DAFTAR KUANTITAS DAN HARGA

PEKERJAAN TAMBAH / KURANG (CCO) AMANDEMEN KONTRAK

PENINGKATAN JALAN BAAD - SINEGI DISTRIK ANIMHA KABUPATEN MERAUKE

SEMULA PEKERJAAN TAMBAH/KURANG (CCO)

NO URAIAN PEKERJAAN SAT. PEKERJAAN TAMBAH PEKERJAAN KURANG


PERKIRAAN HARGA SATUAN JUMLAH HARGA BOBOT
VOLUME (Rupiah) (Rupiah) (%)
VOLUME JLH. HARGA VOLUME

I DEVISI 1 UMUM
1 Mobilisasi Ls 1.00 125,750,000.00 125,750,000.00 1.07
2 Pengukuran Dan Pematokan Jalan M1 1,480.00 1,257.00 1,860,360.00 0.02 -

II DEVISI 2 PEKERJAAN TIMBUNAN TANAH DAN PASIR PADA BADAN DAN BAHU JALAN
1 Timbunan Pilihan Bahu Jalan M3 284.66 275,673.00 78,473,076.18 0.67 315.56 86,991,738.07
2 Penyiapan Badan Jalan M2 13,320.00 1,009.00 13,439,880.00 0.11 -
3 Urugan Pasir M3 37.00 408,681.00 15,121,197.00 0.13 37.00

III DEVISI 3 PEKERJAAN PERKERASAN BADAN JALAN


1 Pondasi Jalan Beton Bertulang 25/28 Cm
1.a Cor Beton Mutu Sedang fc' = 25 Mpa (K - 300) M3 121.36 3,898,287.00 473,096,110.32 4.03 85.84 334,628,956.08
1.b besi Tulangan Diameter 10 Kg 9,715.47 18,297.00 177,763,954.59 1.51 342.50
1.c besi Tulangan Diameter 8 Kg 6,074.67 18,055.00 109,678,166.85 0.93 2,734.30 49,367,858.72
1.d Bekisting Badan Jalan M2 43.69 283,743.00 12,396,731.67 0.11 252.31 71,591,196.33
2 LPA - Cor Badan Jalan Beton Bertulang Tebal 18 Cm
2.a Cor Beton Mutu Sedang fc' = 25 Mpa (K - 300) M3 1,465.49 3,898,287.00 5,712,900,615.63 48.62 0.29
2.b besi Tulangan Diameter 10 Kg 102,657.57 18,297.00 1,878,325,558.29 15.99 28,799.61
3 Dowel Tulangan Besi Diameter 16 Kg 67.26 18,478.00 1,242,830.28 0.01 372.61 6,885,124.54

IV DEVISI 4 PEKERJAAN LAPIS PERMUKAAN


1 Prime Coat (Lapis Pengikat) M2 8,880.00 20,804.00 184,739,520.00 1.57
2 HRS LATASTON (Tebal 4 Cm) M2 8,880.00 333,952.00 2,965,493,760.00 25.24

(A) JUMLAH 11,750,281,760.81 100.00 549,464,873.73


(B) PAJAK PERTAMBAHAN NILAI (PPN) = 10 % x (A) 1,175,028,176.08
(C) TOTAL HARGA (A) + (B) 12,925,309,936.89
(D) TOTAL HARGA DIBULATKAN 12,925,309,000.00

MENGETAHUI : MENYETUJUI : DIPERIKSA :


KEPALA DINAS PEKERJAAN UMUM PENATAAN PEJABAT PELAKSANA TEKNIS KEGIATN (PPTK) PENGAWAS LAPANGAN
RUANG DAN PERTANAHAN KABUPATEN MERAUKE PENINGKATAN JALAN BAAD - SINEGI PENINGKATAN JALAN BAAD - SINEGI

Ir. H.B.L.TOBING,MEng LEO PATRIA MOGOT,ST U S M A N ,A . Md


NIP. 19601216 199103 1 008 NIP. 19730628 200605 1 002 NIP. 19610110 200012 1 002
AFTAR KUANTITAS DAN HARGA
N TAMBAH / KURANG (CCO) AMANDEMEN KONTRAK

PEKERJAAN TAMBAH/KURANG (CCO) MENJADI

PEKERJAAN KURANG KET


PERKIRAAN HARGA SATUAN JUMLAH HARGA BOBOT (%)
VOLUME (Rupiah) (Rupiah)
JLH. HARGA

1.00 125,750,000.00 125,750,000.00 1.07 TETAP


- 1,480.0 1,257.00 1,860,360.00 0.02 TETAP

600.22 275,673.00 165,464,814.25 1.41 BERTAMBAH


- 13,320.00 1,009.00 13,439,880.00 0.11 TETAP
15,121,197.00 - 408,681.00 - - DIHILANGKAN

207.20 3,898,287.00 807,725,066.40 6.87 BERTAMBAH


6,266,715.18 9,372.97 18,297.00 171,497,239.41 1.46 BERKURANG
8,808.97 18,055.00 159,046,025.57 1.35 BERTAMBAH
296.00 283,743.00 83,987,928.00 0.71 BERTAMBAH

1,130,503.23 1,465.20 3,898,287.00 5,711,770,112.40 48.61 BERKURANG


526,946,458.31 73,857.96 18,297.00 1,351,379,099.98 11.50 BERTAMBAH
439.87 18,478.00 8,127,954.82 0.07 BERTAMBAH

8,880.00 20,804.00 184,739,520.00 1.57 TETAP


8,880.00 333,952.00 2,965,493,760.00 25.24 TETAP

549,464,873.73 11,750,281,760.82 100.00


1,175,028,176.08
12,925,309,936.90
12,925,309,000.00

DIPERIKSA : DIBUAT :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
PT.MAKROTHUMIA EIRENE CONSULTANT PT. TUNAS JAYA IRJA

WAYAN DARYASA, ST HENRY KURNIAWAN


Team Leader Direktur
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN
BIDANG BINA MARGA

KONTRAKTOR :PT. PEMBANGUNAN JAYA PAPUA RAYA


NO. KONTRAK : 03/KONTRAK/DAK - K1/DPUPRP - BM/V/2018
TGL MULAI KERJA : 23 MEI 2018
KONSULTAN : PT. MAKROTHUMIA EIRENE CONSULTANT

Kegiatan : -
Pekerjaan : PEMBANGUNAN SIRKUIT BALAP MOTOR
Lokasi : DISTRIK TANAH MIRING
Kabupaten : MERAUKE - PAPUA
T. Anggaran : 2019

DAFTAR KUANTITAS DAN HARGA


BOBOT
Jumlah
NILAI
No. Uraian Pekerjaan Satuan Volume
PEKERJAAN
Harga Satuan Harga Satuan %

I PEKERJAAN PERSIAPAN
A. PEKERJAAN PERSIAPAN UMUM 478,400,000.00 0.674
B. PEKERJAAN MOBILISASI DAN DEMOBILISASI 77,000,000.00 0.108

