10 Flash Disk 8 GB 1.00 bh 250,000 250,000 - 250,000 250,000
11 Balpoint Faster 10.00 bh 6,000 60,000 - 60,000 60,000
12 Buku Kwitansi 2.00 bh 13,000 26,000 - 26,000 26,000
13 Buku Kas Folio 5.00 bh 35,000 175,000 - 175,000 175,000
14 Kertas A 4 70 GSM 5.00 Rim 55,000 275,000 - 275,000 275,000
15 Kertas F 4 70 GSM 2.00 Rim 55,000 110,000 - 110,000 110,000
16 Printer Epson Scan Copy A4/F4 1.00 unit 1,300,000 1,300,000 - 1,300,000 1,300,000
17 Kertas Cover Glossy a 4 10.00 lembr 2,500 25,000 - 25,000 25,000
18 foto Copy a 4/F4/Folio 1,200.00 Lmbr 200 240,000 - 240,000 240,000
19 Foto Copy a3 121.00 Lmbr 1,000 121,000 - 121,000 121,000
20 Print A 3 20.00 Lmbr 5,000 100,000 - 100,000 100,000
21 Konsumsi Snack 30.00 Kotak 8,000 240,000 - 240,000 240,000
22 Konsumi Makan+ Minum 30.00 Kotak 20,000 600,000 - 600,000 600,000
23 Biaya Komunikasi 5.00 bln 150,000 750,000 - 750,000 750,000
24 Materai 3000 5.00 lmbr 4,000 20,000 - 20,000 20,000
25 Materai 6000 25.00 lmbr 7,000 175,000 - 175,000 175,000
26 Jilid Laporan Akhir 6.00 Eks 75,000 450,000 - 450,000 450,000
27 Biaya As Built Drawing 1.00 Ls 2,500,000 2,500,000 - 2,500,000 2,500,000
28 Upacara Melaspas 1.00 Ls 2,000,000 2,000,000 - 2,000,000 2,000,000
Harga Satuan Jumlah Harga PEMKAB MASYARAKAT
No Uraian Pekerjaan Volume Material Upah Material Upah Total Harga In-Cash In-Kind In-Cash
Rp Rp Rp Rp Rp. Rp. Rp. Rp.
Perlengkapan K 3
1 Isi P3 K 2.00 Ls 150,000 300,000 - 300,000 300,000
2 Sarung Tangan Safety 16.00 Psng 50,000 800,000 - 800,000 800,000
3 Sepatu Safety (AP Boots) 15.00 Psng 110,000 1,650,000 - 1,650,000 1,650,000
4 Rompi Proyek 15.00 Bh 23,000 345,000 - 345,000 345,000
5 Helm Proyek Safety 15.00 Bh 55,000 825,000 - 825,000 825,000
6 Rambu - Rambu Kerja 4.00 bh 120,000 480,000 - 480,000 480,000

Sub Total I 16,118,546 - 16,118,546 16,118,546 - -


II. BOP OPERASIONAL KEBERLANJUTAN
1 Sopir pick up 3.00 org 1,000,000 3,000,000 - 3,000,000 3,000,000
2 Pemilah & Komposting 3.00 org 1,000,000 3,000,000 - 3,000,000 3,000,000
3 BBM Motor 200.00 ltr 7,650 1,530,000 - 1,530,000 1,530,000
4 Maintenance Motor 3.00 unit 100,000 300,000 - 300,000 300,000
5 Maintenance Mesin Ayakan 2.00 unit 100,000 200,000 - 200,000 200,000
6 Maintenance Mesin Cacah 2.00 unit 100,000 200,000 - 200,000 200,000
7 Listrik untuk mesin Cacah 2.00 unit 100,000 200,000 - 200,000 200,000
8 Listrik untuk mesin Ayakan 2.00 unit 100,000 200,000 - 200,000 200,000
9 Listrik untuk pompa air 2.00 unit 50,000 100,000 - 100,000 100,000
10 Listrik untuk Penerangan 2.00 unit 20,000 40,000 - 40,000 40,000
11 Listrik untuk Komputer 2.00 unit 20,000 40,000 - 40,000 40,000
12 ATK 2.00 pkt 200,000 400,000 - 400,000 400,000
13 Sajen Rutin 45.00 hr 5,000 225,000 - 225,000 225,000
14 Komunikasi 5.00 org 100,000 500,000 - 500,000 500,000
Sub Total II 9,935,000 - 9,935,000 9,935,000 - -

Jumlah 26,053,546 - 26,053,546 26,053,546 - -

PPN/PPH 11.5%

RENCANA ANGGARAN BIAYA BOP 26,053,546 - 26,053,546 26,053,546 - -


RENCANA ANGGARAN BIAYA PENGADAAN PERALATAN

KEGIATAN : PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN/KOTA

SUB KEGIATAN : PENYEDIAAN SARANA PERSAMPAHAN

NO SARANA PERSAMPAHAN SAT VOL CATATAN/SPESIFIKASI HARGA SAT JUMLAH HARGA

1 2 3 4 5 6 4X6
Spesifikasi ; Kapasitas 400 s/d 500 kg/jam, dimensi 3480 x 1050 x 1600 mm, penggerak mesin bensin 6,5
1 AYAKAN SAMPAH UNIT 1 15,000,000 15,000,000
PK/ MZ 200

2 CONVEYOR SAMPAH UNIT 1 Spesifikasi ; Model CD 0,5 CP, Dimensi 4000 x 750 x 850 mm, penggerak diesel 7 PK, Bahan Bakar solar 20,000,000 20,000,000

Spesifikasi : Mesin 200 cc, Jenis Bak Bak Sampah, Type :New Karya Bit, Dimensi 1450x 1200 x 1000
3 MOTOR SAMPAH UNIT 2 35,000,000 70,000,000
mm, Jenis Pintu buka swing kanan dan kiri, dinding lantai plat besi 1,2 mm, rangka besi kotak 2x2 cm
Spesifikasi : Dimensi 1290 x 770 x 1340 mm, bahan konstruksi 40x40x4 mm, 30x30x 2,5 mm, Unp 65mm,
4 PENCACAH SAMPAH UNIT 1 25,000,000 25,000,000
Cup silinder : jumlah pisau penghancur 36 bh, jumlah pisau pencacah;2 buah
JUMLAH 130,000,000

Terbilang : --- Seratus tiga puluh juta rupiah ---

DIPERIKSA
TABANAN, OKTOBER 2021
DIAJUKAN : TFL TEKNIK TFL PEMBERDAYAAN KOORDINATOR TFL PENGAWAS
KSM RESIK LOKHA BALI

I NYOMAN ALIT SUMBERDANA, SE I GEDE RESTU PRASTIA NI MADE REIKA PARAMITA GEDE BUDA KARTIKA, ST I KADEK AFRIADI, ST
KETUA NIP : 19920412 201903 1 008
DISAHKAN :
KEPALA DINAS PEKERJAAN UMUM
DISETUJUI : PENATAAN RUANG PERUMAHAN
PEJABAT PEMBUAT KOMITMEN DAN KAWASAN PERMUKIMAN
KEPALA PENGAWAS BIDANG CIPTA KARYA KABUPATEN TABANAN

I MD PALGUNA KW, A.Md I GEDE ADNYANA, ST, M.Si I MADE YUDIANA, ST, MT
NIP : 19771119 200902 1 002 NIP. 19790927 2009021 1 003 NIP. 19690619 199803 1 005
DAFTAR ANALISA SATUAN PEKERJAAN
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN / KOTA
TAHUN ANGGARAN 2021

Harga Satuan Jumlah Total


No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
1 1 M2 Pek. Pembersihan Lapangan
0.100 /hari Pekerja 95,000.00 9,500.00
0.075 /hari Mandor 140,000.00 10,500.00
Jumlah 20,000.00 - 20,000.00
2 Pembuangan 1 m3 Tanah Sejauh 30 meter
0.330 /hari Pekerja 95,000.00 31,350.00
0.010 /hari Mandor 140,000.00 1,400.00
Jumlah 32,750.00 - 32,750.00
3 Pembuangan 1 m3 Tanah Sejauh 150 meter
0.520 /hari Pekerja 95,000.00 49,400.00
0.049 /hari Mandor 140,000.00 6,888.00
Jumlah 56,288.00 - 56,288.00
4 1M' Pas. Papan Bouwplank
0.001 m3 Kayu usuk 4/6 lokal 2,500,000.00 2,500.00
0.020 kg Paku biasa 2"-5" 22,000.00 440.00
0.001 m3 Kayu usuk 4/6 lokal 2,500,000.00 2,500.00
0.100 /hari Tukang kayu 110,000.00 11,000.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.010 /hari Kepala tukang kayu - - -
0.005 /hari Mandor 140,000.00 700.00
Jumlah 21,200.00 5,440.00 26,640.00
5 1M2 Kantor Direksikit dan Gudang Alat
1.700 btg Bambu 4 m 10,000.00 17,000.00
0.210 m3 Kayu usuk 4/6 lokal 2,500,000.00 525,000.00
0.300 kg Paku biasa 2"-5" 22,000.00 6,600.00
kg Semen portland @40KG 1,275.00 -
m3 Pasir pasang 200,000.00 -
m3 Koral beton 244,444.44 -
1.500 lbr Asbes Gelombang 30,000.00 45,000.00
0.250 lbr Plywood 6 mm 78,500.00 19,625.00
2.000 /hari Tukang kayu 110,000.00 220,000.00
1.000 /hari Pekerja 95,000.00 95,000.00
0.200 /hari Kepala tukang kayu - - -
0.050 /hari Mandor 140,000.00 7,000.00
Jumlah 322,000.00 613,225.00 935,225.00
6 1 m3 Galian tanah biasa sedalam 1 m1
0.750 /hari Pekerja 95,000.00 71,250.00
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 74,750.00 - 74,750.00
7 1 m3 Galian tanah Keras sedalam 1 m1
1.000 /hari Pekerja 95,000.00 95,000.00
0.032 /hari Mandor 140,000.00 4,480.00
Jumlah 99,480.00 - 99,480.00
8 1 m3 Galian tanah biasa sedalam 3 m1
1.050 /hari Pekerja 95,000.00 99,750.00
0.067 /hari Mandor 140,000.00 9,380.00
Jumlah 109,130.00 - 109,130.00

9 1 m3 Urugan tanah dengan pemadatan


1.200 m3 Tanah urug 77,777.78 93,333.33
0.500 /hari Pekerja 95,000.00 47,500.00
0.075 /hari Mandor 140,000.00 10,500.00
Jumlah 58,000.00 93,333.33 151,333.33
10 1 m3 Pemadatan tanah
0.500 /hari Pekerja 95,000.00 47,500.00
0.075 /hari Mandor 140,000.00 10,500.00
Jumlah 58,000.00 - 58,000.00

