Anda di halaman 1dari 9

DAFTAR KUANTITAS DAN HARGA

PEKERJAAN TAMBAH / KURANG (CCO) AMANDEMEN KONTRAK

PENINGKATAN JALAN BAAD - SINEGI DISTRIK ANIMHA KABUPATEN MERAUKE

SEMULA PEKERJAAN TAMBAH/KURANG (CCO)

NO URAIAN PEKERJAAN SAT. PEKERJAAN TAMBAH PEKERJAAN KURANG


PERKIRAAN HARGA SATUAN JUMLAH HARGA BOBOT
VOLUME (Rupiah) (Rupiah) (%)
VOLUME JLH. HARGA VOLUME

I DEVISI 1 UMUM
1 Mobilisasi Ls 1.00 125,750,000.00 125,750,000.00 1.07
2 Pengukuran Dan Pematokan Jalan M1 1,480.00 1,257.00 1,860,360.00 0.02 -

II DEVISI 2 PEKERJAAN TIMBUNAN TANAH DAN PASIR PADA BADAN DAN BAHU JALAN
1 Timbunan Pilihan Bahu Jalan M3 284.66 275,673.00 78,473,076.18 0.67 315.56 86,991,738.07
2 Penyiapan Badan Jalan M2 13,320.00 1,009.00 13,439,880.00 0.11 -
3 Urugan Pasir M3 37.00 408,681.00 15,121,197.00 0.13 37.00

III DEVISI 3 PEKERJAAN PERKERASAN BADAN JALAN


1 Pondasi Jalan Beton Bertulang 25/28 Cm
1.a Cor Beton Mutu Sedang fc' = 25 Mpa (K - 300) M3 121.36 3,898,287.00 473,096,110.32 4.03 85.84 334,628,956.08
1.b besi Tulangan Diameter 10 Kg 9,715.47 18,297.00 177,763,954.59 1.51 342.50
1.c besi Tulangan Diameter 8 Kg 6,074.67 18,055.00 109,678,166.85 0.93 2,734.30 49,367,858.72
1.d Bekisting Badan Jalan M2 43.69 283,743.00 12,396,731.67 0.11 252.31 71,591,196.33
2 LPA - Cor Badan Jalan Beton Bertulang Tebal 18 Cm
2.a Cor Beton Mutu Sedang fc' = 25 Mpa (K - 300) M3 1,465.49 3,898,287.00 5,712,900,615.63 48.62 0.29
2.b besi Tulangan Diameter 10 Kg 102,657.57 18,297.00 1,878,325,558.29 15.99 28,799.61
3 Dowel Tulangan Besi Diameter 16 Kg 67.26 18,478.00 1,242,830.28 0.01 372.61 6,885,124.54

IV DEVISI 4 PEKERJAAN LAPIS PERMUKAAN


1 Prime Coat (Lapis Pengikat) M2 8,880.00 20,804.00 184,739,520.00 1.57
2 HRS LATASTON (Tebal 4 Cm) M2 8,880.00 333,952.00 2,965,493,760.00 25.24

(A) JUMLAH 11,750,281,760.81 100.00 549,464,873.73


(B) PAJAK PERTAMBAHAN NILAI (PPN) = 10 % x (A) 1,175,028,176.08
(C) TOTAL HARGA (A) + (B) 12,925,309,936.89
(D) TOTAL HARGA DIBULATKAN 12,925,309,000.00

MENGETAHUI : MENYETUJUI : DIPERIKSA :


KEPALA DINAS PEKERJAAN UMUM PENATAAN PEJABAT PELAKSANA TEKNIS KEGIATN (PPTK) PENGAWAS LAPANGAN
RUANG DAN PERTANAHAN KABUPATEN MERAUKE PENINGKATAN JALAN BAAD - SINEGI PENINGKATAN JALAN BAAD - SINEGI

Ir. H.B.L.TOBING,MEng LEO PATRIA MOGOT,ST U S M A N ,A . Md


NIP. 19601216 199103 1 008 NIP. 19730628 200605 1 002 NIP. 19610110 200012 1 002
AFTAR KUANTITAS DAN HARGA
N TAMBAH / KURANG (CCO) AMANDEMEN KONTRAK

PEKERJAAN TAMBAH/KURANG (CCO) MENJADI

PEKERJAAN KURANG KET


PERKIRAAN HARGA SATUAN JUMLAH HARGA BOBOT (%)
VOLUME (Rupiah) (Rupiah)
JLH. HARGA

1.00 125,750,000.00 125,750,000.00 1.07 TETAP


- 1,480.0 1,257.00 1,860,360.00 0.02 TETAP

600.22 275,673.00 165,464,814.25 1.41 BERTAMBAH


- 13,320.00 1,009.00 13,439,880.00 0.11 TETAP
15,121,197.00 - 408,681.00 - - DIHILANGKAN

207.20 3,898,287.00 807,725,066.40 6.87 BERTAMBAH


6,266,715.18 9,372.97 18,297.00 171,497,239.41 1.46 BERKURANG
8,808.97 18,055.00 159,046,025.57 1.35 BERTAMBAH
296.00 283,743.00 83,987,928.00 0.71 BERTAMBAH

