DAFTAR NO.

URUT IJIN PEKERJAAN

LOKASI : BENDUNGAN BERINGIN SILA

No Nomor Ijin Pelaksanaan Nomor Ijin Pelaksanaan Refisi TANGGAL IJIN Perihal Refisi Keterangan
1 01 / IP / PBBS / TEK.NK-BRL-KSO / II / 2019 01 / IP / PBBS / TEK.NK-BRL-KSO / II / 2019 22/2/2019 PENGUKURAN , SPILLWAY, AKSES JALAN PENGUKURAN MAINDAM
2 02 / IP / PBBS / TEK.NK-BRL-KSO / III / 2019 14/03/2019 Galian Spillway
3 03 / IP / PBBS / TEK.NK-BRL-KSO / III / 2019 15/03/2019 Stripping Jalan
4 04 / IP / PBBS / TEK.NK-BRL-KSO / III / 2019 15/03/2019 Timbunan Jalan (All STA)
5 05 / IP / PBBS / TEK.NK-BRL-KSO / IV / 2019 4/4/2019 Timbunan Jalan (STA. 3+975 sd STA. 4+125)
6 06 / IP / PBBS / TEK.NK-BRL-KSO / IV / 2019 11/4/2019 Trial Timbunan Jalan
7 07 / IP / PBBS / TEK.NK-BRL-KSO / IV / 2019 11/4/2019 Ijin pekerjaan Timbunan Jalan
8 08 / IP / PBBS / TEK.NK-BRL-KSO / IV / 2019 Galian Spillway STA. 300 sd 440
9 15 / IP / PBBS / TEK.NK-BRL-KSO / IV / 2019 2/5/2019
10 16 / IP / PBBS / TEK.NK-BRL-KSO / IV / 2019 10/5/2019 Pertemuan Galian Spillway & Outlet
11 26 / IP / PBBS / TEK.NK-BRL-KSO / V / 2019 20/5/2019 Galian Spillway (STA. 200 sd STA. 340)
12 27 / IP / PBBS / TEK.NK-BRL-KSO / V / 2019 23/5/2019 Galian Spillway (Breksi Tuff)
13 29 / IP / PBBS / TEK.NK-BRL-KSO / VII / 2019 8/7/2019 Shotecrete
14 30 / IP / PBBS / TEK.NK-BRL-KSO / VII / 2019 8/7/2019 Wiremesh
15 31 / IP / PBBS / TEK.NK-BRL-KSO / VII / 2019 27/7/2019 Jalan Akses
16 33 / IP / PBBS / TEK.NK-BRL-KSO / VIII / 2019 8/12/2019 Trial Embankmen Jalan LPB
17
PEKERJAAN : PEMBANGUNAN BENDUNGAN TANJU DAN BENDUNGAN MILA
LOKASI : KABUPATEN DOMPU

IJIN PELAKSANAAN
NO. : .............. / IP / PBML / TEK.NK-HK-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan :: Check


GambarList
Kerja : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana 5. Laborat 9. Tukang ........orang

II Pekerjaan Perkerasan Jalan : ......................................... 2. Pelaksana 6. Logistik 10. Tukang ........orang

Lapisan Pondasi Bawah (LPB) : Sta./Patok : .....................s/d..................... : ..................... m3 3. Kepala Surveyor 7. Operator
Lapisan Pondasi Atas (LPA) : Sta./Patok : .....................s/d..................... : ..................... m3 4. Surveyor 8. Mandor
Lapis Resap Pengikat/Prime Coat : Sta./Patok : .....................s/d..................... : ..................... m2 Alat Bantu
Lapis antara (AC-BC) (Gradasi halus/kasar) (5 cm) : Sta./Patok : .....................s/d..................... : ..................... ton 1. Total Station 3. Waterpass 5. GPS
III Pekerjaan Drainase Jalan 2. Prisma 4. Bak Ukur 6. Meteran
Pekerjaan Pasangan Batu : Campuran Mortar 1.) 1 Pc : 3 Psr 2.) 1 Pc : 4 Psr (type A) Alat Berat
Estimasi Volume : ................... m3 1. ............................... Unit 3. ............................... Unit 5. ............................... Unit
Material 1.) Pc = ............zak 2.) Pasir = ............ m3 3.) Agregat= ............ m3 2. ............................... Unit 4. ............................... Unit 6. ............................... Unit

Pekerjaan Plesteran : Campuran Mortar 1.) 1 Pc : 2 Psr 2.) 1 Pc : 3 Psr


Estimasi Volume : ................... m3
Material 1.) Pc = ............zak 2.) Pasir = ............ m3
KOMENTAR
Pekerjaan Siar dengan Acian : Campuran Mortar 1.) 1 Pc : 2 Psr (Type A) 2.) 1 Pc : 3 Psr
Estimasi Volume : ................... m3
Material 1.) Pc = ............zak
IV Peralatan : 1. ............................... unit 3. .............................. unit 5. .............................. unit
2. ............................... unit 4. .............................. unit 6. .............................. unit

V Pekerjaan Beton : Type Beton 1.) Type-E/K-125 2.) Type-D/K-175 3.) Type-A/K-225
Estimasi Volume : ....................... m3
Material 1.) PC = ................ Zak 2.) Pasir = ..................... m3 3.) Agregat = ................... m3
Batching Plant : ..............................................
Penulangan Besi Ulir : ............................... Estimasi Volume : ..................... Kg

Menyetujui Diperiksa Diajukan


SATKER PEMB. BENDUNGAN NT I Konsultan Kontraktor
BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

NURDIN, A.Md.T MARYONO BONY ARDY BAGYO


NIP. 1960 05 25 2005 04 1 001 TEAM LEADER OFFICE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN TANJU DAN BENDUNGAN MILA
LOKASI : KABUPATEN DOMPU

IJIN PELAKSANAAN
NO. : .............. / IP / PBML / TEK.NK-HK-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan :: Check


GambarList
Kerja : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana 5. Laborat 9. Tukang ........orang

II Pekerjaan Perkerasan Jalan : ......................................... 2. Pelaksana 6. Logistik 10. Tukang ........orang

Lapisan Pondasi Bawah (LPB) : Sta./Patok : .....................s/d..................... : ..................... m3 3. Kepala Surveyor 7. Operator
Lapisan Pondasi Atas (LPA) : Sta./Patok : .....................s/d..................... : ..................... m3 4. Surveyor 8. Mandor
Lapis Resap Pengikat/Prime Coat : Sta./Patok : .....................s/d..................... : ..................... m2 Alat Bantu
Lapis antara (AC-BC) (Gradasi halus/kasar) (5 cm) : Sta./Patok : .....................s/d..................... : ..................... ton 1. Total Station 3. Waterpass 5. GPS
III Pekerjaan Drainase Jalan 2. Prisma 4. Bak Ukur 6. Meteran
Pekerjaan Pasangan Batu : Campuran Mortar 1.) 1 Pc : 3 Psr 2.) 1 Pc : 4 Psr (type A) Alat Berat
Estimasi Volume : ................... m3 1. ............................... Unit 3. ............................... Unit 5. ............................... Unit
Material 1.) Pc = ............zak 2.) Pasir = ............ m3 3.) Agregat= ............ m3 2. ............................... Unit 4. ............................... Unit 6. ............................... Unit

Pekerjaan Plesteran : Campuran Mortar 1.) 1 Pc : 2 Psr 2.) 1 Pc : 3 Psr


Estimasi Volume : ................... m3
Material 1.) Pc = ............zak 2.) Pasir = ............ m3
KOMENTAR
Pekerjaan Siar dengan Acian : Campuran Mortar 1.) 1 Pc : 2 Psr (Type A) 2.) 1 Pc : 3 Psr
Estimasi Volume : ................... m3
Material 1.) Pc = ............zak
IV Peralatan : 1. ............................... unit 3. .............................. unit 5. .............................. unit
2. ............................... unit 4. .............................. unit 6. .............................. unit

V Pekerjaan Beton : Type Beton 1.) Type-E/K-125 2.) Type-D/K-175 3.) Type-A/K-225
Estimasi Volume : ....................... m3
Material 1.) PC = ................ Zak 2.) Pasir = ..................... m3 3.) Agregat = ................... m3
Batching Plant : ..............................................
Penulangan Besi Ulir / Polos : ............................... Estimasi Volume : ..................... Kg

Menyetujui Diperiksa Diajukan


SATKER PEMB. BENDUNGAN NT I Konsultan Kontraktor
BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

NURDIN, A.Md.T LALU TARPI, ST ARDY BAGYO


NIP. 1960 05 25 2005 04 1 001 OFFICE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN
02 / IP / PBBS / TEK.NK-BRL-KSO / III / 2019
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan : Check List : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana 5. Laborat 9. Tukang .......... Orang

II Pekerjaan Survey : Jenis Survey : .............................................. 2. Pelaksana 6. Logistik 10. Tenaga ........... Orang

III Alat Berat : 1. ............................... unit 3. .............................. unit 5. .............................. unit 3. Kep. Surveyor 7. Operator

2. ............................... unit 4. .............................. unit 6. .............................. unit 4. Surveyor 8. Mandor

IV Pekerjaan Tanah Alat Bantu

Pembersihan dan pembongkaran dengan Alat : Sta./Patok : .....................s/d..................... 1. Total Station 3. Waterpass 5. Meteran

Pengupasan Lap.Top Soil (Stripping) dengan Alat : Sta./Patok : .....................s/d..................... 2. Prisma 4. Bak Ukur 6. GPS
Galian Spillway : Sta./Patok : .....................s/d..................... Jenis Tanah :.................................. Alat Boring Hole dan Grouting
Backfill : Sta./Patok : .....................s/d..................... :.................................. 1. Grouting Mixer ........... unit 4. Stik Bor................ unit 7. Perancah ........... unit
: Sta./Patok : .....................s/d..................... :.................................. 2. Grouting Pump ........... unit 5. Tripot .................. unit 8. ...............................

V Tes Pendukung Perencanaan 3. Mesin Pompa Air ........ unit 6. Takel .................. unit 9. ...............................
Lage Scale Direct Shear Test : ............... test ; Sta./Patok : .....................s/d.....................
URAIAN
Grouting Test : ............... titik ; Sta./Patok : .....................s/d.....................

