Anda di halaman 1dari 14

DAFTAR KOMPONEN BAHAN

BERDASARKAN HARGA SATUAN SAMARINDA 2021

DAN PM HUB NO 75 TAHUN 2013


No. JENIS PEKERJA HARGA SATUAN

1 Aspal AC 60-70 (ex. Shell Drum) Rp 9,500.00


2 Agregat Pecah Mesin 10-20 mm Rp 269,954.58
3 Agregat Pecah Mesin 5-10 mm Rp 269,954.58
4 Pasir aspal/abu batu/screening Rp 213,393.31
5 Minyak tanah Rp 9,630.00
6 Thinner Rp 32,760.00
7 Cat Marka (Thermoplastic) Rp 23,834.25
BAHAN

SAMARINDA 2021

HUN 2013
HARGA SATUAN

kg
m3
m3
m3
kg
ltr
kg
DAFTAR KOMPONEN ALAT

BERDASARKAN HARGA SATUAN SAMARINDA 2021

DAN PM HUB NO 75 TAHUN 2013


No. JENIS PEKERJA HARGA SATUAN

1 Theodolite Rp 31,250.00
2 Waterpass Rp 18,750.00
3 Mistar Ukur Rp 18,750.00
4 Tandem Roller 6-8 T Rp 380,489.00
5 Wheel Loader WA 180 Rp 524,633.00
6 P. Tire Roller 8 - 10 T Rp 529,032.00
7 Dump Truck 3 - 4 M^3 Rp 450,637.00
8 Asphalt Finisher Rp 402,320.00
9 AMP Rp 5,663,112.00
10 Generator Set Rp 272,850.00
11 Asphalt Sprayer Rp 52,973.00
12 Compressor Rp 215,292.00
13 Sprayer Cat Rp 16,183.75
14 Alat bantu pengecatan Rp 10,272.00
N ALAT

N SAMARINDA 2021

HUN 2013
HARGA SATUAN

jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
ls
DAFTAR KOMPONEN UPAH

BERDASARKAN HARGA SATUAN SAMARINDA 2021

DAN PM HUB NO 75 TAHUN 2013


No. JENIS TENAGA KERJA HARGA SATUAN

1 Pekerja / Buruh Rp 150,000.00


2 Tukang Rp 157,500.00
3 Kepala Tukang Rp 173,250.00
4 Mandor Rp 183,750.00
5 Juru gambar/Drafter Rp 173,333.33
RINDA 2021

13
GA SATUAN

OH
OH
OH
OH
OH
A. Membersihkan lapangan dan perataan(m2) (SNI 03-2835-04)
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja 201 OH 0.1000
Mandor 206 OH 0.0500
JUMLAH HARGA TENAGA KERJA

B Harga Satuan Pekerjaan

B. Pengukuran (m2)
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja 201 OH 0.0050
Juru Gambar 209 OH 0.0020
Mandor(Pengukuran) 272 OH 0.0140
JUMLAH HARGA TENAGA KERJA
B ALAT
Theodolite 666 jam 0.0240
Waterpass 667 jam 0.0240
Mistar Ukur 674 jam 0.0480
JUMLAH HARGA ALAT
C Harga Satuan Pekerjaan

C. Lapisan / Overlay Aspal Beton (AC) Tebal 5 cm (m2)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja 201 OH 0.1250
Mandor 206 OH 0.0173
JUMLAH HARGA TENAGA KERJA
B ALAT
Tandem Roller 643 jam 0.0022
Wheel Loader 652 jam 0.0033
Tire Roller 645 jam 0.0032
Dump Truck 5 Ton 621 jam 0.1033
Asphalt Finisher 603 jam 0.0033
AMP 601 jam 0.0033
Generator Set 626 jam 0.0028
JUMLAH HARGA ALAT
C BAHAN
Aspal AC 60-70 (ex. Shell Drum) 1003 kg 7.9333
Agregat Pecah Mesin 10-20 mm 1204 m3 0.0339
Agregat Pecah Mesin 5-10 mm 1206 m3 0.0345
Pasir aspal/abu batu/screening 1248 m3 0.0345
JUMLAH HARGA BAHAN
D Harga Satuan Pekerjaan

D. Tack Coating 1,5 kg/m2


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja 201 OH 0.0113
Mandor 206 OH 0.0009
JUMLAH HARGA TENAGA KERJA
B ALAT
Asphalt Sprayer 604 jam 0.2400
Compressor 607 jam 0.0320
JUMLAH HARGA ALAT
C BAHAN
Aspal AC 60-70 (ex. Shell Drum) 1003 kg 1.2000
Minyak tanah 7026 ltr 0.1166
JUMLAH HARGA BAHAN
D Harga Satuan Pekerjaan

E. Pengecatan / Marking (m2)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja 201 OH 0.1000
Mandor 206 OH 0.0220
JUMLAH HARGA TENAGA KERJA
B ALAT
Sprayer Cat 640 jam 0.0480
Alat bantu pengecatan 813 ls 1.0000
JUMLAH HARGA ALAT
C BAHAN
Thinner 7045 ltr 0.2100
Cat Marka (Thermoplastic) 7118 kg 1.0500
JUMLAH HARGA BAHAN
D Harga Satuan Pekerjaan
Harga Satuan
Jumlah Harga (Rp)
(Rp)

Rp 150,000.00 Rp 15,000.00
Rp 183,750.00 Rp 9,187.50
Rp 24,187.50

Rp 24,187.50

Harga Satuan
Jumlah Harga (Rp)
(Rp)