1,130,503.23 1,465.20 3,898,287.00 5,711,770,112.40 48.61 BERKURANG


526,946,458.31 73,857.96 18,297.00 1,351,379,099.98 11.50 BERTAMBAH
439.87 18,478.00 8,127,954.82 0.07 BERTAMBAH

8,880.00 20,804.00 184,739,520.00 1.57 TETAP


8,880.00 333,952.00 2,965,493,760.00 25.24 TETAP

549,464,873.73 11,750,281,760.82 100.00


1,175,028,176.08
12,925,309,936.90
12,925,309,000.00

DIPERIKSA : DIBUAT :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
PT.MAKROTHUMIA EIRENE CONSULTANT PT. TUNAS JAYA IRJA

WAYAN DARYASA, ST HENRY KURNIAWAN


Team Leader Direktur
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN
BIDANG BINA MARGA

KONTRAKTOR :PT. PEMBANGUNAN JAYA PAPUA RAYA


NO. KONTRAK : 03/KONTRAK/DAK - K1/DPUPRP - BM/V/2018
TGL MULAI KERJA : 23 MEI 2018
KONSULTAN : PT. MAKROTHUMIA EIRENE CONSULTANT

Kegiatan : -
Pekerjaan : PEMBANGUNAN SIRKUIT BALAP MOTOR
Lokasi : DISTRIK TANAH MIRING
Kabupaten : MERAUKE - PAPUA
T. Anggaran : 2019

DAFTAR KUANTITAS DAN HARGA


BOBOT
Jumlah
NILAI
No. Uraian Pekerjaan Satuan Volume
PEKERJAAN
Harga Satuan Harga Satuan %

I PEKERJAAN PERSIAPAN
A. PEKERJAAN PERSIAPAN UMUM 478,400,000.00 0.674
B. PEKERJAAN MOBILISASI DAN DEMOBILISASI 77,000,000.00 0.108

II PEKERJAAN PEMBENTUKAN LAHAN (CUT & FILL) 6,433,061,917.88 9.061

III PEKERJAAN STRUKTURAL


A. GEDUNG TRIBUN 2,657,426,718.86 3.743
B. GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP) 910,496,470.68 1.282
C. RUMAH JAGA 177,169,596.40 0.250
D. TOILET 209,937,048.46 0.296
E. BENGKEL (TIDAK TERMASUK LINGKUP) 231,436,877.32 0.326
F. POS JAGA (3 UNIT) 39,597,012.19 0.056
G. BANGUNAN GERBANG MASUK 86,246,855.83 0.121

IV PEKERJAAN ARSITEKTURAL
A. GEDUNG TRIBUN 2,967,712,846.00 4.180
B. GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP) 1,019,217,984.12 1.436
C. RUMAH JAGA 526,906,824.01 0.742
D. TOILET 357,025,666.62 0.503
E. BENGKEL (TIDAK TERMASUK LINGKUP) 423,373,185.13 0.596
F. POS JAGA (3 UNIT) 87,709,150.99 0.124
G. BANGUNAN GERBANG MASUK 52,037,207.65 0.073
H. LANDSCAPE 10,844,334,975.64 15.274

V PEKERJAAN LANSEKAP
A. PEKERJAAN HARDSCAPE 788,347,303.00 1.110

VI PEKERJAAN INFRASTRUKTUR
A. PEKERJAAN DRAINASE 1,937,944,871.80 2.730
B. PEKERJAAN JALAN 33,205,620,463.00 46.770
C. MARKA JALAN 5,656,194,000.00 7.967

VII PEKERJAAN ELEKTRIKAL


A. PENYAMBUNGAN, DISTRIBUSI DAN PEMBANGKITAN DAYA 778,615,000.00 1.097
B. PEKERJAAN INSTALASI PENERANGAN 378,980,000.00 0.534
C. PEKERJAAN PENANGKAL PETIR 61,560,000.00 0.087
D. PEKERJAAN SISTEM TELEPON 79,892,000.00 0.113
E. SISTEM TATA SUARA 98,493,000.00 0.139
F. SISTEM FIRE ALARM 59,820,000.00 0.084

VIII PEKERJAAN MEKANIKAL


A. PEKERJAAN PLUMBING AIR BERSIH 74,169,000.00 0.104
B. PEMIPAAN AIR BERSIH TOILET 8,697,000.00 0.012
C. PEMIPAAN AIR KOTOR DAN BUANGAN TOILET 102,746,000.00 0.145
D. PEMIPAAN AIR BERSIH KE AREA MOTOR CROSS 57,850,000.00 0.081
E. PEKERJAAN SISTEM TATA UDARA 60,320,000.00 0.085
F. BANGUNAN SEKERTARIAT 69,920,000.00 0.098

(A) JUMLAH 70,998,258,975.58 100.000


(B) PAJAK PERTAMBAHAN NILAI (PPN) = 10 % x (A) 7,099,825,897.56
(C) TOTAL HARGA (A) + (B) 78,098,084,873.14
(D) TOTAL HARGA DIBULATKAN 78,098,084,000.00
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN
BIDANG BINA MARGA

KONTRAKTOR : : PT. PT. PEMBANGUNAN JAYA PAPUA RAYA


NO. KONTRAK : : 03/KONTRAK/DAK - K1/DPUPRP - BM/V/2018
TGL MULAI KERJA : : 23 MEI 2018
KONSULTAN : : PT. MAKROTHUMIA EIRENE CONSULTANT
:
Kegiatan : PEMBANGUNAN SIRKUIT BALAP MOTOR
Pekerjaan : GEDUNG SEKRETARIAT
Lokasi : DISTRIK TANAH MIRING
Kabupaten : MERAUKE - PAPUA
T. Anggaran : 2019

DAFTAR KUANTITAS DAN HARGA SEKRETARIAT


BOBOT
Jumlah
NILAI
No. Uraian Pekerjaan Satuan Volume
PEKERJAAN
Harga Satuan Harga Satuan
%

