LELANG
2 APRIL Kajian Penanganan Banjir Kali Manseng dan Kali Blen
BINA
MARGA
bo 100,000,000.00
PT. Martha Tria Selaras S1 Teknik Sipil/ Ahli Madya Sumber Daya AIr 4 th
Pengairan 1 org;
Muhammad Imamuddin
PT. Tata Bumi Konsultan S1 Teknik Sipil/ Ahli Madya Sumber Daya AIr 4 th
Pengairan 1 org;
PT. Martha Tria Selaras S1 Teknik Sipil/ Ahli Madya Sumber Daya AIr 4 th
Pengairan 1 org;
Muhammad Imamuddin
PT. Tata Bumi Konsultan S1 Teknik Sipil/ Ahli Madya Sumber Daya AIr 4 th
Pengairan 1 org;
Juli Patwiko
PT. Ganesha Pratama Consultant S1 Teknik Sipil Ahli Madya Teknik Jalan 4 th
1 org; 2 bln
Deni Nurhidayat
PT. Ramu Prima Persada S1 Teknik Sipil Ahli Madya Teknik Jalan 4th
1 org; 2 bln
Kurniawan
330,000,000.00
99,000,000.00
PERSONIL
TENAGA AHLI
BELUM ADA
ADA
by P. IMAM
by
Kurniawan/pandu/Wasi
s
by
Kurniawan/pandu/Wasi
s
by
Kurniawan/pandu/Wasi
s
by P. Teguh
by Kurniawan
by Kurniawan
by P. TEGUH
by B. RENY