11 1 m3 urugan pasir
1.200 m3 Pasir urug 177,777.78 213,333.33
0.300 /hari Pekerja 95,000.00 28,500.00
0.010 /hari Mandor 140,000.00 1,400.00
Jumlah 29,900.00 213,333.33 243,233.33
12 1 M3 Pasangan Batu Kosong
1.200 m3 Batu belah 15/20 cm 222,222.22 266,666.67
0.432 m3 Pasir urug 177,777.78 76,800.00
0.780 /hari Pekerja 95,000.00 74,100.00
0.390 /hari Tukang batu 110,000.00 42,900.00
0.039 /hari Kepala tukang batu - - -
0.039 /hari Mandor 140,000.00 5,460.00
Jumlah 122,460.00 343,466.67 465,926.67
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
13 Pemasangan 1 m3 pondasi batu belah/batu kali campuran 1SP : 6PP
1.200 m3 Batu belah 15/20 cm 222,222.22 266,666.67
117.000 kg Semen portland @40KG 1,275.00 149,175.00
0.561 m3 Pasir pasang 200,000.00 112,200.00
1.500 /hari Pekerja 95,000.00 142,500.00
0.750 /hari Tukang batu 110,000.00 82,500.00
0.075 /hari Kepala tukang batu - - -
0.075 /hari Mandor 140,000.00 10,500.00
Jumlah 235,500.00 528,041.67 763,541.67
14 1 m2 Pasangan batu bata Tebal 1/2 bata campuran 1 PC : 3 Pasir
70.000 buah Batu bata merah 1,200.00 84,000.00
14.370 kg Semen portland @40KG 1,275.00 18,321.75
0.075 m3 Pasir pasang 200,000.00 15,000.00
0.300 /hari Pekerja 95,000.00 28,500.00
0.100 /hari Tukang batu 110,000.00 11,000.00
0.010 /hari Kepala tukang batu - - -
0.015 /hari Mandor 140,000.00 2,100.00
Jumlah 41,600.00 117,321.75 158,921.75
15 1 m3 Beton lantai kerja 1 : 3 : 5
218.000 kg Semen portland @40KG 1,275.00 277,950.00
0.520 m3 Pasir pasang 200,000.00 104,000.00
0.780 m3 Koral beton 244,444.44 190,666.67
1.650 /hari Pekerja 95,000.00 156,750.00
0.250 /hari Tukang batu 110,000.00 27,500.00
0.025 /hari Kepala tukang batu - - -
0.080 /hari Mandor 140,000.00 11,200.00
Jumlah 195,450.00 572,616.67 768,066.67
16 1 m3 Beton cor 1 : 2 : 3
232.000 kg Semen portland @40KG 1,275.00 295,800.00
0.520 m3 Pasir pasang 200,000.00 104,000.00
0.780 m3 Koral beton 244,444.44 190,666.67
1.650 /hari Pekerja 95,000.00 156,750.00
0.250 /hari Tukang batu 110,000.00 27,500.00
0.025 /hari Kepala tukang batu - - -
0.080 /hari Mandor 140,000.00 11,200.00
Jumlah 195,450.00 590,466.67 785,916.67
17 1 kg Pembesian dengan besi polos
1.0500 kg Besi beton polos 9,990.03 10,489.53
0.0150 kg Kawat bendrat 18,000.00 270.00
0.0070 /hari Pekerja 95,000.00 665.00
0.0070 /hari Tukang besi 110,000.00 770.00
0.0007 /hari Kepala tukang besi - - -
0.0003 /hari Mandor 140,000.00 42.00
Jumlah 1,477.00 10,759.53 12,236.53
18 1 m2 Pekerjaan Begisting Pondasi
0.0400 m3 Kayu usuk 4/6 lokal 2,500,000.00 100,000.00
0.3000 kg Paku biasa 2"-5" 22,000.00 6,600.00
0.1000 ltr Minyak begisting 12,000.00 1,200.00
0.5200 /hari Pekerja 95,000.00 49,400.00
0.2600 /hari Tukang kayu 110,000.00 28,600.00
0.0260 /hari Kepala tukang kayu - - -
0.0260 /hari Mandor 140,000.00 3,640.00
Jumlah 81,640.00 107,800.00 189,440.00
19 1 m2 Pekerjaan Begisting Kolom
0.0400 m3 Kayu usuk 4/6 lokal 2,500,000.00 100,000.00
0.4000 kg Paku biasa 2"-5" 22,000.00 8,800.00
0.2000 ltr Minyak begisting 12,000.00 2,400.00
0.0150 m3 Kayu usuk 4/6 lokal 2,500,000.00 37,500.00
0.3500 lbr Plywood 9 mm 85,000.00 29,750.00
2.0000 btg Bambu 4 m 10,000.00 20,000.00
0.6600 /hari Pekerja 95,000.00 62,700.00
0.3300 /hari Tukang kayu 110,000.00 36,300.00
0.0330 /hari Kepala tukang kayu - - -
0.0330 /hari Mandor 140,000.00 4,620.00
Jumlah 103,620.00 198,450.00 302,070.00
20 1 m2 Pekerjaan Begisting Ring/Balok
0.0400 m3 Kayu usuk 4/6 lokal 2,500,000.00 100,000.00
0.4000 kg Paku biasa 2"-5" 22,000.00 8,800.00
0.2000 ltr Minyak begisting 12,000.00 2,400.00
0.0180 m3 Kayu usuk 4/6 lokal 2,500,000.00 45,000.00
0.3500 lbr Plywood 9 mm 85,000.00 29,750.00
2.0000 btg Bambu 4 m 10,000.00 20,000.00
0.6600 /hari Pekerja 95,000.00 62,700.00
0.3300 /hari Tukang kayu 110,000.00 36,300.00
0.0330 /hari Kepala tukang kayu - - -
0.0330 /hari Mandor 140,000.00 4,620.00
Jumlah 103,620.00 205,950.00 309,570.00
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
21 1 m2 Pekerjaan Begisting Lantai
0.0400 m3 Kayu usuk 4/6 lokal 2,500,000.00 100,000.00
0.4000 kg Paku biasa 2"-5" 22,000.00 8,800.00
0.2000 ltr Minyak begisting 12,000.00 2,400.00
0.0150 m3 Kayu usuk 4/6 lokal 2,500,000.00 37,500.00
0.3500 lbr Plywood 9 mm 85,000.00 29,750.00
6.0000 btg Bambu 4 m 10,000.00 60,000.00
0.6600 /hari Pekerja 95,000.00 62,700.00
0.3300 /hari Tukang kayu 110,000.00 36,300.00
0.0330 /hari Kepala tukang kayu - - -
0.0330 /hari Mandor 140,000.00 4,620.00
Jumlah 103,620.00 238,450.00 342,070.00
22 1 m2 Plesteran 1 Pc : 3 Ps
7.7760 kg Semen portland @40KG 1,275.00 9,914.40
0.0230 m3 Pasir pasang 200,000.00 4,600.00
0.3000 /hari Pekerja 95,000.00 28,500.00
0.1500 /hari Tukang batu 110,000.00 16,500.00
0.0150 /hari Kepala tukang batu - - -
0.0150 /hari Mandor 140,000.00 2,100.00
Jumlah 47,100.00 14,514.40 61,614.40
23 1 m2 Plesteran 1 Pc : 4 Ps
6.2400 kg Semen portland @40KG 1,275.00 7,956.00
0.0240 m3 Pasir pasang 200,000.00 4,800.00
0.3000 /hari Pekerja 95,000.00 28,500.00
0.1500 /hari Tukang batu 110,000.00 16,500.00
0.0150 /hari Kepala tukang batu - - -
0.0150 /hari Mandor 140,000.00 2,100.00
Jumlah 47,100.00 12,756.00 59,856.00
24 1 m2 Plesteran Siaran Pas. Batu kali 1 Pc : 2 Ps
6.340 kg Semen portland @40KG 1,275.00 8,083.50
0.012 m3 Pasir pasang 200,000.00 2,400.00
0.300 /hari Pekerja 95,000.00 28,500.00
0.150 /hari Tukang batu 110,000.00 16,500.00
0.015 /hari Kepala tukang batu - - -
0.015 /hari Mandor 140,000.00 2,100.00
Jumlah 47,100.00 10,483.50 57,583.50
25 1 m2 Pekerjaan Acian Dgn Semen
3.250 kg Semen portland @40KG 1,275.00 4,143.75
0.200 /hari Pekerja 95,000.00 19,000.00
0.100 /hari Tukang batu 110,000.00 11,000.00
0.010 /hari Kepala tukang batu - - -
0.010 /hari Mandor 140,000.00 1,400.00
Jumlah 31,400.00 4,143.75 35,543.75
26 1 m1 Pemasangan Pipa PVC D Ø 2"
1.200 m1 Pipa PVC D Ø 2" 15,500.00 18,600.00
0.350 % Perlengkapan 5,425.00 5,425.00
0.005 /hari Pekerja 95,000.00 513.00
0.090 /hari Tukang Pipa 110,000.00 9,900.00
0.009 /hari Kepala tukang Pipa - - -
0.003 /hari Mandor 140,000.00 420.00
Jumlah 10,833.00 24,025.00 34,858.00
27 1 m1 Pemasangan Pipa PVC D Ø 3"
1.200 m1 Pipa PVC D Ø 3" 27,500.00 33,000.00
0.350 % Perlengkapan 9,625.00 9,625.00
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.081 /hari Pekerja 95,000.00 7,695.00
0.135 /hari Tukang Pipa 110,000.00 14,850.00
0.014 /hari Kepala tukang Pipa - - -
0.004 /hari Mandor 140,000.00 560.00
Jumlah 23,105.00 42,625.00 65,730.00
28 1 m1 Pemasangan Pipa PVC D Ø 4"
1.200 m1 Pipa PVC D Ø 4" 38,750.00 46,500.00
0.350 % Perlengkapan 13,562.50 13,562.50
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.081 /hari Pekerja 95,000.00 7,695.00
0.135 /hari Tukang Pipa 110,000.00 14,850.00
0.014 /hari Kepala tukang Pipa - - -
0.004 /hari Mandor 140,000.00 560.00
Jumlah 23,105.00 60,062.50 83,167.50
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
29 1 m1 Pemasangan Pipa Limbah Ø 6"
1.200 m1 Pipa Limbah Ø 6" 142,750.00 171,300.00
0.350 % Perlengkapan 49,962.50 49,962.50
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.081 /hari Pekerja 95,000.00 7,695.00
0.135 /hari Tukang Pipa 110,000.00 14,850.00
0.014 /hari Kepala tukang Pipa - - -
0.004 /hari Mandor 140,000.00 560.00
Jumlah 23,105.00 221,262.50 244,367.50
30 1 m1 Pemasangan Alat Sambung T,L Ø 2"
1.000 bh Alat sambuung T,L ø 2" 5,000.00 5,000.00
- kg Semen portland @40KG 1,275.00 -
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.040 /hari Pekerja 95,000.00 3,800.00
0.020 /hari Tukang Pipa 110,000.00 2,200.00
0.002 /hari Kepala tukang Pipa - - -
0.004 /hari Mandor 140,000.00 490.00
Jumlah 6,490.00 5,000.00 11,490.00
31 1 m1 Pemasangan Alat Sambung T,L Ø 3"
1.000 bh Alat sambuung T,L ø 3" 10,000.00 10,000.00
- kg Semen portland @40KG 1,275.00 -
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.040 /hari Pekerja 95,000.00 3,800.00
0.020 /hari Tukang Pipa 110,000.00 2,200.00
0.002 /hari Kepala tukang Pipa - - -
0.004 /hari Mandor 140,000.00 490.00
Jumlah 6,490.00 10,000.00 16,490.00
32 1 m1 Pemasangan Alat Sambung T,L Ø 4"
1.000 bh Alat sambung T,L ø 4" 15,000.00 15,000.00
- kg Semen portland @40KG 1,275.00 -
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.040 /hari Pekerja 95,000.00 3,800.00
0.020 /hari Tukang Pipa 110,000.00 2,200.00
0.002 /hari Kepala tukang Pipa - - -
0.004 /hari Mandor 140,000.00 490.00
Jumlah 6,490.00 15,000.00 21,490.00
33 1 m1 Pemasangan Alat Sambung T,L Ø 6"
1.000 bh Alat sambung T,L ø 6" limbah 141,750.00 141,750.00
- kg Semen portland @40KG 1,275.00 -
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.040 /hari Pekerja 95,000.00 3,800.00
0.020 /hari Tukang Pipa 110,000.00 2,200.00
0.002 /hari Kepala tukang Pipa - - -
0.004 /hari Mandor 140,000.00 490.00
Jumlah 6,490.00 141,750.00 148,240.00
34 1 m1 Pemasangan Tutup Manhole
1.000 unit Casing Plat Besi Tutup Manhole 1,350,000.00 1,350,000.00
- kg Semen portland @40KG 1,275.00 -
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.100 /hari Pekerja 95,000.00 9,500.00
0.100 /hari Tukang batu 110,000.00 11,000.00
0.010 /hari Kepala tukang batu - - -
0.005 /hari Mandor 140,000.00 700.00
Jumlah 21,200.00 1,350,000.00 1,371,200.00
35 1 m1 Pemasangan Buis Beton 40 Cm
1.200 bh Buis Beton Ø 40 cm 70,000.00 84,000.00
0.003 kg Semen portland @40KG 1,275.00 3.83
0.013 m3 Pasir pasang 200,000.00 2,600.00
- m3 Pasir urug 177,777.78 -
0.200 /hari Pekerja 95,000.00 19,000.00
0.075 /hari Tukang batu 110,000.00 8,250.00
0.008 /hari Kepala tukang batu - - -
0.020 /hari Mandor 140,000.00 2,800.00
Jumlah 30,050.00 86,603.83 116,653.83
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
36 1 m1 Pemasangan Buis Beton 1/2 D 60 Cm
1.000 bh Buis Beton Ø 60 cm 95,000.00 95,000.00
0.0314 kg Semen portland @40KG 1,275.00 39.99
0.0001 m3 Pasir pasang 200,000.00 18.65
- m3 Pasir urug 177,777.78 -
0.100 /hari Pekerja 95,000.00 9,500.00
/hari Tukang batu 110,000.00 - -
/hari Kepala tukang batu - - -
0.010 /hari Mandor 140,000.00 1,400.00
Jumlah 10,900.00 95,058.65 105,958.65
37 1 bh Pasangan buis beton ø 60 cm
1.2000 bh Buis Beton Ø 60 cm 95,000.00 114,000.00
0.0030 kg Semen portland @40KG 1,275.00 3.83
0.0130 m3 Pasir pasang 200,000.00 2,600.00
- m3 Pasir urug 177,777.78 -
0.2000 /hari Pekerja 95,000.00 19,000.00
0.0750 /hari Tukang batu 110,000.00 8,250.00
0.0075 /hari Kepala tukang batu - - -
0.0200 /hari Mandor 140,000.00 2,800.00
Jumlah 30,050.00 116,603.83 146,653.83
38 1 m1 Pemasangan Buis Beton Ø 30 Cm
1.200 bh Buis Beton Ø 30 cm 60,000.00 72,000.00
0.003 kg Semen portland @40KG 1,275.00 3.83
0.013 m3 Pasir pasang 200,000.00 2,600.00
- m3 Pasir urug 177,777.78 -
0.200 /hari Pekerja 95,000.00 19,000.00
0.075 /hari Tukang batu 110,000.00 8,250.00
0.008 /hari Kepala tukang batu - - -
0.020 /hari Mandor 140,000.00 2,800.00
Jumlah 30,050.00 74,603.83 104,653.83
39 1 m1 Pemasangan Pipa PVC AW Ø 4"
1.200 m1 Pipa PVC AW Ø 4" 77,500.00 93,000.00
0.350 % Perlengkapan 27,125.00 27,125.00
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.081 /hari Pekerja 95,000.00 7,695.00
0.135 /hari Tukang batu 110,000.00 14,850.00
0.014 /hari Kepala tukang batu - - -
0.004 /hari Mandor 140,000.00 560.00
Jumlah 23,105.00 120,125.00 143,230.00
40 1 m1 Pemasangan Pipa PVC AW Ø 6"
1.200 m1 Pipa PVC AW Ø 6" - -
0.350 % Perlengkapan - -
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.081 /hari Pekerja 95,000.00 7,695.00
0.135 /hari Tukang Pipa 110,000.00 14,850.00
0.014 /hari Kepala tukang Pipa - - -
0.004 /hari Mandor 140,000.00 560.00
Jumlah 23,105.00 - 23,105.00
41 1 m1 Pemasangan Pipa Galvanis Ø 6"
1.200 m1 Pipa Galvanis Ø 6" 188,475.00 226,170.00
0.350 % Perlengkapan 65,966.25 65,966.25
- m3 Pasir pasang 200,000.00 -
- m3 Pasir urug 177,777.78 -
0.081 /hari Pekerja 95,000.00 7,695.00
0.135 /hari Tukang Pipa 110,000.00 14,850.00
0.014 /hari Kepala tukang Pipa - - -
0.004 /hari Mandor 140,000.00 560.00
Jumlah 23,105.00 292,136.25 315,241.25
42 1 m1 Pemasangan Buis Beton20 Cm
1.200 bh Buis Beton Ø 20 cm 50,000.00 60,000.00
0.003 kg Semen portland @40KG 1,275.00 3.83
0.013 m3 Pasir pasang 200,000.00 2,600.00
- m3 Pasir urug 177,777.78 -
0.200 /hari Pekerja 95,000.00 19,000.00
0.075 /hari Tukang batu 110,000.00 8,250.00
0.008 /hari Kepala tukang batu - - -
0.020 /hari Mandor 140,000.00 2,800.00
Jumlah 30,050.00 62,603.83 92,653.83
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
43 1 m2 Pasangan Bataco 1 PC : 4Pasir
12.500 bh Bataco Buntu 2,500.00 31,250.00
7.500 kg Semen portland @40KG 1,275.00 9,562.50
0.029 m3 Pasir pasang 200,000.00 5,720.00
1.950 kg Besi beton polos 9,990.03 19,480.56
0.300 /hari Pekerja 95,000.00 28,500.00
0.100 /hari Tukang batu 110,000.00 11,000.00
0.010 /hari Kepala tukang batu - - -
0.015 /hari Mandor 140,000.00 2,100.00
Jumlah 41,600.00 66,013.06 107,613.06
44 1 m2 Pasangan Bataco 1 PC : 4Pasir
12.500 bh Bataco Lobang 2,300.00 28,750.00
7.500 kg Semen portland @40KG 1,275.00 9,562.50
0.029 m3 Pasir pasang 200,000.00 5,720.00
1.950 kg Besi beton polos 9,990.03 19,480.56
0.300 /hari Pekerja 95,000.00 28,500.00
0.100 /hari Tukang batu 110,000.00 11,000.00
0.010 /hari Kepala tukang batu - - -
0.015 /hari Mandor 140,000.00 2,100.00
Jumlah 41,600.00 63,513.06 105,113.06
45 1 m1 Membuat Ring Balok Beton Bertulang (10x15)
0.003 m3 Kayu usuk 4/6 lokal 2,500,000.00 7,500.00
0.020 kg Paku biasa 2"-5" 22,000.00 440.00
3.600 kg Besi beton polos 9,990.03 35,964.11
0.075 kg Kawat bendrat 18,000.00 1,350.00
5.500 kg Semen portland @40KG 1,275.00 7,012.50
0.009 m3 Pasir pasang 200,000.00 1,800.00
0.015 m3 Koral beton 244,444.44 3,666.67
0.297 /hari Pekerja 95,000.00 28,215.00
0.033 /hari Tukang batu 110,000.00 3,630.00
0.033 /hari Tukang kayu 110,000.00 3,630.00
0.033 /hari Tukang besi 110,000.00 3,630.00
0.010 /hari Kepala tukang batu - - -
0.015 /hari Mandor 140,000.00 2,100.00
Jumlah 41,205.00 57,733.28 98,938.28
46 1 m1 Membuat Kolom Penguat Beton Bertulang (11x11)
0.002 m3 Kayu usuk 4/6 lokal 2,500,000.00 5,000.00
0.010 kg Paku biasa 2"-5" 22,000.00 220.00
3.000 kg Besi beton polos 9,990.03 29,970.09
0.450 kg Kawat bendrat 18,000.00 8,100.00
4.000 kg Semen portland @40KG 1,275.00 5,100.00
0.006 m3 Pasir pasang 200,000.00 1,200.00
0.009 m3 Koral beton 244,444.44 2,200.00
0.180 /hari Pekerja 95,000.00 17,100.00
0.020 /hari Tukang batu 110,000.00 2,200.00
0.020 /hari Tukang kayu 110,000.00 2,200.00
0.020 /hari Tukang besi 110,000.00 2,200.00
0.006 /hari Kepala tukang batu - - -
0.009 /hari Mandor 140,000.00 1,260.00
Jumlah 24,960.00 51,790.09 76,750.09
47 1 m2 Pasang Keramik 40cm x 40cm
1.050 m2 Keramik 40/40 45,000.00 47,250.00
10.400 kg Semen portland @40KG 1,275.00 13,260.00
0.045 m3 Pasir pasang 200,000.00 9,000.00
0.500 kg Semen Nat Keramik 12,000.00 6,000.00
0.700 /hari Pekerja 95,000.00 66,500.00
0.350 /hari Tukang batu 110,000.00 38,500.00
0.035 /hari Kepala tukang batu - - -
0.035 /hari Mandor 140,000.00 4,900.00
Jumlah 109,900.00 75,510.00 185,410.00
48 Pemasangan 1 m' plint keramik ukuran 10 cmx 40 cm
2.650 bh Plint keramik 7,200.00 19,080.00
1.140 kg Semen portland @40KG 1,275.00 1,453.50
0.100 kg Semen Nat Keramik 12,000.00 1,200.00
0.003 m3 Pasir pasang 200,000.00 600.00
0.090 /hari Pekerja 95,000.00 8,550.00
0.090 /hari Tukang batu 110,000.00 9,900.00
0.009 /hari Kepala tukang batu - - -
0.005 /hari Mandor 140,000.00 700.00
Jumlah 19,150.00 22,333.50 41,483.50
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
49 Pemasangan 1 m² lantai keramik ukuran 20 cm x 20 cm
1.050 m2 Keramik 20 x 20 cm 30,000.00 31,500.00
10.400 kg Semen portland @40KG 1,275.00 13,260.00
0.500 kg Semen Nat Keramik 12,000.00 6,000.00
0.045 m3 Pasir pasang 200,000.00 9,000.00
0.700 /hari Pekerja 95,000.00 66,500.00
0.350 /hari Tukang batu 110,000.00 38,500.00
0.035 /hari Kepala tukang batu - - -
0.035 /hari Mandor 140,000.00 4,900.00
Jumlah 109,900.00 59,760.00 169,660.00
50 Pemasangan 1 m² dinding keramik 20 cm x 25 cm
21.500 bh Keramik 20 x 25 cm 4,000.00 86,000.00
9.300 kg Semen portland @40KG 1,275.00 11,857.50
0.018 m3 Pasir pasang 200,000.00 3,600.00
1.940 kg Semen Nat Keramik 12,000.00 23,280.00
0.900 /hari Pekerja 95,000.00 85,500.00
0.450 /hari Tukang batu 110,000.00 49,500.00
0.045 /hari Kepala tukang batu - - -
0.045 /hari Mandor 140,000.00 6,300.00
Jumlah 141,300.00 124,737.50 266,037.50
51 1 m3 Pembuatan Rumah Bakteri
4,000.0 bj Rumah Bakteri Botol Plastik 367.50 1,470,000.00
1.0 ls Benang & Jarum 14,700.00 14,700.00
80.0 /ikat Pekerja botol bakteri 13,125.00 1,050,000.00
Jumlah 1,050,000.00 1,484,700.00 2,534,700.00
52 1 Unit Pek. Pemasangan Flor drain
1.000 bh Saringan Floor Drain (CO) Km/WC 10,000.00 10,000.00
0.010 /hari Pekerja 95,000.00 950.00
0.100 /hari Tukang batu 110,000.00 11,000.00
0.010 /hari Kepala tukang batu - - -
0.005 /hari Mandor 140,000.00 700.00
Jumlah 12,650.00 10,000.00 22,650.00
53 Pengecatan 1 m2 Permukaan Tembok dengan Waterprofing
0.100 kg Cat Dasar 46,250.00 4,625.00
0.260 kg Cat waterproofing 46,250.00 12,025.00
0.010 bh Kuas 10,000.00 100.00
0.160 /hari Pekerja 95,000.00 15,200.00
0.160 /hari Tukang batu 110,000.00 17,600.00
0.080 /hari Kepala tukang batu - - -
0.020 /hari Mandor 140,000.00 2,800.00
Jumlah 35,600.00 16,750.00 52,350.00
54 1 m2 Pasangan Koral Sikat
1.650 zak Koral Sikat 45,000.00 74,250.00
9.280 kg Semen portland @40KG 1,275.00 11,832.00
0.018 m3 Pasir pasang 200,000.00 3,600.00
0.350 /hari Pekerja 95,000.00 33,250.00
0.035 /hari Tukang batu 110,000.00 3,850.00
0.620 /hari Kepala tukang batu - - -
0.030 /hari Mandor 140,000.00 4,200.00
Jumlah 41,300.00 89,682.00 130,982.00
55 1 M3 Pas. Pondasi siklop,60% beton 1PC : 2PB : 3 KR dan 40% batu belah
0.400 m3 Batu belah 15/20 cm 222,222.22 88,888.89
200.000 kg Semen portland @40KG 1,275.00 255,000.00
0.300 m3 Pasir pasang 200,000.00 60,000.00
0.400 m3 Koral beton 244,444.44 97,777.78
3.000 /hari Pekerja 95,000.00 285,000.00
0.530 /hari Tukang batu 110,000.00 58,300.00