III PEKERJAAN STRUKTURAL


B GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP)
B.1 PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank M 80.00 93,857.00 7,508,560.00 0.389

B.2 PEKERJAAN TANAH DAN PASIR


Galian Tanah Pondasi M3 37.22 152,233.00 5,666,112.26 0.294
Urugan Tanah Kembali Galian Pondasi M3 12.41 50,744.00 629,733.04 0.033
Urugan Pasir Bawah Pondasi tebal 10 cm M3 3.17 878,744.00 2,785,618.48 0.144

B.3 PEKERJAAN STRUKTUR BANGUNAN


1 Pek. Cor lantai kerja 1pc 6psr
˗ Beton campuran 1pc 6psr M3 1.58 2,908,534.00 4,595,483.72 0.238
˗ Bekisting Kayu Kelas III (Setara bekisting Pondasi) M2 0.12 247,699.00 29,723.88 0.002
2 Pek. Pondasi poer plat F1 , uk. 120 x 120 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 9.50 3,492,364.00 33,177,458.00 1.719
˗ Pembesian Besi polos . 16 mm SNI Kg 1,522.18 20,357.00 30,987,018.26 1.606
˗ Bekisting untuk Pondasi M2 6.34 247,699.00 1,570,411.66 0.081
3 Pek. Kolom Pedestal K-1 , uk. 30 x 70 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.39 3,492,364.00 4,854,385.96 0.252
˗ Pembesian Besi polos . 16 mm SNI Kg 257.95 20,357.00 5,251,088.15 0.272
˗ Pembesian Besi polos . 10 mm SNI Kg 35.32 20,357.00 719,009.24 0.037
˗ Bekisting untuk kolom M2 2.64 419,917.00 1,108,580.88 0.057
4 Pek. Kolom Pedestal K-2 , uk. 25 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.32 3,492,364.00 4,609,920.48 0.239
˗ Pembesian Besi polos . 16 mm SNI Kg 374.23 20,357.00 7,618,200.11 0.395
˗ Pembesian Besi polos . 10 mm SNI Kg 47.20 20,357.00 960,850.40 0.050
˗ Bekisting untuk kolom M2 3.43 419,917.00 1,440,315.31 0.075
5 Pek. Kolom Pedestal K-3 , uk. 20 x 70 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 0.62 3,492,364.00 2,165,265.68 0.112
˗ Pembesian Besi polos . 16 mm SNI Kg 187.12 20,357.00 3,809,201.84 0.197
˗ Pembesian Besi polos . 8 mm SNI Kg 14.41 20,357.00 293,344.37 0.015
˗ Bekisting untuk kolom M2 1.58 419,917.00 663,468.86 0.034
6 Pek. Sloof TB1, uk. 25 x 50 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 8.75 3,492,364.00 30,558,185.00 1.584
˗ Pembesian Besi polos . 16 mm SNI Kg 1,129.07 20,357.00 22,984,477.99 1.191
˗ Pembesian Besi polos . 10 mm SNI Kg 358.67 20,357.00 7,301,445.19 0.378
˗ Bekisting untuk sloof M2 17.40 247,699.00 4,309,962.60 0.223
7 Pek. Sloof TB1-b, uk. 25 x 50 cm + kupingan 15 x 25 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 8.45 3,492,364.00 29,510,475.80 1.529
˗ Pembesian Besi polos . 16 mm SNI Kg 838.36 20,357.00 17,066,494.52 0.884
˗ Pembesian Besi polos . 10 mm SNI Kg 266.44 20,357.00 5,423,919.08 0.281
˗ Bekisting untuk sloof M2 18.72 247,699.00 4,636,925.28 0.240
8 Pek. Sloof TB3, uk. 20 x 40 cm + kupingan 15 x 25 cm x 2
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.24 3,492,364.00 14,807,623.36 0.767
˗ Pembesian Besi polos . 16 mm SNI Kg 474.61 20,357.00 9,661,635.77 0.501
˗ Pembesian Besi polos Ø. 10 mm SNI Kg 241.21 20,357.00 4,910,311.97 0.254
˗ Bekisting untuk sloof M2 8.69 247,699.00 2,152,504.31 0.112
9 Pek. Kolom K1, uk. 30 x 70 cm
˗ Campuran beton 1PC : 2PS : 3KR, Import (mekanis) M3 6.55 3,492,364.00 22,874,984.20 1.185
˗ Pembesian Besi polos Ø. 16 mm SNI Kg 746.57 20,357.00 15,197,925.49 0.788
˗ Pembesian Besi polos Ø. 10 mm SNI Kg 166.96 20,357.00 3,398,804.72 0.176
˗ Bekisting untuk kolom M2 12.48 419,917.00 5,240,564.16 0.272
10 Pek. Kolom K2, uk. 25 x 40 cm
˗ Campuran beton 1PC : 2PS : 3KR, Import (mekanis) M3 6.24 3,492,364.00 21,792,351.36 1.129
˗ Pembesian Besi polos Ø. 16 mm SNI Kg 995.43 20,357.00 20,263,968.51 1.050
˗ Pembesian Besi polos Ø. 10 mm SNI Kg 223.12 20,357.00 4,542,053.84 0.235
˗ Bekisting untuk kolom M2 16.22 419,917.00 6,811,053.74 0.353
No. Uraian Pekerjaan Satuan Volume
PEKERJAAN
Harga Satuan Harga Satuan
%