II PEKERJAAN PEMBENTUKAN LAHAN (CUT & FILL) 6,433,061,917.88 9.061

III PEKERJAAN STRUKTURAL


A. GEDUNG TRIBUN 2,657,426,718.86 3.743
B. GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP) 910,496,470.68 1.282
C. RUMAH JAGA 177,169,596.40 0.250
D. TOILET 209,937,048.46 0.296
E. BENGKEL (TIDAK TERMASUK LINGKUP) 231,436,877.32 0.326
F. POS JAGA (3 UNIT) 39,597,012.19 0.056
G. BANGUNAN GERBANG MASUK 86,246,855.83 0.121

IV PEKERJAAN ARSITEKTURAL
A. GEDUNG TRIBUN 2,967,712,846.00 4.180
B. GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP) 1,019,217,984.12 1.436
C. RUMAH JAGA 526,906,824.01 0.742
D. TOILET 357,025,666.62 0.503
E. BENGKEL (TIDAK TERMASUK LINGKUP) 423,373,185.13 0.596
F. POS JAGA (3 UNIT) 87,709,150.99 0.124
G. BANGUNAN GERBANG MASUK 52,037,207.65 0.073
H. LANDSCAPE 10,844,334,975.64 15.274

V PEKERJAAN LANSEKAP
A. PEKERJAAN HARDSCAPE 788,347,303.00 1.110

VI PEKERJAAN INFRASTRUKTUR
A. PEKERJAAN DRAINASE 1,937,944,871.80 2.730
B. PEKERJAAN JALAN 33,205,620,463.00 46.770
C. MARKA JALAN 5,656,194,000.00 7.967

VII PEKERJAAN ELEKTRIKAL


A. PENYAMBUNGAN, DISTRIBUSI DAN PEMBANGKITAN DAYA 778,615,000.00 1.097
B. PEKERJAAN INSTALASI PENERANGAN 378,980,000.00 0.534
C. PEKERJAAN PENANGKAL PETIR 61,560,000.00 0.087
D. PEKERJAAN SISTEM TELEPON 79,892,000.00 0.113
E. SISTEM TATA SUARA 98,493,000.00 0.139
F. SISTEM FIRE ALARM 59,820,000.00 0.084

VIII PEKERJAAN MEKANIKAL


A. PEKERJAAN PLUMBING AIR BERSIH 74,169,000.00 0.104
B. PEMIPAAN AIR BERSIH TOILET 8,697,000.00 0.012
C. PEMIPAAN AIR KOTOR DAN BUANGAN TOILET 102,746,000.00 0.145
D. PEMIPAAN AIR BERSIH KE AREA MOTOR CROSS 57,850,000.00 0.081
E. PEKERJAAN SISTEM TATA UDARA 60,320,000.00 0.085
F. BANGUNAN SEKERTARIAT 69,920,000.00 0.098

(A) JUMLAH 70,998,258,975.58 100.000


(B) PAJAK PERTAMBAHAN NILAI (PPN) = 10 % x (A) 7,099,825,897.56
(C) TOTAL HARGA (A) + (B) 78,098,084,873.14
(D) TOTAL HARGA DIBULATKAN 78,098,084,000.00
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN
BIDANG BINA MARGA

KONTRAKTOR : : PT. PT. PEMBANGUNAN JAYA PAPUA RAYA


NO. KONTRAK : : 03/KONTRAK/DAK - K1/DPUPRP - BM/V/2018
TGL MULAI KERJA : : 23 MEI 2018
KONSULTAN : : PT. MAKROTHUMIA EIRENE CONSULTANT
:
Kegiatan : PEMBANGUNAN SIRKUIT BALAP MOTOR
Pekerjaan : GEDUNG TRIBUN
Lokasi : DISTRIK TANAH MIRING
Kabupaten : MERAUKE - PAPUA
T. Anggaran : 2019

DAFTAR KUANTITAS DAN HARGA GEDUNG TRIBUN


BOBOT
Jumlah
NILAI
No. Uraian Pekerjaan Satuan Volume
PEKERJAAN
Harga Satuan Harga Satuan %

III PEKERJAAN STRUKTURAL


A GEDUNG TRIBUN
A.1 PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank M 215.00 93,857.00 20,179,255.00 0.359

A.2 PEKERJAAN TANAH DAN PASIR


1 Galian Tanah Pondasi M3 436.66 152,233.00 66,474,061.78 1.182
2 Urugan Tanah Kembali Galian Pondasi M3 145.55 50,744.00 7,385,789.20 0.131
3 Urugan Pasir Bawah Pondasi tebal 10 cm M3 26.46 878,744.00 23,251,566.24 0.413