0.076 /hari Kepala tukang batu - - -
0.010 /hari Mandor 140,000.00 1,400.00
Jumlah 344,700.00 501,666.67 846,366.67
56 1 M3 Pek. Pasangan Arang Bakar
166.670 kg Arang Kayu Bakar 8,000.00 1,333,360.00
1.000 ls Jaring Arnet 200,000.00 200,000.00
1.000 /hari Pekerja 95,000.00 95,000.00
Jumlah 95,000.00 1,533,360.00 1,628,360.00
57 1 M2 Pasangan Turap Galian
1.500 btg Bambu 4 m 10,000.00 15,000.00
0.350 lbr Plywood 9 mm 85,000.00 29,750.00
0.010 m3 Kayu usuk 4/6 lokal 2,500,000.00 25,000.00
0.250 kg Paku biasa 2"-5" 22,000.00 5,500.00
0.200 /hari Pekerja 95,000.00 19,000.00
0.188 /hari Tukang kayu 110,000.00 20,625.00
- /hari Kepala tukang kayu - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 43,125.00 75,250.00 118,375.00
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
58 1 m1 Pengukuran Pipa
0.100 /hari Pekerja 95,000.00 9,500.00
0.005 /hari Mandor 140,000.00 700.00
Jumlah 10,200.00 - 10,200.00
59 1 m1 Ralling Pengaman ( h = 1,5 m')
1.250 btg Bambu 4 m 10,000.00 12,500.00
0.520 lbr Plywood 6 mm 78,500.00 40,820.00
0.200 kg Paku biasa 2"-5" 22,000.00 4,400.00
0.200 /hari Pekerja 95,000.00 19,000.00
0.188 /hari Tukang kayu 110,000.00 20,625.00
- /hari Kepala tukang kayu - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 43,125.00 57,720.00 100,845.00
60 Pemasangan 1 kg Baja profil
1.050 Kg Besi / Baja Profil IWF 250 , 200, 150, 100 17,700.00 18,585.00
0.060 /hari Pekerja 95,000.00 5,700.00
0.060 /hari Tukang Las 110,000.00 6,600.00
0.006 /hari Kepala tukang Las - - -
0.003 /hari Mandor 140,000.00 420.00
Jumlah 12,720.00 18,585.00 31,305.00
61 Pemasangan 1 kg rangka kuda-kuda IWF 250 , 200, 150, 100 dengan cat menie
1.050 Kg Besi / Baja Profil IWF 250 , 200, 150, 100 17,700.00 18,585.00
0.180 Kg Cat Dasar/Menie Besi 35,000.00 6,300.00
0.060 /hari Pekerja 95,000.00 5,700.00
0.060 /hari Tukang Las 110,000.00 6,600.00
0.006 /hari Kepala tukang Las - - -
0.003 /hari Mandor 140,000.00 420.00
Jumlah 12,720.00 24,885.00 37,605.00
62 Pemasangan 1 m2 Atap Jurai(Limasan) Rangka Atap Baja Ringan C75
4.050 Kg Baja Ringan C 75 11,764.71 47,647.06
0.100 % Peralatan 47,647.06 4,764.71
0.760 /hari Pekerja 95,000.00 72,238.00
0.760 /hari Tukang besi 110,000.00 83,644.00
0.076 /hari Kepala tukang besi - - -
0.038 /hari Mandor 140,000.00 5,320.00
Jumlah 161,202.00 52,411.76 213,613.76
63 Pemasangan 1 m² rangka besi hollow 1x40.40.2 mm, modul 60x60 cm Untuk Plafond
5.000 m1 Rangka metal hollow 40.40.2 mm 5,750.00 28,750.00
1.000 Ls Assesories (perkuatan, las dll) 28,750.00 28,750.00
0.350 /hari Pekerja 95,000.00 33,250.00
0.350 /hari Tukang besi 110,000.00 38,500.00
0.035 /hari Kepala tukang besi - - -
0.018 /hari Mandor 140,000.00 2,520.00
Jumlah 74,270.00 57,500.00 131,770.00
64 Pemasangan 1 m2 Plafond Kalsiboard 4.5 mm
0.364 Lbr Kalsiboard (4,5 x 1220 x 2420) mm 63,000.00 22,932.00
0.110 Kg Paku skrup 20,000.00 2,200.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.075 /hari Tukang kayu 110,000.00 8,250.00
0.005 /hari Kepala tukang kayu - - -
0.005 /hari Mandor 140,000.00 700.00
Jumlah 18,450.00 25,132.00 43,582.00
65 Pemasangan 1 m' list langit-langit kayu profil dan list gypsum
1.050 m1 List kayu profil 2/4 P = 4m 9,375.00 9,843.75
1.050 m1 List Gypsum Stdr 5 cm p = 4 m 3,750.00 3,937.50
0.010 kg Paku GRC/Board/Plapond 22,000.00 220.00
0.050 /hari Pekerja 95,000.00 4,750.00
0.050 /hari Tukang kayu 110,000.00 5,500.00
0.005 /hari Kepala tukang kayu - - -
0.003 /hari Mandor 140,000.00 420.00
list langit-langit kayu profil Jumlah 10,670.00 10,063.75 20,733.75
list langit-langit list gypsum Jumlah 10,670.00 4,157.50 14,827.50
66 Pemasangan 1 m² atap genteng Press Mini/Palentong kecil
25.000 Bh Genteng Press Mini/Palentong kecil 800.00 20,000.00
0.150 /hari Pekerja 95,000.00 14,250.00
0.075 /hari Tukang batu 110,000.00 8,250.00
0.008 /hari Kepala tukang batu - - -
0.008 /hari Mandor 140,000.00 1,120.00
Jumlah 23,620.00 20,000.00 43,620.00
67 Pemasangan 1 m' bubungan genteng press mini/pelentong kecil
5.000 Bh Bubungan Press Mini 1,200.00 6,000.00
8.000 kg Semen portland @40KG 1,275.00 10,200.00
0.032 m3 Pasir pasang 200,000.00 6,400.00
0.400 /hari Pekerja 95,000.00 38,000.00
0.200 /hari Tukang batu 110,000.00 22,000.00
0.020 /hari Kepala tukang batu - - -
0.002 /hari Mandor 140,000.00 280.00
Jumlah 60,280.00 22,600.00 82,880.00
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
68 Pemasangan 1 m2 atap spandek (6.2m*0.30m)
0.183 lbr Spandeck 0,3mm 390,000.00 71,370.00
0.020 kg paku pancing 60 x 230 22,000.00 440.00
0.150 /hari Pekerja 95,000.00 14,250.00
0.350 /hari Tukang kayu 110,000.00 38,500.00
0.060 /hari Kepala tukang kayu - - -
0.006 /hari Mandor 140,000.00 840.00
Jumlah 53,590.00 71,810.00 125,400.00
69 Pemasangan 1 m' nok spandeck
1.200 m1 Bubungan Spandeck 30,000.00 36,000.00
0.040 ktk Paku Sekrup 2'' 15,000.00 600.00
0.100 /hari Pekerja 95,000.00 9,500.00
1.000 /hari Tukang kayu 110,000.00 110,000.00
0.100 /hari Kepala tukang kayu - - -
0.050 /hari Mandor 140,000.00 7,000.00
Jumlah 126,500.00 36,600.00 163,100.00
70 Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela , kayu kamper
1.200 m3 Kayu Kamper Balok 7,000,000.00 8,400,000.00
1.250 kg Paku biasa 2"-5" 22,000.00 27,500.00
1.000 Kg Lem Kayu 10,000.00 10,000.00
6.000 /hari Pekerja 95,000.00 570,000.00
18.000 /hari Tukang kayu 110,000.00 1,980,000.00
1.800 /hari Kepala tukang kayu - - -
0.300 /hari Mandor 140,000.00 42,000.00
Jumlah 2,592,000.00 8,437,500.00 11,029,500.00
71 Pembuatan dan pemasangan 1 m² daun pintu panel, kayu Kamper
0.040 m3 Papan kayu kamper 7,000,000.00 280,000.00
0.500 Kg Lem Kayu 10,000.00 5,000.00
1.000 /hari Pekerja 95,000.00 95,000.00
3.000 /hari Tukang kayu 110,000.00 330,000.00
0.300 /hari Kepala tukang kayu - - -
0.050 /hari Mandor 140,000.00 7,000.00
Jumlah 432,000.00 285,000.00 717,000.00
72 Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kamper
0.024 m3 Papan kayu kamper 7,000,000.00 168,000.00
0.700 m2 Kaca 5 mm bening 165,000.00 115,500.00
0.300 Kg Lem Kayu 10,000.00 3,000.00
0.800 /hari Pekerja 95,000.00 76,000.00
2.400 /hari Tukang kayu 110,000.00 264,000.00
0.240 /hari Kepala tukang kayu - - -
0.040 /hari Mandor 140,000.00 5,600.00
Jumlah 345,600.00 286,500.00 632,100.00
73 Pembuatan 1 m² daun pintu Plywood rangkap , rangka kayu kamper
0.025 m3 Papan kayu kamper 7,000,000.00 175,000.00
0.030 kg Paku biasa 2"-5" 22,000.00 660.00
0.500 Kg Lem Kayu 10,000.00 5,000.00
1.000 lbr Plywood 4 mm 53,000.00 53,000.00
0.700 /hari Pekerja 95,000.00 66,500.00
2.100 /hari Tukang kayu 110,000.00 231,000.00
0.210 /hari Kepala tukang kayu - - -
0.035 /hari Mandor 140,000.00 4,900.00
Jumlah 302,400.00 233,660.00 536,060.00
74 Pemasangan 1 m1 list plank ukuran (3x20), cm , kayu kamper
0.011 m3 Papan kayu kamper 7,000,000.00 75,600.00
0.050 kg Paku biasa 2"-5" 22,000.00 1,100.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.200 /hari Tukang kayu 110,000.00 22,000.00
0.020 /hari Kepala tukang kayu - - -
0.005 /hari Mandor 140,000.00 700.00
Jumlah 32,200.00 76,700.00 108,900.00
75 Pemasangan 1 m² rangka langit-langit (60x60) cm, kayu kamper
0.016 m3 Kayu Usuk Kamper 7,000,000.00 114,100.00
0.250 kg Paku biasa 2"-5" 22,000.00 5,500.00
0.200 /hari Pekerja 95,000.00 19,000.00
0.300 /hari Tukang kayu 110,000.00 33,000.00
0.030 /hari Kepala tukang kayu - - -
0.010 /hari Mandor 140,000.00 1,400.00
Jumlah 53,400.00 119,600.00 173,000.00
76 Pemasangan 1 buah kunci Tanam lengkap handel
1.000 bh Kunci Pintu + Handel SOLID DIONS 190,000.00 190,000.00
0.010 /hari Pekerja 95,000.00 950.00
0.500 /hari Tukang kayu 110,000.00 55,000.00
0.050 /hari Kepala tukang kayu - - -
0.005 /hari Mandor 140,000.00 700.00
Jumlah 56,650.00 190,000.00 246,650.00
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
77 Pemasangan 1 buah kunci bulat
1.000 bh Kunci Silinder 200,000.00 200,000.00
0.020 /hari Pekerja 95,000.00 1,900.00
0.220 /hari Tukang kayu 110,000.00 24,200.00
0.025 /hari Kepala tukang kayu - - -
0.001 /hari Mandor 140,000.00 182.00
Jumlah 26,282.00 200,000.00 226,282.00
78 Pemasangan 1 pasang engsel pintu
1.000 ps engsel pintu solid 60,000.00 60,000.00
0.015 /hari Pekerja 95,000.00 1,425.00
0.150 /hari Tukang kayu 110,000.00 16,500.00
0.015 /hari Kepala tukang kayu - - -
0.001 /hari Mandor 140,000.00 112.00
Jumlah 18,037.00 60,000.00 78,037.00
79 Pemasangan 1 ps engsel jendela kupu-kupu
1.000 ps Engsel kupu-kupu 30,000.00 30,000.00
0.010 /hari Pekerja 95,000.00 950.00
0.100 /hari Tukang kayu 110,000.00 11,000.00
0.010 /hari Kepala tukang kayu - - -
0.001 /hari Mandor 140,000.00 70.00
Jumlah 12,020.00 30,000.00 42,020.00
80 Pemasangan 1 buah kait angin
1.000 bh Kait angin 50,000.00 50,000.00
0.015 /hari Pekerja 95,000.00 1,425.00
0.150 /hari Tukang kayu 110,000.00 16,500.00
0.015 /hari Kepala tukang kayu - - -
0.008 /hari Mandor 140,000.00 1,120.00
Jumlah 19,045.00 50,000.00 69,045.00
81 Pemasangan 1 buah kunci slot/Gerendel
1.000 bh Kunci slot 40,000.00 40,000.00
0.020 /hari Pekerja 95,000.00 1,900.00
0.200 /hari Tukang kayu 110,000.00 22,000.00
0.020 /hari Kepala tukang kayu - - -
0.001 /hari Mandor 140,000.00 140.00
Jumlah 24,040.00 40,000.00 64,040.00
82 Pemasangan 1 m² kaca tebal 5 mm
1.100 m2 Kaca 5 mm bening 165,000.00 181,500.00
0.050 kg Sealent 50,000.00 2,500.00
0.015 /hari Pekerja 95,000.00 1,425.00
0.150 /hari Tukang kayu 110,000.00 16,500.00
0.015 /hari Kepala tukang kayu - - -
0.001 /hari Mandor 140,000.00 112.00
Jumlah 18,037.00 184,000.00 202,037.00
83 Pengecatan 1 M² bidang kayu baru (1 lapis plamier, 1 lapis cat dasar, 3 lapis cat penutup)
0.150 kg woodfiller/Dempul Kayu 35,000.00 5,250.00
0.372 ltr Politur Mowilex 73,000.00 27,156.00
2.000 lbr Amplas 3,000.00 6,000.00
0.040 /hari Pekerja 95,000.00 3,800.00
0.060 /hari Tukang kayu 110,000.00 6,600.00
0.016 /hari Kepala tukang kayu - - -
0.003 /hari Mandor 140,000.00 420.00
Jumlah 10,820.00 38,406.00 49,226.00
84 Pengecatan 1 M² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
0.100 kg Plamir Dinding 11,500.00 1,150.00
0.100 kg Cat dasar dinding vinilex 24,000.00 2,400.00
0.260 kg Cat Tembok/ Plafond Vinilex 24,000.00 6,240.00
0.020 /hari Pekerja 95,000.00 1,900.00
0.063 /hari Tukang batu 110,000.00 6,930.00
0.006 /hari Kepala tukang batu - - -
0.003 /hari Mandor 140,000.00 420.00
Jumlah 9,250.00 9,790.00 19,040.00
85 Pengerjaan 1 buah closet jongkok INA
1.000 unit Closet jongkok INA 150,000.00 150,000.00
6.000 kg Semen portland @40KG 1,275.00 7,650.00
0.010 m3 Pasir pasang 200,000.00 2,000.00
1.000 /hari Pekerja 95,000.00 95,000.00
1.500 /hari Tukang batu 110,000.00 165,000.00
0.150 /hari Kepala tukang batu - - -
0.160 /hari Mandor 140,000.00 22,400.00
Jumlah 282,400.00 159,650.00 442,050.00
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
86 Pemasangan 1 buah wastafel KIA
1.000 bh Wastafel KIA 150,000.00 150,000.00
0.600 kg Semen portland @40KG 1,275.00 765.00
0.010 m3 Pasir pasang 200,000.00 2,000.00
0.120 % Perlengkapan 150,000.00 18,000.00
1.200 /hari Pekerja 95,000.00 114,000.00
1.450 /hari Tukang batu 110,000.00 159,500.00
0.150 /hari Kepala tukang batu - - -
0.060 /hari Mandor 140,000.00 8,400.00
Jumlah 281,900.00 170,765.00 452,665.00
87 Pemasangan 1 buah bak fibreglass
1.000 unit Bak mandi fibre glass 250,000.00 250,000.00
0.120 % Perlengkapan 250,000.00 30,000.00
0.300 /hari Pekerja 95,000.00 28,500.00
0.450 /hari Tukang batu 110,000.00 49,500.00
0.050 /hari Kepala tukang batu - - -
0.900 /hari Mandor 140,000.00 126,000.00
Jumlah 204,000.00 280,000.00 484,000.00
88 Pemasangan 1 buah Zink Royal 14 (SB 45)
1.000 unit Zink Royal 14 (SB 45) 150,000.00 150,000.00
1.000 bh Water drain 80,000.00 80,000.00
0.030 /hari Pekerja 95,000.00 2,850.00
0.300 /hari Tukang batu 110,000.00 33,000.00
0.030 /hari Kepala tukang batu - - -
0.015 /hari Mandor 140,000.00 2,100.00
Jumlah 37,950.00 230,000.00 267,950.00
89 Pemasangan 1 buah Kran
1.000 bh Kran Onda 35,000.00 35,000.00
0.025 bh Seal tape 4,000.00 100.00
0.010 /hari Pekerja 95,000.00 950.00
0.400 /hari Tukang batu 110,000.00 44,000.00
0.040 /hari Kepala tukang batu - - -
0.005 /hari Mandor 140,000.00 700.00
Jumlah 45,650.00 35,100.00 80,750.00
90 Pemasangan 1 m' pipa PVC tipe AW diameter ½ "
1.200 m1 Pipa PVC ½" 7,000.00 8,400.00
0.350 % Perlengkapan 8,400.00 2,940.00
0.036 /hari Pekerja 95,000.00 3,420.00
0.060 /hari Tukang Pipa 110,000.00 6,600.00
0.006 /hari Kepala tukang Pipa - - -
0.002 /hari Mandor 140,000.00 280.00
Jumlah 10,300.00 11,340.00 21,640.00
91 Pemasangan 1 m' pipa PVC tipe AW diameter 3/4 "
1.200 m1 Pipa PVC ¾" 11,250.00 13,500.00
0.350 % Perlengkapan 13,500.00 4,725.00
0.036 /hari Pekerja 95,000.00 3,420.00
0.075 /hari Tukang Pipa 110,000.00 8,250.00
0.006 /hari Kepala tukang Pipa - - -
0.002 /hari Mandor 140,000.00 280.00
Jumlah 11,950.00 18,225.00 30,175.00
92 Pemasangan 1 instalasi Stopkontak, Lampu, Exhaustpan, dan celling fan
6.415 M' Kabel NYM 3x2.5 mm Ex Supreme 15,000.00 96,225.00
3.000 bt Pipa Clipsal 20 mm Hitam 15,000.00 45,000.00
2.000 bh Tee dos Clipsal 20 mm Hitam 5,000.00 10,000.00
15.000 bj Klem Clipsal 20 mm Hitam 2,000.00 30,000.00
3.000 bj Sock Klipsal 20 mm Hitam 2,000.00 6,000.00
1.000 m1 In bow dos plastik Klipsal E 175 P 10,000.00 10,000.00
0.075 /hari Pekerja 95,000.00 7,125.00
0.100 /hari Tukang Listrik 110,000.00 11,000.00
0.010 /hari Kepala tukang Listrik - - -
0.006 /hari Mandor 140,000.00 784.00
Jumlah 18,909.00 197,225.00 216,134.00
93 1m2 Pasangan Grass Block
1.000 m2 Grass Block 23,000.00 23,000.00
0.076 m3 Pasir urug 177,777.78 13,493.33
0.600 /hari Pekerja 95,000.00 57,000.00
0.300 /hari Tukang batu 110,000.00 33,000.00
0.030 /hari Kepala tukang batu - - -
0.030 /hari Mandor 140,000.00 4,200.00
Jumlah 94,200.00 36,493.33 130,693.33
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
94 1m' Kanstein polos
2.000 m1 Kanstein polos 50,000.00 100,000.00
0.450 kg Semen portland @40KG 1,275.00 573.75
0.002 m3 Pasir pasang 200,000.00 460.00
0.400 /hari Pekerja 95,000.00 38,000.00
0.050 /hari Tukang batu 110,000.00 5,500.00
0.020 /hari Kepala tukang batu - - -
0.010 /hari Mandor 140,000.00 1,400.00
Jumlah 44,900.00 101,033.75 145,933.75
95 1 m2 Pengecetan Kanstein
0.284 kg Cat Tembok/ Plafond Vinilex 24,000.00 6,816.00
0.071 Ltr Thiner 30,000.00 2,130.00
0.150 /hari Pekerja 95,000.00 14,250.00
0.030 /hari Tukang batu 110,000.00 3,300.00
0.003 /hari Kepala tukang batu - - -
0.015 /hari Mandor 140,000.00 2,100.00
Jumlah 19,650.00 8,946.00 28,596.00
96 Pemasangan 1 m² lantai batu candi
18.333 bh Batu candi 10,000.00 183,330.00
9.300 kg Semen portland @40KG 1,275.00 11,857.50
0.018 m3 Pasir pasang 200,000.00 3,600.00
0.900 /hari Pekerja 95,000.00 85,500.00
0.450 /hari Tukang batu 110,000.00 49,500.00
0.045 /hari Kepala tukang batu - - -
0.045 /hari Mandor 140,000.00 6,300.00
Jumlah 141,300.00 198,787.50 340,087.50
97 Pemasangan 1 m2 paving block natural tebal 6 cm
1.010 m2 paving block 6 cm 70,000.00 70,700.00
0.050 m3 Pasir pasang 200,000.00 10,000.00
0.250 /hari Pekerja 95,000.00 23,750.00
0.500 /hari Tukang batu 110,000.00 55,000.00
0.050 /hari Kepala tukang batu - - -
0.001 /hari Mandor 140,000.00 182.00
Jumlah 78,932.00 80,700.00 159,632.00
98 Pemasangan 1 m talang 1/2 lingkaran dia. 15 cm, Seng BJLS 20
1.050 lbr Seng Plat 3" x 6" BJLS 28 86,500.00 90,825.00
0.010 ktk Paku Sekrup 1/2'' 20,000.00 200.00
0.500 kg besi strip 9,650.00 4,825.00
0.150 /hari Pekerja 95,000.00 14,250.00
0.300 /hari Tukang Las 110,000.00 33,000.00
0.030 /hari Kepala tukang Las - - -
0.008 /hari Mandor 140,000.00 1,120.00
Jumlah 48,370.00 95,850.00 144,220.00
99 Pemasangan 1 Buah Saklar Tunggal
1.000 Bh Saklar tunggal 17,000.00 17,000.00
1.000 Bh Sock 20mm 3,000.00 3,000.00
0.250 Bh Isolasi 10,000.00 2,500.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.100 /hari Tukang listrik 110,000.00 11,000.00
0.050 /hari Kepala tukang - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 24,000.00 22,500.00 46,500.00
100 Pemasangan 1 Buah Saklar Doble
1.000 Bh Saklar seri 21,000.00 21,000.00
1.000 Bh Sock 20mm 3,000.00 3,000.00
0.250 Bh Isolasi 10,000.00 2,500.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.100 /hari Tukang listrik 110,000.00 11,000.00
0.050 /hari Kepala tukang - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 24,000.00 26,500.00 50,500.00
101 Pemasangan 1 Buah Stop Kontak
1.000 Bh Stop kontak 20,000.00 20,000.00
1.000 Bh Sock 20mm 3,000.00 3,000.00
0.250 Bh Isolasi 10,000.00 2,500.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.100 /hari Tukang listrik 110,000.00 11,000.00
0.050 /hari Kepala tukang - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 24,000.00 25,500.00 49,500.00
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
102 Pemasangan 1 Buah Stop Kontak 3phase
1.000 Bh Stop kontak 3phase 65,000.00 65,000.00
1.000 Bh Sock 20mm 3,000.00 3,000.00
0.250 Bh Isolasi 10,000.00 2,500.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.100 /hari Tukang listrik 110,000.00 11,000.00
0.050 /hari Kepala tukang - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 24,000.00 70,500.00 94,500.00
103 Pemasangan 1 Buah Downlight & Lampu Led 10 Watt
1.000 Bh Lampu Downlight bulat 50,000.00 50,000.00
1.000 Bh Bola lampu LED philips 50,000.00 50,000.00
0.250 Bh Isolasi 10,000.00 2,500.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.100 /hari Tukang listrik 110,000.00 11,000.00
0.050 /hari Kepala tukang - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 24,000.00 102,500.00 126,500.00
104 Pemasangan 1 Buah Fitting & Lampu Led 10 Watt
1.000 Bh Fitting lampu 12,000.00 12,000.00
1.000 Bh Bola lampu LED philips 50,000.00 50,000.00
0.250 Bh Isolasi 10,000.00 2,500.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.100 /hari Tukang listrik 110,000.00 11,000.00
0.050 /hari Kepala tukang - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 24,000.00 64,500.00 88,500.00
105 Pemasangan gantungan lampu (pipa galvanis Ø1")