11 Pek. Kolom K3, uk. 20 x 70 cm


˗ Campuran beton 1PC : 2PS : 3KR, Import (mekanis) M3 2.91 3,492,364.00 10,162,779.24 0.527
˗ Pembesian Besi polos Ø. 16 mm SNI Kg 497.71 20,357.00 10,131,882.47 0.525
˗ Pembesian Besi polos Ø. 8 mm SNI Kg 68.12 20,357.00 1,386,718.84 0.072
˗ Bekisting untuk kolom M2 18.72 419,917.00 7,860,846.24 0.407
12 Pekerjaan Ringbalk uk. 50x25 cm (RB1b)
˗ Campuran beton 1PC : 2PS : 3KR, Import (mekanis) M3 17.88 3,492,364.00 62,443,468.32 3.236
˗ Pembesian Besi polos Ø. 16 mm SNI Kg 2,964.69 20,357.00 60,352,194.33 3.128
˗ Pembesian Besi polos . 10 mm SNI Kg 747.23 20,357.00 15,211,361.11 0.788
˗ Bekisting untuk ringbalk M2 36.29 425,609.00 15,445,350.61 0.800
13 Pekerjaan Ringbalk uk. 40x20 cm (RB2)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.96 3,492,364.00 10,337,397.44 0.536
˗ Pembesian Besi polos . 16 mm SNI Kg 490.14 20,357.00 9,977,779.98 0.517
˗ Pembesian Besi polos . 10 mm SNI Kg 147.76 20,357.00 3,007,950.32 0.156
˗ Bekisting untuk ringbalk M2 7.40 425,609.00 3,149,506.60 0.163
14 Pek. Pelat dak atap, Tebal. 12 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 31.97 3,492,364.00 111,650,877.08 5.786
˗ Pembesian Besi polos . 10 mm SNI Kg 3,315.03 20,357.00 67,484,065.71 3.497
˗ Bekisting untuk Pelat Lantai M2 58.94 496,909.00 29,287,816.46 1.518
15 Pek. Lisplank beton LB1, uk. 20 x 50 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 3.76 3,492,364.00 13,131,288.64 0.680
˗ Pembesian Besi polos . 16 mm SNI Kg 481.81 20,357.00 9,808,206.17 0.508
˗ Pembesian Besi polos . 8 mm SNI Kg 114.23 20,357.00 2,325,380.11 0.121
˗ Bekisting Kayu Kelas III M2 9.02 247,699.00 2,234,244.98 0.116
16 Pek. Lisplank beton LB2, uk. 15 x 50 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.40 3,492,364.00 15,366,401.60 0.796
˗ Pembesian Besi polos . 16 mm SNI Kg 743.41 20,357.00 15,133,597.37 0.784
˗ Pembesian Besi polos . 8 mm SNI Kg 163.90 20,357.00 3,336,512.30 0.173
˗ Bekisting Kayu Kelas III M2 13.48 247,699.00 3,338,982.52 0.173
17 Pek. Beton ornamen lingkaran dinding, uk. 70 x 10 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.40 3,492,364.00 15,366,401.60 0.796
˗ Pembesian Besi polos . 16 mm SNI Kg 743.41 20,357.00 15,133,597.37 0.784
˗ Pembesian Besi polos . 8 mm SNI Kg 163.90 20,357.00 3,336,512.30 0.173
˗ Bekisting Kayu Kelas III M2 13.48 247,699.00 3,338,982.52 0.173
18 Pek. Beton ornamen lingkaran dinding, uk. 70 x 10 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.63 3,492,364.00 9,184,917.32 0.476
˗ Pembesian Besi polos . 16 mm SNI Kg 240.90 20,357.00 4,904,001.30 0.254
˗ Pembesian Besi polos . 10 mm SNI Kg 54.09 20,357.00 1,101,110.13 0.057
˗ Bekisting Kayu Kelas III M2 6.77 247,699.00 1,676,922.23 0.087

IV PEKERJAAN ARSITEKTURAL
B GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP)
B.1 PEKERJAAN TANAH DAN PASIR
1 Urugan Pasir Bawah Lantai tebal 10 cm M3 29.00 878,744.00 25,483,576.00 1.321
2 Urugan Tanah Peninggian Lantai M3 134.17 282,037.00 37,840,904.29 1.961

B.2 PEKERJAAN PASANGAN DINDING


1 Pasangan Dinding Bata merah Tebal 1/2 Bata, 1PC 4PS - Pasir Import M2 354.32 329,687.00 116,814,697.84 6.053
2 Plesteran 1PC 3PS, Tebal 20 mm - Pasir Import M2 708.63 174,916.00 123,950,725.08 6.423
3 Pekerjaan Acian M2 708.63 62,001.00 43,935,768.63 2.277
4 Cor lantai ruangan tebal 5 cm, 1 pc 3psr M3 8.15 4,084,554.00 33,289,115.10 1.725
5 Cor lantai rabat tebal 7 cm, 1 pc 3psr + aci kasar M3 5.77 4,084,554.00 23,567,876.58 1.221
6 Pas. Batu pot pohon M3 6.12 2,967,183.00 18,159,159.96 0.941
7 Plesteran dinding pot pohon M2 34.00 131,187.00 4,460,358.00 0.231
8 Curb Beton 1pc 3psr ( Tanpa tulangan ) M3 1.02 4,084,554.00 4,166,245.08 0.216
9 Pas. Batu tangga rabat / Selasar M3 9.10 2,967,183.00 27,001,365.30 1.399
10 Pek. Kolom praktis, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 0.37 3,492,364.00 1,292,174.68 0.067
˗ Pembesian Besi polos . 10 mm SNI Kg 95.73 20,357.00 1,948,775.61 0.101
˗ Pembesian Besi polos . 8 mm SNI Kg 20.53 20,357.00 417,929.21 0.022
˗ Bekisting untuk Kolom M2 1.85 419,917.00 776,846.45 0.040
11 Pek. Balok Lintel, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.49 3,492,364.00 5,203,622.36 0.270
˗ Pembesian Besi polos . 10 mm SNI Kg 333.23 20,357.00 6,783,563.11 0.352
˗ Pembesian Besi polos . 8 mm SNI Kg 82.37 20,357.00 1,676,806.09 0.087
˗ Bekisting untuk Balok M2 6.40 425,609.00 2,723,897.60 0.141