A.3 PEKERJAAN STRUKTUR LANTAI 1


1 Pek. Cor lantai kerja 1pc 6psr
˗ Beton campuran 1pc 6psr M3 13.23 2,908,534.00 38,479,904.82 0.684
˗ Bekisting Kayu Kelas III (Setara bekisting Pondasi) M2 7.02 247,699.00 1,738,846.98 0.031
2 Pek. Pondasi poer plat F1 , uk. 9920 x 120 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 95.23 3,492,364.00 332,577,823.72 5.912
˗ Pembesian Besi polos . 13 mm SNI Kg 7,367.88 20,357.00 149,987,933.16 2.666
˗ Bekisting untuk Pondasi M2 6.07 247,699.00 1,503,532.93 0.027
3 Pek. Pondasi poer plat F2 , uk. 2680 x 80 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 8.58 3,492,364.00 29,964,483.12 0.533
˗ Pembesian Besi polos . 13 mm SNI Kg 699.20 20,357.00 14,233,614.40 0.253
˗ Bekisting untuk Pondasi M2 6.07 247,699.00 1,503,532.93 0.027
4 Pek. Pondasi poer plat FG , uk. 160 x 80 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.05 3,492,364.00 7,159,346.20 0.127
˗ Pembesian Besi polos . 13 mm SNI Kg 178.26 20,357.00 3,628,838.82 0.065
˗ Bekisting untuk Pondasi M2 2.11 247,699.00 522,644.89 0.009
5 Pek. Kolom Pedestal K-1 , uk. 30 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 5.94 3,492,364.00 20,744,642.16 0.369
˗ Pembesian Besi polos . 16 mm SNI Kg 1,974.95 20,357.00 40,204,057.15 0.715
˗ Pembesian Besi polos . 10 mm SNI Kg 183.10 20,357.00 3,727,366.70 0.066
˗ Bekisting untuk kolom M2 17.82 419,917.00 7,482,920.94 0.133
6 Pek. Kolom Pedestal K-2 , uk. 50 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.35 3,492,364.00 4,714,691.40 0.084
˗ Pembesian Besi polos . 16 mm SNI Kg 269.31 20,357.00 5,482,343.67 0.097
˗ Pembesian Besi polos . 10 mm SNI Kg 36.07 20,357.00 734,276.99 0.013
˗ Bekisting untuk kolom M2 3.96 419,917.00 1,662,871.32 0.030
7 Pek. Sloof TB1, uk. 25 x 45 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 41.12 3,492,364.00 143,606,007.68 2.553
˗ Pembesian Besi polos . 16 mm SNI Kg 4,679.04 20,357.00 95,251,217.28 1.693
˗ Pembesian Besi polos . 10 mm SNI Kg 1,032.91 20,357.00 21,026,948.87 0.374
˗ Bekisting untuk sloof M2 94.59 247,699.00 23,429,848.41 0.417
8 Pek. Balok B1, uk. 25 x 45 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 53.82 3,492,364.00 187,959,030.48 3.341
˗ Pembesian Besi polos . 16 mm SNI Kg 6,107.41 20,357.00 124,328,545.37 2.210
˗ Pembesian Besi polos . 10 mm SNI Kg 1,622.13 20,357.00 33,021,700.41 0.587
˗ Bekisting untuk Balok M2 123.79 425,609.00 52,686,138.11 0.937
9 Pek. Balok B2, uk. 20 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 8.64 3,492,364.00 30,174,024.96 0.536
˗ Pembesian Besi polos . 16 mm SNI Kg 1,370.67 20,357.00 27,902,729.19 0.496
˗ Pembesian Besi polos . 10 mm SNI Kg 299.62 20,357.00 6,099,364.34 0.108
˗ Bekisting untuk Balok M2 24.30 425,609.00 10,342,298.70 0.184
10 Pek. Kolom K1, uk. 30 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 20.20 3,492,364.00 70,545,752.80 1.254
˗ Pembesian Besi polos . 16 mm SNI Kg 3,974.89 20,357.00 80,916,835.73 1.438
˗ Pembesian Besi polos . 10 mm SNI Kg 622.54 20,357.00 12,673,046.78 0.225
˗ Bekisting untuk kolom M2 60.59 419,917.00 25,442,771.03 0.452
11 Pek. Kolom K2, uk. 50 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.59 3,492,364.00 16,029,950.76 0.285
˗ Pembesian Besi polos . 16 mm SNI Kg 542.03 20,357.00 11,034,104.71 0.196
˗ Pembesian Besi polos . 10 mm SNI Kg 122.62 20,357.00 2,496,175.34 0.044
No. Uraian Pekerjaan Satuan Volume
PEKERJAAN
Harga Satuan Harga Satuan
%

˗ Bekisting untuk kolom M2 11.02 419,917.00 4,627,485.34 0.082


12 Pek. Pelat Lantai 2, Tebal. 12 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 70.48 3,492,364.00 246,141,814.72 4.376
˗ Pembesian Besi polos . 8 mm SNI Kg 4,206.76 20,357.00 85,637,013.32 1.522
˗ Bekisting untuk Pelat Lantai M2 264.44 496,909.00 131,402,615.96 2.336
13 Pek. Tangga type 1 12 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 6.82 3,492,364.00 23,817,922.48 0.423
˗ Pembesian Besi polos . 16 mm SNI Kg 757.88 20,357.00 15,428,163.16 0.274
˗ Pembesian Besi polos . 8 mm SNI Kg 203.49 20,357.00 4,142,445.93 0.074
˗ Bekisting untuk Pelat Lantai M2 22.10 496,909.00 10,981,688.90 0.195
14 Pek. Tangga Type 2 12 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.57 3,492,364.00 8,975,375.48 0.160
˗ Pembesian Besi polos . 8 mm SNI Kg 361.99 20,357.00 7,369,030.43 0.131
˗ Bekisting untuk Pelat Lantai M2 7.39 496,909.00 3,672,157.51 0.065

A.4 PEKERJAAN STRUKTUR LANTAI 2


1 Pekerjaan Kolom uk. 30x30 cm (K1d)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 3.46 3,492,364.00 12,083,579.44 0.215
˗ Pembesian Besi polos . 16 mm SNI Kg 692.41 20,357.00 14,095,390.37 0.251
˗ Pembesian Besi polos . 10 mm SNI Kg 130.20 20,357.00 2,650,481.40 0.047
˗ Bekisting untuk kolom M2 9.22 419,917.00 3,871,634.74 0.069
2 Pekerjaan Kolom uk. 50x30 cm (K2c)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.32 3,492,364.00 15,087,012.48 0.268
˗ Pembesian Besi polos . 16 mm SNI Kg 519.30 20,357.00 10,571,390.10 0.188
˗ Pembesian Besi polos . 10 mm SNI Kg 115.41 20,357.00 2,349,401.37 0.042
˗ Bekisting untuk kolom M2 9.22 419,917.00 3,871,634.74 0.069
3 Pekerjaan Ringbalk uk. 45x25 cm (RB1c)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 18.03 3,492,364.00 62,967,322.92 1.119
˗ Pembesian Besi polos . 16 mm SNI Kg 2,063.96 20,357.00 42,016,033.72 0.747
˗ Pembesian Besi polos . 10 mm SNI Kg 543.37 20,357.00 11,061,383.09 0.197
˗ Bekisting untuk ringbalk M2 36.86 425,609.00 15,687,947.74 0.279
4 Pekerjaan Plat lantai Tribun, Undagan (S1)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 13.50 3,492,364.00 47,146,914.00 0.838
˗ Pembesian Besi polos . 13 mm SNI Kg 2,326.26 20,357.00 47,355,674.82 0.842
˗ Bekisting untuk plat lantai M2 22.50 496,909.00 11,180,452.50 0.199
5 Pekerjaan Balok uk. 45x25 cm, Tribun (B1)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.84 3,492,364.00 9,918,313.76 0.176
˗ Pembesian Besi polos . 16 mm SNI Kg 410.09 20,357.00 8,348,202.13 0.148
˗ Pembesian Besi polos . 10 mm SNI Kg 129.47 20,357.00 2,635,620.79 0.047
˗ Bekisting untuk ringbalk M2 17.33 425,609.00 7,375,803.97 0.131
6 Pekerjaan Plat Dak Tribun, Torn (S2)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.08 3,492,364.00 14,248,845.12 0.253
˗ Pembesian Besi polos . 10 mm SNI Kg 428.11 20,357.00 8,715,035.27 0.155
˗ Bekisting untuk plat lantai M2 7.41 496,909.00 3,682,095.69 0.065

IV PEKERJAAN ARSITEKTURAL
A GEDUNG TRIBUN
PEKERJAAN ARSITEKTUR LANTAI 1
A.1 PEKERJAAN TANAH DAN PASIR
1 Urugan Pasir Bawah Lantai tebal 10 cm M3 39.27 878,744.00 34,508,276.88 0.613
2 Urugan Tanah Peninggian Lantai M3 174.84 282,037.00 49,311,349.08 0.877