1.500 M¹ Pipa Galvanis Ø ½" 47,875.00 71,812.50


0.250 Bh Isolasi 10,000.00 2,500.00
0.100 /hari Pekerja 95,000.00 9,500.00
0.100 /hari Tukang listrik 110,000.00 11,000.00
0.050 /hari Kepala tukang - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 24,000.00 74,312.50 98,312.50
106 Pemasangan 1 Unit panel MCB
1.000 Group MCB 25A 3P MG 350,000.00 350,000.00
0.075 /hari Pekerja 95,000.00 7,125.00
0.100 /hari Tukang listrik 110,000.00 11,000.00
0.010 /hari Kepala tukang - - -
0.006 /hari Mandor 140,000.00 840.00
Jumlah 18,965.00 350,000.00 368,965.00
107 Pemasangan 1 Unit Penangkal Petir (1 blitzem + 1 tombak)
4.000 Bh Blacksem Ø 1" 51,850.00 207,400.00
4.000 Bh Sok Galvanis Ø 1" 9,350.00 37,400.00
1.000 Btg GIP Galvanis Ø 1" 152,000.00 152,000.00
20.970 M¹ Kawat BC 50 MM² 51,000.00 1,069,470.00
6.000 Bh Klem Begel Ø 1" 3,500.00 21,000.00
1.000 Bh Klem Sisir 50 mm2 6,500.00 6,500.00
1.000 Bh Kotak Kontrol 10 Cm x 15 Cm 68,000.00 68,000.00
1.000 Bh Perluv Sok Ø 1" 12,750.00 12,750.00
10.000 Btg Pipa Conduit PVC Ø 3/4" 25,000.00 250,000.00
1.000 Ls Biaya Pasang Instalasi 1,000,000.00 1,000,000.00
6.000 M¹ Biaya Pengeboran 59,500.00 357,000.00
Jumlah 1,357,000.00 1,824,520.00 3,181,520.00
108 Pelaburan 1 M² Bidang Kayu Dengan Politur
0.150 Kg Woodfiller/Dempul Kayu 35,000.00 5,250.00
0.372 Ltr Politur jadi 73,000.00 27,156.00
2.000 Lbr Amplas 3,000.00 6,000.00
0.040 /hari Pekerja 95,000.00 3,800.00
0.060 /hari Tukang batu 110,000.00 6,600.00
0.016 /hari Kepala tukang - - -
0.003 /hari Mandor 140,000.00 420.00
Jumlah 10,820.00 38,406.00 49,226.00
109 Pengecatan 1 M² Permukaan Baja Dengan Menie Besi
0.100 Kg Cat menie besi 35,000.00 3,500.00
0.010 Ltr Thiner A Bonanza 30,000.00 300.00
0.010 Bh Kuas 4" 10,000.00 100.00
0.250 /hari Pekerja 95,000.00 23,750.00
0.225 /hari Tukang batu 110,000.00 24,750.00
0.023 /hari Kepala tukang - - -
0.008 /hari Mandor 140,000.00 1,050.00
Jumlah 49,550.00 3,900.00 53,450.00
Harga Satuan Jumlah Total
No Uraian Pekerjaan Bahan / Upah Upah Material Harga
(Rp) (Rp) (Rp) (Rp)
110 Pengecatan 1 M² Pekerjaan Waterproofing
0.100 Kg Cat dasar 50,000.00 5,000.00
0.010 Kg Cat waterproofing 38,000.00 380.00
0.010 Bh Kuas 4" 10,000.00 100.00
0.160 /hari Pekerja 95,000.00 15,200.00
0.075 /hari Tukang batu 110,000.00 8,283.00
0.006 /hari Kepala tukang - - -
0.003 /hari Mandor 140,000.00 420.00
Jumlah 23,903.00 5,480.00 29,383.00
111 Pemasangan 1 Bh Ikut Celedu Paras
1.000 Kg Ikut Celedu Paras 80,000.00 80,000.00
0.013 Bh Semen Portland 1,275.00 16.58
0.050 /hari Pekerja 95,000.00 4,750.00
/hari Tukang batu 110,000.00 - -
/hari Kepala tukang - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 8,250.00 80,016.58 88,266.58
112 Pemasangan 1 Bh Ikut Celedu Paras
1.000 Kg Murda Paras 140,000.00 140,000.00
0.013 Bh Semen Portland 1,275.00 16.58
0.050 /hari Pekerja 95,000.00 4,750.00
/hari Tukang batu 110,000.00 - -
/hari Kepala tukang - - -
0.025 /hari Mandor 140,000.00 3,500.00
Jumlah 8,250.00 140,016.58 148,266.58
113 Pemasangan 1 M¹ Pipa Galvanis Ø 2”
1.000 Kg Pipa galvanis 2” 135,000.00 135,000.00
0.013 Bh Perlengkapan 35% 47,250.00 614.25
0.054 /hari Pekerja 95,000.00 5,130.00
0.090 /hari Tukang batu 110,000.00 9,900.00
0.009 /hari Kepala tukang - - -
0.027 /hari Mandor 140,000.00 3,780.00
Jumlah 18,810.00 135,614.25 154,424.25
113 Pemasangan 1 M² Jaring Kawat Baja (Wiremesh) M-6 1 Lapis
0.100 Lbr Wiremesh M6 2,1 x 5,5 295,000.00 29,500.00
0.150 Kg Kawat Beton 18,000.00 2,700.00
0.070 /hari Pekerja 95,000.00 6,650.00
0.070 /hari Tukang Besi 110,000.00 7,700.00
0.007 /hari Kepala Tukang - - -
0.004 /hari Mandor 140,000.00 560.00
Jumlah 14,910.00 32,200.00 47,110.00
114 Pemasangan 1 m¹ Border keramik ukuran 10 cmx 20 cm
5.250 bh Border keramik 5,000.00 26,250.00
1.140 kg Semen portland @40KG 1,275.00 1,453.50
0.100 kg Semen Nat Keramik 12,000.00 1,200.00
0.003 m3 Pasir pasang 200,000.00 600.00
0.090 /hari Pekerja 95,000.00 8,550.00
0.090 /hari Tukang batu 110,000.00 9,900.00
0.009 /hari Kepala tukang batu - - -
0.005 /hari Mandor 140,000.00 700.00
Jumlah 19,150.00 29,503.50 48,653.50
115 Pemasangan 1 m¹ Pagar BRC (1.2 x 2.5m) + Tiang Pipa Galvanis
0.410 Lbr Pagar BRC (1.2 x 2.5m) + Tiang Pipa Galvanis300,000.00 123,000.00
/hari Pekerja 95,000.00 - -
1.050 /hari Tukang Besi 110,000.00 115,500.00
0.007 /hari Kepala Tukang - - -
1.050 /hari Mandor 140,000.00 147,000.00
Jumlah 262,500.00 123,000.00 385,500.00
DAFTAR HARGA SATUAN BAHAN
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN / KOTA
TAHUN ANGGARAN 2021
KSM RESIK LOKHA BALI, BANJAR BASANGBE, DESA PEREAN KANGIN, KEC. BATURITI KABUPATEN TABANAN