B.3 PEKERJAAN KUSEN,PINTU/JENDELA TERMASUK FINISHING & ACCESSORIES


1 Tipe P1 Pintu Pintu Double plywood rangka kayu kusen Alumunium uk. 900 x 2900 Unit 3.00 4,100,000.00 12,300,000.00 0.637
mm
2 Tipe CW.1 Curtain Wall back Mullion System + tinted tempered glass + accessories Unit 1.00 89,000,000.00 89,000,000.00 4.612
3 Tipe CW.2 Curtain Wall back Mullion System + tinted tempered glass + accessories Unit 1.00 84,000,000.00 84,000,000.00 4.353
4 Tipe CW.3 Curtain Wall back Mullion System + tinted tempered glass + accessories Unit 1.00 51,000,000.00 51,000,000.00 2.643
No. Uraian Pekerjaan Satuan Volume
PEKERJAAN
Harga Satuan Harga Satuan
%

B.4 PEKERJAAN LANGIT- LANGIT


1 Gypsum Board t=9mm, Rangka Hollow 40x40mm t=0.35mm Galvanized + Gantungan M3 144.00 208,560.00 30,032,640.00 1.556
2 Plafond Gypsum Waterproof, t=12mm berikut Rangka Hollow Galvanised t=0.4mm M3 126.97 236,928.00 30,082,748.16 1.559
3 Acian Beton Expose M 279.95 62,001.00 17,357,179.95 0.899

B.5 PEKERJAAN FINISHING LANTAI & DINDING


1 Lantai Keramik 40 x 40 cm Polished M2 148.80 365,143.00 54,333,278.40 2.816
2 Lantai Keramik 40 x 40 cm Unpolished M2 118.67 365,143.00 43,331,519.81 2.245
3 Plint Keramik 10 x 40cm setaraf Lantai M 73.60 84,221.00 6,198,665.60 0.321
4 Bak Kontrol Pasangan Bata Ukuran (300 x 300) x 500 Unit 4.00 1,350,000.00 5,400,000.00 0.280
5 Bak pohon Unit 4.00 4,300,000.00 17,200,000.00 0.891

B.6 PEKERJAAN PENGECATAN


1 Pengecatan Dinding Interior Jenis Cat Acrylic Emulsion M2 184.37 26,873.00 4,954,575.01 0.257
2 Pengecatan Dinding Exterior Jenis Cat Weathershield M2 524.27 49,953.00 26,188,859.31 1.357
3 Pengecatan Balok Beton Exposed Jenis Cat AEP M2 279.95 26,873.00 7,523,096.35 0.390

B.7 PEKERJAAN PENUTUP ATAP


1 Pekerjaan Water Profing + Screed M2 267.47 160,848.00 43,022,014.56 2.229
2 Pasangan Gutter M2 41.60 150,000.00 6,240,000.00 0.323
3 Pasangan Talang Tegak pipa PVC 3 M2 56.00 135,000.00 7,560,000.00 0.392
4 Roof drain M2 8.00 500,000.00 4,000,000.00 0.207

JUMLAH 1,929,714,454.80 100.0


JADWAL PELAKSANAAN PEKERJAAN KURVA "S"
Paket Pekerjaan : PEMBANGUNAN SIRKUIT BALAP MOTOR
Lokasi : DISTRIK TANAH MIRING, KABUPATEN MERAUKE
Tahun : 2019
WAKTU PELAKSANAAN 210 HARI KALENDER
Bobot %
BULAN DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI BULAN VIII
MINGGU KE : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
No. URAIAN KET
2 9 16 23
Renc Real
TANGGAL S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
8 15 22 29 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr

I PEKERJAAN PERSIAPAN 100


A PEKERJAAN PERSIAPAN UMUM 0.67 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
B PEKERJAAN MOBILISASI DAN DEMOBILISASI 0.11 0.04 0.04 0.04

II PEKERJAAN PEMBENTUKAN LAHAN (CUT & FILL) 9.06 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65
90
III PEKERJAAN STRUKTURAL
A GEDUNG TRIBUN 3.74 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
B GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP) 1.28 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
C RUMAH JAGA 0.25 0.04 0.04 0.04 0.04 0.04 0.04
80
D TOILET 0.30 0.07 0.07 0.07 0.07
E BENGKEL (TIDAK TERMASUK LINGKUP) 0.33 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
F POS JAGA (3 UNIT) 0.06 0.02 0.02 0.02
G BANGUNAN GERBANG MASUK 0.12 0.03 0.03 0.03 0.03 0.03
70
IV PEKERJAAN ARSITEKTURAL
A GEDUNG TRIBUN 4.18 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
B GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP) 1.44 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
C RUMAH JAGA 0.74 0.25 0.25 0.25
D TOILET 0.50 0.25 0.25 60
E BENGKEL (TIDAK TERMASUK LINGKUP) 0.60 0.15 0.15 0.15 0.15
F POS JAGA (3 UNIT) 0.12 0.06 0.06
G BANGUNAN GERBANG MASUK 0.07 0.07
H LANDSCAPE 15.27 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09
50
V PEKERJAAN LANSEKAP
A PEKERJAAN HARDSCAPE 1.11 0.28 0.28 0.28 0.28

