SPH KAV KAV KOMODITY LABOUR MATERIAL FERTILISER MATERIAL HERBICYDA MATERIAL PEST MATERIAL UMUM
NO JOB ACTIVITY DATE BLOK HA
AREN KELAPA NUMBER AREN KELAPA TOTAL M W TOTAL TYPE SATUAN VOLUME TYPE SATUAN VOLUME TYPE SATUAN VOLUME TYPE SATUAN VOLUME

Priode November 2019 Konversi Area


I Stanbay in office area 11/18/2019

2 Stanbay in office area 11/19/2019

3 Control Area 11/20/2019 B 29.9 20 10 4,260 2,130 6,390


D 15.5 20 10 3,100 1,550 4,650

4 Control Area 11/21/2019 A 21.3 20 10 4,260 2,130 6,390


B 29.9 20 10 6,860 3,430 10,290
C 21.2 20 10 4,240 2,120 6,360
D 15.5 20 10 3,100 1,550 4,650

5 Control Area 11/22/2019 A 21.3 20 10 4,260 2,130 6,390


B 29.9 20 10 6,860 3,430 10,290
C 21.2 20 10 4,240 2,120 6,360
D 15.5 20 10 3,100 1,550 4,650
REMARKS

Tidak ada kegiatan lapangan mandor dan assisten melakukan pembersihan,dan belajar membuat belajar membuat absen mandor dan daily cost

Tidak ada kegiatan mandor dan assistent melakukan penyusunan blok yang akan di kirim kan ke HO

Assistent dan Mandor control area dan memeriksa tanaman yang rusak dan diserang hama landak

Assistent dan Mandor control area dan membuat invidual terace di blok A4 serta rapat untuk membahas anggota BHL yang akan diperkerjakan

Assistent dan Mandor control area dan mengumpulkan kerja kenapsek dari anggota BHL lama dan mempersiapkan anggota BHL baru
ABSENT LAPANGAN PRIODE NOVEMBER 2019
ESTATE : BANGKINANG
LABOUR SPH KAV KAV
NO JOB ACTIVITY DATE NAME BLOK HA PARAF
M W TOTAL AREN KELAPA NUMBER
1 Standby in Office IRMANZA 1 0 1
2 Menyusun Blok Area 11/18/2019 EFRIZAL 1 1
3 Menenangkan HK yang datang

Total 0 0
1 Standby in Office
2 Menyusun Blok Area
3 Mempelajarin RKB
4 Pemeriksaan Batas Penanaman IRMANZA 1 0 1
Oleh Sepadan di Area Blok B.12 EFRIZAL 1 0 1
11/19/2019
Terlalu Rapat /Ke Area Lahan Aren
5 Pemeriksaan Individual terace di Area
Blok D.10
6 Pemeriksaan Individual terace di Area
Blok D.11

Total
1 Membersihkan Kantor 1 0 1
(mengeluarkan lemari) IRMANZA 1 0 1
11/20/2019
EFRIZAL
2 Control Area

Total
1 Control Area Efrizal 1 0 1
11/21/2019
Dedi Surya Hadi 1 0 1

Total
Total
Grand Total 0 0 0
REMARKS

Mempelajarin Daily Cost

1.Mempelajarin Daily Cost


2.Mencocokan Nama No.KAV
3.Rancangan RKB
4.Control Blok B.12 Penanaman
Sawit Oleh Sepadan Terlalu
Dekat Dengan Area Aren
5.Control Individual Teras

6.Control Individual Teras

Membersihkan Ruangan Kantor

Turun Ke Lokasi Sampai Area


Hari Hujan Deras (14.00-16.00)

Dikarenakan Belum Ada Pelunasan


HK belum ada kegiatan dilapangan
Rapat penentuan anggota BHL
PAYMENT BHL PRIODE 26 OKTOBER s/d 25 NOVEMBER 2019

Sept.2019 Oktober 2019 TOTAL DAILY


NO NAME AMOUNT PARAF
26 27 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 HK WAGES
1 Agus 0 Rp 80,000.00 Rp 0.00
2 Edi 0 Rp 80,000.00 Rp 0.00
3 Adi 0 Rp 80,000.00 Rp 0.00
4 M.yunus 0 Rp 80,000.00 Rp 0.00
5 Harun 0 Rp 80,000.00 Rp 0.00
6 Mahdar 0 Rp 80,000.00 Rp 0.00
7 Sholeh 0 Rp 80,000.00 Rp 0.00
8 Rezi 0 Rp 80,000.00 Rp 0.00
Total 0 Rp -
Pembayaran Gaji BHL Perawatan Kebun Siak Priode Oktober 2019
Terbilang Lima juta dua ratus ribu rupiah

(…………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………….)

DI BUAT OLEH DI PERIKSA OLEH DI SETUJUI OLEH DI PERIKSA OLEH PT.AREN RIAU AGRO

(............................................) (............................................) (............................................) (............................................................) (............................................)