DAFTAR HARGA BAHAN

No. JENIS BAHAN SATUAN HARGA


1 Pasir urug m3 Rp 177,777.78
3
2 Tanah urug m Rp 77,777.78
3
3 Pasir pasang m Rp 200,000.00
4 Koral beton m3 Rp 244,444.44
5 Batu belah 15/20 cm m3 Rp 222,222.22
6 Semen portland @40KG kg Rp 1,275.00
7 Paku biasa 2"-5" kg Rp 22,000.00
8 Kawat bendrat kg Rp 18,000.00
9 Besi beton polos kg Rp 9,990.03
10 Minyak begisting ltr Rp 12,000.00
3
11 Kayu usuk 4/6 lokal m Rp 2,500,000.00
12 Bambu 4 m btg Rp 10,000.00
13 Plywood 9 mm lbr Rp 85,000.00
3
14 Kayu usuk 5/7 meranti m Rp 5,250,000.00
3
15 Kayu usuk 4/6 meranti m Rp 5,250,000.00
3
16 Kayu papan 3/20 meranti m Rp 5,250,000.00
17 Batu bata merah buah Rp 1,200.00
18 Pipa PVC D Ø 2" m1 Rp 15,500.00
19 Pipa PVC D Ø 3" m1 Rp 27,500.00
20 Pipa PVC D Ø 4" m1 Rp 38,750.00
21 Pipa Limbah Ø 6" m1 Rp 142,750.00
22 Pipa PVC AW Ø 4" m1 Rp 77,500.00
23 Pipa PVC AW Ø 6" m1 Rp -
24 Pipa Galvanis Ø 6" m1 Rp 188,475.00
25 Alat sambuung T,L ø 3" bh Rp 10,000.00
26 Alat sambung T,L ø 4" bh Rp 15,000.00
27 Alat sambung T,L ø 6" limbah bh Rp 141,750.00
28 Buis Beton Ø 60 cm bh Rp 95,000.00
29 Buis Beton Ø 40 cm bh Rp 70,000.00
30 Buis Beton Ø 30 cm bh Rp 60,000.00
31 Alat sambuung T,L ø 2" bh Rp 5,000.00
32 Casing Plat Besi Tutup Manhole unit Rp 1,350,000.00
33 Rumah Bakteri Botol Plastik bj Rp 367.50
34 Buis Beton Ø 20 cm bh Rp 50,000.00
35 Stamper hr Rp 400,000.00
36 Bataco Buntu bh Rp 2,500.00
37 Bataco Lobang bh Rp 2,300.00
2
38 Keramik 40/40 m Rp 45,000.00
39 Cat waterproofing kg Rp 46,250.00
40 Kuas bh Rp 10,000.00
No. JENIS BAHAN SATUAN HARGA

41 Koral Sikat zak Rp 45,000.00


42 Semen Nat Keramik kg Rp 12,000.00
43 Arang Kayu Bakar kg Rp 8,000.00
44 Benang & Jarum ls Rp 14,700.00
45 Jaring Arnet ls Rp 200,000.00
46 Asbes Gelombang lbr Rp 30,000.00
47 Besi / Baja Profil IWF 250 , 200, 150, 100 Kg Rp 17,700.00
48 Cat Dasar/Menie Besi Kg Rp 35,000.00
49 Baja Ringan C 75 Kg Rp 11,764.71
50 Kalsiboard (4,5 x 1220 x 2420) mm Lbr Rp 63,000.00
51 Paku skrup Kg Rp 20,000.00
52 Genteng Press Mini/Palentong kecil Bh Rp 800.00
53 Bubungan Press Mini Bh Rp 1,200.00
54 Kayu Kamper Balok m3 Rp 7,000,000.00
55 Lem Kayu Kg Rp 10,000.00
3
56 Papan kayu kamper m Rp 7,000,000.00
2
57 Kaca 5 mm bening m Rp 165,000.00
1
58 Rangka metal hollow 40.40.2 mm m Rp 5,750.00
59 Plywood 4 mm lbr Rp 53,000.00
60 Kunci Pintu + Handel SOLID DIONS bh Rp 190,000.00
61 Kunci Silinder bh Rp 200,000.00
62 engsel pintu solid ps Rp 60,000.00
63 Engsel kupu-kupu ps Rp 30,000.00
64 Kait angin bh Rp 50,000.00
65 Kunci slot bh Rp 40,000.00
66 Sealent kg Rp 50,000.00
67 woodfiller/Dempul Kayu kg Rp 35,000.00
68 Politur Mowilex ltr Rp 73,000.00
69 Amplas lbr Rp 3,000.00
70 Plamir Dinding kg Rp 11,500.00
71 Cat dasar dinding vinilex kg Rp 24,000.00
72 Cat Tembok/ Plafond Vinilex kg Rp 24,000.00
73 Paku GRC/Board/Plapond kg Rp 22,000.00
1
74 List kayu profil 2/4 P = 4m m Rp 9,375.00
75 List Gypsum Stdr 5 cm p = 4 m m1 Rp 3,750.00
76 Closet jongkok INA unit Rp 150,000.00
77 Wastafel KIA bh Rp 150,000.00
78 Bak mandi fibre glass unit Rp 250,000.00
79 Zink Royal 14 (SB 45) unit Rp 150,000.00
80 Water drain bh Rp 80,000.00
81 Kran Onda bh Rp 35,000.00
82 Seal tape bh Rp 4,000.00
1
83 Pipa PVC ½" m Rp 7,000.00
1
84 Pipa PVC ¾" m Rp 11,250.00
85 Kabel NYM 3x2.5 mm Ex Supreme M' Rp 15,000.00
No. JENIS BAHAN SATUAN HARGA

86 Pipa Clipsal 20 mm Hitam bt Rp 15,000.00


87 Tee dos Clipsal 20 mm Hitam bh Rp 5,000.00
88 Klem Clipsal 20 mm Hitam bj Rp 2,000.00
89 Sock Klipsal 20 mm Hitam bj Rp 2,000.00
90 In bow dos plastik Klipsal E 175 P m1 Rp 10,000.00
91 Grass Block m2 Rp 23,000.00
92 Kanstein polos m1 Rp 50,000.00
93 Thiner Ltr Rp 30,000.00
94 Batu candi bh Rp 10,000.00
95 Kayu Usuk Kamper m3 Rp 7,000,000.00
2
96 Keramik 20 x 20 cm m Rp 30,000.00
97 Keramik 20 x 25 cm bh Rp 4,000.00
98 paving block 6 cm m2 Rp 70,000.00
99 Spandeck 0,3mm lbr Rp 390,000.00
100 paku pancing 60 x 230 kg Rp 22,000.00
1
101 Bubungan Spandeck m Rp 30,000.00
102 Paku Sekrup 2'' ktk Rp 15,000.00
103 Paku Sekrup 1/2'' ktk Rp 20,000.00
104 Seng Plat 3" x 6" BJLS 28 lbr Rp 86,500.00
105 besi strip kg Rp 9,650.00
106 Plywood 6 mm lbr Rp 78,500.00
107 Saringan Floor Drain (CO) Km/WC bh Rp 10,000.00
108 Lampu Downlight bulat bh Rp 50,000.00
109 Bola lampu LED philips bh Rp 50,000.00
110 Saklar Double broco bh Rp 21,000.00
111 Saklar tunggal broco bh Rp 17,000.00
112 Stop kontak broco bh Rp 20,000.00
113 Fitting lampu bh Rp 12,000.00
114 Sock 20mm bh Rp 3,000.00
115 Isolasi Bh Rp 10,000.00
116 Stop kontak 3phase bh Rp 65,000.00
117 Pipa Galvanis Ø ½" M¹ Rp 47,875.00
118 MCB 25A 3P MG Group Rp 350,000.00
119 Blacksem Ø 1" Bh Rp 51,850.00
120 Sok Galvanis Ø 1" Bh Rp 9,350.00
121 GIP Galvanis Ø 1" Btg Rp 152,000.00
122 Kawat BC 50 MM² M¹ Rp 51,000.00
123 Klem Begel Ø 1" Bh Rp 3,500.00
124 Klem Sisir 50 mm2 Bh Rp 6,500.00
125 Kotak Kontrol 10 Cm x 15 Cm Bh Rp 68,000.00
126 Perluv Sok Ø 1" Bh Rp 12,750.00
127 Pipa Conduit PVC Ø 3/4" Btg Rp 25,000.00
128 Sika Coat Kg Rp 50,000.00
129 Sika Bon Kg Rp 38,000.00
130 Ikut Celedu Paras Bh Rp 80,000.00
No. JENIS BAHAN SATUAN HARGA

131 Murda Paras Bh Rp 140,000.00


132 Pipa galvanis 2” M¹ Rp 135,000.00
133 Wiremesh M6 2,1 x 5,5 Lbr Rp 295,000.00
134 Penyambungan Baru Air PDAM Unit Rp 3,000,000.00
135 Penyambungan Baru Listrik PLN 10600 watt (3 phase, termasuk SLO) Unit Rp 17,000,000.00
136 Keramik Border 10/20 Bh Rp 5,000.00
137 Pekerjaan Pelinggih Tugu Unit Rp 2,000,000.00
138 Pagar Model BRC (1.2x2.4m) + tiang Galvanis Lbr Rp 300,000.00
DAFTAR HARGA SATUAN UPAH
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN DI DAERAH KABUPATEN / KOTA
TAHUN ANGGARAN 2021
KSM RESIK LOKHA BALI, BANJAR BASANGBE, DESA PEREAN KANGIN, KEC. BATURITI KABUPATEN TABANAN

No. TENAGA SATUAN HARGA


1 Pekerja /hari Rp 95,000.00
2 Mandor /hari Rp 140,000.00
3 Tukang batu /hari Rp 110,000.00
4 Kepala tukang batu /hari Rp
5 Tukang besi /hari Rp 110,000.00
6 Kepala tukang besi /hari Rp
7 Tukang Pipa /hari Rp 110,000.00
8 Kepala tukang Pipa /hari Rp
9 Tukang kayu /hari Rp 110,000.00
10 Kepala tukang kayu /hari Rp
11 Tukang Las /hari Rp 110,000.00
12 Kepala tukang Las /hari Rp
13 Tukang Listrik /hari Rp 110,000.00
14 Kepala tukang Listrik /hari Rp
13 Pekerja botol bakteri /ikat Rp 13,125.00
SPESIFIKASI TEKNIS/
S YA R AT- S YA R AT T E K N I S

KEGIATAN :
PENGEMBANGAN SISTEM DAN PENGELOLAAN PERSAMPAHAN
DI DAERAH KABUPATEN/KOTA

PEKERJAAN :
PEMBANGUNAN TPS/TPST/SPA/TPS-3R/TPS

LOKASI :
DESA PEREAN KANGIN, KECAMATAN BATURITI,
KABUPATEN TABANAN

TAHUN ANGGARAN :
2021

DIAJUKAN

KSM
RESIK LOKHA BALI
SPESIFIKASI TEKNIS/SYARAT-SYARAT TEKNIS

1. LINGKUP PEKERJAAN
1.1. Pekerjaan yang dimaksud dalam uraian ini adalah ’Pembangunan TPS-3R di Kabupaten
Tabanan Tahun Anggaran 2021
1.2. Lokasi Pekerjaan : Desa Perean Kangin, Kecamatan Baturiti, Kabupaten Tabanan
1.3. Lingkup Pekerjaan :
a. Gedung Kantor KSM dan Bank Sampah serta Hangar Pengolahan
b. Penataan Halaman
c. KM/WC dan Dapur
d. Gudang Peralatan
e. Tempat Suci (Padmasana)
f. Pekerjaan Lain-lain

2. PEKERJAAN PERSIAPAN
Pekerjaan persiapan meliputi :
2.1. Pembersihan Lapangan.
2.2. Papan Nama Pekerjaan
2.3. Pembentukan Site (Perataan Lahan)
2.4. Mobilisasi Alat dan Tenaga Kerja

3. PEKERJAAN TANAH DAN PASIR.


3.1 Menggali/mengurug tanah dalam site dikerjakan sesuai dengan kebutuhan yang ditentukan
dalam gambar. Mengurug dilakukan lapis demi lapis dengan tebal urugan setiap lapis adalah
25 cm yang dipadatkan dengan mesin pemadat sampai mencapai kepadatan yang disyaratkan
dan bahan urugan harus bebas dari kotoran dan humus.
Sebelum pengurugan dilaksanakan, terlebih dahulu diadakan pembersihan lapangan terhadap
benda-benda yang dapat mengurangi kepadatan tanah dikemudian hari.

3.2 Ukuran galian pondasi disesuaikan dengan gambar, bila keadaan tanah mudah longsor
pinggiran lobang galian dibuat miring, sehingga galian tidak tertimbun sebelum pekerjaan
pondasi selesai.

3.3 Mengurug kembali pada bekas galian pondasi dan urugan peninggian lantai bangunan
dengan tanah bekas galian, dilakukan lapis demi lapis, disiram dengan air sampai padat. Bila
dianggap perlu pemadatan menggunakan alat / mesin pemadat.
Bahan urugan ini harus bebas dari segala kotoran-kotoran humus.

3.4 Tebal urugan pasir dibawah pondasi menerus dan dibawah lantai adalah 5 cm. Tebal urugan
pasir dibawah pondasi telapak adalah 5 cm. Urugan pasir pada tempat-tempat lain
disesuaikan dengan gambar rencana.

3.5 Urugan pasir disiram dengan air sampai padat.

4. PEKERJAAN BETON.
4.1 Lingkup Pekerjaan
a. Pekerjaan ini meliputi penyediaan tenaga kerja, bahan-bahan, peralatan dan alat-alat
bantu yang dibutuhkan di dalam pelaksanaan pekerjaan ini sehingga mendapatkan
hasil yang bermutu baik.
b. Pekerjaan ini meliputi beton kolom, sloof, pondasi telapak, balok, plat lantai dan beton
rabat, seperti yang ditunjukkan pada gambar.

4.2 Bahan :
a. Tim KSM Pelaksana Konstruksi harus menyampaikan terlebih dahulu contoh-contoh
bahan yang akan dipergunakan untuk mendapat persetujuan TFL Teknis dan Direksi
DPUPRPKP Kabupaten Tabanan.
b. Bahan yang dipakai harus memenuhi syarat sesuai dengan ketentuan PBI 1971 dan
Standar Beton 1991.
c. Apabila diminta oleh TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan, Tim
KSM Pelaksana Konstruksi wajib memeriksakan bahan-bahan tersebut pada
laboratorium yang ditunjuk atas biaya sendiri.

4.3 Peralatan :
a. Tim KSM Pelaksana Konstruksi wajib menyediakan semua peralatan untuk
pembuatan kubus beton, pemeriksaan leleh (Slumptest).
b. Untuk pelaksanaan seperti beton molen, vibrator, kereta dorong, takaran bahan, alat-
alat untuk membasahi/pemeliharaan beton wajib disiapkan oleh Tim KSM Pelaksana
Konstruksi.
c. Jumlah dan kualitas peralatan harus cukup dan baik untuk menjamin mutu dan
kelancaran pelaksanaan pekerjaan di lapangan.

4.4 Campuran dan Mutu Beton :


a. Beton yang digunakan dalam Kontrak ini sebagai berikut :
Beton campuran 1Pc : 2Psr: 3krl : digunakan untuk struktur beton bertulang pada
umumnya.
b. Beton untuk rabat adalah campurannya 1Pc : 3Psr : 5Krl.

4.5 Pelaksanaan :
a. Pada prinsipnya setiap tahap pelaksanaan beton harus sepengatahuan dan atau
persetujuan TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan sebagai
pengendali teknis lapangan.
b. Pada waktu pemeriksaan pendahuluan menjelang pengecoran TFL Teknis dan Direksi
DPUPRPKP Kabupaten Tabanan akan mengecek kesiapan Tim KSM Pelaksana
Konstruksi tersebut sehubungan rencana kerja.
c. Tim KSM Pelaksana Konstruksi wajib memelihara kerapian, kebersihan dan
kebenaran pekerjaan dan mematuhi petunjuk-petunjuk TFL Teknis dan Direksi
DPUPRPKP Kabupaten Tabanan.
d. Begesting harus disiapkan sesuai dengan bentuk akhir beton dan harus cukup kuat
menerima beban selama pelaksanaan, serta dapat dibongkar dengan mudah tanpa
menimbulkan kerusakan pada konstruksi.
e. Pengecoran beton harus dilaksanakan dengan pengawasan atau persetujuan TFL
Teknis dan Direksi DPUPRPKP Kabupaten Tabanan, pengecoran harus dilakukan
dengan tertib, rapi dan teratur dengan cara-cara semestinya.
TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan berhak menghentikan
pengecoran apabila dipandang mutu pelaksanaan tidak dapat dipertanggung jawabkan.
f. Beton yang sudah dicor harus dilindungi dari gangguan luar/cuaca dan senantiasa
dibasahi selama 28 hari, pembukaan begesting harus dilakukan dengan hati-hati
setelah beton berumur 28 hari, cukup kuat menerima beban-beban dan harus
sepengetahuan TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.
g. Toleransi akhir pekerjaan disyaratkan maximal 1 mm dalam 1 m baik horisontal
maupun vertikal.
h. Sloof dan ring untuk bangunan harus merupakan lingkaran tertutup.
i. Setiap pertemuan tembok menggunakan kolom praktis dengan angker ketembok setiap
jarak 1 m.
j. Kusen-kusen pintu bila ada, harus sudah dipasang beserta angkernya sebelum
pengecoran beton praktis, namun tidak sebelum pengecoran kolom struktur.

5. PEKERJAAN PASANGAN.
5.1 Lingkup pekerjaan :
a. Pekerjaan ini meliputi penyediaan tenaga kerja, bahan-bahan, peralatan dan alat-alat
bantu yang dibutuhkan dalam pelaksanaan pekerjaan ini sehingga mendapatkan hasil
yang bermutu baik.
b. Pekerjaan ini meliputi pekerjaan pasangan batu kali, pasangan batu kosong, pasangan
dinding sesuai dengan yang ditunjukkan di dalam gambar.