A.2 PEKERJAAN PASANGAN DINDING


1 Pasangan Dinding Bata merah Tebal 1/2 Bata, 1PC 4PS - Pasir Import M2 616.42 329,687.00 203,225,660.54 3.613
2 Plesteran 1PC 3PS, Tebal 20 mm - Pasir Import M2 1,232.84 174,916.00 215,643,441.44 3.834
3 Pekerjaan Acian M2 1,232.84 62,001.00 76,437,312.84 1.359
4 Cor lantai ruangan tebal 5 cm, 1 pc 3psr M3 23.10 4,084,554.00 94,353,197.40 1.677
5 Pek. Kolom praktis, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 0.60 3,492,364.00 2,095,418.40 0.037
˗ Pembesian Besi polos . 10 mm SNI Kg 176.37 20,357.00 3,590,364.09 0.064
˗ Pembesian Besi polos . 8 mm SNI Kg 33.27 20,357.00 677,277.39 0.012
˗ Bekisting untuk Kolom M2 2.18 419,917.00 915,419.06 0.016
6 Pek. Balok Lintel, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.47 3,492,364.00 5,133,775.08 0.091
˗ Pembesian Besi polos . 10 mm SNI Kg 451.65 20,357.00 9,194,239.05 0.163
˗ Pembesian Besi polos . 8 mm SNI Kg 81.50 20,357.00 1,659,095.50 0.029
˗ Bekisting untuk Balok M2 5.35 425,609.00 2,277,008.15 0.040

A.3 PEKERJAAN KUSEN,PINTU/JENDELA TERMASUK FINISHING & ACCESSORIES


1 Tipe PG Pintu Polding get uk. 270x220 Cm Unit 28.00 15,020,000.00 420,560,000.00 7.476
2 Tipe P1 Pintu Kaca Rangka dan kusen Alumunium uk. 170x220 Cm Unit 2.00 14,800,000.00 29,600,000.00 0.526
3 Tipe P2 Pintu Double plywood rangka kayu kusen Alumunium uk. 70x220 Cm (Area Unit 2.00 4,100,000.00 8,200,000.00 0.146
Toilet)
4 Tipe P3 Pintu Double plywood rangka kayu kusen Alumunium uk. 80x220 Cm (Area Unit 2.00 2,750,000.00 5,500,000.00 0.098
Toilet)
5 Tipe GR1 Ventilasi Angin uk. 2400 x 800 mm Unit 28.00 2,000,000.00 56,000,000.00 0.996
No. Uraian Pekerjaan Satuan Volume
PEKERJAAN
Harga Satuan Harga Satuan
%

A.4 PEKERJAAN LANGIT- LANGIT

A.5 PEKERJAAN FINISHING LANTAI & DINDING 1.00


1 Lantai Keramik Area Basah 25 x 25 cm Unpolished M2 19.98 349,917.00 6,991,341.66 0.124
2 Dinding Keramik Area Basah 25 x 40cm Tipe Polished M2 65.49 340,023.00 22,268,106.27 0.396
3 Floor Hardener M2 426.13 155,000.00 66,050,150.00 1.174
6 Finishing Tangga
˗ Traf Tangga Vertikal Keramik 18x30 Cm Unpolished-setara Roman Gol.B M2 20.20 349,917.00 7,068,323.40 0.126
˗ Step tile keramik 30 x 30 cm unpolished setara Roman M2 33.66 349,917.00 11,778,206.22 0.209
˗ Hand Railing dari pipa BSP finish cat minyak M 67.20 450,000.00 30,240,000.00 0.538

A.6 PEKERJAAN SANITAIR 1.00


1 Closet duduk setara TOTO Type CW 421 J / SW420JP Unit 4.00 3,900,000.00 15,600,000.00 0.277
2 Closet jongkok setara. Toto type CE 7 Unit 2.00 1,100,000.00 2,200,000.00 0.039
3 Wastafel setara TOTO tipe LW 236 CJ Unit 6.00 4,600,000.00 27,600,000.00 0.491
4 Floor drain setara TOTO Type TX 1 BN Unit 6.00 400,000.00 2,400,000.00 0.043
5 Paper holder setara. Toto tipe TX720ACRB Unit 6.00 400,000.00 2,400,000.00 0.043
6 Shower Spray THX 20 MCRB Unit 6.00 400,000.00 2,400,000.00 0.043
+ TX277S
7 Urinal setara TOTO tipe U 370 M Unit 4.00 4,500,000.00 18,000,000.00 0.320
8 Urinal partition setara TOTO tipe A100 Unit 4.00 2,000,000.00 8,000,000.00 0.142
9 Double Robe Hook TOTO Type TS 118 WS Unit 6.00 200,000.00 1,200,000.00 0.021
10 Kaca Cermin M2 3.60 340,000.00 1,224,000.00 0.022
11 Cove lampu diatas Wastafel dari kayu kelas II finish cat M 3.60 50,000.00 180,000.00 0.003
12 Partisi cubical toilet lengkap daun pintu berikut Accessories Unit 4.00 4,350,000.00 17,400,000.00 0.309

A.7 PEKERJAAN PENGECATAN 1.00


1 Pengecatan Dinding Interior Jenis Cat Acrylic Emulsion M2 932.11 26,873.00 25,048,592.03 0.445
2 Pengecatan Dinding Exterior Jenis Cat Weathershield M2 328.89 49,953.00 16,429,042.17 0.292
3 Pengecatan Balok Beton Exposed Setara Jenis Cat AEP M2 921.50 26,873.00 24,763,469.50 0.440
4 Pengecatan Dak Beton Exposed Setara jenis Cat AEP M2 593.13 26,873.00 15,939,182.49 0.283

PEKERJAAN ARSITEKTUR LANTAI 2


A.1 PEKERJAAN PASANGAN DINDING
1 Pasangan Dinding Bata merah Tebal 1/2 Bata, 1PC 4PS - Pasir Import M2 482.19 329,687.00 158,971,774.53 2.826
2 Plesteran 1PC 3PS, Tebal 20 mm - Pasir Import M2 964.39 174,916.00 168,687,241.24 2.999
3 Pekerjaan Acian M2 964.39 62,001.00 59,793,144.39 1.063
4 Pek. Kolom praktis, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.19 3,492,364.00 4,155,913.16 0.074
˗ Pembesian Besi polos . 10 mm SNI Kg 363.29 20,357.00 7,395,494.53 0.131
˗ Pembesian Besi polos . 8 mm SNI Kg 65.73 20,357.00 1,338,065.61 0.024
˗ Bekisting untuk Kolom M2 4.31 419,917.00 1,809,842.27 0.032
5 Pek. Balok Lintel, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.39 3,492,364.00 8,346,749.96 0.148
˗ Pembesian Besi polos . 10 mm SNI Kg 434.11 20,357.00 8,837,177.27 0.157
˗ Pembesian Besi polos . 8 mm SNI Kg 125.94 20,357.00 2,563,760.58 0.046
˗ Bekisting untuk Kolom M2 9.58 419,917.00 4,022,804.86 0.072