VI Pekerjaan Pemboran dan Grouting (KONDUIT, SPILLWAY)

Pemboran Lubang : Blangket Grouting Curtain Subcurtain


Kedalaman : 0 - 15 m Kedalaman : 15 - 25 m Kedalaman : 10 - 15 m
Pemboran : Pilot hole (10-20m) check hole (10-20 m)

VII Pekerjaan Pemboran dan Grouting (MAINDAM)


KOMENTAR
Pemboran Lubang : Blangket Grouting Curtain Subcurtain
Kedalaman : 0-10 m Kedalaman : 10 m Kedalaman : 15 m
Pemboran : Pilot hole (10-20m) Pilot hole (20-30 m)
Check hole (10-20 m) Check hole (20-30 m)
Water Pressure Tes untuk curtain grouting (1 tekanan) : ........... Titik
Water Pressure Tes untuk lubang pilot hole dan check hole (7 tekanan) : ........... Titik
VIII Pekerjaan Pengeringan :.....................................................

Menyetujui Diperiksa Diajukan


PEMBANGUNAN BENDUNGAN Pengawas Pekerjaan Konsultan Kontraktor
PENGAWAS LAPANGAN BENDUNGAN INDRA BINA TUAH. KSO NINDYA - LESTARI. KSO

….......................... .......................................................... LALU TARPI, ST Ahmad Taris, ST


SITE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN
NO.
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan : Check List : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana 5. Laborat 9. Tukang .......... Orang

II Pekerjaan Survey : Jenis Survey : .............................................. 2. Pelaksana 6. Logistik 10. Tenaga ........... Orang

III Alat Berat : 1. ............................... unit 3. .............................. unit 5. .............................. unit 3. Kep. Surveyor 7. Operator

2. ............................... unit 4. .............................. unit 6. .............................. unit 4. Surveyor 8. Mandor

IV Pekerjaan Tanah Alat Bantu

Pembersihan dan pembongkaran dengan Alat : Sta./Patok : .....................s/d..................... 1. Total Station 3. Waterpass 5. Meteran

Pengupasan Lap.Top Soil (Stripping) dengan Alat : Sta./Patok : .....................s/d..................... 2. Prisma 4. Bak Ukur 6. GPS
Galian : Sta./Patok : .....................s/d..................... Jenis Tanah :.................................. Alat Berat
: Sta./Patok : .....................s/d..................... :.................................. 1. ......................... Unit 3. ....................... Unit 5. ..................... Unit
: Sta./Patok : .....................s/d..................... :.................................. 2. ......................... Unit 4. ....................... Unit 6. ..................... Unit

V Tes Pendukung Perencanaan


URAIAN
Lage Scale Direct Shear Test : ............... test ; Sta./Patok : .....................s/d.....................

Grouting Test : ............... titik ; Sta./Patok : .....................s/d.....................

VI Pekerjaan Pemboran dan Grouting (KONDUIT, SPILLWAY)


Pemboran Lubang : Blangket Grouting Curtain Subcurtain
Kedalaman : 15 m Kedalaman : 15 m Kedalaman : 15 m
Pemboran : Pilot hole (10-20m) check hole (10-20 m)

VII Pekerjaan Pemboran dan Grouting (MAINDAM)


KOMENTAR
Pemboran Lubang : Blangket Grouting Curtain Subcurtain

Kedalaman : 0-10 m Kedalaman : 10 m Kedalaman : 15 m


Pemboran : Pilot hole (10-20m) Pilot hole (20-30 m)
Check hole (10-20 m) Check hole (20-30 m)
Water Pressure Tes untuk curtain grouting (1 tekanan) : ........... Titik
Water Pressure Tes untuk lubang pilot hole dan check hole (7 tekanan) : ........... Titik
VIII Pekerjaan Pengeringan :.....................................................

Menyetujui Diperiksa Diajukan


SATKER PEMB. BENDUNGAN NT I Pengawas Pekerjaan Konsultan Kontraktor
BENDUNGAN III BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

SIGIT TRIHARSO, ST NURDIN, A.Md.T LALU TARPI, ST ARDY BAGYO


NIP. 19580628 199003 1 005 NIP. 1960 05 25 2005 04 1 001 OFFICE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan : Check List : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana 5. Laborat 9. Tukang .......... Orang

II Pekerjaan Survey : Jenis Survey : .............................................. 2. Pelaksana 6. Logistik 10. Tenaga ........... Orang

III Alat Berat : 1. ............................... unit 3. .............................. unit 5. .............................. unit 3. Kep. Surveyor 7. Operator

2. ............................... unit 4. .............................. unit 6. .............................. unit 4. Surveyor 8. Mandor

IV Pekerjaan Tanah Alat Bantu

Pembersihan dan pembongkaran dengan Alat : Sta./Patok : .....................s/d..................... 1. Total Station 3. Waterpass 5. Meteran

Pengupasan Lap.Top Soil (Stripping) dengan Alat : Sta./Patok : .....................s/d..................... 2. Prisma 4. Bak Ukur 6. GPS
Galian Spillway : Sta./Patok : .....................s/d..................... Jenis Tanah :.................................. Alat Boring Hole dan Grouting
: Sta./Patok : .....................s/d..................... :.................................. 1. Grouting Mixer ........... unit 4. Stik Bor................ unit 7. ...............................
: Sta./Patok : .....................s/d..................... :.................................. 2. Grouting Pump ........... unit 5. Tripot .................. unit 8. ...............................

V Tes Pendukung Perencanaan 3. Mesin Pompa Air ........ unit 6. Takel .................. unit 9. ...............................

Lage Scale Direct Shear Test : ............... test ; Sta./Patok : .....................s/d.....................


URAIAN
Grouting Test : ............... titik ; Sta./Patok : .....................s/d.....................

VI Pekerjaan Pemboran dan Grouting ...........................................................


Pemboran Lubang : Blangket Grouting Curtain Subcurtain
Kedalaman : 0 - 15 m Kedalaman : 15 - 25 m Kedalaman : 10 - 15 m
Pemboran : Pilot hole (10-20m) check hole (10-20 m)

VII Pekerjaan Pemboran dan Grouting ............................................................


KOMENTAR
Pemboran Lubang : Blangket Grouting Curtain Subcurtain
Kedalaman : 0-10 m Kedalaman : 10 m Kedalaman : 15 m
Pemboran : Pilot hole (10-20m) Pilot hole (20-30 m)
Check hole (10-20 m) Check hole (20-30 m)
Water Pressure Tes untuk curtain grouting (1 tekanan) : ........... Titik
Water Pressure Tes untuk lubang pilot hole dan check hole (7 tekanan) : ........... Titik
VIII Pekerjaan Pengeringan :.....................................................

Menyetujui Diperiksa Diajukan


SATKER PEMB. BENDUNGAN NT I Pengawas Pekerjaan Konsultan Kontraktor
BENDUNGAN III BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

NURDIN, A.Md.T DIDIK WURYANTO ARDY BAGYO


NIP. 1960 05 25 2005 04 1 001 OFFICE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan :: Gambar


Check List
Kerja : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana 5. Laborat 9. Tukang ........orang

II Persiapan : ......................................... 2. Pelaksana 6. Logistik 10. Tenaga ........orang


Pembersihan : Sta./Patok : .....................s/d..................... 3. Kepala Surveyor 7. Operator

Uitzet/Pengukuran dan Bouwplank : Sta./Patok : .....................s/d..................... : ..................... m' 4. Surveyor 8. Mandor


III Pekerjaan Tanah Alat Bantu

Galian Tanah : Sta./Patok : .....................s/d..................... : ..................... m3 1. Total Station 3. Waterpass 5. GPS

Urugan Tanah Kembali : Sta./Patok : .....................s/d..................... : ..................... m3 2. Prisma 4. Bak Ukur 6. Meteran
IV Pekerjaan Drainase Jalan / Gorong-Gorong Alat Berat

Pekerjaan Pasangan Batu : Campuran Mortar 1.) 1 Pc : 3 Psr 2.) 1 Pc : 4 Psr (type A) 1. ............................... Unit 3. ............................... Unit 5. ............................... Unit

Estimasi Volume : ................... m3 2. ............................... Unit 4. ............................... Unit 6. ............................... Unit

Material 1.) Pc = ............zak 2.) Pasir = ............ m3 3.) Agregat= ............ m3


URAIAN
Pekerjaan Plesteran : Campuran Mortar 1.) 1 Pc : 2 Psr 2.) 1 Pc : 3 Psr

Estimasi Volume : ................... m3


Material 1.) Pc = ............zak 2.) Pasir = ............ m3
Pekerjaan Siar dengan Acian : Campuran Mortar 1.) 1 Pc : 2 Psr (Type A) 2.) 1 Pc : 3 Psr
Estimasi Volume : ................... m3
Material 1.) Pc = ............zak
V Peralatan : 1. ............................... unit 3. .............................. unit 5. .............................. unit
KOMENTAR
2. ............................... unit 4. .............................. unit 6. .............................. unit

VI Pekerjaan Beton : Type Beton 1.) Type-E/K-125 2.) Type-D/K-175 3.) Type-A/K-225
Material 1.) PC = ................ Zak 2.) Pasir = ..................... m3 3.) Agregat = ................... m3
Estimasi Volume : ................... m3 Batching Plant : ....................................

VII Bekesting : Estimasi Volume : .............................. m2

VIII Penulangan Besi Ulir / Polos : ......................... mm ; Estimasi Volume : ...................................... Kg

Menyetujui Diperiksa Diajukan


SATKER PEMB. BENDUNGAN NT I Pengawas Pekerjaan Konsultan Kontraktor
BENDUNGAN III BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

SIGIT TRIHARSO, ST NURDIN, A.Md.T LALU TARPI, ST ARDY BAGYO


NIP. 19580628 199003 1 005 NIP. 1960 05 25 2005 04 1 001 OFFICE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN
NO.
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan : Check List : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana 5. Laborat 9. Tukang .......... Orang

II Pekerjaan Survey : Jenis Survey : .............................................. 2. Pelaksana 6. Logistik 10. Tenaga ........... Orang

III Alat Berat : 1. ............................... unit 3. .............................. unit 5. .............................. unit 3. Kep. Surveyor 7. Operator

2. ............................... unit 4. .............................. unit 6. .............................. unit 4. Surveyor 8. Mandor

IV Pekerjaan Tanah Alat Bantu

Pembersihan dan pembongkaran dengan Alat : Sta./Patok : .....................s/d..................... 1. Total Station 3. Waterpass 5. Meteran

Pengupasan Lap.Top Soil (Stripping) dengan Alat : Sta./Patok : .....................s/d..................... 2. Prisma 4. Bak Ukur 6. GPS
Galian : Sta./Patok : .....................s/d..................... Jenis Tanah :.................................. Alat Berat
Backfill : Sta./Patok : .....................s/d..................... :.................................. 1. ......................... Unit 3. ....................... Unit 5. ..................... Unit
: Sta./Patok : .....................s/d..................... :.................................. 2. ......................... Unit 4. ....................... Unit 6. ..................... Unit

V Tes Pendukung Perencanaan


URAIAN
Lage Scale Direct Shear Test : ............... test ; Sta./Patok : .....................s/d.....................