5.2 Bahan dan Standard :


a. Semen, sesuai SNI 15-2049-1994 atau SNI 15-0302-2004.
b. Pasir sesuai SNI 03-4141-1996.
c. Air sesuai NI - 3 Pasal 10.
d. Batu kali / alam sesuai NI - 3 Pasal 19.
e. Batu bata merah/batako sesuai NI - 10.
Tim KSM Pelaksana Konstruksi terlebih dahulu harus memberikan contoh bahan yang akan
dipakai dan menyatakan sumber bahannya untuk persetujuan TFL Teknis dan Direksi
DPUPRPKP Kabupaten Tabanan.

5.3 Adukan Pasangan :


Bahan dan adukan diukur dengan takaran volume dengan komposisi campuran semen dan
pasir sebagai berikut :
a. Pasangan pondasi batu kali 1Pc : 6Psr.
b. Pasangan adukan kuat (trasram) 1Pc : 2Psr digunakan :
-Untuk semua pasangan diatas sloof sampai ketinggian 20 cm diatas lantai.
-Dan pasangan-pasangan lain yang harus kedap air
c. Pasangan batako 1 Pc : 4 Psr.
Adukan harus betul-betul homogen dengan menggunakan beton molen dan pemakaian air
secukupnya.

5.4 Pelaksanaan pemasangan pondasi Batu Kali :


a. Pondasi batu kali harus dipasang dibawah tembok, kolom, sloof sesuai dengan
petunjuk gambar.
b. Diatas galian pondasi yang telah rata, bersih dari kotoran, dengan kondisi tanah padat
ditebar pasir urug setebal 5 cm sesuai dengan gambar.
c. Batu kosong harus dipasang berdiri dengan ukuran 20 cm sesuai dengan gambar.
d. Batu harus dan dibasahi sehingga bersih sebelum dipasang.
e. Pasangan batu harus sedemikian sehingga tidak ada perletakan batu-batu kecil atau
ukuran sama yang mengelompok dan gunakan yang cukup besar pada alas dan sudut-
sudut pasangan pondasi.
f. Adukan harus mengisi semua sela batu dan tidak boleh menembus melampaui dua
batu.
g. Pasangan baru harus dilindungi dari gangguan luar dan cuaca.

5.5 Pelaksanaan pemasangan batako/batako expose:


a. Batako yang dipakai harus batako utuh yang tanpa cacat, kecuali pada sudut-sudut
pertemuan dapat dipakai batako potongan dengan ukuran yang semestinya.
b. Bila dalam pasangan terdapat batako cacat, batako ini harus diganti atas beban KSM.
c. Semua sambungan antar batako harus terisi penuh oleh adukan dengan jarak siar yang
seragam.
d. Jarak siar batako rata-rata 12,5 mm dengan toleransi 2,5 mm.
e. Dalam 1 hari pasangan batako tidak boleh lebih tinggi dari 1 m.
f. Pengakhiran pasangan itu harus dibuat bertangga menurun dan tidak bergigi untuk
untuk menghindari retak kemudian hari.
g. Baik tertera dalam gambar atau tidak, tembok batako harus diperkuat dengan kolom
atau ring beton praktis pada luas paling besar 12 m2 atau paling jauh setiap jarak 4
m1.
h. Pada tempat yang akan terdapat rangka kayu / Kusen, Pasangan batako hendaknya
ditinggalkan sampai kusen tersebut terpasang dengan baik.
i. Semua angker-angker kusen dan lain-lain harus ditunjukkan dulu kepada TFL Teknis
dan Direksi DPUPRPKP Kabupaten Tabanan sebelum pekerjaan dilanjutkan. Alur-
alur tersebut harus diisi penuh dengan adukan dan angker-angker ditanam dengan
beton campuran 1Pc : 2Psr : 3Krl di dalam tembok.
j. Semua pasangan harus rapi, rata, baik horisontal maupun vertikal. Penjepitan dengan
benang harus dilakukan tiap-tiap jarak tidak lebih dari 30 cm. Semua pertemuan agak
lurus harus benar-benar bersudut 90 derajat.
k. Semua pasangan batako expose, permukaan batako harus rata dengan menggunakan
batako kwalitas I utuh, tidak cacat, sudut tajam, dan dipasangan saling mengunci
antara satu batako dengan batako lainnya. Sebelum mortar kering siar batako harus
dikerok atau disapu dengan sapu lidi dan difinishing dengan mortar ayakan halus atau
pasta semen.

6. PEKERJAAN PELAPIS DINDING DAN LANTAI


6.1 Pekerjaan Plesteran Dinding
6.1.1. Lingkup Pekerjaan.
1. Pekerjaan ini meliputi penyediaan tenaga kerja, bahan-bahan, peralatan dan
alat-alat bantu yang dibutuhkan dalam pelaksanaan pekerjaan ini sehingga
mendapatkan hasil yang bermutu baik.
2. Pekerjaan plesteran dinding dan beton dikerjakan pada permukaan dinding
dan beton bagian luar dan dalam sesuai dengan petunjuk di dalam gambar.

6.1.2. Bahan dan Standard :


a. Semen sesuai SNI 15-2049-1994 atau SNI 15-0302-2004
b. Pasir sesuai SNI 03-4141-1996.
c. Air sesuai NI-3 Pasal 10.
Tim KSM Pelaksana Konstruksi harus memberikan contoh-contoh bahan terlebih
dahulu kepada TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan .

6.1.3. Komposisi Campuran :


Adukan untuk plesteran dibuat sesuai dengan yang digunakan pada pasangan batu
batanya :
a. Plesteran Trasram 1Pc : 2Psr.
b. Plesteran Kolom, beton dengan campuran 1Pc : 4Psr dan diaci dengan
campuran 1 Pc : 1 Psr (Diayak halus).
c. Plesteran dinding 1Pc : 4Psr dan diaci dengan campuran 1 Pc : 2Mil (yang
halus/Super).
d. Pasangan dinding sejauh menempel pada tanah dan pondasi batu kali yang
diatas tanah harus diplester 1Pc : 4Psr dan diaci dengan 1 Pc : 1 Psr (Diayak
halus)

6.1.4. Pelaksanaan :
a. Campuran harus dibuat secara homogen dengan cara dan peralatan yang
semestinya dengan air secukupnya.
b. Campuran yang akan dipasang harus selalu baru, jangan dibiarkan membeku
lebih dari 1 jam.
c. Semua siar hendaknya dikerok sedalam mungkin lebih kurang 10 mm,
sebelum diplester dan bila batu bata harus bersih dari bekas-bekas perekat /
kotoran-kotoran.
d. Semua dinding beton yang akan diplester harus dikerik agar plesterannya
dapat melekat dengan baik.
e. Semua bidang yang akan diplester harus disikat sampai bersih dan dibasahi
sebelum diplester.
f. Tim KSM Pelaksana Konstruksi akan membuat contoh bidang plesteran
terlebih dahulu. Kemudian setelah disetujui oleh TFL Teknis dan Direksi
DPUPRPKP Kabupaten Tabanan, plesteran harus dilanjutkan sesuai dengan
contoh.
g. Semua sudut-sudut harus tegak dan tajam, dan bidang-bidang plesteran harus
rata.
h. Untuk dapat mencapai permukaan yang rata dari suatu plesteran yang baik,
dimana diadakan pemeriksaan dengan garisan yang panjang baik horisontal
maupun vertikal.
I. Bilamana terdapat bidang plesteran yang berombak harus berusaha
memperbaikinya secara keseluruhan. Bagian-bagian yang diperbaiki
hendaknya dibobok terlebih dahulu dengan baik, bobokan dibuat dalam
bidang segi empat, kemudian diplester rata dengan sekitarnya.
j. Tebal plesteran tidak kurang dari 1,50 cm dan tidak lebih dari 2,00 cm dengan
toleransi 1 mm setiap meter panjang, sebelum benar-benar kering
permukaannya digaris silang-silang untuk mengikat lapisan berikutnya.
Permukaan plesteran harus dibasahi secara berkala dan dilindungi dari terik
matahari atau hujan.
k. Pengacian dilakukan setelah lapisan plesteran mengeras dan tidak berkerut
lagi dimana tebal acian tidak kurang dari 1 mm.
l. Antara plesteran dan kusen atau kolom harus dibuat alur yang rapi.
m. Hasil akhir yang dikehendaki adalah : bidang plesteran halus, rata, tidak
bergelombang dan retak-retak, alur-alur lurus dengan ukuran yang sama dan
sudut-sudut yang tajam dan rapi.
6.2 Pekerjaan Pelapis Dinding Keramik
6.2.1. Lingkup pekerjaan.
1. Pekerjaan meliputi tenaga kerja, bahan-bahan peralatan dan alat-alat bantu
yang dibutuhkan dalam terlaksananya pekerjaan ini untuk mendapatkan hasil
yang baik.
2. Pekerjaan pelapis dinding keramik ini meliputi dinding KM/WC atau pada
tempat-tempat sesuai detail yang disebutkan/ ditunjukkan dalam gambar atau
sesuai dengan petunjuk TFL Teknis dan Direksi DPUPRPKP Kabupaten
Tabanan.
6.2.2. Persyaratan Bahan Keramik Dinding :
1. Jenis keramik/tile.
2. Finishing permukaan rata.
3. Produksi setara kualitas asia tile.
4. Ketebalan minimum 0.5 cm.
5. Bahan pengisi siar digunakan tile grout.
6. Bahan perekat dengan adukan 1 Pc : 3 Psr
7. Warna texture ditentukan kemudian
8. Ukuran keramik dinding 20 x 25 dan 10 x 20 untuk border atau sesuai gambar.
9. Pengendalian seluruh pekerjaan ini harus sesuai dengan peraturan-peraturan
ASTM, Peraturan Keramik Indonesia ( NI-19 ), PVBB 1970 dan PVBI 1982.
10. Bahan-bahan yang dipakai, sebelum dipakai, sebelum dipasang terlebih
dahulu harus diserahkan contoh-contohnya untuk mendapatkan persetujuan
dari TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.

6.2.3. Syarat-syarat pelaksanaan.


1. Pada permukaan dinding beton/bata merah/batako, keramik dapat langsung
diletakkan, dengan menggunakan perekat spesi 1 Pc : 3 Psr, diaduk baik
memakai larutan supercement, jumlah pemakainnya adalah 10 % dari berat
semen yang dipakai dengan tebal adukan tidak lebih dari 1,6 cm atau bahan-
bahan perekat khusus, sehingga mendapatkan ketebalan dinding seperti tertera
pada gambar.
2. Keramik yang dipasang adalah yang telah terseleksi dengan warna, motif tiap
keramik harus sama tidak boleh retak, gompal atau cacat lainnya.
3. Pemotongan keramik harus menggunakan alat potong khusus untuk itu sesuai
dengan petunjuk pabrik.
4. Sebelum keramik dipasang, keramik harus terlebih dahulu direndam air
sampai jenuh.
5. Pola keramik harus memperhatikan ukuran/letak dan semua peralatan yang
akan dipasang di dinding seperti : exhaust fan, panel, stop kontak, lemari
gantung dan lain-lain yang tertera dalam gambar.
6. Ketinggian peil tepi atas pola keramik disesuaikan dalam gambar.
7. Awal pemasangan keramik pada dinding dan kemana sisa ukuran harus
ditentukan/harus dibicarakan terlebih dahulu oleh Tim KSM Pelaksana
Konstruksi sebelum pekerjaan pemasangan dimulai.
8. Pembersihan permukaan keramik dari sisa adukan semen hanya boleh
dilakukan dengan menggunakan cairan pembersih untuk keramik.
9. Naad-naad pada pada pemasangan keramik harus diisi dengan bahan tile
grout.

6.2.4. Hasil akhir yang diharapkan :


1. Bidang dinding keramik harus benar-benar rata, garis siar harus benar-benar
lurus.
2. Siar arah horisontal pada dinding yang berbeda ketinggian peil lantainya harus
merupakan garis lurus.
6.3 Pekerjaan Lantai
6.3.1. Lingkup Pekerjaan
1. Meliputi semua tenaga kerja, peralatan dan bahan-bahan yang berhubungan
dengan pekerjaan lantai sesuai dengan RKS serta gambar rencana.
2. Tim KSM Pelaksana Konstruksi wajib memberikan contoh-contoh bahan
yang akan dipasang khususnya untuk menentukan warna dan texture dan
mendapatkan persetujuan dari TFL Teknis dan Direksi DPUPRPKP
Kabupaten Tabanan.
3. Pekerjaan lantai keramik ini meliputi seluruh ruang yang akan ditunjukkan
dalam gambar.
6.3.2. Bahan dan Standard :
Lantai keramik yang dipakai harus memenuhi syarat uji menurut SII 0583-81,
produksi setara kualitas asia tile dengan spesifikasi sebagai berikut :
1. Ukuran 40 x 40 cm untuk lantai kantor, 40 x 40 antislip untuk teras dan
ukuran 20 x 20 cm untuk lantai KM/WC dan meja dapur atau sesuai dengan
yang ditunjukkan di dalam gambar.
2. Bahan dasar Kaolin
3. Kekerasan glasur mencapai 6-7 skala moh” s
4. Kekerasan badan mencapai 8 skala moh ” s
5. Moisture Expantion mencapai 0.2-0.05 %
6. Pengkaburan tidak terjadi
7. Tahan terhadap asam setelah dilakukan pencelupan ke dalam HCL selama 2
hari hanya terpengaruh sampai 3 %.
8. Thermal Shock dimana dipanaskan sampai 250 derajat celcius kemudia
dicelupkan ke dalam air dengan suhu ruangan tidak akan terjadi keretakan.
9. Daya tahan terhadap alkali dimana dicelupkan ke dalam KOH selama 2 hari,
hanya terpengaruh 3 %.
10. Warna tidak luntur, tahan terhadap asam dan basa yang umum dipakai, tahan
terhadap cuaca dan perubahan suhu yang mendadak.
11. Warna keramik ditentukan kemudian (minimal dengan contoh kombinasi
warna untuk ruang yang spesifik).
12. Lembaran tidak bergelombang atau cacat lainnya.

6.3.4. Pelaksanaan Pemasangan Keramik :


a. Lantai yang akan dipasang keramik harus dipersiapkan dulu dengan teliti
mengenai kepadatan, kerataan maupun elevasi setiap lapisannya.
b. Sudut-sudut tegel keramik harus betul-betul siku dan susunan lapisan berturut
- turut :
- Urugan tanah dipadatkan.
- Urugan pasir 5 cm disiram air sampai jenuh.
- Beton rabat 1Pc : 3Psr : 5Krl dengan ketebalan 5 cm.
- Spesi dengan campuran 1 Pc : 4 Psr tebal 3 cm.
- Keramik 40 x 40 cm dan 20 x 20 cm kwalitas baik.
c. Pola pemasangan harus ditentukan terlebih dahulu dengan memasang keramik
kepala.
d. Siar dari pasangan keramik harus benar-benar lurus, siku-siku dan rapi dengan
jarak siar max. 2 mm.
e. Siar diisi dengan adukan air + semen dimana sampai siar-siar tadi tertutup
rapat.
f. Keramik yang baru dipasang minimal 3 hari tidak boleh diganggu, diinjak,
ditempati steger atau beban yang lain.
g. Warna keramik harus sama/merata.

6.3.5. Hasil Akhir yang dikehendaki :


a. Lantai tidak bergelombang dan tidak cacat.
b. Kerataan/kemiringan harus sama dengan rencana.
c. Lantai harus bersih dari sisa-sisa adukan semen, cat, atau kotoran yang lain.
7. PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA.
7.1 Pekerjaan Kusen, Daun Pintu dan Daun Jendela :
7.1.1. Lingkup pekerjaan
1. Pekerjaan ini meliputi penyediaan tenaga kerja, bahan-bahan, peralatan dan alat-alat
bantu lainnya yang digunakan dalam pelaksanaan, hingga dapat dicapai hasil
pekerjaan yang bermutu baik dan sempurna.
2. Pekerjaan Kusen, Daun Pintu dan Daun Jendela akan dilaksanakan di dalam
bangunan sesuai dengan yang ditunjukkan di dalam gambar.

7.1.2. Bahan:
1. Kusen pintu dan jendela : setara kayu kamper.
2. Daun Pintu panil dan daun jendela dengan kaca

7.1.3. Perlengkapan Pintu dan Jendela :


Pintu :
- Engsel direkomendasikan sesuai dengan SNI dan Gambar Rencana.
- Grendel daun pintu satu bukaan direkomendasikan sesuai dengan SNI dan Gambar
Rencana.
- Kait angin direkomendasikan sesuai dengan SNI dan Gambar Rencana.
- Kunci tanam double slaag direkomendasikan sesuai dengan SNI dan Gambar Rencana.
- Pintu kamar mandi menggunakan pintu PVC pabrikan yang dijual komplit di toko-toko
bangunan.

