PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

Proyek :
Lokasi :
Km/Sta :
Ukuran Konus :
Tanggal :

BANYAK KUMULATIF PENETRASI (MM) KUMULATIF DCP LOG CBR CBR (%)
TUMBUKAN TUMBUKAN PENETRASI (MM) (MM/TUMBUKAN)
0 0 0 0 0 0.00 0.00
1 1 15 15 15.0 1.27 18.59
1 2 5 20 10.0 1.50 31.66
1 3 11 31 10.3 1.48 30.33
1 4 5 36 9.0 1.56 36.36
1 5 6 42 8.4 1.60 39.80
1 6 10 52 8.7 1.58 38.20
1 7 8 60 8.6 1.59 38.76
1 8 10 70 8.8 1.58 37.73
1 9 11 81 9.0 1.56 36.36
1 10 12 93 9.3 1.54 34.82
1 11 12 105 9.5 1.53 33.65
1 12 11 116 9.7 1.52 33.10
1 13 13 129 9.9 1.50 31.98
1 14 17 146 10.4 1.48 29.96
1 15 19 165 11.0 1.45 27.94 25.93
1 16 20 185 11.6 1.42 26.16
1 17 21 206 12.1 1.39 24.60
1 18 23 229 12.7 1.36 23.08
1 19 24 253 13.3 1.34 21.74
1 20 21 274 13.7 1.32 20.94
1 21 24 298 14.2 1.30 20.00
1 22 26 324 14.7 1.28 19.04
1 23 28 352 15.3 1.26 18.11
1 24 28 380 15.8 1.24 17.32
1 25 30 410 16.4 1.22 16.54
1 26 31 441 17.0 1.20 15.82
1 27 38 479 17.7 1.17 14.91
1 28 37 516 18.4 1.15 14.19
1 29 40 556 19.2 1.13 13.47
1 30 42 598 19.9 1.11 12.80

KONTRAKTOR KONSULTAN PENGAWAS PU PETUGAS PENGUJIAN

(...........................) (...........................) (...........................) (...........................)


Pekerjaan / Proyek :
:
Peminta Jasa :
Jenis / Sumber Contoh :
Tanggal :
Dihitung :

PEMERIKSAAN KEPADATAN LAPANGAN DENGAN SAND CONE

LOKASI / KM KETERANGAN

I. KALIBRASI PERMUKAAN :
1 Berat pasir dalam corong 1520 1520 1520
2 Berat isi kering pasir 1.547 1.547 1.547

II. PENENTUAN ISI LUBANG :


3 Berat botol + corong + pasir
4 Berat botol + corong + sisa pasir
5 Berat pasir corong + lubang (3-4)
6 Berat pasir dalam lubang (5-1)
7 Isi lubang (6/2)

III. PENENTUAN KEPADATAN :


A. KADAR AIR :
8 Berat tanah basah + cawan
9 Berat tanah kering + cawan
10 Berat air (8-9)
11 Berat cawan
12 Berat tanah kering (9-11)
13 Kadar air ((10/12)x100%)

B. BERAT ISI KERING LAPANGAN :


14 Berat tanah basah + cawan
15 Berat cawan
16 Berat tanah basah (14-15)
17 Berat isi tanah basah (16/7)
18 B.I Tanah kering (17/(100+13)x100%)
19 Berat isi kering Max (lab) Hasil terkoreksi
20 D. Kepadatan lapangan (18/19)x100%
21 Tebal (Cm)

B. BERAT ISI TERTAHAN NO 4" DILAPANGAN :


22 Berat tanah / Agregat basah
23 Berat Cawan
24 Berat isi tanah / Agregat basah (22-23)
25 Berat tanah / Agregat dikoreksi (24/16)x100%
KETERANGAN :
1. Kepadatan Lapangan Sub Grade / Agregat
2. Kepadatan Lapangan Dikoreksi / Tidak Dikoreksi
3. Kesimpuulan Hasil Pengujian Masuk / Tidak Masuk

KONTRAKTOR KONSULTAN PENGAWAS PU PETUGAS PENGUJIAN


(..................................) (..................................) (..................................) (..................................)
Pekerjaan / Proyek