Grouting Test : ............... titik ; Sta./Patok : .....................s/d.....................

VI Pekerjaan Pemboran dan Grouting (KONDUIT, SPILLWAY)


Pemboran Lubang : Blangket Grouting Curtain Subcurtain
Kedalaman : 15 m Kedalaman : 15 m Kedalaman : 15 m
Pemboran : Pilot hole (10-20m) check hole (10-20 m)

VII Pekerjaan Pemboran dan Grouting (MAINDAM)


KOMENTAR
Pemboran Lubang : Blangket Grouting Curtain Subcurtain

Kedalaman : 0-10 m Kedalaman : 10 m Kedalaman : 15 m


Pemboran : Pilot hole (10-20m) Pilot hole (20-30 m)
Check hole (10-20 m) Check hole (20-30 m)
Water Pressure Tes untuk curtain grouting (1 tekanan) : ........... Titik
Water Pressure Tes untuk lubang pilot hole dan check hole (7 tekanan) : ........... Titik
VIII Pekerjaan Pengeringan :.....................................................

Menyetujui Diperiksa Diajukan


PEMBANGUNAN BENDUNGAN III Pengawas Pekerjaan Konsultan Kontraktor
PENGAWAS LAPANGAN (MILA) BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

SOSIAWAN SURANGGANA, ST NURDIN, A.Md.T LALU TARPI, ST I NYOMAN WISNA, ST


NIP. 19670614 200701 003 NIP. 19600525 200504 1 001 SITE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan :: Check


GambarList
Kerja : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana .... Orang 5. Laborat .... Orang 9. Tukang .... Orang

II Pekerjaan Pembesian Struktur Diamater Besi: 2. Pelaksana .... Orang 6. Logistik .... Orang 10. Tenaga .... Orang
Intake Konduit : Sta./Patok : .....................s/d..................... 1. f 12 2. D13 3. D16 4. D19 5. D22 6. D25 3. Kepala Surveyor .... Orang 7. Operator .... Orang

Konduit : Sta./Patok : .....................s/d..................... 1. f 12 2. D13 3. D16 4. D19 5. D22 6. D25 4. Surveyor .... Orang 8. Mandor .... Orang

Spillway : Sta./Patok : .....................s/d..................... 1. f 12 2. D13 3. D16 4. D19 5. D22 6. D25 Alat Ukur

Outlet Konduit : Sta./Patok : .....................s/d..................... 1. f 12 2. D13 3. D16 4. D19 5. D22 6. D25 1. Total Station .... Unit 3. Waterpass .... Unit 5. GPS .... Unit
III Pekerjaan Bekesting Bahan: 2. Prisma .... Unit 4. Bak Ukur .... Unit 6. Meteran .... Unit
Intake Konduit : Sta./Patok : : .....................s/d..................... 1. Penolfilm 2. Kaso 4/6 3. Kaso 5/7 4. Paku Alat Bantu
Konduit : Sta./Patok : : .....................s/d..................... 1. Penolfilm 2. Kaso 4/6 3. Kaso 5/7 4. Paku 1. Bar Bending .......... Unit 3. Compressor ......... Unit 5. Cutting whell .... Unit
Spillway : Sta./Patok : .....................s/d..................... 1. Penolfilm 2. Kaso 4/6 3. Kaso 5/7 4. Paku 2. Bar Cutter .......... Unit 4. Vibrator elektrik ...... Unit 6. Catut .... Unit
Outlet Konduit : Sta./Patok : .....................s/d..................... 1. Penolfilm 2. Kaso 4/6 3. Kaso 5/7 4. Paku
IV Pekerjaan Pengecoran Beton
Intake Konduit : Sta./Patok : : .....................s/d.....................
Konduit : Sta./Patok : : .....................s/d.....................
Spillway : Sta./Patok : .....................s/d.....................

Outlet Konduit : Sta./Patok : .....................s/d.....................


KOMENTAR
Pengecoran Sitemix
Pekerjaan Beton : Type Beton 1.) Type-E/K-125 2.) Type-D/K-175 3.) Type-A/K-225
Estimasi Volume : .............................. m3 : .............................. m3 : .............................. m3

Material 1.) PC = ................ Zak 2.) Pasir = ..................... m3 3.) Agregat = ................... m3
: ..............................................
Pengecoran Readymix
Batching Plant : ..............................................
: Type Beton 1.) Type-E/K-125 2.) Type-D/K-175 3.) Type-A/K-225
Estimasi Volume : .............................. m3 : .............................. m3 : .............................. m3

Menyetujui Diperiksa Diajukan


PEMBANGUNAN BENDUNGAN III Pengawas Pekerjaan Konsultan Kontraktor
PENGAWAS LAPANGAN (MILA) BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

SOSIAWAN SURANGGANA, ST NURDIN, A.Md.T LALU TARPI, ST I NYOMAN WISNA, ST


NIP. 19670614 200701 003 NIP. 19600525 200504 1 001 SITE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan :: Check


GambarList
Kerja : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana .... Orang 5. Laborat .... Orang 9. Tukang ..... Orang
II Pekerjaan Tanah Alat: 2. Pelaksana ..... Orang 6. Logistik .... Orang 10. Tenaga .... Orang

Galian Pondasi 1. Exavator 2. Cangkul 3. Arco / Gerobak Sorong 3. Kepala Surveyor .... Orang 7. Operator ..... Orang
Timbunan Kembali 1. Exavator 2. Stamper 3. Cangkul 4. Surveyor ..... Orang 8. Mandor ..... Orang
III Pekerjaan Pondasi Alat: Alat Ukur
Pasangan Batu Belah 1. Concrete Mixer 2. Cangkul 3. Sendok Semen 1. Total Station .... Unit 3. Waterpass .... Unit 5. GPS ..... Unit
IV Pekerjaan Besi dan Bekesting Bahan: 2. Prisma .... Unit 4. Bak Ukur .... Unit 6. Meteran ... Unit
Pembesian Footplat 1. D. 16 2. Kawat Bendrat

Pembesian Sloof / Ringbalk 1. f 8 2. f 10 3. f 12 4.D 16 5. Kawat Bendrat Alat Bantu

Pembesian Kolom / Balok / Plat 1. f 8 2. f 10 3. f 12 4.D 16 5. Kawat Bendrat 1. Bar Bending .......... unit 3. Compressor ......... unit 5. Cutting whell ...... unit
Bekesting Sloof / Ringbalk 1. Penolfilm 2. Kaso 4/6 3. Kaso 5/7 4. Paku 2. Bar Cutter .......... unit 4. Vibrator elektrik ...... unit 6. Catut ....... unit
Bekesting Kolom / Balok 1. Penolfilm 2. Kaso 4/6 3. Kaso 5/7 4. Paku
Bekesting Plat 1. Penolfilm 2. Kaso 4/6 3. Kaso 5/7
V Pekerjaan Pengecoran Beton Bahan:
Footplat 1. D. 16 2. Kawat Bendrat

Sloof / Ringbalk 1. f 8 2. f 10 3. f 12 4.D 16 5. Kawat Bendrat

Kolom / Balok / Plat 1. f 8 2. f 10 3. f 12 4.D 16 5. Kawat Bendrat

KOMENTAR
Pengecoran Sitemix
Pekerjaan Beton : Type Beton 1.) Type-E/K-125 2.) Type-D/K-175 3.) Type-A/K-225
Estimasi Volume : .............................. m3 : .............................. m3 : .............................. m3

Material 1.) PC = ................ Zak 2.) Pasir = ..................... m3 3.) Agregat = ................... m3
: ..............................................
Pengecoran Readymix
Batching Plant : ..............................................
: Type Beton 1.) Type-E/K-125 2.) Type-D/K-175 3.) Type-A/K-225
Estimasi Volume : .............................. m3 : .............................. m3 : .............................. m3

Menyetujui Diperiksa Diajukan


PEMBANGUNAN BENDUNGAN III Pengawas Pekerjaan Konsultan Kontraktor
PENGAWAS LAPANGAN (MILA) BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

SOSIAWAN SURANGGANA, ST NURDIN, A.Md.T LALU TARPI, ST I NYOMAN WISNA, ST


NIP. 19670614 200701 003 NIP. 19600525 200504 1 001 SITE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan :: Gambar


Check List
Kerja : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana .... Orang 5. Laborat .... Orang 9. Tukang ..... Orang

II Pekerjaan Pasang Bata, Plesteran dan Acian Alat: 2. Pelaksana ..... Orang 6. Logistik .... Orang 10. Tenaga .... Orang
Pasang Bata 1. Cangkul 2. Sendok Semen 3. Jidar 3. Kepala Surveyor .... Orang 7. Operator ..... Orang

Plesteran dan Acian 1. Jidar 2. Raskram 3. Benang 4. Surveyor ..... Orang 8. Mandor ..... Orang
III Pekerjaan Pasang Kusen Pintu dan Jendela Alat: Alat Ukur
Pasang Kusen Pintu Pasang Daun Pintu 1. Pahat 2. Palu 3. Waterpass 1. Total Station .... Unit 3. Waterpass .... Unit 5. GPS ..... Unit
Pasang Kusen Jendela Pasang Daun Jendela 1. Pahat 2. Palu 3. Waterpass 2. Prisma .... Unit 4. Bak Ukur .... Unit 6. Meteran ... Unit
IV Pekerjaan Atap dan Penutup Atap Bahan: Alat Bantu

Pasang Rangka Atap Kayu / Beton 1. Kayu 8/12 2. Kayu 5/12 3. Kayu 5/7 4. Kayu 6/12 5. Kayu 2/20 6. f 8 1. Mesin Potong Kayu .... unit 3. Mesin Potong Keramik ... unit 5. Catut ....... unit

Pasang Penutup Atap 7. f 12 8. Bendrat 9. Spandex 10. Kaso 2/20 11. Baja Ringan 12. Multiroof 2. Stamper ..... unit 4. Cutting whell ...... unit 6. ...........................
13. Listplank
V Pekerjaan Plafond Bahan:
Rangka Plafond 1. Kayu 5/7 2. Plywood 3. Paku 4. Rangka Hollo
Plafond Plywood 1. Plywood 2. Paku
VI Pekerjaan Pasang Keramik