VI PEKERJAAN INFRASTRUKTUR
40
A PEKERJAAN DRAINASE 2.73 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19
B. PEKERJAAN JALAN 46.77 1.23 1.23 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46
C MARKA JALAN 7.97 1.99 1.99 1.99 1.19 0.80

VII PEKERJAAN ELEKTRIKAL 30


A PENYAMBUNGAN, DISTRIBUSI DAN PEMBANGKITAN DAYA 1.10 0.27 0.27 0.27 0.27
B PEKERJAAN INSTALASI PENERANGAN 0.53 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
C PEKERJAAN PENANGKAL PETIR 0.09 0.09
D PEKERJAAN SISTEM TELEPON 0.11 0.03 0.03 0.03 0.03
SISTEM TATA SUARA 20
E. 0.14 0.03 0.03 0.03 0.03
F SISTEM FIRE ALARM 0.08 0.02 0.02 0.02 0.02 0.02

VIII PEKERJAAN MEKANIKAL


A PEKERJAAN PLUMBING AIR BERSIH 0.10 0.02 0.02 0.02 0.02 0.02 0.02 10
B PEMIPAAN AIR BERSIH TOILET 0.01 0.01 0.01
C PEMIPAAN AIR KOTOR DAN BUANGAN TOILET 0.14 0.04 0.04 0.04 0.04
D PEMIPAAN AIR BERSIH KE AREA MOTOR CROSS 0.08 0.02 0.02 0.02 0.02 0.02
E PEKERJAAN SISTEM TATA UDARA 0.08 0.04 0.04
F BANGUNAN SEKERTARIAT 0.10 0.02 0.02 0.02 0.02 0

Bobot (%) 100 0.06 0.06 0.67 0.89 1.08 2.32 2.32 3.55 3.45 3.49 3.49 3.49 3.49 3.49 3.49 4.58 4.28 4.66 4.66 4.70 4.59 4.53 4.53 4.61 4.96 4.99 4.88 4.69 3.06 0.98
Rencana
Kumulatif (%) - 0.06 0.12 0.79 1.68 2.76 5.08 7.39 10.94 14.39 17.88 21.37 24.86 28.35 31.84 35.33 39.92 44.19 48.85 53.51 58.21 62.80 67.33 71.86 76.47 81.43 86.41 91.30 95.99 99.05 100
KEMAJUAN
PEKERJAAN Bobot (%) - #REF!
Realisasi
Kumulatif (%) - - #REF!
Deviasi Bobot (%) - 0.059 #REF!

KONTRAKTOR PELAKSANA
PT. BANGUN PERSADA PAPUA RAYA

JONI PASULE
Direktur
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA

PEKERJAAN : PEMBANGUNAN SIRKUIT BALAP MOTOR PEKERJAAN : PENGAWASAN PEMBANGUNAN SIRKUIT BALAP MOTOR
KONTRAKTOR : PT. PEMBANGUNAN JAYA PAPUA RAYA KONSULTAN : PT. MAKROTHUMIA EIRENE CONSULTANT
NO. KONTRAK : 03/KONTRAK/DAK - K1/DPUPRP - BM/V/2018 NO. KONTRAK : 10/KONTRAK/DAU-PENG.DAK.1/DPUPRP - BM/V/2018
TGL MULAI KERJA : 02 DESEMBER 2019 TANGGAL KONTRAK : 2 DESEMBER 2019
LOKASI : DISTRIK TANAH MIRING SUMBER DANA : APBD
KABUPATEN : MERAUKE - PAPUA TAHUN ANGGARAN : 2019 - 2020

LAPORAN MINGGU KE - 1
PERIODE 2 DESEMBER S/D 8 DESEMBER
TAHUN 2019
PEKERJAAN : GEDUNG SEKRETARIAT

BOBOT REALISASI KEMAJUAN FISIK


NILAI MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
No. Uraian Pekerjaan Satuan Volume PROGRES
PEKERJAAN BOBOT BOBOT BOBOT
VOLUME VOLUME VOLUME
% % % % %

III PEKERJAAN STRUKTURAL


B GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP)
B.1 PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank M 80.00 0.3891 - - - - - - -

B.2 PEKERJAAN TANAH DAN PASIR


Galian Tanah Pondasi M3 37.22 0.2936 - - - - - - -
Urugan Tanah Kembali Galian Pondasi M3 12.41 0.0326 - - - - - - -
Urugan Pasir Bawah Pondasi tebal 10 cm M3 3.17 0.1444 - - - - - - -