A.2 PEKERJAAN KUSEN,PINTU/JENDELA TERMASUK FINISHING & ACCESSORIES


1 Tipe P2 Pintu Pintu Double plywood rangka kayu kusen Alumunium uk. 700 x 2200 Unit 2.00 4,100,000.00 8,200,000.00 0.146
mm
Tipe(Area Toilet)
2 P4 Pintu Pintu Double plywood rangka kayu kusen Alumunium uk. 1000 x 2700 Unit 6.00 4,200,000.00 25,200,000.00 0.448
mm
3 Tipe J1 Jendela Kaca Rangka Alumunium uk. 2200 x 4200 mm Unit 4.00 9,500,000.00 38,000,000.00 0.676

A.3 PEKERJAAN LANGIT- LANGIT


1 Gypsum Board t=9mm, Rangka Hollow 40x40mm t=0.35mm Galvanized + Gantungan M3 117.48 208,560.00 24,501,628.80 0.436

A.4 PEKERJAAN FINISHING LANTAI & DINDING


1 Lantai Keramik 40 x 40 cm Polished M2 90.05 365,143.00 32,881,127.15 0.585
2 Lantai Keramik 40 x 40 cm Unpolished M2 7.56 365,143.00 2,760,481.08 0.049
3 Lantai Keramik area basah 25 x 25 cm Unpolished M2 5.40 349,917.00 1,889,551.80 0.034
4 Plint Keramik 10 x 40cm setaraf Lantai M 78.60 84,221.00 6,619,770.60 0.118
5 Dinding Keramik Area Basah 25 x 40cm Tipe Polished M2 24.24 340,023.00 8,242,157.52 0.147
6 Water Profing Membrane + Screed M2 509.41 160,848.00 81,937,579.68 1.457
7 Pagar Pengaman dari Pipa BSP 2 + WM 10-150 Finish M2 113.48 1,350,000.00 153,198,000.00 2.723
Cat Minyak
8 Hand Railing dari Pipa BSP Finish Cat Minyak M 109.20 450,000.00 49,140,000.00 0.874
9 Floor Hardener M2 426.98 155,000.00 66,181,900.00 1.177

A.5 PEKERJAAN SANITAIR


1 Closet duduk setara TOTO Type CW 421 J / SW420JP Unit 2.00 3,900,000.00 7,800,000.00 0.139
2 Wastafel setara TOTO tipe LW 236 CJ Unit 2.00 4,600,000.00 9,200,000.00 0.164
3 Floor drain setara TOTO Type TX 1 BN Unit 2.00 400,000.00 800,000.00 0.014
4 Paper holder setara. Toto tipe TX720ACRB Unit 2.00 400,000.00 800,000.00 0.014
5 Shower Spray THX 20 MCRB + TX277S Unit 2.00 400,000.00 800,000.00 0.014
6 Urnal setara TOTO tipe U 370 M Unit 2.00 4,500,000.00 9,000,000.00 0.160
7 Double Robe Hook TOTO Type TS 118 WS Unit 2.00 200,000.00 400,000.00 0.007
8 Kaca Cermin M2 1.20 340,000.00 408,000.00 0.007
No. Uraian Pekerjaan Satuan Volume
PEKERJAAN
Harga Satuan Harga Satuan
%

9 Cove lampu diatas Wastafel dari kayu kelas II finish cat M 1.20 50,000.00 60,000.00 0.001

A.6 PEKERJAAN PENGECATAN


1 Pengecatan Dinding Interior Jenis Cat Acrylic Emulsion M2 170.93 26,873.00 4,593,401.89 0.082
2 Pengecatan Dinding Exterior Jenis Cat Weathershield M2 793.45 49,953.00 39,635,207.85 0.705
3 Pengecatan Balok Beton Exposed Setara Jenis Cat AEP M2 256.29 26,873.00 6,887,281.17 0.122
4 Pengecatan Dak Beton Exposed Setara jenis Cat AEP M2 112.50 26,873.00 3,023,212.50 0.054

A.7 PEKERJAAN PENUTUP ATAP


1 Rangka Atap Dari Pipa Baja Sch 40 Kg 4,003.26 55,775.00 223,281,826.50 3.969
2 Pekerjaan Rangka Atap Baja Ringan M2 119.26 302,002.00 36,016,758.52 0.640
3 Penutup Atap Zincalum t=0.50 mm M2 263.18 447,385.00 117,742,784.30 2.093
4 Pengecatan Rangka Atap Dengan Cat Duco M2 92.79 94,216.00 8,742,302.64 0.155
5 Water Profing + Screed M2 92.52 160,848.00 14,881,656.96 0.265
6 Roof Drain Bh 9.00 500,000.00 4,500,000.00 0.080
7 Pipa PVC dia 4 M 108.00 78,000.00 8,424,000.00 0.150
8 Talang Air Seng Plat M 18.00 110,000.00 1,980,000.00 0.035

JUMLAH 5,625,139,564.86 100.0


JADWAL PELAKSANAAN PEKERJAAN KURVA "S"
Paket Pekerjaan : PEMBANGUNAN SIRKUIT BALAP MOTOR
Lokasi : DISTRIK TANAH MIRING, KABUPATEN MERAUKE
Tahun : 2019
WAKTU PELAKSANAAN 210 HARI KALENDER
Bobot %
BULAN DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI BULAN VIII
MINGGU KE : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
No. URAIAN KET
2 9 16 23
Renc Real
TANGGAL S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
8 15 22 29 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr

I PEKERJAAN PERSIAPAN 100


A PEKERJAAN PERSIAPAN UMUM 0.67 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
B PEKERJAAN MOBILISASI DAN DEMOBILISASI 0.11 0.04 0.04 0.04

II PEKERJAAN PEMBENTUKAN LAHAN (CUT & FILL) 9.06 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65
90
III PEKERJAAN STRUKTURAL
A GEDUNG TRIBUN 3.74 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
B GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP) 1.28 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
C RUMAH JAGA 0.25 0.04 0.04 0.04 0.04 0.04 0.04
80
D TOILET 0.30 0.07 0.07 0.07 0.07
E BENGKEL (TIDAK TERMASUK LINGKUP) 0.33 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
F POS JAGA (3 UNIT) 0.06 0.02 0.02 0.02
G BANGUNAN GERBANG MASUK 0.12 0.03 0.03 0.03 0.03 0.03
70
IV PEKERJAAN ARSITEKTURAL
A GEDUNG TRIBUN 4.18 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
B GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP) 1.44 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
C RUMAH JAGA 0.74 0.25 0.25 0.25
D TOILET 0.50 0.25 0.25 60
E BENGKEL (TIDAK TERMASUK LINGKUP) 0.60 0.15 0.15 0.15 0.15
F POS JAGA (3 UNIT) 0.12 0.06 0.06
G BANGUNAN GERBANG MASUK 0.07 0.07
H LANDSCAPE 15.27 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09
50
V PEKERJAAN LANSEKAP
A PEKERJAAN HARDSCAPE 1.11 0.28 0.28 0.28 0.28