Pasang Keramik Bahan: 1. Keramik 40x40 2. Keramik 30x30 3. Keramik 20x20 4. Pasir 5. Semen 6. Air
Alat: 1. Mesin Potong Keramik 2. Sendok Semen 3. Benang 4. Paku 5. Waterpass
VII Pekerjaan Pengecatan
Pengecatan Bahan: 1. Cat Dinding 2. Cat Kayu 3. Plamur 4. Meni Kayu
KOMENTAR
Alat: 1. Kuas 2. Kuas Roll 3. Amplas 4. Ember Cat
: ..............................................
VIII Pekerjaan Sanitair
Pasang Kloset Jongkok Bahan: 1. Kloset Jongkok 2. Kloset Duduk 3. Semen 4. Pasir 4. Air
Alat: 1. Sendok Semen 2. Mesin Gerinda
IX Pekerjaan Instalasi Air

Pasang Instalasi Pipa Bahan: 1. Pipa f 4" 2. Pipa f 3" 3. Pipa f 3/4" 4. Pipa f 1/2" 5. Kran Air f 1/2" 6. Lem Pipa 7. Solasi Pipa
Alat: 1. Gergaji Pipa 2. Multitester 3. Tang 4. Palu 5. Solasi Kabel
X Pekerjaan Instalasi Listrik
Pasang Instalasi Listrik Bahan: 1. Kabel 2. Stopkontak 3. Saklar

Menyetujui Diperiksa Diajukan


PEMBANGUNAN BENDUNGAN III Pengawas Pekerjaan Konsultan Kontraktor
PENGAWAS LAPANGAN (MILA) BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

SOSIAWAN SURANGGANA, ST NURDIN, A.Md.T LALU TARPI, ST I NYOMAN WISNA, ST


NIP. 19670614 200701 003 NIP. 19600525 200504 1 001 SITE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan : Check List : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana 5. Laborat 9. Tukang .......... Orang

II Pekerjaan Survey : Jenis Survey : .............................................. 2. Pelaksana 6. Logistik 10. Tenaga ........... Orang

III Alat Berat : 1. ............................... unit 3. .............................. unit 5. .............................. unit 3. Kep. Surveyor 7. Operator

2. ............................... unit 4. .............................. unit 6. .............................. unit 4. Surveyor 8. Mandor

IV Pekerjaan Tanah Alat Bantu

Pembersihan dan pembongkaran dengan Alat : Sta./Patok : .....................s/d..................... 1. Total Station 3. Waterpass 5. Meteran

Pengupasan Lap.Top Soil (Stripping) dengan Alat : Sta./Patok : .....................s/d..................... 2. Prisma 4. Bak Ukur 6. GPS
Galian Spillway : Sta./Patok : .....................s/d..................... Jenis Tanah :.................................. Alat Boring Hole dan Grouting
Backfill : Sta./Patok : .....................s/d..................... :.................................. 1. Grouting Mixer ........... unit 4. Stik Bor................ unit 7. Perancah ........... unit
: Sta./Patok : .....................s/d..................... :.................................. 2. Grouting Pump ........... unit 5. Tripot .................. unit 8. Readout Vibrating .....

V Tes Pendukung Perencanaan 3. Mesin Bor ........ unit 6. Takel .................. unit 9. Pompa Air

Lage Scale Direct Shear Test : ............... test ; Sta./Patok : .....................s/d.....................


URAIAN
Grouting Test : ............... titik ; Sta./Patok : .....................s/d.....................

VI Pekerjaan Pemboran dan Grouting (KONDUIT, SPILLWAY)

Pemboran Lubang : Blangket Grouting Curtain Subcurtain


Kedalaman : 0 - 15 m Kedalaman : 15 - 25 m Kedalaman : 10 - 15 m
Pemboran : Pilot hole (10-20m) check hole (10-20 m)

VII Pekerjaan Pemboran dan Grouting (MAINDAM)


KOMENTAR
Pemboran Lubang : Blangket Grouting Curtain Subcurtain
Kedalaman : 0-10 m Kedalaman : 10 m Kedalaman : 15 m
Pemboran : Pilot hole (10-20m) Pilot hole (20-30 m)
Check hole (10-20 m) Check hole (20-30 m)
Water Pressure Tes untuk curtain grouting (1 tekanan) : ........... Titik
Water Pressure Tes untuk lubang pilot hole dan check hole (7 tekanan) : ........... Titik
VIII Pekerjaan Instrument :.....................................................

Menyetujui Diperiksa Diajukan


PEMBANGUNAN BENDUNGAN III Pengawas Pekerjaan Konsultan Kontraktor
PENGAWAS LAPANGAN (MILA) BENDUNGAN III KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

SOSIAWAN SURANGGANA, ST NURDIN, A.Md.T LALU TARPI, ST I NYOMAN WISNA, ST


NIP. 19670614 200701 003 NIP. 19600525 200504 1 001 SITE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN/REQUEST
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

Estimasi Volume : :

I Dasar Pelaksanaan : Check List : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana ...... Orang 5. Laborat ..... Orang 9. Tukang .......... Orang

II Pekerjaan Survey : Jenis Survey : .............................................. 2. Pelaksana ....... Orang 6. Logistik ...... Orang 10. Tenaga ........... Orang

III Alat Berat : 1. ............................... unit 3. .............................. unit 5. .............................. unit 3. Kep. Surveyor ....... Orang 7. Operator ...... Orang

2. ............................... unit 4. .............................. unit 6. .............................. unit 4. Surveyor ......... Orang 8. Mandor ...... Orang

IV Pekerjaan Tanah Alat Bantu

Pembersihan dan pembongkaran dengan Alat : Sta./Patok : .....................s/d..................... 1. Total Station ...... Unit 3. Waterpass ..... Unit 5. Meteran ..... Unit
Pengupasan Lap.Top Soil (Stripping) dengan Alat : Sta./Patok : .....................s/d..................... 2. Prisma ....... Unit 4. Bak Ukur ..... Unit 6. GPS ...... Unit
Galian Spillway : Sta./Patok : .....................s/d..................... Jenis Tanah :.................................. Alat Boring Hole dan Grouting
Backfill : Sta./Patok : .....................s/d..................... :.................................. 1. Grouting Mixer ........... unit 4. Stik Bor................ unit 7. Perancah ........... unit
: Sta./Patok : .....................s/d..................... :.................................. 2. Grouting Pump ........... unit 5. Tripot .................. unit 8. Pompa Air .......... Unit

V Tes Pendukung Perencanaan 3. Mesin Bor ........ unit 6. Takel .................. unit 9. ...............................
Lage Scale Direct Shear Test : ............... test ; Sta./Patok : .....................s/d.....................
URAIAN
Grouting Test : ............... titik ; Sta./Patok : .....................s/d.....................

VI Pekerjaan Pemboran dan Grouting (KONDUIT, SPILLWAY)

Pemboran Lubang : Blangket Grouting Curtain Subcurtain


Kedalaman : 0 - 15 m Kedalaman : 15 - 25 m Kedalaman : 10 - 15 m
Pemboran : Pilot hole (10-20m) check hole (10-20 m)

VII Pekerjaan Pemboran dan Grouting (MAINDAM)


KOMENTAR
Pemboran Lubang : Blangket Grouting Curtain Subcurtain

Kedalaman : 0-10 m Kedalaman : 10 m Kedalaman : 15 m


Pemboran : Pilot hole (10-20m) Pilot hole (20-30 m)
Check hole (10-20 m) Check hole (20-30 m)
Water Pressure Tes untuk curtain grouting (1 tekanan) : ........... Titik
Water Pressure Tes untuk lubang pilot hole dan check hole (7 tekanan) : ........... Titik
VIII Pekerjaan Pengeringan :.....................................................

Menyetujui Diperiksa Diajukan


PEMBANGUNAN BENDUNGAN Pengawas Pekerjaan Konsultan Kontraktor
PENGAWAS LAPANGAN BENDUNGAN INDRA KARYA BINA TUAH, KSO
KSO NINDYA LESTARI. KSO

…......................................................... …............................................... …............................................... Achmad Taris Atsarudin


SITE ENGINEER
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

IJIN PELAKSANAAN/REQUEST
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan : Check List : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana ...... Orang 5. Laborat ..... Orang 9. Tukang .......... Orang

II Pekerjaan Survey : Jenis Survey : .............................................. 2. Pelaksana ....... Orang 6. Logistik ...... Orang 10. Tenaga ........... Orang

III Alat Berat : 1. ............................... unit 3. .............................. unit 5. .............................. unit 3. Kep. Surveyor ....... Orang 7. Operator ...... Orang

2. ............................... unit 4. .............................. unit 6. .............................. unit 4. Surveyor ......... Orang 8. Mandor ...... Orang

IV Pekerjaan Tanah Alat Bantu

Pembersihan dan pembongkaran dengan Alat : Sta./Patok : .....................s/d..................... 1. Total Station ...... Unit 3. Waterpass ..... Unit 5. Meteran ..... Unit

Pengupasan Lap.Top Soil (Stripping) dengan Alat : Sta./Patok : .....................s/d..................... 2. Prisma ....... Unit 4. Bak Ukur ..... Unit 6. GPS ...... Unit
Galian Spillway : Sta./Patok : .....................s/d..................... Jenis Tanah :.................................. Alat Boring Hole dan Grouting
Backfill : Sta./Patok : .....................s/d..................... :.................................. 1. Grouting Mixer ........... unit 4. Stik Bor................ unit 7. Perancah ........... unit
: Sta./Patok : .....................s/d..................... :.................................. 2. Grouting Pump ........... unit 5. Tripot .................. unit 8. Pompa Air .......... Unit

V Tes Pendukung Perencanaan 3. Mesin Bor ........ unit 6. Takel .................. unit 9. ...............................

Lage Scale Direct Shear Test : ............... test ; Sta./Patok : .....................s/d.....................


URAIAN
Grouting Test : ............... titik ; Sta./Patok : .....................s/d.....................

VI Pekerjaan Pemboran dan Grouting (KONDUIT, SPILLWAY)


Pemboran Lubang : Blangket Grouting Curtain Subcurtain
Kedalaman : 0 - 15 m Kedalaman : 15 - 25 m Kedalaman : 10 - 15 m
Pemboran : Pilot hole (10-20m) check hole (10-20 m)

VII Pekerjaan Pemboran dan Grouting (MAINDAM)


KOMENTAR
Pemboran Lubang : Blangket Grouting Curtain Subcurtain
Kedalaman : 0-10 m Kedalaman : 10 m Kedalaman : 15 m
Pemboran : Pilot hole (10-20m) Pilot hole (20-30 m)
Check hole (10-20 m) Check hole (20-30 m)
Water Pressure Tes untuk curtain grouting (1 tekanan) : ........... Titik
Water Pressure Tes untuk lubang pilot hole dan check hole (7 tekanan) : ........... Titik
VIII Pekerjaan Pengeringan :.....................................................

