Anda di halaman 1dari 1

KEBUTUHAN 

BESI UNTUK BORED FILE, PILE CAP, SLOF dan KOLOM ZONA 1 & 2 ( LT DASAR )
NO  Nama Pekerjaan  Item Pek. WIREMESH BESI Ø8 BESI Ø10 BESI Ø13 BESI Ø16 BESI Ø19
1 Bored File 3372.96 12085.81

1 Pondasi pile cap  p1  91.82


p2 1528.29
p3 1589.35
p4 603.52
p5 491.96
p6 163.99
p7 222.01
Pondasi Lift 575.30

2 Sloof SL1 111.86 210.45


103.07 186.24
1168.11 2159.07
137.43 251.17
679.94 1242.75
18.38 35.09
23.17 43.66
18.38 34.38
39.15 72.78

SL2 610.14 1303.71


67.57 151.74
20.95 45.04
14.19 33.20
165.54 368.29
20.95 45.51
18.24 40.30

3 SL3 45.15 87.72


7.36 15.05
29.44 61.46
6.38 13.18
8.83 20.35
18.65 36.98
12.27 24.74
7.36 15.37
7.36 17.97
24.54 48.86
14.23 27.87
5.40 11.93
53.00 105.22
6.38 13.49
14.23 27.87
10.31 21.62
12.27 24.43
13.25 26.31
10.80 21.98
30.92 61.25
21.10 42.06
40.24 77.62
20.12 38.81
20.12 38.81
20.12 38.81
19.14 37.87
31.90 63.00
30.92 59.44
65.27 126.33

4 Kolom K1 645.85 2175.75


K1A 179.16 150.90 644.67
K2A 272.62 606.09
K5 18.84 123.55
K5B 18.84 19.28 82.36
K5C 18.84 9.64 82.36
KL 1808.81 46.49 454.57

5 LT DASAR  240.81

JML TON
Jumlah KG 240.81 235.68 9278.48 2078.53 24636.10 3108.69 39.34
Jumlah Batang 48 20 773 173 2053 259