VI PEKERJAAN INFRASTRUKTUR
40
A PEKERJAAN DRAINASE 2.73 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19
B. PEKERJAAN JALAN 46.77 1.23 1.23 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46
C MARKA JALAN 7.97 1.99 1.99 1.99 1.19 0.80

VII PEKERJAAN ELEKTRIKAL 30


A PENYAMBUNGAN, DISTRIBUSI DAN PEMBANGKITAN DAYA 1.10 0.27 0.27 0.27 0.27
B PEKERJAAN INSTALASI PENERANGAN 0.53 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
C PEKERJAAN PENANGKAL PETIR 0.09 0.09
D PEKERJAAN SISTEM TELEPON 0.11 0.03 0.03 0.03 0.03
SISTEM TATA SUARA 20
E. 0.14 0.03 0.03 0.03 0.03
F SISTEM FIRE ALARM 0.08 0.02 0.02 0.02 0.02 0.02

VIII PEKERJAAN MEKANIKAL


A PEKERJAAN PLUMBING AIR BERSIH 0.10 0.02 0.02 0.02 0.02 0.02 0.02 10
B PEMIPAAN AIR BERSIH TOILET 0.01 0.01 0.01
C PEMIPAAN AIR KOTOR DAN BUANGAN TOILET 0.14 0.04 0.04 0.04 0.04
D PEMIPAAN AIR BERSIH KE AREA MOTOR CROSS 0.08 0.02 0.02 0.02 0.02 0.02
E PEKERJAAN SISTEM TATA UDARA 0.08 0.04 0.04
F BANGUNAN SEKERTARIAT 0.10 0.02 0.02 0.02 0.02 0

Bobot (%) 100 0.06 0.06 0.67 0.89 1.08 2.32 2.32 3.55 3.45 3.49 3.49 3.49 3.49 3.49 3.49 4.58 4.28 4.66 4.66 4.70 4.59 4.53 4.53 4.61 4.96 4.99 4.88 4.69 3.06 0.98
Rencana
Kumulatif (%) - 0.06 0.12 0.79 1.68 2.76 5.08 7.39 10.94 14.39 17.88 21.37 24.86 28.35 31.84 35.33 39.92 44.19 48.85 53.51 58.21 62.80 67.33 71.86 76.47 81.43 86.41 91.30 95.99 99.05 100
KEMAJUAN
PEKERJAAN Bobot (%) - #REF!
Realisasi
Kumulatif (%) - - #REF!
Deviasi Bobot (%) - 0.059 #REF!

KONTRAKTOR PELAKSANA
PT. BANGUN PERSADA PAPUA RAYA

JONI PASULE
Direktur
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA

PEKERJAAN : PEMBANGUNAN SIRKUIT BALAP MOTOR PEKERJAAN : PENGAWASAN PEMBANGUNAN SIRKUIT BALAP MOTOR
KONTRAKTOR : PT. PEMBANGUNAN JAYA PAPUA RAYA KONSULTAN : PT. MAKROTHUMIA EIRENE CONSULTANT
NO. KONTRAK : 03/KONTRAK/DAK - K1/DPUPRP - BM/V/2018 NO. KONTRAK : 10/KONTRAK/DAU-PENG.DAK.1/DPUPRP - BM/V/2018
TGL MULAI KERJA : 02 DESEMBER 2019 TANGGAL KONTRAK : 2 DESEMBER 2019
LOKASI : DISTRIK TANAH MIRING SUMBER DANA : APBD
KABUPATEN : MERAUKE - PAPUA TAHUN ANGGARAN : 2019 - 2020

LAPORAN MINGGU KE - 1
PERIODE 2 DESEMBER S/D 8 DESEMBER
TAHUN 2019
PEKERJAAN : GEDUNG TRIBUN

BOBOT REALISASI KEMAJUAN FISIK


NILAI MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
No. Uraian Pekerjaan Satuan Volume PROGRES
PEKERJAAN BOBOT BOBOT BOBOT
VOLUME VOLUME VOLUME
% % % % %

III PEKERJAAN STRUKTURAL


A GEDUNG TRIBUN
A.1 PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank M 215.00 0.3587 - - - - - - -

A.2 PEKERJAAN TANAH DAN PASIR


1 Galian Tanah Pondasi M3 436.66 1.1817 - - - - - - -
2 Urugan Tanah Kembali Galian Pondasi M3 145.55 0.1313 - - - - - - -
3 Urugan Pasir Bawah Pondasi tebal 10 cm M3 26.46 0.4134 - - - - - - -

A.3 PEKERJAAN STRUKTUR LANTAI 1


1 Pek. Cor lantai kerja 1pc 6psr
˗ Beton campuran 1pc 6psr M3 13.23 0.6841 - - - - - - -
˗ Bekisting Kayu Kelas III (Setara bekisting Pondasi) M2 7.02 0.0309 - - - - - - -
2 Pek. Pondasi poer plat F1 , uk. 9920 x 120 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 95.23 5.9123 - - - - - - -
˗ Pembesian Besi polos . 13 mm SNI Kg 7,367.88 2.6664 - - - - - - -
˗ Bekisting untuk Pondasi M2 6.07 0.0267 - - - - - - -
3 Pek. Pondasi poer plat F2 , uk. 2680 x 80 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 8.58 0.5327 - - - - - - -
˗ Pembesian Besi polos . 13 mm SNI Kg 699.20 0.2530 - - - - - - -
˗ Bekisting untuk Pondasi M2 6.07 0.0267 - - - - - - -
4 Pek. Pondasi poer plat FG , uk. 160 x 80 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.05 0.1273 - - - - - - -
˗ Pembesian Besi polos . 13 mm SNI Kg 178.26 0.0645 - - - - - - -
˗ Bekisting untuk Pondasi M2 2.11 0.0093 - - - - - - -
5 Pek. Kolom Pedestal K-1 , uk. 30 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 5.94 0.3688 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 1,974.95 0.7147 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 183.10 0.0663 - - - - - - -
˗ Bekisting untuk kolom M2 17.82 0.1330 - - - - - - -
6 Pek. Kolom Pedestal K-2 , uk. 50 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.35 0.0838 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 269.31 0.0975 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 36.07 0.0131 - - - - - - -
˗ Bekisting untuk kolom M2 3.96 0.0296 - - - - - - -
7 Pek. Sloof TB1, uk. 25 x 45 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 41.12 2.5529 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 4,679.04 1.6933 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 1,032.91 0.3738 - - - - - - -
˗ Bekisting untuk sloof M2 94.59 0.4165 - - - - - - -
8 Pek. Balok B1, uk. 25 x 45 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 53.82 3.3414
˗ Pembesian Besi polos . 16 mm SNI Kg 6,107.41 2.2102 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 1,622.13 0.5870 - - - - - - -
˗ Bekisting untuk Balok M2 123.79 0.9366 - - - - - - -
9 Pek. Balok B2, uk. 20 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 8.64 0.5364 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 1,370.67 0.4960 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 299.62 0.1084 - - - - - - -
˗ Bekisting untuk Balok M2 24.30 0.1839 - - - - - - -
10 Pek. Kolom K1, uk. 30 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 20.20 1.2541 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 3,974.89 1.4385 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 622.54 0.2253 - - - - - - -
˗ Bekisting untuk kolom M2 60.59 0.4523 - - - - - - -
11 Pek. Kolom K2, uk. 50 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.59 0.2850 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 542.03 0.1962 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 122.62 0.0444 - - - - - - -
˗ Bekisting untuk kolom M2 11.02 0.0823 - - - - - - -
12 Pek. Pelat Lantai 2, Tebal. 12 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 70.48 4.3757 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 4,206.76 1.5224 - - - - - - -
˗ Bekisting untuk Pelat Lantai M2 264.44 2.3360 - - - - - - -
13 Pek. Tangga type 1 12 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 6.82 0.4234 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 757.88 0.2743 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 203.49 0.0736 - - - - - - -
˗ Bekisting untuk Pelat Lantai M2 22.10 0.1952 - - - - - - -
14 Pek. Tangga Type 2 12 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.57 0.1596 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 361.99 0.1310 - - - - - - -
˗ Bekisting untuk Pelat Lantai M2 7.39 0.0653 - - - - - - -