B.3 PEKERJAAN STRUKTUR BANGUNAN


1 Pek. Cor lantai kerja 1pc 6psr
˗ Beton campuran 1pc 6psr M3 1.58 0.2381 - - - - - - -
˗ Bekisting Kayu Kelas III (Setara bekisting Pondasi) M2 0.12 0.0015 - - - - - - -
2 Pek. Pondasi poer plat F1 , uk. 120 x 120 x 30 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 9.50 1.7193 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 1,522.18 1.6058 - - - - - - -
˗ Bekisting untuk Pondasi M2 6.34 0.0814 - - - - - - -
3 Pek. Kolom Pedestal K-1 , uk. 30 x 70 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.39 0.2516 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 257.95 0.2721 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 35.32 0.0373 - - - - - - -
˗ Bekisting untuk kolom M2 2.64 0.0574 - - - - - - -
4 Pek. Kolom Pedestal K-2 , uk. 25 x 40 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.32 0.2389 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 374.23 0.3948 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 47.20 0.0498 - - - - - - -
˗ Bekisting untuk kolom M2 3.43 0.0746 - - - - - - -
5 Pek. Kolom Pedestal K-3 , uk. 20 x 70 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 0.62 0.1122 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 187.12 0.1974 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 14.41 0.0152 - - - - - - -
˗ Bekisting untuk kolom M2 1.58 0.0344 - - - - - - -
6 Pek. Sloof TB1, uk. 25 x 50 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 8.75 1.5836 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 1,129.07 1.1911 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 358.67 0.3784 - - - - - - -
˗ Bekisting untuk sloof M2 17.40 0.2233 - - - - - - -
7 Pek. Sloof TB1-b, uk. 25 x 50 cm + kupingan 15 x 25 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 8.45 1.5293 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 838.36 0.8844 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 266.44 0.2811 - - - - - - -
˗ Bekisting untuk sloof M2 18.72 0.2403 - - - - - - -
8 Pek. Sloof TB3, uk. 20 x 40 cm + kupingan 15 x 25 cm x 2
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.24 0.7673 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 474.61 0.5007 - - - - - - -
˗ Pembesian Besi polos Ø. 10 mm SNI Kg 241.21 0.2545 - - - - - - -
˗ Bekisting untuk sloof M2 8.69 0.1115 - - - - - - -
9 Pek. Kolom K1, uk. 30 x 70 cm
˗ Campuran beton 1PC : 2PS : 3KR, Import (mekanis) M3 6.55 1.1854 - - - - - - -
˗ Pembesian Besi polos Ø. 16 mm SNI Kg 746.57 0.7876 - - - - - - -
˗ Pembesian Besi polos Ø. 10 mm SNI Kg 166.96 0.1761 - - - - - - -
˗ Bekisting untuk kolom M2 12.48 0.2716 - - - - - - -
10 Pek. Kolom K2, uk. 25 x 40 cm
˗ Campuran beton 1PC : 2PS : 3KR, Import (mekanis) M3 6.24 1.1293 - - - - - - -
˗ Pembesian Besi polos Ø. 16 mm SNI Kg 995.43 1.0501 - - - - - - -
˗ Pembesian Besi polos Ø. 10 mm SNI Kg 223.12 0.2354 - - - - - - -
˗ Bekisting untuk kolom M2 16.22 0.3530 - - - - - - -
11 Pek. Kolom K3, uk. 20 x 70 cm
˗ Campuran beton 1PC : 2PS : 3KR, Import (mekanis) M3 2.91 0.5266 - - - - - - -
˗ Pembesian Besi polos Ø. 16 mm SNI Kg 497.71 0.5250 - - - - - - -
˗ Pembesian Besi polos Ø. 8 mm SNI Kg 68.12 0.0719 - - - - - - -
˗ Bekisting untuk kolom M2 18.72 0.4074 - - - - - - -
12 Pekerjaan Ringbalk uk. 50x25 cm (RB1b)
˗ Campuran beton 1PC : 2PS : 3KR, Import (mekanis) M3 17.88 3.2359 - - - - - - -
˗ Pembesian Besi polos Ø. 16 mm SNI Kg 2,964.69 3.1275 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 747.23 0.7883 - - - - - - -
˗ Bekisting untuk ringbalk M2 36.29 0.8004 - - - - - - -
13 Pekerjaan Ringbalk uk. 40x20 cm (RB2)
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.96 0.5357 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 490.14 0.5171 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 147.76 0.1559 - - - - - - -
˗ Bekisting untuk ringbalk M2 7.40 0.1632 - - - - - - -
14 Pek. Pelat dak atap, Tebal. 12 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 31.97 5.7859 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 3,315.03 3.4971 - - - - - - -
˗ Bekisting untuk Pelat Lantai M2 58.94 1.5177 - - - - - - -
15 Pek. Lisplank beton LB1, uk. 20 x 50 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 3.76 0.6805 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 481.81 0.5083 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 114.23 0.1205 - - - - - - -
˗ Bekisting Kayu Kelas III M2 9.02 0.1158 - - - - - - -
16 Pek. Lisplank beton LB2, uk. 15 x 50 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.40 0.7963 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 743.41 0.7842 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 163.90 0.1729 - - - - - - -
˗ Bekisting Kayu Kelas III M2 13.48 0.1730 - - - - - - -
17 Pek. Beton ornamen lingkaran dinding, uk. 70 x 10 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 4.40 0.7963 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 743.41 0.7842 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 163.90 0.1729 - - - - - - -
˗ Bekisting Kayu Kelas III M2 13.48 0.1730 - - - - - - -
18 Pek. Beton ornamen lingkaran dinding, uk. 70 x 10 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 2.63 0.4760 - - - - - - -
˗ Pembesian Besi polos . 16 mm SNI Kg 240.90 0.2541 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 54.09 0.0571 - - - - - - -
˗ Bekisting Kayu Kelas III M2 6.77 0.0869 - - - - - - -

