PERHITUNGAN BACK UP DATA

MC . 0 %
Balai Wilayah Sungai : Maluku Utara
SNVT : Pelaksanaan Jaringan Pemanfaatan Air Maluku, Provinsi Maluku Utara
Pelaksana Kegiatan : Pengembangan Dan Rehabilitasi, Jaringan Irigasi Permukaan,Rawa,dan Tambak
Paket Pekerjaan : Pembangunan Bendung Tiley
Lokasi : Kab. Pulau Morotai
Sumber Dana : APBN
TA : 2018 Item Pekerjaan : Pas. Batu Kali Untuk Oprit Jembatan

NO SKETSA GAMBAR VOLUME

A B

9.54 3.50 10.50 3.50 12.23


12.00
KORDINAT VOLUME
NO
X Y ((X2xY1)-(X1xY2))/2

1 246.0148 48.025
2 247.838 54.2759 (725.127)
3 245.338 54.2759 (67.845)
4 243.8939 54.1984 (29.683)
5 242.0041 54.097 (38.847)
Area A 6 239.591 53.9676 (49.613)
Kiri 7 238.1642 53.891 (29.324)
56 8 236.4947 53.8015 (34.328)
9 236.2314 53.7773 (4.221)
10 236.2314 53.7773 -
54 11 236.3559 53.7377 8.025
12 236.6026 53.6591 15.917
13 236.7197 53.6217 7.566
52
14 236.9299 53.5541 13.637
15 237.2345 53.455 19.896
16 237.5324 53.3561 19.693
50
17 237.7243 53.2911 12.839
18 237.9059 53.2285 12.280
48 19 238.3005 53.0881 27.203
20 238.8294 52.8882 37.857
21 239.3681 52.6667 40.696
46 22 240.0126 52.3709 52.374
23 240.3537 52.1975 29.741
24 240.9258 51.8736 53.856
44
234 236 238 240 242 244 246 248 250 25 241.3074 51.6299 39.254
26 241.7167 51.3382 45.761
27 241.9825 51.129 32.106
28 242.3778 50.7859 51.618
29 242.795 50.3912 58.427
30 243.2931 49.9009 72.071
31 243.5069 49.6923 30.710
32 243.7209 49.4885 30.130
33 243.9109 49.314 25.966
34 244.2752 49.0016 47.081
35 244.4284 48.8806 18.532
36 244.6284 48.7331 22.915
37 244.854 48.5816 24.028
38 245.2179 48.3722 34.476
39 245.484 48.2456 21.958
40 245.7292 48.146 18.140
41 246.0148 48.025 21.742
-
Kiri (32.491)

Total Luas = (32.49)


Tebal = 0.300
Volume = (9.747)

DISETUJUI : DIPERIKSA DIBUAT :


DIREKSI LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR
Yudit Agus Priambodo,ST
Tri Widodo Ir. Agus Salim
NIP. 19750521 201410 1 001 Team Leader Site Manager
at point X= 246.0148 Y= 48.025 Z= 0
at point X= 247.838 Y= 54.2759 Z= 0
at point X= 245.338 Y= 54.2759 Z= 0
at point X= 243.8939 Y= 54.1984 Z= 0
at point X= 242.0041 Y= 54.097 Z= 0
at point X= 239.591 Y= 53.9676 Z= 0
at point X= 238.1642 Y= 53.891 Z= 0
at point X= 236.4947 Y= 53.8015 Z= 0
at point X= 236.2314 Y= 53.7773 Z= 0
at point X= 236.2314 Y= 53.7773 Z= 0
at point X= 236.3559 Y= 53.7377 Z= 0
at point X= 236.6026 Y= 53.6591 Z= 0
at point X= 236.7197 Y= 53.6217 Z= 0
at point X= 236.9299 Y= 53.5541 Z= 0
at point X= 237.2345 Y= 53.455 Z= 0
at point X= 237.5324 Y= 53.3561 Z= 0
at point X= 237.7243 Y= 53.2911 Z= 0
at point X= 237.9059 Y= 53.2285 Z= 0
at point X= 238.3005 Y= 53.0881 Z= 0
at point X= 238.8294 Y= 52.8882 Z= 0
at point X= 239.3681 Y= 52.6667 Z= 0
at point X= 240.0126 Y= 52.3709 Z= 0
at point X= 240.3537 Y= 52.1975 Z= 0
at point X= 240.9258 Y= 51.8736 Z= 0
at point X= 241.3074 Y= 51.6299 Z= 0
at point X= 241.7167 Y= 51.3382 Z= 0
at point X= 241.9825 Y= 51.129 Z= 0
at point X= 242.3778 Y= 50.7859 Z= 0
at point X= 242.795 Y= 50.3912 Z= 0
at point X= 243.2931 Y= 49.9009 Z= 0
at point X= 243.5069 Y= 49.6923 Z= 0
at point X= 243.7209 Y= 49.4885 Z= 0
at point X= 243.9109 Y= 49.314 Z= 0
at point X= 244.2752 Y= 49.0016 Z= 0
at point X= 244.4284 Y= 48.8806 Z= 0
at point X= 244.6284 Y= 48.7331 Z= 0
at point X= 244.854 Y= 48.5816 Z= 0
at point X= 245.2179 Y= 48.3722 Z= 0
at point X= 245.484 Y= 48.2456 Z= 0
at point X= 245.7292 Y= 48.146 Z= 0
at point X= 246.0148 Y= 48.025 Z= 0
PERHITUNGAN BACK UP DATA
MC . 0 %
Balai Wilayah Sungai : Maluku Utara
SNVT : Pelaksanaan Jaringan Pemanfaatan Air Maluku, Provinsi Maluku Utara
Pelaksana Kegiatan : Pengembangan Dan Rehabilitasi, Jaringan Irigasi Permukaan,Rawa,dan Tambak
Paket Pekerjaan : Pembangunan Bendung Tiley
Lokasi : Kab. Pulau Morotai
Sumber Dana : APBN
TA : 2018 Item Pekerjaan : Timbunan Tanah Bendung Tiley Hillir

