0 1 2 3 4
Jumlah kunjungan baru 585 633 686 742
Planing cost 0 1 2 3 4
pembelian kursi 16 buah 50000000
Variabel cost 55.374 32.393.790 35.072.756 37.973.273 41.113.663
Fix cost 35.503 20.769.255 22.486.872 24.346.537 26.359.995
Total 90.877 53.163.045 57.559.629 62.319.810 67.473.658
Planing benefit
Pendapatan A - 105.300.000 114.008.310 123.436.797 133.645.020
Total - 105.300.000 114.008.310 123.436.797 133.645.020
fix cost
bangunan 9263
sarpras 1341
alkes 6668
perawatan 1036
diklat 2375
pengembangan 324
LTA 1477
marketing 259
biaya pegawai 12760
total 35503
variable cost
jasa medis 25000
jasa perawat 20000
admin 2000
LTA 1354
linen 3041
bmhp 3979
total 55374