Menyetujui Diperiksa Diajukan


PEMBANGUNAN BENDUNGAN Pengawas Pekerjaan Konsultan Kontraktor
PENGAWAS LAPANGAN BENDUNGAN INDRA KARYA - PETUAH AGUNG ANUGRAH. KSO NINDYA - LESTARI. KSO

…...................................................... …..................................................... .............................................................. …......................................................


PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

REQUEST / I J I N P E L A K S A N A A N
NO. : .............. / IP / PBBS / TEK.NK-BRL-KSO / ............ / ...............
Tanggal Ijin :
Macam Pekerjaan : Bagian Pekerjaan :
URAIAN PEKERJAAN
Lokasi Pekerjaan : Waktu Pelaksanaan :

I Dasar Pelaksanaan : Check List : Ada Tidak Ada No.Gambar : ........................................ Personil
Gambar Kerja : Ada Tidak Ada 1. Kepala Pelaksana ...... Orang 5. Laborat ..... Orang 9. Tukang .......... Orang

II Pekerjaan Survey : Jenis Survey : .............................................. 2. Pelaksana ....... Orang 6. Logistik ...... Orang 10. Tenaga ........... Orang

III Alat Berat : 1. Wheel Loader : .............. unit 3. Vibro Roller ............. unit 5. Watertank Truck ............... unit 3. Kep. Surveyor ....... Orang 7. Operator ...... Orang

2. Exavator : .............. unit 4. Bulldozer .............. unit 6. Tronton/DT ............... unit 4. Surveyor ......... Orang 8. Mandor ...... Orang

IV Pekerjaan Tanah Alat Bantu

Pembersihan dan pembongkaran dengan Alat : Sta./Patok : .....................s/d..................... 1. Total Station ...... Unit 3. Waterpass ..... Unit 5. Meteran ..... Unit

Pengupasan Lap.Top Soil (Stripping) dengan Alat : Sta./Patok : .....................s/d..................... Jenis Material :.................................. 2. Prisma ....... Unit 4. Bak Ukur ..... Unit 6. GPS ...... Unit
Galian Spillway : Sta./Patok : .....................s/d..................... :.................................. Alat Laboratorium dan Alat Bantu
Backfill : Sta./Patok : .....................s/d..................... :.................................. 1. Sandcone ........... set 3. Cangkul ...... unit 5. Ember ..... unit
Embankment / Timbunan : Sta./Patok : .....................s/d..................... :.................................. 2. Permeability Test ....... set 4. Linggis ....... unit 6.Meteran .... unit

V Tes Pendukung Perencanaan


Lage Scale Direct Shear Test : ............... test ; Sta./Patok : .....................s/d..................... URAIAN

Grouting Test : ............... titik ; Sta./Patok : .....................s/d.....................

VI Pekerjaan Pemboran dan Grouting (KONDUIT, SPILLWAY)


Pemboran Lubang : Blangket Grouting Curtain Subcurtain
Kedalaman : 0 - 15 m Kedalaman : 15 - 25 m Kedalaman : 10 - 15 m
Pemboran : Pilot hole (10-20m) check hole (10-20 m)

VII Pekerjaan Pemboran dan Grouting (MAINDAM)


KOMENTAR
Pemboran Lubang : Blangket Grouting Curtain Subcurtain

Kedalaman : 0-10 m Kedalaman : 10 m Kedalaman : 15 m


Pemboran : Pilot hole (10-20m) Pilot hole (20-30 m)
Check hole (10-20 m) Check hole (20-30 m)
Water Pressure Tes untuk curtain grouting (1 tekanan) : ........... Titik
Water Pressure Tes untuk lubang pilot hole dan check hole (7 tekanan) : ........... Titik
VIII Pekerjaan Instrument :.....................................................

Menyetujui Diperiksa Diajukan


PEMBANGUNAN BENDUNGAN Pengawas Pekerjaan Konsultan Kontraktor
PENGAWAS LAPANGAN BENDUNGAN KSO YODYA - BRAHMA - RAYA KONSULT NINDYA - HUTAMA KSO

.......................................................... …............................................................ LALU TARPI, ST …..............................................................


PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PENGUKURAN

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Material :
A. Kayu ya tidak ya tidak ya tidak
1. Ukuran dan panjang patok-patok sudah disesuaikan
2. Pengecetan pada ujung kayu sebagai marking pengukuran
3. Jumlah sesuai dengan volume yang dibutuhkan

B. Cat Minyak ya tidak ya tidak ya tidak


1. Warna cat minyak sudah disesuaikan untuk marking ukuran
2. Jumlah sesuai dengan volume yang dibutuhkan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Administrasi Teknik
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PENGUKURAN

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Material :
A. Kayu ya tidak ya tidak ya tidak
1. Ukuran dan panjang patok-patok sudah disesuaikan
2. Pengecetan pada ujung kayu sebagai marking pengukuran
3. Jumlah sesuai dengan volume yang dibutuhkan

B. Cat Minyak ya tidak ya tidak ya tidak


1. Warna cat minyak sudah disesuaikan untuk marking ukuran
2. Jumlah sesuai dengan volume yang dibutuhkan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NIP. 19600525 200604 1 001 Administrasi Teknik


PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PENGUKURAN

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Material :
A. Kayu ya tidak ya tidak ya tidak
1. Ukuran dan panjang patok-patok sudah disesuaikan
2. Pengecetan pada ujung kayu sebagai marking pengukuran
3. Jumlah sesuai dengan volume yang dibutuhkan

B. Cat Minyak ya tidak ya tidak ya tidak


1. Warna cat minyak sudah disesuaikan untuk marking ukuran
2. Jumlah sesuai dengan volume yang dibutuhkan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, Amd. T
NIP. 19600525 200604 1 001 Administrasi Teknik
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PENGUKURAN

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Material :
A. Kayu ya tidak ya tidak ya tidak
1. Ukuran dan panjang patok-patok sudah disesuaikan
2. Pengecetan pada ujung kayu sebagai marking pengukuran
3. Jumlah sesuai dengan volume yang dibutuhkan

B. Cat Minyak ya tidak ya tidak ya tidak


1. Warna cat minyak sudah disesuaikan untuk marking ukuran
2. Jumlah sesuai dengan volume yang dibutuhkan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, Amd. T
NIP. 19600525 200604 1 001 Administrasi Teknik
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
MOBILISASI ALAT BERAT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan
B. Bulldozer ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, Amd. T
NIP. 19600525 200604 1 001 Administrasi Teknik
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PEMBERSIHAN, PEMBONGKARAN DAN STRIPPING DENGAN ALAT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan
B. Bulldozer ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, Amd. T
NIP. 19600525 200604 1 001 Administrasi Teknik
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
DIREKSI KEET

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................

2. ...........................................................................................................................................................

III. Catatan :
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, Amd. T
NIP. 19600525 200604 1 001 Administrasi Teknik
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PEMBERSIHAN DAN STRIPPING DENGAN ALAT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PEMBERSIHAN DAN STRIPPING DENGAN ALAT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PEMBERSIHAN DAN STRIPPING DENGAN ALAT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
GALIAN CONDUIT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
GALIAN GORONG - GORONG

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
TIMBUNAN LAPISAN PONDASI BAWAH (LPB)

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Bulldozer ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Vibroroller ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

C. Watertanktruck ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan


III. Nama penanggung jawab lapangan
1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


CHECKLIST INI HARUS DIISI SEBELUM KONTRAKTOR MENGAJUKAN PERMOHONAN IJIN KERJA / REQUEST

SATUAN KERJA : PEMBANGUNAN BENDUNGAN NUSA TENGGARA I BENDUNGAN III (RABABAKA KOMPLEKS) DI
KABUPATEN DOMPU
SATUAN KEGIATAN : BENDUNGAN - III
PEKERJAAN : PEMBANGUNAN BENDUNGAN TANJU DAN BENDUNGAN MILA (RABABAKA KOMPLEKS)
KONTRAK TANGGAL : HK.02.03-AS / SK-PB.III / 173 / 2015, TANGGAL 22 JUNI 2015
TAHUN ANGGARAN : 2015 - 2018
KONTRAKTOR : NINDYA - HUTAMA KSO

PEKERJAAN YANG DILAKSANAKAN :

PATOK / STA :

DIAJUKAN DIPERIKSA
NO URAIAN
KONTRAKTOR KONSULTAN PENGAWAS
I PERSIAPAN ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Gambar kerja / Shop Drawing (SD)
2 Request Pekerjaan
3 Seting dan Patok-Patok

II KESIAPAN LAHAN ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Lebar & Kedalaman Pondasi sdh cukup
2 Lahan bebas dari genangan

III MATERIAL
- SEMEN / PC ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Stock mencukupi
2 Type / Jenis Semen sudah disetujui
- PASIR ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Stock mencukupi
2 Gradasi Pasir sesuai Spesifikasi
3 Kadar Lumpur memenuhi syarat
- BATU PECAH ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Stock mencukupi
2 Mutu sesuai spesifikasi
3 Gradasi Batu Pecah sesuai spesifikasi
4 Bt Pecah / Kerikil telah bersih dari kotoran
- AIR ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Stock mencukupi
2 Bebas dari kotoran dan minyak dll
- ALAT BERAT & PERALATAN ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Truck Mixer / Beton Readymix
2 Concrete Pump
3 Slump Tes dan Kubus beton tersedia
4 Vibrator
5 Kompressor

IV CATATAN :

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :

SOSIAWAN SURANGAMA, ST NURDIN, A.Md.T


NIP.19670614 2007001 003 NIP.19600525 2005041 001
CHECKLIST INI HARUS DIISI SEBELUM KONTRAKTOR MENGAJUKAN PERMOHONAN IJIN KERJA / REQUEST

SATUAN KERJA : PEMBANGUNAN BENDUNGAN NUSA TENGGARA I BENDUNGAN III (RABABAKA KOMPLEKS) DI
KABUPATEN DOMPU
SATUAN KEGIATAN : BENDUNGAN - III
PEKERJAAN : PEMBANGUNAN BENDUNGAN TANJU DAN BENDUNGAN MILA (RABABAKA KOMPLEKS)
KONTRAK TANGGAL : HK.02.03-AS / SK-PB.III / 173 / 2015, TANGGAL 22 JUNI 2015
TAHUN ANGGARAN : 2015 - 2018
KONTRAKTOR : NINDYA - HUTAMA KSO