A.4 PEKERJAAN STRUKTUR LANTAI 2


1 Pekerjaan Kolom uk. 30x30 cm (K1d)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 3.46 0.2148 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 692.41 0.2506 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 130.20 0.0471 - - - - - - -
˗ Bekisting untuk kolom M2 9.22 0.0688 - - - - - - -
2 Pekerjaan Kolom uk. 50x30 cm (K2c)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.32 0.2682 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 519.30 0.1879 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 115.41 0.0418 - - - - - - -
˗ Bekisting untuk kolom M2 9.22 0.0688 - - - - - - -
3 Pekerjaan Ringbalk uk. 45x25 cm (RB1c)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 18.03 1.1194 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 2,063.96 0.7469 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 543.37 0.1966 - - - - - - -
˗ Bekisting untuk ringbalk M2 36.86 0.2789 - - - - - - -
4 Pekerjaan Plat lantai Tribun, Undagan (S1)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 13.50 0.8381 - - - - - - -
˗ Pembesian Besi polos . 13 mm SNI Kg 2,326.26 0.8419 - - - - - - -
˗ Bekisting untuk plat lantai M2 22.50 0.1988 - - - - - - -
5 Pekerjaan Balok uk. 45x25 cm, Tribun (B1)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.84 0.1763 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 410.09 0.1484 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 129.47 0.0469 - - - - - - -
˗ Bekisting untuk ringbalk M2 17.33 0.1311 - - - - - - -
6 Pekerjaan Plat Dak Tribun, Torn (S2)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.08 0.2533 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 428.11 0.1549 - - - - - - -
˗ Bekisting untuk plat lantai M2 7.41 0.0655 - - - - - - -

IV PEKERJAAN ARSITEKTURAL
A GEDUNG TRIBUN
0 PEKERJAAN ARSITEKTUR LANTAI 1
A.1 PEKERJAAN TANAH DAN PASIR
1 Urugan Pasir Bawah Lantai tebal 10 cm M3 39.27 0.6135 - - - - - - -
2 Urugan Tanah Peninggian Lantai M3 174.84 0.8766 - - - - - - -

A.2 PEKERJAAN PASANGAN DINDING


1 Pasangan Dinding Bata merah Tebal 1/2 Bata, 1PC 4PS - Pasir Import M2 616.42 3.6128 - - - - - - -
2 Plesteran 1PC 3PS, Tebal 20 mm - Pasir Import M2 1,232.84 3.8336 - - - - - - -
3 Pekerjaan Acian M2 1,232.84 1.3589 - - - - - - -
4 Cor lantai ruangan tebal 5 cm, 1 pc 3psr M3 23.10 1.6773 - - - - - - -
5 Pek. Kolom praktis, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 0.60 0.0373 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 176.37 0.0638 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 33.27 0.0120 - - - - - - -
˗ Bekisting untuk Kolom M2 2.18 0.0163 - - - - - - -
6 Pek. Balok Lintel, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.47 0.0913 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 451.65 0.1634 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 81.50 0.0295 - - - - - - -
˗ Bekisting untuk Balok M2 5.35 0.0405 - - - - - - -

A.3 PEKERJAAN KUSEN,PINTU/JENDELA TERMASUK FINISHING & ACCESSORIES


1 Tipe PG Pintu Polding get uk. 270x220 Cm Unit 28.00 7.4764 - - - - - - -
2 Tipe P1 Pintu Kaca Rangka dan kusen Alumunium uk. 170x220 Cm Unit 2.00 0.5262 - - - - - - -
3 Tipe P2 Pintu Double plywood rangka kayu kusen Alumunium uk. 70x220 Cm (Area Toilet) Unit 2.00 0.1458 - - - - - - -
4 Tipe P3 Pintu Double plywood rangka kayu kusen Alumunium uk. 80x220 Cm (Area Toilet) Unit 2.00 0.0978 - - - - - - -
5 Tipe GR1 Ventilasi Angin uk. 2400 x 800 mm Unit 28.00 0.9955 - - - - - - -

A.4 PEKERJAAN LANGIT- LANGIT

A.5 PEKERJAAN FINISHING LANTAI & DINDING


1 Lantai Keramik Area Basah 25 x 25 cm Unpolished M2 19.98 0.1243 - - - - - - -
2 Dinding Keramik Area Basah 25 x 40cm Tipe Polished M2 65.49 0.3959 - - - - - - -
3 Floor Hardener M2 426.13 1.1742 - - - - - - -
6 Finishing Tangga
˗ Traf Tangga Vertikal Keramik 18x30 Cm Unpolished-setara Roman Gol.B M2 20.20 0.1257 - - - - - - -
˗ Step tile keramik 30 x 30 cm unpolished setara Roman M2 33.66 0.2094 - - - - - - -
˗ Hand Railing dari pipa BSP finish cat minyak M 67.20 0.5376 - - - - - - -
A.6 PEKERJAAN SANITAIR
1 Closet duduk setara TOTO Type CW 421 J / SW420JP Unit 4.00 0.2773 - - - - - - -
2 Closet jongkok setara. Toto type CE 7 Unit 2.00 0.0391 - - - - - - -
3 Wastafel setara TOTO tipe LW 236 CJ Unit 6.00 0.4907 - - - - - - -
4 Floor drain setara TOTO Type TX 1 BN Unit 6.00 0.0427 - - - - - - -
5 Paper holder setara. Toto tipe TX720ACRB Unit 6.00 0.0427 - - - - - - -
Shower Spray THX 20 MCRB Unit 6.00 0.0427 - - - - - - -
6
+ TX277S
7 Urinal setara TOTO tipe U 370 M Unit 4.00 0.3200 - - - - - - -
8 Urinal partition setara TOTO tipe A100 Unit 4.00 0.1422 - - - - - - -
9 Double Robe Hook TOTO Type TS 118 WS Unit 6.00 0.0213 - - - - - - -
10 Kaca Cermin M2 3.60 0.0218 - - - - - - -
11 Cove lampu diatas Wastafel dari kayu kelas II finish cat M 3.60 0.0032 - - - - - - -
12 Partisi cubical toilet lengkap daun pintu berikut Accessories Unit 4.00 0.3093 - - - - - - -