Division Clerk Field Assistant Ka.Cabang Siak Directur Perencanaan & Pengembangan Directur Operasional
DAILY COST STACKING KAVELING AREN + KELAPA LAHAN BANGKINANG
PERIODE : OKTOBER 2019
DIVSI : BANGKINANG

MASTER KAVLING KHL HASIL RASIO COST


DATE JENIS PERKERJAAN TAHUN SPK COST REMARKS
TANAM BLOK M W TOTAL KERJA UNITE Rp.KAV HK/KAV Rp/TRESS
11/11/2019 Spraying Circle AP CN.2019 A 23 1.2 30 4 4 25 PK 100,000 4,000 0.05 133
Rintis jalur AP CN.2019 A A 1.2.3.4.5 30 1 1 5000 M 100,000.00 20,000.00 0.2 667 Cost per meter
9/10/2019
Cari Anak Pancang AP CN.2019 A A 1.2.3.4.5 30 1 1 5 kav 100,000.00 20,000.00 0.2 1,428.57 cost per stick
Pancang Jalur Stacking AP CN.2019 A A 1.2.3.4.5 30 2 2 5.00 kav 200,000.00 40,000.00 0.4 40 Cost permeter
Rintis jalur AP CN.2019 A A 1.2.3.4.5 30 1 1 5000 M 100,000.00 20,000.00 0.2 667 Cost per meter
10/10/2019
Cari Anak Pancang AP CN.2019 A A 1.2.3.4.5 30 1 1 5 kav 100,000.00 20,000.00 0.2 1,428.57 cost per stick
Pancang Jalur Stacking AP CN.2019 A A 1.2.3.4.5 30 2 2 5.00 kav 200,000.00 40,000.00 0.4 40 Cost permeter
Rintis jalur AP CN.2019 A A 1.2.3.4.5 30 1 1 5000 M 100,000.00 20,000.00 0.2 667 Cost per meter
11/10/2019 Cari Anak Pancang AP CN.2019 A A 1.2.3.4.5 30 1 1 5 kav 100,000.00 20,000.00 0.2 1,428.57 cost per stick
Pancang Jalur Stacking AP CN.2019 A A 1.2.3.4.5 30 2 2 5.00 kav 200,000.00 40,000.00 0.4 40 Cost permeter
Rintis jalur AP CN.2019 A.B A.B 1.2.3.4.5 30 2 2 10,000 M 200,000.00 20,000.00 0.2 20
Cari Anak Pancang AP CN.2019 A.B A.B 1.2.3.4.5 30 2 2 10 KAV 200,000.00 20,000.00 0.2 2000
12/10/2019
Pancang Jalur Stacking AP CN.2019 A.B A.B 1.2.3.4.5 30 2 2 10 kav 200,000.00 20,000.00 0.2 20
Perbaikan jembatan OFFICE OFFICE 2 2 1 200,000.00 200,000.00 Jembatan masuk
Rintis jalur AP CN.2019 B B 1.2.3.4.5 30 2 2 10,000 M 200,000.00 20,000.00 0.2 20
Cari Anak Pancang AP CN.2019 B B 1.2.3.4.5 30 2 2 10 KAV 200,000.00 20,000.00 0.2 2000
14-10-2019
Pancang Jalur Stacking AP CN.2019 B B 1.2.3.4.5 30 2 2 10 kav 200,000.00 20,000.00 0.2 20
Kebersihan Rumah/Pondok OFFICE OFFICE 2 2 1 200,000.00 200,000.00
Rintis jalur AP CN.2019 B B 1.2.3.4.5 30 2 2 10,000 M 200,000.00 20,000.00 0.2 20
Cari Anak Pancang AP CN.2019 B B 1.2.3.4.5 30 2 2 10 KAV 200,000.00 20,000.00 0.2 2000
15/10/2019
Pancang Jalur Stacking AP CN.2019 B B 1.2.3.4.5 30 3 3 10 kav 300,000.00 30,000.00 0.3 30
Pengawas Alat AP CN.2019 B B 1 1 6 kav 100,000.00 16,666.67 0.2 16.67
Rintis jalur AP CN.2019 B B 1.2.3.4.5 30 2 2 10,000 M 200,000.00 20,000.00 0.2 20
Cari Anak Pancang AP CN.2019 B B 1.2.3.4.5 30 2 2 10 KAV 200,000.00 20,000.00 0.2 2000
16-10-2019
Pancang Jalur Stacking AP CN.2019 B B 1.2.3.4.5 30 3 3 10 kav 300,000.00 30,000.00 0.3 30
Pengawas Alat AP CN.2019 B B 1 1 6 kav 100,000.00 16,666.67 0.2 16.67
Rintis jalur AP CN.2019 C C 1.2.3.4.5 30 2 2 10,000 M 200,000.00 20,000.00 0.2 20
Cari Anak Pancang AP CN.2019 C C 1.2.3.4.5 30 2 2 10 KAV 200,000.00 20,000.00 0.2 2000
17-10-2019
Pancang Jalur Stacking AP CN.2019 C C 1.2.3.4.5 30 3 3 10 kav 300,000.00 30,000.00 0.3 30
Pengawas Alat AP CN.2019 C C 1 1 6 kav 100,000.00 16,666.67 0.2 16.67

DI BUAT OLEH DI PERIKSA OLEH DISETUJUI OLEH

( AWANG ) (SUPRAYITNO .W)


(Harapan Mulia Pulungan) Kepala Cabang Estate Siak Perencanaan &*Pengembangan
Field Assistant
( AWANG ) (SUPRAYITNO .W)
(Harapan Mulia Pulungan) Kepala Cabang Estate Siak Perencanaan &*Pengembangan
Field Assistant
LAPORAN DARI MANDOR
PT. AREN RIAU AGRO
ESTATE :

RENCANA KERJA HARIAN


DATE :
PROGRAM REALISASI
NAME SAT.
NO DESCRIPTION BLOK KAV LABOUR TOTAL KOMODITY
MANDOR ( HA,Kg, Output
M W HK AREN KELAPA UNITE, dll )

TOTAL ABSENT
CUTI TAHUNAN
MANGKIR
GREEN TOTAL

TARGET PERAWATAN (UPKEEP) FIELD ASSISTANT


TARGET TENAGA KERJA

( …………………………………….. )
KETERANGAN DLL

TARGET s/d TO DAY


REALISASI s/d TO DATE