PERENCANAAN CORE TEAM BALAI RUAS TABONE - POLEWALI 1 168+800 (L) 1 Bor Lereng Bawah 2 169+150 (L) 1 Bor Lereng Bawah 3 170+800 (R) 1 Bor Lereng Bawah 4 173+900 (R) 1 Bor Lereng Bawah 5 175+850 (R) 1 Bor Lereng Bawah 6 176+850 (L) 1 Bor Lereng Bawah 1 Sondir 7 181+400 (L) Lereng Atas 1 Hand Bor 8 193+650 (L) 1 Bor Lereng Bawah 9 194+450 (L) 1 Bor Lereng Bawah 10 195+300 (L) 1 Bor Lereng Bawah RUAS MALABO - TABONE 11 139+400 (L) 1 Bor Lereng Bawah 12 139+500 (L) 1 Bor Lereng Bawah 13 145+350 (R) 1 Bor Lereng Bawah 1 Sondir 14 147+450 (R) Lereng Atas 1 Hand Bor 1 Sondir 15 163+450 (L) Lereng Atas 1 Hand Bor Nb: Pengujian 6 Lintasan Geolistrik pada lereng bawah