A.7 PEKERJAAN PENGECATAN


1 Pengecatan Dinding Interior Jenis Cat Acrylic Emulsion M2 932.11 0.4453 - - - - - - -
2 Pengecatan Dinding Exterior Jenis Cat Weathershield M2 328.89 0.2921 - - - - - - -
3 Pengecatan Balok Beton Exposed Setara Jenis Cat AEP M2 921.50 0.4402 - - - - - - -
4 Pengecatan Dak Beton Exposed Setara jenis Cat AEP M2 593.13 0.2834 - - - - - - -

PEKERJAAN ARSITEKTUR LANTAI 2


A.1 PEKERJAAN PASANGAN DINDING
1 Pasangan Dinding Bata merah Tebal 1/2 Bata, 1PC 4PS - Pasir Import M2 482.19 2.8261 - - - - - - -
2 Plesteran 1PC 3PS, Tebal 20 mm - Pasir Import M2 964.39 2.9988 - - - - - - -
3 Pekerjaan Acian M2 964.39 1.0630 - - - - - - -
4 Pek. Kolom praktis, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.19 0.0739 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 363.29 0.1315 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 65.73 0.0238 - - - - - - -
˗ Bekisting untuk Kolom M2 4.31 0.0322 - - - - - - -
5 Pek. Balok Lintel, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.39 0.1484 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 434.11 0.1571 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 125.94 0.0456 - - - - - - -
˗ Bekisting untuk Kolom M2 9.58 0.0715 - - - - - - -

A.2 PEKERJAAN KUSEN,PINTU/JENDELA TERMASUK FINISHING & ACCESSORIES


1 Tipe P2 Pintu Pintu Double plywood rangka kayu kusen Alumunium uk. 700 x 2200 mm (Area Toilet) Unit 2.00 0.1458 - - - - - - -
2 Tipe P4 Pintu Pintu Double plywood rangka kayu kusen Alumunium uk. 1000 x 2700 mm Unit 6.00 0.4480 - - - - - - -
3 Tipe J1 Jendela Kaca Rangka Alumunium uk. 2200 x 4200 mm Unit 4.00 0.6755 - - - - - - -

A.3 PEKERJAAN LANGIT- LANGIT


1 Gypsum Board t=9mm, Rangka Hollow 40x40mm t=0.35mm Galvanized + Gantungan M3 117.48 0.4356 - - - - - - -

A.4 PEKERJAAN FINISHING LANTAI & DINDING


1 Lantai Keramik 40 x 40 cm Polished M2 90.05 0.5845 - - - - - - -
2 Lantai Keramik 40 x 40 cm Unpolished M2 7.56 0.0491 - - - - - - -
3 Lantai Keramik area basah 25 x 25 cm Unpolished M2 5.40 0.0336 - - - - - - -
4 Plint Keramik 10 x 40cm setaraf Lantai M 78.60 0.1177 - - - - - - -
5 Dinding Keramik Area Basah 25 x 40cm Tipe Polished M2 24.24 0.1465 - - - - - - -
6 Water Profing Membrane + Screed M2 509.41 1.4566 - - - - - - -
Pagar Pengaman dari Pipa BSP 2 + WM 10-150 Finish M2 113.48 2.7235 - - - - - - -
7
Cat Minyak
8 Hand Railing dari Pipa BSP Finish Cat Minyak M 109.20 0.8736 - - - - - - -
9 Floor Hardener M2 426.98 1.1765 - - - - - - -

A.5 PEKERJAAN SANITAIR


1 Closet duduk setara TOTO Type CW 421 J / SW420JP Unit 2.00 0.1387 - - - - - - -
2 Wastafel setara TOTO tipe LW 236 CJ Unit 2.00 0.1636 - - - - - - -
3 Floor drain setara TOTO Type TX 1 BN Unit 2.00 0.0142 - - - - - - -
4 Paper holder setara. Toto tipe TX720ACRB Unit 2.00 0.0142 - - - - - - -
5 Shower Spray THX 20 MCRB + TX277S Unit 2.00 0.0142 - - - - - - -
6 Urnal setara TOTO tipe U 370 M Unit 2.00 0.1600 - - - - - - -
7 Double Robe Hook TOTO Type TS 118 WS Unit 2.00 0.0071 - - - - - - -
8 Kaca Cermin M2 1.20 0.0073 - - - - - - -
9 Cove lampu diatas Wastafel dari kayu kelas II finish cat M 1.20 0.0011 - - - - - - -

A.6 PEKERJAAN PENGECATAN


1 Pengecatan Dinding Interior Jenis Cat Acrylic Emulsion M2 170.93 0.0817 - - - - - - -
2 Pengecatan Dinding Exterior Jenis Cat Weathershield M2 793.45 0.7046 - - - - - - -
3 Pengecatan Balok Beton Exposed Setara Jenis Cat AEP M2 256.29 0.1224 - - - - - - -
4 Pengecatan Dak Beton Exposed Setara jenis Cat AEP M2 112.50 0.0537 - - - - - - -

A.7 PEKERJAAN PENUTUP ATAP


1 Rangka Atap Dari Pipa Baja Sch 40 Kg 4,003.26 3.9694 - - - - - - -
2 Pekerjaan Rangka Atap Baja Ringan M2 119.26 0.6403 - - - - - - -
3 Penutup Atap Zincalum t=0.50 mm M2 263.18 2.0932 - - - - - - -
4 Pengecatan Rangka Atap Dengan Cat Duco M2 92.79 0.1554 - - - - - - -
5 Water Profing + Screed M2 92.52 0.2646 - - - - - - -
6 Roof Drain Bh 9.00 0.0800 - - - - - - -
7 Pipa PVC dia 4 M 108.00 0.1498 - - - - - - -
8 Talang Air Seng Plat M 18.00 0.0352 - - - - - - -

JUMLAH 100.0 0.000 0.000 0.000

RENCANA = 0.059 %
REALISASI = 0.000 %
DEVIASI = -0.059 %

MENGETAHUI: DISETUJUI OLEH : DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) DIREKSI TEKNIS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
PEMBANGUNAN SIRKUIT BALAP MOTOR PEMBANGUNAN SIRKUIT BALAP MOTOR PT. MAKROTHUMIA EIRENE CONSULTANT PT. BANGUN PERSADA PAPUA RAYA

LEO PATRIA MOGOT,ST U S M A N ,A . Md WAYAN DARYASA, ST. YANI SALEA BATU, ST.
NIP. 19730628 200605 1 002 NIP. 19610110 200012 1 002 Team Leader Sita Manager