Anda di halaman 1dari 1

RENCANA ANGGARAN BIAYA PEMBANGUNAN KOLAM PRAKTEK

SISWA BUDIDAYA PERIKANAN SMK


TAHUN ANGGARAN 2016

Rincian Perhitungan
No Uraian Kegiatan Jumlah
Volume Satuan Harga Satuan
1 Pembangunan Kolam Perikanan Permanen 3 X 3 M3 10 buah 10,680,000 106,800,000
`a. Pembangunan 1 Kolam Ukuran 3x3x1 m3
`- Beli barang dan Jasa
Senen 50 sak 70,000 3,500,000
Bata 2000 biji 650 1,300,000
Pasir 14 M3 150,000 2,100,000
Vipa PVC + Elblow 2 buah 150,000 300,000
Cat Kolam 5 Kg 300,000 1,500,000
Batu 4 M3 120,000 480,000
Upah Tenaga Kerja 15 OK 100,000 1,500,000
Jumlah 10,680,000
2 Peralatan
`- Mesin Pompa air 1 unit 3,000,000 3,000,000
`- Jaring 1 unit 700,000 700,000
`- Seser Induk 5 unit 50,000 250,000
`- Seser Benih 10 unit 15,000 150,000
`- Otomatic Heater 10 unit 600,000 6,000,000
`- Refractometer 3 unit 3,500,000 10,500,000
`- Ph Meter Digital 3 unit 3,000,000 9,000,000
`- Salino Meter 3 unit 3,000,000 9,000,000
`- Sentrifugal 3 unit 3,500,000 10,500,000
`- Mikroskop 3 unit 10,000,000 30,000,000
`- Aerator 3 unit 3,000,000 9,000,000
`- Alat Bedah Ikan 20 unit 3,000,000 60,000,000
`- Bak Grading 1 Paket 35,000 35,000
`- Hapa 5 unit 300,000 1,500,000
`- Bak Fiber 10 buah 3,000,000 30,000,000
`- Tabung Oksigen 1 buah 3,000,000 3,000,000
`- Opaprim 10 buah 350,000 3,500,000
Jumlah 186,135,000
Total Jumlah (1+2) 292,935,000

Anda mungkin juga menyukai