7.1.4. Pelaksanaan :
a. Selama pekerjaan berlangsung kusen-kusen harus dilindungi dari benturan-benturan
benda keras dan kerusakan atau cacat-cacat harus diganti oleh KSM atas biaya sendiri.
b. Pegangan kunci dipasang sesuai dengan gambar dan kalau tidak disebutkan lain, maka
tinggi pengangan kunci dari lantai 1 m.

7.1.5. Hasil akhir yang dikehendaki :


a. Bentuk dan letak pintu disesuaikan dengan rencana gambar.
b. Tidak ada bagian atau sudut-sudut yang cacat.
c. Kusen-kusen terpasang dengan kuat pada tembok atau beton.
d. Daun pintu tidak muntir atau meleot, dan dapat dibuka/ditutup dengan lancar.
e. Kunci-kunci penggantung dengan kait dapat digerakkan dengan lancar.

8. PEKERJAAN LANGIT – LANGIT


8.1 Pekerjaan Langit – langit/plafond
8.3.1. Lingkup pekerjaan
1. Pekerjaan ini meliputi penyediaan tenaga kerja, bahan-bahan, peralatan dan
alat-alat bantu lainnya yang digunakan dalam pelaksanaan, hingga dapat
dicapai hasil pekerjaan yang bermutu baik dan sempurna.
2. Pekerjaan langit - langit akan dilaksanakan di dalam bangunan sesuai dengan
yang ditunjukkan didalam gambar.

8.3.2. Bahan:
1. Struktur Rangka
Rangka langit-langit menggunakan holo galvalum 2/4 dan 4/4 dipasang
dengan jarak 600 x 600 mm.
2. Penutup Langit–langit/plafond
Penutup langit-langit dan Plafond dipilih produksi dalam Negeri Kalsi Board
4.5mm (dengan ukuran sesuai gambar).
8.3.3. Pelaksanaan :
a. Rangka holo galvalum 2/4 dan 4/4 dipasang dengan jarak 600 x 600 mm
disesuaikan dengan pola pemasangan.
b. Rangka langit-langit harus digantung dengan baik dan kokoh pada tembok dan
jarak tiap penggantung tidak lebih dari 1,20 m.
c. Sistem sambungan harus betul-betul kuat.
d. Kalsiboard 4.5mm dipasang dengan paku yang tahan karat dan antar sambungan
ditutup dengan plamir putih sebelum di cat.
8.3.3. Hasil Akhir:
a. Bidang Plafond dan langit-langit rata, sambungan rapi dan kokoh tergantung
pada dudukannya.
b. Semua komponen terpasang rapi, rata, lurus dan tidak cacat.
c. Hasil akhir pengecatan halus dan merata sesuai dengan tata warna yang
dikehendaki.
d. Sesuai dengan ketentuan gambar dan spesifikasi serta diterima oleh TFL Teknis
dan Direksi DPUPRPKP Kabupaten Tabanan.

9. PEKERJAAN PENGECATAN .
9.1 Lingkup pekerjaan
1. Pekerjaan ini meliputi penyediaan tenaga kerja, bahan-bahan, peralatan dan alat-alat
bantu lainnya yang digunakan dalam pelaksanaan, hingga dapat dicapai hasil
pekerjaan yang bermutu baik dan sempurna.
2. Pekerjaan pengecatan ini meliputi semua dinding luar dan dalam, plafond sesuai
dengan yang ditunjukkan di dalam gambar.

9.2 Pekerjaan Pengecatan


9.2.1. B a h a n :
a. Penggunaan :
- Dinding bangunan kantor, gudang peralatan, KM/WC bagian luar, dapur
dan plafond menggunakan cat setara kualitas Vinilex dan untuk dinding
hangar, KM/WC bagian dalam dan gudang lapak serta kompos
menggunakan cat waterproof.
- Pada Plesteran pepalihan dan tiang beton dicat dengan cat waterproof
namun bidang yang dicat tidak diplamir.
- Bila tidak disebutkan lain, disesuaikan dengan ketentuan gambar rencana.
b. Warna/nomor cat yang akan dipakai harus mengikuti petunjuk/daftar yang akan
diberikan oleh Tim KSM Pelaksana Konstruksi.
c. Tim KSM Pelaksana Konstruksi harus menunjukkan contoh cat yang dimaksud
sebelum pengecatan dimulai.
d. Harus bedakan pula mengenai warna cat untuk Exterior dan Interior.

9.2.2. Pemakaian :
a. Untuk semua kayu/tembok/plafond yang akan dicat memakai 1 lapis cat dasar
dan 2 lapis cat finishing. Untuk lapisan pertama dipakai wall filler/plamir
(khusus untuk dinding hanya bagian dalam saja).
b. Semua pekerjaan kayu, yang bersinggungan dengan pekerjaan beton dan atau
pasangan harus dicat 2 lapis.
c. Sengkang-sengkang, baut-baut, angker-angker dll logam yang kelihatan harus
dimeni dan dicat dengan warna yang akan ditentukan kemudian.

9.2.3. Pelaksanaan :
a. Pada prinsipnya semua pengecatan harus dilaksanakan sesuai dengan petunjuk
dari pabriknya, sebelumnya Tim KSM Pelaksana Konstruksi harus
memberikan brosurnya dan cara pengecatan tersebut kepada TFL Teknis 3R/
Direksi DPUPRPKP Kabupaten Tabanan.
b. Bidang-bidang yang akan dicat harus sudah disiapkan dalam arti cukup kering,
rata tidak ada cacat, bersih, tidak berminyak dll dengan persyaratan dari pabrik.
c. Setiap lapisan harus dilaksanakan dengan baik dan rata (digunakan rol), yang
jangka waktu antara pengecatan lapisan pertama dan lapisan selanjutnya harus
cukup lama, sesuai dengan persyaratan pabrik.
d. Bidang cat yang masih basah dilindungi dari debu, atau kotoran lainnya.
e. Perbaikan-perbaikan dilaksanakan apabila retak-retak yang terdapat pada
bidang cat, harus diperbaiki dengan menggunakan plamir, amplas halus,
kemudian dicat lagi sampai baik.

9.2.4. Hasil akhir yang dikehendaki :


a. Warna sesuai dengan perencanaan Tim KSM Pelaksana Konstruksi.
b. Tebal lapisan cat harus merata dan sama warnanya (tidak belang-belang).
c. Harus bersih dari kotoran-kotoran, tidak boleh ada bekas goresan kuas atau
cacat lainnya.
d. Tidak boleh ada kerusakan seperti : menjamur bidang permukaan, terkelupas
lapisan cat dan luntur warna aslinya.

10. PEKERJAAN INSTALASI LISTRIK


10.1 Ketentuan Umum
10.1.1.Pekerjaan yang harus dilaksanakan meliputi penyediaan tenaga kerja, peralatan
kerja dan material serta melaksanakan seluruh pekerjaan sistem listrik, hingga
beroperasi sempurna.
10.1.2. Gambar dan spesifikasi merupakan bagian yang saling melengkapi dan bersifat
mengikat.
10.1.3. Pekerjaan instalasi listrik, harus dilaksanakan oleh (sub kontraktor) yang mempunyai
pekerja yang cukup dan berpengalaman dalam bidangnya, serta perusahaan memiliki
SIKA dan SPI dari PLN
10.1.4. Pedoman dasar pelaksanaan pekerjaan instalasi listrik dan pemakain bahan adalah
peraturan umum instalasi (PUIL 1987), peraturan PLN, Standar PLN, SII dan
peraturan yang berlaku di daerah setempat.

10.2 Lingkup pekerjaan


10.2.1.Pengadaan dan pemasangan instalasi listrik penerangan dan kontak-kontak serta
fixtures, secara lengkap dan berfungsi di dalam maupun yang di luar bangunan
10.2.2.Pengadaan dan pemasangan kabel feeder untuk panel distribusi maupun sub panelnya.
10.2.3.Hubungan pentanahan seluruh sistem instalasi listrik sesuai peraturan yang berlaku.
10.2.4. Pengujian sistem instalasi listrik sesuai dengan peraturan, sampai dinyatakan baik
secara tertulis.

10.3 Koordinasi Pekerjaan


Untuk kelancaran pekerjaan harus diadakan dari seluruh bagian yang terlibat dalam proyek.

10.4 Material
10.4.1.Material yang digunakan harus baru, bermutu baik dan sesuai spesifikasi yang telah
ditentukan.
10.4.2. Tim KSM Pelaksana Konstruksi harus menyerahkan contoh material yang akan
dipasang untuk mendapatkan persetujuan dari : TFL Teknis dan Direksi DPUPRPKP
Kabupaten Tabanan.

10.5. Shop Drawing


Sebelum pelaksanaan pekerjaan Tim KSM Pelaksana Konstruksi harus menyerahkan shop
drawing untuk disetujui TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan termasuk
katalog / data dan literatur serta uraian tentang sistim teknisnya.

10.6. Substitusi.
Bila material ditentukan mereknya pada penawaran maka Tim KSM Pelaksana Konstruksi
harus memenuhi, hanya dapat diganti merk lain atas persetujuan TFL Teknis dan Direksi
DPUPRPKP Kabupaten Tabanan.
10.7. Proteksi
Seluruh material dan peralatan harus diproteksi secara sempurna sebelum, selama dan
sesudah pemasangan, Tim KSM Pelaksana Konstruksi bertanggung jawab atas kerusakan
akibat cara proteksi yang tidak sempurna.

10.8. As Installed Drawing


Tim KSM Pelaksana Konstruksi harus membuat secara lengkap gambar yang sebenarnya
dari seluruh pekerjaan yang telah dilaksanakan untuk diserahkan kepada TFL Teknis dan
Direksi DPUPRPKP Kabupaten Tabanan sebanyak 3 (tiga) set (As Build Drawing).

10.9. Pengujian
10.9.1. Tim KSM Pelaksana Konstruksi harus melaksanakan pengujian / pengetesan dan
percobaan seperti operasi sesungguhnya dari sistem instalasi listrik. Peralatan yang
mengalami kerusakan/cacat harus diganti/diperbaiki dan percobaan ulang.
10.9.2. Sebelum instalasi diberikan beban arus, harus diadakan pengujian tahanan isolasi di
merger.
10.9.3. Seluruh instalasi harus balancing antara phase R,S dan T menjadi seimbang.
10.9.4. Seluruh hasil pengujian harus secara tertulis dan disaksikan oleh Tim KSM Pelaksana
Konstruksi serta diketahui oleh TFL Teknis dan Direksi DPUPRPKP Kabupaten
Tabanan..

10.10. Peraturan Hak Patent.


Pihak dan Direksi DPUPRPKP Kabupaten Tabanan terbebas dari klaim/tuntutan biaya
sehubungan dengan merk dagang atau hak cipta material yang digunakan pada proyek ini.
Hal ini sepenuhnya menjadi tanggung jawab KSM.

10.11. Gambar
Gambar perencanaan menunjukan kapasitas, jumlah dan perletakan serta spesifikasi, Tim
KSM Pelaksana Konstruksi wajib memeriksa kemungkinan adanya
kesalahan/ketidakcocokan pada gambar dan bila terdapat hal tersebut, harus segera
memberitahukan kepada TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.

11. SPESIFIKASI TEKNIS INSTALASI


11.1. Panel
Menggunakan type plat. Spesifikasi yang harus diperhatikan dalam pemasangan panel
distribusi dan sub panelnya adalah sebagai berikut :
1. Input panel diambil dari panel utama dengan menggunakan kabel feeder dengan ukuran
yang sesuai dengan kapasitas panel. Jenis kabel digunakan adalah NYY setara
Supreme.
2. Panel untuk output-nya menggunakan grounding. Kabel grounding menggunakan kabel
BC.
3. Setiap penyambungan harus menggunakan sepatu kabel.
4. MCB yang digunakan setara merk MG (Merlin Gerin).

11.2. Instalasi Stop Kontak dan Saklar


Adalah instalasi yang sumbernya dari listrik PLN, dalam pekerjaanya harus memenuhi
spesifikasi sebagai berikut :
1. Kabel yang digunakan setara Merk Supreme yang lulus standar LMK/PLN. Ukuran
kabel 3 x 2,5 mm dan jenis kabel yang digunakan adalah NYM. Penyambungan kabel
yang berisolasi PVC harus diisolasi dengan pipa PVC yang khusus untuk listrik dan
harus di dalam kotak penyambungan atau yang disebut Tee Dus.
2. Setiap saluran kabel dalam bangunan atau plafond dilindungi dengan pipa conduit
diameter minimum 5/8 ” setara mer Clipsal.
3. Semua pemasangan instalasi kabel ” inbow ” tertanam dalam dinding.
4. Stop kontak dinding (inbow) satu lobang setara merk Broco, warna disesuaikan.
5. Penyambungan kabel harus dilakukan dalam kotak-kotak penyambungan khusus, setiap
group maksimal terdiri dari 5 stop kontak.

11.3. Instalasi Penerangan


Instalasi yang diperuntukan bagi penerangan lampu pada eksterior maupun interior dalam
pemasangannya harus memenuhi spesifikasi sebagai berikut :
1. Kabel yang digunakan setara Merk Supreme yang lulus satandar LMK/PLN . Ukuran
kabel 3 x 2,5 mm dan jenis kabel yang digunakan adalah NYM. Penyambungan kabel
yang berisolasi PVC harus diisolasi dengan pipa PVC yang khusus untuk listrik dan
harus di dalam kotak penyambungan atau yang disebut Tee Dus.
2. Setiap saluran kabel dalam bangunan atau plafond dilindungi dengan pipa conduit
diameter minimum 5/8 ” setara mer Clipsal.
3. Semua pemasangan instalasi kabel ” inbow ” tertanam dalam dinding.
4. Saklar dinding (inbow) satu lobang setara merk Clipsal, warna disesuaikan.
5. Penyambungan kabel harus dilakukan dalam kotak-kotak penyambungan khusus, setiap
group maksimal terdiri dari 12 saklar.
11.4. Armature Lampu
11.4.1.Armature lampu penerangan yang dipasang harus memenuhi spesifikasi sebagai
berikut :
a. Housing Lampu : setara Broco
b. Armature lampu : setara Philips
c. Komponen : setara Philips.
11.4.2.Armature lampu yang digunakan dimana penempatannya disesuaikan dengan
petunjuk gambar.
a. Lampu SL
b. Lampu Aluminium

12. PEKERJAAN SANITAIR


12.1. Lingkup pekerjaan
Meliputi penyediaan semua bahan yang diperlukan, tenaga kerja dan perlengkapannya untuk
pekerjaan pemasangan alat-alat sanitair pada toilet, KM/WC dan dapur.

12.2. Bahan-bahan yang dipakai dengan merk setara kualitas Kia Standar dimana tipe akan
ditentukan kemudian:
a. Kloset jongkok lengkap setara kualitas Kia Standar;
b. Ember PVC untuk bak air;
c. Washtafel setara kualitas Kia Standar;
d. Kran air setara Onda;
e. Floor drain dari Pvc dengan penutup air jenis sangkup kualitas baik;
f. Standar pekerjaan mengikuti Pedoman Plumbing Indonesia dan uraian ini.

12.3. Pelaksanaan Pemasangan


a. Tempat yang akan dipasang alat-alat tersebut di atas harus diukur/diperiksa dulu
dengan teliti, serta dipelajari kemungkinan–kemungkinan sehubungan alat/bahan yang
akan dipergunakan.
b. Pemasangan dilaksanakan sesuai dengan petunjuk dari pabriknya, serta foto kopi brosur
peralatan yang disampaikan kepada TFL Teknis dan Direksi DPUPRPKP Kabupaten
Tabanan.

12.4. Hasil akhir yang dikehendaki :


a. Peralatan dapat berfungsi dengan baik.
b. Penempatan sesuai dengan gambar rencana
c. Tidak ada kebocoran–kebocoran, baik pada peralatan maupun sambungan–sambungan
Pipa.
d. Terpasang rapi, bersih dan tanpa cacat.

13. PEKERJAAN INSTALASI SANITASI.


13.1. Instalasi Air Bersih
Instalasi air bersih yang peruntukannya pada KM/WC, dapur dan bangunan yang telah
direncanakan.
1. Bahan :
a. Untuk air dingin Menggunakan Pipa PVC kwalitas AW 0,5” (15 mm) sesuai
dengan gambar dengan persetujuan TFL Teknis dan Direksi DPUPRPKP
Kabupaten Tabanan.
b. Semua bahan – bahan untuk sambungan, pencabangan, belokan dan lain–
lainnya harus memakai pipa sejenis dengan pipa yang dipakai.
c. Penyambungan pipa PVC memakai perekat “Lem Pipa” atau sejenis lainnya
yang mendapatkan persetujuan Tim KSM Pelaksana Konstruksi.
2. Pelaksanaan.
a. Kedalaman untuk galian pipa diluar gedung minimal 50 cm dengan lebar galian
25 cm.
b. Dasar galian harus padat, dengan kemiringan yang merata, dan diberi lapisan
pasir urug setebal 10 cm.
c. Galian harus ditunjukkan kepada TFL Teknis dan Direksi DPUPRPKP
Kabupaten Tabanan.
3. Sambungan.
a. Hubungan–hubungan pipa harus dikerjakan dengan teknik yang baik.
b. Gunakan alat/bahan–bahan pembantu, yang semestinya sehingga tidak terjadi
kebocoran–kebocoran kecil maupun besar.
c. Pipa yang ditanam harus terlebih dahulu diuji dan disetujui TFL Teknis dan
Direksi DPUPRPKP Kabupaten Tabanan.sebelum ditimbun.