IV PEKERJAAN ARSITEKTURAL
B GEDUNG SEKRETARIAT (TIDAK TERMASUK LINGKUP)
B.1 PEKERJAAN TANAH DAN PASIR
1 Urugan Pasir Bawah Lantai tebal 10 cm M3 29.00 1.3206 - - - - - - -
2 Urugan Tanah Peninggian Lantai M3 134.17 1.9610 - - - - - - -

B.2 PEKERJAAN PASANGAN DINDING


1 Pasangan Dinding Bata merah Tebal 1/2 Bata, 1PC 4PS - Pasir Import M2 354.32 6.0535 - - - - - - -
2 Plesteran 1PC 3PS, Tebal 20 mm - Pasir Import M2 708.63 6.4233 - - - - - - -
3 Pekerjaan Acian M2 708.63 2.2768 - - - - - - -
4 Cor lantai ruangan tebal 5 cm, 1 pc 3psr M3 8.15 1.7251 - - - - - - -
5 Cor lantai rabat tebal 7 cm, 1 pc 3psr + aci kasar M3 5.77 1.2213 - - - - - - -
6 Pas. Batu pot pohon M3 6.12 0.9410 - - - - - - -
7 Plesteran dinding pot pohon M2 34.00 0.2311 - - - - - - -
8 Curb Beton 1pc 3psr ( Tanpa tulangan ) M3 1.02 0.2159 - - - - - - -
9 Pas. Batu tangga rabat / Selasar M3 9.10 1.3992 - - - - - - -
10 Pek. Kolom praktis, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 0.37 0.0670 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 95.73 0.1010 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 20.53 0.0217 - - - - - - -
˗ Bekisting untuk Kolom M2 1.85 0.0403 - - - - - - -
11 Pek. Balok Lintel, uk. 11 x 11 cm
˗ Campuran beton 1PC 2PS 3KR, Import (mekanis) M3 1.49 0.2697 - - - - - - -
˗ Pembesian Besi polos . 10 mm SNI Kg 333.23 0.3515 - - - - - - -
˗ Pembesian Besi polos . 8 mm SNI Kg 82.37 0.0869 - - - - - - -
˗ Bekisting untuk Balok M2 6.40 0.1412 - - - - - - -

B.3 PEKERJAAN KUSEN,PINTU/JENDELA TERMASUK FINISHING & ACCESSORIES


1 Tipe P1 Pintu Pintu Double plywood rangka kayu kusen Alumunium uk. 900 x 2900 mm Unit 3.00 0.6374 - - - - - - -
2 Tipe CW.1 Curtain Wall back Mullion System + tinted tempered glass + accessories Unit 1.00 4.6121 - - - - - - -
3 Tipe CW.2 Curtain Wall back Mullion System + tinted tempered glass + accessories Unit 1.00 4.3530 - - - - - - -
4 Tipe CW.3 Curtain Wall back Mullion System + tinted tempered glass + accessories Unit 1.00 2.6429 - - - - - - -

B.4 PEKERJAAN LANGIT- LANGIT


1 Gypsum Board t=9mm, Rangka Hollow 40x40mm t=0.35mm Galvanized + Gantungan M3 144.00 1.5563 - - - - - - -
2 Plafond Gypsum Waterproof, t=12mm berikut Rangka Hollow Galvanised t=0.4mm M3 126.97 1.5589 - - - - - - -
3 Acian Beton Expose M 279.95 0.8995 - - - - - - -

B.5 PEKERJAAN FINISHING LANTAI & DINDING


1 Lantai Keramik 40 x 40 cm Polished M2 148.80 2.8156 - - - - - - -
2 Lantai Keramik 40 x 40 cm Unpolished M2 118.67 2.2455 - - - - - - -
3 Plint Keramik 10 x 40cm setaraf Lantai M 73.60 0.3212 - - - - - - -
4 Bak Kontrol Pasangan Bata Ukuran (300 x 300) x 500 Unit 4.00 0.2798 - - - - - - -
5 Bak pohon Unit 4.00 0.8913 - - - - - - -

B.6 PEKERJAAN PENGECATAN


1 Pengecatan Dinding Interior Jenis Cat Acrylic Emulsion M2 184.37 0.2568 - - - - - - -
2 Pengecatan Dinding Exterior Jenis Cat Weathershield M2 524.27 1.3571 - - - - - - -
3 Pengecatan Balok Beton Exposed Jenis Cat AEP M2 279.95 0.3899 - - - - - - -

B.7 PEKERJAAN PENUTUP ATAP


1 Pekerjaan Water Profing + Screed M2 267.47 2.2294 - - - - - - -
2 Pasangan Gutter M2 41.60 0.3234 - - - - - - -
3 Pasangan Talang Tegak pipa PVC 3 M2 56.00 0.3918 - - - - - - -
4 Roof drain M2 8.00 0.2073 - - - - - - -

JUMLAH 100.0 0.000 0.000 0.000

RENCANA = 0.059 %
REALISASI = 0.000 %
DEVIASI = -0.059 %

MENGETAHUI: DISETUJUI OLEH : DIPERIKSA OLEH DIBUAT OLEH


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) DIREKSI TEKNIS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
PEMBANGUNAN SIRKUIT BALAP MOTOR PEMBANGUNAN SIRKUIT BALAP MOTOR PT. MAKROTHUMIA EIRENE CONSULTANT PT. BANGUN PERSADA PAPUA RAYA

LEO PATRIA MOGOT,ST U S M A N ,A . Md WAYAN DARYASA, ST. YANI SALEA BATU, ST.
NIP. 19730628 200605 1 002 NIP. 19610110 200012 1 002 Team Leader Sita Manager