WEEKLY REPORT PG PAGOTTAN Tanggal : 6-Dec-2021

TARGET
PROGRESS S.D MINGGU INI STATUS PROGRESS THD BOBOT KETERANGAN
NO PROGRAM KERJA BOBOT
RENCANA REALISASI % (Open/Close) BOBOT RENCANA REALISASI % (DMG/LMG)
KUALITAS PRODUK
1 Pengecekan Ulang Design Pengaduk Defekator 3 0.40 0.40 100.00 Open 3.33 12.01 12.01 100.00 LMG
2 Penggantian Peti Sulfitier Nira Mentah -   -   -   Open 5.00 -   -   -   LMG
3 Penyekatan Babonan C -   -   -   Open 4.17 -   -   -   LMG
4 Penggantian Jalur Pipa D2 -   -   -   Open 5.00 -   -   -   LMG
5 Pengadaan spartpart LGF -   -   -   Open 5.00 -   -   -   LMG
6 Balancing Basket Puteran HGF TSK -   -   -   Open 5.00 -   -   -   LMG
JUMLAH KUALITAS PRODUK 0.40 0.40 100.00 27.50 1.45 1.45 100.00
EFISIENSI ENERGI
7 Penggantian Pipa Boiler Sejumlah 1250 lonjor 0.67 0.67 100.00 Open 10.83 6.00 6.00 100.00 LMG
8 Penggantian Tembokan Boiler 0.60 0.60 100.00 Open 10.00 6.00 6.00 100.00 LMG
Penggantian Transmisi IDF Boiler OSRO No. 1 (Dari 750 rpm ke 900
9 -   -   Open -   -   -   LMG
rpm) -   6.67
10 Penggantian Pipa Pemanas eva No.7 sejumlah 2000 lonjor -   -   -   Open 5.00 -   -   -   LMG
11 Pembatasan Pemakaian Sumur dalam (Timer) 0.30 0.30 100.00 Open 2.50 12.00 12.00 100.00 LMG - DMG
12 Pemakaian lampu hamat energi 0.20 0.20 100.00 Open 1.67 12.00 12.00 100.00 LMG - DMG
JUMLAH EFISIENSI ENERGI 1.77 1.77 100.00 36.67 4.83 4.83 100.00
EFISIENSI PABRIK
13 Penggantian 3 buah roll gilingan 0.74 0.74 100.00 Open 11.67 6.34 6.34 100.00 LMG
14 Rekondisi anvil Unigrator -   -   -   Open 5.00 -   -   -   LMG
15 Penggantian Bearing HSR Gilingan No.3 -   -   -   Open 3.33 -   -   -   LMG
JUMLAH EFISIENSI PABRIK 0.74 0.74 100.00 20.00 3.70 3.70 100.00
JAM BERHENTI B
16 Penggantian 56 buah Hammer Tip 0.59 0.59 100.00 Open 5.00 12.00 12.00 100.00 LMG
17 Penggantian 56 buah Pisau Cane Cutter 0.59 0.59 100.00 Open 5.00 12.00 12.00 100.00 LMG
18 Perbaikan valve input VD 3 diameter 1500 mm -   -   -   Open 5.83 -   -   -   LMG
JUMLAH JAM BERHENTI 1.18 1.18 100.00 15.83 7.45 7.45 100.00
JUMLAH TOTAL 4.09 4.09 100.00 100.00 4.09 4.09 100.00

STATUS TARGET
PROGRESS S.D MINGGU INI PROGRESS TERHADAP BOBOT
NO PROGRAM KERJA (Open/Close) BOBOT
RENCANA REALISASI % (Open/Close) BOBOT RENCANA REALISASI %
1 KUALITAS PRODUK 0.40 0.40 100.00 Open 27.50 1.45 1.45 100.00
2 EFISIENSI ENERGI 1.77 1.77 100.00 Open 36.67 4.83 4.83 100.00
3 EFISIENSI PABRIK 0.74 0.74 100.00 Open 20.00 3.70 3.70 100.00
4 JAM BERHENTI B 1.18 1.18 100.00 Open 15.83 7.45 7.45 100.00
JUMLAH 4.09 4.09 100.00 Open 100.00 4.09 4.09 100.00

RENCANA TINDAK LANJUT


BENCHMARK DAN KNOWLEDGE SHARING DI PG JATIROTO
PROGRESS SD MINGGU INI STATUS TARGET PROGRESS THD BOBOT KETERANGAN
NO PROGRAM KERJA
RENCANA REALISASI % (OPEN/CLOSE) BOBOT RENCANA REALISASI % (DMG/LMG)
Penyempurnaan DCH
1 Menambah sumber panas -   -   -   Open 20.00 -   -   -   LMG
Perawatan Inverter
2 Dijalankan 2x seminggu 2.50 2.50 100.00 Open 50.00 5.00 5.00 100.00 LMG
3 Dipasang pemanas 5.00 5.00 100.00 Open 10.00 50.00 50.00 100.00 LMG
Alignment peralatan yang berputar
4 Pembelian alat dial clok 5.00 5.00 100.00 Open 20.00 25.00 25.00 100.00 LMG
JUMLAH 12.50 12.50 100.00 100.00 12.50 12.50 100.00