4. Pelindung Pipa.
a. Semua pipa – pipa yang berada di daerah umum (halaman) harus dilindungi
dengan penutup bata atau bahan lainnya yang disetujui.
b. Apabila kedudukan pipa dipandang kurang aman misalnya di bawah jalan
kendaraan, Tim KSM Pelaksana Konstruksi harus melindungi yang disetujui
oleh TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.
c. Pipa yang menembus dinding atau lantai beton harus dilengkapi dengan
selongsong (Sleave)
d. Pipa–pipa pada dinding atau lantai harus tertanam cukup dalam, dan teratur
sehingga tidak mengurangi kesempurnaan permukaan dinding / lantai yang
bersangkutan.
e. Route/jalur pipa harus diberi tanda–tanda yang cukup jelas bila perlu digambar
jaringan Isometriknya.

5. Pengujian Pipa Air Bersih.


a. Pengujian terhadap kebocoran dilakukan sebelum pipa ditimbun.
b. Tim KSM Pelaksana Konstruksi wajib menyediakan alat untuk keperluan
pengujian tersebut.

13.2. Instalasi Air kotor.


1. Bahan.
a. Pipa saluran air kotor menggunakan Diameter 3“ dan pipa kotoran
menggunakan Diameter 4“ yang dipakai pipa PVC Klas AW merek Paralon
atau sejenisnya yang mendapat persetujuan TFL Teknis dan Direksi
DPUPRPKP Kabupaten Tabanan.
b. Semua bahan – bahan untuk pencabangan belokan, ventilasi udara, clean out
harus memakai pipa sejenis dengan pipa yang dipakai.
c. Penyambungan pipa PVC dengan sambungan “Socet T, Elbow harus memakai
perekat Lem PVC atau jenis lainnya yang mendapatkan persetujuan TFL
Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.

2. Pelaksanaan Pemipaan Air Kotor.


a. Dalamnya galian untuk pipa pembuangan disesuaikan dengan gambar dan
petunjuk TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.
b. Pemasangan pipa mendatar harus mempunyai kemiringan paling sedikit 2 %.
c. Pengetesan terhadap kebocoran dilakukan sebelum pipa ditimbun.
d. Ujung Pipa ditutup dan diisi air sampai jenuh, setelah 24 jam, pipa diisi
kembali sampai jenuh dimana air tidak boleh turun lagi setelah 24 jam.

3. Hasil akhir yang dikehendaki pada instalasi Air Bersih dan Instalasi Air Kotor.
a. Sistem dapat berfungsi secara lancar, tidak ada bagian –bagian yang buntu atau
tersumbat.
b. Tidak terdapat kebocoran pada sistim baik sambungan, pipa – pipa dan Valve –
valve maupun alat – alat sanitair lainnya.
c. Instalasi cukup aman dan kuat.
d. Jaringan mudah dikenali dan diperbaiki untuk itu diwajibkan pemborong
Instalasi Air :
- Memberikan tanda – tanda yang jelas pada route / jalur pipa yang
bersangkutan.
- Membuat As Built Drawing yang dengan jelas menunjukkan letak – letak
pipa / sambungan dengan ukuran yang tepat.
- Memberi cat pada pipa yang terlindung dengan warna sebagai berikut ; Pipa
Air bersih dengan warna Biru, Pipa Air Kotor dengan Warna Abu – Abu,
dan Pipa Vent dengan warna Putih.
13.3. Septictank dan Peresapan.
a. Dimensi/ukuran/kedalaman dan jumlahnya septictank dan peresapan dibuat sesuai
dengan gambar yang telah dibuat Tim KSM Pelaksana Konstruksi.
b. Dinding septictank dibuat dari Buis beton Kwalitas I dengan perekat campuran 1 Pc : 3
Psr serta diaci dengan Semen.
c. Septictank dilengkapi dengan pipa Udara yang disesuaikan dengan gambar kerja.
d. Peresapan dipasang batu karang + Ijuk dan Krikil sesuai dengan gambar petunjuk
Direksi.

14. PEKERJAAN BANGUNAN BAJA.


Pemasangan Struktur Bangunan Baja diperuntukan untuk keseluruhan bangunan hanggar/pengolahan
yang disesuaikan dengan gambar. Pekerjaan ini meliputi pengadaan tenaga kerja, pengadaan dan
pemasangan seluruh komponen bangunan baja sehinga bangunan baja berdiri dan dapat berfungsi
sebagai bangunan pengolahan.
14.1. Bahan - bahan :
a. Kolom dan bentang kuda-kuda menggunakan baja WF 150.75.5.7
b. Gording mengunakan baja CNP 100.35.2,0. Dengan alas penumpu menggunakan siku
70.70.7, regel menggunakan CNP 100.35.2,0 dan besi beton Ø 11 mm, kait angin
menggunakan besi beton Ø 11 mm, trackstang menggunakan besi beton Ø 11 mm dan
list plank menggunakan CNP 125.35.2.0
c. Atap menggunakan atap bahan trimdec 0,30 mm dan bubungan menggunakan bahan
zincalum 0.30 mm.
d. Plat simpul dan pengaku menggunakan plat baja dengan ketebalan 8 mm.
e. Semua bahan baja dilapisi anti karat Cat cyncromate.
14.2. Pelaksanaan :
a. Sebagian komponen bangunan dapat dikerjakan di workshop dimana kontraktor dapat
melaksanakan pengelasan, pelubangan dan pemotongan material dengan menggunakan
peralatan yang tersedia di workshop yang diajukan oleh kontraktor dan disetujui Tim
KSM Pelaksana Konstruksi atau TFL Teknis dan Direksi DPUPRPKP Kabupaten
Tabanan..
b. Pemasangan konstruksi harus dilaksanakan dengan baik dan tepat sehingga presisi
bangunan terletak pada ukuran yang tepat.
c. Semua komponen baja harus dilapisi dengan lapisan anti karat cat cyncromate sehingga
baja terhidar dari korosi.
14.3. Hasil akhir yang diharapkan :
a. Bangunan baja berdiri kokoh sesuai dengan gambar
b. Tidak ada keropos dan lubang pada atap bangunan
c. Angker dengan kolom beton harus dijamin terkunci dengan baik.

15. PEKERJAAN STRUKTUR KAP BAJA RINGAN


Pemasangan Struktur Kap Baja Ringan diperuntukan pada bangunan kantor KSM dan Gudang
Peralatan yang disesuaikan dengan gambar. Pekerjaan ini meliputi pengadaan tenaga kerja,
pengadaan dan pemasangan seluruh komponen kap baja ringan sehinga bangunan baja berdiri dan
dapat berfungsi sebagai bangunan kantor.

15.1. Bahan-bahan :
a. Top Chord profil C, t=0.75 mm
b. Web Chord profil C, t=0.75 mm
c. Bottom Chord profil C, t=0.75 mm
d. Truss profil C, t=0.75 mm
d. Reng profil, t=0.45 mm

15.2. Pelaksanaan
a. Sebagian komponen bangunan dapat dikerjakan di workshop dimana kontraktor dapat
melaksanakan pengelasan, pelubangan dan pemotongan material dengan menggunakan
peralatan yang tersedia di workshop yang diajukan oleh kontraktor dan disetujui Tim KSM
Pelaksana Konstruksi atau TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.
b. Pemasangan konstruksi harus dilaksanakan dengan baik dan tepat sehingga presisi
bangunan terletak pada ukuran yang tepat.
15.3. Hasil akhir yang diharapkan :
a. Bangunan baja berdiri kokoh sesuai dengan gambar
b. Tidak ada keropos dan lubang pada atap bangunan

16. PERKERASAN HALAMAN


15.1. Lingkup pekerjaan :
a. Pekerjaan ini meliputi penyediaan tenaga kerja, bahan-bahan, peralatan dan alat-alat bantu
yang dibutuhkan dalam pelaksanaan pekerjaan ini sehingga mendapatkan hasil yang bermutu
baik.
b. Pekerjaan ini meliputi pekerjaan urugan pasir dan pasangan paving blok, sesuai dengan yang
ditunjukkan di dalam gambar.
c. Juga dilakukan pekerjaan taman termasuk di dalamnya urugan tanah subur serta penanaman
rumput dan tanaman hias.

15.2. Bahan dan Standard :


a. Paving blok ukuran 20 x 20 x 6 cm mutu K 225.
b. Pasir urug sesuai SNI 03-4141-1996.
c. Air sesuai NI - 3 pasal 10.
Tim KSM Pelaksana Konstruksi terlebih dahulu harus memberikan contoh bahan yang akan
dipakai dan menyatakan sumber bahannya untuk persetujuan TFL Teknis dan Direksi
DPUPRPKP Kabupaten Tabanan.

15.3. Pelaksanaan pekerjaan pasangan paving blok :


a. Areal halaman yang akan dipasang paving blok harus dibersihkan dari unsur
humus/akar-akar pohon dan dilakukan pemadatan menggunakan alat stamper dan
disiram air
b. Setelahnya tanah diratakan serta diatur kemiringannya untuk saluran air hujan
d. Pekerjaan pasangan paving blok selalu diawali dengan penebaran pasir sebagai bantalan
± 5 cm dan dilanjutkan dengan pemasangan paving. Setelah paving terpasang ditaburkan
lagi pasir halus untuk mengisi nat/rongga antar paving.
15.4. Hasil akhir yang diharapkan.
1. Bidang permukaan harus benar-benar rata atau sesuai dengan kemiringan yang
diinginkan.

16. PEMERIKSAAN BAHAN-BAHAN.


16.1. Perselisihan :
a. Bila terdapat perselisihan antara Tim KSM Pelaksana Konstruksi dengan TFL Teknis
dan Direksi DPUPRPKP Kabupaten Tabanan.atas suatu bahan bangunan maka
selanjutnya harus meminta Tim KSM Pelaksana Konstruksi untuk mengambil contoh
bahan yang dipertentangkan untuk dikirim ke laboratorium pemeriksaan bahan
bangunan.
b. Semua biaya untuk pemeriksaan bahan-bahan bangunan menjadi tanggungan KSM
c. Contoh bahan yang sudah disetujui TFL Teknis dan Direksi DPUPRPKP Kabupaten
Tabanan.digunakan sebagai standar bahan-bahan yang akan digunakan selanjutnya.

16.2. Hasil Pemeriksaan :


Sementara masih diadakan pemeriksaan bahan-bahan di laboratorium, pekerjaan boleh
berjalan terus dengan catatan, apabila ternyata bahan yang dipermasalahkan tidak memenuhi
persyaratan dimana pekerjaan harus dibongkar kembali dan diganti dengan bahan yang
disetujui oleh TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.
17. PENGADAAN PERALATAN 3R

a. Sepeda Motor Roda Tiga

Spesifikasi Motor :
- Jenis Motor : Sepeda Motor
- Tipe Motor : Sport
- Model Mesin : 4 Langkah OHC, Water Cooler (Radiator)
- Panjang x Lebar x Tinggi : 3050 x 1260 x 1345 mm
- Jarak Sumbu : 2000 mm
- Jarak terendah ke tanah : 175 mm
- Kapasitas silinder : 150 cc
- Diameter x langkah : 62,0 x 49,5 mm
- Transmisi : 5 percepatan + gigi mundur
- Daya Maksimum : 7,5 / 7500 Kw / rpm
- Torsi Maksimum : 9,8/7000 Nm/rpm
- Bahan Bakar : Premium
- Kapasitas Tangki : 12,5 Liter
- Suspensi Depan : Teleskopik
- Suspensi Belakang : Pegas daun peredam hidraulik
- Rem depan : Tromol
- Rem Belakang : Tromol + RL

Spesifikasi Gerobak / Bak


- Lantai : Plat Esser 2 mm
- Dinding : Plat Esser 1,2 mm
- Tulang Profil : Pipa Kotak 4x4 cm
- Pintu Belakang Model Kupu-Kupu
- Casis bak : Pipa Kotak 4x6 cm
- Panjang x Lebar x Tinggi : 154 cm x 125 cm x 80 cm
- Daya Angkut : 500
b. Mesin Pencacah

Spesifikasi Mesin Pencacah :


- Kecepatan : 1450 rpm
- Dimensi (P x L x T ) : 1050 x 600 x 1250 mm
- Berat : 80 Kg Tahun 2015
- Penggerak : Elektro Motor 3 phase, 5.5 HP
- Perlengkapan : Buku Petunjuk Pemeliharaan dan Operasional

Spesifikasi Material

- Rangka : Besi UNP 65, MS L 50 x 50 x 5


- Silinder Tab : Baja Plate D 350 mm
- Panjang Silinder : Baja Plate P 600 mm
- Jumlah Pisau : 4 Jalur , 44 Buah
c. Mesin Ayakan

Spesifikasi Mesin Ayakan :


- Model : Tab Silinder
- Mesin : Dinamo
- Power : ½ hp
- Kapasitas/Jam : 700 kg/jam
- Dimensi mesin p x l x t : 1500 x 700 x 800 mm

d. Timbangan Duduk dan Timbangan Gantung

e.
Timbangan Mekanik Timbangan Gantung
Bodi besi Merk NAGATA
Merk CAHAYA ADIL Kapasitas 60 kg
Kapasitas 300 kg Produksi Jepang
f. Sepatu Boot

g. Gerobak Sorong Merk ‘Artco’


h. Mesin Sealer / Kemasan Plastik

sealer/ press plastik merk WIPRO, mesin press plastik


Spesifikasi :
- Bodi besi
- Power 300 w
- Lebar seal maksimal 40 cm
- Hasil seal 2 mm
- Berat barang : 3 – 7 kg

i. Keranjang Takakura Susun dan Keranjang Pilah

Keranjang Takakura dan Keranjang Pilah merek Kirapac, dengan spesifikasi :


- ukuran dalam 575 x 390 x 370 mm, dan
- dimensi luar 605 x 420 x 380 mm.
- Material HDPE, berat 2.5 kg, kapasitas 80 Lt.

j. Sekop, Cangkul, Cangkul Garpu, Cetok Tanah/kompos

Bahan : plat baja dan besi, tangkai/gagang


dari kayu
Cangkul

Bahan : dari baja/besi dan


tangkai/gagang dari kayu

Cangkul Garpu/Garu

Bahan : dari besi/baja, gagang dari kayu

Cetok tanah/kompos

Bahan : besi/baja, gagang dari


kayu
k. TEROWONGAN/AERATOR BAMBU (OPEN WINDROW)
Terowongan bambu/open windrow dibuat dari kayu untuk piramid segitiga sama kakinya dan
bambu untuk gelagar sisi samping kiri dan kanannya. Memiliki dimensi/ukuran P/L/T : 250-270
cm/ 60cm/ 52cm.

l. Keset Serabut Kelapa

Bahan : serabut kelapa


m. Termometer

Termometer yang dipakai adalah termometer daging untuk mengukur suhu benda padat (termasuk
suhu kompos)

18. P E N U T U P.
19.1. Perbedaan Pengertian :
Hal - hal yang tidak tercantum dalam rencana kerja dan syarat - syarat ini, pada uraian
pekerjaan dan bahan - bahan tidak dinyatakan dengan kata - kata “ Harus dipasang, dibuat,
dilaksanakan dan disediakan oleh Tim KSM Pelaksana Konstruksi“ tetapi bilamana
pekerjaan - pekerjaan bahan-bahan tersebut nyata adalah menjadi bagian dari pekerjaan
pelaksana, maka pernyataan tersebut dianggap dimuat dalam Rencana Kerja dan Syarat -
Syarat ( RKS ) ini, dan bukan sebagai pekerjaan lebih.

19.2. Pelaksana sebelum penyerahan pekerjaan :


Wajib mengadakan pembersihan dan perapian dan perbaikan - perbaikan di lapangan sampai
mendapat persetujuan TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.. Selain itu
KSM wajib menyerahkan laporan berupa harian, mingguan, dan bulanan yang sudah
disetujui oleh TFL Teknis dan Direksi DPUPRPKP Kabupaten Tabanan.dan sebanyak 3 set,
dokumentasi pekerjaan berupa foto pelaksanaan (0%, 50% dan 100%) serta gambar-gambar
pekerjaan berupa shop drawing dan as built drawing masing-masing 3 set.

TABANAN, OKTOBER 2021


DIAJUKAN :
KSM RESIK LOKHA BALI TFL TEKNIK TFL PEMBERDAYAAN KOORDINATOR TFL

I NYM ALIT SUMBERDANA, SE I GEDE RESTU PRASTIA NI MADE REIKA PARAMITA GEDE BUDA KARTIKA, ST
KETUA
PENGAWAS KEPALA PENGAWAS

I KADEK AFRIADI, ST I MD PALGUNA KW, A.Md


NIP : 19920412 201903 1 008 NIP : 19771119 200902 1 002
DISAHKAN :
KEPALA DINAS PEKERJAAN UMUM
DISETUJUI : PENATAAN RUANG PERUMAHAN
PEJABAT PEMBUAT KOMITMEN DAN KAWASAN PERMUKIMAN
BIDANG CIPTA KARYA KABUPATEN TABANAN

I GEDE ADNYANA, ST, M.Si I MADE YUDIANA, ST, MT


NIP. 19790927 2009021 1 003 NIP. 19690619 199803 1 005