NO Rekapitulasi Perhitungan Volume VOLUME


TIMBUNAN
LUAS PANJANG VOLUME
POT
M2 M ( A + B ) /2 X PANJANG
P1 0.00 0.000
P2 0.00 25.00 0.000
P3 0.00 25.00 0.000
P4 0.0000 25.00 0.000

0.000

Total Timbunan = 0.000

DISETUJUI : DIPERIKSA DIBUAT :


DIREKSI LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR

Yudit Agus Priambodo,ST


Tri Widodo Ir. Agus Salim
NIP. 19750521 201410 1 001 Team Leader Site Manager
PERHITUNGAN BACK UP DATA
MC . 0 %
Balai Wilayah Sungai : Maluku Utara
SNVT : Pelaksanaan Jaringan Pemanfaatan Air Maluku, Provinsi Maluku Utara
Pelaksana Kegiatan : Pengembangan Dan Rehabilitasi, Jaringan Irigasi Permukaan,Rawa,dan Tambak
Paket Pekerjaan : Pembangunan Bendung Tiley
Lokasi : Kab. Pulau Morotai
Sumber Dana : APBN
TA : 2018 Item Pekerjaan : Pas. Batu Kali Untuk Oprit Jembatan

NO SKETSA GAMBAR VOLUME

A B

9.54 3.50 10.50 3.50 12.23


12.00
KORDINAT VOLUME
NO
X Y ((X2xY1)-(X1xY2))/2

1 52.0191 24.5032
2 49.7435 24.5032 (27.880)
Area A 3 40.4496 25.0018 (126.266)
Kiri 4 38.1417 25.002 (28.855)
5 39.7674 18.8125 138.362
27
6 40.0191 18.9137 0.355
7 40.2782 19.0279 0.165
8 40.5584 19.1405 0.398
25 9 (0.712)
40.9438 19.3575
10 41.1562 19.4539 0.082
11 41.3991 19.5414 0.562
23 12 41.845 19.6582 1.939
13 42.2896 19.7385 2.690
14 42.8628 19.8157 4.025
21 15 43.6438 19.9168 5.571
16 44.4334 20.0677 4.570
17 45.0142 20.2488 1.804
19 18 45.5345 20.482 0.019
19 45.9476 20.7107 (0.976)
20 46.4536 21.0318 (2.137)
21 47.0851 21.4709 (3.558)
17
22 47.541 21.7941 (2.715)
23 48.4933 22.4338 (4.829)
24 48.9691 22.7351 (1.969)
15
35 37 39 41 43 45 47 49 51 53 25 49.9737 23.3414 (3.425)
26 50.6483 23.7316 (1.877)
27 52.0191 24.5032 (3.274)
28
29
30
31
32
33
34
35
36
37
38
39
40
41

Kanan (47.929)

Total Luas = (47.93)


Tebal = 0.300
Volume = (14.379)

DISETUJUI : DIPERIKSA DIBUAT :


DIREKSI LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR
Yudit Agus Priambodo,ST
Tri Widodo Ir. Agus Salim
NIP. 19750521 201410 1 001 Team Leader Site Manager