Rp 150,000.00 Rp 750.00
Rp 173,333.33 Rp 346.67
Rp 183,750.00 Rp 2,572.50
Rp 3,669.17

Rp 31,250.00 Rp 750.00
Rp 18,750.00 Rp 450.00
Rp 18,750.00 Rp 900.00
Rp 2,100.00
Rp 5,769.17

Harga Satuan
Jumlah Harga (Rp)
(Rp)

Rp 150,000.00 Rp 18,750.00
Rp 183,750.00 Rp 3,178.88
Rp 21,928.88

Rp 380,489.00 Rp 837.08
Rp 524,633.00 Rp 1,731.29
Rp 529,032.00 Rp 1,692.90
Rp 450,637.00 Rp 46,550.80
Rp 402,320.00 Rp 1,327.66
Rp 5,663,112.00 Rp 18,688.27
Rp 272,850.00 Rp 763.98
Rp 71,591.97

Rp 9,500.00 Rp 75,366.35
Rp 269,954.58 Rp 9,151.46
Rp 269,954.58 Rp 9,313.43
Rp 213,393.31 Rp 7,362.07
Rp 101,193.31
Rp 194,714.16

Harga Satuan
Jumlah Harga (Rp)
(Rp)

Rp 150,000.00 Rp 1,695.00
Rp 183,750.00 Rp 165.38
Rp 1,860.38

Rp 52,973.00 Rp 12,713.52
Rp 215,292.00 Rp 6,889.34
Rp 19,602.86

Rp 9,500.00 Rp 11,400.00
Rp 9,630.00 Rp 1,122.86
Rp 12,522.86
Rp 33,986.10

Harga Satuan
Jumlah Harga (Rp)
(Rp)

Rp 150,000.00 Rp 15,000.00
Rp 183,750.00 Rp 4,042.50
Rp 19,042.50

Rp 16,183.75 Rp 776.82
Rp 10,272.00 Rp 10,272.00
Rp 11,048.82

Rp 32,760.00 Rp 6,879.60
Rp 23,834.25 Rp 25,025.96
Rp 31,905.56
Rp 61,996.88
HARGA PERKIRAAN SENDIRI ( H P S )
KEMENTRIAN : KEMENTRIAN PERHUBUNGAN
UNIT ESELON II : DIREKTORAT BANDAR UDARA HERBI ARUL TRINABILA
KEGIATAN : PEMBANGUNAN, REHABILITAS & PEMELIHARAAN PRASARANA BANDAR UD
KELUARAN ( OUTPUT) : PEKERJAAN OVERLAY RUNWAY
VOLUME :1
SATUAN UKUR : PAKET
ALOKASI DANA : Rp0.00 (Rupiah)

Volume Utama /
URAIAN SUB OUTPUT / KOMPONEN
No.
SUB KOMPONEN / DETAIL Sub Output Pendukung
I PEKERJAAN PERSIAPAN
a. Membersihkan lokasi 48000 m2
b. Pengukuran sebelum dan sesudah 96000 m2
SUB TOTAL I : PEKERJAAN PERSIAPAN
II PEKERJAAN LABORATORIUM
a. Analisa material 1 pkt
b. Jobmix formula
c. Trial mix
d. Marshal test 3 spl
e. Core dril 4 titik
SUBTOTAL II : PEKERJAAN LABORATORIU
III PEKERJAAN OVERLAY RUNWAY
a. Tack coat 48000 m2
b. Overlay aspal beton (AC) tebal 5 cm 48000 m2
SUBTOTAL III : PEKERJAAN OVERLAY
HARGA PERKIRAAN SENDIRI ( H P S )

ERBI ARUL TRINABILA


& PEMELIHARAAN PRASARANA BANDAR UDARA

Rincian Perhitungan
Panjang x Lebar Tinggi Jumlah

1600 x 30 48000
1600 x 30 96000
SUB TOTAL I : PEKERJAAN PERSIAPAN

SUBTOTAL II : PEKERJAAN LABORATORIUM

1600 x 30 48000
1600 x 30 48000
SUBTOTAL III : PEKERJAAN OVERLAY
TOTAL
PPN 10%
TOTAL + PPN 10%
PEMBULATAN
TERBILANG (RUPIAH)
Harga Satuan Jumlah Harga
(Rp) (Rp)

Rp 24,187.50 Rp 1,161,000,000.00
Rp 5,769.17 Rp 553,840,000.00
Rp 1,714,840,000.00

Rp 3,500,000.00 Rp 3,500,000.00
Rp - Rp -
Rp - Rp -
Rp 150,000.00 Rp 12,000,000.00 waktu pengerjaan :
Rp 250,000.00 Rp 1,000,000.00 Core drill :
Rp 16,500,000.00

Rp 33,986.10 Rp 1,631,332,656.00
Rp 194,714.16 Rp 9,346,279,788.82
Rp 10,977,612,444.82
TOTAL Rp 12,708,952,444.82
PPN 10% Rp 1,270,895,244.48
TOTAL + PPN 10% Rp 13,979,847,689.30
PEMBULATAN Rp 13,979,847,689
TERBILANG (RUPIAH) Rp 13,979,847,689

Bandung, Juli 2021


PEJABAT PEMBUAT KOMITMEN
UPBU HERBI ARUL TRINABILA

HERBI ARUL TRINABILA


Panjang Runway / 60 m : 26.66667 hari
1 titik/10000 m2 : 4 titik

Anda mungkin juga menyukai