PEKERJAAN YANG DILAKSANAKAN :

PATOK / STA :

DIAJUKAN DIPERIKSA
NO URAIAN
KONTRAKTOR KONSULTAN PENGAWAS
I PERSIAPAN ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Gambar kerja / Shop Drawing (SD)
2 Request Pekerjaan
3 Seting dan Patok-Patok

II KESIAPAN LAHAN ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Lebar & Kedalaman Pondasi sdh cukup
2 Lahan bebas dari genangan

III PERALATAN PENGUKURAN ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Topcon
2 Waterpass
3 Prisma
4 Bak Ukur
5 Meteran
IV ALAT BERAT ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Ripper
2 Breaker
3 Exavator
4 Bulldozer
5 Tronton

IV CATATAN :

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :

SOSIAWAN SURANGAMA, ST NURDIN, A.Md.T


NIP.19670614 2007001 003 NIP.19600525 2005041 001
CHECKLIST INI HARUS DIISI SEBELUM KONTRAKTOR MENGAJUKAN PERMOHONAN IJIN KERJA / REQUEST

SATUAN KERJA : PEMBANGUNAN BENDUNGAN NUSA TENGGARA I BENDUNGAN III (RABABAKA KOMPLEKS) DI
KABUPATEN DOMPU
SATUAN KEGIATAN : BENDUNGAN - III
PEKERJAAN : PEMBANGUNAN BENDUNGAN TANJU DAN BENDUNGAN MILA (RABABAKA KOMPLEKS)
KONTRAK TANGGAL : HK.02.03-AS / SK-PB.III / 173 / 2015, TANGGAL 22 JUNI 2015
TAHUN ANGGARAN : 2015 - 2018
KONTRAKTOR : NINDYA - HUTAMA KSO

PEKERJAAN YANG DILAKSANAKAN :

PATOK / STA :

DIAJUKAN DIPERIKSA
NO URAIAN
KONTRAKTOR KONSULTAN PENGAWAS
I PERSIAPAN ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Gambar kerja / Shop Drawing (SD)
2 Request Pekerjaan
3 Seting dan Patok-Patok

II KESIAPAN LAHAN ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Lebar & Kedalaman Pondasi sdh cukup
2 Lahan bebas dari genangan

III MATERIAL ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Material Besi sudah sesuai spesifikasi
2 Diameter Besi sudah sesuai spesifikasi
3 Panjang Potongan Besi
4 Jumlah Potongan Besi

IV ALAT BANTU ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Bar Cutter
2 Bar Bending
3 Cutting Whell
4 Catut
5 Kapur Besi

IV CATATAN :

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :

SOSIAWAN SURANGANA, ST NURDIN, A.Md.T


NIP.19670614 2007001 003 NIP.19600525 2005041 001
CHECKLIST INI HARUS DIISI SEBELUM KONTRAKTOR MENGAJUKAN PERMOHONAN IJIN KERJA / REQUEST

SATUAN KERJA : PEMBANGUNAN BENDUNGAN NUSA TENGGARA I BENDUNGAN III (RABABAKA KOMPLEKS) DI
KABUPATEN DOMPU
SATUAN KEGIATAN : BENDUNGAN - III
PEKERJAAN : PEMBANGUNAN BENDUNGAN TANJU DAN BENDUNGAN MILA (RABABAKA KOMPLEKS)
KONTRAK TANGGAL : HK.02.03-AS / SK-PB.III / 173 / 2015, TANGGAL 22 JUNI 2015
TAHUN ANGGARAN : 2015 - 2018
KONTRAKTOR : NINDYA - HUTAMA KSO

PEKERJAAN YANG DILAKSANAKAN :

PATOK / STA :

DIAJUKAN DIPERIKSA
NO URAIAN
KONTRAKTOR KONSULTAN PENGAWAS

I PERSIAPAN : ADA TDK ADA ADA TDK ADA ADA TDK ADA
1 Gambar kerja / Shop Drawing (SD)
2 Request Pekerjaan
3 Seting dan Patok-Patok
II RENCANA PENGECORAN :

NO KOMPONEN PENGECORAN VOLUME SATUAN MUTU BETON KETERANGAN

III CHECK LIST SEBELUM PENGECORAN : * Ada Ö Tidak Ada x

1. Cuaca pada saat Cor Cerah Mendung Hujan


2. Referensi Gambar Disetujui Tidak Disetujui
3. Bekesting / Cetakan Kebersihan Panjang Cetakan
Perminyakan Vertikal Cetakan Samping
Pengaku Cetakan Samping Leveling Cetakan Samping
Lebar Cetakan Kelurusan Cetakan
Tinggi Cetakan Stopcor Cetakan

4. Pembesian Dia. Tulangan Utama Selimut Beton


Dia. Tulangan Sengkang Panjang Stek Besi
Jumlah Tulangan Atas Posisi Stek Besi
Jumlah Tulangan Bawah Jarak Tulangan Utama
Beton Decking Jarak Tulangan Sengkang
Pengikatan Besi

5. Persiapan Lain-Lain Concrete Mixer Truck


Concrete Vibarator
Compressor
Terpal / Plastik Cor

IV PERMASALAHAN : :
................................................................................................................................................................................................................................................

................................................................................................................................................................................................................................................

................................................................................................................................................................................................................................................

V CATATAN :

................................................................................................................................................................................................................................................

................................................................................................................................................................................................................................................

................................................................................................................................................................................................................................................

................................................................................................................................................................................................................................................

................................................................................................................................................................................................................................................

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :
SOSIAWAN SURANGANA, ST NURDIN, A.Md.T
NIP.19670614 2007001 003 NIP.19600525 2005041 001
CHECK LIST
PELAKSANAAN PEKERJAAN STRUKTUR

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-Patok

II. Item Pekerjaan Pondasi

1. Cuaca pada saat Pasangan Batu Belah Cerah Mendung Hujan

2. Referensi Gambar Disetujui Tidak disetujui

3. Bouwplank Disetujui Tidak disetujui

4. Pasangan Batu Belah Panjang Lebar Tinggi

Campuran Mortar Plesteran

Elevasi Siar

Kelurusan Pasangan Acian

5. Persiapan Lain Concrete Mixer

IV. Check List sebelum Pengecoran Sloof, Kolom, Balok, Ringbalk


1. Cuaca pada saat Cor Cerah Mendung Hujan

2. Referensi Gambar Disetujui Tidak disetujui


3. Bekesting / Cetakan Kebersihan Panjang Cetakan

Peminyakan Vertikal cetakan samping

Pengaku cetakan samping Leveling cetakan samping

Lebar cetakan Kelurusan cetakan

Tinggi cetakan
4. Pembesian Dia. Tulangan utama Selimut beton
Dia. Tulangan sengkang Panjang stek besi
Jumlah Tulangan atas Posisi stek besi
Jumlah Tulangan bawah Jarak tulangan utama

Beton decking Jarak tulangan sengkang

5. Persiapan Lain Concrete Mixer Penerangan

Concrete Vibrator Terpal


Compressor * Ada Ö Tidak ada x

V. Permasalahan :

..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................

VI. Catatan :

..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :

SOSIAWAN SURANGANA, ST NURDIN, A.Md.T


NIP.19670614 2007001 003 NIP.19600525 2005041 001
CHECK LIST
PELAKSANAAN PEKERJAAN ARSITEKTUR

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-Patok

II. Item Pekerjaan Atap Kayu, Kusen Pintu, Kusen Jendela, Daun Pintu, dan Daun Jendela

1. Cuaca pada saat Pasangan Batu Belah Cerah Mendung Hujan

2. Referensi Gambar Disetujui Tidak disetujui

3. Bouwplank Disetujui Tidak disetujui

4. Pasangan Kusen Panjang Lebar Tinggi

5. Daun Pintu dan Daun Jendela Bahan Kayu Sambungan Kayu

Elevasi Pengecatan

Kelurusan Pasangan

5. Pasangan Kuda-Kuda Bahan Kayu / Baja Ringan Sambungan Kayu / Baja Ringan

III. Item Pekerjaan Penutup Atap


1. Penutup Atap Disetujui Tidak disetujui

IV. Check List sebelum Pasangan Keramik


1. Cuaca pada saat Pemasangan Cerah Mendung Hujan

2. Referensi Gambar Disetujui Tidak disetujui


3. Pemadatan Lantai Kebersihan Panjang Cetakan

4. Ukuran Keramik Sesuai Tidak Sesuai

5. Campuran Pasangan Sesuai Tidak Sesuai

6. Pemasangan Lebar Panjang

7. Elevasi Pasangan Keramik Sesuai Tidak Sesuai

V. Check List sebelum Pengecatan


1. Warna Cat Disetujui Tidak disetujui

2. Persiapan Lain Penerangan Genset

Alat Potong Keramik Alat Potong Kayu / Baja Ringan


* Ada Ö Tidak ada x
VI. Permasalahan :

..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................

VI. Catatan :

..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :

SOSIAWAN SURANGANA, ST NURDIN, A.Md.T


NIP.19670614 2007001 003 NIP.19600525 2005041 001
CHECK LIST
PEKERJAAN BORING DAN GROUTING

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Grouting Mixer ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Grouting Pump ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

C. Pompa Air ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

III. Material
A. Semen ya tidak ya tidak ya tidak
1. Material yang digunakan sudah sesuai dengan spesifikasi

2. Jumlah material yang digunakan sesuai dengan kebutuhan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :

SOSIAWAN SURANGANA, ST NURDIN, A.Md.T


NIP.19670614 2007001 003 NIP.19600525 2005041 001
CHECK LIST
TEST PENDUKUNG PERENCANAAN

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Grouting Mixer ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Grouting Pump ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :

SOSIAWAN SURANGANA, ST NURDIN, A.Md.T


NIP.19670614 2007001 003 NIP.19600525 2005041 001
LINGKUP PEKERJAAN INSTRUMENT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)

II. Lokasi Pemasangan Instrument ya tidak ya tidak ya tidak


1. Dimensi, Penampang Area sudah disesuaikan dengan gambar
2. Kedalaman Galian Lokasi Area sudah disesuaikan dengan gambar

3. Titik Area Boring sudah disesuaikan dengan gambar

4. Pembersihan Area Boring sudah dikerjakan

III. Peralatan yang digunakan


A. Readout Vibrating ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Mesin Bor ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

IV. Bahan Material

A. Paralon 3" ya tidak ya tidak ya tidak


1. Bahan yang digunakan sudah sesuai dengan persyaratan
2. Jumlah bahan sudah sesuai yang dibutuhkan

B. Bentonite ya tidak ya tidak ya tidak


1. Bahan yang digunakan sudah memenuhi persyaratan
2. Jumlah bahan yang dibutuhkan sudah disesuaikan waktu pelaksanaan

C. Pasir ya tidak ya tidak ya tidak


1. Pasir yang digunakan sudah memenuhi persyaratan
2. Banyaknya pasir sudah disesuaikan dengan kebutuhan

D. Air ya tidak ya tidak ya tidak


1. Air yang digunakan sudah memenuhi persyaratan
2. Banyaknya air sudah disesuaikan dengan kebutuhan

III. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :

...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :

SOSIAWAN SURANGAMA, ST NURDIN, A.Md.T


NIP.19670614 2007001 003 NIP.19600525 2005041 001
CHECK LIST
PEKERJAAN BACKFILL

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

B. Dumptruck ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :

...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :
CHECK LIST
TIMBUNAN MAIN DAM

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok
3. Boring Grouting Main Dam

II. Peralatan
A. Wheel Loader ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

B. Bulldozer ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

C. Vibroroller ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

D. Exavator ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

E. Dump Truck ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

F. Handstamper ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

G. Watertank Truck ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

III. Material ya tidak ya tidak ya tidak


1. Material Zone 1

2. Meterial Zone 2a (Filter Halus)

3. Meterial Zone 2b (Filter Kasar)

4. Meterial Zone 3 (Random)

5. Meterial Zone 4 (Rip Rap)


III. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :

...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................