Peminta Jasa
Jenis Contoh / Sumber Contoh
Tanggal
Dihitung

PEMERIKSAAN KEPADATAN LAPANGAN DENGAN SAND CONE

LOKASI / KM 18+679 19+105 KETERANGAN

I. KALIBRASI PERMUKAAN :
1 Berat pasir dalam corong 1520 1520 1520
2 Berat isi kering pasir 1.547 1.547 1.547

II. PENENTUAN ISI LUBANG :


3 Berat botol + corong + pasir 7,393.00 7,228.00
4 Berat botol + corong + sisa pasir 3,315.00 3,210.00
5 Berat pasir corong + lubang (3-4) 4,078.00 4,018.00
6 Berat pasir dalam lubang (5-1) 2,558.00 2,498.00
7 Isi lubang (6/2) 1,653.52 1,614.74

III. PENENTUAN KEPADATAN :


A. KADAR AIR :
8 Berat tanah basah + cawan 70.00 75.00
9 Berat tanah kering + cawan 69.00 74.00
10 Berat air (8-9) 1.00 1.00
11 Berat cawan 44.00 44.00
12 Berat tanah kering (9-11) 25.00 30.00
13 Kadar air ((10/12)x100%) 4.00 3.33

B. BERAT ISI KERING LAPANGAN :


14 Berat tanah basah + cawan 3,878.00 3,763.00
15 Berat cawan 72.00 72.00
16 Berat tanah basah (14-15) 3,806.00 3,691.00
17 Berat isi tanah basah (16/7) 2.30 2.29
18 B.I Tanah kering (17/(100+13)x100%) 2.21 2.21
19 Berat isi kering Max (lab) 2.219 2.215 Hasil terkoreksi
20 D. Kepadatan lapangan (18/19)x100% 99.76 99.87
21 Tebal (Cm) 10.00 10.00

B. BERAT ISI TERTAHAN NO 4" DILAPANGAN :


22 Berat tanah / Agregat basah 2,140.00 2,025.00
23 Berat Cawan 293.00 293.00
24 Berat isi tanah / Agregat basah (22-23) 1,847.00 1,732.00
25 Berat tanah / Agregat dikoreksi (24/16)x100% 48.53 46.92
KETERANGAN :
1. Kepadatan Lapangan Sub Grade / Agregat
2. Kepadatan Lapangan Dikoreksi / Tidak Dikoreksi
3. Kesimpuulan Hasil Pengujian Masuk / Tidak Masuk

KONTRAKTOR KONSULTAN PENGAWAS PU PETUGAS PENGUJIAN


(..................................) (..................................) (..................................) (..................................)
STA. 0+005
KONUS 60*
Banyak Kumulatif Kumulatif Penetrasi Kumulatif
DCP (mm/tumb)
Tumbukan Tumbukan Penetrasi (Cm) (mm) Penetrasi (mm)
0 0 0 0 0 0.00
1 1 1.5 15 15 15.00
1 2 2 5 20 10.00
1 3 3.1 11 31 10.33
1 4 3.6 5 36 9.00
1 5 4.2 6 42 8.40
1 6 5.2 10 52 8.67
1 7 6 8 60 8.57
1 8 7 10 70 8.75
1 9 8.1 11 81 9.00
1 10 9.3 12 93 9.30
1 11 10.5 12 105 9.55
1 12 11.6 11 116 9.67
1 13 12.9 13 129 9.92
1 14 14.6 17 146 10.43
1 15 16.5 19 165 11.00
1 16 18.5 20 185 11.56
1 17 20.6 21 206 12.12
1 18 22.9 23 229 12.72
1 19 25.3 24 253 13.32
1 20 27.4 21 274 13.70
1 21 29.8 24 298 14.19
1 22 32.4 26 324 14.73
1 23 35.2 28 352 15.30
1 24 38 28 380 15.83
1 25 41 30 410 16.40
1 26 44.1 31 441 16.96
1 27 47.9 38 479 17.74
1 28 51.6 37 516 18.43
1 29 55.6 40 556 19.17
1 30 59.8 42 598 19.93
Log CBR CBR (%)

0 0
1.27 18.59
1.50 31.66
1.48 30.33
1.56 36.36
1.60 39.80
1.58 38.20
1.59 38.76
1.58 37.73
1.56 36.36
1.54 34.82
1.53 33.65
1.52 33.10
1.50 31.98
1.48 29.96
1.45 27.94
1.42 26.16
1.39 24.60
1.36 23.08
1.34 21.74
1.32 20.94
1.30 20.00
1.28 19.04
1.26 18.11
1.24 17.32
1.22 16.54
1.20 15.82
1.17 14.91
1.15 14.19
1.13 13.47
1.11 12.80