DISETUJUI : DIPERIKSA : DIAJUKAN


Pengawas Lapangan Pengawas Pekerjaan Konsultan Kontraktor
KSO YODYA-BRAHMA-RAYA KONSULT NINDYA-HUTAMA KSO
Tanggal : Tanggal : Tanggal :

SOSIAWAN SURANGAMA, ST NURDIN, A.Md.T


NIP.19670614 2007001 003 NIP.19600525 2005041 001
CHECK LIST
GALIAN LERENG SPILLWAY

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Breaker ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


CHECK LIST
UITZET / PENGUKURAN DAN BOUWPLANK

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-Patok

II. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

III. Pelaksanaan Pekerjaan


A. Pemasangan Bouwplank ya tidak ya tidak ya tidak
1. Ukuran dan panjang kayu sudah disesuaikan
2. Jumlah sesuai dengan volume yang dibutuhkan

B. Dimensi Galian Tanah ya tidak ya tidak ya tidak


1. Panjang, Lebar, dan Tinggi sudah disesuaikan

2. Volume pekerjaan sesuai yang dibutuhkan


C. Dimensi Gorong-Gorong ya tidak ya tidak ya tidak
1. Panjang, Lebar, dan Tinggi sudah disesuaikan
2. Volume pekerjaan sesuai yang dibutuhkan
D. Dimensi Pasangan Batu ya tidak ya tidak ya tidak
1. Panjang, Lebar, dan Tinggi sudah disesuaikan
2. Volume pekerjaan sesuai yang dibutuhkan

IV. Catatan :
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
GALIAN TANAH GORONG-GORONG

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama Penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Dimensi Galian ya tidak ya tidak ya tidak
1. Panjang, lebar dan kedalaman galian tanah sudah disesuaikan
2. Jumlah sesuai dengan volume yang dibutuhkan

B. Exavator ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan


C. Dump Truck ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Catatan :
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
PASANGAN BATU BELAH

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan

A. Batu ya tidak ya tidak ya tidak


1. Ukuran sesuai dengan spesifikasi
2. Jumlah sesuai dengan volume yang dibutuhkan

B. Pasir ya tidak ya tidak ya tidak


1. Ukuran gradasi pasir sesuai dengan spesifikasi

2. Jumlah sesuai dengan volume yang dibutuhkan


C. Semen ya tidak ya tidak ya tidak
1. Jenis semen sesuai dengan spesifikasi
2. Jumlah sesuai dengan volume yang dikerjakan
D. Air ya tidak ya tidak ya tidak
1. Kebersihan Air sesuai dengan spesifikasi
2. Banyaknya sesuai dengan yang dikerjakan

III. Catatan :
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
PLESTERAN, SIAR DENGAN ACIAN

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Pasir ya tidak ya tidak ya tidak
1. Ukuran gradasi pasir sesuai dengan spesifikasi
2. Jumlah sesuai dengan volume yang dibutuhkan

B. Semen ya tidak ya tidak ya tidak


1. Jenis semen sesuai dengan spesifikasi

2. Jumlah sesuai dengan volume yang dikerjakan


C. Air ya tidak ya tidak ya tidak
1. Jenis semen sesuai dengan spesifikasi
2. Banyaknya sesuai dengan yang dikerjakan

III. Catatan :
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
BEKESTING, PEMBESIAN PLAT GORONG-GORONG

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan

A. Pemasangan Bekesting ya tidak ya tidak ya tidak


1. Ukuran dan panjang bekesting sudah disesuaikan
2. Perkuatan bekesting sudah disesuaikan

B. Pemasangan Besi ya tidak ya tidak ya tidak


1. Diameter besi sudah disesuaikan

2. Panjang penyaluran besi sudah disesuaikan

3. Jarak pemasangan besi sudah disesuaikan

4. Ikatan pembesian sudah disesuaikan

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
PENGECORAN PLAT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Agregat ya tidak ya tidak ya tidak
1. Ukuran dan bentuk batu sesuai dengan spesifikasi
2. Kebersihan material batu sesuai dengan spesifikasi

3. Jumlah sesuai dengan volume yang dikerjakan

B. Pasir ya tidak ya tidak ya tidak


1. Ukuran dan bentuk batu sesuai dengan spesifikasi

2. Kebersihan material batu sesuai dengan spesifikasi

3. Jumlah sesuai dengan volume yang dikerjakan

C. Semen ya tidak ya tidak ya tidak


1. Panjang penyaluran besi sudah disesuaikan

2. Jarak pemasangan besi sudah disesuaikan

3. Jarak pemasangan besi sudah disesuaikan

D. Air ya tidak ya tidak ya tidak


1. Kebersihan Air sesuai dengan spesifikasi

2. Banyaknya sesuai dengan yang dikerjakan

III. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
URUGAN TANAH KEMBALI

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Vibroroller ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

III. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
UITZET / PENGUKURAN DAN BOUWPLANK

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-Patok

II. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

III. Pelaksanaan Pekerjaan


A. Pemasangan Bouwplank ya tidak ya tidak ya tidak
1. Ukuran dan panjang kayu sudah disesuaikan
2. Jumlah sesuai dengan volume yang dibutuhkan

B. Dimensi Galian Tanah ya tidak ya tidak ya tidak


1. Panjang, Lebar, dan Tinggi sudah disesuaikan

2. Volume pekerjaan sesuai yang dibutuhkan


C. Dimensi Gorong-Gorong ya tidak ya tidak ya tidak
1. Panjang, Lebar, dan Tinggi sudah disesuaikan
2. Volume pekerjaan sesuai yang dibutuhkan
D. Dimensi Pasangan Batu ya tidak ya tidak ya tidak
1. Panjang, Lebar, dan Tinggi sudah disesuaikan
2. Volume pekerjaan sesuai yang dibutuhkan

IV. Catatan :
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
GALIAN TANAH GORONG-GORONG

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama Penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Dimensi Galian ya tidak ya tidak ya tidak
1. Panjang, lebar dan kedalaman galian tanah sudah disesuaikan
2. Jumlah sesuai dengan volume yang dibutuhkan

B. Exavator ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan


C. Dump Truck ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Catatan :
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Pengawas Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :
CHECK LIST
PASANGAN BATU BELAH

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan

A. Batu ya tidak ya tidak ya tidak


1. Ukuran sesuai dengan spesifikasi
2. Jumlah sesuai dengan volume yang dibutuhkan

B. Pasir ya tidak ya tidak ya tidak


1. Ukuran gradasi pasir sesuai dengan spesifikasi

2. Jumlah sesuai dengan volume yang dibutuhkan


C. Semen ya tidak ya tidak ya tidak
1. Jenis semen sesuai dengan spesifikasi
2. Jumlah sesuai dengan volume yang dikerjakan
D. Air ya tidak ya tidak ya tidak
1. Kebersihan Air sesuai dengan spesifikasi
2. Banyaknya sesuai dengan yang dikerjakan

III. Catatan :
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
PLESTERAN, SIAR DENGAN ACIAN

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Pasir ya tidak ya tidak ya tidak
1. Ukuran gradasi pasir sesuai dengan spesifikasi
2. Jumlah sesuai dengan volume yang dibutuhkan

B. Semen ya tidak ya tidak ya tidak


1. Jenis semen sesuai dengan spesifikasi

2. Jumlah sesuai dengan volume yang dikerjakan


C. Air ya tidak ya tidak ya tidak
1. Jenis semen sesuai dengan spesifikasi
2. Banyaknya sesuai dengan yang dikerjakan

III. Catatan :
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
BEKESTING, PEMBESIAN PLAT GORONG-GORONG

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan

A. Pemasangan Bekesting ya tidak ya tidak ya tidak


1. Ukuran dan panjang bekesting sudah disesuaikan
2. Perkuatan bekesting sudah disesuaikan

B. Pemasangan Besi ya tidak ya tidak ya tidak


1. Diameter besi sudah disesuaikan

2. Panjang penyaluran besi sudah disesuaikan

3. Jarak pemasangan besi sudah disesuaikan

4. Ikatan pembesian sudah disesuaikan

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
PENGECORAN PLAT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Agregat ya tidak ya tidak ya tidak
1. Ukuran dan bentuk batu sesuai dengan spesifikasi
2. Kebersihan material batu sesuai dengan spesifikasi

3. Jumlah sesuai dengan volume yang dikerjakan

B. Pasir ya tidak ya tidak ya tidak


1. Ukuran dan bentuk batu sesuai dengan spesifikasi

2. Kebersihan material batu sesuai dengan spesifikasi

3. Jumlah sesuai dengan volume yang dikerjakan

C. Semen ya tidak ya tidak ya tidak


1. Panjang penyaluran besi sudah disesuaikan

2. Jarak pemasangan besi sudah disesuaikan

3. Jarak pemasangan besi sudah disesuaikan

D. Air ya tidak ya tidak ya tidak


1. Kebersihan Air sesuai dengan spesifikasi

2. Banyaknya sesuai dengan yang dikerjakan

III. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
URUGAN TANAH KEMBALI

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Vibroroller ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

III. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

NURDIN, A.Md. T
NIP. 19600525 200604 1 001
CHECK LIST
MAINDAM (CUT OFF ABUTMENT KANAN)

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Breaker ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


CHECK LIST
PEKERJAAN PEMBORAN DAN GROUTING (CUT OFF MAINDAM ABUTMENT KANAN)

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)

II. Lokasi Boring Hole dan Grouting ya tidak ya tidak ya tidak


1. Dimensi, Penampang Area sudah disesuaikan dengan gambar
2. Kedalaman Galian Lokasi Area sudah disesuaikan dengan gambar

3. Titik Area Boring dan Grouting sudah disesuaikan dengan gambar

4. Pembersihan Area Boring dan Grouting sudah dikerjakan

III. Peralatan yang digunakan


A. Grout Mixer ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Grouting Pump ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

IV. Bahan Material

A. Semen ya tidak ya tidak ya tidak


1. Komposisi Semen sudah disesuaikan spesifikasi
2. Jenis Semen yang digunakan sudah disesuaikan
B. Air ya tidak ya tidak ya tidak
1. Air yang digunakan untuk campuran semen sudah disesuaikan
2. Banyaknya air sudah disesuaikan dengan kebutuhan

III. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :

...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


CHECK LIST
PEKERJAAN PEMBORAN DAN GROUTING (KONDUIT)

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)

II. Lokasi Boring Hole dan Grouting ya tidak ya tidak ya tidak


1. Dimensi, Penampang Area sudah disesuaikan dengan gambar
2. Kedalaman Galian Lokasi Area sudah disesuaikan dengan gambar

3. Titik Area Boring dan Grouting sudah disesuaikan dengan gambar

4. Pembersihan Area Boring dan Grouting sudah dikerjakan

III. Peralatan yang digunakan


A. Grout Mixer ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Grouting Pump ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

IV. Bahan Material

A. Semen ya tidak ya tidak ya tidak


1. Komposisi Semen sudah disesuaikan spesifikasi
2. Jenis Semen yang digunakan sudah disesuaikan
B. Air ya tidak ya tidak ya tidak
1. Air yang digunakan untuk campuran semen sudah disesuaikan
2. Banyaknya air sudah disesuaikan dengan kebutuhan

III. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :

...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik


CHECK LIST
PENGECORAN BETON LANTAI KERJA

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Agregat ya tidak ya tidak ya tidak
1. Ukuran dan bentuk batu sesuai dengan spesifikasi
2. Kebersihan material batu sesuai dengan spesifikasi

3. Jumlah sesuai dengan volume yang dikerjakan

B. Pasir ya tidak ya tidak ya tidak


1. Ukuran dan bentuk batu sesuai dengan spesifikasi

2. Kebersihan material batu sesuai dengan spesifikasi

3. Jumlah sesuai dengan volume yang dikerjakan

C. Semen ya tidak ya tidak ya tidak


1. Type semen sudah disesuaikan dengan spesifikasi

2. Komposisi semen sudah disesuaikan dengan spesifikasi

3. Jumlah sesuai dengan volume yang dibutuhkan

D. Air ya tidak ya tidak ya tidak


1. Kebersihan Air sesuai dengan spesifikasi

2. Banyaknya sesuai dengan yang dikerjakan

E. Kebersihan ya tidak ya tidak ya tidak

1. Pembersihan lokasi Pekerjaan Konduit

III. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan
CHECK LIST
PENGECORAN BETON LANTAI KERJA

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Dimensi Area Konduit ya tidak ya tidak ya tidak
1. Dimensi galian Konduit sudah sesuai dengan gambar
2. Batas area pengecoran Konduit sudah dipasang

3. Area yang akan dilantai kerja lokasi sudah dibersihkan

B. Pasir ya tidak ya tidak ya tidak


1. Ukuran dan bentuk batu sesuai dengan spesifikasi

2. Kebersihan material batu sesuai dengan spesifikasi

3. Jumlah sesuai dengan volume yang dikerjakan

C. Semen ya tidak ya tidak ya tidak


1. Type semen sudah disesuaikan dengan spesifikasi

2. Komposisi semen sudah disesuaikan dengan spesifikasi

3. Jumlah sesuai dengan volume yang dibutuhkan

D. Air ya tidak ya tidak ya tidak


1. Kebersihan Air sesuai dengan spesifikasi

2. Banyaknya sesuai dengan yang dikerjakan

III. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan
CHECK LIST
PEKERJAAN FABRIKASI PEMBESIAN STRUKTUR

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)

II. Peralatan yang digunakan ya tidak ya tidak ya tidak


A. Bar Cutter
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan
B. Bar Bending ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Bahan Material


A. Besi Beton ya tidak ya tidak ya tidak
1. Diameter tulangan sudah sesuai dengan gambar dan spesifikasi
2. Kondisi material masih layak digunakan

B. Kawat Bendrat ya tidak ya tidak ya tidak


1. Kondisi material masih layak digunakan

2. Kebutuhan material sudah disesuaikan kondisi dilokasi pekerjaan

IV. Pembesian
A. Fabrikasi Besi ya tidak ya tidak ya tidak
1. Dimensi pembesian sudah disesuaikan dengan gambar dan spesifikasi
2. Pemotongan besi sudah sesuai dengan gambar dan spesifikasi

III. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :

...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan
CHECK LIST
PEMASANGAN PEMBESIAN STRUKTUR

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)

II. Peralatan yang digunakan ya tidak ya tidak ya tidak


A. Bar Cutter
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan
B. Bar Bending ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

III. Bahan Material


A. Besi Beton ya tidak ya tidak ya tidak
1. Diameter tulangan sudah sesuai dengan gambar dan spesifikasi
2. Kondisi material masih layak digunakan

B. Kawat Bendrat ya tidak ya tidak ya tidak


1. Kondisi material masih layak digunakan

2. Kebutuhan material sudah disesuaikan kondisi dilokasi pekerjaan

IV. Pembesian
A. Pemasangan Besi ya tidak ya tidak ya tidak
1. Jumlah besi yang dipasang sudah disesuaikan dengan gambar
2. Jarak pemasangan besi sudah disesuaikan dengan gambar
3. Pengikatan besi sudah disesuaikan gambar dan spesifikasi
4. Panjang penyaluran besi sudah disesuaikan spesifikasi dan gambar

III. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :

...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan
CHECK LIST
BEKESTING KONSTRUKSI KONDUIT

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Penolfilm ya tidak ya tidak ya tidak
1. Ukuran dan bentuk penolfilm sesuai dengan spesifikasi
2. Pamasangan sudah disesuai dengan gambar

3. Jumlah sesuai dengan volume yang dikerjakan

B. Rangka Bekesting Kayu Kaso ya tidak ya tidak ya tidak


1. Ukuran dan bentuk batu sesuai dengan spesifikasi

2. Pemasangan rangka bekesting sudah sesuai gambar

3. Jumlah sesuai dengan volume yang dikerjakan

4. Perkuatan Rangka Bekesting sudah diperkuat

C. Perkuatan Rangka Bekesting Sisi Luar ya tidak ya tidak ya tidak


1. Ukuran dan panjang pipa sesuai dengan kebutuhan lapangan

2. Pemasangan pipa besi bekesting sudah diperkuat

3. Jumlah sesuai dengan volume yang dikerjakan

D. Pembersihan ya tidak ya tidak ya tidak


1. Pembersihan area bidang pengecoran

III. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Pekerjaan
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PENGECORAN BETON

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Nama penanggung jawab lapangan


1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

II. Pelaksanaan Pekerjaan


A. Agregat ya tidak ya tidak ya tidak
1. Ukuran dan bentuk batu sesuai dengan spesifikasi
2. Kebersihan material batu sesuai dengan spesifikasi

3. Jumlah sesuai dengan volume yang dikerjakan

B. Pasir ya tidak ya tidak ya tidak


1. Ukuran dan bentuk batu sesuai dengan spesifikasi

2. Kebersihan material batu sesuai dengan spesifikasi

3. Jumlah sesuai dengan volume yang dikerjakan

C. Semen ya tidak ya tidak ya tidak


1. Type semen sudah disesuaikan dengan spesifikasi

2. Jumlah sesuai dengan volume yang dibutuhkan

D. Air ya tidak ya tidak ya tidak


1. Kebersihan Air sesuai dengan spesifikasi

2. Banyaknya sesuai dengan yang dikerjakan

III. Catatan :
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Pekerjaan
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PEKERJAAN PEMBORAN SUMUR OP

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)

II. Lokasi Boring Sumur ya tidak ya tidak ya tidak


1. Dimensi, Penampang Area sudah disesuaikan dengan gambar
2. Kedalaman Galian Lokasi Area sudah disesuaikan dengan gambar

3. Titik Area Boring dan Grouting sudah disesuaikan dengan gambar

4. Pembersihan Area Boring dan Grouting sudah dikerjakan

III. Peralatan yang digunakan


A. Mesin Bor ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Mata Bor ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

IV. Bahan Material


A. Air ya tidak ya tidak ya tidak
1. Air yang digunakan untuk campuran semen sudah disesuaikan
2. Banyaknya air sudah disesuaikan dengan kebutuhan

III. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :

...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Administrasi Teknik
PEKERJAAN : PEMBANGUNAN BENDUNGAN BERINGIN SILA (PAKET - II)
LOKASI : KABUPATEN SUMBAWA

CHECK LIST
PEMBERSIHAN DAN PENGUPASAN TOP SOIL (STRIPPING)

Pekerjaan : ............................................................... Jenis Pekerjaan : ...............................................................

Lokasi Pekerjaan : ............................................................... Tanggal : ...............................................................

Diajukan Diperiksa
No Uraian
Kontraktor Konsultan Pengawas

I. Persiapan : ada tidak ada ada tidak ada ada tidak ada
1. Gambar Kerja/Working Drawing (WD)
2. Setting dan Patok-patok

II. Peralatan
A. Exavator ya tidak ya tidak ya tidak
1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi
2. Kondisi alat masih layak untuk digunakan

B. Bulldozer ya tidak ya tidak ya tidak


1. Kapasitas peralatan sudah disesuaikan dengan spesifikasi

2. Kondisi alat masih layak untuk digunakan

III. Nama penanggung jawab lapangan

1. ...........................................................................................................................................................
2. ...........................................................................................................................................................

IV. Catatan :

...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................

Disetujui oleh : Diajukan Oleh


Direksi Pekerjaan Konsultan Kontraktor
Tanggal : Tanggal : Tanggal :

Pengawas Lapangan Administrasi Teknik